- Stuart Peaslee, Kathleen Barach, Grace Luddy and Chair William Rewinski were present; Marla Butts was absent and no alternate was available. Minutes of September 14 were approved with spelling corrections, unanimously.
- Application 09-26-01, pond change at 110 Stone Bridge Rd by the Putnam Fish and Game Club: discussion covered the embankment, proposed stairs and ledge for fishing access, silt control and dredging. Approved as a regulated activity, 3-0, with the chair recused as a club member.
- Application 09-26-02, 29 Crabtree Ln, Jeffco Fibres LLC: a two-phase warehouse addition (about 30,000 sq ft, then about 65,000 sq ft) in the upland review area, with a gravel fire access road and an extension of an existing drainage pipe. Accepted for review, with discussion and determination set for the November meeting. See Jeffco Fibres Warehouse Addition.
- On Jeffco, wetland flags were delineated in 2022 and reverified. The pipe outlet extension would fill a small wetland area (stated figures varied), and pipe depth must be verified for heavy-vehicle loading. No septic or bathrooms are proposed in the first phase.
- The wetlands agent reported that the citation ordinance passed at town meeting lacked a wetlands enforcement component. Jeffco has also filed a special permit application with Planning and Zoning, and the Bassett Hill Road excavation project is on track.
- A scaled-back Scranton Village Shops proposal added rain gardens and stone sediment-catching trenches beside the proposed vendor buildings. One concern was that the new retention areas could concentrate runoff, but it was not judged significant enough for further requirements; the wetlands agent had approved the plan the prior Thursday. See Scranton Shops Change of Use.
- Draft agency forms (permit extension, modification, transfer) were reviewed but not approved. Members agreed to add the property owner's name and sign-off, and revisions will return.
- One additional legal notice was approved. A question about an agency membership fee needs follow-up, since no invoices were received.
- There were no citizen comments on non-agenda items. The meeting adjourned unanimously.
Agenda
Agenda PDF posted; see Sources.
Sources
- Agenda: https://www.woodstockct.gov/AgendaCenter/ViewFile/Agenda/_10052026-560
- Draft minutes: https://www.woodstockct.gov/AgendaCenter/ViewFile/Minutes/_10052026-560
- Video: https://www.youtube.com/watch?v=TijQoy-TNDI (Town of Woodstock YouTube channel, 1:34:37)
- Agenda Center: https://www.woodstockct.gov/agendacenter
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
00:00meeting of the the Woodstock Inland
00:03Wetlands and Water Courses Agency. Time
00:06is 700 pm and we'll start with a call uh
00:10roll call.
00:12>> Even on time
00:14>> Peasley,
00:16>> Kathy Barrett,
00:18Grace Luddy,
00:20>> and Bill Rwinsky.
00:22Uh Milabuts will not be joining us
00:24tonight.
00:27Um we don't have any alternates with us.
00:30We only have one alternate and he is not
00:32here and
00:34uh so we will have nobody to appoint.
00:39So we'll move on to action of the
00:41minutes the previous meeting September
00:4314th 2026.
00:48So are there changes or adjustments
00:51uh that need to be made?
00:54I didn't see any.
00:55>> Anybody else has seen?
00:58>> I didn't see any Stuart Beasley here.
01:02>> Okay.
01:04Anybody else?
01:10>> I got a question about one of the the
01:12the projects that was going on, but
01:15that's that it really has nothing to do
01:16with the minutes, so
01:18>> I'll ask it later on.
01:21>> Okay.
01:23So, I see Reed's up with us at the last
01:27uh meeting. You're uh Oh, he's not
01:32connected to audio.
01:40Reed, are you there?
01:43>> Yeah. Having a little technical
01:44difficulty here, but I think I'm finally
01:46with you.
01:48>> Okay. I don't the last meeting your
01:50computer came up as Jay Banderell.
01:54>> Yeah.
01:55>> Uh but you're you
01:58should be Reed Banderell, correct?
02:00>> Well, I go by Reed.
02:03>> Is Jay an official name also?
02:06>> It is.
02:07>> Okay.
02:09All right. So, uh you're in the minutes
02:13as two different ways as J as J A Y and
02:16J period. I would just like to
02:19consolidate and your application is says
02:22read. So I would propose that we change
02:27all the wording to be read Vanderhell.
02:34>> Are we refi required to have legal
02:36names? Bill
02:39>> uh it's whoever you're signed in as for
02:42for this part. But, uh, as far as the
02:45legality of it, um, it would make sense
02:49for the consistency for the the minutes
02:52and the actual person's name to and what
02:54they typically go by. What
02:58>> should be go by? What the application is
03:00signed as?
03:02>> Well, I'm using a a score application,
03:05so they have me listed as J. Vandercale.
03:09>> so because of my participation in their
03:12program.
03:14>> Yeah.
03:15>> You know my full legal Christian name is
03:18Jay Reed Vandercel.
03:21>> Okay. And it's scale not shell.
03:25>> Yeah. They sent me school to say skill.
03:28>> Okay. [laughter]
03:31So we will officially since like I said
03:33since the application
03:35uh says read that I will propose that we
03:38change the name to read. It's got two
03:41different places in here. One of them is
03:44uh number two
03:46and
03:49the other one is
03:527B the second line down.
03:59Oh yeah. Is it two words?
04:05>> Bander scale. Yes, it is two words.
04:07>> Okay. But that's the whole last name.
04:10>> That's the whole last name.
04:12>> Okay.
04:15>> Thank Ellis Island for that. [laughter]
04:18>> Yeah. They do a lot of fun things, don't
04:20they? Or they did. Not anymore.
04:22>> Well, it used to be three parts.
04:25>> Oh, wow.
04:26>> Yeah. That's uh Dutch origin.
04:31>> Dutch origin. Yes.
04:32>> Yeah. Okay. Uh does anybody else have
04:35any uh corrections?
04:38Um well, the other thing I would like to
04:40say is that my name is there as W and
04:45sometimes as B. So I would like to uh
04:51have some consistency with that uh
04:53throughout the whole uh I is Bill
04:56Ruinsky chairman. So you can uh please
04:59change the W to B
05:02>> or or perhaps uh Mr. Chair sometimes in
05:05on on minutes I see the chairman
05:06referred to as chair Rinsky rather than
05:10you know.
05:11>> Yeah, that's that's fine. That kind of
05:13eliminates the initial part. So, um, we
05:17could change that to chair would be for
05:19for clarity
05:21because otherwise it could look
05:23potentially be two different people.
05:25Are there any other changes that anybody
05:28sees in the minutes?
05:32So, I entertain a motion
05:35for the minutes with the corrections
05:37suggested.
05:38>> Stuart Peasley. I make a motion that we
05:41approve the minutes on Monday, September
05:4514th,
05:47>> uh,
05:492026.
05:52>> I second.
05:55>> Okay. With the two the several
05:57corrections that were mentioned
05:59>> with the with the corrections that were
06:01um mentioned specified.
06:05>> Okay. Any other comments, questions?
06:08>> [clears throat]
06:09>> All those in favor signify by saying I.
06:11>> I.
06:12>> I.
06:15>> Grace, you're mute. I say I.
06:17>> I.
06:18>> I.
06:19>> Okay. Uh, the motion passes.
06:22>> Okay. Moving on to
06:26citizens comments. Is there anyone on
06:29the Zoom tonight who would like to speak
06:31to something that's not on the agenda? I
06:36don't really see anybody here that uh
06:41would be interested in doing that. So,
06:43we'll move along to pending
06:45applications.
06:47Application 09-26-01
06:52110 Stonebridge Road, map 5779,
06:56block 55, lot 35, Putnham Fishing Game
07:00Club, change of exist existing pond.
07:05So, uh, hopefully everybody's a little
07:08bit up to date that there are new
07:09documents posted today. Um, John, you
07:13you have them already there. Thank you.
07:15>> There sure are lots of new documents.
07:18>> Reed, I'm I'm happy to navigate to
07:19wherever you'd like in terms of your
07:21description.
07:23Um, I
07:26basically, you know, uh, am going to,
07:30uh, defer to the board and let them
07:33direct where they want to be with it.
07:36>> Well, uh, Bill Rowinsky, I'm going to
07:38have to recuse myself at this point from
07:40this discussion
07:42as a member of the club. So, Stuart, if
07:45you could take over, please.
07:48>> Okay. Um, I looked at the I gota put my
07:53glasses on here. I didn't find anything.
07:59Uh, in the first paragraph, one question
08:01I had was the topographical mapping
08:04identifies that the northern area is
08:06limited by a vertical boundary of 35 ft
08:10in elevation.
08:11So, we're talking about a 35 ft
08:14differential between one
08:18point of the uh map and the other and
08:22another high and low highest and lowest.
08:26>> It's Yeah, it's it's a 35 foot cliff.
08:31>> Okay.
08:33So,
08:36and that's so the stairs are kind of an
08:39important element to discuss.
08:42The stairs are not accurate. They're
08:44just a sketch. They're not showing
08:46actual
08:48layout, but that's just the placement
08:51where you would think they would go.
08:54So, there is what is the height
08:57differential at each of those stairs
08:59represent? It's 16 ft
09:01>> at each one.
09:03>> Yes.
09:03>> Okay.
09:06Well, I'm going to, you know, I'm I'm
09:08I'm going to offer this as a
09:09consideration. Uh
09:14we don't it the stairs aren't in our
09:16scope usually. Um, but I will say in my
09:20own experience that that
09:23I would want to suggest
09:28an alternative
09:30be explored besides having stairs.
09:34And the only reason why is that if you
09:37put stairs in like that with a 16 ft
09:41differential,
09:43that's uh
09:46that's about at least 24 risers,
09:50>> right?
09:51>> So you'll need
09:54at least two
09:56um
10:00uh platforms. uh
10:04my mind's blank on it. It's a long day,
10:06but you'll need uh
10:11to to have a step platform at every 12
10:1612th riser. So, that extends it. And it
10:20also means that anytime you have more
10:22than two risers, you'll need a handrail.
10:26So, you'll probably have to have
10:27handrails on both sides. There will be
10:30handrails on both sides.
10:32>> Okay.
10:33>> It's it's a very it's a very similar
10:35construction that I install with every
10:37dock that I build.
