2026-11-04 - Board of Regional Commissioners Public Hearing
Summary
Built from the county's event listing and a Whisper speech-to-text transcript of the video; names may be misspelled.
- Public hearing on a MassDOT petition under M.G.L. c.160 s.104 for two new at-grade shared-use path railroad crossings, at the Mid-Cape Connector and the Keith Field Recreation Area, tied to the Sagamore Bridge replacement. See Sagamore Bridge Shared-Use Path Railroad Crossings.
- MassDOT said the bridge replacement is fully funded, with the design-build selection expected early next summer and a notice to proceed for construction in late 2027.
- The crossings would connect Sandwich Road to the Canal Service Road, and would be built before the Canal Service Road is closed for bridge work, with detours for cyclists and pedestrians around the work zone.
- Safety features presented include gates, flashers and bells, lighting, detectable warning surfaces, and fencing to discourage informal crossings.
- Public comment was supportive, and questions touched on maintenance, train whistles and quiet zones, accessibility, and access near the post office.
- The Board closed the hearing and voted unanimously that public necessity and convenience require the two crossings.
Agenda
The agenda link is on the county's document site and requires a login; only the agenda text on the county's event page (if any) was read, as summarized above.
Sources
- Event page: https://www.capecod.gov/event/barnstable-county-board-of-regional-commissioners-public-hearing/
- Agenda or business calendar (login required): https://barnstablecounty.sharepoint.com/:b:/s/Public/IQDzZm2IhFDbQaVBQBLFYMAtAd0nekvq0vhzywIymcd7fCE?e=u3PJUh
- Hearing documents (login required): https://barnstablecounty.sharepoint.com/:b:/s/Public/IQDOpCE6O7-pTbIhzM7j4a6OAW4grUlxNH8eQICUbtxv8-M?e=pjS7CY
- Video: https://www.youtube.com/watch?v=g1lGO9931sw (Barnstable County YouTube channel, live-stream entry)
- County meeting center: https://www.capecod.gov/county-government/meeting-center/
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
09:55I'm going to declare a quorum present and I'm going to call this meeting of the Barnstable
10:02County Board of Regional Commissioners call it to order. This meeting will be conducted
10:09in accordance with applicable laws. Anyone wishing to participate can do so in person
10:14or may view the meeting via live broadcast on our Barnstable County YouTube channel or
10:24our website Cape Cod.gov and anyone who wishes to audio or video record this meeting should
10:31please raise their hand and acknowledge be acknowledged by the chair. Bingo we have someone
10:36recording our meeting from the enterprise. Okay so I would to start our meeting what
10:42I'd like to do is begin with a pledge of allegiance to the flag. Pledge allegiance
10:50to the flag of the United States of America, to the republic for which it stands one nation
10:57under God indivisible with liberty and justice for all. The next item on our agenda is I'm
11:10going to ask you just to join the board in a brief moment of silence to reflect on the
11:15bravery and the sacrifices of all those who have put their lives on the line in service
11:21to our country, protecting our safety, protecting our freedom and our democracy. Thank you.
11:43We normally have public comments so before we begin the public hearing I'm going to
11:48ask if there's anybody that would like to address the board on any other matter unrelated
11:59to the purpose of the public hearing. Hearing none, we'll move on to the next item. So
12:07we have called this meeting together this public hearing at the request of the Massachusetts
12:14Department of Public Utilities as well as the Massachusetts Department of Transportation
12:20and we honored a request by the the born select board to hold this meeting here in
12:26born so that we would have an opportunity to present some information to the community
12:32and receive input and feedback from the community. I would like to acknowledge that we have
12:40several representatives from the town of born here. I see Mary Jane Mrangelo here.
12:46I see Jean as our of it's here and I do see I think it's Anne Marie Soroni is here and
12:53thank you for being here tonight. Born by the way has been incredibly generous with
12:58their facilities and this is one of several meetings that we've had here recently here
13:03in the town of born. The Board of Commissioners play a very small but important role in making
13:11decisions regarding new grade public shared use railroad crossings and so the Massachusetts
13:21Department of Transportation has requested that the county board of commissioners determine
13:26that public necessity and convenience require the construction of two new at grade public
13:34shared use path railroad crossings associated with the Sagamore Bridge replacement project
13:41phase one of the Cape Cod bridges mid Cape connector crossing in the Keith field recreation
13:49area crossing. So we need to make a finding tonight that this work is of public necessity
13:58and so that's what this public hearing is all about. We are going to receive a presentation
14:02tonight from the Massachusetts Department of Transportation. Joining us tonight is Louisa
14:08Pywonski. She's the mass DOT executive director of the mega projects delivery office. We have
14:15Guy Resendez I believe is here guy from mass DOT the state utilities engineer John Weston
14:22from mass DOT the rail program is here. Dave Anderson from HNTB the program manager is
14:28here and I believe there are other people here from HNTB. So without any further ado
14:37I'd like to turn it over to Louisa and her team at mass DOT and HNTB and let us begin.
14:56Good evening. Thank you to the board for having us here tonight. We appreciate the
15:02prompt response to our request and as mentioned we have David Anderson, James Barnack, John
15:08Weston, Guy Resendez and I think Rich Bilski is here. Glad to have him here and I'd also
15:15like to acknowledge the presence of several members of the born select board with whom
15:20we've worked closely to advance this vital project. So we're going to start before we
15:27get into the details of the request with a quick overview of what we'll be talking about
15:33today. We're going to give you an update on the Cape Cod bridges. Many of you are aware
15:38that the project is moving ahead quickly. The Sagamore bridge replacement project is
15:43due to start construction late next year. In our work to seek your approval on these
15:49crossings is an essential element of moving this project forward. Then we're going to
15:55talk about the scope of the Sagamore bridge project, get into the fine details of what
16:01we're proposing and then talk about the schedule. And to start I'll say that our interest always
16:08begins with safety. We've worked very closely with our colleagues from the rail and transit
16:12division, Mass Coastal, the Federal Railroad Administration. Guy Resendez is our expert
16:18within the highway division, the district office. So we've brought a lot of expertise
16:25into this request because our interest is in making sure that people can cross those
16:30tracks safely in a much more rational and structured way than they're able to do today.
16:38So we'll start with a project update. We made a great step forward at the end of September.
16:46We received an obligation of $956 million from the Federal Highway Administration. As
16:53many of you know, we received a grant, a bridge investment program grant and a mega
16:59grant program, totaling about $1.2 billion. We'd already used about $36 million for
17:06pre-construction activities. And in September we completed a series of steps and documentation
17:13needed by the Federal Highway Administration to guarantee that funding for the bridge.
17:19So we were able to get access to $956 million in mega grant funding, BIP grant funding.
17:27And we soon expect to receive the balance of the grant funding, the mega grant funding
17:32in the amount of $371 million. That means Sagamore Bridge is fully funded for our replacement
17:39project. And funding is secure, not only in the federal side, but on the state side Governor
17:44Healy has committed $700 million in state funds and the Corps of Engineers has committed
17:49$350 million in their own funds. So we are at the, let me just put this down for a second,
17:59the stage of the project where our work on the design is complete. We have put together
18:05a preliminary design which has a lot of detail about what we need to see, what we will hand
18:11it off to the design build team that we select. Property acquisitions has not been a quiet
18:19topic here in Bourne. We acquired 13 homes by eminent domain. They are all acquired
18:26now and we will be moving forward with some minor strip takings and easements for the
18:33next several months, but the land that we need to build the bridge is largely assembled.
18:39We are going, the design build approach, this is a more rapid approach to get us to
18:46the start of construction. That process is underway. We issued a notice
18:50to proceed, I'm sorry, I wish we issued a notice to proceed, a request for proposals
18:55in late September. And we have already started interacting with the shortlisted three design
19:01build teams. So we're well underway toward the selection of a winner early next summer.
19:08And we expect to issue the notice to proceed for construction to begin in late 2027. So
19:14moving fast on Sagamore Bridge, a little stuck here. Did I just not apply enough force
19:28to it? Okay, really exciting next slide to come.
19:36Oh, thank goodness you're here. We've been using these arrows.
19:42Are we here? You're on this one? Or was I on that one?
19:50Thank you so much. Don't go far, please. Thank you. So we, of course, have not forgotten
20:01about the Bourne Bridge. We know it's vitally important to replace both bridges. They are
20:07the exact same age, both 91 years old. And toward that end, we applied for a bridge investment
20:13program grant, the same type we got for Sagamore in August of 2025. And a year later, we heard
20:21back from the Federal Highway Administration and they invited us to provide more information.
20:26They said they had rated us highly on two of three categories. And one where we got
20:32a medium rating was project readiness. So they asked us if we wanted to say more, and
20:38we certainly did because we had done a year's worth of work getting Bourne Bridge ready.
20:44So we were happy to provide them with lots of new information about permitting, design,
20:51everything that we needed. And so we think we will get a high rating in that category.
20:56That doesn't mean we're guaranteed to get the grant. They do try to distribute grants
21:01geographically. And of course, we got a big one for Sagamore. But we feel like we've
21:05made a very strong case to the federal government that in preparing the Bourne design in environmental
21:13permitting and doing a lot of activities to prepare it, that we can take a lead role
21:19in a system and replacing what is, of course, a federally owned bridge. So fingers crossed
21:25on that one, we will keep everybody up to date as we receive any additional information
21:29from federal government on that. Next, on the Bourne Bridge status, we have been moving
21:39Bourne Bridge along at the same clip as we've been moving Sagamore. The reason is, as I
21:45said, both bridges are the same age. We view them as both equally important. And we are
21:51prepared to make the same deal with the federal government that we did on Sagamore. We'll
21:55take the lead on constructing the bridges. We'll contribute funding toward it ourselves.
