  • Quorum of seven members. Three items: 222 Broadway, 6 Wheatland Street and 8 Medford Street.
  • 222 Broadway Permit Application: staff had no recommendation because the applicant's neighborhood meeting report arrived only that afternoon. The applicant, representing the property owners, agreed to continue to October 1 so staff could finish the review. Roll call vote to continue.
  • 6 Wheatland Street Apartment Building: a proposal to demolish a vacant single-family house and build a three-story, five-unit apartment building (one unit affordable, five parking spaces, five long-term bike spaces) in the MR3 zone, needing site plan approval and a residential special permit. The Zoning Board of Appeals granted variances on July 15 for facade buildout and the landscape buffer. Design is compliant with the 0.25 green score, with a green roof and preserved mature trees at the rear. No one spoke in public testimony. Members praised the three-bedroom unit and several asked for one more bike space. The mobility division had not yet signed off on a revised transportation plan (bike aisle, rack length and clearance, vehicle movements), so the chair held to the board's practice of requiring a complete application. Two members would have been willing to vote that night; the item was continued to October 1, ahead of a joint session with the Land Use Committee, with written comments open until the 25th.
  • 8 Medford Street Residential Special Permit: the applicant answered earlier questions on parking by citing a neighbor's lot and nearby garages, and the loading space will be on the street. Staff pointed to a condition that commercial entrances be updated after approval. The board approved both the residential special permit and the site plan approval with the staff conditions, with all seven members voting in favor.
  • Adjourned; the next meeting is October 1.

Issues discussed

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:04Okay, good evening everybody. This is

00:05the regularly scheduled meeting of the

00:07planning board. It is September 17th,

00:102026.

00:12Pursuant to chapter 2 of the acts of

00:132025, this meeting of the planning board

00:15will be conducted via remote

00:16participation. A video recording of the

00:19proceedings will be available on the

00:20city website's meetings and events page

00:22or by emailing planning boards ma.gov.

00:25This meeting is being recorded. I am

00:28Mike Capiono. I am the chairman of the

00:30planning board. Uh with me tonight is

00:33our vice chair Ameilia Abof, our clerk

00:36Jan Habib, and our members Michael

00:38McNeely, Cory Cooper, Luke Schustster,

00:41and Lynn Richards. We have a quorum. We

00:44have a number of items on our agenda

00:45tonight. Uh 222 Broadway, which has

00:49previously been um opened and continued.

00:53We have uh 8 Medford Street which has

00:56been opened, heard um and continued.

01:01And we have uh six Wheatland Street

01:03which has not yet been opened. So here's

01:06what I'm going to do. First, I'm going

01:08to take 222 Broadway

01:12um

01:14which has previously been read in. So,

01:15I'm going to invite the applicant and

01:17their team to be unmuted and to

01:21um

01:23share a present.

01:29This is Ala from the planning office. Uh

01:32I promoted Nicole Solomon who is one of

01:34the applicants. If anybody else from

01:35their team needs to be promoted, just

01:36raise your hand.

01:52Hello.

01:53>> Oh, hello. Just get my monitor down

01:56here.

01:57>> Sure.

02:03>> All right. Hi. Good evening. How are

02:05you?

02:06>> I'm I'm I'm doing I'm doing well. If you

02:08could introduce yourself for the record,

02:09please.

02:10>> Okay. Great. My name is Nicole Sullivan

02:12and I work for Mark and Megan Pa, the

02:15owners of this Duncan location.

02:18>> Great. And so what we have is is no

02:22recommendation

02:24on our staff memorandum for this

02:26application um on the grounds and and is

02:30uh is is Kit the planner on this one?

02:32>> Yes.

02:33>> Yep. Um, Kit, it's it's my understanding

02:35that this m this application um has not

02:39submitted all of the required materials

02:41that staff needs in order to make a

02:43recommendation and to assess the

02:45application fully.

02:47>> That's correct. I did receive a

02:49neighborhood meeting report this

02:51afternoon around 2:00 p.m. Um, but of

02:53course I didn't have time between then

02:55and now um to, you know, get you guys an

02:58updated staff memo. So, at this point, I

03:01have received everything, but it wasn't

03:03until today.

03:04>> Okay. And so, um, Nicole, just so you

03:08know, it's the policy.

03:09>> I did know that it had to be I had no

03:11idea that there was a deadline. That's

03:13my fault and my ignorance. Um,

03:16>> I'm sorry. So, what what what I'm going

03:17to suggest to you uh because usually

03:20it's the planning board's practice uh

03:22not to take applications uh to be heard

03:25that uh that have not yet either been

03:27complete uh or have not been fully

03:30reviewed by staff in order to weigh in

03:32because that may change the nature of

03:34your application and presentation to us.

03:36Um it's my suggestion to you that you um

03:41continue for another couple of weeks so

03:43that uh Kit and the and the relevant

03:45staff will be able to review that

03:47material and update our uh

03:49recommendation memo so that you can get

03:51a recommendation um one way or one way

03:54or the other.

03:56>> Okay, I I'm fine with that.

03:59>> Okay, our next meeting is October 1st.

04:01Will that be um a good enough duration

04:05of time for you to review Kit?

04:06>> Sure,

04:07>> Kit.

04:08>> It's fine.

04:08>> Yeah, that work that works for me. Thank

04:10you.

04:11>> Okay. Um so, the applicant has made a

04:14request to continue this agenda item uh

04:17to the 1st of October. So, the chair

04:20moves to continue that agenda item.

04:22Seconded by Amelia

04:24Alro, can we please have a roll call?

04:27>> Kabid.

04:29>> Lyn Richards. I

04:31>> Luke Schuster.

04:32>> Hi

04:33>> Carly Cooper.

04:35>> I

04:36>> Michael Magnelli.

04:37>> Hi

04:38>> Emmeilia Ael.

04:39>> I

04:40>> Michael Kaplan.

04:42>> Hi.

04:42>> This agenda item is continued uh so that

04:45staff will be able to review any of the

04:47missing materials and make uh a

04:49recommendation accordingly. Thank you.

04:51>> Okay. Thanks.

