2026-09-30 - Select Board

Summary

  • The meeting opened with the Board sitting as County Commissioners, chaired by Jill Vieth, then reconvened as the Select Board at 6:04 PM under Chair Hill.
  • County Commissioners, Wauwinet Road Multi-Use Path Alignment: after a presentation on the alternatives, members favored Alternative 1C, the narrower path with a grass buffer, citing lower right-of-way and wetland impact. Members said they did not want rumble strips or guardrails, and welcomed the Conservation Foundation's offer to avoid sensitive cultural assets by shifting the path in places. About 112 survey responses followed the August 12 public meeting.
  • County Commissioners also took up the Sheep Pond Road betterment assessments, with McDonald and Marsh, and a Land Court request for county assent to a three-lot subdivision plan at One Hatch Circle, which was described as routine.
  • Announcements: Round 4 committee vacancies were open for applications through noon Friday, October 2 (Committee Appointments 2026 Round 4); the written comment period on the Draft 2026 Master Plan ran through October 15; consultations for citizen warrant articles were set for October 14 and 15, with the signature requirement expected to rise from 10 to 25 once the governor signs the pending law (Annual Town Meeting 2027 warrant- citizen article submittals).
  • Minutes and warrants, items 1 through 3, were approved 5-0.
  • Capital Improvement Plan FY 2028-2037: Deputy Town Manager Sears reviewed the updated plan. Resequencing took about $600 million out of the $1.3 billion ten-year plan, leaving roughly $702 million, and work continues on the 115 projects under $3 million. Members discussed ranking the smaller projects, and one favored looking three years out rather than ten. No vote.
  • Town Concession Facilities Planning: the Parks and Recreation Manager reviewed Surfside, the Jetties, Jetties tennis and Children's Beach. The Board voted unanimously, 5-0, to move ahead with a three-year concession arrangement at Children's Beach, which staff said must go out for competitive proposals. Members favored using roughly $700,000 remaining from the tennis court appropriation to improve the tennis bathrooms.
  • Sherborn Commons Memorandum of Understanding: Vice Chair Mohr moved to approve a further $141,000 from the project contingency, after an earlier $59,000, contingent on Sherborn Commons executing the access license by Friday, October 2 and completing the follow-up agreement a week later. Fee seconded. Members voiced frustration at the late request but said they did not want to put the project at risk. The motion passed 4-1, with DeCosta voting no.
  • The Board voted 5-0 to adjourn to executive session without returning to open session.

Agenda

Posted agenda: Wednesday, September 30, 2026 at 5:30 PM; PSF Community Room, 4 Fairgrounds Road and remote participation via Zoom webinar.

  • Call to order, agenda acceptance, public comment, new business, approval of minutes (Sept 23), payroll warrants (Sept 27), treasury warrants (Sept 30), and committee reports (routine/procedural).
  • Announcements: 2026 Committee Vacancies Round 4 (applications due Oct 2; appointments Oct 14), Draft 2026 Master Plan comments due Oct 15, Town Counsel citizen warrant article consultation Oct 14/15, executive session minutes release of 2023/2024 minutes, and board comments.
  • Update on public comment questions from prior Select Board meetings.
  • Town Manager's report: continued review of Capital Improvement Plan for FY 2028-2037.
  • Discussion regarding town concessions at Jetties, Surfside, and Children's Beach.
  • Request for additional compensation for Residences at Sherburne Commons for increased use of leased property for Our Island Home.
  • Adjourn to executive session under MGL c. 30A §21(A), Purpose 7, to conduct periodic review of listed 2022 executive session minutes for continued withholding or release; not to return to open session.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:03Please rise for the pledge of

00:04>> allegiance

00:08to the flag of the United States of

00:10America and to the republic for which it

00:13stands, one nation under God,

00:15indivisible, with liberty and justice

00:18for all.

00:21>> Good evening. Tonight we also have the

00:23county commissioners meeting. So we're

00:24going to go to that first before I open

00:26the select board meeting. and I will

00:28turn it under over to Jill Ve who is the

00:30chair of county.

00:32>> Hi everyone. Um and please bear with me.

00:35It's the only second time I've done

00:36this, but I'm calling to order the

00:38Nantka County Commissioners meeting.

00:40It's September 30th and we're all here.

00:44Um just a reminder that this meeting is

00:46being audio video recorded and Brook

00:48Moore is on roll call and we need to

00:50take um she's online and we need to take

00:53votes by roll call. Yeah.

00:56>> Okay. Is there any public comment

00:59for items not on the agenda?

01:04Seeing none, um I don't think there's

01:06any new business.

01:10And can I now we'll look to approval for

01:12the minutes and the warrants.

01:14>> So moved.

01:15>> Second.

01:17>> And on your motion, Don

01:18>> I.

01:19>> Bob.

01:20>> Matt.

01:21>> I.

01:21>> Brooke.

01:22>> I.

01:24and the chair of Ozai.

01:28We are now going to go over a review and

01:31selection of the preferred Winnit road

01:34multi-use path alignment alternative.

01:38And I think we probably have Mike Burns

01:41online.

01:43And is there anyone online that we need

01:47to acknowledge?

01:50>> Just

01:50>> Hi, Madam Chair. Thank you. I'm I'm

01:52happy to hopefully I'm sharing my screen

01:54and you're all seeing it. Okay. Um Okay.

01:58Uh if it's all right, I'm going to

02:00expedite the uh the presentation here.

02:02Uh we we've a lot of material in the

02:04slides has been presented at the uh the

02:06August 12th uh public meeting. Uh

02:10and um I know there's a Red Sox game on

02:12later and I'm sure you all want to get

02:14home and watch that. So I'll be very

02:15quick. Uh just to let you know the

02:17Wawwinet road uh multi-use path is a

02:21federal aid and local aid project. Uh

02:24we're working with a team from Federal

02:25Highways Eastern Federal Lands Division

02:27and US Fish and Wildlife Service and uh

02:29planning staff is also coordinating with

02:31the DPW and town administration on the

02:34project. Uh as you all likely know uh

02:37the wall path was originally recommended

02:39in the 1977 Anta bikeway master plan. Uh

02:43there's been three federal grants

02:45applied to this project totaling $2.4

02:47million. Uh local appropriation was

02:49approved in 2003 for $4.6 million and

02:53the pro project is now in the conceptual

02:55and uh going into preliminary design

02:57phase uh to review alignment

02:59alternatives based on a lot of field

03:00survey um materials. Uh just briefly the

03:04uh the project as you know goes from

03:06Polish road to the gate house at the end

03:08of Wallwin Road. Uh for planning

03:10purposes, we've divided it into uh six

03:12uh sections.

03:14Uh there were also a number of different

03:16alignment alternatives that were

03:17reviewed. Uh there are three alternative

03:19one options. This is option 1 a, a

03:22guardrail uh option with a 10-ft wide

03:25path and three-foot buffer. The 3-ft

03:27buffer used for guard rail uh

03:29installation uh along areas where the

03:34roadway will curve away from the path.

03:36uh and that's to protect pro protect

03:37users of the path in areas where the

03:39path does not or the excuse me the

03:40roadway does not bend away from the the

03:42path. uh a 3-foot buffer with rumble

03:45strips uh was recommended for this

03:47option 1B and based on neighborhood

03:50feedback and trying to minimize impacts

03:52to uh wetlands and abutters and and

03:55cultural assets uh an 8 foot wide path

03:59was uh recommended with a 4ft grass

04:01buffer and this has about a foot less

04:04overall width impacts to a butters.

04:07Again, this alternative was developed in

04:10coordination with the neighborhoods. Uh

04:12there's also uh alternatives 2, three,

04:14and four uh that I'll briefly go over as

04:16we progress through the slides. Uh this

04:18has a 10-ft wide path that breaks away

04:20from the roadway and has more of a

04:22buffer uh between the road and the path

04:25to utilize conservation properties. Um

04:28and I'll go over the reasons why we're

04:30not recommending al alternatives 2,

04:32three, and four later on. Um, we have a

04:34variety of slides about the uh uh

04:37permitting um that I'm not going to dive

04:39into because I the uh technical staff

04:42from federal highway is not here to

04:44present on this and a lot of this

04:46material is presented uh at the August

04:4812th meeting. I'll just note that

04:49wetland uh resources were surveyed uh

04:52last year September 2025 and the project

04:55will impact wetlands and there will need

04:57to be wetland replication as part of

04:58this and that's listed in the next steps

05:00on the slide. Uh there was also a lot of

05:02biological uh resources in the area that

05:05were surveyed uh last uh fall. Um

05:09mammals uh invertebrates, birds and

05:11plants were were surveyed and part of

05:13the next steps is again coordination on

05:15mitigating those that will be impacted

05:17by the project. And lastly, there are

05:20cultural uh significant cultural

05:22properties uh in the area. Uh I do not

05:26have a map of those as they're very

05:28sensitive and not public information. Uh

05:30but there are a lot of protocols uh that

05:32are set up for archaeological uh re

05:34assets that might be impacted. Uh and

05:37there are in the next steps uh to uh

05:40items to perform more intensive

05:41archaeological survey uh as well as

05:44oversight uh during construction if we

05:46get to that point. Uh just to go over

05:48the impacts of each of these

05:50alternatives. Uh here's a table here

05:52showing alternatives uh 1 A and B. the

05:55guard rail and the rumble strip option

05:56at the top uh with a 10-ft path that has

05:59the highest impact for cultural uh

06:01assets as it's a a bigger a wider

06:05project and on the side of the road

06:06where there's uh you know some of those

06:08sensitive assets. Alternative 1C the uh

06:11the grass buffer option because it's

06:13narrower has less rightaway impact. It

06:16has less wetland impacts. Um it does

06:18have a a higher but not the highest

06:20cultural impact because it's smaller. Um

06:23and then the alternative two which has a

06:24path on the uh west side of Wanet Road

06:28um that has because of the layout of the

06:29roadway extremely uh significant

06:32rightway impacts uh but but because

06:35there's no uh there's few less wetland

06:37resources on that side of the road

06:38there's less wetland impact and cultural

06:40impact but the the the cost of the

06:42project would be much much higher and

06:44these uh subsequent alignments it this

06:46does get repetitive so I'll skip through

06:49these if that's all right madam chair

06:50I'll just note that the lowest impact uh

06:53for uh

06:55um this is the uh grass buffer option

06:58because of the narrower uh path. Um it's

07:01the lowest cost, the lowest impact to

07:02cultural areas. Uh there's no wetlands

07:05on the east side of the road in this

07:06section, but there is on the opposite

07:08side. That's why the the bottom row

07:10there, alternative to that breaks away

07:12from the roadway. It's meant to take

07:14advantage of some of the cultural I mean

07:15excuse me the conservation assets uh be

07:18nice a better user experience of the

07:20path but it's extremely impactful to uh

07:22the ride ofway uh and there are wetland

07:25resources that would be impacted so it

07:26does have a higher cost um and uh again

07:29the same story for uh going further up

07:31the roadway uh the grass buffer option

07:34is the the least impact there is an

07:36alternative three that does break away

07:37from the roadway to utilize Nucket

07:40Conservation Foundation property uh

07:42we've heard from them that they're not

07:44uh uh uh interested in having the path

07:48run so significantly away from the

07:50roadway and through their property. Um

07:52again uh section D, same story. Uh the

07:55least impactful is the grass buffer

07:57option. Alternative three uh does have a

08:00greater cultural impact and greater

08:02cost. Uh there are no wetlands in this

08:03area.

08:05Um getting towards the end of the path

08:06in section E, again, same story. uh the

08:09grass buffer with 8 foot wide path has

08:12the least amount of impact uh for

08:14wetlands cultural and cost. The highest

08:17is this alternative four that again goes

08:19through conservation foundation property

08:21that they do not uh support. Uh and

08:24lastly as the path ends at the gate

08:26house uh again same story the lowest

08:29impactful option is alternative 1C the

08:31grass buffer option. Uh we did survey

08:33after the survey the community uh after

08:36the August 12th uh public meeting. Uh we

08:38got about 112 responses which isn't too

08:41bad for uh a project of this scale. Uh

08:44majority of the responses we got were

08:46from uh seasonal or part-time residents.

08:48Uh we did ask if uh residents were from

08:50the Wawwinet area. Uh the numbers here

08:53are really low. About 20 respondents

08:55identified to be uh Wawwinet residents,

08:57business owners or employees in that

08:59area. Uh maybe there was some confusion

09:01with that and uh they selected the wrong

09:03option, but again uh here's what the uh

09:06the breakdown of the respondents were.

09:08What did they say? Uh a lot of them

09:10drive the road uh and and some of them

09:13bike and a fewer walk. Most residents

09:17don't do not use the NRTA again because

09:20of there's really not a a safe

09:22accommodating accessible option of

09:24getting to the bus stop at Pulpus Road

09:26and Walet Road. that's rarely utilized

09:29if if ever. Uh what they do like about

09:31the area is the the character and the

09:34roadway condition. They do not like the

09:35high speeds, the the safety risk and the

09:38lack of bike walking and biking

09:40accommodations. That's pretty

09:41overwhelming. Uh project goals, they

09:44absolutely want to preser uh improve

09:46bike and pedestrian accommodations. Uh

09:49there's u some desire to minimize

09:52residential impacts more so than

09:54minimizing environmental impacts. In

09:56fact, it was it was surprising how many

09:58respondents actually wanted to utilize

10:00the the conservation properties for the

10:02user experience of the path. Uh but

10:04again, the uh because it's impactful uh

10:06uh that's not the option we're going to

10:09recommend. What staff would recommend is

10:12this alternative 1C as uh for the

10:14reasons we previously described. And

10:16Madam Chair, I should note that this is

10:18not only supported by the neighborhoods

10:20because this is what they told us they

10:21wanted. Uh and there's uh should be a

10:23letter in the packet uh um uh stating

10:27that uh the advisory committees, the

10:29historical commission supports this

10:31alternative. The transportation public

10:32access advisory committee or TAC

10:34supports this and our design team at

10:37federal highway uh believe that this was

10:39acceptable uh especially since an 8 foot

10:41wide path is acceptable if you're if the

10:44project is so impactful to environmental

10:46resources. Uh so this is the option

10:48we're recommending uh madam chair and

10:50we're asking for your support for that.

10:52Uh if approved the next steps after we

10:54get past se the September meeting is to

10:56coordinate with the federal highway

10:57design team on the uh the permitting of

10:59the project. It will be a significant

11:01amount of effort for to permit this and

11:03secure rightway. As I mentioned there

11:05are wetland impacts uh mitigating that

11:08wetland impact and any other uh

11:10environmental for animals or plants. uh

11:13that's going to be some effort and we're

11:15guessing that that'll be about a 2-year

11:17uh process uh or more and we anticipate

11:20if everything goes at the speed of light

11:23uh starting construction in the spring

11:25of 2029. Um so that said, Madam Chair,

11:28I'm happy to answer any questions uh but

11:30again the ask is to uh get your support

11:32for alternative 1C as the preferred

11:34option uh for the Wet Road multi-use

11:37path.

11:39>> Thanks Mike. Does anybody from the board

11:41have

11:41>> Yeah,

11:42>> go ahead, Matt.

11:43>> Uh, yeah, Mike, I like uh the grass

11:46buffer alternative as well. One question

11:49uh and I was one of the people who wrote

11:51in saying, "Geez, could we use

11:52conservation land?" Have you worked with

11:54the conservation foundation and they pic

11:56they specifically said they were not

11:58interested. Is that

12:01>> Oh, I didn't correct. Uh madam chair,

12:04the uh conservation foundation supports

12:07the project. uh their mission is to

12:09actually conserve the properties that

12:11are have conservation as their number

12:13one mission and that does not include

12:15conservation in their minds does not

12:17include having bike paths and

12:18recreational areas go through that

12:20conservation area. Uh so they're very

12:22supportive of the project. They just

12:23want to minimize to the greatest extent

12:24possible the impacts of the path.

12:28>> Just to follow up, I was one of the

12:29people that thought it would be a nice

12:31thing to dip in in a couple spots, but

12:33Madam

12:33>> Chair totally is here from the I'd like

12:36to hear him.

12:37if he doesn't mind.

12:38>> Cormarmac, do you want to come up and

12:40talk about

12:42>> Thank you so much, Madam Chair.

12:44Cormarmac Collier, president of the uh

12:46Conservation Foundation. I haven't done

12:47this in a long time, which is nice. Um

12:50but it's funny you guys said the Red

12:51Sox. I

12:51>> thought you were going to say Land Bank.

12:53>> I I I land council, right? Yeah. Um M's

12:56got that under control. She's good. Um

12:59it's funny you said the the socks. You

13:00guys remember 2004 when we were all at

13:02town meeting

13:04>> four nights in a row

13:05>> and then it was like till 2 o'clock in

13:07the morning every night. That was great.

13:09Um yeah, I was just I got a nice

13:11flashback of that. Okay, so um just want

13:14to maybe correct Mike just a little bit.

13:17Okay, so the first two lines the first

13:18two alternatives those are just lines on

13:20a map. Nobody even consulted anybody in

13:23terms of going through our property that

13:24the consultants just threw lines on

13:26maps. And that's what happens in

13:27alternative analysis. you just throw a

13:29couple alternatives out there. So those

13:31were those weren't even considered

13:33essentially by the town either. They

13:35were just off off they were off off the

13:36table. So what we did talk with Mike way

13:39back when um when we asked him to come

13:41to the office to discuss this um is uh

13:45the alternative where there's dips going

13:47in and out um because in specifically we

13:50said there's a number of sensitive

13:52resources that we want to avoid that are

13:54right on the side of the road and

13:55certainly you can come into our

13:57property. So, I just want to make sure

13:58the public understands that we weren't

14:00saying no. We actually want to work with

14:02the town as much as possible utilizing

14:04our land to avoid essenti resources that

14:08are more towards the road. And that

14:09means I mean there's some 120 year old

14:12trees that are up there at that line in

14:13that road and we don't want those cut

14:14down if you can come in. As you guys

14:16know, we've worked with the town and

14:17county on multiple back bike path

14:20projects, specifically Milestone, which

14:22is on our property, some of it, and then

14:24also Pulpus Road, which weaves in and

14:26out throughout our properties as well.

14:28The thing that I would really like to

14:30emphasize today is is um the process in

14:34terms of working with us, the land

14:36owner, that has almost a mile of linear

14:38feet on this road. It hasn't been as

14:41good as we would like it to be. We want

14:43to be uh working with the town to design

14:47a bike path that minimizes those impacts

14:50to the greatest extent possible. In the

14:52past, we unfortunately have just seen

14:54plans just pop up. And if we go with 1C

14:58in 7, 8, nine months time, I don't want

15:00to just see a thing that just is right

15:02along the side of the road without the

15:04town getting in in touch with us to

15:05really a avoid those. At the last

15:07meeting, I zoomed in. I had said that

15:11I'm here. I'm available. My whole team

15:13is available. We got eight scientists on

15:15staff to talk this through. We actually

15:17have people that are land managers. Nick

15:19and his team. Everybody's available for

15:21the town. I didn't hear a single peep

15:24from the town. We didn't even know this

15:25was meeting was was happening until the

15:27Abutters um contacted us this morning.

15:29We know this is part of the process and

15:32hopefully the meat will really happen

15:34after this project process. But I want

15:36to assure you that we are here to work

15:38with you. We understand there's a need,

15:39but I don't want to be back here again

15:41with a plan that we have never even

15:43really seen or renewed or uh uh

15:45commented on. Thank you.

15:47>> So, can I just follow up with you on

15:48that? Yeah.

15:49>> So, you would be open to the bike path

15:52moving into conservation land?

15:54>> It already is on conservation land right

15:56now as it's presented.

15:57>> But I mean to really come into it

15:58because I really loved that last

16:00alternative. I know it was more

16:01expensive, but it actually didn't affect

16:03the wetlands from what I could tell.

16:05>> It Well, it doesn't. Wetlands were never

16:07I I'm sorry. The wetlands were never um

16:10surveyed. Again, it was just lines on a

16:12map. So, the wetlands were never

16:14surveyed. They use some GIS, but they

16:16never actually went out there. We know

16:17this like the back of our hand. That one

16:19goes through numerous wetlands. And talk

16:21about replication and permitting

16:23problems. You're never going to get that

16:24that permitted. So, we also said, look,

16:27in ease of vital need for the town, why

16:30not go back to the 1C? But what we're

16:32saying is that there's spots where you

16:34can go in about 10 ft and come off like

16:36you see on Pulpus Road where it comes

16:38out and comes back and comes out comes

16:40back.

16:40>> Right. I think Go ahead, Bob.

16:41>> That's exactly like I know what you're

16:44talking about, Cormarmac, because I I do

16:46hunt out there a bit and there are some

16:47very old trees there right up close to

16:49the road, but if the path goes in 25 ft

16:51behind them, just like the popus path

16:53where you don't see it for sections,

16:55which is kind of nice too as well. So,

16:57it breaks up the path. Um, and it also

17:00is a safety factor. If that pass 25 ft

17:02on one of those hairpin turns, if a car

17:05comes screaming around the corner,

17:07they're not going to take a biker out.

17:08So,

17:09>> exactly. And we're there. We're there

17:10for you to mark the trees, to show you

17:12our preferred alternative.

17:14Again, just get in touch with us as the

17:16land owners. That's all.

17:18>> Okay. Thank you.

17:19>> Thank you.

17:19>> Um, Brooke has her hand up.

17:22>> Um, thank you, Madam Chair. Um well I uh

17:26you know obviously we've thrown out the

17:28deep into conservation options and um

17:32honestly the old college quad thing um

17:36you can make try to get students to talk

17:38walk in squares but they always go on

17:40the diagonal. This will be a mode of

17:43getting from point A to point B. So, the

17:45most direct route in terms of it being

17:48utilized by uh folks in the

17:50neighborhood, say to get to the bus or

17:52to get to town, um I think you know the

17:55straight shot is is going to be used

17:58more. Um and and sometimes when you see

18:02like on even on Old South Road where the

18:05where the path veers off um people end

18:09up riding down Old South Road because

18:11they get on it, they don't see it or

18:13it's it's not where they want to go. So

18:15um I'd be more inclined to go with

18:18alternative 1C and I do appreciate

18:20Conservation Foundation's um uh offer to

18:24you know avoid some of the assets by

18:27dipping in and out. So, um, I would

18:31agree that this alternative is the best

18:33one. I definitely don't want rumble

18:35strips or guardrails for sure.