21:59And we will take ownership of the bridges if they provide their share of funding to
22:06the Bourne Bridge. So toward that end, we have covered both bridges in our NEPA and
22:12NEPA documents. We got a record of decision covering both projects. We have preliminary
22:18design complete on the Bourne as well as the Sagamore. So when we get that funding,
22:25we'll be ready to move forward with it. The only thing we have not done for Bourne that
22:29we have done in Sagamore is take land or take private property. And we don't think
22:33it's the right thing to do before we have funding in hand that would be taking it prematurely.
22:39So we're holding off on that. And just about that, I'll say we need significantly less
22:44in land and property for the Bourne than we did for the Sagamore. The rest of this presentation
22:51is going to focus exclusively on the Sagamore Bridge. But we know there's a lot of interest
22:55in the town of Bourne and beyond in the Bourne Bridge as well. So I'm going to turn it over
23:01to David now and he will take it over and he will turn it over to James.
23:06Thank you. So you see in this presentation, what we're doing is we're starting big and
23:13we're going to work our way down to the details. So I promise you, we will get to these great
23:17crossings that we wanted to kind of put things in context of the big picture. So this image
23:23is intended to show just the total scope of the Sagamore Bridge project. In looking
23:29at this, you'll see that north is to the right. That's the canal in the middle. And
23:33one of the more important takeaways from this image, because I get that things look pretty
23:37small on the screen, but the main takeaway is that route six is going to be relocated
23:43to the west a little bit. And why that's important is because we want to make sure
23:47that we can be constructing the new bridges. They're going to be twin bridges crossing
23:51the canal that we construct the new bridges while the existing bridge is still able to
23:56carry two lanes of traffic in each direction at all times. So that's why that was so
24:00important. And what you'll see here when you look at this plan and in some of the
24:05future slides is because we're moving over, it does require some reconfiguration of how
24:11route six and route three connect to the local roadway network. And we want to take
24:15that opportunity to really improve things and make these interchanges function better.
24:21So this image is just of the north side of the canal. So north is still to the right.
24:27That's the canal on the left. You can see a little bit more clearly how we've offset
24:34the new structures so that the existing bridge can remain in service. One of the things to
24:39keep in mind on this side of the canal is it wasn't that long ago that the rotary that
24:43was there was removed and a grade separation was installed allowing route six to go over
24:49scenic highway. So a lot of things were reconfigured at that time. So there's not like dramatic
24:54changes in how the user will interact. The ramps are except for one exception pretty
25:00much in the same spot, but it is expected that this will operate much better in the
25:06final condition. What you see there are those yellowish lines. Those are the bicycle and
25:12pedestrian paths that are being proposed. And one thing I do want to mention while
25:16we're looking at this slide, James will talk about this more in a few minutes, but constructing
25:21the bridges is it's a lot. It requires big equipment. These are big bridges and unfortunately
25:27doing so requires that the canal service road be closed. And one of the things that we
25:33are proposing in as part of the RFP that the three shortlisted firms have now is detouring
25:41people using the canal service road bicycles and pedestrians around the work zone so that
25:46they can safely navigate around the area while it's under construction. And again, there'll
25:50be more on that. A good example of how what that looks like when we get to James's presentation.
25:58So this is the south side of the canal. And here things really do look a lot different
26:03and will be different as far as how the users interact with things in the future. And the
26:08main thing that we were trying to accomplish is to separate the local traffic from the
26:11regional traffic. So a lot of ramps are located in different places. And one of the things
26:16we wanted to make sure is that, for example, if somebody's coming from Provincetown and
26:22they want to get over to the Bourne Bridge, they take that off ramp, they go down Cranberry
26:28Highway, then Ben Abbey and then up Sandwich. Those are local roads that really aren't intended
26:33to carry the regional traffic. So a move like that will all be accommodated right in this
26:37area here of the interchange. And likewise, going in the opposite direction, Adam Street
26:42will no longer be necessary as a way to get on the bridge. There'll be a ramp that carries
26:48traffic directly there. So that whole notion of keeping the regional traffic on the regional
26:52roads and the local traffic on the local roads was what we were trying to accomplish here.
26:57The other thing you notice is being different, is that Cranberry Highway currently kind
27:02of ends at Route 6, where the off ramp comes in and the on ramp goes off. And we're going
27:10to extend Cranberry Highway under the new Route 6 and connect up with the mid-cave
27:15connector. But what we're really here to talk about is how bicycles and pedestrians
27:20will get from Sandwich Road down to the Canal Service Road. And I know it's hard to see
27:24on this graphic, but James will have better graphics in a moment. At the end of the mid-cave
27:30connector, kind of towards the top of the screen, you can see that little yellow line
27:34going from Sandwich Road out towards the canal. And then likewise, down towards the
27:38bottom of the screen where Keith Field is, there's another yellow line going from Sandwich
27:42Road to the Canal Service Road. So that's what's envisioned will be where these crossings
27:48are that we'll talk more about in a moment will be located. And one of the benefits
27:54of this approach and having these two ways for people to safely get from Sandwich Road
27:58to the Canal Service Road is that during construction that'll be really valuable because
28:03it will provide a means of getting around that construction work zone when they're
28:07constructing the bridges. We did want to take the chance just to show what the user
28:14experience will be like for bicycles and pedestrians in the final build condition.
28:18So this would be on the Canal Crossing Bridge. And this is about mid-span. One of the things
28:23you see to the right is that things kind of bump out and allow people to kind of, you
28:29know, get off to the side, taking the view. One of the things we've seen is that people
28:33always want to stop mid-span anyway, so why not give them a space where they can safely
28:38do that. Another thing to notice is that the existing sidewalk on both the Bourne and
28:44Sagamore is about six feet wide, which is extremely narrow. What's being proposed here
28:48is 14 feet wide. And then the other thing that will be a real differentiator as far
28:53as the user experience is the separation that will exist from the cars and trucks that are
28:59using the bridge to where users of this bicycle and pedestrian path are. So like if you look
29:05at where a bicycle or a ped would be, to the left, those are the cables coming down
29:10that will support the bridge structure. And then if you go a little bit further left,
29:14you'll see the barrier that's installed to keep the vehicles where the vehicles are
29:18supposed to be. And then we're going to have a shoulder. So not only will there be these
29:22positive barriers separating the vehicles from bikes and peds from the safety perspective,
29:29but then there'll be this buffer of space that'll make it just a lot more pleasant
29:32for people using the facility. And then in this image, we just wanted to give you a
29:38taste of what things will look like when you're down at canal level. So one of the
29:42things we were seeing during the design process is as the foundations come out of the ground,
29:47they naturally wanted to be fairly close in elevation to where the canal service road
29:51is. So we wanted to take that opportunity to make a space where people using the canal
29:57service road could get off the canal service road, then go out to this area and it would
30:01be fenced in. And we just provide an opportunity to take a break, maybe have a seat and really
30:06experience the canal up close. So as you can see, you know, all along, we've been thinking
30:13about how bikes and peds are going to interact with this project. And, you know, one of
30:17the real key things in, you know, James can come up now is we're going to get down on
30:22the ground and how people will get safely across the tracks.
30:29Thank you, Dave. I'm going to turn on the laser pointer. So as Luisa mentioned, tonight
30:37is really about public safety and making safer crossings. This graphic is looking north,
30:44so the canal is up at the top of the screen. You have Mint Cape Connector, Market Basket
30:49down here, the existing route six and the Sagmore bridge. This is Keith Field over here.
30:55There are many informal crossings today where people cross the tracks to get to the canal
31:01service road. You can see that in the red triangles, there's one existing private crossing
31:07underneath the bridge that is used by the Army Corps or for maintenance and operations.
31:13And what Dave was alluding to is there's two proposed crossings that we're seeking
31:19for your feedback tonight. This one over here is the Mid Cape Connector, and then this green
31:24dot over here is the crossing at Keith Field. Just to go into a little bit more detail,
31:31the image on the left is the informal crossing. This is right behind the post office adjacent
31:37to Keith Field. You can see the worn path that many people use on a daily basis, and
31:43we're trying to make a safer crossing to not have these informal crossings. And then
31:48on the right, this is the private crossing that exists underneath the existing bridge
31:53that's used by the Army Corps of Engineers. As Dave mentioned, to build these twin span
32:01bridges, there's going to be a lot of heavy construction that is required. This is an
32:07example photo of the type of machinery, the heavy equipment that's going to be used to
32:14necessitate closing the canal service road. As Dave mentioned, we're going to be creating
32:19two temporary detours to allow safe crossing around the work zone, and the public crossings
32:28will remain after construction. Just to go into a little bit more detail, this is focusing
32:37on Sagamore South, so north is at the top of the page. You can see the canal. In order
32:43to do the construction, the heavy construction is in this purple color near the canal, and
32:48then over here in the Round Hill neighborhood, we need to close the canal service road for
32:53public safety. And what we're doing is installing a temporary detour on Sandwich Road. And what
33:00we want to do is install these crossings before the design builder gets noticed to
33:06proceed. So the crossings are there, and then they can establish their temporary detour
33:11as soon as possible, get people safely out of the work zone, and then they can start
33:15building the two bridges. As Louisa mentioned, we've done a lot of collaboration with many
33:26entities and agencies, really with Mass DOT, Rail and Transit, and Mass Coastal, to improve
33:33these crossings and enhance safety features. From a bicycle and pedestrian safety standpoint,
33:40we meet all the MUTCD compliance for signage and pavement markings. We're adding detectable
33:46warning surfaces. We're adding pedestrian scale lighting. We'll have visual and auditory
33:52warning devices on the crossings. We'll have gate crossing arms. And then at each crossing,
33:58we'll have a chain-length fence roughly 200 feet on the south side to prohibit people
34:07from informally crossing and make them use these safer permanent crossings. Again, at
34:16the railroad safety end, we are installing signal houses. This allows for better safe
34:23access for operations and maintenance. We've identified areas for maintenance vehicle
34:28parking to inspect the crossing. And really the best feature is we're improving the switches.