10:40>> Okay. I just wanted to put that out
10:42there. If in fact you want to
10:45>> if you want to consider another option
10:47like a landscape, you know, ramp um
10:53>> as because with the stairs, you'll
10:55you'll probably have to go through
10:56building department.
10:58And that's fine. We can do that when the
11:00when when when it comes that way. Either
11:02that or we can do landscape landscape
11:05flagstone stepping
11:08>> store. Yeah.
11:10>> Can I just ask a question of the the
11:13applicant?
11:14>> Sure.
11:15>> What was the purpose of putting these
11:17stairs here? I mean, I've seen them for
11:20when you're going in swimming and stuff,
11:23but
11:24>> to get out,
11:26>> the the grade on that that banking there
11:29is extremely steep. Um, it it serves two
11:33purposes. One, we're trying to keep
11:35people off of the the embankment.
11:39Um, so it provides them to an access to
11:41that proposed ledge water um water level
11:46edge at that point. So, it's basically
11:49an ingress and egress point for that
11:51access. It's it uh
11:53>> Oh, it is. Okay.
11:54>> Okay. And it it keeps people off of that
11:57surrounding vegetation.
12:02>> Well, I I'm just wondering
12:06why are people on it? Just they're
12:08standing there. So, like they're they're
12:11what's that called when you when you
12:13flip the the fishing rod over and it
12:16casting. when when you're casting into
12:18the
12:18>> right. Well, you you have to understand
12:20you're standing about 16 feet above the
12:22water line.
12:24>> Okay.
12:26>> So, people like to be at the water's
12:28edge to fish.
12:30>> Ah, okay. Okay. Well, I'm I apologize. I
12:33>> No, no, not at all. Not at all.
12:35>> I have [clears throat] 50 years beyond
12:39beyond the last time I held a fishing
12:41pole. So,
12:42>> no, it's it's it's perfectly all right.
12:44But people get up and down that
12:47embankment there.
12:48>> Yeah.
12:49>> And all it does is it it degrades the
12:52vegetation that's on there. There's
12:56they they have mismanaged this over so
12:58many years. All right. Uh one they they
13:02cut the grass and they treated it like
13:05it was some kind of golf course fairway.
13:08All right. And you don't cut grass
13:11around a pond that low. It it doesn't
13:14work well [clears throat] ever. Um I
13:18have two ponds on my farm. I don't ever
13:21get grass get lower than 6 in in height
13:25around those ponds because the the
13:27grasses lose their filtration capability
13:30at that point. So this way why people
13:33have a means of being able to actually
13:36get to a a stable shelf where they can
13:39fish in comfort. All right. They have an
13:42ingress and egress uh point out of
13:44there. The banks and the vegetation, the
13:47vegetation surrounding it is not being
13:49disturbed. It's not being, you know, um
13:52torn by people up and down it. At that
13:55point, the actual shelf serves as a
14:01natural filtration system with the
14:03number two stone at a depth of 6 to 8
14:06in. So that any silting that comes off
14:09of that bank is inhibited prior to it
14:11actually reaching the pond itself.
14:16>> So you don't have any problem with
14:17people going down and standing on that
14:21like the circle that goes around the
14:24excavation dredging area.
14:27>> No, if if they're standing on that
14:30proposed ledge area there, that's that's
14:32that's a dual purpose. Basically, it it
14:35adds for the the inh it inhibits the the
14:40propagation of the silt into the pond
14:43and it allows people an access and a
14:47waterway or a direct access to the water
14:50line itself.
14:54>> Okay,
14:56>> Kathleen, just a quick clarification.
14:59that that path uh that circle around the
15:04pond is it's above. It's above. It's
15:06they're not going down.
15:09>> You know that, right?
15:10>> It's above. Oh,
15:12>> yeah.
15:13>> Okay. I'm looking at the photographs.
15:16Um
15:21Okay. So, there's
15:23>> Do you want a different a different
15:24image up to to help or even
15:27>> Where where would you like Where would
15:28you like to go? Uh, one of those photos.
15:30Yeah.
15:30>> Okay.
15:34>> Oops. No. Uh, I
15:36>> think you got to go back to the initial
15:38package.
15:39>> Okay. Sure.
15:48>> Has this pond been here for a long long
15:51time?
15:52>> It was certified by Deep in January of
15:542010. It was actually uh start started
15:58in 97.
16:01>> Oh,
16:06see that work?
16:08>> Does that help, Kathleen?
16:10>> So 047 I'm looking at and and that I can
16:14see there's it's like a burm on the
16:16outside of the pond.
16:17>> Yeah, actually that's not a burm. Uh if
16:21if you were to actually stand on that
16:23physically, it's about a one in three
16:25drop.
16:26>> Oh, okay. Well, it looks more like it
16:29from this picture cuz you can't really
16:31see anything behind it.
16:33>> If you if you transit to if you uh go to
16:38the westerly looking uh westerly
16:40photographs,
16:43>> westerly
16:46>> 270.
16:48>> All right, hang on. My my I'm advancing
16:51a little bit choppily here. Uh I got two
16:54Oh, 270. Okay.
16:56>> Okay.
16:58>> You're going too far.
17:02>> Back up.
17:06>> What is this? Right. That's 183. 183.
17:09>> Yeah, that's 183 from an aerial.
17:13I don't
17:14>> Do I have a 270?
17:15>> Yeah, you do. You have a 270.
17:19way in the back.
17:25>> Oh, yeah. Okay.
17:27>> Map. There's That's
17:31>> 183.
17:36That's It's jamming on me. 90.
17:41>> Well, it purpose its purpose.
17:42>> I don't think I do.
17:44>> Its purpose obviously is to contain the
17:46pond. All right, that's probably
17:49>> All right, that's right there at 151 or
17:53>> Yep, I can see that.
17:55>> Okay, that
17:58that is probably the most shallow
18:00banking that there is in that entire
18:02pond structure.
18:03>> Wow.
18:05>> Okay. And I can tell you from
18:08yesterday's experience about getting
18:10from getting measurements out there,
18:11it's exactly the same point where I lost
18:13my footing and wound up on my kester.
18:16Whoops. [laughter]
18:18>> It is extremely steep.
18:21>> Okay. Wow.
18:25>> In both sides, the out the outer slope
18:28is the same.
18:29>> The outer slope is the same.
18:34>> Well, looking at the right side of 151,
18:37it looks a lot steeper than it does on
18:39the left side. It looks like the left
18:41side it kind of
18:44>> out. It's deceptive in its appearance,
18:46but unfortunately it is it is consistent
18:50all the way around.
18:56>> Well, be careful. We'll make you put up
18:58a fence [laughter]
19:00>> with with handrails and [snorts] you
19:02know the Americans for Disability and
19:04all that.
19:11Well, it's not a place of assembly, so
19:13you don't have to do that. You don't
19:14have to worry about it.
19:16>> Um,
19:17>> okay.
19:21>> That was that was just one thing. I
19:23mean,
19:25you know, if if it were a
19:29place of assembly where there were more
19:31than 50 or 49 people assembling, then
19:35those would be issues,
19:37>> right? But
19:38>> but it's not
19:39>> that's not the case here.
19:40>> Yeah. And it's not in our scope of work.
19:43I just brought those stairs up as
19:49just it caught my eye and uh I guess
19:53you're already aware of it but but uh
19:56you know this may have to get a run by
19:59the
20:00>> well the stairs were only included
20:01because at the last meeting it was
20:03indicated that they that the position of
20:06the stairs needed to be included in it.
20:08>> Okay. So,
20:10>> I I just, you know, if there is a
20:12possibility of doing a ramp instead of
20:14the stairs, then you might want to think
20:16about it. But
20:19if it's if it's prohibitively expensive,
20:21then stairs are the way to go.
20:24>> So, the stairs are there to get somebody
20:26out of the pond,
20:29not so they can walk in to go swimming.
20:31>> No, there is no swimming allowed in this
20:33pond.
20:34>> Right. Okay.
20:35>> All right. None. All it does is it
20:37accesses access access that waterline
20:40edge for them to fish.
20:43>> Oh. Takes them down. Not into the water,
20:46but to the edge of the water.
20:47>> To the edge of the to the water's edge.
20:50>> Yep.
20:51>> Are are those going those stairs going
20:53down or are they going up?
20:56>> Well, I didn't know.
20:57>> Going down.
20:58>> I I didn't know stairs that didn't that
21:00didn't go down that also didn't go up.
21:03>> Right. But but you notice that stair on
21:06the upper right corner says proposed
21:08stair proposed stair access.
21:11>> I'm assuming that goes up to the top
21:14platform that that
21:17uh circumference
21:20egress or egress
21:23>> the the proposed le the proposed ledge
21:25is the high point. Correct.
21:27>> Yeah. Yeah. Exactly.
21:29>> That's what I that's what I think we
21:31need to clarify.
21:32>> Right. So the stairs are go right. the
21:34stairs accessing heading towards the
21:36pond. The stairs go up to the the ledge.
21:39>> When we draw a stair, we usually put an
21:41air from the
21:42>> arrow
21:43>> from the lowest tread to the highest. So
21:48that's why we're guessing this. This is
21:50confusing if you're not familiar with
21:51the photographs. Um, but I assume that.
21:54And plus, we've got that overflow
21:56spillway
21:58uh helping us. Um
22:03I since that's not in our our scope of
22:07services here, I think we I'm just
22:10making it as a suggestion.
22:13Uh
22:16are there any other issues to talk about
22:18for this
22:20stage of the application?
22:24Anything else?
22:29One of the other items requested by the
22:31commission last time, the agency last
22:33time was the location of the proposed
22:35deposition site for for spoils which is
22:38here on this aerial.
22:42And
22:45he went in and u
22:49we do have a pretty good description of
22:51where that water is going and how it's
22:53going to be handled. Some of the
22:55questions were about the uh turbidity of
22:59it. Um,
23:04has that been addressed? Is that an
23:06issue?
23:08No, it's it's been addressed. I mean,
23:11the the the the pickup tube in and of
23:14itself would basically inhibit the the
23:17uh transmission of the the silt. Okay.
23:20>> The installation of the silt fence in
23:22itself is going to inhibit any possible
23:25propagation.
