  • Called to order with an invocation and pledge; the agenda and the consent agenda (including uncollectible water and sewer account write-offs, described as consistent with past years) were approved without opposition. The Onslow Water and Sewer Authority is a separate body from the City; its meeting is posted on the City's channel.
  • Camp Davis wastewater force main expansion and emergency connection: the board approved an amended project ordinance and authorized the CEO to sign two construction contracts with the apparent low bidder, Busco Contractors, Inc.: $9,988,100 for about 55,237 linear feet of 12 to 20 inch force main (capacity about 1.8 MGD, with an emergency connection to the Holly Ridge plant) and $7,881,500 for two new pump stations. Also covered were $1,689,600 for design-engineer construction administration and about $75,000 for easements. There were 21 bidders (13 on the pipeline, 8 on the pump stations) and the bids ran about $2 million under estimate on wastewater. A director who came from the contracting world said the low bid looked too cheap and voted yes anyway; staff said the engineers vetted it closely and the contractor is bonded. See Camp Davis Wastewater Force Main Expansion.
  • A federal-advocacy firm presented its services (earmark requests, Army Corps environmental infrastructure funding, defense-authorization funding for communities near Camp Lejeune, and WIFIA financing, which North Carolina does not yet fully access). The board approved a one-year agreement, subject to attorney review, funded from the administrative budget; a director said the cost was in the range of $72,000 a year. A member disclosed that their town signed with the same firm earlier that day. See ONWASA Federal Advocacy Agreement.
  • Surplus property on Viking Place, next to a former wastewater treatment plant where only a pump station operates: the board declared it surplus and authorized the upset bid process on an offer of $5,000 from the adjacent owner, with survey costs covered. The acreage was stated inconsistently in the captions.
  • Interlocal agreement with Onslow County for fleet repair and maintenance of about 50 diesel vehicles and 100 pieces of heavy equipment, approved. Costs are close to the current vendor (examples: $380 versus $560 for a service-truck service, $360 versus $480 for a backhoe), the main benefit is faster turnaround, either party can cancel on 30 days' notice, it is not exclusive and no employees are displaced. See ONWASA Fleet Maintenance Interlocal Agreement.
  • Four project ordinances approved, all in the capital improvement plan: Irving Town wastewater pump station upgrade (continuing design), initial study for a Northeast wastewater treatment plant on the Parkertown property serving the Swansboro and Highway 24 corridor, a study to relocate North Topsail pump station 49 (its current site is environmentally unsound and unsafe for crews, and the pipe hangs from the bridge), and a wastewater system master plan with a hydraulic model the authority will own. See ONWASA Wastewater Project Ordinances.
  • No public comment; the planned closed session did not materialize and moves to October.
  • CEO report: signatures are being gathered on a letter to the base ahead of a regional planning group meeting; an EDA grant for a Holly Ridge water tower was not awarded and staff will seek feedback; a state abandoned-landfill review near Camp Davis is not expected to affect authority wells; new drought areas appeared in the county; the authority is coordinating with the City of Jacksonville on utility service for areas leaving the City's extraterritorial jurisdiction; staff described cybersecurity controls and said customers would be notified of any water-quality issue; crews fixed about 30 leaks in a week with about 50 on the list.
  • Next meeting is October 22, to consider debt placement for capital projects ahead of Local Government Commission review in November.

Agenda

Agenda not yet posted.

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

00:24director's meeting for Thursday,

00:26September 17 to order. And I'm going to

00:30ask everyone to stand as Pastor Brian

00:33Young, uh, pastor of Love, Grace, and

00:35Mercy Church, provides the imitation and

00:38remain standing for the pledge, pledge

00:40of allegiance.

00:44Amen. Father, we just thank you tonight,

00:46Lord God. We are eternally grateful for

00:48your grace and your mercy, Lord, upon

00:50us, God. We thank you God tonight that

00:52you God your spirit is here God lead

00:55these men God and these women Lord in

00:57making the right decisions God for this

00:59community. Thank you oh Lord for a

01:01spirit of cooperation father God that we

01:04will come to the best decisions God to

01:07God just further God Anwasa's goals and

01:10their vision Lord God to be what they

01:13need to be in this community father we

01:15thank you for leading and guiding us

01:17tonight in Jesus name. Amen.

01:19>> Amen. Amen.

01:22>> Face the flag. I pledge allegiance to

01:25the flag of the United States of America

01:28and to the republic for which it stands,

01:31one nation under God, indivisible, with

01:34liberty and justice for all.

01:37>> Thank you.

01:42We ask all those present to turn their

01:45cell phones off or to vibrate.

01:49Individuals making presentations, public

01:52comments are asked to adjust the

01:53microphones as necessary and speak

01:55directly into the microphone.

01:58This meeting is being recorded.

02:01All right. I need a motion to approve

02:04the agenda.

02:05>> So moved.

02:06>> Second.

02:07>> I have a motion and a second. All in

02:09favor say I.

02:10>> I.

02:11>> Any opposed? By the same sign.

02:14The agenda is approved and then we'll

02:17consider adoption of the consent agenda.

02:23>> I have a motion and a second. Anybody

02:25need anything removed?

02:28Royce, not the remove, but could I ask

02:29one question about one item just real

02:31quick for clarification in regards to

02:33the uncollectible water and sewer

02:34account write offs? I was just wondering

02:36if the number there was in line with

02:38historical averages or if that was

02:40higher or lower from what we've seen in

02:42past years. It is consistent.

02:45>> Thank Thank you. That's the only thing I

02:47was wondering how much.

02:49>> Yeah, I think what I remember seeing in

02:52the past, we're

02:54in pretty good shape there.

02:57>> Um, all right. So, we have a motion and

02:59a second. Can we approve the consent

03:01agenda? All in favor say I.

03:04>> Any opposed?

03:06All right. The consent agenda is passed

03:09and we move into

03:11business and the Camp Davis Wastewater

03:14Force main expansion and emergency

03:17connection. Mr. Lore,

03:24>> good evening directors.

03:28This item consists of two single prime

03:31construction contracts for the Camp

03:33Davis wastewater force main expansion

03:36and emergency connection project along

03:39with construction administration and

03:41observation services and funding for

03:44necessary easement acquisition.

03:48The project includes the following major

03:51components for contract one. It's the

03:54wastewater force main transmission lines

03:57construction, testing and startup

04:01of the wastewater force main

04:02transmission lines from the Camp Davis

04:04Industrial Park. [clears throat]

04:07South on Highway 50, north on Highway

04:1117, then east on Highway 172 to 210, and

04:16then to the Southeast Regional

04:19Wastewater Treatment Facility.

04:22This project also includes an emergency

04:24pipeline connection from the new force

04:26man that'll be constructed on 17 to the

04:30existing Holly Ridge wastewater

04:32treatment plant.

04:34This project includes the installation

04:36of approximately 55,237

04:40linear feet of 12 to 20 in C900

04:46PVC and ductal iron pipe [clears throat]

04:49and associated pertinances via open cut

04:53and directional drill.

04:55The ultimate average daily flow capacity

04:58of this expansion is approximately 1.8 8

05:01MGD.

05:03The apparent low bidder was uh Busco

05:07Contractors, Inc. at $9,988,100.

05:16The next item is contract two, which is

05:18the wastewater pump stations for this

05:21project.

05:23Uh construction, testing, and startup of

05:25two new wastewater pump stations. one

05:28located in the Camp Davis Industrial

05:30Park in the town of Holly Ridge and the

05:33second pump station located off Highway

05:36172 in the Oyster Landing subdivision

05:39area. Again, the apparent low bidder was

05:43Busco Contractors, Inc. at 7,881,500.

05:52Uh this item also includes construction

05:54administration and observation services

05:57by the design engineer of record which

05:59is high infrastructure engineering at

06:031,689,600

06:07and necessary easement acquisition costs

06:10of approximately $75,000.

06:14Uh I will make note that we had a

06:16tremendous uh bid activity for these pro

06:20for this project. We had uh 21 total

06:22biders. Wow.

06:23>> For the pipeline work, we had 13.

06:27And for the pump stations, eight. So

06:29that's that's a pretty good turnout. And

06:32the cost of the pump stations was much

06:35less than what our estimate was.

06:39>> I'm sure you've vetted them, but have

06:41you ever done any business with this

06:42company?

06:43>> No.

06:44>> So we really just hadn't done anything.

06:47What were they out of? Um,

06:51Angier,

06:55>> do do we have any

06:56>> the city?

06:57>> I'm sorry.

06:58>> I was just gonna say, do we have any

06:59concerns at all based on I mean, looking

07:00at the numbers, you guys sent them over

07:01to us and we looked at them and they

07:03were significantly lower on wastewater

07:05by about 2 million and about a million

07:06on the water. So,

07:07>> right,

07:08>> no real concerns. I mean, you're saying

07:10they were vetted by the vetted by the

07:12engineers, but I mean there that's a lot

07:15of competition. That's a

07:17>> it is a lot of competition. Uh if you

07:19look at the range of bids,

07:23it was it's quite a range from the low

07:25bid to the high bid. Um I will say that

07:30uh they were vetted pretty closely. Uh I

07:33had that conversation with uh the

07:36engineer before they started their

07:39review since we had not worked with them

07:42uh here at ona.

