2026-10-13 - City Planning Commission

Summary

Based on auto-generated captions; names, numbers and some motions may be misheard.

Time on topic (from transcript timestamps; approximate, includes side talk; the recess is not counted):

Topic Minutes Share
Data Center Zoning Amendment 204 99%
Other business 2 1%
  • Tuesday, October 13, 2026.
  • The recording starts at the first caption (0:21) and the captions end at 3:32:35 with adjournment.
  • A recess ran from about 2:20 to 2:26 with no speech captioned.
  • Chair Meyer presided; seven members were present (Wagner absent, plus two others recorded absent), and a written statement from the absent Commissioner Wagner was read into the record.

Other business

0:21-1:13, 3:31:51-3:32:35

  • Roll call and a quorum; minutes of September 28, 2026 adopted on a voice vote.
  • Staff reported that the site plan decision for 3561 44th Street West Mixed-Use Project was appealed and goes to the Business, Housing and Zoning Committee (the rezoning moves forward regardless). The next regular meeting is October 26.

Data Center Zoning Amendment

1:13-2:20:16, 2:26:38-3:31:51

  • The only item on the agenda: a zoning code text amendment on data centers and on electric utility equipment, with a public hearing. Staff recommended allowing principal-use data centers only in the DT1 and DT2 downtown districts, only inside existing buildings, by conditional use permit, with up to 175,000 square feet of server "white space", set back from outside walls, off the first and second floors and 100 feet from nearby homes. The City Council's moratorium on new data centers ends November 21; without new rules, data centers revert to a broadly allowed "communication exchange" use in 10 of 15 zoning districts. A planning staff member presented the proposal (name unclear in the captions).
  • Commissioner questions covered what happens if nothing is adopted, non-disclosure agreements (the Council banned them in August), outreach to Dakota and other Native nations (staff said none was done; Commissioner Chowdhury and Commissioner Garcia pressed for it), why new construction is barred, how utility disclosures will be used, and the 175,000 square feet figure (staff estimated 50 to 90 megawatts could fit, versus 100 or more for a "hyperscale" site that the rule aims to prevent).
  • Public hearing: about 30 people signed up and each had two minutes. Most urged removing data centers from primary zoning, extending the moratorium, a much lower size cap (25,000 square feet), notice to residents within 1,000 feet, no tax breaks and franchise fee revenue for climate work; several asked for a ban. Labor representatives and a few residents supported the ordinance, with requests for labor standards or fewer restrictions. Council Member Wonsley also testified for eliminating primary zoning. An Xcel Energy representative said data centers pay for the grid upgrades they need and answered questions on the state clean energy standard (about 70% carbon-free now, about 85% projected by 2030).
  • Deliberation: commissioners debated fiscal benefits (Commissioner Conley cited the property tax levy and downtown vacancy; Commissioner Chowdhury cited the city assessor's caution that revenue gains are uncertain), the arbitrary nature of a square footage cap, and the limits of city authority under state law. Commissioner Wagner's statement supported the ordinance as proposed.
  • Amendment 1, from Commissioner Conley: require data centers to go through a new overlay district created by rezoning (legislative review by this commission and the Council) rather than primary zoning with a conditional use permit anywhere; staff to draft it for the Business, Housing and Zoning Committee. Adopted 6-1 on a roll call, Chair Meyer opposed (he preferred clear rules).
  • Amendment 2, from Commissioner Garcia: direct staff to cap white space at 50,000 square feet instead of 175,000. Adopted 5-2, Commissioner Baxley and Chair Meyer opposed. Commissioner Gordon proposed the same range earlier; Commissioner Chowdhury said she supported lowering the cap but wanted battery storage incentives for larger sizes left for the Council.
  • A below-grade amendment from Commissioner Baxley was withdrawn after staff said the draft does not restrict basements.
  • Main motion (staff recommendation as amended): approved 7-0 on a roll call. Staff will attach the commission's recommendations to the committee packet. Next steps given in the hearing: Business, Housing and Zoning Committee on November 6 and the full Council on November 12.

Issues discussed: Data Center Zoning Amendment, 3561 44th Street West Mixed-Use Project

Agenda

  • Approval of minutes, September 28, 2026
  • Zoning code text amendment on data centers and electric power distribution and storage: Data Center Zoning Amendment (public hearing)

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:21Welcome everyone to the regular meeting

00:23of the Minneapolis Planning Commission

00:24for October 13th, 2026. My name is Chris

00:27Meyer and I'm chair of the commission.

00:28At this time, I'll ask the clerk to call

00:30the role.

00:32>> Commissioner Baxley

00:33>> here.

00:34>> Chowry,

00:35>> present.

00:37>> Connley,

00:37>> present. Garcia

00:40>> present.

00:41>> Gordon

00:42>> present.

00:43>> Jones is absent. Sheepy is absent.

00:47Shepard

00:48>> here.

00:49>> Vice President Wagner is absent. And

00:52President Meyer

00:53>> here.

00:54>> There are seven members present.

00:56>> We have a quorum. Uh we'll go to the

00:58minutes for September 28, 2026. Is there

01:00a motion to adopt those minutes?

01:02>> So moved.

01:03>> Second.

01:03>> Is there any discussion?

01:05>> All right. All in favor say I. I.

01:06Opposed abstensions. The minutes are

01:09adopted. Uh so we have just one item on

01:13our agenda today. The zoning code text

01:15amendment for data centers. Um

01:19before I begin, I want to ask everyone

01:21if you are planning to testify, please

01:23sign up. Um you can either go outside or

01:27um can they also go to you? I don't

01:30know. Um so go outside to sign up.

01:32You'll get a number. Right now we have

01:3423 people who are signed up. Um you know

01:38after the the staff presentation is

01:40over. We're going to figure out how much

01:43time we can allocate to each speaker. We

01:46have to be completely done by 8:30 p.m.

01:49tonight because that's how long we have

01:51our captioner. Um so we want to make

01:53sure that we get everything through. So

01:56if you wanted to testify and you haven't

01:57signed up already, uh please do sign up.

02:00Uh with that, um staff is Jaden

02:03Whitenberg, uh to present the data

02:05center amendment.

02:10>> Good afternoon, commissioners. Happy to

02:12be here with you this afternoon to

02:13present a zoning code text amendment

02:15addressing data centers and a few other

02:18uh things related to the uh distribution

02:20and storage of uh electric power. Uh

02:24over the past uh several years, the uh

02:27expansion of cloud-based computing and

02:30artificial intelligence has led to rapid

02:34expansion of data centers in many

02:36communities throughout the country and

02:37communities have found that their zoning

02:39codes are not equipped to properly deal

02:42with modern data centers and we are no

02:44exception to that. Um our zoning code is

02:47three years old. that does not use the

02:49term data center.

02:54So earlier this year, the city council

02:56enacted a six-month moratorum on the

02:59establishment or expansion of data

03:01centers. Uh there was an exception

03:04written into that to allow uh somewhat

03:06smaller scale facilities uh to uh

03:09establish or expand within the downtown

03:11area bounded by the freeway ring of 35W

03:15I94 Plymouth Avenue and the Mississippi

03:18River.

03:24At that time uh an ordinance was

03:26introduced uh that's in front of you uh

03:28now uh five chapters five chapters of

03:31the zoning code were introduced. I

03:33believe we have uh nine authors who've

03:36signed on uh that's quite unusual a lot

03:39of interest in this topic and we've been

03:41working uh very closely with council

03:42member Chowdery and uh council member

03:44Schaefer to advance uh uh the

03:48regulations that are in front of you

03:49tonight.

03:55Uh this is a quick overview of the

03:57process that we've gone through. Again,

04:00in uh uh in the spring, a moratorum was

04:03uh introduced by the city council. There

04:05was a staff direction to our uh

04:08legislative research and oversight staff

04:10uh to produce a report that was sort of

04:13a landscape analysis of data centers and

04:15how cities are approaching them and what

04:17issues they're experiencing throughout

04:19the country. that report uh it's very

04:22thorough, very well done and is attached

04:23to your packets uh uh that you received

04:26for this meeting

04:29in June. Uh the the business housing and

04:32zoning committee held a public hearing

04:34on the data center moratorum that was uh

04:36adopted. Uh CPED uh presented uh

04:39recommendations uh preliminary

04:41recommendations to the city planning

04:42commission at its committee. the whole

04:44meeting in mid July.

04:47A month after that, mid August, uh we

04:49put up a a project website uh about two

04:52months, a little over two months in

04:54advance uh of this public hearing and

04:56that allowed people to uh take a look at

04:59draft recommendations and submit

05:02comments through a smart sheet.

05:06Uh also in August, our LRO staff

05:08presented its report about data centers

05:10to city council and there was a uh

05:14policy round table held where all city

05:16council members uh were invited and here

05:19we are today October 13th uh city city

05:22planning commission public hearing. You

05:24will of course be making a

05:25recommendation to the city council that

05:28goes through the uh business housing and

05:30zoning committee which is scheduled for

05:32November 6th and then on November 12th

05:35we expect the full city council to take

05:37action and publication and effective

05:40date of the ordinance would happen I

05:42believe literally the same day that the

05:44uh moratorum is uh set to expire.

05:54What is a data center? A data centers

05:57primary function is to make the internet

05:59function. Um including uh with servers,

06:03storage uh data data storage devices and

06:06networking hardware that needs an awful

06:08lot of equipment to make it function

06:10including the electrical infrastructure,

06:13the cooling systems to keep the servers

06:15uh at a temperature that uh they can

06:17function. and then uh physical and

06:20digital security systems.

06:23I'll note that uh when we are talking

06:25about data centers this evening, we're

06:27talking about principal use data centers

06:29where the storage and retrieval of data

06:32is the primary function on the property.

06:35If uh if a business or an institution

06:38has a server room or rooms with servers

06:40that serve that business's needs, that

06:43is not uh from our standpoint a data

06:45center that we're regulating through

06:47through these regulations.

06:52Again, the the uh term data center

06:54doesn't currently appear in the zoning

06:56code. They uh have historically been

06:58classified as what uh is referred to in

07:00the zoning code as communication

07:02exchanges.

07:04that use is very broadly broadly allowed

07:07in 10 of our 15 primary zoning

07:09districts. Um I I'll just note that

07:13barring adoption of new rules, these

07:15would be the rules that we would revert

07:17to uh and have that uh level of

07:19flexibility uh that would remain in our

07:22in our zoning code. Uh much more

07:24permissive than the regulations that

07:26we're uh we're bringing forward for your

07:29consideration.

07:31uh communication exchange would continue

07:33to exist as a use in the zoning code,

07:36but it would it would serve uh uh the

07:38the types of uses that it was really

07:40more intended for, which are sort of uh

07:44routing and switching of internet and

07:46telephone uh uh traffic essentially.

07:50That those uses simply don't have uh the

07:53same types of impacts that we're seeing

07:55on in uh modern-day data centers.

08:05uh proposed definition very concise a

08:08principal use where the primary function

08:10is to house computers and/or related

08:13equipment for the purpose of collection

08:15processing storage and retrieval of

08:18data. Again as I referenced this is uh

08:21regulating principal uses and not when

08:24uh a business is serving its own on-site

08:27needs.

08:30Data centers aren't new, of course. We

08:31have uh uh eight existing data centers

08:34in our downtown. This is a map uh that

08:36our assessing uh department produced

08:39that has identified eight in in our uh

08:42our downtown. We don't have a lot of

08:44information about some of these. They

08:46some of these are seem to be relatively

08:48smallcale tenants in multi-tenant

08:50buildings.

08:52Uh there were a number of years where a

08:55a a communication exchange did not

08:58require a conditional use permit uh

09:00through this body and were established

09:03administratively

09:04essentially through a building permit

09:06and electrical permit.

09:12You'll see in our draft recommendations

09:14that we are largely focused on downtown

09:17Minneapolis. There are a number of

09:19reasons for this. Uh the uh power grid

09:22has uh a lot of capacity and redundancy.

09:26There are electric substations

09:28essentially circling our downtown. There

09:30is access to high-speed fiber lines.

09:33There's a pro a great proximity to a

09:36large number of end users and there are

09:38a number of adaptable buildings many of

09:40which are underutilized in the post

09:43pandemic era.

09:49Uh to expand on that, we have roughly a

09:5230% vacancy rate in our downtown. That

09:55equates to over 8 million uh square feet

09:59of uh vacant space, roughly the

10:02equivalent of uh I believe five IDs

10:04centers worth of office space. Uh we

10:09>> [snorts]

10:09>> uh there's not a clear path to reusing

10:12much of this space. We of course have

10:14been working to clear the path for uh

10:17conversion to residential use. Uh not

10:20every building, many buildings quite

10:22frankly are not adaptable for uh

10:25residential use, especially newer

10:28buildings with large floor plates.

10:31Uh again a limited number of buildings

10:34that are suitable uh also uh to

10:36conversion to a data center. data

10:38centers have very specific specific

10:40needs as well in terms of the

10:41infrastructure that serves uh the

10:44building um and the structural capacity

10:47of the building itself. We are unlikely

10:50for example to see a 30story building

10:52get converted to uh entirely to a data

10:55center. We we can uh talk more about

10:57that if if the commission uh wishes.

11:01uh data centers are taxed at a higher

11:03rate than uh uh residential uses. Our uh

11:08decline in our downtown tax base is uh

11:12uh a significant reason why we are in

11:14the current uh budget uh situation that

11:17we're in. Uh downtown has historically

11:20uh carried a significant uh percentage

11:23of the city's uh downtown tax base.

11:28uh data centers do uh require uh a a a

11:33lot of uh skilled skilled trades people

11:35to get those up up and running uh over

11:38the longer term. However, as most people

11:40are aware, data centers do are not large

11:42job producers on the site uh it itself.

11:47Utility franchise fees are um are are

11:50paid and go directly into the city's

11:53general fund. large electricity users

11:55are big big contributors and the

11:58practice has been to uh dedicate

12:01a portion of uh of those funds uh to

12:05climate initiatives.

12:08Revenue from large water users

12:11subsidizes the cost uh of water users

12:13for the rest of us who live in the city.

12:15Of course, uh the city has an interest

12:17in ensuring that people uh use water

12:21wisely. uh but it's it's a fact that uh

12:25commercial water users uh do uh help

12:27help out the rest of us in in that way.

12:31And again, there are practical and

12:32regulatory limits u that will uh keep

12:36the scale uh of of data centers uh in

12:40the areas that we are recommending at

12:42below what we consider a hypers scale

12:44type of facility of 100 megawws or more.

12:59A little bit of uh state context. This

13:01state uh in 2025, the legislature

13:04adopted some tax changes that extend

13:07some uh tax uh credits uh for uh

13:12investment in things like software. uh

13:15the state eliminated the uh uh

13:19electricity sales tax exemption for for

13:21this use. There are some environmental

13:24standards uh when uh data centers are

13:28utilizing these tax changes.

13:32Are these slides uh advancing on their

13:35own? Okay.

13:39Uh there is some rateayer protection uh

13:41language. I will note that we have uh

13:44representatives from Excel Energy here

13:46uh who can uh answer questions about

13:49power capacity uh and uh rateayer

13:52protection if the commission is

13:53interested. The the state also adopted

13:56some prevailing wage requirements uh for

13:58those who are working on on uh data

14:02centers.

14:08a little bit about what cities uh have

14:10the ability to regulate and what they do

14:12not. Uh we can regulate which zoning

14:15districts uh the use is located in. We

14:18can require a discretionary

14:20discretionary review like a conditional

14:22use permit. We can limit the size in

14:25square feet. We uh can limit noise

14:29uh location of of generators and

14:32mechanical equipment. site design and

14:35compatibility with adjacent uses. Things

14:38that we are not able to regulate that we

14:40do not have the authority to regulate

14:42are the size of a facilities based

14:44strictly on uh the power use in

14:46megawatts for example. Uh air emissions

14:49are regulated by the state. We do not

14:51have the ability to direct directly uh

14:54regulate air emissions.

14:56uh building mechanical systems like the

14:58type of cooling uh or backup power

15:01systems

15:03uh building standards that exceed the

15:04green energy code. Essentially,

15:06Minnesota is a state where we uh are not

15:09able to um uh exceed the requirements of

15:13the of the building code.

15:16Uh cities do not have the ability to

15:18levy impact fees or other fees that

15:20exceed the co cost of providing

15:23services.

15:27There are very real concerns about data

15:30centers uh that have played out in in in

15:33communities uh throughout the country.

15:35Uh they use a lot of power. That's uh

15:38one thing a lot of people know about

15:40about data centers. Uh they require uh

15:43careful cooperation with Excel Energy uh

15:46to ensure that uh they are u uh within

15:49the the grid's capacity.

15:53There are concerns about uh uh the

15:56impacts that that electricity use has on

15:58long-term long-term renewable energy

16:00goals. The state of Minnesota has a

16:02requirement that we are uh run by

16:06carbon-f free electricity statewide by

16:08by the year 2040. Some have expressed

16:11concerns that uh the the large energy

16:14needs of this particular use will impede

16:16progress toward that goal.

16:20High water use

16:23Um

16:25uh cities need to understand the impact

16:28uh that uh that it has on the ability to

16:31distribute water depending on again on

16:33the uh on the type of cooling system

16:35being used

16:37uh by the facility.

16:40Backup generators can cause intermittent

16:42noise and pollution. They typically have

16:44to be tested monthly.

16:47uh the design of these facilities and

16:49the security needs can uh be sort of a

16:52warehouse uh type of u of uh look that

16:56is not consistent with the urban fabric

16:59that we're always going for particularly

17:01uh something that has to be mitigated in

17:02a downtown environment and the noise

17:05from the hum of servers uh has to be

17:08mitigated including preventing that uh

17:10noise violations uh really before they

17:13occur. Getting

17:19into draft recommendations in front of

17:22you. Uh we would require a conditional

17:25use permit to be reviewed by the city

17:27planning commission for all new data

17:28centers. The city planning commission

17:30makes final decisions on conditional use

17:32permits unless those unless your

17:34decision is appealed uh to the city

17:37council. Our recommendation is uh to

17:41regulate square footage based on what's

17:44referred to as whites space. That's a

17:45term that we also would define in the

17:47zoning code. This is essentially the

17:49area dedicated to IT equipment, server

17:52racks, network networking gear, and

17:54power distribution units. We think it's

17:56a better measure of the kind of resource

17:59needs of the of the facility rather than

18:02regulating the entire square footage of

18:05the facility that would include things

18:06like office spaces and loading loading

18:08docks for example.

18:11The recommendation is to allow that

18:13white space to be up to 175 square feet

18:16uh on a property in the downtown zoning

18:19districts only in the DT1 and DT2

18:23districts uh shown on that map.

18:31I'll just note that uh one

18:34difference that uh the recommendations

18:37in front of you today have between uh

18:40compared to what the what we brought you

18:42over the summer is that at that point we

18:44had uh considered allowing uh data

18:47centers to be uh established in the PR2

18:50district, our heavier of our two

18:52production industrial districts.

18:55Um, we had proposed regulating those

18:58similarly to how we do high uh high

19:00impact industrial uses uh uses requiring

19:03that they be at least a quarter mile

19:05from uh any uh district other than PR2

19:09or our transportation district and

19:11therefore ensuring that they would be uh

19:14a significant distance from districts

19:16where you could establish residential

19:18uses.

19:20We got some uh significant push back on

19:22that and that is not currently part of

19:24the recommendation. We are currently

19:25focused on the two downtown districts.

19:28There were also uh really questions

19:30about whether uh there was a likelihood

19:33that there would be the the uh uh kind

19:37of utility compa capacity to to address

19:41a sizable data center in those small

19:44areas of PR2 that were recommended.

19:53The recommendations uh and I think this

19:56uh would be somewhat unique in the

19:58country is that is that new data centers

20:00would only be allowed to be established

20:02within an existing structure. We would

20:05allow minor additions uh uh to uh to

20:08enclose equipment for example.

20:11Uh we would require disclosure of uh

20:14expected use of water electricity

20:17generators uh as well as a sound

20:19attenuation plan. Again very uh uh uh

20:23concerned about ensuring that we don't

20:25res uh see ourselves in a situation

20:27where we're having to enforce against

20:30noise violations for these facilities.

20:34We would like to ensure that there has

20:36been some coordination with Excel Energy

20:39at the time of application

20:41again given the careful coordination

20:43that's needed. Uh so we are asking for

20:45evidence that there's been some

20:47coordination with Excel Energy at the

20:50beginning of the application process.

20:55Uh also we would provide clarification

20:57in the ordinance that a data center does

20:59not uh constitute an active function uh

21:03for the purpose of complying with our

21:04ground floor active function standards

21:07uh in the zoning code.

21:19The rooms housing servers again

21:22essentially the white space uh would be

21:24required to be at least 20 feet from an

21:27exterior wall of the building. When we

21:29toured a uh existing data center in

21:31Minneapolis, they touted the fact that

21:34their uh white space was uh uh at the

21:38interior of the building and therefore

21:40their building itself captured some of

21:42the noise from that uh from that uh uh

21:45use within the building. So they gave us

21:48the idea essentially uh for for that

21:50regulation.

21:52And uh we would also require that that

21:55specific space within a data center be

21:57at least 100 ft from an uh nearby

22:00residential use on on adjacent property.

22:06Uh again, to meet our goals for uh

22:09active street life in downtown, we would

22:12not allow uh uh white space to be or or

22:16other equipment to be on the first or

22:19second floor.

22:21And newly established data centers could

22:24not be the only principal use within the

22:26downtown districts that where we're

22:28recommending that they be allowed. Uh we

22:31would prefer that entire downtown

22:33buildings, entire downtown blocks not be

22:36converted to uh such an inactive use.

22:41And then all equipment necessary for the

22:43use would have to be either enclosed

22:45within the principal building or placed

22:47on the rooftop.

22:52Just to note that uh there are existing

22:56existing city and state regulations

22:58addressing noise. Again, we are it's our

23:01hope that we uh prevent the potential

23:04violations from happening in the first

23:06place, but uh if needed, uh these are

23:09the this is the primary uh noise

23:12regulation that the city would uh

23:14enforce against these facilities if we

23:16do find uh potential violations or if

23:19there are complaints about noise

23:20emanating from them.

23:28uh that there are understandably

23:30concerns about uh water capacity and

23:33water use for these facilities. Uh

23:36Minneapolis of course gets its water

23:38from the Mississippi River. We as a city

23:42have uh the capacity to distribute

23:45roughly 100 million gallons of water per

23:48day.

23:50Water use in in the city of Minneapolis

23:52has been declining for decades uh partly

23:56due to uh improved efficiencies and

23:59Minneapolis is typically uh delivering

24:02about 55 million gallons of water per

24:05day with a peak uh in around the

24:08summertime uh going up to around 80

24:10million gallons uh a day.

24:14uh month. Uh we had our asked our water

24:17distribution folks to gather uh

24:19information about high volume water

24:21users and they pulled info about the uh

24:24top 40 commercial accounts in the city.

24:27Those range from uh using about 800,000

24:31gallons to about 5.4 million gallons per

24:34month uh with an average uh of about 1.7

24:38million gallons per month among those

24:40users.

24:43um one using one of the largest uh data

24:46centers in Minneapolis as an example. It

24:48has be it has become one of the 40

24:49largest data uh water users uh uh in the

24:53city and has typically been using uh

24:55last time we pulled data around three uh

24:583 million uh gallons per month. again,

25:02sort of in the middle of that top 40

25:06um

25:09top 40 commercial water users.

25:19>> [snorts]

25:19>> Uh as briefly noted at the beginning,

25:22there are some non-data center uh issues

25:25addressed in the proposed

25:26recommendations related to the uh

25:28distribution of electricity. Uh utility

25:31boxes like the one pictured here. Uh we

25:35would allow those in a front yard

25:37setback. Uh they are required to be

25:39screened.

25:41uh they and they would be allowed up to

25:43six feet in height in a front yard

25:44setback and we would allow them in a uh

25:47rear yard setback where adjacent to an

25:49alley. Uh the rationale uh is that these

25:53require easy access by Excel Energy. We

25:57uh get in an awful lot of fights with uh

26:00with XL and with uh with people uh

26:03proposing uh these facilities uh because

26:06they are in locations that our zoning

26:07code does not currently allow often

26:12uh battery energy storage systems. We

26:15would clarify that these systems are

26:16allowed as an accessory use subject to

26:19uh state building code and the state

26:21fire code.

26:23Uh we propose to exempt uh bas what's

26:26called basic utilities that includes

26:28things like electric substations

26:30uh from our general landscaping and

26:33screening standards and in instead of

26:35that uh require site enhancements uh

26:38like screening public arts plazas uh

26:41quasi public space and andor pedestrian

26:44realm improvements.

26:46And then stationary generators uh with

26:48internal combustion engines are uh

26:50proposed to have some restrictions that

26:52aren't currently in place um when they

26:55are placed uh on a property that is

26:57adjacent to residential property.

27:02That concludes my presentation. Be happy

27:04to stand for any questions.

27:06>> Thank you. Are there questions for staff

27:08before? Go ahead, Commissioner Shepard.