34:36So we're installing these foot pedal switches, which really prohibits future tampering.
34:46This is a proposed design of the Mid Cape connector. So from the plan, this is on the
34:52west side of the new bridge. I'll start from the south and work my way up. But from the
35:00pedestrian and bicycle network that Dave was mentioning, those yellow lines, this is a
35:05zoomed in picture. So people that are on Sandwich Road that want to cross the train
35:11tracks will take this. This is a 12 foot pedestrian and bike path. We have a raised
35:18landscape median. Not only does it add an element, an aesthetic element for vegetation,
35:25but it also prevents informal or unauthorized vehicles from crossing. This will be used
35:33for mass DOT operations and maintenance and also Army Corps operation maintenance, but
35:38we just don't want unauthorized vehicles. You can say, you can see these are the new
35:43crossing gates with flashers and bells. This is that railroad signal house. We have gravel
35:50parking for maintenance. We had the detectable warning panels because of the turning movements
35:57of the inspection vehicles. We've also added this maintenance roadway, and then the bicycle
36:03and pedestrian path will meander and connect to the existing canal service road, which
36:08will also have a landscape trailhead that will be for wayfinding for all users.
36:15The last thing I wanted to mention, this is that chain length fence that I mentioned
36:20that's roughly 200 feet on either side. This is an illustrative view of the plan that
36:28I was just showing. So this is looking south. So your back is to the canal, looking up the
36:33mid-cape connector, and this is what is proposed to be built. You can see the gates, the flashers,
36:42the fences, just really something that is inviting and a safe crossing instead of the
36:49informal crossings that exist today. Moving over to Keyfield, so now we're on
36:55the east side of the bridges, right behind Keyfield, adjacent to the existing post office.
37:03We're looking north, so the canal is up on the top. Sandwich Road is at the bottom. The
37:09pedestrian and bicycle facility will come down from Sandwich Road. It will be behind
37:14the outfield. It will take a right turn, and then we'll cross the train tracks and
37:21connect to the canal service road. A lot of the same safety features and railroad features
37:26are present here, as what I discussed at Mid-cape Connector. A few things I wanted
37:31to highlight, at Keyfield, because we do have an area where there are double tracks,
37:38we did relocate the switch roughly 150 feet east of the existing location. That allowed
37:45us to make this single-track location. It's much easier to have the crossing cross one
37:52set of tracks instead of two. And also by relocating the switch that far, again, it
37:58reduces the potential for future tampering of the switches. The other thing here is this
38:06chain-link fence. We did extend this beyond the 200 feet, because we wanted to extend
38:12it beyond that existing informal crossing right behind the post office that you can
38:17see here. Again, this is an illustrative view, looking south, so your back is to the canal.
38:25You can see the path meanders, crosses the train tracks, and then is adjacent to the
38:33outfield. And then over here, we connect to Sandwich Road. So this is something that
38:38would be built hopefully next year, and Luis will discuss the schedule.
38:45Thank you, James and David. So as we mentioned, this presentation is the culmination of just
39:07probably over a year's worth of work with our colleagues at the Rail and Transit Division
39:11and other agencies that have jurisdiction or interest in it, including Mass Coastal
39:17and the Federal Railroad Administration. We had two formal rail diagnostic meetings
39:22and eight coordination meetings. The last one was last week, so all this information
39:28is quite fresh. Mass Coastal will perform the work within the Rail and Transit Division's
39:35property prior to the bridge construction beginning, so likely starting next summer
39:41with your approval of this. And we'll have the selected design build team for the Sagamore
39:49Bridge Replacement Project complete the two bicycle and pedestrian connections before
39:55we close the Canal Service Road. And just want to clarify, when we've mentioned several
40:00times closure of the Canal Service Road, we're talking about just the portion of it
40:05where we have all this heavy equipment and movement in the order of several hundred
40:10feet, which is a small percentage of the overall length of the Canal Service Roads.
40:14But we understand it's important, and that's why we're rooting people around it with a
40:19safe alternative detour route. So that's it. If you have any questions, we'll be happy
40:26to answer them. I'll invite my colleagues to help with the response as well.
40:32Thank you, Luisa. What I'd like to do to proceed with the next stage of this public
40:38hearing is to invite the comments from the public first. And then I'm going to ask particularly
40:45born residents to give us your name, your address for the record. And then after we
40:52hear from the public, I'll invite any other local officials, county officials, other
40:59officials to come up and offer comments as well. So we're going to begin this phase
41:05of the hearing by inviting the public. I'm going to ask whoever would like to make a
41:10comment to keep the remarks brief for a few minutes. And then at least let's get through
41:17everybody and then if we've got, we will have more time. If you'd like another bite
41:21at the apple, we can do that once we give everybody a chance to be heard. So who would
41:25like to be recognized first? Yes, sir. Come to the podium.
41:31Yes, my name is John York. I am a resident of the town of Bourne. I live in the southern-most
41:40village in Catombin. Although I'm seven miles from the bridge, I frequently use the canal
41:46path and the bridges for transportation purposes by bicycle and on foot. And I want to note
41:55at this point that the correspondence from mass DOT, the county commissioners describing
42:00the existing conditions refers to recreational use of the canal path. But I could not find
42:08anywhere where it mentions transportation use of the canal path. I'm sure that just
42:13assumed everyone assumes that. But for the record, it would be better when they talk
42:18about recreational use of the canal path if they also talk about transportation use.
42:24As the team discovered on the north side of this Agamemow Bridge when they proposed not
42:30providing a detour, there is quite a bit of transportation use of the canal path. It's
42:38critical to us in the summertime when the traffic gets so bad, you can't really get
42:43there by car reliably. And I think Sheila and Ron can say something about that. And
42:47we're not even in the summer right now. So for the record, I think that that is important
42:54that these canal paths serve essential transportation purposes. The south side canal path in particular,
43:02because the only other way to get from one side of our town to the other, that is from
43:06Bourne Village to Sagamore, would be to use Sandwich Road. And I don't know, I don't recommend
43:12most people that they ride a bicycle on the road anywhere. I do it, but it's never safe.
43:19But if you can imagine riding a bicycle on Sandwich Road, I did it once, both ways. Mostly
43:27I was walking in the dirt on the side of the road. So that's not an option. The only
43:32option is the canal path. So just for the record, I want to make clear that that's
43:36a transportation used as a transportation facility. So also along those lines, the
43:45existing crossing under the railroad bridge that is shown as a private crossing in the
43:52correspondence from MassDOT, it states that there is signage to, I'm not sure exactly
43:59the word prohibit or prevent public use at that point. I don't believe that's correct.
44:06I was there a couple of days ago. I go through there regularly. There is no signage. In fact,
44:13in the past, there has been signage, no trespassing signs. But those were taken down. They've
44:21gone up and down over the years. They were taken down, I believe, most recently in 2023,
44:29when there was a realignment of Massachusetts Bicycle Route 1. And in 2024, I believe,
44:36the current signage, which instructs people crossing the tracks to look both ways before
44:41they cross the tracks, is clearly not intended to discourage public use. So MassDOT has advertised
44:50that crossing for public use continuously since 1981. Most of that time, there was
44:57a no trespassing sign up over it. And they still continue to advertise that for public
45:04use through their Massachusetts Bicycle Route 1 route, which crosses at that point. So just
45:13for the record, it is technically a private crossing, but it is advertised by MassDOT
45:21for public use. And there's no signage there to prevent public use. So that said, I've
45:27been waiting since 1981 for legitimate crossings. And I'm very happy to thank Luisa and her
45:35team for proposing not one, but two, because it's essential to make that whole system
45:40work and to really do it right. So I'm actually here in spite of everything I just said to
45:47support this. And I think I'll just leave it there in the spirit of brevity, except
45:53I do want to point out there's more information in the correspondence from MassDOT about
45:59crossings near the Boon Bridge. And that needs to be adjusted, corrected, and amended
46:05for the reality on the ground and for some of those as well. And I hope I can submit
46:10written comments with those details in it and not take the time here.
46:14That would be welcome. Thank you, John. Thank you. Luisa, do you or your team want to respond
46:21to any of the comments that Mr. York has made? Or do you want to save that for some
46:26other time? Okay, that's very good. Excellent. Anybody else?
46:34Hi, I'm Karen Wilson from Sagamore. I just want to say for us, John talked about commuters.
46:46I'm also on the recreation committee. I'm one of our members last night when I mentioned
46:50this meeting. He commutes on that canal path, so he was a little concerned. So those commuters,
46:57but what I see, I'm right on the canal. And when I'm not on it myself, using it, I see
47:02people every day, all year long, and the parking sandwich, and they go the entire length.
47:11So when this project came about and I realized, oh, it's going to be shut down for years,
47:17there's so many people that walking, biking, rollerblading, and they go the entire length.
47:23And if we didn't have these two crossings, if you leave from San Jose, you get a mile
47:27and a half, a little bit more. People aren't going to come ride their bikes. It'll be
47:32years that they'll go away. They won't come to the area. It's a big draw. If you look
47:39up on Cape Cod, it says Cape Cod Canal. I know some of you guys aren't from the area,
47:44but there's tons of people all the time going back and forth the whole way, way past the
47:50bridge, maybe the whole length. So if we don't have these, like John said, you can't go
47:56ride on Sandwich Road safely. So I think it's a great idea. I think it's necessary, convenient.