04:57>> Okay. Um

05:04and in a similar way, um it's my

05:06understanding that uh Six Wheatland

05:09Street

05:10um has not yet completely submitted all

05:15of the required materials in order to

05:17get the um

05:21appropriate staff to to weigh in. But

05:23what I'd like to do is invite the

05:25applicant for um Weatland Street to um

05:29come in and just um have a have a quick

05:31discussion on on that. And who is the

05:33case planner on 6 week? Is it is it

05:37>> Yep.

05:38>> Okay. So,

05:40>> hi. Sure. Hi, Adam Dash 48 Grove Street

05:42representing NPO Properties LLC. Um

05:45we've been going back and forth with

05:46mobility and the last bit of it, it has

05:49to do with the mostly the configuration

05:51of the bike parking. This is all going

05:53to comply by the end. None of this is

05:55gamechanging. Certainly has nothing to

05:57do with the special permit for

05:58residential living, which one of the

06:00things we're here for tonight. And on

06:01the site plan approval, we'll we will be

06:05compliant and sorted out. We did not get

06:07them the they want to revised tap, which

06:10our engineer is working on, but it's not

06:12going to change the basic plan here.

06:15We've already gotten our variances from

06:16the ZBA. I should just note we filed

06:19this in March. So, I mean, this has been

06:21going on for a very long time for was an

06:23abandoned derelic property in the

06:25neighborhood. And I know October 1st

06:27you're going to have a probably very

06:28lengthy joint meeting with the land use

06:30committee. U I see on the calendar

06:33I would request.

06:36>> Yeah. Well, I would suggest it's

06:38certainly your call, but I mean if we

06:39we're all here, if we could present

06:41tonight, if you wanted so we don't take

06:43up all that time on the first. Are you

06:45are you s So, so this technically hasn't

06:47been read into the record yet, but we're

06:48not actually discussing the case. Um, do

06:51you think that a review of the TAP uh

06:56Alvaro will change the nature of this

06:58application in any meaningful way?

07:01>> Uh, from the comments that I received

07:03from the mobility division and submitted

07:05on the supplemental staff memo, no,

07:08there seems to be no major changes that

07:10will be implemented on the tab. um they

07:12just have to make reference to the

07:14updated plans that were submitted on

07:15September 10.

07:16>> Okay. So, in some ways that's a

07:18formality as opposed to the previous

07:19case which was more substantive.

07:23Okay. Um then what I'd like to do now

07:25then is Jan, could you read into the

07:27record the notice of public hearing for

07:29six week because I don't think it's been

07:30done yet.

07:32>> Absolutely, Mr. Chair. Adam- Essquire on

07:35behalf of Nelson Group Construction Cor

07:38uh proposes to develop an apartment

07:41building in the Midrise 3 MR3 zoning

07:44district which requires site plan

07:45approval ZP25-000016

07:51Adam Esquire on behalf of Nelson Group

07:54Construction proposes to establish

07:56residential housing in the Midrise 3 MR3

08:00zoning district which requires a special

08:02permit ZP P25-0000117.

08:07Thank you, Mr. Chair.

08:09>> Um, Mr. Chair, just one note. Um, Jan,

08:13just there was a revised um agenda.

08:16There was a couple of typos on the

08:17permit numbers. So, just to clarify, the

08:19site plan approval for Sigland is

08:21CP26-000016

08:25and the special permit is CP26-000017.

08:30>> Thank you, Alro. And thank you, Mr.

08:32Chair.

08:33>> Thanks for the clarification, Alro. Um,

08:36it's good to obviously have that on on

08:37the record for uh going forward. Um,

08:40Adam, I don't know if you have members

08:42of team that need to be um shared or

08:45unmuted or whatever. Um, Evan Stelman

08:48has his hand up to be he's the

08:50architect. Um, I'm by the way, I'm

08:52representing NPO Properties as I said.

08:54Evan Stelman from KDI Architecture needs

08:56to be promoted. Jeremy Henry on behalf

08:59of NPO Properties needs to be promoted

09:02and likewise Mark Maserelli from Mark

09:04Maserelli Associates Associates

09:06landscape architect needs to be appro um

09:08promoted. So um I can also share my

09:11screen. We have some slides here to show

09:13you if you could grant me the permission

09:16to do so. Whoever is controlling the

09:19Zoom. Yeah.

09:20>> Adam, this is Albert and you should be

09:21good to present.

09:23>> I am indeed now. Thank you so much.

09:24over.

09:27Okay. So, there we go. So, all right.

09:31Now, we're good. So, we're here tonight

09:33for site plan approval and for special

09:35permit for the residential living use at

09:376 Wheatland Street. This matter went

09:40before the zoning board of appeals on

09:41July 15th. And the zoning board approved

09:44variances for the primary front facade

09:46buildout and the landscape buffer

09:48requirement regarding an abuing NR zone

09:51property. So those issues

09:52[clears throat] have been resolved. Um

09:54the six Wheatland Street is located in

09:56the MR3 zone and is not in a transit

10:00area and it has been a vacant and

10:02derelic property for quite some time.

10:05So I'm going to show you some existing

10:06conditions here. So uh this red box here

10:10is the property. As you can see here's

10:12Broadway, here's Wheatland Street. It

10:15and right here there's a commercial

10:16building here. I'll give you some more

10:17pictures. There's a commercial building

10:19here on Broadway. And this is the first

10:21house, if you will, in this in on

10:23Wheatland. This whole thing here is the

10:26old Star Market site, which thankfully

10:27no longer looks like what you're seeing

10:29in this image. Um, and over here is Foss

10:31Park. So, pretty decently well located

10:34here, and only one building in from

10:35Broadway, which is important for later.

10:38Um, so what we've got here, this is the

10:41the building we're talking about here on

10:43the left. Um, you can see the one on the

10:45right when this picture was taken

10:46underwent its own whole big project over

10:49here. But we're just talking about this

10:50little narrow lot here on the left. What

10:53I do want to show you, this is an

10:54important image. This building here on

10:56the left, the brick one, this is the

10:58building FA at 2733 Broadway, which is a

11:01commercial structure facing Broadway.

11:03And this building, this property

11:06basically just faces the blank wall

11:08here, as you can see. Um, and as you can

11:11see also on the property, this is a very

11:13narrow lot, but the building that we

11:15have here is pushed over to the right as

11:17far as it can go up against the

11:19residential neighbor here and far away

11:21from as far away as possible from the

11:23commercial blank wall for some reason.