27:10>> Please. Thank you so much for the

27:12presentation, Jason. and and you I I

27:13went from seven questions down to three

27:15as a result of your presentation. And

27:17thank you again to you and staff for

27:18that really terrific uh package that we

27:20received uh for this meeting. Can you

27:24just review just touch on briefly and I

27:25know you touch on it in that package the

27:27consequences of non-approval

27:30of for tonight.

27:32>> Yes. Uh Commissioner Shepard. Uh if we

27:36were to uh not adopt new regulations and

27:40the uh interimm ordinance moratorum

27:43expires, we would go back to these

27:46facilities being classified as a

27:48communication exchange

27:50allowed in 10 of the city's uh zoning

27:53districts rather than the two zoning

27:55districts that we're proposing.

27:57>> Thank you. Another one which up came up

27:59frequently in the public comments which

28:01were just a gold mine of information at

28:03the end of that package. Many folks were

28:05concerned about non-disclosure

28:07agreements and it is my understanding

28:08and correct me if I'm mistaken that in

28:10August of this year the city council has

28:12prohibited remove the authority of of uh

28:14agencies to execute any ND NDAs on this

28:18or any other sort of project. That's my

28:20understanding also and we in CPED would

28:23not have entertained uh NDAs uh prior to

28:27that but uh I believe the city council

28:29did take action to to be clear about

28:31that. Yes.

28:32>> Great. Thank you. My last question is a

28:33is a wonky one about those transformer

28:35boxes you were just showing uh the

28:37utility boxes and a a data center even

28:40the 25 megawatt size can have a number

28:42of these like 8 10 12 um not not just

28:46one and they're they're not small. And I

28:48notice, and maybe this is just a quirk

28:49in the way this is written, that if it's

28:51in a rear yard, it's restricted to a

28:53maximum of 20% of the area of the

28:55required rear yard, but there is no such

28:57restriction on the front yard, which

29:00seems a little counterintuitive in a in

29:02a downtown district that we would not

29:05have a maximum on the frontage, which

29:07they could cover.

29:09>> Sure. Uh that's a good question, uh,

29:11Commissioner Shepard. And to be clear,

29:14uh there are no required setbacks

29:16essentially in our in our downtown

29:18zoning districts. So they are already

29:21allowed along the entire perimeter of a

29:23property subject to screening

29:25requirements. I will note though that we

29:27are requiring that equipment associated

29:30with the data center does have to be

29:32located uh within the building itself.

29:35>> Oh, within the building.

29:36>> Correct.

29:37>> Oh, thank you. So the the type of

29:39setting that we're talking about for

29:40those transformers would be, you know,

29:43not a typ typically a single family home

29:45wouldn't have one, but a small scale

29:47apartment often would have a a

29:50transformer like the one pictured. And

29:52and in those cases, they would be in

29:53often in districts that have a setback

29:55requirement.

29:56>> My concern with the quantity of

29:57equipment was that these would become a

29:59screen of the building itself,

30:02>> right? um as as written uh on page 14 of

30:06our package. But I think that's that

30:08addresses it. Thank you so much.

30:10>> Yeah,

30:11>> the commissioners.

30:16>> Thank you, Mr. Ch Mr. President. Thank

30:18you for the presentation. Very much

30:19appreciated. Lots of information. I had

30:21one question. You you showed a slide

30:23that showed challenges and concerns.

30:26Wonder if you can go back to that for a

30:28second.

30:28>> We can't hear you.

30:30>> Oh, okay. Hi, thank you for the

30:33presentation. You showed a slide that's

30:35called challenges and concerns and so I

30:38wanted to kind of go through that a

30:40little bit. If you can bring it back up.

30:44>> It's showing up on my screen there.

30:46>> There it is. Thank you. So, it seems

30:48like there's still quite a bit of work

30:49that needs to be done, more research,

30:51more study um in in in these several

30:55bullets here. So, I'm wondering, we're

30:56being asked to approve a couple of

30:58different things here while there's

31:00still some unknowns, still some

31:02challenges that need to be addressed,

31:04still some concerns that need to be

31:05addressed. Can you talk through kind of

31:06where we are with these in relation to

31:10how we're, you know, we're being asked

31:12to vote on something that I think still

31:13needs a little bit more research?

31:15>> Uh, Commissioner Conley, is there a

31:16particular bullet point here that you

31:18are interested in more than others?

31:20>> I would say all of them. It seems like

31:21there's quite a bit of challenges and

31:22concerns around the around this and so

31:25is there research currently underway on

31:28some of the concerns and challenges

31:29here? Is there um more staff work that

31:32needs to be done?

31:33>> Sure. Uh Commissioner Connley, the many

31:36of these were addressed in the LRO uh uh

31:39report. Um but I I can go through each

31:42of these uh bullet points. Uh in terms

31:45of high electricity use, we are limiting

31:49these to a scale that that uh at least

31:52under current technology should prevent

31:55uh data centers of that's that we would

31:58consider a hypers scale of 100 megawatts

32:00or or more.

32:02Um, Excel Energy uh has worked closely

32:06closely with us and will work closely

32:08with any proposer of a data center to

32:10ensure that uh uh the capacity needs uh

32:14will will not be affected by uh other

32:17rateayers who who need electricity.

32:20uh they can explain better than I can

32:23about um Minnesota being a state where

32:26uh electrical providers like Excel are

32:29regulated much more heavily than uh

32:33providers in states where we've seen uh

32:35real questions raised uh serious

32:38questions about uh electricity going to

32:40data centers when other people are are

32:43either going without uh power or they're

32:45they're paying more than they than they

32:48had because of the electricity demands

32:51of of some of some uses like data

32:53centers.

32:55Um concerns about uh the growing demand

32:59uh and impacts on long-term uh renewable

33:02energy goals. Excel Energy again they

33:05are here uh if you have questions they

33:07are confident that even with the

33:09establishment of data centers they will

33:12definitely meet the the 2040 uh

33:15renewable energy goal set by the state

33:17of Minnesota. they believe they are uh

33:19on track to to to meet that and will

33:21continue to be on track to meet that

33:25uh high water usage. Again, that is one

33:27reason to uh limit this the overall

33:29scale of of the use. Uh I I explained

33:33that the city is currently distributing

33:35a little over half of the water capacity

33:38that it that has the ability to

33:41distribute. So, our uh water

33:43distribution services uh folks uh are

33:47not concerned about the ability to serve

33:50the use at the scale uh and the number

33:53that we are likely talking about uh in

33:55the city of Minneapolis.

33:58Uh backup generators, we have uh

34:01proposed regulations that will keep them

34:04farther from uh from uh residential uses

34:08than they are allowed to be today. Uh

34:11that includes not just for um for data

34:14center uses but for any use that

34:16requires backup generator. City you know

34:18city buildings of course have have

34:20backup gen generators. Our new public

34:22service building has you know two

34:23generators on its rooftop. This is a an

34:26issue that is as far broader than uh

34:29just data centers.

34:32uh the warehouse-like design issues.

34:34Again, uh that this is uh uh where we

34:38clarified that data centers are not an

34:40active function along along the street

34:43and we are not allowing them uh on the

34:45first or second floor. We have window

34:48requirements above the above the second

34:51floor as well. They won't won't be able

34:52to to block up windows with with

34:55mechanical equipment.

34:57And then uh noise. Again, we are uh

35:00recommending uh a standard that I I

35:02haven't seen anywhere else in the

35:04country uh requiring white space to be

35:06at the interior of the building to to to

35:08mitigate that noise and and if it does

35:10become a problem, that's when the city

35:13will enforce its uh noise regulations

35:15that it has on the books.

35:17>> Thank you for that. So, so you think

35:18that all of the challenges and concerns

35:20around this have been met?

35:23Commissioner Connley, I believe we are

35:26we have proposed some of the strictest

35:29rules in the country to try and ensure

35:31that all of these challenges are met

35:34while still allowing

35:36that 8 million square feet of vacant

35:39space to to have a path to being

35:42utilized.

35:43>> Thank you.

35:45>> Other commissioners, uh, Commissioner

35:46Garcia, then Baxley, then Gordon.

35:50>> Um, thank you for the presentation. It

35:52was very informative and thank you for

35:53the uh summary and the packet. I just

35:56wanted to let the people in the gallery

35:59um here know that the um packet that we

36:03received totaled about 305 pages of that

36:08about 80 was the summary, the proposed

36:12language, things like that. Um and about

36:14200 and so that leaves about 220 pages

36:18uh were public commentary. um they

36:21averaged about

36:2310 to 12 public comments per page. Um I

36:28spent a lot of time over the weekend

36:29reading through them and I found I think

36:34less than 12 that were in support of

36:36data centers in Minneapolis.

36:38Um

36:40but one of the questions that came up

36:42from your presentation was um you

36:45mentioned that we have about 30% of

36:47downtown space that is vacant right now.

36:51Um but you also there it wasn't clear

36:54how much of that space was deemed

36:56suitable for data center use. Um can you

36:59speak to that?

37:01>> Yes, thanks Commissioner Garcia. Um

37:05the most recent data centers we have

37:08seen in Minneapolis that have either

37:10been established or expanded have

37:13generally been in spaces that have been

37:15used for a similar function. So they

37:17have some of that infrastructure already

37:19in place. Uh the most recent uh uh

37:22proposal that we saw which uh had has

37:25been withdrawn uh as we speak today was

37:27for the Star Tribune printing plant. uh

37:29also a you know a significant uh uh

37:33power user uh previously and not a a

37:37building type that we have many of

37:39throughout our downtown. Um

37:44so

37:45I think we could see uh a number of

37:48smaller scale data centers. I think the

37:51likelihood that we will see

37:54uh uh the scale of say say this this

37:58data center that's in the sleep number

38:00building the number of buildings that

38:02will be adaptable for that scale of data

38:04center is probably very very limited to

38:07no more than a few

38:11>> is a few two to three is a few 12 to 15

38:16>> I would say a few is two to three

38:19>> okay Um,

38:22as Commissioner Connley um brought up,

38:26it it appears that we at the city level

38:28are unable to regulate based on water

38:31usage or electric electricity

38:34consumption. That's correct. Is that

38:35correct?

38:36>> That's correct.

38:38So given that we as a municipality do

38:42not have that capability um

38:46is it staff's opinion that

38:50allowing primary use of a data center or

38:54primary use of data centers without

38:57going through additional regulatory

39:00steps is acceptable or is it the city

39:04proposing only allowing in these overlay

39:07districts um with the additional

39:10conditions of the overlay districts.

39:14>> Uh Commissioner Garcia, I'm not sure I'm

39:15following a question about for example

39:18additional regulatory steps.

39:20>> Sure. So, if the um if a data center is

39:25going to be the primary use of a

39:26building,

39:28um would that be allowed as

39:32uh or would it still require conditional

39:35use permitting or would it be allowed by

39:38right?

39:39>> Sure. Uh, as proposed, any principal use

39:42data center, regardless of how what

39:44percentage of a building, how much of a

39:45building it takes up, uh, or really the

39:47square footage of it, if it's a

39:49principal use data center, it's not

39:51serving the, uh, just the needs of the

39:55of the use on the property or that

39:57property's branch locations, for

39:59example.

40:00>> Sure.

40:00>> It will require a conditional use permit

40:02and come before this body for a public

40:04hearing.

40:05>> Okay. And then um my final question is

40:08um when staff was doing all of the work

40:12to prepare this um has there been uh

40:15meaningful discussion and collaboration

40:17with um the local indigenous communities

40:20who um we acknowledge before so many

40:24events and say we understand that we're

40:26on their land and things like that. Um,

40:29has there been an effort to collaborate

40:32and work with them on

40:35regulations or concepts behind data

40:37center usage?

40:39>> Uh, Commissioner Garcia, there was not

40:40specific outreach to that community.

40:43>> Okay. Is that not city policy or is

40:46there a reason why that isn't part of

40:48the consideration before us?

40:50>> Uh, it has not, Commissioner Garcia,

40:53been a typical practice uh for a zoning

40:55code change. Uh it may have been a

41:00consideration had we uh uh looked more

41:03broadly outside of outside of downtown

41:05Minneapolis, but as proposed, we're

41:07we're propos uh we're proposing this use

41:09be allowed in less than 4% I believe it

41:12is of the of the city land area. Uh so

41:15that that specific community was not um

41:18not contacted.

41:19>> Okay. I'd just like to point out that uh

41:21the Mississippi River, particularly

41:24around um Oamni um is

41:28um regional parkland, but it is also

41:31considered um vital and historic to

41:34Dakota people. Um so I would recommend

41:36that the city looks into that and

41:39includes

41:41those communities in further discussions

41:43about things that could potentially

41:45impact that area.

41:48>> Thank you. Commissioner Baxley.

41:52>> Thanks, Chair. Um Jason, thanks again

41:54for the presentation. Just a couple

41:56questions um maybe about where your

42:00thinking was on this. So, we're

42:01prohibiting no new construction. So, I

42:04wonder why do that uh rather than

42:07evaluate proposals against

42:09performance-based standards such as

42:11noise demand, energy demand, noise,

42:13water consumption, and land use

42:15compatibility by just existing

42:17buildings. Yeah, Commissioner Baxi,

42:18that's I think an excellent question.

42:22We acknowledge that data centers are not

42:25a great use of [snorts] downtown space.

42:29Uh and that a primary reason for

42:33allowing them in in downtown is to

42:38uh find a viable economically

42:41uh sustaining use for much of our of our

42:45space existing space that has no viable

42:51use in the foreseeable future. So,

42:54balancing those objectives led us to

42:58this being a use that we would prefer to

43:00not see within new construction in uh in

43:03downtown and really have this uh be a

43:06use that can contribute hopefully to uh

43:10some of these buildings being more

43:11economically sustaining and perhaps

43:15subsidizing the uh ability for other

43:18uses to to to use some of the same

43:20buildings. Hence the not allowing uh a

43:23data center to be the only use of the of

43:25a building in question.

43:27>> Great. Thank you. Um just a quick

43:31question about utility disclosure. Um

43:34the requirement

43:37forces disclosure around anticipated

43:39water and electricity use. Um and I'm

43:41just wondering what does the city

43:43actually do with that information?

43:45um is it creating more meaningful

43:47accountability or is it just another

43:49requirement?

43:52>> Yeah, that's a a good question because

43:53as we discussed ultimately we don't have

43:56the ability to regulate based on the

43:58proposed megawatts being used. Uh some

44:02of that information will be used in the

44:04preliminary development review process

44:06to for example to for uh when a uh user

44:10is is changing its the capacity of its

44:14water connections

44:16uh that information will be used as part

44:18of that uh process. Um a the adequacy of

44:25utilities is one of the findings in a

44:28conditional use permit. So it is

44:29relevant uh to to that analysis even if

44:33ultimately we aren't able to deny a

44:37project solely based on the the power

44:40capacity that that's more in the realm

44:43ultimately of XL Energy and the public

44:45utilities commission.

44:46>> Very good helpful. Thank you. Lastly, um

44:50just wonder thinking out in the future,

44:52you know, given how quickly this

44:54technology is changing

44:56um and infrastructure requirements are

44:58evolving, how will the city determine

45:00whether these regulations remain

45:02appropriate? What's the review cycle

45:04here? How are we going to step into

45:05that?

45:06>> Yeah, good question, Commissioner

45:07Baxley. think um the the uh if we find

45:12that we are uh seeing more of these uses

45:16than expected and they have uh uses that

45:20aren't being uh we have situations where

45:23you the impacts aren't being properly

45:25mitigated. uh we have the ability to uh

45:29revise those regulations and decide that

45:32they're they're prol we've we've become

45:34too flexible and they're proliferating

45:36more than we would like them to. Uh

45:38there isn't a specific

45:41timeline by which we plan to to u

45:44revisit regulations but as you've noted

45:47the the industry is changing relatively

45:51fast. So, um, one can imagine that

45:55within a few years we will be examining

45:57this issue again.

45:59>> Thank you very much, Commissioner

46:01Gordon.

46:02>> Thank you. Thank you. Um, so just

46:06touching back on a comment you made

46:07earlier, aside from the ground level

46:09uses that um are outlined in the

46:11language, why do you feel it's unlikely

46:13that you believe an entire office tower

46:15would be converted?

46:16>> Sure, good question. Um,

46:20essentially the structural capacity

46:22needed to stack this type of equipment

46:27on a every floor of a 30story building

46:31is not that's not going to work. uh

46:34there is a degree to which that

46:39can be solved with enough investment

46:43but um it's our understanding in talking

46:46with people with expertise about this is

46:49that that's the thing that makes it

46:51highly unlikely in addition to sort of

46:54the high ceilings that are that are

46:56needed. Uh it's really um partly the

47:00structural capacity and if you are

47:03talking about a uh a data center with

47:07that's getting up around 100 megawws as

47:09well, you're talking about needing an

47:11on-site uh substation as well. And there

47:14just isn't room to accommodate that in

47:17in a on a typical downtown Minneapolis

47:21uh office building. Not only is there

47:24not room to accommodate it, but we are

47:26forcing it to be either on the rooftop

47:28and screened or within the building as

47:31well.

47:31>> Okay. Well, then um in relationship to

47:34scale, um was that was the 175,000 ft of

47:39white space determined primarily by

47:42energy usage energy usage or what other

47:44scale factors or factors were put into

47:46that determination?

47:47>> Yeah, good question. Uh when the city

47:49council adopted uh an exemption from the

47:52moratorum of 350,000 square feet in

47:55downtown

47:57that was used as part of the rationale

48:00for 175,000 ft² because that would

48:03roughly result in that scale of of

48:06whites space. But the intent also was to

48:10again using um approximating current

48:13technology that's generally going to

48:15prevent facilities that are that are 100

48:19megawatts or more and and therefore

48:21prevent the some of the impacts that are

48:23are going to be more acute for a a

48:27facility of that size more generators

48:30um higher higher water use etc. Okay,

48:34one last question. Um, and this is in

48:36relationship to environmental standards

48:37and dubtales um with comments by

48:40commissioners Connley, Garcia, and

48:42Baxley. Um, it's a little bit of a

48:43building code question, so I know it's

48:45outside, but it's highly related. Um,

48:47it's my understanding that a lot of data

48:49centers are currently classified as a B

48:50occupancy. Um, most office spaces in

48:53downside downtown are also B

48:54occupancies. If data data centers slide

48:58into a B occupancy, it's my

48:59understanding that a change of occupancy

49:01would not occur, meaning current entry

49:02code require requirements would not

49:04apply. Is it your understanding that um

49:06data centers would remain a B occupancy?

49:09Because if this is the case, then we may

49:11be up against some other environmental

49:13issues.

49:14>> Uh Commissioner Gordon, it is my

49:17understanding that it would be the same

49:19occupancy as as an office building.

49:22>> Okay. Thank you. Anyone

49:26else?

49:29>> Commissioner John.

49:31>> Uh, thank you, Chair Meyer, and thank

49:33you, uh, Mr. Whittenberg for your

49:35presentation. You and I have had a lot

49:37of discussion about data centers since,

49:40I would say, April. Um, so some of the

49:43things that I'm asking you is just to

49:44kind of put it into the public space.

49:47Could you share what the current policy

49:51is? Should a data center developer

49:55decide to build a data center and where

49:57they would be allowed to, I think it's

49:59important to understand where we

50:01currently are so we can look at what

50:03we're trying to change.

50:05>> Uh yeah, Commissioner Chad, I do not

50:07have a map handy of the areas where um

50:11data centers are currently allowed as a

50:13communication exchange. It is a large

50:17percentage of our city uh in 10 of the

50:20city's 15 primary zoning districts. Um

50:24so it's uh it's coupled with utilities

50:28user uh uses that that have to be near

50:32the end user whereas a data center

50:35really doesn't. There may be some

50:37benefits to it being near the end user

50:39but it doesn't have to be. So that's why

50:41those utilities uses are allowed much

50:43more broadly and why a data center is

50:46not a good fit to be classified

50:49the same way as those uses.

50:51>> Yeah, thank you. I I think it's also

50:54correct me if I'm wrong, but I think

50:55it's 13 out of 15 zoning districts allow

50:59for a communications exchange. It might

51:01not fit, but it would have to go through

51:03a conditional use permit. It's a large

51:05amount of our zoning districts.

51:08>> I I may be misspeaking. I thought it was

51:1010 of the of the 15, but it's it's a

51:14majority of our existing zoning

51:16districts. Yes.

51:17>> Yeah. And I think

51:19I there's so much more for me to say. Um

51:22I want to make sure we have time for

51:24everyone that's giving a public comment

51:26to share their voice. I think the thing

51:28that I will note um in being an author

51:32in the moratorum and then now a

51:35co-author in these regulations is what

51:39we currently have in place is wholly

51:41inadequate to meet the moment as it

51:44comes to new generation data centers

51:47that are not the data centers that power

51:50hospitals, banks, universities. We're

51:53talking about the generative AI data

51:56centers, the ones involved in crypto

51:59mining, the ones that support high loads

52:03of use, very very high loads of use. And

52:06I also just want to share that 50

52:08megawatts of use is not hyper hypers

52:11scale. It's not what you're thinking of

52:13when you think of those giant campuses

52:15that have um have acres and acres and

52:19acres of land. But 50 megawws is still a

52:23lot of power. It's enough to power

52:2650,000 homes and that runs 247. And I

52:31think it's really important that the

52:33city of Minneapolis recognizes how much

52:36community has shared concerns about

52:38this. And I I believe we've had over

52:421,600

52:45public comments, more than that, from

52:47community members. and those are largely

52:50sharing concerns about energy use, the

52:52impacts to climate, the impacts to

52:55water, the impacts to just land use, and

52:58being able to build our city for the

52:59future. Um, and I think that's no small

53:02thing for us to consider as a de

53:04democratic body in terms of building out

53:08regulations that are restrictive. while

53:11the work of having a statewide

53:14regulatory framework or even a national

53:16regulatory framework is being done and

53:18is largely missing. Um, so I want to

53:21make that point and I also do want to

53:23make the point to the public the

53:25moratorum does end on November 21st. I

53:29wanted to see a year-long moratorum. I

53:32felt like that was in league with what

53:33other cities are doing across the

53:36country. I think we have over 360

53:39moratoriums active across the country

53:42right now. Um, a pure city, Denver has a

53:45moratorum for a year. Uh, but

53:48unfortunately there was not the appetite

53:50on the Minneapolis city council to pass

53:53a year-long moratorum. I do think

53:56further work and time would have been

53:58helpful. Um, but this is the place that

54:01we're at. And I really believe that it's

54:03important that we have some forms of

54:06strong regulations on the books to

54:08protect our community to have time to

54:11work through the state legislative

54:13process. Because if we don't have

54:15something on the books come November

54:1721st, we fall back to what's currently

54:20in place. And that's that either 10 or

54:2213. I'm going to air on the side of 10

54:25zoning districts allowing for a

54:27communication exchange without a

54:29definition of a data center and all of

54:31these different things that are touching

54:32here. Um so that's just an important

54:35note to make.

54:37>> Thank you. Um Jason, can you go to the

54:40PR2 map that came out of the committee

54:43of the whole because I wanted to um ask

54:45about that. So, I mean, it makes

54:49complete sense to me to be narrowing

54:51this down from the the 10 or 13 zoning

54:54areas where it's where it's currently

54:55allowed. Um, and

54:58there was an initial map that went out

55:01at some point that made a lot of people

55:03concerned because it covered a lot of

55:04areas in the city and there was a lot of

55:06opposition uh to allowing them in the

55:09north and south side green zones and

55:11that made perfect sense to me. Um but I

55:14thought it made sense to have a few

55:17small industrial zones where we could

55:19accommodate data centers. Um so can you

55:22explain more why these were taken off?

55:24So so I mean what we saw from committee

55:26the whole was that in in the downtown

55:28area

55:30um existing buildings could be adapted

55:34um and then in these industrial zones

55:36that's where new construction could

55:39happen. And with the proposal now taking

55:42out those PR2 mix zones, there would be

55:45no new construction anywhere. Correct.

55:48>> Uh that's correct. Uh President Meyer

55:51and this is the map uh that I I hope you

55:54see in front of you right now that we

55:55presented at the committee of the whole

55:56that would have also allowed data

55:59centers in the uh in the PR2 district

56:02spaced from uh districts that uh allow

56:05residential use. Um,

56:09again, we received a lot of uh feedback,

56:11a lot of push back to uh allowing the

56:13use outside of downtown.

56:16Um, and we felt like particularly in

56:20speaking with uh XL Energy that the

56:23likelihood of a of a user coming in in

56:28one of those relatively small areas in

56:30the next several years

56:33um seems small. and that uh a larger

56:38scale use probably would require some

56:41significant buildout of of the grid in

56:43order to accommodate the the use in

56:45those locations anyway. So I those are

56:47the reasons our recommendation currently

56:49doesn't reflect those areas.

56:52>> Okay. Okay. And this might be a question

56:53for Excel, but if they if they need to

56:57build out the grid in those areas, the

57:00the rate payers protection that was

57:01passed in 2025, wouldn't that make the

57:03the the people building it out have to

57:06pay for the grid?

57:07>> That's correct. The the the upgrade to

57:11the grid would be the responsibility of

57:13the user. Um, my understanding is that

57:17how that would likely work is that XL

57:19Energy would say it's going to cost X

57:23million to upgrade the grid and it'll

57:26take 5 years and there and that at that

57:29point the user would look elsewhere most

57:31likely.

