  • The commission reopened continued public hearing No. 676-04-26, a special permit for a change of use at 292 Route 169 by Scranton Shops LLC. See Scranton Shops Change of Use.
  • The applicant's engineer presented revised plans: silt fence and hay bales added to the legend, a water-quality trench symbol, building spacing of at least 10 feet per the fire marshal, and a dark-sky-compliant lighting plan.
  • The narrative described eight retail sheds, reuse of existing buildings for antique retail, a cafe and ice cream, gravel parking for 38 vehicles plus two paved accessible spaces, no septic changes, and a new 24-foot gravel access with a paved apron. State DOT approval was noted.
  • Staff confirmed the revision has less impact than the plan the Inland Wetlands agency originally approved, so no further wetland approval was needed. Fire marshal comments and responses are in the file.
  • An erosion and sediment control bond of $5,900 was entered. Commissioners asked that bonding also cover the infiltration trenches and rain gardens.
  • Maximum hours were set at 9 AM to 9 PM Monday to Saturday and 9 AM to 5 PM Sunday.
  • Lighting and music drew resident comments. The applicant said any music would be incidental and acoustic, not a music venue.
  • Traffic discussion covered the one-way driveway, do-not-enter signage, sight lines and emergency access.
  • A commissioner asked for written acknowledgment that all lessees must follow the permit conditions, and the applicant agreed.
  • The hearing was closed unanimously. Joseph Adiletta moved approval, seconded by Amy Monahan, and it passed unanimously. Conditions: a larger bond covering the infiltration trenches and rain gardens; lessees bound by the permit; site lighting off 30 minutes after and on no sooner than 30 minutes before operating hours (emergency lighting excepted); and no amplified music.
  • The meeting adjourned at 8:12 PM.

Agenda

Agenda PDF posted; see Sources.

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

00:03Josh.

00:03>> Hi.

00:05>> Thank you. I'm going to call this

00:06meeting to order.

00:07Um sorry for the delay getting in.

00:10Um So, we'll start with roll call.

00:13Today, will you start, please?

00:14>> John Day.

00:16>> Joe Polulick.

00:17>> Aaron Barbo.

00:18>> Sid Blodgett.

00:19>> Amy Monahan.

00:20>> David Morris.

00:21>> Um online, we have

00:24Can you hear us, Joe?

00:25>> Yes, Josh Fadilat.

00:29>> And Doug Porter.

00:31>> Thank you.

00:32Um

00:34We will designate John and uh Amy as

00:37alternates.

00:39Um

00:41And now we'll do the Pledge of

00:42Allegiance.

00:46>> I pledge allegiance to the flag of the

00:47United States of

00:49America,

00:50and to the republic for which it stands,

00:51one nation under God, indivisible, with

00:53liberty and justice for

00:56>> [clears throat]

00:58>> all.

01:05>> Um

01:07Citizens comments. Do we have any

01:08citizens comments not to do with what

01:10we're um discussing tonight?

01:14Hearing none,

01:15we'll move on to um

01:19meeting minutes. We have some minutes

01:20from uh September 17th

01:24that I assume everybody got online.

01:27Did you have a chance to look at them?

01:28Any comments or anything Do we have a

01:31motion?

01:33>> I'll make a motion to approve.

01:35>> I'll second.

01:37>> Abstain.

01:38>> Well, we have any discussion on the

01:40minutes?

01:44Hearing none, um all in favor of

01:47accepting the minutes of September 17th,

01:49all in favor?

01:50>> Aye.

01:51>> Aye.

01:53>> Aye. Any opposed?

01:55Any abstentions?

01:56>> Motion

01:57>> John, can you get that John?

01:59>> Thank you. Approved.

02:00Um

02:03Here we are. We're going to

02:05reopen the public hearing number

02:07676-04-26.

02:11Um

02:13I'm not sure what all those other

02:14numbers are.

02:15But the screen shops, Josh Biondo open

02:18reopening it.

02:20Continue

02:22going on. So

02:25do um

02:27We've got all the the new information.

02:30Thank you, Josh. And guys, you got any a

02:33presentation you want to

02:34>> Yes. Yes, I

02:37Uh thank you, Mr. Chairman. Uh for the

02:38record, Norm Chibo, Killing the

02:40Engineering Associates.

02:42Uh I am here representing um

02:44uh Scranton Village LLC this evening. Uh

02:47so, on after the last meeting, I had uh

02:50had my laundry list of um of items that

02:53the commission wanted to see. And some

02:55things, some changes to the plans, a

02:57couple of other things. So, um well,

02:59first of all, you know, regarding the

03:01legend and uh and what we've got uh

03:04back here, we do we do it we did label

03:06it

03:07uh the silt fence and uh state hay bales

03:09on the plans. We added it to the um

03:12uh to the legend as well.

03:14Uh and also on sheet I believe sheet um

03:19uh two

03:20the plans

03:22uh we added we added the symbol for the

03:23water quality trenches, so the first

03:25storm trenches

03:27uh just for for clarification purposes.

03:30Uh another thing that we did too uh by

03:32the request of the fire marshal is we

03:34made sure all the buildings were uh a

03:36minimum of 10 ft apart. Uh so, they we

03:39did adjust uh the configuration very

03:42slightly in this area here uh and over

03:44here as well. Uh so, these uh these are

03:47uh you know, placed at that 10-ft

03:49spacing uh per request of of the uh fire

03:52marshal.