11:25That's hard to understand. And you can

11:27also see here the little loading area

11:29for that commercial building, which is

11:30also right next door. Um, so this is

11:33this building over here is over in the

11:35NR zone and we're in the MR3

11:38to be clear here.

11:40So, um, right now this building is only

11:432.3 feet from the property line on the

11:46NR side.

11:48And here's another image. Gives you a

11:50view up Wheatland Street. You can see

11:51Broadway in the distance. Again, there's

11:53that commercial building with the blank

11:55wall. This is the neighbor which was

11:56undergoing renovation. This gray house

11:58here is the one we're talking about

12:00right now. So, the um,

12:05okay, go over here. All right. So again,

12:08you can see here the the zoning. Um you

12:10can see this dark purple over here is

12:12the star market site that's currently

12:14undergoing that big redevelopment. Um

12:16you can see here that we are part of

12:18this light purple MR3 and then the

12:21street goes into NR as it goes up

12:23because this is Broadway and that's why

12:25all this I guess is MR3. So the um

12:30so as you know the star market size can

12:32have two very large buildings, a new

12:34park, a new civic plaza, new retail

12:36storefronts and our main rear butter to

12:39this property over here is the Elizabeth

12:41Peody House. So really the only actual

12:45residential property we abut is just

12:46this one on the right here. Um, an

12:49applicant is seeking to demolish this

12:51existing structure and build a new

12:52three-story uh five unit residential

12:56apartment building. And that new

12:57building is conforming building type for

12:59the MR3 zone. This existing detached

13:02house that's there now is not a

13:04conforming building type. So the

13:10I would note the historic preservation

13:11commission has already looked at this

13:13and determined the existing structure

13:15not to be significant such that no

13:17demolition review has been proposed.

13:19This is just the summary as I was saying

13:21and MR3 three stories is compliant. Five

13:24residential units compliant uh one unit

13:28which is easy math to do the 20% will be

13:30affordable and you can see the size of

13:32the units here which are you know fairly

13:35decent not extravagant sized units. Um

13:39this is sort of a summary of where we've

13:41been. Um and um you can see here that

13:45we've been uh we've had the neighborhood

13:47meetings. We've been through the uh

13:49urban design commission which is

13:50recommending the design option we're

13:52going to show you tonight. Um and

13:55obviously we've already been to the

13:56zoning board of appeals and you are

13:58basically our last stop at this point.

14:00So the um

14:05so again here is the site plan. So you

14:08can see here on this existing site plan

14:10again the narrowness of the lot, how

14:12this existing building that we're taking

14:13down is shoved right up against the

14:15house here and as far away from this

14:17blank brick wall as possible. Um and uh

14:21we're looking to reverse that with our

14:24proposal.

14:28So this is the site plan here. Um and

14:31this is the zoning table and I will have

14:33uh the our experts go through this with

14:35you. this proposed three-story building

14:38um here with the five has five motor

14:40vehicle parking spaces. It will we have

14:43compliant bike parking. We will work out

14:45those details with mobility about how

14:47they're configured, but that's it's not

14:48going to change from being compliant

14:50bike parking. It will be compliant bike

14:51parking and we're sure we can get to a

14:53situation with mobility to sort that

14:55details out on that. Um, this is going

14:58to act as a good buffer between that

15:00commercial zone along Broadway and the

15:03rest of the street as it goes NR up uh

15:06along Wheatland. Um, the other two

15:08aspects for which the variances have

15:10been the other than the two aspects for

15:13which the variance has been obtained,

15:15the proposed structure is otherwise

15:16zoning compliant entirely. So, at this

15:19point, I'd like to have uh Evan Stman,

15:21the architect um and Mark Measerelli,

15:23the landscape architect, talk about the

15:25project. And do you want to go forward

15:28uh Evan and just let me know if you want

15:29me to change the slides?

15:31>> Okay. Yeah, I'll start with the site

15:33plan that we have here. Uh so the yellow

15:35shaded region is the footprint of the

15:38ground floor habitable space. Um the

15:41area behind that in gray is where we

15:43have our parking. So there's five units

15:46and five parking spaces. And towards the

15:49back left of uh the structure we have

15:51our required bike parking and trash. And

15:54then behind that we have a 10-ft setback

15:56where we're showing our condensers and

15:58some landscaping area. Uh access to the

16:02habitable space of the building occurs

16:03at the front left of the site. Uh so

16:06there's uh an entry at the ground floor,

16:08some steps up to the first floor, and

16:11then we have circulation up to the upper

16:12stories from there.

16:15Uh with regards to setbacks, uh the left

16:17side is basically on the lot line, give

16:19or take a few inches for

16:20constructibility. Uh the right side

16:22setback is about 10 ft. Well, it is 10

16:25ft. Um the front setback is 5'8, which

16:31leaves a 12T curb setback. And then as I

16:34mentioned, the rear setback there is 10

16:35ft.

16:37Uh next slide, please.

16:41And then we have the landscaping plan. I

16:44don't know if you want to jump in to

16:45discuss this, Mark.

16:48If so, yeah, there you go.

16:50>> Hey, Evan. Um Mark Mezerelli here. Good

16:53evening. I'm the landscape architect for

16:54Six Wheatland Street. I'm just going to

16:56give a very brief presentation.

16:58Um this plan responds to the constrained

17:02urban site by concentrating meaningful

17:04green infrastructure wherever feasible.

17:06And you can see it's really just in that

17:08rear area. And the design works around

17:11the existing mature Sycamore maples at

17:13the rear property line. These are these

17:15are large uh 28 in uh diameter breast

17:19height mature trees that we've been very

17:22careful to preserve um on our design.

17:27The um

17:29the design also provides 915 square ft

17:33of pvious paving and the planted area at

17:36the rear is populated with uh native

17:39ostrich ferns. uh it's not intended to

17:42be uh used as open space for this

17:45particular project. The roof adds

17:48approximately 970

17:51square ft of extensive sedum green roof

17:54uh which provides storm water retention,

17:56cooling and habitat value.