57:32>> Okay. And then my other question um was

57:36there ever any discussion about

57:38permitting u data centers in basement?

57:42So, you said, you know, you probably

57:43wouldn't be likely in a a 30s story

57:46building. And to me, um, it seems like

57:50basements might make make more sense

57:51because you're not as exposed to the

57:53elements. You wouldn't have the noise

57:54concerns. Um, and it it seems like

57:58if something was built in a um a

58:01basement that could help facilitate

58:04commercial and and residential as part

58:05of a mixed use project and make that

58:07pencil out. Was there any consideration

58:08to that? Uh, Commissioner Meyer, we did

58:10give that some thought and uh ultimately

58:13didn't move forward with that

58:14recommendation, but I think that would

58:15be a a reasonable recommendation.

58:18>> Okay. Any other questions for staff

58:20before we open the public hearing?

58:23All right. And I'll just say um we do

58:25have a representative from Excel here.

58:28Um my plan is to proceed with the public

58:30hearing and then before we close it um

58:33we can bring back the Excel

58:34representative to answer any questions

58:37uh that you may have. but we're going to

58:38go with the people who signed up first.

58:39Okay, so we have um 30 people who have

58:43signed up, which is actually less than I

58:45was anticipating. So that means we've

58:47got enough time to give everyone the

58:48regular 2 minutes um that we normally

58:52do. I'm going to read out um names five

58:56in a row um so that people from the um

59:01overflow room can have a chance to to

59:02come over. Uh so the first five people

59:05that we're going to hear from number one

59:07Francis Bull, number two uh Jay Nlesny,

59:11number three Lee Amlson, number four

59:13Mags Bell, and number five Roxan uh

59:18Thrfall. And apologies if I mispronounce

59:20any of your names. I'm using the yellow

59:22sheet so the ink doesn't go all the way

59:25through on them. Um so I can't always

59:27see all of your writing. Um but first up

59:30we have Francis Pull. Is Francis here?

59:32Great.

59:33welcome and introduce yourself and you

59:34have two minutes.

59:36>> Good afternoon. My name is Francis Bull.

59:38I live in Ward 12. I'm 17 years old and

59:41I'm enrolled in the Minneapolis public

59:43school district.

59:45I love connecting with my community and

59:47spending time in nature. I also love and

59:49work with kids.

59:51It is because of these things I oppose

59:53the allowable use of 175,000 square feet

59:56of downtown for data centers as well as

59:58as well as the lack of statewide

1:00:00regulations surrounding them.

1:00:02I want to have fun envisioning a future

1:00:04for myself. But instead of thinking

1:00:06about where I want to go to school, my

1:00:08future career choices, and if I want

1:00:10kids, I'm measuring whether these dreams

1:00:11could be a reality in a world without

1:00:13access to public resources, clean water,

1:00:16and unpolluted air. Because that is my

1:00:19reality.

1:00:21Every child has so much potential,

1:00:23creativity, and love. I have a

1:00:25responsibility to protect the youth in

1:00:27my community, and so do you.

1:00:30Living in Minneapolis has given me the

1:00:32privilege to be a part of something

1:00:33bigger and taught me the value of

1:00:35community. We must defend our access to

1:00:37public resources.

1:00:39We have one grocery store downtown. My

1:00:42public school system is in a financial

1:00:44crisis.

1:00:46We need to be focused on creating

1:00:47infrastructure to support the public,

1:00:49not privatizing land that could

1:00:51otherwise be used to promote the common

1:00:52welfare.

1:00:54I urge city council to consider our

1:00:56future. We need statewide regulations on

1:00:59hypers scale data centers. Do not trade

1:01:01our futures. Do not trade my futures. My

1:01:04future

1:01:06for false promises of revenue or cave to

1:01:09large corporation.

1:01:11For council members currently working to

1:01:13defend this planet, I thank you. And for

1:01:15other council members, I ask you to

1:01:17expand your capacity for empathy. Thank

1:01:19you for your time.

1:01:21>> Thank you. Next we have Jay Nollesnney

1:01:23followed by Lee Hamilton, Mags Bell,

1:01:25Roxan Thrawal, and Gabrielle

1:01:27Clinkenberg.

1:01:30>> Hi, my name is Jay Allesn. I'm 16 and

1:01:33I'm an MPS student in Ward 13. I'm here

1:01:36to ask that the city does not support

1:01:37the building of data centers in downtown

1:01:40and create stricter regulations on data

1:01:42centers in general. As a kid, some of my

1:01:45best memories are playing on the river

1:01:46and exploring the city with my family

1:01:48and friends. And as I've grown up, it's

1:01:50been wonderful seeing little kids in my

1:01:52family and the community continue that

1:01:55tradition. Putting data centers in our

1:01:57cities and neighborhoods could directly

1:01:59threaten our children's chance to have

1:02:00outdoor experiences because of the

1:02:03amount of emissions and water use

1:02:04required in just one day of operation.

1:02:07As Commissioner Garcia said, the

1:02:09Mississippi is incredibly important to

1:02:10our indigenous communities, local

1:02:12wildlife, and general city life. It is

1:02:15also where the city draws most of its

1:02:17water from. Um, in this presentation it

1:02:21stated that we are below our capacity

1:02:24for water use and we could use more for

1:02:27data centers. I think that's amazingly

1:02:31neglectful.

1:02:33Um, it's an amazing accomplishment that

1:02:35we have our water usage below capacity

1:02:37and just because we're able to does not

1:02:39mean we should be taking more. As

1:02:42leaders in our community, this

1:02:43commission and the city council have the

1:02:45responsibility to uphold the community's

1:02:47wants and needs, not just the

1:02:48corporations. I ask that everybody

1:02:50present today truly considers and makes

1:02:53decisions according to what is best for

1:02:54our generation and future generations.

1:02:56Thank you.

1:02:57>> Thank you. Next, we have Lee Samson and

1:03:00Magpell, Rexandra Threeall, Gabrielle

1:03:02Clinkenberg, and Kevin U practice.

1:03:08Welcome.

1:03:09Yeah, Chair Meyer, members of the

1:03:11commission. Yeah, I work for a

1:03:13Minneapolis focused energy democracy

1:03:15nonprofit that follows the city's

1:03:17climate goals, but I'm speaking on

1:03:19behalf of myself. I attended at least

1:03:21four data center forums with city

1:03:23council members from both sides of the

1:03:26moratorum vote so that I could best

1:03:28inform myself and because the city's

1:03:31hands are tied in so many different ways

1:03:33such as not being able to regulate data

1:03:35centers by the megawatt without a change

1:03:38in state law. Here's my conclusion that

1:03:41um development should be limited to

1:03:43distributed smallcale data centers and

1:03:46only if necessary to meet the computing

1:03:48needs of local businesses, public

1:03:50agencies and community services. The

1:03:53data and processing must be managed by

1:03:56local companies or cooperatives rather

1:04:00than by the dominant tech firms who

1:04:02might host surveillance data. So, I'd

1:04:04recommend at least two changes to the

1:04:06city's proposed framework. The the first

1:04:09would be to limit primary zoning so that

1:04:12each individual data center project

1:04:14would have its own public hearing so

1:04:17neighbors could weigh in. And uh the

1:04:19second change would be to reduce the cap

1:04:22of 175,000 square ft of white space to

1:04:27uh weigh less than that but to but then

1:04:30to um raise the cap if the data center

1:04:34developers build offsite community solar

1:04:36and grids scale battery storage in the

1:04:39local area. And that should serve as an

1:04:42incentive for data centers to reduce

1:04:44reliance on backup diesel generators as

1:04:48one answer I have on the energy

1:04:50question. Uh given that the city can

1:04:53only regulate by square footage and

1:04:55location and I appreciate this process

1:04:58for local communities to retain the

1:05:00power to set strict conditions and

1:05:04ironclad environmental guard rails for

1:05:06how it is done. Thank you.

1:05:08>> Thank you. Uh we have next Mags Bell and

1:05:12followed by Roxan Gabriel Kevin and then

1:05:15Margaret Sullivan.

1:05:18Welcome.

1:05:20Good evening. Um my name is Mags. I'm a

1:05:23resident of W 9. I'm also a public

1:05:25health expert. I work in public health

1:05:27emergency preparedness and response.

1:05:30I'm here today because I believe that

1:05:32generative AI is known to be an

1:05:34environmental, climate, and public

1:05:37health disaster. And so adding to the

1:05:40electricity and water use for such

1:05:42problematic technology, especially in

1:05:45the climate crisis that we're in, is

1:05:46actually just completely unacceptable.

1:05:51I know that you know that there is broad

1:05:53opposition to this across the city,

1:05:54across the state, and across the globe

1:05:57at this point. Uh opposition to these

1:05:59large-scale data centers. And so while I

1:06:02understand that your hands are tied in

1:06:04many ways, I understand that the state

1:06:06cannot just have us have a ban outright.

1:06:08I understand that we need smaller

1:06:10centers that run things like the

1:06:12internet. There are ways that the

1:06:14existing proposals to regulation, which

1:06:17I think are a great start, could go a

1:06:18lot further. So first, so there are many

1:06:21ways I've shared some with some of you.

1:06:23The things that I will highlight are

1:06:25bringing down that 175,000 square

1:06:27footage to a absolute cap of 25,000

1:06:31square footage. This allows for the

1:06:33small things that exist without even

1:06:35coming close to these mega data centers.

1:06:38Additionally, 100 ft from a residential

1:06:40housing unit is not enough. At least 250

1:06:43ft distance from residences, daycarees,

1:06:46schools, and parks should be a part of

1:06:47the regulation. And the thing I really

1:06:49want to highlight is nowhere in this

1:06:51regulation is there anything that says

1:06:54that talks about public notification

1:06:56requirements. And I know that that is

1:06:58possible. So I want anyone who is within

1:07:01a 100,000 or I'm sorry a th000 ft of a

1:07:04proposed center to be notified so that

1:07:07they have the ability to respond to what

1:07:10could be coming to their neighborhood.

1:07:12This is Minneapolis. We have shown that

1:07:14we take care of our neighbors. We take

1:07:16care of our city and by if we do not

1:07:20regulate this as much as humanly

1:07:21possible, we will be failing our city in

1:07:23doing so. Thank you.

1:07:25>> Thank you. Next, we have Roxan followed

1:07:27by Gabrielle, Kevin, Margaret, and then

1:07:30Timothy Hart.

1:07:32Welcome.

1:07:34[clears throat]

1:07:36>> Hello. Uh, my name is Roxan Thal. You

1:07:40tried on my name, so good job. Thank

1:07:43you.

1:07:43>> I'm a resident that lives in the north

1:07:45side of Minneapolis and I come here

1:07:48today on behalf of Minneapolis north

1:07:50side for safeguards against dirty data

1:07:53minad.

1:07:55We are a small group of neighbors in the

1:07:57north side who are fighting back against

1:07:59data centers being in our neighborhoods.

1:08:02I'm aware we are discussing downtown

1:08:04today. However, as we said earlier, this

1:08:07can and probably will be discussed again

1:08:10in the future for further expansion.

1:08:13I'm attending this resoning meeting to

1:08:16discuss my concerns about what this

1:08:17means for our future as northsiders and

1:08:20as a Minneapolis resident.

1:08:22Reszoning to me means that you are

1:08:25wanting more data centers.

1:08:27A month ago at Open Streets Broadway, a

1:08:30small group of us were able to collect

1:08:32260 signatures within 5 hours from north

1:08:36side residents. This to me signals that

1:08:38we do not want data centers on the north

1:08:41side. A week and a half ago, we

1:08:43submitted these signatures to Ward 4 and

1:08:46five city council members. We have not

1:08:49heard back.

1:08:51Recently, a development group backed out

1:08:53of the north or out of the Star Tribune

1:08:55building. I went to the first community

1:08:57meeting at the neighborhood association.

1:09:00I was not surprised that it did not go

1:09:02through. My thought was that it would

1:09:05not go through and this was the first

1:09:07step of a long con where they would

1:09:10eventually put a data center somewhere

1:09:11on the north side. If you look at the

1:09:14McKinley neighborhood, it extends all

1:09:16the way to the river. There is a lot of

1:09:18empty space and a lot of warehouse

1:09:20buildings. a lot of buildings that are

1:09:22not used or that potentially just could

1:09:24be bought out and used for other things.

1:09:28The north side has a long history of

1:09:30environmental racism and this is just

1:09:32the logical next step.

1:09:35My thoughts were Star Tribune gets

1:09:37turned down. People forget.

1:09:41The last thing I'll say, this directly

1:09:44impacts black and brown communities.

1:09:47We do not want data centers in our

1:09:49communities. Thank you.

1:09:51Thank you. Next we have Gabrielle

1:09:52Clinkberg followed by Kevin Margaret

1:09:54Timothy and then Dan McConnell.

1:09:59>> Welcome.

1:10:00>> Hello. My name is Gabby Clinkenborg. I

1:10:03am a resident of W 12 and a teacher in

1:10:05the same district where the largest data

1:10:07center in Minnesota currently resides.

1:10:09I'm also part of a grassroots

1:10:11organization effort led by Twin Cities

1:10:13DSA to bring education around data

1:10:14centers to neighborhoods in our city.

1:10:16Because of our work, nearly a fifth of

1:10:18the neighborhood associations in the

1:10:20city of Minneapolis have passed or are

1:10:21planning to vote on a resolution to stop

1:10:23data center development. The

1:10:25neighborhood associations of Luring

1:10:26Park, Fwell, Weber, Camden, Otbond Park,

1:10:30Botnau, Marshall Terrace, Weight Park,

1:10:32and Seward have all passed a resolution

1:10:35against the development of data centers.

1:10:37Five additional neighborhood

1:10:38associations are currently considering

1:10:39this resolution and will vote on it

1:10:41later this month. seven distinct wards

1:10:44across the city and thousands of your

1:10:46constituents are represented in those

1:10:47neighborhoods. Any vote you take to open

1:10:50the door for data center development

1:10:51puts you out of step with all of them.

1:10:54As the strictest possible measure, we

1:10:56would like to see a complete ban on new

1:10:58data center development. We cannot

1:11:00separate the rapid development of data

1:11:02centers from the rise in surveillance

1:11:03tech and the use of flock, for example,

1:11:05to stalk, kidnap, and traffic our

1:11:07neighbors. As Minneapolis residents, we

1:11:10know that these issues are deeply

1:11:11interconnected and we cannot look away

1:11:13from that. We cannot and should not

1:11:15accept tech billionaires polluting our

1:11:17water, air, and earth while getting

1:11:19millions in tax cuts and offering no

1:11:21benefits to our communities. Our

1:11:22communities need food, housing, and

1:11:24healthcare. We do not need data centers,

1:11:27especially when the public and city

1:11:29council will be cut out of the

1:11:30decision-making process if we allow

1:11:32primary zoning of data centers. Primary

1:11:34zoning gives developers free reign and

1:11:36disempowers the planning commission,

1:11:38city council, and the public from saying

1:11:40no. Developers who wish to exploit our

1:11:42city should at the very least have to

1:11:45make their case before these bodies in

1:11:47order to be approved. I urge you to vote

1:11:49against any primary zoning for data

1:11:50centers and to make our city as hostile

1:11:52an environment for data center

1:11:54development as possible. Thank you for

1:11:56your time. [snorts]

1:11:57>> Thank you. Next we have Kevin Premis

1:11:59followed by Margaret Timothy Dan and

1:12:02then Gary Dukes.

1:12:06>> Hi. Uh my name is Kevin Prramis. Uh and

1:12:09I represent Lyuna. Uh we have 14,000

1:12:13members who are construction laborers

1:12:14that including many that live and work

1:12:15in Minneapolis. I live next door in St.

1:12:17Paul where I think we share similar

1:12:19values and are struggling with some of

1:12:20the same problems. The question as I

1:12:23understand it that the city's grappling

1:12:24with is how's whether data center

1:12:27development uh the urban infill

1:12:29development can be consistent with the

1:12:30sort of vision of a vibrant city with

1:12:32ample affordable housing, public green

1:12:34space and a diverse mix of businesses

1:12:35that are employers, service providers

1:12:37and sources of housing. We think that

1:12:40development of the kind of data

1:12:42infrastructure we're talking about here

1:12:43supports that vision. I think two

1:12:45reasons. One, services that make it

1:12:47attractive for businesses to invest in

1:12:48Minneapolis. And it's important to

1:12:50remember these kinds of data centers are

1:12:52designed to allow the sort of speed that

1:12:54highspeed internet is designed to

1:12:55provide to all sorts of architecture,

1:12:57engineering firms, medical research, all

1:12:59the sort of businesses that we'd like to

1:13:01have here and jobs we'd like to have in

1:13:03Minneapolis and in St. Paul where I am.

1:13:05The other is the te the fees uh taxes

1:13:08and rate revenues that fund programs and

1:13:10resources including parks, including

1:13:12schools, including our infrastructure.

1:13:14And that's an important value that this

1:13:16provides. In fact, these developments

1:13:18provide more taxes, right, per square

1:13:21foot than almost any other kind of

1:13:22development. And that's what we need. If

1:13:24we want to convert more buildings uh

1:13:26from commercial into residential, that

1:13:28takes money. That takes subsidies from

1:13:29the city, that has to come from

1:13:30somewhere. If we want better, if we want

1:13:32to keep our parks up, which our members

1:13:33do for local 363, that requires money.

1:13:36All of these are important revenues that

1:13:38these could provide. We have some

1:13:39concerns that it's overly restrictive as

1:13:42it's proposed. Now, appreciate the

1:13:43questions uh by Council President Meyer

1:13:45and uh Commissioner Baxley about whether

1:13:48their performance-based standards would

1:13:49be more effective. Ultimately, we want

1:13:51to leverage these investments to be able

1:13:54to support the development we need as

1:13:56well as the clean energy that those 50

1:13:57megawatts require. Thank you.

1:14:00>> Thank you. And next we have Margaret

1:14:02Sullivan, followed by Timothy, Dan,

1:14:04Gary, and then Suzanne Murphy.

1:14:12Hi, I live in Ward 4 in North as well.

1:14:16I'm guessing from the polling, it really

1:14:19could be that most of us here and you

1:14:22too know deep in our bones that a ban on

1:14:27AI data centers like Monterey Park has

1:14:30until the existential risks are solved

1:14:33is conservative.

1:14:37But if you can't do that, um I would

1:14:40like you to recommend extending

1:14:41moratorum.

1:14:43Uh this proposal is completely missing

1:14:45business regulations

1:14:47which we need to make sure a data

1:14:50center's compute reflects who we want to

1:14:52be as a city. And to know how much of a

1:14:56data center is controlled by a foreign

1:14:58ally or adversary, that's just sensible.

1:15:02And how great would it be if together,

1:15:05residents and city council, we could

1:15:07write limits for the uses of data center

1:15:10compute that reflect who we want to be.

1:15:13If data centers could be randomly

1:15:15inspected, site and compute to make sure

1:15:19our limits are in place like the many

1:15:21other Minneapolis businesses with city

1:15:23regulations.

1:15:25We'd also need to know uh shell

1:15:28companies, parent companies and

1:15:30collocation tenants before starting any

1:15:32work for waste heat distribution. I mean

1:15:35we only want American allies for that.

1:15:39And remember that a hypers scale is

1:15:42effectively a group of smaller data

1:15:44centers behind a boundary.

1:15:47And we really that's the proposal here

1:15:50with even less environmental review. So

1:15:54let's don't build a hypers scale

1:15:55downtown. No primary zone.

1:15:59And after the first 100 megawws are

1:16:02claimed by Minneapolis data centers.

1:16:05Hypers scale is often considered 100 and

1:16:07we're halfway there already. Require

1:16:10from the city of Minneapolis an

1:16:12environmental impact statement for every

1:16:15new data center proposal. So we don't

1:16:17build the hypers scale you say you don't

1:16:19want here. Thank you.

1:16:21>> Thank you. Next we have Timothy Hart

1:16:23followed by Dan, Gary, Suzanne, and next

1:16:25will be Casemiram.

1:16:29Welcome.

1:16:31Hello everyone. Uh my name is Timothy

1:16:33Hart. I live in Longfellow. Thank you

1:16:35all for your time this evening and for

1:16:37the work that staff has put in on this.

1:16:39U I was glad that data centers would no

1:16:41longer be lumped in together under

1:16:43communication exchanges. Uh, however, I

1:16:46want to say that I do not believe that

1:16:47they should be expressly allowed under

1:16:49any of our primary zoning designations.

1:16:52We're talking here during the week that

1:16:54we're losing our cars car share service.

1:16:56People in the city are facing the loss

1:16:58of infrastructure and support systems

1:17:00that serve the public while being asked

1:17:02to summit projects like data centers

1:17:04without being given any say in the

1:17:06matter. If we are going to speak about

1:17:08data centers coming into the city, then

1:17:10any proposal should have to justify

1:17:12itself, be subject to community

1:17:13scrutiny, and enable this body and city

1:17:16council to be able to actually speak to

1:17:18if it's a development that is wanted as

1:17:20opposed to just if a permit application

1:17:22has dotted the eyes and crossed the

1:17:24tees. Please don't allow data centers in

1:17:26a primary zoning designation. And thank

1:17:28you for your time.

1:17:30>> Thank you. Next we have Dan McConnell

1:17:32followed by Gary Suzanne Casemra and

1:17:35Mary Franchet.

1:17:38Welcome.

1:17:41[clears throat]

1:17:41>> Thank you, Chair Meer and uh members of

1:17:42the planning commission. I provide a

1:17:44letter with extensive comments. I'll

1:17:46just highlight a couple things. Uh I'm

1:17:48as they mentioned, I'm Dan McConnell. I

1:17:50live in Ward 12. I'm an electrician by

1:17:52trade and I have the honor of serving as

1:17:54the uh business manager of the

1:17:55Minneapolis Building and Construction

1:17:57Trades Council where we represent 20,000

1:17:59skilled construction workers. I just

1:18:01want to be clear, our council supports

1:18:03responsible limits on data center

1:18:05construction. We wanted to see

1:18:07development that protects workers,

1:18:09neighborhoods, and the environment and

1:18:11[snorts] utility rate payers while also

1:18:13creating family sustaining union careers

1:18:16and meaningful community benefits. We

1:18:18appreciate the council's uh proh

1:18:21prohibition on NDAs. We support a cup

1:18:24process. We would appreciate the ability

1:18:27to uh have developers be able to come in

1:18:30and review the project based on what

1:18:31they're actually proposing. Uh some of

1:18:34the um things that we want to highlight

1:18:36in the letter. Uh there's no mention in

1:18:38any of the stuff that we've seen so far

1:18:40around uh uh uh [clears throat]

1:18:45uh labor standards protections for

1:18:47workers on the projects. Uh we would

1:18:49support uh addition of uh requirements

1:18:52for job quality, registered apprentichip

1:18:55programs, prevailing wage as done in the

1:18:57in the state law, local hiring

1:18:59requirements, responsible contracting,

1:19:01and community benefits for our

1:19:02neighbors.

1:19:04uh we would actually uh suggest that we

1:19:07re regulate this based on measurable

1:19:09impacts based rather than arbitrary

1:19:11restrictions. I appreciate that the 20

1:19:14foot setback works well at Sleepnumber.

1:19:17That's great for Sleep Number. That

1:19:18doesn't mean it's going to work

1:19:19everywhere else. Uh these are design

1:19:21considerations that can be taken into

1:19:23account on the project. Uh I've actually

1:19:26worked on data centers in the in the

1:19:28city of Minneapolis. Neither uh two

1:19:29different ones. Neither one of them were

1:19:31in the downtown core. One was in Ward

1:19:33one, the other was in Ward six. Uh,

1:19:35nobody knows. None of the reports

1:19:37mention those projects. They are

1:19:40innocuous. Nobody knows that they're

1:19:42there. There have been no negative

1:19:44impacts on that. I'm done already. All

1:19:45right. Uh, read the letter, please.

1:19:47Appreciate your support or your u

1:19:49consideration of this topic. Thank you.

1:19:51>> Thank you. Next, we have Gary Dukes,

1:19:53followed by Suzanne Casemira Marie and

1:19:56then Will Reley.

1:19:59Good afternoon, members of the planning

1:20:01commission. My name is Gary Dukes, and I

1:20:04am a resident of Ward 12, Nenina.

1:20:07As you deliberate today, you must

1:20:09scrutinize the framing of these zoning

1:20:11amendments and address their

1:20:12shortcomings. The proposed framework

1:20:15risks opening the door to massive

1:20:18industrial nodes under square footage

1:20:20thresholds that are simply too large for

1:20:23our local ecosystems to safely absorb.

1:20:27Facilities drawing millions of gallons

1:20:29of water for cooling and tens of

1:20:33megawatts of power will inevitably

1:20:36strain our regional grid, lock in fossil

1:20:39fuel reliance, and threat our municipal

1:20:41climate goals. Furthermore, carving out

1:20:45exemptions or relying on basic setbacks

1:20:49does nothing to mitigate the cumulative

1:20:52ecological degradation, noise pollution,

1:20:55and environmental justice burdens

1:20:58shifted directly onto our neighborhoods.

