2026-10-20 - City Council Committees
Summary
Based on auto-generated captions; names and details may be misheard and outcomes incomplete. Committee names come from the captions and the posted agenda.
Time on topic (from transcript timestamps; approximate, includes side talk):
- Tuesday, October 20, 2026.
- Committee day: the recording runs from the Memphis Light, Gas and Water Committee at 9:02 a.m. through the council executive session in the early afternoon.
- Caption timestamps run 2:17 to 5:32:20.
Where each committee runs in the recording
- Memphis Light, Gas and Water Committee: 2:17-18:44 (called to order 9:02 a.m.)
- Parks & Environment Committee: 23:43-36:51 (captions begin mid roll call; the call to order is not captured)
- Libraries Committee: 1:01:40-1:07:28
- Economic Development Committee: 1:15:13-1:43:24
- Public Safety & Homeland Security Committee: 1:45:24-1:56:53 (10:45 a.m.)
- Budget Committee: 2:17:19-2:36:31 (11:17 a.m.)
- Afternoon committee (name not spoken in the captions; about 1:15 p.m.; the items suggest Public Works or General Services): 4:14:46-4:30:16
- Planning & Zoning Committee: 4:43:31-4:54:11 (about 1:45 p.m.)
- Council executive session: 5:13:08-5:32:20 (about 2:10 p.m.)
- No captions from 2:36:31 to 4:14:46 (about 11:36 a.m. to 1:14 p.m.); what happened in that stretch, including any other committees, is not in this record. The other gaps between committees are breaks.
Memphis Light, Gas and Water Committee (2:17-18:44)
MLGW consent agenda approvals
2:39-18:44
- One item: about $4.9 million of MLGW approvals, presented by McGowan.
- Contracts: MLGW's share of the Shelby County groundwater quality control program (55 cents per meter, also paid by Bartlett, Collierville, Germantown and Millington), replacement of old water mains near South 2nd Street and Union Avenue by the Peabody Hotel, a five-year meter data analysis contract, concrete street light post-tops, flood light fixtures, and about 76 miles of distribution wire ($1.7 million over 24 months).
- Councilmembers asked why only a two-block section is being replaced; Smith said the area around the Peabody has had the most breaks, the pipes date to about the 1940s, and more downtown sections will follow.
- McGowan said replacement pace is a balance among cash, borrowing and rates, noted a rate increase request is coming to the MLGW board, and said data center revenue could help fund more main replacement.
- MLGW recovers roughly $1 million a year from drivers who damage poles; a wooden pole costs about $5,000 to $8,000 to replace. No vote is audible in the captions.
Parks & Environment Committee (23:43-36:51)
Mud Island update
23:48-24:04
- The Memphis River Parks Partnership update on Mud Island was postponed to the next meeting at the request of Cooper-Sutton.
Raymond Skinner Center pool reopening
24:06-25:51
- Bolden and general services staff (Spencer, Jamerson) reported the Raymond Skinner Center pool reopened the morning of 10/20.
- The center closed in May for roof repairs, finished in July; the boiler was repaired the prior week and the set point was changed the day before. Supply chain delays were blamed for the long closure.
- Parks will announce the reopening on social media and message Skinner Center members.
Westwood Pool funding transfer
25:51-28:01
- Resolution to transfer $43,224.45 from the Memphis Parks Capital Reserve (project PK25104) to Westwood Pool Improvements (project PK04020), District 6, Super District 8.
- Bolden said the pool had been closed about six years, was fully renovated and opened in August, and that the money covers unforeseen backflow prevention and deck drain line work as the project closes out.
- Approved by voice vote with a favorable recommendation and same-night minutes; it was read again as add-on item 34 at the executive session.
Memphis Roller Derby relocation from the Pipkin Building
28:05-36:49
- The chair asked for an update after delaying the vote; Bolden presented replacement venues for Memphis Roller Derby's practices and bouts.
- Practices: Davis Community Center at the $150 per hour tier-one rate (about 210 hours a year, $31,500 unsubsidized); Parks proposes a subsidized $42.86 per hour (about $9,000 a year, a 71% subsidy). The Pipkin rate would have been about $59,000 a year.
- Bouts: Davis, Gaston or Orange Mound community centers on Saturdays (about $6,000 for four bouts, roughly $7,560 with security), or the Memphis Sports and Event Center (about $20,000 unsubsidized, a 50% subsidy offered).
- Parks also plans skate school for adults (18 and up) at Davis. Staffing is a real cost to Parks; weekend bouts are charged at the for-profit rate because admission is charged.
- The resolution was already sent down with a favorable recommendation at the prior meeting; the chair expected to keep it that way.
Libraries Committee (1:01:40-1:07:28)
Memphis Public Libraries state Metro grant
1:02:12-1:04:50
- Resolution to accept and appropriate $430,500 from the Tennessee State Library and Archives 2027 Metro Grant (all districts, administration).
- Library director Harris said the grant supports the collection of almost 2 million items; e-books cost more than double a physical copy for a limited license. Approved by voice vote.
East Shelby Branch Library agreement
1:04:52-1:06:26
- Resolution approving an intergovernmental agreement with Shelby County government for Memphis Public Libraries to operate the East Shelby Branch Library in unincorporated Shelby County.
- The director said it is the only library owned by the county; the city staffs and runs it. Approved by voice vote. A library book sale was announced for October 22 to 25.
Economic Development Committee (1:15:13-1:43:24)
M Street Fiber network buildout
1:15:23-1:42:10
- New CEO Shimos and new Memphis general manager Kesler updated the council on the public-private open-access fiber network (requested by Walker; Logan had asked for the update).
- Claims: 28,000+ passings built this quarter, 175,000 targeted by the end of 2027, nearly $250 million invested and nearly $500 million more planned; Orange Mound launched a few weeks ago and the Hollywood Community Center follows in early December.
- Quality: construction slowed at the end of Q2 so the network built over two years could be re-certified, to finish by year end, with a vendor providing quality control.
- Councilmembers (Logan, Warren, Walker, White) objected that the maps show little work in Districts 3 and 6 and Hickory Hill while District 4 and the popular corridor in 5 get more, contrary to the promise to serve underserved areas first. The executives could not explain the build order or give a timeline for the unserved areas (2028 and beyond).
- The company says about half of what it has built is in low-income areas and it is at roughly 40 to 45% of planned coverage. Councilmembers asked for the timeline, the quality findings and a plan for the least-connected areas, and the chair invited the company back in two months. Low-hanging wires interfering with MLGW lines were also raised.
Legacy at Countrywood economic impact plan amendment
1:42:12-1:43:24
- Resolution approving the first amendment to the economic impact plan for Legacy at Countrywood (District 1, Super District 9), sponsored by Logan; nobody from the administration was present to speak, so it was held two weeks.
Public Safety & Homeland Security Committee (1:45:24-1:56:53)
Police support for special events
1:45:46-1:54:12
- A Memphis Police colonel (name unclear in captions) described the Special Events Office: it reviews permit applications, assesses security, and alerts every station even when MPD is not working an event.
- This year MPD reviewed more than 600 events (about 65 a month): 155 street closures, 40 parades, 57 runs and 353 public assemblies.
- Hotspot patrols are driven by Real Time Crime Center data and weekly Thursday meetings; a councilmember reported complaints about Overton Square have eased.
- Council members pressed on who pays: MPD invoices large events such as the St. Jude Marathon, Memphis in May and River Beats, but a member recalled only about $1,200 recovered from the marathon and asked for the real figures and a policy requiring organizers to pay upfront. Another member said a Hickory Hill Christmas parade was cancelled for lack of police coverage on the same weekend as the St. Jude event.
US Marshals Service overtime grant
1:54:14-1:55:28
- Resolution to accept additional grant funds from the US Department of Justice through the US Marshals Service (Western District of Tennessee) for overtime for personnel salaries.
- MPD said it received an initial $1.9 million at the start of the Memphis Safe Task Force and this is leftover money offered months later. The amount is captioned as $15,528.10 in committee and $105,528.10 in the add-on listing.
- Sent to the full council with a favorable recommendation and same-night minutes; read again as add-on item 35.
Downtown crime center funding transfer
1:55:28-1:56:50
- Resolution to amend the FY27 capital improvement program and transfer $319,000 of general obligation bond funds within the downtown command project (IT010008) from other costs to architecture and engineering (District 6, Super District 8).
- Major Merrick (as captioned) said the project began as an IT project and moved to police services; the transfer pays architects' invoices so phase two of the downtown crime center can start. Approved with a favorable recommendation and same-night minutes; add-on item 36.
Budget Committee (2:17:19-2:36:31)
Q4 general fund financial update
2:17:42-2:18:37
- The Q4 general fund financial update was moved to the November 10 council meeting, where members hope to review the fiscal 2026 fourth quarter and the fiscal 2027 first quarter together; Davis was asked how long the Q1 numbers will take.
Solid waste service update
2:18:37-2:27:02
- Winton (COO) said trash pickup was the top concern when he took the role about 90 days earlier. The system serves about 180,000 customers, collects over 380,000 tons a year with about 600 staff and 400 vehicles, and is split into five areas.
- Missed bulk trash was the top 311 call driver (about 2,250 incidents on August 1), worst in Area D (White Haven, Westwood, Parkway Village), where rentals and turnover create set-outs.
- Fixes: a second maintenance shift, Saturday sweep crews borrowed from other areas starting about August 10, and a 20-person code enforcement team on the solid waste ordinance. The call trend is down and 311 average answer time fell from about 6 minutes to about 26 seconds.
- One cited property owner faced about $1,300 in cleanup charges and a court date; the city will return on whether fines are high enough. Councilmembers asked about charging tree companies; the code process tags the homeowner, who may pursue the contractor.
Solid waste worker pay budget amendment
2:27:04-2:36:28
- Resolution to amend the FY2027 general fund, solid waste, sewer and storm water operating budgets, presented by Winton.
- Terms: a 5% raise across solid waste positions (2% for special equipment operators, already near market) and a wage floor raised from $20 to $22 an hour, following the budget impasse with the employee association (captioned 'ask me'). Cost: about $786,000 general fund, $1.4 million solid waste, $66,000 sewer, $94,000 storm water.
- Allen said no position is close to or above the market study except the 2% one. Questions centered on the sewer fund's negative cash balance; Davis said receivables cover it ($12 million received that day), staff will find the $66,000 in expense cuts, and the first month of the sewer rate increase came in near $3.5 million.
- Smiley backed it as a matter of priorities; the chair wanted the Q1 numbers but would support it if they check out. A voice vote was taken (the captions do not make the result clear).
Afternoon committee (name not spoken) (4:14:46-4:30:16)
Data center community benefits fund allocation
4:15:00-4:20:49
- Resolution to allocate and appropriate $3,259,282 of FY26 data center revenue to nine projects and programs under the community benefits ordinance (District 6, Super District 8). Ford had held it; he said agreements were reached.
- Mayor Young said it is the city's first participatory budgeting, based on a resident survey. Changes: home repair raised to $2 million (from $1.4 million), City Beautiful cut to $25,000, environmental education kept at $100,000, air quality monitoring reduced (the county health department installed an EPA monitor in the Riverview area in June), more for air conditioner distributions, and a $359,000 grant pool with at least $50,000 for health care needs.
- FY27 revenue is expected to be about $6.6 million for ZIP codes 38109 and 38116, with recommendations to come. Approved by voice vote.
Memphis Zoo pervious pavement grant
4:21:05-4:22:18
- Resolution to accept and appropriate a $500,000 Tennessee Department of Environment and Conservation grant for design and construction of pervious pavement at the Memphis Zoo (District 5, Super District 9); Dodson said it replaces at least 44,000 square yards of asphalt. Approved by voice vote; add-on item 37.
Homes Road-Two Lane truck traffic
4:22:19-4:30:12
- City traffic engineer Tatum gave a timeline: no-truck signs went up October 1 after Cooper-Sutton raised truck traffic at Homes Road and Two Lane, with no noticeable drop; trucks were traced to vendors serving the xAI facilities (captioned 'Space XAI').
- After October 9 to 12 meetings, xAI shared routing guidance and alternate routes with its truck partners. Observations on October 19 and 20 showed a significant decline (about one truck every two minutes) with a few stragglers; school drop-off and pickup entrances had been disrupted.
- Warren asked about tickets and fines; the city does not yet know how many citations MPD has issued or the maximum fine and will report back in two weeks. A member also asked about access to the White Haven golf course lot, where nearby worker parking causes delays.
Planning & Zoning Committee (4:43:31-4:54:11)
Austin Peay Highway planned development amendment
4:44:20-4:46:55
- PD 2026-013 (District 1, Super District 9; Logan's district): an amendment to a planned development approved in 2000 to allow commercial, office, residential and civic uses on the west side of Austin Peay Highway between New Covington Pike and Egypt Central Road in the Raleigh area.
- Planning staff and the Land Use Control Board recommended approval (Penzes introduced the case; 38 notices were sent; the plan is consistent with Memphis 3.0). Sent down with a favorable recommendation and same-night minutes without objection.
- A separate first item in Logan's district was held until November 24 so a neighborhood meeting can occur first.
Cordova Market Drive street name change
4:46:57-4:48:45
- Street name change SNC 2026-0003 (District 1, Super District 9): the planner presented four MLGW-approved names for the street captioned 'IKEA Way'. Logan favored Cordova Market Drive and the committee chose it without objection.
147 North Germantown Parkway car wash ownership change
4:48:51-4:51:41
- MJR 2026-022 (District 2, Super District 9): a major modification to planned development PD 2021-024 at 147 North Germantown Parkway (Cordova) only to reflect a new car wash owner; no site changes.
- 148 notices went out September 18 with no letters of support or opposition; staff and the Land Use Control Board recommended approval. The applicant said Club Car Wash bought the Glide car washes and this is the last to convert. Sent down favorably with same-night minutes.
Car wash special use permit SUP 26-013
4:51:41-4:54:08
- SUP 26-013 (District 2, Super District 9): a car wash on a corner lot in a CMU (commercial mixed use) district that the council downzoned from CMU-3 to CMU-1 in February 2021.
- Planning staff recommended rejection as inconsistent with the neighborhood (four existing car washes in a five-mile stretch from North Parkway to White Station along Summer Avenue, plus one newly approved); the Land Use Control Board also rejected it. The applicant was not present and the committee held the item without objection.
Council executive session (5:13:08-5:32:20)
Data center community benefit agency ordinance
5:13:35-5:29:13
- Ordinance sponsored by Warren to set up a framework for a state-approved nonprofit community benefit agency so the city can lawfully receive, manage and spend data center community benefit funding. He said it is separate from the 25% of tax revenue going to neighborhoods near the xAI plant.
- The agency would receive contractual per-kilowatt-hour fees from data centers (not property taxes, which the city cannot impose), run by a board like an airport authority with annual reporting; it needs the state legislature's approval. Cited estimates were $120 million to $980 million a year within 10 years.
- Logan asked why the city cannot negotiate directly; Warren said the city attorney advises that would be treated as a tax. Walker asked how xAI's current community gifts compare (donations).
- Spinosa suggested folding it into a related data center item before the council; Wade said it can go to first reading tonight and be substituted next meeting. Approved with a favorable recommendation and placed on first reading under consent.
Other business
- Roll calls and presiding remarks; the Libraries Committee announced a library book sale for October 22 to 25.
- Planning & Zoning held its first item (in Councilwoman Logan's district) until November 24 so a neighborhood meeting can happen first.
- At the executive session the council read add-on items 34 to 37 (Westwood Pool transfer, US Marshals overtime grant, downtown crime center transfer, Memphis Zoo pavement grant) with same-night minutes; see the linked topics above.
Agenda
MLGW, Parks & Environment (Mud Island update, Westwood Pool transfer), Libraries (state Metro grant, East Shelby library agreement), Economic Development, Public Safety, Budget, Public Works and Planning & Zoning committees.
Sources
- Video: https://youtube.com/watch?v=wZPr55ycAMU
- Agenda: https://memphistn.gov/wp-content/uploads/2026/10/October-20-Committee-Agenda-final-as-of-10.15.16.pdf
- Minutes: not posted as of 2026-11-07
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
02:17Good morning, colleagues. Today is
02:19Tuesday, October 20th. It is 9:02 a.m.
02:23and I hereby call the Memphis Light,
02:25Gas, and Water Committee of the Memphis
02:27City Council to order.
02:30Miss Robinson, can you call the role,
02:33please?
02:33>> Yes, ma'am.
02:35Councilman Dr. Warren, Chair Walker,
02:38>> present.
02:39So today we have one item. It is a
02:42discussion on the MLGW consent agenda.
02:46All council districts requested by MLGW.
02:50President McGawan, you are recognized.
02:52>> Thank you, Madam Chair. Doug McGowan,
02:54Memphis Light Gas and Water 220 South
02:56Main Street. Today we bring forward $4.9
02:58million worth of approvals. These cover
03:00multi-year contracts for work we need to
03:03do at Memphis Light Gas and Water to
03:05maintain reliable and resilient
03:08utilities.
03:10The first item is partial funding of
03:12pollution control groundwater quality
03:13control program. This is partial because
03:15this is MLGW's share. Uh we charge 55
03:18cents per meter in our system. We
03:20provide this to the Shelby County Health
03:22Department for their groundwater control
03:23board as do the other water systems in
03:25Shelby County, Bartlett, Carville,
03:27Germantown, Millington. uh this uh
03:30provides them the resources that they
03:32need to do uh study of the groundwater
03:34to prevent contamination. They do
03:36sampling and monitoring of existing
03:38wells uh particularly private wells
03:41since we do that uh most of the water
03:43systems do that on their own and report
03:44to the county. So uh this is our part
03:47here and there's been a lot of dialogue
03:48about making sure that the pollution
03:51control groundwater quality control
03:53program is fully funded.
03:56Next is a project that will replace
03:58water manes in the vicinity of South 2nd
04:01Street and Union Avenue, approximately
04:03one block to the east and one block to
04:05the south. If you think about this, uh
04:07to the north and west of the Peabody
04:09Hotel, we will be replacing a 12-in
04:11water man and an 8 in water man. You
04:14will recall over the last few years that
04:16area has been torn up several times
04:18because of water mane breaks. It's a
04:20very old water man. We have flooded the
04:22basement of uh the Peabody several times
04:25and so uh we committed that we would
04:28just replace this entire section because
04:30patching is clearly not working. Uh we
04:33patched successfully several times the
04:35areas that were broken and then
04:36downstream we'd get another break. So
04:38our team has assessed and said it's time
04:40uh to replace this line in total because
04:42there is so much infrastructure there
04:44and so many businesses that are around
04:46there. So, this will be a project that
04:48will start this winter and take probably
04:50about a year or so.
04:53The next is meter data data interval
04:55analysis. This is a five-year contract
04:57with LBMC.
04:59Now, because we have advanced meters, we
05:01take samples of our meters every 30
05:03minutes. And what that you can see on
05:05the graph here, this tells us how our
05:07customers are using energy, when they're
05:09using their energy, and it helps us
05:11predict where our peaks will be and what
05:13kind of infrastructure we need. So we
05:15talk about using batteries for peak
05:17shaving. Well, this will help us
05:19determine when do we dispatch those
05:21batteries to make sure we hit that peak.
05:24So this software analysis allows us to
05:26make sure we hit that uh the peaks right
05:28and allows us to forecast into the
05:30future uh changes in the way that our
05:32customers are using energy. So
05:34critically important for our folks to
05:36manage the electric load in our system.