07:44And uh I'm comfortable with their

07:46recommendation to award the contracts to

07:50Busco.

07:51>> Maybe they're hungrier than everybody

07:53else.

07:54>> Well, that amount of

07:55>> Well, given the overall bid numbers, I

07:58think uh several people are

08:00>> getting hungrier than they than they

08:02were.

08:06Uh the action requested uh is to

08:08consider a motion to approve the amended

08:10project ordinance and authorize the

08:14chief executive officer to execute the

08:16construction contracts

08:18and any additional documents as required

08:20in connection with this action.

08:22>> Motion second.

08:25>> I have a motion and a second. Is there

08:27any other

08:27>> Yeah, I have uh as y'all know I came

08:31from the contracting world. I have a

08:33concern. I mean, I'm I'm not going to

08:35vote against it, but uh they're too

08:37cheap. They've got a problem. They don't

08:39realize it. It's hard to find your own

08:41problem when you when you bid these

08:42things. Uh I would have preferred to

08:45seen them perhaps drop out. Uh just

08:49because they've got a $2 million

08:52problem. That number for the pipeline

08:55looks to be in line somewhere in the 12

08:57to 13 range. They're they're down there,

09:00you know, 11 to to 12 range. They're

09:03down in close to 10. So I I think

09:06they've [clears throat] got a problem,

09:06but they just don't realize it. But u I

09:09don't know that we can do much. I mean,

09:10they are responsive. They've told

09:12they've told Highfield that, hey, we

09:14we've gone back through our our our

09:16work, and we don't see a problem. So,

09:19but uh I'm still going to vote for it. I

09:21just I just have a concern and I just

09:24didn't want to go without

09:25[clears throat] saying that we that I

09:26had a concern. Sir,

09:28>> do we uh do we investigate their

09:31financial position so that we know if

09:35they fail to perform that we have some

09:38>> recourse?

09:39>> We check references.

09:41>> They're bonded.

09:43>> They're bonded too, right?

09:45[clears throat]

09:45>> The bonding company actually does the

09:47the due diligence on their fi company's

09:50finances. So,

09:53>> but there is one little thing that they

09:54don't do. Um, you know, it takes money

09:57to to to mobilize and you know,

10:01sometimes when we did core of engineer

10:03projects, we had to show a balance uh

10:06statement that we had money in the bank

10:07that we could we could go the first

10:09month of of construction. We could

10:11[clears throat] mobilize the first month

10:13before we ever started getting paid for

10:15our work because you got to put the work

10:17in before you get start getting paid.

10:19So, uh, but hey.

10:22>> Okay.

10:22>> Anyway, I've said my my my two cents.

10:26[laughter]

10:26>> Good concern.

10:27>> Yeah. Yeah.

10:28>> Absolutely. If I may, Bob, I mean, those

10:30are the same questions I sent Frankie

10:31last Friday when I first read over the

10:33agenda, thinking the same thing about

10:34past performance and responsiveness and

10:36understanding the true requirement that

10:38that we're asking them to fulfill. Uh,

10:41and so forth. Uh the the trouble is when

10:44you when you when you get notified that

10:46uh by your the engineering company or

10:48architect that you're low, you you can

10:50go back and through your your bid as

10:52best you can, but but if you've got a

10:54blind spot going in, that blind spot's

10:57generally unless there's a major mistake

11:00that just jumps out of a math mistake,

11:02you're not going to find it. So, but

11:04hey, we'll we'll cross our fingers and

11:06and and hope hope for the best. So,

11:09>> I agree.

11:11>> All right. Any other discussion?

11:14Seeing none, all in favor say I.

11:16>> I.

11:16>> Any opposed?

11:18All right.

11:22Motion pack carries. And uh you're

11:25all right. Miss And

11:28senior associate at the Ferguson Group

11:31has a presentation for us. Welcome.

11:33>> Hello. I'm Andrean. Thanks for um having

11:37me here tonight um to speak. I know um

11:41I've met Chairman Bennett before and

11:43worked with uh Mayor Grant um and many

11:48of you I'm just now meeting but I'm very

11:51happy to be here. Um

12:00I am with uh the Ferguson Group. Um we

12:03do federal advocacy for local

12:07governments, municipalities,

12:09um special districts, authorities, all

12:12of those sorts of things. Um and have

12:14been doing so for 40 years. um

12:18specializing in getting appropriations,

12:22finding funding, implementing that

12:24funding, keeping

12:26uh keeping fees and things or things

12:31problems from popping up u that could

12:33cost you money. I say that uh my job is

12:37twofold. It's to find you money and to

12:39save you money. And I'll show you uh

12:43some specific examples of those things.

12:47uh here in a minute. Uh but I'll keep

12:50this pretty short so that you can ask

12:52questions and we can have a discussion

12:55if you would like on these specifics. Um

12:59I work with um Jeremiah who is also

13:04specializes in the uh water issues and

13:08infrastructure funding, military um

13:13funding which you are uniquely

13:15positioned to based on your position

13:17next to camp lune.

13:20Um we do kind of a fivestep

13:24uh process for identifying. So the first

13:27is what is what are your problems? What

13:30do you need? What are your needs? What

13:32are you worried about? Um and then look

13:35for opportunities. Um trying to find fit

13:40the puzzle pieces together of how we can

13:44make that work at the federal level

13:45because it's not as government's not

13:48always so easy and straightforward. Uh,

13:51and there's if it was then everybody

13:54would go, well, we'll just go to the

13:56water money pot. Well, there's several

13:58different water money pots at the

14:00federal level and they're spread out in

14:02different areas and you're eligible

14:04based on a lot of different criteria.

14:07So, it's finding uh finding those

14:10opportunities

14:12uh and then strategically uh planning

14:16your projects and putting it on the

14:18radar of your uh federal elected

14:21officials. Um working to submit projects

14:27for earmark appropriations.

14:29um working to get authorizations in

14:32bills like WERA to be able to fund

14:35projects a couple years out. Uh and then

14:38organizing that support with the

14:40delegation uh and making sure that uh

14:43your federal elected officials are

14:46listening um listening to you

14:50specifically.

14:52uh our expertise and my personal

14:55expertise aligns with uh working with

14:59water in North Carolina. I work uh this

15:01is all publicly available information uh

15:04with Capefir public utilities, Fateville

15:06Public Works uh and have had some really

15:09great success um with with those

15:12organizations finding funding for those.

15:15So, uh, those don't you're in a

15:18different area. That's not they are not

15:20in competition with you for those money

15:22because we're not going to the same

15:23places. We're not going to the same

15:25representatives for that. Uh, but it

15:27does give me a lot of experience with

15:29these issues because those issues are

15:32the same across the board. Fyville

15:34Public Works is located next to Fort

15:36Bragg, uh, similar to your proximity to

15:40Camp Leune. So, I have a lot of work

15:43with being able to talk with uh the

15:47Pentagon and the military bases and

15:50commanders and have a good working

15:53relationship and establish good working

15:55relationships

15:57um with those because that's you provide

16:00a very good service here and your

16:03proximity to Camp Lune is uh they the

16:08military wants to help and they want to

16:10make things easy for you. Um it's just

16:14explaining how those how your priorities

16:16and their priorities align, how you can

16:18make their lives easier um doing what

16:21you do. We work with policy development.

16:24So if you have an issue, um we will

16:28create a policy and try to work and get

16:30that policy passed. Um environmental

16:34infrastructure through the core. I'll

16:35give you a specific example of this in

16:38just a second. Um, but that's a really

16:42good opportunity for uh getting core

16:45money, core funding for projects. I have

16:48one pending right now with uh Capefar um

16:52for some of their uh long-term projects.