1:21:02I urge the commission to recognize these

1:21:05serious gaps and to strengthen these

1:21:08amendments to pro to truly protect our

1:21:12ecosystems and our communities. Thank

1:21:16you very much.

1:21:18>> Thank you. Next we have Suzanne Murphy

1:21:20followed by Casemira Marie Will and then

1:21:24uh Mary Jennles.

1:21:27Welcome.

1:21:28>> Hi Chair Meyer and uh commissioners. My

1:21:31name is Suzanne Murphy and I live in the

1:21:33How neighborhood of Ward 12 and I'm the

1:21:35Minneapolis community relations manager

1:21:37for Excel Energy. Um, Excel Energy

1:21:40appreciates the city of Minneapolis's

1:21:42thoughtful approach to developing a

1:21:44long-term framework for data centers. We

1:21:47share the city's goal of supporting

1:21:49responsible economic growth, job

1:21:52creation, and adaptive reuse of existing

1:21:55buildings while protecting residents and

1:21:58businesses. Data centers can provide

1:22:00significant investment, increased tax

1:22:03base and economic activity, particularly

1:22:06in downtown areas. Importantly,

1:22:09Minnesota's regulatory framework ensures

1:22:11that data centers pay the costs of the

1:22:14infrastructure needed to serve them,

1:22:16including power lines, substations, and

1:22:19other electric system upgrades. So these

1:22:21costs are not shifted to existing

1:22:24customers. Excel Energy has the

1:22:26experience, planning processes, and

1:22:29system capabilities necessary to

1:22:31reliably serve uh projects of the size

1:22:34currently being discussed in

1:22:35Minneapolis. We support requirements

1:22:38that improve transparency and help

1:22:41decision makers understand anticipated

1:22:43energy needs while avoiding duplicative

1:22:46utility review processes that are

1:22:48already governed by Excel Energy,

1:22:51regional grid operators, and state

1:22:53regulators. Thank you.

1:22:55>> Thank you. Next we have Casemira

1:22:57followed by Marie, Will, Mary, and then

1:23:00Kai

1:23:01Caillou.

1:23:07Do we have Oh, welcome.

1:23:10Introduce yourself and you have two

1:23:12minutes.

1:23:13Hello.

1:23:16Hello. Let me just

1:23:19My name is Casemira. I live in Ward 7.

1:23:24Um this is I'm with Neidos um climate

1:23:28and um we're showing up today just to

1:23:34um just in regard to the unregulated

1:23:37data centers and um first of all I would

1:23:42recommend extending the moratorum

1:23:45because we currently are not in line um

1:23:50with meeting our climate goals And it is

1:23:53stated in the data center report that

1:23:59with the increase of data centers we

1:24:02that like goal is likely to get pushed

1:24:05back. So, um, specific regulations do

1:24:10not allow primary zoning. Um, h have a

1:24:14neighbor agreement for each individual

1:24:16data center to not allow primary zoning.

1:24:19Zoning offer incentives for battery

1:24:21storage. So, data centers rely less on

1:24:25diesel backup generators. White space

1:24:27for data centers cannot be larger than

1:24:30170 square feet to protect small

1:24:33businesses and abate noise complaints.

1:24:36Data centers should be restricted to

1:24:38floors above the second story. Ensure

1:24:41all construction jobs uh labor and jobs

1:24:44created are local and union affiliated.

1:24:47Uh, and Minneapolis should ensure that

1:24:49the added franchise fee revenue from

1:24:51data center energy sales actually fund

1:24:54climate initiatives and clean energy

1:24:56projects.

1:24:58No data centers outside of downtown.

1:25:01Create a periodic reporting mechanism.

1:25:04Um, as well as notifying the residents

1:25:09within a,000 ft of a data center. I

1:25:11think that was a very good addition. um

1:25:14no tax breaks or financial incentives

1:25:16given to data centers and we know this

1:25:19isn't the final fight that there will be

1:25:22yes

1:25:24thank you

1:25:25>> thank you next we have Marie Franchett

1:25:28followed by Will Mary Kai and then Mike

1:25:31Arm

1:25:35welcome

1:25:37>> good afternoon my name is Marie Franchad

1:25:40uh I live in W 11 and I'm a volunteer

1:25:42with UNI working on climate change in

1:25:44the environment. So, I'm here because

1:25:46I'm concerned about the future of our

1:25:48children and the earth um and the

1:25:51increased uh emissions of fossil fuels

1:25:54that will result from data center

1:25:57development and the negative impacts

1:25:58that has on our infrastructure. So it

1:26:02sounds like under this ordinance up to

1:26:04100 megawatt facilities would be allowed

1:26:07and it or I' I understand that even a 50

1:26:10megawatt plant uses as much energy as

1:26:1350,000 homes which is like the size of a

1:26:16small city. Um so I'm concerned about

1:26:19the level of energy and the fossil fuel

1:26:22emissions. Recently, the MPCA released a

1:26:25report that says that climate change is

1:26:28going to result in state costs of 20

1:26:31billion per year by 2040.

1:26:34So, we have to do all that we can to

1:26:36meet the city's climate change goals to

1:26:39prevent um all these weather events and

1:26:42infrastructure destruction that we're

1:26:44seeing across the country. Um, and I did

1:26:47want to point out that data centers of

1:26:49course are not going to be creating

1:26:50permanent jobs or bringing vitality to

1:26:53downtown. They're essentially warehouses

1:26:55uh that use enormous amounts of water

1:26:57and energy and nuisance levels of noise

1:27:01uh that may well lead to decreased

1:27:03property values and increased energy

1:27:05costs for residents.

1:27:07um to mitigate all these concerns about

1:27:10the huge energy uses of data centers. I

1:27:14I would also support extending the

1:27:16moratorum to make sure that we have the

1:27:18proper regulations in place and that

1:27:21which could include limiting data

1:27:23centers to 25,000 square feet that they

1:27:26be located at least 250 ft from other

1:27:28residents, schools or um parks. and that

1:27:34um there be strict sound uh requirements

1:27:39potentially limited to 60 dB. Thank you.

1:27:44>> Thank you. Next we have Will Reley

1:27:46followed by Mary Kai Mike and Steven

1:27:50Johnson.

1:27:52>> Hi. Uh my name is Will Reley. I'm from

1:27:55Weber Camden in Ward for Minneapolis.

1:27:58Um, I would just like to say that

1:28:01Minopolitans are intelligent. They have

1:28:04long memories. We understand that data

1:28:09centers are necessary for a lot of uh

1:28:11modern life and technology. But we also

1:28:14know that this push for high-capacity

1:28:17data centers, this recent push for

1:28:19high-capacity data centers is not a

1:28:22quirk. It's not an accident. It's

1:28:24because large tech firms and large AI

1:28:28firms, including Google, [snorts] etc.,

1:28:30want to insert themselves into our

1:28:32communities to consume our water, our

1:28:35labor, our electricity, to line their

1:28:38own p to line their pockets for their

1:28:40own profit. Um, I would also like to

1:28:43recognize and uplift Commissioner

1:28:44Garcia's inquiries as to whether or not

1:28:47native communities have been approached

1:28:50and asked about the about this. It's

1:28:53appalling that that has not happened. Um

1:28:56it's shameful quite honestly. Um I'm

1:28:59also here with my friend Roxan um with

1:29:02Minneapolis North Cyper Safeguards

1:29:03Against Dirty Data or M MNSAD. I'm just

1:29:07going to list off a few of our demands

1:29:09uh for data centers uh that want that

1:29:13are um that want to be construct or that

1:29:16want to be constructed in Minneapolis.

1:29:18Um, data centers built in Minneapolis

1:29:21must file their own water permit per

1:29:23house file SE or 3793.

1:29:26Data centers in Minneapolis must be

1:29:28powered entirely by renewable energy

1:29:30sources. Data centers in Minneapolis

1:29:33must only contain closed loop cooling.

1:29:35Uh if North Min or if Minneapolis enters

1:29:38D1 as defined by the US drought monitor,

1:29:40data centers must suspend their

1:29:42operations in order to prior prioritize

1:29:44water access for city residents and

1:29:47local small businesses [snorts]

1:29:49and data centers must seek approval from

1:29:51city council to address how to use water

1:29:54from existing but thank you for your

1:29:56time.

1:29:57>> Thank you. Um, next we have Mary

1:30:00Dennicles, followed by Kai, Mike,

1:30:03Stephen, and then Andres.

1:30:09>> Welcome. Introduce yourself and you have

1:30:11two minutes.

1:30:13>> Mr. Chair, members, my name is Mary Joe

1:30:16Nichols. I'm representing W 8 in

1:30:18Minneapolis. I first of all want to

1:30:20thank um Commissioner Garcia for

1:30:22speaking to our indigenous communities,

1:30:24which have been totally missing from

1:30:26conversations to date. Um,

1:30:29our history tells us that we are living

1:30:31on the lands that we inherited from our

1:30:34um, from our ancestors, from our for

1:30:36forefathers, from those indigenous

1:30:39communities. They recognized, preserved,

1:30:42protected, and stewarded these lands and

1:30:44their resources for generations. We

1:30:47haven't learned well at all, and we are

1:30:50paying the consequences in myriad ways

1:30:52for those absences. data centers are are

1:30:55um consuming huge amounts of water, huge

1:30:58amounts of energy, creating heat

1:31:00islands, raising temperatures up to as

1:31:02much as 16 degrees Fahrenheit,

1:31:04along with masses increases in energy

1:31:07costs. More than 70%, probably closer to

1:31:1080% now of Americans are opposed to

1:31:13building data centers in their

1:31:14communities. Um there was mention made

1:31:17of um of building codes and zoning. I

1:31:20want to specifically say right now, I'm

1:31:22rejecting primary zoning for data

1:31:24centers. Uh, thus requiring that case by

1:31:26case decisions for data centers are made

1:31:29by elected officials. We are in a

1:31:32climate crisis which continues to be

1:31:34dismissed and disregarded. As stewards

1:31:36of our environment, we must do all that

1:31:38we can to preserve and protect our green

1:31:40zones as well as our city at large and

1:31:43communities throughout the state of

1:31:44Minnesota. legislation was produced in

1:31:47the introduced in the 2026 legislative

1:31:50session. There are companion bills that

1:31:53placed the public utilities commission

1:31:55in the lead role of um permitting and

1:31:58that included conditional use permits

1:32:01along with recording requirements that

1:32:03included some pretty stringent reporting

1:32:05um uh specifics. They also required that

1:32:10our tribal governments be included while

1:32:13they were creating the report and that

1:32:15the impacts on tribal nation treaty

1:32:17rights resources and cultural uh

1:32:20practices were included. Thank you very

1:32:22much. I have backup resources um that I

1:32:25would like included in the record if you

1:32:27can just tell me how.

1:32:28>> Yes, you can give it to the clerk right

1:32:29over here.

1:32:30>> Okay. Thank you.

1:32:33>> All right. Next we have Kai Uhara

1:32:35followed by Mike, Steven, Andres, and

1:32:38Hana.

1:32:50Hello, Planning Commission. Thanks for

1:32:52hosting this. My name is Caillou. I'm a

1:32:54teacher in MPS, also a member of Twin

1:32:56Cities DSA. Today, I'm talking to you

1:32:59all because I'm really concerned about

1:33:01the future we're building for our

1:33:02children.

1:33:03My students have shared with me their

1:33:05concerns about AI, about AI data

1:33:08centers, about the way these data

1:33:10centers are destroying environments.

1:33:12They're taking water. AI is taking jobs.

1:33:15AI is being used to create things like

1:33:17deep fakes, which are often very

1:33:19inappropriate and exploitative

1:33:21materials. And I know that this hearing

1:33:24is about data centers, but it's also

1:33:27really about AI because we know that

1:33:30these data centers are being built at

1:33:33such a pace to fuel AI's expansion.

1:33:37Something else we're also concerned

1:33:38about is expansion of flock and other

1:33:42surveillance technology which is being

1:33:45enabled because these data centers are

1:33:47being built. And there's no way for us

1:33:49to really measure or monitor what these

1:33:53data centers are being used for. We just

1:33:55know that they exist. They're serving

1:33:57some companies, some customers, but we

1:34:00don't know what those companies are. We

1:34:02don't know who those customers are. So

1:34:04until AI is better regulated, until the

1:34:07environmental impacts of AI data centers

1:34:09are better regulated, it falls upon us,

1:34:11the adults, to do whatever we can do to

1:34:15protect our kids. And so the adults on

1:34:18this planning commission, what I'm

1:34:19asking for you all is to get rid of

1:34:21primary zoning for data centers. Make

1:34:24the process for them coming into our

1:34:25city be as arduous as possible. We need

1:34:29to slow down big tech. We need to allow

1:34:32there to be a fight in the state

1:34:34capital. We need to make sure that we

1:34:37are protecting our kids. We're

1:34:39protecting our future by making sure

1:34:42that we are slowing down AI and by

1:34:45getting rid of primary zoning. That is

1:34:46something that you all can do and

1:34:48helping that fight. Thank you.

1:34:50>> Thank you. Next we have Mike Arm

1:34:52followed by Steven Andreas Hana and Ria.

1:34:56>> Mike Arm had to leave.

1:34:57>> Okay. Mike Arm had to leave. Uh so we

1:35:00have Stephen Johnson. Do we have

1:35:02Stephen?

1:35:07We'll come back to Steve. Oh, welcome.

1:35:09Introduce yourself and you have two

1:35:10minutes.

1:35:12>> Thank you. My name is Steven Johnson and

1:35:15I live in the Sheridan neighborhood of

1:35:16Northeast W 3. I live in one of the

1:35:19proposed zoning districts. I love my

1:35:21neighborhood and I do not want to live

1:35:24next to a data center. My question for

1:35:27the city council and this planning

1:35:28commission is who benefits? Who benefits

1:35:32when massive amounts of our city land is

1:35:34devoted to massive hypers scale data

1:35:36centers used for AI?

1:35:38Not me, not my neighbors. None of us, as

1:35:42far as I know, are tech bros or

1:35:43billionaires. None of us are trained for

1:35:46the minuscule number of maintenance

1:35:47positions that will be required to keep

1:35:49the data centers running. Construction

1:35:51might work might be nice for the few

1:35:53months it's available, but what's after

1:35:54that? So, who benefits? Who benefits

1:35:57when constant infrasound hums through

1:35:59our bodies at every moment of every day,

1:36:01affecting our sleep, our focus, our

1:36:03well-being? Not my wife who already

1:36:06deals with insomnia and a various a

1:36:07variable sleep schedule as a nurse. Not

1:36:10my neighbors with their toddler. Not the

1:36:12animals that live on my block. Not any

1:36:14of us who are already fighting every day

1:36:15to find some quiet and peace of mind.

1:36:18Who benefits when big tech and data

1:36:20companies get endless exemptions and

1:36:22incentives and concessions to suck up

1:36:24all our energy? Not us who are already

1:36:27facing challenges with high grocery

1:36:29prices, high gas prices, high energy

1:36:31prices. None of us are getting the

1:36:34generous handouts that these

1:36:35corporations have come to expect.

1:36:37So, please give us an answer. Who

1:36:39benefits with these data centers?

1:36:42Because it certainly isn't us, your

1:36:44neighbors. I'm asking you to do

1:36:46something that benefits your

1:36:47constituents.

1:36:49Extend the moratorum. Reject primary

1:36:51zoning for data centers. Cap data

1:36:54centers at 25,000 square ft. Require

1:36:56public notification. Do something. Do

1:36:59anything that shows that you love your

1:37:01neighbors. Thank you.

1:37:03>> Thank you. Next we have Andreas followed

1:37:05by Hana, Ria, Carmen, and Riley.

1:37:10Welcome.

1:37:11>> Hi. Um, my name is Andreas. I live in

1:37:14War 12 and I'm a organizer with Unidas

1:37:17Minnesota. I'm a climate organizer with

1:37:20Unitos Minnesota. Um today I am showing

1:37:24up to uh to urge your guys' support and

1:37:28to put a stop to these unregulated

1:37:30development of data centers. Um for me

1:37:33personally, I think that there's a huge

1:37:35risk when there's a new industry that's

1:37:37coming in unregulated. Um and it

1:37:42and we're able to see a lot of the

1:37:43effects that it's had in other areas,

1:37:46right? um we see what they are doing to

1:37:49other towns that don't have um the same

1:37:52capabilities that Minneapolis does and

1:37:54they're just steamrolling over them. And

1:37:57here in Minneapolis, they tried that and

1:37:59we're not going to let that happen.

1:38:02I have a vision where

1:38:06we can all work together, where we can

1:38:08have a city that the energy production

1:38:11is actually owned by Minneapolis and the

1:38:13residents and where people can actually

1:38:15sell the energy back and benefit. So, if

1:38:18data centers want to help contribute to

1:38:19that, you know, we'll we'll we'll

1:38:22consider it. Um, and alongside to that,

1:38:26uh, I I urge you to pass any kind of

1:38:28resolution, ordinance, or amendments

1:38:29that are needed. um to get us closer to

1:38:33that vision. Um some of those things are

1:38:35here in the Unidos neighborhood

1:38:38agreement. I don't know if you guys want

1:38:39this, but that's all I have to say.

1:38:41>> Yes, you can give it to the clerk. Thank

1:38:42you. Next, we have Hana, Ria, Carmen,

1:38:46Riley, and Quentyn.

1:38:50We have Hana.

1:38:53Welcome.

1:39:00Whoop. Um, hello. My name is Hannah. Um,

1:39:03I live right in the heart of downtown in

1:39:04Ward 7. Um, last time I stood before

1:39:07city council. I shared the mic with many

1:39:09others who felt exactly like I do that

1:39:12Minneapolis has the chance to model what

1:39:14it looks like to grow our data center

1:39:16infrastructure responsibly. But I also

1:39:18shared it with people who worry that

1:39:20these regulations will cost jobs and

1:39:22slow down progress. I've been thinking

1:39:24about this a lot because I don't think

1:39:26we're actually on opposing sides here. I

1:39:28want us to keep building, too. We'll

1:39:30need a massive amount of infrastructure

1:39:32to fight climate change, housing to help

1:39:35fight income equal inequality, and all

1:39:37the spaces like parks, rec centers,

1:39:39libraries, and shopping that make

1:39:41downtown feel like home. Airing on the

1:39:43side of causing less harm is always the

1:39:46right choice. I don't think the same can

1:39:48be said for the alternative. I hope

1:39:51you'll consider removing data centers

1:39:53from primary zoning, reducing the cap on

1:39:56square footage, and voting against the

1:39:59harm that data centers welcome into our

1:40:02community. Thank you so much for your

1:40:03time.

1:40:04>> Thank you. Next, we have Ria, then

1:40:05Carmen, Riley, Quentyn, and Daniel

1:40:08Rockcastle.

1:40:11>> Do we have Ria?

1:40:15All right, we'll come back to Ria. Do we

1:40:17have Carmen?

1:40:19Welcome. Introduce yourself and you have

1:40:21two minutes.

1:40:25>> Hello. I am Carmen. I'm from the fifth

1:40:28ward and I'm here today with SA uh

1:40:30Mallister Sunrise. We're a youth climate

1:40:32organizing group. Um as a lifelong

1:40:35Minneapolis resident, I implore the

1:40:37council to continue to tighten the

1:40:39registration regulations on data centers

1:40:41and remove them from primary zoning. Uh

1:40:44too many communities around this country

1:40:46have been struck uh been stuck dealing

1:40:49with the risks, the downsides and the

1:40:51damages of this new technology and have

1:40:53that has been shoved upon them by tech

1:40:55giants who invest nothing back into our

1:40:57cities and our communities that are

1:40:59struggling. And we are struggling with

1:41:01the very same issues brought to our

1:41:02doorstep by irresponsible land and water

1:41:05use of these private interests. We have

1:41:07the opportunity to set an example uh to

1:41:10the rest of the country by setting up a

1:41:12strong and tight framework and

1:41:13regulation around data centers making it

1:41:16so that if these environmental bllightes

1:41:18wish to exist here they must do so on

1:41:20our terms with our informed and

1:41:22continuing ascent. Um I and Mallister

1:41:27Sunrise will second all of you's

1:41:29demands. Thank you.

1:41:31>> Thank you. Next we have Riley, then

1:41:33Quentyn, Daniel Rockcastle, and Barbara

1:41:36Terat.

1:41:41>> Hello, my name is Riley. I'm glad you

1:41:43guys are all here today. I appreciate

1:41:44all the concerns and recommendations

1:41:46that have been shared thus far. Um,

1:41:48especially the honest assessment stated

1:41:49earlier that the main reason for

1:41:51consideration of data centers in

1:41:52downtown in Minneapolis is providing a

1:41:54way to use our vacant space and generate

1:41:56revenue. as there were a few other

1:41:58significant benefits mentioned of

1:41:59allowing their presence in downtown and

1:42:01many many more risks and many more

1:42:03concerns. I have very low trust in the

1:42:06promises made by developers of

1:42:07large-scale data centers around reducing

1:42:09resource use, noise pollution, etc. And

1:42:12I support the city and this council in

1:42:14setting even stricter regulations than

1:42:15what's been brought forward today um

1:42:17around the presence size and feasibility

1:42:19of these data centers in Minneapolis. I

1:42:21want a city that's financially solvent,

1:42:23but not at the expense of our previous

1:42:25resource management successes, the risk

1:42:27of devaluing downtown properties in

1:42:29favor of favor of a tax break, or at the

1:42:31expense of resident and visitor quality

1:42:33of life and quality of leisure. I urge

1:42:35this commission to pass any kind of

1:42:37resolution, ordinance, or amendment that

1:42:39can address at a minimum the following.

1:42:42Um, no new data centers constructed,

1:42:44functional bans on large-scale data

1:42:46centers anywhere in Minneapolis city

1:42:48limits. Um certainly not allowing that

1:42:50data centers are approved for primary

1:42:52zoning. Incentives for battery storage

1:42:54to reduce reliance on diesel backup

1:42:56generators. Limitations on white size or

1:42:59white space uh based on actual noise and

1:43:02energy use data versus approximations

1:43:04from previous policies which I suspect

1:43:06would be significantly below 170,000

1:43:09square feet. Strict sound requirements

1:43:11as previously shared. All franchise fee

1:43:14revenue from data center energy sales

1:43:16fund climate change initiatives and

1:43:17clean energy projects. Periodic

1:43:19reporting around resource use noise

1:43:21levels and other considerations brought

1:43:22forth by the community and um specific

1:43:24to where the data center is being built

1:43:26and no tax breaks or financial

1:43:27incentives for data centers. Thank you

1:43:29so much.

1:43:30>> Thank you. Next we have Quentyn followed

1:43:33by Daniel Barbara Kate Derekson and

1:43:36Hazel.

1:43:39>> Hello. I'm my name is Quentyn and I live

1:43:41in the Ward 12 of in South Minneapolis

1:43:45and I don't I don't want data centers in

1:43:48residential areas. There may be a place

1:43:50for them industrial parks or downtown.

1:43:53Data centers are a new type of industry

1:43:55with potential major impacts. Citizens

1:43:57deserve a careful, thoughtful, open

1:43:59process to determine what this new

1:44:02industry and how it should be regulated.

1:44:04Data data centers use lots of

1:44:06electricity and water. And this extra

1:44:09demand will drive up prices for all of

1:44:11us citizens, businesses, and government.

1:44:14Additional demand means that utilities

1:44:16will build more power plants, creating

1:44:18more pollution and consuming more of our

1:44:21rapidly dwindling resources, including

1:44:23the availability of water. Data centers

1:44:26create a lot of noise. Constant noise is

1:44:29detrimental to people's health and will

1:44:31either make people sick or drive them

1:44:33away. Both prospects erode the

1:44:35livability of Minneapolis.

1:44:38Developers of data centers receive sales

1:44:40tax exemptions from the state which

1:44:42could cost cities more than the property

1:44:44tax gained. The data centers take up

1:44:47resources which could be used to help

1:44:49folks who are struggling or encourage

1:44:51creative ventures to flourish within the

1:44:53city. This financial and creative drain

1:44:56will far outweigh small bene benefits

1:44:59created. No tax exemptions or incentives

1:45:01for this type of development.

1:45:04Local governments have the obligation to

1:45:06regulate businesses and land uses.

1:45:09Careful consideration of the impacts of

1:45:11a new industry to protect the city both

1:45:13in the present and the f and the future

1:45:16is the role of a planning committee. The

1:45:18city me of Minneapolis should strictly

1:45:20limit the size and number of data

1:45:22centers and their location. Thank you.

1:45:26>> Thank you. I'm told Ria is back. We have

1:45:29Ria. Welcome. Introduce yourself and you

1:45:32have two minutes.

1:45:37>> Hi, my name is Ria Giggera. I'm a W one

1:45:40resident from Marshall Terrace.

1:45:43>> Should I restart?

1:45:43>> Yes, please. Apologies for that.

1:45:45>> Uh, hi, my name is Ria Giggera. I'm a

1:45:47Ward One resident from Marshall Terrace.