18:41>> Where's one hand up online? Allison

18:43Hudson. Allison.

18:49>> Hi.

18:49>> Hi. Sorry, I think I was muted. Can you

18:51hear me now?

18:52>> We can. Thank you.

18:53>> Oh, great. Um, thank you, Madam Chair.

18:55My question was partially answered. um

18:57was Cormarmac's comments, but I did want

19:00to ask a little bit more detail about

19:02the wetlands um because it seems like

19:06[clears throat]

19:06where the lines on the map are drawn,

19:08there are clearly some wetlands. And so

19:11I was wondering if because this is a

19:13Nucketbased project, if a Nantucket

19:16based wetlands designation is applied

19:18here or if it's a federal wetlands

19:20designation and tangentially being that

19:24there are confidential environment uh

19:26historical sites that are not included

19:29on the map, how can we be certain that

19:30the historical association is on board?

19:34Thank you.

19:35>> Thank you,

19:38Miss Molden.

19:40Thank you, Madam Chair. Emily Molden,

19:42executive director of the Nant Atlantan

19:43Water Council. I just wanted to come and

19:45make a comment and sort of a request

19:47that I think's relevant to the

19:49conversation sort of more in line again

19:51with next steps and the sort of the

19:54final layout and uh permitting and that

19:56has to do with the wetlands impacts. I

19:58think, as has been said, for cost

20:00reasons and other obvious reasons,

20:02trying to avoid the direct impacts as

20:04much as possible is definitely

20:06preferred. And the town has permitted uh

20:09bike paths in multiple places around the

20:11island that has required wetland

20:13replication as a result of direct

20:15impacts. And I mean, not only is that

20:18expensive, but it's very challenging to

20:21be successful with a wetland

20:22replication. And so just looking ahead

20:24to that permitting process, I think it

20:26certainly would streamline things and

20:28would certainly help us to be more

20:29supportive of the project to avoid that

20:32wherever possible. Um but I appreciate

20:34the discussion on this and um where the

20:37conversation's headed and all the

20:38thought going into it. Thank you.

20:40>> Thank you.

20:43>> So I don't think we have to vote on this

20:46tonight. I think Mike probably wanted to

20:48get some guidance about which

20:49alternative Oh, excuse me.

20:50>> Hi there. Hi

20:52>> Tom Dixon 15 Wallwin Road and I want to

20:55thank the board Libby and Mike. We met

20:57last uh August to go over some of these

21:00issues and the one thing that I brought

21:03up that I thought was most most

21:05important was the safety of those using

21:07the bike path. The highlights, the

21:10features going out the Wallwin road are

21:13on the west side, the left hand side.

21:15You have Pulpus Harbor, you have the uh

21:18open land just before Chaos Corner, Jay

21:21Lamb's Old House. You also have uh

21:24Pakamo Beach, which people will be

21:26looking for. My issue is people

21:29constantly going back and forth,

21:31crossing the road. The traffic is

21:33outrageous any time of year, especially

21:35in the summer. and I'd like to know how

21:38you're going to avoid any traffic

21:39incidences getting people across the

21:41road. Thank you.

21:43>> Thank you.

21:46>> Okay.

21:52Amanda Cross, year round resident um

21:55nine wall road and a member of the

21:57pulpus association board. And I realize

22:00there may be a little bit of

22:02miscommunication.

22:04Um, Mike talked about meeting with the

22:07neighborhood associations. I don't think

22:10he quite realizes that the Wallwin

22:12association is not the entire Winner

22:15Road. That actually the pulpus

22:16association is

22:19probably about half of it. It goes all

22:21the way up to Pakamo. The Pulpus

22:23Association's natural boundaries is the

22:27drainage into Pulpus Harbor. That's

22:29where we have in common. So while I live

22:33on the wall road, I live in pulpus and I

22:35am member of the pulpus association and

22:38he did not meet with the pulpus

22:39association.

22:41Um going on I want to say I am

22:44absolutely in favor of doing this but

22:47especially for safety reasons. Um it's

22:49too dangerous for bikes and pedestrians

22:51to be sharing the road with cars and

22:53trucks. Um, at the August meeting, the

22:57preferred route, we saw this path on the

23:02east side, right? But right along the

23:04Winnipe road, but we were only given two

23:07options for the buffer. One was the

23:10guardrail and one was the rumble strip.

23:13There was no mention of that one that

23:16was right along of just the grass by

23:19itself. That was only for the roots that

23:21went up and around through um the area.

23:26For the northern end of the wall road,

23:30it is straight. It is fairly flat.

23:36Um and just having a 4 foot wide grass

23:41piece next to it is probably fine. But

23:45at the end that I live on, it is curvy.

23:49It is up and downhill

23:52and right now and there's no um shoulder

23:56and right now

23:58if you come around a corner you don't

24:00see it and you'd at least you end up in

24:01the bushes you don't end up hitting a

24:04bicyclist. Now, if we have a just grass,

24:07just grass right next to folks road I

24:10mean the winner road. I I believe in

24:13some areas you're going to need. Sorry.

24:16I believe in some areas you're going to

24:17need that um guard rail particularly in

24:22the beginning because I would prefer to

24:25hit a guard rail than to hit somebody a

24:27pedestrian or be that pedestrian. So,

24:30that option was not mentioned the August

24:33meeting. Um,

24:39another thing

24:41going forward is that please and it was

24:45it was acknowledged in the letter that

24:47the wall association wrote to you um is

24:52to please include us,

24:55anybody who uses the wall when it road

24:57every day, whether they live in Pakamo,

25:00whether they are on the side roads to

25:03please include include us in future

25:05discussions about the side path. And the

25:07best way to do that is to email the

25:10three neighborhood associations. It's

25:12easy. And don't wait till the last

25:15minute.

25:16Late last week, we thought in in August,

25:19they told us we were not meeting with

25:21you until the end of October. Late last

25:24week, we were told, "Oh, no. You're

25:26meeting with you this today." We had

25:29almost no notice. We then had to wait

25:32for the the new plans that showed what I

25:35just saw about the it's new to us. So,

25:38please in the future,

25:41can you be more proactive about talking

25:44to all of the

25:47constituents that

25:49are interested? Thank you.

25:51>> Thank you.

25:54Is there anyone else here to talk about

25:56it?

25:58>> Oh, yes,

25:59>> I would. Thank you. Robert

26:00[clears throat] Young.

26:01>> Robert,

26:02>> um, a lot of comments here. First of

26:05all, to hear Carmarmac talk about, uh,

26:07the foundation being willing to work

26:10with the town, I think it's fabulous.

26:13Uh, I think Matt's and maybe uh, some

26:17other comments about going off the road

26:20a little bit is great. I think most

26:22people who wrote in, from what I could

26:24tell, were in favor of a like a the 1C

26:28plan, which is not guard rails. It's not

26:30rumble strips. It's not a highway next

26:32to a highway. I [clears throat] think

26:34it's very attractive. Quite frankly, if

26:36you need to do guard rails anywhere, you

26:38can do them. You can put the wood face

26:39on them like you have on on the uh

26:42guardrails along Sacha Pond, for

26:44example. Um I think working with the

26:47communities is going to be really

26:48helpful. Um I think we can mitigate the

26:51wetlands and uh do replication. The

26:53replication that was done for Pulpus

26:55Road is is extremely successful. if

26:59anybody knows where it is. Uh I should

27:01say if you don't know where it is, you

27:02should check it out. Uh it's quite quite

27:05substantial. Um

27:08and uh just we're we're uh we're very

27:12anxious to get this done. This road

27:14continues to be incredibly dangerous. We

27:16live on Wallwinner Road at 40 49. We

27:20walk and bike it regularly.

27:23And uh what we'd like to see if it's

27:25going to be another 3 years before we

27:26begin construction,

27:29if the DPW could just go out with a with

27:32a loader with a blade on it and just

27:34scrape the shoulder so you could walk on

27:37the shoulder, I think it would be a huge

27:39improvement for safety in the interim

27:42because we do have an issue that

27:44shouldn't have to wait three years. and

27:46a little bit of if you decide that if

27:48you know the route you're going to go uh

27:50it's not about an easement it's just

27:52that the public shoulder could be

27:54scraped even if it's only three or four

27:56feet it would be great and thank you

27:58very much

27:59>> thank you

28:03>> I was just going to say that um Mike

28:05Burns is looking for a vote he wants

28:07direction on the alternative so that

28:10they can proceed with the planning

28:13>> okay Matt

28:13>> I have a a question for Mike

28:16is if guardrails are needed at the

28:18beginning of it, will that happen in the

28:20next phase and could they and could they

28:23have the wood like Mr. Young is talking

28:25about?

28:28>> Madam Chair, absolutely. Uh that's

28:31something we had talked about and we did

28:32get comments that there there actually

28:34some uh abutters that want guardrail the

28:37entire length of the project just for

28:38safety reasons. Uh that might be a

28:39little too extreme and it's very

28:41expensive. Uh so that's probably not

28:43going to happen. But where the roadway

28:45bends away from the path? Absolutely.

28:48Those those they'll be guarded out on

28:49those sections for safety reasons.

28:55>> Any other comments from the board, the

28:57commission?

29:00>> Jill, I'd be happy to make a motion if

29:02we're ready.

29:07>> Great. Go ahead, Brooke.

29:08>> Okay. Um I move that we support option

29:121C with the following caveats. That um

29:15guardrails be considered

29:18um where safety is necessary and um the

29:22protection of cultural assets through

29:25you know meandering off into

29:28conservation pro property be considered

29:31as well.

29:33>> I'll second that.

29:35On your motion, Brooke

29:37>> I,

29:39>> Don, I, Matt,

29:41>> uh, I with a caveat. I want to make sure

29:44that we'll win it. Opus Association,

29:46Conservation Foundation, Land Bank. I'm

29:49I'm voting yes, assuming that people

29:51will be involved in this. So, thank you,

29:56>> Bob.

29:56>> I chair votes eye. That passes. Mike, is

30:01that what you needed to move forward?

30:03>> Uh, thanks, Madam Chair. I appreciate

30:05that.

30:06>> Thank you.

30:07>> And one other comment before we go off

30:09it,

30:09>> please.

30:10>> Se was was it 77 when this was first

30:13proposed? So, what are we 50 years, 49

30:17years? So, we're we're we're moving at

30:19the speed of government. We're going to

30:21get there. [laughter]

30:22So, thank you,

30:23>> Madam Chair. Can I just add to that if

30:25that's all right? Uh this would almost

30:27complete that 1977 master plan with the

30:30Tom Nevers path going on for

30:31advertisement in about a month and this

30:33project happening and with the Oracle

30:35Monahhans path being implemented.

30:39>> Mission complete. I would think

30:40>> the only master plan ever come to

30:42completion.

30:43>> What's the one? The Dionis. I always

30:46thought that one was pretty ambitious

30:49going Dionis out to there. That's not

30:50that's not all the way out yet, but

30:52that's was ambitious. hopeful.

30:58>> Thank you everyone. Um, moving on,

31:03we are going to look to the Sheep Pond

31:06Road Order of Betterment Assessments. We

31:09have Tracy here and do we have Vicki

31:10online as well? Tracy,

31:12>> correct? Vicki is online as well. Tracy

31:14McDonald, the real estate manager. Um so

31:18as you may recall back in the fall of

31:21last year um the board voted or the

31:24county voted to um set a betterment

31:27assessment that was an estimated value

31:30of what the cost of the project would be

31:33to put new roadway access in for the

31:35Jeep pond residents. And today we're

31:37here to actually finalize those figures

31:41and do an order um of the betterment

31:44assessment for the final amount of

31:4727885651.

31:51Um and that is for the roadway that's

31:55been constructed on plan 2016-18.

31:59And um that cost is then divided between

32:03what what turns out to be 13 properties.

32:06Um some of them are there some people

32:09own two properties. So they will pay a

32:11double assessment and um that cost is

32:15broken out by each person on the order

32:18of betterment statement that um or order

32:20of betterment assessment that was

32:22provided to you in your packet. And so I

32:25just ask if the commissioners have any

32:27questions regarding the the Betterment

32:29Assessment.

32:31Any questions from the board?

32:34>> Anybody want to move approval?

32:36>> I'll I'll move approval.

32:39>> Second.

32:41>> Uh Matt Fee

32:42>> I.

32:43>> Bob.

32:44>> I.

32:45>> Don Hill.

32:45>> I.

32:46>> Burke Moore.

32:47>> I.

32:49>> The chair votes I. Great. Thank you very

32:51>> Thank you, Tracy. Thanks for getting

32:53that done.

32:54>> Thank you.

32:56>> And um now we're going to move on to the

32:59petition for the uh land court approval

33:02of the subdivision plan. Correct. Um so

33:06this is a common request of the land

33:08court for the county to assess um to the

33:12plan approval and the petition. Um, in

33:15this case it happens to be one Hatch

33:17Circle um, who has applied and

33:20petitioned for approval of a plan of a

33:23three lot subdivision. Um, it's been in

33:26Lancport for quite a while and um, it's

33:30moving forward now and so the land court

33:32has requested this ascent from the

33:34county commissioners. Um, it's pretty

33:36straightforward and um, so if you have

33:39any questions um, Vicki can Vicki or I

33:43can probably answer them.

33:47Move approval.

33:49>> Second.

33:50Um Bob

33:52>> I

33:53>> Don

33:54>> I

33:54>> Matt

33:55>> Hi.

33:55>> Brooke

33:56>> I

33:58>> and chair votes I. Thank you. Great

34:01>> motion to adjurnn.

34:02>> Hold on. Got one more which I don't

34:05think you have anything but

34:07>> I don't commissioners reports.

34:10I mean, we did have an NP and EC

34:12meeting, but I don't really have

34:14anything to report on at the moment.

34:17>> That's it.

34:18>> Now, I have a motion to adjurnn.

34:20>> Okay.

34:22>> On your motion, Bob

34:24>> I,

34:24>> Matt,

34:25>> I,

34:25>> Don,

34:26>> I,

34:26>> Brooke,

34:27>> I.

34:28>> Chair votes I. Thank you everyone.

34:31>> Nice job, Joe.

34:32>> Thank you.

34:37>> Tracy makes it easy. Sorry. Okay, I'll

34:40call the select board meeting to order

34:42at 6:04

34:44um September 30th.

34:46There are a couple of additional

34:49announcements in terms of changes to the

34:52agenda and just adding those in which

34:55the town manager will report on. Um

34:57we'll accept the agenda as written and

35:00then move to announcements.

35:02>> Thank you. This meeting is being video

35:04and audio recorded.

35:06Round four of our 2026 committee

35:09vacancies is underway and we have

35:11vacancies currently on the cannabis

35:13advisory committee, coastal resiliency

35:15advisory committee, town of Nantucket

35:17scholarship committee and applications

35:19for those are due by noon on Friday,

35:22October 2nd. Appointments will be made

35:24on October 14th.

35:26The planning board is currently

35:28accepting public written public comments

35:30on its draft 2026 master plan through

35:34October 15th. The draft plan and a

35:36message board for public comment is on

35:38the project website listed on the select

35:40board meeting and agenda. And I wanted

35:42to add to this that the planning

35:43director will be attending your meeting,

35:45the select board meeting on October 14th

35:47to review the master plan with you

35:49directly.

35:51Town council citizen warrant article

35:53consultations are available on

35:56Wednesday, October 14th from 10:00 a.m.

35:58to noon and Thursday, October 15th from

36:01400 pm to 6 pm. that is via teams and

36:04you may contact town manager's office

36:06for um the meeting links. And I wanted

36:09to add something. We're going to add

36:11this to next week as well. The citizen

36:13warrant article deadline is um

36:17in November. I think it's November 16th.

36:19I'll double check that in a moment. Um

36:22but there's a a bit of an issue with the

36:24number of signatures that I wanted to

36:26make people aware of. We had some

36:28charter amendments that were approved at

36:29town meeting in 2022. for those have

36:31been working their way through the

36:32legislature and they are now um

36:35hopefully almost ready for the governor

36:37to sign and once signed those will

36:39become effective immediately and the

36:42signature requirement will change from

36:4410 to 25.

36:47And so even though at this exact moment

36:51the state requirement is 10,

36:55it could very well be 25.

36:57>> So get

36:58>> very shortly. So the recommendation is

37:00get at least 25 if not more like 30 or

37:03>> 35

37:04>> just to make sure you have registered

37:06voters of Nantucket signing your

37:08petition.

37:10Uh executive session minutes released.

37:13Um we had a minor typo on the agenda at

37:15its September 23rd not 9th meeting

37:18executive session meeting. The select

37:20board voted to authorize the continued

37:22withholding or release in part subject

37:24to redactions under the public records

37:26law of 2024 and 2023 executive session

37:30minutes dated March 14, 2024.

37:34That's a revote. March May 2nd, 2024,

37:38that was a revote. June 6, 2024, revote.

37:42July 29th, 2024, revote. August 8th,

37:452024, revote. September

37:4912th, 2024 revote. October 3rd, 2024

37:53revote. November 7th, 2024, revote.

37:56January 5th, 2023. February 2nd, 2023.

38:00March 9th, 2023. April 13th, 2023. May

38:054th, 2023. All the rest of these are

38:072023. June 15th, June 23rd, July 13th,

38:11August 10th, September 7th, September

38:1314th, October 5th, November 2nd,

38:15November 6th, and December 7th.

38:18And that's it for announcements.

38:20>> Okay. Are there any opening select board

38:23announcements or comments?

38:26Okay. Uh seeing none, um I don't have

38:31any updates. There were mainly

38:32statements on last week's select board

38:34um public comment. Um so we'll move to

38:38public comment for items not on our

38:41agenda tonight.

38:43And um I do have to limit the comments

38:46to three minutes per speaker.

38:50Either one, we're we're back in

38:52business.

38:56Amy Eldridge, this is just basically a a

38:58comment. I had the pleasure of attending

39:00the Mass DOT um reconfiguration of the

39:03Rotary and uh they did a lovely

39:05presentation. You can go on their

39:06website and find further details on the

39:09project. Um, but it was really nice to

39:11see them hear the concerns of the

39:13islanders about the trees, the bike

39:16paths, the lengths of 18 wheelers that

39:18they're considering, you know, 73 and 70

39:22foot 75t long trailers. So, it was just

39:25really nice to see them open to hearing

39:28from us about how it's going to be used

39:30and how it'll how it will flow. So, if

39:33you get a chance, go on their website

39:35and take a look at the project. It was

39:36really nice. Thanks,

39:40Is there anyone else for public comment

39:41this evening? Okay. Um seeing none, uh

39:45there is no new business, we will move

39:47to approval of the minutes and warrants

39:50items one through three.

39:52>> So move.

39:53>> Second.

39:54>> All those in favor? Uh

39:56>> Matt

39:57>> I.

39:57>> Bobby

39:58>> I

39:59>> Jill

39:59>> I.

40:00>> Brooke

40:01>> I.

40:02>> Don I. That carries unanimously. Five to

40:04zero. Um, next up we move to a sele town

40:09manager report, a continued review of

40:12the capital improvement plan.

40:14Thank you, Madam Chair. So, Deputy Town

40:16Manager Rick Sears is going to take us

40:18through this. And as you know, we've

40:19been working on this since July. And the

40:22idea is that ultimately we will end up

40:24with a what we're calling a reset

40:27capital improvement plan that can be

40:29socialized throughout the town

40:30government and the community.

40:34Good evening, Rick Sears, deputy town

40:36manager.

40:38You received some materials kind of late

40:40this week. Um, but I think they're in

40:43printed in front of you. So, just real

40:46quickly, I'm going to take you through a

40:48few items um in a PowerPoint and then I

40:50just want to take them review the

40:53spreadsheet of of the capital projects.

40:57So, just the just where where we've

40:59gotten to so far, just the progress. So,

41:01at your second session, you reviewed the

41:03remaining 19 projects that were greater

41:05than $3 million. And um we moved you all

41:10moved nine of the 19 projects to a

41:13parking lot. The parking lot defined as

41:16sometime past the 10-year horizon of the

41:20SEP. So, of the project we move, we we

41:23moved there. Uh all any project that was

41:26ranked low by all of you was moved

41:27there. There was a bunch of conversation

41:30about phasing. So, we've we've done some

41:33phasing work for the CRP, which has

41:35changed the profile of the projects.

41:38There were some comments about waiting

41:39and seeing on on things like town

41:41employee housing. So, we moved those

41:43out. We did move um wind drive wind

41:48street project up a few years at the

41:51request of uh the board last week and um

41:55as I said, we phased a lot of the

41:56coastal resilience projects. One of the

41:58things we didn't do though, there are

42:00two NK public school projects. The new

42:02administrative building which is in 2028

42:05and the new school which is currently

42:08planned for 2037.

42:12Um just a quick summary comment. Moving

42:18those things around like that, we um

42:21took about $600 million out of the $1.3

42:24billion 10-year plan. doesn't mean it's

42:27gone away. It's just not in the first in

42:29the next 10 years. So, if you could

42:31change slides, please Erica.

42:34And it looks like this. So, these are

42:36the projects that we eliminated in the

42:38top table. So, um $450 million of CRP

42:44money was moved out beyond the 10-year

42:47horizon.

42:49106 million from town admin, which is a

42:52central municipal facility in the senior

42:54center, and then another 36 from town

42:56employee housing. That's the Tacoma and

43:00Oraca that um the comment was, let's

43:03wait and see how weight drive goes. So,

43:06what you end up with after you take the

43:08604 out is the profile on the bottom of

43:10the page. You see sort of I guess a more

43:14manageable profile. the it's it's so

43:18702437

43:20is what the 10-year SIP looks like now

43:23from 1.3 and I you used to think of a

43:26number of 1.1 1.8 but we had to that was

43:31when the school was in for $85 million

43:32it's now for $200 million.