03:53Um, also uh it was requested uh that we

03:56uh uh provide a bond for erosion and

03:58sedimentation controls.

04:00Uh so uh we have a state hay bales, silt

04:03fence, silt sock, uh and the anti

04:06anti-tracking construction entrance, uh

04:09and based upon um

04:11uh the unit cost that uh the Connecticut

04:14DOT puts out uh a couple of times a year

04:16for their project, uh we have uh a a

04:19total bonding amount of $5,900

04:23uh for those items.

04:25Uh that we we also handed that in for

04:27the record.

04:29Uh the drainage report was updated. It

04:32was sent in I just modified the date for

04:35to September. Uh nothing on that

04:37drainage report had changed in in that

04:40uh drainage report actually was um done

04:44in September, but I just forgot to

04:45change the date on the cover sheet of

04:47that.

04:48Um

04:49sheet three of the plans, I had I added

04:51a a lighting plan.

04:53And uh essentially we're we're we are

04:56specifying dark sky compliant lighting.

04:59I've showed some examples uh that could

05:01be used. Uh something similar. I did

05:03note that uh these are sample lightings.

05:06Uh you know, any certified dark sky

05:08compliant lighting would be acceptable

05:10here. Uh so we've got um building

05:12mounted lightings on on the uh

05:15on uh the sheds uh and uh we've got to

05:18building mounted on the 30 by 40 uh

05:21storage building as well. Uh we did note

05:25also that um one of the one of the

05:27questions that was raised was whether

05:29the existing light on the utility pole

05:31on the site if if those were going to

05:32remain,

05:33uh and they will remain. Uh those are

05:35simply two

05:36lighting standards, the sort of the arms

05:38that come out. Uh there two of them that

05:40that put some light mostly where these

05:43where these two buildings are.

05:45Uh and and where the carousel and the

05:48warehouse uh building will be. Uh, so

05:51those those will remain.

05:54Uh, what else do we do here?

06:00Uh, I did I we did hand in some copies

06:02of some

06:04uh, of these these sheds, the style that

06:07that Josh is looking at. Uh, they could

06:09be any one of these styles, but I I

06:11believe that um,

06:13you know, these styles that we put

06:14forward really do kind of meet the

06:15flavor of what he wants to do here, so

06:17that village concept. We've got

06:20uh, the either the clapboard or the or

06:23some of them they actually have metal

06:24roofs on them. They they all have little

06:26porches on the front of them. So, I

06:29think these things would really going to

06:31be nice looking for this village sort of

06:33concept that we're going for.

06:36And lastly, the um,

06:38the metal building itself, and I had I

06:41had difficulty printing this out, so I

06:42apologize.

06:44But, it's a 30 by 40 building. It will

06:46be it's a your typical steel building,

06:49but uh,

06:51the siding will be red. It'll be a black

06:53roof.

06:54Once once again, sort of really keeping

06:57in the flavor with the agricultural

06:58concept of the site and and what I

07:01believe

07:02the town of Woodstock is all about.

07:10Regarding

07:11um, I did put together a narrative that

07:14I'm going to read instead of well, which

07:16you know, talks about

07:18the the approval conditions and things

07:20of that nature.

07:22Uh, the Scranton Village LLC has

07:24submitted an application to Town of

07:25Woodstock Planning and Zoning Commission

07:28to construct eight retail buildings,

07:30gravel parking and access,

07:32children's gold mining activity and

07:34small carousel.

07:36The new proposed retail buildings will

07:37be built shed style, installed on a

07:39block base with no foundation work will

07:41be required.

07:43If a proposed 30 by 40 metal storage

07:45building is also proposed, it will be

07:47constructed on a slab with frost walls,

07:50red siding to resemble a barn, and black

07:51metal roofing. Aside from the featured

07:54building at the site,

07:55entrance to the houses the the antique

07:57retail space,

07:59there are two additional existing

08:00buildings on the site that will be

08:01utilized as a cafe and coffee shop, and

08:04an ice cream shop.

08:06The intention of Scranton Village is to

08:07provide a casual

08:09village-like setting where patrons may

08:11shop in a family-friendly atmosphere.

08:14Site improvements will include the

08:15addition of new gravel parking areas.

08:18These areas, combined with existing

08:20parking, will provide for a total of 38

08:22parking spaces.

08:23And for ADA requirements, two paved

08:26handicap parking spaces would be will be

08:28provided.

08:30Site improvements will also include

08:31paved or concrete sidewalks throughout,

08:34which will provide handicap access on

08:36the property that is not currently

08:38available.

08:39The project will not require

08:40modifications to the two on-site septic

08:43systems.

08:44The existing northern site access is

08:46steep and narrow with limited sightline,

08:48which in the past has created concerns

08:50for emergency vehicle access. Therefore,

08:53a new 24-ft wide gravel access with

08:55paved apron will be constructed at the

08:57southern end of the site, which will

08:59significantly improve access.

