16 and 18 Vesper Lane Cottage Hospital Housing
At a glance
Based on auto-generated captions; names and details may be misheard.
- What: Nantucket Cottage Hospital major site plan review for staff housing (about 48 apartments in two buildings) at 16 and 18 Vesper Lane.
- Where it stands: approved 5-0 on 2026-10-19 after the applicant moved the east building back and added parking.
- Next: approval letter to be signed by the chair; the hospital still hopes for a better alternate access across federal (Coast Guard) land.
The revised plan
- Presented by Rick Bodd with the hospital team and civil engineer Steve Glowaki.
- East building moved to 20 ft from the east boundary (was 7 ft).
- 22 parking spaces added and 8 lost, so 116 spaces are provided and no parking waiver is needed.
- Buildings are 39 ft and 38.5 ft; the hospital overlay district allows up to 50 ft.
- Landscape plan with evergreen screening, a board fence and a patio; arborist letter calls for a root protection fence 15 ft from neighbor trees.
- Shadow study: the neighbor's own trees cast nearly as much shadow to the east in the late afternoon.
- Construction expected to take 14 to 16 months; digging 5 to 6 ft from the east foundation with sheet piles.
- An alternate access (needs Coast Guard approval) would add about 10 parallel parking spaces.
Concerns raised
- Abutters worried about lost sunset views, noise, parking lot lighting, construction disruption and overlapping work with the adjacent town affordable housing parcel.
- Member Borgerson urged parking permits and management so the lot does not become a free-for-all.
- Campbell Sutton suggested a management plan and motion-activated lighting.
- Cameron Marks asked the arborist to confirm sheet piles will not harm boundary trees and asked about east-side lighting.
- Tracy McDonald asked whether the shared easement is wide enough for emergency access; the engineer said a fire truck turning template worked.
- A hospital housing coordinator and the chief nursing officer spoke in support.
Decision
- This is site plan review, not a special permit, so Leslie Snell said the board cannot attach conditions.
- The applicant volunteered to protect all adjacent mature trees, add signage and a management plan, use low and motion-sensor lighting where sensible, and have the arborist review the sheet piles.
- Public hearing closed 5-0; major site plan review approved 5-0 on a motion by Nat.
Sources
- Video: https://youtube.com/watch?v=UWKCbpltIDk
- Agenda: https://nantucketma.portal.civicclerk.com/event/26585/overview
Discussion time
About 38 minutes across 1 meeting (from transcript timestamps; approximate).
| Meeting | Minutes |
|---|---|
| 2026-10-19 - Planning Board | 38 |
Log
- 2026-11-04 - Select Board — Affordable Housing Trust update: the town was awarded a $3.14 million Housing Works Infrastructure Program grant for Vesper Lane.
- 2026-10-19 - Planning Board — Revised plan presented; neighbors and supporters heard; major site plan review approved 5-0.