2026-10-28 - Planning & Transportation Commission Regular Meeting

Summary

Built from the posted agenda and the video's YouTube auto-generated captions. Minutes are not yet posted. Some audio was unclear, so garbled figures are left out.

  • Staff reports: the City Council will next take up the permanent SB 9 and SB 450 housing ordinance, which the commission had already considered. Transportation staff reported the end of bike rodeo season, completion of the Caltrain bank stabilization at San Francisquito Creek, Council approval of quiet-zone design contracts, and upcoming outreach on South Palo Alto bike and pedestrian connectivity and Bryant and Lincoln traffic calming.
  • Study session on 60% plans for the Quarry Road Transit Connection: a transit-only extension of Quarry Road across El Camino Real to the transit center, with a protected intersection and a realigned multi-use path. The design budget rose from $878,000 by $127,000 (to about $1.0 million) for added stormwater, geotechnical, Caltrans and public-meeting scope; funding comes from Stanford, medical center development agreement funds and a regional transportation grant.
  • Staff will seek a Caltrans design exception to keep roughly 10-foot receiving lanes on the west leg, avoiding median changes and tree removal.
  • Staff offered two bike-lane treatments at the northwest and southwest corners: Option A keeps lanes at street level, and Option B raises them to sidewalk level at about $284,000 more and at least three months longer. The commission's straw poll favored Option A unanimously.
  • Commissioners asked for a color-coded diagram of all movements and volume estimates, confirmed bus queuing on the southbound off-ramp would remain, asked for no right turn on red at the protected intersection, and asked for pedestrian refuges on both sides of El Camino. They also raised wrong-way bicycle riding and long signal waits; staff said broader circulation changes are outside the project and comments will go to VTA.
  • Schedule: final design and another round of public engagement in spring, then a Caltrans permit submission, with construction possibly starting late 2027 or early 2028.
  • Public hearing on a zoning text amendment for 51 Encina Avenue Historic Building Zoning Amendment (the City Attorney noted it is a legislative item): it would expand floor-area bonus and transfer-of-development-rights benefits for Category 1 and 2 historic buildings in the CS zone. Staff said 51 Encina is currently the only eligible property, for up to 2,500 square feet of bonus floor area, awarded only after qualifying historic or seismic rehabilitation.
  • Commissioners asked about the limited market for transferred development rights and requested clearer language on floor-area ratio versus use-size limits; one suggested a historic marker. The motion to recommend the ordinance to Council, with those clarifications, carried 6-0.
  • Minutes of August 26 were approved as revised, 4-0-2, with two abstentions from commissioners who were absent.
  • The item on 531 Stanford was rescheduled to November 18, 2026; see 531 Stanford vesting tentative map. No public comments were received on the agenda items.

Agenda

  • Study session: 60% plans, Quarry Road Transit Connection.
  • Public hearing: 51 Encina Ave [26PLN-00236], zoning text amendment for historic buildings in the CS zone.
  • 531 Stanford [26PLN-00011], vesting tentative map, 20 lots, RM-30 TOD: rescheduled to 11/18/26.
  • Draft minutes of 8/26.

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

17:37you all did an excellent job finding

17:39that balance in between and the city

17:41council recognized that and appreciated

17:42the efforts uh for that project. So,

17:45thank you for for your um your diligence

17:48on that. And then uh upcoming we have uh

17:52the uh city council will take up the SB9

17:54ordinance which you've uh already have

17:56considered. Next slide please.

18:00That concludes my report. Um Azie Arce

18:04is here to uh provide a similar update

18:07for transportation.

18:10>> Thank you, Director Lei. Uh good

18:12evening, commissioners. My name is Azie

18:14Arce, senior transportation planner,

18:16providing this week's updates for OOT.

18:19Uh as the uh slide deck pulls up. Uh

18:22next slide, please. On the programmatic

18:24side, uh bike rodeo season comes to a

18:27close. Just wanted to report that uh

18:29this fall, city staff and community

18:31volunteers reached every third grade

18:32class in the PASD district. And this is

18:35for our annual bike rodeos. Students

18:37participate in this immense outdoor

18:39safety experience. And uh every year we

18:42organize around 200 parent volunteers uh

18:46including a city-f funed personal or

18:49professional bicycle mechanic on site

18:52repairing these bikes as well as uh

18:54partnering with Stanford injury

18:55prevention to provide helmet education

18:58uh uh safety programs on site as well.

19:01Thank you to all who make it possible.

19:03and I participated in one yesterday and

19:06just want to acknowledge the immense

19:07amount of work that goes into hosting

19:09these bike rodeos and it's all done with

19:12a small team. Next slide, please. Uh

19:15other transportation items, just wanted

19:17to announce that Cal Train completed the

19:19San Francisco Keto Creek Bank

19:21stabilization project early in

19:23September. Uh and this is uh a $14

19:26million project which is a joint effort

19:29between the city Cal Train and Menllo

19:31Park to provide long-term erosion

19:34control along that creek bank uh with

19:37final landscaping wrapping up next month

19:39in November. Uh additionally, uh earlier

19:43this month on October 5th, city council

19:45approved of the design contract for the

19:47quiet zones around Charleston Meadow and

19:50Churchill. So, we're excited for uh uh

19:53the advancement of those projects.

19:56Uh next slide, please. Just wanted to

19:58flag some upcoming project meetings for

20:00the community to join us on the South

20:02Palo Alto bike ped connectivity project.

20:05Uh which you all saw last month. uh

20:08currently in phase three of community

20:09engagement and there is a rail committee

20:12meeting happening on November 10th with

20:14city council review of the 15% design uh

20:18or sorry to consider advancing the

20:20project up to two alternatives to 15%

20:23design and that's on December 7th uh

20:26regarding the Bryant Lincoln traffic

20:27calming project which you also saw last

20:29month uh we are heading to city council

20:32on November 9th to request authorization

20:34to advance the project to final design.

20:38And lastly, an item you're you're

20:40reviewing tonight is the Corey Road

20:42Transit Connection Project. Uh also with

20:45the city council meeting scheduled for

20:47Monday, November 9th, following

20:48tonight's PTC recommendation. And I

20:52believe that concludes my updates. Happy

20:53to answer any questions. Thank you.

20:58>> You have questions. Commissioner G or

21:00Vice Chair G.

21:01>> Thank you, Chair. Since being back in

21:04town, I'm excited to see some of the

21:06garage updates, like driving in today

21:07into City Hall, as well as some of our

21:09other garages. I was wondering when the

21:12uh downtown garage project will come

21:15back to us.

21:18I don't have an update for you on the

21:21exact date. I don't know if there is

21:24one. Uh

21:27but we can we can check and circle back

21:29with the commission. And I know that's

21:31something that you all have asked for in

21:33the past.

21:34>> Okay. Regardless, I am excited about the

21:36updates to the downtown garages. And

21:38also, I want to make a comment about the

21:40bike rodeo. I I was lucky enough to do

21:42one when I was in third grade here, and

21:43it was very fun. So,

21:45>> really appreciate the work there.

21:49>> Okay. Uh, I do have some questions. And

21:52first of all, I wanted to thank Kelly

21:54Chaw, who's not with us in the city of

21:56Palo Alto anymore, for her work on the

21:57stream ordinance because she really did

22:00a good job listening to the community.

22:02Um, and also assistant director armor

22:04because she helped along with that too.

22:06Um, [clears throat]

22:08and with respect to the bike rodeos, I'

22:12been the parent lead on that twice, so

22:13it can attest to how much work it is. I

22:16had nightmares the night before cuz I'm

22:19What do we do with 72 third graders with

22:21bikes? Um, [clears throat]

22:24so I had a question for you, Mr. RC. I

22:27don't know if you got a chance to um

22:30find out what the process, this is a

22:32result of one of the public comments

22:34that we received from Ms. Anne Wei. Um,

22:37and the question was around when a

22:40neighborhood wants to do a traffic

22:42calming project. um and it's multiple

22:46intersections in a row. Um do they need

22:49to address a separate do they need to do

22:52a separate petition for every

22:54intersection or how can it be looked at

22:57as a whole?

22:58>> Yes, and thank you for the question and

23:01uh short answer is the form does allow

23:04for uh folks to provide uh boundaries

23:09for the area that they're wanting us to

23:11look into. So it's not we do not want

23:14residents to submit a petition for each

23:16intersection and so it would be on the

23:18application for the petition where they

23:20can note the project boundaries if you

23:22will. Um but thank you for forwarding us

23:25that that uh correspondence and uh we'll

23:28be sure to circle back if responses

23:30warranted.

23:31>> Okay, great. Thank you. I just thought

23:32that it was such a good question and

23:34have received many kind of anecdotal

23:37questions about how does this whole

23:39process work and so I thought it was one

23:41that the public might be interested in

23:42hearing an answer to. Uh that's it for

23:44me. Any other question? Oh, uh,

23:46Commissioner Templeton,

23:48>> sorry to cut cut off the thought, but

23:51before we move on, just wanted to note

23:52that there is also the city's existing

23:54311 process, uh, which also allows

23:57residents to submit uh, those more uh,

23:59specific spot location uh, treatments

24:02for us to look at. Sorry to interrupt.

24:04>> Thank you.

24:05>> You're not interrupting. Don't worry

24:07about it. [clears throat] Um, what uh,

24:10it's good to hear about the quiet zones.

24:12What's the timeline on that?

24:16I assume we'll get started on it if not

24:19by the end of this year uh early next

24:21year with the contract for the design

24:23just being approved. So

24:25>> So it won't be quiet for

24:29a year, two years, five years.

24:32>> If Yeah. If the if director uh Rio Lo

24:36wants to jump in here for more specific

24:38timeline on the actual implementation of

24:39the quiet zone.

24:43Hi, I'm Ria Huch Barrett, chief

24:44transportation official. So the quiet

24:46zone uh process is uh one where uh we've

24:50gone through a diagnostic with federal

24:53railroad administration and now we're

24:56doing the design. Um then the design

24:58needs to get um approved by the CPU, the

25:03California Public Utilities Commission

25:04and the FRA. So there's there's actually

25:06quite a lot of back and forth between

25:08multiple agencies and also Cal Train and

25:11then it will be constructed after that

25:14and then after the construction then

25:15there needs to be a post construction

25:17with all of those eight agencies there

25:19and we need need to get that approved.

25:22So it it's it's like typically a

25:25three-year process. Um but we've done

25:27part of the process already. So,

25:30>> so you're estimating it'll be

25:33>> typical is like 3 years. Um, we're

25:36trying to do it.

25:37>> But you said we we're already started.

25:38So, I don't know what the already

25:39started is deducting.

25:42>> Um, a lot of it is is kind of based on

25:48other agencies. So, it's difficult to

25:50estimate, but I'm that's kind of the

25:51typical

25:53uh

25:54amount of time that it takes for for

25:56agencies to get through all of the

25:58process. Thank you. Uh just to share,

26:00the reason I asked is when we were

26:02talking about uh suicide prevention

26:05approaches for the Church Hill

26:07intersection, um this was brought up as

26:10a solution because it would be quick.

26:12>> And so, if we're talking multiple more

26:15years, um I just thought it would be

26:16good for the public to know that. Thank

26:18you for answering. Thank you.

26:24>> All right. Uh no more questions for

26:27staff, right? All right. Uh so

26:29[clears throat] that brings us to our

26:31first item which is study session. Um so

26:34we are reviewing the 60% plans for the

26:37Corey Road Transit Connection. And it

26:40would be great if we could start with

26:41the staff presentation.

