  • Roll call and minutes: The committee met in a hybrid format with a quorum; members and the city mobility liaison each named the intersection most important to them. September minutes were approved on a motion and second, and Tom Lamar served as acting secretary.
  • Outreach events: Members filled tabling slots for the Monster Mash on Sunday, October 18 (one early shift still open) and discussed an Illuminations ride, likely focused on East Somerville because West Broadway work will not be finished. A joint ride with a Union Square yoga studio was pushed to spring. A member of the public described a group ride and screening of the film The Simple Machine in Arlington, with tabling space for local bike groups.
  • Bike and Pedestrian Counts 2026: The annual volunteer counts closed that day. Members said counts near schools should be done close to 7:15 a.m. to catch the peak, one member suggested every councillor count an intersection in their ward, and another proposed a detailed timestamped count to test how much results shift by hour. Volunteers noted heavy flows toward the Green Line extension and the Community Path, and a member recalled Cambridge counter data showing the cyclist peak lagging the car peak.
  • School Drop Off Traffic Safety: With bike lanes now on both sides of Elm Street near the Kennedy School and flex posts not yet installed, members discussed confusion over where parking is allowed. City staff said the short-term drop-off parking on Sartwell and Cherry Streets is now signed, the school has been told, and parking changes go through the Traffic Commission. One member said they saw a space free about half the time from 7:40 to 8:10, with city trucks and long-term cars in the short-term spaces, and urged enforcement. Members also discussed school bike buses, which leave from the Community Path and L Street, and encouraging schools to promote them.
  • Webster Avenue Bridge Replacement Bike Facilities: Members reviewed the one-page MassDOT plan, the only design shared since the March 2025 public meeting. It shows a 10-foot raised bikeway apparently northbound only, leaving unclear what southbound riders would do. City staff said the bridge is going out to bid this month with construction planned for next year, and that Prospect Street, the Webster Avenue bridge and Newton Street are in phase one of the Union Square Plaza project, which still lacks funding. Staff said they will ask the project designer to return and are preparing interim conditions. No vote was taken.
  • City update: Staff announced the Tufts Street Neighborway ribbon cutting for Tuesday, October 6 at 11 a.m. Somerville Avenue and East Washington Avenue engagement reports are out, with Somerville Avenue designs expected at the end of the year; Community Path pavement markings and tests at the Central Street intersection are underway; West Broadway sidewalk work continues; the Mystic River bike-pedestrian bridge has a construction contract with a three-year schedule; McGrath Boulevard designs are expected later this year.
  • Adjournment: A motion and second to adjourn passed; the next meeting is in November.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:10Oh gosh.

00:13Excuse me. I got hit right out of the

00:15bat with an adorable baby on camera. Um,

00:19welcome to the October 2026 Bicycle

00:23Advisory Committee meeting. Um, this is

00:27both this is hybrid. We've got folks in

00:29person. You can come in person. We're in

00:31the TOPS administrative building and

00:32we've also got folks on Zoom. So, um we

00:36will go through and to ensure we have

00:38quorum do a little roll call and a

00:40little um um icebreaker question. And um

00:46in the spirit of

00:49our bike pedestrian counts, not everyone

00:52got was able to sign up to do one. So,

00:54but my question is what is what is what

00:57intersection is most important to you?

01:00And I will start. Um I'm Lena Webb. I'm

01:03the chair of the committee. Um I live in

01:06W seven and the intersection that's most

01:08important to me is Broadway and

01:10Illithburg Parkway.

01:13And I will pass it on to our acting

01:16secretary of the night, Tom Lamar, and

01:19guest.

01:24Yeah, we need to see the

01:26>> Here's little guy. He's right at daycare

01:28this week.

01:29>> Uh he's having a great time. Um uh

01:33favorite intersection I I will say doing

01:35counts at um in Union Square is really

01:38fun because there are so many bikes that

01:39it's hard to keep track of and that's a

01:41great experience. Um

01:44uh but for uh for otherwise doing

01:46counts, I I really like picking

01:48somewhere that has a nice coffee shop or

01:49something hanging out of the patio.

01:52strategy of doing counts.

01:55>> You got to line up the sight line with

01:57your c your street on street dining.

02:01>> I do I do plan it out intricately and

02:03check out the sight lines.

02:05>> I know it's it's really fun. Anyway,

02:07we're going to talk a little bit about

02:08it. Um Adrian, I see you there. Um

02:13can you sign sign off?

02:16>> Sound off.

02:17>> Um hi Adrian. Can you hear me now?

02:21>> Yes.

02:21>> Yeah. Um, Adrien Agarwal. Okay. W five.

02:25And I,

02:28um, I would say Cedar and the community

02:31path is real because I like walking from

02:35there. That's the closest entry and I

02:38use it almost every really important

02:41path uh, location. And I did a new

02:44location this this year and it was

02:46interesting to see how much less busy it

02:48is. I did theater in the community path

02:50last year for counts and

02:53>> it's a really busy one.

02:56>> Well, we'll talk a little bit more too

02:57about about the bike counts. Um, thank

03:00you. And then Cat Banesh, hello.

03:03>> Hello. Can you guys hear me?

03:05>> Hi. Yes.

03:06>> Cool. Uh, I'm going to be off screen in

03:07just a bit finishing dinner and then

03:08I'll be on. Cat Benish, I think W three.

03:11I always forget. It's only been 10

03:13years. Um

03:16uh oh to I know I vote in the church at

03:20St. Catherine's. Um let's go with that.

03:23Um I you would phrase it the most

03:27important or most interesting

03:28intersection. Um so I didn't think this

03:30is here

03:31>> to me and it's actually it's funny. It's

03:32funny how it changes when your commutes

03:34change.

03:35>> So I was talked to several about this

03:36recently. My son now goes to Capawano

03:39and I now take the left at Cross Street

03:42and the community path every day. Uh,

03:45and I was really struggling with that

03:47because it's a very much a blind left.

03:49You cannot see the cars coming. And then

03:51Amanda suggested taking the Gilman

03:52Street underpass off Walnuts and that

03:55has been a game changer. And I'm like, I

03:57want to tell all the parents cuz so many

03:59parents bike the Capawan of like and I

04:02really like the Tusk um street neighbor.

04:06I think it's fantastic. Uh, but getting

04:09there is actually really hard across

04:10that bridge from that left in a cargo

04:12bike. Um, so that's I think something

04:15we'll talk about at some point in the

04:16bike committee. Also, I realize I've

04:18been very remiss in telling this, but

04:19some of you saw me at the Gilman Arts

04:21Festival two weeks ago, but I'm 37 weeks

04:24pregnant, so I will probably be missing

04:26the November bike meeting, but I'll be

04:28back in December.

04:29>> Um, Congratulations.

04:32>> Thank you. But I am still biking, which

04:34is very exciting. And I would not be

04:35able to get around right now without my

04:37cargo bike because I cannot get a kid in

04:39and out of a cargo seat on a bike.

04:41>> It's low impact.

04:43>> Biking is awesome.

04:45>> That's awesome. Congratulations. Um and

04:48then Alex and Katherine Lane are both

04:51absent tonight. So, uh we did I ask you

04:56Tom? I started with Tom and then Amanda

04:59in person.

05:00>> Um hello Amanda Riel.

05:02>> I think the owl will find you. That's

05:04done. Um, so I counted at the closest

05:10counting place to my house and on my

05:12commute, which is Central and the

05:16Junction Park. But like one some

05:19intersections that are important to me

05:20that I don't love and I would love to

05:23have better because I I do them every

05:25day and so does my son on his bike is to

05:28like traverse

05:30um Broadway at Temple Street to get down

05:32to Blessing of the Bay Boat House and

05:34like there's sort of a box to cross from

05:38Marshall but it it's a little I don't

05:40let him do it. I make him go at the

05:42light but um you know

05:45places to make improvements.

05:47>> Yes. And we just had Ted vice chair sign

05:52on the um question is what what is an

05:56intersection that is most important to

05:57you? What intersection is really

06:00important to you?