17:59We've also included on the plan specific

18:02uh tree protection and root pruning

18:04measures for the mature offsite trees

18:07along the rear property line which I

18:08mentioned are the sycamore maples. Uh

18:11together with these elements we achieve

18:13the required Somerville green score of

18:150.25

18:16while we hope creates a durable and

18:19lowmaintenance uh landscape that's

18:20appropriate to this um site. And I just

18:24would like to add in conclusion that the

18:26landscape plan has been reviewed and

18:28approved by Somerville's public space

18:30and urban forestry division. Thank you.

18:38>> Perfect. Um if you go could go on. Okay.

18:41So this is a a sheet showing the the

18:44zoning associated diagrams. Uh I'll

18:47point out the right two images are

18:49diagrams of the uh facade buildout that

18:52we were granted for the ZBA. Uh the top

18:55image shows uh the red hatched region on

18:58the right. Um which is what would be the

19:01required facade buildout and everything

19:03to the left of that is what we are

19:04proposing to build out. So uh we were

19:07off about by about 2 feet on that facade

19:09buildout and again we did receive the

19:11variance for that. Next slide.

19:16And this is just the ground floor again.

19:18So, uh, Wheatland would be on the right

19:20of this sheet. The proposed driveway

19:22runs from the right to the left, uh, to

19:25access those parking spaces and bike

19:26parking. Uh, this is showing the

19:30proposed lobby at the front bottom of

19:33the site. Uh, you can walk in there.

19:34There's a vestibule accessible entry to

19:39the top of the sheet, some mail spaces,

19:41and a sprinkler room. And then we have

19:43our first floor and basement unit there.

19:46And again, that's about

19:481,800 square feet and it's a

19:50threebedroom, three bathroom unit. And

19:53we we'll go up to the second floor.

19:57Oh, down to the basement. Sorry.

19:58>> Yeah. Wow.

19:59>> Yeah. So, this is just the lower level

20:01of that first floor unit showing um the

20:04two bedrooms down there and then some

20:05areaways and then we'll go up to the

20:08second floor.

20:10Okay. So on this level we have two

20:12units. The stairs are coming up towards

20:14the middle on the bottom of the sheet.

20:16Uh the unit at the front which is on the

20:19right side is about 1025 ft and it's a

20:22two-bedroom two-b unit. The unit at the

20:25rear is also a two-bedroom two-b unit at

20:28about 1,270

20:30ft.

20:32And then up to the third floor, it's a

20:34pretty similar layout except the stairs

20:37coming up are more to the left. Uh both

20:39units are two bedrooms, two bathrooms.

20:42Uh the one in the front is about 1285

20:45and the one in the rear is about 1125.

20:51Next slide.

20:54And these are the proposed elevations.

20:56So the top one is the front elevation

20:58which is facing Wheatland. We're

21:00proposing uh cementitious siding for a

21:04majority of the building. Uh so we broke

21:06the front elevation up to highlight the

21:08entry at the left side and brought that

21:10parapit up a few feet beyond the parapit

21:13for the remaining building and it's clad

21:15in a lighter color than the the

21:16remaining building. The right portion of

21:19the front facade is clad with a darker

21:21color with the lighter color uh higher

21:24exposure cladding between the windows

21:27and within the recessed balconies.

21:30The bottom elevation here is the right

21:32side elevation. So that's facing our

21:34driveway and the residential properties

21:36to the right of us. Um again it's clad

21:40with a smaller exposure darker siding

21:42and then the areas between the window

21:44head and window sills use that larger

21:46exposure uh lighter color siding. And at

21:49the bottom right of this elevation is

21:51where we can lever the or we extend the

21:54structure over the parking and by

21:55parking there. And then on the next

21:59sheet we have the other two elevations.

22:02So the top one here is the rearfacing

22:04elevation. Um it's takes the same uh

22:08aesthetic as the right side and wraps it

22:11around the rear of the structure. The

22:13ground floor is uh the wall at the rear

22:15of the parking. And then we have the

22:18upper story units on the second and

22:20third floor with the recess balconies at

22:22the right side there.

22:24And [clears throat] then the bottom

22:25elevation is the left side elevation.

22:28So, this is the one that faces Broadway

22:30and we masked out the adjacent building,

22:33uh, the singlestory building at the

22:35bottom of this elevation here. Uh, we

22:37carried the darker exposure siding

22:39across this side. And the right side is

22:42where we're highlighting the main entry

22:43at the front of the building where we

22:44pull that parapit wall up. And then

22:47towards the rear of the structure, we

22:49broke up the massing with alternate

22:50color siding.

22:52>> You can also see the short-term bike

22:54parking here on the front. Yeah.

22:59And these are the proposed elevation or

23:02uh sections going through the structure.

23:05Um the top right section is through uh

23:09the threetory portion of the structure

23:10where we have units one 101 2011 and

23:15301. Um and then the top left elevation

23:19is cutting through the parking area. So

23:21we just have living spaces at the upper

23:23two stories.

23:25And then the bottom elevation cuts uh

23:27from Wheatland towards the rear of the

23:29site. So on the right side you can see

23:31the living space uh and then it opens up

23:33to the parking and then we have the open

23:35space at the rear of the structure.

23:41And these are a few proposed 3D images.

23:44The top right one is looking from

23:46Wheatland towards Broadway. Uh the top

23:49left image is a view from Broadway

23:52looking towards Wheatland. Uh, and the

23:55bottom two images are really just shown

23:58for the massing and materials. There are

24:01some existing structures at the rear of

24:02the site. So, these aren't actually

24:04images that would be visible, but um, we

24:07wanted to present the materials and

24:09mass.

24:11Next slide.

24:14Onto the shadow studies. So, this is

24:16showing the existing shadows. Um, and

24:18then if you toggle to the next slide, it

24:20shows how they change for the proposed.

24:23Uh so new shadows are shown in blue. Um

24:26the summer solstice is the top row. So

24:29in the morning we're casting shadows uh

24:31kind of parallel to Broadway. Uh towards

24:34the afternoon they wrap around towards

24:36the rear of our site. Um and then into

24:39the evening they wrap around to

24:40Wheatland Street. Um so the most

24:44significant effects are um really during

24:48the winter solstice and I'm sorry it's

24:50mislabeled here but that's the bottom

24:51row. um where we're casting more shadow

24:55in the afternoon towards the rear of the

24:57site and then um into the evening

25:00towards the the right of the site.