43:36The those two numbers in 28 and 37 are

43:38the two largest. Um in 28 that's that

43:42number is

43:44most impacted by the new DPW and in 37

43:47the 209200 of that is for the school the

43:52a new school you can advance the page

43:54please Erica. Thank you. So I'm just

43:58keeping this slide in each week so that

43:59you guys remember that when you have

44:01things that you want to add potentially

44:03add to the SIP you let me know. And then

44:07Erica, if you could go to the next page,

44:09which is really just want to just

44:11confirm with uh you all what the next

44:14steps are. So for the projects that are

44:17greater than $3 million that we've

44:18reviewed them all now with the exception

44:20of the schools, um we're going to

44:23continue to work on some sequencing.

44:25We've done some sequencing. That's how

44:26we got the 600 million out of the plan,

44:29but we want to continue to refine that

44:31for the projects that are less than 3

44:33million. Now, this is thatund that list

44:35of 115 projects I sent you all um a week

44:38ago, last Thursday, I think it was. Um

44:41that just seems like a lot of projects

44:43for you all to go through and I just

44:45kind of need some feedback if you want

44:47to go through all of them. So, my a

44:52recommendation would be that pick a

44:55threshold of

44:57value that you are comfortable or you

45:00don't want to review them. So, I picked

45:02just randomly $250,000. If you reviewed

45:04everything over $250,000 less than three

45:07million, you're going to have to review

45:0845 projects instead of the full 115.

45:12I I just kind of want to know how you

45:14guys want how you all want to do it

45:15because I I I sent you the the

45:18spreadsheet with 115 and um

45:22well, I don't have any feedback at this

45:23point in time. So, I'm guessing that's a

45:25little bit of a protest vote.

45:29>> I I didn't Did you send them to me?

45:32>> Yeah. I mean, I saved it. I I thought

45:34that you got it. I didn't do the trucks

45:36draw.

45:37>> Okay.

45:38>> Too many trucks, but

45:40>> I've been away, but I did not see that.

45:41>> But I had a lot of questions about some

45:43of them, actually. I mean, a lot of X's

45:45to be honest, but I did it.

45:46>> Okay. I don't think you [clears throat]

45:49>> Listen, I think this is a really

45:51critical exercise we're going through. I

45:52think it's the most important thing

45:53we're doing all year in my personal

45:55view. And I think all of you need to

45:56look at every single one of these

45:57projects. I don't care what it costs. I

45:59do.

46:00because a lot of these things feed

46:02bigger projects later and so they're an

46:04indication of something to come. Now

46:07again the trucks I don't know if you

46:09need a 10wheel or Drew I I don't know

46:11but that's why we have the capital

46:13committee and we get to talk to you

46:14about those things but so I I was hoping

46:17not to have to rank every truck but past

46:21that I I think I think you guys should

46:24all weigh in.

46:25>> My question is of this

46:34six pages.

46:35>> 145 million for fiscal 28. How much of

46:40that?

46:44Sorry. How much of that's going to be

46:46funded from

46:49wherever and how much of its overrides?

46:51Because anything that's an override or

46:53we think it's going to be an override, I

46:54want to review.

46:57>> Sure. I my So, you've already reviewed

47:01all the big projects,

47:03>> right? But that doesn't come out to 145,

47:06>> correct? No, it doesn't. It um I it's a

47:09little early for us to be saying how

47:11we're going to fund these projects to be

47:13honest with you. That doesn't usually

47:14happen until later in the year, but um I

47:19I I don't know the answer to the

47:20question. It's a good question, Bob. I I

47:22just don't

47:22>> because I I can go through we can I I

47:25kind of agree with Jill. we could go

47:26through them and I'm I'm going to say

47:28that my rankings when we do them and I

47:32know it's preliminary and you haven't

47:34figured out what you've got and where

47:35you can spend it, but if it's going to

47:38be an override or if it's going to be a

47:39budget or a capital or something that's

47:42not paid with an override, it's going to

47:44how I rate it. If it's an override, it's

47:46going to get a lesser rating for me than

47:47if it's a uh something that we can

47:49figure out how to purchase or pay for

47:52through our regular revenue sources. Do

47:56you want to give some gu Sorry, Don, can

47:58I do you want to give some guidance

48:00there where if it's under $250,000, you

48:02might fund it through free cash through

48:04the through the budget or

48:09>> Here's the other question I have about

48:10them, and I asked this at capital, but I

48:12think it'd be really good for the board

48:14to know of the of the requests that come

48:18in that are pretty routine, and I'm not

48:21talking about trucks again because

48:23that's different. the routine request.

48:27How much unused borrowing is there? And

48:30and maybe there's unused borrowing for

48:32buying trucks from the DPW. I don't

48:34know. But I actually think that might be

48:37useful so that people can see, hey,

48:40they've had this money. They could have

48:42used it and they didn't and it's been, I

48:44don't know, seven years or 10 years or

48:46something like that. Um, I think that

48:48also kind of helps because if they still

48:51have money that they can use,

48:53>> can they actually use it for what's on

48:55this page,

48:57>> right? And sometimes they can and

48:59sometimes they can't.

49:00>> Yeah, correct. Depends.

49:01>> Depends on the vote.

49:02>> It's a debt exclusion and we haven't

49:04borrowed it yet. You're not going to be

49:05able to use it. You know, there's all

49:07>> Sometimes they ask for something and

49:08they don't go buy it and then maybe they

49:10still need to buy it and,

49:11>> you know, they have that money. That

49:13does happen.

49:14>> I've seen it happen multiple times.

49:15>> Yes, of course. So think that's might

49:18help.

49:22>> Okay,

49:22>> we know coastal resency money, they ask

49:24for a million dollars every year. We

49:26know that they have some money left, but

49:27they also have to have some money in

49:29order to get some grant money. You know,

49:31the same for other requests. It's it's

49:34usually more the the handful of repeat

49:37requests that are the annual requests

49:40when they ask for the same thing every

49:41year.

49:43Brooke.

49:46>> Um, I would just say that I actually

49:48don't mind I I did not do my homework

49:50and I apologize for that, but I actually

49:52don't mind going through and doing

49:56everything because even at a quarter of

49:58a million dollars, if there's, you know,

50:0150 of them, it's a lot of money

50:03collectively. So, um I will commit to

50:07looking at at everything on the list and

50:11um

50:12coming back with things that I need more

50:14information on.

50:17>> Can I ask one

50:18>> Bobby? Yeah.

50:18>> Madam Chair

50:20>> Rick,

50:22I guess the hardest part for me is

50:24looking at every one of these going out

50:2610 years. you know, I I would I'd be

50:29more comfortable to look at him going

50:31out three years, which is the length of

50:34my

50:36term. You know, [laughter] I mean, I'm

50:38making decisions for somebody that might

50:40be sitting in the seat different than

50:41myself. Um, so especially on these

50:45lesser ones and and I do agree with Jill

50:48that sometimes, you know, you fund a

50:49study for $200,000, but then that study

50:53turns into something else two or three

50:55years down the road. Um, so the the

50:59large number projects I had no problem

51:02doing out 10 years, but the smaller ones

51:04I think three years is a good number to

51:07start with. Um,

51:10and and then kind of going down,

51:14you know, maybe every year you add a

51:16year to it or another couple years to it

51:18and and kind of push it along. I don't

51:20know if that's a feasible or not, but

51:22it's just a thought. Well, that would

51:25kind of align with the strategic plan

51:27because we try and

51:30although it continues to reset, we try

51:32to keep it in a three-year outlook, it

51:35ends up being longer for a lot of

51:37things, but um

51:41but I don't know how that plays into

51:43trying to do a 10-year going when we

51:46meet on the 6th,

51:48that's the strategic plan that day,

51:50right? Are we do we go through these

51:52then or we just kind of talk about the

51:53overall plan? We don't

51:55>> we don't go through this but Oh, sorry

51:58Libby. Sounds like you we won't go

52:00through this but but take housing for

52:02instance. Housing is one of the four

52:06focus areas of the strategic plan. So we

52:09will be talking about housing which is

52:12in the 10-year SEP.

52:15So it's a yes and no answer really.

52:18>> Yeah, I I understand. And I mean, I I'll

52:21I'll be quite frank. I um I have some

52:24real concerns about going to town

52:27meeting this year and asking for any

52:30kind of overrides or substantial

52:32overrides, especially because there's so

52:35many things that are going on right now.

52:37I mean, I think the the impression that

52:40I'm getting from the people that talked

52:41to me is even though we approved $200

52:44million in overrides last year, I think

52:46it's starting to sink in and people are

52:48getting a little bit of sticker shock

52:50and

52:52interest rates have gone up. The tariffs

52:54just kicked in in Canada. Lumber prices

52:57are going to go through the roof. We've

52:59we've we start building things at the

53:02probably the worst time in the next 10

53:05years to build something. Um, and some

53:07of these projects may need to be pushed

53:09back a year or two till we have a better

53:10environment with interest rates and and

53:12and

53:14materials. You know, I mean, I one of

53:16the things that I always was amazed by

53:19was when we looked at the DPW complex

53:23and the fact that uh the one on the Cape

53:27that we toured, I didn't go, but the

53:29other guys did, they were able to build

53:30it for only $20 million because it was

53:32during CO and things were cheap. So

53:34sometimes you might want to just push

53:36things out a year or two and get a

53:37better a better um

53:42price or a better advant take advantage

53:44of different times in the economy. Right

53:47now building anything right now I'm I'm

53:49worried that the projects we have going

53:51forward are how the tariffs are going to

53:53affect it. I mean I I can see lumber

53:54prices going up substantially here in

53:57the next 3 to 6 months. And I don't know

53:59how much of this these, you know,

54:01materials for these projects have been

54:03locked in yet or any of that. So, you

54:05know, I know we have contingencies, but

54:07>> Well, then they're not approved, so

54:09nothing's locked in.

54:10>> No, I mean, on the projects that we

54:12approved last year,

54:13>> right?

54:13>> I.e. [clears throat] the island home.

54:15You know, I don't know if those lumber

54:17prices are blocked in yet or any of

54:19that.

54:19>> We have a guaranteed maximum price that

54:21we're going to pay for our island home.

54:24>> Okay.

54:24>> It's guaranteed you're going to pay the

54:25maximum price.

54:27>> All right. Well, anyway, that's the

54:30thought. So, yeah, I just kind of doing

54:32a quick

54:34>> uh look relative to your comment about

54:38>> um items that are going to require an

54:40over an an override or debt exclusion.

54:45>> Well, they're not this list.

54:47>> Pardon?

54:47>> They're not on this list. The debt

54:49exclusions aren't on this.

54:50>> No, no, correct. I'm I'm just saying I

54:52just did a quick little survey. My guess

54:55would be Baxter Road,

54:57DPW facility.

55:01Um

55:02there's a $10 million item for

55:06it was

55:07>> portable housing

55:08>> package of pond and the next largest one

55:11is $4.5 million which is the school

55:13administrative building. So that that in

55:17total is 100 million out of the

55:20>> Well, then you So we've got townwide

55:23municipal improvements that 10 million.

55:26That would be probably a debt exclusion.

55:28>> Yep.

55:28>> I would think.

55:28>> Yeah, I missed I missed that one.

55:30>> Dark skies street light replacements.

55:32>> Three million.

55:33>> That's three and a half three million.

55:38U

55:40drive it just, you know. Yeah.

55:43>> It's it's it's substantial amount of

55:45this is debt debt exclusions, overrides,

55:49whatever you want to call it. It's just

55:50>> Yeah.

55:51>> Yeah.

55:51>> I I I personally I'm not going to

55:53support any debt exclusions at this

55:55time. I'm not. But I realize this

55:58exercise is different. What I wanted to

55:59ask the board and if you agreed is can

56:02we come up with a number that we're

56:03comfortable with for article 10 because

56:05I feel like these 115 projects are in

56:07article 10. Yeah, that pretty much.

56:12And if we can come up with some number,

56:14people are comfortable with that. There

56:16is some borrowing. It's some free cash.

56:18But if we come up with the overall

56:20number, then I I feel better about that.

56:23You all haven't done it that way before.

56:25So I don't know if you want to, but I'

56:27I'd ask that you'd think about it.

56:29>> Is it even possible to do

56:32>> with article 10?

56:33>> Well, no. We know what we're going to

56:35collect in taxes. We don't know what

56:36we're going to get in free cash and all

56:37of that stuff, but we know basically

56:39what we're going to get. We know what

56:40our operating costs, fixed costs are,

56:42whether it be pension,

56:44>> free cash will be certified before we

56:45set the warrant.

56:46>> Yeah,

56:47>> I understand. But I understand what I

56:49think what I understand as you're saying

56:51is we're going to make X amount here

56:54regardless of free cash in taxes revenue

56:57and our fixed costs are here. So that

57:00leaves us this number and that's what

57:03we're going to fund these departments

57:04with. Is that

57:05>> And how much of this stuff can be funded

57:07with that?

57:09Yes, I'd feel more comfortable if we did

57:11it that way, but I don't think that's

57:13not how we've been doing it. So,

57:16>> well, it's it's going to be a

57:18conversation that is going to have to

57:19wait a while then if in order for us to

57:23to get to a 10-year SIP. Another

57:26alternative would be to go ahead and say

57:30and and rate these projects how

57:32important they are. Then when when we

57:35understand better how much funding

57:38resources we have, we'll take the most

57:40important projects from this plan that

57:43you've agreed and slot them in. I mean,

57:46it just

57:48doesn't matter that they're all that

57:49they're all on here right now. If we

57:51don't have the money, then we're going

57:52to, you know, we do this almost every

57:54year where we lop off the bottom right

57:56of the capital requests. That's I I

57:59could go through these these smaller

58:01ones and I could say that

58:06for example, if we can fund it through

58:09article 10, I support it. If we have to

58:10go for an override, I don't support it

58:12at this time. I could give you a yay or

58:14nay in that direction. Um if that would

58:17be helpful.

58:18>> Yeah, I think that'd be fine. Yes, same

58:22>> comment that that's where my a lot of

58:24this and I wrote originally I wrote uh

58:26it should be budgeted and I think I'm

58:28I'm sort of where Bobby is on on that. I

58:30I looked at some of these like trucks

58:33that they should have a line item or

58:34maintenance that should be a line item.

58:36It should be in the budget. It shouldn't

58:37have to be a debt exclusion. If we have

58:39to bump the budgets up to do that and

58:41then stay within that going forward, we

58:43should. But I think some of this is is

58:46normal things you need and maintenance

58:48is a normal thing we need. We have to

58:50find a way to do that. Uh I agree with

58:53Bobby 100% about interest rates. I made

58:55a comment to a friend of mine who's on

58:58one of the reserve banks uh weekend and

59:00a week weekend ago or so. I said three

59:03to five years and he said no Matt, it's

59:05more like 10 or 15 years. You aren't

59:07going to see lower rates for 10 to 15

59:09years. And he's in the business. So I

59:12you know is he right or wrong? we, you

59:14know, none of us know, but I do think

59:16that that's going to be, you know,

59:18figure that's going to influence us for

59:20a while. Uh,

59:22I I didn't get it to you because I my my

59:25Microsoft is not talking to my computer,

59:28which is not talking to me. I don't

59:30know, but it's but I have it written

59:31down, I think. And some of it,

59:34>> like coastal resiliency and some of the

59:37transportation stuff,

59:39>> I don't think we should shove it if

59:41there's a chance to get money. And so I

59:44I want to make sure we aren't parking

59:45something that, you know, either parking

59:48the beginning of of coastal resiliency

59:50so we have the right studies done or

59:52parking some of the, you know, some of

59:54the transportation stuff. There's some

59:56big transportation things that I

59:58wouldn't want to do, but if we get a lot

59:59of money, we should do them. So I I I

1:00:02want to make sure that we're doing that.

1:00:04So, I'm going to show you the

1:00:06spreadsheet in a moment which has the

1:00:07phasing for the coastal resilience

1:00:10projects which would allow us to go

1:00:12after the to go after the money.

1:00:15>> And we've seen how how the NRTA has how

1:00:17well the NTA has done going after it. I

1:00:20think it's a I think that there's money

1:00:23my my intuition tells you there's money

1:00:25available for transportation and other

1:00:27things, but we need to make an effort

1:00:29like that for it. So,

1:00:31>> Sure. Yes. May I comment on a couple

1:00:33things? Number one, um we would like

1:00:36there to be a policy directive from the

1:00:37board about whether or not vehicles

1:00:39should be replacement vehicles should be

1:00:41in the operating budget on an annual

1:00:42basis or in the capital plan. Um we've

1:00:45kind of gone back and forth a little

1:00:48bit, but of course if they're in the

1:00:50operating budget, we are going to need

1:00:52to increase the operating budget

1:00:54somehow. Some of that could be one-time

1:00:58purchases with free cash. Um, so that's

1:01:01number one. And number two, when you

1:01:04comment, Matt,

1:01:06hopefully we'll get a lot more money for

1:01:09transportation projects or coastal

1:01:10resilency. I don't know where a lot more

1:01:12money is going to come from, but um the

1:01:16idea of the the NRTA, I just want to

1:01:18mention Gary has done a fantastic job

1:01:20getting lots of money for the NRTA, but

1:01:23that is a completely different funding

1:01:25source for public transportation than we

1:01:27are looking at for our transportation

1:01:30projects and vehicles and things like

1:01:31that. Of course, if there are grant

1:01:33opportunities, we will pursue them. DPW

1:01:36director recently pursued a grant

1:01:38opportunity with the state for a new

1:01:40road grader and and we got one. Thank

1:01:42you, Drew, for that. And that was a big

1:01:44savings o over $100,000,

1:01:47right? 200 over $200,000 of savings that

1:01:51we don't have to pay for now. Came

1:01:53through a grant from the state. So,

1:01:54wherever there's an opportunity, we are

1:01:56pursuing that. But there aren't they

1:01:59aren't all over the ground to pick up.

1:02:01>> No.

1:02:02>> Well, Mike is pursuing things in the

1:02:04tip. Yes, he is. And pretty competitive

1:02:07is and my question is let's some of this

1:02:09is changing culture. Is there other like

1:02:12the culture changed at NRTA and when the

1:02:14culture changed the amount of money that

1:02:16we pursued and and achieved has changed.

1:02:19I think we need to make sure that we are

1:02:21doing that as much as we can everywhere

1:02:23on some of this. That's my only you my

1:02:25point. The other thing we haven't we I

1:02:28talk about it every year is you know can

1:02:31we increase you know some of the fees

1:02:33and things in other we we do it

1:02:35automatically on restaurants but we

1:02:37don't do it in other areas. We should be

1:02:39everyone should be going up cost of

1:02:40living or a little more and we should be

1:02:43you know in the top quarter of the state

1:02:45on expenses not the cheapest for a lot

1:02:48of these things. And if we did that we

1:02:50would be you know if we did paid parking

1:02:5315 years ago it was $2 million. It's

1:02:55probably three or four a year now that

1:02:57we would be netting out, you know, three

1:02:59or four million. And so I I think

1:03:00there's things like that that we should

1:03:02be looking at again to to take care of

1:03:05to start to fund some of this.

1:03:07>> Yeah, we've been talking about the fees.

1:03:09Where are we on that?

1:03:12Well, it wasn't completed and

1:03:16previously, so um Alicia and I have

1:03:18briefly um discussed it and we need to

1:03:23get back to it, but there's other things

1:03:25that have risen to the top now.

1:03:26>> No, I got that.

1:03:27>> Um there needs to be some analysis with

1:03:30the fees and I totally agree with you,

1:03:32Matt. We need to have an annual across

1:03:33the board fee um review. And some fees

1:03:38are statutoily capped, so we can't

1:03:40increase those too much. And some are

1:03:42based on whatever the town's cost is to

1:03:44produce a permit or something like that.

1:03:47And so there we just we just need to get

1:03:49at it. Um there's just too many things

1:03:51that have surfaced.

1:03:53>> But as we learned in the uh interviewing

1:03:56the various finance candidates, there

1:03:59are, you know, some we've been told one

1:04:01thing or I've been told one thing about,

1:04:03oh, we can't change that at all because

1:04:04of whatever. then you talk to them and

1:04:06they're talking about oh this and that

1:04:07and the other can all be included etc

1:04:09etc and it was much more uh you know

1:04:13expansive than what we have been led to

1:04:14believe what I've been led to believe

1:04:16for 20 years. So I think that we have

1:04:18more lee we potentially have more leeway

1:04:20and hopefully we look at that because it

1:04:23is substantial and yeah so anyway and

1:04:26I've and Rick I I've got this my own

1:04:29rankings as much as I did and if I can

1:04:32figure how to send it to you I will.

1:04:36Uh yeah, go ahead.

1:04:38>> The only comment and I I've brought this

1:04:40up with DPW before, Rick, is is there

1:04:43any possibility we can look at le

1:04:45putting some of these cars and trucks on

1:04:47a lease

1:04:50because then it will roll over. It

1:04:52doesn't mean that you won't need the

1:04:54money. It doesn't mean you won't cost,

1:04:55but it's more of a you're on a schedule.

1:04:59You've got a maintenance plan. Uh

1:05:01hopefully a repair plan in that.

1:05:05>> Hi Trip Padno, director of public works.