06:02>> Yeah, that's a great it's a great

06:04question everybody. um

06:07intersections that I pass through a lot.

06:11Um

06:14I mean I regularly go down Mossland

06:18Street. So I think the intersection of

06:21Mossand with Somerville A and with Elm

06:23are both um like navigating that is a

06:27corridor I use a lot.

06:30um navigating. I need to put a 311

06:35request in for um

06:38Elm and Somerville AB. It's great to see

06:41the flex posts. The pavement quality

06:44along the the newly striped bike lane

06:47there is just so not great that I hurt

06:50my wrist.

06:50>> We'll get to that. We'll get to that.

06:53>> Yeah.

06:55>> Going through. So,

06:56>> good to see you, Ted. Um and then we

06:59have um oh we have um Paul secretary of

07:04committee

07:06>> uh Paul Morgan mine is ditto to Adrian

07:09community path in Cedar Street close to

07:12my house and I am so impressed at the

07:15volume of crossings there especially

07:17considering there's almost no commercial

07:20activity

07:22at that location.

07:24>> That's also an excellent choice.

07:27Yes,

07:29>> you didn't get John.

07:30>> Nope. We will now move on to our

07:31exhibition. Uh John counselor link.

07:36>> Hey. Um so I think for me it would be

07:40the the most important intersection

07:41right now is the um

07:44uh what is it? So it's Washingtonville

07:51pro uh Webster um

07:54>> intersection.

07:56square.

07:57>> Oh, yeah. Uh, so that's, you know, I

08:00have to go through that intersection,

08:02uh, every day with my kids. Uh, and it

08:06is a little bit of a nightmare. So, um,

08:08that is the one that I think about a

08:10lot.

08:12>> Awesome. Yes. Yes.

08:16Um, so we do and Rishika, hi. Mobility

08:20liaison,

08:22MC of the whole show.

08:25Um, I'm Rushka, community outlet

08:28coordinator with the mobility team. Um,

08:31I don't know if I have a favorite

08:33intersection, but I did do bike pedals

08:35last year um on two of the Potter House

08:39streets, and I thought that was

08:40interesting, just like trying to guess

08:42where people are going to go, like which

08:44street. So, that was definitely fun to

08:46see.

08:48>> Awesome.

08:50I think that's everybody. Um and that we

08:55have a quorum. Um we can go through the

08:58general stuff quickly. Um Tom Lamar is

09:00acting secretary tonight. Thank you,

09:02Tom. Um and if we can get approval of

09:06our September meeting minutes. Um can I

09:09get a motion to approve those minutes? I

09:11have one from Amanda, a second from Ted.

09:14Everybody else, please make your vote

09:16known. say I

09:21>> September meeting minutes are approved.

09:24Um and just a check-in quick check in

09:26about upcoming outreach events. I know

09:28we have some that Adrian has been

09:30coordinating with everybody um as to uh

09:34tableabling slots. Um Adrien, do you

09:36have um everyone you need um or can can

09:40this be like a little call to any slots

09:43that you have left? I know I'm doing

09:46Monster Mash in the afternoon, right?

09:49Yeah.

09:50>> Yeah. Yeah. So, we have um we have one

09:52more spot the earlier uh Monster Mash

09:57spot if anyone can do that.

10:00>> Uh uh I think so. That's the Sunday. Um

10:04>> 18th 18.

10:06>> Okay. Yeah. So it's it's Sunday the 18th

10:10of October and the first shift is 1 to 3

10:14and then Lena you're doing 3 to 5.

10:17>> Correct.

10:18>> So if anyone can do it wonderful. Um we

10:21also can just do half the time if need

10:23be.

10:25>> And is that the is that the next most

10:28soon upcoming one? Yeah, we had one for

10:31uh an opportunity for this coming

10:34Saturday for the farmers market, but um

10:37both Ted and I had to uh cancel.

10:42>> Cool. Um do we have any other shoutouts

10:45for upcoming outreach events?

10:48>> Um Alina, I I guess I maybe missed on

10:51the on the meeting notes, but you had

10:53been talking about a yoga a bike ride to

10:56a yoga studio. Did that happen or is it

10:58going to

10:58>> have to wait to like bloom in spring?

11:01>> Oh, okay.

11:03>> Yeah. Yeah. But what's good to know is

11:05that the place that they're looking at,

11:07so they the the studio is in Union

11:09Square. They do Pilates, yoga, um

11:13strength class as well. But um they're

11:16very like integrated into the community.

11:18They like doing walks and community

11:20stuff at I think it's called the

11:21Somerville Growing Center. um as well as

11:25pop-ups at Remnant

11:27um in the mornings. And so they gave us

11:30both of those options, but there's more

11:32flexibility with time and like if we

11:34wanted to have a ride beforehand, I

11:36think you have to be starting at Remnant

11:38at 9:00 a.m.,

11:39>> but at the Growing Center, it could be

11:42closer to noon. Um Saturdays work best

11:44for them. So basically, it kind of just

11:46got whittleled away until there just

11:47wasn't an option for the fall and um

11:50they're still interested in doing it. um

11:52they would love to, you know, bring new,

11:55you know, folks in from, you know, kind

11:57of trade, have have folks that do yoga

12:00pilates, maybe come on a bike ride

12:01around and vice versa.

12:03>> Um so that's something for the spring,

12:06>> but I like the venue. I do like the

12:08Somerville growing center. It's like

12:09outdoors, so like the weather would be

12:11important as well.

12:12>> Um so that's a that's a fun thing for

12:15the future. And I don't know, Paul, do

12:18you have any rides of significance?

12:21>> Well, the Illuminations ride is coming

12:23up

12:23>> sooner rather than later. You're like

12:25putting the holiday candy in the CBS

12:27right now.

12:30>> So, um, I'll be reaching out to the

12:31Somerville Arts Council

12:34>> shortly to tell them our plans. Um, most

12:38likely it'll be an East Somerville ride

12:41this time going along with the

12:45um out what I outlined at an earlier

12:48meeting where we would rotate the rides.

12:51Um, it seems like West Broadway will not

12:53be available, not be completed by that

12:57time. So, we'll go with East Somerville

13:00this time.

13:02And uh so if anybody's interested in

13:04being planning that

13:06or anything to do with that, let me

13:08know.

13:10And if anyone

13:12wants something to do Saturday morning,

13:14October 18th before you table the

13:16Halloween family bike ride is that

13:19morning. It is not in Somerville, but uh

13:22it is nearby in Alustin. They have some

13:25cool infrastructure over there that I

13:27never would have known about. Um that's

13:29fun to explore.

13:31Thanks for the plug.

13:33>> Yeah, any and all upcoming outreach and

13:36events.

13:37>> Hello, member of the public. Please

13:40introduce yourself.

13:41>> Hi, Zachary Yoro, member of the public.

13:43I'm in David Square. Um I'm uh

13:47organizing a group ride to there's a

13:49screening of a movie called The Simple

13:51Machine which is about a guy who fixes

13:54up a bicycle and it's like about it's

13:57supposed to be about like economic

13:58mobility and personal freedom that

14:00that's from that. Um but we're doing

14:02this group ride from Boston up through

14:05Brookline all the way to Arlington. But

14:07also apparently there's a a different

14:10bike related event with the um the new

14:14New England Juice Cycling. I might have

14:16the name wrong off the top of my head.

14:18Um and the theater said that there's

14:21space there for local bike related

14:23organizations to table. So I wanted to

14:26let you all know about that. Um

14:30completely understand that this is a

14:32group that does a lot and there are a

14:34lot of events. Um but um I'll ensure

14:38that that has uh hit your all's radar.

14:41>> No, that's awesome. And that uh if we

14:44like look up uh Cambridge Bike Safety,

14:47would we find more information on the

14:49the the screening ride?

14:51>> Uh definitely at the QR code, there's an

14:53event on PartyFull. I need to double

14:54check if it's been put on the Cambridge

14:56Bike Safety

14:58>> website yet.

14:59>> I bet it will be.