09:01Grading within the right-of-way will

09:03provide extended sightline to the north,

09:05and

09:06and that would be with some minor

09:08grading along the roadside slope. The

09:10proposal has been approved by the

09:11Connecticut DOT,

09:13and documentation of that approval has

09:15been submitted as part of the record for

09:16this application.

09:18During construction,

09:20the plan proposes a row of silt fence

09:22back with staked hay bales adjacent to

09:23the wetlands in the western portion of

09:25the site,

09:26and a row of silt sock along the state

09:28right-of-way.

09:30Both of these mechanisms will serve to

09:31control any potential transport of

09:33sediment that may result from site

09:35development activities.

09:37For post-construction conditions,

09:40roof water will be directed to rain

09:41gardens that have been sized in

09:42accordance with the University of

09:44Connecticut Center for Land Use

09:45Education and Research Nemo program.

09:48Runoff from gravel parking will be

09:50directed to crushed stone water quality

09:51infiltration trenches to relieve to

09:54alleviate concentrated flow paths and

09:56the transport of sediment.

09:58The crushed stone water quality trenches

09:59will also act as a means to alleviate

10:01the potential for concentrated road

10:03runoff

10:05offsite. They are not intended to be

10:07mechanisms for detention.

10:09These soil water quality mechanisms have

10:11also been approved reviewed by the

10:14town's engineer.

10:17As a special permit use, the applicant

10:19is obligated to demonstrate the proposed

10:21use meets the intentions of the plan of

10:23conservation and development,

10:25the plan. The project meets the plan as

10:27follows.

10:28Number one, community character.

10:31The project maintains a sense of place

10:33by balancing community character while

10:35providing a means to preserve the rights

10:36of property owner.

10:38The proposed use of the property is

10:39essentially an extension of the existing

10:41use while promoting expansion within the

10:44village district. The plan encourages

10:46enhancement of the villages by promoting

10:48and developing

10:50while retaining the look, feel, and

10:51function of village in a walkable

10:53setting.

10:54Natural resources, the project does not

10:57propose any land development activities

10:59that take away or alter natural

11:01resources.

11:03Aquifers and floodways,

11:05the project will not impact aquifers or

11:07floodways.

11:09Portions of the site are are within

11:11flood zone C, which we've added to the

11:13plan. That's that heavy dotted line that

11:15you see here.

11:16That is the uh

11:17the flood zone from the FEMA mapping.

11:20Uh that's shown on firm map 090120

11:24panel 002758.

11:27Uh and no activity is proposed proposed

11:29within that flood.

11:31Land conservation, uh not really

11:32applicable to this project. All proposed

11:35activity is within previously developed

11:36areas.

11:38PA 490, not applicable to this project

11:41as the project does not contain farmland

11:42forest or open space.

11:45Retaining active agriculture or

11:47farmlands, once again, not applicable to

11:49this project. Public infrastructure, the

11:52project does not propose any

11:54improvements or modifications to public

11:56infrastructure.

11:57There will not be any significant energy

11:59consumption, will not impact public

12:01school system, and access to the site uh

12:04for emergency vehicles has been approved

12:06with the installation of the new

12:07driveway.

12:09Public safety, once again, uh access to

12:12the site for emergency service will be

12:14improved with the installation of the

12:15new driveway.

12:17Population and housing is not

12:18applicable.

12:20Balancing growth, change, and

12:21development,

12:23the project provides an opportunity to

12:25meet the goals of this section of the

12:27plan.

12:28As proposed, the existing use of the

12:30site will remain intact while allowing

12:32expansion of said use

12:34and the addition of components that

12:36provide family-oriented activities that

12:38blend well with the character of the

12:39village.

12:41The project provides a walkable setting

12:43while requiring setbacks for new

12:45structures

12:46and not allowing parking requirements to

12:49overwhelm the neighborhood or disrupt

12:50the pattern of existing development.

12:54And then finally, our growth management

12:55principle number three

12:57uh in the plan's uh talks about

12:59concentrating development around

13:01transportation nodes along major

13:03transportation corridors and to support

13:05the viability of transportation options.

13:08This project is positioned on Route 169,

13:11one of the four major roads in

13:13Woodstock, and the project is

13:14essentially a redevelopment of the

13:16property, which will retain the

13:17small-town farm-friendly character of

13:20Woodstock.

13:23The project uh

13:25uh conclusions, this project uh has

13:28addressed two of the five major concerns

13:30of the residents that are stated in the

13:32plan specifically. It preserves the

13:34town's rural character and

13:37it does not disturb any undeveloped

13:39land.

13:40Finally, your regulations for a special

13:43permit evaluation include a bunch of

13:45criteria.

13:46>> Living area.

13:47704.

13:49Rep

13:54>> Do you hear that, John? Do you have

13:55anything Who's that?

13:57>> That was

13:58someone was unmuted and and played

14:00something in the background. They're

14:01muted.

14:01>> Okay.

14:03Okay, thank you.

14:04Okay, number one, the project is in

14:06compliance with the zoning regulations

14:08of the town of Woodstock.

14:10>> [clears throat]

14:10>> Number two,

14:12it is consistent with the plan of

14:13conservation and development and the

14:15plan of open space and conservation as

14:17previously summarized.