05:39The next is uh purchase of standard
05:42concrete posttops. for purchasing 320 of
05:44these. Uh these are the concrete
05:47posttops that you'll see where there are
05:49street lights in and around the city. Uh
05:51these are hollow concrete with the wires
05:53that go up through the inside and
05:55they're installed places where we need a
05:57new posttop or places typically where uh
05:59drivers have knocked them down. So this
06:02is just a recurring purchase of those
06:04posttops.
06:06Unrelated to that, these are the
06:07Luminere flood lights in the 1000 watt
06:10equivalent. These are the very high
06:11power lights. 661 of these that we use
06:15uh for our street light inventory for
06:17expansions. There are several areas
06:19where we're adding new street lights and
06:21this goes back to replace ones that
06:22again have been damaged or knocked down
06:25um and are no longer serviceable across
06:27the territory.
06:30The next request is for $1.7 million
06:33over 24 months. We have about an 11
06:35million budget for purchasing wire. This
06:37is $1.7 million of that. Uh this is
06:41purchasing uh this is the high voltage
06:43wire that we use for distribution of
06:45electric power across our system. It's
06:48405,000 ft just or 405,000 linear feet.
06:52That is 76 miles of wire that comes on
06:55these large spools that we will use um
06:58to both extend services and also replace
07:01services when it is time to replace the
07:03wires in our distribution system either
07:06because of failure or because of age.
07:09Subject to your question that concludes
07:11my presentation for the consent agenda
07:13items.
07:29So this is the pollution control water
07:31quality control program. This is with
07:33the Shelby County Health Department.
07:35This is allows them to do the
07:36monitoring. Let me talk since you asked
07:38the question about Caesar. We have two
07:41programs, two contracts that we um have.
07:44One is with Caesar and that is we're in
07:46the second uh second phase of that
07:49study. We provide all of the data that
07:51we have on our wells. They look at all
07:53of our wells. They help us determine
07:56where we can position wells uh so we
07:58don't introduce hazards into at the at
08:02the macro level. We also have the USGS
08:05contract and they're doing more micro
08:07level with the specific placement of
08:09wells in and around our well fields so
08:11that we don't hazard any contaminants in
08:14there. So two contracts Caesar has a
08:16broad ranging one that helps us overall
08:18manage and USGS is looking specifically
08:20at placement of wells in our well field.
08:22And then the pollution control
08:24groundwater quality control program is
08:26making sure that they can track uh the
08:29flow of contaminants across the county
08:30if there are any and to make sure that
08:32individual wells are not having any
08:34contaminants in them. So it's a
08:35monitoring and a testing program here
08:37that we all contribute to.
08:52Yes,
08:55>> that is the [clears throat] Shelby
08:56County Health Department. Caesar has
08:58access to all of our information. They
09:01have, you know, free access because we
09:03have a contract with them and and so we
09:05provide all of our data. We do not have
09:07access to the private well data. The
09:09Shelby County Health Department has that
09:10information. And so I think that's where
09:13they're looking for that data. And I
09:15don't know that it's uh there's any real
09:17limitation here. I think we just need to
09:18do a better job of coordinating across
09:20the county on that kind of thing. So,
09:22but we're not we're not in the middle of
09:23that engagement.
09:25>> And could you look at your next slide?
09:27>> My next slide?
09:28>> Yes.
09:28>> Yes, sir.
09:30>> All right. That's like only a twob block
09:33section. Is that what we're looking at
09:34here?
09:35>> It is.
09:35>> Okay. What makes us think it's not going
09:37to break if it's really old there? A
09:40block above and a block below? Why are
09:42we not doing
09:43>> that whole area based? So I guess that
09:47was my question.
09:48>> This is an area that has been broken and
09:50repaired multiple times. So we have
09:51multip we've introduced more
09:53vulnerabilities. So is there assessment
09:55for why we're doing that section.
09:57>> Come on up. Come on up here. Yeah.
10:02Introduce yourself and let them know
10:03what we're talking about here. So uh
10:06Aaron Smith, acting manager, water
10:07engineering and operations from MLGW. We
10:11have replaced not recently but in the
10:14past some just to the south on South
10:16Second Street. And so that section right
10:19around the Peabody is really the most
10:22we've experienced a lot of breaks there
10:24as uh President McGawan said earlier and
10:26so that's the section that we're
10:27targeting with this. Um in the future we
10:30may target there will be more sections
10:32in and around downtown that we will
10:34probably have to target but this is just
10:36our first location. I just was wondering
10:38because normally all these things tend
10:41to go bad at once because they're put in
10:43ground time maybe. How old are these
10:45pipes that you're replacing in general?
10:48The oldest to the newest?
10:50>> Uh those two pipes
10:54I think were like in the 40s um based on
10:57my memory. Um I don't have the exact
11:00date on me right now, but I want to say
11:01it was in the 40s.
11:03>> 1940s. And out of the pipes that are in
11:06downtown, how many were in the 1940s?
11:09>> Oh, a lot.
11:10>> Okay. So, as we're thinking about this
11:13and we're looking at, you know, uh how
11:16we potentially may be able to get some
11:18more money into our system to be able to
11:20do this, that would be something that is
11:23necessary, should be done. And is it in
11:25your plans to do? Do we have do we have
11:28plans for this?
11:30>> I'm I'm thinking tree cut trimming here,
11:32Doug. Yeah. No, absolutely right. This
11:34is a this is one of those questions.
11:36We'll be talking about this with our
11:37budget. We have to balance uh the amount
11:41of cash that we have, the amount of
11:43borrowing that we do, and the amount of
11:44work we have to do across system with
11:46the rates. And as you know, we're coming
11:48with a request for the rate increase if
11:49our board approves that. And so there's
11:51going to be questions about how much do
11:53we have to invest now versus delaying in
11:56the future. That's always the question.
11:58So, uh over time we have delayed
12:00investments. uh that has not been our
12:03practice here. We have taken a strategic
12:05approach to getting those most critical
12:06things that are most important. So
12:09critically when I got here we had uh
12:11some water mane breaks and we didn't
12:13have enough production to overcome that.
12:15So we invested heavily in new production
12:18making sure we had enough wells to
12:19produce enough water to to get past any
12:22breaks. Then we had some vulnerabilities
12:24in our uh filtering system. So we had to
12:27make sure we get those filters back up
12:29to speed. And then along the way we also
12:31have been doing lead service line
12:33replacements because that became a need
12:35here too as well as replacing um the
12:38infrastructure under the ground. Now the
12:40other thing I asked the team for was
12:42give me an analysis of what we could do
12:44to to predict the failure of the water
12:46lines and there is not real good science
12:48out there for how you predict the
12:50failure of that like there is for an
12:52electric transformer or a circuit
12:54breaker. we have pretty good idea about
12:56how they're performing. A water main
12:59either works or it doesn't. So, this is
13:02all about prioritization. So, I if I had
13:05um all of unlimited funds, we would
13:08definitely be uh replacing water manes
13:11before they break before she before they
13:15broke
13:16um on a regular and recurring basis. But
13:19we are balancing uh what everybody wants
13:21us to do to make sure that we stay
13:23affordable and that we minimize the
13:26amount of impact. Uh so we think this is
13:29the precise kind of thing we need to do.
13:31We we have a really good sense of where
13:33these things are vulnerable, where
13:34they're breaking. And so uh in the order
13:37of priorities once we get some of these
13:39other major like production components,
13:42we may be able to get into that probably
13:44in a few years. You know, we're we're
13:46looking at what do we do with these data
13:49centers and how do we get funds from
13:51them?
13:51>> Sure.
13:52>> Okay. And part of what I'm looking at is
13:54how much funds does MLG&W need for able
13:58to extract more funds from these things
14:00as we move forward in the future. This
14:02is a particular spot that having that
14:05information will be helpful as we figure
14:07out how we want to ask and what we want
14:09to do to move forward. We we certainly
14:11have an idea of of the things we'd like
14:13to do that we think are prudent, but
14:16again, we're going to have prudence
14:17because I know this is a community of
14:19many needs, Dr. Warren, and and we want
14:21to make sure that we're balancing what
14:23we need to, you know, we just want to
14:25make sure we're on target with that. So,
14:27so we'll definitely have uh some ideas
14:29about that and where we could use a
14:31little additional help.
14:32>> Yeah. Because you're thinking, you know,
14:33you look back at the tree thing, you
14:35know, and the power line thing, they
14:37were balancing that too as best they
14:39could on no money.
14:40>> My idea of balancing is making sure that
14:42we meet the basics. We have to fund all
14:45of the preventative maintenance. We have
14:46to fund all of the uh all of the
14:49recurring maintenance. So, we have to
14:50renew and replace infrastructure. And
14:52that's exactly what you're talking about
14:53here is renewing and replacing
14:55infrastructure when and before it fails.
14:58So,
14:58>> thank you, Madam Chair. Yeah, thank you,
15:01Miss McGome.
15:03>> You're welcome.
15:05And I had a couple of questions. So, on
15:07page four, the partial funding, so we're
15:12paying part of it. Are these
15:14municipalities at the bottom paying the
15:16other portion?
15:17>> Yes, ma'am. They are everybody. I think
15:18it's like 55 cents per meter that we all
15:21pay. So, the number of meters that they
15:22have, that's how much money flows into
15:24the program.
15:25>> Okay. And then one more, please.
15:32This is an annual contribution.
15:35>> Okay, thank you for that. And then on
15:37page um
15:40so these are post tops. These are not
15:43the actual post.
15:45>> Uh these the we call them post tops,
15:48concrete post tops. That means that the
15:50light fixture sits on top of the post.
15:52You know, there are some that have the
15:53gooseeneck arm that sticks out and the
15:55like the this slide. That luminere will
15:59sit on one of those arms that sticks out
16:01on these concrete post tops. They're the
16:04decorative posts that go into the ground
16:06and then the light fixture sits on top
16:08typically with a globe on it. That's why
16:09we call it a posttop. So, this is the
16:12concrete standard. This is the light
16:14pole and then there's a posttop light
16:16that sits on top. That's why it's called
16:18the posttop.
16:19>> Okay. Um, and sometimes, unfortunately,
16:23someone can
16:26hit a pole and knock it down. So, are
16:29they do you all currently charge people
16:32for that?
16:33>> Yes, ma'am. Our uh claims department
16:35does a good job of trying to recover
16:37resources when we can um if it is known
16:40and if the vehicle is still there and if
16:43many times we see a pole knocked down
16:46and there's no no evidence, there's
16:47nobody there on the scene. So, but when
16:49we know somebody has caused damage to
16:51the system, our team will work to
16:53recover a claim from that damage. So, I
16:56think it's how many millions of dollars,
16:58>> Jennifer, have we recovered, do you
17:00think?
17:01>> I think it's a couple million in our
17:02budget. A million and a half.
17:08>> So, Mr. Cle says it's about about a
17:10million dollars a year in recovery that
17:12we actually are able to to recover for
17:15damage to our systems. Um, so probably
17:18not close to the overall cost, but
17:20that's just the nature of
17:22>> Okay.
17:23>> And how much do you assess um the driver
17:26for a pole?
17:27>> We're just trying to recover the cost
17:29for the the full requirements of
17:31replacing that pole.
17:32>> And that's how much?
17:34>> It depends on the pole that we have. If
17:36it's a highmass light on the interstate,
17:37that pole's more expensive. These
17:39lights, uh, you can see here are a
17:41little less expensive than we also have.
17:43If it's a wooden pole, um, all in, if we
17:46have to change out the pole, it's about
17:48$5,000 to do the pole and all the
17:50attachments with the labor and
17:52everything else. So, it can vary. A
17:54street light pole could be several
17:55thousand uh just to replace the pole and
17:58the lighting uh structure that goes with
18:00it. It's more expensive. If they hit the
18:02pole and it dra has underground
18:04infrastructure and pulls up all the
18:06wires, uh, that's more pricey because
18:08it's affecting multiple poles. So, it
18:10does vary pretty widely. Okay, thank you
18:13for that. Let the record show that
18:15Councilwoman White has joined us.
18:23>> Yeah, 8,000. Okay, I was correct. It's
18:25about 8,000 to totally replace a wooden
18:28pole with all of the attachments to it.
18:31>> Okay, thank you. Councilwoman White, did
18:35you have anything before I wrap up?
18:37>> You're welcome. Well, being that there
18:40are no other questions or comments, we
18:42are adjourned. Thank you.
18:44>> Thank you, ma'am.
23:43Councilwoman White
23:45and Chair Warren also present.
23:48Colleagues, um we are not going to have
23:51an update on Mud Island River Parks
23:53Partnership after talking with uh
23:56Councilwoman Cooper Southern. She would
23:58like for us to delay that till the next
24:00meeting. So, we'll do that. And uh the
24:04first item I'd like to call is item
24:06number three, a quick update on the
24:08repair of the Raymond Skinner pool. Uh
24:11do we have anyone here for that
24:13presentation? This is I think going to
24:15be good news for people who want to swim
24:17there. Uh it is a supply chain issue. I
24:21think that has been our downfall. Uh
24:23>> yes, good morning. Uh Justice Balden,
24:25Memphis Parks director, 2599 Avery.
24:28Also, I'll allow my colleagues to
24:30introduce themselves.
24:32Gerald Spencer, deputy director, general
24:35service, 125 North Main.
24:38>> Melvin Jamerson, Director, General
24:39Service, 125 North Main.
24:42>> Yes. So, we'll save the best news for
24:44last. I guess first off, I'll just turn
24:46it over to uh general services just to
24:48talk about uh some of the updates they
24:50performed uh both on the roof as well as
24:52the boiler.
24:53>> Excellent. Gentlemen,
24:55being heroes already at Over Park, let's
24:57see how we can do today.
24:59>> [laughter]
25:00>> So, good morning. Yeah, we um the
25:02Skinner Center uh was shut down in May
25:05for roof repairs. Uh the roof repairs
25:07were completed in July. Um the boiler
25:10was repaired last week. Yesterday, we
25:12went in and changed the set point so
25:14it'll be warm and properly. So, the pool
25:16is um area is opened and ready ready to
25:19be used.
25:21>> Well, when is the exact opening date?
25:24>> So, it actually opened this morning. So,
25:26Raymond Skinner Pool is is back open.
25:28Yeah, there we go.
25:29>> Okay, that's I think that's a win-win.
25:31You have any questions from fellow
25:33council member?
25:35>> Okay, if not, thank you gentlemen for
25:38that great news. Thank you.
25:39>> Hopefully uh we can put that out and
25:41people know they can start going back.
25:43>> Oh yeah, it'll be out on our socials and
25:45also uh we have a a message that's going
25:47to all the members who are uh of the
25:49Raymond Skinner Center.
25:51>> Excellent. We have a resolution to
25:53allocate appropriate and this is item
25:55number four. Thank you guys. Item number
25:56four is a resolution to allocate,
25:58appropriate, and transfer the sum of
25:59$43,2245
26:03from Memphis Parts Capital Reserve CIP
26:06project PK25104
26:09fiscal year 2027 contract construction
26:12and transfer to Westwood Pool
26:14Improvements CIP project number PK 04020
26:19contract construction as part of fiscal
26:21year 2027 capital improvement budget.
26:24This is district six super district 8.
26:26Could I please have a motion
26:29move by white and seconded by the chair.
26:32All right. Um you have the form is p.
26:35>> Okay. So westwood pool um as many of you
26:39are aware this pool closed pre-
26:41pandemic. Um had been closed for roughly
26:44about 6 years or so. Had an aluminum
26:46main drain system and whatnot. parks
26:48went in, performed a complete renovation
26:50of this pool and we actually opened
26:52during the month of August. Now, why it
26:55was unique, we were essentially uh
26:57complete with the summer months, but we
26:59were able to open and coincide with the
27:01the opening of uh Westwood High School,
27:04who also had uh middle school students
27:06transition over from Chickasaw. So
27:08ultimately we provided uh programming
27:11Tuesday through Friday from 3 to 6:00
27:13p.m. um during the month of August up
27:15until Labor Day as well as Saturday from
27:171 to6 and and guess what we doubled the
27:19membership at uh Charles Powell. So u we
27:23started with roughly about 350 members.
27:25We had 700 members by the end of the
27:27month. So u it offered us a unique
27:29opportunity to work with the community.
27:31Now, when it comes to this particular
27:33allocation, appropriation and transfer,
27:35essentially there was some unforeseen
27:36circumstances, mainly the backflow pre
27:39as well as uh some deck uh drain line
27:41repairs and whatnot. And so, those have
27:44been completed and we're just closing
27:45out the project.
27:48>> Do we have any other questions?
27:51If not, all those in favor, please say
27:53I.
27:55>> Okay. And the chair's eye. I believe the
27:57eyes have it. That goes down with a
27:59favorable approval for same night
28:01minutes without objection. Okay. And
28:05item uh our last item is uh updates on
28:09park discussion with Memphis Roller
28:11Derby on relocation from Pipton Building
28:14District 4 Super District 9. This was
28:16requested by me at the since we delayed
28:20the vote last time. Where are we now
28:23director and should we proceed with our
28:26vote tonight? Yes. So, we've uh made
28:28tremendous pro progress uh during the
28:31past few days. Uh first I'll say it's
28:33been a great opportunity to work
28:34alongside the roller derby community. U
28:36certainly uh we understand when a in in
28:39sports sometimes when an official makes
28:41a call 50% of the people may not agree
28:44with the call but ultimately our goal is
28:46to make sure we continue to deliver
28:48quality services. And so, uh, what you
28:50have here is, uh, locations that we've,
28:54uh, determined that Roller Derby will be
28:56able to both practice as well as host
28:58bouts. So, uh, first off, if you're
29:01looking at the screen here, you'll see
29:02Davis Community Center. So, the tier one
29:05rental rate for Davis Community Center
29:06is typically $150 an hour. So, what
29:09we've done, uh, historically, roller
29:11derby practice is about 210 hours per
29:15year. Uh the annual rate without a
29:18subsidy would be $31,500.
29:22Um a few weeks ago, Chair Warren, you
29:25asked us to essentially keep the price
29:26the same for roller derby. So what we're
29:28showing you is what a subsidized rate
29:30would look like at $42.86 or about
29:34$9,000 a year. That is a 71% subsidy
29:38that the Memphis Parks would be
29:40providing to roller derby. Um now I I'll
29:43also bring you down to the Pipkin
29:44building. So, what we're looking at is
29:45the weekday uh nonprofit rental rate.
29:48Um, so normally the cost would be for
29:52210 hours at $281.25
29:56would be approximately 59,000 a year. U
30:01roller derby was receiving a rate at
30:03approximately right around 42.86 and so
30:06thus there was an 84% subsidy there.
30:09Now, um, couple of things that that are
30:12important to note for Davis Community
30:14Center. This is a location that not only
30:15we've uh secured for practices for
30:17roller derby but also for skate schools.
30:19So what that means is uh for the first
30:21time in at least under my tenure uh we
30:24will offer not only uh practices to
30:26roller derby in a Memphis community
30:28center um in in the university district
30:30mess bun but also skate school for 18
30:34and up. So our goal through this process
30:36is to really activate the community
30:38center in a way in which we are bringing
30:40more skaters into the community. We are
30:42introducing more skaters to what roller
30:44derby does and ultimately we hope more
30:48members of the community skate. Memphis
30:50is a skating community. We we've done it
30:52at Crystal Palace, Raleigh skating rink
30:54and historically we're skating on wood
30:56floors, gymnasium floors simp simply and
30:58so we will do that at Davis Community
31:01Center. Um now I want to uh also move to
31:04the next page just to talk a little bit
31:06about bouts.