23:26>> Okay.
23:33And then the volume of water was 13,000
23:37gallons.
23:38>> That's that's a maximum.
23:41I think it's a lot less than that.
23:44the the western side. If you if you were
23:47to physically look at the pond itself,
23:49the you can tell where the silting comes
23:52from the west goes to the east in in an
23:55incline. So the water depth from the
23:58west is only about 4t deep in some
24:02places. In fact, some places it's not
24:04even 4t deep.
24:10How what's the uh
24:14period of
24:17uh
24:19draining or dredging, cleaning,
24:21whatever?
24:23Once a year, once every three years.
24:27[laughter]
24:29Uhoh.
24:33>> I I really wish they'd had a period of
24:36draining and dredging, but unfortunately
24:38this is the first time this has been
24:40addressed since this pond has been
24:41installed.
24:42>> Okay. All right. [laughter]
24:44>> I am I am trying to undo over a decade
24:48of negligence.
24:49>> Okay.
24:51>> What would you what would you recommend
24:53as a uh
24:56>> personally my smaller pond on my farm? I
24:59usually go every 36 months.
25:01>> Okay. Three years.
25:02>> Wow.
25:03>> Yeah.
25:06The larger pond I don't bother with
25:08because it's an old um limestone quarry
25:12and it's over 30 feet deep.
25:14>> Cool.
25:16>> Whoa.
25:17It [clears throat] covers a little more
25:19than four acres.
25:21>> Wow.
25:22>> Is that in eastern Connecticut?
25:24>> Uh no sir, that is in west central
25:26Illinois.
25:27>> Oh, okay. I own I own our family farm.
25:31We farm roughly what is now 970 acres of
25:37which 200 acres of that is actually in
25:39the Mississippi glacial basin abuing the
25:44river tributaries, estuaries, marshes,
25:47wetlands.
25:50>> Very impressive.
25:52I was I was thinking it might be in
25:53Sterling or something.
25:55>> No, no, no, no.
26:00Uh
26:02>> anyone else that this pond is really in
26:05like a like a concrete not concrete but
26:08you know stone
26:10like a vessel.
26:12>> It is the this property is an abandoned
26:17gravel pit.
26:18>> Ah okay.
26:20>> Okay. Which basically
26:23uh the the soil classification I think
26:25is HKA. HKA
26:29and it is high in silk content.
26:33Um
26:36so basically everything we do we have to
26:38do with silk mit medication in in mind.
26:44>> Okay.
26:44>> Um is that what happened when this pond
26:48was drafted and when it was built? Um
26:53no I don't think so. [laughter]
26:57Well, I was wondering why I was
26:59wondering why they could go down another
27:01five feet if they hadn't
27:04>> if it hadn't been that deep before.
27:07>> Well, it was 16 ft initially.
27:10>> Oh, and then the silt came along.
27:12>> Yeah.
27:14>> Okay.
27:16>> John, do you is is there a I believe
27:19there's a section drawing on this
27:22part as well.
27:25right here.
27:26>> Yeah.
27:26>> All right. Let me flip. Let me rotate it
27:28for you.
27:29>> Yep.
27:29>> Yeah, that helps.
27:40So, when it was built, they didn't give
27:43much consideration to
27:46preservation of the walls.
27:49>> Oh, yeah.
27:50>> All right. They didn't give any
27:52consideration to the biodiversity or uh
27:56any type of thermoclining at all or um
28:01aquatic habitat.
28:03Um what they did was they dug a hole
28:07[laughter]
28:08[clears throat]
28:08>> well. It worked
28:10>> well. It to a to a certain extent
28:12>> sort of. Yeah.
28:13>> To a certain extent. Yes. Uh but if you
28:17don't put some type of of uh structural
28:21holding material in there, the walls
28:23eventually have a tendency to to to
28:25give. Um if you don't put some type of
28:29of thermal clining in there, why you're
28:31not uh you're not you're not maximizing
28:36the environment for your aquatic uh um
28:40animals.
28:41Um, be it fish, be it turtles, be it
28:43crayfish, be it whatever. Um,
28:47there there there is a lot lacking in
28:50this, let's put it that way.
28:53I'm trying to bring it back into where
28:55it actually has a viable
28:59um environmental structure.
29:07Well, that
29:10that section explains a lot
29:13and and we could we could just uh
29:17envision that the out outer slope is a
29:20reflection of what we're seeing on the
29:22inner slope
29:23>> basically. Yeah.
29:30How many people are generally at up
29:33there at one time?
29:36It's
29:38I mean, you know, we we we have a family
29:40that'll come in and do fishing or we
29:42have a couple of old goats like me that
29:45show up every now and then on a weekend
29:47because we need some solitude.
29:50[laughter]
29:52>> Well, maybe one to 10.
29:56If you get 10 people around that pond at
29:58one time, somebody's having a party.
30:00[laughter]
30:10Uh
30:13what else, John? Were we were we what
30:15were some of the other issues that we
30:17were faced with here?
30:26All right. So, um we have the spoils
30:29location,
30:31uh the extraction and sediment
30:34mitigation, uh the the piping and sump
30:38area. We we showed you the sump area.
30:40Anything you guys need to know about
30:42piping? We have I think uh Reed provides
30:46some pipe
30:48perforated pipe
30:51>> perforated. Yeah. Basically, we put
30:53drain sleeve sock on it with a double
30:55roll uh folded end
31:01>> and and where does that drain to?
31:05I mean the water only comes in from the
31:07sky, right? I mean there's nothing that
31:09flows into here.
31:10>> There is no ingress. It's that it's it's
31:13groundwater and that's that's it. It has
31:16no inlet. It has no outlet,
31:18>> right?
31:21>> Are there springs? Is it springfed?
31:24>> No, I mean it it is groundwater fed.
31:28>> Yeah. Okay.
31:29>> All right. But as far as for any any
31:32direct input from a spring, no.
31:35>> Okay.
31:38>> Well, what's the what's the blue line on
31:42the overhead the sump pumping A2.
31:49>> Okay.
31:52Uh where are we?
31:53>> That's on the initial package.
31:55>> Oh, okay.
31:55>> Oh, it is. Yeah. Sorry. It just I mean
31:58it looks like a big
32:01>> like at least a stream.
32:02>> Okay.
32:03>> But it's not attached to the pond at
32:05all.
32:06>> Yeah, there it is.
32:07>> Okay. That line is basically indicative
32:10of the the line from the sump pump
32:14to the to the dispersal area.
32:21>> Is that because it if it fills if we
32:23have raging rainstorms that it fills and
32:27maybe runs over the top
32:29>> that and groundwater coming up.
32:31>> Okay.
32:32>> All right. So basically it's basically
32:35designed to keep the the groundwater
32:38level down so that we can manage during
32:42the the excavation process.
32:45>> Ah okay.
32:46>> And and and not risk having an excavator
32:49floating around in it. [laughter]
32:57>> Okay.
33:02Yeah, I think those are the those are
33:04the major issues.
33:19So,
33:21is that basically what we need to do is
33:23approve this permit request?
33:29Unless there are any unless there are
33:31any issues that
33:33are outstanding or
33:37aren't included in this description.
33:43I think this was ready. This was
33:46submitted last month.
33:48>> That's correct.
33:49>> And and we asked for more information
33:52which was provided
33:55tonight.
33:57Uh, unless there's anything else,
34:01I think we're ready to vote on it.
34:06[clears throat]
34:11Is that correct, Chen? I think we've
34:15>> Yes, that's Yeah, that's I think I think
34:18he's I believe to my recollection, Reed
34:20has answered the questions that were
34:21posed at the last meeting. So, it's it's
34:24really a question of if you're ready to
34:26approve and if there are any additional
34:28conditions.
34:30>> So, uh
34:33does anybody else have any questions?
34:42I would ask for a motion to uh
34:47approve. I don't have the
34:49>> it's uh application
34:5109-26-01
34:54110 Stonebridge Road Putnham Fish and
34:56Game Club changes to existing pond.
35:01>> Uh so we just need a motion to entertain
35:06uh approval or denial of this
35:09application.
35:11>> Okay. I will make a motion on
35:14partial or
35:17It would be application number
35:19>> application number 09-
35:2326-01-
35:26110 Stonebridge Road
35:295779/5539
35:35um an application by the Putnham Fishing
35:37Game Club changes to their existing pond
35:41and I make a motion that we accept their
35:45application and approve it in one of the
35:48>> I'm not sure it's not a right I I'm
35:52still not completely familiar with that.
35:54So if one of you would help me out what
35:56it is
35:57>> approved as a regul regulated activity.
36:00>> Regulated. Okay, that's that sounds
36:02great.
36:05>> I'll second it.
36:07>> Very good. All those in favor say I.
36:11>> I I.
36:13All those opposed.
36:16All those abstained.
36:18The vote is passed unanimously.
36:21We have approved the additional
36:24application materials of October 5th,
36:282028
36:30for
36:34application number 09-26-1-10
36:39Stonebridge Road.
36:43Okay,
36:44>> thanks Reed.
36:46Thank you Reed.
36:47>> Thank you very much everyone.
36:51>> Good job.
36:53Enjoy it.
36:56>> It's been a long time since I did any
36:59engineering work. [laughter]
37:03>> Yeah,
37:06it uh it disappears pretty quick if you
37:08don't use it. Uh, it was the first
37:11four-year degree I got and that was back
37:14in the 80s.
37:15>> Yeah.
37:20>> Right.
37:22>> Yep. It's Bill Veritzky coming back at
37:247:37. So, we'll move on to new
37:26applications.
37:28Application 09-26-02
37:3229 Crabtree Lane
37:35map 6397
37:37block 62 lot 16A
37:41Jeff Coof Fibers LLC new warehouse
37:44building and Upland Review Area
37:47I believe we have the engineer with us
37:49this evening.
37:54>> Good evening. Yes, I'm here. Mark Santo
37:57on behalf of the applicant.
37:59>> Yep.
38:00>> Would you like to give us a brief
38:02overview over overview?