1:45:49Our neighborhood or recently met to

1:45:51discuss what we can do about unregulated

1:45:53data centers and large tech companies

1:45:54just running rough shot on our lives and

1:45:56communities. So, I'm here today to urge

1:45:57you to include the protections which the

1:45:59Marshall Terrace Neighborhoods

1:46:00Resolution has outlined, including

1:46:02requiring a community benefits agreement

1:46:04process with meaningful representation

1:46:05from all neighborhoods and communities

1:46:07and requiring an independent,

1:46:09comprehensive, and publicly available

1:46:10assessment of operational,

1:46:12environmental, infrastructure, fiscal,

1:46:14and neighborhood impacts before any new

1:46:15data center receives final approval

1:46:17along with what others have mentioned.

1:46:19Um, the push for data center development

1:46:22driven by, as Council President Pain put

1:46:24it, the AI inertification speedrun is a

1:46:26clear threat to our community resources

1:46:28as well as to the long-term

1:46:29desiraability of living and working

1:46:30downtown and the resulting tax pace,

1:46:32which others have raised concerns about.

1:46:34state history to date with industries

1:46:37like mining and plastics doesn't give me

1:46:40confidence as to whether we had the

1:46:41tools and muscles at the ready to have

1:46:43private companies pay for the damages

1:46:45and long-term remediation that's needed

1:46:47when they wreck our resources for a

1:46:48speculative book. When I think of the

1:46:50future that I want for my family, it's

1:46:52not the ability to stream 150 movies at

1:46:544K simultaneously. It is clean water,

1:46:57clean air, safe and nutritious food, and

1:46:59an end to the rising power costs that

1:47:01are making it extremely difficult for us

1:47:02to afford to continue living here uh and

1:47:05not our data centers. Thank you very

1:47:07much.

1:47:08>> Thank you. Next, we have Daniel

1:47:10Rockcastle followed by Barbara, Kate,

1:47:13Hazel, and Britney.

1:47:16We have Daniel.

1:47:19Welcome. Introduce yourself and you have

1:47:20two minutes.

1:47:24Good evening, chair and commissioners.

1:47:26My name is Daniel. I live in Ward 12. I

1:47:29work in software development and I'm

1:47:31here because of my interest in

1:47:32technology, not on behalf of any company

1:47:35or group. I support advancing this

1:47:37ordinance as written. Like railroads and

1:47:40the electricity grid, data centers,

1:47:43including generative AI ones, are

1:47:45essential infrastructure. They support

1:47:48finance, medicine, government services,

1:47:50and the internet itself. Though data

1:47:53centers tailored towards generative AI

1:47:55are new, in the future, they will be

1:47:58just as economically essential as the

1:48:00data centers of old. Data centers can

1:48:03have negative effects on nearby

1:48:05communities and the environment. It's

1:48:07reasonable to limit those effects, and

1:48:09the proposed ordinance would do that. It

1:48:12would allow new data centers only in

1:48:15existing buildings and certain downtown

1:48:17districts cap server space, require

1:48:20disclosure of expect expected energy and

1:48:22water use and subject every project to

1:48:25individual city approval.

1:48:27Some have called for lowering the square

1:48:29foot cap on server space to reduce

1:48:31electricity consumption. However, square

1:48:34footage is a poor measure of power use.

1:48:36A smaller facility with denser equipment

1:48:38can use more electricity than a larger

1:48:40one. And because developers would

1:48:43already disclose their energy use and

1:48:44seek individual approval, lowering the

1:48:47cap would exclude potential projects

1:48:49before their actual impacts were

1:48:51considered. There are also calls for

1:48:53mandatory waste heat recovery and clean

1:48:55energy. Both can be valuable, but

1:48:58universal requirements introduce

1:49:00technical costs and complications that

1:49:02could eliminate otherwise viable

1:49:04projects.

1:49:05If anything, I'm concerned this proposal

1:49:08is too restrictive. But seeing as the

1:49:10public has already spoken in opposition

1:49:12to data centers in general, I support

1:49:14advancing the ordinance as written

1:49:16without further further restrictions.

1:49:18Thank you.

1:49:21>> Thank you. Next, we have Barbara Ter

1:49:24followed by Kate, Hazel, Brittney, and

1:49:27Fernando.

1:49:29>> Welcome.

1:49:29>> Hi, I'm Barbara Tarant. Um, thank you

1:49:32for Orene for um, putting this being a

1:49:36part of this, putting it together and

1:49:38Jason for um, also speaking about the

1:49:41indigenous people's voices and then for

1:49:43everybody else being here. Um, I live in

1:49:47the Standish neighborhood and um, I have

1:49:50a butterfly garden and I feel like being

1:49:53out there um, raising the butterflies

1:49:56and I've seen some go into crystals,

1:49:58come out of crystals, all that detail

1:50:01and [snorts] that we are at a climate

1:50:02crisis. We are, you know, at the point

1:50:05of we could kill off bees and

1:50:08butterflies. I find this horror

1:50:11and we need to prioritize the

1:50:14environmental impact of these data

1:50:16centers which is um actually quite

1:50:19terrible. The water, the energy use, the

1:50:22fossil fuels, the the noise. I know that

1:50:26I would not be able to live with that

1:50:27noise. Animals would not be able to and

1:50:30other people as well. Um, and I think we

1:50:33need to all realize that we are

1:50:34basically just Lego pieces in this game

1:50:36with the tech bros, billionaires

1:50:39just using us as pawns to carry out

1:50:42their little fantasy world and that

1:50:44corporations are going to benefit from

1:50:46this and some other people here and

1:50:47there and that we need to restrict this.

1:50:50There may be some benefits from this. We

1:50:53do not know what they are for regular

1:50:55people. Um, but we do see that the

1:50:59downside is horrendous. And I do feel

1:51:02for the younger generations

1:51:04that have been growing up with this fear

1:51:07of this climate change and the horrors

1:51:10that we're seeing all the time. And so I

1:51:13propose um no absolutely no data centers

1:51:16in any Minneapolis neighborhoods.

1:51:19100% transparency. the neighborhoods

1:51:22must have advanced notice if there's a

1:51:25possibility they would be in their

1:51:27neighborhood. Um, only renewable energy,

1:51:31no fossil fuels, no tax breaks or incent

1:51:34uh incentives,

1:51:36no extra cost to the residents. Um,

1:51:39thank you.

1:51:42>> Thank you. Next, we have Kate Derekson,

1:51:44followed by Hazel, Brittany Fernando,

1:51:47and Council Member Ros Robin Wley.

1:51:50Um, good afternoon. I'm Dr. Kate

1:51:52Derekson. I'm a professor of geography

1:51:54and I direct an urban studies program at

1:51:56a local research university. But I'm

1:51:58here today speaking on my own behalf as

1:52:01a resident of Minneapolis and a

1:52:03concerned citizen of Ward 12. I'm here

1:52:05because I'm deeply concerned about the

1:52:08impact of data centers on our downtown.

1:52:10Specifically, we need creative solutions

1:52:13to make downtown Minneapolis a vibrant

1:52:16place for people to live, work, and

1:52:18recreate. And I know from teaching

1:52:20future planners and young urbanists that

1:52:23there are no shortage of ideas about how

1:52:25we can realize that vision. The

1:52:28proliferation of data centers will

1:52:29mortgage the future of our downtown and

1:52:32it sends the signal that we're giving up

1:52:34on it. We're turning it over to uses

1:52:36that are so disliked the nationwide that

1:52:40there's a massive movement to stop them

1:52:42everywhere. And what message does it

1:52:43send if our downtown is where we're uh

1:52:46encouraging those uses? Um,

1:52:50a central principle of urbanism is that

1:52:53a vibrant city needs what Jane Jacobs

1:52:55calls eyes on the street. People going

1:52:57about their day-to-day lives, uh, making

1:53:00the city more compelling, safer, and the

1:53:02kind of places people want to live,

1:53:03work, and shop. Minneapolis has a lot of

1:53:06work yet to do to reimagine our

1:53:08downtown, but please don't sell it out

1:53:11to tech infrastructure that won't create

1:53:13jobs beyond the sugar rush of

1:53:15construction, won't create eyes on the

1:53:17street, and won't promote a healthy

1:53:19downtown um for the future. I also want

1:53:22to mention that I'm the mother of a

1:53:24teenaged urban fisherman. He's the

1:53:26co-founder of the Southwest High School

1:53:27bass fishing team and he works for the

1:53:29Minneapolis Park Board teaching you

1:53:31youth to fish every summer. And it

1:53:34breaks my heart to think about um the

1:53:37the river where he and his friends and

1:53:39the kids that he teaches uh you know

1:53:41play and fish every day being used to

1:53:44cool down data centers that are

1:53:46throttling development in our downtown.

1:53:48So I want to encourage you um to uh I

1:53:51want to say that I'm in favor of a total

1:53:53ban, but I want to encourage you to

1:53:54remove primary zoning for these projects

1:53:56and force them to go through a more

1:53:58robust process.

1:54:00>> Thank you, Kate. And next we have Hazel,

1:54:02Brittany, Fernando, Council Member Robin

1:54:04Monsley, and then Emily Martin.

1:54:14Hi everyone. My my name is Hazel. I'm a

1:54:17resident of the Whittier neighborhood in

1:54:19Ward 10. Um I'm not a great public

1:54:21speaker, so I'll attempt to keep this

1:54:23short.

1:54:25As laid out before you, I support the

1:54:29current uh proposal for data center

1:54:32regulation. However, I do wish that it

1:54:33was more stringent, including the

1:54:35removal of primary uh zone planning and

1:54:38the um bringing down of total size from

1:54:44175,000 ft² down to 25,000 square ft. As

1:54:48we see the full impact of the climate

1:54:51disaster that we're in right now and as

1:54:54that continues

1:54:57data centers as they're bring spending

1:55:00their billions we we and the residents

1:55:03will be the ones left holding the bag at

1:55:04the end of the day if they do continue

1:55:07to expand not not the companies behind

1:55:09data centers that's all I have thank you

1:55:12>> thank you Hazel next we have Britney

1:55:15followed by Fernando Robin Wanley Emily

1:55:17Martin and Rebecca Stack.

1:55:22>> Hi,

1:55:27>> good evening commission members. Uh, my

1:55:29name is Britney Dennis. I live in W 8.

1:55:31I'm an organizational strategy and

1:55:33equity consultant with experience

1:55:35helping public sector organizations in

1:55:37Minnesota translate equity principles

1:55:39into policies and decisions that affect

1:55:41people's lives. I urge you to vote no on

1:55:44allowing data centers as a primary use.

1:55:46Allowing a land use and mitigating its

1:55:48harms are two different things. Making

1:55:51data centers allowable does not make

1:55:53them safer or less resource intensive.

1:55:55It changes the framework for future

1:55:57decisions and may limit the city's

1:55:58ability to reject a proposal even when

1:56:01residents oppose it. [clears throat] I

1:56:03ask you to consider four areas of

1:56:05impact. First, water. US data centers

1:56:08directly consumed an estimated 17

1:56:10billion gallons in 2023, excluding water

1:56:13used to generate their electricity. The

1:56:15city should evaluate projected water

1:56:17use, peak demand, and water resources,

1:56:19and excuse me, water sources before

1:56:22permitting this use. Second, noise.

1:56:24Cooling systems and backup generators

1:56:26can produce persistent noise, including

1:56:28at night 247. This city should require

1:56:31independent assessment assessments and

1:56:33enforceable noise limits that protect

1:56:35nearby residents. Third, environmental

1:56:37racism. Environmental justice research

1:56:40shows why existing environmental burdens

1:56:41matter when evaluating new development.

1:56:43The city should assess cumulative

1:56:45environmental impacts, identify the most

1:56:48vulnerable communities, and use that

1:56:50evidence to determine whether the

1:56:51proposed land use would compound

1:56:53existing inequities. Fourth, electricity

1:56:55and infrastructure. Data centers use an

1:56:57estimated 4.4% of US electricity in

1:57:002023. Um, with projections reaching as

1:57:03high as 12% by 2028. The city must

1:57:06evaluate infrastructure capacity,

1:57:07necessary upgrades, and potential

1:57:09effects on existing rateayers rather

1:57:11than allow the public to bear costs that

1:57:13have not been adequately assessed. These

1:57:15are foreseeable concerns. The city has a

1:57:17responsibility to prevent avoidable harm

1:57:19before it occurs, not wait for residents

1:57:21to bear the consequences and attempt to

1:57:23remedy them afterward. Economic

1:57:25development is not a success if it cost

1:57:27if its costs fall on the public, its

1:57:29burdens disproportionately affect

1:57:30vulnerable communities, and its

1:57:32consequences compromise future

1:57:33generations. Please vote no on allowing

1:57:35data centers as a primary use. Thank

1:57:37you.

1:57:38>> Thank you. Next, we have Fernando,

1:57:41followed by Council Member Robin

1:57:42Monsley, Emily Martin, Rebecca Stack,

1:57:44and Sophie uh Sophie S. Do we have

1:57:48Fernando? I might have read it wrong.

1:57:51Um, last name is uh B U.

1:57:57No. Okay, we'll come to that back to

1:57:59that person. Uh, next we have Council

1:58:01Member Robin Hsley. Welcome.

1:58:09>> Good evening everyone. I am Council

1:58:12Member Robin Wsley. I also serve as the

1:58:15city council's minority leader and

1:58:17represent W um specifically. So, shout

1:58:20out to y'all. Um at a time of deep uh

1:58:23political division, opposition to data

1:58:25centers is been bringing Americans all

1:58:28across the country together.

1:58:30Specifically, 70% of Americans oppose

1:58:32data centers in their communities. And

1:58:34when there's such overwhelming

1:58:36opposition, yet we're seeing city hall

1:58:39continue to advance policies that

1:58:41accommodate these facilities. And that

1:58:43really should cause us to pause and

1:58:45question who are data centers actually

1:58:47serving? And let's be clear, data

1:58:49centers exist to generate enormous

1:58:51profits for big tech billionaires while

1:58:54our communities are left to bear the

1:58:56environmental and infrastructure costs

1:58:58um that you heard from many of the

1:58:59testifiers before me. Um you also heard

1:59:02this in the more than a thousand public

1:59:04comments submitted to you all that made

1:59:05it abundantly clear that Minneapolis

1:59:07residents overwhelmingly oppose data

1:59:09centers in our city. And I want to know

1:59:11for the record, so do I. I oppose them

1:59:14heavily. Um, but unfortunately the myth

1:59:16of trickle down economics continues to

1:59:18influence decision-making at city hall.

1:59:21So once again, we're being asked to

1:59:22prioritize corporate profits under the

1:59:24promise of economic development despite

1:59:26overwhelming public opposition. And as

1:59:28an elected official, it's my

1:59:30responsibility uh to protect the public

1:59:33interest, not facilitate opportunities

1:59:35for predatory big tech companies to

1:59:36extract more wealth and resources from

1:59:39our communities. So with that, my call

1:59:41to action to you all is if a outright

1:59:43ban is not legally viable or politically

1:59:45viable, then our number one priority

1:59:48should be eliminating all primary zoning

1:59:50permissions for data centers. Make them

1:59:52go through a robust process as we saw

1:59:54many of our communities want, especially

1:59:56with the Star Tribute site where North

1:59:58Loop residents said, "Why not a grocery

2:00:00store? Why not housing? Why not

2:00:01playgrounds instead of a data center?"

2:00:04So, commissioners, I urge you to stand

2:00:06with our residents and recommend

2:00:07eliminating all primary zoning for data

2:00:09centers. Our residents have spoken and

2:00:11now it's time for us as elected

2:00:13officials to listen. Thank you.

2:00:15>> Thank you. Next, we have Emily Martin,

2:00:18followed by Rebecca, Sophie S., Sophie,

2:00:21Sophie Opich, and Lonnie uh Proust.

2:00:25Do we have Emily Martin?

2:00:28Not seeing Emily, so we'll come back to

2:00:30that. Uh, do we have Rebecca? Rebecca

2:00:32Stack.

2:00:37Not seeing Rebecca. Um Sophie S. Sophie

2:00:42maybe.

2:00:44>> Great. Welcome. You have two minutes.

2:00:49>> Hi,

2:00:51my name is Sophie Schmurer. I live in

2:00:54St. Paul, but I'm here because I know

2:00:56that whatever we decide on today will

2:00:58have ramifications in St. Paul as well.

2:01:02I want to be realistic about what the

2:01:04city is capable of regulating and I

2:01:06think we are being realistic when we ask

2:01:08that no tax breaks be given to data

2:01:10centers and no financial incentives be

2:01:12received by city council members. I also

2:01:15think it's realistic to ask that we to

2:01:18ask data centers to provide the public

2:01:20with periodic accurate data about their

2:01:22water and electricity usage. Thank you.

2:01:26>> Thank you Sophie. Next we have Sophie

2:01:28Opich. and Sophie opener. Great.

2:01:36>> Hi, my name is Sophie. I live in Seward.

2:01:39Um, and I traveled this year for the

2:01:41first time to Rochester as a state DFL

2:01:44delegate and I saw some of the

2:01:45commissioners there. Um, and that's

2:01:47where I got my butt in. Um, and

2:01:52um, at the state convention, we passed

2:01:54two resolutions related to data centers.

2:01:56one was in support of a proper full

2:01:58moratorum which in a more ideal

2:02:00situation the city council would extend

2:02:04um I'm in favor of a total ban um but I

2:02:07I want to speak to the other data center

2:02:09res resolution which was in support of

2:02:13strong regulatory framework for data

2:02:14centers including comprehensive

2:02:17environmental review water and energy

2:02:19protections local government authority

2:02:21public transparency requirements and

2:02:23safeguards ensuring infrastructure and

2:02:25utility costs are not shifted to

2:02:27taxpayers, rateayers or natural

2:02:30resources. That resolution passed as one

2:02:32of the most popular resolutions at the

2:02:34convention at 76%.

2:02:37And I bring this to your attention to

2:02:39point out that this is not something

2:02:41that centrist DFLers

2:02:43can pat off some leftistonly concept.

2:02:46Um, regulating data centers is literally

2:02:48a part of the DFL platform. Thank you.

2:02:52>> Thank you, Sophie. Next we have Lonnie

2:02:54Provost. Um followed by Sam um Green,

2:02:59Joshua Gonzalez, Becca David, and Rachel

2:03:02C.

2:03:05>> Welcome. Introduce yourself and you have

2:03:06two minutes.

2:03:07>> Uh hi, commissioners. Uh Lonni Provos,

2:03:09Imacha Pidau. Uh uh Dakota.

2:03:14Uh my name is Lonnie Provost. Uh I'm

2:03:17Hank Dakota and I'm a resident here in

2:03:20uh Minneapolis recently. And uh I would

2:03:23I would like to recommend uh an

2:03:25extension of the moratorum because there

2:03:27is uh significant data that that says

2:03:30that you know there's there's a lot of

2:03:32issues that we need to continue to

2:03:34compile to really make an informed

2:03:37decision on on what we're going to do

2:03:39that's going to impact our next seven

2:03:41generations. And um you know um some of

2:03:44those things that that we haven't

2:03:46haven't addressed here you know is is

2:03:48you know and well uh our commissioner

2:03:51Garcia has mentioned you know um we

2:03:53haven't mentioned or consulted with any

2:03:55of the tribal nations around here

2:03:56because there is a lot of areas around

2:03:58here that have a lot of sign uh cultural

2:04:01significant uh impact that would that

2:04:03would happen with all these uh with the

2:04:05usage of the water usage that's

2:04:07happening to these uh data centers. um

2:04:10the these these data centers um the

2:04:13issues when it comes to water and energy

2:04:16they they they don't have boundaries you

2:04:18know those boundaries extend past

2:04:20Minneapolis so we need to start thinking

2:04:22about more more of the people that it's

2:04:24going to impact to as well and I think

2:04:25if it's not in your policies you know to

2:04:29really start reaching out to the native

2:04:31communities out there I think you should

2:04:33add those into your policies and also

2:04:35add into having annual cultural

2:04:37competency training too as Well, because

2:04:40I I think to really start thinking about

2:04:42a lot of these areas, these are we are

2:04:44on native lands. You know, I I I live

2:04:47right here down downtown and I see these

2:04:50these uh signs up on up in the signs and

2:04:52I think, wow, this is great. you know,

2:04:54we're acknowledging we're on native

2:04:55lands, but if we're not actively

2:04:57engaging with those native communities

2:04:59and and having them be have a seat at

2:05:01the table and have decision making

2:05:03authority and power and and recognizing

2:05:05what that they are, the first people of

2:05:07these lands, we're we're doing a

2:05:09disservice to to our people and our

2:05:11community and our neighbors. Thank you.

2:05:12[clears throat]

2:05:13>> Thank you.

2:05:15We have five speakers left and then

2:05:17three that we skipped. Just want to

2:05:19remind everyone if you haven't signed up

2:05:20yet, please do because when we finish

2:05:22the end of the list, we're going to um

2:05:24be done with it. So, if you haven't

2:05:26signed up, you still wanted to speak,

2:05:27sign up now, please. All right. Next, we

2:05:30have Sam G. I couldn't quite read the

2:05:31whole thing, but

2:05:38>> welcome. Introduce yourself when you

2:05:39have two minutes.

2:05:44My name is Sam Greenstein and I'm a W 10

2:05:46resident in Whittier, a proud member and

2:05:48officer of ASKME 2822 and I am here

2:05:50today to demand that data centers be

2:05:52removed from primary zoning um and the

2:05:54current moratorium be extended and

2:05:56include downtown.

2:05:58When I think about what our community

2:06:00needs right now, I think of affordable

2:06:02health care, good union jobs, renewable

2:06:04energy, fast and free public

2:06:06transportation, and more cultural and

2:06:08recreation opportunities. Instead,

2:06:10rather than revitalize our historic

2:06:12downtown, big tech and fry are pushing

2:06:14us to accept data centers in our

2:06:16high-rise buildings. No one who actually

2:06:18lives here is asking for this. This is

2:06:20just big tech ruining our city in the

2:06:22relentless quest for more profit while

2:06:24many well, many of us sleep on the

2:06:26street and more of us are are graveling

2:06:29our right up poverty level. During our

2:06:32climate crisis, these data centers will

2:06:34use more electricity and water. Let's

2:06:37regulate these data centers as much as

2:06:38possible to give our communities power

2:06:41to continue to fight data centers here.

2:06:43Removing data centers from primary

2:06:45zoning and extending the moratorum are

2:06:47minimum demands. Second, as our city and

2:06:50county leaders, I call on you to

2:06:52urgently prioritize the things that we

2:06:54all demanding. Instead of these data

2:06:56center projects, we could be um building

2:06:58public renewable energy that would

2:07:00create union jobs and um and actually

2:07:03solve the climate crisis. We could be

2:07:05creating more art institutions that will

2:07:07draw people through downtown. We could

2:07:09be creating public playgrounds. There

2:07:11are so many. We could be creating

2:07:12affordable housing to end the

2:07:13homelessness crisis here in Henipin

2:07:15County. There is so much we could be

2:07:17doing. Instead, we're just coming up

2:07:19with pet projects for tech bros.

2:07:23>> Thank you. Next, we have Joshua

2:07:25Gonzalez.

2:07:29>> Be followed by Becca, Rachel, and

2:07:30Bonnie.

2:07:32>> Thank you, council. My name is Joshua

2:07:34Gonzalez. I am a constituent of W 5 and

2:07:36I'm here with Unidos Minnesota. Um I'm

2:07:40not sure about y'all. I tend to make a

2:07:41lot of mistakes when I rush. So I

2:07:43encourage you to extend the moratorum so

2:07:45that we have time to fully flush out

2:07:47regulation that is going to stop data

2:07:50centers from continuing not just data

2:07:53centers but corporations from continuing

2:07:55to take advantage of our communities.

2:07:58Um, I'm here today because the future

2:08:00that I want to see is one where the

2:08:04focus, the priority is on our people, is

2:08:07on our cultures, on our arts, and not on

2:08:10profits. So, I encourage you all to

2:08:13pass, I urge you all to pass any

2:08:15ordinance, any resolution that is going

2:08:18to hinder [snorts] data centers from

2:08:20being developed to the full extent of

2:08:22your power, such as not allowing them in

2:08:25primary zoning, such as requiring them

2:08:28to have community input and say on if

2:08:33they get developed um as well as a

2:08:36variety of other things that my fellow

2:08:37neighbors have brought up to you. So

2:08:39once again, I encourage you all to do

2:08:41everything to your power to make sure

2:08:43that we aren't continuing to get abused

2:08:45by corporations. Thank you for your

2:08:48time.

2:08:50>> Thank you. And next we have Becca David.

2:08:56Welcome.

2:08:58>> Hi.

2:09:00>> So, my name is Becca David and I just

2:09:03want to start by saying 10 years ago

2:09:05that I could have been anywhere in the

2:09:06United States and I chose Minneapolis

2:09:10partially because of its commitment to

2:09:13climate.

2:09:14And the fact that I am standing here

2:09:17right now concerns me. I'm urging you to

2:09:22take a look at the impact of our

2:09:24environment,

2:09:26on our future, our children, and our

2:09:28climate equity plan if data centers are

2:09:31allowed to come in as unregulated

2:09:34businesses.