31:10Okay. So, um, I've listed just a couple
31:13of locations. Orange Mound could be a
31:15third location where bouts could be
31:16hosted on a Saturday. Keep in mind the
31:18Memphis Parks is, uh, typically has
31:20hours on Saturday of 9:00 a.m. and until
31:231:00 p.m. Typically, historically, uh,
31:26roller derby has bouts that will start
31:29in the afternoon around 4:00 and then if
31:31they have a second bout, it will be
31:32about six o'clock. And so we have an
31:34example where uh if they were to use
31:36Davis or Gaston Community Center, which
31:38we've provided a a permit for, the
31:41annual rate without a subsidy would be
31:43$6,000. And so we don't Yeah. Without we
31:46don't need to provide a subsidy. The
31:48cost is actually uh much lower uh than
31:50what they were paying at the Pipkin
31:52building. And so what you see here, four
31:54four bouts that that's four different
31:56dates where you would have a bout. Um
31:58the roughly the cost would be right
32:00around $6,000. We've incur we've
32:03included the cost of what security would
32:05would include. And so that's essentially
32:07about one for for every 50 or so. U and
32:10keep in mind the the crowd may change
32:12from from bout to bout, but roughly
32:15we're estimating about $7,560.
32:18So essentially what we've shown you is
32:20an opportunity to actually uh place some
32:22funds back into uh roller derby to be
32:25able to you use for other things. Um,
32:27but certainly we're also looking to the
32:29fact that now on a Saturday, whether
32:32it's the afternoon or the evening, you
32:33could visit a Memphis Parks community
32:35center and you could see roller derby
32:37for the first time. And so we're excited
32:39about that opportunity.
32:40>> Are you plans on thinking of alternating
32:43Davis and Gaston to get into different
32:45communities and explore? They would they
32:48prefer just to have one?
32:49>> Yeah. So ultimately that'll be under the
32:50purview of roller derby to determine. Um
32:53we've asked that essentially we host
32:54some scrimmages and really lay out what
32:56it feels like. So there'll be an
32:58opportunity for them to invite uh you
33:00know members of the community. Certainly
33:01we'll be able to you know assist with
33:03that outreach, but it gives us an
33:04opportunity to really see what it looks
33:06like to have a bout in a community
33:07center. So we're looking forward to
33:09that. Um also um and and essentially
33:12what we've done is said hey uh during
33:14the peak months when Memphis sports and
33:16event sports and event center is at its
33:19highest Davis Gaston or even Orange
33:21Mound Community Center would be
33:22available for your use. So we're talking
33:24March, April, May and June if necessary.
33:27Uh and now when we look at the Memphis
33:29Sports and Event Center, the annual rate
33:32without a subsidy for four bouts would
33:34be right around $20,000.
33:37Certainly u there's an opportunity for
33:39security. It all depends upon whether
33:41roller derby is hosting without any
33:43events on site. If there's an event on
33:44site on courts uh uh 12 through 16, the
33:49security is essentially already there
33:51and that would be a cost that roller
33:53derby doesn't necessarily have to occur.
33:54So ultimately that will just depend on
33:56some coordination that would happen with
33:58with Memphis Sports and Event Center. Uh
34:00yesterday uh we did have a great
34:02conversation with Sports and Event
34:03Center. They also got over the license
34:05agreement which uh you know now roller
34:08derby has in their hands. I also in
34:10included uh what the subsidize rate will
34:13look like. So what you see now is the
34:15Memphis Sports and Event Center is
34:17providing a 50%
34:19subsidy to Memphis Roller Derby. So um
34:24currently if if you'll look at the cost
34:26there, they're offering a cost of
34:27roughly $10,000 and then certainly we've
34:30got the option for security um as well.
34:33And then I'll flip down to the bottom
34:35Pipkin building. So, um, essentially
34:37you've got a base rate that's about
34:39$2,125.
34:41When you add that up, it's over four
34:43bouts. You're looking at about 8,500.
34:45And then we have the security and
34:46additional fees that are there. Uh, that
34:48cost was roughly about $12,900. Um, I
34:51did not include the optional buyout cost
34:54because that more so refers to permits
34:55related to either food or or beverage,
34:58alcohol. Um, but what you see here once
35:01again is an opportunity to actually
35:04place funds back in the hands of Memphis
35:06Roller Derby. So certainly we understand
35:08that change is not always comfortable,
35:11but what we wanted to do was make sure
35:12that we were equitable at what we were
35:14providing. So um, this is essentially
35:16what we have here uh, as it relates to
35:19both practices and ballots.
35:20>> Thank you. Let the record show that
35:22Councilwoman Logan and Councilwoman
35:24Walker and Councilman Ford are also
35:26present.
35:28Do we have questions? Council members
35:32clarifying questions.
35:34>> So there's no additional expense to
35:36parks to for these arrangements. It's
35:38it's evening out in other words.
35:40>> Well, there is a cost for us when it
35:42comes to staffing. Yes. So, when we're
35:45staffing the location, uh if it's Davis
35:47or or Gas and Community Center from 8 to
35:509:00 p.m. on a weekday, uh there is a
35:52cost associated with that in terms of
35:53part-time staff, but we're at least
35:56capturing that hour through the $150
35:58cost. So, that's essentially the
36:01community center is already open during
36:02normal business hours. Now, when it
36:04comes to the actual bouts on the
36:06weekend, that is our rate if you were to
36:09reserve a facility for a for-profit
36:11rental. Essentially what we're saying is
36:13if you're going to charge admission,
36:15right, uh you you will have patrons
36:17coming in paying to enter the facility.
36:20That is what that rate is for. So yes,
36:21there is a cost associated with it, but
36:23we believe that this is a cost that we
36:25would provide to any community
36:26organization we were working alongside.
36:28>> Okay. Thank you.
36:32>> So um I think we'll be voting on this
36:35tonight. It was already sent down with
36:36the favorable recommendation last time.
36:39Unless there are any changes, uh, we'll
36:41continue that this time. And I believe
36:44that's it. Unless anyone has any other
36:46issues today. If not, thank you very
36:49much. We're ajourned. And great news on
36:51the pools.
36:52>> Thank you.
36:53>> Thank you.
1:01:40Walker, I'm sorry.
1:01:41>> Present.
1:01:42>> Councilwoman Logan.
1:01:45>> Councilman Warren.
1:02:12Thank you for coming today. We have two
1:02:15items. Item number one is a resolution
1:02:18to accept and appropriate grant funds in
1:02:20the amount of $430,500.
1:02:28Let me say that again. in the amount of
1:02:30$430,500
1:02:33from the state of Tennessee Library and
1:02:36Archives 2027 Metro Grant. All council
1:02:40districts sponsored by the
1:02:42administration.
1:03:02It's been moved and it's been second.
1:03:04Um, and with us today we have library
1:03:08director Harris. Thank you for coming
1:03:11and you have the floor.
1:03:18>> Thank you all for having me this
1:03:19morning. Um this is a grant from the
1:03:21state which is uh supports one of the
1:03:23most critical functions that we have at
1:03:25the library system and that is our
1:03:27collection. Uh the Memphis Public
1:03:29Libraries has a collection of almost 2
1:03:31million items to check out we use a
1:03:34shared system. So uh no matter which
1:03:36library that you frequent uh if there is
1:03:38an item that you desire if it is at
1:03:41another branch we are able to ship that
1:03:43over to you to the next day. So it's
1:03:46very important for us to keep our
1:03:47collection robust and this is also
1:03:50important because the costs of books are
1:03:53really skyrocketing uh especially
1:03:56electronic books. We have about a
1:03:57100,000 items that are available for
1:04:00checkout. Uh but the way that the
1:04:02publishing companies uh price them is
1:04:06you're going to pay more than double for
1:04:07an electronic book that you only have
1:04:09for a very limited amount of time as
1:04:12opposed to a physical book that you keep
1:04:13forever. Um, so this grant allows us to
1:04:16help stay ahead of the curve uh for
1:04:18other systems that are anywhere near our
1:04:20size, anywhere in our location. Um, so
1:04:24we really would like for the council to
1:04:27approve this and accept this uh grant
1:04:30from the state.
1:04:35>> Okay. Is there anyone in the queue?
1:04:43All those in favor?
1:04:45>> I
1:04:46>> oppose.
1:04:48The eyes have it.
1:04:52Item number two is a resolution
1:04:54approving and ratifying an
1:04:56intergovernmental agreement between the
1:04:58city of Memphis
1:05:00by and through Memphis Public Libraries
1:05:04and Shelby County government for the
1:05:06operation of the East Shelby Branch
1:05:08Library.
1:05:10unincorporated Shelby County sponsored
1:05:12by the administration.
1:05:18>> Director Harris, you have the floor.
1:05:20>> Yes, ma'am. This is a contract with
1:05:23Shelby County government to operate the
1:05:25East Shelby Drive branch uh which is
1:05:27located uh at Shelby Drive and
1:05:29Germantown uh road. It is the only
1:05:33library that is technically owned by
1:05:35Shelby County government. uh they do
1:05:37contract with us to completely staff it
1:05:40to uh handle all operational functions
1:05:43of that library. It is something that we
1:05:44see is very important for us to serve
1:05:47this mixed uh demographic, mixed zip
1:05:50code uh to where you have a lot of
1:05:53unincorporated residents along with city
1:05:56of Memphis residents as well. Um we feel
1:05:59that it's very important to us and we
1:06:01love providing that service for all
1:06:03citizens in that area.
1:06:07Okay, thank you for that.
1:06:12And let the record show that
1:06:13Councilwoman White has joined us.
1:06:21All in favor?
1:06:23>> Oppose.
1:06:26The eyes have it.
1:06:31This being the only item
1:06:35this excuse me
1:06:38there are no other items for this
1:06:40committee. So we are adjourned.
1:06:48>> Sure.
1:06:50We need to make this announcement that
1:06:51there is a book sale at the library uh
1:06:55on the 22nd, 23rd, 24th, and 25th. And
1:06:59we pass this out to people. You already
1:07:02did that. I didn't do
1:07:03>> No, I forgot. And thank you so much.
1:07:05>> So, we need to make sure everybody knows
1:07:06about this and pass it on to your
1:07:08friends and everybody so we can make
1:07:10them some money. Okay.
1:07:12>> All right. Thank you. and that's October
1:07:1522nd, 23rd, 24th, and 25th of this week.
1:07:21So, make sure you
1:07:23get a hold of these great deals on our
1:07:25books. Thank you. We are journ.
1:07:28>> Thank you all.
1:15:13Councilwoman White,
1:15:15>> Councilwoman Logan,
1:15:18>> and Chairwoman Green
1:15:20>> present. All right.
1:15:23Our first item is a update from M Street
1:15:28Fiber, all council districts requested
1:15:30by Councilwoman Walker. I see we have
1:15:33people here to present if you want to
1:15:34give us your name and begin.
1:15:41Perfect. Good morning. How do we control
1:15:44this?
1:15:47Perfect. Thank you. Good morning, U
1:15:50Council. Thanks for allowing us to come
1:15:52in. Uh Gus Shimos, I am M Street Fers,
1:15:56uh new CEO. I joined the company back in
1:15:59June. Um, we'll give you a quick update
1:16:02as to where we stand. We'll go through a
1:16:03quick slide deck and again allow for
1:16:06some uh from open questions here. So,
1:16:08real quickly just on my background, I've
1:16:09been in the telecom industry for over 30
1:16:11years, been building fiber networks
1:16:12across across the country and uh most
1:16:16recently was uh building networks in
1:16:18upstate New York as our chief operating
1:16:21officer. And you know, we've been at M
1:16:24Street. We've been we've been focused on
1:16:27some new leadership. And I'd like to
1:16:29introduce um Adrien Kesler, who's our
1:16:33our latest and our newest GM and
1:16:35president here of Memphis, who joined us
1:16:37about a month or so ago now to help lead
1:16:40uh M Street Fiber Memphis and uh and
1:16:42take on all the initiatives we have we
1:16:44have in front of you. And just just as a
1:16:46as background for Adrian, you know, I
1:16:49can I can share that his past experience
1:16:53over the 25 years and
1:16:56specifically with the city of Lafayette
1:16:58working with the city and running a
1:17:00network um and and and really taking
1:17:02advantage of a public private
1:17:04opportunity. Uh he brings us a level of
1:17:08experience to kind of really help take
1:17:09this project to the next level here. Um,
1:17:12the changes that have been made at M
1:17:14Street. I'm sure many of you have heard
1:17:15of some changes across the board
1:17:18honestly has been a function of bringing
1:17:20a a higher sense of urgency and
1:17:22accountability to our organization,
1:17:25pushing for results, continuing on the
1:17:28path that was set forward, but uh really
1:17:30trying to drive uh the the successes
1:17:33that uh we set up a few years ago when
1:17:35the contract was put in place. So, um,
1:17:38if we if we want to move on,
1:17:40>> can you tell me I need the name of the
1:17:41of your other friend here?
1:17:43>> Oh, yes, sure.
1:17:44>> Adrien Kesler.
1:17:46>> Thank you.
1:17:49>> So, as just a quick quick background,
1:17:53the the partnership that M Street Fiber
1:17:55has today with the city is a fairly
1:17:58unique partnership. It's it's a P3
1:18:00partnership. It's a it's a function of
1:18:03um our sponsor Meridium and in their
1:18:06commitment and long-term partnerships
1:18:08and investments with uh with city and
1:18:09municipalities. Uh at the same time,
1:18:12we're not building a what I'll call a
1:18:14traditional fiber optic network. We're
1:18:17building an open access network that
1:18:18will enable competition, bring multiple
1:18:22internet providers to the city of
1:18:24Memphis. Um, and more importantly doing
1:18:27all of that um without having to dig up
1:18:29streets more than once, which is a
1:18:31difficult uh process. And it's a uh
1:18:35let's just say it's not uh very friendly
1:18:37to our neighbors and our communities as
1:18:39we dig up these streets. too. The
1:18:41opportunity that we bring here is to
1:18:43make an investment that um is is forward
1:18:47thinking, is committed for the long run.
1:18:50Um and we're kind of excited to be
1:18:52partnering with uh with the city of
1:18:54Memphis in kind of really enabling a
1:18:56true partnership across across the table
1:18:58here. And with regards to community and
1:19:01community access, we'll get into some
1:19:03more details, but we uh we're excited to
1:19:06support kind of the launch of the
1:19:08connecting 901 uh agenda process with
1:19:11the smart Memphis City Network um which
1:19:15we just launched a couple of weeks ago
1:19:16out in Orange Mountain and really really
1:19:19bringing connectivity uh and fiber uh
1:19:22fiber networks to all all parts of the
1:19:24city uh both on the resident side and
1:19:26and on the businesses themselves.
1:19:28I I don't want to interrupt you, but we
1:19:31do have your presentation. If we can
1:19:33move through it um so that we can open
1:19:35it up for questions because I'm sure
1:19:36this is something the council members
1:19:38have and I know Councilwoman Logan
1:19:39requested this, so she probably has some
1:19:40things she wants to
1:19:42>> share. Understood. So, real real
1:19:44quickly, we with the changes we made,
1:19:46we're building faster, building at a
1:19:48pace that we haven't built before. We
1:19:50built over 20 over 28,000 passings this
1:19:53quarter scheduled to get to 175,000
1:19:57passings by by year end 2027. Um we we
1:20:00we are really pushing to get to the
1:20:03commitments we have contractually as
1:20:05well as reach all the neighborhoods that
1:20:06are looking for connectivity itself.
1:20:09This gives you kind of a rough timeline
1:20:12as to what's been completed to date and
1:20:14and how we're going to progress here
1:20:16over the next five quarters. Um we're
1:20:18really focused through the next uh five
1:20:21quarters on pushing our construction and
1:20:24enabling our networks itself.
1:20:30The the investment been made two almost
1:20:33250 million. Our goal or expectation is
1:20:37we're going to we're going to commit
1:20:38another almost half billion dollars uh
1:20:40to kind of build out uh and support the
1:20:42entire project going forward. So this is
1:20:45a significant investment by our sponsor
1:20:47sponsors at Meridium uh to kind of
1:20:49support the M Street fiber network
1:20:50buildout itself.
1:20:52If we go to the next page, we'll see to
1:20:54the left the top left shows where we
1:20:57built in green. Um to the top right
1:21:00gives you an idea of construction in
1:21:03process and and more importantly down at
1:21:06the bottom um we we call these fiber
1:21:09huts. Uh we have all of those blue I
1:21:12call them look look like blue houses.
1:21:14All those huts are fibered and connected
1:21:17today. Those are our launching um
1:21:20opportunities for building out within
1:21:22the community uh extending to certain
1:21:24needs within the city in a more uh
1:21:27short-term need when those commitments
1:21:29come up. But you see how we have
1:21:32completed our a very significant
1:21:33investment in our backbone to support
1:21:36the ultimate growth of connecting uh all
1:21:38of our uh residences and businesses
1:21:40within the city of Memphis itself
1:21:46with with the connecting 901 project. We
1:21:49launched Orange Mound a few weeks back.
1:21:51We're excited that our next uh our next
1:21:53launch will be in the early part of
1:21:54December um with uh you know in the
1:21:58Hollywood Community Center and we'll
1:22:00continue to work with the city to really
1:22:02push forward and enable smart city
1:22:03across all of all of me men all of
1:22:06Memphis itself
1:22:08and and and with that uh we'll we'll
1:22:10definitely open up for questions. Just
1:22:12gives you a couple of images from our
1:22:13last event.
1:22:16>> Um can we go back to the maps please? I
1:22:19think that'll probably be most helpful
1:22:21for us as we start talking through our
1:22:23districts.
1:22:23>> Yes.
1:22:24>> Um, Councilwoman Logan, the floor is
1:22:26yours.
1:22:29>> Thank you, Chair. Um, can you all just
1:22:31kind of go over page Well, I don't know.
1:22:35Page this right here. Yeah. What exactly
1:22:37what are we looking at in all three
1:22:39images?
1:22:40>> Yes, exactly. Okay. So, in the top left,
1:22:42the the the dark green shaded areas are
1:22:45areas where we have fully constructed
1:22:47and completed our fiber buildout.
1:22:49>> Okay?
1:22:50>> In the top right, the orange that you're
1:22:52seeing is active construction in the
1:22:55city today. Um, that's part of our
1:22:57current build plan and we'll have that
1:23:00those are the targeted areas that we're
1:23:01building through 20 through Q3 of 2027.
1:23:05The bottom area gives you an outline as
1:23:08to all of those huts, as we call them,
1:23:11are connected via fiber today, creating
1:23:14the backbone that will enable us to
1:23:16expand in each one of the communities
1:23:17that we're supporting.
1:23:19>> So, when will
1:23:21the areas that are that don't have um
1:23:24current build passings, when will those
1:23:27what's the target to have those done?
1:23:29>> So, those targets are in 2028 uh and and
1:23:32beyond. So I think there's a 24month
1:23:35forecast from 2028 going forward. Um
1:23:38right now we have immediate outlook into
1:23:40the next five quarters as to where
1:23:42they're coming and every quarter we'll
1:23:44update and advance um our buildout uh
1:23:46timelines to support the network growth.