16:56We uh literally TFG wrote the WIFIA

17:00program. Our CEO, Roger Gwyn, wrote uh

17:04the Water Infrastructure Financing and

17:06Innovation Act, uh which pro provides

17:09long-term financing. Currently, North

17:12Carolina is the only state that does not

17:15have the same access to WIFIA as other

17:18states. However, we are actively working

17:21right now with the state to change uh to

17:25change that and remove those limitations

17:27because you are currently at a

17:29disadvantage not being able to take

17:31advantage of WIFIA which is um low fi

17:36low interest rate financing for

17:38long-term really big projects uh really

17:42big money projects um you know hundred

17:44million dollar uh type of projects uh

17:48creative engagement with the NDAA,

17:51National Defense Authorization Act. Um,

17:54that is something a lot of people don't

17:57a lot of other groups like you do not

17:58have access to um because they're not

18:02next to a military base. The uh NDAA has

18:05to be passed every year and uh Jeremiah

18:08specifically right now uh is working

18:10with a transit organization um in

18:14Virginia

18:15um and getting actually getting funding

18:18through the NDAA um for projects uh next

18:23to military bases. Uh we have really

18:26good agency and committee relationships

18:30uh in Washington DC. um so that when

18:34problems arise we can get people on the

18:36phone. Um we can get you in the room and

18:40have meetings. Um I can call I have

18:45happy hours and dinners all the time

18:47with the staff of um the your delegation

18:52and the committees to one hear about

18:55what's going on on the ground and then

18:57also be able to tell them your position

19:02influence policy and tell them what

19:05we're our concerns are because what our

19:08concerns are are also your congressmen

19:10and senators concerns. concerns too

19:12because you are voting constituents. Uh

19:16they really do care. I promise. Uh and

19:19then through annual appropriations. This

19:21is the really big one. Uh and this is

19:24where uh you can get a lot of projects

19:28funding if you are just submitting these

19:30projects. Uh I work every year to submit

19:33a pile of earmark requests um to a v to

19:38everybody but in your state here to

19:40senators and to u mur congressman Murphy

19:43in this district here. Um

19:46appropriations got a bad rep pork barrel

19:49spending way back in the day and that's

19:51why in 2012 they stopped doing earmarks

19:54um and for good reasons. They brought

19:56them back in 2023, but with a whole

19:59different set of restrictions,

20:02requirements. Uh there's no more just

20:05sending some money through and or

20:08sending an idea through and just getting

20:09the money there. Each earmark request is

20:12about a 75page packet uh that I fill

20:15out. Um it's not exceptionally

20:18complicated to do. It's just a very

20:20tedious process. You're gathering

20:22letters. They have a lot of follow-up

20:24requests. uh and so getting the

20:27knowledge of how to submit and get those

20:30projects funding behind the scenes. I

20:32work with uh the congressional offices

20:36ahead of time. So when they're getting

20:38that appropriation request,

20:39[clears throat] that's not a surprise. I

20:41work to long-term plan out with them how

20:45we can get these funded and what they're

20:47looking for each year. Um, Congressman

20:50Murphy

20:53from year to year changes, you know,

20:54what types of projects they're looking

20:56to fund. So, we then pick uh based off

20:59your priorities and your funding needs,

21:01what is going to align that year and

21:03then knowing in the next year they might

21:05be looking at a different focus. And so,

21:08it's strategizing with those offices

21:11uh to make it work for them, make their

21:14lives easier, and get your projects uh

21:17funded.

21:19I have two examples. Like I said, I work

21:22with Fagville Public Works uh and Kate

21:25Fear. Uh Kate Fear I have just worked

21:27with in the past year. Um but right now

21:31uh if they ever pass the

21:34uh appropriate budget bills this year.

21:36They have just voted to ex a continuing

21:39resolution to December. So these are on

21:41hold. This is business as usual uh in DC

21:45these days. Eventually, it gets done,

21:47but uh not ever on time. Um but they

21:51have a $1.83 million uh request right

21:54now uh for um some of their projects.

21:58This is one where we went uh a few years

22:02before and got the authorization in

22:04WERA. Um WERA is Water Resources

22:07Development Act. It is a two-year

22:10authorization. And in fact, the House um

22:12just voted on this version today, this

22:16morning, last night. Um and it's getting

22:20that wording in the bill to be able to

22:22then go after that money in

22:24environmental infrastructure

22:26[clears throat] appropriation bills

22:27later. Uh Fagetville Public Works, uh we

22:31have done a lot of work with I've worked

22:33with them for a couple years now. uh and

22:35they're right now currently uh drawing

22:37down the a $4.5 million request uh that

22:42they received from uh Senator Tillis. Uh

22:46and that was the work I did to uh get

22:50that request submitted and then lobby

22:53and advocate get that request approved.

22:56Um those it's really easy. I never worry

23:01about when people ask me, you know,

23:046,000 a month or 10, that's a lot of

23:06money. That is a lot. But I never worry

23:08about uh ever proving a return on

23:10investment. I've never had that issue.

23:15Um in my work pays for itself tfold

23:20oftentimes. I have many of my clients

23:23have a 30 to1 return on investment. uh

23:25it takes a little while to build that

23:28up, but you know, you can see that

23:30compounds on itself over time because

23:33the longer I'm advocating and working,

23:36the more chance you have of getting that

23:39money. Um the other thing, uh I

23:42actually, it's not water related, but I

23:45work with Holden Beach. the saving you

23:48money part is harder to quantify because

23:51it's easy to go look and see 4.5 million

23:55uh for an infrastructure project that

23:57you get and that's great but the saving

24:00money is where you it's hard to put a

24:03number sometimes on that but uh Holden

24:06Beach uh this past week we resolved an

24:09issue uh with they have a dred they were

24:12dredging they're doing a dredge they use

24:14the core army corps of engineers uh

24:17disposal site for this. Uh out of

24:20nowhere, they had been paying about $5 a

24:23cubic yard for disposal. Out of nowhere,

24:26the core tells them, "Yes, you can use

24:28the site as usual. That'll be $26 a

24:31cubic yard." Uh that was not budgeted

24:34for. [snorts] Uh Holden Beach

24:36[clears throat] is happy to pay, but a

24:38little planning in advance. Uh, I've

24:41spent the last three months with the

24:44Wilmington district, then followed by

24:47Core HQ, uh, dealing with this and

24:50arguing about that one, their

24:53calculation was wrong. Uh, it was just

24:56wrong. There was no way, uh, that that

24:58was true. Um, and it went back and

25:02forth, back and forth. We got an answer

25:04Thursday. Uh, that number is $10. So

25:08that's a savings of $16

25:11uh dollars air ins with 30,000 cubic

25:14yards of material. Uh that's $470,000

25:20saved. Uh just because we have the

25:23knowhow and the relationships with the

25:25Pentagon and Wilmington uh to be able to

25:28say no, that calculation is incorrect.

25:32Um, but that's not necessarily money

25:33back in their pocket, but that was money

25:35they were going to have to pay because

25:36they were going to have to do the

25:37dredge. Um, not specifically water

25:40authority related, but those are the

25:42types of things uh that I do to save

25:45money and keep you from having to spend

25:48money you didn't want to or didn't plan

25:49for. Um,

25:55general overview of how we work with

25:57communications. We have a lot of special

26:00reports of like for example Wera um we

26:05do a special report and tailor it to

26:07you. So how does WRA affect you? Uh and

26:11we send those reports out. We have

26:13meetings with

26:15um anybody you need us to have meetings

26:18with within and we establish how often

26:20you want those. I have some that are

26:22people are like ah every month is fine,

26:25every two weeks uh is fine. Uh some of

26:28my clients, it's no official meetings.

26:30They call me

26:32when they have issues and I keep them

26:34updated when I see things. Uh it's just

26:37how you want that to to work. Uh and

26:40then

26:42um giving you those reports. I think the

26:44day I met Frankie, I was actually

26:46editing a data center um memo report. I

26:51gave them the unedited. I hope there

26:53weren't typos in that. Uh [laughter]

26:55but [snorts] uh we do those and say, you

26:58know, how does that affect you? Um

27:00they're working right now on a lot of

27:03data center, energy, water types of

27:06things in DC right now. Uh nobody's in

27:08agreement. That's a very wishy-washy

27:10area right now where nobody really knows

27:13yet their position. Uh, and that's a

27:16really good area to be able to make uh,

27:20you know, help shape their opinion uh,

27:22and tell them how it would affect you.

27:26Those are really, really good

27:27opportunities.

27:30Uh, these are examples of our uh, like

27:33weekly reports. We send out the

27:35legislative update tells you what's

27:38going on, any bills that are reg uh

27:40would affect you or if interest you as

27:42well as grants funding which is all of

27:45the different grants uh that come out

27:47every week that you might be eligible

27:50for. I kind of call it a shopping list

27:53um to go after

27:57special reports. For example, we've got

27:59a midterm election coming up that it

28:01doesn't matter if the makeup of the

28:04House stays the same, majority stay the

28:06same. The dynamics in every Congress are

28:09different. Um, and so we look at all of

28:12those factors and then tell you what

28:14that is go what to look for. The

28:17priorities change with every

28:19administration. Uh and so we want to

28:22make sure that we're pushing the

28:24priorities that we have that are going

28:27to get the attention in that specific

28:29Congress and in that administration.

28:33That was a pretty quick overview. I

28:36wanted to keep it a little bit short to

28:38uh answer any questions you may have.

28:43>> Yes, sir.

28:44>> Ju just full disclosure, I actually

28:46signed a contract with that firm today

28:48for the town. Um, and it was

28:50[clears throat] because the work that

28:51she did with Topsil Island Shoreline

28:53Protection Group in the interaction that

28:55we had with an um that I mean full

28:58disclosure I pushed um because I felt

29:01that particularly in DC and probably in

29:04the state although the county is working

29:06on that now is we really don't have

29:09anybody looking out for our stuff and

29:11you know not that we think you're cheap

29:14but this is short money to be able to do

29:16that particularly the way the contract

29:17is structured. Um, but also Anna talked

29:20about earmarks coming back and financing

29:23and and a lot of this stuff is knowing

29:24what's out there. So, I just wanted full

29:26disclosure. We've already I literally

29:28signed the contract this morning. So, we

29:30had approved last board meeting. Um, so

29:33full disclosure.

29:35>> Yes, sir.

29:36>> How big a company are you? I mean, how

29:38many how much staff do you have? Because

29:40you got a lot of things going. It's

29:41obvious.