15:01>> If it isn't now, it will be soon.

15:03>> Okay. Well, that's awesome. That looks

15:05cool.

15:05>> It's at the the tableabling would be at

15:08the region's theater in Arlington where

15:09the actual screening is. Um though

15:11obviously u if yall are down to um

15:15support the ride as well or just feel

15:17like joining it that would be great.

15:19>> Yeah.

15:20>> Always happy to have more people at a

15:21group ride.

15:23>> Awesome. Thanks so much.

15:25>> Yeah.

15:26>> That looks awesome. By the way, look up

15:28a simple machine. Um

15:31awesome. Uh let's move right along. We

15:34did hit on this a little bit in our um

15:37our icebreaker, but um 2026 pad bike

15:42counts closed today

15:45um last day and it's always a fun thing

15:48to do. I always have a good time and

15:51learn something from every year that

15:53I've done it. I used to kind of like do

15:55too much. Now I just like do the ones

15:57that are I don't overextend myself. I do

15:59the ones that are important to me. like

16:01my question, the intersections that are

16:03important to me. Um, and I'll just start

16:07really quick. I have a couple things.

16:09Um, one thing particular just like for

16:12mobility as well, and I'll submit this

16:14in the comment section when I turn in my

16:16sheets tomorrow. Um, I was doing my

16:19count at North and Powder House, which

16:22was right near the West uh, Somerville

16:25Neighborhood School. And um I was there

16:29with the crossing guards. I don't know

16:30how many folks did counts and also

16:32shared an intersection with our greatest

16:36folks, the crossing guards. Um but ma

16:40mine gave me a heads up that said, you

16:42know, you should come at 7:15 if you

16:45want

16:46to see like 100 people and 100 people.

16:50And so I wonder that if there's

16:52locations in the future that are near

16:55schools,

16:56you know, because 7:15 is the early side

16:58of the range. So I was on the later

17:01side. So I went at like 7:40.

17:04And so I missed the action. And she kept

17:06looking at me like she was like, "See,

17:08you know, you this would have been way

17:11more exciting for you had you been here

17:12earlier." So I wrote it down. And so I

17:15don't know if there could be like a

17:16special note for the intersections that

17:18are close to schools where you see a lot

17:19of like cargo bike like walking um

17:23getting to school to advise if you can

17:25get closest to 7:15 on those you'll get

17:28a more accurate count of like when you

17:30get the most. So that's straight from a

17:33crossing guard through me to you because

17:36it makes sense. Um,

17:38and

17:41I think that was like the main thing

17:43that I wanted to pass on. Um,

17:48yeah, that was that was the main thing I

17:49wanted to share for my bike ped account

17:52experience. So, um, oh, and another

17:54thing I did when I was looking at the

17:56signup sheet, I was happy to see

17:57counselor Wheeler um, sign up to do a

18:00shift. And now that made me think that

18:03every year a counselor should have to do

18:07one intersection in their ward should

18:09have to do it. Everyone, every counselor

18:11counselor link.

18:12>> What about large?

18:14>> You're missing out. So you're here

18:15you're hearing you're like, "Oh, I wish

18:16I had picked an important intersection

18:18to me." Um, no, but it's really good

18:20because like even you know the

18:22intersection becomes more important to

18:23you after you stare at it for an hour

18:25and like in my case the like carnage and

18:28insanity that is the you know Broadway

18:30and Oford Parkway you know I'm invested

18:33in personally invested in that. Um, but

18:35anyway, I feel like it's a good thing to

18:37kind of see like, you know, step out

18:40from, you know, I know we have a very,

18:43you know, walking, biking, um, transit

18:47forward council, but to just kind of

18:50watch what folks on foot and on bike

18:52like with your boots on the ground like

18:55um, is is cool. And I think I think it

18:58should be mandatory

19:00per counselor, per ward. And I don't

19:03know how you would organize that

19:04mobility, but you can enforce it

19:06somehow. I know it. Bring it to the

19:08traffic commission.

19:11Um, but yeah. So, yes, have counselors

19:13do it. And then also, if you're near

19:14school advised to start earlier, those

19:17are my two thing things from that. I

19:20don't know if anyone else who did counts

19:22uh had any fun observations or or things

19:26to share.

19:28>> I was I know Amanda, I'm alive bound

19:31commuter. So I go towards Davis, but

19:34I've noticed that the majority of people

19:36in the morning are going towards Lee Mir

19:39>> on the path.

19:41>> Although there's a lot going both ways,

19:43but

19:43>> on Boston.

19:44>> Yeah. So like the extension has really

19:47like ramped up

19:48>> the number of people especially on bikes

19:51going

19:52>> back.

19:56>> Tom, did you do counts?

19:59Uh, this is the first time in many years

20:01that I did not uh just don't get into

20:03this little guy's schedule, but usually

20:06I love doing many counts.

20:09>> All right. Well, I I don't know. Oh, Ted

20:12has his head his virtual hand raised.

20:14Hi, Ted.

20:15>> Yeah. Um I I did accounts at uh

20:21>> at uh Broadway in u Boston A on

20:25Somerville side and it's always amazing

20:27just to see the stream of people going

20:31to the GLX extension and I started in

20:35the morning few minutes after 7:30 and

20:38towards the end of the hour there was

20:41pretty continuous stream of cyclists

20:43coming from the the Bedford side of uh

20:48Boston A going to the community path

20:50access. Um so it's really cool to to see

20:54that.

20:57So no no nothing I would change or major

21:00observations but just you know cool to

21:04cool to see the infrastructure being

21:06found and used.

21:10Lena, uh, your your comment about the

21:127:15 a.m. school drop off got me

21:15thinking. I've kind of speculated

21:16sometimes. I'm curious mo if mobility or

21:18any especially dedicated volunteers have

21:21ever considered doing an especially

21:23detailed timestamped count uh at, you

21:27know, several chosen locations with the

21:29idea of kind of assessing like how much

21:32would the count shift for this

21:33particular location. uh if either there

21:36was a different methodology or if the

21:38the volunteer, you know, happened to

21:40pick slightly earlier, slightly later

21:43within the time range that that they're

21:45allowed to choose. Maybe something like,

21:47you know, you spend a full like

21:50two or two or three hours all through

21:52rush hour doing a very detailed count

21:54that capture the time stamp for each

21:56time a person comes through. I can get

21:58kind of a sense of like, you know, is it

22:01is it pretty standard and would you get

22:03the same numbers if you did, you know,

22:06uh uh an hour anywhere in that window or

22:10or does it change drastically?

22:12>> You need an app

22:15for sure.

22:16>> Uh summer school start at 810 by the

22:19way. Uh I don't know what school that

22:21was that would have so many at 7:15.

22:25>> So it was some school I don't

22:29>> because you don't understand at 7:30 7

22:32when does breakfast

22:33>> Yeah. But you don't get like a giant

22:34influx.

22:35>> I know. I actually noticed in my area

22:37more people were coming like I started

22:40at 7:20ish

22:42and like it got much busier like towards

22:45G.

22:46>> I mean it was clear that I was late.

22:49Showing up at 7 showing up at um

22:53>> yeah was not sufficient. I was I was too

22:56late for the action at 7:40. Yeah.

22:59>> Um

23:03yeah, I feel like I don't know. Oh, P,

23:05do you still have your hand?

23:06>> Yeah, I was going to say so haven't ever

23:08looked at this in Somerville, but about

23:1010 years ago, I looked at this

23:12>> through the the Cambridge like automated

23:15bike counter data that's released on

23:16their data portal. There's a there there

23:19was a small peak of cyclists around like

23:22start of school time, but it looked like

23:24there was a much bigger bike rush hour

23:26that was like 9:30, 10:00.

23:30>> Like the cyclist rush hour seemed to

23:32sort of lag.

23:33>> Yeah.

23:34>> The car rush hour by like an hour.