26:46>> Thank you chair. We'll just need one

26:47minute to get Senator

27:15Great. Thank you. Uh, good evening

27:18everyone. My name is Sylvia Starlac,

27:19transportation planning manager with an

27:22update on the Quarry Road Transit

27:24Connection Project. Um, I'm joined by,

27:27uh, Leslie Lowe, Stanford University

27:29transportation director. And um seated

27:33in the audience are Tylin design team

27:36members Sarah Rickman and Kevin Quiardi.

27:39This project is the first step in

27:41retooling the PaloAlto transit center

27:44for enhanced efficiency and safety. The

27:47project will extend Corey Road across El

27:49Camino Rial to connect a transit only

27:52roadway to the PaloAlto Transit Center.

27:57The goals of the project are on this

27:59slide. We are uh enhancing public

28:03transit efficiency. We're reducing trans

28:06traffic congestion. We're improving

28:07safety and convenience for cyclists and

28:09pedestrians. And we're increasing active

28:11transportation mode share by extending

28:14Corey Road to create a direct connection

28:17between the Palo Alto Transit Center and

28:18El Camino Rial for use by public buses

28:22and shuttles. And we're constructing a

28:25protected intersection at Corey Road and

28:27El Camino Rial. Um, I wanted to note

28:30that this project has many constraints

28:32that restrict the degrees of freedom

28:34that the city has to alter the design.

28:37These have to do with CALR standards for

28:39Elcominel and the need to minimize

28:41utility conflicts. The city's several

28:44roles include obtaining and managing

28:46grant funds, sharing costs with Stanford

28:48and MTC, and partnering with Stanford on

28:50design and community engagement.

28:52Next slide.

28:55As background, the project was included

28:58in the 2017 comprehensive plan and

29:00beginning in 2024, steps were taken to

29:03place a ballot measure before PaloAlto

29:05voters to undedicate a portion of El

29:08Camino Park to create a transit

29:10connection to the PaloAlto Transit

29:11Center. The project began in late 2025

29:15and the project has reached 60% design.

29:19Next slide.

29:22This is a project area map showing the

29:25site between the bus depot area and

29:28Corey Road. This site is adjacent to the

29:32Stanford Shopping Center as well. Uh

29:34currently buses enter and exit the

29:38transit center bus depot by navigating

29:41through University Circle which is on

29:43the right there of the uh photo. With

29:46the addition of the transitway

29:47connection at Corey Road, buses

29:49traveling on El Camino Rial can avoid

29:51three traffic lights they currently uh

29:54need to use to exit the depot.

29:59Um,

30:02okay. Sorry,

30:07I've lost my slide. Here we go. Uh, next

30:10slide.

30:14the bus only.

30:17Sorry, I am confused. Here we go. This

30:20is a graphic of the project's main

30:22elements. The project includes firstly

30:26the transit way at the top of the screen

30:28which includes 11 to 13 ft lane widths

30:31with 6 in curbs. Uh secondly, the large

30:35median between the transit lanes. Um

30:38that's there due to you utilities

30:40located in that space. We can't build on

30:43that. Um, and this wide median is

30:46between 28 and 33 feet wide. Um, third,

30:51the realigned multi-use path

30:54in white at the top right quadrant of

30:56this image, excuse me,

30:59um, that will be slightly uh,

31:01straightened out. And fourth, the new

31:03protected or Dutch style intersection.

31:06The next slide will um uh next slide I'm

31:10gonna talk more in depth about the bus

31:13only transit way. So if we can go to the

31:16next slide. The bus only transit way

31:18supports our goal of reliable transit

31:20times transit travel times. This is

31:23needed now because vehicle congestion is

31:25slowing buses and increasing the cost of

31:27maintaining that service. When a bus

31:29takes longer to complete a route, the

31:31transit agency needs more buses and more

31:33operators simply to maintain the same

31:35scheduled service.

31:37That creates a cycle. Congestion slows

31:40transit. Slower transit costs more to

31:43operate and limited resources make it

31:45harder to provide frequent service. The

31:47dedicated transit way reduces the number

31:49of signals for buses exiting as they as

31:51they can bypass two lights on university

31:55and one on El Camino. Together, the

31:57transit way and transit priority signal

31:59operations at the new intersection will

32:01help interrupt that cycle by reducing

32:03delay behind general traffic and turning

32:07vehicles. More reliable bus travel times

32:09allow the system to deliver the same

32:11service with fewer operating resources

32:13or to improve frequency without

32:15proportionally increasing costs. This

32:17means more reliable transit for our

32:19community.

32:21Next slide.

32:23The other design feature I wanted to

32:25highlight is a protected or Dutch style

32:27intersection. A design that makes

32:29movement safer, clearer, and more

32:30predictable for people walking, biking,

32:33taking transit, and driving. Pictured

32:35here in his example, it's an example at

32:37the Mountain View Google Plex. The

32:39design uses corner islands, protected

32:41bicycle space, bike specific signals,

32:43and pedestrian head and pedestrian head

32:46starts. Together, these features slow

32:49vehicle turns, reduce conflicts, improve

32:51visibility, and provide clearer crossing

32:53locations. Protected intersections are

32:55most useful where many modes overlap

32:57near downtowns, schools, parks,

32:59commercial areas, transit stops, and key

33:01bicycle routes.

33:03Next slide.

33:06Um, the team has engaged in has engaged

33:09the public in many ways that are

33:10described in the staff report. We wanted

33:13to highlight for you today the initial

33:15engagement of bicyclists and pedestrians

33:17who use the area. On May 7th of this

33:19year, the design team along with city

33:21and Stanford staff hosted a bicycle and

33:23pedestrian stakeholder workshop at city

33:25hall to understand current users

33:27experiences and pain points navigating

33:28through the transit center site. We

33:30heard about the need for improved

33:32signage, wayfinding and pavement

33:33markings, improvements to bike

33:35connections within the area and to and

33:38from Menllo Park. request for increased

33:40visibility for people on bikes at the

33:42Corey El Camino Rial intersection and

33:44request to retain all bicycle movements

33:46at that intersection. More details about

33:49the themes raised are detailed in your

33:51attachment B. Throughout our ongoing

33:53engagement, these themes continue to

33:55surface. Next slide.

34:01The project is now at the 60% design

34:03stage and plans are being reviewed by

34:04city staff. As the design has

34:06progressed, several unanticipated tasks

34:09have arisen. Um, increasing the original

34:11design budget of 878,000 to 1,5,000.

34:17Um, which is an addition of 127,000.

34:20The new scope items are to be funded by

34:23the medical center development agreement

34:26funds, um, Stanford University funds,

34:29and an MTC grant. Um, and those items

34:34include a storm water management plan,

34:37additional geotechnical data, CALR

34:39requirements, public meeting support,

34:41and contract contingency. Staff will

34:44bring an amendment to the cost sharing

34:45agreement with Stanford to council later

34:47this year once we've secured the

34:49additional grant grant funds by from

34:52MTC.

34:53Next slide.

34:58To obtain CALR acceptance, roadway

35:01features along or connecting to the

35:04state highway system need to conform to

35:06CALR design standards. Um, where an

35:10existing or proposed feature does not

35:12meet those standards, a design standards

35:15decisions document or DSDD is used to

35:18document and evaluate the non-standard

35:20condition and support CALR's decision on

35:22whether it can be retained. Um, in this

35:26case, we are going to have to file a

35:28DSDD.

35:30Um,

35:31and that is because the existing

35:33receiving lanes on the west leg of Py

35:35Road are approximately 10 ft wide, which

35:37is less than the current CALR standard

35:40lane width. Bringing these lanes up to

35:43standard would require reconfiguring the

35:44median and would likely result in

35:46removal of several existing trees. So

35:49the design team will need to generate a

35:50DSTD in order to retain the existing

35:52lane widths, median and avoid free

35:55removal. And this is one of the tasks

35:56that um additional scope tasks that we

35:58will need to complete.

36:01Uh next slide.

36:04As design advanced um the project team

36:07took a closer look at how the bike lanes

36:09transition through the northwest and

36:11southwest corners of the intersection.

36:14Those are the bottom corners in this

36:16graphic. They evaluated two

36:19configurations. Option A keeps the bike

36:21lanes at street level while option B

36:24raises the bike lanes to the sidewalk

36:26level at these two corners. The main

36:28difference in how each option balances

36:30the pedestrian and bicycle experience

36:32with um sorry, the main difference is

36:36how each option balances the pedestrian

36:39and bicycle experience with

36:40constructibility, cost, and project

36:42delivery risk.

36:45Next slide.

36:47Option A maintains the bike lanes at

36:49street level through the northwest and

36:51southwest corners. One of the primary

36:53advantages of this is that this option

36:55fits within the established project

36:57footprint, minimizing the need for

36:58additional utility investigations,

37:00relocations, and adjustments. From a

37:03drainage perspective, option A allows

37:05the project to maintain a more

37:06conventional layout and avoids

37:09triggering additional storm water

37:10treatment. The smaller disturbance area

37:13also helps limit environmental and

37:15permitting risk. The trade-off is that

37:17pedestrian crossing distances are

37:19slightly longer than under option B.

37:21There's also less direct um there's a

37:24less direct bicycle connection at the

37:26southwest corner. An eastbound cyclist

37:29connecting to the Stanford perimeter

37:31trail would need to make a relatively

37:33sharp right turn onto the corner ramp in

37:35order to access the sidewalk.

37:38Next slide.

37:40Option B raises the bike lanes to

37:42sidewalk level at the northwest and

37:44southwest corners. This creates

37:46additional pedestrian refuge space and

37:48shortens the pedestrian crossing

37:49distances. The raised configuration can

37:52also make bicyclists more visible as

37:54they approach and move through the

37:55intersection. However, these benefits

37:57come with additional cost and schedule

37:59impacts. Based on the current estimate,

38:02it would add approximately 284,000 in

38:05design and construction costs and at

38:06least 3 months to the project timeline.

38:09Option B would also have greater utility

38:11impacts which could require additional

38:13investigation, relocation, or

38:15adjustment. Because the bike lane is

38:17raised, drainage becomes more complex

38:20and would require a less conventional

38:22layout as well as additional storm water

38:24treatment. The larger disturbance area

38:27would also increase environmental

38:28permitting risk.

38:36Next slide.

38:41The city's pedestrian and bicycle

38:42advisory committee reviewed the concepts

38:45uh on October 1st. Feedback received

38:48included the following. Payback members

38:51identified potential pedestrian bicycle

38:53conflicts at the protected intersections

38:56shared use corners and discussed

38:57refinements such as colored pavement and

38:59detectable warning strips. They asked

39:01questions about proposed signal

39:02operations, including no right turn on

39:04red, bicycle only phasing were required

39:06and leading pedestrian and bicycle

39:08intervals. The design team committed to

39:11preparing a color-coded diagram of

39:13bicycle vehicle

39:15and pedestrian movements. Members raised

39:18concerns about cyclist visibility to

39:20right turning vehicles, adequate bicycle

39:22storage and passing space, and cyclist

39:24potentially bypassing the intended

39:25alignment by using travel lanes. The

39:28design team confirmed that option A

39:29provides approximately 6 ft of storage

39:31adjacent to the turning islands,

39:33allowing cyclists on cross streets to

39:34pass behind those waiting near turning

39:36islands. HBEC discussed the planning the

39:39planned straightening of the transit

39:41center multi-use path adjacent to the

39:43transit way and documentation of broader

39:45cycling circulation needs for the area.