29:42>> Yes. Uh we have uh I think it's in and

29:4730 I believe

29:48>> how many

29:49>> 30 uh I think it's kind of a a small a

29:53small but very impactful firm. Our uh CE

29:56or our president Mark Limba uh was a

30:00secretary in the Bush administration

30:02worked for the interior. Um, and it's

30:06one of those we are small, but the

30:08connections and relationships we have go

30:12a really long way. And something else I

30:16was sitting here thinking, u, you know,

30:18there's only so much money in the pots

30:20and in this region, we're all competing

30:24for the same amount of money. How do

30:25y'all handle that part of it?

30:28>> So, I actually did a lot looking at

30:32where you are. Uh there are act like

30:35there are laws that would prohibit me

30:38from uh actually you know conflict of

30:40interest wise um and I wouldn't take

30:44somebody who I was going to be in

30:46conflict with any of my other clients.

30:48So my concern was that I worked with

30:49Capefir and Fagatville, but that money

30:52uh and they have different in fact

30:54Fagatville uh Congressman Hudson does

30:56not earmark. They are at a disadvantage.

30:59So we have to go differently.

31:01Fortunately, um Congressman Dr. Murphy

31:05does earmark. Um and so we're not

31:07chasing the same the same money there.

31:11The uh congressmen get each year 15.

31:15they pick of all their projects that

31:17they get 15 and then they submit those

31:19to the committee. Um, and so you're kind

31:22of competing against other interests in

31:24your area.

31:25>> Well, my town's been fortunate with

31:27Congressman Murphy to get some money

31:28already.

31:30>> But, uh, that was just I was just

31:32curious about that because, you know,

31:34when there's only so much money there,

31:36everybody wants it

31:38>> and uh,

31:38>> yes. And it's a shame, you know, you

31:41can't the Congress, we have to have

31:43somebody advocate for us because

31:45congressman won't just do specifically

31:47for us. I mean, I, you know,

31:49>> uh,

31:51you one fortunate, um, Senator Bud has

31:55not previously earmarked. He would only

31:57do military defense related earmarks.

32:00That is changing. I actually helped his

32:02office this past year uh, set up how

32:04they do the portal uh, based on my work

32:07with the other offices.

32:09um telling them which offices had good

32:11ways of doing it versus really

32:13cumbersome ways. Uh but Congress or

32:16Senator Bud

32:18pays even he will do more than just the

32:21defense has works really well and does a

32:24lot uh with the defense communities. Uh

32:27and so you're very uniquely positioned

32:29with Senator Bud. Additionally, uh

32:33Senator Tillis earmarked. He's he

32:35obviously will not be there. Um but we

32:39my conversation so far with the part uh

32:43both potential new senators is that they

32:46do intend on earmarking and so actually

32:49you're growing your chances of being

32:51able to get money uh with this new

32:54Congress no matter how it shakes out.

32:57>> Director Herbert may have two questions.

32:59One, where are you physically located

33:01then? Just thinking for accessibility

33:02and so forth.

33:04>> So uh our firm is in DC. Okay.

33:07>> Uh we are on Pennsylvania Avenue. Um I

33:10am have just actually relocated to this

33:13area. Uh I kind I was in I'm from

33:16Georgia. I lived in Mobile, Alabama. Um

33:19I spend the bulk of like the first half

33:21the year in DC every week. Uh but have

33:25worked just out of how it shook out the

33:28clients I have in this area in North

33:30Carolina. Just very much liked uh and

33:33had I said, "Well, I like it here. Why

33:35don't I just live here? I'm here also

33:38>> and it's a closer uh to DC. So

33:41>> my my other question is c can you

33:43quantify then what your I guess for lack

33:45of better word your success rate is with

33:47water water authority projects i.e.

33:50annually you're submitting 12 projects

33:52for some type of support uh and eight

33:55are approved nine are approved or

33:57something along those lines.

33:59So that

34:00>> and when I say approve that could be any

34:02level of support not the you know the if

34:04they're asking for x amount of dollars

34:05or getting a portion of that or

34:06something along those lines.

34:08I wouldn't know how to do that. I could

34:11give you a list of, you know, this year

34:14each earmark that I received uh and the

34:17year before and that would span across,

34:19you know, from water authorities and to

34:21towns, municipalities. Um

34:25the I wouldn't just condense it down to

34:28just the appropriations request. Those

34:29are kind of the big flashy ones and

34:32those are the ones everybody's going

34:34after [clears throat] more competitive.

34:36However, there are other harder kind of

34:40to not as easy accessible money pots

34:44like the uh environmental in

34:46infrastructure uh pot of money with the

34:48core of engineers. Um that's there's

34:52that extra step and so it's not just

34:54easy for everybody to go. So, we want to

34:56think long term um of being able to set

35:00up projects to go after those pots or

35:04going with the funding you can get out

35:07of things like the NDAA

35:09um for, you know, defense communities.

35:13Um, and so spreading out where you're

35:16asking the money, looking at your

35:18project strategically from a one year,

35:20three year, 5year plan of what you want

35:24and then going after gradually uh, and

35:27spreading out where we're looking for

35:29that money and creating opportunities,

35:32too. For example, WIFIA, that would be

35:34an example of we built all of our water

35:38and sewer way back in the 40s, 30s. I've

35:41heard towns with older and it's really

35:43frightening. But around the time in 2014

35:46where this was created, the towns were

35:50going bankrupt with uh having to

35:53overhaul uh their water infrastructure.

35:56And that was an example of where we

35:59advocated the need to Congress uh and to

36:03DC to actually create WIFIA, to make

36:07that law, to create that pot of money uh

36:10to be able to help towns uh and local

36:13governments fund those those massive uh

36:16projects that were all coming due at the

36:18same time.

36:20>> If I can just two context things real

36:23quick. when we were we've been trying to

36:25the town's been trying to do this Cobra

36:27stuff for 25 years and [clears throat]

36:29when I did some research on it I found

36:32out that the the bills that are

36:34introduced in Congress it's about a 4%

36:36chance of it even getting to a vote

36:38[snorts] but the other reason and to

36:40follow up on your point which is a good

36:41point is we don't even know what's out

36:43there that that's what we faced is what

36:46pots are to your point what pots are out

36:48there what do we even ask for you know I

36:50couldn't go to Murphy today and say can

36:52you ask us you know can we get money in

36:53this pot or what's and that's why we

36:56decided, you know, because the work you

36:57did with TISPC, it's like you we had a

37:00discussion about we ought to spend some

37:02money in the front end to find out if

37:03there's value in doing other things. And

37:05so it was kind of a a test run and you

37:07would you were doing this stuff for

37:08TISPC, but you will be committing your

37:10time to on WASA, correct?

37:13>> Yes.

37:13>> Okay. Sorry.

37:15Um,

37:17I don't even know how to really phrase

37:19the question really, but so when you

37:21identify things when you we retain your

37:23guys services. So, do you look at our

37:25current CIP list and kind of go from

37:28there and see where the money would go

37:29or do or do you also do we get maybe

37:34lent staff that would look at our our

37:35organization holistically and say,

37:37"Well, you guys aren't really there's

37:39other places that you could spend money

37:40that you don't have um identified on

37:42your CIP and we could perhaps go that

37:45direction."

37:45>> Yes. So, uh, when I was drafting the

37:48proposal, [clears throat] I, uh, met

37:50with Frankie, uh, and this was, I would

37:52say, a more broad strokes of just

37:54understanding

37:56what your needs, priorities, issues were

37:59right now, uh, which is what I put, you

38:02know, specifically in the proposal. Um,

38:04looking at with EPA permitting, I job is

38:08to go make EPA get an answer back to

38:11Frankie. Um, and I go into the offices

38:15uh to do that. Uh, but it's looking at

38:19you. You would tell me how you would

38:21want, but looking overall at your CIP

38:24and then I can sit and say, "All right,

38:26here's easy. Here's where we want to

38:28focus this part." Um, how do you eat an

38:32elephant? A bite at a time. There's not

38:34going to be $500 million sitting

38:36somewhere so that you can do everything.

38:39But it's strategically looking at for

38:41like Cape Fear. They're $250 million

38:45project [clears throat] we paired down

38:48to all right this year we can go after

38:50phase one. And so you're gradually doing

38:53that uh and picking the projects.

38:56There's going to be some that are going

38:58to be easier to go find with military.

39:02There's going to be some that are easier

39:03to earmark. There's going to be some

39:05that are easier to go after grants.

39:07Hopefully, uh, we're getting close and

39:09getting North Carolina to change their

39:10mind on WIFFIA. Um, it's fine in that.

39:14And I always say it's easier sometime

39:17sometimes, you know, your easiest thing

39:19to fund is not what there's just federal

39:21money sitting there for. Uh, which is a

39:23challenge. So, it's finding what you

39:26have that you need that there is easy

39:29money for. So then you you can get that

39:32funded and have that money left over in

39:34a budget to fund the thing that's harder

39:36to find federal dollars for.

39:43>> Yeah. So I don't know in my recollection

39:47I don't know that we've ever had an

39:48advocate in in DC for Anasa. I had an

39:53opportunity to to talk to an uh

39:58before and um

40:01you know she she already has has

40:04introduced us to money sources talking

40:08about we wifia

40:11um that we didn't know about to start

40:14with and um I don't know it just seems

40:18like it uh the the I'd be happy to go to

40:22DC and hang out and do this for on, but

40:25it cost you a whole lot more than

40:26$72,000 a year. Um, so anyway, uh, if

40:31if, uh, if we need more discussion, if

40:33if somebody wants to make a motion to,

40:36uh, to approve the proposal from

40:39Ferguson Group for one-year term subject

40:41to renew

40:43the renewal and approval of the

40:45agreement by the authority attorney and

40:48authorizes CEO to execute the agreement.

