What: application 09-26-02 by Jeffco Fibres LLC for a two-phase warehouse addition (30,000 sq ft, then 65,000 sq ft) at 29 Crabtree Ln, partly in the upland review area.
Where it stands: received for review at the November meeting after being introduced on 2026-10-05; listed as pending on the 2026-11-02 agenda (outcome unknown, no minutes yet).
Next: decision by the Inland Wetlands and Watercourses Agency.
Details
The November 2 meeting is summarized on its meeting page; the posted minutes record unanimous tabling to December. (The agency's minutes may number this application 09-26-01.)
Application 09-26-02 received for review, with discussion and determination set for November. Two phases (about 30,000 then 65,000 sq ft) in the upland review area, with a gravel fire access road and a drainage pipe extension; wetland flags were delineated in 2022 and reverified. Pipe depth must be verified for heavy-vehicle loading.
Tabled to December for revisions (unanimous, per the posted minutes); decision window ends December 9. Open points: property named on the form, applicant registration status, FEMA lines, topography labels and legend.