1:05:07Um we have looked into that. I I think

1:05:10the biggest challenge to leasing is not

1:05:13only that it is more costly. We get uh

1:05:16we purchase motor vehicles off the state

1:05:19bid list, which is dramatically less

1:05:20than what you see as an MSRP on a

1:05:22sticker on the lot. In addition, um

1:05:27leases obviously um don't go the full

1:05:30life of the vehicle. So if we're getting

1:05:3110 years out of a vehicle now, that's

1:05:33like say two or three leases. Um and you

1:05:36know at the end of the lease, we have to

1:05:37bring it off island and bring a new one

1:05:39back. So there's a lot more

1:05:40transportation cost included in that as

1:05:41well. The the dealers also require that

1:05:44you get maintenance done at the

1:05:46dealership. So that's incredibly

1:05:49inefficient for us to to bring vehicles

1:05:51off island to do maintenance. I'm really

1:05:53even talking about the bigger equipment

1:05:55like Caterpillar. I mean, they're not

1:05:56going to make you have it service at Don

1:05:58Allen. Like, how do they work with some

1:05:59of some of these big trucks or the more

1:06:02expensive ones? I'm really thinking

1:06:03about those

1:06:04>> and and we actually have Caterpillar uh

1:06:06Milton Cat come out here and do

1:06:07maintenance on some of our vehicles. We

1:06:08have worked to try to in incorporate

1:06:10some maintenance contracts with the

1:06:12purchase of our vehicles for a number of

1:06:14years. Um, it just I think for me, and

1:06:18maybe people would disagree with this,

1:06:19but moving vehicle purchases into our

1:06:22operating budget doesn't allow us to

1:06:24have the flexibility to say yes or no,

1:06:26especially if we we need to be a little

1:06:28bit tighter with our spending. Um, so,

1:06:30you know, these the one-time purchase is

1:06:33just a I I think it makes us a little

1:06:35bit more nimble to say yes or no,

1:06:36whereas once you're locked into a lease,

1:06:38then then we're really committed. um if

1:06:40we do need to make cuts to the budget,

1:06:42it's going to be a d tough

1:06:44>> conversation to have of who's given a

1:06:46vehicle back um and how are we doing all

1:06:48that type of stuff. So I I think that's

1:06:51>> well my view lease would lock you in so

1:06:53that you're guaranteed those trucks

1:06:55because we'd have to sign it the year

1:06:56that it got approved and then you have

1:06:58it and it's just on a rotation. You when

1:07:01the new lease comes up, yeah, then you

1:07:03got to sign it again and get

1:07:04authorization, but you could do that the

1:07:06year in advance. I don't know. I I just

1:07:08feel like it might make the process

1:07:10simpler. You might not like it, but I I

1:07:13still think it's worth looking at. Maybe

1:07:15not for all the vehicles, but for some.

1:07:18>> Yeah. And when when we um so Nick

1:07:20Torres, our central fleet manager,

1:07:22reached out to a number of um

1:07:24dealerships. We actually thought if

1:07:26anything, it would be the like smaller

1:07:27passenger vehicles that it might be

1:07:30might be viable for. I think the biggest

1:07:32problem with the bigger uh say trucks

1:07:34and heavy equipment is a how they're

1:07:36worked. Um and then the upfitting and

1:07:38stuff that's needed for them um adds a

1:07:40lot of cost if they are even willing to

1:07:42take them back. So we can certainly

1:07:44continue to look at that.

1:07:45>> Okay. Thanks. I appreciate.

1:07:48>> I think maybe just from a financial

1:07:49perspective, we should think about too

1:07:51that the cost of the interest rate on a

1:07:54lease is typically going to be higher

1:07:56than our borrowing cost because nobody's

1:07:58lending us money at what we can borrow

1:08:00at. So let's just say lease rate is 7%

1:08:03and we borrow at 4%. So 3% on every

1:08:06vehicle for as long as you pay it off.

1:08:08I'm just saying there's there's a

1:08:10there's a whole there's other aspects of

1:08:13this as well. And and our cost of

1:08:15capital is actually pretty low.

1:08:17>> Yeah. That's why I think you could get a

1:08:19municipal lease. I just I just want a

1:08:21little more information on it.

1:08:24>> Bobby,

1:08:25>> just

1:08:27how do we when we replace a vehicle? I'm

1:08:32assuming some of them are by the age,

1:08:34some of them by miles. But what do we do

1:08:35with the old ones? Do we sell them? Do

1:08:38they just

1:08:39>> We typically trade them in.

1:08:41>> So, we trade in a 10 wheel dump truck on

1:08:43a new 10 wheel dump truck.

1:08:44>> Sometimes we do. Yeah. Uh otherwise,

1:08:46we'll do a surplus sale, which is

1:08:48required by law. So, we advertise them

1:08:50and sell the vehicle.

1:08:51>> So, like a town vehicle, like a

1:08:52administrative

1:08:55administrative vehicle, what do we do?

1:08:57We do do it every certain amount of

1:08:59years or we do it by miles or

1:09:01>> we have a vehicle replacement schedule

1:09:02and it's on condition. I'm not sure if

1:09:05miles is it it's more condition and age

1:09:10um

1:09:13how the vehicle is used the age of it

1:09:16whether or not can be serviced that

1:09:18there's a variety of

1:09:19>> So everyone's different roughly.

1:09:21>> Yeah. But like administrative vehicles

1:09:23are probably about the same. They're pro

1:09:25I don't remember what they are, but

1:09:27they're they're all probably about the

1:09:29same replacement schedule because

1:09:30they're used pretty much the same way.

1:09:32>> Okay.

1:09:34>> But just so you'll know, we even have

1:09:35the trucks for the enterprise funds. I

1:09:37mean, Mark will let He had a truck for

1:09:3918 years, so not everybody is the same

1:09:41before he came and asked for another

1:09:43one.

1:09:43>> Well, yeah. Not I'm sorry, not to

1:09:46interrupt, Madam Chair. Um, it does

1:09:49depend on how it's used. Yeah,

1:09:50>> there's some you could keep an 18y old

1:09:52vehicle if you don't use it that much

1:09:54and or sometimes they just use it to the

1:09:58end.

1:09:59>> Yeah,

1:10:01>> that's you know my bread trucks that's I

1:10:04try to get 10 12 15 years and hold them

1:10:07together if I can pay cash and try to

1:10:09run them as long as you can. That's the

1:10:12most cost-effective way for us to do it.

1:10:14And in the municipal world, um there are

1:10:18other considerations probably like we

1:10:20want to make sure snow plows and dump

1:10:22trucks and things like that work during

1:10:24a snowstorm and aren't breaking down

1:10:26constantly because they're too heavy.

1:10:29>> Go ahead, Tro.

1:10:30>> While we're on the topic, um and it came

1:10:32up early like all the vehicles in the

1:10:33tenure capital plan. So I worked with

1:10:35Nick Tori's central fleet manager to

1:10:36develop our our DPW tenure capital plan.

1:10:39We are also working on doing that for

1:10:41other department fleets. And for now,

1:10:43what we're what we basically did, just

1:10:45to give you a history of how we kind of

1:10:46arrived at all the vehicles in the plan,

1:10:49we took a vehicle, whatever model year

1:10:51it is, put it in the plan 10 years out.

1:10:53So, if it was a 2014, it would be in

1:10:552024. And if it's a 2018, it' be in

1:10:572028, etc., right? Um, from there on an

1:11:01annual basis, we would evaluate the

1:11:03vehicle, you know, and its condition and

1:11:05either move it up or move it out in the

1:11:07plan. So, that it's kind of just a

1:11:08placeholder, but we want to get all of

1:11:09our vehicles. With that said, all of the

1:11:11vehicles in our 10-year capital plan are

1:11:13existing vehicles. That's not adding new

1:11:16new vehicles for a growing department or

1:11:18or new, you know, need or service.

1:11:21That's just a vehicle that already

1:11:23exists and when we think it's going to

1:11:24die pretty much. So, that's that's how

1:11:26we got to where it is now. But again,

1:11:29obviously things will move. Our trash

1:11:30truck may move up and a dump truck might

1:11:32move out. So, that's that's how we

1:11:34developed that.

1:11:36>> Okay. and and if we take uh if we get a

1:11:39wash bay, if eventually that does

1:11:40happen, then we are going to get a

1:11:42longer vehicle life and they're going to

1:11:44be better taken care of. When we first

1:11:46discussed this, I looked up uh online

1:11:50and what somewhere on the Cape had

1:11:51quantified how much they were going to

1:11:53save and I'm going to get the number

1:11:55wrong, but it was like a million dollars

1:11:57a year on m it was a million or it was

1:12:00four million total or a million a year

1:12:02on replacing vehicles because they were

1:12:04having stuff under you know they were

1:12:07washing trucks and they were having it

1:12:08under uh cover etc. and it was going to

1:12:11be substantial savings. And so that's

1:12:14part of I think what we're working the

1:12:16DPW is working toward. So

1:12:21>> okay,

1:12:22>> it will be

1:12:23>> um

1:12:25>> Can you put the power?

1:12:27>> Do we?

1:12:27>> Not quite.

1:12:28>> Do we have an idea of where we're going

1:12:29to land with free cash this year? Any

1:12:32projection? Are we going to be maybe in

1:12:35the $20 million range again?

1:12:37>> I don't think we're there yet at all.

1:12:42I'm just asking where where what we're

1:12:44going to have available in free cash.

1:12:45>> Oh, that's what I'm asking. Not

1:12:47>> when when do you think we'll know? Like

1:12:49November.

1:12:50>> Is that normal?

1:12:51>> November might even be ambitious.

1:12:53>> Okay,

1:12:54I'll get back to you.

1:12:55>> Okay, that's I'll just remind you now in

1:12:57Sorry. Sorry.

1:12:59>> Go ahead. I have something else, but go

1:13:01ahead.

1:13:01>> No, you go ahead. You were speaking. I

1:13:03>> No, this is a different topic. So on

1:13:05that,

1:13:05>> I just want to remind everybody in 2019,

1:13:07article 10 was $6 million.

1:13:10>> 6 million.

1:13:11>> Six million.

1:13:12>> That wasn't that long ago.

1:13:14This year we did it at 16 and it ended

1:13:16up at 18, I think. But it was pretty

1:13:20good. The years before were not so

1:13:22great. They were 30, 50. I think one

1:13:25year might have been 72. I really just

1:13:28want to encourage us to try and keep

1:13:29that down this year. Yeah. I mean, I

1:13:32want to keep it down every year, of

1:13:33course, but I just don't know how it

1:13:36ballooned like that. And anyway, it

1:13:39happens and we get a reset and this is

1:13:42great and I'm glad we're having this

1:13:43discussion and now you guys know at the

1:13:45capital committee why it takes so much

1:13:46time to go through all the tracks.

1:13:48>> Yeah, I mean, we we did spend a lot of

1:13:50money this past year or well, we

1:13:53authorized it. We haven't actually spent

1:13:55it yet. But um

1:13:58in terms of FY28, I I mean, if we're

1:14:01talking about what we're doing for debt

1:14:04exclusions, I don't I think we have to

1:14:06prioritize the DPW

1:14:09and what the school needs.

1:14:12Other than that, I think everything else

1:14:14should probably be pushed a year,

1:14:17including Baxter Road alternative access

1:14:19and the next phase of weight drive. We

1:14:22>> they shouldn't be taken off, but I think

1:14:24they need to be pushed.

1:14:26>> I'm sorry.

1:14:26>> But I mean, this is an going to be an

1:14:28ongoing discussion till January, but I'm

1:14:30just saying that now. I I my only

1:14:33comment to that would be is we need to

1:14:35start also in the back of our heads come

1:14:38up with a plan if these all get shot

1:14:40down because my experience from what I'm

1:14:43hearing the public is

1:14:45>> that's why I think we can't bring more

1:14:47than one big thing

1:14:53>> really

1:14:54>> anyway

1:14:55>> any yeah you want to

1:14:57>> would you Rick I'll go through this list

1:15:00and I'll market

1:15:02budget or override. So, okay. So,

1:15:08are you all going to do the whole 10

1:15:09years or you want to do three years? We

1:15:11can. I mean, I'd like to do three.

1:15:14>> I think I can work if we

1:15:15>> Can we start with three?

1:15:17>> You can start with anything you want.

1:15:19Um, absolutely. If you start with three,

1:15:21I think that'll be great. And I it's

1:15:23just we'll probably have to have, you

1:15:24know, one more step in this process and

1:15:26we'll see how it all

1:15:28uh pans out and and

1:15:32go ahead.

1:15:32>> Sorry, Joe.

1:15:33>> Yeah. I mean, some of these are just

1:15:34routine. You know, it's the sidewalk

1:15:35money, it's the cobblestone money, it's

1:15:37the roads money. I mean, that that stuff

1:15:40I I'm I'm great with all that, right? We

1:15:42we have to. Although sometimes he has

1:15:44some unused borrowing and so maybe he

1:15:46didn't get to the cobblestones. I kind

1:15:47of like to know that. I do. But some of

1:15:50it's pretty routine.

1:15:51>> Yeah. But it's also the costs of these

1:15:53things may grow. Like it can't just be

1:15:55the same for the next 10 years most

1:15:58likely.

1:16:01>> And like the the school at 200 million.

1:16:04We know that that's not real. It's going

1:16:07to be a lot more than that to build a

1:16:09new school by 2037.

1:16:14>> So Erica, now you can go to the

1:16:16spreadsheet if you wouldn't mind going

1:16:18Oh, yeah. I should go back to the

1:16:19PowerPoint real quickly. Yeah, you're

1:16:21right.

1:16:24>> Um, yeah, just just stay here. So, just

1:16:29when we get all this done, the next step

1:16:31will be to run the SIP, whatever we have

1:16:35left in it, run the debt service

1:16:38analysis with Hilltop so we understand

1:16:40what we're doing each year. Um, and then

1:16:45the really good news is we get to start

1:16:46this all over again with the enterprise

1:16:48funds. So, um, this may go on for a

1:16:51little bit. Okay. Now, if you could put

1:16:52up the, uh, Excel real quickly. I just

1:16:55want to show you,

1:16:58um, how to read this. So, anywhere we

1:17:01moved a project out, I've highlighted it

1:17:03in yellow. So, downtown neighborhood

1:17:07flood barrier was low for all of you.

1:17:09So, that is in the parking lot for $105

1:17:12million. So, that's why, you know, this

1:17:14is this is how we got to the $600

1:17:16million worth of savings.

1:17:19Matt, to your to your point, um,

1:17:24Steamboat Warf,

1:17:26we we had $120 million in FY30.

1:17:31It's now $18 million so that we can

1:17:35begin

1:17:37um the planning the planning

1:17:40for that project so that we have

1:17:43resources if we need to write a a grant

1:17:46or we need to match some funds or that

1:17:48kind of thing. So, what Vince and Jeff

1:17:51did was essentially

1:17:53take about 10% of the project value,

1:17:56leave it in the year that um they think

1:17:59they need to start the project so that

1:18:02we have monies to get to construction.

1:18:06Uh it may it may be the way you like it

1:18:08may make sense to you, may may not, but

1:18:10that's how we um have shaped the

1:18:15SIP going forward. Um, and then there's

1:18:18a few things in blue where we've um I

1:18:22want to highlight that that project

1:18:24there that's highlighted in blue in the

1:18:26cells that was $40 million. We talked

1:18:29about this one last week. Um, it's split

1:18:32in a way. I just was mentioning to you

1:18:34$4 million for having funds to make sure

1:18:37that we

1:18:39can develop the project to go and get

1:18:42the construction money.

1:18:44Um there's just a few others I'm going

1:18:47to try and touch on real quickly.

1:18:51Yeah, please if you could go to the fire

1:18:54department.

1:18:56So, fire department, you can see we

1:18:58moved out the fire station.

1:19:02And then in housing, just below that,

1:19:05you can see we've removed

1:19:08the design and construction all phases

1:19:10for Tacoma and Oracawa as well. So,

1:19:14those are sitting out in the parking lot

1:19:15way out on the right. That's 35 million

1:19:17bucks. You can scroll down to the next

1:19:19yellow. You see, oh, wait. Uh, that $30

1:19:23million right there with housing. That's

1:19:25that authorized uh that's the borrowing

1:19:27authorization that was moved out a few

1:19:30years. That's why it's highlighted in

1:19:31blue

1:19:34down below. Yeah. And then you can just

1:19:36scroll down. Erica,

1:19:36>> can I can I ask a question about that?

1:19:38>> Does their override cover the debt

1:19:40service on that?

1:19:42>> Does their Yes. Correct. Yes. Their

1:19:44existing as Brooke explained last week,

1:19:46the $6.5 million

1:19:48>> will cover that debt service. Yes. That

1:19:51Yes.

1:19:52>> Okay.

1:19:55Oh, Mary Longacre has a question online.

1:19:59Mary,

1:20:02>> thank you, Don. If I may ask Mr. Shears

1:20:04through you, um, can you provide a

1:20:07little bit more of an explanation

1:20:09um, about how items in the parking lot

1:20:11will be treated? My assumption is that

1:20:15while they may not be included in the 10

1:20:17years shown on the spreadsheet, they

1:20:20could re-enter at any time based on a

1:20:23changing priority or other need or are

1:20:27you saying that by putting them in the

1:20:29parking lot, they will not appear at all

1:20:31in the next 10 years?

1:20:35>> So the

1:20:38well I mean they can always come back

1:20:39in. So, for instance, the two that you

1:20:41see towards the bottom of the screen,

1:20:42the two housing ones, the the feedback

1:20:46from the select board last time we

1:20:49talked about this was, hey, let's let's

1:20:52finish weight drive first and then wait

1:20:54and see were the exact words and then

1:20:56we'll wait and see how that works and

1:20:58and figure out if we can pull those back

1:21:00in. If some of the other ones, like the

1:21:03coastal resilience ones, if this was a

1:21:0520-year plan, you'd probably see this

1:21:07the actual

1:21:09construction of whatever it is in a

1:21:1220-year horizon, but you don't see it in

1:21:14the 10-year horizon because we're not

1:21:15going to do it in the next 10 years.

1:21:18>> Yeah. So, things c can come in and out,

1:21:20Mary. And um I mean like for example the

1:21:23central municipal facility, we know that

1:21:26we need offices, but we're looking at

1:21:29alternative ways to have more of a

1:21:31campus. So there there are things that

1:21:33are in flux.

1:21:36>> So there the parking lot they're not

1:21:39cancelled, they're just parked.

1:21:42>> Yeah. Thank you.

1:21:46>> Good answer.

1:21:47>> Anyway, so that's how that's how you

1:21:48read it. So, I think where we left it is

1:21:51you're you're going to try and rank rank

1:21:55the next three years. So, 28, 29, and

1:21:5730. And then we'll see where we get to

1:21:59after that.

1:22:01>> Okay. So, we'll do our homework,

1:22:04>> I think.

1:22:04>> Thank you.

1:22:05>> Yes. The rest of us will do our homework

1:22:09>> or and send it in.

1:22:11>> You're the you're the top student for

1:22:12today. [laughter]

1:22:14That's a star.

1:22:16Well, I was I I was fortunate enough to

1:22:18be familiar with a few of them anyway,

1:22:20but yeah, there's some you just got to

1:22:22tick through and say, "Yeah, that's just

1:22:24going to definitely be an article 10

1:22:26like the roads." I still would like to

1:22:29know about the dorm improvements because

1:22:31I

1:22:33I kind of tempted to have us encourage

1:22:36that in article 10 because if we all

1:22:38back article 10 in the warrant, then I

1:22:40think that's putting a stronger message

1:22:41behind that and it does seem like they

1:22:43need that. But that it's over $5

1:22:46million. So,

1:22:48>> Brooke,

1:22:49>> um I just want to confirm that the

1:22:52process is we take the spreadsheet, we

1:22:55add our information, we save it and

1:22:57email it back to you, Rick.

1:23:00>> Yes. Right. Yes.

1:23:02>> It's not like a shared doc, Jill, where

1:23:04if you save it, he can see it.

1:23:06>> I was just hearing you

1:23:08>> email it back to him, right?

1:23:09>> Yeah.

1:23:10>> It's not

1:23:11>> It's not like a Google doc. I don't know

1:23:13if everybody is on one drive, so I think

1:23:15you're better off just sending it back

1:23:17to me. I can just cut and paste them

1:23:18right down the spreadsheet.

1:23:21>> Oh, did you get that, Brooke? Okay.

1:23:24>> Yes, that's what I thought. I just had

1:23:26heard Jill thought she submitted it and

1:23:28I just wanted to make sure the process

1:23:30was clear to everybody.

1:23:32>> Okay. May I ask one little followup? Are

1:23:34we thinking this is going to be ready

1:23:36for next week

1:23:39>> or what? For Tuesday?

1:23:40>> No, Wednesday. the seventh

1:23:44>> um

1:23:45>> for continued review. Is that what we're

1:23:47going to do?

1:23:48>> Is that what we're shooting for?

1:23:50>> I can be ready.

1:23:51>> I will commit to doing one tomorrow.

1:23:54>> H

1:23:56>> We've got a lot of stuff between now and

1:23:57then.

1:23:58>> I'd like two weeks. Please, can I have

1:24:00an extension on my homework?

1:24:01>> No, no, Bob. We actually the capital

1:24:03committee has to start like meeting.

1:24:05>> We have five meetings in a row this

1:24:07week.

1:24:07>> Yeah, I know.

1:24:08>> And I don't have time to do this. So,

1:24:10you can do it without me if you want in

1:24:12a week, but I won't get it done more

1:24:13than likely by next Wednesday.

1:24:15>> We know your opinions come fast, so I

1:24:17feel like if you just started working on

1:24:19it, you could get going on [laughter]

1:24:20it.

1:24:21>> I have to get up at 3 in the morning.

1:24:23You want to get up with me and we'll do

1:24:24it then? [laughter]

1:24:26>> I mean, seriously, I we meeting I have a

1:24:28two meetings tomorrow.

1:24:29>> Why don't we tentatively put it on for

1:24:31next week and if we're not complete,

1:24:34we'll put it on in two weeks.

1:24:36>> Yeah. And I really do want your

1:24:37feedback, Bob, because you actually know

1:24:39a lot about these, a lot about

1:24:40everything in it. So that's all I mean.

1:24:44>> Okay,

1:24:44>> Madam Chair, back to I I don't mean to

1:24:47prolong this, but back to my original

1:24:49comment about the CIP being the select

1:24:53board's plan.

1:24:55I don't I understand Capcom would like

1:24:59to start reviewing things, but there's

1:25:01nothing for them to review until this

1:25:03process is complete. So I I don't know

1:25:05that it needs to be rushed because

1:25:08there's not going to be a lot of

1:25:11unvetted projects that is going to be on

1:25:13there for fiscal 28 and based on the

1:25:16discussion that we've heard so far there

1:25:17will be very few debt exclusions.

1:25:22So just I'm just I'm just saying I don't

1:25:24know there's a big rush. We don't want

1:25:26to linger of course.

1:25:28>> Yeah, I agree. Well, then then what I

1:25:30just think about your timeline when you

1:25:32ask us to produce a report.

1:25:34>> Sorry, I can at least get fiscal 28 done

1:25:37for next week.

