Police Station Vehicle Damage Repair

At a glance

  • What: repair of the police station after a car drove into the building in February 2026, plus a new driveway layout to prevent straight-on approaches.
  • Where it stands: building repairs go to public bid (general bids Nov 25, notice to proceed mid-December, construction from January). Driveway work is bid separately by the town to be substantially complete by winter.
  • Cost: architect estimate just under $800,000 for the building (down from about $1.1 million), expected to be covered by insurance; $120,000 Town Meeting appropriation for the driveway.

The design

  • Architect: Galante Architecture Studio (per captions). Scope: front entrance repairs, security features, structural planters and impact-resistant bollards.
  • Driveway designed in-house by the town engineer with the police chief: more green space, graded drainage, trees, a bollard island, and fire and ladder truck access preserved.
  • Rationale: limit vehicle speed on approach (the February vehicle reached about 72 mph, per captions).

Discussion time

About 7 minutes across 1 meeting (from transcript timestamps; approximate).

Meeting Minutes
2026-09-22 - Select Board 7

Log

  • 2026-09-22 - 2026-09-22 - Select Board: Keith Baldinger gave the update; questions on cost, insurance and cheaper barriers.