14:19Number three,

14:21it will generate minimal off-site

14:22adverse impacts on the surrounding area,

14:24including

14:25the environment, the character of the

14:28area, including any natural, historical,

14:30and cultural features.

14:32It will not impact property values

14:35and it will not impact the reasonable

14:37use, enjoyment, and development of

14:38adjacent properties.

14:41Number four, it will neither adversely

14:43affect ground or surface waters nor

14:45endanger drinking water supplies.

14:48Number five, it has been the It has been

14:50approved by the Northeast District

14:51Department of Health and the Connecticut

14:53DOT.

14:55Number six, it does not adversely impact

14:57existing traffic conditions and sight

14:59line would be improved with the newly

15:01proposed driveway.

15:03Number seven,

15:04it will provide unhindered and improved

15:06emergency vehicle access.

15:09Number eight, it will not adversely

15:11affect public health, safety, or

15:12welfare.

15:14And number nine, it will meet the

15:15following standards.

15:17The site will have adequate landscaping

15:19and buffering.

15:20Storm water management is addressed with

15:22gardens and water quality trenches.

15:25Sufficient erosion and sedimentation

15:27controls will be implemented during

15:28construction.

15:30Lighting will be limited and dark sky

15:32compliant.

15:34No signage except for site entrance

15:35archways proposed and on-site signs.

15:39No activity is proposed within the flood

15:40plain.

15:42And finally dimensional requirements uh

15:44setbacks are met.

15:46So,

15:47I believe um

15:49that kind of covers um everything that

15:51was brought up

15:52uh last month

15:55uh Mr. Porter uh went through the uh

15:58went through my uh statement of use and

16:00project narratives. He had some comments

16:01on that uh that that I addressed um

16:05with the uh uh

16:07essentially there was some language in

16:09there that we took out and and some of

16:10the other questions he had regarding the

16:12the existing lighting and so forth. I

16:14I've addressed as well. So,

16:15I'd be happy to answer um any further

16:18questions the commission may have at

16:20this time.

16:21Do we um any commissioners have any

16:23questions?

16:25>> [clears throat]

16:25>> Joe.

16:27>> Yeah, I'm uh glad that you've

16:28incorporated

16:31all the things that I requested last

16:33time. I appreciate that. Makes the

16:35drawings a lot clearer and it makes it a

16:38lot easier

16:40for our zoning enforcement officer

16:43uh to check out the work when it's done.

16:46>> Mhm.

16:47>> Uh the only thing that I would add

16:51is uh I noticed that you put in bonding

16:55for the erosion and sediment control.

16:57>> Mhm.

16:59>> I would also like to see bonding for the

17:01infiltration trench and the rain

17:04gardens.

17:08And this is I'm not asking you to do

17:10anything different

17:12than what we asked the Country Store to

17:14do

17:15over in West Woodstock.

17:20So,

17:21as a matter of course, I think we should

17:23have bonding for

17:25all ENS practices

17:27and all stormwater management practices.

17:31And again, it's going to make it easier

17:34for John to go out and inspect

17:38and make sure that it's done properly.

17:43>> Okay, thank you, Gregory.

17:45Any other commissioners?

17:48Anybody online have any Any commissioner

17:50Doug or Joseph?

17:51>> No.

17:52>> Yeah.

17:52>> Joe's hand is up.

17:55>> Yes,

17:56thank you. First of all, I want to

17:58compliment the app- applicant and Norman

18:00for going through and addressing

18:03all the concerns raised by the public

18:05and the commission. I think it's very

18:07helpful to get all of these uh

18:10perhaps picky details resolved, but

18:13they're important to make sure the

18:15special permit process is followed. Um

18:19I also like the the fact that

18:22Norman mentioned that he spoke with the

18:24fire marshal and based on that

18:27conversation, they modified the spacing

18:29a little bit. Um I think that points to

18:31the value of speaking with the

18:35emergency services personnel in the

18:37town.

18:38But I'm wondering, Norman, is there any

18:41written note of that? Or if not, could

18:43you just send it email to John

18:47>> I do have the email. I think I think

18:49John has a copy of it as well

18:51with

18:52the fire marshal's comments and my

18:53responses to them.

18:55>> Oh, perfect. Okay, so that'll be part of

18:57the file.

18:58>> Correct.

18:59>> Great. Great.

19:01The other [clears throat] thing I wanted

19:02to

19:03comment on

19:05mostly for the applicant is if I

19:07understand it, some of those

19:09additional buildings will be rented out

19:12or leased out to other kinds of vendors.

19:14And it it First of all, is that a

19:17accurate statement?

19:19>> That's That's correct. Yes.

19:21>> Then

19:22>> It's a It's similar to what they do

19:24currently. People rent space in the

19:26existing building and they'll have their

19:28own dedicated building, whoever chooses

19:30to do so.

19:31>> Okay.

19:32Uh but those different buildings will uh

19:35have different owners. And all that All

19:37I'd like to do is make sure there's a

19:38document in the file and it can be an

19:41email saying that the applicant

19:43recognizes that any of the renters or

19:47lessees are are have to comply with the

19:50conditions of the special permit. Uh

19:53lighting, uh time hours of operation, uh

19:56signage, things like that.

20:00And that could simply be an email

20:02acknowledging that understanding that

20:05all those renters and lessees have to

20:07follow uh the conditions of the special

20:10permit.