38:04>> Certainly. Certainly. Thank you very
38:05much, John. Um, Mr. Chairman, my my my
38:10name is Mark Santo. I am an engineer
38:13from Grafton, Massachusetts. I've been
38:16engaged by Jeffco Fibers to prepare
38:19plans and specifications for a addition
38:23to their facility. They are looking to
38:26do a um two-phase project. Phase one,
38:30they're looking to add a 30,000 square
38:32foot addition to the existing warehouse
38:35building. And they'd also like to add a
38:40um a second phase, an additional um
38:4465,000
38:46f future square feet
38:48along right right where the mouse is is
38:50tracking on the screen right now. So um
38:54[clears throat] the um application
38:56before you this evening. Um we we're
38:59looking to
39:02basically do all the site work,
39:05excavation, land clearing and all um
39:10activities required to to perform the
39:12construction of the of the 30,000 square
39:15foot edition and also um construct the
39:19access road, the fire access road for
39:22the for the for the ultimate buildout so
39:25that we manage our disturbances all in
39:28one
39:29um construction project and then leave
39:33minimal disturbance for a phase two.
39:35That that that will occur in the future.
39:37Now, if permits expire and things
39:41change, we we likely will be back before
39:43you for the phase two, but uh you know,
39:45basically we are showing the full
39:48buildout and on these plans and it's
39:51more of a um for the benefit of the the
39:54zoning commission. We want to show show
39:56our our full plans to for the property
39:59and um and then you know if we f if we
40:02scale back we scale back but we want to
40:04show that the ultimate
40:06goal here is to build these two
40:09buildings and and at that point the
40:11property is
40:14there doesn't have any there's no other
40:16development potential in this property
40:18because there's they're you know it's a
40:20big facility already and they're adding
40:22some some square footage but this is the
40:25ultimate buildout for for the the Jeffo
40:27Fibers factory. Um I don't I don't know
40:30if everybody's familiar with what they
40:32do there. They're a um
40:35uh ma a mattress manufacturer and it's
40:38pretty benign use. They they um I know
40:41that I'm getting into the use and I I
40:43won't go crazy on that because this is
40:44the inland wetlands commission, but I
40:46want to tell you brief briefly what they
40:48do and and how how it would impact or
40:51lack of impact to the to the wetlands.
40:54that basically it's going to be a
40:55storage facility when they're said and
40:57done. Um they're [snorts] looking to
40:58take a lot of their their um mattresses
41:02are stored outside right now in in in um
41:06tractor trailers in the parking lot and
41:08they they're they're busting at the
41:10seams. They the business is good. They
41:12need they need space. So, they want to
41:14add a building and bring some of that
41:16storage into the building and also um
41:19you know lighten up their their their
41:22manufacturing floor because they're
41:23storing mattresses in the same area
41:25where they're manufacturing. So, this
41:27this new building will be strictly for
41:29storage.
41:31in terms of construction and and
41:33activities that um impact the wetlands.
41:36We there's Can can everyone see my mouse
41:39or is this something that I
41:41>> No, I I I'm sharing my screen, so Mark,
41:43if you want to direct me for I I if you
41:45want to be on a different page, we can,
41:47but
41:47>> No, no, that page is great. Um so, let's
41:50say um first I'd like to outline where
41:52the resource area is. Um the the
41:55>> Oh, the wetlands. this. Yeah, the solid
41:58blue line down the center is Peakbrook.
42:01It's a perennial stream. I've provided a
42:04125 foot um buffer zone from that. And
42:09then
42:10yes, where your mouse is is is
42:12meandering now is the edge of wetlands.
42:15And that's a flag delineated wetland
42:17that um we flagged in 2022 and then
42:21verified recently.
42:23And um the flags were originally
42:26surveyed and located by um a local
42:30engineering firm. And then we we we we
42:33did an additional topographic survey a
42:36couple of months ago, six weeks ago and
42:38and and and verified the topographic
42:41features and and the wetland flags at
42:43that time. So basically we've done two
42:45two full surveys of the property and the
42:49um the map the topographic features
42:51shown here in are are accurate. So what
42:55the um the basically the the most of the
42:59work is is in creating the fire access
43:01road. We're going to be doing cuts and
43:04fills, balancing it to to to the minimum
43:07work necessary to to um to make a gravel
43:10access road so that if if the fire
43:12department ever has to fight a fire here
43:15or get access to this building for any
43:17reason, they can drive up that red road,
43:21turn around on a on a gravel culdeac and
43:23come back out. Now, um
43:27is is basically we get close to the
43:31wetland. We're we're in the inland up
43:33the um upland review area with most of
43:37most of the fire road and part of the um
43:41phase 2 building and just a little nip
43:44of the phase one building. Just you can
43:46see in the um northwest corner of the
43:49building right there. just just inland
43:52upland review area goes into that just
43:55just a little bit. Um
43:58the there is a pipe an existing drainage
44:02pipe that that juts out into the wetland
44:05and the water coming. That's correct.
44:08And the as the wa the water that's been
44:11coming out of the drainage over the
44:12years has caused the wetland to creep up
44:16in and and and and exit, you know, make
44:19a make a little um a jetty, if you will,
44:21out into into the site. If that drainage
44:24wasn't there, I think that we wouldn't
44:26have any filling of the wetland or any
44:28impact to this wetland at all for this
44:30work. Uh we'd be able to um put up an
44:33erosion control barrier, stay out of the
44:35stay out of the resource, do the work,
44:38stabilize and and have zero impact. Now,
44:41that being said, when to build this fire
44:44access and stay outside of the phase 2,
44:47we're going to have to extend the pipe,
44:49the drainage pipe that is our our
44:51drainage outlet and move it out towards
44:54the wetland a little bit and
44:56[clears throat] move that head wall out.
44:57And that technically is
45:02um impact to the wetland and and filling
45:05of what you call a resource area. I
45:08don't I don't see it as a a swamp or a
45:11marsh or any high high value resource,
45:14but it technically meets the definition
45:17of a wetland because of the plants and
45:18the hydraology and and the topography.
45:21So, um you know, in full disclosure,
45:23there is a couple hundred square feet of
45:26of of um of impact that that is proposed
45:29as part of this project. Now, um
45:32>> I'm sorry. Wait, Mark, can you stop?
45:33>> Of course. Of course. Yes, sir.
45:35>> So, there's and I'm sorry, Mr. if I
45:37might jump in.
45:38>> Go ahead. Go ahead.
45:39>> Um, so in in Massachusetts, wetlands are
45:41defined slightly differently than in in
45:43uh Connecticut. In Connecticut, it's
45:45entirely soil based. In Massachusetts,
45:47obviously, there's vegetation and and
45:49some of the topography at uh at hand.
45:52So, if all you're disturbing is outside
45:55the delineated area, it's not
45:58necessarily wetlands um just by virtue
46:00of vegetation. It's really soils based.
46:03>> Oh, that's very helpful. Yeah. and and
46:04and um
46:07so you know is there hydric soils
46:11that were man-made from the from the
46:14from the pipe um that in the outlet of
46:17the pipe? I I I don't think so. I think
46:19the hydric soils are out. And if you if
46:22you look at wetland flag, let me let me
46:24zoom in on my own map so I can I can be
46:27accurate here. If we drew a line from
46:29wetland flag um 312 to 317
46:35that that this that's that's where I
46:37think the wetland um the natural wetland
46:42was and and the flags that go up to the
46:45pipe. Um
46:47you know I I think when we auger there
46:51it's it's it's grally stuff. I don't see
46:53it as black and and hydric like like the
46:56like the swamp wetland that that the
46:57rest of the wetland that's associated
47:00with Peak Brook is. So
47:01>> flags 12 to 17 are right over here.
47:04>> Um
47:05>> so this is looks like it's here's 12
47:08>> um
47:09>> 13 14 15 and then this looks like 17.
47:11>> Corre correct. Correct.
47:13>> So um so we're being ultraconservative
47:16showing that right to the right to the
47:18pipe. Um and if so I I leave it to the
47:23to the committee if commission if you'd
47:26like to see any um replication or
47:28restoration of of that wetland somewhere
47:31else. I think it might be more harm than
47:33good to dig and impact the edge of the
47:35wetland in a different area. Um so right
47:38now we don't have any proposed
47:41replication. We're just looking to fill
47:42that. I think I' I've got it labeled as
47:46um
47:48um
47:50>> it's like below 200 square feet.
47:53>> Yeah. Yeah. Yep. And this my map I'm
47:56looking at says 500, but when I when I
47:58calculated it in AutoCAD, it's it's it's
48:01under 200
48:02>> 280.
48:05>> Yeah. Yes. Yes. 280. and and that so the
48:08original um drawing someone asked for
48:12500 but the 280 is what what AutoCAD's
48:16area calculation across those those
48:19green lines um
48:22create. So uh I I um I I I I think we
48:27can
48:29if we filled that in I don't I don't see
48:31any imp any any impact to the main
48:33wetland. But I again that's not my call.
48:35That's up to up to the commission to
48:37decide if you'd like to see replication
48:39or not, but we we're not proposing any
48:41at this time.
48:44>> Well, at the the moment, since it's a
48:46full application for permit, we can only
48:49accept it tonight and we'd have to
48:51discuss it and vote on it uh or at least
48:55more discuss it next next meeting,
48:58November.
48:59>> Fair enough.
49:00>> Okay. Um,
49:02>> I Bill, sorry, Storm Pasley here. I I
49:06have a little I've had a little uh
49:12trouble, not trouble, but I'm I'm still
49:15a little confused about what's going on
49:16in that green.
49:18What
49:21>> line
49:23>> through the chair? What's your question,
49:24sir?
49:25>> Uh, I'm not sure. We've got a pipe
49:28coming out. That's a drainage pipe.
49:31Okay. So, ba so basically if if you look
49:34at um where it's labeled 12-inch PVC,
49:38>> right?
49:39>> And it stops right in the middle of the
49:41the proposed road. That's where the
49:43existing pipe is. And so we we need to
49:46extend that pipe out and out of the um
49:49proposed access road and beyond it a few
49:52feet and put a head wall in. And that's
49:54and then and then grade 3 to one off the
49:57edge of the road.
49:59>> And so it it's proposed to end right
50:01here at wetland flag uh 317 basically.