48:02What was the other thing that you needed it to be?
48:05You said all the right words. Yes.
48:09Thank you.
48:10Thank you for coming here tonight.
48:12Thank you.
48:13What else from the public? Come on.
48:21I don't believe we posted a meeting, so I speak as a resident of Monument Beach. And
48:32I might get, I'm not sure, I'd like to read into the record some of the questions that
48:36I have more specifically to the layout of the railroad crossings, as opposed to the
48:43public necessity. Obviously, there's no doubt that it's neat. I'm looking more concerned
48:50with specific physical mitigation features with respect to the type of material. So for
48:56instance, it's a shared use path. So we'll have wheelchairs, bicycles, families with
49:02children and strollers. Is there some type of mitigation to ensure that those wheels
49:07don't get stuck in the gaps of the railroad crossing? And how will the design force trail
49:14users to slow down before reaching the tracks? Because Mr. York can fly right by me as I'm
49:20traveling down the road. So that's a concern. Z gates, chicanes, any of those types of
49:30things, whether that's been taken into consideration. Will the new crossing trigger the requirement
49:38for train operators to blow the whistle? Or is this going to be designated a quiet
49:43zone? So as time as they approach, and are these spots considered a quiet zone or will
49:53be whistleblowing? And lastly, this is going to be done early. So as far as the maintenance
50:02goes along, I mean, there won't be some overgrowth because it'll be, but eventually the state
50:08is taking over the bridges. So in that interim time over the course of eight years or so,
50:14who's responsible for that maintenance? Is it mass DOT? Is it the coastal operator,
50:21the railroad operator or the Army Corps? Somebody's car is going off. Those are just the questions
50:30I have. And I don't know if it's premature, if there's any definitive design with respects
50:36to those questions. Thank you. Thank you.
50:39Thank you. That's a good question. Anybody else from the public? Yes. MJ?
50:54Thank you, Mary Jane. Ms. Strangelove from monument beach as well, speaking as a resident.
51:01I have a question about the purple area. So I think as you're coming from Sagmore from
51:11Sagmore and you're coming across that first crossing by Keith field, and then you're going
51:18to go through that purple area because you're still in that purple area. And then you're
51:24going to go back up and you're going to have another crossing. And then you're going to
51:27be able to continue to go through the, down the service route. So that's a great way of
51:33being able to continue access through the canal. I think that's an awesome thing. What
51:39I don't understand is the gates that are happening, the signal gates. Are they blocking?
51:48Are they across the tracks unless there's a train coming or are they blocking people?
51:56People who have to press a button to be able to access the track. I mean, I'd like to
52:01understand how that's working. And I'd like to understand once you get down a sandwich
52:07road, how, how, if you're a pedestrian or a bicycle, how are you going to get from
52:13the first path into the next path? And when you come back, how are you going to do that?
52:17I just liked a little bit more explanation. There was a lot of information in the slides
52:21and it's hard when you come here and I was, didn't have access to your materials. I don't
52:27know why, but yeah. So I couldn't like those are my questions. So thank you. Absolutely
52:33a necessity. We definitely need these crossings. I wish there weren't 200 feet of chain link
52:39fence going with them, but I mean, yeah, I know messed up like that. So the good crossings
52:46would be awesome. So thank you. Thank you very much. Is there anybody else who would
52:52like to be heard? Yes, sir. I'm a Shampala 176 route six a and sandwich. I'm the bicycle
53:12representative on the Cape Cod joint transportation committee, but I also am the chairman of
53:15the sandwich bikeways and pedestrian committee. I'll be brief. I just want to, I think I share
53:20some of the same comments and questions that predecessors have aired. I just want to speak
53:27to the necessity for the people of sandwich and for the people of the region. There are
53:32definitely people who use that service road path to commute every day to work. I see them
53:38riding by my house on six a because they have come from elsewhere in Falmouth along
53:44that service road to get to their jobs further down Cape. I know of two people personally.
53:51I'm sure there are many more. There's no doubt in my mind, and I'm sure in anybody's
53:55mind in this room of the necessity of these crossings to preserve the access during the
54:00construction. Thank you. Thank you. Very good. Come on. Hi. Gina Zarevitz. I'm also
54:14speaking as a resident, um, the necessity of these crossings for sure. When I was working
54:19at the Montessori school that was near the bridge, I was shocked to learn about how
54:23many people that would even ride their bikes all the way from Plymouth and over the bridges
54:28all the way to its hole to go to work. So it's, it's really amazing the amount of people
54:33that take advantage of those canal roads, especially the service roads, especially in
54:36the summertime. And yeah, trying to envision the crossings. I mean, sometimes there's,
54:41you know, dozens of people crossing all at once, back and forth. It's very busy at time.
54:46So also interested in seeing those details. Thank you. Thank you very much for your comments.
54:52Is there anybody else who would like to speak, uh, make a comment? I'm going to recognize
54:57Steve Tupper from the Cape Cod commission. Steve. Good evening. Thank you, commissioner.
55:06Steven Tupper, deputy director at the Cape Cod commission. Um, we have submitted a letter
55:10from Cape Cod commission staff into the records. So I'll be very brief today, but did want
55:13to add a little bit of regional context, um, building on what everyone else has provided
55:17today. There's clearly necessity for this crossing. It is a frequent comment anytime
55:21wrote in a public meeting in this area. It's been come up on every single regional transportation
55:26planning meeting, um, over the last couple of decades. It's also a priority in the born
55:30complete streets prioritization plan, the plan developed by Cape Cod commission staff.
55:34This was one of the priorities for the town of born as well. So really important. A couple
55:38of the things to note is that there's also regional significance to this crossing. It
55:42was alluded to earlier, but making this connection allows for safe, uh, bike route one throughout
55:47the region. Right now, there are a lot of, uh, challenges associated with this portion
55:52of bike route one that were alluded to earlier, um, legally, if this crossing does not, uh,
55:58proceed as proposed cyclists would have to go along sandwich road. So clearly a less
56:02safe alternative. So this is really important. Um, commission staff have been trying to
56:07get this crossing for many years. In fact, decades at this point, it's really quite
56:10challenging given all of the entities involved. So this is really the time to do it given
56:14the major infrastructure changes. So we want to thank mass DOT and all the partners involved
56:18in this. Um, and so, uh, if there's any further question about the need, I don't think there
56:22is at this point, um, but just simply looking to all the data that's been collected of
56:26all the activity in this area, all the use of this path. So this is really important
56:30connection both for the community of born and the region. Thank you.
56:34Thank you, Steven. Very helpful comments. Is there anybody else who would like to be
56:38heard? Hearing none. I'll entertain a motion to close the public hearing.
56:45Uh, so moved. I'm sorry, John. Did you want to make another
56:49comment? Yes. What's the presentation here? And there's small details. Um, one is, um,
56:59they talked about the chain link fence, uh, for 200 feet either side. I understand that's
57:04part of the MUTCD. So we don't get much choice in that. Okay. It does improve safety, but
57:09in the rendering, it showed a split rail fence would fence where I believe that was going
57:15to be or can, or maybe that's, maybe that's down at one side of the tracks and the other
57:20fence on the other side. So I was just looking for a little clarification about that. Um,
57:25and, uh, at this Keith field crossing where there's currently a lot of use from the post
57:31office and there's parking there and there's people who neighbors who just walk through
57:34other paths to get there. And, um, it would be nice if there was just a narrow sidewalk
57:40type path on the backside of Keith field, just outside of the, of the home run fence,
57:46like so that they could get from the post office to the, um, proposed new crossing without
57:53having to go out onto sandwich road. Thank you. Thank you. Yes, please.
58:02Sandra Goldstein, uh, county road and comment. I don't have questions about the, uh, crossings
58:11at the trail at the railroad. I think it's probably good, all that, but my concern is
58:17a driver and a resident in where I drive and where I go on sandwich road by the Keith
58:25field and the apartments there in the street that I take the Abbott, whatever its name
58:31is, it will used to be two way, but now it's one to go to the current Sagamore bridge.
58:37What's going to happen to those apartments there or anything? Is that destined to change
58:41or is that everything else going to stay the same in that area? So post office, the Montessori
58:49school, the apartments there, that little street, as far as being not a bike rider
58:57or whatever, but just to use that street, we can't answer that question, but we can,
59:03we can deal with it after we allow everybody else to speak. Good. Okay. I mean, that's,
59:09you never know what changes could happen with that to add to what's happening here.
59:14That's an excellent point. Um, is there anybody else? Any other comments? Okay. Before we
59:21close the public hearing, I'm going to ask mass DOT if they would like to make any comments
59:27in response to the questions and concerns that have been expressed, uh, in the hearing
59:32so far.
59:37Going to get several of us. This is going to take the team.
59:40Yeah, nobody does it alone. Um, yeah. I just want to clarify one term that you've heard
59:50a couple of times already. The M U T C D, um, sort of trips off the tongue. I realized
59:56that it is the manual of uniform traffic control devices and
1:00:00The reason that signs and payment markings and signals look the same in Oklahoma and
1:00:07Massachusetts and California and Alaska and really many places around the world is because
1:00:11we all abide by this manual of uniform traffic controls and it is designed, it's based on
1:00:18decades of research and it's designed to keep everybody safe.
1:00:21So right down to the color and the sign size of the legends on the sign all governed by
1:00:28the MUTCD and we used it of course on this project.
1:00:34Thank you to Mr. York for your support, I know I want to acknowledge, we are well aware
1:00:41that people use these bicycle facilities for more than recreation.