2:09:36There are so many many better things

2:09:40that we could put downtown. Housing,

2:09:43creative industries, live work studios.

2:09:46Look at look at Main Street at the use

2:09:48of those historical

2:09:51industrial buildings.

2:09:54I live in Powder Horn in Ward 9 and I'm

2:09:58proud of the fact that I'm a Minneapolis

2:10:00and a Minnesota resident now and I am

2:10:03asking you to think forward.

2:10:06No matter what your stance was a day

2:10:08ago, think forward and vote against

2:10:12primary zoning and for the future of our

2:10:15community.

2:10:17>> Thank you. And next we have Rachel C.

2:10:20We have Rachel. Welcome. Introduce

2:10:22yourself and you have two minutes.

2:10:28>> Hi, I'm Rachel. I live in Ward 3 in

2:10:31North Loop area. Um, we just had

2:10:34obviously the Star Tribune tried to um

2:10:37become a data center. I mean, it's

2:10:39obviously still possible, but that

2:10:41developer backed out. Um, and the entire

2:10:45community pretty much organized against

2:10:48it in a pretty crazy way. At one point,

2:10:50I was at five meetings in a week and

2:10:52they were all different. So, pretty

2:10:54intense um, rebuttal against it. Um, I

2:10:58think what I would like to see is just

2:11:00an extension on the moratorum. At this

2:11:04point, there's too much that we do not

2:11:06know. Okay, we do not know the health

2:11:09impacts. There's a lot of air pollution

2:11:11from data centers right now. We're also

2:11:14trying to get the herk to shut down and

2:11:16so it would be like one step forward and

2:11:19two to three steps back for our climate

2:11:22goals. It doesn't make sense. Um and

2:11:26then obviously environmental aspect and

2:11:28then as well you have to look at um is

2:11:32what they say true like are they really

2:11:35only using this much energy? Are they

2:11:37really going to pay for it? The amount

2:11:40of calls and emails I got from Excel

2:11:43about reducing my energy this summer.

2:11:45Make it make sense. So that's just what

2:11:49I'm saying. So thanks.

2:11:54>> Thank you. Thank you. Next we have

2:11:55Bonnie Beckl followed by Trent Weisner.

2:11:58And then after that we'll go back to the

2:11:59three names that we skipped over which

2:12:00were Fernando, Emily, and Rebecca.

2:12:02[snorts]

2:12:07Welcome.

2:12:10>> Hello. My name is Bonnie Beckl and I

2:12:13live in W 9 and I'm a volunteer with

2:12:15Unidos Minnesota.

2:12:18So um when I first started hearing about

2:12:22a moratorum on data centers, I a lot of

2:12:27uh feelings of confusion and uh

2:12:30powerlessness in the face of

2:12:33corporations uh running over us um came

2:12:36up and I

2:12:39feel like minimally hopeful that we're

2:12:43talking to you about setting some

2:12:46serious boundaries. based on what they

2:12:48are allowed to do. Um so we're in a

2:12:52climate crisis and that means that um

2:12:57the excessive use of energy and water by

2:13:02data centers will mean unless unless we

2:13:06do something to stop it will mean that

2:13:08all of our utility bills are going to go

2:13:10up. Um, [snorts]

2:13:12so I love the idea of requiring them to

2:13:17um

2:13:19create their own energy through

2:13:21batteries, through renewable energy

2:13:24energy sources. Um the Minnesota

2:13:28Pollution Control Agency did a study um

2:13:30that said that uh if we don't address

2:13:34the climate crisis in a timely way like

2:13:37now, these costs over the next 20 years

2:13:41are going to go up to um 20 billion

2:13:44dollar per year for Minnesota. And if we

2:13:48address it now, it will be like1 to2

2:13:51billion dollars for Minneapolis. um not

2:13:55the whole state but our portion of it.

2:13:58Um so we need to make sure um that we

2:14:03get an ordinance that requires that the

2:14:05franchise fees that come from data

2:14:08centers are used to address um clean

2:14:11energy home upgrades and weatherization

2:14:14and give these people no tax breaks.

2:14:18>> Thank you Bonnie. Uh next we have Trent

2:14:20Weisner.

2:14:22Is Trent here?

2:14:25Welcome. Introduce yourself and you have

2:14:26two minutes.

2:14:30>> Hello. My name is Trent Weezner. I live

2:14:32in Ward 2 in the Co neighborhood. Hi,

2:14:34Robin. Um the um I like a lot of this

2:14:38ordinance. Um I think that and I do also

2:14:41apologize for my attire. I didn't

2:14:42realize I was going to be talking today.

2:14:44I like uh a lot of this ordinance. I

2:14:46don't think it goes quite far enough. Um

2:14:48the uh proposed cap on square footage is

2:14:51gigantic at 175,000 ft². It's just

2:14:54that's I can't even imagine a building

2:14:56that big. Um it needs to be kept at

2:14:59probably more like 25,000 and um to also

2:15:02remove primary zoning uh would be a

2:15:04really good step. Um I do uh urge the

2:15:08that something get adopted. Uh even if

2:15:10it's just in its current form, that's

2:15:12better than nothing. uh but we can't uh

2:15:15go back to the extremely permissive um

2:15:18zoning code that uh existed uh before

2:15:22that the moratorum did. Also I think it

2:15:25would be a very good idea to extend that

2:15:27moratorum because of the uh so far

2:15:29extremely fast changing nature of AI the

2:15:33uh sort of cycle of reinvestment of fake

2:15:37money into it. Um, for all we know, an

2:15:41additional 6 months the bubble could pop

2:15:43and we won't even need to have this

2:15:44conversation. So, um, I would like, uh,

2:15:48those three things. A extension, the

2:15:50moratorum, a cap on square footage

2:15:52that's much lower than it is, and an end

2:15:54to primary zoning for data centers.

2:15:56Thank you.

2:15:57>> Thank you. We're going to go back to the

2:15:59names that we skipped over before. And I

2:16:02I think this says Fernando, but I'm not

2:16:04sure. Starts with an FE. Last name

2:16:06starts with a B.

2:16:08We have that person. All right. Do we

2:16:10have Emily Martin?

2:16:13Do we have Emily Stack?

2:16:15All right. Was there anyone here who

2:16:18wanted to speak but didn't get to?

2:16:21All right. So, um I still want to hear

2:16:24from Excel. So, what I'm going to

2:16:26suggest is um we um give a chance to ask

2:16:30questions uh from Excel. Then we'll

2:16:33close the hearing and I'm going to

2:16:34suggest a fivem minute recess and then

2:16:36we can come back because it looks like

2:16:37we have time okay with that.

2:16:41All right. Um

2:16:44so uh

2:16:48John Marshall are you here? Great. And I

2:16:50don't know if Suzanne was also did you

2:16:52want to ask? Okay.

2:16:55Um I have some questions but I'll open

2:16:56up other commissioners first. Other

2:16:58commissioners have questions for Excel.

2:17:02>> All right. algorithm.

2:17:03>> Um can you um walk us through some of

2:17:06the details of how the 2040 uh clean

2:17:10energy standard works because you know

2:17:12we know that it's 100% by 2040 but there

2:17:14are increments before then. Can you walk

2:17:17us through those the 2030 and 2035

2:17:21standards?

2:17:21>> Um I could say good evening

2:17:23[clears throat] commission. Um John

2:17:25Marshall with XL Energy. With respect to

2:17:27the 2040 legislation of Minnesota, um we

2:17:30are currently as a utility with our

2:17:32energy mix at about 70% carbon-f free

2:17:34electricity have made significant

2:17:36progress in in prior years. Um current

2:17:39plans that have been approved by the

2:17:40utility commission uh via our recent

2:17:42integrated resource plan. We are

2:17:44tracking close to 85% carbon-f free

2:17:46electricity by 2030. Uh so we continue

2:17:49to make specific uh uh progress on those

2:17:52goals. Um we do not foresee that um uh

2:17:55any load growth be it from a data center

2:17:57or a mixeduse commercial or residential

2:17:58or any incoming customer uh truly that

2:18:01we are agnostic towards the customer use

2:18:04will impact us achieving that 2040 goal

2:18:06by uh by the state law.

2:18:08>> Okay.

2:18:09>> Mhm.

2:18:10>> And then so but the law requires for

2:18:122030 is it 80% is the requirement like

2:18:15you're you're exceeding that right but

2:18:17>> uh we are yes correct. We are right now

2:18:19currently forecast to achieve about 85%

2:18:22carbon-f free by 2030 with the

2:18:23investments that we have approved um

2:18:25including significant additional

2:18:27investments in wind energy. Uh

2:18:28significant investments in solar energy.

2:18:30We're actively building one of the

2:18:32larger solar arrays in the country right

2:18:34now up in Becker, Minnesota. About 5,000

2:18:36acres of solar. Uh we have plans for

2:18:38long duration storage as well and then

2:18:40upwards of 200 megawatts of distributed

2:18:43capacity uh storage on our distribution

2:18:46system peppered around our our footprint

2:18:48here in Minnesota.

2:18:49>> Okay.

2:18:49>> Mhm.

2:18:50>> And then we heard people talk about the

2:18:53increase in cost of electricity and that

2:18:55being passed on. So So can you explain

2:18:56how the the rateayer act works? Like is

2:18:59that going to prevent

2:19:01you know higher costs from coming out of

2:19:03a new data center?

2:19:04>> Uh that is correct. when when we add

2:19:06load or add sales if you will and and

2:19:09see that increased sales growth. Um

2:19:11portions of everybody's bills include

2:19:12fixed costs which means the existing

2:19:14infrastructure in the system the

2:19:16existing poles wires transformers are

2:19:18all called fixed costs. um when you

2:19:20increase uh like bring on a larger user

2:19:23again whether it's a data center or a

2:19:24manufacturer etc they do absorb

2:19:27significantly more portions of those

2:19:28fixed costs which do bring downward

2:19:30pressure on rates and actually provide

2:19:32um rate savings for customers um for

2:19:34specific projects and again this goes

2:19:36for a data center or any other new

2:19:38customer that comes in uh when we intake

2:19:40that customer um we are looking at what

2:19:43infrastructure is needed to serve you uh

2:19:45this is going to cost you x amount of

2:19:47money for you to be served uh there are

2:19:49also So clawback provisions in the

2:19:51agreements that we have with customers,

2:19:53data centers included, if where if they

2:19:55don't achieve a certain amount of

2:19:56electricity that they have stated for

2:19:58which we've built that infrastructure,

2:20:00we claw back those dollars and protect

2:20:02our customers um thereby putting that

2:20:04entire cost burden on that customer.

2:20:06Again, be it a data center or a

2:20:07different uh type of customer use.

2:20:09>> Great.

2:20:10>> Any other questions?

2:20:13>> Not seeing any. Thank you.

2:20:14>> Great. Um, with that, we will close the

2:20:16hearing

2:20:17>> and I'm going to put us in recess until

2:20:217 p.m.

2:20:22>> So, come back at 7. Thank you.

2:26:38I'm going to bring the commission back

2:26:39to order.

2:26:42All right.

2:26:46Uh so, commissioners, we have the staff

2:26:48recommendation for the

2:26:50um ordinance. Are there any comments or

2:26:54amendments or any other discussion?

2:26:56We'll start with Commissioner Baxley.

2:27:00Um, I think maybe a a easy proposed

2:27:03amendment would be for us to consider

2:27:06um allowing below grade use for this.

2:27:11Maybe somebody can help wordsmith that.

2:27:14Can you Oh, and so in general for

2:27:17amendments, one suggestion that I'll

2:27:19make if you don't have the exact

2:27:21language, we can give a staff direction

2:27:25to say, you know, create an amendment in

2:27:28this this direction. So you you could do

2:27:31that. So can you clarify? Um I think cuz

2:27:34currently it reads that um

2:27:37data centers could not be if given all

2:27:40the other regulations proposed here that

2:27:43they are not allowed below grade. And I

2:27:45think if we could write an amendment

2:27:47staff could write an amendment allowing

2:27:51as part of this same framework below

2:27:53grade

2:27:55use. Okay.

2:27:58Um, so that would

2:28:01apply to just the downtown zones and it

2:28:04would apply to

2:28:04>> all the other requirements of this

2:28:07issue. This would apply to. Correct.

2:28:09>> So you would allow it for new

2:28:10construction though, right?

2:28:11>> There's no new construction allowed in

2:28:13this proposal.

2:28:14>> Okay. That's what I wanted

2:28:15clarification.

2:28:15>> Yeah.

2:28:16>> Okay.

2:28:18Um,

2:28:18>> so maybe existing below grade space

2:28:22should be considered for use, data

2:28:24center use as part of this.

2:28:26>> I see. Okay. Um,

2:28:29as I had indicated earlier, I think we

2:28:32should be thinking about basements and I

2:28:34was also thinking that for new

2:28:35construction downtown. Um, so that I

2:28:39don't know how that would interplay with

2:28:42yours. I guess it'd be I think um I mean

2:28:46just so I'm clear, I don't think new

2:28:48construction is provided for in this

2:28:51current amendment. So that would have to

2:28:53be an additional nuance to that. this

2:28:55seemed easier.

2:28:57>> Okay.

2:28:58>> Um, so let's go through, how about we go

2:29:02through each commissioner and each

2:29:03commissioner can give your your thoughts

2:29:05and any amendments that that you might

2:29:07have and then we'll come back and

2:29:09consider potential amendments one by

2:29:11one.

2:29:11>> Sounds good.

2:29:12>> Did you have any more comments that you

2:29:13wanted to say, Commissioner Beckley?

2:29:14>> That's it. Thanks.

2:29:15>> All right,

2:29:17Commissioner Shri.

2:29:19>> Thank you, Chair Meyer. I want to first

2:29:21off start off by thanking every single

2:29:24person who came down to the public

2:29:27service center to come and testify. Um,

2:29:30and all of the people in the city of

2:29:32Minneapolis who reached out and gave

2:29:35public comment. There's been just an

2:29:38unprecedented amount of public comment,

2:29:40I would say, um, on a specific zoning

2:29:43ordinance. maybe our 2040 plan

2:29:47uh rivals that that and I think that

2:29:50just goes to show how much this

2:29:53community, this city cares deeply about

2:29:56shaping our future and we we really have

2:30:01to ensure that their voice is reflected

2:30:04in what we're moving forward as a city.

2:30:07And I'll just share I think I want to

2:30:09first say thank you to the staff who

2:30:11spent a lot of time working on this and

2:30:14um talking to me about what are our

2:30:17options here. I think it's no secret to

2:30:19the staff that I've worked with and my

2:30:22colleagues on the city council how I

2:30:24feel about AI generative data centers. I

2:30:27have really tried and really strained to

2:30:30see what the benefit is that exists

2:30:34beyond

2:30:36maybe some temporary construction jobs,

2:30:39which construction jobs are important,

2:30:42but the question that always comes back

2:30:43is why don't we build things that we see

2:30:46popular support for that our communities

2:30:48want to see? And I think it's really

2:30:52hard um to be in the position that I'm

2:30:55in as someone who is trying to push for

2:30:59the strongest regulations possible on

2:31:03these new generation data centers. um

2:31:07someone that's pushed for the moratorum

2:31:10at the city council level and has seen

2:31:12the limits in which there was political

2:31:15appetite for a year-long moratorum and

2:31:18the carveout that we got for downtown. I

2:31:21would say the policy that's in front of

2:31:22us right now is actually stronger than

2:31:25the moratorum that we have in place. Um

2:31:29but I don't I don't think we should

2:31:31count out the voices of our community. I

2:31:33mean, my responsibility in this role

2:31:35first and foremost is to represent the

2:31:37people of the 12th ward. And what I

2:31:41worry the most about in our present day

2:31:43is that we are seeing over and over that

2:31:48cities,

2:31:50governments, states, they're

2:31:52prioritizing the interests of big techs

2:31:55profiting over the needs of community

2:31:58over what our job is, which is

2:32:01democratically representing people and

2:32:02their and their interests. Um

2:32:06I believe and there is so much evidence

2:32:09to support that this AI boom is

2:32:12speculative.

2:32:14It has huge ties to the fossil fuel

2:32:16industry, the military and defense

2:32:20industries and crypto mining and

2:32:23contract contrary to any of the claims

2:32:25from big tech there is a lack of

2:32:28evidence of benefits to everyday people.

2:32:31um there is a lot of evidence to support

2:32:34that right now there's an overbuild of

2:32:36data centers

2:32:38um

2:32:40to show profitability when there isn't

2:32:42de demand and the thing that I really am

2:32:46struggling with here today is does this

2:32:49policy before us go far enough and I'll

2:32:53I'll just say I don't think it does I

2:32:57think the place in which our [snorts]

2:33:00community really highlighted is

2:33:04the impact in the future and the facts

2:33:07are the facts. We do not have 100% clean

2:33:09energy right now in the state of

2:33:11Minnesota and we don't have 100% clean

2:33:13energy in the city of Minneapolis. We're

2:33:15at about 70%

2:33:18carbon-f free and that means 50

2:33:20megawatts, 60 megawatts, 70 megawatts,

2:33:2280 megawatts. If you add them together,

2:33:25we're only multiplying our contribution

2:33:27to

2:33:29unclean energy, greenhouse gas

2:33:31emissions. And that's contrary to what

2:33:34we have set out as policy for the city

2:33:36of Minneapolis and our clean energy

2:33:38partnership where we have several goals

2:33:41that we aren't meeting. We're not

2:33:42meeting our goals to have um net zero as

2:33:45it comes to the net zero greenhouse gas

2:33:48emissions as it comes to our industrial

2:33:50and commercial industry citywide. Um we

2:33:55aren't even close uh communitywide. And

2:33:58I think this is something that puts us

2:34:00behind. And the last thing I'll just

2:34:02note is

2:34:05while I think this policy is a good

2:34:07start and it puts puts restrictions in

2:34:10place, I do think there is a huge risk

2:34:12that it becomes obsolete into the

2:34:14future. And I think it puts in important

2:34:18safeguards that we do need if there

2:34:20isn't any policy.

2:34:23But we need the state to act.

2:34:26We don't have the ability in the city of

2:34:27Minneapolis to regulate by megawatt. We

2:34:30aren't able to regulate the type of

2:34:33cooling system that a data center has.

2:34:36We aren't able to say no tax breaks to

2:34:39data centers. Um we aren't able to

2:34:44require different community benefits or

2:34:47say 100% clean energy. And so I think if

2:34:51there are steps to move this forward um

2:34:54further in respect to what the community

2:34:56has said, this testimony was very

2:34:59compelling. I would be interested to

2:35:01hearing more in terms of what this body

2:35:04has to share. And I have other comments

2:35:07um that I might chime in on later on as

2:35:09I hear from my fellow commissioners. But

2:35:11I kind of wanted to start there. And

2:35:13also apologies. Uh it's been a long day

2:35:16for me. I have been in committee since

2:35:1810:00 a.m. So, if it's not all linear,

2:35:21that's exactly why I've been sitting

2:35:22here in front of a camera um since early

2:35:25morning, but I'm glad to be here in

2:35:27community and with you all today.

2:35:30>> Thank you, Commissioner Towry. We

2:35:31appreciate your hard work. Um before I

2:35:34forget, I want to um read a statement

2:35:38from Commissioner Wagner. Um,

2:35:40Commissioner Wagner is in Italy on a

2:35:43vacation that was planned six months ago

2:35:44and really regretted uh that he couldn't

2:35:47be here, but I told him if he wanted to

2:35:49say something that I would read it for

2:35:50him. Uh, so this is what he sent. Um, he

2:35:53says, "I'm extremely sad not to be at

2:35:55the meeting today and appreciate Chairs

2:35:57Meyer's suggestion that I still provide

2:35:58a few comments. I also appreciate the

2:36:01public's engagement on this important

2:36:02issue for our city. I think it is

2:36:05important to acknowledge the context for

2:36:06today's discussion. We are not the

2:36:09federal federal government. We are

2:36:10planning commissioners for the city of

2:36:12Minneapolis. Our charter is to guide the

2:36:14long-range planning, development, and

2:36:15land use for the city. For that reason,

2:36:17I don't believe this meeting's purpose

2:36:19should be to litigate the morality of

2:36:20AI. Instead, we should center the

2:36:22conversation on whether it makes sense

2:36:24for data centers to exist specifically

2:36:26in Minneapolis and consider how building

2:36:28them will impact our city. I will also

2:36:31share one more thought. I welcome a

2:36:32correction from staff on these figures.

2:36:34Uh but I believe the Sleep Number data

2:36:36center increased the building's

2:36:38valuation approximately eight times

2:36:41versus the prior value and now it

2:36:43generates roughly 5 to7 million in tax

2:36:46revenue per year. That is impactful for

2:36:48our city and for that reason I support

2:36:50the ordinance as proposed. Thank you.

2:36:53All right, other commissioners.

2:36:58>> Commissioner Conley.

2:36:59>> Thank you, President Meyer. I actually

2:37:01have an amendment, so I'm going to talk

2:37:02a little bit through it. Um, so, uh, I

2:37:06heard loud and clear from folks tonight

2:37:08and and something that I was thinking

2:37:09about too is the primary zoning piece,

2:37:11right? So, primary zoning pretty much

2:37:14means that um, city staff, us, the

2:37:18planning commission, the city council,

2:37:20we're all kind of um, giving away our

2:37:23authority, so to speak, right? Um, in in

2:37:26terms of like evaluating proposals that

2:37:28come in, determining if they advance

2:37:29city goals, serve the purpose of of

2:37:32community, etc. And so I want us to

2:37:35think about overlay zoning as opposed to

2:37:37primary zoning. And I'll give you a

2:37:39reason why. So overlay zoning empowers

2:37:42us as the planning commission and the

2:37:44city to actually evaluate each proposal

2:37:46on a case-byase basis, which we

2:37:48typically do. This means that thing

2:37:51we're looking at things like which

2:37:52building is being proposed to be

2:37:53converted, the energy water use

2:37:55projections, what kind of mixed use is

2:37:57being proposed, um just what advances

2:37:59the city the city's goals, which is our

2:38:01charge here. Um and so another thing

2:38:04about overlay zoning and is that it

2:38:06allows the city to build data centers,

2:38:09but that um they have to make a good

2:38:11case. They have to make um a good case.

2:38:13They have to prove that they're going to

2:38:15serve the public good. And so based on

2:38:18this, what I'd like to propose as an

2:38:19amendment is that data centers should

2:38:21only be through overlay districts in the

2:38:24DT1 and DT2 districts. No primary zoning

2:38:27with or without conditional use anywhere

2:38:29in the city. And [snorts] I'll move

2:38:31that. And and what I'd also like to do

2:38:33is move to direct staff to draft

2:38:35appropriate language in time for

2:38:37consideration by the BIS committee of

2:38:38the city council.

2:38:41>> All right, we have a motion. Second.

2:38:44There's a second.

2:38:45>> All right. discussion.

2:38:48[snorts]

2:38:49>> I want to

2:38:50>> Commissioner Baxley. Um, I wonder if we

2:38:52could just ask uh Jason uh to provide

2:38:56comment about overlay usage um in in

2:39:01contrast or in is it compatible with

2:39:03conditional use and and uh just some

2:39:07counsel on that

2:39:09>> that commissioners as I understand the

2:39:11the proposal

2:39:14we would develop a new overlay district

2:39:16and any proposal for a new principal use

2:39:19data center would require

2:39:21be required to file a resoning

2:39:23application in order to um facilitate

2:39:27the review of that that proposal. Uh a

2:39:32an idea that staff had put out there on

2:39:35the project website was to have a

2:39:38similar concept but outside of the

2:39:40downtown districts and allow as we're

2:39:43now proposing uh data centers to proceed

2:39:45with a conditional use permit in the

2:39:48downtown zoning districts.

2:39:50>> Um

2:39:52I I think there are a lot of things to

2:39:55uh balance.

2:39:57I think the idea of having some level of

2:40:00predictability with stringent standards

2:40:02in place uh makes sense and that's where

2:40:05staff landed to allow this with very

2:40:08strict standards through a conditional

2:40:10use process that does involve public

2:40:13notice to um area residents the

2:40:17neighborhood group published in a

2:40:18newspaper posted on the property. So

2:40:21that notice does happen and uh

2:40:23opportunities for feedback are are

2:40:26present. The the uh overlay district

2:40:29concept certainly does give the city

2:40:31more uh discretion to evaluate

2:40:34individual proposals. Um

2:40:40I from staff's perspective we put an a

2:40:44lot of safeguards in place in the in the

2:40:47draft recommendations and there may be

2:40:49conditions of approval that can be

2:40:51evaluated on a case-bycase basis. There

2:40:54will be conditions of approval that

2:40:55would be evaluated on a case-bycase

2:40:57basis through the conditional use

2:40:59process. Uh so we feel like there's uh

2:41:03sufficient discretion uh as proposed but

2:41:06um you certainly have the uh ability to

2:41:09to recommend that we we choose the path

2:41:11of a of developing a new overlay

2:41:13district. That would that would be uh

2:41:15something that applicants would have to

2:41:17apply for through a resoning every time

2:41:20one is proposed

2:41:21>> through resoning. And who would write

2:41:23the uh parameters of that overlay

2:41:26district? How does that work?