39:49They conducted a straw poll showing

39:51option A is preferred by most members.

39:53Please note that payback consists of

39:55pretty experienced cyclists and this

39:58might make them more likely to prefer

39:59alternative A to alternative B. Um also

40:02the additional cost and time estimates

40:04for option B were not available when

40:07this was this information was presented

40:09to payback. Uh but they were informed

40:12that option B would cost more and take

40:14more time. We just didn't know how much.

40:18Next slide please.

40:22Through October and November, standing

40:24comm standing committees, council, and

40:25the VTA ad hoc will review the 60%

40:28concepts. Coordination with Calrans is

40:31ongoing. After plan revisions this

40:33winter, we hope to finalize design with

40:35another round of engagement in the

40:37spring for eventual submission and

40:39likely resubmission of the CALR

40:41encroachment permit. Pending CALR

40:44approval, construction could begin in

40:46late 2027 or early 2028.

40:50Thank you for your attention. We are

40:52here with the team to receive your

40:53feedback regarding options A and B and

40:55answer any questions.

40:59Um [clears throat]

41:01PTC, does anybody have clarifying

41:03questions?

41:08>> All right. Um and so then I think we can

41:11go ahead and take public comment now if

41:13there is any.

41:14>> Um the chair have not received any

41:16public comment cards. If there's any

41:17members on Zoom that would like to speak

41:18to this item, ask that you raise your

41:20hand.

41:24>> There are none.

41:25>> Okay. Then back to the commission. Um,

41:30great. Commissioner Hecman, then Aken,

41:33then Templeton.

41:36>> Uh, thank you for the staff report, uh,

41:39both in writing and in person. Uh, you

41:42know, this seems like a relatively

41:43simple project. Let's just punch a bus

41:46road through uh an unused part of a park

41:49um from El Camino to the station and

41:52save a bunch of time for commuters

41:54riding buses and in the process reduce

41:56congestion around the center. Um but uh

41:59it turns out it's it's as simple as it

42:01is to describe it's not so simple to do

42:04and uh and as reflected in the staff

42:07report there are many many many many

42:10steps uh that have to be taken and

42:13you're taking those steps not uh

42:16PaloAlto in isolation but you're

42:17coordinating both with Stanford and with

42:19Calrans and so I think that from the

42:22time of the measure D funding in 2024

42:25it's really been impressive how house

42:28staff has moved to get us to the 60%

42:30point. Uh, and I appreciate that and and

42:32I like uh what I saw in the roll out of

42:34the schedule to fingers crossed get

42:36construction started winter of 27 early

42:3828. That's all great. Um um uh in terms

42:43of uh feedback um I am persuaded by the

42:47staff explanation of the uh the uh

42:50benefits of option A compared to option

42:53B uh benefits versus detriment and also

42:57um you know take into account that the

43:00PABAC um felt similarly to that that

43:04straw poll was I think a 611 in support

43:07of a uh so uh good work uh keep it

43:10going. Um, and that's my feedback.

43:12Thanks.

43:16>> Uh, [clears throat] Commissioner Aken,

43:18>> thank you, Chair. So, I have a few

43:20questions and a few comments, too. Um, I

43:24spent some time wandering around the

43:26site yesterday and was pleased to see

43:29Calrans was out there with Surveyor's

43:31Wheel um, measuring things. And so, I

43:34asked, "Oh, what are you guys working

43:35on?" and they said, "Oh, we're redoing

43:36the intersection for pedestrians and

43:38cyclists." So, uh, CALR is doing its

43:42part. Um,

43:46let's see. Uh, knock off a few easy

43:48ones. First, uh, I second payback

43:51request for a color-coded diagram. Um,

43:54to make sure everyone understands the

43:57turning movements for all the modes. Um,

44:01as I walked the area, I also wondered

44:03whether it's feasible to have u some

44:06volume estimates

44:08so that we get some sense of which

44:10movements are actually the most

44:12important to prioritize uh if we need to

44:16uh make decisions about them.

44:19Um, a lot of bus parking on the

44:22southbound El Camino offramp. I assume

44:25given the way things are drawn that that

44:27does not change. Um, is that correct?

44:32>> Yes.

44:34>> Okay. So, those folks will still be

44:36going around University Circle, but they

44:37just need the uh they need the space to

44:40wait. Is that what's going on?

44:43>> Mhm.

44:45Yeah. Yeah. The buses need the

44:48overspace.

44:49>> Okay. Um,

44:53let's see. Um,

44:56getting to the harder questions,

44:59uh, that turn onto the, uh, perimeter

45:02trail at the southwest corner does look

45:04awkward. That was the one part of option

45:06B that I missed, uh, as I, uh,

45:10considered the the choices uh, there on

45:13the site. Um, so the two parts uh I

45:18might two pieces of feedback I might

45:20want to give on that are uh are there

45:23any small ramps we can build to help

45:25mitigate that? Um, and

45:30perhaps uh more relevant to payback. Uh,

45:33do we expect a lot of expert riders to

45:36just turn directly onto southbound El

45:38Camino rather than using the perimeter

45:41trail? Yeah, granted there's no bike

45:44lane there, but

45:46strong cyclists might want to just take

45:48the lane. So, I'm wondering if there was

45:51any um any feedback given to you about

45:55the likelihood of that happening.

45:59>> We didn't get feedback and Leslie feel

46:01free to hop in if you want. Um we didn't

46:03get feedback on that potentiality. I

46:07think we are hoping to have wayf finding

46:11so that what you suggested would not

46:13happen. Um

46:16yeah, the the other thing is if they

46:19make that right turn, they would if they

46:21don't go to the underpass, they still

46:23have the off-ramp to go to so they could

46:26access the perimeter trail once they get

46:28to that next intersection.

46:30>> Yeah, I don't know what the standard

46:32pattern would be. Uh there's certainly a

46:35lot of multidirectional bike traffic um

46:39up there near the intersection of the

46:40offramp and university.

46:43Um and I suppose that leads me to my um

46:47last difficult question which is

46:51all the paths that I saw being used were

46:55you used heavily by cyclists in both

46:58directions.

47:00So is it realistic for us to assume that

47:04um unidirectional bike paths

47:08uh are the right design? Do we need to

47:11uh do we need to anticipate that people

47:14will use them birectionally regardless?

47:19>> That's a good question. Um I'm not sure

47:20if anyone on the design team wants to uh

47:24talk about why we are proposing them to

47:27be single um direction, but I think that

47:30has to do with CALR

47:32um standards and the the need to avoid

47:37conflicts. I think

47:38>> it's a nice design as long as people are

47:40willing to obey the the constraints. I

47:43think that there's a second reason which

47:45is to do with enforcement and um

47:48allocation of faults if there's a

47:51collision. And so we want to encourage

47:53people to ride in the direction of

47:55traffic.

47:56>> And so um I guess then that raises the

48:01question of uh should there be physical

48:05diversions that make it harder to go the

48:08wrong direction?

48:10I don't know what form those might take.

48:13Um but uh

48:17simply yeah simply

48:19>> signage alone might not be enough

48:25>> based on what I saw. I mean there's a

48:27there's a lot of birectional traffic all

48:29around there.

48:32>> Yeah, we can um we can think about that.

48:35We can try to figure out how to develop

48:37a norm uh for that.

48:39Maybe we have, you know, like what

48:42Stanford does on campus, like go this

48:44way around the circle. So Stanford has

48:46some um ideas on how to get people to do

48:50the right thing, I think.

48:52>> Okay. I think those are those ideas are

48:54definitely worth pursuing.

48:57And let's see. I believe that is

49:00everything for me. Thank you very much.

49:03>> Thanks. Thanks for that. Also, I wanted

49:05to mention thank you for the ramp idea.

49:06We'll look at that.

49:11Uh, Commissioner Templeton,

49:14>> thank you. Um, great presentation and

49:16it's really exciting to see this project

49:18coming along. Um, I had a couple of

49:21questions. I I I think that, uh,

49:23Commissioner Akin's questions were

49:25really valuable and I do hope that you

49:28will take some serious thought. Um, you

49:30know, we we've seen all sorts of bad

49:32behavior even on on the side of El

49:34Camino in terms of what direction people

49:37want to go. if it's expedient, they

49:38don't they don't cross the street,

49:39right? They want they want to go the

49:41other way. Um so, uh looking into that's

49:44a really good idea. So, um the other

49:47question, uh I have two questions. One

49:49is um you mentioned that they have three

49:52traffic lights that they have to contend

49:54with uh currently what's the count going

49:57to be? Are we

50:00>> You mentioned it in a way that made me

50:02think we're going to reduce the number

50:03of lights that that the buses have to

50:05contend with. So, can you tell me more?

50:08>> So, the um there would be the one

50:11intersection, the one light if people if

50:13the buses are using the new transit way,

50:15but currently in order to get out of

50:17that bus depot, they encounter a light

50:21at uh University A on the east side.

50:25Then they travel University A and then

50:28they encounter a light to make a left

50:30turn onto El Camino. So, that's lake

50:33number two. And then they end up on the

50:35on-ramp to El Camino. And that's light

50:37number three.

50:38>> Right. And so this is going to just

50:40reduce it to one. And they're not going

50:42to have to contend with that light on El

50:44Camino.

50:44>> Correct. Because they will be bypassing

50:46that light on El Camino because they'll

50:47be going through the underpass under

50:49University Avenue.

50:51>> Cool. Um then the other question I have

50:54is um pedestrian refuges on uh crossing

50:59El Camino. Um, I can't tell if

51:05by the diagram if we have them in the

51:07middle. Um, one of the the cons that you

51:10mentioned for option A was how long it

51:13was to go across El Camino and um, we've

51:16discussed that many times here. Uh, it's

51:19a it's a very large number of lanes. Um,

51:22so is there a place where someone could

51:24stop if they started too late when

51:26crossing the road and had to stop in the

51:28middle, have somewhere to stand?

51:32>> So, right. So, there is on option A,

51:35there does appear to be a space. Um,

51:39>> is this the little gray semicircle or

51:41what is the space?

51:42>> We pull up option A just so every

51:44>> Yeah, it could be slide um you could

51:47also use slide 11

51:49which has both of them.

51:51Okay.

51:53>> So, the north leg has that space, but I

51:56don't uh there's also a little bit on

51:59the east leg as well if you got caught.

52:02>> And I would just add to this that all of

52:04this design work is pending CALR

52:07approval. Um so, CALR trend has been

52:10towards not having sign. You might have

52:13noticed like in they tend not to have

52:14the uh signal poles in the median

52:17anymore. They tend to have the long mast

52:18arm from the side and they tend also not

52:21to have pedestrian buttons in the

52:23middle. So that's that's what I've seen

52:26trending in terms of cow trends. So

52:28>> Oh yeah, I agree with all of that. We're

52:30not disputing that, but um we have seen

52:33um when when you have to cross seven or

52:36nine lanes of traffic that sometimes

52:38younger people don't make it all the way

52:40across in one light cycle um or slower

52:43people with different mobility issues.

52:45And so, um, I just was hoping to to

52:48understand right now I see this these

52:51hash mark for the, um, crosswalks and

52:53the bike lanes going all the way across.