1:00:47We heard loud and clear at a conservation commission meeting earlier this summer how
1:00:52much people relied on the canal service road to get to work to for recreation other purposes
1:00:59fishing so we took that into account and that's what made us propose a detour around it.
1:01:05We hadn't originally planned a detour but we heard that there are multiple public uses
1:01:09of the canal service road and we will take that into account as we design our facilities.
1:01:17To take note about the signage, Mr. York, I understand that it's gone up and down and
1:01:23up and down so we'll make sure that our information is up to date, thank you.
1:01:37Born crossing, we acknowledge that that information is not robust yet and that's because we haven't
1:01:42completed the process of advancing the born bridge but we do recognize that the other
1:01:47two crossings that we will propose will need much more information and we'll make sure
1:01:51you get that before we return to this body.
1:01:56On the physical features on how we're going to allow wheelchairs and strollers to cross
1:02:01down, cross, I'm going to leave it to James and I'm going to rather than have you interpret
1:02:06my handwriting I'll let you know what the questions are.
1:02:09Thank you.
1:02:10So the bicycle and pedestrian path will be asphalt and then over the tracks it will
1:02:17be rubber very similar to the traffic crossing or roadway crossing that you see today.
1:02:25So wheelchairs will be able to go over it.
1:02:28It will be oriented perpendicularly as well.
1:02:31Yes.
1:02:32I think there was a question about the crossing gate.
1:02:36The crossing gates will be up similar to a typical roadway crossing when the train comes
1:02:42and I believe they are roughly at six times a day.
1:02:46The crossing gate will come down and it will be perpendicular to the path so it will prevent
1:02:52bicycle and pedestrians from crossing.
1:02:55I think similar to just how we drive on roadways with vehicles, I think there was a question
1:03:06about whistles.
1:03:10Whistles are a federal requirement at all public crossings so there will be whistles
1:03:16at this crossing.
1:03:17I thought it was going to keep going, unless designated as a quiet zone.
1:03:27I think there was a question about maintenance.
1:03:38So within the rail corridor, MassDUT rail and transit will maintain that.
1:03:44Outside of the rail corridor, during construction, the design builder will be responsible for
1:03:51maintenance and then after construction, MassDUT highway will be responsible for maintenance.
1:03:58Is the Canal View apartments in the largest area?
1:04:02Yeah, great question.
1:04:03So the Canal View apartments, there's no impacts to the Canal View apartments, the existing
1:04:08trees along Sandwich Road right in front of the apartments.
1:04:12Those are deemed historic.
1:04:14Those will be maintained.
1:04:16There's the post office, no changes to the post office, and no changes to the Montessori
1:04:21School.
1:04:23I'll let Louisa talk about that.
1:04:30Oh, okay, I'm sorry, yes, kind of caught me flat footed there.
1:04:39Sorry about that.
1:04:40Yes, we are currently working with the town.
1:04:42In fact, we'll be back to interact with the town select board next week to talk about
1:04:48Sandwich Road improvements and Keith Field.
1:04:51Mr. York, we did hear your suggestion for a path and we will take that under advisement.
1:04:56But all of those details, including maintenance, will be worked out between MassDUT and the
1:05:01town of Bourne through their select board.
1:05:10So there's a good question about how to slow fast bicyclists like Mr. York down.
1:05:20So there's two different ways I'll explain the mid-cape connector first.
1:05:26You notice I spoke about that raised island, the vegetation island, really to restrict
1:05:33unauthorized vehicles.
1:05:35But there's also splitter islands on either side.
1:05:38So the 12-foot bicycle and pedestrian path would have a splitter island.
1:05:43So it'd be six and six.
1:05:45So bikes and peds would have to go around that.
1:05:48That in itself would slow bikes and peds down.
1:05:54And then on the other side, you could see it kind of chicane to the right.
1:05:58And there was two low-grade retaining walls that meet all around the curve.
1:06:05So that would also slow bicyclists down.
1:06:09And then at Keith Field, you're on the outfield side and then it takes almost a 90-degree
1:06:15right on the outfield.
1:06:17That turn is designed to slow bicyclists down.
1:06:23And then they have to essentially turn, stop to cross the tracks at 90 degrees.
1:06:29So really how it's designed, there's no feasible way that someone could ride it 20, 30 miles
1:06:36an hour.
1:06:39And then splitter islands?
1:06:40Do they have any?
1:06:41Hang on a second.
1:06:42Yeah.
1:06:43So the chain link fence, I don't know if you saw in the details, it will be a 72-inch
1:06:49powder-coated chain link fence just to give it a little bit more aesthetic appeal.
1:06:55And you have a really good eye.
1:06:58Those were illustrative renderings.
1:06:59We're still working on the details about the split rail fence.
1:07:03The split rail fence is going to be used throughout the rest of the project.
1:07:08So we kind of wanted to incorporate some of those details here.
1:07:12Did you have a follow-up, ma'am?
1:07:13I just want to mention e-bikes.
1:07:14Are they allowed on the ground?
1:07:17I don't know the state law.
1:07:20That might be a select board.
1:07:22Yes.
1:07:24Board of Engineers manage the path itself, now path, and they publish on their website
1:07:29their rules.
1:07:30They do allow some e-bike use with some limitations.
1:07:33It's all on their website.
1:07:35That's an issue for any shared news path in the country, certainly in the state right
1:07:40now.
1:07:41I don't mind how many hours the past few meetings, because in the last few months it's
1:07:45been on that subject for many, many hours.
1:07:48It's a difficult situation, but it's important to get maximum use from those facilities.
1:07:54I don't want to see e-bikes.
1:07:56I think so.
1:07:57So if you didn't know, I'm going to pull a passion bike with no motor.
1:08:02I'm happy to see e-bikes using, I'm using as long as it's not at 35 miles on that one.
1:08:09That was probably as long as it was.
1:08:11There are problems.
1:08:12I said there are problems.
1:08:13Definitely not.
1:08:14If we can keep them under control, it's good to get them off.
1:08:21Thank you, John.
1:08:22Is there anything else?
1:08:23Any other comments?
1:08:24Dave, Luisa, James?
1:08:25I'll come to my list.
1:08:27Yep.
1:08:31Okay.
1:08:32You're done with your list.
1:08:33Excellent.
1:08:34Were there any other?
1:08:35Luisa.
1:08:36I think we pretty much touched.
1:08:37Oh, thank you.
1:08:39Okay.
1:08:41If there are no more comments, then what I'd like to do is entertain a motion to close
1:08:50the public hearing.
1:08:51Mr. Chairman, I move to close the public hearing at 6/29.
1:08:56Do we have a second on that?
1:09:02Second.
1:09:03Okay.
1:09:04Is there any discussion on the motion to close the public hearing?
1:09:06Hearing none.
1:09:07All those in favor say aye.
1:09:08Aye.
1:09:09Opposed?
1:09:10It carries unanimously.
1:09:11Let's just, we're going to take a few moments to deliberate on the subject matter.
1:09:15Do you, Commissioner Lyons, have any questions for MassDOT?
1:09:19No.
1:09:20I don't live here.
1:09:21So I'm happy to hear from everyone who does and that they are pleased with the attempt
1:09:27to make sure everybody is happy and they're pleased with the layout of that.
1:09:31And I want to thank all of you and your team for listening to people and trying to accommodate
1:09:38their needs and daily lives.
1:09:41I do think that there has to be limits on e-bikes.
1:09:44So I'm in on that conversation.
1:09:46And that was my thing.
1:09:47You know, you have these e-bikes, some of them can go up to 40 miles an hour now and
1:09:51they are dangerous.
1:09:52And I think that that is something we have to regulate across the board.
1:09:56So I'm in on that conversation.
1:09:58But if everybody's happy, I will be happy too.
1:10:03And it sounds like, you know, under the circumstances, you're doing a good job in trying to accommodate
1:10:09everyone's needs.
1:10:11So that's great.
1:10:12That's what we can do.
1:10:13But I'm also going to come to the canal because I'm very intrigued.
1:10:17My last question, how long is the bridge?
1:10:20How long is the canal from just bridge to bridge?
1:10:22What is that distance?
1:10:27Just from that distance.
1:10:28And it goes, okay, that's a good little workout.
1:10:36There you go.
1:10:37You came to the right place.
1:10:38Yeah.
1:10:39All right.
1:10:40Thank you, Commissioner Alliance.
1:10:41I'm going to ask Commissioner Bergstrom, do you have any questions or comments from
1:10:46SDOT?
1:10:47I was going to address the issue of e-bikes.
1:10:48It's probably more of a DOT issue than it is for the Home Corps and the development
1:10:54of the bridge.
1:10:55This has been a project now that's been discussed and banged around for years.
1:10:59And it's good to see that it's finally going to become a reality.
1:11:04It's a huge project.
1:11:05And we can't deceive anybody into thinking it's not going to be some disruption and some
1:11:10inconvenience for a while.
1:11:11But I know the Army Corps, Cape Cod Commission, dealing with the outside, doing everything
1:11:17we can to make it as user-friendly as possible to make sure that the town of Bourne and so
1:11:24on is not too inconvenienced by this, if that's possible.
1:11:29So there's more to come on this.
1:11:32So we'll see what happens.
1:11:35Thank you.
1:11:36Thank you, Commissioner.
1:11:37I want to thank everybody for joining us tonight and I want to thank members of the public,
1:11:42the town officials, and our own folks at the Cape Cod Commission for being here tonight
1:11:48to offer comments on this.
1:11:50I think we've heard plenty and clearly, I think there's a compelling need here.