50:06>> Yes. If you if can you go to a grading
50:09page that's a facilities page. So
50:11there's no um could you go to page um
50:16either um
50:18three or or four of six
50:24it'll show a little better. There you
50:26go. If you can zoom in on that. Um,
50:32f I'm sorry. Five five five
50:36of five of eight is got is good or good.
50:41>> I don't know if this has the full plan
50:43set.
50:46>> Yeah, you do. That that that's all of
50:48them. So, yeah, that's the sheet. So,
50:50zoom in on it there. You can see better
50:52what what what's going on. Um so
50:55basically the green lines are are are
50:58proposed grades and the dark and the
51:01black dotted lines are existing grades.
51:04So they where they meet is is the limit
51:06of work and that and that's a 3 to1
51:09slope that's required to so that we
51:12don't have a cliff off the edge of the
51:13of the road. Okay, that helps.
51:16>> And it goes to daylight and then the
51:18green pipe goes through the green lines
51:21and out to out to and and discharges to
51:24to to you know basically take that water
51:28out another you know 40 ft or so to so
51:33really in terms of um the drainage it's
51:36it's we're not creating a new point
51:38source discharge. We're just moving it
51:39out and so that we have room to build
51:41the access road. So the same
51:44[clears throat]
51:44>> same same same drainage we have now is
51:46going to the same place. We're just
51:48extending the pipe.
51:50>> Mark, so the the extension of the PVC
51:54pipe is going to be put in to go out
51:57almost to Peak Brook.
52:00>> Um
52:01>> and and the road the the the pink
52:04speckled road is going to go over that
52:06pipe.
52:08>> Correct.
52:08>> What is the speckled road made of? Is
52:11that paved? Is it gravel? Is it
52:14>> gravel?
52:14>> It's just gravel.
52:16>> Gravel. Okay.
52:19How How deep is the pipe going to be?
52:21Actually, it's going half over the the
52:24old blue pipe and half over the green
52:26pipe.
52:27>> Yes. So, the blue pipe is where it is
52:29now and the green pipe is the proposed
52:31pipe.
52:32>> Right.
52:33>> So, we're just we're adding pipe to to
52:35to to extend it. And um
52:40that's the existing drainage system and
52:42it's it's collecting you know runoff
52:45from the site catch basins what
52:47whatever's going on now to collect water
52:49and very I don't I I've been there I
52:51haven't seen any major flow coming out
52:53of it but you know it's an existing
52:55existing drain pipe so we we're we're
52:57maintaining it in in place
53:00>> but what you've got there has never been
53:02driven on by
53:06a heavy fire truck for example.
53:09>> Um let's look at the existing conditions
53:12sheet. There is a fire road there now.
53:14It's just it's not as extensive. Um let
53:17me look back to the existing conditions
53:20>> sheet on my end.
53:25Um, so if you look at page two,
53:32is that a different PVC pipe
53:36that's right in the middle of that page?
53:38>> No, it's the same one. This is existing
53:40condition. So,
53:42>> this purple right here, Mark, is
53:45>> Yeah.
53:47>> Yes, it is.
53:49>> Okay.
53:49>> And I only showed the pipe, you know,
53:52see it does it continues. It's just I if
53:55you can see I put little little zigzag
53:56on it right there. So that pipe does go
53:59under the under the the existing fire
54:01the exist it's they don't call it fire
54:03road that's what it's for. It's a gravel
54:05drive that goes to the back of the site
54:07and actually this it goes right through
54:08the wetland. We're we're we're bringing
54:10it in tighter so that to minimize impact
54:14and bring it closer to the building turn
54:16around but there is a pathway now that
54:18that that goes between the tree line and
54:20goes over that pipe. So they're not
54:22they're not using that that as a road
54:25per se now. It's just
54:27>> sort of a dirt way
54:29>> only that no one's using it but I my I
54:33venture to guess if there was an
54:34emergency that's what it's for. uh you
54:37know and and we
54:39>> you know when I drove to survey I used
54:41that path and I drove on it and it's
54:43hard pack and it's it's it's stable and
54:46[sighs]
54:47there's so um
54:51but we certainly could
54:54verify that that pipe I think I know
54:56what you're going with that that we
54:59could be you know we could verify the
55:00depth of the pipe and and make sure that
55:02it'll stand up to H20 loading so that
55:04we're not crushing it with future truck
55:07if I can read [clears throat] into your
55:09to your comment. I I understand you
55:12>> Kathleen Stewart here just just to
55:14clarify that's that's part of the code
55:16building code requirement to allow uh uh
55:22fire safety equipment to access
55:25>> okay
55:25>> 360 degrees of a building.
55:27>> So the existing the existing driveway
55:30you can see comes back here that's sort
55:31of a gravel road and then it goes up in
55:33here.
55:34>> Yeah.
55:35>> Right. Right. And and so we'll improve
55:37that, modify it, improve it, make it a
55:40little more formal and make make sure
55:42that there's a um you know, if there's
55:45if there's a fire and they need to fight
55:47the fire from that side, they can get
55:48back there and and and take care of it.
55:50Now, um that being said, Jeffco is very
55:53serious about their their fire
55:55protection system. They have their own
55:58um water tower. They have their fire
56:00pumps. They have fire um sprinkler
56:03systems within the building. It's all
56:05maintained professionally. They um
56:08they're actually putting um significant
56:10money into the u maintenance and upgrade
56:13of the of the of the their water system
56:16now. They're they're um maintaining the
56:18tank and
56:20and um so this is part and parcel to the
56:24to the to the fire safety of of the of
56:27the entire facility.
56:29Do they make any mattresses that I would
56:32be familiar with the names, you know?
56:35>> Uh um I I think yeah, I I think they
56:38make mattresses for all major
56:40manufacturers. They they're a um Yeah,
56:42they're pretty pretty um
56:45>> pretty pretty pretty big company.
56:48>> Yeah. Yeah. They're they're also in um
56:51Webster, Mass, and Worcester Mass. There
56:54three divisions and they make the fibers
56:57for my pillow that
57:00>> Oh, really?
57:01>> Yeah. Yeah. And then um
57:04you know if I I I want to say
57:06>> grew those in a swamp somewhere. No.
57:10>> What's that?
57:11>> I thought he grew those in a swamp
57:13somewhere. The
57:14>> Well, you know, some everything starts
57:16somewhere. But when these companies
57:18grow, they they they Jeffco is um
57:21they're Oh, and they
57:22>> that's just foam. I mean, they don't
57:24make the foam in Woodstock, do they?
57:27>> I you know, um I think they I think they
57:30have a machine that makes the pillows
57:32and everything in Woodstock. Yes, they
57:34they um they have um another facility in
57:38Milbury, Mass also. So they four four
57:40four four four four four four four four
57:41four four four four four four four four
57:41four four four four four four four four
57:41four four four four um
57:42>> four locations and and uh the company
57:45was founded by um Jeff's
57:49mother and father almost um I want to
57:52say 75 years ago and and um Blanch
57:57Blanch Long is the founder and she named
58:00it after her son Jeff um she's still
58:03alive she's um an amazing woman I I met
58:07her I've been doing their site work in
58:09and their engineering since the '9s. And
58:12we we did three auditions for them in in
58:14Webster. We worked on the Milbury
58:17facility. We we looked into doing
58:18something in Worcester, but never never
58:21um never did it. So, um I I remember
58:24when they bought this property and it's
58:28we've been talking about an addition
58:30here for years, but they're finally at
58:32the point where they're they're running
58:34out of space and and it's becoming a
58:36reality. So, uh, we were going to come
58:38before you in 2022. They got put on hold
58:41and so now now it's back back and and,
58:45um, you know, I I I'm not saying it's
58:48100% that they'll build this, but I feel
58:52like if the budget meets what they what
58:56you know, they they're working on some
58:59performing out and if it comes meets
59:01their their goals, I I think they will
59:03go forward and build this. But they they
59:06have released us to do the permitting
59:08and and do the engineering and and you
59:10know get all the get all the permits for
59:12it. So I I I I think I I don't want to
59:16say that they are 100% ready to build,
59:19but I I think they're very, you know,
59:22it's 95 90% chance that they've had
59:25serious serious meetings this time
59:27around. And I and they've last time they
59:29didn't give us the gohead to go to the
59:31board. So we we've had I drew these
59:33plans in 2022 and and and then held on
59:36to them for all this time and now they
59:38brought us back and said now we want to
59:40go forward. So I I I do believe it'll it
59:43may happen now.
59:47But it's a it's a they're they're um
59:51they're you know they run a tight ship.
59:53It's it's pretty cool. You go in there,
59:55they they can get a mattress into a they
59:58pack it down to um about a tenth of the
1:00:02size of the mattress. When they when
1:00:04they ship it, it's it's amazing. When
1:00:05they cut it open, it pops out of out of
1:00:08the bag and big grows. It's they they've
1:00:12got a
1:00:13>> they've got it down and they they can
1:00:15make and on the pillow side, they make a
1:00:17pillow every I want to say every, you
1:00:19know, 20 seconds a pillow comes out of
1:00:22the out of the machine. So, it's it's
1:00:23it's pretty
1:00:25>> pretty amazing the equipment they have.
1:00:30>> Big market for it.
1:00:32>> Yeah. Yeah. I I know that the builder I
1:00:34work with bought bought a mattress from
1:00:36them and and and and he he was looking
1:00:39for a mattress. He called Jeff. He said,
1:00:40"Can you help me?" And he got a mattress
1:00:42for, you know, $800 that he would had to
1:00:45buy buy for $2,000 at a mattress store.
1:00:48and
1:00:49>> he showed up at the house and just like
1:00:50I said, it was in the bag packed down to
1:00:52one/10enth the side. They cut it open
1:00:54and boom, popped right open.
1:00:56>> Yeah.
1:00:57>> But it but they they make they they
1:00:59don't just make the phone. They they
1:01:00actually make the mattresses right to
1:01:02completion. And in this in this building
1:01:05where um it's connected to over at um
1:01:09the the brick the big the beautiful
1:01:11brick office building. When you walk
1:01:13through there there's they've got a
1:01:14showroom and samples of the mattresses
1:01:17and and but this office was it was a
1:01:22different facility and they're just
1:01:24finally growing into the offices and and
1:01:27using it all and and uh but the but the
1:01:30warehouse is at capacity. So that's that
1:01:33why we're why we're before you. They
1:01:35really need need the space badly.
