Demolition Delay Extension for Fire Training
At a glance
Based on auto-generated captions; names and details may be misheard.
- What: a request to add two to three weeks to the demolition delay for dwellings that cannot be given away so the fire department can train in them.
- Where it stands: Bobby proposed it; Leslie Snell will check with the fire chief and revisit an earlier look at the idea.
- Next: staff report back; an alternative was a fire department assessment of each building first.
Discussion
- The demolition delay bylaw applies only to dwelling units, not commercial buildings, sheds or garages, and was recently amended by Town Meeting.
- Bobby noted the island has no fire academy and said firefighters found training in the old Downyflake building valuable (roof venting, searches).
- A board member suggested the fire department assess each building before extra time is required.
- A resident asked that material reuse be considered too and was told the buildings would not be burned.
Sources
- Video: https://youtube.com/watch?v=EGzgmcRU2zY
- Agenda: https://nantucketma.portal.civicclerk.com/event/26593/overview
Discussion time
About 4 minutes across 1 meeting (from transcript timestamps; approximate).
| Meeting | Minutes |
|---|---|
| 2026-10-21 - Select Board | 4 |
Log
- 2026-10-21 - Select Board — Proposal raised by Bobby; planning to consult the fire chief.