2:41:28So staff would draft that uh per the

2:41:32direction of the planning commission and

2:41:34and city council if they were to accept

2:41:36that recommendation of the planning

2:41:37commission. Uh, I think maybe something

2:41:41that um I would like more feedback from

2:41:44the commission about is if we would in

2:41:47this overlay district have the same

2:41:50standards that we are recommending that

2:41:53be uh generally applicable in the DT1

2:41:55and DT2 district and then just have it

2:41:58also be a reasonzoning application which

2:42:00has its own set legal findings based on

2:42:03state statute and and city ordinance.

2:42:06And how does this uh deployment of this

2:42:10um instrument fit in with the current

2:42:13schedule um of review?

2:42:18[snorts] Uh commissioners, it would be a

2:42:20uh not an easy lift to pull that

2:42:23together in before the uh business

2:42:27housing and zoning committee, but we we

2:42:29would do that. we would do that in a

2:42:32manner that kept us on the schedule and

2:42:34and prevents us from reverting to

2:42:37calling these communication exchanges

2:42:39allowed in 10 of the 15 zoning

2:42:41districts. Great.

2:42:43>> Thank you.

2:42:44>> Okay. So, it's been pointed out to me

2:42:45that uh the motion was premature because

2:42:48there needs to be a motion on the main

2:42:50ordinance before we can consider an

2:42:52amendment. What I'm going to propose is

2:42:53we let each commissioner give their

2:42:55overall thoughts and then I'll come to

2:42:56Commissioner Connley um after we've had

2:42:58the main motion for the first amendment.

2:43:00Before Jason steps down, did anyone else

2:43:02have other questions for Jason?

2:43:06>> Commissioner Shepard, were this to come

2:43:08up again tonight, does a U if we

2:43:11establish a new build form overlay

2:43:13district for data centers or

2:43:14environmental overlay district, does

2:43:16that preclude the necessity for public

2:43:18notification?

2:43:21Commissioner Shepard, it does not. Uh, a

2:43:23resoning would go through a a similar

2:43:26process requiring public hearing in

2:43:28front of this body. Uh, one key

2:43:30difference between the resoning and a

2:43:32conditional use permit is that your

2:43:35action on a resoning is advisory and it

2:43:37it goes on to the city council. Whereas

2:43:39a conditional use permit, this body has

2:43:42the the final say unless appealed.

2:43:44>> Is there any difference in the distance

2:43:46involved of a public notification? I

2:43:48think for COP it's 350 ft. Uh, same

2:43:50distance.

2:43:51>> Same distance.

2:43:52>> Okay. Thank you.

2:43:56>> All right. Not seeing any other

2:43:57questions for Mr. Whittenberg. Um, so

2:43:59commissioners, want to give your general

2:44:01thoughts for those who haven't yet.

2:44:05Commissioner Gorton.

2:44:08>> Well, thank you all for uh taking the

2:44:11time to be here this evening and the

2:44:12intention you put into um your comments.

2:44:15I share many of the concerns uh you guys

2:44:18expressed and uh appreciate the

2:44:19specificity.

2:44:21So, thank you. Um I am

2:44:25just before I jump into some other

2:44:28things, I do support um the overlay

2:44:30amendment mentioned by Commissioner

2:44:32Connley. Um

2:44:35I am skeptical of the 175,000 ft allowed

2:44:39rather than prescriptive

2:44:40performance-based requirements. um

2:44:42primarily due to environmental concerns.

2:44:45Um you know for context and this is

2:44:47helpful for me because this is the way I

2:44:49think and imagine things is 1775,000 ft

2:44:52of just the white space is more than the

2:44:55average size of a Costco. It's greater

2:44:57than the average 150 unit apartment

2:44:59building. All the new apartment

2:45:01buildings we see around. It's greater

2:45:03than that on average. Um it's

2:45:06[clears throat] just over 17 floor 17

2:45:08floors of 10,000 square feet floors

2:45:11each. So that's fairly significant and

2:45:13that's just the white space. I have as I

2:45:16mentioned earlier in um my question for

2:45:19staffenberg was um my concern regarding

2:45:21the occupancy though it is building

2:45:23code. If these data centers are a be

2:45:26occupancy

2:45:28and the existing floors are be occupancy

2:45:31they will be able to go in there without

2:45:33a change of occupancy. working on

2:45:35projects as an architect, change of

2:45:36occupancy is what allows us to raise the

2:45:38bar whether it's ADA, energy code, and

2:45:40other other things of that nature. So if

2:45:43the data center is a B occupy, it goes

2:45:45in. My concern is that it won't need to

2:45:47meet energy code. It will be just kind

2:45:49of grandfathered into those existing

2:45:50spaces, all of which in these office

2:45:52conversions are currently B occupancy,

2:45:55the majority of them. Um, I would like

2:45:57to hear from [sighs] my fellow

2:46:01commissioners their appetite for

2:46:03considering a reduction in this overall

2:46:06square footage. Um, I would propose an

2:46:09amendment to reduce that. Um,

2:46:12I think five floors, 50,000 square feet

2:46:16hypothetically would be a good cap, but

2:46:18I would like to hear from other

2:46:19commissioners.

2:46:22>> Commissioner Garcia.

2:46:25Thank you, President Meyer. Um, I again

2:46:29would echo the sentiments of the fellow

2:46:31commissioners. Thank you all for being

2:46:33here. Thank you for taking your time to

2:46:35come and speak to this. Um, thank you to

2:46:38staff again for all of the work that you

2:46:40put into this. It's a tremendous

2:46:42document and something that um I can

2:46:45tell everybody worked really hard on.

2:46:47Um,

2:46:50so I I would also support um

2:46:54Commissioner Connley's proposed

2:46:56amendment. Um, and I agree um with

2:47:01Commissioner Gordon regarding the size

2:47:05limitations

2:47:06um

2:47:08when you were mentioning the

2:47:11um footprint of 175,000 square ft and

2:47:16just the sheer size that that is in

2:47:18terms of larger than a Costco and 17

2:47:22floors of an of a um office building or

2:47:27something like that. Um it really does

2:47:30drive home the scale of what we're

2:47:33talking about and as we look at the

2:47:36technology that goes into data centers

2:47:39um there will be more and more servers

2:47:41that are allowed to fit into that space

2:47:43as um it's like every 3 years everything

2:47:48reduces in size again and again and

2:47:50again. So, um I would also support a

2:47:56reduction in maximum size to um that

2:48:0150,000 square foot range. 50,000 to

2:48:06potentially 75,000 square ft at the

2:48:10absolute outside limit that I would be

2:48:12comfortable with. Um thank you.

2:48:16>> Thank you, Commissioner Garcia.

2:48:17Commissioner Shepard.

2:48:19>> Thank you. Thank you, Chair Meyer. Um,

2:48:23Mr. Raw Castle, I hear you. I too

2:48:26support this this amendment as written.

2:48:28I also think that if you my guess is

2:48:31that if you were to take a poll of us

2:48:32here, the idea of extending a moratorum

2:48:35would be like a slam dunk that it it

2:48:38ought to be extended. That is, however,

2:48:40not our prerogative. And um I don't know

2:48:43that there's a motion we could even make

2:48:45to send that on to to the city council

2:48:48other than the message that you know

2:48:50more time to cook this would be just a

2:48:52would be a great idea. I'm a little

2:48:54unclear on the there's a there's a

2:48:56rubric on page uh 80 of our material

2:49:00which kind of compares square footage to

2:49:03to megawatts of of the data center. And

2:49:05at current technology, we're at 25

2:49:09with 175,000 square feet of of white

2:49:12space, which does not seem um large to

2:49:15me. It's much smaller than a than a than

2:49:17a hypers scale data center. So, we're

2:49:19not talking about enormous enormous

2:49:21generative AI data centers. Is that not

2:49:23correct? I'm happy to be wrong on this.

2:49:26>> Yeah, Commissioner Shepard, I would uh

2:49:28honestly ask uh Mr. Wittenberg about

2:49:31this. We've had lots of discussion about

2:49:33what square footage equates to megawatt

2:49:37and

2:49:39>> and and before he does, may I clarify my

2:49:41question?

2:49:42>> Yeah.

2:49:42>> I note that the city of Nashville

2:49:44regulates on both square footage and and

2:49:47power capacity and and yet we cannot for

2:49:51some reason which which confuses me and

2:49:55that is really my question.

2:49:56>> Sure. Uh, Commissioner Shepard, uh, I

2:49:59don't have that rubric in front of me,

2:50:00but, uh, we did set out to create

2:50:03estimates of the range of likely data

2:50:07center power capacity that would fit

2:50:09within different sizes in terms of

2:50:12square footage. Uh

2:50:18our best estimate based on as you noted

2:50:21currently available technology is that

2:50:24we could see 90 megawatt data centers

2:50:28within the space that's recommended.

2:50:30We're unlikely to see based on current

2:50:32technology 100 plus, but uh a a 50 to 60

2:50:40watt megawatt facility would

2:50:44definitely be something that was is

2:50:46within the expectation of uh current

2:50:49technology and 175,000 square feet of

2:50:52white space.

2:50:54>> Thank you. I mean that addresses my

2:50:56question. I concede I concede that that

2:50:58point. Um my my biggest concern, this is

2:51:01your my general comments. I'm sorry. I

2:51:03have no further questions for you, Mr.

2:51:04Whittenberg. I'm sorry. Um is that we

2:51:07adopt this is a I see this as a movement

2:51:09toward regulation, not away from it. And

2:51:12which which is a great thing. I'm just

2:51:14concerned that we not let the moratorum

2:51:16expire no matter what we do.

2:51:19Hence,

2:51:21if all else fails, I'm in favor of the

2:51:23ordinance as written. Thank you. I

2:51:26realized didn't I didn't respond to your

2:51:28second question about uh a community in

2:51:30in another state. Some states have

2:51:33different uh rules about communities

2:51:36ability to regulate beyond the building

2:51:38code or regulate in ways that uh that

2:51:41Minnesota is not able to do. Most states

2:51:44are are are like ours um in that regard.

2:51:48However, but I don't know the specific

2:51:50uh framework within which you know

2:51:52Tennessee addresses this issue. I will

2:51:55note that uh communities uh a community

2:52:00in Minnesota has placed a moratorum in

2:52:02place

2:52:04has put a moratorium in place and has

2:52:07used megawws as a measure of restriction

2:52:10and they have faced um legal action for

2:52:13for taking that step. I don't I don't

2:52:15believe we have an out outcome yet on

2:52:16that legal action. Good.

2:52:19>> Thank you.

2:52:21>> Did anyone else have general thoughts

2:52:22before I give mine? Sure. Commissioner

2:52:24Baxley.

2:52:26>> Thank you, Chair. Um,

2:52:30I think, uh, just for reference, I think

2:52:32the Sleep Number data center is about

2:52:35180,000 square feet, produces about 21

2:52:39megawatts currently.

2:52:45>> I just wonder how much of that is white

2:52:47space versus the entire footprint.

2:52:51>> Agreed. I think it's the entire

2:52:52footprint. So

2:52:53>> yeah, and I think

2:52:54>> just as a reference,

2:52:55>> right? And I think they're trying to

2:52:56expand to 60 megawatts.

2:52:58>> Yep.

2:52:59>> Right.

2:53:00>> I think

2:53:02my experience has been within that

2:53:03footprint that's easily achievable with

2:53:06today's technology. So that being said,

2:53:08I I I think the um [snorts]

2:53:11I think it's important to get something

2:53:14done and uh so I really appreciate the

2:53:16staff's effort um to establish a clear

2:53:20regulatory framework. I mean this is in

2:53:22a rapidly evolving land use and data

2:53:24centers are important infrastructure

2:53:27but is their impacts and contribute

2:53:29contributions to the urban environment

2:53:31are different from traditional

2:53:32commercial and employment uses. I

2:53:35believe the proposed emphasis on

2:53:36adaptive reuse neighborhood

2:53:38compatibility and a public review

2:53:40process

2:53:42gives me enough a reasonable bias for

2:53:44moving forward. Um certainly the overlay

2:53:47district I think is also interesting and

2:53:49entertain but I support the

2:53:51proposal as written. Thank you.

2:53:57Commissioner Connley, did you have more

2:53:58that you wanted to say generally because

2:54:00you just made your amendment? Okay. Um

2:54:02so uh my thoughts on this um

2:54:07you know first I want to thank the staff

2:54:09and um all of the people who made

2:54:12comments more than 300 pages worth. I

2:54:14read the whole thing. um and 10 council

2:54:17members uh involved in drafting this. I

2:54:19don't think I've ever seen that before.

2:54:21Um I support the large majority of this

2:54:25ordinance regulating um data centers.

2:54:28You know, whether it was 10 or 13 zoning

2:54:30districts. I think that was way too

2:54:31many. We shouldn't have it in in the

2:54:33residential neighborhoods. Um I support

2:54:36a lot of the aspects in here. I think

2:54:37it's really important. Um someone

2:54:38mentioned in the testimony about eyes on

2:54:40the street. I talk about that a lot.

2:54:41That's why I think it's important to

2:54:43have active use on the the first uh and

2:54:47second floors. Um I think there are a

2:54:50lot of things that people really want to

2:54:52see that need to be done by the state.

2:54:56Uh thankfully we have the chair of the

2:54:57intergovernmental committee with us and

2:54:59I'm sure she's going to be at the

2:55:00capital a lot advocating for some of

2:55:02these things. Um, you know, we have uh

2:55:06the clean energy standard at the state

2:55:08which requires 100% clean energy um by

2:55:112040 and increments um in 2030 and and

2:55:152035. But it would be even better if we

2:55:17could require that any new data center

2:55:20had to be fully powered by clean energy

2:55:22uh from the start.

2:55:24um a lot of the other uh things that

2:55:26that people talked about um are are

2:55:29things that we don't have the ability to

2:55:32control here. Um, but I I do think that

2:55:37there are some benefits to having data

2:55:40centers and we do need some of them just

2:55:42for everyday things like

2:55:43telecommunications for powering the

2:55:45internet and and having highspeed

2:55:46internet. And the main benefit uh from

2:55:50to me of having them in Minneapolis

2:55:52instead of, you know, getting um our

2:55:55data needs from a different city are the

2:55:56property tax revenue and the franchise

2:55:58fee revenue. Um and just walking through

2:56:01the context of the property tax revenue,

2:56:03you know, um the BET just approved an

2:56:0711.87%

2:56:09um property tax increase, which is very

2:56:11large. Um it would have needed to be 19%

2:56:16in order to prevent budget cuts. So,

2:56:17we're getting almost a 12% property tax

2:56:20levy increase at the same time that

2:56:22we're also going to have budget cuts.

2:56:24And the the main reason why um is

2:56:28because we're losing so much revenue

2:56:30from downtown. Um the Amir Prize

2:56:33Financial Center, I think, is probably

2:56:34the the best example. Um it was sold at

2:56:39$200 million in in 2016. Um and it was

2:56:43just sold uh for 6.25 million. Um so

2:56:47just a couple percent of what it had

2:56:50been previously valued at that. So that

2:56:53means that everyone else in the city has

2:56:55to pay higher property taxes to make up

2:56:58for the lost value um from downtown with

2:57:01the the 30% vacancy rate. And we you

2:57:04know on the planning commission we've

2:57:06done a lot to try to make it easier um

2:57:08to convert to residential. Um but a lot

2:57:11of the buildings aren't aren't suited

2:57:13for that. um when a data center can go

2:57:15in like the Sleep Number building had a

2:57:17had a massive property value increase

2:57:20when they when they got one. Um it was

2:57:22previously assessed at at 30 million um

2:57:25then was sold um for 235 million um when

2:57:29it got the the data center in it and the

2:57:33commercial tax rate is is about 2%. So

2:57:36my back of the envelope math was that

2:57:37that's about $4 million a year every

2:57:41year year after year. And that's a lot

2:57:44that can pay for a lot of the priorities

2:57:45that people talked about today. You

2:57:47know, I think about like the public

2:57:49housing levy. That's 5 million a year.

2:57:52Um, someone mentioned our car. Uh,

2:57:56they're they're closing because they

2:57:58have a $625,000 deficit and it's a $1.1

2:58:02million structural deficit.

2:58:04Uh, the park board um their increase um

2:58:09five uh something% uh was $5.6 $.6

2:58:12million. Um, you know, there was, you

2:58:15know, a big push to make sure that that

2:58:17they got that uh full amount that they

2:58:19they had requested. Um, so $4 million

2:58:22was just from one facility. And

2:58:27I I think that, you know, that can make

2:58:30a really big difference um for a lot of

2:58:33the things that we care about the most.

2:58:36Um, I care really deeply about climate

2:58:38change. Anyone who knows me knows that.

2:58:39A lot of people around here, you you

2:58:41won't know me, but you know, I've I've

2:58:42never driven a car in my life. I moved

2:58:44here from South Dakota, so I wouldn't

2:58:45have to. I bike everywhere. So, I I

2:58:47really deeply care about climate, but um

2:58:49to me, some of um the aspects of the way

2:58:52has been written, you know, are really

2:58:53thoughtful about that because we want to

2:58:56adaptively reuse some of these buildings

2:58:58instead of, you know, tearing them down,

2:59:01which I think some of them might end up

2:59:03being torn down because there just

2:59:04hasn't been a use for them. A lot of

2:59:05them have been um vacant for years. So

2:59:07if you can find a use I I want to u

2:59:10welcome that.

2:59:12Um

2:59:15so

2:59:17the two amendments that I um cont

2:59:20contemplated coming in um were um first

2:59:24to allow

2:59:26um data centers and basements as I said

2:59:28I think that makes sense because you

2:59:30don't have the noise issues um for those

2:59:32and I'm talking basement in downtown um

2:59:36and I think that can help make a a

2:59:39project pencil out like the way I kind

2:59:41of look at these data centers is whether

2:59:43they're competing with or complementing

2:59:47housing production. You know, that's one

2:59:48of my most important things is to see

2:59:50more housing built so that more people

2:59:51can be enabled to live in Minneapolis.

2:59:53Um I think if it was, you know, a big

2:59:55hypers scale data center in a

2:59:57neighborhood that would take up space

2:59:58that could otherwise go to housing. Um

3:00:01but if it's you know downtown then and

3:00:05um there's you know active use on the

3:00:07first and second floors like we require

3:00:09and there was residential as part of it

3:00:11that that could complement it and as I

3:00:13said before you know the the $4 million

3:00:15from one project you know that goes

3:00:16towards like you know go a long way um

3:00:19for for paying for affordable housing.

3:00:21Um so I I see that benefit there as

3:00:24well. Um,

3:00:26and as I also stated, I thought it made

3:00:29sense to have a limited space in the

3:00:32industrial uses quarter mile away from

3:00:34any residential or any other type of

3:00:36zoning um where where new construction

3:00:39could be allowed. Um, as as written,

3:00:42this won't allow for any new

3:00:44construction at all. So, if we have some

3:00:47some business that needs a new kind of

3:00:50setup for whatever reason and the

3:00:52existing

3:00:54um buildings don't work for them, they

3:00:56just can't be in Minneapolis. So, then

3:00:58they're going to go to other cities. And

3:01:01I don't necessarily think it it's

3:01:04helpful if we just push it to other

3:01:07places. Like the the the demand for data

3:01:10is going to be there either way, I would

3:01:13think. And in general, I would prefer um

3:01:17that it come in in Minnesota where, you

3:01:22know, the temperatures are cooler, they

3:01:23don't have as much energy. We have a a

3:01:25strong um clean energy mandate and in

3:01:29Minneapolis where they have to play by

3:01:30our rules, follow our labor laws, pay

3:01:32our franchise fees. I think there's um

3:01:34there's a benefit to that. My my sense

3:01:37is probably the majority of the

3:01:39commissions in the other direction. So I

3:01:40won't propose my amendments unless um I

3:01:44hear otherwise from commissioners um to

3:01:49um commissioner and so so for Baxley's

3:01:51amendment, you know, that is similar to

3:01:53what I my proposal would go a little

3:01:56further than that um

3:01:59to Commissioner Conley's amendment. Um,

3:02:04so in general, I I think it's

3:02:09really good if we can set out the rules

3:02:12and you either meet them or or you

3:02:13don't. Um, with with the 2040 plan,

3:02:16that's one of the main things that we

3:02:17accomplished. We reduce the number of of

3:02:20variances

3:02:22massively. Um,

3:02:24I'd kind of like to see the planning

3:02:26commission be as irrelevant as possible.

3:02:29like we should be involved in in setting

3:02:30the rules but on once the the rules are

3:02:34set I think it's better um if you know

3:02:38you you you have a an understanding

3:02:41going in whether it's something that's

3:02:42going to get approved or not and my

3:02:46concern is that with with more

3:02:48discretion um like a problem you see in

3:02:51other cities is when there's a lot of

3:02:52discretion you see higher rates of of

3:02:54corruption like especially when there's

3:02:56just a lot of money involved like like

3:02:58Chicago's one example where you see a

3:03:01lot of corruption when there's more

3:03:02discretion. When you have a more

3:03:03rules-based system, you see less of it.

3:03:05Um, so I'm I'm open to precision on

3:03:08this, but I I think

3:03:11my my default on it is probably to vote

3:03:14no on that amendment. Um, so

3:03:16Commissioner Chowry,

3:03:20>> thank you. Um, Commissioner Meyer, I

3:03:22said I would probably have some more

3:03:24thoughts as our discussion unfolded. I

3:03:27think it's really important um to root

3:03:30ourselves in the reality of what the

3:03:33actual fiscal benefit of data centers

3:03:36are. And to that it I would point you to

3:03:40the legislative

3:03:42um research oversight department's

3:03:44research on this question that we asked

3:03:46them to do. And they also work directly

3:03:50with our city assessors department. um

3:03:53it's on page 26 of their report and you

3:03:56can you can find that. I think it's uh a

3:04:00part of the packet. But the few things

3:04:02that I would caution in terms of trying

3:04:05to convert estimated property value

3:04:08market value into direct revenue is that

3:04:11our assessor's department shared that in

3:04:16determining how these investments

3:04:18translate into municipal revenue. It's

3:04:20more complex than simply estimating a

3:04:23property's market value. And they also

3:04:25share that unlike conventional office,

3:04:27retail or multifamily buildings,

3:04:29dedicated data centers represent a

3:04:32highly specialized property type.

3:04:36um making uh making the estimation of

3:04:41the value of data centers particularly

3:04:43difficult um because many facilities

3:04:47occupy only a portion of a large

3:04:49commercial building.

3:04:51And ultimately it shares that although

3:04:56data centers may increase assessed

3:04:57values of individual properties,

3:04:59increases in assessed value do not

3:05:01necessarily produce propo proportional

3:05:04increases in municipal revenue. So, our

3:05:07city assessors department and very clear

3:05:11um

3:05:13language through our uh LRO department

3:05:16essent essentially said that we do not

3:05:18have enough information to be conclusive

3:05:21about the fiscal benefit. And the other

3:05:23thing that I'll point to that's within

3:05:24the LRO report is that um we've actually

3:05:29lost tax revenue to data centers due to

3:05:33the exemptions on the hypers scale tax

3:05:36exemptions on the hypers scale data

3:05:38centers. So they showed us given the

3:05:412025

3:05:43um policy they p that was passed and

3:05:49that approximately 7.4 4 million

3:05:54dollars of tax dollars were refunded

3:05:57under the qualified data center

3:05:59exemption in add in addition to refunds

3:06:02associated with Henipin County and

3:06:04regional sales tax. And so that's the

3:06:07direct fiscal impact that Minneapolis

3:06:09faces. And that's why I've strained to

3:06:13say that there is a benefit beyond

3:06:15creating a trades job. I don't think

3:06:18that it's a golden. We cannot say with

3:06:20any real certainty with the data that's

3:06:23before us and the information that we

3:06:25have from our city assessors department

3:06:26that this is a golden goose for

3:06:28municipal revenue. And I think this is a

3:06:30case of us having to make big tech and

3:06:33this industry prove itself before we say

3:06:35that that's it's going to do the thing

3:06:37that it's going to do. So I deeply

3:06:38caution the fiscal argument on this

3:06:42um because because of the research that

3:06:45has been done over it. And then also I

3:06:48would also caution an argument to say

3:06:50that there is enduser demand. Um more

3:06:53and more as recent today there is

3:06:57indicators that

3:06:59there are more data centers that are

3:07:01being built out than actual demand.

3:07:04Goldman Sachs estimates that only about

3:07:06half the scheduled data center capacity

3:07:08will come online due to cancellations

3:07:11and delays. And I think that's something

3:07:12that we have to be mindful of because

3:07:15we're allowing for this infrastructure

3:07:16to be created in our downtown.

3:07:19And we we have a question on how it will

3:07:21be utilized. I mean, even with the Sleep

3:07:23Number building, there's commitments

3:07:25that it's going to expand to 60 megawws.

3:07:29That hasn't happened yet. I will also

3:07:30say in all of this, there's just a genu

3:07:34genuine lack of transparency.