1:01:39>> Uh Bill Ritzky, I only have one uh
1:01:43question or request and that is that
1:01:47somewhere we have some delineation that
1:01:50this is
1:01:52uh site work for the proposed
1:01:55full extent.
1:01:57that's deemed possible on that site
1:02:01because it could get confusing part uh
1:02:03phase one. Are we just approving phase
1:02:06one of you know 30,000 ft of 95,000
1:02:11or you know in how many phases? Um so if
1:02:14we had somewhere a note that says this
1:02:17provides the future expansion or the the
1:02:20uh full potential expansion of the site
1:02:24that is proposed for the future.
1:02:27>> Absolutely. Yes sir. Um so right if you
1:02:30look at sheet four um there it does
1:02:35label phase one and phase two. Um, we we
1:02:39could add some notes that that that to
1:02:41to that effect that say um
1:02:46>> it's our opinion that this is the full
1:02:48buildout for for the for the parcel. You
1:02:50know, it the owner did ask me, he says,
1:02:53"I got all this land. What can I do with
1:02:55it?" I says, "Really? Nothing. This that
1:02:57the stream goes through it as wetlands
1:02:59on the other side. They don't have um
1:03:02roadway access to the other side of the
1:03:04stream. So, um I mean, could they build
1:03:07something on lot 16A in the front off on
1:03:12Peak Book Brook Road? Yes, there's room
1:03:15for for buildings, but that is outside
1:03:17of the the the the um up in review area.
1:03:22And so, I don't want to say that they
1:03:25can never build anything else on the
1:03:26land, but this is for [snorts] lot I'll
1:03:30say lot 16A. This is the full build out.
1:03:34>> So this Mark, if I'm correct, the the
1:03:37heavy purple line here is phase one.
1:03:40>> Yes.
1:03:40>> Which is about a 28,000 foot addition.
1:03:43>> Phase two is this rectangle that's
1:03:45outlined in sort of a tan color.
1:03:48>> That's right.
1:03:48>> Um which is an additional 65,000 square
1:03:50feet or 66,000 square feet.
1:03:53>> That's phase phase two.
1:03:55>> Yes. And and if you will go back there,
1:03:57you can see that it's pretty much it's
1:04:01it's almost at grade now. You know,
1:04:05there isn't like there's not going to be
1:04:07a lot of earth work for the building.
1:04:10It's going to be a little bit to make
1:04:11the access road and the the major
1:04:14earthwork will be for phase one because
1:04:17to to to
1:04:20build phase one up to grade there's like
1:04:23right now it's at 306
1:04:26and finished floors at 314. Now we'll
1:04:28have docks that come in. So they they'll
1:04:31have to fill
1:04:33it's a good size fill to to create the
1:04:3628,000t building. the um
1:04:39and there's a little bit of a cut to
1:04:41create the the the 95 the 60,000 square
1:04:45foot building but it um
1:04:49you know a lot I I shouldn't say that
1:04:51half about half of the 60,000 square
1:04:54foot building is that grade the rest of
1:04:55it it it will be a cut
1:04:58>> there's a little bit of a knob a little
1:04:59bit of a knob right over here
1:05:01>> yes yes that's correct
1:05:05nice map that's good yeah So um so
1:05:07that's so basically what we're trying to
1:05:09do with this is
1:05:12avoid having
1:05:15you know a a building
1:05:18and site work and then a building and
1:05:21site work and have stockpiles and yeah
1:05:23we wanted to make bring the site to the
1:05:25grade the ultimate shape that it's going
1:05:28to be for for for phase one and phase
1:05:31two and then if they ever build the
1:05:33second building it it won't be there
1:05:36won't be major earthworks. They'll just
1:05:38be have to go in and entrench to put
1:05:40footings in and and build the building.
1:05:42But the the everything will be flat and
1:05:44and
1:05:46that road will that that fire road will
1:05:49will have access to the where the
1:05:51building's going to be phase two.
1:05:58Now, um, and and again, I I certainly
1:06:00can put notes on the plan to that effect
1:06:02that this this is the um this that the
1:06:06the project before you is um represents
1:06:11the the the full buildout of um parcel
1:06:1416A. I I'll I'll reserve the front one.
1:06:1816
1:06:20A3
1:06:21is there's a big field over by the road.
1:06:24And the reason they don't want to do
1:06:25anything there is because it's all
1:06:26residential and they they don't want to
1:06:28they want to keep the like right now
1:06:30when they put the factory
1:06:33attach the factory to the factory and if
1:06:35there was warehouse put behind the
1:06:36factory no one will that like they'll be
1:06:39like it's no impact to to the
1:06:41neighborhood. They won't see that at
1:06:43all. It'll just blend right in with the
1:06:45with they are all the the industrial
1:06:48activity that they already have going
1:06:49on. But if they put it in the front out
1:06:52by Peak Book Road, then it's all
1:06:56residential neighborhood there. They
1:06:57would it would it, you know, it's it's
1:06:59really it when you pull in and drive
1:07:01around that that rotary, it it it looks
1:07:04like almost like a like a school or a or
1:07:07a um municipal building. It's it's it's
1:07:10a majestic building and it's not the
1:07:12place for for the warehouse. the
1:07:13warehouse. They want to keep the
1:07:15warehouse behind the warehouse. And
1:07:16that's and and that's out of respect for
1:07:18the community, but for their own needs,
1:07:22they also need it to be connected to the
1:07:23warehouse because their for workflow and
1:07:26and and you know, utilities, electrical,
1:07:29the all the all their their their um
1:07:35um trailer access, it's all connected.
1:07:37So they want to just build the building
1:07:39right next to the other building and and
1:07:41and and keep keep the keep it all in one
1:07:45place.
1:07:46>> Good.
1:07:47>> I have one question. Um is there any
1:07:50septic associated with these buildings?
1:07:53>> So at there is a septic system right now
1:07:57and it's all the way out front and they
1:08:00pump to it. um if they they right now do
1:08:04not have any bathrooms proposed in the
1:08:0730,000 or 28,000 square foot edition. If
1:08:12through um
1:08:14for any reason they they need to add a
1:08:17bathroom to that then there would be I
1:08:20think the right thing to do is design a
1:08:22small septic system near that building
1:08:25just for that bathroom and and and and
1:08:29not add on to the other septic system
1:08:31because the other septic systems is is
1:08:34existing we don't know its capacity I we
1:08:37don't want to overwhelm it with with
1:08:39addition flows. So if we if we do put a
1:08:41bathroom in in phase one, then we'll
1:08:45design a septic system for that. And it
1:08:49would probably go um there's a spot
1:08:53outside of the upland review area. Um
1:08:56let me let me see. Right. Right. Right.
1:08:58I don't again my mouse is just on the
1:09:01outside of the access road. um between
1:09:06the Upland Riv area and the and the and
1:09:08the access road, there's there's an area
1:09:10big enough for a small legion field down
1:09:13gradient from the building,
1:09:15>> but at this time there's no we do not
1:09:17have a subject system of
1:09:18>> and also in in theory, Crabtree Lane is
1:09:21is on the sewer line also.
1:09:24>> Okay.
1:09:24>> So, it's going to
1:09:28>> Oh, and I we didn't realize that. And so
1:09:32if it would be quite a sewer connection,
1:09:35but
1:09:36we we could pump to the sewer and
1:09:39connect to
1:09:40>> if the if the existing septic system is
1:09:42functioning, there's there's, you know,
1:09:43no reason to hook it up. But yeah, for
1:09:45expansion purposes, but that's that's
1:09:47entirely outside the purview of this.
1:09:49>> I and I didn't know that and thank you
1:09:50for bringing that to my attention
1:09:53because I know we um we would love to
1:09:55have public water and it's it's just not
1:09:57there. It's it's it's about a half a
1:10:00mile up the road in Thompson and um
1:10:04they've talked about it, but it's it's
1:10:06quite the undertaking to tie into the
1:10:09water system. So, they're this and they
1:10:12and they're they have their own water
1:10:14system and it's working for them. So,
1:10:15they they're they're going to keep that
1:10:19and maintain that and and continue to
1:10:21use their own water system. They have a
1:10:23a major well and a they have their own
1:10:26their own um reservoir tank. I mean,
1:10:29it's like a they have their own water
1:10:31system.
1:10:32>> So, you're almost you're almost
1:10:33literally next door to the Putinham WPCA
1:10:38uh water intake.
1:10:40>> Yes, it's it's it but it's but it's it's
1:10:43a you know, it's a half a mile up the
1:10:45road in the across the river and it's
1:10:47probably a a million dollar water
1:10:50connection to bring it up the road. So,
1:10:52they're going to spend $75,000
1:10:55um maintaining that that water tank now.
1:10:57So, that the numbers don't quite work to
1:11:00to hook up to to water. So, this time
1:11:03there isn't that where they isn't that
1:11:05where they just put a new bridge or did
1:11:07some big thing with the road there
1:11:10>> right in front of them.
1:11:12>> You could be right. I I [clears throat]
1:11:13when I went in there, I saw when it does
1:11:16go over a river coming in in Thompson.
1:11:20[sighs] Um but if you if you look at the
1:11:22plan and I it's we're out we're just
1:11:25talking we're outside of the the the
1:11:29um wetlands or the inland wetlands
1:11:32jurisdiction but I just want you to know
1:11:34what's going on. If you look at the the
1:11:36back of the um back of the site the
1:11:39north part that circle that's their
1:11:42water tank and right right there John
1:11:44circle that's their that's their their
1:11:47reservoir tank. It's about 60 ft high
1:11:49and 60 foot diameter.
1:11:51>> Wow.
1:11:52>> Okay.
1:11:53>> So, they have sufficient water for fire
1:11:55protection with that. You know, they
1:11:57they have a a hardy well. They keep that
1:12:00reservoir. There it is right there. So,
1:12:01they keep that tank full and um that
1:12:04gives them the head to to to to
1:12:07um for their sprinkler systems to have
1:12:10capacity to to put out the fires if
1:12:12they're they haven't had fires, but they
1:12:14they are in compliance. if they their
1:12:16fire protection engineers have designed
1:12:18fire um sprinkler systems that that are
1:12:22adequate for this with their with their
1:12:23own water system.