1:23:50>> Okay. Can you send that um timeline or
1:23:53include send that re you can send it
1:23:56alone or you can add it to this and
1:23:57resend it. And I also have a question. I
1:23:59want to can you elaborate on the quality
1:24:03of what has been installed and um talk
1:24:07to me about the
1:24:10um quality control measures that are in
1:24:12place as you are installing rolling this
1:24:16out um and where that fares in terms of
1:24:21excellence and the best quality um that
1:24:24type of thing.
1:24:25>> Yes. Um by all means what what our
1:24:28construction team congruix CNS as you
1:24:30may have heard the name in the market
1:24:32itself are actively constructing the
1:24:35network on our behalf. Uh we have um a
1:24:39partner in Nokia who's helping provide
1:24:41oversight and project management support
1:24:44um as well as QC quality control uh
1:24:47reviewing what CNS is building uh where
1:24:50and when and we are implementing what I
1:24:54would call more string more stringent um
1:24:57testing um back in Q2 at the end of Q2
1:25:02we made a decision to slow down some of
1:25:05our construction Um and to circle back
1:25:07and further test uh the network that was
1:25:10being built, we we had we had a pace
1:25:12issue in how we were building and we
1:25:14were concerned on the quality. We've
1:25:16been reertifying uh the entire network
1:25:18that was built u going back uh going
1:25:21back two years. Now that reertification
1:25:23process um will complete by the end of
1:25:25this year, giving us a a 100% confidence
1:25:28level in what we've built um is not only
1:25:32available to support the speeds and the
1:25:35network quality that that we expect from
1:25:37what we what we've spent and built um
1:25:39but also support the future growth out
1:25:41there.
1:25:41>> If you could share that um your
1:25:44assessment and your findings with us,
1:25:46that would be great. And if there are
1:25:48any areas that are not um at the the
1:25:53level that you feel they are, what are
1:25:56you doing and what has been done or
1:25:58going to be done to um bring those
1:26:00levels up to where they should be or
1:26:02exceed where they you know the standard?
1:26:05Um and what are you putting in place to
1:26:07ensure that the rest of the installation
1:26:12exceeds that standard? We we've we've
1:26:15increased our testing parameters to
1:26:17levels that are beyond a normal
1:26:18acceptance level, which now puts puts
1:26:21what we built at a higher quality than
1:26:23what we were doing in the past. In the
1:26:25current deployment that we have in
1:26:26turning up customers, we have our teams
1:26:30reertifying every installation to
1:26:32confirm quality before we activate the
1:26:34service itself. So, we're doing a a
1:26:36double check at every install period,
1:26:38but at the same time, we've raised our
1:26:40standards on testing uh with incremental
1:26:43testing um pieces of equipment um and
1:26:46the team that we have in place that's
1:26:48that's providing incremental oversight
1:26:50as well.
1:26:50>> Okay. How long has Noia been in place?
1:26:52>> Noia has been with us for the beginning
1:26:55of the project as our as our project
1:26:56management or PMO team.
1:27:00>> All right. Thank you.
1:27:01>> No problem. Thank you.
1:27:04Um yeah, I wanted this map pulled up and
1:27:07I have a couple of other members in the
1:27:09queue, but um district 4 definitely
1:27:11getting more. That's what I see. Um and
1:27:14I do see that a lot is planned in five.
1:27:18And what I found initially exciting
1:27:20about this project and this investment
1:27:22and this partnership was that we were
1:27:24going to bring connectivity to our
1:27:27underserved communities. And I am
1:27:30looking at a couple of maps here where
1:27:32we have nothing going on in six,
1:27:34district six. Nothing going on in
1:27:37district three and my part of district
1:27:41two, which is in Hickory Hill. Um,
1:27:43again, that connects with some of
1:27:45Councilwoman Walker's. I I know the need
1:27:47is great there. We And
1:27:51maybe that's happening in 2028. I don't
1:27:53know because this is um you know only
1:27:57this year and next year but it is
1:28:00concerning to me that we're going into
1:28:04let's say the popular corridor in
1:28:06district 5 where I know there is good
1:28:09connectivity before we are going into
1:28:12the communities in need. So, I'm just
1:28:15going to say that um you don't have to
1:28:17have an answer for it right now, but I
1:28:20would like to have a plan moving forward
1:28:23that talks about the areas that are most
1:28:26in need because um we are trying to
1:28:29build a city that is connected. You
1:28:32know, when we shut the world down during
1:28:34COVID, what we learned was people were
1:28:37having to bring their kids to McDonald's
1:28:39for Wi-Fi to do school work and
1:28:41homework. And it doesn't look like I've
1:28:44been on council now for three years that
1:28:46we're solving that problem yet even
1:28:48though we've made this great investment
1:28:50and we're going to continue to be
1:28:52building out in places that are already
1:28:54connected. That's problematic to me
1:28:56because we're not meeting the need where
1:28:58the need is most. Um, so I hope that
1:29:00when you come back to us or through
1:29:03email that you talk specifically about
1:29:06the areas that have the least
1:29:08connectivity and how we are planning to
1:29:11put connectivity in place there. Um,
1:29:15next in the queue I have Councilman
1:29:17Warren.
1:29:19>> Thank you, Madam Chair. Uh, you took
1:29:21part of that out of my mouth. Um, when
1:29:24we first did this project, I thought it
1:29:26was a four-year project. Is that a four?
1:29:29Is that correct?
1:29:30>> No, that's
1:29:31>> what was the what was the initial time
1:29:33frame for this project?
1:29:35>> The the initial time frame had a had a
1:29:38five I believe a five to six year
1:29:40construction window and
1:29:41>> a five to six year and we're now in
1:29:43construction year four.
1:29:46>> We kicked off the project in 2023 with
1:29:50design mapping preparation on that
1:29:52front. I believe we actually only
1:29:54started constructing in 2024 but
1:29:57>> Okay. So, so we're looking at a 5-year
1:29:59window from 2024.
1:30:02And it was the purpose of this was to
1:30:05get, and I remember the presentation,
1:30:08we're not we don't need to go in places
1:30:10that already have it. We're going to go
1:30:11in places that don't have it.
1:30:13>> And it looks like where we are places
1:30:16that mostly do have it. So, why is that?
1:30:20[clears throat]
1:30:23I it's I can't specifically answer the
1:30:26question,
1:30:28>> but let me allow me allow me to to take
1:30:30that back. Um what what I can share is
1:30:34out of the construction that we've
1:30:35completed, we have completed 50% of what
1:30:39we've completed has been in in
1:30:40low-income areas where from our
1:30:42calculation, we don't believe there was
1:30:45good if any connectivity. But uh if if
1:30:48your data is different, then allow me to
1:30:50take some of that.
1:30:51>> Go look at that again. Okay. You know, I
1:30:54can see parts of this map that that may
1:30:56be true, but we've got 85% I think of
1:30:59our city that's in need of this, you
1:31:01know, that is not connected. And you
1:31:03know, so it's only 50% you're you're
1:31:06going into the easiest parts first. So
1:31:09it would be nice maybe in 6 months if
1:31:12you came back and told us how the rest
1:31:13of this is going to play out and where
1:31:15you're mapping it. so we can make sure
1:31:18it occurs
1:31:19>> and do do the places that need it least
1:31:23last and most first.
1:31:26>> All right. Thank you, Madam Chair.
1:31:28>> Yeah, I think I think we all feel that
1:31:30way. Um, and I know there is a
1:31:33geographical issue of how the internet
1:31:36comes in. I think it's just that we're
1:31:38talking about the fact that it's coming
1:31:40in, but it's not going down into the
1:31:44places where we really need to see it.
1:31:46And it, you know, um, you gave us your
1:31:49brief bio. I don't know if you're a
1:31:50native, uh, Memphian, but I know you
1:31:53have a local Memphian here. Hopefully,
1:31:55you have some Memphians in your seats of
1:31:57power. Yes. um and some diversity at the
1:31:59places and tables where these decisions
1:32:01are being made so that people are
1:32:04expressing we don't just need to go to
1:32:06places where we can make money on the
1:32:07fiber but places that are needing it
1:32:09desperately. Next in the queue is
1:32:12Councilwoman Walker.
1:32:15>> Thank you, Madam Chair, and thank you
1:32:17all for coming today. So, I want to go
1:32:20back to um Councilman Warren's question.
1:32:23If I understood it correctly, he wanted
1:32:26to know why you were in the areas that
1:32:30have the coverage already. And did you
1:32:33say you weren't versus the areas that
1:32:35are most needy?
1:32:38Did I understand you correctly to say
1:32:40something to the effect of that you
1:32:41didn't know?
1:32:42>> No, no, no. Again,
1:32:46my my response was the what the initial
1:32:48schedule was put in place, some of the
1:32:50parameters that were kicked off back in
1:32:5423 and 24. Again, I wasn't around for
1:32:57some of those details. So, that's what I
1:32:59don't have readily available uh for for
1:33:01for me. Um what what what I can share
1:33:03that
1:33:05similar to the the feedback as we have
1:33:08to build from a central point and and
1:33:09build out and at times that may not
1:33:11target the ability to to hit an area
1:33:15that either whether it sits on the
1:33:18fringe or or or creates a just a
1:33:22difficult situation for us to kind of go
1:33:23connect back into. And we can't create
1:33:26little islands. They all have to be
1:33:28connected. And so it has to kind of
1:33:30spread out from kind of a of a central
1:33:32point is kind of what you're seeing
1:33:34right now and then edges out to the the
1:33:36outer parts of the city.
1:33:40>> Okay. So you don't have the figures. So
1:33:43you're saying that you don't know them
1:33:44in real time or they're at the office?
1:33:46>> I don't have I don't have it at real
1:33:47time with me right now.
1:33:48>> Okay. All right. Um
1:33:53earlier in your comments you said going
1:33:56to the next level. What does next level
1:33:58mean to you
1:34:00>> with regards to our build schedule? The
1:34:03first half of this year we I think we
1:34:05had built less than 10,000 homes. Uh in
1:34:08Q3 we built almost three times that
1:34:12amount. So the next level for me is
1:34:15progressing our agenda of building out
1:34:17the network that we've committed to as
1:34:19part of this partnership.
1:34:21>> Okay. So to
1:34:24make this recent progress, was it
1:34:27because the terrain in these areas where
1:34:31they already have access? Is it are
1:34:35these areas easier to install and that's
1:34:38why you shifted and chose these areas?
1:34:43So to to to be clear, we've had a build
1:34:45plan and schedule in place going on two
1:34:48years now and we've been following that
1:34:50progression. And so what we've been able
1:34:54to do is just build faster uh according
1:34:57to our build plan. So we we we didn't
1:34:59retarget new areas, you know, we we face
1:35:03normally we face issues with regards to
1:35:05ability to get on poles, whether they
1:35:07are MLGW poles or AT&T poles or if we're
1:35:11building underground. The the the
1:35:13geography issue is just a normal what
1:35:17I'll call construction process that we
1:35:19go through.
1:35:21>> Okay. And I'm almost finished, Madam
1:35:22Chair. So plan coverage at least 85%.
1:35:26Where are you with that
1:35:29>> right now? We're about halfway through
1:35:31that. We're at the Can you confirm for
1:35:33me, Adrian?
1:35:34>> Yeah. So, [clears throat] we're about 40
1:35:3645% of that. And just to reiterate, we
1:35:40we did not shift anything. We just went
1:35:43much faster. Uh and you know, I just
1:35:46want to confirm our data against the
1:35:49data you're seeing. And I would welcome
1:35:50feedback into areas that uh you think
1:35:53that are not on the list that have the
1:35:55greatest need. I'd love to partner with
1:35:57you to make sure um that we're hitting
1:36:00those. We think we are. Um so Fraser,
1:36:03Hollywood, Orange Mound, we're doing all
1:36:05the these events. Uh those are already
1:36:08built and we're continuing to build out
1:36:10at a faster rate. We haven't changed the
1:36:12actual map that we shared with you two
1:36:14years ago.
1:36:16>> Okay. Let me say this and and I'll I'll
1:36:19close here. When we talk about Memphis,
1:36:23when we brag on Memphis, when we share
1:36:26about great things that are taking place
1:36:28here, this project is one of the
1:36:30projects that some of us do refer to and
1:36:34I believe it is a good project. I know
1:36:36what it's supposed to mean from its
1:36:38inception. And I think I can safely
1:36:42speak on behalf of my colleagues. We
1:36:44just wanted to do what the intended
1:36:46purpose was and and hopefully in the
1:36:49intended
1:36:51in the estimated amount of time that was
1:36:54given at the beginning. And so I hope
1:36:58that this is going to move forward and
1:37:00these other areas will be addressed in
1:37:04in a timely fashion.
1:37:06Thank you and I yield the floor.
1:37:09>> Thank you. Yeah, I I think um as you
1:37:12said, you haven't been here this whole
1:37:14time. We have.
1:37:15>> Um and some of the council members like
1:37:17Councilwoman Logan were here at the
1:37:19inception of this project. A lot of us,
1:37:21this was one of our first votes when we
1:37:24came on, but we were proud of that vote
1:37:29because of what it was going to do for
1:37:31Memphians in need. And because we're all
1:37:34Memphians, because we all serve here, we
1:37:37can look at that map and tell you that's
1:37:38not the Memphians most in need, um
1:37:42especially of this. And so, um it is
1:37:45disconcerning
1:37:47to get this update
1:37:49>> that we are we don't know when we're
1:37:53going to get to those places and we
1:37:54don't have a a a math and a a plan for a
1:37:58timeline for that. Um, again, the the
1:38:03problematic areas, I agree with you,
1:38:06there are some things in Orange Mound
1:38:07and Frasier that we absolutely needed to
1:38:09do, and it looks like you're covering
1:38:11district 4. She always gets more, uh,
1:38:14chairwoman, very well, but
1:38:18there is a swath of Memphis that is
1:38:21blank and no timeline for when they're
1:38:25going to be there. and to hear the
1:38:27leadership sit in front of us today
1:38:30>> and not recognize those neighborhoods in
1:38:33White Haven, in Hickory Hill, in
1:38:35Westwood
1:38:37and not have a timeline for it is
1:38:40incredibly frustrating because this is a
1:38:43multi-million dollar project that we
1:38:45have put so much behind.
1:38:48Um, I think the last I No, Councilwoman
1:38:51White, you're in the queue.
1:38:54Nope. Y'all touched on everything that I
1:38:57wanted to say. Thank you. Um,
1:38:59Councilwoman swearing, chairwoman
1:39:01swearing in Washington,
1:39:03>> we've had some concern with some of our
1:39:05constituents about the wires hanging low
1:39:09and them interfering with um, MLGW
1:39:12wires. So, we just need to make sure
1:39:14that there's a plan in place to go
1:39:15behind whoever the contractors are to
1:39:18make sure that the wires are, you know,
1:39:20are placed
1:39:21>> correctly. Understood. And we're
1:39:23definitely working handinhand with MLGW
1:39:26to address any of the any of those
1:39:27concerns. Um, we appreciate we've gotten
1:39:30some feedback from some of our
1:39:32constituents who have raised concerns
1:39:34and I'm I'm confident that we jump on
1:39:38those as quickly as as as possible. So,
1:39:40we will continue to make sure um we're
1:39:43not putting um our whether it's trucks
1:39:46or vehicles or or actually our people in
1:39:48danger with what we're doing.
1:39:49>> Okay. Thank you.
1:39:51Councilwoman Logan, you want to close us
1:39:53out?
1:39:54>> Yes. Thank you, Chair. I just wanted to
1:39:56um remind us that when they when we
1:40:00initially start began the project, I
1:40:03think it was President McGawan, he was
1:40:05here the CIO at that time, um
1:40:08communicated to us that the and tell me
1:40:11if I'm wrong, the fiber comes into
1:40:14Memphis in this area in the Bartlett
1:40:16area and they were going to start
1:40:18district one and go all the way around
1:40:21and come back and they would hit the the
1:40:25areas in each district that needed, you
1:40:28know, needed the most it would cover.
1:40:30So, are you all still following that and
1:40:32you just got behind? Is that what you're
1:40:34saying? Or you have a you're routing it
1:40:37a different way now? We're still
1:40:39following the initial plan and what we
1:40:41what we are able to do now as I
1:40:43mentioned where our the bottom the
1:40:45bottom map over there is that we can now
1:40:47hit certain areas in a short time frame
1:40:51to support public areas, public spaces
1:40:54that we can try to connect multiple um
1:40:58um constituents at the same time as as
1:41:01part of these community centers. The
1:41:03completion of that ring that we uh we
1:41:06completed last month enables us to start
1:41:09to actually expand outside and do what I
1:41:13would call kind of high u high need
1:41:15areas that can actually impact a
1:41:17significant part of the constituents
1:41:19themselves. And so we're in position to
1:41:21do that now. and and the first part of
1:41:23that was actually the the Orange Mound
1:41:25um launch that we did and excited about
1:41:28doing it in Hollywood and other areas
1:41:30that could sit in and around those blue
1:41:32huts.
1:41:33>> And so you all have um shor up the
1:41:38quality control. Correct.
1:41:39>> So that because that's important to me.
1:41:42I don't want you to go fast putting bad
1:41:44w you know you know bad connections out.
1:41:46So, it's good that you all took the time
1:41:49to correct the things that were not in
1:41:51place to make sure that we have the best
1:41:54product and um I'm hearing you say that
1:41:57you've done that now. You put those huts
1:41:59there. So, you should be able to go
1:42:00faster. So, you send us that information
1:42:03prior to you coming for us to review
1:42:04that and see where you are.
1:42:06>> Perfect. We'll do. Thank you.
1:42:07>> Thank you.
1:42:10>> All right. Thank you so much. We're
1:42:12going to move on to item number two on
1:42:13the agenda, which is a resolution
1:42:16approving the first amendment to the
1:42:17economic impact plan for legacy [snorts]
1:42:20at Countrywood District 1, Super
1:42:22District 9, sponsored by Councilwoman
1:42:25Logan. Councilwoman,
1:42:27>> second.
1:42:28>> Thank you. Moved by Chairwoman Swaren
1:42:30Washington, seconded by Councilwoman
1:42:32Councilman Warren. I always say that
1:42:34because there's a W in your name. Uh,
1:42:36who do we have here to speak on this
1:42:38item?
1:42:39Anybody
1:42:41from the administration?
1:42:47Do you want to hold this item? Okay, we
1:42:49will hold this for two weeks. All right,
1:42:51we'll hold this for two weeks. And I
1:42:53also want to say, Councilwoman Logan,
1:42:54I'm going to invite uh M Fiber back in
1:42:57two months to get an update on where we
1:43:01>> Yeah.
1:43:04>> Well, I have nobody. This is not an
1:43:07exception of money. It's approving the
1:43:09amendment for the economic plan and I
1:43:11don't have anyone here to speak on it.
1:43:14>> No, no, we'll hold item number two for
1:43:16two weeks. Item number one, I'm going to
1:43:18have M fiber come back in two months.
1:43:20Does that make sense? Okay, we'll hold
1:43:22this for two weeks. Thank you. And with
1:43:24that, our committee is adjourned.
1:43:34>> [clears throat]
1:45:24>> Security Committee meeting to order.
1:45:26It's now 10:45.
1:45:28Uh, could we please have a roll call?