52:56I see this kind of gray semicircle on

52:58one side. I don't see it on the other

53:00side, and I don't think it's big enough

53:01on the side it's on where somebody could

53:04wait, but people will, right? So, that's

53:08that's the thing. I'm not suggesting

53:09you'd have any kind of signaling or

53:11something that if a car were to go over

53:13that without people in it that they

53:15would hit something, but it would be

53:17nice for people that can't make it

53:19across to have somewhere to stay because

53:22they will. That's that's what I'm trying

53:23to get at. So, if if you were going to

53:26um you know, as as you mentioned,

53:28iterate on this again. I think that

53:30might be something to consider. Um and

53:33you know when you're coming from Mllo

53:34Park uh down towards PaloAlto

53:37there's an obvious space but when you're

53:39going towards um towards the mall or

53:41towards Milo from from Palo Alto there's

53:44not really an obvious place where people

53:46could stand in the current design. So I

53:51guess I would love for you guys to think

53:53about that because especially if we are

53:55going to have more people walking, do we

53:56think that number of people will

53:58pedestrians will increase like people be

54:00coming through this bus area more?

54:04>> Yeah. Do you want to talk about that?

54:07>> Hi Les, executive director of

54:09transportation for Stanford University.

54:11Um the university currently has a

54:14application in with this the county of S

54:16um Santa Clara to look at housing on

54:19that corner that's opposite of the um

54:22shopping center for 500 units. So

54:24absolutely we think there'll be more

54:26pedestrians because we want to create

54:27that synergy between

54:29>> the transit center and the housing site.

54:32I will also say that that um this

54:35intersection is also adding pedestrian

54:37and bicycle um access on that I guess

54:41northbound um if you're going north on

54:44the on the right side of the diagram.

54:47I'll say that I don't know which way is

54:49north and south on this um diagram. Um

54:51so that's a new pedestrian access

54:54crossing because right now you can only

54:56cross on the on the Menllo Park side.

54:58So, um, this will be hopefully

55:01increasing people's pedestrian

55:03experience at that intersection.

55:05>> I I think it's I think it's fantastic.

55:07The the um

55:11um I live very near an El Camino

55:13crossing right by a school that's

55:15heavily used on a bike path to several

55:17other adjacent schools. And um I'm I'm

55:21in complete earnest when I tell you

55:23people can't make it all the way across.

55:25Um so if we are adding that there and

55:28the reason that it's it's a little bit

55:31oh that's a very thin there's no place

55:32for someone to hide and wait uh if they

55:35if they stupidly cross too late uh which

55:38people do um then then maybe that's

55:41something that we hadn't thought about

55:42before that you can add in. So I think

55:44on both sides but otherwise um I think

55:46it's very exciting. I I do hope that we

55:48can figure out a way um

55:52to plan for

55:54and mitigate bad behavior um because

55:57people just do their best and they just

55:58want to cross the street and they don't

56:00think about it the way that we all think

56:01about it. So um especially if you're

56:05going to be adding some young people and

56:08maybe young families in that area

56:10additionally uh important. So thank you

56:13very much.

56:13>> Oh, thanks thanks for the comment. I

56:15just wanted to say that um

56:18the reason people get caught is because

56:21the timing is not long enough. Um and

56:24Calrans has recently shown that they are

56:26willing to work with us on timing for

56:28crossing particularly at Los Robles. So

56:31they've just extended green times. So

56:33I'm I am

56:34>> Stop. I'm blushing.

56:36So um so I so we will be you know hoping

56:40we we'll be trying to uh impress upon

56:43them that they need to adjust time uh

56:48times appropriately for the level of use

56:50that's happening here and the types of

56:52users here. That's amazing. It's very

56:54exciting to hear. I'm so glad. I know

56:55you've been working on getting that

56:57dialogue open for some time. So thank

56:59you. Uh in case I didn't explicitly say

57:01it, option A was my preference as well.

57:04was very excited to hear that. That's

57:05Payback's preference, strong preference.

57:07So, I think you'll see some um

57:09solidarity with us. Thank you.

57:11>> Thanks,

57:13>> Vice Georgie.

57:14>> Thank you, chair. Um, since we have the

57:16slides up, do you mind going to the

57:18timeline? I don't know what slide number

57:19that is. I think it's back a few at

57:21least.

57:25Yep. Okay. Thank you. I was wondering if

57:27staff could talk a little bit about the

57:30one-year gap between the measure D

57:32passing in November 5th to the November

57:343rd cost sharing agreement with Stanford

57:37as to why it took a year to get to

57:39there.

57:40>> Um, we did not have a project manager

57:42available to lead this project.

57:45>> Okay, that makes sense. And hopefully we

57:48will get some more project managers to

57:50help manage this cuz I'm very excited

57:51about this project. Um, and then can we

57:54pull up the slide with the project area,

57:56please? I don't know where that is.

57:59Okay, thank you. Um, I was wondering if

58:03staff could explain um kind of how we

58:06came up with the project area. Is this

58:08like in the ballot measure or did this

58:10just come up through the contract that

58:13city council helped negotiate? Help me

58:15understand the project area defined

58:17here.

58:18You are correct, commissioner, that the

58:21project area was defined by the measure

58:23D. It it's largely um the scope of what

58:27the um city of Palo Alto residents

58:30approved for um addressing what the

58:33transit connection was. So is what we

58:36had in the concept design plus a 10-ft

58:38buffer on either side. So it was very

58:41limited because we didn't want to um

58:44decommission any parkland that would

58:46need that that wasn't necessary for the

58:48project. And then of course it needed to

58:50extend into El Camino Riel in order to

58:54make sure that we were addressing the

58:55signal need

58:57>> and then as a follow-up question to that

58:59was there any discussion during the

59:01design about potentially connecting to

59:03other parts of downtown? So, for

59:04example, as a biker that's coming down

59:07the trail on the other side of

59:08University Circle, it's a little bit

59:10hard to navigate over here. So, is there

59:13is any kind of signage or any other

59:15projects connecting these two pieces or

59:17with other parts of downtown is that

59:19within scope for this project?

59:23>> So, no, it's not within scope for this

59:25project. However, if that is something

59:27that um council wants us to pursue, we

59:30could do that assuming we can find

59:33resources.

59:34>> Yeah. Go ahead.

59:34>> It would require an amendment.

59:36>> Can can I just um also add that there's

59:39two other projects that we are working

59:41in concert with VTA on that would

59:44address some of the commissioner's um

59:46comments. one there's um MTC is doing a

59:49wayfinding signage a pilot at this

59:51station and so I think that will help

59:53with wayfinding and um the city and the

59:57transit agencies in Stanford have been

59:59weighing in on those um concepts and

1:00:01those are supposed to roll out soon. Um

1:00:04and the second piece I'd like to mention

1:00:06is that Stamford VTA and um the city are

1:00:10also have a VTA mobility um study that

1:00:14we will be doing a larger transit area

1:00:17study led by VTA and I'm sure that will

1:00:19come to you at some future meeting.

1:00:22>> Thank you. Apologies, Miss Low. I

1:00:24actually didn't hear what you had said

1:00:25when you chimed in there. Could you

1:00:26repeat that? um in order to if we if we

1:00:30are directed to expand the scope that

1:00:32would require an amendment.

1:00:34>> Yeah,

1:00:34>> an amendment is what you said. Cool.

1:00:36Thank you. I just wanted to make sure I

1:00:38capture that and and thank you for

1:00:39explaining that further. Um what is the

1:00:41timeline do we know for these other two

1:00:43projects that are happening in parallel?

1:00:46the the signage and the Yeah, the

1:00:51>> I don't recall off the top of my head

1:00:53when the MTC is supposed to roll out

1:00:56their signage, but it's imminent. I

1:00:58think they I believe that they are

1:01:00working with a vendor to help um look,

1:01:03they already have a plan and I think

1:01:05they're just going through and figuring

1:01:06out the cost and the timeline. So, it's

1:01:09it's in our near future. I will add um

1:01:12the second the second scope of work

1:01:14which is the station area plan that they

1:01:16are working on. They are in the process

1:01:19of negotiating a contract with a um

1:01:22consultant and so that will be coming

1:01:25online pretty soon for public to go

1:01:28through their process. But yes, that is

1:01:30also um about to kick off. [snorts]

1:01:33>> Okay, cool. Thank you. because I think

1:01:35that the public may be a little caught

1:01:39off guard by how long some

1:01:40transportation projects happen. And so I

1:01:42think it's very exciting that these are

1:01:44coming pretty soon. I had another

1:01:46question about I think the slide that

1:01:48had the different lane widths and

1:01:50especially the port the portion where it

1:01:52says that the quarry road uh kind of

1:01:55left turn onto it the the entrance you

1:01:57said is shorter like less wide than the

1:02:01recommended CALR width.

1:02:04Um

1:02:05so yeah the 10 foot versus whatever is

1:02:09>> uh

1:02:11>> yeah that's slide uh 10.

1:02:13>> Yes. Uh okay thank you. Um so just so I

1:02:18understand what you said. Are you saying

1:02:20that we will have to do the median

1:02:23reconfiguration entry removal or we're

1:02:25trying to apply so that we don't have to

1:02:28do the removal?

1:02:28>> The second thing that you just said.

1:02:30>> Okay. Perfect. I just wanted to make

1:02:31sure I un understood that because it

1:02:34says removal. So I was just

1:02:36>> Yes. Sorry. We should change that to say

1:02:38potential removal.

1:02:39>> So that was my question because I think

1:02:41the words that were coming out of your

1:02:42mouth were contradicting what was on the

1:02:45on the

1:02:46>> Yes, we are trying to avoid taking the

1:02:48trees.

1:02:49>> Okay. Um that's appreciated. And then I

1:02:53had another question about kind of

1:02:54echoing what Commissioner Templeton had

1:02:56said about the slightly longer uh

1:03:00crossing for options AM and B.

1:03:02Approximately how long is that like 6 in

1:03:05longer or is this like five feet longer?

1:03:08How much longer are we are we

1:03:10approximately estimating here?

1:03:14>> Okay,

1:03:15>> we can circle back to that while while

1:03:17um staff is looking

1:03:18>> the team will look at that.

1:03:19>> Team is looking into that. Um, and then

1:03:21I just had some general comments. I am

1:03:23in agreement with Payback and my fellow

1:03:25commissioners about option A as my

1:03:27preferred for several reasons. One is

1:03:30that when I think about this

1:03:31intersection, especially with the

1:03:33housing that's going to come on this

1:03:34corner as well as the type of traffic

1:03:37that tends to come into the shopping

1:03:40center, I think a lot about pedestrians.

1:03:42And so I actually prefer having the

1:03:46pedestrians on the sidewalk and the

1:03:48bikers below mostly because then you

1:03:51won't have as much congestion. So when I

1:03:52was recently in China, we had a lot of

1:03:54bikers on the sidewalk and it was uh

1:03:56made walking pretty painful. Um and so

1:04:00as an area that I foresee to be very

1:04:02walking heavy, I think that having the

1:04:05separation there is preferred. And then

1:04:08my second comment actually is more of a

1:04:10question. I was wondering if we could

1:04:11pull up the satellite image for this

1:04:13corner because I couldn't quite wrap

1:04:15around my head uh this awkward turn

1:04:18you're talking about with the perimeter

1:04:19trail. So, if you could just kind of

1:04:20show me what that is because that wasn't

1:04:22on my radar prior.