20:11>> Absolutely. And I'm And having um

20:13another thing too, one thing I I I uh

20:16neglected to mention is that I did add

20:19on on sheet to two of the plans. We We

20:21do have the hours of operation on sheet

20:24two of the plans,

20:25uh which would be Monday through

20:27Saturday, uh 9:00 to 9:00 and Sundays

20:299:00 to 5:00. And those would be the

20:31maximum hours. Clearly, if someone's

20:34renting out a space and

20:36they want to be there 10:00 to 4:00 or

20:38whatever they want to do, I mean, that's

20:39that's uh that's their choice to do so,

20:41but those would be the maximum hours

20:43that anyone would operate.

20:45>> Yep. That That's fine. And in fact, I

20:47asked John Guskoskey about that earlier

20:49today and uh he pointed out that that

20:52was a new uh addition to the drawing.

20:54So, I'm glad to see that on there.

20:57Uh and then finally, the one last point

21:00was uh

21:01from the last meeting was about a

21:03comment or note from the Inland Wetlands

21:06Commission that there's no issue with

21:09this uh

21:10property.

21:11Was there something entered in? John, go

21:14ahead.

21:14>> I can I can speak to that if you want,

21:16Norm.

21:17So, John Gaskowski, town planner and

21:19also wetlands agent. I conferred with

21:21the wetlands chairman, Mr. Bill Rowinski

21:23about this.

21:25We reviewed the revised plans and

21:26concluded that this was a lesser impact

21:30than what was reviewed and and approved

21:32originally by wetlands. So, similar to

21:34the hours of operation

21:36this is you know, they are they are

21:39proceeding along a less

21:42extensive impact than what was

21:44originally approved. Therefore, no

21:45additional approvals were necessary and

21:48that documentation has been in entered

21:50into the file.

21:51>> And that is in the file. Okay, that's

21:52all I wanted to see that there were

21:54documents uh

21:55covering all of these verbal

21:57conversations.

21:59Okay, that was it. Thanks again for the

22:01presentation and the updated drawings.

22:05>> Thank you.

22:08>> Doug, do you have anything?

22:13>> I have to unmute myself.

22:15And also, I want to thank Norm for

22:17addressing my concerns

22:19from the last meeting and also from my

22:21concerns earlier this week. I appreciate

22:23that very much. The only thing similar

22:26to what we did with the convenience

22:28store in West Woodstock we asked that

22:31the applicant agree that the lights

22:34would go off a certain time after their

22:36normal working hours. So, they wouldn't

22:38stay lit all night. And is that

22:41something that we could

22:42the applicant would be considered

22:45for this project? Now, I think in the

22:47West Woodstock, I think we gave them an

22:48a half hour before opening and a half

22:52hour after closing.

22:54And I think that's helpful

22:57so that people can that you know, at

22:599:30 at night they know the lights are

23:01it's going to be dark again.

23:06>> I I don't I don't believe that.

23:07>> I have no problem with shutting lights

23:09off early, trust me.

23:11>> I am not asking you to do that.

23:15>> So, no, we will not be keeping lights on

23:17all night. One, nobody goes on the

23:19property, and two, out of respect for

23:21any neighbors or anybody.

23:23>> Well, and it's

23:25I appreciate that very much, but we do

23:27have another use in town that now has

23:30put up what they call seasonal lights

23:34that outline their structure, and

23:35they're on all night. Um

23:38and as most people know, I ride my

23:40bicycle early in the morning

23:42at 5:30 in the morning to see all those

23:45lights on.

23:46Um

23:47It's got to be difficult for the

23:48neighbors. So, by having the included as

23:51part of our approval

23:53conditions that the lights go off after

23:57um

23:58half hour after closing, I think that's

24:00great.

24:06>> Okay. Um sit. Uh

24:09Dr. again, Tibo. I'm going back to your

24:12presentation on July 16th.

24:15>> Mhm.

24:15>> Uh there's discussion about seating and

24:18a comment or two about lighting for the

24:21seating.

24:22What I think happened though is that the

24:24application evolved to exclude the

24:26holiday events in the train loop.

24:28>> Mhm.

24:29>> So, that's why I'm not seeing seating

24:31and seating and lighting on the

24:34plan.

24:35>> of spots. That would be number 10 on the

24:36drawing. So, it was showing a couple of

24:38scattered They would just be benches

24:40with a little bar light next to it.

24:42That's all. Nothing Nothing much.

24:44>> Okay. All right.

24:46Uh

24:48address the hours, which

24:50uh appreciate as well.

24:52Uh and then it's a little minor. Uh

24:55on the older plans, there were two

24:57drawings, both having to do with uh line

24:59of sight. One looking south, the other

25:02looking north. I think the second plan,

25:04which addresses the north, was

25:06mislabeled.

25:08Maybe that was corrected subsequently.

25:11Let's see here.

25:14That would be

25:15site line south.

25:19Site line north.

25:21Okay.

25:21>> Yeah, we're good.

25:22>> Yeah, since adjusted. All right, great.

25:25Uh

25:29So, hey John.

25:31>> Yeah.

25:32>> This council

25:35>> I'm here.

25:36>> Uh

25:37Just generally, yeah.