40:51Somebody want to make that motion?

40:53>> Moved.

40:54>> We have a motion.

40:55>> Second.

40:55>> Second.

40:56>> And we have a second.

40:57>> Do we have any more discussion? Anybody?

40:59>> Brett, do I need to recuse myself or

41:01not?

41:02[snorts]

41:03>> Any other concerns, discussions? I mean,

41:06it's not like we're uh not like we're

41:09committing ourselves to a huge uh

41:12long-term

41:14commitment.

41:15Um,

41:17you know, we look at it again months, a

41:20year from now and and if we see the uh

41:25um see the benefits, we continue. We

41:29don't and [sighs and gasps] we wave

41:32goodbye.

41:33>> That's

41:34>> um

41:35>> easy. [laughter]

41:36>> Well, is she going to work hard the

41:37first year, huh?

41:38>> That's right. when she she said

41:4210% that's that's only $770,000.

41:45That's true. She can bring us

41:47>> 10 10 to one. Yeah, she'll be all right.

41:50>> I got a question, Eric. Where where does

41:53this money come from that we're going to

41:54pay for this?

41:55>> It was included in our administrative

41:58budget.

41:59>> Okay.

42:01>> All right. Any other discussion?

42:04All in favor say I.

42:06>> Any opposed? All right. Motion carries.

42:10Thank you, Ann.

42:10>> Thanks,

42:11>> very much. Very excited to work with

42:12you.

42:13>> Look forward to to getting you working

42:15with you and the staff and and

42:18determining what those priorities and

42:20opportunities are for Anasa.

42:22>> Very excited. Uh Frankie has my contact.

42:25I know I passed out my business cards,

42:26but please, if you have any questions or

42:28want to talk in detail about anything,

42:30I'm always available.

42:32>> Thank you very much.

42:33>> Thank you.

42:34>> Thank you.

42:34>> How does the county use to lobby at

42:36state level? You got everybody or no?

42:39[snorts] Yeah, we did. Um, all right.

42:42Let's see. Item C, uh, authorization of

42:46upset bid process for surplus property

42:48on Viking Place. And that is, um, who's

42:53presenting that? Frankie,

42:55>> that's me. I got you [laughter] got me.

42:57I appreciate everybody's attention this

42:59matter. We've got I think we spoke about

43:00this um prior meeting, but we've finally

43:03got everything sort of in order to be

43:04able to present to the board. So, we

43:06just want to go um out for upset bid on

43:09this particular piece of surplus

43:11property. This uh sits adjacent to um a

43:15facility that we we took over in this

43:17community. It's old wastewater treatment

43:19plant. This individual has a piece of uh

43:23I think a storage unit on this property.

43:25So, we felt the easiest thing to do is

43:28mark it as surplus. It doesn't do us any

43:30good as far as valuable to that. All we

43:32operate there now is a pump station um

43:34and send that flow to another site. Um

43:37so worked with the individual that's

43:40adjacent there who has the property and

43:42he submitted an offer of 5,000 to

43:45purchase approximately 2 acres and that

43:48area has been surveyed out that is

43:50included in the cost of this transaction

43:52as well. Just so there's no cost to

43:54Anasa. So, what we're doing is

43:56requesting that the board consider a

43:57motion to adopt a resolution declaring

43:59the 0.2 acres um as surplus property and

44:03authorizing the upset bid process.

44:06>> I move second.

44:07>> All right. I have a motion and a second.

44:09Is there any discussion?

44:12All in favor say I.

44:14>> Any opposed?

44:16>> Motion carries. And the interlocal

44:19agreement for fleet maintenance, Mr.

44:21Adams.

44:22>> Yes, sir. Thank you, Mr. Chairman. Good

44:23evening directors. First item this

44:25evening is the interlocal agreement

44:27[clears throat] between Enslow County

44:29and Anasa to provide for Enslow County

44:32to provide Anwasa with fleet repair

44:35maintenance services for specifically

44:37our diesel vehicles and equipment

44:40approximately 50 vehicles and 100 um

44:44heavy equipment. [cough]

44:46[clears throat] Our staff had an

44:47opportunity some time back to visit the

44:50the maintenance facility the county

44:52operates. uh and feel very very

44:54comfortable with their expertise and

44:56ability to perform these services. Um

45:01enter into some negotiations discussing

45:03and it's very coste effective um and

45:07very similar to what we're currently um

45:10receiving from our current vendor. So we

45:14feel that this is a very beneficial

45:15agreement for both parties and and a

45:18cost-effective one going forward. So

45:20this evening we're considering asking

45:23you to consider a motion to adopt or

45:26approve the interlocal agreement and

45:27authorize the CEO to execute any

45:30contracts required with this action.

45:32>> So move

45:33>> second. I have a motion and a second

45:36>> question.

45:36>> Yes.

45:38>> What was your guess on savings? What

45:40what did you what did you guess?

45:43>> So savings are not going to be as

45:45significant as as we had might have

45:47hoped. Um, but I do think that the the

45:51benefits come from the access to them

45:53and and utilizing their um systems for

45:58identifying issues and their uh queuing

46:02system for lack of a better term is how

46:04how they enter enter those projects in

46:07the costs were very very close with what

46:10we currently have with our current

46:11vendor. Um,

46:12>> what about timing? what about,

46:14[clears throat] you know, returning

46:15returning an equipment or vehicle back?

46:17>> And and that's where I think the real

46:18benefit is is is their their promises in

46:22the agreement their their

46:23[clears throat] agreement to um perform

46:26the necessary repairs and maintenance in

46:28a timely manner.

46:30>> That was that was a question I was going

46:32to ask is would we be put on the back

46:34burner because the county has a lot of

46:36vehicles they have to maintain.

46:38>> They have a really good system that

46:39they've employed that that keeps their

46:42their

46:43they're uh them flowing. They are very

46:47upfront that emergency services do take

46:50a priority. So we know that you know

46:52going in um this doesn't

46:56you know disallow us from using any

46:57outside vendor if it became an issue

46:59where we had a piece of equipment that

47:01we needed

47:04you know serviced immediately and they

47:06were unable to provide it. Um, but they

47:09they do have a very good process. It it

47:13does seem and how they present it is how

47:15they

47:16>> enter and and keep things moving.

47:18>> Well, I think the uh you know the

47:20naturally the cost savings, but if the

47:22cost savings wasn't significant to to

47:24amount for the time we'd have to have

47:26our vehicle down, I think that would be

47:28considered too. So,

47:29>> right.

47:30>> Thank you.

47:31>> What was the uh what's what's the uh how

47:33long is this agreement for?

47:37Anybody can

47:38>> anybody can cancel at any time if that's

47:40>> a 30-day notice or something.

47:42>> Yeah, we we have in here that anybody

47:44>> All right. So So we have a we have a

47:47self check selfchecking me mechanism. If

47:49we if we don't get the service we feel

47:51we deserve, we have a we have an out.

47:53Okay.

47:54>> Correct.

47:54>> 30 no exclusivity. So you don't get

47:57locked in if you've got to go someplace

47:59else. Right.

48:00>> Right.

48:01>> Worth a shot. [clears throat]

48:02Al also I would say the reason they are

48:05efficient because they schedule

48:07everything

48:07>> right

48:08>> and

48:08>> and I can tell you I started that

48:11>> and it makes a big difference

48:13>> and if you can keep people on time to do

48:16their part can more

48:20over more then do their part. So uh I'm

48:24glad this worked out.

48:25>> I think it's a great thing. And I think

48:27it's a way we can all down the road save

48:30money in government and uh not just

48:33savings on dollar amount but turnaround

48:36time is very important when it comes to

48:39projects.

48:40>> Their scheduling Bob well.

48:42[clears throat]

48:43>> Yes sir. Their their scheduling was was

48:45uh excellent. They also use the uh

48:48similar fleet maintenance software that

48:50we have recently employed um for

48:53tracking. So,

48:55>> are we will we have any employees

48:57displaced?

48:59>> No.

48:59>> Because of this move.

49:00>> No, sir.

49:01>> It was a contract. It's a prior

49:02contract. We had a

49:04>> service provider.

49:05>> That's correct.

49:06>> Also, just real quick to follow up on

49:08Tony's comment, anytime we can do a

49:10partnership with the different agencies

49:12and stuff, to me, you know, it's

49:17>> I think it's mutually beneficial.

49:18>> Yeah. I I just think the more you can do

49:20like that, the better the part more

49:22partnerships, Tony, you can make between

49:24between [clears throat] the groups makes

49:25a lot of sense to me.

49:26>> You have something?

49:28>> Yeah, just for what it's worth, I did a

49:29little bit of research on base and we

49:30have a very similar IGSA with the base

49:33and the county for very similar

49:35equipment sets for the last three years.