1:25:38>> 29 and 30 might take me a little longer,

1:25:40but I'll get I I will get fiscal 28.

1:25:43>> We'll put it on the agenda for next

1:25:44week. If we're not fully ready, we can

1:25:47continue it to the following week

1:25:50>> or we can discuss a little bit and then

1:25:52discuss the next week, too. Um, okay.

1:25:55We're going to move on to select board

1:25:56reports and comments. First up, we have

1:25:58a discussion regarding town concessions.

1:26:00Judy's Surfside and Children's Beach. I

1:26:03believe that Charlie Palaki is joining

1:26:05us online. Libby, did you

1:26:07>> He is just just a little bit of

1:26:08background on this and some of this is

1:26:10in the presentation. Um we've had some

1:26:12internal discussion about this um a few

1:26:15times now. In 2024, there was a study of

1:26:20the three concessions, Jettis, Surfside,

1:26:23Children's, and and sort of a side

1:26:25concession, which is the tennis courts

1:26:27at Jetty's. And um that study was

1:26:31looking at coastal resiliency measures

1:26:33at each of those um because of their

1:26:36locations and physical um condition and

1:26:40what sorts of things they might need.

1:26:41And the the I kind of one of our themes

1:26:44here is that we need some direction from

1:26:46the board which will help inform all of

1:26:49us as to how much work we may or may not

1:26:52want to put into a particular

1:26:54concession. Some concessions will

1:26:56depending on the type of work needed hit

1:26:59a trigger for flood mitigation measures

1:27:03or um

1:27:05what is it called then storm pathways

1:27:09storm tide pathway requirements and um

1:27:12we can advise further on that but that's

1:27:15just a little bit of background and

1:27:16Charlie has prepared um this

1:27:19presentation that he'll take us through.

1:27:21Charlie.

1:27:23>> Uh, good evening. Charlie Balaki, parks

1:27:25and recreation manager. Uh, here to

1:27:27discuss the future of several town

1:27:28concession facilities and more

1:27:30specifically some of the decisions we

1:27:32need to uh begin to make about these

1:27:33properties. Uh, the goal of tonight will

1:27:36not be to simply look at these

1:27:37concessions as revenue producing

1:27:38operations. These are town-owned public

1:27:41facilities, many of which provide

1:27:43bathrooms, beach access, food service,

1:27:44and other amenities. As these buildings

1:27:47age, we need to consider how much we

1:27:48invest in them, how coastal resilency

1:27:50affects those investments, and what

1:27:52operating model makes the most sense

1:27:54going forward. Could you go to the next

1:27:56slide, please, Erica?

1:28:03Uh, we're going to look at four

1:28:04concession operations. Surfside Beach,

1:28:06Jetty's Beach, the Jetty's Tennis

1:28:08Concession, and Children's Beach. For

1:28:10each location, we'll look at the

1:28:11physical condition of the facility,

1:28:13coastal resiliency where applicable, the

1:28:15current contract and revenue picture,

1:28:17the potential future options. The intent

1:28:19is sufficient uh is to finish with some

1:28:21specific action items to get direction

1:28:23on how the board would like staff to

1:28:24proceed. Uh the next slide, please.

1:28:28Uh a lot of the information we will

1:28:30discuss tonight uh comes from the beach

1:28:32concessions resiliency study completed

1:28:33by Weston and Samson in October of 24.

1:28:37Uh it was a multi-disiplinary effort

1:28:39involving preservation, sustainability,

1:28:41coastal resilience, parks and recreation

1:28:43and real estate. Uh the options that

1:28:45were presented were reviewed jointly by

1:28:48HDC and Cong. Uh the process is

1:28:51important because the solutions for

1:28:52these buildings cannot just be

1:28:53considered strictly as a facility

1:28:55standpoint. We also have to consider

1:28:57historic preservation, environmental

1:28:59permitting, accessibility, and coastal

1:29:01resilience considerations.

1:29:03And next slide, please.

1:29:08Uh starting with Surfside, this is

1:29:10actually the least complicated of the

1:29:11beach concessions from a coastal

1:29:12resiliency standpoint. The building

1:29:15currently resides outside the FEMA VE

1:29:17zone and outside the priority high and

1:29:19moderate coastal areas uh risk areas as

1:29:22identified in the town's coastal

1:29:23resiliency plan. Uh based on the current

1:29:26information, there's no immediate

1:29:27coastal resilency projects required for

1:29:29Surfside. Gives us some flexibility to

1:29:31focus on the condition and future use of

1:29:33the facility itself.

1:29:35Can you go to the next slide, please,

1:29:36Erica?

1:29:39Uh, Surfside is currently in its second

1:29:40year of its contract running through

1:29:42November of 29 with the Surf LLC. The

1:29:45current contract totals approximately

1:29:46$250,000

1:29:48compared with $210,000 under the

1:29:50previous contract. Historically, the

1:29:53numbers show that Surfside is a fairly

1:29:54consistent revenue producing concession

1:29:56for the town. From 2017 through the

1:29:58available 2024 data, the town received

1:30:00approximately 377,000 in lease and

1:30:03revenue share payments. Could you go to

1:30:05the next slide, please?

1:30:08Uh, the biggest question for Surfside is

1:30:10what we want the facility to look like

1:30:12long term. The exterior needs some

1:30:14improvements. The bathrooms have been

1:30:15evaluated as part of the SMRT restroom

1:30:18study, and we have some drainage,

1:30:19septic, and parking lot needs to resolve

1:30:22out there.

1:30:24Making a substantial investment.

1:30:25However, before making a a substantial

1:30:27investment, we should decide what we

1:30:29want the continuing program model to

1:30:31look like at the building. One option is

1:30:33to retain the kitchen and traditional

1:30:34concession operation. The other is to

1:30:37transition towards a food truck model

1:30:38and potentially convert more or all of

1:30:40the existing building into bathrooms. Uh

1:30:43that programming decision we'd like to

1:30:45make uh before we do any significant

1:30:47improvements to the building.

1:30:50Uh next slide please Erica.

1:30:53Uh moving to jetties. This is a very

1:30:54different situation. Here is a

1:30:56concession is a significant oper

1:30:57operation a big revenue generator. Uh

1:31:00but the building also presents a much

1:31:02more significant coastal resiliency

1:31:04challenge.

1:31:05Next slide, please.

1:31:09Uh several alternatives were evaluated

1:31:12for jetties. One option was relocating

1:31:13the building further south to the

1:31:15existing parking area. That option was

1:31:18ultimately problematic because of

1:31:19historic preservation concerns and the

1:31:21relocation would still leave the

1:31:22building in a resource area.

1:31:24Public feedback also showed that there

1:31:26was limited support for relocation of

1:31:28the building. The preferred alternative

1:31:30emerged uh from the process that to

1:31:32raise the existing building in place

1:31:34where flood mitigation would minimize

1:31:36changes to the historic building and the

1:31:38site. Uh it is important however to

1:31:40recognize that this is not a permanent

1:31:42solution. Even after being raised, the

1:31:44building will be still be vulnerable to

1:31:461% wave action in 20150. Uh it should be

1:31:49viewed as a nearterm resiliency

1:31:51investment rather than a permanent

1:31:53solution.

1:31:56>> Next slide please.

1:31:59We have a current uh estimated

1:32:01resiliency work is approximately $6

1:32:03million. Uh in the SIP, we kind of

1:32:05talked about last week that the overall

1:32:07estimate for jetties was in the $16

1:32:08million range. This included the $6

1:32:11million for resiliency work, but also

1:32:13included some very high level estimates

1:32:15on renovating the interior of the

1:32:16existing concession and the bath house.

1:32:21Next slide, please.

1:32:23Uh Jenny's is by far the largest of the

1:32:25concessions that are operating

1:32:26financially. Uh the current contract

1:32:28expires at the end of 2026 and a new

1:32:30contract was awarded in May uh to the

1:32:32Sandbar for approximately $1.13 million

1:32:35along with a 7.5% revenue share.

1:32:38Historically, this operation has

1:32:40generated significant revenue. Available

1:32:42data shows nearly $17.9 million in gross

1:32:45concession revenue and approximately

1:32:46$1.6 $6 million return to the town

1:32:49through lease payments, revenue share,

1:32:51and donation or gifts. Uh so unlike

1:32:53other some of the facilities we'll

1:32:54discuss, there's a sub substantial

1:32:57operating business here at this

1:32:59property. Next slide, please.

1:33:02Uh at the same time, we have several

1:33:04building issues that cannot be ignored.

1:33:06Electrical panel is at capacity. There's

1:33:08some corroded pipes underneath the

1:33:09building that will need replacement.

1:33:10Windows and doors uh in the building

1:33:12need attention. Uh the bathrooms have

1:33:15been identified is for a future

1:33:16renovation. Uh some work is already

1:33:19underway on the exterior of the building

1:33:21of the bath house. Uh the concession

1:33:22area has installed a second walk-in. The

1:33:24new flooring in the building and town

1:33:26administration along with the sewer and

1:33:28storm water teams are looking at uh

1:33:30improvements to the lower parking lot

1:33:31and the access road.

1:33:33Uh the challenge is coordinating these

1:33:35short-term improvements with the larger

1:33:36resilency project so we're not making

1:33:38investments today that could conflict

1:33:39with tomorrow.

1:33:42Next slide, please.

1:33:44Uh Jay's concession is pretty much very

1:33:47straightforward. It's on a new four and

1:33:48a halfyear contract to begin this year

1:33:50for approximately $106,000 plus 4%

1:33:53revenue share. The building interior was

1:33:55recently refreshed uh with paint and

1:33:57flooring. Uh unlike the beach

1:33:59concession, we do not have an immediate

1:34:00coastal resiliency concern at this

1:34:02location.

1:34:05Next slide. Uh the primary opportunity

1:34:07here is to create a better bathroom

1:34:09facility. We have approximately $700,000

1:34:12remaining from the tennis court

1:34:13construction appropriation. So, one

1:34:16concept would be to reallocate a portion

1:34:17of those funds to improve this building

1:34:20uh creating an exterior access uh men's

1:34:24and women's ADA accessible bathrooms.

1:34:26This would greatly improve the tennis

1:34:27court experience, not having to use a

1:34:29porta potty and it would just add

1:34:30another uh public amenity to the overall

1:34:32jetty's property.

1:34:35Next slide. Uh Children's Beach is where

1:34:38the discussion becomes a little bit more

1:34:40complicated. We have a long history or

1:34:42difficulty maintaining sustainable

1:34:44concessions at the building. The

1:34:46building requires substantial investment

1:34:48in coastal resiliency requirements uh

1:34:50that increase the cost of renovating it.

1:34:54Next slide, please.

1:34:56Uh the history is kind of important

1:34:57because it's not new. Going back to

1:34:592011, the town has repeatedly had

1:35:01difficulty attracting and retaining

1:35:02concession. There have been cons uh

1:35:04solicitations where only one bidder

1:35:07applied or in periods where no biders

1:35:08were applied, contracts ended early,

1:35:10waved or disputed rent and renovation

1:35:12projects that could not move forward uh

1:35:15because they exceeded available funding.

1:35:18And the important thing is here kind of

1:35:19look at is since 2013 approximately

1:35:22$83,000 in contract payments have been

1:35:24lost due to concession turnover uh

1:35:26facility issues and uh and co obviously

1:35:29took a little bit of a hit. Uh so we

1:35:31consider other major investments in this

1:35:33building, we should do so in the context

1:35:34of more than a decade of difficult

1:35:36operating history.

1:35:39Next slide, please.

1:35:43Uh the current contract

1:35:45with the surf runs through the end of

1:35:462026 and totals approximately $138,000.

1:35:50Uh looking at the historical revenue,

1:35:52the scale of the operation is

1:35:54substantially different from Jetty's. Um

1:35:56obviously it's a smaller location. Uh

1:35:58the available data that I had to work

1:36:00off shows about $466,000 in gross

1:36:03concession revenue in that time with

1:36:04approximately 159,000 returned to the

1:36:06town in the form of lease payments and

1:36:08revenue share. Uh the distinction

1:36:10becomes important when we compare

1:36:12revenue generating capacity at a

1:36:13concession with a capital investment

1:36:15required uh for the future. Next slide

1:36:19please.

1:36:21We've also had constant uh fairly

1:36:24consistent feedback from concessioners

1:36:26that the concession is difficult to

1:36:27operate, noting that the facility is

1:36:29small, there's limited storage, limited

1:36:31preparation, refrigeration space,

1:36:33electrical panel is constrained, and the

1:36:35equipment that is there shows

1:36:36significant wear and tear. Um though

1:36:40those issues are compound and those

1:36:41issues are compounded by limited foot

1:36:43track rent obligations that don't always

1:36:46align with the economical operation of

1:36:48the facility.

1:36:50And next slide please.

1:36:53So we had asked MRT to give us uh

1:36:56evaluation of renovation costs doing

1:36:58very high level based on per square foot

1:37:00and usage of the building and the

1:37:01estimated ranges came between $496 to

1:37:04$873,000

1:37:06just for the building improvements.

1:37:08The complication is that any of those

1:37:10renovation scenarios trigger the coastal

1:37:12resiliency requirement is required by

1:37:14the 50 FEMA percent rule, which in its

1:37:16simplest forms means if the cumulative

1:37:18cost of a renovation exceeds 50% of the

1:37:21building's value, it must be made

1:37:22compliant.

1:37:24Once resiliency is incorporated, the

1:37:26alternatives become much more expensive.

1:37:28Three options that we looked at in the

1:37:29study for coastal resiliency range from

1:37:312 million on the low end to 4.6 on the

1:37:34high end. Next slide, please.

1:37:39Just to kind of put that into cost

1:37:40perspective based on the current lease

1:37:42structure uh in increasing annually for

1:37:46the required base 3% each year a $2.5

1:37:49million investment would take

1:37:50approximately 45 years of cumulative

1:37:52rent to recover and that doesn't include

1:37:55any ongoing maintenance that would have

1:37:56to happen in that time and just for fun

1:37:59the $5.5 million high end the break even

1:38:02point would be uh 66 years. That's not

1:38:04to suggest that every public facility

1:38:06needs to pay for itself. Public

1:38:08bathrooms, beach access, recreation, and

1:38:10other community benefits obviously have

1:38:11a value beyond the concession revenue,

1:38:14but it does illustrate the scale of a

1:38:16capital investment compared to the

1:38:17revenue revenue generate generated at

1:38:19this particular operation.

1:38:23Next slide, please.

1:38:26Uh for that reason, uh staff is

1:38:28recommending maybe we consider operating

1:38:30a different model. Uh rather than making

1:38:32a multi-million dollar investment to and

1:38:34to preserve the existing concession

1:38:35building, the concept would be to

1:38:37demolish or relocate the building and

1:38:38repurpose it somewhere else, install a

1:38:40concrete slab capable of supporting the

1:38:43existing restroom trailer and bring in a

1:38:45food truck and picnic tables to the

1:38:47area. Uh the preliminary cost there is

1:38:49somewhere between $150 to $250,000.

1:38:52This would maintain the basic public

1:38:53service at Children's Beach while

1:38:55significantly reducing the town's

1:38:56capital exposure and giving us more

1:38:58flexibility as coastal conditions and

1:39:00recreation needs change over time.

1:39:03Next slide, please.

1:39:06Uh so bring it all together, uh we're

1:39:08looking for direction in kind of four

1:39:09areas. Children's Beach, we need to

1:39:11determine whether to proceed with one of

1:39:13the resiliency options and building

1:39:14improvements or move towards an

1:39:16alternative model. Jetty's Tennis. We

1:39:19would like uh to move forward with

1:39:21planning for the bathroom and building

1:39:22improvements.

1:39:23Jetty's concession. Uh we are

1:39:25recommending to continue work necessary

1:39:27to raise the building to have a goal uh

1:39:30with a defined project and funding

1:39:32strategy in place before the new lease

1:39:33expires.

1:39:35And then finally at Surfside, uh we need

1:39:38some direction as to the long-term

1:39:39operating model model, whether we retain

1:39:41the kitchen, renovate the existing

1:39:43building, or explore transitioning uh

1:39:45the food service to a food truck and

1:39:47converting buildings to the bathroom.

1:39:49Common theme is we want to establish a

1:39:50long-term use of these facilities uh

1:39:52before we commit substantial capital to

1:39:54them.

1:39:56Next slide.

1:39:58I'm happy to answer any questions and

1:40:01I'd love to hear what the board's

1:40:02thoughts are and opinions and get some

1:40:04direction as to which way you'd like us

1:40:06to proceed.

1:40:18>> M how I noticed that we are the

1:40:22concessionary the jetties is fixing the

1:40:24floor and doing some other work. Is

1:40:26there a way to uh you know have town

1:40:30meeting approve it and put these bids

1:40:32out to a longer period so and putting

1:40:34the responsibility on some of this to

1:40:36the concessionires? That is one

1:40:38question.

1:40:41>> Oh, that's certainly something we could

1:40:42explore. Um I know we talked with the

1:40:45existing concessionire at Jettis. They'd

1:40:48approached the town about adding an

1:40:49awning uh to the town, which of course

1:40:51requires town procurement law, and it

1:40:54came in at about a $250,000

1:40:57um price tag, which they then declined

1:40:59to do. And any improvements that are

1:41:00made to the building uh the town ends up

1:41:02with ownership of as part of the lease,

1:41:05>> right?

1:41:05>> But it's something we could explore.

1:41:07>> Yeah. And and as an operator, it you

1:41:10know, you don't want to have a five-year

1:41:12lease and and then not be able to

1:41:13advertise it. But if you have a longer

1:41:16term, it might be more worth it worth it

1:41:18to do it or if you can do more business.

1:41:20I think part of what's happening uh with

1:41:23a couple of these concessions, not

1:41:24necessarily jetties, but the others is

1:41:27that we're they're trying to be more

1:41:30than what they are. There are, you know,

1:41:32it's a a hamburgers and and ice cream at

1:41:34the beach. It's, you know, people are

1:41:36trying to be restaurants and trying to,

1:41:38you know, be more. I think that we

1:41:39should be, you know, if our rent is low,

1:41:41that's fine. It's providing the service

1:41:43that you want at a beach which is

1:41:44hamburgers, hot dogs and ice cream you

1:41:46know and some bathrooms. I think you

1:41:49know uh you know the history of these

1:41:53that's what the jetty started out as and

1:41:54then Tim Madden added liquor and you

1:41:57know and then it became something

1:41:58different over time. There's a pressure

1:42:00to do that, but I think we should resist

1:42:03that pressure in the other places. Keep

1:42:05them uh at a, you know, keep them small

1:42:07and manageable. And maybe we should put

1:42:10the, you know, from a modeling

1:42:12standpoint, maybe we should put together

1:42:15the surf side and the children's beach

1:42:18to get one person to bid on and operate

1:42:21both of them. They're both similar. It'd

1:42:22be the same type of thing. Uh

1:42:26so, so it so that's one part of it. Uh

1:42:29but I think the expectations are too

1:42:31high. Some of the people are bidding. It

1:42:33should be they have got to lower their

1:42:35expectations. Uh the food truck model at

1:42:39Jetty at Children's yet maybe at

1:42:42Surfside I don't think it's necessary.

1:42:44Keep it as a you know keep it as a

1:42:45hamburger stand. It's great. Uh I think

1:42:49if we are going to do a food truck at

1:42:51Children's I don't think it needs to be

1:42:53a pad where the old building was. That's

1:42:55just going to bring, you know, notice to

1:42:57the fact that the building is gone and

1:42:59wasn't there. You know, make a nice

1:43:01place for it near, you know, near the

1:43:03road. Find a good spot there, uh, where

1:43:05it will fit. You know, maybe keep the

1:43:08building for bathrooms, uh, if that's

1:43:10the case. Uh, and don't don't change it

1:43:13so that you have to raise it that much.

1:43:15Turn it into bathrooms and keep it under

1:43:16the 50% for now and worry about that

1:43:19later. That's what I think for

1:43:21children's and for Surfside. Jetty's is

1:43:23a different topic, but I'll talk about

1:43:25that. I'll let everyone else speak.

1:43:28>> Okay. Um Brooke has her hand up, but

1:43:30just quickly on children's

1:43:33um I don't think the building can come

1:43:35down because of its history. Um but

1:43:39there was a thought of potentially

1:43:41containing the pumps that are needed

1:43:44down there inside the building.

1:43:48We already have portable bathrooms

1:43:50because the bathroom renovation was so

1:43:52expensive. Um that was one of my first

1:43:55years on the board with you guys. Um but

1:43:58let me go to Brooke.

1:44:01>> Um yeah, I mean obviously Jetty's is

1:44:04probably the most challenging one. Um I

1:44:08the Jetty's concession I I think um if

1:44:13the bathrooms are needed for the tennis

1:44:15building and we have the allocation from

1:44:17the corpse I I'm would favor going

1:44:20forward with that um can it be wrapped

1:44:23in with the other bathroom projects that

1:44:25are going on now um as a contract

1:44:28amendment as opposed to starting from

1:44:29scratch just as a wild thought. Um, and

1:44:33then for me for Children's Beach, I

1:44:36really like the idea of not doing a

1:44:39major project, not triggering the

1:44:40coastal resilience stuff and and trying

1:44:43even with this next contract

1:44:46um the food truck model and see if it

1:44:50works um before we do anything major to

1:44:53the building at all. Just um see how the

1:44:57food truck model works. And um I mean

1:45:01the idea that we're we have bathrooms

1:45:03down there that get put away seasonally

1:45:06and uh we don't have offseason weather

1:45:10impact um on facilities is an

1:45:14interesting one to me. And Surfside

1:45:17Beach

1:45:18I kind of agree with Matt. I mean though

1:45:22in terms of

1:45:24not building more than might be

1:45:26necessary but I do think it's very

1:45:29people what people want today is not

1:45:31necessarily hot dogs and hamburgers.

1:45:33People's pallets are very different in

1:45:35terms of um healthful eating and so

1:45:37forth. So I'm not sure um

1:45:42that I want to I want to presume what

1:45:44would sell, but I also don't think we

1:45:47need super elaborate facilities there.

1:45:50Um, keep it simple. Um,

1:45:54and there was a food truck down there at

1:45:56one point, right?