1:12:26>> Mark, do you have any idea how many
1:12:28people work there? [sighs and gasps]
1:12:30>> Uh I want to say I'll I'll get you a
1:12:33better answer and I'll and that question
1:12:35I'm sure will come up at planning and
1:12:36zoning and I need to get an answer for
1:12:38that. I want to say there's probably 20
1:12:40office staff and uh maybe about twice as
1:12:43many um employees in in the in the
1:12:46warehouse, but I'll get an accurate
1:12:48answer for that.
1:12:48>> That that's okay. I I I
1:12:51>> No, it's a good question and I should
1:12:52know that because I think they'll
1:12:54that'll probably be asked that at
1:12:55planning and zoning. So, I'm going to
1:12:57find out.
1:12:59>> Okay. Well, at this point, I think we
1:13:01could entertain a motion.
1:13:06I'll make a motion that we accept this
1:13:10uh
1:13:14>> application number 09-26-02.
1:13:21>> Thank you, John. I make a motion we
1:13:23approve that.
1:13:24>> Whoa, whoa, whoa, whoa. Accept and and
1:13:27table for discussion.
1:13:28>> I'm sorry. I'm sorry. Accept.
1:13:30>> I like the first motion, but I know it's
1:13:32not possible. [laughter] No, it's all
1:13:34good. It's all good.
1:13:35>> Long day. Long day. Good.
1:13:36>> It's all It's all good. We We'll be
1:13:38patient. It's not No rush. Thank you
1:13:40very much.
1:13:43>> Yeah. I make the motion that we accept
1:13:45that uh application for uh review and
1:13:49determination.
1:13:53>> I second.
1:13:55>> Okay. A motion by Stuart Peasley, second
1:13:59by Kathy Barrack to accept application
1:14:0209-26-02
1:14:05for 29 Crab Tree Lane for Jeffco Fibers
1:14:09new warehouse building in the upland
1:14:11review area for site work for the
1:14:15proposed
1:14:16uh new
1:14:18uh warehouse extension and for future
1:14:22expansion. Any
1:14:27further questions, comments?
1:14:30All those in favor signify by saying I.
1:14:33>> I.
1:14:33>> I.
1:14:35>> Anybody opposed? Any abstain? Okay, the
1:14:38motion passes.
1:14:40So, we'll give it another review next
1:14:42month. And uh
1:14:46>> Okay. Very good. Let me know before the
1:14:49meeting if you need any any revisions.
1:14:51I'd be glad to to to provide additional
1:14:53information and I I thank you all for
1:14:55your time tonight. It's been a pleasure.
1:14:57We'll see you at the next meeting.
1:14:59>> Thanks for your effort.
1:15:00>> Thank you.
1:15:00>> Thank you. Good night. Now,
1:15:02>> good night.
1:15:03>> Good night.
1:15:07>> Okay, let's move on to administrative
1:15:10business wetlands agent report.
1:15:13>> Okay, I submitted my agent report. Um
1:15:16nothing too particularly um
1:15:19earthshattering. uh what you're working
1:15:21with the the current uh applicants to
1:15:24get information um and you know the the
1:15:28the um crab lane Jeffco fibers one has
1:15:31also submitted a special permit
1:15:32application so working with him on that
1:15:34end um the um the uh citation ordinance
1:15:40that again um members of this agency
1:15:43were involved in but did not include uh
1:15:45wetlands enforcement um citations was
1:15:48approved by town meeting uh I believe
1:15:50last week. Um we did uh been been
1:15:55tracking I' I received a lot of
1:15:57questions um by passers by people
1:15:59driving up and down 171 wondering about
1:16:01Jeff uh I mean Josh Pratt's project on
1:16:04Basset Hill Road because I'm sure if
1:16:05you've driven by you see it's it's you
1:16:07know substantial uh excavation related
1:16:09mounds but uh he's he's on track. Um,
1:16:14I'd also note that uh in consultation
1:16:16with Chairman Rowinsky, and he can talk
1:16:18about this a little bit more later, um,
1:16:20we issued um, an administrative notice
1:16:23that, uh, there were some proposed
1:16:26changes, uh, basically scaling back of
1:16:29the proposal at Scranton Village Shops.
1:16:32Um, that changed the activity in the
1:16:36Upland Review area, uh, but actually
1:16:38scaled it back and and planning and
1:16:39zoning ended up approving that last
1:16:41week. uh in a special meeting. Um so we
1:16:43just confirmed that the impact was
1:16:45lesser than that. Um the the wetlands
1:16:48agency approved a couple of months ago.
1:16:51Um and that's you know principally
1:16:54principally it nothing nothing too uh
1:16:56earthshattering happening over the last
1:16:58couple of weeks.
1:17:00John, I have a question. Sto there uh on
1:17:04the
1:17:08is it plat what's uh Josh uh
1:17:11>> Josh Pratt
1:17:13>> um on that project I'm just curious we
1:17:15we never talked about where all that
1:17:17overburden is being taken to. Is it
1:17:20staying on site or is it being removed?
1:17:24>> Uh I think it's a combination. Uh he's
1:17:26he's redistributing some of it and I
1:17:28think some is going off site.
1:17:30>> Okay. Do they know where have they said
1:17:32where is it that part of the
1:17:33application?
1:17:34>> Uh no neither.
1:17:40>> Think he's had issues with getting
1:17:42people to take it.
1:17:45>> Oh really?
1:17:47>> We may just have a landscape there.
1:17:50[laughter]
1:17:52I know that's usually a question that
1:17:53comes up in our conversations. Where
1:17:56where if you're having a dispersal,
1:17:59where is it going?
1:18:02>> Yeah. Well, I don't think we know that.
1:18:03And
1:18:05>> yeah, unless it was part of the original
1:18:07was part of the original approval, but
1:18:08nothing has has changed as far as I'm
1:18:10aware.
1:18:10>> Yeah.
1:18:13So, and if it's long as it's dewatered
1:18:16basically, then it's fine to go
1:18:18wherever.
1:18:20Okay. Any correspondence, John? Uh
1:18:23>> uh no, no correspondence of of note.
1:18:26>> Financial report.
1:18:29>> Basically,
1:18:30uh we have one more legal notice that uh
1:18:34I just approved for last week, but
1:18:35that's not covered in there. So, there's
1:18:38another forget whether it's 40 250 or
1:18:41something like that that's
1:18:43>> come out of the the notices. Uh, is
1:18:47there any
1:18:48um
1:18:50do we know what the situation is with
1:18:53the khakiwick membership, John
1:18:56>> Nico?
1:18:57>> No, we haven't uh we haven't received
1:18:59any any invoices.
1:19:05>> Okay. So, we don't really know if we
1:19:07have an active membership then.
1:19:10>> I don't I No, I don't. Um
1:19:12>> Okay. And I think I I apologize if that
1:19:14if that was something I was intended to
1:19:16follow up on. I I can can do that. I
1:19:19don't recall that that was a todo, but I
1:19:21can follow up.
1:19:23>> Yeah.
1:19:23>> If you wouldn't mind uh
1:19:26>> following up uh
1:19:27>> Yep.
1:19:28>> AC either across the hall or
1:19:30conservation or they must have the the
1:19:33records across the hall.
1:19:34>> Okay, I'll check.
1:19:36>> Yeah.
1:19:38Okay. Thank you.
1:19:40uh
1:19:44draft IWWA forms and we have a set that
1:19:50is currently before us in our package.
1:19:54We could just go through try to go
1:19:56through these three and see if there's
1:19:59something else you want to change. So
1:20:01basically you have a red letter page and
1:20:06then you have the same page without red
1:20:09letter how it would look as a final
1:20:11document.
1:20:12>> This is for the extension.
1:20:14>> Yeah. So I don't know if anybody's had
1:20:18chance to look at those and uh whether
1:20:19you have any
1:20:21uh thoughts or opinions on those.
1:20:25I I have a
1:20:28question.
1:20:30>> Go ahead.
1:20:32>> It it seems to be consistent throughout.
1:20:35Uh what what's the relationship
1:20:41um between the permittee and the owner?
1:20:46And are we
1:20:47>> the owner? Is the permittee doesn't have
1:20:49to be the owner to the property.
1:20:52The permittee could be a contractor or a
1:20:56family member that's overseeing the
1:20:58project. Uh, but the land owner does not
1:21:01have to be the permittee, but the land
1:21:04owner usually has to be on record.
1:21:06>> So, the land owner's
1:21:11record
1:21:13on the is not on this application.
1:21:18It's only the permitting.
1:21:26That's my question.
1:21:29>> Yeah, I guess we don't have that on
1:21:31there.
1:21:32>> And and
1:21:33>> although although let me tell you this
1:21:36is we're looking at request for permit
1:21:38extension right now,
1:21:40>> right? So no, it's no new activity. It's
1:21:42just timing and so that would have to be
1:21:44requested by the permit.
1:21:46Yeah. So, we we're going to have a a
1:21:49reference for permit number on the upper
1:21:51left there. Permit information, the
1:21:53permittee name.
1:21:55So, all of that information should be on
1:21:58record unless the property owner
1:22:01changes.
1:22:04>> That's where there's a lack of
1:22:05consistency and could be some
1:22:09possibility for an error.
1:22:11>> Well, we have we have a separate form
1:22:13for we have a separate form for
1:22:14transfer.
1:22:18That's third one.
1:22:20>> I just I just raised that as a question
1:22:22because if in fact there are problems
1:22:26then who has responsibility?
1:22:29>> Well, the permit always has
1:22:30responsibility. If there's a new owner
1:22:32and you wish to transfer the permit,
1:22:33then you would do a a a permit transfer
1:22:35form, not an extension form.
1:22:40>> But ultimately, you could end up doing
1:22:42both, but you'd have to do the transfer
1:22:44first. and then the extension.
1:22:47>> But only only the permit only the
1:22:50permite can speak for the permit and
1:22:52request the the extension.
1:22:54>> What if what if the permit does not act
1:22:57responsibly to the owner and the
1:23:00>> that's between the own that's between
1:23:01the owner and the permit
1:23:02>> but the owner is liable.