1:45:31>> Councilman Ford, Councilwoman Walker,
1:45:34>> present.
1:45:35>> Councilwoman White,
1:45:37>> Councilwoman Logan,
1:45:39Chairwoman Surging Washington,
1:45:41>> present.
1:45:41>> And Chair Dr. Warren
1:45:43>> also present. Cogs, we have three items
1:45:46on the agenda today. Item number one is
1:45:49a discussion of MPD efforts to protect
1:45:52public events. This is general all
1:45:54counselor districts requested by me.
1:45:57Who's going to be our lead? Chief
1:45:59cooler.
1:46:00>> Uh that will be Colonel Mathenina. We
1:46:03will talk about the public events.
1:46:05>> Excellent. Mina,
1:46:08>> good morning sir. How are you?
1:46:10>> I'm doing great. How you doing? Can you
1:46:11hear me? doing well. We Yeah. Get it
1:46:13close to you.
1:46:14>> Okay.
1:46:19[clears throat]
1:46:23>> There. We're getting a handed out a
1:46:26little item here for the event. And you
1:46:29have the floor, sir.
1:46:36>> Turn the mic back on.
1:46:40As long as he's green, you're on
1:46:43now. You're on.
1:46:45>> All right. Good morning.
1:46:47>> All right. I'm Colonel Main. I'm with
1:46:49the Memphis Police Department. So, I'm
1:46:51here today to talk about special events
1:46:53and how we protect special events in
1:46:55general. So, the Memphis Police
1:46:57Department Special Events Office, we
1:46:59protect the public by coordinating
1:47:01safety efforts for special events
1:47:03throughout the city. So our mission is
1:47:05to help ensure events are safe, orderly,
1:47:08and wellcoordinated while maintaining
1:47:10the flow of vehicle and pedestrian
1:47:11traffic. So when we're looking at
1:47:13special events, we're looking at the
1:47:15business, trying to get the business
1:47:16back to running smoothly, make sure that
1:47:19the neighborhoods are accessible when
1:47:20we're having the special events,
1:47:22especially when it comes to medical
1:47:24needs. Cuz while you're enjoying
1:47:25yourself and enjoying the events, we
1:47:27want you to be safe. You have to think
1:47:29about medical. If someone has a medical
1:47:31issue, can they get in and can they get
1:47:33out? So we look at ingress and egress.
1:47:36So our key responsibilities,
1:47:38we look at our events and we evaluate
1:47:41the security assessment. We review each
1:47:43application that is presented to the
1:47:45permit office. Uh we do the schedule. We
1:47:48look at the attendance and we also speak
1:47:50to the organizers to see if they need
1:47:52police involvement. Even if they do not
1:47:55need police involvement, we contact each
1:47:57and every single station so that they
1:47:59can know that this event even though it
1:48:01does not have MPD involvement, it may be
1:48:04occurring in the park is going to occur
1:48:06in the neighborhood. So we need to do a
1:48:08directed patrol and or a routine patrol
1:48:10to make sure that of course our citizens
1:48:13are safe. uh just this year alone we
1:48:18have looked at more than 609 events that
1:48:22we have this year uh every week that
1:48:24equals out to about 15 events and about
1:48:2765 events a month. So just to break
1:48:31those down this year we've had 155
1:48:34street closures. We've had 40 parades.
1:48:36We had three parades that require street
1:48:38closures, 57 runs, and 353 public
1:48:43assemblies and one spontaneous event.
1:48:45So, when we're looking at these 69
1:48:47events, actually 6:34 this morning, we
1:48:51not only look at the safety, but we look
1:48:53at what can we do to improve our
1:48:56community. Let's make the event
1:48:58organizer happy. Let's make the
1:49:00neighborhood happy. You know, Memphis is
1:49:03Memphis is great. Different things like
1:49:05St. J Classic to Memphis in May. When we
1:49:08things go good, we meet. When things go
1:49:10not so good, we meet. If you have 35
1:49:13eyes looking at something, you have 35
1:49:15eyes that saw something different. So,
1:49:18how can we improve? How can we maintain
1:49:20this great city of Memphis?
1:49:27>> Thank you. Any other questions or any
1:49:30other presentations on that? Uh,
1:49:33specifically, I think y'all were going
1:49:35to comment on some of the things you've
1:49:37been doing for hotspots. What do you do
1:49:39when you have the hotspots? Is that
1:49:41coming next?
1:49:46>> Yes. So, our hotspots, depending on what
1:49:48you mean by hotspots, uh, we do look at
1:49:50hotspots for real time crime center. We
1:49:53are information technology. Uh, the real
1:49:55time crime center with director Brown.
1:49:58We receive those hotspots daily and we
1:50:01receive them weekly. Of course, we have
1:50:02our weekly Thursday meetings where we
1:50:05talk about crime in our hotspot areas
1:50:07and every single station including every
1:50:10specialized unit. We are aware of those
1:50:12hotspots. So, the things that we do is
1:50:15of course is going to be computer
1:50:18generated data driven. It puts those in
1:50:20in those areas. We put our stations in
1:50:22that area along with our specialized
1:50:24units and it's helping to decrease the
1:50:27crime in those hotspot areas.
1:50:29>> Yeah, I was just going to give you some
1:50:30congratulations. I'd gotten some emails
1:50:33about problems in Overton Square and you
1:50:37know a couple phone calls to you guys
1:50:39and now I'm getting emails about how
1:50:41those problems are much better. So just
1:50:43that direction uh and response to the
1:50:47citizens I think is very well
1:50:48appreciated. Let the record show we've
1:50:51been joined by Easter Thomas Green and
1:50:54Smiley and do we have any questions uh
1:50:57concerning efforts to protect public
1:51:00events?
1:51:02You're right here, Councilwoman.
1:51:04>> And I'm sorry I walked in late. Y'all
1:51:07getting paid for this.
1:51:11>> Special events.
1:51:12>> Getting paid for special events.
1:51:15>> Yes, ma'am. Some of them we do, some of
1:51:16them we do not.
1:51:18>> What What was that, Chief Davis? Most of
1:51:20them we don't.
1:51:23>> And um so something big like the St.
1:51:26June marathon about how much should we
1:51:27bring in for that for all the overtime
1:51:29and and manpower that we use for it?
1:51:33>> We do create an invoice for that. I do
1:51:35not have the number but we do create a
1:51:37invoice for not only St. Jude Marathon
1:51:40but other events like Memphis and May
1:51:43and also River Beats.
1:51:44>> Yeah, I would love to to get that update
1:51:47because it was my understanding the last
1:51:50time for the St. Jude Marathon we got
1:51:52about $1,200.
1:51:55>> [clears throat]
1:51:56>> So, I know that we're putting more um
1:51:58manpower in. And look, I love St. Jude,
1:52:02but
1:52:04it's a it's a donation from the citizens
1:52:06of Memphis every time that we pay the
1:52:08overtime for all of these officers to
1:52:11work these streets during that marathon.
1:52:14I believe they raised $17 million that
1:52:17last weekend
1:52:19for that one day. So, I I'm just asking
1:52:22for for us to have a real cost estimate.
1:52:24Other cities do this. Other I bring this
1:52:27up every year when it gets to be budget
1:52:29time. Other cities say you cannot host
1:52:32your event unless you can pay for the
1:52:34manpower. And you have to pay it
1:52:37upfront, not at the end. So, I encourage
1:52:41us as a body to consider that and to
1:52:44make sure that whether it is your family
1:52:47fund run 5K or something as big as St.
1:52:50Jude that we have a policy where people
1:52:54pay for the manpower because otherwise
1:52:56it is the taxpayers that pay for that
1:52:59manpower.
1:53:00But yeah, if you could get us an
1:53:02estimate of what what was paid. I'm just
1:53:06going to I'm just going to pull out St.
1:53:07Jukes is the biggest one we have and uh
1:53:10what was paid by them and what it cost
1:53:12us in overtime.
1:53:14>> Thank you.
1:53:16>> Thank you, Councilwoman. Uh let the
1:53:18record show that we've been joined by
1:53:20Councilwoman Walker and Chair Canali who
1:53:22is getting ready to take over this
1:53:24committee.
1:53:25>> Oh, and you're in the queue.
1:53:28>> Thank you. Um Councilwoman Green, you
1:53:31make a good point. Made some good
1:53:33points. So, um, um, Chief Davis, I know
1:53:36you did come to us before with a
1:53:38presentation on
1:53:41that particular part in terms of who
1:53:44does and does not pay. And to that, I
1:53:47just want to mention that in 23 or 24,
1:53:52the Hickory Hill Christmas Parade had to
1:53:55be cancelled because there was not
1:53:57enough coverage because it was the same
1:53:59weekend as the same St. Jude event. and
1:54:03we just cannot have things like that
1:54:06happening. Thank you and I yield the
1:54:08floor.
1:54:10>> Thank you, Councilwoman. Anybody else in
1:54:12the queue?
1:54:14All right, moving on. Item two is a
1:54:17resolution to accept additional grant
1:54:19funds in the amount of $15,52810
1:54:24from the US Department of Justice
1:54:25through the United States Marshall
1:54:27Service Western District of Tennessee.
1:54:29All council districts sponsored by the
1:54:31administration for the purpose of
1:54:32overtime funding for personnel salaries.
1:54:35There is a request for same night
1:54:37minutes. Can I get a motion to second?
1:54:40>> Moved by chair JSW, seconded by Warren
1:54:46ACA, you speaking on this?
1:54:49>> I can speak on this.
1:54:50>> Okay.
1:54:51>> Uh this money we received an initial 1.9
1:54:54million from them at the very beginning
1:54:56of the Memphis Safe Task Force. uh
1:54:59towards the very end of or just several
1:55:02months ago, they offered there was some
1:55:04little bit extra in the extra in their
1:55:07money that wasn't used, so they offered
1:55:09that to us, so we accepted it.
1:55:13>> Okay. Yeah. Always. Any questions about
1:55:16this item? All those in favor of sending
1:55:19it downstairs with a positive
1:55:21recommendation with same night minutes
1:55:23signify by saying I. I.
1:55:25>> I'm also an I. Any opposed? That item
1:55:28passes. Item three, a resolution to
1:55:30amend the FY27 CIP program and transfer
1:55:35$319,000
1:55:37in appropriated GEO bonds funds within
1:55:40the downtown command project IT010008
1:55:44from other costs to architecture and
1:55:46engineering district 67 super 8
1:55:50sponsored by the administration. Can I
1:55:51get a motion? Moved by JSW, seconded by
1:55:54Warren.
1:55:57>> You speaking on this one?
1:55:58>> Yes, sir. Major Merrick, 170 North Main.
1:56:00Uh, this was initially a IT project. It
1:56:03was transferred to police services and
1:56:06we're just uh transferring uh money
1:56:08within the project from construction to
1:56:11A&E so we can pay the A&E's uh invoices.
1:56:14>> Okay.
1:56:16Any questions on this item?
1:56:19All right. any uh
1:56:23is time of the essence on this item?
1:56:27>> Uh yes sir. So we can uh initiate the
1:56:29phase two of the downtown crime center
1:56:31project.
1:56:32>> Okay. Without objection, can we move
1:56:35this downstairs same night minutes?
1:56:38All right. All those in favor of sending
1:56:40this downstairs with a positive
1:56:42recommendation with same night minutes
1:56:44signify by saying I.
1:56:45>> I.
1:56:45>> I'm also an I. Any opposed? That item
1:56:48passes. Colleagues, anything else for
1:56:50public safety?
1:56:53Thank you to MPD as always.
2:17:1917 a.m. and I hereby call our budget
2:17:21committee to order. Please call the
2:17:28>> Yes, ma'am. Councilman Ford,
2:17:31Councilwoman Easter Thomas, Chairwoman
2:17:33Swear and Washington
2:17:34>> present.
2:17:35>> Councilman Canali, Councilman Warren,
2:17:40Cochair White
2:17:42>> present. Thank you so much. First, we
2:17:45have our Q4 general fund financial
2:17:47update. All council districts requested
2:17:49by the budget committee. We're going to
2:17:50move that to our next um council
2:17:52meeting, which will be November 10th. At
2:17:55that time though, I wanted to
2:17:58There we go. Chief Davis, thank you. Um,
2:18:02I wanted to ask you, and I started to
2:18:04actually over there, and I didn't get
2:18:05the answer. How long will it take for us
2:18:08to be able to have the Q1 numbers?
2:18:11[clears throat]
2:18:14>> Okay.
2:18:18>> Okay.
2:18:27That's perfect. So, we'll we'll leave it
2:18:28at November 10th in hopes that we'll be
2:18:30able to also uh review the quarter 4 for
2:18:342026 and then the quarter 1 for 2027.
2:18:37Number two is solid waste update all
2:18:40council districts requested by the
2:18:42administration. Chief Winton, I see you.
2:18:45Do we have anyone else? So, you'll be
2:18:46presenting.
2:18:47>> All right, you may proceed. Please say
2:18:49your name and address for the record.
2:18:50Yes, Chris Winton, COO, City of Memphis.
2:18:54Uh, thank you for the time for the
2:18:57update. Um, when I first took the role
2:18:59about 90 days ago, uh, trash pickup was
2:19:02one of the top concerns. So, wanted to
2:19:04give you an update on progress to date.
2:19:07Um, just for a quick level set, we
2:19:09service 180,000 uh, constituents
2:19:12citywide. uh that's picking up over
2:19:15380,000 tons annually with approximately
2:19:18600 active headcount and over 400 pieces
2:19:22of rolling stock. Um if you think about
2:19:25it, these are our people who are every
2:19:28day, you know, constituents rolling down
2:19:30their two carts to the street and often
2:19:32two additional trash bags, for example,
2:19:35after they cut their grass. So, you
2:19:38know, as we move forward,
2:19:40each of the whole solid waste operating
2:19:42model is broken down into five areas.
2:19:45That's areas A, B, C, D, and E with
2:19:48about 35,000
2:19:50constituents per area. Uh, in short, you
2:19:54essentially have uh each area broken
2:19:56down to a zone and then each zone into a
2:19:59day of the week and that's how services
2:20:01are provided. Uh for the purposes of
2:20:04today, I want to focus in on because on
2:20:06August or August 1st, we took a snapshot
2:20:09of the metrics because we heard the
2:20:12feedback and then looked at the internal
2:20:14dashboards as well as call volumes in
2:20:16the 311 and what we started to see was
2:20:19miss bulk trash was the top call driver.
2:20:23U so and we understand that that was
2:20:25also escalations to you. So when we
2:20:27looked at our internal dashboard, as you
2:20:30can see on that date, we had about
2:20:322,2500 of those incidents and these are
2:20:36the people that were calling repeat
2:20:37calling 311 saying when is someone going
2:20:40to pick up our bulk trash. As you can
2:20:43see right there, area D was our biggest
2:20:46opportunity. So if we go to the next
2:20:48slide, we start to zoom in on area D and
2:20:51those areas are White Haven, Westwood,
2:20:54Parkway Village. So based on the
2:20:56feedback I was hearing from you, the
2:20:57data actually showed it. So when we
2:20:59started to doubleclick and zero in, we
2:21:02realized this area has a large
2:21:04percentage of rental properties with
2:21:06high volume of turnover. So we start to
2:21:09realize you had setouts occurring. And
2:21:12so all right, we got to now zoom in on
2:21:14this. So, what we also realized too that
2:21:18the bottleneck in in getting these
2:21:20picked up on time was also our
2:21:24maintenance equipment because we were
2:21:26running these bulk trucks more
2:21:28frequently, but we were only operating a
2:21:31first shift maintenance operation. So,
2:21:33we've now added the second shift mainten
2:21:36maintenance operation to keep the bulk
2:21:38trucks repaired and ready for operation
2:21:42each day.
2:21:43In parallel with that, we also started
2:21:46saying, well, wait a minute. Let's use
2:21:48our equipment from other areas. And I
2:21:50want to give a shout out to interim
2:21:52director Darius Jones as well as the ask
2:21:54me leadership team for their flexibility
2:21:57because we actually started using trucks
2:22:00and team members from other areas to
2:22:02sweep on Saturdays through White Haven,
2:22:05Westwood, and Parkway Village. And the
2:22:07numbers you see here on the board are
2:22:09the results as of 10:14 last week. This
2:22:12is a dashboard I watch daily and I can
2:22:14tell you the numbers are even better
2:22:16today. So we're we're seeing tremendous
2:22:18progress and we will keep that momentum
2:22:21going. Uh next slide. So when we think
2:22:24about what we're facing and this is one
2:22:27where we're now starting to do our
2:22:28homework and want to come back later
2:22:30with a recommendation to you the
2:22:33setouts. So if you look at this example,
2:22:36you know, this is someone you know where
2:22:38their things were set out. uh the code
2:22:41inspectors which the solid waste team
2:22:43allocated 20 resource 20 resources uh to
2:22:47create the enforcement team just on the
2:22:50solid waste ordinance. So they
2:22:52identified this issue late end of August
2:22:55actually cited the property owner which
2:22:58was out of town. Uh that individual was
2:23:01required to go to uh court. We actually
2:23:04cleaned up this property as you see on
2:23:06the next slide and that individual has
2:23:08been fined. Uh we do want to come back
2:23:11and the co the conversations now is are
2:23:14I are our fines high enough to
2:23:17disincentivize behavior. I know we've
2:23:19talked about that before. That'll be one
2:23:21of the things we come back with at
2:23:23another date. Um on the next slide
2:23:25you'll see also too as a part of that
2:23:27Boech storm. I mean we had about 300
2:23:30trees that fell in rightways. Uh those
2:23:33tree that tree debris has now been
2:23:35cleaned up. So, as you see on the next
2:23:37slide, we've we're pretty much got that
2:23:39past us. Um, so now the focus is to keep
2:23:42the trend uh as you see on the final
2:23:45slide going because the Saturday sweep
2:23:47started in around August 10th. We had
2:23:50that bump in in calls around that bow
2:23:53echo storm with tree debris, but you can
2:23:56see the trend is now down. We're
2:23:58actually also seeing now call volume
2:24:00down to 311. And so in the last two
2:24:04weeks, we've noticed that now our
2:24:06average speed to answer is about every
2:24:0826 seconds. When we compared that to
2:24:11August when this was high, it was about
2:24:146 minutes. So tremendous work also in
2:24:17the 311 area. So wanted to give a brief
2:24:19update and open it up for questions.
2:24:23>> Let the record reflect [clears throat]
2:24:24that um Councilwoman Walker and Council
2:24:27Miss Smiley have joined us. In the
2:24:29queue, we have Dr. Warren
2:24:32>> on the fine issue. I I I know that at
2:24:36least I'm under the impression we're
2:24:37limited by state constitution, but I
2:24:40understand that we can charge a fee for
2:24:43removal and our cost for removal. So,
2:24:46are we doing that?
2:24:48>> Yes.
2:24:48>> Okay. And how much did it cost to remove
2:24:50from that house? Any idea?
2:24:52>> Just right at $1,300.
2:24:53>> Okay. So, that that's probably enough to
2:24:56make people think about it. They need to
2:24:58realize we may be only able to charge
2:25:00him. Did we get that when we got to
2:25:02court?
2:25:02>> Well, that actually that's in the
2:25:04process now.
2:25:04>> Okay. So,
2:25:05>> that court date was this week.