23:37Well, I I used to do I like I used to do

23:41in like three years in a row I did um

23:44Willow and Elm

23:47and

23:49that was a tremendously busy busy

23:52intersection, but it was I thought it

23:55was going to be super bike busy. It was

23:56so pedestrian busy right there. There's

23:59there were so many people walking on

24:01Elm. Like I feel like when I do my you

24:04know bike pet counts the peds like I get

24:07a lot of people walking. We definitely

24:09have a ton of people walking in

24:10Somerville like walk commuting in

24:13Somerville and like you can even see it

24:15like heading to to Illife like on the

24:18path like you have tons of people

24:19walking in the morning. Um which is

24:22always good to see but I'm always

24:23surprised at how like robust the

24:25specifically the pedestrian numbers are.

24:28Um,

24:30but I think to I guess it might be

24:34unless there do we have any public

24:36comment on any bike anyone who

24:40volunteered

24:42any bike palance observations? If not,

24:46um, we could go right into the kind of,

24:49you know, think about school granular

24:51school pickup, drop off, um, who's

24:54coming how. Um

24:57that's a good lead in to talking a

24:59little bit about um just the Elm Beacon

25:02connector project roll out as it is

25:05continuing. And then also um just

25:08something that came up that that kind of

25:10came to ESPback and had questions about

25:13kind of what was going on is um

25:16the JFK school

25:19um pickup drop off time specifically. um

25:22now that there are bike lanes um on both

25:27sides of Elm Street um both of which

25:31will have flex posts, but currently the

25:36just that part of Elm Street doesn't

25:38have flex posts yet. Um so I think there

25:41was a little bit of can we park here,

25:44can we not park here? Um and

25:49uh one thing that I what when this

25:52question came up I what I recall from

25:54the plans was that there was to be not

25:57like auxiliary but like additional

25:59parking provided on some of the side

26:01streets which are on the the side of the

26:04school. um that is like I guess live

26:08parking I've learned is the term where

26:10you know folks are able to come drop off

26:13and go and keep that space turning over

26:16um and have that specifically to sort of

26:19offset um any

26:22curb you know repurposing outside of JK

26:25school on street. Um, and I think there

26:28might have been a little bit of like a

26:30communication breakdown about like that

26:32specific thing, whether it existed,

26:33whether it was going to be available

26:37soon or later. Um, and I think that

26:42there's just a little bit of a Okay,

26:45cool. So, there'll be some updates, I

26:47guess. Um, yeah. So basically this stuff

26:49just kind of came across our our desk if

26:52you will and we talked a little bit with

26:54mobility kind of just about like where

26:56it's at, you know, where are the flex

26:58post is that parking coming just to so

27:00that we can kind of have, you know,

27:02communication, not just sort of like I

27:05heard this, I heard that like post on

27:06Reddit or Facebook or whatever. Um,

27:12so I guess and then the other nice thing

27:16about this is that in talking about it,

27:20you know, we'd like people to be using

27:22the new bike lanes to get to school. Um,

27:26and so we've been recently talking about

27:28safe school partnership and this is sort

27:30of a, you know, like why don't we get a

27:32bike bus? Why don't we get a bike bus

27:34going to like, you know, help those

27:35lanes get used for, you know, and and

27:38offset that need in a different way? Um,

27:42>> there is a Kennedy bike bus.

27:44>> There's a Kennedy bike bus

27:46>> and I'm sure they would welcome any

27:49support.

27:52>> Like what? Like how what's the like how

27:55many strong like I don't know how you

27:57describe a bike? Um, the Kennedy bike

28:01bus

28:03I think is in the 10 to 20 range. Um,

28:10and um,

28:12>> the root

28:15>> um, I can I could find what the route

28:18is. It's in in my phone, but um, I don't

28:21want to take up too much committee time

28:23on that. They do

28:26struggle a little bit with the route and

28:28the pros and cons of different options

28:31within the route and they have expressed

28:34some frustration about a curb cut going

28:38away. I'm not prepared to um speak uh

28:43much to that but um it's at some point

28:46they will probably be coming to mobility

28:49or whatn not to ask about it but I guess

28:52it was um very important to their their

28:56mission last year and they're frustrated

28:58about a change this year. Um

29:01>> would they like marshals to help them? I

29:03>> I mean I'm sure I'm sure they would.

29:09Uh there are three bike buses that all

29:11leave from L Street and Community Path.

29:15Uh Edgarly Brown and Kennedy. If you go

29:18there at that at um 7:50, it looks like

29:22there's like a giant bike ride that's

29:24about to happen.

29:25>> Um it's like a wonderful chaos

29:28scene.

29:29>> So I wonder if the school knows that

29:31like these things are options. It's like

29:34I'm wondering like if it has been

29:35communicated to like the school that

29:37there will be that this like live

29:38parking exists and also that there is a

29:40bike bus that is you know promotable

29:43from like the school's end. So I don't

29:46know

29:48>> uh yeah my observation is the schools um

29:51don't do a lot of promoting of these

29:53bike buses

29:54>> or adopt or adopting or partnering and I

29:57think that that would be

29:58>> a good thing if they did. I've made some

30:02overtures to um at the schools I've been

30:06involved with and been softpled a bit.

30:10Um everyone's busy.

30:12>> Um I think that there should be, you

30:16know, we should all be trying to mode

30:17shift and uh I think it's uh should it

30:21would help help the school to have mode

30:24shifting. Um the Kennedy I don't know

30:27how much you want to jump around. The

30:29Kennedy School has some

30:31uh drop off differences from the other

30:35schools that I'm aware of where they

30:38don't have morning supervision. So, the

30:40parents have to stay till 8:10 and that

30:44um is a detriment to the parking issue

30:48because other schools parents can drop

30:52off at 7:45 and then leave with their

30:54car. So, there's more cars hanging

30:57around the Kennedy School and there's

31:00some, you know, institutional

31:04uh maybe resistance to changing that,

31:07but um it can be done. The teachers

31:10union does allow it with a stipend

31:12that's done at other schools. Edgarly is

31:16and Brown School are experts at at this.

31:20Um, so I, as I I'm a new Kennedy parent,

31:24I'm intend to keep promoting that

31:28>> from within.

31:31>> I don't know, I'm getting off track

31:32here.

31:33>> That means the live parking doesn't work

31:34for those folks is what, you know, we're

31:36kind of coming down to because there's

31:37no live parking when you have to walk

31:39away.

31:41>> Yeah, I I did do an observation.

31:43>> I was going to say

31:45>> 40. I did like my own my own version of

31:48a

31:49>> of a count but for cars parked at

31:51Kennedy.

31:52>> So from 7:40 to 8:10

31:55>> I observed the the parking. I didn't I

31:58should have done it minute by minute. Um

32:01but I would say that 50% of the time

32:04there was an available spot. So there

32:07were some some minutes where there

32:09wasn't, but a lot of times there was.

32:12There were DPW trucks parked in the

32:16short-term parking on Elm, so that

32:18wasn't great. There were long-term cars

32:20parked in the short-term parking on Elm.

32:23So, really should have some enforcement

32:25there. Um, you know, if it's

32:30not an emergency for me, but if it's

32:32emergency for the people are parking,

32:33then okay, well, let's let's treat it

32:36like it's urgent. Um, another

32:38observation,

32:40uh, but a lot of times there were

32:42parking spots available, so I feel like

32:43just a little bit of, um, pressure

32:45relief would go a long ways because it's

32:47not like it's not like there was like

32:49nothing during that time frame. Um,

32:53there is a lot uh, the the Sart the

32:56Sartwell short-term parking, school

32:58dropoff parking is already in place and

33:01it does not take up all of Sartwell. And

33:03the Cherry short-term parking is I see

33:06is there is a sign up there now. I don't

33:08know if that's the only one,

33:11but there's also a lot more of Cherry

33:13Street that could be taken. I mean, so I

33:18as as I am involved in the Kennedy

33:20School, if there's any more

33:22consternation about the changes, I I

33:24will be trying to suggest that we that

33:28there's additional long-term parking

33:30that could be repurposed to drop off

33:33parking, you know, that's adjacent to

33:35the school. So,

33:38>> so the school just

33:41effectively banks on having available on

33:44street parking for the purposes of all

33:46of their students being able to be

33:49picked up, dropped off to their school.