1:04:24>> All right. You um

1:04:25>> to the I think it's the southwest

1:04:28corner.

1:04:29>> So, number slide 13.

1:04:36>> Sorry, slide 12. That's the one. I'm

1:04:39sorry. It's slide 12. So if you look at

1:04:41the um bottom right corner of slide 12.

1:04:46>> Hang on one second.

1:04:47>> Yeah. So that

1:04:48>> Yeah.

1:04:49>> Okay. So the bike lane um that is on the

1:04:53right side there that's going up the the

1:04:57graphic. If a cyclist in that bike lane

1:05:02there uh would like to turn right and

1:05:04get onto the Stanford perimeter trail

1:05:06that goes to the right off the graphic,

1:05:08they would have to turn very sharply

1:05:12right onto the um ADA ramp that you see

1:05:15there at the corner.

1:05:17>> Can I

1:05:19Okay. Okay. Wait. So, can you say that

1:05:21again? I will try to draw what I

1:05:23understood that you said.

1:05:25>> Yeah. the uh a cyclist at the

1:05:29um bike lane on the right side there at

1:05:31the uh bottom right corner um would have

1:05:34to make a I'm sorry I'm back in the bike

1:05:38lane. Your circle is further up.

1:05:40>> Okay.

1:05:40>> Um

1:05:44>> like

1:05:46Oh, I like like here.

1:05:48>> Yes. They'd have to turn a very hard

1:05:52right to get onto the um ADA ramp

1:05:54>> like this.

1:05:56>> Yes, that.

1:05:58>> I see. Okay. Um I see. So then in option

1:06:02B, because all of it is like a big

1:06:04sidewalk mush, you can just kind of like

1:06:06go over without having to do this

1:06:09>> Yeah.

1:06:09>> sharp turn.

1:06:10>> Yeah. they would already be on the on

1:06:12the sidewalk because of the ramps that

1:06:14ramp up prior to the intersection and

1:06:17they could sort themselves and get

1:06:19around the corner.

1:06:20>> Okay, thank you. And then I'm going to

1:06:24clear this so well. Okay. So

1:06:29then I also had another question about

1:06:32the

1:06:34the potent is there going to be a right

1:06:35turn on red potentially here because as

1:06:37we now have a crossing that is now the

1:06:41new crossing that we're adding like this

1:06:42this new crossing uh this right turn is

1:06:46heavily used and so I was wondering if

1:06:49there's any if there's been discussion

1:06:51about no right on red or any other uh

1:06:54potential mitigations for to increase

1:06:56the safety of this new crosswalk.

1:06:59>> We have to have no ride on red in a

1:07:01protected intersection design.

1:07:04>> Okay. Um, great. That just uh covers

1:07:07most of my questions. And um, again, I

1:07:09want to reiterate my support for option

1:07:12A. Thank you,

1:07:14>> Commissioner James.

1:07:17>> Thank you. Um, this is exciting.

1:07:20Um, uh, I certainly, uh, don't think I

1:07:25know better than the staff and the and

1:07:26the and the bikers. Uh, and and so I'm

1:07:29I, uh, am happy to kind of embrace, uh,

1:07:32a, um, I would, uh, add that I do think

1:07:36the, uh, the color-coded diagram that

1:07:38you mentioned, I think would be super

1:07:40helpful. Uh, and it's it's a little

1:07:42niggly National Geographic uh of me to

1:07:46say, but I think the directional on on

1:07:48where north is I I felt like a lot of

1:07:50people got turned around.

1:07:51>> Yeah.

1:07:51>> And I feel like on the big maps, it's

1:07:54kind of hidden in the corner. It could

1:07:55be closer to the legend or wherever you

1:07:57think it should be, but I think it's not

1:07:59here at all on the small maps. And I

1:08:00think for when it gets to council, I

1:08:02think that would be helpful.

1:08:03>> Thank you.

1:08:06>> Thank you.

1:08:09>> Yeah. Yeah.

1:08:09>> Okay. Um, can we circle back to the team

1:08:12to see if they have an answer to that

1:08:14question?

1:08:17>> If you could stand up and come to the

1:08:18mic so that people online can also hear

1:08:21you.

1:08:25>> Yes. Do I press anything or

1:08:27>> All right. Hi, Sarah Rakeman with TY

1:08:29Lynn. I'm the deputy project manager for

1:08:31this project on the consultant team. Um,

1:08:33the distance will be about 8 feet longer

1:08:37in option A.

1:08:41total.

1:08:42>> Yeah.

1:08:42>> Okay. Thank you. Um, thank you. So, I'll

1:08:47go with my comments now. I'm fine also

1:08:50with option A. My questions have mostly

1:08:53to do with bike circulation and

1:08:56connection to things that are not in

1:08:59this picture. Um, so if we could go back

1:09:03to the slide that has the yellow box.

1:09:07Um,

1:09:11so

1:09:12let me just back up a little bit. When

1:09:14we look at the appendex in the

1:09:17[clears throat] staff report, the

1:09:18appendix um showed a bunch of uh aerial

1:09:22photos with sticky notes and with

1:09:25people's comments. Um, and so that's

1:09:28where all the comments about wayfinding

1:09:30and kind of connectivity with the bike

1:09:32path uh come up. And I understand that

1:09:37right now the you're saying that the

1:09:40project scope is purely within this

1:09:42yellow area. Um, and I just want to make

1:09:46sure because

1:09:49I just want to make sure that whatever

1:09:50we do doesn't preclude whatever solution

1:09:53might come with the VTA Mobility Hub

1:09:56project. And is the VTA Mobility Hub

1:09:59project including I assume the full

1:10:02transit center as well?

1:10:05Yes. Okay. Um, and so right now my

1:10:10concern is, and maybe I'm not

1:10:13understanding exactly how the flow will

1:10:16work.

1:10:17Right now, it looks like

1:10:20we're actually slowing down

1:10:24bike traffic because if somebody is

1:10:26coming from, looking at this picture,

1:10:28the top right side, which is where the

1:10:30bike path ends, then they would have to

1:10:33go make their way through University

1:10:35Circle,

1:10:37go into Mitchell Lane, and then come out

1:10:41at an intersection.

1:10:44Yes. Right there. And at the at the end

1:10:47there where there is no road now there's

1:10:49going to be the quarry road extension

1:10:51and they're going to have to cross the

1:10:53bike only the bus only lanes and they're

1:10:56going to have to wait at a light there.

1:10:58Correct.

1:10:59>> Correct. And then when you add the fact

1:11:01that there's this oneway travel,

1:11:06um I I think it's birectional. If I

1:11:10looked at uh right at the

1:11:14top side of Elino,

1:11:15>> the [clears throat] east leg is

1:11:17birectional,

1:11:17>> right? I don't want to like the

1:11:19northwest, east, south was um confusing.

1:11:22So that's birectional and that's good.

1:11:25But then the other side isn't

1:11:28birectional. So then there could be

1:11:31really long wait times at traffic

1:11:33lights.

1:11:34>> And based on what I've seen with bikes,

1:11:38they don't always observe stop signs.

1:11:41And if there's no traffic there, they

1:11:43kind of go anyway. And so my concern is

1:11:46that if we're having if we're making

1:11:49bikes wait a substantial amount of time

1:11:53that it might

1:11:57well if the goals of the project are to

1:11:59increase or enhance safety convenience

1:12:03for cyclists and pedestrians, these long

1:12:06wait times might

1:12:09make it less convenient for bicyclists.

1:12:11And similarly, if we needed to increase

1:12:13the light time, crossing time to for the

1:12:16safety of pedestrians, that means that

1:12:17the bicyclists would have to wait even

1:12:19longer. So, I'm concerned about that.

1:12:22And I didn't know if there were any

1:12:24things that we could do. Um it might not

1:12:27be in the scope of this project, but it

1:12:29seems that it'd be really critical to

1:12:33um make sure that we didn't preclude any

1:12:37potential rerouting of the bike path

1:12:40like around the transit center for

1:12:42example,

1:12:42>> right?

1:12:43>> Um similarly, if bikes didn't have to

1:12:47wait like you know there are only so

1:12:51many buses. So if bikes were able to

1:12:54cross at a different point than right at

1:12:56the intersection and if they were able

1:12:59to go even when cars can't go um like

1:13:04somewhere between El Camino and the

1:13:07train tracks

1:13:10um

1:13:11maybe at where the exactly where

1:13:14Commissioner G has has has drawn a line

1:13:18like if is there some way that we could

1:13:21make it so that the bikes don't have to

1:13:23wait as long that the bikes aren't bound

1:13:25by the same rule. So like a bike ped

1:13:29only crossing.

1:13:32>> Yeah, that's good feedback. Um we can

1:13:34look at that. The transit center is a

1:13:36very very busy place and um we don't

1:13:39want to put bikes in the way of buses.

1:13:44So I'm I'm not sure what is feasible

1:13:47given the existing footprint that we

1:13:50have available to work with. We were not

1:13:53planning on a signal there um which

1:13:57would require it. And actually we

1:13:59probably can't even put one there

1:14:01because of the utility conflict. So

1:14:02yeah, Leslie probably has things to say

1:14:04about that. Um I just wanted to say we

1:14:07did have someone who had brought this

1:14:09idea of a cross through the the transit

1:14:11operators were opposed to it because of

1:14:15their own reason you know driver safety

1:14:17and and such and the buses will be

1:14:19queuing in those spaces. So now you know

1:14:22you'd be creating more stacking that

1:14:24could go into the transit center. Um and

1:14:26then again yeah the there are multiple

1:14:29utilities in the middle that we are

1:14:30trying to avoid with the design. Um, and

1:14:33then the other thing just to comment on,

1:14:36we we're taking all the comments that

1:14:38we've heard through this process that

1:14:40don't apply to our project and making

1:14:42sure that VTA has them for their study

1:14:45so that they're as they're looking at

1:14:47the whole of the transit center. So, we

1:14:49don't want to lose the information that

1:14:51we've gotten from the public thus far.

1:14:54um understanding that and we and we do

1:14:56tell them yes that's outside of our

1:14:58project area but we're going to collect

1:14:59your information anyway because I feel

1:15:00like it it is for the good of the order.

1:15:03>> Okay. Yeah. It's just maybe there should

1:15:05be as part of this design as it moves

1:15:07from 60 to 100 um places where you could

1:15:10pencil in a connection to a potential

1:15:13when we don't know what will happen to

1:15:15the to the bike to the designated bike

1:15:19path kind of from where the bike path

1:15:21ends through this mush of transit

1:15:24center. Um

1:15:27and then they do at some point have to

1:15:29move through or pass the yellow box. So,

1:15:33it seems like we should guess at what

1:15:36they might come up with and

1:15:39design a solution that would allow for

1:15:42that connectivity.

1:15:45>> Uh, Commissioner Aken,

1:15:49>> thank you, Chair. Let me see if I can

1:15:51draw this.

1:15:54So, there is another path here. Um

1:16:08uh so the multi-use path goes through

1:16:10here and you can uh go down University

1:16:14Circle or I suppose you could even

1:16:16negotiate going through a parking lot if

1:16:19you wished but you can reach that uh

1:16:22birectional path right at the front. So

1:16:25you don't need to add another crossing

1:16:28over the yellow area. You can just use

1:16:31this one. Does that address the sort of

1:16:34question you were you were after or not?