3:07:37And while I agree in in most of our

3:07:40planning protocols, especially as it

3:07:42comes to the things that we regularly

3:07:45zone for that aren't emerging and

3:07:47everchanging industries, it makes sense

3:07:50to have set rules. But these set rules

3:07:52are going to change. Like they're going

3:07:54to be obsolete within a year's time. And

3:07:57it's proven by the fact that we know

3:07:59that compute power is only going to have

3:08:01less of a less footprint. and we're

3:08:03going to need to get state authority to

3:08:05say we want to regulate bu building

3:08:07components on data centers otherwise

3:08:08local government doesn't have control.

3:08:10So I think I at this juncture I would I

3:08:14I I will heir on the side of more

3:08:17transparency in this industry than less.

3:08:20And I think it's hard to treat it as the

3:08:22same as

3:08:24what a a housing development or

3:08:28honestly I would say for our um

3:08:32emergency shelters, we might even we put

3:08:34maybe a little bit extra scrutiny on

3:08:36them more than we're talking about um a

3:08:40data center development currently. So

3:08:43those are the things that I'll just kind

3:08:44of bring into the fold. I think it's an

3:08:46interesting question about um the

3:08:49primary eliminating primary zoning. I've

3:08:52only really heard about this in the last

3:08:54week. Uh while we've been steeped in our

3:08:57policy conversations at city hall about

3:08:59what's the best way forward, I I don't

3:09:03uh imagine to speak for the rest of my

3:09:06colleagues in terms of what they will

3:09:08support or won't support, but I think

3:09:09what this body does sends a message. Um,

3:09:13I also will just like point to the high

3:09:17level of community engagement and the

3:09:18direct ask for transparency as one of

3:09:20the top priorities. And I think

3:09:24there is work that state states need to

3:09:26do. And in the meantime, while they put

3:09:28the comprehensive regulatory framework,

3:09:31local governments should safeguard as

3:09:35much as possible and allow community

3:09:36members to have a say and have more

3:09:38oversight. So, those are a couple things

3:09:40I wanted to add into it. I'll also share

3:09:43I've shared before to my colleagues um

3:09:47to staff. I've also shared it on my

3:09:49newsletter. I am concerned about the

3:09:51175,000 square feet. I do think that is

3:09:55really large. And I also think it's hard

3:09:59to get past one

3:10:03one

3:10:05downtown data center being at 70 megawws

3:10:07and then down the street or just like

3:10:10five minutes over you have another data

3:10:13center that's at the same size and

3:10:15you're at 140 megawws of use that you

3:10:19didn't have before. It's like it's not

3:10:21one campus but it still amounts to a

3:10:24hypers scale. So those are some of the

3:10:27things that I'll bring forward. Um I do

3:10:30think it is very likely that we come

3:10:32back to this policy and changes are made

3:10:34given how everything is changing really

3:10:37fast like things are already way

3:10:39different than they were when we started

3:10:41in May and when we placed the moratorum.

3:10:44Um the political reality that's one

3:10:46we'll have to see. But I think the thing

3:10:49that's before us is what is the best

3:10:52thing that we can do out of this

3:10:54discussion with the tools that we have.

3:10:58>> Commissioner Connley.

3:11:00>> Thank you, Mr. President. A couple of

3:11:02things I that I just wanted to mention

3:11:03is, you know, the amendment that that I

3:11:06would like to bring forward really is

3:11:07about maintaining local control. I'll

3:11:09say that in the staff's recommendation,

3:11:11they highlight that there's a very

3:11:13limited ability for cities to regulate

3:11:16data centers due to state preeemption.

3:11:18So since we are preempted from doing the

3:11:20kind of regulation that we know really

3:11:22is needed here, it's even more important

3:11:24that we just retain our ability to say

3:11:26no to proposals that could potentially

3:11:28hurt our communities. So for me, that's

3:11:30local control. I'll also say that we do

3:11:32kind of have a role in setting the

3:11:34rules. uh staff is getting our uh our

3:11:38feedback, our recommendations on what

3:11:40the 2050 plan could could look like and

3:11:42and that's rule setting. I think that we

3:11:44have a piece of that to consider. And

3:11:47then I also think that this the

3:11:48conversation around revenue and revenue

3:11:50desperation is real and it's happening

3:11:52all over the country. But I want to

3:11:54really just be clear that the reason why

3:11:57so many communities are desperate for

3:11:59revenue right now is because of the

3:12:01devastating impacts of the federal

3:12:03government and what HR1 has done to

3:12:05counties and cities which has stripped

3:12:07us our ability to um maintain revenue

3:12:11outside of property tax. So, I I'm

3:12:14co-chair of the county's

3:12:15intergovernmental relations committee

3:12:16and we're going to the capital to get

3:12:18rid of things like preeemption. Um

3:12:20because we need to be able to bring in

3:12:22new sources of revenue and we can get

3:12:24creative with that. Um data centers come

3:12:26in and they really sell to communities

3:12:30this idea of lots and lots and lots of

3:12:32revenue. Lowden County, Virginia is a

3:12:35really good example of that. They are

3:12:37swimming in riches because they are the

3:12:39data center capital of the world. Um

3:12:42[snorts] what you don't hear about

3:12:43though when you hear about the revenue

3:12:44that comes into Lowden County, Virginia

3:12:46is um the water usage, the the water

3:12:51restrictions for communities, mostly

3:12:53communities of color. Um [snorts] the

3:12:55the sound, the the all of the things

3:12:58that that we've heard from from

3:12:59residents tonight and that we are kind

3:13:01of talking about are are things that

3:13:04there are communities, cities that have

3:13:06chosen the revenue over um over the

3:13:10risk. And it's because we are all

3:13:12desperate for it. Um we can't rely on

3:13:14property tax in a way that we used to

3:13:16before. Um I think you mentioned it,

3:13:18President Meyer, we keep going up in

3:13:20terms of our property tax levy and

3:13:22that's not sustainable. So we do have to

3:13:24look at new sources of revenue, but it

3:13:26doesn't have to necessarily be one

3:13:28source, right? We could be very

3:13:29creative. we could use our legislative

3:13:31muscle to to fight back against or or um

3:13:35for for the direction that we need on

3:13:37more um stringent regulations around

3:13:40state statewide around data centers. Um

3:13:42but for this proposal or for for the

3:13:45amendment honestly it really boils down

3:13:47to what we can and cannot control and it

3:13:50doesn't necessarily um stop any data

3:13:53center build. I mean I would be

3:13:54supportive of a smaller footprint. I

3:13:56think it was mentioned that there's a

3:13:57potential amendment around reducing the

3:13:59footprint to maybe 50 to 75,000 square

3:14:02feet. I would be okay with that. For me,

3:14:04it's just if there's overlay overlay

3:14:07zoning as opposed to um as opposed to

3:14:11primary zoning that gives um more

3:14:14control to the local government, the

3:14:16local entity that's making the final

3:14:18decision. I just think that's important.

3:14:20>> Thank you.

3:14:21>> Let's take up your amendment now. First,

3:14:23um, is there a motion to adopt the staff

3:14:26recommendation? Put that on the floor

3:14:28first.

3:14:28>> So moved.

3:14:29>> Second.

3:14:30>> All right. Now you can propose an

3:14:32amendment, Commissioner Connley, if you

3:14:33can repeat it.

3:14:34>> I will repeat it. Thank you, Mr.

3:14:35President. So my proposal is

3:14:38uh my proposed amendment would be that

3:14:41um data centers should only be through

3:14:43overlay districts through overlay

3:14:46district in DT1 and DT2 districts. no

3:14:49primary zoning with a re without

3:14:51conditional use anywhere in the city and

3:14:54I would move the recommendation and move

3:14:56to direct staff to draft the appropriate

3:14:58language in time for consideration for

3:15:01the uh by the bis committee of the city

3:15:02council.

3:15:04>> I'm looking to staff to see if that's

3:15:06sufficient direction.

3:15:08>> Me and Jason

3:15:13I think that is sufficient direction.

3:15:15Maybe the uh one additional question I

3:15:18would have is that should this overlay

3:15:21district have all of the same standards

3:15:24the staff has recommended be applicable

3:15:26to the DT1 DT2 zoning district? Is that

3:15:31part of the intent as well?

3:15:33>> Commissioner Conley, can you clarify?

3:15:39In other words, I'm I'm sorry to

3:15:40interrupt, but the no first and second

3:15:42floor, the must be in an existing

3:15:44building, those types of

3:15:45>> I think everything stays the same. It's

3:15:47just we're creating an overlay district.

3:15:48Thank you,

3:15:51>> Commissioner Shepard.

3:15:51>> Chair Meer, are there there are also

3:15:53suggested modifications to maximum area,

3:15:55suggested modifications to where in the

3:15:57building it can be located such as below

3:15:59grade? Should we get that done first?

3:16:03>> In other words, that would all were that

3:16:05to pass, that would also be part of the

3:16:07overly district. is my point.

3:16:11>> Yes.

3:16:12>> Is there a sequence

3:16:14>> mic? Sorry.

3:16:15>> Is there a sequence to that which we

3:16:16have to worry about or is that

3:16:18>> I would defer to staff but I would say

3:16:19if this you if this amendment passes

3:16:23then the other amendments would align

3:16:25with what this is doing.

3:16:27>> Yeah. So I mean it's a directive to

3:16:28staff. So staff would be able to

3:16:30incorporate any subsequent amendments

3:16:32and make them match I think.

3:16:36>> Okay. Did we get a second on that?

3:16:38Second.

3:16:39>> All right. Um, further discussion on

3:16:42Commissioner Connley's amendment.

3:16:47>> All right. Not seeing any. So, sorry.

3:16:49>> Sorry, Commissioner Trey.

3:16:50>> I just want to be clear on what this is.

3:16:53So it would be a reasonzoning that would

3:16:57come back come before the planning

3:16:59commission

3:17:01and then it would be everything that's

3:17:03within

3:17:05the current proposed policy and then it

3:17:07would have to go before the city

3:17:09council. Is that right? It goes between

3:17:11both bodies.

3:17:14Commissioner Chowy, that's correct that

3:17:16uh the the planning commission would

3:17:18make an advisory recommendation on the

3:17:20resoning for to apply the overlay

3:17:22district or to deny the overlay district

3:17:25as the case may be and that would move

3:17:27through the city council.

3:17:28>> Okay.

3:17:30I'm sorry I'm so confused between the

3:17:32two. Is this a quasi judicial would it

3:17:35still be a quasi judicial action?

3:17:37>> It would be a legislative decision

3:17:39whether to apply the overlay district.

3:17:42>> Okay. All right. Thank you. That helps.

3:17:45Again, I'm gonna hit 12 hours of being

3:17:48on committee in just a couple hours.

3:17:51[laughter]

3:17:52[panting]

3:17:55>> Commissioner Conley.

3:17:56>> Thank you, Mr. President. Just to add,

3:17:58so primary zoning is quasi judicial and

3:18:01that means that there's only legal basis

3:18:04to deny an application based on it being

3:18:05incomplete or inaccurate.

3:18:08Um, so what we would be doing with

3:18:10primary zoning is giving us less due

3:18:13diligence, whereas overlay zoning

3:18:15empowers the planning commission and the

3:18:17city council to evaluate each proposal

3:18:19on a case- by case basis

3:18:22to add some help.

3:18:24>> Thank you. Other thoughts?

3:18:28>> I'm going to be voting no at this time.

3:18:30Um, I I think the ordinance is pretty

3:18:32good as written and it's it's going to

3:18:34be a lot of work for for staff to re

3:18:38rewrite that and

3:18:40I I I just think we should try to lay

3:18:42out the rules as clearly as we as we

3:18:44can. Um, any other comments? All right,

3:18:47clerk, please call the RO.

3:18:50>> Commissioner Baxley,

3:18:52>> just to be clear, this is on the

3:18:53proposed amendment's

3:18:55amendment.

3:18:56>> The amendment.

3:18:57>> Uh, yay.

3:18:59Chry

3:19:00>> I

3:19:02>> Connley

3:19:03>> I

3:19:04>> Garcia

3:19:05>> I

3:19:06>> Gordon

3:19:07>> I

3:19:09>> Sheepard

3:19:09>> I

3:19:11>> and President Meyer

3:19:12>> no

3:19:14>> there are six I's and one N

3:19:16>> that is adopted. Are there additional

3:19:19amendments?

3:19:22Uh

3:19:24>> I would like to

3:19:27uh move an amendment to direct staff to

3:19:30um

3:19:32forward forward a um recommendation

3:19:37that the size [clears throat] the square

3:19:40footage size be capped at 50,000 square

3:19:43ft as opposed to 175,000 square ft.

3:19:50>> Is there a second?

3:19:50>> Second.

3:19:51>> All right. It has been seconded.

3:19:53Discussion to Commissioner Garcia's

3:19:54amendment.

3:19:59>> Commissioner Chowry.

3:20:03>> Um,

3:20:04I think it would be helpful to

3:20:06understand

3:20:08the amount of megawattage that this

3:20:10would allow for because I've kind of I

3:20:12want to be consistent in asking that

3:20:15question as we make square footage

3:20:16discussions. And I will also say that

3:20:19like the square footage

3:20:22decision

3:20:23or the square footage to megawatt math

3:20:27is not an actual

3:20:30there's not an actual strong methodology

3:20:32in that. I think there's like some

3:20:34assumptions based off of existing data

3:20:37centers and their square square footage

3:20:39that staff is making. They've done a

3:20:41really good job of trying to put

3:20:43together a key, but I think that's

3:20:45always an important asterisk to put on

3:20:47the square footage conversation. And

3:20:49that's why we need to get authority to

3:20:50regulate by megawatt because industry

3:20:52doesn't talk in square footage. It talks

3:20:54in megawatt.

3:20:57>> Other commissioners,

3:20:59>> that's Oh, I had a that was a question

3:21:00to

3:21:00>> Oh, sorry. Okay. Go ahead.

3:21:03I'm not sure I followed the specific

3:21:05question there, but I um I 100% agree

3:21:08with you that there is not a direct

3:21:11linear correlation between square

3:21:12footage and megawws. It's uh that's why

3:21:15in our in that matrix that was referred

3:21:17to earlier, there's a there's a big

3:21:19range within which um a data center is

3:21:23going to fall in terms of its megawatt

3:21:25usage within a certain square footage uh

3:21:29within a sorry the motion was uh what

3:21:32[snorts] size?

3:21:33>> 50,000

3:21:34>> 50,000. So we're looking at um

3:21:39uh you know 20 25 megawatt facilities

3:21:42most likely that but that again that's a

3:21:45that's a estimate.

3:21:52Anything further, Commissioner Chry?

3:21:55>> That's helpful. Um,

3:22:00I

3:22:01I think that there is a conversation to

3:22:04be had in terms of incentivizing higher

3:22:08square footage if they agree to battery

3:22:12storage. I think that's a way to get a

3:22:15community benefit.

3:22:18And I know that that's something

3:22:19[clears throat] that we've discussed. I

3:22:21don't know if that's something we could

3:22:22hold for the city council level, but

3:22:25that's where my mind goes.

3:22:30Uh, commissioners, I think, um,

3:22:33we would have some discussions with the

3:22:35city attorney's office, but I think it

3:22:38is likely within our authority, the

3:22:42city's authority to

3:22:45cap the square footage, but allow

3:22:47greater square footage if there's a

3:22:50certain degree of battery energy storage

3:22:52associated with the with the use. um how

3:22:57we would say what capacity that that

3:23:01battery energy storage has to have. Um

3:23:04I'm I'm not certain yet, but um I think

3:23:07they're that again that may be within

3:23:10our authority.

3:23:14>> That's it for me.

3:23:15>> Okay.

3:23:18Commissioner Bley,

3:23:20>> sorry. Jason, could you uh just talk to

3:23:23us one more time about how you guys

3:23:25landed on 175

3:23:28175,000 square feet?

3:23:30>> Sure. We uh commissioners took some

3:23:32direction from the city council's action

3:23:35to exempt facilities of a certain size

3:23:39from the interim ordinance moratorum and

3:23:43uh equated that to what would roughly be

3:23:47the white space in a facility of that

3:23:50size. And [snorts] there was also an

3:23:52intent to

3:23:55uh generally prevent

3:23:58uh hypers scale type of facilities of

3:24:01you know more than 100 megawws.

3:24:06>> Thank you.

3:24:09>> All right. Anyone else to Commissioner

3:24:11Garcia's motion?

3:24:16>> Commissioner Baxley,

3:24:17>> can we restate the motion again? Sorry.

3:24:19Commissioner Garcia, can you restate the

3:24:21motion?

3:24:22>> No, no problem. Um, the motion would be

3:24:26to um direct staff to create an

3:24:29amendment capping the square footage at

3:24:3350,000 square ft as opposed to 175,000

3:24:37square ft.

3:24:41>> Everyone clear on that?

3:24:44Commissioner Todd,

3:24:46>> I will just say this is not me saying

3:24:49that I don't support lowering the square

3:24:51footage. I do support lowering the

3:24:53square footage. I think where it is is

3:24:55too high. I think 50,000 is like I

3:25:00haven't spent enough time with that

3:25:01number to understand what that means.

3:25:05Um so I'm struggling with that. Um, I am

3:25:09supportive of moving this through and

3:25:12moving it forward, but I want to just be

3:25:14really tr transparent with that. I've

3:25:16been really consistent with the fact

3:25:19that the way that we have decided square

3:25:22footage has been very arbitrary both in

3:25:25the 350,000 square foot carveout that

3:25:27was in the moratorum that was decided

3:25:30between council members at a number that

3:25:32they could agree to. I think the 175,000

3:25:36is getting more to a reality, but now

3:25:38we're setting another arbitrary number.

3:25:41I'm I'll vote for this today to say that

3:25:44I support lowering it, but I think uh I

3:25:49would work towards getting us into

3:25:52more of a reality place with the square

3:25:56footage. So, that's what I'm going to

3:25:57say about that.

3:26:00>> Commissioner Gordon.

3:26:01>> Yes. I when originally proposing the

3:26:04amendment agree too that it's arbitrary

3:26:06and that's why I'm struggling with it

3:26:07rather rather than performance-based

3:26:09metrics. Um my points have been made

3:26:13purely on scale. If we're talking about

3:26:15eyes on the street, invigorating

3:26:16downtown, maintaining a sense of

3:26:18livability, all the comments that people

3:26:21presented, if you just take it, you say,

3:26:24"Okay, we can allow something around 17

3:26:25floors out of one building to

3:26:27potentially be a data center." I mean,

3:26:29that's what we're saying, right? I mean,

3:26:31that's the math. So, five floors, that

3:26:34opens it up to a boutique environment.

3:26:36If you want to have smaller companies

3:26:37with data centers in there, they could

3:26:39still occupy several floors. Again, that

3:26:41is just white space, too. There's going

3:26:43to be other circulation space. There's

3:26:44going to be bathrooms. There's going to

3:26:45be storage. There's going to be loading

3:26:46docks. There's going to be everything

3:26:47else that supports this. So, 50,000

3:26:50could easily transform into 100,000.

3:26:52175,000 could easily transform into

3:26:54350,000. That's why this arbitrary

3:26:56number is really difficult to wrestle

3:26:58with when we don't have metrics. I know

3:27:00we're not in control of that, but that's

3:27:01where I'm coming from.

3:27:04>> Other commissioners,

3:27:06I guess my thoughts, I mean, this is for

3:27:09it's only going to be allowed as

3:27:11currently proposed for existing

3:27:14buildings, adaptive reuse of them. And

3:27:16if an applicant came to me and said they

3:27:19they needed this in order to be able to

3:27:21put a vacant unit, vacant building to

3:27:24use, I'm going to be receptive to what

3:27:27they need to do that. Um, I agree that

3:27:29the number is is arbitrary, but um I I

3:27:34think with all the other restrictions

3:27:35that we have, I'm okay with having some

3:27:38more flexibility on it. So, I'm going to

3:27:40vote no on the amendment at this time.

3:27:42Any other commissioners? All right.

3:27:45Clerk, please call the role on

3:27:46Commissioner Garcia's amendment.

3:27:49>> Commissioner Baxley.

3:27:50>> Nay.

3:27:52>> Chowry.

3:27:53>> I.

3:27:55Connley.

3:27:55>> I.

3:27:57>> Garcia. I

3:27:59>> Gordon

3:28:00>> I

3:28:02>> Sheepard

3:28:03>> I

3:28:04>> and President Meyer

3:28:05>> no.

3:28:06>> There are five I's and two NAZs.

3:28:08>> That is adopted.

3:28:11Any other amendments or discussion

3:28:12before we go to the main motion?

3:28:16>> Below grade.

3:28:18>> Would you like to do the below grade

3:28:20proposal? Commissioner Beexling. We

3:28:21>> would actually. Yeah. Um, if we could

3:28:24direct staff to draft uh an amendment

3:28:26allowing

3:28:28um subgrade or below grade

3:28:32use uh data center use as part of the

3:28:34proposal.

3:28:36>> Is there enough clarity on that?

3:28:38>> Commissioners, I'm actually not aware of

3:28:40which rule we're thinking will would

3:28:42prevent them in subterranean levels. I I

3:28:45think it's a great idea for them to go

3:28:47into basements and I don't think the the

3:28:49draft prevents it that the the one thing

3:28:53that I did hear uh from President Meyer

3:28:56was that

3:28:57>> perhaps we would allow them in

3:28:59subterranean levels of new construction.

3:29:01That of course would not be

3:29:02>> okay

3:29:03>> uh authorized within the staff

3:29:05recommendation. But um

3:29:07>> well if you think it's uh allowed in the

3:29:09current proposal then I I'll withdraw

3:29:11the proposal.

3:29:13Can we reference the language of the

3:29:16current proposal?

3:29:18>> Does it use the word above?

3:29:22>> I'm not sure what you're asking.

3:29:24>> How is it worded in the current

3:29:25proposal?

3:29:28>> Oh. Um Jason, do you have an answer to

3:29:30that? Because you're you're not seeing

3:29:32anything in there that restricts it.

3:29:34>> I I can't think of anything,

3:29:36commissioners, that restricts the uh

3:29:39below grade levels, the the the first

3:29:41and second floors. Uh we are only

3:29:43allowing kind of conduit and and water

3:29:45pipes to go uh through the first and

3:29:47second floors to get up to the above

3:29:49ground levels. Uh but u there there

3:29:53shouldn't be anything that uh restricts

3:29:57uh below grade

3:29:58>> okay

3:29:58>> facilities.

3:29:59>> Um so you're already going to have an

3:30:01opportunity to rewrite it with

3:30:03Commissioner Conley's

3:30:05amendment. So if you so the staff's

3:30:06intent is that you're not restricting

3:30:08anything below grade. If you find that

3:30:10there is, you can adjust it consistent

3:30:12with Commissioner Connley's amendment.

3:30:15Um, my proposal would be allowed to

3:30:17allow in basement for new construction.

3:30:19I don't know if any other commissioner

3:30:21shared that.

3:30:23Not seeing any, so I won't make that

3:30:24motion.

3:30:26Any other motions or discussion?

3:30:34All right, then we're back to the main

3:30:36motion.

3:30:38Are people ready for a vote on it? As

3:30:41amended by Commissioner Garcia and

3:30:42Connley's amendments.

3:30:46>> All right. Clerk, please call the role

3:30:48on the main motion.

3:30:49>> Commissioner Baxley.

3:30:51>> Yay.

3:30:53>> Chry.

3:30:55>> I.

3:30:57>> Connley.

3:30:57>> I.

3:30:59>> Garcia.

3:31:00>> I

3:31:01>> Gordon.

3:31:01>> I

3:31:03>> Shepard.

3:31:04>> Hi.

3:31:05>> And President Meyer.

3:31:06>> I. There are seven eyes.

3:31:09>> All right, that concludes our business.

3:31:11Um,

3:31:12>> just make sure we're clear about what

3:31:14happens now.

3:31:15>> Yes, please.

3:31:16>> Since zoning code text amendments aren't

3:31:18something that's in front of you as

3:31:19frequently as other types of uh actions,

3:31:22the the staff recommendation moves

3:31:24forward to the uh business, housing, and

3:31:26zoning committee of the city council.

3:31:27That's what is before them. your

3:31:30recommendations will be drafted up by

3:31:31staff and will be attached to that uh to

3:31:35the city council's packet and summarized

3:31:38uh in the presentation to the business

3:31:40housing and zoning committee. So they

3:31:41will have they will have both of those

3:31:43things in front of them and they will

3:31:45they will choose from that menu of

3:31:47options.

3:31:48>> All right.

3:31:51>> Right. So thank you for everyone. That

3:31:53concludes our business for the day. Uh

3:31:56we do have committee of the whole on

3:31:57Thursday and then our next regular

3:31:59meeting um will be on October 26th. Are

3:32:03there any other updates from staff or

3:32:05commissioners?

3:32:09>> Uh chair mayor just the uh resoning um

3:32:1344th of Chowan was appealed and so

3:32:15that'll go to the biz committee at their

3:32:16next uh regular event meeting.

3:32:19>> Okay. It was it was a resoning so the

3:32:22legislative portion would have moved

3:32:23forward uh regardless but uh the site

3:32:26plan review was appealed.

3:32:27>> Okay.

3:32:29>> Anyone else?

3:32:32>> All right. We are a journ with time to

3:32:34spare.

3:32:35>> Okay.