25:03And I think we have some more uh

25:05extensive shadow studies showing each

25:08solar event. So, we have the summer

25:10solstice here from 8:00 a.m. to uh 8:00

25:14p.m. And the next slide, we have um the

25:19equinoxes from 8:00 a.m. to 6:30 p.m.

25:22And next slide, we have uh equinoxes

25:26again from 8:00 a.m. to 6:15 p.m. Okay.

25:30Yeah. Then we go into the winter

25:31solstice from 8:00 a.m. to 3:30 p.m.

25:36And that's everything.

25:38>> Great. Thanks, Evan. So, um, creating

25:41more housing is a goal of the city. Uh,

25:43it will create density near this old

25:45Star Market site's new redevelopment and

25:48the main thoroughare of Broadway and Fos

25:50Park while providing a buffer between

25:52Broadway and the NR zone and pulling the

25:55building closer to the commercial blank

25:56wall and away from its NR residential

25:58neighbor. So, um, the it will comply

26:02with the green score and will have one

26:03affordable unit. As far as the site plan

26:06approval is concerned, the project

26:08complies with some vision and the intent

26:09of the MR3 zoning district by providing

26:12muchneeded housing, including that one

26:14affordable unit, removing a vacant

26:16eyesore from the neighborhood. Um,

26:18creating more space between the

26:20structure and its residential neighbor

26:21to the right and increasing the density

26:23as I described. Um, the project will

26:25have the on-site parking because it is

26:28not in a transit area. It will comply,

26:30as I said, with the green score and

26:32promote the goals of the Somerville

26:33Pollinator Action Plan as requested by

26:35the urban design commission. The project

26:38provides usable green space um there

26:41that we showed there and it does have or

26:43green space and does have a green roof.

26:45And as for the residential living use

26:47special permit, that residential use

26:50meets the standards of summer revision

26:51in the intent of the MR3 zoning district

26:53by created creating badly needed

26:55housing, including one affordable unit,

26:57revitalizing the long derelict site, and

26:59adding density near these new

27:01developments. And as um Evan stated,

27:03there's five long-term biking bike

27:05parking spaces in the back, and then

27:07those two uh bike parking spaces you can

27:09see for short-term on the street. So,

27:12uh, in short, it's a compliant

27:14three-story project, and the applicant

27:16would request that the board grant the

27:18site plan approval and the special

27:19permit. And I will take this off the

27:21screen.

27:24>> Thank you.

27:24>> Thanks very much, Adam. Um,

27:28so I I only have a few comments, but I'm

27:30going to reserve them until after public

27:32testimony, um, if there will be any. But

27:34does anybody on the planning board have

27:36any comments or questions that they'd

27:38like to ask of the applicant or of staff

27:40before I open up testimony.

27:46Okay.

27:48Uh with that, I'm going to open up this

27:51hearing to public testimony. For anybody

27:54that would like to speak in support of

27:55the application, please hit the raised

27:58hand button and I will go in.

28:05Going once.

28:07Going twice.

28:09Seeing none, I will close that portion

28:12of the public hearing and open it up to

28:14anybody that would like to speak in

28:16opposition to the application or

28:17otherwise express concern.

28:24Going once,

28:26going twice.

28:28Seeing none, I will close that portion

28:30of the public hearing and bring it back

28:33to any questions or discussions that

28:35members of my uh my colleagues might

28:38have.

28:39Is anybody having they would like to

28:44contribute at this time?

28:49Okay, we're all quiet tonight. Good. Um,

28:52and then I'll just say this project

28:54seems to be pretty pretty

28:55straightforward, pretty pretty decent.

28:57Um, I appreciate the um the bedroom

29:00counts on the on that unit mix. Um

29:03that's something that this board as as

29:05you know has been um advocates for for

29:08for a long time. Multiple different

29:10projects. Um other than that, it's it's

29:14a nice transition between, you know,

29:15Broadway and and a and a neighborhood

29:17residential zone. Seems pretty uh pretty

29:20straightforward to to me. Um, I know we

29:24have one piece that's maybe somewhat of

29:27a of a of a formality that just needs to

29:29be um inked out over the next two weeks,

29:32but um other than that, does anybody

29:35have anything they would like to add?

29:40Uh I see Michael first and then Luke

29:44quickest on the draw again. Um I just

29:46would like to echo your comments, Mr.

29:48Chair. Uh, and I have just a little bit

29:50of color for yourself and my colleagues

29:52based on some other projects that we've

29:53had that are similar. Um, this is very

29:56similar to the project that was near the

29:59Star Market in Porter Square. Um, and I

30:01know that one we had a lot more debate

30:03around the parking. Uh, I would just

30:05like to indicate to to you all and the

30:07public that I feel like because this is

30:09not in that transit zone. Um, I

30:12personally don't feel like I've got that

30:13same strong opinion about the parking at

30:15this site. Um, so just want to add that

30:17color. I guess I'd make one last plea to

30:19the applicant though to to give one last

30:22look over on the bike parking if you if

30:24you don't mind. Again, I really like the

30:26project as it is, but if there's any way

30:28to squeeze in an extra bike parking

30:30space, I think that would be

30:31appreciated. Just feels a little thin to

30:33only have one bike parking spot per

30:35unit. Um, so if there's any way you

30:37could squeeze that in. I know there's

30:39lots of great biking uh around there and

30:41and and bike uh bike lanes, so it'd be

30:45good to give that group access to it.

30:48Otherwise, again, love the project.

30:49Thank you.

30:53>> Thanks, Michael. The next person I saw

30:54was Luke, and I do see Lynn's hand after

30:57that.