2:25:07>> So, and that I'd say that's a small
2:25:09amount, the $1,300. So, if you really
2:25:11put stuff out there, we could be talking
2:25:13three, four, $5,000.
2:25:15>> Correct.
2:25:15>> Okay. Thank you very much, Madam Chair.
2:25:21>> Councilman Canali, you're recognized.
2:25:23>> Thank you, Madam Chair. Uh
2:25:24[clears throat] Chief, who's responsible
2:25:26when something like this happens? When
2:25:29tree companies know that they can't set
2:25:31whole trees in the curb and expect the
2:25:33city to pick it up? It is their
2:25:34responsibility. We find the homeowner.
2:25:36Can we find the tree company?
2:25:38>> Yeah. Well, this one was actually more
2:25:41of a unique situation. This was the
2:25:43storm. So, these trees were in right
2:25:45away. So,
2:25:46>> okay. Yeah, but for trees that are not.
2:25:48So, you I mean, everybody sees in their
2:25:49neighborhood. Somebody has a tree cut
2:25:51down and they stack it all on the curb.
2:25:53Mhm.
2:25:53>> Um, and it's not our responsibility as a
2:25:55city to pick that up. That is the tree
2:25:56company's responsible. They were paid to
2:25:58do that job, which is to complete the
2:26:00job and haul it off. So,
2:26:02>> is there a way that we can,
2:26:06if we find somebody, do we find the
2:26:07homeowner? Just like one of my biggest
2:26:09gripes since I've been on this council
2:26:11is lawn companies blowing leaves and
2:26:13yard clippings into our storm drains.
2:26:16>> And I've always been in favor of of
2:26:19finding them if you can catch them in
2:26:21the act. similar to this that would be
2:26:24the tree companies that will cut up an
2:26:25entire tree and leave it and expect our
2:26:28solid waste crews to pick it up.
2:26:30>> So what what can we do?
2:26:32>> Yeah. So actually that does follow our
2:26:34code enforcement process. So we can tag
2:26:37uh and when we removal similar process
2:26:39we can charge for that
2:26:40>> but it goes to the homeowner. Correct.
2:26:41>> And then that would be up to them to
2:26:43fight that out with the tree company
2:26:45that they hired. Correct.
2:26:46>> Okay. All right. Thank you sir.
2:26:49>> Thank you so much. Seeing no other
2:26:50council members in the queue. Um do want
2:26:52to acknowledge our mayor who has joined
2:26:54us. Thank you so much for joining us. Uh
2:26:56mayor, is there something that you
2:26:57wanted to add to this presentation at
2:26:59this time?
2:27:00>> No, I'm here for the next item. So
2:27:01number three.
2:27:02>> All right. Thank you. All right. Moving
2:27:04on to item number three. It is a
2:27:06resolution to amend the fiscal year 2027
2:27:08general fund, solid waste management
2:27:10fund, sewer treatment and collections
2:27:12fund, and storm water fund operating
2:27:14budgets all council districts requested
2:27:16by the administration. Can I get a
2:27:18motion and a second? Motion from
2:27:19chairwoman swearing Washington. A second
2:27:21from Councilman War. Chief Winton, Mary
2:27:24Young, [clears throat] you're
2:27:24recognized.
2:27:25>> All right. Thank you uh for the
2:27:27opportunity to present this item. As you
2:27:29all know, during budget season, there
2:27:31was a lot of talk around uh ask me and
2:27:34uh I think it went to impass and when we
2:27:37closed out budget, one of the things
2:27:38that we said was through the first
2:27:40quarter, we would work and determine
2:27:41what type of increase we could afford.
2:27:44Uh we've had a substantial conversation
2:27:47since that time. uh and even the
2:27:49presentation that came prior to this was
2:27:51a part of that dialogue uh because as we
2:27:54talk about increases, we want to make
2:27:57sure that we're also increasing the
2:27:59impact in the community. And so uh
2:28:01during that dialogue we did come to an
2:28:03agreement uh that we could uh support a
2:28:075% increase uh across solid waste with
2:28:11the exception of one uh particular uh
2:28:14position which is the solid waste
2:28:16special equipment operator. Uh that one
2:28:18we did at 2% and it was because that one
2:28:21was already close to its market uh range
2:28:24based on the compens compensation
2:28:26studies. Uh, and we also increased the
2:28:30hourly wages from $20 an hour to $22 an
2:28:34hour, which is really a preview of where
2:28:37we want to go as an administration over
2:28:39time. Begin moving uh from $20 up to 22.
2:28:43Uh the financial impact uh to the
2:28:46general fund is to the tune of roughly
2:28:48786,000.
2:28:50Um the solid waste fund, the impact is
2:28:53about 1.4. And as you all know, the
2:28:56solid waste fund is pretty healthy, so
2:28:58we felt like we could afford that. The
2:29:00sewer fund was 66,000 and then the storm
2:29:03water fund was 94,000. Another important
2:29:07point as you all take this into
2:29:08consideration is that during our
2:29:10dialogue, while it doesn't impede on any
2:29:12of their rights as an organization and
2:29:14they can still go to impass, we did talk
2:29:17about making sure [clears throat] that
2:29:18as we're doing this in the first quarter
2:29:21uh of the year that we are taking this
2:29:24into consideration when we go through
2:29:26budget season uh at the end of the year,
2:29:28which they did acknowledge that this
2:29:30certainly would be included as a part of
2:29:33that conversation when we get to the end
2:29:35of the year discussions for next year's
2:29:37budget. So with that said, uh our
2:29:40finance team feels comfortable with
2:29:42this. I would humbly ask for your
2:29:44approval. Uh as as noted, we also made
2:29:47it a got a commitment from them that
2:29:49they are going to coordinate with our
2:29:50teams and work hard and as you can see
2:29:52the results are already showing. So I
2:29:54would ask for your approval and I'll
2:29:56stop there and take any questions that
2:29:57you have.
2:30:02>> Any members in the queue?
2:30:06No. Well, I just have a couple of
2:30:08questions. The um the last time we were
2:30:11here, one of the things that I wanted to
2:30:13see was in terms of the proposed
2:30:16increases, how they measured out amongst
2:30:19the different range levels in terms of
2:30:23how is it going to fair? Are we going to
2:30:25is it getting people up to a certain
2:30:27level? Is are some exceeding some level
2:30:29in terms of market? kind of that
2:30:32comparison that we normally get
2:30:34>> during the actual impass,
2:30:36>> right? Uh I would have to ask I don't
2:30:38know if Fonda is Fonda in here.
2:30:40>> Oh, sorry. Chris is here. Fonda's out.
2:30:42Uh but Chris, I don't know if you can
2:30:44speak to that. I don't have it with me,
2:30:46but I know that they have looked at some
2:30:48of those things.
2:30:49>> Okay.
2:30:50>> Um good morning, Chris Allen, deputy
2:30:52chief HR compliance. None of the
2:30:54positions at the moment are close to or
2:30:56exceeding the the market study at the
2:30:59moment. the the one that is is the 2%
2:31:02one, which is the one that was reduced.
2:31:03>> Thank you. And I'm glad that you
2:31:05actually came up because you
2:31:06participated in the um the working
2:31:09sessions that we had as it pertains to
2:31:11trying to get these various um positions
2:31:14kind of level set. So after reviewing
2:31:17these, it's your opinion that this is in
2:31:21part with kind of the recommendations
2:31:22[clears throat]
2:31:22that we came up with out of the work
2:31:26kind of the working committee for the
2:31:27study as it pertains to compensation.
2:31:30>> Yes, ma'am. These are these would be
2:31:32considered the targeted increases that
2:31:33we would of course like to do throughout
2:31:35the year um as it relates to negotiating
2:31:38with the associations.
2:31:39>> Thank you. Then Chief Davis, my next
2:31:41question is for you.
2:31:49Art Davis, City of Memphis, CFO 125
2:31:52North Wings.
2:31:53>> Thank you. So, I know that you just let
2:31:55us know that the books just closed. I
2:31:58think the quarter ended two weeks ago
2:31:59and I think you closed out your books
2:32:01yesterday in terms of quarter 1. Um, and
2:32:04we don't have that report yet. We'll get
2:32:05that on November 10th to be able to see
2:32:07where we are from a fiscal standpoint.
2:32:10from the sewer fund. It's going to be
2:32:12$66,000. My concern is is that one, from
2:32:16my understanding, still has a negative
2:32:17cash on hand balance. That's the fund
2:32:20that we had to loan the money to. Is
2:32:22that right?
2:32:23>> Yes. But again, the negative cash on
2:32:26hand is offset by the receivables. For
2:32:28instance, we uh just received $12
2:32:30million today. So, that will post
2:32:33tomorrow. So, it does cover the uh cash
2:32:35on hand balance through the receivables.
2:32:38my I understand that part. The I guess
2:32:40my bigger concern is that with the sewer
2:32:43fund specifically and it's not much.
2:32:45It's $66,000,
2:32:46but just coming from that fund in
2:32:48general, that's the fund that had a
2:32:50continuous period of being out of
2:32:54balance, I would say, with the negative
2:32:55to the point that we had to cut a check
2:32:58or move money to be able to compensate
2:33:00for that fund to be able to cover the
2:33:03expenses. And so my question is, how
2:33:06have you all evaluated that to deem that
2:33:08the 66,000 is able to come out of that
2:33:11fund [clears throat]
2:33:11because I don't think there've been any
2:33:13more um is there some new revenue that's
2:33:16coming in or how is that going to
2:33:18balance now because it seemed as if it
2:33:19was going in a negative trend. So, uh,
2:33:22one of the things that we've done with
2:33:23that is is actually talked with Director
2:33:26Morgan, um, and Chief Whitten about how
2:33:28can we find that as a reduction of
2:33:30expenses rather than looking to the fund
2:33:32balance of this particular fund, and
2:33:34they are confident that they can find
2:33:36that $66,000.
2:33:38The other thing, and we only have one
2:33:40month, so I want to be cautious with
2:33:41this, is the uh increase for the rate uh
2:33:46came in at about $3.5 million, which is
2:33:48a little bit more than what our um
2:33:51budgeted increase amount was. So, I I
2:33:54don't want to extrapolate that over 10
2:33:56months because I only have one month um
2:33:59of history there, but there is uh an
2:34:02increase which should help cover this as
2:34:04well.
2:34:07Thank you. Do we have any other members
2:34:08in the queue?
2:34:10>> Councilman Smiley, you're recognized.
2:34:12>> So, thank you, U, Madam Chair. Thank
2:34:14you, Mayor. Thank you, um to all the
2:34:16administration. I think when we proposed
2:34:18this um myself and I think it was
2:34:20co-sponsored by Councilwoman Thomas and
2:34:22Councilwoman Green during the budget
2:34:25session
2:34:26I think the same funding sources
2:34:28identified by the administration the
2:34:30same funding sources that our staff
2:34:32identified um what we were told then
2:34:34that essentially it was not feasible for
2:34:37us to do this and you know you know my
2:34:40position then was you know if the
2:34:42administration
2:34:44um would take the time um they can
2:34:46always find the money and you know the
2:34:49reason I'm going to support this now is
2:34:51the same reason I support it then. I
2:34:53think um it's about priorities.
2:34:57I I know we're we're looking at you know
2:34:59this presentation that our budget
2:35:00analyst prepared is it it says something
2:35:03about it's question um the liquidity of
2:35:06of some of certain funds talked about a
2:35:08negative cash on hand. I just think the
2:35:11administration um has the the the staff
2:35:15necessary to figure out how to make this
2:35:17work. I'm not sure if it works on paper,
2:35:19but I believe they can make it happen.
2:35:21Um you know, I'm going to support it and
2:35:22I hope that each and every person here
2:35:24supports it as well. Um the folks who
2:35:27are working hard for us, they deserve a
2:35:28pay increase and I hope we all support
2:35:31this particular um budget amendment. So
2:35:34that's it.
2:35:38>> Thank you. Seeing no other members in
2:35:40the queue. Um I will say that I of
2:35:44course want to see the Q1 numbers. Um
2:35:47but if according to HR, this is in par
2:35:51with what we discussed in our work in
2:35:52session. If all is well in terms of our
2:35:56quarter one, I as well will support it.
2:35:58Um of course with the upcoming changes
2:36:01as it pertains to
2:36:04pickup because that is absolutely the
2:36:06number one thing in my inbox. um is
2:36:09trash pickup and those are the times
2:36:11that I actually get messages to my
2:36:12phone. So, I'm hoping that this will
2:36:15also incentivize, you know, um
2:36:18incentivize those who work in these
2:36:20departments as well. But I would like to
2:36:23see the Q1 numbers. Uh but seeing no
2:36:25other members in the queue, all those in
2:36:27favor say I. I.
2:36:28>> Any opposed? Nay. Let the record reflect
2:36:31also that um Councilwoman Green has
2:36:34joined us as well.
4:14:46Smile.
4:14:57>> Let's roll. We have
4:15:00we have three items on the agenda today.
4:15:02Uh item number one, a resolution to
4:15:04allocate and appropriate 3,259,282
4:15:08in data center revenues collected during
4:15:10FY26 to nine projects and programs in
4:15:13accordance with community benefits
4:15:14ordinance. Just a nice cell phone ring.
4:15:16Sounds like the doctor. Number uh 5953,
4:15:19District 6, Super District 8, sponsored
4:15:21by the administration. Moved by for
4:15:24seconded by Councilman Walker. Before I
4:15:26let the mayor speak, Councilman Ford,
4:15:28you're in the queue.
4:15:31>> Thank you very much, Mr. Chair. Uh this
4:15:33is an item in which I kind of was
4:15:37holding for a while. I think we've come
4:15:40to agreements on everything that's
4:15:41needed.
4:15:45Yeah, I think we've come to an agreement
4:15:48on everything that's needed. Uh I think
4:15:52we going to be passing out this
4:15:53resolution plus
4:15:56did they get this also? Everybody
4:16:00and I think everything will be fine.
4:16:03Only other thing that we're going to do
4:16:05and then I talk with the mayor. We going
4:16:07to get with the other side of the street
4:16:10and see some of the other things that
4:16:12they supposed to have for us also that
4:16:14will work in conjunction with
4:16:15everything. Now I'm going to turn it
4:16:17over to the mayor. We all good.
4:16:20>> Hold on. You where you at?
4:16:34No,
4:16:35>> you can go ahead.
4:16:37>> Can I talk?
4:16:39>> Yeah, you can talk.
4:16:42>> Yeah, go ahead. Go right ahead.
4:16:44>> Thank you for coming today. We are
4:16:46finally here. Thank you so much,
4:16:49Councilman Ford and everyone who worked
4:16:53on this. Um, thank you to my colleague
4:16:56Cooper Sutton who was um over the
4:17:00convening of the advisory board that led
4:17:05the process in coming up with some data
4:17:07to help you all make your decision and
4:17:10I'm just glad that we are here finally.
4:17:13Thank you. I yield the floor.
4:17:15>> The floor is yours, sir.
4:17:16>> All right. I want to say thank you to uh
4:17:18Councilman Ford, Councilwoman Walker, uh
4:17:21Councilwoman Cooper Sutton. Uh we've
4:17:23certainly had a lot of dialogues about
4:17:24this and I I feel like we're in a good
4:17:26place. As you [clears throat] all know,
4:17:28we presented this uh a few weeks ago and
4:17:31gave a full presentation. So, I'm not
4:17:33going to do that today. I'm just going
4:17:35to show you uh what is different from
4:17:37what we originally proposed. As you all
4:17:40know, uh I look at this as probably the
4:17:42first form of participatory budgeting
4:17:45we've actually done uh in the city of
4:17:47Memphis where we actually had residents
4:17:49that were able to uh vote or respond to
4:17:53a survey and highlight their greatest
4:17:56desires for using the dollars. Uh and I
4:17:59think the money reflects that. uh home
4:18:01repair uh even in the adjusted budget is
4:18:04still the highest uh amount that gets
4:18:07funded. Uh at $2 million increased from
4:18:101.4. Uh we thought that it was very
4:18:12important to ensure given the the state
4:18:15of the housing stock and the needs in
4:18:17the community to put more dollars in
4:18:19that area. Um and so we increased that
4:18:21to two million. Uh we reduced uh some of
4:18:25the beautifification and blight
4:18:27remediation. So you can see those
4:18:29numbers reflected here in the table. We
4:18:31reduced the number for city beautiful
4:18:33down to 25,000. Uh it still will allow
4:18:36for uh materials and supplies for the
4:18:39area for cleanup for voluntary cleanups
4:18:42but we reduced that number down. We kept
4:18:44the environmental education number at
4:18:46100,000 which is really important. The
4:18:49most glaring thing here is you see the
4:18:51reduction in air quality monitoring. Uh
4:18:53that is as Councilman Ford said, there
4:18:56has been dollars that have been
4:18:57allocated from Shelby County Health to
4:18:59the Shelby County Health Department uh
4:19:01to install an EPA monitor in the area.
4:19:05Uh and I literally just hung up the
4:19:07phone right before I came down here with
4:19:09uh Miss Kesa Alexander who runs the air
4:19:11quality department at the health
4:19:13department and she said that they
4:19:14actually installed that monitor uh in
4:19:17the Riverview area back in June of this
4:19:19year. So, uh there is constant air
4:19:22quality monitoring that's being done. We
4:19:25increased the amount for AC
4:19:26distributions because obviously there
4:19:28are needs for that. Uh and the grant
4:19:30pool is still uh at a healthy amount
4:19:33with 359,000.
4:19:35So qualified nonprofit entities will be
4:19:38able to apply with at least $50,000
4:19:41going towards uh health care needs for
4:19:44the community. So with that, I would ask
4:19:46for your uh support. Uh the team put in
4:19:49a lot of work, the council's put in a
4:19:51lot of work. This is for FY26.
4:19:54Uh FY27
4:19:56uh I think the total amount of the funds
4:19:59will be about $6.6 million and as you
4:20:01all know it will be for 38109 and 38116.
4:20:06And so we will bring forth uh more
4:20:08recommendations for that coming soon.
4:20:12>> Any questions by this body?
4:20:16Let the record reflect. Madam Chairwoman
4:20:18is here. Uh, all right. Y'all kind of
4:20:21quiet. So,
4:20:23ready to take a vote. All those in
4:20:25favor?
4:20:26>> Any
4:20:33I think Councilwoman Walker wants to
4:20:35sing to us today. Um, it's an opinion of
4:20:39the chair that uh, Councilwoman Walker I
4:20:42carries.
4:20:44All right. This item is approved.
4:20:49Thank you members.
4:20:51Thank you Motion Picture Academy and
4:20:53Screen Actors Guild.
4:20:57>> Yeah, I just cut up today. I just
4:21:01>> But seriously, thank you all for the
4:21:03work that you were doing.
4:21:04>> Thank you, Mayor Young
4:21:05>> doing today on this item. Item number
4:21:07two, [clears throat] resolution to
4:21:09accept and allocate and appropriate
4:21:10$500,000 in grant funds received from
4:21:12the Tennessee Department of Environment
4:21:13and Conservation Design and Construction
4:21:15of Memphis Zoo Pervious Pavement Project
4:21:18District 5 Superition 9 sponsored by
4:21:20administration request. I get a motion
4:21:22to second move by J.
4:21:24There's someone from administration
4:21:25speak it.
4:21:36>> Good afternoon.
4:21:38Greg Dodson, director of engineering,
4:21:40125 North Main.