1:11:55So I'm going to ask for a motion to determine that public safety, excuse me, public necessity
1:12:02and convenience require the construction of two new at-grade public shared use path railroad
1:12:08crossings associated with the Sagamore Bridge Replacement Project, phase one of the Cape
1:12:14Cod Bridges, Mid-Cape Connector Crossing, and the Keithfield Recreational Area Crossing.
1:12:21So do I have such a motion?
1:12:23Yes, Mr. Chair, I move to determine that public necessity and convenience requires
1:12:32the construction of two new at-grade public shared use path railroad crossings associated
1:12:41with the Sagamore Bridge Replacement Project, phase one of Cape Cod Bridges, Mid-Cape Connector
1:12:48Crossing, and the Keithfield Recreation Area Crossing.
1:12:52Second.
1:12:53Okay, so we have a motion and a second.
1:12:56Is there any more discussion?
1:12:58Last chance.
1:12:59Hearing none, all those in favor say aye.
1:13:02Aye.
1:13:03Opposed?
1:13:04It carries unanimously.
1:13:05Great.
1:13:06Thank you.
1:13:08Well done.
1:13:09And thanks to the town of Bourne.
1:13:10You have my admiration and condolences.
1:13:14I want to note for the record that this is the first hearing that I've been at with
1:13:20John York has actually commended all of the project proponents.
1:13:26John, thank you.
1:13:31And we applaud your persistence, John.
1:13:33Yes, I have a feeling you were heard, John.
1:13:36So thank you all.
1:13:37We have some other business to attend to.
1:13:39You folks are welcome to stay.
1:13:41I can assure you it'll be relatively boring, but you're certainly welcome to go.
1:13:44Thank you so much.
1:13:45Thank you.
1:13:46Thank you.
1:13:50Thank you.
1:13:51So.
1:13:52Yes, please.
1:13:53Yes, you can approach.
1:13:54So nice to meet you.
1:13:55I have attended a couple of meetings tonight.
1:13:57We've got the right person on the truck.
1:13:59So thank you.
1:14:00It's a big job.
1:14:01It's a big job.
1:14:02You're doing a great job.
1:14:03Thank you, Louisa.
1:14:04Thank you.
1:14:05You're welcome.
1:14:06I'm welcome.
1:14:07Yeah.
1:14:08Yes, good luck.
1:14:09It's a long haul.
1:14:10Thanks for coming down.
1:14:11How far do you have to come?
1:14:12How far do you have to come?
1:14:15Yeah.
1:14:16He's flying.
1:14:17He's flying.
1:14:18I like this.
1:14:19Look who this is.
1:14:20Lou.
1:14:21I say myself.
1:14:22Lou Gonzaga, Colonel.
1:14:23Hey, Lou.
1:14:24How are you?
1:14:25Long time no see.
1:14:26I said, Jesus.
1:14:27I know who that is.
1:14:28Thank you.
1:14:29Let me know if you need anything.
1:14:30You know, Commissioner Bergstrom.
1:14:31Yep.
1:14:32So you're here in Bournemouth?
1:14:33Yes.
1:14:34And he's on the assembly.
1:14:35He was elected.
1:14:36Oh, you are on the assembly.
1:14:37Thank you.
1:14:38All right.
1:14:45We got to go.
1:14:46Congratulations.
1:14:47Thank you.
1:14:48We'll see you.
1:14:49Thanks, Lou.
1:14:50All right.
1:14:51Take care, Lou.
1:14:52The next item on our agenda is item number six, General Business.
1:14:54I'm going to turn it over to the county administrator to update us on the operating budget statement
1:15:00for FY27.
1:15:01All right.
1:15:03Thank you.
1:15:05We do have, as you know, part of the process of putting the budget together as the commissioners
1:15:10budget message to the department heads and to the public about what your sort of strategic
1:15:15priorities are.
1:15:16I have taken the liberty of starting that message and will come to you probably at your
1:15:22next meeting asking for a vote on that.
1:15:26And I just wanted to sort of open up the conversation to see if you have any particular
1:15:31items that you want us to focus on fiscal 28.
1:15:36I can tell you right now, sort of our strategic goals remain a structurally balanced budget.
1:15:42We are looking at obviously, you know, making sure that the elected charter committee will
1:15:50be up and going.
1:15:51But aside from that, more importantly, we're looking at continuing our operations as we
1:15:55have, regardless of what goes on on sort of the political side.
1:16:01We're also looking at addressing deferred capital issues, and as you know, there's
1:16:06a $78 million backlog, but that's more on the capital side, but still trying to address
1:16:14some of those deferred capital items.
1:16:17Maximizing the county's efforts around wastewater research and the work that Mass Tech does
1:16:24or the Clean Water Center does, also making sure that we assess our freshwater supplies
1:16:29and water quality as a priority.
1:16:33And then making sure that we can do what we can as a county to improve housing coordination.
1:16:39I refer to it as coordination and just trying to improve the connection between some of
1:16:45the disparities in state outlook on housing and environment and playing a role there and
1:16:52trying to reconcile those differences.
1:16:54So those are sort of the focuses of the budget message.
1:17:00But if there's anything else that the board would like me to focus on.
1:17:04Can you remind us when we have to have this finalized, Michael?
1:17:09I can tell you, technically, there's no timeline for your budget message.
1:17:14But last year, we voted your budget message at your second November meeting, which seemed
1:17:20to be the department heads appreciated that sort of timeline.
1:17:24I can outline.
1:17:25So our goal should be for our next meeting, then, to have a vote on the budget message.
1:17:31And what you're doing is you're soliciting input from the board in terms of what items
1:17:35we should emphasize in that message.
1:17:38Correct.
1:17:39Okay.
1:17:40So we can provide that input to you over the next week or two until our next meeting.
1:17:45Okay.
1:17:46That sounds good.
1:17:47One of the things that I think we need to make abundantly clear is now that the election
1:17:50cycle is over, there was a fair amount of mention of some kind of huge budget surplus
1:17:56that the County had.
1:17:58And I was sort of at a loss as to where this surplus was and where it came from.
1:18:05For the record, there is no huge budget surplus.
1:18:09Whatever that is, it's fiction.
1:18:10It must have been in some novel somewhere.
1:18:13The monies that have been perhaps attributed to our unfunded fund balance in the reserves,
1:18:22those monies are actually targeted for specific uses given the large liabilities and the
1:18:27other expenditures that we need to address, including PFAS remediation, including a host
1:18:34of other projects, particularly related to our capital and our facilities.
1:18:39So my hope is, is that in this message, we can at least reassure people that we're not
1:18:45sitting on some largess that has not been properly allocated.
1:18:50I will make a note of that and I agree with that.
1:18:55Commissioner Bergstrom, did you have something?
1:18:56No, just, you know, my mind goes back to previous budget cycles and dealing with some
1:19:01of the money that we set aside, particularly the revenue contingency.
1:19:06We brought this up a couple of years ago and the question came up is, if we get into the
1:19:12budget year and we find that we have a shortfall, which happened before, what's the mechanism
1:19:17by which we can tap into that fund to continue to basically pay for the, you know, whatever
1:19:25remains of the fiscal year?
1:19:27I suggested that they'd be able to just simply be able to do it, that we decide at some
1:19:32point that we can use that contingency fund.
1:19:35We need emergency money, the assembly has said, no, no, you have to come back to us,
1:19:39which I mean, if you run out of money, if you have to come from somewhere, you know,
1:19:44so I mean, I don't know if that's a problem we can solve, but I would like to get some
1:19:48kind of process going in case we do run into a shortfall, that we have confidence so we
1:19:55can continue.
1:19:56In other words, my, my attitude is we have a budget, we have programs, we have employees
1:20:03on July 1st, we should commit ourselves to continuing the fiscal year, regardless of
1:20:10what, regardless of what, you know, fiscal contingencies we have, make that commitment.
1:20:16So I'd like to suggest that we talk about that as a future agenda item in December,
1:20:23as opposed to trying to bake it somehow into a budget message.
1:20:27I think what we're trying to do is make sure that we have a good clear directive to our
1:20:31departments in terms of our priorities and our constraints in terms of spending for it
1:20:37for the upcoming fiscal year.
1:20:40I think we have a budget message we got from the assembly.
1:20:43Well, they said they gave us some recommendations.
1:20:46This is really our job and, in terms of setting financial policy.
1:20:51And one of the things that we like to do is we like to set our budget message and our
1:20:56directives to make them consistent with our financial policies, which we spent a great
1:21:01deal of time and effort in.
1:21:03And for anybody who reads the S&P bond rating reports on Barnstable County, we get wide
1:21:09praise for our financial policies, both in terms of the content and the breadth of them.
1:21:16So they've served us well.
1:21:17They've helped us with the bond rating and the improvement there.
1:21:21And my hope is, is that as we continue to follow those policies and follow those guidelines,
1:21:27it will continue to be in a strong financial position and hopefully see other benefits
1:21:33in terms of our bond rating.
1:21:34So I think it would be a mistake for us to depart from those policies.
1:21:38Those are best practices.
1:21:40Our financial team, both before Carol Coppola and during Carol's tenure, I think have been
1:21:47well constructed, well thought out.
1:21:49And I think it's important in coming on us to continue to stick with them.
1:21:54And a lot of this has to do with how we manage our reserves and in terms of how those dollars
1:22:00get allocated.
1:22:02One of the debates that we've had in the past in the county is, is that some of those
1:22:05funds should be used for operating expenditures as opposed to one time costs.
1:22:11And as we know, in municipal government, you know, the Department of Revenue and, you
1:22:17know, the Finance Officers Association, all these other groups, they frown upon that
1:22:24kind of activity.
1:22:25So no go.
1:22:26No, if you want to diminish your bond rating, then start using those one time dollars for
1:22:31reoccurring expenditures.