30:59>> Thanks. Yeah, I I thought this is a

31:01great proposal. Um echo almost

31:04everything said. I guess the the one

31:06thing on my mind is about the

31:08possibility of actually voting on this

31:10today. Um and and one broader context on

31:14my mind is I know there's this broader

31:16conversation around shifting more

31:18responsibilities to the planning board,

31:20but the concern around our workload and

31:24you know some of that falls on us. If we

31:25can free up capacity by moving pro, you

31:28know, projects quicker and not across

31:30multiple meetings, that just helps

31:34meet the math on how much time we've

31:36got. So, I don't know if if other folks

31:38feel like we actually could move this

31:40today. I was frantically clicking around

31:43trying to make sure I was fully up to

31:46speed on it. It's it's just the tap,

31:48updated tap that we're waiting for. I I

31:50don't know. curious about other people's

31:51reactions, but I'd be comfortable

31:54if we could find a way to move it today.

31:56>> Yeah. So, look, I I'll respond to that.

31:59It's been the practice of the board to

32:02require a complete application, complete

32:04review. That's that's kind of the

32:05standard that we've got um in order to

32:08write a a a decision that complies with

32:13um the ordinance and and state law to

32:15make sure that we have in fact

32:16considered everything that we need to

32:18consider. Um we have held other projects

32:22for um for taps both both ministerial

32:26and substantive and I would be

32:31you know reticent to to speed this one

32:33along when it's not quite there yet. I

32:35think by the I'm expecting that when we

32:38reconvene on this um it will be a a

32:4130-se secondond discussion. Um that's my

32:44guess. But for the purpose of

32:46consistency and making sure that we have

32:47what we need and what staff has what

32:49they need, um I'm I'm a little hesitant

32:52to to do that.

32:54But well, I appreciate that. The one

32:57thing I'll say is is

32:59maybe there's a way we can tweak our

33:01practice so that we just shift it and

33:03are consistent with ourselves moving

33:05forward. I know this isn't would

33:06probably have to be in some sort of gray

33:08area that you know we'd want to be

33:10comfortable with beyond just myself, but

33:13um

33:14anyhow, I'll leave it at that for now. I

33:16see Alvaro's hand and others. So,

33:17>> yeah, I'd like to get Alvo's view on

33:19that.

33:22>> Um just one more answer to that, Luke.

33:25Um often if mobility feels like the tap

33:28is at a point that they can just submit

33:30a condition and it could be voted

33:32tonight, they will um submit that to the

33:34staff planner and then we would add that

33:36in a recommendation. So in that case my

33:38memo would say approved with conditions

33:41and then we'll submit that additional

33:42condition. In this case, I guess the

33:44mobility planner did not feel that that

33:46con that the tab was ready to provide

33:49that condition and that's why the um the

33:53suggestion currently was to continue.

33:56>> Helpful. You know what? Sorry, if I can

33:58ask just one other question. I don't

34:00want to belabor this as one case study,

34:02but I think it might actually help my

34:04thinking about this project and the

34:06broader question of of when we really

34:09need to push something to a second

34:10meeting.

34:13What is the tic-tac on this the tick

34:15tock on this tap and why it's not

34:19complete or like I'm just curious for I

34:22guess both sides perspective on

34:25why this process just wasn't complete

34:27before today.

34:29>> Uh Adam Dash I I mean I could say the

34:32the comments um we've worked through

34:34most of the comments with mobility over

34:36the last few months. Um they want um

34:41just sort of abbreviating here. Uh it's

34:44got to do with the access aisle through

34:46the parking area for the bikes they want

34:49reconfigured

34:51um to provide un so it's not obstructed.

34:54They want the bikes parking space racks

34:59um longer. They're a little too short, I

35:02guess. They want the bike racks at least

35:04one foot from the wall. one bike rack is

35:07too close to the wall. Uh the angled

35:10parking space length and they want us to

35:14show vehicle movement. Um so I mean we

35:18just know we we did file a tap just to

35:20be clear. This is a revision to it. It's

35:22not like there's no tap at all.

35:24>> No, no. And that

35:26>> those specifics are helpful for the

35:28flavor of it. So, um, what's the timing

35:31on why the revisions couldn't have been

35:34made in time for this meeting?

35:37>> I will leave that to Evans Stallman

35:38because I don't know the answer to that.

35:40We don't have

35:40>> We had made the revisions on the on the

35:42architectural documents and uh that was

35:44submitted to you guys, but we uh sent

35:47the the plans over to our engineer. I

35:50was hoping they'd be done to submit to

35:52you guys by this meeting, but they they

35:54just need a little more time to wrap it

35:56up, which they're currently working on.

36:00And and I would I would note mobility

36:01has been great. We have no complaints

36:02with mobility. They've been very

36:03responsive. They have offered to meet

36:05with us whenever to make it happen for

36:07tonight. We just it was on on our on our

36:09traffic engineer guy's end. It just

36:11didn't happen. That's all.

36:13>> No, I appreciate that. And and my

36:14questions sound like I'm really trying

36:16to pin blame on one side or the other

36:17and I'm really just trying to track if

36:19there's some systemic bottleneck in

36:21these things. you know, it just helps us

36:22to

36:24>> No, it's it's it's mostly ticky tac

36:27stuff and then expl and show more how

36:29this works. It's not like it doesn't

36:30work. It's just show me how it works.

36:32So, the it's show me and move the rack a

36:35foot over. I mean, none of this stuff's

36:36going to change anything to your point,

36:38but I I get it. And like I said,

36:40mobility has been very, you know, very

36:42responsive and been very available. It's

36:45the fact we didn't get it in time, it's

36:46on us. I I don't know what else to say.

36:48The engineer just couldn't pull it

36:49together. We filed the revised plans on

36:51the 10th like last week and I know with

36:53the holiday and stuff I whatever

36:55happened happened but we'll I think

36:57October 1st you know hopefully you can

36:59take us before you go into that land use

37:01committee meeting if it's only literally

37:02going to be 30 seconds that would be

37:03awesome but

37:09you good.

37:11>> Okay next person I saw was Lynn and then

37:14Corali and then Amelia.

37:17>> Um uh Thank you. Thank you, Michael. And

37:21uh it seems like a great project. I

37:23would just uh echo uh Councilman um

37:27Michael, the other Michael's comment

37:28about thinking, can you squeeze in one

37:31more long-term bike rack? I I think

37:35about biking visav bedrooms um versus

37:38units. But the question that I have is

37:42the affordable unit um of the five units

37:46there, which one will be the affordable

37:47one?

37:49Yeah, Adam Dash, again, that's a

37:51discussion with the housing division.