1:16:37>> I mean I think my concern is that

1:16:40crossing where your crossing the yellow

1:16:42area where you are uh where the red line

1:16:46is right now could be a very long wait

1:16:50for bicyclists. Um, and they

1:16:55might ignore the weight.

1:16:58>> Yeah. I mean, there's a

1:17:02You're hoping you were hoping to have a

1:17:06crossing up here.

1:17:08>> Oh, or just completely. Yes. Completely

1:17:11go around. Or or what if we were able to

1:17:13have the bike lane just go above the

1:17:15transit bus depot and around so that

1:17:18bicyclists going from Pal to Tumlo Park

1:17:22could just circumvent the whole mess.

1:17:26>> Okay. I'm just trying to understand what

1:17:27you're

1:17:28>> that I mean that would be ideal. Yes. If

1:17:30we could do the purple line,

1:17:33>> but I I don't know what's feasible and

1:17:36what's not there. But we do know that a

1:17:38lot of bicyclists come out at the start

1:17:40of the purple line and then they have to

1:17:42navigate the mess of the transit center

1:17:45and they need to continue on. And by

1:17:48adding lights there, it might encourage

1:17:51bad behavior as

1:17:53>> Yeah.

1:17:54>> Yeah.

1:17:54>> Yeah. I was curious because of course

1:17:56this segment right here flows as long as

1:18:00El Camino flows, which is most of the

1:18:02time.

1:18:04Um, so

1:18:06>> right, correct. And because the transit

1:18:09way is only going to have conflicts on

1:18:11it when there are buses, it we could

1:18:14have that be available for it could be

1:18:17green for cyclists for most of the time

1:18:19except for when the we expect movement

1:18:22into the transit way.

1:18:24>> Okay.

1:18:26>> Okay. That's all I had to suggest.

1:18:28>> Commissioner,

1:18:31thank you. Um, I I love this idea. And I

1:18:35I guess the the the the

1:18:38takeaway here is

1:18:41none of the diagrams you have presented

1:18:44tonight show that path that goes along

1:18:47behind Pali over behind town and country

1:18:50and nearly connects with this. It goes

1:18:53through that parking lot and I think

1:18:54that's what what you're referring to.

1:18:56So, um I would suggest for the purposes

1:18:59of helping people who don't live here

1:19:01but are designing this, um I would add

1:19:04that bike path in because it's really

1:19:06heavily used. Um so if if they see it,

1:19:11then they'll understand about connecting

1:19:12with it much like they're trying to

1:19:14connect with that perimeter path for

1:19:15Stanford. Um so that's one piece of

1:19:17advice is figure out how to connect that

1:19:20through and bypass as many obstacles as

1:19:22possible. Um and then we talked about

1:19:25the uh safer pedestrian crossing and

1:19:27then we talked about the connecting

1:19:29better with the pedestrian path. Are is

1:19:31it reasonable uh like do you want us to

1:19:35provide any additional guidance on that

1:19:37those objectives but because it seems

1:19:38like you understand them uh even though

1:19:41you know option A doesn't have a good

1:19:43connection to the perimeter path you

1:19:44know that you need to work on that that

1:19:46kind of thing. Is there any more detail

1:19:48you'd want from us or on these things or

1:19:50have we captured it? I think I think we

1:19:53have everything everything you're saying

1:19:55are things that we're hearing from uh

1:19:58people who use the space.

1:20:00>> Look at us speaking for the people.

1:20:03>> No, that's great. Thank you so much,

1:20:04Miss Starlac.

1:20:08I think uh commissioner vice chair G has

1:20:11a comment and then we can

1:20:14>> I actually had a question about how long

1:20:16is this light for one cycle right now

1:20:19because as I remember right because that

1:20:22the traffic that comes out from

1:20:24university circle is also a separate in

1:20:27injection into El Camino it's it's

1:20:29actually been quite long and then if we

1:20:31add no right on red the right turns

1:20:32might be long so I was just wondering if

1:20:34we have a sense of how long this light

1:20:35is today.

1:20:41>> Yeah. The like this inter the quarry

1:20:43road elo intersection that we're

1:20:44discussing right now.

1:20:48>> I think our design team can help us with

1:20:50this.

1:20:54>> Hi. Um the current cycle length at the

1:20:57intersection is 150 seconds long and it

1:21:00is coordinated with other intersections

1:21:02along El Camino Rail. So um we also

1:21:05studied sand hill road so it's time to

1:21:07be 150 seconds um with that as well the

1:21:11um actual lengths themselves um the

1:21:14various cycles are actuated so it's

1:21:15demand based

1:21:18>> thank you um I'd like to make a motion

1:21:21unless anyone else has any other

1:21:22comments

1:21:24>> if I if I can interrupt chair the study

1:21:27session item so

1:21:28>> oh right we don't need a motion point

1:21:30>> thank you So, are we good then? Do you

1:21:35need a straw poll or anything that's not

1:21:37official? We're

1:21:38>> will do a straw poll for A versus B

1:21:40because that's the clearest thing. All

1:21:42right. Um, so

1:21:47all in favor of A, raise your hands and

1:21:49we'll just sort of that's unanimous. So,

1:21:53hopefully that gives you your straw

1:21:54poll. [laughter]

1:21:55>> Thank you very much.

1:21:56>> All right, with that um then I think

1:21:59we're ready to go on to the next item.

1:22:01Thank you. Thank you for bringing us

1:22:04cool stuff like this.

1:22:09Uh okay. So this next one is an action

1:22:13item and it is uh on it's a uh public

1:22:20hearing quasi judicial item on 51 Incina

1:22:24Avenue and the PTC needs to make a

1:22:27recommendation on a zoning text

1:22:29amendment to Palatoto Municipal Code

1:22:31section 18.18.080 080 which is the

1:22:34transfer of development rights and

1:22:37section 18.16.060

1:22:40on the CS zone development standards to

1:22:43expand the floor area bonus and transfer

1:22:46of development right benefits for

1:22:47category 1 and two buildings on the

1:22:50city's historic inventory in the CS zone

1:22:53district.

1:22:58>> Yeah, thank you chair. So, um I was just

1:23:00going to make a note and I believe we

1:23:02have uh city attorney uh um Howard Yang

1:23:06on

1:23:08uh on Zoom, but this is listed as the

1:23:11quasi judicial item, but I believe it's

1:23:13more it's a legislative action and so I

1:23:15don't believe disclosures are

1:23:17>> That was my next question. Thank you. I

1:23:18didn't I thought it odd that we needed

1:23:20disclosures on this one.

1:23:21>> Yeah, I don't think we do, but uh

1:23:23perhaps the city attorney can verify

1:23:26>> that. That's right. That's an error in

1:23:28the um in the agenda for it been listed

1:23:31as quite judicial.

1:23:33>> Great. Thank you. So, it's a legislative

1:23:35item. Mr. Switzer, would you like to go

1:23:37ahead with the staff presentation?

1:23:40>> Sure. Will.

1:23:41>> All right. Well, how about we all take a

1:23:44trip to 51 and Cena?

1:23:47[laughter]

1:23:48All right. To orient oursel here, I have

1:23:51uh just the project location. So uh some

1:23:55adjacent uses to the north is the Palo

1:23:57Alto Medical Foundation campus. Uh to

1:24:00the east is the Peninsula Healthcare

1:24:02Connection. Uh to the west are some

1:24:06additional um CS that service commercial

1:24:09zone properties and to the south is the

1:24:12Town and Country Village Shopping

1:24:13Center. And for a little bit more

1:24:15context on the historic resource in

1:24:18question tonight, I have few details

1:24:21listed on the screen. Uh this is a

1:24:23category 2 historic resource. It was

1:24:25added to our inventory in 1986. The

1:24:28significance is under exploration and

1:24:30settlement. Uh it's a colonial revival

1:24:33architecture building. It was built in

1:24:351900 and some interesting history here.

1:24:39It it was built for Mary Greer O'Brien

1:24:42who was the daughter of Captain John and

1:24:44Mary Louisa Sodto Greer. And uh Mary

1:24:48Louisa Sto's actual father was part of

1:24:51the Deansza expedition. Um so if we go

1:24:54back to the 1700s, that original 240

1:24:57settlers from Spain that founded the San

1:25:00Francisco uh Presidio mission. So this

1:25:04was part of that original Mexican land

1:25:06grant in 1835.

1:25:10So on to the actual request here. It is

1:25:14to expand the bonus floor area and

1:25:16transfer of development right program

1:25:18those TDRs to a historic category one or

1:25:22two buildings in the CS zone district.

1:25:26So a little bit about the transfer of

1:25:28development right program

1:25:32the next slide. So, this was a program

1:25:35established in the 1980s with the city

1:25:37to help encourage and offset some

1:25:39historic and seismic rehabilitation

1:25:41projects in the downtown area. Um,

1:25:44subsequently since the 80s, it's been

1:25:46expanded in 2003 and 2007 with

1:25:50city-owned historic properties and into

1:25:53our south of Forest area sofa

1:25:55residential properties. There's

1:25:57approximately

1:25:5932,000 square ft of uh bonus floor area

1:26:02available on the market and this

1:26:05property would be eligible for up to

1:26:082,500 square ft of bonus floor area.

1:26:13And just on that, um the transfer

1:26:17development right program um allows for

1:26:19qualifying properties known as say

1:26:21sender sites uh to receive that bonus

1:26:24floor area um when they either preserve

1:26:26historic resources such in this case or

1:26:29complete a seismic improvement. That

1:26:31bonus floor area represents say the

1:26:33unused development potential that can be

1:26:36transferred to another property known as

1:26:38say a receiver site. Um and some other

1:26:43considerations were the comp plan

1:26:46policies that we have for adaptive reuse

1:26:48of historic resources. Um expanded

1:26:52historic incentives as well as

1:26:54encouraging innovative preservation

1:26:56approaches in our comp plan. Um this

1:26:59project would help um offset some of the

1:27:02costs for the adaptive reuse of a

1:27:05category uh 2 historic resource uh that

1:27:09may be say um scuttled by some financial

1:27:12constraints due to the lack of

1:27:14development incentives currently

1:27:15available with the city. Um a little bit

1:27:18on potential impacts to the program.

1:27:21This would be sight specific. So,

1:27:23there's currently only one eligible CS

1:27:26property, the one in question tonight.

1:27:28And staff did pull all of the properties

1:27:31in the CS zone that are over 50 years of

1:27:34age. So, there's 68. Some of those have

1:27:37been evaluated. And some of those 68 uh

1:27:40properties are air parcels. So, that

1:27:42leaves us with 46 unevaluated

1:27:45properties. So out of those 46 um if any

1:27:48of those would need to one have a

1:27:51determination to be found historic and

1:27:54to go through the process of being

1:27:56designated through city council and

1:27:57historic resources board to be eligible

1:27:59for um the same benefits that the

1:28:02current property is requesting.

1:28:07So for the sequest status here it we're

1:28:10seeking an exemption with the common

1:28:12sense uh provision and that leads me to

1:28:17the recommendation

1:28:19which is that the PTC recommend to city

1:28:23council to adopt the proposed ordinance

1:28:26by modifying those uh municipal code

1:28:29sections listed consistent with the

1:28:31applicant's request. And the applicant

1:28:34is available online for some questions.

1:28:37And with that, I can entertain any

1:28:40questions myself.

1:28:47>> Do we have any clarifying questions

1:28:48before I take public comment?

