Town Sponsored Warrant Articles for 2027
At a glance
Based on auto-generated captions; names and details may be misheard.
- What: the town manager's second outline of town-sponsored articles for the May 10, 2027 Annual Town Meeting, with planning staff reviewing the zoning concepts.
- Where it stands: preliminary; the board was asked for direction on which articles to draft. A third outline is due in about two weeks. The board will have until January to decide debt exclusion ballot questions.
- Next: staff to follow up on the airport fuel revolving fund, demolition delay for fire training, fire retardant shingles, and the shellfish board's two requests.
Items on the outline
- Airport request to dissolve the fuel revolving fund; staff meet with finance and town counsel because it was created by special legislation and could not be recreated.
- Municipal aggregation operational adder: state law changes end the revolving fund, so a new special stabilization fund and a transfer vote are planned.
- Zoning map: continued RC and RC-2 phase-out (including a neighborhood where staff are working with a family), a remaining parcel to rezone, and a possible placeholder rezoning for the DPW facility.
- Zoning bylaw: state-driven changes for accessory dwelling units and seasonal communities, possible state duplex legislation, a year-round restriction on new secondary dwellings (see Year-Round Restriction on New Second Dwellings), storage container extensions through a special permit, a covenant program 2.0 with a possible ground cover bonus (see Ground Cover Bonus for Covenant Units), year-round lot creation, formula and pop-up businesses (see Formula Business and Pop-Up Retail Bylaw), removing leftover tertiary dwelling references, and implementing new state variance and nonconforming structure standards.
- Non-zoning bylaws: reorganizing the Historic District Commission roof and satellite dish rules, and reviewing the fire retardant shingles, trench safety and the 1997 street and sidewalk interim-control provisions as conflicting with state code or outdated.
- Real estate: an easement conveyance to National Grid and other items still in review.
- Financial and ballot: the sewer enterprise fund operating override was struck, school central office improvements added with funding unknown, and prior-year reappropriations pending.
Board input
- Leslie Snell, director of planning, presented the zoning concepts. Related to the 2026 Master Plan, see Draft 2026 Master Plan.
- Two items from the shellfish and harbor board (SHAB) came up: asking the legislature again for a home rule fix so its elected members with scalloping interests can vote, and moving the no-wake buoys about 150 yards farther out to slow high-speed ferries; staff thought the buoys may need Town Meeting action. SHAB members want to stay elected.
- See also Demolition Delay Extension for Fire Training, Fire Resistant Shingles Bylaw, Pending Home Rule Petitions and State Housing Mandates Response.
- The manager asked for clear yes or no direction early so drafting time is not wasted; the board was told ballot wording can be added or removed later.
Sources
- Video: https://youtube.com/watch?v=EGzgmcRU2zY
- Agenda: https://nantucketma.portal.civicclerk.com/event/26593/overview
Discussion time
About 14 minutes across 1 meeting (from transcript timestamps; approximate).
| Meeting | Minutes |
|---|---|
| 2026-10-21 - Select Board | 14 |
Log
- 2026-11-04 - Select Board — Town Manager presented outline #3 of potential articles; no real objections from the board. New: a revolving fund for low-income community shared solar (Low-Income Community Shared Solar Revolving Fund); a possible conservation restriction for mitigation property tied to the Somerset Lane bike path (to be discussed in executive session); and pending ballot or funding items including an electrical-only phase of a barracks project estimated at about $2 million (facility name unclear in the captions; free cash or a one-year capital exclusion mentioned) and central office improvements. Authorized borrowing that could be rescinded is under review. The Finance Committee set a review schedule for the FY28 budget and warrant articles on 2026-10-27 - Finance Committee.
- 2026-10-21 - Select Board — Second outline of town-sponsored articles reviewed; planning concepts presented; no votes.