37:53We've submitted, we filed the, you know,

37:55signed the form that we will provide

37:57one, but as far as which unit it is,

37:59that's usually a discussion that comes.

38:01Um, they traditionally we we say, well,

38:04we would propose this one, and housing

38:06says we would want that one, and

38:07whatever ends up getting happens. But,

38:11>> okay. So, you don't want to tell us

38:13which one you propose?

38:14>> I I don't think we know because housing

38:15is going to basically tell us which one

38:16is going to be. They usually ask a

38:18suggestion, but they often will say,

38:20"No, I want that unit or whatever it

38:21is." And so, whatever unit it is,

38:24historically, when they want the unit,

38:25it's kind of not much of a discussion

38:27after that. So, it's not really up to

38:28us. They ask our opinion. They don't

38:30necessarily do what we ask.

38:32>> All right. Thank you very much.

38:34>> No problem.

38:41>> Yes. Thank you, Mr. Chair. And I also

38:43want to say that I like this project

38:44very much. Um Lynn essentially asked my

38:46question, but I just wanted to add a

38:48little flavor to it and um and that is

38:50that the board has discussed often the

38:52need to make it easier for families to

38:55stay in Somerville. So to the extent

38:57that you might recommend the

38:58three-bedroom being the affordable unit,

39:01um I think we would I would certainly

39:04encourage that. Thank you.

39:10>> Then Amelia had her hand up. I don't

39:14>> Thank you.

39:15>> I I just wanted to follow up on Luke's

39:17comment. Um, as one member personally, I

39:21feel like if a tap is what's holding

39:23something up and it only has to do with

39:27bicycles,

39:28I would I personally would feel fine

39:30about advancing it anyway because I I

39:32think that like bike parking is

39:34something that is

39:36uh nimble and low stakes. and when we're

39:39talking about things that have to do

39:41with the vehicles and turns and safety

39:44that to me that is in like a different

39:46ballpark. And so I just wanted to

39:49respond to Luke's like I I know I've

39:51been the hold up on some taps before and

39:53like I always have a great deal of

39:55concern about how um moving things are

39:58interacting with one another. But like

40:00if we were talking only about the

40:02location of bike parking as the

40:05remaining piece, I would find that

40:07something that was sort of a different

40:10category. So I just wanted to offer that

40:12perspective. Thank you to the applicant.

40:13I don't have any comments on the

40:15application. and I think that it's a

40:16really solid project and I appreciate

40:18you putting it forward.

40:19>> Um, so Luke and Amelia, I I would I

40:22would

40:24kind of follow where you're going on

40:25this. The only hangup I have is what um

40:30Alvaro said a few minutes ago, were

40:32there something that could be fit into a

40:34condition, mobility would have told us

40:35that as they have done in the past and

40:38they didn't do that in this

40:39circumstance, which means there's

40:41something um that's not quite right. Oh,

40:44I absolutely defer to Alro and and

40:47mobility through him. I just wanted to

40:49offer to the extent Luke was proposing

40:51sort of an alternative framework for

40:52moving forward, I wanted to offer a

40:55layer to consider in that.

40:57>> Thank you.

40:59>> Um,

41:01all right. So, good discussion,

41:04good application. Thank you. Uh, our

41:07next meeting is October the 1st. I'm

41:10going to leave written comment open

41:11until um Friday the 25th at um at 9:00

41:16a.m.

41:18Planning Board at some ma.gov is where

41:21they can be directed. Um the chair moves

41:23to continue this agenda item to October

41:261st. Seconded by Amelia. Roll call,

41:28please.

41:29>> Jan Khabib,

41:30>> I.

41:31>> Lynn Richards

41:33>> I.

41:34>> Luke Schuster.

41:35>> Hi.

41:36>> Carly Cooper.

41:37>> Hi. Michael Mi.

41:40>> Hi.

41:41>> Ailia.

41:42>> Hi.

41:43>> Michael Capuano. Great.

41:45>> Thank you. See you in a couple weeks.

41:47>> Thank you for letting us present tonight

41:48as well. I appreciate it.

41:49>> Yeah, of course.

41:51Um, last item on our agenda is 8 Medford

41:54Street, which has previously been

41:55opened. Uh, it has been heard. Testimony

41:58has been taken. The board had

42:02um asked a few questions, raised a

42:04raised a few points. Um, it's been a few

42:07weeks since the last time we all met. I

42:10believe the applicant has submitted some

42:12responses to um some of the board's

42:15questions and concerns. And I think we

42:18are, you know, probably ready to to

42:20proceed tonight. But just wanted to

42:22welcome the applicant and uh, attorney

42:24Vito. Anybody else in your team that you

42:26need to bring up?

42:28>> Yes. Thank you, uh, Chairman Capoano.

42:31Attorney Vigorito, 424 Broadway,

42:33Somerville. if we could have [sighs]

42:35uh Steve [clears throat] Sraagusa

42:37promoted. Uh Evan Stalman, he's the

42:40architect standing in this evening. And

42:43we also have Katya Pada from Verdant.

42:45She is our landscape architect. Uh so

42:48[clears throat] that would be great.

42:56>> [clears throat]

42:59>> So, so just to kind of dive right in, if

43:03is there any part of the presentation

43:04you would like us to uh you know revisit

43:08or discuss? Uh I know Evan can run the

43:10slideshow. I I mean the specific

43:12question was about some parking in the

43:15area. So Steve Suruser and I worked on

43:18that. I also went out and walked the

43:20site with the [clears throat] developer

43:23and we were able to zero in on a

43:25neighbor at 11 Ward Street that had some

43:28parking that if you know a resident of

43:31the building or you know a commercial

43:35person or commercial store owner or

43:37whatever the business may be, I don't

43:39know at this time needed parking, he

43:41would be available. But I did submit a

43:43memo uh and I actually had a

43:46conversation with Kit about it. Well, I

43:48happen to be in the planning department

43:49one day and we have, you know, she I

43:51think she liked it. I don't want to

43:53misspeak for Kit, but there is uh three

43:58parking garages with a within a

43:5915-minute walk of the site and then

44:02there's also 481 Columbia Street. The

44:05parking garage there is an 8minute walk.