1:45:58>> Yes. The current concessionaire operates

1:46:00a food truck mainly as the main kitchen.

1:46:02There's a strange caveat that we're kind

1:46:04of looking into about the building where

1:46:06they couldn't have a fry lighter in the

1:46:08building. And so the I guess the work it

1:46:11just says it couldn't be in the

1:46:11building. Doesn't say it can't be on the

1:46:13property. Um, and so they're operating

1:46:16out of a food truck now. Uh that's how

1:46:18their their main kind of kitchen is

1:46:20there. I believe you order at the

1:46:21building and they have ice cream and

1:46:23other things out of the small kitchen

1:46:24area there but then operate the the food

1:46:27truck as the actual hot kitchen.

1:46:30Well, I think that's interesting. It's

1:46:31already working, right? So, um as a

1:46:34model and it's been that way for a

1:46:36while. So, putting a whole lot of money

1:46:38into that building if something's

1:46:40functioning fine with the with the

1:46:43combination of a food truck as a kitchen

1:46:45and um seems okay to me.

1:46:51That's it.

1:46:55>> I take public comment first or

1:46:56>> Sure.

1:46:58>> Hi.

1:46:59>> Hi.

1:47:00>> Can you hear me? Or you can. Um

1:47:01>> just state your name, please.

1:47:02>> My name's Bodie. Very nervous to be

1:47:04here. Um, old named

1:47:06>> Bowden Lovering, sorry. Um, I'm very

1:47:10passionate about this. I have a lot to

1:47:12go over here just because I mean there's

1:47:13a lot to uncover at least just from the

1:47:16front of children's speech. Um, I think

1:47:18Surf Side is well what it is. I don't

1:47:20think it we really need much change

1:47:22there or at Jetties. I mean moving

1:47:23jetties is not my expertise. I sell ice

1:47:25cream.

1:47:28Um, but I guess let's just jump right

1:47:31into this. I want to start by saying

1:47:33that I am 19 and that is very important

1:47:36to my perspective and how I feel on this

1:47:37topic. I would like to start by saying

1:47:40that not jetties but as it stands the

1:47:43lease for Surfside and Children's Beach

1:47:46are pretty much the golf club

1:47:48scholarship for people who want to go

1:47:50into the hospitality business such as

1:47:52myself and have an actual outing into it

1:47:55on this island. As we know, um, you

1:47:58know, uh, rent is reasonable at these

1:48:00two locations. Um, Children's Beach, it

1:48:03averages around 25 grand and at

1:48:04Surfside, I think it's rent 50 to 60

1:48:06grand. That's very reasonable

1:48:08considering the potential for money to

1:48:10be made. And considering that if I

1:48:12wanted to go through NIR, I'd probably

1:48:14have to,

1:48:15you know, I I don't know. So, I don't

1:48:17have enough stuff to sell to be able to

1:48:19rent from NI, it'd be what, like 150,000

1:48:22a year. I think that's pretty hard to

1:48:24tack on. Um, I want to start by

1:48:27addressing some of the current issues at

1:48:30Children's Beach by reviewing the

1:48:32history of Children's. Um, so 2011, some

1:48:36guy puts in a bid and then runs away

1:48:38under the name ASHack. And no one gets a

1:48:41lease until 2014. One bid goes out for a

1:48:44three-year lease. This is very

1:48:46important, and this was not covered

1:48:48properly in the presentation. I believe

1:48:50it says in 2015, word for word,

1:48:52renovation projects were cancelled due

1:48:54to bids exceeding costs of 900,000

1:48:57versus a projected 550 grand. $350,000

1:49:02is a lot. I mean, that's a long shot. If

1:49:05it was within a few grand, that would

1:49:06make sense, but that's almost well,

1:49:08that's a little more than half of the

1:49:10number there. Um, and then the person

1:49:14with the lease during the time in 2016,

1:49:16the operator refused to pay the final

1:49:17rent payment due to poor conditions,

1:49:20lack of action by town. And I don't know

1:49:23if a bone was thrown to him, but if

1:49:25nothing if this money was raised and or

1:49:28he or she, this person, sorry, was told

1:49:29that they were going to have renovations

1:49:31and they did not receive any throughout

1:49:33their years, I would be pretty mad. I

1:49:35don't know if I wouldn't pay the lease,

1:49:37but I will say I do not blame him. The

1:49:41issue of children's beaches, it's always

1:49:43been changing as we've seen in the past

1:49:4410 years. People come and people go,

1:49:46whether that's for good reasons or bad

1:49:48reasons. Um, some people because, well,

1:49:50they just ran away and disappeared. Some

1:49:53people because they couldn't afford to

1:49:54keep the upkeep. But I think what we're

1:49:56seeing now is I guess I guess I should

1:50:00have said but I it's assumed to me after

1:50:032016 you know we had a few years of

1:50:05prosperity then CO hit and there's no

1:50:07need to explain what impact CO had on

1:50:09local businesses. Um obviously people

1:50:13weren't outside the location was pretty

1:50:15much dead. Uh it's been changing rapidly

1:50:18over the past 10 years and

1:50:21a lot a good few of those years there

1:50:23was nothing there to begin with. Now,

1:50:25the ladies there right now have sort of

1:50:27brought it out of, I don't know, a

1:50:30hiding period. If you can imagine, it

1:50:32was an undesirable location. No one

1:50:34would go because it would always change

1:50:35and no one knew what they wanted. And

1:50:37now people are starting to go. Um, I

1:50:39know some of the people who live out by

1:50:41Children's and they say great things

1:50:42about it. Um, not going to comment on

1:50:45the menu just cuz I I don't guys, I make

1:50:48ice cream. You know what I'm saying? I

1:50:50do think a simpler menu is always a

1:50:52better idea when you're at the beach

1:50:53just for a children's sake. I know when

1:50:55I was little, I would never dare to eat

1:50:57fish or shrimp or, you know, if I saw a

1:51:00hot dog that didn't say like Frank

1:51:02kosher hot dog, it said wag you. I

1:51:04wouldn't know what that was. I'd get a

1:51:05little scared even if dad told me it was

1:51:06good. Um, but yeah, see these are the

1:51:10problems with the shack. And I would

1:51:12argue a lot of which are and I don't I

1:51:16don't address this to you guys directly

1:51:17but I will say they are town-caused. Um

1:51:20as we see with the negligence of

1:51:22renovations, renovations have just

1:51:24become more costly and becoming more

1:51:27costly means that there's more upkeep,

1:51:29more things have gone wrong and now

1:51:30we're looking at what like a minimum $3

1:51:32million to fix the shack. That's a

1:51:35problem. But I believe that that being a

1:51:37problem, the cost of this to need to fix

1:51:41the shack through its negligence over

1:51:43the years, I think it's absurd that it's

1:51:46being, I guess, denied because of the

1:51:50money it makes compared to how much the

1:51:52town leases it for. Like I said, this is

1:51:54pretty much the golf club scholarship

1:51:56for local kids who want to get into the

1:51:58hospitality business because we know

1:52:00rent prices and property prices are way

1:52:03too high. Um, but I just want to go over

1:52:07the whole food truck versus concession

1:52:09shack thing. I run a food truck,

1:52:11obviously. I've been running it for a

1:52:12few years, so I have some personal

1:52:14experience. Um, I will say I don't think

1:52:18a food truck is the right idea for

1:52:19Children's Beach. I think Children's

1:52:21Beach should be fully protected and

1:52:23revamped. I don't think because we've

1:52:26done one projection or a few projections

1:52:28that say it's going to be anywhere

1:52:30between 2 million and 5 million that

1:52:31that's the end- all beall solution. I

1:52:33think within the projected next uh 2 to

1:52:363 years, I think it might be possible to

1:52:39find other solutions that might be more

1:52:40cost effective. But anyways, a food

1:52:44truck wouldn't work because trucks

1:52:46aren't usually like a sole business.

1:52:48They're always complimentary. So, if you

1:52:50notice,

1:52:52Milliey's has theirs for catering. You

1:52:54know, Island Kitchen has it for

1:52:55catering, private events. I have mine

1:52:57for a summer job. That's the problem.

1:53:00It's always complimentary to a

1:53:01business's services or your lifestyle.

1:53:04If I had a well-paying year- round job,

1:53:06I wouldn't be able to run the ice cream

1:53:07truck. But I don't. I choose to run the

1:53:09ice cream truck. That gives me a very

1:53:12short window. Very, very short window

1:53:15because it means I need something to do

1:53:17before the season and after, which also

1:53:20means you can really only start heading

1:53:23out there once, you know, July hits or

1:53:26the end of June. you couldn't have a

1:53:28pre-season or a postseason like you

1:53:29could if you were a developed shack and

1:53:31people knew you were there. Um,

1:53:34but I do understand trucks are awesome.

1:53:38You got low upkeep, minimal management,

1:53:41little to no maintenance, you know what

1:53:43I mean? It's pretty nice. But all of

1:53:45these are a curse and a blessing when it

1:53:46comes to leaving a food truck stationary

1:53:48at a location like Children's Beach. Um,

1:53:51these exact reasons could be stated as a

1:53:53burden. An ease of operation

1:53:56is nice, but that restricts everything

1:53:59because on a food truck you have minimal

1:54:01space. Um, you have minimal storage, but

1:54:04the most important things people don't

1:54:06seem to consider are how you have

1:54:08minimal clients and minimal time and

1:54:10minimal potential for high yield cash.

1:54:13you

1:54:15have the option as a food truck to be

1:54:16mobile because you don't have a set

1:54:19location. And a lot of people think

1:54:20that's an advantage. I don't believe so.

1:54:23I think it's a genuine disadvantage

1:54:24because if people knew you were in one

1:54:26spot and you could have your operating

1:54:28hours upfront all day, I believe more

1:54:30people would come in. I think you would

1:54:32get more business. And I think this is

1:54:34blatantly obvious if you look at revenue

1:54:36numbers between a shack like Children's

1:54:38and then compare it to the ice cream

1:54:39truck. Um,

1:54:42it's also not that profitable like I

1:54:44just said and that's kind of one of the

1:54:47problems because the the entire I guess

1:54:51the sole purpose of the two concessions,

1:54:53Children's and Surfside, is to pretty

1:54:56much be a substantial means to invest in

1:54:58our people. And that becomes pretty

1:55:01obvious when you uh think about

1:55:03replacing the concession with a food

1:55:05truck. If you put someone in the

1:55:06concession, you have the potential to

1:55:09pay out an owner and usually I think

1:55:11it'd be two people. Small stuff, you

1:55:13know, I' I'd run it with two people.

1:55:14Let's assume there's two people running

1:55:16it right now. So, you'll get a rough

1:55:19payout of 100K plus for the both of the

1:55:22owners and around like, you know, 7K for

1:55:24employees. Depends how hard they work,

1:55:26how much they get paid, blah blah blah.

1:55:29Versus if you just put a food truck

1:55:30there, you're going to get a measly 60

1:55:32grand for the owner maybe. And usually

1:55:34food trucks don't have any employees.

1:55:37You might have one or two if you're a

1:55:39catering company. Yeah, because you know

1:55:41who doesn't have the money to go send

1:55:42someone out there. I don't. So I have to

1:55:44be on that truck. Um

1:55:47>> over for Donna's chair right now. We're

1:55:49we're

1:55:50>> you need to wrap up.

1:55:51>> We would like you to encourage you.

1:55:53We're really kind of focused on whether

1:55:54or not we want to spend money on

1:55:56renovating these locations. And

1:55:58>> sorry

1:56:00to three minutes. So Oh, yeah. I'm

1:56:02sorry. I' I've never

1:56:03>> That's okay. This is I'm learning a lot.

1:56:04I appreciate it.

1:56:05>> Pretty much what I'm saying is I don't

1:56:07think the town should treat the

1:56:10concession at Children's like it's a

1:56:13profit b or it's a spending burden

1:56:15because again it is very much the sole

1:56:18purpose of this concession is just to

1:56:21help people get a footing into the

1:56:23hospitality business whereas it would be

1:56:25literally impossible. I'd have to work

1:56:26you know how many years under someone

1:56:28else and prices go up with that. It

1:56:31might genuinely be impossible. What I'm

1:56:33saying is to not consider the cost and

1:56:35how expensive it might be, but to

1:56:37consider how much you could help your

1:56:40community, especially in today's day and

1:56:42age where most of restaurants are

1:56:44corporate owned. We could sort of, you

1:56:46know, shuffle it back. Sorry for taking

1:56:48up too much time, y'all.

1:56:49>> No, you're okay.

1:56:52>> Amy, I'm back.

1:56:55Amy Eldridge, I just um I saw on there

1:56:58the potential for two food trucks and

1:57:01reuse and repurpose of the Surfside

1:57:04building and Children's Beach. Um I just

1:57:06want to remind people about the struggle

1:57:09that food trucks have with the

1:57:12commercial kitchen aspect through the

1:57:14health department and not everybody has

1:57:17access to a commercial kitchen. So,

1:57:21you're limiting what food trucks can

1:57:23actually go out there. And not a lot of

1:57:25restaurants want to share their space.

1:57:28Um, I had a cousin that had a food truck

1:57:29that lost her space when fairgrounds

1:57:31sold. So, it it's kind of risky. And I

1:57:34think it's important if there's already

1:57:35a commercial kitchen at Surfside Beach

1:57:38as well as Children's Beach, they can

1:57:41add the food truck, but it doesn't make

1:57:43sense to take it away because not

1:57:45everybody's going to have that proper

1:57:47spacing. So, you know, I see that the

1:57:50Surfside project is to turn it all into

1:57:52bathrooms. Well, I'd rather see a

1:57:54commercial kitchen and what is currently

1:57:57happening now, which is they're frying

1:57:58food in a truck and then coming through

1:58:00the commercial kitchen with the food.

1:58:02Perfectly fine. But when you start

1:58:04eliminating commercial kitchen space,

1:58:06which is at a premium on this island,

1:58:07and you run the risk of only allowing

1:58:11the handful that are already here that

1:58:13are compliant, you're taking away that

1:58:15option for people. Thanks.

1:58:21>> Oh, you'll got to come to the mic if you

1:58:24don't mind. Oh, I'm sorry.

1:58:26>> I think the I think one of the bigger

1:58:28issues too with putting a food truck at

1:58:30Children's is if we're assuming the food

1:58:31truck does the same numbers as a

1:58:32concession, there's nowhere near enough

1:58:34storage in the food truck to be able to

1:58:35do those numbers and you're going to

1:58:36have to keep some aspect of the shack

1:58:38open for dry storage. Especially if you

1:58:40want to invite other food trucks out

1:58:42there and then it comes a problem of who

1:58:45deserves a spot. But you would still

1:58:47need to keep a piece of the shack for

1:58:48storage.

1:58:52>> Okay, Mary

1:58:54Longre.

1:58:57>> Hi, Mary Longacre. Um, thanks to Amy and

1:59:00Bod for making some of the points I I

1:59:03thought of, but I wanted to um

1:59:07take I wanted to advise you to take a

1:59:08look at the responsibilities that are in

1:59:11the lease for the property itself. Uh

1:59:15the food truck is mobile. So uh if it

1:59:19assuming that you know they're open

1:59:20certain hours, I I don't know if the

1:59:22food truck will then drive away at the

1:59:24end of the afternoon. Uh where owners

1:59:27who or or lease holders who are in the

1:59:29building, you know, might have cleanup

1:59:31tasks, might have other things going on

1:59:33would have more of a presence. Um the

1:59:36the food truck can also decide not to be

1:59:39there anytime they have an opportunity

1:59:41for a better sales day. you know, a

1:59:44catering job as as Bod mentioned or some

1:59:46other event. And so it can be a very

1:59:49irregular presence. Uh so I I I

1:59:52appreciate that you're looking at it. Uh

1:59:54I think that you need to look a little

1:59:56deeper before you make that jump. Uh,

1:59:58and I'd also say if you're looking at

2:00:00renovating these buildings and you might

2:00:03consider whether or not there is room

2:00:05for a small apartment for staff housing,

2:00:08that might help the concessionires

2:00:11um to, you know, be more successful to

2:00:14stay there longer. Um, that's something,

2:00:17you know, I I realize these are of

2:00:18course coastal locations, but something

2:00:20I think the town should consider as to

2:00:22whether or not any kind of housing can

2:00:24be incorporated in the renovations.

2:00:26Thank you.

2:00:29Madam Chair, I just want to clarify and

2:00:31um Charlie could elaborate if needed,

2:00:33but the if big if we were going to try

2:00:37the food truck idea at Children's, say

2:00:41the bid would require the food truck to

2:00:44be there all day and at certain times.

2:00:46It wouldn't be able to just up and drive

2:00:48away whenever it felt like it.

2:00:50>> Correct, Libby. It would it would be in

2:00:52the contract for certain operating hours

2:00:54uh during the day.

2:00:58Paulie.

2:00:59>> Thank you, Madam Chair. Um, this Holly

2:01:02Bachis, preservation planner. Uh, first

2:01:04I want to apologize for not being here

2:01:05while for all of Charlie's presentation.

2:01:07I was actually at open house for my

2:01:09junior. Um, but I was involved with the

2:01:13um the review discussions for these uh

2:01:16structures. And I just wanted to be on

2:01:18record to remind or inform you um that

2:01:21both the Jetty's beach and the

2:01:24children's beach structures are uh

2:01:25historic resources within our local and

2:01:27national historic district. Both of them

2:01:29have actually been surveyed with uh

2:01:31updated form B's with Massachusetts

2:01:33Historical Commission. They're being

2:01:35currently reviewed with um Massachusetts

2:01:37Historical Commission as well as the

2:01:38Naka Historical Commission. Um uh the

2:01:42Jetty's Beach Pavilion is an

2:01:43individually significant historic

2:01:45resource uh built by um actually in 1904

2:01:49uh by PB and Sterns architecture firm in

2:01:52Boston. And both of these structures um

2:01:55are eligible now that we have these

2:01:57updated form surveys for the

2:01:59Massachusetts preservation projects

2:02:01fund. I bring that up because that could

2:02:03be another source of revenue um to go

2:02:06towards a project, not just at the tax

2:02:09base. So before you all make your

2:02:12decision on what actions to move, um I

2:02:14did want to let you know that you know

2:02:16we've when I was involved with the

2:02:18review with Weston Samson and and

2:02:20Charlie um we did have both the

2:02:23regulatory bodies the HDC and the concom

2:02:27to review these structures because you

2:02:28have coastal resiliency you have our

2:02:30resilient anti design guidelines for

2:02:32elevating historic resources within his

2:02:34historic district and they need to come

2:02:36up to you know some sort of an agreement

2:02:38on how that's going to book. Um, let's

2:02:41just say I think there there's

2:02:43definitely room for um improvement and

2:02:46that was just a really a more of a

2:02:48preliminary um postponent, but um at the

2:02:51end of the day I think it's important to

2:02:53look at the fact that these are

2:02:54contributing resources. Thank you very

2:02:56much.

2:03:00>> Yes, ma'am. here. Uh, I was going to

2:03:02bring up that the spaces are valuable

2:03:06even if there are food trucks for

2:03:07storage and refrigeration, etc. They may

2:03:10not be full kitchens, but they may be

2:03:12valuable for that purpose. And a couple

2:03:14people have brought that up. Uh,

2:03:17regarding what these can do, a

2:03:20restaurant, if if a restaurant is

2:03:22successful, it's going to you want to

2:03:23your rent wants to be about between five

2:03:27and 10%. If you're doing 10 to 15%,

2:03:29you're not going to last five years. If

2:03:31you're doing 5 to 10% of your sales,

2:03:34you're going to make it. And that's sort

2:03:35of across all different types of

2:03:38restaurants. So, if you back into the

2:03:39numbers, something that's 25,000 a year

2:03:42has to do uh 250 300,000 a year. It's

2:03:45got to do $3,000 a day. Two and a half

2:03:47to 3,000 on a 100 day 100 days summer.

2:03:53uh if it's 50 to 60,000 you're talking5

2:03:56to $6,000 a day that's not unsubstantial

2:04:00that you know to do that is fairly

2:04:02substantial uh and so I think that's

2:04:05what we're sort of facing so if people

2:04:07go in and if we want them to put their

2:04:10own money in and put their own time in

2:04:12they need to have it for longer than

2:04:13five years we want to find consistent

2:04:16people that are going to stay there uh

2:04:18so that's one uh historic preservation

2:04:21money I had that that NHC had offered to

2:04:24look into that previously for the Jettys

2:04:27uh building and I think that that is a

2:04:30resource for us uh for the town uh

2:04:35something like the Jettys that could you

2:04:38know I think that we should have a bit

2:04:40bigger vision down there. I think if

2:04:42that was if instead of like trying to

2:04:45retrofit an existing uh you know

2:04:49historic building and and and put AC in

2:04:52and put insulation and all that. I think

2:04:55the kitchen could be a mobile kitchen,

2:04:57one or two trailers, one or two mobile

2:04:58kitchens in the back so it can

2:05:00eventually be moved if it has to be. If

2:05:02the weather is bad in the winter, it can

2:05:04be driven off to high ground. Uh

2:05:07renovate the interiors to be wood still.

2:05:10bring the bring the utilities from

2:05:12above. Uh so it is it is able to handle

2:05:16weather going in and out uh because

2:05:19they're only opened in the summer and

2:05:21there you have there are different

2:05:22building rules if you're not opened uh

2:05:25year round. So I think that we can we

2:05:28can renovate these and make them more

2:05:30efficient. Uh, and what I, you know,

2:05:33would I I I sent this like five or six

2:05:35years ago and I've spoke to the, uh,

2:05:37guys that are down at the jetties now.

2:05:40If that could be opened up so the front

2:05:42of it was uh, for concession and for

2:05:46beachgoers and sort of the left side of

2:05:48it could have uh, a patio and covered

2:05:53and make it look like the existing and

2:05:55that could be where sort of the alcohol

2:05:58and the partying and the sitdown was.