1:28:53>> I am seeing no lights. So, uh, Mr. Traa,

1:28:56are there any comments?

1:28:59>> Uh, do the chair have not received any

1:29:00public comment cards? If there's any

1:29:02member of Zoom that would like to speak

1:29:03to this item, please raise your hand.

1:29:07>> There are none.

1:29:08>> Okay, great. So, let's start with

1:29:10Commissioner James then.

1:29:14>> Um, yeah, I mean, I think this is pretty

1:29:16interesting. I love I love the uh the

1:29:18kind of innovative uh incentives and

1:29:21fundings for for uh historical

1:29:23preservation. I think that's uh uh I

1:29:26didn't know about that and I think

1:29:27that's um pretty admirable. and I loved

1:29:30reading about the history of this house.

1:29:32Um um I do have some questions about

1:29:36TDRs and and um do we know uh for a fact

1:29:40now the that the owner of this property

1:29:42would want to um not take the 2500 as

1:29:48buildable area? They want it they want

1:29:50it to be a an exchanged uh or of it put

1:29:54it on the market as a TDR if that's the

1:29:57right terminology. Well, I can't speak

1:29:59for the applicant, but based on their

1:30:00request, they're trying to seek some

1:30:02financial um kind of offsetting the cost

1:30:05of the rehabilitation. So, that would be

1:30:07implied that they would be selling that

1:30:09bonus floor area on the on the market to

1:30:12to get that. So, and they're online to

1:30:14answer a question.

1:30:16>> And do you have a sense? I mean, 32,000

1:30:18that's sort of available that kind of

1:30:20suggests there's more supply than demand

1:30:22for this. I mean, I don't want to get

1:30:24into the economics lesson, but I mean,

1:30:27you know, I guess um

1:30:30so so I was I was kind of I looked back

1:30:32to see like what the city has has sold

1:30:35some TDRs. Um and it looks like they go

1:30:40for about uh I think 300 a square foot.

1:30:43So there's this this is sort of like,

1:30:46you know, I I don't want you to accept

1:30:48my math, but just as kind of my way of

1:30:50understanding it, there's there's

1:30:51potentially like threequarters of a

1:30:52million dollars that could be sort of

1:30:56returned to historic preservation if if

1:30:59they sell the TDR or if it's exchanged,

1:31:01whatever the terminology is. So, but I

1:31:04guess so, so that's not really really

1:31:06where that math is. I don't think that's

1:31:08in the ballpark. just using what the

1:31:10city has done in that there were three

1:31:12three things I think sort of between

1:31:132015 and 2018. So I just trying to get a

1:31:16sense of like the value here and and I

1:31:19think the reason that I wanted to do

1:31:20that is I wanted to kind of make sure

1:31:23that uh there is some provision or

1:31:26assurance that that the value that would

1:31:28be uh gained from that

1:31:33would would be guaranteed to be turn

1:31:35returned to the historic preservation.

1:31:37And I didn't see anything in the

1:31:38ordinance that that so I wouldn't want

1:31:40I'm not suggesting this owner would do

1:31:42that, but I wouldn't want it be possible

1:31:44for someone to use this provision to

1:31:45strip value out of a property and then

1:31:48return a small portion of that for the

1:31:52the preservation. Does that make sense?

1:31:54>> Yes, it it does. Um just to maybe

1:31:56address a few of the things that you

1:31:58mentioned. I mean the the city doesn't

1:32:00track say the actual um cost of of the

1:32:03TDRs or say that that square footage. Or

1:32:06if you want to think about it, kind of

1:32:07bookending the process, right? We award

1:32:09it if we review a project based on

1:32:12either compliant with the Secretary of

1:32:14Interior standards, which we would be

1:32:15looking at in this case. Um, and then

1:32:18whenever that transfer does come up, say

1:32:20they find a buyer for that square

1:32:22footage, we would be doing that final

1:32:25stage of awarding that to say a subject

1:32:29site downtown that would want to use it.

1:32:31um the situation that you're describing

1:32:34wouldn't come up because the the

1:32:36property itself would have to have a

1:32:37compliant project with the Secretary of

1:32:39Interior standards in order to receive

1:32:42that that benefit of the floor area. So

1:32:46um I mean certainly they could apply for

1:32:48an application but um we would need to

1:32:51have that revised that would be

1:32:53compliant with the Secretary of Interior

1:32:54standards.

1:33:01Are you

1:33:01>> okay? Thank you.

1:33:03>> Other questions or comments?

1:33:06Commissioner Aken, then Hecman.

1:33:10>> Thank you, Chair. Yeah, not much. Uh, I

1:33:12would really like to see um

1:33:15[clears throat] this house improved and

1:33:16preserved. Um

1:33:19the location will be amusing for all

1:33:22time to come but uh but the house itself

1:33:26uh looks very much worth preserving both

1:33:29physically and for its historical

1:33:31significance. So uh however we go about

1:33:35it, it would be I think it would be nice

1:33:36to make this to make this happen. So

1:33:39really the only concerns for me are uh

1:33:43are there any potential unintended

1:33:46future consequences as other properties

1:33:49in CS um come uh designated category 1

1:33:54or two and it sounds like

1:33:58both that's not likely to be a huge

1:34:02issue and that there is a process to

1:34:04make sure that um

1:34:08the uh seismic or historic value is

1:34:12adequately preserved before um rights

1:34:15could be transferred. Um so the I guess

1:34:19the the substantive question that goes

1:34:21along with that is I think of Dames and

1:34:24Moore as having surveyed absolutely

1:34:26everything.

1:34:28So did did they identify anything in CS

1:34:31that was uh significant naturally

1:34:34significant

1:34:35>> just this property. So, um this was the

1:34:38only property that was identified in

1:34:40that kind of citywide dames and more uh

1:34:43survey. Um since then we've had some

1:34:45other development applications um come

1:34:48through that required a historic

1:34:50resource evaluation just um and

1:34:52reviewing say SQA for for those

1:34:54projects. I believe it was four or five

1:34:57that had an evaluation and they were

1:34:58determined to not be historic. though um

1:35:02that I mean remains right that the

1:35:04question say those 46 other properties

1:35:06that are unevaluated um I mean whether

1:35:09they've retained their integrity whether

1:35:11they've had building permits um you know

1:35:13that have substantively changed since

1:35:15their construction date lots of moving

1:35:18pieces would need to go forward before

1:35:21say 46 new properties would be category

1:35:24ones and twos on our inventory that

1:35:26could be available to pursue this

1:35:28expansion

1:35:30Yeah, I think you've reassured me that

1:35:32uh I shouldn't worry about this,

1:35:35but I wanted to check to make sure.

1:35:37Thank you,

1:35:38>> Mr. Hman.

1:35:41>> So, I'm I'm pretty familiar with this

1:35:42property because often when I go to

1:35:44PAMP, I go past this property and I've

1:35:47always been fascinated by the the barn

1:35:49behind the house because, you know, like

1:35:52everything's up to date in PaloAlto.

1:35:55Everything's clean. There aren't

1:35:56buildings with tarps over them, but but

1:35:59that barn behind that building is like

1:36:01you you you go by that and you're like,

1:36:04what's the story with that? Um, and so,

1:36:08you know, I understand from the staff

1:36:09report is is actually not directly part

1:36:12of of what we're looking at, but but

1:36:15mentioned in the staff report is a

1:36:16separate application to uh demo that uh

1:36:20structure. Um, so, so I I I did want to

1:36:24piggyback a little bit on Commissioner

1:36:26James's point because it's kind of a

1:36:28chicken and egg thing. If if I can sell

1:36:33my TDRs for a half million dollars and

1:36:37use that to, you know, which I don't

1:36:40have until I have it and then I can use

1:36:42that to fund the renovation. But if I

1:36:45get the money and then say, "Eh, you

1:36:47know what? I decided I didn't want to do

1:36:48the renovation. Now I've got the half

1:36:50million dollars and but this

1:36:54our TDO TDR program is older and so like

1:36:58this this issue has been

1:37:00>> dealt with

1:37:01>> dealt with somehow and so I just how

1:37:03does it work? Do you get um do you have

1:37:07to, you know, get your certificate of

1:37:08occupancy before the TDRs are issued and

1:37:11then you might have to do some

1:37:13short-term financing to to bridge until

1:37:16you can get the TDR cash from the sale?

1:37:19>> Yes. So, you would have to complete the

1:37:22uh rehab, say seismic or historic first

1:37:25and then upon completion of that, the

1:37:27city would award the that um incentive

1:37:31right for the bonus floor area. So it

1:37:33really helps offset the costs of the

1:37:35investment that the property owner would

1:37:37be putting up front. So

1:37:38>> yeah. Yeah. Okay. So that that makes

1:37:41sense. That's that's a logical way to do

1:37:43it. And like I said, you might need some

1:37:44bridge funding to to carry you through.

1:37:47Uh it does seem from this backlog of uh

1:37:51TDRs that we have 32,000 plus uh

1:37:54already, you know, basically available

1:37:56to purchase, not being purchased. Um,

1:37:58not really on topic tonight, but um, I

1:38:01think it's curious that there is square

1:38:05footage that people are not finding

1:38:08economic, uh, value to purchase to use

1:38:12downtown. Um, and so, um,

1:38:17any any gut on why that is so?

1:38:21Uh, so I I don't have an answer to it,

1:38:24but I there is um the commission may

1:38:28recall um reviewing changes to the

1:38:31downtown

1:38:33uh uh

1:38:35>> shrink wrap, put that way,

1:38:36>> the shrink wrap provision and that

1:38:39really limited uh development. So we

1:38:41have COVID and a reduction in in office

1:38:43demand downtown and then we had this

1:38:45really um restrictive shrink shrink wrap

1:38:49rule um which just you know recently

1:38:51passed through the city council. So, uh

1:38:54I think the combination of sort of the

1:38:56office market and which is what the TDRs

1:38:58can be used for and uh or commercial uh

1:39:02and um and that shrink wrap rule uh I

1:39:06think pretty much constrained um

1:39:09interest in in that program. So, uh not

1:39:13to say that it's going to pick up and

1:39:15there's going to be a demand for it, but

1:39:16uh I think those are um factors.

1:39:19>> Okay. Thank you. That's that's helpful.

1:39:21But but I I think it reflects maybe the

1:39:24reality of this concept we're talking

1:39:26about that that we're trying to

1:39:28incentivize these historic um structures

1:39:32from reinvesting and we give them these

1:39:34couple of tools. You can add more square

1:39:36footage or you can sell TDRs. But if the

1:39:39TDRs really can't be sold because

1:39:43because of other constraints on

1:39:45potential receiver sites, then we're

1:39:48only giving them the one tool. And so I

1:39:50think at some point um uh that needs to

1:39:54be uh examined to see and and maybe it

1:39:59if we are seeing the the historic

1:40:02structures rehabilitated at a good pace

1:40:04without a realistic TDR market then

1:40:07maybe it's okay that they don't have

1:40:09that tool. Um, but if we're finding

1:40:12people are not willing, you know, they

1:40:15have these sites, I can't add square

1:40:16footage. Um, and I can't realistically

1:40:20sell TDR, so I'm just got to sit on it.