44:07So there are, you know, very close

44:09parking facilities for residents of the

44:12building to, you know, if they, you

44:14know, if they have vehicles and they

44:16need parking, it will be accessible to

44:18them.

44:19>> Um, so I will say this, as as I'm sure

44:22you know, we have I haven't seen it in a

44:24while. Um, but every so often we do get

44:27an application that um

44:30has some sort of a either an explicit or

44:33an implicit agreement with some sort of

44:35a neighboring property that has some uh

44:38you know some parking that's you know

44:39utilized after business hours, whatever

44:41it is. Um so I'm glad you were able to

44:43explore kind of that as well as

44:46kind of an identification of other um

44:49other options. So I I that's a great

44:51idea.

44:52>> Absolutely. And you know,

44:54[clears throat] and it's just as the

44:55saying goes, you can't put that cart

44:57before the horse. You know, until you

44:59know, the developer builds and, you

45:01know, has residents in there and, you

45:04know, can explore what their needs are,

45:06you know, he has these relationships

45:07now. So, uh, [clears throat] you know,

45:10if you know, there are specific parking

45:12needs of any of the residents, you know,

45:14they can be addressed and and that's the

45:16goal here. You know, we want to they

45:18Nelson Olive has been a developer a long

45:20time in the city. you know, he has

45:23[clears throat] his uh whether he's

45:25renting or if he's doing, you know,

45:28condos, you know, his uh his tenants

45:30especially always appreciate what he

45:32does for him or does for them. Excuse

45:34me.

45:38>> Okay. I those those were kind of my

45:40questions uh from the last time we got

45:43to got together. Does anybody have

45:45anything that they would like to add for

45:47the good of this meeting? Um, based on

45:50kind of the new information that was

45:52presented this evening, Corali.

45:57>> Yes. Thank you, Mr. Chair. I I just

45:58wanted to add that I did I was in the

46:00neighborhood a couple weeks ago and I

46:02walked around and I counted at least 50

46:05um Somerville resident parking spots on

46:09um I know the applicant mentioned a

46:11couple of streets like Horus, but there

46:12was also Wards, South Porter, Harding,

46:14Hunter. So, it seemed like there was

46:16quite a bit of um Somerville resident

46:19parking close by. So, um I just wanted

46:22to mention that. And then I did if I

46:24could I have a question about the the

46:26loading dock or the loading space. Um

46:31and I I just wanted to ask is is the

46:33loading space on Warren is that

46:37um created from the larger setback that

46:40the building has compared to the current

46:42building or is the loading space going

46:46to actually be in or on Warren Street?

46:51Evan, do you can you pull up that slide?

46:53That might be I want to answer your

46:56question correctly and I think sometimes

46:58a photo, you know, a picture's worth a

47:00thousand words and I think helpful.

47:07[clears throat]

47:10Okay, I'll just go to the site plan. Um,

47:13let me find it.

47:15I'll zoom in here. Uh so it would be

47:19entirely on the street. Um the curb

47:22setback is is just to the existing curb

47:26and then we have the bike parking and

47:28trees and then the sidewalk.

47:36>> Okay. Thank you. I was just trying to

47:38understand from the design where where

47:40that would be. Thank you. Sure.

47:48Um yeah uh yeah is is here we

47:54>> hi I just um want to point everyone's

47:57attention to the condition that I had

47:59left in the supplemental staff memo just

48:01so it doesn't get uh lost in the shuffle

48:04of any motions or vote but I think our

48:07inspectional services department felt

48:10you know kind of contrary to the last

48:11application felt comfortable moving this

48:13application forward forward with the

48:14condition um that the commercial

48:18entrances uh be

48:22be updated post um post approval if

48:25that's the way you vote. Um so I just

48:28wanted to point everyone's attention to

48:29that condition as well.

48:31>> I appreciate that. Okay. Thank you.

48:35>> Um anybody else before we move this

48:37application along?

48:40Okay.

48:43Following public testimony, review of

48:45the submitted materials, and

48:46deliberation of the required

48:47considerations outlined by the

48:49ordinance, I move to approve with uh

48:52conditions as outlined by the staff memo

48:54and the supplemental staff memo the

48:57residential special permit in the

48:58midrise Ford district, seconded by

49:01Amelia. We got a roll call, please.

49:04>> Jan Habib,

49:05>> I.

49:06>> L Richards,

49:08>> I.

49:09>> Luke Schuster,

49:10>> hi. Carly Cooper.

49:12>> Hi.

49:13>> Michael Mcnilli.

49:15>> Hi.

49:16>> Emilia.

49:17>> Hi.

49:18>> Michael Capon.

49:19>> Hi.

49:22>> Following public testimony, review of

49:23the submitted materials and deliberation

49:25of the required considerations outlined

49:27by the ordinance. I move to approve with

49:29the conditions outlined in the staff

49:31memo and the supplemental staff memo the

49:34residential site plan approval in the

49:36Midrise Ford district. Seconded by

49:39Amelia. We have a vote.

49:42>> Jan Khabib.

49:43>> Hi.

49:44>> Lyn Richards.

49:45>> Hi.

49:47>> Luke Schustster.

49:48>> Hi.

49:49>> Carly Cooper.

49:50>> Hi.

49:51>> Michael McN.

49:52>> Hi.

49:53>> A familia.

49:54>> Hi.

49:56>> Michael Capon.

49:57>> Hi.

49:58>> Congratulations. Good luck.

50:00>> Thank you so much everyone. Have a great

50:02evening.

50:02>> Thank you. You too. Okay. planning board

50:06has nothing else on its agenda um prior

50:09to a joint hearing between the land use

50:13committee and this body on October 1st.

50:17So with no further business before the

50:19planning board at 7:52

50:216:52 p.m. the chair moves to ajourn

50:26seconded by Amelia.

50:29>> Jan Khabib

50:30>> I

50:31>> Lyn Richards

50:32>> I

50:33>> Luke Schuster.

50:34>> Hi

50:35>> Carly Cooper.

50:36>> Hi

50:37>> Michael McN.

50:38>> Hi

50:39>> Amelia Evov.

50:40>> Hi

50:41>> Michael Kaplan.

50:42>> Hi.

50:43>> Thank you everybody. Have a nice night.

50:46Thank you.