33:51Is that like like

33:53>> the the the I think the accompaniment to

33:55the kids is for up to second grade or

33:58something. So it's not

33:59>> I just mean like is there's nothing in

34:01the school property where people can

34:03like

34:04>> no the children with their vehicles.

34:07>> The um the concourse there is for

34:10special education bus.

34:12>> Okay.

34:13>> Or sped

34:15I I want to make sure I use the right

34:16term but I think they call it sped sped

34:18drop off. So there can't be any

34:20individual um motor vehicles dropping

34:24off using that

34:26is what I've been

34:28>> okay

34:28>> told. Um

34:32>> well it I think my main thing that would

34:34be my question to comm which was to

34:37communicate is is the start well cherry

34:41live part being real and is that

34:44available yet and are you know does the

34:47school know about it? Is the school

34:49promoting it? Is it being used? Is there

34:52any,

34:54you know, because at first it was sort

34:55of like we didn't know if it was going

34:56to be ready, but it sounds like there's

34:58signs. You just showed me signs. It

35:00sounds like it's an action. Misha, I

35:02don't know if you have anything from the

35:05city just saying like the start cherry

35:08was like in the plans and it's it's it's

35:11happening now. It's rolling out. Rolled

35:14out.

35:15>> Yeah. Um they should all be in for

35:17Cherry Street. We were just waiting for

35:19the construction for the parking lot to

35:21be done. So now those signs are in.

35:23>> Okay.

35:24>> Um so yeah at the moment

35:29you know we're welcoming feedback that

35:31beacon project is still going in and um

35:34parking changes take have to go through

35:38the traffic commission process. So it's

35:39not a quick process. Um I can say that

35:43we have notified the school that all the

35:44changes are in place. um especially

35:47after the parking lot has been done. So

35:49yeah um we're open to feedback and

35:52learning. We've been hearing from

35:54parents from the Kennedy and um Yeah.

35:58Cool.

36:00>> And so then also I wonder if do you

36:04think that um Amanda Safe Roots School

36:07you're you're officially the le I'm just

36:09going to say right now. Um, I know you

36:11sent an email saying like, you know, um,

36:13would do you think that

36:16having a safer to school

36:19group partnership um, means anything to

36:23JFK school or like a a larger school in

36:26terms of being like, oh, this is like a

36:27program like this is something that like

36:29we want to invest in ourselves. Like is

36:32there any sort of like, you know, an

36:34advantage in that sense to partnering

36:36with um,

36:38>> I mean, I think so. Yeah, they're

36:40willing to come out and do, you know,

36:42demonstration orientations to bicycles

36:45or talk about various like levels of

36:48education schools and kids.

36:52>> Yeah.

36:52>> And I'm sure as a busy body interested

36:56person of myself, I would be happy to go

36:58to any school that wanted to. The

37:01Kennedy School has invited us to do

37:06>> some sort of event that involves uh bike

37:09safety and um I am waiting to have that

37:12meeting with the principal.

37:13>> Yep.

37:14>> And I have some ideas and I've spoken

37:16with with Amanda and other Kennedy

37:19parents about that, but we haven't had a

37:21meeting with principal yet. So that's

37:23still sort of an early idea.

37:25>> Cool.

37:26Yeah, this will be a a good opportunity

37:29to

37:31see where it goes.

37:32>> Yeah. And just like a good thing to, you

37:36know, make sure that the new

37:38infrastructure can be used by as broad

37:41an audience as possible, especially at

37:43times when you need to relieve like a

37:44burden of parking and get more people to

37:47use the lanes. That's why they're why we

37:50build them.

37:55All right. pool.

37:57Anyone from the public to speak on that

38:00or anything? If not, um we can shift our

38:04focus

38:06um to the Webster AB bridge. And uh just

38:09as a caveat, um Alex Freeden uh brought

38:12this agenda item to us um after getting

38:16some um design plans that I think had

38:18not been forthcoming. Um I don't know

38:20the ins and outs, but um Alex had wanted

38:23to talk a little bit about it. Um, but

38:25Alex can't be here. Um, and so the other

38:28two intrepid members of the evaluation

38:31sub engineering subcommittee, Ted and

38:34Tom, are here. Um, and we're not going

38:36to dive deep into it. Um, not really

38:39have any don't have any slides prepared

38:41um or anything to vote on. Um but just a

38:45little bit of uh preliminary feelings or

38:50um if anyone wanted to pop up the the

38:53single page of plan data we got.

38:56>> Yeah, sure. Since Dom is taking notes,

38:59I'm happy to pop up the

39:01>> I uh go for it, Ted. I will say I do

39:04also have some other like tab a

39:06bajillion tabs open with other

39:07potentially useful things. So I'm also

39:08happy to

39:10>> Yeah, I I was also opening up Tom, to

39:12try to find what you probably have.

39:16>> So, the the brief background is we we

39:19spoke about the bridge I think a year

39:21ago originally, Tom, and I think we

39:24looked at their like 25% design.

39:28>> Um,

39:29>> yes,

39:30>> I wrote a lot of feedback. I couldn't

39:31find the

39:32>> drive document where we

39:35>> put all of that down, but you might have

39:37it. But let me

39:40>> yeah, if you can pull that up

39:41specifically, that'd be great. That was

39:42one of the things I did not find. Um,

39:44all right. So, to set expectations, this

39:46is going to be a slightly confusing item

39:49where we don't have quite incomplete

39:51information, quite complete information,

39:53uh, but it is timely and we want to

39:55discuss what we do know. Um, so we were

39:59discussing the replacement of uh Webster

40:02A in general and specifically the

40:03replacement of the Webster AB bridge uh

40:06which uh which Mascot has an active

40:10project that I think I saw in the city

40:12update is going out to bid nowish. Uh

40:16the the only public as Ted mentioned the

40:18only public meeting on this was in March

40:212025.

40:22Um

40:24uh and we'll go briefly over you know

40:26existing conditions reminder uh and then

40:30uh uh what was shown then uh and the

40:35potential newest plans uh that were were

40:39one page uh was sent to Alex Frerieden

40:42after he uh was was requesting that from

40:45MASDOT. uh that is slightly hard to

40:48interpret but it's kind of the only

40:49public information from there and it's

40:51it's worth discussing. Uh so anyway let

40:54me know if I should cover more if we

40:56should cover more. Let me know if you

40:58know we're trading stuff everyone's

41:00familiar with.

41:02Um so Webster A of course has a uh

41:06unprotected bike lane in one direction

41:08from uh Washington Street Somerville A.

41:12Uh I don't know if this was exactly

41:15Council Link's favorite intersection or

41:17or nearby uh a heavily trafficked bike

41:21route for of course after Prospect

41:23Street. Uh the protected bike lanes

41:25began in both directions.

41:28Um and they're somewhat interrupted by

41:30the existing left turn lanes. Uh it was

41:32great to hear that mobility is planning

41:34to remove the left turn lanes in both

41:37directions on Webster A approaching here

41:40which the committee has requested for

41:41many years.

41:44uh knowing that these are relatively

41:45lightly used, especially this left turn

41:48uh lane. Uh and that'll free up space to

41:53uh I don't think we've seen specific

41:54designs um uh mobility. Feel free to

41:58share more specifics, but as you can

42:00see, removing uh a turn lane that could

42:03not be used much of anything will free

42:05up about 10 ft of space. Uh enough to

42:08add, you know, bike lanes both

42:11directions. uh hopefully to protect an

42:14ex an an existing bike lane and uh add

42:17another bike lane that would hopefully

42:18be protected and so on. Um

42:23so great to hear that that is happening

42:25very soon apparently.

42:27As folks may recall when MATUP presented

42:30about their bridge replacement uh which

42:32included a street changed from

42:33approximately Everett Street just up

42:35here to um to approximately Prospect

42:39Street along a section of Webster A. Uh

42:43at the meeting it was fairly confusing.