2:06:00You could make that a unbelievable

2:06:03venue. It already is kind of now it

2:06:06could be uh you know if it's doing two

2:06:09and a half now it could do four million

2:06:11a year. It could do it could do

2:06:13unbelievable. And so I think a little

2:06:15bit more money with a little different

2:06:17view I think could make that and and

2:06:20it's got alcohol. I would rather not see

2:06:23it but it's there now. Let's take

2:06:24advantage of it. But I think there's a

2:06:26way to do that and make it more a little

2:06:29more resilient, make it uh a lot more

2:06:32desirable and profitable. And if we want

2:06:35these guys, you know, the existing or a

2:06:38new tenant to do it, maybe find a way to

2:06:40lengthen it, you know, and then so I I

2:06:42just think that there's things that we

2:06:44could be doing there that could improve

2:06:46it from a business standpoint, from a

2:06:48customer standpoint, from a neighborhood

2:06:50standpoint. uh and we should be look,

2:06:53you know, sort of looking a little

2:06:55deeper on it. Thank you.

2:07:02Okay, so uh the tennis thing is a

2:07:05no-brainer. Put the bathrooms in, the

2:07:07money's there. Try I love what Brooke

2:07:09said about trying to lump it in with the

2:07:11other bathrooms so we don't have to go

2:07:12through another whole procurement

2:07:13process if that's possible. Um,

2:07:18Jetty's Beach is more con convoluted. I

2:07:22love what Matt just said about the

2:07:23portable kitchens. You know, the fact

2:07:25that you get a hurricane, you can unplug

2:07:27them and take them away. Um, and I

2:07:30wonder how much when you start they are

2:07:33historic buildings and when you start

2:07:35trying to raise them eight feet, do they

2:07:37still maintain their historic character?

2:07:40So, that's a big question. I think

2:07:43Surfside is a little different because

2:07:46it can be a destination for lunch.

2:07:49People will drive out there and park and

2:07:51have lunch and then go back to work.

2:07:53Guys that are working on that end of the

2:07:55island. So to me, that is a that's

2:07:59what's going on there now is is really

2:08:01what should probably be done. some type

2:08:03of hybrid where they use the kitchen and

2:08:06the building for storage, but they also

2:08:09have a food truck there all the time

2:08:10because I think that's the only way it

2:08:13works.

2:08:15Children's Beach is completely

2:08:16different.

2:08:18And and I I love your passion as to what

2:08:20you said there, but we're this isn't a

2:08:24scholarship program. Children's Beach

2:08:27really only is operates for two months.

2:08:29It's July and August. Nobody goes there

2:08:31for lunch because there's no parking.

2:08:33And if you walk there, you walk by the

2:08:35strip and there's seven stores on the

2:08:37strip. So, no one's going to go down to

2:08:40Children's just to have lunch. So, it's

2:08:42really for the people that go to the

2:08:44beach there.

2:08:46Again, it's another historic building,

2:08:47but that building would make perfect

2:08:48storage if you took the kitchen out of

2:08:50it and you just used it for

2:08:51refrigeration and dry storage and you

2:08:53put a food truck there and you tied the

2:08:56two together that said the truck had to

2:08:57be there all the time, it could still be

2:09:00a viable business for someone. Um,

2:09:04that's my thought. I I I also think, you

2:09:07know, everywhere I go

2:09:09um on vacation, they have public parks

2:09:12where they have little metal charcoal

2:09:15grill stands and you can bring, you

2:09:16know, you can bring your own stuff to

2:09:18the to the park and you or the beach and

2:09:20you can grill at the beach. Maybe we put

2:09:22some of those down at Children's for

2:09:24people so that they can sit in that park

2:09:27and grill. But to put $3 million into

2:09:30that building, it just doesn't make

2:09:33sense. It's it's never it's never really

2:09:35worked at anything because of the

2:09:38location. You just you drive down there

2:09:40and you drive down there and you drive

2:09:41around, you're never going to find

2:09:42parking. So, the only people are going

2:09:44to go that to the lunch there are the

2:09:46people that are at that beach. And it's

2:09:47such a small beach that it just it just

2:09:50doesn't work. So,

2:09:55>> I I guess my only question for you about

2:09:56the food trucks down there is it going

2:09:58to take away parking?

2:09:59>> No, because you could put it up onto the

2:10:03You drive it up on there next to the

2:10:04building.

2:10:05>> It wouldn't be down the street.

2:10:07>> So, you're just going to put it there so

2:10:08it's not going to move.

2:10:10>> Well, I guess they could take it away if

2:10:12they wanted to, but it would it would be

2:10:14there for most of the time. But again,

2:10:17it's just like the public ba the

2:10:19bathrooms. I mean, all this is based on

2:10:21the culture resiliency study, but and I

2:10:25got it today and I started to try to

2:10:27read it. It's 113 pages. I haven't had

2:10:29time to go through it, but I mean I the

2:10:32minute you start doing the work on the

2:10:33building and triggers everything having

2:10:35to be raised and then we got all kinds

2:10:36of issues with the historicness of the

2:10:39building. I I mean I think you just redo

2:10:42the outside of the building and

2:10:43restructure the inside for storage and

2:10:45keep it the way it looks. You can maybe

2:10:47sell ice cream out of it or something

2:10:49like that. That's just my thought.

2:10:52>> Holly,

2:10:52>> thank you, Madam Chair. Just to clarify,

2:10:55historic resources can be exempt under

2:10:57the substantial compliance section of

2:10:59the building code. That's um so our

2:11:02design guidelines that we created,

2:11:03resilient Nucket, which were created by

2:11:07um uh the National Park Service and FEMA

2:11:11together for guidance for historic

2:11:13districts. And then we created the our

2:11:15guidelines out of an MVP action grant

2:11:18project. And the HDC has been using

2:11:20those guidelines since 2021.

2:11:23um all contributing structures do not

2:11:26have to meet the full FMEA height. So I

2:11:28believe Jetty's beach is area is in the

2:11:30AE8

2:11:32um or AE9 all of Brandt Point is and

2:11:36contributing structures don't have to be

2:11:37the full FEMA height. They can be say 4

2:11:40feet with the proper flood proof

2:11:42mechanism underneath to allow the water

2:11:44to go under. And so that was kind of

2:11:46where the exercise that Weston Samson

2:11:49did to show the different options of how

2:11:51do we kind of elevate it just a little

2:11:53bit. How do we do all these other there

2:11:55the fact that the the restrooms are in a

2:11:57not even in the building itself. There's

2:11:59that component. Um but historic

2:12:02resources and this believe it or not is

2:12:04a historic resource um can be exempt at

2:12:07a certain compliance section of the

2:12:09building code that um so it can be done.

2:12:12it can be um brought up to compliance

2:12:16but not the full gamut and that even

2:12:18includes the stretch energy code which I

2:12:20know a lot of people have talked about.

2:12:21We have a historic determination process

2:12:23through the HDC um provided we have all

2:12:26the historic information both these

2:12:28structures we have the historic

2:12:29information now that we have surveys

2:12:31that were just um done and funded by the

2:12:33wind farm fund um for town historic

2:12:36resources. So the historic termination,

2:12:38the HDC approves it. I write the letter

2:12:40to the building commissioner allows them

2:12:42that particular structure to be exempt

2:12:44under the substantial compliance section

2:12:45of the building code. Obviously anything

2:12:48but life safety. So hopefully that

2:12:50helps.

2:12:50>> Ollie, can I ask a question?

2:12:52>> Yeah.

2:12:53>> So that sounds great. So that means we

2:12:56wouldn't have to raise the building, but

2:12:58could we add to the footprint of that

2:13:00building without change would that

2:13:02change the historic aspect of that

2:13:04building? because everyone complains

2:13:05that the Children's Beach building is

2:13:06too small. It doesn't have enough

2:13:08storage. It doesn't have enough of what

2:13:10they need to make it work.

2:13:12>> So, the Secretary of Interior standards

2:13:14for rehabilitating structures allows you

2:13:16to rehabilitate it and do some additions

2:13:19onto it to bring things up to compliance

2:13:22provided you're retaining all the

2:13:24character defining features of the

2:13:25historic resource. So, of course, you

2:13:27don't want to exasperate the size of the

2:13:30structure. You want to do a a modest

2:13:32addition. Again, that's where the HTC

2:13:34would be reviewing that for its

2:13:35appropriateness. So, there's a fine line

2:13:38um between um bringing something up to

2:13:41today's standard, so to speak, but also

2:13:43retaining it its its actual character

2:13:45defining features and its historicness.

2:13:49>> Just to follow up on that aspect, is it

2:13:51Bob, if you how I think about it, we've

2:13:54take by allowing some of the awnings and

2:13:57things that are on there, we've taken

2:13:58away from the historic building itself.

2:14:01if some of those were going away and

2:14:03that was going to be another section

2:14:05that was uh covered was a you know a

2:14:08porch that was covered that looked like

2:14:10the historic bath houses that were there

2:14:12where the coahons used to have their

2:14:14camps. If we had that to the left it

2:14:17would completely be fine. It would be

2:14:19you know

2:14:20>> we're talking about jetties.

2:14:21>> Yeah, jetties over the jetties. If you

2:14:22did something like that down there it

2:14:24would completely be fine. It would

2:14:25improve the building. And that's what

2:14:28Holly was talking about earlier is you

2:14:30know there's room improvement. It could

2:14:32bring we'd be bringing it back in some

2:14:34ways.

2:14:35>> So, yeah. I Sorry.

2:14:37>> Go ahead.

2:14:37>> Uh the jetties I I'm not it's it's I

2:14:42don't have any problem with the jetties.

2:14:43It's it's children's beach. That's the

2:14:46one that you know really it just it just

2:14:50I mean I think the only solution there

2:14:52is a combination of the building and the

2:14:54food truck and using the building for

2:14:57storage and the food truck for prep and

2:15:00And yeah.

2:15:04>> Okay. Um, Brooke, you had had your hand

2:15:06up. Did you still want to say something?

2:15:09>> I I was gonna say something that may

2:15:11sound really stupid, but um I was

2:15:13listening to Amy's um Amy Eldridge's

2:15:16point about lack of commercial kitchen

2:15:18space. And I don't know whether there's

2:15:20some when I think about what's happening

2:15:22at Surfside, the combination of the food

2:15:24truck and the kitchen inside and and is

2:15:27there a way to marry the food truck with

2:15:32um prep area in the building that would

2:15:36qualify a as a food truck home base. Um

2:15:42because that's the problem, right? A

2:15:44food truck has to have a commercial

2:15:45kitchen home base to operate out of for

2:15:48prep. And so could we structure this

2:15:52these changes in a way that would

2:15:55provide that for that some combination

2:15:58whether it's the external kitchen Matt

2:16:00was talking about at Jett's or like what

2:16:02is the way to to to work with the health

2:16:06code in a way that that provides the

2:16:09resources that someone needs to

2:16:11successfully operate a of a a food

2:16:14business at these locations. Um,

2:16:17>> yeah. No, that makes sense.

2:16:18>> The answer to that is the answer to that

2:16:20is yes that you you could that you're

2:16:22talking three basinks and the proper

2:16:24refrigeration, the proper flooring, you

2:16:26know. But the answer is yeah, you could

2:16:28do it.

2:16:29>> Yeah, that's what I was thinking. Make

2:16:30it make it the home base for the food

2:16:32truck and that way it would open it up

2:16:34to other potential vendors other than

2:16:38those that already that that we know of

2:16:40that already are in the food truck

2:16:42business because they they're also a

2:16:43restaurant. Um, so it wouldn't preclude

2:16:46other biders. I I would be curious to do

2:16:49sort of an RFI in a way uh just inquire

2:16:54from people who how they could put it

2:16:57together in that location and what would

2:16:59they would need to put it together from

2:17:01a resource point of view. Um, and see

2:17:04whether there's any, you know, ideas

2:17:06that we haven't come we haven't thought

2:17:07of because

2:17:12>> Yeah. Okay. Um,

2:17:16Mary Longacre.

2:17:21>> Thank you, Don. Um, I'm wondering, you

2:17:24know, listening to the the trend of the

2:17:25conversation, if it wouldn't be better

2:17:27value for money spent to put a new

2:17:31building at Surfside, put a new building

2:17:33at Children's Beach, make them, you

2:17:36know, modern standard for the uh food

2:17:40prep and for serving the public.

2:17:42repurpose the existing buildings. You

2:17:45know, expand the bathrooms has been

2:17:46mentioned at Surfside and storage for or

2:17:50cover for the pump system has been

2:17:52mentioned at Children's. But just build

2:17:54new for, you know, for purpose and for

2:17:58modern standards and leave the existing

2:18:00buildings, you know, in a much simpler

2:18:03configuration without pouring all this

2:18:05money into them.

2:18:06>> Oh, you mean build new and keep the

2:18:08existing building?

2:18:09>> Yes.

2:18:10I don't think we're going to well

2:18:12besides the finances I don't think we're

2:18:14going to get a com concom permit to

2:18:17build an structure next to the existing

2:18:21structures.

2:18:24>> Yeah, Vince,

2:18:28>> thank you. Just Vince Murphy financial

2:18:30resources department just to talk about

2:18:32the jetties one in particular in terms

2:18:34of um I do like the idea of build new in

2:18:37some ways. However, the existing

2:18:39building is within the dune. It's in a

2:18:41resource area. In order to do anything

2:18:43on that site, you have to more or less

2:18:45stay within the remaining footprint. I

2:18:47don't think we could even pick it up and

2:18:48turn it much. Um, it's either pick it up

2:18:50and elevate on site or retreat it. Um,

2:18:54in terms of resilience options, we uh

2:18:57looked at both. I think we ended up

2:18:59retaining it on its existing footprint

2:19:01um for historic character and also um

2:19:05for cost savings.

2:19:08Charlie Palaki.

2:19:13>> Yeah, I just wanted to touch on the the

2:19:15food truck model. Our original thought

2:19:17was that, you know, we would offer it

2:19:19out as, you know, as

2:19:23to existing food truck, you know,

2:19:24vendors, people who have an existing

2:19:26kitchen to go back to, or there's also

2:19:28the option for some people, the Hive

2:19:29exists as a commercial kitchen that food

2:19:30trucks can operate out of. Um, so those

2:19:33are just some op options that are there

2:19:34as far as bringing in food trucks. We

2:19:37had some internal conversation about how

2:19:39we would structure that where whether it

2:19:41would be one, you know, restaurant or

2:19:44business there all season or do some

2:19:46sort of a rotation with existing food

2:19:48trucks so nobody was stuck there for,

2:19:50you know, a bad a bad day. There's just

2:19:53many different options that we could

2:19:54explore as far as the food truck avenue.

2:20:00Okay.

2:20:02Where do we how do we want to end this

2:20:06conversation for this evening?

2:20:10>> Um, well, I think we wanted some

2:20:13direction on children's in particular

2:20:15because Charlie, is that leased up at

2:20:17the end of this year?

2:20:20>> It is. I mean, ultimately what our

2:20:22recommendation is in there, we kind of

2:20:24thought was to do a three-year lease,

2:20:25which is two years shorter than our

2:20:28normal lease. would align it with the

2:20:30existing lease and existing concession's

2:20:32current lease at Surfside. It would kind

2:20:35of give us three years to to sort out

2:20:37what we want to do down there.

2:20:38Similarly, you know, with jetties, we'd

2:20:40like to have something in place at the

2:20:41end of their next 5-year lease term at

2:20:44least with a plan going forward just so

2:20:46we can also notify both, you know, any

2:20:47and all of the concessionires about what

2:20:50construction may or may not be happening

2:20:52at each site.

2:20:54>> Yeah. Part of the problem is once we

2:20:57start if we start doing a renovation at

2:21:00any of these sites, they're probably

2:21:02going to miss two seasons

2:21:06at least one, but I would but likely

2:21:09two.

2:21:10>> We have we're doing a major runout

2:21:12>> for any of that anyway.

2:21:13>> We have no funding for any of that

2:21:15anyway.

2:21:16>> So the back to the parking lot

2:21:21>> question, Madam Chair.

2:21:23>> Yes. Sorry. The leasey at Surfside is

2:21:25also the leasey at Children's. Is that

2:21:27what I'm understanding? And their lease

2:21:29at Surfside has three years left in it.

2:21:31>> Is that right, Charlie?

2:21:33>> Correct.

2:21:34>> So, you need a if you I would make a

2:21:38motion then to extend the lease at

2:21:40Children's for three more years. So,

2:21:42hopefully I mean that does this go out

2:21:44to an does they automatically get a

2:21:46renewal or does it have to go out to an

2:21:48RFP?

2:21:48>> It's going to have to go out to the

2:21:50>> request

2:21:50>> I believe. So we can check with finance,

2:21:52but I believe it has to go out.

2:21:54>> Yeah,

2:21:55>> I'm I'd make that motion.

2:21:57>> Okay,

2:21:57>> if that helps.

2:21:58>> Is there a second?

2:22:00>> Second.

2:22:01>> Okay. All those in favor? U Matt?

2:22:03>> Hi.

2:22:04>> Bobby,

2:22:04>> I.

2:22:05>> Jill,

2:22:05>> I.

2:22:06>> Brooke,

2:22:07>> I.

2:22:08>> Don I. That carries unanimous.

2:22:10>> Do we need to a vote for the Jettys

2:22:13Beach for the tennis court, Charlie,

2:22:17>> or can you just go forward with that?

2:22:20uh we can go forward. We uh I don't

2:22:21believe we'll be able to get it into

2:22:22this current round of bathrooms. We

2:22:24don't have we have to do the design for

2:22:26it. Uh we don't have that yet because we

2:22:28need didn't have the funds appropriated,

2:22:29but we can work with finance to figure

2:22:31out the allocation or what we need to

2:22:33exactly do there and then we can get

2:22:35working with SMRT on some design plans

2:22:37and to put that in. So maybe into phase

2:22:39two or uh it could maybe if they can do

2:22:42it quickly because it's fairly simple uh

2:22:45later this year.

2:22:47>> Jill has a question.

2:22:47>> Go ahead. Yeah, Charlie, you said you're

2:22:50going to do that this year.

2:22:52>> So, was that Jill? Sorry.

2:22:54>> You You said you're going to add the

2:22:56bathroom to the tennis courts this year.

2:22:59We need to do

2:23:00>> Well, we need to get the funding

2:23:00appropriated and do design.

2:23:04>> So, it's probably for not this coming

2:23:07summer, the following summer.

2:23:08>> We'd have we'd have to talk to finance

2:23:10to see if if we can use the existing

2:23:12allocation or if it would have to go to

2:23:14town meeting for reappropriation.

2:23:17Uh if we can use some of it, we could

2:23:18start immediately on some design work

2:23:20and we could report back when we have a

2:23:22better idea of a timeline.

2:23:25>> Well done getting those courts well

2:23:27under budget and having so much left

2:23:29over. I've never seen that. It was

2:23:31amazing.

2:23:33>> So

2:23:34>> does it make sense to make a motion to

2:23:36authorize Charlie to move forward with

2:23:39um

2:23:41the bathroom project at Jetties or is is

2:23:44a consensus enough?

2:23:46It seems like the consensus was enough

2:23:49on this one because they still have a

2:23:51lot of steps to go through.

2:23:53>> Okay.

2:23:56>> Okay. Anything else on this for now?

2:23:59>> Okay. Um, we will move on to an acquest

2:24:03for additional compensation to residents

2:24:05of Sherburn Commons for an increase in

2:24:08the use of the leased property for our

2:24:10island home.

2:24:13Um, there's been

2:24:17an an issue that's arisen where um the

2:24:21definition of the takeback area

2:24:25um is a little bit greater than um than

2:24:29what was originally

2:24:32identified. We paid them Do you want to

2:24:35put up the slide, Erica? Um, we I mean

2:24:38we

2:24:41over the 55,000 square feet that was in

2:24:43the original lease when we factored in

2:24:47the actual size of the building and the

2:24:50landscaped areas and the parking um we

2:24:53ended up negotiating a deal with

2:24:55Sherburn Commons for an additional

2:24:5740,000 square ft and it's gone slightly

2:25:01over. So they initially came back to us

2:25:03about a month ago and asked for 59,000

2:25:07for,00 square feet. Um which we agreed

2:25:11to it fell under the $100,000 threshold.

2:25:15Um but then this past week they came

2:25:20back um with some concerns about some

2:25:23additional like paved areas where the

2:25:26driveway aprons and so forth for worth

2:25:28um were being placed and asked us

2:25:33actually for more than 141,000 initially

2:25:36but this is where we have currently

2:25:39landed and and if we do not agree to

2:25:43fund this additional $141,000.

2:25:47They're basically not going to sign the

2:25:51revised

2:25:53to so that we can move forward with the

2:25:55construction.

2:25:56>> Okay.

2:25:58>> Sausage.

2:25:59>> Yeah, sounds like it. Can I ask a

2:26:02question? So, is 59 and the 141?

2:26:05>> 59

2:26:06we agreed to already.

2:26:08>> You did it, but you did it later. I

2:26:10mean, that was still recent.

2:26:11>> Yes. So, they're basically their

2:26:13settlement is is $200,000

2:26:18>> is what they're asking for. They

2:26:19actually did ask for about

2:26:22>> closer to $600,000,

2:26:24but um this is where we've gotten to um

2:26:29>> to buy our own.

2:26:32>> Yes,

2:26:34that is correct.

2:26:35>> Where's the money come from?

2:26:37>> Contingency,

2:26:40Brooke.

2:26:43Um,

2:26:45while I'm hugely disappointed that this

2:26:47is where we're at,

2:26:50um,

2:26:52I think

2:26:54the cost of delay of construction could

2:26:57exceed this number. Um, they're poised

2:27:00and ready to go. Um, but I would make

2:27:04the approval of this. So, I'm I'm I'm

2:27:06I'm going to support the approval of

2:27:08this um additional extraction of money.

2:27:12Um but I am going to make a contingent

2:27:14on the execution of the documents by a

2:27:16week from Friday because um I don't want

2:27:21there to be further threats to delay the

2:27:24project. Um and I'd like, you know, to

2:27:28say we

2:27:31we have made this concession.

2:27:34>> Can I just suggest Uh what we are trying

2:27:36to get signed in regard to theou is a

2:27:39license agreement and I would prefer to

2:27:42be even sooner than a week from Friday

2:27:44to get the license agreement in place.