1:22:33And so that's a practice that's served every municipality or most municipalities in Massachusetts
1:22:38as well.
1:22:39It has served us well.
1:22:41And we just need to push back on that temptation that sometimes emerges where we're going
1:22:46to dip into those funds for non-capital, non-one time costs, but for recurring operating
1:22:53costs.
1:22:54That's a real problem.
1:22:54We're going to have to continue to stand tall on that especially in our uncertain environment,
1:22:59even though today it looks a little better, but no, no, commissioner, I'm glad you mentioned
1:23:05that because I think we need to in the message, recognize, remind our department heads, remind
1:23:14the public to the extent that there's there are public eyes on this is that we are in
1:23:18a very challenging financial climate right now, regardless of how strong our county finances
1:23:23are.
1:23:24Right, MMA is called this a perfect storm for municipalities and local regional governments
1:23:32in Massachusetts.
1:23:33We're in still a perfect storm.
1:23:35The situation has not improved dramatically.
1:23:37In fact, I would argue in the next budget cycle for the, with the Commonwealth, we're
1:23:44going to see more threats of cuts.
1:23:47We're going to see more trickle down impacts on our communities.
1:23:53And in turn, we in turn may be asked to sort of help step in and help address this void.
1:23:59So I see this as a perfect storm that continues to build and to continue to deteriorate.
1:24:04And from everything that we're getting from the mass municipal association, you know,
1:24:09there's there's there's potentially storm, more storm clouds amassing on the horizon.
1:24:16So we need to be very, very cautious in terms of making future commitments.
1:24:21And as, and as, as I think Michael has said, there are important priorities that we need
1:24:25to address, but on the financial side, we need to be cognizant of the realities of the
1:24:30moment.
1:24:31So I'm glad you brought that up.
1:24:32And I think we're going to have very interesting conversations coming to you.
1:24:35Go right ahead, commission.
1:24:36You know, we want, we want to, we obviously want to have expenses, uh, revenues cover
1:24:42expenses, but the, uh, dredge, do we think that that's going to happen?
1:24:47Uh, okay.
1:24:48That's going to be incorporated in the actual budget.
1:24:51We're not going to take any reserves out of you think we're not anticipating doing that.
1:24:56The, uh, within the, the, the dredge enterprise fund, um, they did a really bang up year last
1:25:03year so that there's a good, a good healthy reserve in there.
1:25:07Um, Ken is a little challenged this year, um, you know, mostly with permit, uh, issuances
1:25:14and things like that, but, um, but he has, he's figured out a way to sort of continue
1:25:20a revenue stream, um, even in the sort of the interim as we're waiting for a long road
1:25:26to get there.
1:25:27Well, I think the improvement in the rates helped has helped us.
1:25:30I think the work in getting grant monies from the Commonwealth has been incredibly
1:25:33helpful.
1:25:34Uh, Ken has been, I think has done a reasonably good job in attracting outside money to the
1:25:40county.
1:25:41So I think all in all, I think you're right.
1:25:43We've come a long way and, and, and, uh, we're able, we're in a much better position
1:25:47than we were, you know, four or five years ago.
1:25:50So I think that's, that's important to acknowledge.
1:25:52Um, is there anything else, uh, Michael, on, uh, on the operating budget statement or
1:25:58capital budget statement?
1:25:59No, I just wanted to add that, um, you know, departments are currently formulating capital
1:26:03requests.
1:26:04Um, we've made it very clear that the buildings are buildings and the $78 million, uh, sort
1:26:12of backlog of, of capital, um, uh, is something that we're going to have to address over
1:26:18the next four or five years, um, in particular, second district court is a huge project that,
1:26:25uh, you know, we are, we're communications with the state.
1:26:28Uh, the state has not committed to yet to funding, um, that's a hundred percent reimbursement.
1:26:35Yeah.
1:26:36And, you know, but, but we'll get there, uh, but they do, but you know, department had
1:26:40to know that our focus has to be, you know, our fixed assets and our, in our, uh, buildings,
1:26:46um, you know, that's sort of key.
1:26:50Yeah.
1:26:51And vehicle replacements, you know, equipment replacements, those are important, but, um,
1:26:55but if we can sort of push off some of those, um, and create a predictable, uh, replacement
1:27:03schedule, let's, that's sort of the effort this year.
1:27:06Yeah.
1:27:07Thank you.
1:27:08Um, we also have to, um, you know, we had our AmeriCorps the other day and I, I did
1:27:14visit the, um, facility in mostly, and it is a seashore house.
1:27:20It does need, you know, I'm sure it's kind of cold in the winter.
1:27:23I'm sure there's a lot of drafts coming in there.
1:27:25Uh, although they didn't complain, um, I could just tell.
1:27:30And uh, I do think that we have to think about what we can contribute to shoring up
1:27:34some of these buildings to make sure these kids are warm and safe and that sort of thing
1:27:39and comfortable.
1:27:40It doesn't have to be fancy, just comfortable and safe.
1:27:43So how soon do we get a revenue protection from, from the, uh, registry?
1:27:49Uh, very soon, uh, Carol's been working with Dave Murphy to, to develop that, that, uh,
1:27:56have any projection from them.
1:27:57Okay.
1:27:58Thank you.
1:27:59Anything else on 6A?
1:28:01Nope.
1:28:02Nope.
1:28:03Okay.
1:28:04Let's move on to new business.
1:28:05Our next meeting is when Michael and, uh, we're in Dennis, I believe, right?
1:28:10Isn't it?
1:28:11Our next meeting is, uh, just, uh, coming up, it's the 17th, um, it's a Tuesday, uh,
1:28:20the 17th in Dennis.
1:28:23And again, you will be having, uh, a night meeting where he, uh, late afternoon meeting
1:28:28for 30 to accommodate the Dennis select board.
1:28:31Yeah.
1:28:32So it's essentially a joint meeting.
1:28:33Yeah.
1:28:34Um, any particular topics we've discussed or we're thinking about yet?
1:28:43Uh, not yet.
1:28:44Okay.
1:28:46Yeah.
1:28:47Maybe we should talk to the town manager and see, um, well, I think we should go back
1:28:51to our high button topics.
1:28:52Oh yeah.
1:28:53We would read that bring up at every, at every road, we need to know how they, how it's
1:28:58going there.
1:28:59We've received several letters on the whole 40 B issue.
1:29:02Yeah.
1:29:03Um, and we need to hear what the recommendations from the Harwich board that we support.
1:29:08Yep.
1:29:09And from, uh, born, I wonder where that came from.
1:29:12Was it born?
1:29:13Yeah.
1:29:15Yeah.
1:29:16Uh, we've heard from, we've heard from Mashpee we've, uh, in the Falmouth select board are
1:29:19on record.
1:29:20Um, and I've talked to a couple of the newly elected state representatives who are actually
1:29:26very interested in this topic.
1:29:28So, um, they brought it up to me expressing interest and working with us on it, which
1:29:33is interesting.
1:29:34So yes, they know exactly who you're talking about and he was right on that.
1:29:38Yep.
1:29:39All right.
1:29:40So let's move on to, uh, if we're done with number seven new business, let's work on the
1:29:43consent agenda.
1:29:45So we have a force, a number of items.
1:29:47Is there anything I'm actually trying to, there it is for, um, reducing.
1:29:57No, it's a lot of really in the weeds miscellaneous testing.
1:30:04When you characterize it as that Robin, all important things to certain people.
1:30:09Yes.
1:30:10Yes.
1:30:11Very important to certain people.
1:30:12Mr. Chair, I move to approve the commissioners consent agenda items eight Roman numeral one
1:30:18through Roman numeral three, including all subsections as listed on the November 4th
1:30:252026 meeting agenda.
1:30:27Okay.
1:30:30We've got a motion and a second.
1:30:32Any more discussion on the consent agenda, hearing none.
1:30:36All those in favor say aye, aye.
1:30:40Those who are opposed say nay.
1:30:42It carries unanimously.
1:30:43All right.
1:30:44Item number 10 commissioners reports.
1:30:47Commissioner Bergstrom.
1:30:48Oh, yeah.
1:30:50Sorry.
1:30:51Regular meeting.
1:30:52Yeah.
1:30:53Thank you Robin for catching that.
1:30:54Okay.
1:30:55How about number nine?
1:30:56We have a motion on our October 14th, 2026 regular meeting.
1:30:59Yeah.
1:31:00Um, I moved to approve the October 14th, 2026 regular meeting minutes as drafted.
1:31:05Second.
1:31:07Um, any, so I got a motion and a second.
1:31:10Any discussion?
1:31:11Hearing none.
1:31:12All those in favor say aye.
1:31:13Aye.
1:31:16Aye.
1:31:17It carries unanimously.
1:31:18Thank you.
1:31:19Commissioner.
1:31:21Yeah.
1:31:22Okay.
1:31:23Very good.
1:31:24So am I on?
1:31:25Commissioner's reports.
1:31:26Okay.
1:31:27We want to move to item number 10.
1:31:28Anybody have a report?
1:31:29Well, we, we attended the AmeriCorps swearing in ceremony.
1:31:32I guess I could let a mission align some part of that.
1:31:36Well, we both, we both were kind of equal co-leaders there and, um, as usual, it was
1:31:42a great group of very energetic young people.
1:31:45It does give you a lot of energy and feeling that they're the young people behind us.
1:31:50There's a lot of them that do get it and they do love the environment and they get
1:31:55the challenges that, uh, this generation has left for them, but they're willing to
1:32:00tackle them with a smile and, uh, and hard work.
1:32:04So it's really a very energetic group that are here to study coastal issues and biology.