25:39This parcel, this application seems to

25:42have a couple different uses.

25:45Uh storage, retail commercial,

25:49uh food service, coffee {slash} cafe

25:52{slash} ice cream.

25:55Which are

25:56well identified on the plan.

25:58Is that adequate, or do we need to get

26:01more specific in the approval that says

26:03these buildings can be used for that,

26:06and that building can be used for this,

26:08or is what has been submitted clear

26:11enough for

26:13people in your seat and our seat 25

26:15years from now or so?

26:18>> Um

26:20you have to answer that question for

26:22yourself. I will say if you choose

26:26to require specificity for what each

26:29building

26:31can be used for down to the this needs

26:34to be ice cream, this other one needs to

26:35be candy, this other one needs to be

26:38t-shirts, this other one needs to be

26:41fireworks, um you're going to have a

26:43never-ending

26:45uh cycle of repeated special permit

26:48applications for modifications every

26:50time they need a new tenant.

26:52Um so similar to the hours of operation

26:56uh keeping it relatively broad and and

26:58setting essentially the outside uh

27:00parameters for how late they could go, I

27:03think um saying that the the sheds, the

27:06buildings, you know, it's in the

27:08interior will be used for

27:10you know, essentially, you know, the

27:12tourist and visitation, food service,

27:15uh retail,

27:17you know, and small-scale, you know,

27:19kiosk sort of sort of things in a broad

27:21sense allows the applicant and the

27:23commission some latitude to allow the

27:25market to, you know, all of a sudden,

27:27you know, everyone may want to have

27:29little, you know,

27:31sandal shops or something like that. And

27:33then the next season it might be

27:34something entirely different. So that

27:36would allow the applicant to move with

27:39the market as long as we're in the broad

27:41parameters of

27:43you know, small-scale retail, food

27:44service, and and what have you.

27:48>> Yeah,

27:49I thank you. I agree with what you're

27:50saying.

27:52Uh and I think also the site plan has a

27:56table or a chart on the left side that

27:58identifies the

28:01Uh I think there are 11

28:04uses of buildings which provides some

28:07clarity about what different buildings

28:10are used for. So All right, thanks. I

28:12was just curious about that.

28:16>> Um I have a question. There's nothing

28:18said about entertainment. So I assume

28:19you're not having entertainment here at

28:22all?

28:22>> That is not the No.

28:23>> Okay. I just want to We've had issues on

28:25other avenues and with that. So

28:28>> I mean, unless you unless you find a

28:29little carousel and shopping

28:30entertaining.

28:32>> No, I mean, music, live music.

28:34>> Mhm.

28:34>> I'm thinking of having something as

28:36having a band or something come in.

28:38Um

28:39and amplified music and stuff like that.

28:41I just

28:41>> I mean, I don't um

28:43I mean, to me, um

28:45you know, and you know, truth be told, I

28:47was a musician for 12 years. And, um

28:50but, you know, this is the type of

28:52setting I think it would be more of like

28:54someone playing an acoustic guitar or

28:56something like that. I mean, I don't I

28:58don't see anything like this where you

28:59would have like a band a big amplifier.

29:02>> I mean, if you're going to have music,

29:03make sure we put it in that it's not

29:05it's acoustic, it's not amplified music.

29:07>> Right. And I don't know, Josh, if that

29:08would be a problem of yours, so that

29:10>> No, it's not.

29:11>> Okay, I just I just kind of knew with

29:13the holidays playing

29:15Yeah, no, I understand. I just wanted to

29:18>> And I will I I'll I'll note, Mr. Chair,

29:20again, that that, you know,

29:22uh low level of, you know, music or or

29:27sound is considered customary and

29:29incidental to a retail use. So, if you

29:31go into a store,

29:32>> Oh, no, I I understand.

29:34>> playing, right? They don't get special

29:35permitting for that. But, yeah, it's

29:37it's the the point of the venue is not a

29:40a music venue.

29:42>> Yes, and I just, you know, it's a

29:45you know, you have Christmas music

29:46Christmas time and I mean, I can

29:47understand that. I just don't want

29:49somebody to start complaining about

29:51amplified music.

29:52>> Mhm.

29:52>> Cuz it's not amplified.

29:54>> We've had that issue before, so we try

29:56to

29:58It's hard to foresee everything that can

30:00happen, but we're trying to do our best.

30:01>> Yeah, absolutely. I I agree. I mean, you

30:04you you know, you as the commission, I

30:06know you try to anticipate, you know,

30:08every little thing and

30:09and clearly, you know, things come up

30:11with that you don't think about

30:12occasionally. You know,

30:14and hopefully, you know, if something

30:15like that does happen here, it's nothing

30:17that's like disruptive or or anything of

30:19that nature.

30:20>> Really good. Thank you. Such a nice job

30:21covering everything.

30:22>> Um

30:23>> Any more commissioners have comments?

30:25>> Yes, Aaron.

30:25>> I just have one thing about uh traffic

30:27on on site. So, you you're building a

30:31new entrance on the north, improving the

30:33sight lines and everything, obviously.

30:35Um but you're still going to use the

30:37south entrance, correct?

30:38>> Mhm.