4:21:43>> Gerald Spencer, deputy director for
4:21:44general services, 125 North M.
4:21:47>> All right.
4:21:48>> Yeah. So,
4:21:50>> you can probably just read one line. All
4:21:52is accept and allocate.
4:21:54>> Very brief. Uh yes, accept, allocate,
4:21:57and appropriate
4:21:58>> and appropriate
4:21:58>> uh $500,000 of TD deck funds. Uh
4:22:02basically, again, the grant will be for
4:22:04the design and construction of pvious
4:22:07pavement to replace minimum of 44,000
4:22:10square yards of asphalt pavement at the
4:22:12Memphis Zoo.
4:22:14>> All right. Any questions from this body?
4:22:15Appears to all heart. All those in favor
4:22:17signify by saying I.
4:22:18>> Any oppose? It's the Py. Thank you. Item
4:22:21number three, division of engineing
4:22:23update on traffic congestion at Homes
4:22:25Road and Tain Road. We got some
4:22:27questions. Hopefully you got some
4:22:28answers. How can you enforce this? How
4:22:30they listen to us? Those are going to be
4:22:32two questions right there.
4:22:33>> Absolutely.
4:22:35>> All right. Uh I thought it would be
4:22:37good.
4:22:40>> Hey, Randall Tatum, city traffic
4:22:41engineer.
4:22:45Uh, so I thought it would be good to
4:22:46maybe kind of uh go through a narrative
4:22:50and maybe a timeline of kind of what our
4:22:52actions have been up to this point. Say
4:22:55it again.
4:22:59>> Can use Yes, sir. Uh so um going back to
4:23:04September 28th,
4:23:06um engineer met with Councilwoman Cooper
4:23:09Sudden uh and staff to discuss the
4:23:13concerns with the truck traffic at the
4:23:16intersection of homes in two lane. Uh
4:23:19that same day she requested that no
4:23:21truck signs be installed at that
4:23:24intersection and upstream and downstream
4:23:27on both h uh homes and two-lane as well.
4:23:31Um Thursday, so that same week, um
4:23:36engineering signs and markings crews uh
4:23:39installed no truck signs on homes and
4:23:42two lane.
4:23:44This was this was October 1st.
4:23:48Uh and then just as a note as a result
4:23:51of that there there was no noticeable
4:23:54decrease uh in truck traffic after those
4:23:56signs were
4:23:57>> so they disregard the signs.
4:23:58>> They disregarded the signs.
4:23:59>> And who is they?
4:24:00>> This is the truck traffic and the truck
4:24:04vendors and partners of Space XAI.
4:24:08>> Did a good job. Go ahead.
4:24:11Uh Friday, October 9th, uh that morning,
4:24:16uh Chief Wind connected us with uh Space
4:24:20XAI personnel um that oversees the truck
4:24:24traffic uh in and out of those
4:24:26facilities uh you know in the area. Uh
4:24:31that afternoon
4:24:33I took it upon myself to observe the
4:24:34traffic and noted the significant truck
4:24:36traffic that caused a number of
4:24:39disruptions to vehicular traffic
4:24:43particularly as it relates to the school
4:24:45pickup entrance at John P. Freeman on
4:24:48two lane.
4:24:48>> Quick question. Isn't the traffic
4:24:50similar in the morning time as well?
4:24:53>> It is similar. The only thing you need
4:24:55to keep in mind is that
4:24:58in the mornings the the drop off is on
4:25:02Homes Road.
4:25:03>> Okay.
4:25:03>> The pickup is on Two Lane in the
4:25:05afternoon.
4:25:09So, um, Monday, December, uh, I'm sorry,
4:25:13o October 12th, uh, engineer met with
4:25:17SPE SpaceX AAI personnel to share
4:25:19concerns of the truck trafficing
4:25:22on no truck routes, uh, no truck routes
4:25:26signs, you know, on on two lane and
4:25:28homes. Um that same day, Space XAI
4:25:32shared the routing guidance and we have
4:25:34some slides if or it's in y'all's uh you
4:25:37know packet where you can see what they
4:25:39shared with us. And these are basically
4:25:41guidelines
4:25:42uh notices to all of the truck partners
4:25:45and vendors uh to alerting them that
4:25:49those yeah no truck routes were uh to to
4:25:53not be utilized. Uh and then we also
4:25:56identified some
4:25:58truck routes that they actually some
4:26:00alternate routes that they could
4:26:02actually utilize which would pretty much
4:26:04eliminate the truck traffic entering
4:26:07into the home's two-lane road
4:26:09intersection.
4:26:11Um so we figured it'd take a little bit
4:26:14of a little bit to kind of get that
4:26:15disseminated. Uh so following week which
4:26:19is October 19th yesterday
4:26:22um I observed the traffic between 7:30
4:26:26and 8 uh a.m. and noticed significant
4:26:29decrease uh in the traffic and this
4:26:32amounts to about one truck for every two
4:26:36minutes. This was yesterday.
4:26:39I went in the morning time.
4:26:42We did not go back in the evening.
4:26:44namely because I realized that the
4:26:46students were still out of school
4:26:49yesterday.
4:26:53>> Yeah. Well, in addition to yesterday, I
4:26:56went out there this morning
4:26:58uh and there there so we did have the
4:27:02parents dropping off the students as
4:27:04well as faculty uh and and noticed that
4:27:08there was again significant decrease uh
4:27:12in the truck traffic. still some
4:27:14stragglers. Uh but the what I'm what I'm
4:27:17observing is that there's just a
4:27:21significant decline particularly from
4:27:23the notices given out October 12th to
4:27:26this week where we're we're now seeing
4:27:29you know the effects of those of those
4:27:31notices.
4:27:37>> Oh no, I'm good. I'm good. I'm good.
4:27:40>> Dr. War I can see. Are we giving out
4:27:43tickets now to truckers who are not
4:27:45where they're supposed to be?
4:27:48Because I I think that would be the next
4:27:49step. So, when do we start that?
4:27:52>> Yes, sir. So, we've been in constant
4:27:53communication with MPD uh for
4:27:55enforcement in the area. Uh so, they are
4:27:57aware. We're going to continue to uh
4:27:59coordinate with them to ensure that they
4:28:01are citing any uh trucks that are
4:28:03violating our truck restrictions in the
4:28:04area.
4:28:04>> How many tickets have we given so far?
4:28:06>> U we don't have that information.
4:28:09>> Can you bring that back to us so we
4:28:10know?
4:28:11>> Yes, sir. We'll check with the video on
4:28:12that.
4:28:14>> What's What's the maximum amount of the
4:28:16fine
4:28:16>> when they violate?
4:28:19>> We don't know.
4:28:20>> I've seen signs that say $1,000.
4:28:25>> I don't know if we actually have
4:28:26anything that actually shows it may be
4:28:28in in Mississippi or
4:28:30>> Okay. So, I guess bring back that
4:28:32information when you come back.
4:28:35>> So, in uh two weeks we see you back kind
4:28:37of just talk about, you know, where we
4:28:39are today and Are we still seeing signs
4:28:42of decrease or if it's upticking more
4:28:45and also talk about an involvement of
4:28:48MPD and are we issuing citations in the
4:28:50amount?
4:28:51>> Absolutely.
4:28:52>> Okay. Any questions from anyone on this
4:28:54body? Council woman.
4:28:55>> Yes.
4:29:02>> If you will, can you check with the
4:29:04White Haven links? I know that there are
4:29:07users who at certain times of the day
4:29:11they are having challenges getting on
4:29:13and off the parking lot.
4:29:15>> Yes. You're talking about the golf
4:29:16course, right?
4:29:16>> The golf course.
4:29:17>> Yes. Yes, ma'am. I actually did have a
4:29:18conversation with them. I also spoke
4:29:20with the staff at um at John P. Freeman
4:29:23uh as well. And they they they did say
4:29:26that there was some disruption. Um and
4:29:30it has to do not to get in too much of
4:29:32the weeds here, but there is a an
4:29:34adjacent parking lot that a lot of the
4:29:38XI workers use
4:29:39>> street before you get to the railroad.
4:29:41>> That's right. That's right. And so
4:29:43there's been some disruption there. Um
4:29:45but he he noted uh the staff there noted
4:29:49that it it wasn't it wasn't terrible to
4:29:52where they could not get out but it it's
4:29:54it's part of the particularly in the
4:29:55peak hour. You know there's just some
4:29:57issues particularly turning left.
4:30:00>> Okay. Thank you. This is complete for
4:30:02me.
4:30:03>> Anybody else in the queue on this
4:30:04particular issue? I know many of us have
4:30:06been out there.
4:30:07>> Well, thank you for actually showing up
4:30:09and taking a look at it yourself. We
4:30:10appreciate that type of diligent work.
4:30:12Um with that um this item is ended and
4:30:16this committee is adjourned.
4:43:31Uh,
4:43:31>> call the role, please.
4:43:32>> Yes, sir.
4:43:34>> Just relax.
4:43:35>> Councilwoman Green, Councilman Smiley,
4:43:38Councilwoman Walker,
4:43:41>> Councilman Dr. Warren,
4:43:43>> Councilwoman White,
4:43:45>> Councilman Canali,
4:43:47>> Councilwoman Logan, just
4:43:49>> and Chair Spinosa.
4:43:50>> All right. Here. So, item number one uh
4:43:52is going to be held until November 24th.
4:43:57That's in Councilwoman Logan's district.
4:44:00And
4:44:02just for the record, we'll do that
4:44:03without objection. But I think the
4:44:06expectation is we have a neighborhood
4:44:07meeting between now and then. So 11:24
4:44:16y'all get together.
4:44:20>> All right.
4:44:22Thank you. That's it for item number
4:44:23one. Item number two, PD 2026-013
4:44:29also in Councilwoman Logan's district 1,
4:44:31Super District 9, sponsored by the
4:44:33administration. There is a request for
4:44:34same night minutes. Could I get a motion
4:44:36in a second?
4:44:37>> All right. Measure was made by
4:44:39Councilman Canali, seconded by
4:44:40Councilman Warren.
4:44:43Name and address for the record, please.
4:44:46>> Jeffrey Penzes, zoning administrator,
4:44:47division of planning development. And
4:44:49with me is TR Sabuzi, who will present
4:44:51this case.
4:45:08Good afternoon. I'm Truce with Planning
4:45:09and Development. This is an amendment to
4:45:12a PD that was approved in 2000 and the
4:45:15applicant is requesting to modify some
4:45:18of the conditions to allow a variety of
4:45:21uses for commercial office residential
4:45:24and civic. It's located on Austin P
4:45:27Highway,
4:45:29west side of Austin P Highway, north of
4:45:31New Coventon Pike and south of Egypt
4:45:34Central Road.
4:45:36It's in the Raleigh area. This is a
4:45:39vicinity map. We sent out 38 notices.
4:45:44It is currently zone residential single
4:45:46family 10, but as I said, a PD was
4:45:49approved in 2000 and they here to amend
4:45:52some of their conditions.
4:45:54Here are a few side photos.
4:45:58So, this is their outline plan. It's a
4:46:00variety of different um uses. It
4:46:03contains multif family civic uses, a
4:46:05hotel, and a mixture of different uses.
4:46:10This proposal was consistent with the
4:46:12Memphis 3.0 comprehensive plan.
4:46:16Um, per staff, this was approved into
4:46:19different areas. Area B was developed
4:46:23and the prop the subject property has
4:46:26remained vacant and we do not find
4:46:30anything against it.
4:46:33So recommended approval and the land use
4:46:35control board also recommended approval.
4:46:37Thank you.
4:46:39>> So everyone can see approved by LUCB and
4:46:42approved by um DPD. So are there any
4:46:46council members that have any questions
4:46:47on this item? All right. Seeing none,
4:46:50without objection, this will go
4:46:51downstairs with the positive
4:46:52recommendation for same night minutes.
4:46:55All right, that does it. Thank you. That
4:46:57does it for item number two. Item number
4:46:59three,
4:47:01SNC street name change 2026-
4:47:050003 District 1 Super District 9,
4:47:07sponsored by the administration.
4:47:10Uh, I need a motion in a second.
4:47:12>> All right. Motion was made by Councilman
4:47:14Canali. Seconded by, I believe,
4:47:15Councilwoman Green.
4:47:18Moved all the way to the end down there.
4:47:21Uh, motion was made and properly
4:47:22seconded.
4:47:24Floor is yours.
4:47:30So we were here last meeting and we have
4:47:34a few different name options here that
4:47:37got approved by MLGW.
4:47:39>> So this these are the street name
4:47:42>> the street name change for IKEA way.
4:47:44>> Exactly.
4:47:44>> Okay. And so these are four options for
4:47:46street names.
4:47:49This is in Councilwoman Logan's
4:47:50district.
4:47:52Uh
4:47:54if if you're I would like to give you
4:47:56the microphone on this. I feel like this
4:47:57is your district. I mean, if we want to
4:47:59vote on a street name, I guess we could
4:48:01do that, but what do you think?
4:48:03>> Can we vote on a street name first and
4:48:04then come right back?
4:48:05>> Sure.
4:48:06>> Yeah.
4:48:07>> This is this the street name?
4:48:09>> Yeah.
4:48:09>> Yeah. This this is on the screen. So,
4:48:12these are the the four options that MLGW
4:48:14have said are okay.
4:48:16>> Uh
4:48:16>> oh, these are the options.
4:48:17>> Yes.
4:48:18>> Yeah. Cordova something.
4:48:20>> Okay. You if you Okay. If you pick
4:48:22between either of those two,
4:48:24>> I'm in favor of Cordova Market Drive.
4:48:26>> Okay, so we made a motion. [laughter]
4:48:28>> Oh, she said I.
4:48:31>> Okay, there's an I. All right, so for
4:48:33the record, Cordova Market Drive without
4:48:36objection, we're going to go with
4:48:37Cordova Market Drive. Any objection from
4:48:39council members?
4:48:40>> All right, seeing none, we just named a
4:48:42street. That does it for item number
4:48:44three.
4:48:45>> Thank you.
4:48:45>> Uh Cordova Market Drive.
4:48:47Congratulations.
4:48:49All right. Item number four,
4:48:51MJR2026-022,
4:48:54District 2, Super District 9, sponsored
4:48:56by the administration. There is a
4:48:58request for same night minutes. Could I
4:49:00have a motion in a second, please? All
4:49:02right. Move. Moved by Councilwoman Ford,
4:49:04seconded by Councilwoman Warren.
4:49:08>> I mean Green. Sorry. Councilwoman Warren
4:49:12already slip. Uh, go ahead, please.
4:49:17Alexis Long Street with the Division of
4:49:19Planning and Development. I'm presenting
4:49:21on case MJR 202622,
4:49:24which is a correspondence case to plan
4:49:26development 2021 024. This property is
4:49:30located at 147 North Germantown Parkway
4:49:33with a request to major modification to
4:49:35the approved plan development from 2021
4:49:38to reflect a change of ownership for a
4:49:40car wash. Um, as you all can see here,
4:49:43property is located in the Cordova area.
4:49:45About 148 notices were mailed out
4:49:47September 18th. Um there were no letters
4:49:50of opposition or support received during
4:49:53that time. Um the current zoning use is
4:49:56RU3 but it is governed by the plan
4:49:59development 2021 024 parcel D which
4:50:03permits commercial mixeduse 2 zoning
4:50:05uses
4:50:07and it does have a commercial zoning
4:50:09land use designation as well. And here
4:50:11are a few of the existing site photos.
4:50:15in the existing recorded plan. So, the
4:50:17applicant is not proposing to change
4:50:19anything to the existing site. They're
4:50:20simply just proposing the street name
4:50:22change, which was added by a fellow
4:50:25member back during its council approval
4:50:28to
4:50:30to require the business name change um
4:50:32of the operating business underneath
4:50:35this plan development. And so, as I
4:50:38mentioned earlier, here are a few of
4:50:40those conclusions regarding the approval
4:50:43or the request. itself in the original
4:50:44approval and the applicant is present.
4:50:47Staff did recommend approval and as well
4:50:49as the lane use control board.
4:50:51>> All right, thank you so much. So staff
4:50:53recommends approval. So did LUCB
4:50:56and again time and effort and energy
4:50:58goes into all of this before we get here
4:51:00today. So thank you all for that. Um any
4:51:02comments over there before we this is
4:51:04kind of non-eventful.
4:51:05>> Yeah, very nonful which I appreciate.
4:51:08>> Club Car Wash has bought the Glide Car
4:51:10Washes and this is their last in order
4:51:14to purchase. So, they're wanting to grow
4:51:16in the Memphis market. Their their way
4:51:19to grow in the Memphis market.
4:51:20>> So, thank you for growing in the Memphis
4:51:22market. Um, any comments, questions from
4:51:25council members? All right. Seeing none,
4:51:28um, all those in favor of this, please
4:51:29respond by saying I.
4:51:31>> I.
4:51:31>> All right. Anyone opposed? All right.
4:51:33Opinion of the chairs, the eyes have it.
4:51:35So, item four will go downstairs with
4:51:36the positive recommendation for same
4:51:38night minutes. Thank you. All right. The
4:51:41last item on the agenda, item number
4:51:43five, sup26-013.
4:51:46This is in district 2, super district 9,
4:51:48sponsored by the administration
4:51:52penises and with me is manad nita who
4:51:55will present this item.
4:51:57>> Welcome.
4:51:57>> Good afternoon, Masan Oadia with DPD. Uh
4:52:00this is a request for a car wash in a
4:52:02CMU zoning district. Um in February uh
4:52:06on February 2021 uh Memphis City Council
4:52:10downzone this area from CMU3 to CMU1 and
4:52:14the surrounding land use ma uh land uses
4:52:17are a mixture of commercial, multif
4:52:19family and single family. Here are few
4:52:22pictures of the site. Uh this is a
4:52:24corner lot and this is the site plan
4:52:27that the applicant uh proposed
4:52:33and here are some elevation uh proposed
4:52:35by the applicant.
4:52:38Uh Memphis 3.0 believes that this is a
4:52:40consistent use. Um however our uh
4:52:44broader um analysis uh we believe that
4:52:47this is um an inconsistent use and um
4:52:51there are um several residential areas
4:52:54in in the neighborhood and also uh there
4:52:57are four existing car washes from uh
4:53:00North Parkway to um White Station um
4:53:04which is along Summer Avenue. It is in a
4:53:07fivemile segment and uh one newly
4:53:11approved car wash along summer avenue by
4:53:14city council uh in the previous uh
4:53:17meeting. Um hence we believe that um
4:53:20this um shall not be a consistent use um
4:53:25for the neighborhood. Uh we are
4:53:28recommending rejection. Versus control
4:53:30board also rejected uh this case.
4:53:33However, if approved, here are the list
4:53:36of conditions. That concludes my
4:53:38presentation. Happy to answer any
4:53:39questions.
4:53:40>> Thank you. Uh, Councilwoman Green,
4:53:43>> is this in my district?
4:53:45>> No, I was just looking at it. So, that's
4:53:47uh down the street from my house. That's
4:53:48going to be district five. Is the
4:53:50applicant here?
4:53:52>> Okay. I just wanted to make sure.
4:53:54>> Yeah.
4:53:54>> Okay.
4:53:55>> All right. So, um,
4:53:58>> I'm going to follow your lead, chair.
4:54:00We're going to hold this item without
4:54:02objection.