1:32:11And it's just a great group.
1:32:14It was really a fun, fun, enthusiastic group and they're from all over the country this
1:32:18year and one, even from all the way from East Ham to get up the road and stay at this house.
1:32:26But, um, the rest of them really, and there's one international student from India, which
1:32:32is also very exciting.
1:32:34So it's going to, it looks like a great group and I can't wait to see them have, uh, you
1:32:39know, gain all this experience and knowledge and have fun while doing it.
1:32:44And I hope to see them through the winter.
1:32:46I'm going to have our group come before our select board and introduce themselves.
1:32:51That sounds good.
1:32:52I think it would be good.
1:32:53That's great.
1:32:54Since they're around the community a lot, they should know who they are.
1:32:58My report is to note that the ballot question A involving, uh, a charter review, uh, of
1:33:07the county charter, uh, passed overwhelmingly over 67% of the vote vote is affirmed.
1:33:14Obviously that proposal and, uh, it received a fairly modest, um, opposition 32%.
1:33:22So I want to thank everybody who voted for it.
1:33:26I want to thank the various groups that spoke out in support of it and, and, and urged the
1:33:33voters to support it.
1:33:35And, uh, and I'm glad to see that, uh, we're now moving on, um, you know, with respect
1:33:41to, uh, the charter review, that process will begin.
1:33:45My understanding is, is that within 15 days of the ballots being certified, there will
1:33:49be a need for an organizational meeting.
1:33:52That meeting will be convened by the candidate for commissioner that received the largest
1:33:57number of votes.
1:33:58Uh, at the moment, it looks like it might be Patrick Princey, uh, convening that meeting.
1:34:03That doesn't necessarily mean that he will stay on or might want to stay on, uh, or
1:34:09compete for the chairmanship of it, but he's, he's tasked with organizing it.
1:34:14I remember Lucy and point was, uh, the one that convened the 1988 charter commission.
1:34:20Uh, I hate to show my age, but I was around back then.
1:34:24And Lucy and point was talked into, um, continuing on as the chairman, which he did.
1:34:31And he served well, uh, in that capacity.
1:34:34And, uh, he got us, he got us a charter.
1:34:37And quite frankly, in 1988, the charter that was being drafted was a totally new thing.
1:34:42We had no idea.
1:34:43Yeah, no template.
1:34:44There's no template.
1:34:45There's no form.
1:34:46We had this, we were creating a new Cape Cod commission at the time.
1:34:51And we were creating this thing called an assembly of delegates.
1:34:55And in the past, we used to have the old Barnstable County finance advisory board as
1:34:59to sort of the legislative body approving and acting on budget requests, uh, submitted
1:35:04by the commissioners and the Barnstable County finance advisory committee did, did a wonderful
1:35:09job back then.
1:35:10I served on it when I was in local government.
1:35:12Um, you probably served during your tenure.
1:35:15And the thing that I liked about, yeah, yeah.
1:35:19The thing that I liked about the, that group was that we had selectmen chairman.
1:35:25The chairman of the local select board was the designee, uh, on the legislative body
1:35:30or, and, and, uh, I was the designee appointed by the province town chairman of the select
1:35:36board.
1:35:37But what I thought really worked well back then is, is that we had very strong partnerships
1:35:41with the towns.
1:35:43The towns were very engaged in county services, uh, the county select, the select boards
1:35:48in each of the towns played an active role and sort of being partners with the towns.
1:35:53Back then we had a larger budget.
1:35:55We had a hospital, we had a, uh, we had a, we had a sheriff's department.
1:36:00So we were funding the jail and all of that personnel.
1:36:03So back then the county budget was much larger and we were able to get through it without
1:36:09having a full-time staff without having to, um, you know, pay a group, uh, you know,
1:36:16to sort of oversee it, uh, with healthcare benefits and so forth.
1:36:19So the reality was we had a much more streamlined process for going through the county budget
1:36:24with people that were very familiar with what the county did working in partnership
1:36:28with the county.
1:36:29And we got through that process without it being sort of an elongated year long process,
1:36:35uh, that just sort of dragged on.
1:36:37Um, I will admit that we've made some improvements in our budget process, but, um, clearly that
1:36:44process was a very efficient one.
1:36:46So, um, there's something to be learned.
1:36:49There's something to be said about, yeah, um, commissioner.
1:36:55So when the official certification, so that's not like 15 days from now, it's, it's once
1:37:00the, so that's about another month.
1:37:02The certification could happen in early, I think it will happen early December early
1:37:07to mid December, but the reality is, is that it's going to come quick and we think, right.
1:37:13So we have to start thinking and Robin, as our county clerk and Michael will be interacting
1:37:19with the people that have been, uh, elected in the towns, we'll make sure that they're
1:37:25up to speed on what's going on when the results will be certified.
1:37:29And if there's an organ, there will be an organizational meeting, um, Michael and Robin
1:37:34will be working to make sure that it gets properly posted and properly supported the
1:37:39role that we have to play in this process.
1:37:41As we did in 1988, when we did this before was to provide support legal council support
1:37:47and some staff support office support space and so forth.
1:37:50And that worked out well, quite frankly, they were able to, um, keep their records.
1:37:55Robin and I have periodically spent time reviewing the records of the 1988 charter
1:38:00commission.
1:38:01And, um, so our hope is, is to, to do at least that level of effort and hopefully we can
1:38:06find ways to improve the record keeping and the documentation, uh, of, of their work.
1:38:11So that's, that's to be worked on.
1:38:14Do we have, um, we were right off of a vote here.
1:38:20So I'm thinking of the local votes.
1:38:21Do we have not just the numbers for the question A, but, um, I'm sure it can just go on some
1:38:28website.
1:38:29Where do I find the final numbers for who was elected, um, how did the questions go?
1:38:34I don't have.
1:38:35I haven't seen anything in the Cape Cod times, the daily paper of record.
1:38:39No, the stuff that we've seen is stuff that's been pulled together by it's not the final
1:38:45numbers.
1:38:46Right.
1:38:47Yeah.
1:38:48So, but I do have to say, I want to congratulate the candidate from Falmouth, um, that was,
1:38:55that was a tough seat.
1:38:58And I do want to thank David Vera, you know, he was always been a good, um, you know, working
1:39:04as easy to work with him.
1:39:05So, um, you know, all things, you know, come to an end, but it was really, uh, I was shocked
1:39:12when I heard that.
1:39:13No, this, there's no question.
1:39:14This has been, it's a change, you know, change happens with every election and, uh, there
1:39:19are people that we're going to see be sad to see go, but there's, there's new blood,
1:39:23there's new energy and, um, hopefully they're, um, Commissioner Berger.
1:39:28Yeah.
1:39:29I don't know.
1:39:30The charter review.
1:39:31Um, I don't know if you guys remember, I probably feel it does if they did a comprehensive
1:39:36look at Washington County operations probably 10 to 15 years ago, Rob O'Leary.
1:39:42And I was on that task force.
1:39:43Yep.
1:39:44He was, I have all, I have all the records for that.
1:39:46Yeah.
1:39:47If you have the records of that.
1:39:48Oh, I've got all of the records for that.
1:39:50I've collected pretty much all of the records for all of them stacked up somewhere.
1:39:57No, but you have to understand, uh, I teach American government at the community college
1:40:02and I do teach in my classes.
1:40:04I create, uh, an awareness and an understanding and we do class projects on county and local
1:40:09government.
1:40:10Yeah.
1:40:11And I hope you impress upon them that what happens in their local boards and local governments
1:40:16actually has more of an impact on their everyday life.
1:40:20I have students subjected to, I have, unfortunately, I have, I have, I have students that have
1:40:26been interns in local government.
1:40:29I have former students that ran for office and won their seat in local government.
1:40:35So I don't want to say it's a training ground for, uh, candidates for public office, but,
1:40:41um, that's what it's sort of turned into be.
1:40:43So, uh, I'm, I'm very excited.
1:40:45I was on that task force, but I did not keep comprehensive.
1:40:48Yeah.
1:40:49I did.
1:40:50I think I did.
1:40:51I mean, I'll probably find them when this next charter review is over, but I do have
1:40:56more things that I want to think about myself.
1:40:57All right.
1:40:58Um, just looking at the agenda, um, I'm going to go to, uh, Michael for, uh, I don't think
1:41:06we have any more upcoming business to discuss, do we?
1:41:08No.
1:41:09Okay.
1:41:10So let's go right to your report, staff reports, and then adjourn.
1:41:12Uh, I just want to let you know that, uh, your, your December, first December meeting,
1:41:17which I think is now scheduled for December 2nd, uh, we will give you a sort of a report
1:41:23and update on the superior court, uh, work with pictures, which are great, um, and also
1:41:29give you an update on ARPA, you know, sort of our final ARPA spending and Carol give
1:41:33you financial, uh, report, um, at that, at that point.
1:41:38So looking forward to the December 2nd meeting.
1:41:42That sounds good.
1:41:43Great.
1:41:44Anything else?
1:41:45Any other staff reports?
1:41:46No.
1:41:47All right.
1:41:48Hearing none.
1:41:49Let's move on to the next item.
1:41:50Do I have a motion?
1:41:51Um, yes.
1:41:52I move that we adjourned at, uh, seven o'clock.
1:41:54And I second.
1:41:55All right.
1:41:56We have a motion and a second.
1:41:57Is there any more discussion?
1:41:58Hearing none.
1:41:59All those in favor say aye.
1:42:00Aye.
1:42:01Aye.
1:42:02It carries unanimously.
1:42:03And thank you.
1:42:04We are adjourned.
1:42:05It's very nice that everybody.
1:42:06Unless when we're on.
```*