2:27:47>> Okay. So the the license agreement by

2:27:49this Friday and theou by the following

2:27:52Friday. Vicki does that make sense so we

2:27:56can proceed?

2:27:56>> Um

2:27:58>> yes um madam chair uh to Brooke. Um yes,

2:28:02because the license is the document

2:28:05that's actually authorizing us to be

2:28:07able to enter the property and start the

2:28:09construction work. Um and so um

2:28:12currently as drafted the amendedou

2:28:15um if that isn't signed um they're not

2:28:18going to sign um they're not going to

2:28:20allow us to continue the work. So, I

2:28:22think it's really important that we get

2:28:24to um get on the site, be able to start

2:28:27the construction, and then in the

2:28:29meantime um finish the negotiation on

2:28:32the amendedou so that we have that

2:28:35signed by the following Friday at the

2:28:37latest.

2:28:40>> Thank you, Vicki. Uh yes.

2:28:44Okay. Yes. Go ahead.

2:28:46>> Can you just give us a little bit more

2:28:47explanation about what happened?

2:28:50like why why they're asking for more

2:28:52money and when and like

2:28:54>> because when they had to go revise their

2:28:58agreement with their lender I believe

2:29:00they had to finalize a definition of the

2:29:04takeback area and

2:29:10you know we can agree or disagree with

2:29:12their methodology but they came up with

2:29:16an additional takeback area. Um, we

2:29:19initially said 59,000 will be okay for

2:29:23because that was

2:29:25within the building envelope of where

2:29:27the building was going. There was an

2:29:29additional,00 ft². We didn't love it,

2:29:31but we said, "Okay." Then they came back

2:29:35more recently defining all of these

2:29:38little areas of sidewalk areas and

2:29:42driveway aprons in terms of getting off

2:29:44Sherburn Commons Lane, the the driveway

2:29:47to the main development into

2:29:50this was when we really started to have

2:29:54concerns. Um but at the same time

2:29:59we went back and forth with them and we

2:30:02came to the 200,000 and we do need to

2:30:04start this project because time is

2:30:06money. Um so it's not ideal. We also we

2:30:09did act request or invite we invited

2:30:14them to be here tonight to go over their

2:30:17reasoning and they declined.

2:30:20Um,

2:30:23so yeah, I mean, Bobby, I would have

2:30:26used a diff a different word, but yeah,

2:30:28they are holding holding us hostage a

2:30:31little bit on this, and I don't think

2:30:32that it's a very

2:30:35that it's in terribly good faith, but I

2:30:38think that we don't have a choice.

2:30:42>> Amy Amy Eldridge. Um, who is the pro who

2:30:46owns the land that Sherburn Common sits

2:30:48on? And what is their

2:30:52rent if it's us, the town?

2:30:57>> We No, we we are not paying them rent.

2:30:59We're paying them a lump sum.

2:31:00>> No, I mean, we own the land.

2:31:03>> We own the land. We lease it to them for

2:31:05what? A dollar a year for 99 years.

2:31:08We had a percentage that's actually if

2:31:11you look at the we are we have in this

2:31:14agreement waved the rest of their

2:31:16payments.

2:31:18I find that really interesting. I I

2:31:20agree with Brooke and you. I'm not I I

2:31:24think delaying this is just going to

2:31:26cost us way more money, but I feel like

2:31:28we're being held hostage for stuff that

2:31:30we we already own. We've made

2:31:32concessions on whatever their lease

2:31:36agreement is with us for a 100red years.

2:31:38>> The the waiver of the annual lease

2:31:40payments, the estimate on here is 2.870

2:31:43million, but it would probably with

2:31:45inflation be more than that over time,

2:31:48>> right? I mean, I just feel like they're

2:31:49just

2:31:51>> Why couldn't they do it through that

2:31:52then? What I mean,

2:31:57why do we have to

2:31:58>> They're already getting that.

2:31:59>> Yeah, but why do we have to pay them? I

2:32:01mean, that's

2:32:02>> Yeah, that's what I don't understand why

2:32:03we why we have to pay them when they're

2:32:06already getting kind of like a really

2:32:09sweet deal. Thanks.

2:32:11>> Thank you.

2:32:14>> And I hear you on the pressure about

2:32:16having to do it and I I understand that

2:32:19except you've all assured me that it's a

2:32:21maximum price bid so it can't go over.

2:32:24It is a me it's complet it's a

2:32:27completely separate issue and yes I did

2:32:30argue that we already went to town

2:32:33meeting for the money why is this coming

2:32:35up now and but

2:32:39this is where we are

2:32:40>> hi Raymond Dassa I'm speaking as private

2:32:43citizen what happened there you have

2:32:4655,000 square feet that you purchased

2:32:48back from Sherburn Commons and you

2:32:50needed an extra 1,100 and they charged

2:32:53you 59,000 Is that where we're at? And

2:32:55then after you paid him 59,000, they

2:32:58said, "Oh, we're going to need another

2:33:00141 for frontage." Is that That's

2:33:03basically

2:33:05Did I follow it? It

2:33:06>> I sort of

2:33:09>> Okay,

2:33:11>> you've got the gist of it, but your

2:33:13facts are a little bit off, but

2:33:15>> Okay,

2:33:15>> you've got the gist of what's happening.

2:33:17>> So, I have a couple questions then. How

2:33:20much is left in the contingency fund?

2:33:22because I know it's

2:33:24certainly now.

2:33:25>> I'm going to invite John Lemieux up from

2:33:27Vertex.

2:33:31>> Unreal.

2:33:34>> Hi, John Lemu. Vert.Ex. Um, the

2:33:37contingency fund is 6 million. We

2:33:39haven't touched it yet. The project is

2:33:41just starting. Um, and just to one

2:33:43thing, Jill, what you said, a guaranteed

2:33:45maximum price is great for things that

2:33:47are in their control. if this issue

2:33:50blows it up, that's not in their control

2:33:52and they have contractual rights to come

2:33:54back at us for costs. We don't get the

2:33:56building, but it lists out what they can

2:33:58and can't do because it's this issue

2:34:00with Sherman Commons has nothing to do

2:34:01with them just like um if the tariffs if

2:34:04suddenly there's a 10,000% tariff. They

2:34:07didn't cover that in their bid either

2:34:08and we would have to work something out

2:34:10with them with that. But for right now,

2:34:12they have made no issues with this. It's

2:34:15only been a week. there. You know, I

2:34:18don't anticipate there being any issues.

2:34:20So, right now, the contractor isn't

2:34:22saying anything about this about the

2:34:24time that it's taken to um get this

2:34:28squared away because we're still dealing

2:34:30with a bit of a a bat concern um up in

2:34:33the trees and we're, you know, so we're

2:34:35hoping that both these things grow

2:34:37themselves out for the next couple of

2:34:38weeks.

2:34:40>> Okay. So, six million. Thank you. So

2:34:44200,000 is that coming out of the six

2:34:46million?

2:34:47>> Yes.

2:34:48>> Yes.

2:34:48>> Yes. Okay. So when you I have a couple

2:34:51other questions then when you reach over

2:34:546 million just let's say we do

2:34:56hypothetically what happens?

2:34:58>> Uh the plan is to not reach over six

2:35:00million because that

2:35:01>> let's say it does let's say it does what

2:35:03happens is the project then just latered

2:35:05or what happens?

2:35:07>> No it's it's a good question. So, a

2:35:09couple of things. The contingent

2:35:12contingency that's being talked about

2:35:13right now is above and beyond the

2:35:15guaranteed maximum price you've heard

2:35:17referenced from the builder. The builder

2:35:19themsself has some contingency within

2:35:22their number. And to date, we've been

2:35:24very successful with the buyout. So

2:35:26right now in contingency funds between

2:35:28the six million, the two plus million

2:35:31they have within their bid and then the

2:35:33buyout, we're well over 10 million right

2:35:36now of let's call it one big bucket of

2:35:38contingency. So we're in a really good

2:35:40place. But again, we haven't put a

2:35:41shovel in the ground yet either.

2:35:43>> So I feel really good because of the

2:35:45results of the buyout. We're in a better

2:35:47position than we could have hoped to

2:35:49have been at town meeting, which is

2:35:51great. Now again, tariffs and those kind

2:35:54of crazy things, something new, you

2:35:56know, whatever comes up in the news over

2:35:58the next few weeks, those things, they

2:36:00snapped the line when they were at bid

2:36:02day. Anything new with Canada, any of

2:36:04those kind of things,

2:36:06>> we haven't seen any impacts yet, but

2:36:08that's what we would cover with that

2:36:10that those buyout savings if if in fact

2:36:12they end up happening.

2:36:14>> Okay. So, here's what I would say. My

2:36:16biggest concern is that this project is

2:36:17going to exceed these numbers. I say I

2:36:19understand where you say that you're in

2:36:21a good place right now, but like you

2:36:23just said, you haven't put a shovel in

2:36:24the ground. If we blow these numbers on

2:36:27this project and we don't get this right

2:36:29and we turn it into a project like um

2:36:33the housing development over here that

2:36:34went 14 million or whatever that was, if

2:36:36we do this, we will not clear an

2:36:38override ever again at town meeting. You

2:36:41can forget the school for my future

2:36:43kids. You can forget any other projects.

2:36:45The the town is already looking at the

2:36:49massive amount we spent this last year

2:36:52and no one I know is really thrilled for

2:36:55an override to come forward.

2:36:57If we if we blow this and we go over

2:37:00these numbers, I just I don't know where

2:37:02we would go from there. And I also would

2:37:04love just I don't have anything else but

2:37:08who drew up the 55,000 square feet and

2:37:11how did they miss the 1100 and the

2:37:14frontage and if it was because Sherburn

2:37:17Commons waited for theirou

2:37:21like who who is this on

2:37:24I don't understand how we could go to

2:37:26town meeting and ask for this insanely

2:37:29big number which I agree we need a place

2:37:32for, you know, the older folks of this

2:37:34town. But how do you go through all that

2:37:38process, have us vote, have us vote on

2:37:40the ballot, and then before we even

2:37:42stick a shovel in the ground and move a

2:37:45grain of sand, we got $200,000 of, you

2:37:49know, a hostage ransom from Shering H.

2:37:52Thank you.

2:37:56>> We we might want to clarify a little bit

2:37:58of that. Um the 55,000 was in a ground

2:38:01lease from many years ago. It there was

2:38:04a lease provision that allowed for when

2:38:08the town entered into a long-term ground

2:38:10lease with Sherburn. Um that 55,000

2:38:15would be allowed for a new our island

2:38:17home facility. This is years ago

2:38:20[clears throat] when we brought the

2:38:24project forward to the most recent town

2:38:25meeting because remember we brought a

2:38:28different project forward to the 2027

2:38:312017 town meeting which did not pass.

2:38:34the design had um increased in square

2:38:39footage because of building codes and

2:38:43nursing home requirements and things

2:38:45like that to an additional at least what

2:38:47was determined at most recently to be

2:38:5140,000 square feet. So that takeback

2:38:55number of 40 was more or less agreed on

2:38:59until the design began to get much more

2:39:03refined and this 1100 square ft issue

2:39:07came up and that's where the 59,000 came

2:39:11in. And then much more recently

2:39:15the larger number came up with

2:39:17additional things like driveway aprons

2:39:20and sidewalks. And um that's where we

2:39:24had to have some discussion with

2:39:26Sherburn about

2:39:28the reality of what is being taken back

2:39:32truly.

2:39:40>> Yeah. Go. Go ahead. Right.

2:39:43>> So, who drew the plans? Like if if you

2:39:47had an essential thing in 2017 and then

2:39:51the codes changed and we had to make it

2:39:52bigger, why couldn't we have cut the

2:39:54number of beds to stay on that site? Who

2:39:56drew these plans?

2:39:57>> The 55,000 square feet was in the

2:40:00original lease. We reserved that. I

2:40:03mean, that was before I think all of our

2:40:05time when this lease was entered into.

2:40:08Maybe not all of us, but um but

2:40:10regardless um

2:40:14right at the beginning of this, I will

2:40:16say there was an argument back and forth

2:40:19about what 55,000 square feet meant

2:40:22because to me it would mean the

2:40:24structure, not the parking, not the

2:40:26ancillary stuff around it. But then we

2:40:29made a settlement with Sherburn Common

2:40:30so that we could move forward with

2:40:32building on this site. Um and that's

2:40:35what you see here. That was um a a 2

2:40:40million40,000

2:40:422 million40. That was what we agreed

2:40:44with them to essentially buy back

2:40:47another 40,000 square ft of land area.

2:40:51That's why it feels a little bit picky

2:40:56to come back and say even we need the

2:40:5859,000 for another 1100 square ft.

2:41:02But we said, "Okay, we need to move

2:41:04forward." Then to have it come back

2:41:07again was upsetting. I mean, I'm I'm

2:41:10going not going to lie in the public

2:41:12this is a public meeting and this is

2:41:14what happened. And we went back and

2:41:16forth,

2:41:19but essentially they have come back to

2:41:21us and said that their absolute bottom

2:41:24line final offer don't ask us to give

2:41:27another thing is you have to give us

2:41:29$200,000.

2:41:30That includes the 59. And that's why

2:41:32we're at 141.

2:41:33>> If you pay that, can they does that set

2:41:36precedent? Can they nitpick us on

2:41:37anything else down the line or is there

2:41:40is this the final nail in the coffin for

2:41:42them?

2:41:42>> There is a provision in theou that there

2:41:45is a final survey done after the project

2:41:47is built and if there is a discrepancy

2:41:50either they get paid or we get paid

2:41:52back.

2:41:54>> Okay. Thank you.

2:41:54>> Can I ask your question?

2:41:56>> Yeah. about their lease payments,

2:41:58>> their their their waiver of lease

2:42:01payments. When does that get

2:42:02renegotiated

2:42:05or is that for

2:42:07>> that's until the end of their lease and

2:42:09its extensions?

2:42:11>> Yeah.

2:42:11>> Do we know how long that is?

2:42:12>> It's

2:42:1482 years.

2:42:16>> 82 years.

2:42:19>> Amy,

2:42:20>> if I may.

2:42:22>> Yes, Vicki.

2:42:23>> John, I

2:42:25sorry. Yeah, for the board members who

2:42:27weren't here through all of this, um

2:42:30this was a very challenging negotiation

2:42:33to get um to to get us the ability to

2:42:40locate this project at this location. Um

2:42:45I I'm really hesitant to go back and

2:42:48second guessess. Um I I will ask you all

2:42:52not to go back and second guessess the

2:42:54process by which we arrived at the

2:42:56numbers other than what is before us

2:42:59tonight because

2:43:02the process of that negotiation was long

2:43:05and intense and it went on for quite

2:43:07some time and ultimately those numbers

2:43:10were included in the allocation approved

2:43:12by town meeting for the total cost of

2:43:14this project. Um,

2:43:17unfortunately I cannot think of a better

2:43:21example of being caught between a rock

2:43:23and a hard place on this additional

2:43:25request.

2:43:27Um, and I and I really don't want to

2:43:30throw a, you know, $130 million project

2:43:35in put it in jeopardy over $141,000

2:43:40no matter how much this sticks in my

2:43:42craw. So I um

2:43:46It doesn't feel right. And I and I uh

2:43:49understand the frustration of my fellow

2:43:52board members and of the members of the

2:43:54public who have spoken. Um

2:43:58and

2:43:59I don't want to throw the project at

2:44:01risk. So, I would make a motion to

2:44:02approve this further allocation of

2:44:05$141,000 from the contingency fund

2:44:09contingent on the uh authorities at

2:44:13Sherburn Commons executing the license

2:44:15for the project to access the property

2:44:17by this Friday and the completion of

2:44:21theou

2:44:23by a week from Friday. Um, so there's my

2:44:27motion.

2:44:29>> Thank you. I'll I'll second it.

2:44:31>> Thank you, Matt.

2:44:32>> And note my disappointment as well that

2:44:35we couldn't just move on

2:44:38without having to pay some more. But

2:44:40that's all right.

2:44:40>> Thank you. Um before we vote, Amy, I'll

2:44:43let you say

2:44:45>> I just want to ask so Sherburn Commons

2:44:49is basically like

2:44:52owner person used owned now, right?

2:44:54After a couple of the bankruptcies that

2:44:56they'd had. So, it's my understanding

2:45:00from some people who live there that not

2:45:02all of the people in Sherurn Commons are

2:45:04excited and jumping for joy of the

2:45:06island home going there. And so, to

2:45:09through you, Madam Chair, um to the

2:45:11previous speaker, Mr. Dosta,

2:45:14what's going to stop them from halfway

2:45:15down the road them wanting big dollars

2:45:18for noise issues and annoying me at my

2:45:21house while you guys are building this

2:45:23and then there being some other, you

2:45:25know, strong armed situation? Um, at the

2:45:29end, like you were saying, we're either

2:45:30going to get money or they're going to

2:45:31get money. And I just think that it's

2:45:34shame on Sherburn Commons for doing this

2:45:3711th hour Hail Mary kind of thing and

2:45:39and really putting this whole thing at

2:45:41risk. I mean, I didn't support it, but

2:45:43I'm behind it now because it's the will

2:45:45of the voters and it's got to get done.

2:45:47But I agree with Brooke, like we we

2:45:49can't wait, but what kind of guarantees

2:45:53do we have that they're not going to

2:45:54come back halfway down the road going,

2:45:56you know, we want uh noise, we want

2:45:58money for noise abatement because the

2:45:59construction is driving us crazy and you

2:46:02you know, that kind of thing. I mean, if

2:46:03this is what they're doing now, I can't

2:46:05imagine halfway through the project and

2:46:07then at the end what it's going to cost

2:46:09us.

2:46:10>> Well, that's why we want this agreement

2:46:11signed so that everything's in writing.

2:46:14>> Well, that's why this vote is contingent

2:46:16on that. Well, I hope the contingent is

2:46:18that they can't come back in the middle

2:46:19of the project and complain about noise

2:46:20and want $2 million for the annoyance.

2:46:22So, I just think that it's, you know, a

2:46:25lot of money and,

2:46:27you know, it's just it's just it's sad

2:46:29and and and and just shame on Chevron

2:46:31Commons for putting us in this position.

2:46:34>> Thank you, Amy. All right. Can we go to

2:46:35a vote?

2:46:36>> I look at it slightly differently. I

2:46:38think that they they're a non they're

2:46:40they're they're doing they're providing

2:46:42a service and you know fortunately we

2:46:44were able to negotiate and get that back

2:46:47cheap enough that they were able to do

2:46:48it there but they've got a fiduciary

2:46:50responsibility as well and I think you

2:46:54know so so I you know as as much as I'm

2:46:56disappointed you know I would like to

2:46:58think going forward that we will have a

2:47:00uh you know a congenial amicable working

2:47:04relationship there's some things that in

2:47:07the future

2:47:08could be combined from those two

2:47:10different operations that would be that

2:47:12would benefit both of the operations

2:47:14once they're up and running. And I think

2:47:17that that's, you know, at least I think

2:47:19the town's thinking that way. With my

2:47:21conversations with some of the board

2:47:23members there, I think they're thinking

2:47:24that way, too. So, I, you know, I I

2:47:26don't think it's all doom and gloom. I I

2:47:29think we've got to, you know, vote this

2:47:31and move on and and make it a positive

2:47:34relationship. Tracy, before we go to a

2:47:37vote. Yeah, thank you. Um, you know, I

2:47:39don't often speak as a citizen. Um, but

2:47:42it is extremely disappointing and I just

2:47:45want to say in I think that under the

2:47:49circumstances, you're making the right

2:47:50decision and that, you know, to quote

2:47:53Michelle Obama Obama, when they go low,

2:47:56we go high and and this was taken the

2:47:59high road. So um it is very very

2:48:02disappointing but I think it's what has

2:48:04to be done to move the project forward.

2:48:06Thank you.

2:48:08>> Okay. Can I go to a vote or other top?

2:48:11>> I mean the the the most frustrating

2:48:14thing in this to have to been two weeks

2:48:15ago when John was here. He stood up and

2:48:18the first thing he talked about was a

2:48:19contingency money. The second time he

2:48:21comes contingency money. And we're we're

2:48:24going through it and we haven't even put

2:48:26a shovel in the ground. I mean I just it

2:48:28makes me nervous. I'm not saying I won't

2:48:30go along with this tonight, but you can

2:48:32understand like I've never believed that

2:48:34this project's only 140 $137 million and

2:48:37it's not. It's actually more than that

2:48:38because we have to borrow the money. So,

2:48:40no one's ever really understood that it

2:48:42would cost so much more than that. And

2:48:44now, you know, I'm I'm take we're taking

2:48:48our time to nitpick like whether or not

2:48:50somebody can buy a truck in an apartment

2:48:52and then we just blow through $200,000

2:48:54tonight. Like, this is nothing. I'm

2:48:56sorry. I I I think that's a lot of money

2:48:59and so disappointing. I'm really

2:49:01disgusted with them. I will prove this

2:49:03so that you can keep going forward, but

2:49:05I do not think under any circumstances

2:49:07that this project is going to come in on

2:49:09budget. But I really hope I'm wrong.

2:49:15All right, let's go to a vote. Matt, I

2:49:18>> Bobby,

2:49:18>> no. Jill

2:49:21>> I Brooke

2:49:23>> I

2:49:25>> Okay

2:49:27chair votes I

2:49:30very reluctantly

2:49:34areas four to one.

2:49:37Okay. Do we have any committee reports

2:49:39this evening? That was pretty much my

2:49:41island home committee report.

2:49:44>> True.

2:49:44>> I have none.

2:49:46>> Okay. Can we adjourn to executive then?

2:49:50>> Some moved.

2:49:50>> Um, we're making a motion to adjourn to

2:49:53executive session, not to return to open

2:49:54session for the reasons stated in the

2:49:56agenda. And I do have to clear the room

2:49:58and shut off the recording now.

2:50:01>> So moved.

2:50:03>> Okay. All the Yeah. Um, Brook Matt made

2:50:07Brook seconded. All those in favor Matt

2:50:09Fay, Bob Dosta,

2:50:11>> Le Brook Moore.

2:50:13>> I Don Hilly. That carries unanimously.

2:50:15Five to zero. Brook, you got that link?

2:50:17>> Yeah, I'll find it. Thanks.