4:54:04All right. So, item number five has been
4:54:06held. Any other items before this
4:54:08committee? Seeing none. Thank you. We're
4:54:11done.
5:13:08Good afternoon. The October 20th, 2026
5:13:11executive session of the Memphis City
5:13:13Council is hereby call to order. Chief
5:13:15Johnson, if you'll please call the role.
5:13:18Councilwoman Green,
5:13:22Councilman Ford, Senior, Councilwoman
5:13:25Walker,
5:13:26>> Councilman Warren,
5:13:27>> Councilwoman Logan, Council Miss
5:13:30Spinosa, Chair Swingen, Washington
5:13:33>> present. Thank you, Chief Johnson. We
5:13:35have one item on the agenda today. Item
5:13:38number one is an ordinance to establish
5:13:41a framework for the creation and state
5:13:44approval of a nonprofit community
5:13:46benefit agency to authorize coordination
5:13:50between the city of Memphis and the
5:13:52state of Tennessee for the lawful
5:13:54receipt, administration, and
5:13:57distribution of data center community
5:14:00benefit funding to provide for community
5:14:03representation,
5:14:04financial accountability, and public
5:14:07oversight and to provide for related
5:14:12purposes all council districts. And this
5:14:14is sponsored by Councilman Warren. Can I
5:14:17get a motion and a second?
5:14:19>> Second.
5:14:20>> All right. It's been moved by Councilman
5:14:21Ford, Senior, second by Councilwoman
5:14:24Walker. Councilman Warren, you're
5:14:26recognized at this time. If you could
5:14:28offer us some clarity on this, please.
5:14:35confusion in the press about what this
5:14:38is as opposed to the 25%
5:14:41of tax revenue that we're giving to uh
5:14:44that Councilwoman Walker and Councilman
5:14:47Ford are arranging to go into the
5:14:49districts near Colossus and our XAI
5:14:53plant. This is designed to allow the
5:14:57city to accept funding from potential
5:15:01growth in future data centers that will
5:15:04be above and beyond property taxes. And
5:15:08this funding needs to go to us in a way
5:15:11that's not taxes. We don't have the
5:15:14authority to tax for this. We're going
5:15:17to need to ask the state for authority
5:15:19to develop this community
5:15:22uh community data center benefit agency,
5:15:26the community benefit agency and we'll
5:15:28have to ask them to set up laws and
5:15:30allow us to do this. But without this
5:15:33document, we don't have anything to take
5:15:35to them to ask them to do for us. So
5:15:38what we're trying to do is to set up
5:15:40this process by which we can allow or
5:15:44figure out a way that we can get extra
5:15:47funds from these data centers as they
5:15:49grow. Currently all we can really get is
5:15:51property taxes. In other parts of the
5:15:54country uh they've arranged to where
5:15:57data centers pay a certain amount for
5:15:59megawatt hour that they use. Uh and if
5:16:03we look at what mega megawatt growth
5:16:05could be, that's where this is. This
5:16:08doesn't this doesn't address the things
5:16:10that I think Councilwoman Logan's uh and
5:16:15bill is going to address later on. This
5:16:18is just on how we get money later on.
5:16:20This is what we're trying to do.
5:16:22Establish a lawful mechanism through
5:16:25which the state of Tennessee allows us
5:16:27to collect this money. Okay. to put
5:16:30financial controls on it to develop an
5:16:33agency which is a little bit like the
5:16:35airport authority that's responsible for
5:16:37the airport. This agency would be
5:16:39responsible for funds that were given or
5:16:42obtained or you know by contract
5:16:46acquired for the agency from data
5:16:49centers. Uh and it also proposes how
5:16:53this money would be spent and who would
5:16:55run it. Um the purposes of this would be
5:16:59neighborhood revitalization,
5:17:01workforce development, apprenticeships,
5:17:03employment preparation, small business
5:17:05development, access to economic
5:17:08opportunities, youth development,
5:17:09educational programming, housing
5:17:12stability, neighbor neighborhood
5:17:14stabilization, environmental monitoring,
5:17:17environmental education, public health
5:17:19education, public safety, capacity,
5:17:23building, uh nonprofits and other lawful
5:17:27things. So using it for after school
5:17:29programs, park programs, think of it
5:17:32basically what city functions are. How
5:17:35can we take this extra money and use it?
5:17:38And what would happen is there would be
5:17:40a board that would distribute this
5:17:41money. We as the city council I think
5:17:44would ask where we would want it to go.
5:17:46So and just like the airport author, the
5:17:48airport askked the airport authority, we
5:17:51need money to build this hanger. And
5:17:52they'll go, okay, yes, build the hanger.
5:17:55we have the money for it. Uh we're going
5:17:56to want to build some low-income houses.
5:17:58We're going to tell them how many and
5:17:59where they are. We'll ask the community
5:18:02uh agency and they'll be able to do that
5:18:05for us. So, this provides for legal
5:18:08structure. It also at the very end,
5:18:10you'll notice there's a letter where we
5:18:13ask our legislature if they would grant
5:18:17us permission to do this and help us
5:18:19develop the laws that make this legal.
5:18:22uh and that's going to require our
5:18:24mayor. I think uh at some point as we
5:18:27move this forward uh there may even be a
5:18:30county uh version of this at some point
5:18:32as we go forward, but at this point this
5:18:35is only from the city because that's all
5:18:36that we can do. So this is enabling
5:18:39legislation. The fact we pass it and the
5:18:42fact that it goes through three readings
5:18:45and you know becomes law means that it
5:18:48becomes law if the state says it becomes
5:18:50law. So, we have to take this to the
5:18:52state and ask them to develop the
5:18:55regulations and the laws that allow us
5:18:57to do this. But I think we would be
5:18:59remiss to do this. There have been other
5:19:01communities across the country that have
5:19:04gotten rid of their property taxes. You
5:19:07know, uh I've seen numbers that people
5:19:09have generated based on a certain
5:19:11wattage uh uh fund fee per wattage use
5:19:16that suggests we could get 120 million
5:19:18to $980 million a year uh within 10
5:19:22years on this with the idea that if we
5:19:24do that, you all know what we could do
5:19:27with the city if we had that money. So,
5:19:30one, you lower property taxes, you get
5:19:32people moving back in, you build
5:19:33low-income housing. So, I think what we
5:19:36potentially could do with is great. I
5:19:38think the only thing that's limiting us
5:19:41is our ability to go ahead and get this
5:19:44bill passed and then work well with our
5:19:46state legislature to make sure we can
5:19:48get their approval and assistance to do
5:19:50this. So, I would strongly urge and ask
5:19:54my colleagues to vote for this and I
5:19:56would love to have everyone on this as a
5:19:58co-sponsor if they would so choose.
5:20:02and and I'd like you to go down tonight
5:20:04if possible for first reading so that
5:20:06way we can have it done in uh not in not
5:20:11in two more or three more meetings.
5:20:13>> Okay.
5:20:14>> Thank you, Madam Chair.
5:20:15>> Thank you, Councilman.
5:20:16>> And I'm open to questions if anyone has
5:20:18them.
5:20:18>> All right, Councilwoman Logan, you're
5:20:20recognized.
5:20:27Explain to me the purpose behind I mean
5:20:30I know the purpose but why do we have to
5:20:31do that? It seems as though we did we're
5:20:33already collecting funds on the one we
5:20:37have now and we didn't have to get
5:20:39permission from the state. Seems like we
5:20:41can negotiate instead of regulated.
5:20:43>> The the difference is that's from
5:20:44property taxes.
5:20:45>> Okay.
5:20:46>> Okay. And because it's from property
5:20:48taxes that's within our domain.
5:20:50>> This is not property tax. This would be
5:20:53uh a fee that is negotiated and entered
5:20:57into a contractual relationship with the
5:20:59data center that says, "Okay, we see the
5:21:02need in your community. We agree, you
5:21:04know, for you assisting us getting our
5:21:06permits uh in a rapid fashion that we're
5:21:10going to pay you x amount per kilowatt
5:21:12hour for 10 10 years." and they sign a
5:21:15contract and that contract can't come to
5:21:17us according to our lawyer Allen as a
5:21:21because it would be considered a tax.
5:21:23Evidently, we've done something similar
5:21:24to this with AT&T in the past and there
5:21:27are all sorts of lawsuits and Councilman
5:21:29Ford may remember this. I don't. It was
5:21:31before my time, but yeah, I know you got
5:21:34a memory like a trap. But, uh, but so on
5:21:38that, that's why it's got to do with
5:21:40what Allan said to me and the way we had
5:21:42to set it up. And this is how it's set
5:21:44up in other uh municipalities. And I
5:21:47think the other thing that it does
5:21:49that's good is it gives us an extra
5:21:52layer of public accountability and
5:21:55visibility of where these funds are
5:21:57going. So we'll have a board that's
5:21:58going to be spending that have to do an
5:22:00annual report. They'll report to us and
5:22:03we'll be monitoring what they're doing.
5:22:04Also,
5:22:06>> I hope that answered your question,
5:22:07Councilwoman.
5:22:08>> It did. Thank you. I appreciate that.
5:22:09>> And I'd love to have you as a
5:22:10co-sponsor.
5:22:11>> Absolutely.
5:22:12>> Okay. Thank you. Thank you, Councilwoman
5:22:14Logan. Councilwoman Walker, you're
5:22:15recognized at this time.
5:22:19>> Councilman Warren, so XAI has currently
5:22:24done things in the community for the
5:22:26community. So, what process are they
5:22:30process processes
5:22:33um laws possibly that they are operating
5:22:35under to be able to do that already?
5:22:39I think what they're doing
5:22:41>> without this
5:22:42>> what they're doing is they are just
5:22:44making donations. Okay, they are doing
5:22:47that. What this would do is this would
5:22:49set up a legal framework where we would
5:22:52have a contractual relationship based on
5:22:55kilowatt usage that the new data center
5:22:58would be giving this amount of money per
5:23:01kilowatt use or whatever and to this
5:23:04entity. So, it's a contract. We're going
5:23:07to be using this much. y'all get this
5:23:09much extra above and beyond property
5:23:12taxes. And you'd say, "Well, why would
5:23:14they want to do that?" Well, if we're
5:23:16able to sort of expedite them getting
5:23:19their permits, making sure they do all
5:23:20the things they're supposed to do in the
5:23:22permit process, and we're able to help
5:23:24speed them up, the minute they've got
5:23:26that contract signed, they're they're
5:23:28their stock goes up by 10 or 15 or 20%.
5:23:32Which will more than pay for this amount
5:23:34of money over 10 years. uh you know
5:23:37they'll still be making a lot more money
5:23:39than they'll be giving us. And it's also
5:23:41a way to make the community better. So
5:23:43if you think about it, you're wanting to
5:23:45build your data center and you want the
5:23:47surrounding companies that come around
5:23:48the data center to succeed. You want
5:23:51them to have a really good place to go
5:23:52to. And we know that Memphis is a great
5:23:55place. I mean, you know, Memphis is fun.
5:23:57You know, Memphis is really it's a great
5:24:00place. Memphis is a fund, but we also we
5:24:03got a lot of needs that we could use
5:24:05this money for if we did it wisely, and
5:24:07this is a way to help us do it wisely.
5:24:10>> Okay. Thank you. I yield the floor.
5:24:13I have a clarifying question. All right,
5:24:15Councilwoman.
5:24:16>> Okay. So, you said that that's a
5:24:18donation, but whatever it was, we
5:24:20negotiated it. It's an
5:24:22>> but but the reason why I say that is
5:24:23because
5:24:24>> it seems as though if we go the route of
5:24:26the ordinance, it's going to be like
5:24:28regulated or somebody else has some say
5:24:31over it or can get some of it. But if we
5:24:33in a business transaction negotiate what
5:24:35we want, there's nothing to be
5:24:38regulated.
5:24:39>> The negotiation that you're talking
5:24:41about is one that I think we've done
5:24:44before and it' be nice if Allan's
5:24:46listening somewhere in the back. he
5:24:47could come out and back me up on this,
5:24:49but the the issue is that that would
5:24:51still be considered a tax. It's us
5:24:54getting money directly to us in a format
5:24:57that is not allowed under the state
5:24:59constitution.
5:25:00>> That what we just did. I mean, not I'm
5:25:02not
5:25:03>> No, we use we use tax money that was
5:25:05already owed to us. We're talking about
5:25:07getting extra funding.
5:25:09>> Okay.
5:25:09>> Okay. In another way other than property
5:25:12tax that we can we are actually able to
5:25:15do. And since we can't do that, this is
5:25:18a way that we can get those funds. But
5:25:20that's why we have to go to the state.
5:25:23But if the state says no, then I think
5:25:25it'll be a problem. I have been I have
5:25:27spoken to very prominent businessmen
5:25:30that told me if we could get this thing
5:25:32passed by January, they will do
5:25:34everything in their power to take it to
5:25:36Nashville and make sure it becomes law.
5:25:38They'll go to lobby for us. We've got
5:25:40people in in in the business community
5:25:43that want to see this happen and will go
5:25:45and fight for us in Nashville and have a
5:25:48pretty good track record so far. So, I
5:25:50would I would I think that's that's what
5:25:52we've got. So, we have people that think
5:25:55this is a good idea. They think it's a
5:25:57way we can get money and it's just a
5:25:59boom for what we could do for Memphis
5:26:01and they'll go fight for us in
5:26:03Nashville. And um you know, that's about
5:26:05all we can do. There's no guarantee.
5:26:07Worst case scenario, we pass it. It
5:26:09doesn't go anywhere. And we tried. But
5:26:11if we don't try, I think we're we're
5:26:14we're hurting ourselves.
5:26:19>> All right. Councilman Spinosa, you're
5:26:22recognized.
5:26:23>> Um,
5:26:25Councilman Warren, I'm I'm looking and
5:26:28I'm not saying that I want to I don't
5:26:30know if we hold this.
5:26:32>> Allan thought we should send it down
5:26:34tonight for same night minutes.
5:26:36Thank you.
5:26:38Appreciate knowing Allan's
5:26:39recommendation. I want to talk to Allan
5:26:42because I think that there's a way for
5:26:44you to possibly plug this on to the item
5:26:48that I presented
5:26:51so we can move faster with it. Um
5:26:53because that was a piece
5:26:54>> I'm all I'm all for it
5:26:55>> because that was a piece of what I this
5:26:57was a piece of what I presented humbly
5:27:00presented uh as we're all trying to
5:27:02figure this out together. This is just
5:27:04the first time I've heard of we talked
5:27:05about this obviously. So maybe
5:27:09maybe we could do that in here. Oh and
5:27:11look
5:27:12>> look here.
5:27:12>> I heard my name.
5:27:14>> Yeah,
5:27:15>> I keep hearing a lot of that lady.
5:27:17>> I'm thinking this go downstairs here.
5:27:19Here here I think it's a great idea.
5:27:21>> Recommendation. Send it downstairs and
5:27:23then maybe we could talk through the
5:27:24possibility of
5:27:27>> adding this to what I had brought up as
5:27:30we try to blend all these things.
5:27:31>> Okay. So, so I um
5:27:34>> Thank you, Madam Chair.
5:27:35>> This is Alan Wade, your lawyer.
5:27:38>> Um, so when Jeff presented it to me, I
5:27:41said just go ahead generally go ahead
5:27:44and present an ordinance. We have three
5:27:46readings to adjust it. Uh, this is being
5:27:49presented today and in all fairness to
5:27:51the rest of the members, they may want
5:27:53to have a look at it. If your option is
5:27:56a viable option, it can be exercised at
5:27:59the next meeting and we can we can
5:28:02substitute for yours and just roll it in
5:28:05and then he can drop his and then we can
5:28:06go over.
5:28:09>> I have a feeling that there's going to
5:28:11be a lot of movement on things today and
5:28:13so we could keep mine alive in the hopes
5:28:15of
5:28:15>> Oh, yours will be held. You should hold
5:28:17yours.
5:28:17>> Yeah, I would like to hold mine. Okay.
5:28:19So, I'm going to go ahead and ask the
5:28:20chair to hold.
5:28:21>> Just wait and do it down there.
5:28:22>> Wow. When we can do it now. Just do it
5:28:24down there, bro. Just have that. Listen,
5:28:26let's let's follow the protocol, okay?
5:28:29Just just trust me on this one.
5:28:31>> Just follow the protocol, right?
5:28:34>> I guess I'm I'm a little confused. So,
5:28:36could I ask attorney a question?
5:28:39>> Yours is going to have a first reading
5:28:41tonight. And to the extent that it's
5:28:43ready for the body next meeting, you we
5:28:46can substitute yours in his ordinance
5:28:48and then finally adopt it. Okay.
5:28:50>> I got it.
5:28:51>> You got your same thing. And I didn't
5:28:53have a problem. Let me just say this. I
5:28:54didn't have a problem going three
5:28:56readings with his because his ain't
5:28:58going nowhere until the general assembly
5:29:00authorizes us to go for. Okay. So
5:29:02there's no rush on his. Okay.
5:29:04>> Okay.
5:29:06All those in favor say I.
5:29:08>> Any oppose? Nay.
5:29:10>> It is the opinion of the chair that the
5:29:12eyes have it. This item will go down
5:29:13with a favorable recommendation.
5:29:17That brings us to our add-on items.
5:29:20Items number 34, 35, 36, and 37
5:29:36first reading. Okay. So, that previous
5:29:39item will go down [clears throat] for
5:29:40first reading with under consent. Okay.
5:29:44All right. Item number 34 is a
5:29:46resolution to allocate, appropriate, and
5:29:48transfer the sum of $43,224
5:29:53and45
5:29:54from Memphis Parks Capital Reserve CIP
5:29:57project PK25104,
5:30:01fiscal year 2027, contract construction
5:30:05and transfer to Westwood Pool
5:30:08Improvements, CIP project number PK
5:30:120420.
5:30:1320 contract construction as part of the
5:30:17fiscal year 2027 capital improvement
5:30:21budget district 6 super district 8
5:30:24sponsored by the administration. There's
5:30:26a request for same night minutes.
5:30:30Item number 35 is a resolution to accept
5:30:33additional grant funds in the amount of
5:30:36105,52810
5:30:41from US Department of Justice through
5:30:43the United States Marshall Service
5:30:46Western District of Tennessee. All
5:30:48council districts sponsored by the
5:30:50administration for the purpose of
5:30:53overtime funding for personnel salaries.
5:30:56There's a request for same night
5:30:58minutes. This was passed with a
5:31:01favorable recommendation. Item number 36
5:31:04is a resolution to amend the FY2027
5:31:09capital improvement program CIP and
5:31:12transfer $319,000
5:31:15in appropriated general obligation go
5:31:19funds with the downtown command project
5:31:22IT010008
5:31:24from other cost to architecture and
5:31:27engineering. There's a request for same
5:31:30night minutes. This item was also passed
5:31:33with a favorable recommendation. Item
5:31:35number 37, a resolution to accept,
5:31:38allocate, and appropriate $500,000
5:31:42in grant funds received from the
5:31:45Tennessee Department of Environment and
5:31:47Conservation Tdeoo.
5:31:54Pervious pavement project district 5
5:31:58super district 9 sponsored by the
5:32:00administration. There's a request for
5:32:03same night minutes. The same night
5:32:05minute items are 6 7 34 35 36 and 37.
5:32:13Does any member of the committee have
5:32:14anything else that needs to be
5:32:16addressed?
5:32:18If not we will stand adjourned. Thank
5:32:20you.