42:47Um this this map shifts to having north

42:50uh on the right side of the page. So

42:52Union Square over here on the right

42:54side. Here's Prospect Street uh for

42:56reference.

42:58Um, so while there is some good things

43:01like squaring up intersections in this

43:03plan from March 2025, uh, from Mass,

43:06there's the very there's the extremely

43:08confusing design, uh, that moves to a

43:11two-way bike lane on the on the eastern

43:15side of the street uh, where anybody

43:18trying to bike southbound starting from

43:20Union Square as their March 2025 design

43:23would have had to cross over at this

43:25unsignalized crossike cross here at

43:28Everett Street. Um or sorry, I think

43:31this is Newton Street here. Um and then

43:34continue on uh to Prospect Street here.

43:37And it was unclear what they would do at

43:39all, but presumably one way or another

43:41they would have to transition back to

43:43the unidirectional protected bike lanes

43:46further along Webster.

43:49Um so again, Mascot has not shared

43:52anything public uh that I am aware of

43:55since then.

43:56Um, Alex Frerieden got a response from

43:59them sharing uh, one page from a clearly

44:04much bigger document uh, describing a

44:08somewhat similar plan. Um,

44:12and

44:14again confusing engineering document,

44:17missing context. If mobility knows more,

44:20feel free to jump in. Um, but compared

44:23to what Masset was previously showing,

44:25the curving is substantially similar,

44:28there are some uh uh improvements that

44:31appear to be well thought through. For

44:33example, Newton Street here um uh slated

44:38to be a neighborway overall. Um uh

44:41appears to have an additional

44:43uh barrier here and uh no outlet to

44:46prospect sign. No outlet to prospect

44:49sign. So event uh basically fully

44:51eliminating any cut through traffic uh

44:54going out this way hopefully reducing

44:55volumes and that could be useful

44:59um on this section um for people biking

45:05northbound from Prospect Street into

45:07Union Square.

45:09These masked out plans appear to show a

45:1110 uh 10- foot wide raised uh bikeway

45:16uh curb separated from the road. A 10-ft

45:19bike lane is uh very wide for a one-way

45:23bike lane. It it is wide enough to be a

45:26two-way bike lane. Uh as currently

45:28depicted, it appears to be a one-way

45:31bike lane. Um

45:34as shown here, only heading northbound.

45:37It's somewhat unclear what somebody

45:40biking southbound would do based off of

45:42this plan. As you can see, uh this shows

45:45I think this is more or less the same as

45:47existing conditions. uh with the

45:49unprotected bike lane here starting from

45:52the Union Square side uh heading up here

45:54largely matching existing conditions and

45:57then uh

46:01not existing.

46:03>> So basically they took their 25% plan

46:08and removed the bizarre bike crossing in

46:10the middle of the street parallel to the

46:14crossing the pedestrian crossing

46:16basically.

46:17Yes, that is my read. Um,

46:20>> at the masked up meeting where this was

46:22presented, many of the public comments

46:25were very confused by what the intent

46:27was here. Um, regarding people biking

46:30southbound needing to zigzag over twice

46:33versus zero times to continue in a

46:35straight line. Uh, and Mass do my really

46:38did not have a clear uh

46:42reasoning as to why that was. Um when

46:46the bike committee discussed this uh

46:48soon after we gave similar feedback

46:51several months later uh Viola from

46:53mobility gave a very detailed

46:55presentation added much more context and

46:58it was extremely helpful. Uh I tracked

47:00this down only a couple minutes before

47:02the meeting. So apolog for not being

47:04better prepared. Uh but largely the

47:07context

47:09as I understand it is that mobility

47:11plans to eventually transition Webster A

47:14uh to having a two-way protected bike

47:17lane along the east side for the entire

47:19stretch of the street. Um and

47:24uh is is choosing that kind of because a

47:27two-way protected bike lane is slightly

47:30narrower than a pair of unidirectional

47:32protected bike lanes. uh as well as the

47:35fact that Newton Street is slated to be

47:37upgraded to a neighborway. Uh over here

47:40uh while Prospect Street will largely

47:42not be getting protected bike lanes. Uh

47:45the committee and the UniSquare plans

47:47have kind of consistently favored an

47:49approach with Webster prioritizing

47:51bikes, Prospect prioritizing buses. And

47:55so the two-way protected bike lane along

47:57here uh on the east side could be

48:00compatible with what the bridge uh

48:02design would build. And there's very

48:04much different moving parts of the

48:06bridge design needing to be finalized.

48:10>> Uh so that you know the civil engineers

48:14know what they're actually building for

48:15the bridge structure and everything.

48:18uh and other parts of the project

48:20relying on either quick build changes or

48:23larger uh changes to Union Square as

48:26part of the Union Square Plazet and

48:27Streetscapes uh project by the master

48:30developer.

48:32Uh, and so overall I think the current

48:34state just kind of I at least am just

48:38confused looking at this and you know

48:42there's kind of a charitable read that

48:44this might be a solid plan overall that

48:47would result in you know carefully

48:49coordinated phasing eventually leading

48:51to a uh a two-way protected bike lane

48:55along the east side of Webster A. um

49:01uh and that the bridge bar is needing to

49:03happen at whatever timeline and various

49:06quick build projects reacting to that.

49:08Um but it is you know concerning to me

49:12that there has not been more publicly

49:14shared uh especially by mascot regarding

49:17what the actual plan is. Uh and in the

49:20conditions that are shown here, uh as

49:24currently depicted, I think this could

49:25be a very concerning condition for

49:28people biking southbound not having a

49:30clear path of what to do.

49:33>> Um

49:35so yeah, I think at this point I I don't

49:36know if the it most likely is not needed

49:40for the committee to you know endorse a

49:42particular statement or anything like

49:43that, but it seemed like it made sense

49:45to discuss this publicly at our meeting.

49:47have that the discussion.

49:50Uh anything more than mobility can share

49:51would be welcome. Uh and uh would love

49:56to

49:57discuss what we would ideally like this

49:59to look like and raise any concerns.

50:01Yeah, I I think I would have some

50:03questions for the city too, Tom, about,

50:06you know, if there is to be a sort of

50:10complete two-way bike facility on

50:13Webster,

50:14is is this hypothetical or is this a

50:18project with a particular timeline? Um,

50:23so I guess that would sway my

50:27my perception of the, you know, making

50:31this compatible or masked out attempt

50:34here to maybe make this compatible with

50:36that plan.

50:38Otherwise, I agree that it is bizarre.

50:42Um,

50:45also

50:47I don't remember where we are. I think

50:48it was over a year ago that Viola

50:50presented some of the options for the

50:53Union Square redesign. Uh, which I think

50:56is part of what you were getting at with

50:57the

50:59the the concept of Webster being

51:03prioritizing bikes.

51:13>> Risha, anything to add at this time? Um,

51:17on our end, if you have any questions, I

51:19can take them back to the team, we have

51:22been advising and urging mass to make

51:25things public. So, on our end, that's

51:27kind of all we can do. Um, and I'm happy

51:31to get Viola to come back because I know

51:33that was helpful last time. So, that

51:36feels helpful to just

51:38>> I also know like these aren't public,

51:40but now that we've like they've shared

51:42them and we shared them at this meeting,

51:43they are now. Um, but I'm happy to get

51:46someone from the team to come by. Um,

51:49and on the Union Square Plaza part of

51:52it, um, that was kind of the thinking

51:55here is that most of the decisions that

51:57were made were made based on a future

52:00condition so that we can work on the

52:02Union Square Plaza project. Um, and as

52:05of now, um, it is Prospect Street and

52:09the Webster Bridge and Newton Street are

52:12on phase one. So this kind of ties into

52:15that. I we we don't have a timeline on

52:17that. We are look still in the looking

52:20for funding part of um the Union Square

52:22Plaza project, but these are all um kind

52:25of tying up into phase one of the Union

52:28Square Plaza redesign.

52:30>> Thanks. Uh Risha, for the minutes, could

52:32you say again which streets were part of

52:33phase one?