49:37And to the points a lot of people have

49:38made, we we have seen cost savings on

49:40base and more importantly, we've seen a

49:42very quick turnaround time. uh where

49:44before with the company we were using on

49:46base it was weeks now it's days. Uh so

49:49that is something that we can quantify

49:50to [clears throat] our benefit. And also

49:51some feedback we got from the county was

49:53that it was it was keeping their team

49:55busy and active and working on equipment

49:57repetitively and some new equipment that

49:59they hadn't had experience on and

50:00they've gotten that experience which is

50:01a good thing.

50:02>> And I I I did that too not trying to

50:06take anything because it was a team

50:08effort.

50:10But by doing these projects, just to to

50:13Bob, Bob, you make a great point is that

50:17we're able to buy the up-to-date

50:19equipment to go with the piece of

50:21equipment you bring on help diagnostics

50:25tool

50:26>> and that tool means a lot. That's why

50:28the base I'm so [clears throat] happy we

50:30were able to get the cat machine to to

50:33work to feed in and we can use it not

50:36just for them but for Oslo County as

50:38well as you know

50:40>> anyone else. It's

50:42>> great great facility that the camp

50:43>> Oh yes it is.

50:45>> But thank you. That's all I got to say.

50:47Chairman, I'll pull up.

50:49>> I would I would just commend the uh our

50:52staff and the county and and thank them

50:55all for the work because this has been

50:57in the process for uh many months now

51:01>> negotiating the deal and and trying to

51:03make sure it's good for all parties

51:06involved and I think it'll be good.

51:08It'll be good for us. Did Did we get a

51:10motion?

51:11>> Yeah, we did.

51:12>> We did. Okay. Thank you. You want to say

51:14something? Oh, I just found the uh

51:15quotes that Danny had provided us just

51:17to show us some examples, real life

51:19examples. So, like on a 4500 pickup

51:22truck, service truck, um what we were

51:24paying now was like $560 for a typical

51:26service and their estimated cost would

51:28be $380 for that same service. And then

51:30on a backhoe, it was $480 versus 360.

51:34So, just ballpark kind of idea of what

51:36we would be saving.

51:37>> That's because we're buying bolt.

51:40>> Okay,

51:40>> that's true. All right. If there's no

51:42more discussion, all in favor say I. I.

51:44>> Any opposed.

51:47All right. Motion carries. And then Mr.

51:50Adams, you got the next one.

51:52>> All right. Thank you. Um, next is um

51:56requesting approval for a project

51:58ordinance for the Irving Town Wastewater

52:00Pump Station. So, our staff currently

52:03has an design agreement in place that to

52:07work on an upgrade for the Irving Town

52:09Pump Station, which is located in the

52:10Northwest service area in the Richlands

52:13area. Um, it's been identified as

52:15needing an upgrade for future

52:17development and to meet current needs.

52:19So, this project ordinance would

52:20establish uh the project for the funding

52:24for the next couple years to continue

52:25that design work. At the end of that

52:27work, we would um bring forth a contract

52:30and construction costs to amend the

52:33project ordinance.

52:35Uh this project was included in our CIP,

52:38so has been considered in the 10-year

52:40plan and in the recent rate model.

52:45>> Make a motion we we we adopt the budget

52:48ordinance.

52:49>> Second.

52:50>> We have a motion in a second. Any

52:52discussion?

52:55All in favor say I.

52:56>> I.

52:57>> Any opposed?

52:58>> All right, moving on. Mr. Adams.

53:00>> Yes, sir. Um, next, similarly, a project

53:03ordinance for the Northeast Wastewater

53:05Treatment Plant. Um, this also is

53:08included in our CIP in the five six to

53:1110 year range for a wastewater treatment

53:14plant to serve the Swansboro and Highway

53:1624 corridor. This would be the uh

53:19initial study and analysis for a future

53:23plant to be located potentially at the

53:25Parkertown property that is owned and

53:28operated by Anasa currently.

53:30[clears throat]

53:32Um again, this was included in our CIP

53:35uh and and in a in a future date, we

53:38would come back with a uh

53:42contract or additional design work for

53:45to complete. So move.

53:48>> Got a motion. I have a second.

53:50>> Second.

53:51>> Do we have any discussion about that?

53:54>> This is property that on was owned for

53:56many years. I haven't really used it to

54:00uh to the extent possible hopefully and

54:04this uh study will help us know if if

54:06there's more potential use for that

54:08property. Um so all in favor say I.

54:12>> I.

54:12>> Any opposed?

54:14>> Right. Moving on to item G. Um, Mr.

54:17Adams, you're up again.

54:19>> Yes, sir. Next is a project ordinance

54:21for uh the study to relocate an existing

54:24pump station at North Topsel Wastewater

54:27uh for the North Topsel Wastewater pump

54:29station. It's pump station number 49. If

54:31you're familiar with the area, that's

54:32the pump station just when you uh cross

54:34the bridge on the right. Um its current

54:38location is is not environmentally sound

54:41or safe for staff to maintenance. So,

54:44this ordinance would establish funds to

54:47begin um the process of relocating uh

54:51determining a suitable site to relocate

54:54uh in the in the future. Again, this is

54:56[clears throat] included in our CIP and

54:59these funds would cover that initial

55:01work.

55:04>> Motion to approve.

55:05>> All right. So, we got a motion.

55:07>> Second.

55:08>> Second. Um

55:12does does the study include in uh whe

55:15there's a need to um upgrade that pump

55:18station? It needs to move if you know

55:20where it is. Oh yeah,

55:21>> it definitely needs to move, but is with

55:25the growth in on the on the island, does

55:28it need to be expanded or

55:32will we find out that with this study?

55:35>> Yeah, I'm certain that that would be a

55:37part of that. Um, I'm sure Mr. Lure may

55:40could speak more specifically to those.

55:42>> Yeah. Um, [clears throat]

55:46we might be able to salvage some of what

55:48the pump state what's there now, but I

55:50think we're basically looking at a new

55:52pump station.

55:53>> I gotcha.

55:54>> A new location

55:56>> and then we would demolish the existing

55:59one.

55:59>> I think that's your best bet.

56:01>> Yes, sir. I think what Royce is asking

56:03too is it would it wouldn't need to be

56:05larger, right? Or bigger for for future

56:07growth.

56:08>> We would take that absolutely. The

56:09design would take that into

56:10consideration.

56:11>> Okay.

56:12>> All right. Rick Rick said he had some

56:14room in his yard. [laughter] I'm

56:17>> telling you, if you've ever if you've

56:18ever seen them servicing this thing.

56:20>> It's they got traffic block.

56:22[clears throat] This is just [snorts]

56:24>> you can never figure out why they put it

56:25there. It's it's definitely an unusual

56:27location for anything.

56:29>> We wouldn't know where we're going to

56:30move. Yep. today

56:32>> has not been

56:32>> because we might possibly have to buy

56:33more land or something.

56:35>> Yeah, we've made some inquiries. We've

56:36looked at some alternatives possibly

56:38even different routes off the island.

56:40You know, right now that that pipe is

56:41suspended on the bridge and that's

56:43another concern, right, from the

56:46environmentally standpoint. So, we'd

56:47have to look at the hydraulics of

56:48putting it under the

56:50>> inter coastal waterway.

56:54>> All right, we need a Let's see. All in

56:56favor say I. I.

56:58>> Any opposed? All right.

57:00Motion carries. And then we got Mr.

57:03Adams. Finally, your last one.

57:06>> Final project ordinance for the evening.

57:08Uh for the wastewater system master

57:10plan. Um again, this has been included

57:13in our CIP. Um it would be to create a

57:17wastewater hydraulic model similar to

57:18the work that's been completed on our

57:20water model. um obviously help us ident

57:24to help better help us to identify um

57:27needs issues um throughout the system as

57:30we continue to expand develop but also

57:35be able to identify for um improvements

57:38of aging infrastructure.

57:41[clears throat]

57:42>> Will this model uh be owned by us and

57:46not not a consultant?

57:48>> Be owned by us. Mhm. [clears throat]

57:49>> It will be owned by us

57:51>> and we'll be able to run it on our own.

57:54Okay.

57:56>> To Bob's point though, would we be

57:58hiring in a consultant to develop this

58:01>> the plan and so forth?

58:02>> Yes, we already have this consultant on

58:05board. They've already done begun the

58:07initial work. We're actually I think we

58:10have we're up to about 25

58:1226.

58:14Um we're

58:17have meters and

58:20>> [clears throat]

58:20>> to start to gather the data that's

58:22needed over a period of time

58:26that that'll get built into the model

58:28and then we'll ultimately be using the

58:30model to master plan and develop future

58:33improvements as uh Eric said.

58:36>> Thanks Jeff.

58:39>> We have a motion

58:40>> move and a second.

58:42>> Second.

58:44>> Have any other discussion?

58:46This is definitely uh with the

58:49tremendous growth of Enzo County. Um

58:54planning is what it's all about, right?

58:57>> Crazy.

58:57>> And planning for INI every year. Your

59:00your your infrastructure slowly degrades

59:02and uh and causes you problems. So you

59:05got to

59:06>> got to plan for it.

59:07>> Well, we got these people from like

59:10Mobile and those places moving up here,

59:12too. And so they're adding. It's

59:14terrible.

59:16She just moved here.

59:18>> I didn't [laughter] think you had enough

59:19room down there to build much more.