30:38>> Is the south entrance going to be an

30:40entrance and an exit? Or is there plans

30:42to have everybody exit

30:44>> this this right here we have we have

30:46signage

30:48at this parking lot here

30:50basically you know prohibiting

30:52prohibiting people from going this

30:53direction. This is a one-way driveway

30:55this way. So

30:57the cars that that park here they can

30:59they can either you know go around in

31:01this direction kind of circle

31:03counterclockwise or just or just head

31:06out here. No one who parks in these

31:08parking spaces or in this parking lot is

31:10going to be able to utilize the northern

31:13entrance for an egress point.

31:15>> Okay. All right. Is there any way you

31:16can just put that on the drawing

31:18somewhere showing it's a one-way Is that

31:19on the plans or not? I just

31:21>> Um I mean we do have signage. Um

31:23>> Okay.

31:23>> All right.

31:24You know

31:25to to prohibit people from doing that.

31:27>> Okay. Yeah, cuz I saw that the

31:29the drive connecting the

31:31south entrance to the other parking is

31:32pretty skinny. I'm like if they have

31:33two-way traffic on that might be a

31:34>> No, that's that that would be just for

31:36this direction. We don't have any

31:37signage here really not necessary cuz

31:39people who could go there. We do have a

31:41few parking spaces here as well. But we

31:43do have two

31:45do not enter signs located right at this

31:49point at this parking lot to keep people

31:51from going down that one-way driveway.

31:52>> Okay.

31:53Thank you.

31:55>> Any other

31:56Mr. Collins?

31:58>> Um any citizen comments?

32:02>> Yes, please just state your name.

32:03>> Priscilla Powell 291 River Street.

32:07So could you go back to that map and

32:09show us cuz I couldn't see the direction

32:13of the traffic on that or yeah.

32:17>> Yeah, so [clears throat]

32:18we have we have the the new entrance

32:20that'll be located here.

32:21>> Right. Right.

32:21>> And people can come in here they can

32:22park here they can go around and park in

32:24this parking lot.

32:25Um but they have to they have to egress

32:27this way. If you're using the existing

32:30entrance you could go up this driveway

32:32if you wanted to.

32:34But there are there are do not enter

32:36signs on both sides here uh that

32:38prohibit people from this parking lot

32:40going in this direction.

32:43>> Thank you.

32:44>> And I appreciate talking about the um

32:47time to turn off the lights at night. We

32:49live right across the street and

32:52it would shine right into our bedroom

32:54windows. Thank you.

32:56>> You're welcome.

32:57>> Any other citizen comments?

32:59Yes.

33:00>> Yeah, William Hall, 1291 Route 169. Can

33:02you just tell me exactly where that new

33:05road will be? Cuz we're just opposite. I

33:08just want to know how dangerous it's

33:09going to be pulling out pulling out of

33:10my driveway in the future. You have

33:13Young's driveway.

33:14>> It's it's right it's right after the

33:16Young's driveway.

33:17>> So, how far over from the Young's?

33:19>> Uh about

33:2140 ft or so.

33:23>> 40 ft.

33:24>> Mhm.

33:24>> Okay, I'm just trying to figure out

33:26that's just about across from my

33:27driveway.

33:28>> Um it's it's not like we have we have

33:30driveways that we located that that are

33:32right here. It's not it's not directly

33:34across.

33:35>> Okay.

33:36>> Uh yes.

33:37>> Yeah, that has to move.

33:38>> No. No, we're we're just to the left of

33:40that telephone pole, left of the

33:41>> Okay, yeah. Okay.

33:43>> Yeah, so we won't have any headlights

33:45shining into our

33:46>> We are

33:47we are conscious

33:48of that.

33:49>> We are conscious of that. That's

33:50something that comes up quite frequently

33:52in these

33:52>> Oh yeah, and traffic is getting worse

33:54and worse all the time.

33:56I just wanted to just want to know where

33:57it is. Thanks for

33:58>> You're welcome.

33:59>> Anybody else?

34:01Anybody online has a comment? I Can you

34:03see anybody, John?

34:05>> Uh I don't see anybody with their hands

34:07up, but but we haven't given them the

34:08opportunity yet. So, if anyone uh wishes

34:11to speak online,

34:13you either turn your camera on, unmute

34:15yourself, or put your hand up.

34:19Jeremy Serwer.

34:23>> Uh yeah, full disclosure, I'm I'm a

34:25retail real estate broker of many years

34:28involved in uh

34:30uh uh leasing activity in retail

34:32shopping centers and I'm a Woodstock

34:34resident. Um just want to make the

34:36comment that um

34:39someone brought up about music etc. Um

34:43having been involved in a lot of

34:44shopping centers, I can tell you that

34:46when music and entertainment comes into

34:48a shopping center,

34:50unless it's very specific in writing,

34:53um that only a certain type can be done.

34:56It's not the same as

34:58saying for instance and and I

35:00appreciated uh John G's comments that

35:03you can't really say what this building

35:05can be used for and that building can be

35:06used for. That limits the market for the

35:09for the ownership.