52:34>> Um it's uh Prospect Street, um the

52:38Webster Bridge, and um Newton Street. um

52:42just between Webster and Prospect.

52:49>> Does anyone remember when the when

52:51shovels are supposed to be in the ground

52:52on this one

52:55when they were hoping?

53:00>> Wait, sorry. Can you repeat the

53:01question?

53:02>> Uh does does anyone remember when for

53:04sir? Sorry, I shouldn't be more clear

53:06for the bridge project for the the mass

53:09bridge project. Does anyone remember

53:10when shovels are supposed to be in the

53:11ground when they were they were hoping

53:13to get started?

53:14>> Um they yeah they are um they are going

53:18out to bid this month um for um for a

53:23contractor and they are planning to

53:25start construction next year.

53:29>> Okay.

53:35>> Do you have cat?

53:37>> Yeah.

53:38>> Yeah. I say thanks you guys for walking

53:40through this really really helpful and

53:41also recapping and reminding us what the

53:43previous design had been. Um I don't

53:46think I have too much helpful to add but

53:48I say it would be I think helpful to

53:49have Biola back just because it is

53:53really unclear then what So you said to

53:55the right is the northbound lane.

53:58>> Yeah

53:58>> the bike l Yeah. of just how

54:03because we can't see the Union Square

54:05intersection just like how this is all

54:07supposed to interact knowing that this

54:09is them going out to bed soon. Um and

54:13just would love some understanding of

54:15like what are the interim conditions

54:17going to look like when we have this if

54:19the city is aware of that. Um I

54:21recognize this is a mass dot project.

54:24Uh but is this is now different than the

54:27previous just understanding what I mean

54:29what we should expect and if there's any

54:30way to help optimize it.

54:39>> Definitely agree. And um did I see that

54:41the the bridge project is currently

54:43going out to bid?

54:45>> Yes.

54:46>> Okay. So I hope we can have that

54:48discussion fairly soon. Like I I

54:49definitely trust that mobility has been

54:51engaged with mascot on this,

54:53>> but given that moving along and no other

54:56public information from Masot, I would

54:58>> uh I'll be very reassured hearing from

55:01Biola or or anyone at Mobility

55:03knowledgeable about this uh quite soon

55:06and having confidence that there's a a

55:09plan throughout many phases of this.

55:12>> Yeah, we can do that.

55:19here a second.

55:24>> Another thing I'll mention, uh, while

55:26the overall, uh, bike lane here, uh, is

55:29depicted as 10 ft wide, uh, which is

55:32plenty of room for a two-way bike lane,

55:35over here at Newton Street, where there

55:38appears to be curbing, uh, uh, being

55:41effectively a dead end for cars while

55:42allowing bikes to continue through and

55:45sequentially cross Uh this is definitely

55:47an area where I was a little kind of

55:49curious to understand some of the intent

55:50here. For example, I see some of the

55:53dimensions, but I didn't immediately see

55:54what the actual dimensions would be here

55:57on the island and how much that reduces

55:59the 10-ft bike lane and whether the kind

56:02of squeezed down bike lane here. It was

56:05not immediately clear to me whether that

56:07would still be compatible with a two-way

56:09bike lane along here. Um and then

56:13similarly uh while it appears there

56:15still is very much permeability for

56:17bikes. So, while it would be uh a dead

56:20end for cars, a bike could still enter

56:22here uh either to to turn on here or uh

56:27potentially to want to continue on um to

56:32perhaps cross here uh towards the other

56:35half of Newton Street and Clark Street

56:37uh kind of the uh western direction

56:40towards the Argentinian school and that

56:42general area. It was a little unclear to

56:44me like what would that actually feel

56:46like if somebody biked and entering here

56:48and zigzagging around to do this island

56:51uh crossing perhaps in the crosswalk uh

56:55instead of at a cross bike uh and then

56:58getting over to here. Perhaps that's

57:01that necessary trade-off of prioritizing

57:04a two-way bike lane. But again, I I

57:07would love these assumptions to be

57:08documented publicly.

57:19So Tom, it looks like the the

57:22bike way

57:25ends just at that crosswalk mid street

57:28with a ramp.

57:31So like that that it's raised through

57:34the intersection

57:36and then uh it disappears

57:40if so if you're going northbound it

57:42disappears at that crosswalk

57:45because then there's a parking lane

57:47>> and it appears to show a parking lane

57:49here. So presumably at some point that

57:52parking would have to be either removed

57:54or relocated to accommodate a two-way

57:56protected bike lane here. Um

58:00perhaps the intent is that a bike would

58:03in this film condition, perhaps the

58:05intent is that a bike would take the

58:06lane uh southbound here like they have

58:09to do currently.

58:12>> But again, we would love to see that

58:14explicitly presented.

58:18>> Yeah.

58:26>> It's also just

58:28odd given that I feel like

58:32>> well maybe it's depends on the time of

58:34the day but I feel like there's tends to

58:36be much more traffic uh southbound

58:38towards Cambridge on this road than

58:43northbound. Um,

58:48so you know,

58:50>> it it seems problematic

58:54not to have a easy transition from the

58:58striped bike lane to the bike way. So is

59:01the intent that people are going to just

59:05>> get off their bikes and walk over to the

59:07bike way because I

59:09>> very skeptical that that's actually

59:11going to happen.

59:13>> Hopefully not. uh during Masked Out's

59:16public presentation in March 2025, it

59:19they did have a crossbike and some very

59:21consistent feedback uh from the audience

59:24and I believe from ESPback was that uh

59:28crossing the street uh unnecessarily

59:30especially at a hill is going to be a

59:32very uncomfortable condition also

59:34without a clear place to wait or or pull

59:36over. But yeah, all uncleared.

59:47any uh any other questions or comments?

59:56Yeah, I would also it would definitely

59:57be great to hear from Viola again to

59:59also think about um to not only

1:00:02understand context and timelines but

1:00:04also think about if we if the city is

1:00:07going to remove that southbound left

1:00:09turn lane. Um if that then gives us some

1:00:16maybe options for interim conditions.

1:00:24>> Yes.

1:00:29Um,

1:00:31all right. Um, I'm not seeing anything

1:00:33else right now. U again, acknowledge as

1:00:36a very incomplete situation.

1:00:39Um, from my perspective, no particular

1:00:42uh vote or formal statement is needed

1:00:44from the committee at this time. Um but

1:00:48uh yeah would love to hear uh from

1:00:51mobility and andor masdot uh a clear

1:00:55vision of how all this actually works

1:01:06>> good

1:01:10question.

1:01:12>> Okay. Um, do we have I I have seen just

1:01:16the email announcing that the protected

1:01:18bike lings were going to be extended up

1:01:21Webster south of Prospects Beach Street

1:01:23to that intersection. Are those going to

1:01:25be or do we know yet that those are

1:01:27going to be on one on each side of the

1:01:30street like the rest of Webster south of

1:01:33there?

1:01:36Um

1:01:40they will

1:01:44so sorry I don't but I can bring this

1:01:46back to the team of what is the extent I

1:01:49do know that we are kind of preparing

1:01:51for the interim condition uh because we

1:01:54do not want to put anything on the

1:01:56Webster app bridge that then will be

1:01:59become unsafe if we're like leading

1:02:01people down the bridge where it's just

1:02:02going to be shut for construction next

1:02:05Um so we are working on um what both the

1:02:09sites look like just to prepare for

1:02:11construction as well.

1:02:13>> Um I do know that um the south side of

1:02:16Webster with Prospect Street, we will be

1:02:19um kind of extending the bike lane that

1:02:23has with the protected barriers on that

1:02:25one side. Um so I know that is

1:02:27definitely going to go up to the

1:02:28intersection for sure.

1:02:30>> Okay. Yeah, because that was that was a

1:02:33question I had back when we saw those

1:02:35masked out last year for the bridge that

1:02:38it looks like they're expecting people

1:02:39to not only cross in the middle of the

1:02:41bridge into this like briefly contrad

1:02:44like two-way lane when you're headed

1:02:45southbound but also cross back to the

1:02:48other side at the Prospect intersection

1:02:50which is not my favorite place to be

1:02:51crossing the street.