59:21>> You know, you know what's funny is off

59:23the subject,

59:24>> the next phase is the is the tear down,

59:26build out. They're going to buy that 800

59:28ft house on the beach, tear it down.

59:30It'll be a 12 bedroomedroom, 14 bath

59:32monstrosity like we see near the serve

59:34city line that they're building motel.

59:40>> All right. Um, all in favor?

59:42>> I.

59:43>> Any oppose? say no. All right. And we

59:47move on to Thank you, Mr. Adams.

59:49>> Thanks.

59:50>> Um All right. We have a whole line of

59:52folks for public comment.

59:55>> Nobody. [laughter]

59:56>> Man, [snorts]

59:59nobody. Okay. Um we don't need a closed

1:00:02session. Is that right? So, we're gonna

1:00:07[laughter]

1:00:07>> I know everybody wants to have a clos

1:00:10wants to get home.

1:00:12Um [snorts]

1:00:14I think the item for close session

1:00:16didn't uh isn't hasn't materialized. So

1:00:19um we'll have to do that in October.

1:00:22>> Um so do we have to do anything for

1:00:25that? We just bypass it.

1:00:27>> All right, Mr. Howard, your comments.

1:00:30>> Yes, sir. Thank you. Just a couple items

1:00:32um before we wrap up. Just uh letting

1:00:35the board know we've been successful in

1:00:37getting signatures on the letter to the

1:00:38base. Uh Royce has went around to

1:00:40different meetings and in fact um I

1:00:43think we got one of our signatures this

1:00:44evening from the city of Jacksonville. I

1:00:46think we'll be getting one from the

1:00:48county and Swansboro here later in the

1:00:50week. Um Royce and I will be

1:00:52participating in the CPG meeting uh

1:00:54later this month to maybe hand deliver

1:00:56that letter to the to the general

1:00:58himself uh or his representative that'll

1:01:01be at that meeting. So I know at that

1:01:03meeting they'll be hearing from the

1:01:04group that's conducting the uh

1:01:06resiliency study and we have several

1:01:08items that have been identified in the

1:01:09resiliency study that impact anasa and

1:01:11the base. Uh so and some of those are

1:01:14partly uh identified in that letter as

1:01:16well. Um just wanted to also let the

1:01:19[clears throat] board know that earlier

1:01:20today we received notice from the EDA

1:01:22and I shared that with you all via

1:01:23email. Um in case you hadn't seen that

1:01:26we we did not get the grant for the

1:01:29water tower in Holly Ridge

1:01:31unfortunately. But now that we have some

1:01:33advocacy uh contract work, we might can

1:01:35find another avenue of funding or maybe

1:01:37try again with EDA. Um they told us

1:01:40nicely [clears throat] in the response

1:01:41there that they had quite a few

1:01:43inquiries for funding this year and they

1:01:47had better applicants basically. So

1:01:49>> we don't have a dedicated uh uh grant

1:01:51writer, do we on staff? We we don't and

1:01:54we've used consultants for various um

1:01:57would part of part of uh part of the

1:01:59Ferguson group be be partially doing

1:02:02some grant writing also in addition to

1:02:04finding the uh

1:02:05>> I think they'll definitely help us find

1:02:06the sources. I'm not sure about the

1:02:08actual writing of the grants but

1:02:10>> yes so in the proposal or in the

1:02:12contract it's not we have a the grant

1:02:16division is separate um but with your

1:02:20contract we do already included grant

1:02:23review so if you do write the grant

1:02:24yourself um we will have a grant writer

1:02:27or somebody an expert with it review

1:02:30your grant and get back to you also um I

1:02:34would be getting you letters of support

1:02:37from your delegation to include in your

1:02:38grant packet. Uh as well, did EDA get

1:02:42[cough] debrief?

1:02:43>> We did get offered that and we will

1:02:45reach we reached out and of course

1:02:47thanked them for the the notice and um

1:02:50we're going to reach out again to to get

1:02:51some feedback because I promised at Holl

1:02:54Ridge that we would figure out, you

1:02:55know, where we could maybe make that

1:02:57applicant application better for future

1:03:00submitt. But we will we will definitely

1:03:03follow up with that. We used um Hazen I

1:03:06think was our group that helped us write

1:03:07that particular grant. They had some

1:03:09capacity to help us. They were doing our

1:03:10water model and it was part of that uh

1:03:12water models. We identified these two

1:03:14projects. So, but we've also used

1:03:16others. We've got our firm Rafelis that

1:03:18does our financial models. They have a

1:03:20grant writing group. We've engaged with

1:03:21them to kind of see uh how they can help

1:03:24us. Um and they've identified some areas

1:03:26like some of these projects you approved

1:03:28tonight. these ordinances like the pump

1:03:29station for example is one that they

1:03:31feel like is a prime project for certain

1:03:34funding that's out there that we might

1:03:35seek. So

1:03:39and other than that we uh I just point

1:03:40out I saw a map earlier too. I think

1:03:42it's today Thursday the drought map

1:03:43comes out. So we picked up some areas in

1:03:46the county that's back into the drought.

1:03:48We had kind of come out of the drought

1:03:49and now we're getting some dry areas. So

1:03:52for us hopefully it's not as big a deal

1:03:53because we're on the downward slope of

1:03:55our demand, our peak demand. you know,

1:03:57it's July and August, so we're starting

1:03:58to see that come down, but we still have

1:04:00to pay attention to the drought and that

1:04:02may folks may pick up using water again

1:04:04and try to keep that grass as green as

1:04:06possible to the end this the season.

1:04:09[clears throat]

1:04:10Um, other than that, it was mentioned

1:04:11that we'll meet in October. We

1:04:12appreciate the board's flexibility to

1:04:14have that meeting date. I think we

1:04:16settled on the 22nd. That'll be to

1:04:18consider uh some debt placement for our

1:04:21CIP projects this fiscal year. So Doug

1:04:24Carter and the folks from Rap Tails will

1:04:26be here to talk to us about approving

1:04:28[snorts] items that'll [clears throat]

1:04:29go to the LGC in November

1:04:32for review

1:04:33and that is all I have. So I appreciate

1:04:35staff of course for working on items for

1:04:37this evening. And uh thank you to the

1:04:39board.

1:04:41>> I got I ask Frank a question

1:04:42[clears throat] please.

1:04:43>> Sure. I know that the state was doing

1:04:46that study on the government property

1:04:47down there. Uh

1:04:49>> yes.

1:04:49>> Uh did they finalize that or was that

1:04:52just a preliminary thing?

1:04:54They said that they would let us know if

1:04:55they found anything. We have reached out

1:04:57to our contact through public water

1:04:59supply to see if they were familiar with

1:05:01what was going on there. Um, but just so

1:05:03the board's aware of what's happening,

1:05:04we got notice uh in the town of Holly

1:05:06Ridge did as well because they have

1:05:07property next to uh this subject

1:05:09property that was being reviewed by the

1:05:11state uh department of um

1:05:16whatever that's the state that reviews

1:05:17the uh abandoned landfills. uh they had

1:05:20a consultant doing some studies for the

1:05:22abandoned landfill of Camp Davis that's

1:05:24on the Ottawa property I believe and so

1:05:26we have property north of that the

1:05:27Wakovia track and the town has property

1:05:29adjacent to it in the industrial park

1:05:31and they wanted to identify any public

1:05:33water supply wells within a certain

1:05:35search ring around that

1:05:37>> of course we have wells D10 and 11 that

1:05:39are on the Wovia track so we identified

1:05:42those for this firm uh and we have not

1:05:45heard back so but for what we hear from

1:05:47our consultants we're outside of any

1:05:49concern area that they're aware of, you

1:05:51know, by current state requirements. So

1:05:55now, if they find something through this

1:05:57review or study, then we'll we'll adjust

1:05:59accordingly.

1:06:03>> Uh, Mr. Howard, I have a question, too.

1:06:05Have you have you had a an opportunity

1:06:07to talk to anybody at this uh with the

1:06:09city of Jacksonville about the

1:06:11properties that have left their ETJ

1:06:14that uh are being serviced by the city

1:06:18utilities? I don't know. I' I've assured

1:06:21people that they're not not going to

1:06:23turn off their water, but uh you know,

1:06:26the question then is who's going to

1:06:28service their their water and sewer?

1:06:31>> Yeah. And I think it just comes down to

1:06:34what they've negotiated with that

1:06:36developer, I guess, in these areas for

1:06:39future volunteer annexation because I

1:06:41think they're still allowed to do that

1:06:42in certain areas of the ETJ. Um, and

1:06:44they're working on figuring out what

1:06:45happened with this whole south of 24

1:06:47area. So, if they're, you know,

1:06:49petitioning to voluntary annex and the

1:06:50city has infrastructure there, it

1:06:53naturally fits that they'll be the

1:06:54service provider. In a lot of cases,

1:06:56what we found is, or in some cases, we

1:06:58might have the water there and the

1:06:59city's got sewer. to work out a deal

1:07:01where we'll be the sewer provider and

1:07:04they might be the sewer provider.

1:07:06>> So, we haven't really gone to a lot of

1:07:07detail, but I do meet regularly. Matter

1:07:09of fact, we met Monday with the city

1:07:11manager and so we'll continue.