1:23:05>> Uh
1:23:07>> depends.
1:23:08>> Yeah, it depends. I
1:23:10>> that's that's the question that
1:23:12>> but that's a that's a legal question
1:23:14between the permit and the owner. We
1:23:16would go from an enforcement standpoint
1:23:17we would go after the permite.
1:23:20>> Yeah, that would be a civil action
1:23:22between the permite and the owner.
1:23:26>> Is there anything negative about adding
1:23:28the name of the owner to this as well?
1:23:31>> Yeah, that's that's what I'm trying to
1:23:33get to.
1:23:35Why not have the owner on on this? So it
1:23:38clarifies that it we're in a gray area.
1:23:43Why why have that should black and
1:23:45white?
1:23:48>> Well, you technically
1:23:50>> you're you're kind of not in a gray area
1:23:52unless you unless you step into the gray
1:23:54area, which is what you're doing.
1:23:56>> You have you have the permit number and
1:23:57the permitting name
1:24:00>> and you have a record there to go back
1:24:03to.
1:24:06What if we change ownership during the
1:24:08process?
1:24:10>> Then it's up to then it's up to the
1:24:12permit or andor the new owner to handle
1:24:15the the permit transfer paperwork.
1:24:21>> Yeah. I I just
1:24:24would feel more comfortable if the
1:24:25owner's name was invol involved.
1:24:29>> Well, it looks like there's plenty of
1:24:31room to put it in there. I mean, we're
1:24:32talking about
1:24:34I guess you'd have to put in their
1:24:36address, too. The property could be on
1:24:40Main Street and and the the
1:24:43you know, the person could live in in
1:24:46I don't know, South something street.
1:24:49So, you'd probably want to have their
1:24:53name and address. But there there seems
1:24:56it looks like there's enough.
1:25:02Or you could put it at the bottom.
1:25:05>> Well, to me, if uh
1:25:10if this was coming before us or becoming
1:25:13before Jean, then
1:25:17you would need to have that background
1:25:19information for what the project was and
1:25:22who the parties involved before you
1:25:25would want to make a a decision of any
1:25:28kind. Anyways, so whether it would be an
1:25:31addendum of the original permit
1:25:33application or what was originally
1:25:36approved, you would want to have that
1:25:38information. I believe anyways, you
1:25:41wouldn't just come with this form and
1:25:43say, I want to do this
1:25:45and that's the end of it. That's the way
1:25:47I see it. John, do you How about you?
1:25:50>> I I would tend to agree, but I you know,
1:25:53again, if we want to ask for more
1:25:55information that that's fine. It it it's
1:25:57just a matter of I don't know.
1:26:01>> Well, we can discuss it some more next
1:26:03time. We don't have to approve these
1:26:05tonight. This is just the latest draft.
1:26:09Uh
1:26:11>> my my my uh the key word for me would be
1:26:15that there be a maintenance of
1:26:18consistency in the process. And just
1:26:22having the absence of the owner's name
1:26:24leads an opening. That's all.
1:26:27and you've got answers for it, but there
1:26:29could always be a question that might
1:26:32not be answerable.
1:26:34And just putting the name in there seals
1:26:36it up,
1:26:38>> right? Well, I mean, what if you have
1:26:39two What if you have two owners that
1:26:41that are the children of an inheritance
1:26:43and they don't get along? Who Who's
1:26:44responsible, Steu?
1:26:45>> Well, that's that becomes a legal
1:26:47matter. That's
1:26:48>> exactly which is the case of a an owner
1:26:49and a permit.
1:26:51>> No, I I don't agree. the permite and and
1:26:55the owner in many situations depending
1:26:58on the authority having jurisdiction if
1:27:00they're not on the same page when that
1:27:02can happen an awful lot of times
1:27:06almost more than 50% of the time an
1:27:08owner is not
1:27:11really clued into what the peri is doing
1:27:16>> happens all the time so I think that it
1:27:19would be wise
1:27:22to keep them in the loop.
1:27:25>> So, you're saying having the owner's
1:27:28name and having them sign off also?
1:27:32>> Yes.
1:27:33>> Okay.
1:27:35>> Well,
1:27:37>> I can forward that uh comment to to
1:27:39Marlo.
1:27:40>> Yeah.
1:27:45Okay.
1:27:47>> All right. So, that's extension. If you
1:27:50look at the uh next one, request to
1:27:53modify.
1:27:55Same thing red line that red letter then
1:27:58the the final.
1:28:03Same thing with permitty but no owner's
1:28:06name and sign off.
1:28:12>> I assume students like that as well.
1:28:15>> Yeah, I just again the issue is
1:28:18consistency.
1:28:20It makes it
1:28:23less of a problem potentially.
1:28:28>> Okay.
1:28:28>> Okay. So then the the transfer the third
1:28:30one here
1:28:32um
1:28:35>> current peri
1:28:41you could have the same case for this
1:28:43also.
1:28:46>> That's all I saw. Yeah.
1:28:49Yeah, she's got two different looks like
1:28:51two different versions of this.
1:28:55>> Uh, let's see. Do we get the
1:28:58>> 114?
1:29:00Okay, the 105. The 114 is the old one or
1:29:05maybe original one.
1:29:07>> Uh, this is a version 105.
1:29:10>> Yeah, the last page is 10 one. I mean
1:29:13114.
1:29:15>> That's 114. So that's this is that's the
1:29:17one that waso proposed uh at the
1:29:19beginning of the year.
1:29:21>> This is the current.
1:29:23>> Yeah.
1:29:24>> Clean.
1:29:26>> Okay. So Stuart, you want all three of
1:29:28these to be considered?
1:29:30>> That's my suggestion, Bill. I
1:29:32>> Okay.
1:29:34>> All right. I'll I'll
1:29:35>> I'll make that request tomorrow.
1:29:40>> Okay. So, we won't take any action on
1:29:42those now. Um,
1:29:47but road I think you put it in your a
1:29:49little bit on it on your
1:29:50>> Yeah. Nothing nothing of note just just
1:29:53you know tracking uh you know sort of
1:29:56being looped in on on emails here and
1:29:58there but there's nothing uh
1:29:59particularly to note right now.
1:30:02>> Okay. Uh so let's move on to spent and
1:30:06village shops.
1:30:08I just want to make a note of something
1:30:10here.
1:30:12page 14, I believe, is 13 and 14. Uh,
1:30:20we don't have their last proposal here.
1:30:23That page of narrative on the page,
1:30:27I forget what it was.
1:30:29>> Wow.
1:30:30>> They have a narrative that describes
1:30:32their changes and the drainage that they
1:30:35put in,
1:30:37which is not really drainage, it's
1:30:38retentions by
1:30:40>> killing the engineering.
1:30:41>> Yeah.
1:30:42Yeah.
1:30:44So, this is what they're proposing now.
1:30:46They took out the train
1:30:48and they have six new rental units in
1:30:52the sort of upper right. And I believe
1:30:56they have two more larger rental units
1:30:59kind of in the middle.
1:31:02And then the I'm not sure if the main
1:31:05building that they're trying to put in
1:31:06was on the original one or not.
1:31:09>> This is the this is a basically a
1:31:10storage building.
1:31:12Okay.
1:31:13>> And these are these are essentially
1:31:14vendor vendor buildings.
1:31:16>> Yeah. So I want those vendor buildings
1:31:19in the upper right. I just want to point
1:31:21out that they put rain gardens on both
1:31:23sides there.
1:31:25You can see the ovals.
1:31:28Those are rain gardens.
1:31:32>> And then in the left
1:31:38>> Stewart with a ring. Here's a rainbow
1:31:41second sheet.
1:31:42>> No, no, further up.
1:31:43>> Oh, up here.
1:31:45>> Yep. That's one of them.
1:31:47>> And then up here. Right here.
1:31:48>> Yeah.
1:31:49>> Oh, okay.
1:31:50>> Okay. So, that's the catch runoff and
1:31:54sediment, which is as they describe it
1:31:56in their
1:31:58>> quality. Yeah. And you see the there's
1:32:03>> sort of the hatched areas there. Uh they
1:32:07look like a stone wall or something
1:32:09>> right here.
1:32:11Yeah, there's one there and then there's
1:32:12one up the middle and then one up to the
1:32:15left.
1:32:16So, they're putting in sediment caching
1:32:20areas
1:32:22>> for water quality purpose, stone
1:32:23trenches also. But the point that I want
1:32:27to make with this is that you could look
1:32:30at this as a case of creating uh shoot
1:32:34uh shooting yourself in the foot
1:32:36>> because these these weren't required
1:32:38originally,
1:32:40but they put these in there and
1:32:44depending on how it works out and what
1:32:46they put in, you're now retaining water
1:32:49in areas you didn't before.
1:32:52So you have to maybe look ahead and see
1:32:56where that water is eventually going to
1:32:58end up and if whether it's going to end
1:33:01up all at once or you know if something
1:33:03catastrophic could happen to it because
1:33:06they're concentrating that runoff water
1:33:09now whereas they would weren't before.
1:33:12So that was just my point of uh showing
1:33:15that though they did something for water
1:33:18quality depending on how it could turn
1:33:20out uh could be could be a bad thing. M
1:33:26>> so they gave theirel a problem they
1:33:28didn't need to have but it's not doesn't
1:33:31appear to be significant enough to
1:33:33warrant u further requirements
1:33:36and so John gave wetlands agent approval
1:33:39I believe the last
1:33:42Thursday for this
1:33:43>> that's correct
1:33:44>> y so if that makes sense then I guess
1:33:48we're all set with that
1:33:51is uh
1:33:53anybody on Zoom now that has comments
1:33:57that's citizen that's something not on
1:33:59the agenda.
1:34:02>> I don't think we have
1:34:03>> anybody else have
1:34:06>> any other items to discuss or anything.
1:34:10>> Well, I would entertain a motion to
1:34:12adjourn.
1:34:13>> I'll make a motion for adjournment of
1:34:16October 5th inland meeting.
1:34:20>> I'll second it.
1:34:23Okay, we have motion by Stuart Peasley,
1:34:25seconded by Grace Ley to adjourn. All
1:34:28those in favor signify by saying I.
1:34:30>> I.
1:34:31>> I. Oh, I