35:10But I think you can say

35:13um

35:14in a town of this nature

35:17that if there's to be a certain

35:20uh

35:21cap to noise level,

35:23uh and or you want to define it as

35:25acoustic only, uh you know, at some

35:27point in the future,

35:30if they want outdoor entertainment and

35:32it's not specifically stated in the in

35:34the special permit,

35:36um almost anything could happen, not

35:38necessarily even this owner in case the

35:40project gets sold at a future date.

35:43So to that point, um given the noise

35:46impact of it, I would

35:48suggest that it be specific

35:51um in the special permit subject to

35:54uh

35:56John, I'm sorry, I can't pronounce your

35:57last name. Subject subject to John G's

36:00uh opinion here. I think that's I think

36:03that's an important issue.

36:06Thank you.

36:07>> Thank you, Louise.

36:11Um anybody else online?

36:17Seeing none. Um

36:20I mean, could we just put no amplified

36:22music?

36:23>> I think in the in the permit.

36:25>> Yeah.

36:25>> Mhm.

36:25>> Yeah, that's fine.

36:28>> I don't

36:29I other comments?

36:32I think we can um close this public

36:35hearing.

36:36>> I'll make the motion we close the public

36:38hearing.

36:39>> You have a second?

36:41>> I'll second.

36:43>> All in favor?

36:44>> I.

36:45>> I. Any opposed?

36:47Any abstentions?

36:49So moved.

36:51Um

36:52Now we go on to um

36:55Number five, unfinished business.

36:57Um

36:59we get to vote on this uh um special

37:02permit um number 676-04-26

37:07um with 169 Scranton Shops LLC.

37:10Um

37:12>> Mr. Chair.

37:13>> Yes.

37:14>> Joe raised his hand.

37:17>> Pardon me?

37:17>> Yes, I

37:19Yes, I was just going to make a motion

37:20to approve

37:22uh this application

37:24uh

37:25with uh conditions as noted.

37:29>> Would you like me to Well, I do you want

37:30to Do you want to second or or Are you

37:32want me to delineate uh what I would

37:34propose as motion as uh conditions?

37:36>> If you would.

37:38>> Okay.

37:39So, um based on based on discussion this

37:42evening,

37:44I would uh suggest a motion to approve

37:48the application number 676-04-26

37:54based on plans and the narrative

37:56submitted dated originally 5/15/26

38:00revised through 9/29/26

38:03for Scranton Village LLC with the

38:05following conditions:

38:07that the bond estimate for

38:11uh storm water

38:13uh

38:14improvements

38:16be increased from 5900 to include

38:19bonding for the infiltration trenches

38:21and rain gardens in an amount uh

38:24acceptable to the town planner.

38:28Second, that all lessees

38:32for the shops internal to the site must

38:35comply with the terms of the special

38:37permit.

38:38Third,

38:40site lighting

38:41other than emergency lighting

38:44shall be turned off within a half an

38:46hour after ceasing of operations in the

38:49evening

38:50and turned on no earlier than 1 half

38:52hour prior to the commencement of

38:54operations during the day.

38:56And finally, that there be no amplified

38:59music

39:00on site.

39:04>> That's that's all

39:06Like it captured everything except I

39:07just want to comment on the date. The

39:09application that I'm looking at that

39:12the most recent one shows 9/28/26

39:15and you said it updated through 9/29. I

39:17just don't want to have a date conflict

39:20somewhere in the record.

39:22>> But what I have in front of me, Joseph,

39:23says 9/20

39:25September 29th.

39:27>> An application.

39:29>> Yes. That the receipt of the final one

39:32was received.

39:33>> Okay. Well, I got this one yesterday, so

39:36I guess it was updated since then.

39:39Okay. So, it's dated 9/29 is the most

39:41recent

39:43application. Okay.

39:46Thank you.

39:49>> Okay. Do we have a second for that one?

39:51Amy seconded. All in favor?

39:54>> I.

39:55>> I.

39:56>> I.

39:57>> Any opposed?

39:59Any abstentions?

40:00So moved.

40:03Um

40:06Do we have any citizens comments

40:09before we close?

40:12Hearing none.

40:13>> Uh I

40:14>> Yes.

40:15>> I'm a citizen. of the town.

40:18You're a commissioner, you can speak.

40:21>> Yes. I just wanted to make a note for

40:24John in case you didn't know it, John.

40:28As a result of the town meeting the

40:30other night

40:33uh

40:34an ordinance was adopted

40:38regarding citations for certain

40:40violations

40:41of town ordinances and regulations.

40:44And it had a

40:46it had a fine system in it.

40:49So, that

40:51now you've got another tool

40:54in your toolbox in order to

40:57ensure our town regulations are being

41:00followed.

41:02So, take a look at that. It's quite

41:04extensive.

41:06>> Yeah, it it might be similar to the one

41:08I wrote.

41:10>> [laughter]

41:12>> Well, there was a paragraph added

41:15>> at the end, number 12.

41:17>> So, take a look at the whole thing.

41:19If you already wrote it, fine. You know

41:21more about it than I do.

41:25>> Thank you.

41:25>> That's just information for everybody.

41:27>> Thank you.

41:27>> Anything else? We have a movement motion

41:30to adjourn.

41:31>> Motion.

41:33>> John, second.

41:34Amy.

41:35All in favor?

41:36>> I.

41:37>> I.

41:38>> Any opposed?

41:40Thank you very much, everybody.

```*