1:07:13>> I got one more thing, too.

1:07:15>> Okay.

1:07:15>> Just come to thought, a lady

1:07:17[clears throat] called me the other day

1:07:18and she was really concerned about all

1:07:20these hacks and all this stuff that's

1:07:22going on all over the country with the

1:07:25systems and she was really concerned

1:07:27about it happening here. And I know we

1:07:30had a problem one time before, but uh

1:07:33basically she just want to know how

1:07:35would the public be notified if this

1:07:38happened and would it affect our water

1:07:40system at all?

1:07:41>> Yeah, I mean we we've certainly put

1:07:44things in place to be prepared and to

1:07:46shield ourselves as best we can from

1:07:48these types of attacks. Um in fact,

1:07:51we've gone through some exercises where

1:07:52we make sure certain controls are not

1:07:55connected to outside uh sources. So, and

1:07:58in fact, if if a consultant needs to get

1:08:00in, they're having to directly

1:08:02communicate that with us to do any kind

1:08:04of changes to that system. So, I feel

1:08:06like we're we're we're doing everything

1:08:07possible now. We're participating in

1:08:10statewide communications when when they

1:08:12see things that are happening. Um, we

1:08:15are uniquely position, you know, close

1:08:17with the base, you know, so it's a good

1:08:19thing for a lot of these things we've

1:08:21talked about, but it actually puts a

1:08:22target on us for certain things as well.

1:08:23So, I feel like we've done the best we

1:08:26can. you know, we things, you know, are

1:08:29happening every minute, you know, to try

1:08:31to attack these things.

1:08:32>> Basically, I told her the same after

1:08:33that first time we, you know, we made a

1:08:36lot of changes. Her biggest concern was

1:08:38was how is the public going to know if

1:08:41something happens?

1:08:42>> Yeah. I mean, we would definitely um

1:08:44with with every means of possible, we

1:08:46would communicate like we do now to the

1:08:49customers if there is a concern about

1:08:50water quality. You know, what they

1:08:53they're trying to do is get in there and

1:08:54control the system. Um, fortunately we

1:08:57don't we don't have a lot of systems

1:08:58controls that would impact directly to

1:09:01the customer that I feel like, you know,

1:09:03as far as the way the operations are.

1:09:05Um, but we would definitely communicate

1:09:06out to the customers if there was a if

1:09:09there was something to communicate

1:09:10related to water quality.

1:09:14>> Frank, I got a random question, too. Um,

1:09:18water leaks and stuff like that. When

1:09:19there's a leak near DOT road that's

1:09:22going to potentially affect the road, do

1:09:24we have to get in line to get like

1:09:25permits with them to fix said leaks or

1:09:29do we have a does it depend on how bad

1:09:31the leak is?

1:09:32>> I think it really just depends on how

1:09:33bad um Matthew still here. Yes,

1:09:36>> encroachment.

1:09:37>> We do have a blanket encroachment which

1:09:38would allow us to get into certain

1:09:40areas. They do have restrictions in

1:09:42parts of the um county that we can only

1:09:46work during certain hours, right? if

1:09:48it's a planned event, but I think during

1:09:50emergencies, it's one of those you just

1:09:51got to get it done.

1:09:52>> The only reason I'm and I've been seeing

1:09:54water run down the road and obviously a

1:09:55leak has been identified and I was just

1:09:57kind of looking at it the past couple

1:09:58days and again it's not massive. It's

1:10:00not like it's shooting up in like it was

1:10:01in Steve's Fair or whatever.

1:10:03>> Easy easy.

1:10:04>> Hey you guys, when you guys do it, you

1:10:05do it. Um but no, I was just looking at

1:10:08it. I'm like, well, it's either a

1:10:09scheduling issue on our part or we're

1:10:10waiting on DOT to say we can dig up the

1:10:12road right here. So, I'm glad you asked

1:10:14because I think I answered his question

1:10:15earlier too, but I didn't put it in the

1:10:16all uh email back. So, in in

1:10:18[clears throat] Matthew's report to to

1:10:20the leadership team this week, his

1:10:22distribution department identified how

1:10:24many leaks they've been working on

1:10:25weekly. So, this past week, I think they

1:10:27fixed 30 leaks and they have 50 leaks on

1:10:30the list to be completed. Like, so

1:10:32they're working down a list, you know,

1:10:34but when I got here, it was taps we were

1:10:35trying to deal with and get caught up on

1:10:36taps and now it seems like it's leaks.

1:10:38>> Well, that were

1:10:39>> I just want to make sure. Um, that's

1:10:41just I was just wondering like I said if

1:10:43if it was a thing with DOT cuz we've

1:10:45been dealing with them on something

1:10:46privately, you know what I mean? Just

1:10:47kind of getting in the queue and going

1:10:48through the process and

1:10:50>> man, what a process that can be and I

1:10:52just didn't know if we had a problem if

1:10:53we could figure out how to

1:10:55>> Well, we when we do, you know, I have

1:10:57communicated concerns with DOT to like

1:10:59Senator Lazaro when we have we've been

1:11:00waiting on encroachment approvals or um

1:11:04and that is frustrating because it's

1:11:05take it's taken months sometimes to get

1:11:07those. But for leaks though, we we put

1:11:09them in the queue. We go out and

1:11:10identify them. In fact, we've put some

1:11:11signage out and I think some folks have

1:11:13seen the signage where we once has

1:11:15identified the leak so we don't continue

1:11:16to get multiple calls and that works in

1:11:18some cases but I know it frustrates

1:11:20folks when they see a leak and we

1:11:22haven't jumped right on it. Now there is

1:11:23a time that we do have to wait for

1:11:25[clears throat] um location like

1:11:27locating utilities around there so we

1:11:29can dig

1:11:30>> and I never blame the people. I always

1:11:31blame the bureaucracy that you know that

1:11:33we've been able to create around certain

1:11:35things. So again that was no slight on

1:11:37DOT by any means. Oh, no, no, no, no.

1:11:38It's just a process. It's just a

1:11:40process, right?

1:11:43>> All right. Thank you. Thank you. Um,

1:11:48Mr. Herbert,

1:11:50>> I just want to quickly say thanks to the

1:11:51uh the organization in totality,

1:11:53[clears throat] up and down the org.

1:11:54Appreciate everything you do on a daily

1:11:55basis, especially to our crews out

1:11:57there. You know, I mean, I I travel back

1:12:00uh daily from Swansboro to Jacksonville.

1:12:02my duties on base take me off in the New

1:12:04River out in town and you see our crews

1:12:07consistently almost daily for me at

1:12:09least and they're the face of the

1:12:11organization. They're the they're

1:12:12interacting with the uh the community

1:12:14and so forth and we just want to say

1:12:16thank them for everything they do. We

1:12:17appreciate it.

1:12:20>> Mr. Padet

1:12:20>> couldn't said it better. Thank you so

1:12:22much,

1:12:24>> Mr. Hind.

1:12:25>> Well, I'm just tickled to death to be

1:12:27here. Uh and also my usual say hello to

1:12:30Miss Janette. I got to say that. But uh

1:12:33yeah uh y'all said enough about it. I

1:12:36mean that's we do have I've always said

1:12:38we've got the best crowd out there.

1:12:40>> Absolutely.

1:12:42>> All right, Mr.

1:12:43>> I'll throw some kudos to the uh the

1:12:45staff. Uh this is some of the best

1:12:47planning that I've seen in the in the

1:12:49relatively short time I've been on WASA

1:12:51on Wasa. I can see an improvement. Uh so

1:12:54so thank you all for for what you're

1:12:56doing.

1:12:58>> Took the words right out of my mouth.

1:13:00Great job. Thank you. Thank you.

1:13:02>> Thank you, Mr. Bitner. [clears throat]

1:13:04Um,

1:13:05>> thank you everybody. And Frankie, if you

1:13:07hadn't fixed the geyser soon, we're

1:13:08going to use it as a marketing tool to

1:13:09bring people onto the beach because that

1:13:11I could see that sucker from my house.

1:13:13[snorts] Unbelievable. Everybody got a

1:13:16copy of that. You got the video on that,

1:13:17didn't you?

1:13:18>> Yeah. Yeah, I saw something else. You

1:13:20could have made a splash pad out of it

1:13:21while

1:13:21>> That's what I was thinking. Ain't that a

1:13:23splash pad? I mean,

1:13:25>> behind the booster station.

1:13:26>> But thank thank you and your team.

1:13:28[laughter]

1:13:29>> Uh, Mr. Vice Chairman,

1:13:31>> thank you guys as always. Thank you very

1:13:33much.

1:13:34>> All right. All right. And I'd say the

1:13:36same thing. You guys, you got a lot got

1:13:39a lot done for this meeting tonight. We

1:13:41really appreciate it. And and um yeah,

1:13:45being out there in the middle of the

1:13:46night working on these uh these systems,

1:13:50and I I know I'm glad I'm not out there.

1:13:52You do a great job. [clears throat]

1:13:54All right. So, do we have a motion to

1:13:56adjurnn?

1:13:57>> And we got a motion in a second. And

1:13:59we're ajourned. [snorts] They're like

1:14:01the Coast Guard. They go out.

```*