1:02:52>> Yeah, definitely. And um that

1:02:54intersection will also is part of being

1:02:57redone in that phase one part of Union

1:02:59Square. So all that we're working on and

1:03:02talking about is a lot of working

1:03:04through

1:03:06>> till we can get there.

1:03:08>> Also I don't know.

1:03:23I can only speak anecdotally from what

1:03:24I've heard from folks in the Cambridge

1:03:26bike safety community, but that that's

1:03:28kind of like in an otherwise fantastic

1:03:30project, the kind of worst experience is

1:03:33like

1:03:52Um, I'll just plug again that uh this is

1:03:56something I said uh before I was a city

1:03:58councelor way back in that meeting is

1:04:19uh I know that Newton is going to be

1:04:21closed.

1:04:23Uh and as is like you know the entire

1:04:31you know doing that unprotected

1:04:34um you know where essentially just

1:04:37you're talking about a show situation.

1:04:40Um

1:04:42given the especially the high volume of

1:04:44traffic that

1:04:46people see um you know uh currently

1:04:49going up Webster it's I I think that it

1:04:52would be

1:04:55bothing

1:05:02um which is not what it is intended for

1:05:04uh but yeah so there is there's adequate

1:05:08space I realize that it wouldn't an

1:05:09ideal long-term situation. Um, but for

1:05:29I I am also very curious uh uh what

1:05:33conditions will be while the bridge is

1:05:34being replaced and Prospect Street is is

1:05:37certainly the most obvious alternative

1:05:39for for a safe bike route.

1:05:43Yeah, my memory was correct that that's

1:05:45that mass DOT's idea was that it would

1:05:46be a that this was going to be the

1:05:48detour, but they

1:05:52what they want to do with prospect.

1:05:59I can um when comes or any other staff

1:06:04member um joins a meeting, they I can

1:06:07ask them to also just share uh what that

1:06:10conversation was and what that might

1:06:11look like.

1:06:12>> Thank you.

1:06:32G.

1:07:00Can everyone see their presentation?

1:07:03>> Yes.

1:07:08Okay. Online too.

1:07:12Yep.

1:07:41style and definitely has been

1:07:44interesting and would love feedback on

1:07:45how that's working. Um, we'll be at the

1:07:49groundwork harvest festival this

1:07:50weekend. Um, there is also a ribbon

1:07:54cutting for uh trough street neighbor.

1:07:58um that's happening next week on

1:07:59Tuesday, October 6th at 11:00 a.m. um

1:08:02just to celebrate everything that's

1:08:04happening with Tus Glenn um and also the

1:08:08park um in that area which is exciting.

1:08:12Um and then Union Square Farmers Market,

1:08:14Monster Mash, and then we have the Latin

1:08:16American Caribbean Heritage Month

1:08:18celebration at the end of the month.

1:08:22Uh quick little project updates. Um, we

1:08:25can uh

1:08:52the payment markings go everything kind

1:08:55of is functioning smoothly. Um,

1:08:57summerville a uh we have the engagement

1:09:00report that was published um recently

1:09:03and we're hoping to share designs um at

1:09:06the end of this year with implementation

1:09:08next summer. Um East Washington we just

1:09:12shared the community engagement report

1:09:14um this last week um and we anticipate a

1:09:18concept design early next year. um

1:09:21community pot safety. Um we uh also this

1:09:26week published a design strategy report

1:09:28and we are starting to implement the

1:09:32project um this week. We're testing out

1:09:36um some

1:09:38um some potential um improvements on the

1:09:42path um at central um and the community

1:09:46pod intersection. and then over the fall

1:09:48continuing to do as much pavement

1:09:50marking work as we can. Um

1:10:04this week and it just it looks it's very

1:10:06exciting. Um and ribbon cutting next

1:10:09week. Um West Broadway sidewalk

1:10:12construction on the south side is going

1:10:15on. Um and then we have Western Coral

1:10:18where they're also starting on sidewalk

1:10:20um on that on the north side of Pearl.

1:10:28Uh Broadway um we have the community

1:10:30engagement report that's out and then we

1:10:32are hoping to have uh updated designs

1:10:36this fall.

1:10:39intersection. Um, at this time, B walnut

1:10:41is also complete. Um, and Washington

1:10:45Miriam, there's still construction and

1:10:47some punch punch list items that we're

1:10:49hoping to complete this fall. Um, and

1:10:53then quick build, Broadway, Wallace

1:10:55Simpson. Um, that was completed a few

1:10:58weeks ago.

1:11:00Major infrastructure projects, I know we

1:11:02talked about Webster A, um, which is

1:11:04kind of in the bidding phase at the

1:11:06moment. Um, additionally, McGrath

1:11:09Boulevard, we're anticipating designs

1:11:11later this year. Um, Mystic Mafa

1:11:15construction is complete and we are

1:11:17working with MASDA to monitor um, how

1:11:20it's working so far. And then route

1:11:233828,

1:11:25um, there's construction going on. Um,

1:11:28and they're hoping to complete that next

1:11:30year in the summer and fall. Fed bike

1:11:32ped bridge. Um exciting news that they

1:11:36were a awarded exist build contract

1:11:39masdot um and there is an anticipated

1:11:43three-year construction schedule um

1:11:45which is a change from their initial

1:11:47plan for four years. So it's nice that

1:11:50they're going to get it done earlier. Um

1:11:53and then shore drive um that is also

1:11:56underway at the moment. It looks like

1:11:58there's nothing happening but it is dug

1:12:00up because they are just doing a lot of

1:12:02underground sewage storm water work so

1:12:05that they can um do the plantings and

1:12:08that is um planned to finish we are yeah

1:12:12this summer next year. Um but that was

1:12:17all I had. Do you have any questions?

1:12:25Any questions or comments from the

1:12:28committee?

1:12:32Lots of good stuff.

1:12:34>> Yeah, that's really awesome. It's a lot

1:12:36of great work.

1:12:37>> I almost applauded at the end.

1:12:39>> I know. I just like the city update.

1:12:41It's like the Great British Baking Show

1:12:43or whatever. It's like the feelgood

1:12:45portion of the meeting where we can just

1:12:46sit back and be like, "Ah, 75%."

1:12:50Um, no, that all looks great. Um, I I

1:12:55did appreciate in the West Broadway work

1:12:58um that they did create a nice bumpout

1:13:01sidewalk that also kind of worked as a

1:13:04bike lane. I kind of wish it was still

1:13:06there while the rest of it is still

1:13:12uh getting getting put in place. But I

1:13:15did appreciate the like, you know, like

1:13:17the detour, the attention to detail with

1:13:20the detour. while that significant rip

1:13:23up was happening. Um, so hopefully

1:13:26people found that, you know, pedestrians

1:13:29especially found that feeling okay to

1:13:32use during that because they really did

1:13:34just I mean it's the whole whole side is

1:13:37new now, which is great, but it can be

1:13:39challenging when that much is,

1:13:42you know, being built at the same time.

1:13:44So appreciate that.

1:13:47Um Tom

1:13:50>> uh for the Mystic River Bridge, super

1:13:52exciting. Uh the three-year construction

1:13:54schedule, do we know is that beginning

1:13:56nowish? Uh I know it's approved, but is

1:13:59you know, do those three years start

1:14:01now? Do they start after a notice to

1:14:03proceed next year or

1:14:07>> I will check it.

1:14:10Yeah.

1:14:12All

1:14:17right. If I don't hear anything else

1:14:19from the committee or anyone from the

1:14:22public,

1:14:24I can

1:14:27to make a motion to end October's

1:14:30meeting.

1:14:32Uh Amanda, and can I get a second from

1:14:36Paul? Yes. Everyone in favor of

1:14:40adjourning, say I. And we will meet

1:14:45again next month. And have a great

1:14:48autumn and see you then.

1:14:50>> Great autumn and see everybody in

1:14:52November. Wow.

1:14:5412.