1:40:22Um, then I think we have to to uh look

1:40:24at that. Um, I do note

1:40:27I'm supportive of the staff

1:40:29recommendation here. I note that that

1:40:32this already applies this, um, these

1:40:35benefits already apply to cityowned

1:40:37historic structures citywide. And I

1:40:40generally feel that if the city gets to

1:40:42do it, the private property owner should

1:40:44be able to. Um I note in the general

1:40:46plan from this uh uh excellent staff

1:40:50report that that our general our comp

1:40:53plan actually promotes that the that

1:40:56incentives be provided in all zones. And

1:40:59so uh providing them here in the CS zone

1:41:02um I think is is consistent uh with that

1:41:05as well. Um

1:41:08um I did have a couple of questions

1:41:14in the draft text

1:41:17on packet page 34.

1:41:23um

1:41:25at the top um subp part one

1:41:31seems to me

1:41:33um to conflict with 2B. 2B says all

1:41:38bonus square footage counted as square

1:41:40footage for the purpose of the project

1:41:42size limits specified in this chapter.

1:41:45But

1:41:47in one it seems to say

1:41:51um

1:41:52um the 2500 uh square foot can be added

1:41:56without having this increase count

1:41:58account count uh count toward FAR. So in

1:42:01one place it seems like it's saying it

1:42:03doesn't count and the other place it

1:42:05says like it does. And so I'm wondering

1:42:08if you if staff could look at that and

1:42:10decide if maybe some kind of clarifying

1:42:12language would be appropriate there.

1:42:16And you don't have to do that here.

1:42:18That's a feedback for staff to consider.

1:42:22Um it may not be inconsistent. I'm just

1:42:24not seeing it.

1:42:26>> Thank you.

1:42:27>> All right. And then the other one is uh

1:42:30the deleted language uh at the top of

1:42:33page 35.

1:42:36So, so, um,

1:42:40I was, you know, what's what was deleted

1:42:43is, uh, this section is only applicable

1:42:45to projects in the CD zone. We are now,

1:42:50um, if if this is approved, we're adding

1:42:52the CS zone, but but there's still the

1:42:55CN zone, which is not being added. So, I

1:42:58was wondering why are we taking this

1:43:00language out rather than adding CN to uh

1:43:05sorry CS to it so that that language so

1:43:09it clearly doesn't apply to CM.

1:43:13>> Great question. Um, so in anticipation

1:43:17of that, um,

1:43:20uh, so let's see here. We were thinking

1:43:22ahead rather than providing say a

1:43:24laundry list of what zones it could be

1:43:26provided in to kind of clean up the

1:43:28language um in in the code to just have

1:43:32it as if you go up to the sentence above

1:43:35uh the eligible sites. So it's listed uh

1:43:39explicitly in bonus floor area in that

1:43:41following section which we're not

1:43:43touching here or in these in those

1:43:45subsequent um zoning districts um that

1:43:49are that are detailed out. So rather

1:43:51than providing a list of what's already

1:43:53written out in the code um we just

1:43:56wanted to have it as eligible sites and

1:43:57then the property would know that they

1:43:59were eligible because it would be

1:44:01specified within their own zoning.

1:44:03>> Okay. So if I understand you correctly,

1:44:05today in our code, we have provisions

1:44:08similar to what we see at the top on on

1:44:10packet page 34, all this new language

1:44:12about the CD. And now we're adding this

1:44:16specific language which as it says in

1:44:17point one is about the CS, but we don't

1:44:20have anything about the CN. And so its

1:44:22absence basically means today CN doesn't

1:44:26get to use it.

1:44:27>> Correct.

1:44:28>> Okay, that that then the deletion works

1:44:30for me. Thank you for explaining it. Uh

1:44:33those

1:44:36yeah those are my comments. Thanks so

1:44:37much.

1:44:39>> Uh if I can jump in I can also just

1:44:42explain the apparent inconsistency on

1:44:45you know what counts for F. Um our

1:44:48commercial zones have limits on certain

1:44:51types of uses. So that is um

1:44:56uh that is the project size limit that's

1:45:00referred to where the F does count. Um

1:45:03so you can't if we have for example a

1:45:0510,000 foot limit on a particular type

1:45:08of establishment, you can't exceed that

1:45:10but you can have your structure be

1:45:12larger. You just establish different use

1:45:15uh in that additional square footage.

1:45:24So I I think Mr. Yang, what you're

1:45:26saying is for the reasons you just

1:45:28explained it's not inconsistent.

1:45:31>> That's right.

1:45:33[laughter]

1:45:34>> Okay. Um I'm I'm

1:45:39one's one is um

1:45:42there's a a I was just repeating sort of

1:45:45what Albert had said there. there. Our

1:45:47code has limits on how big an office

1:45:49could be. For instance, in this ES zone,

1:45:51you can't exceed that 5,000 square foot

1:45:53limit. Um, you can't use TDRs to exceed

1:45:56that limit. But your F for that site

1:45:59might be 0.4

1:46:02and you you could exceed that with the

1:46:05TDRs, but you couldn't exceed it beyond

1:46:072.0.

1:46:09>> Okay. So really then the the key I'm

1:46:12need to be focused on is is subp part

1:46:15one at the top is a reference to F

1:46:18whereas

1:46:20uh 2B is a reference to project size

1:46:23limits

1:46:25which would involve like a 10,000 foot

1:46:27cap on a particular use.

1:46:29>> Yeah. And and uh maybe what we can do is

1:46:31take a look at that and see if we can

1:46:33refine that language so where we're

1:46:34tying it back to the the land use

1:46:36limitation that's set forth in the code.

1:46:38>> Okay. I think I think that might be

1:46:40useful. All right. Thanks.

1:46:45>> Before we go, I think uh Commissioner

1:46:47James had a second round comment, but

1:46:49didn't know if anybody else had first

1:46:50round before we do that.

1:46:52>> Go ahead, Commissioner James.

1:46:55>> Just one other thought, um, which is

1:46:57that for me the the most uh uh

1:47:03interesting part of this of this

1:47:05historical structure is kind of the

1:47:07narrative history. Um, I actually find

1:47:09it a little more compelling than the

1:47:11architectural, you know, nature of the

1:47:13of the building itself. Um, and I feel

1:47:16like if we're going to this trouble to

1:47:19try and incentivize it for the

1:47:21betterment of the public, it would be

1:47:22kind of great if we could um require or

1:47:26encourage a historical marker because

1:47:28most of the public is not going to know

1:47:30that history walking by that by that

1:47:32house. But it would be kind of great and

1:47:34particularly because it's so far out of

1:47:36context, right, with all the other

1:47:37buildings around it. It's like you kind

1:47:39of look at it and go, "What's that?" And

1:47:41it would be really great if if we

1:47:44weren't if we were kind of celebrating

1:47:46that history and the reason that we are

1:47:48trying to incentivize preserving it. I

1:47:50think it is as much or more narrative

1:47:52than it is architectural style. I don't

1:47:56know if we can do that or not. if we

1:47:58would be willing to kind of add that to

1:48:00the to the um uh you know it could be

1:48:03just an ask a suggestion.

1:48:08It's been suggested that that I should

1:48:09offer this as a suggestion. [laughter]

1:48:11Okay, I'm happy to do that.

1:48:13>> Well, just to uh put a few thoughts here

1:48:15in in the discussion. I the applicant is

1:48:18online so they are listening. So, I

1:48:20think that's a great suggestion and

1:48:22staff will work with them when they

1:48:24apply uh for that rehab project to see

1:48:27what they can propose.

1:48:31>> All right. I'm not seeing any other

1:48:33lights. So, would somebody like to make

1:48:34a motion?

1:48:37>> Um like my light's still lit. Let's I

1:48:41I'm I uh move that we approve um the

1:48:44amendment as proposed by staff.

1:48:49Second.

1:48:51Any additional discussion?

1:48:54>> Okay, Mr. Tivera, could you call

1:48:57interrupt?

1:48:58>> Sorry.

1:48:58>> See the light. Sorry. Sorry.

1:49:00>> The clarifications discussed by

1:49:01Commissioner Hecman are assumed.

1:49:06>> Okay. Thank you. and and and let's just

1:49:08make that clear for the record that the

1:49:10vote was uh includes the uh Commissioner

1:49:13Hecman's refinement to the use category

1:49:17um F point that we discussed.

1:49:21>> Yeah, maker and secondary.

1:49:23>> Um I'm with that. I'll accept.

1:49:25>> Okay, great.

1:49:28>> Now, any other questions or discussion?

1:49:32>> All right, Mr. Divera, could you please

1:49:34call the vote?

1:49:35>> Commissioner Aken. Yes.

1:49:37>> Commissioner Hecman.

1:49:38>> Yes.

1:49:39>> Commissioner James.

1:49:40>> Yes.

1:49:41>> Commissioner Templeton.

1:49:42>> Yes.

1:49:43>> Vice Chair G.

1:49:44>> Yes.

1:49:44>> Chair Chang.

1:49:45>> Yes.

1:49:45>> Motion carry 6.

1:49:49>> Thank you. All right. So, next we have

1:49:52the approval of minutes uh for the draft

1:49:56and summary minutes for August 26th.

1:49:59>> Uh and to the chair, I just did want to

1:50:01note that uh Commissioners Templeton and

1:50:03Vice Chair G were absent for that

1:50:04meeting. So when we vote if they could

1:50:06abstain

1:50:08>> and Okay.

1:50:11Any comments? Anybody? Any public

1:50:12comments?

1:50:15>> To the chair. We have not received any

1:50:16public comments for this item.

1:50:19>> Do we have a motion?

1:50:22>> I'll move approval as revised.

1:50:24>> Second

1:50:26discussion.

1:50:28All right, let's take that vote.

1:50:31>> Commissioner James,

1:50:32>> yes. Commissioner Aken,

1:50:34>> yes.

1:50:35>> Commissioner Templeton,

1:50:37>> abstain.

1:50:38>> Commissioner Hecman,

1:50:39>> yes.

1:50:40>> Uh, Vice Chair G,

1:50:41>> abstain.

1:50:42>> Uh, Chair Chang,

1:50:43>> yes.

1:50:43>> Motion carries 402.

1:50:46>> Okay.

1:50:48Uh, now we're on to commissioner

1:50:49questions, comments, announcements, or

1:50:52future meetings and agendas.

1:50:56I don't see any lights, but I have a

1:50:58quick question. Um, so I have a question

1:51:01for well I would kind of wish this is

1:51:04director armor were here but maybe uh

1:51:06Mr. Da can also answer this. [laughter]

1:51:10Sorry. Sorry director but maybe you

1:51:13could just pass this message on to on to

1:51:15her. Um so when we receive public

1:51:21comment

1:51:23um that is that kind of requires a

1:51:27response or asks for a response often

1:51:30from staff. What is the protocol that we

1:51:33go through um before that's in the

1:51:38process right now? I think Mr. Tivera is

1:51:40batching that for us and then these

1:51:43things are coming sometimes only to the

1:51:45PTC inbox but really they should be

1:51:48directed to

1:51:51a relevant staff member.

1:51:53Um what's the process for getting to

1:51:57that relevant staff member?

1:52:00>> Yeah, so I believe we monitor that uh

1:52:02mailbox and I believe uh assistant

1:52:04director Armor does look at those and

1:52:06and uh Sam does too. So where things

1:52:09come in that and we have this for a

1:52:12similar format for the city council

1:52:13mailbox. Um we monitor that and then we

1:52:16send an email to um the staff person to

1:52:19follow up uh on that. We don't usually

1:52:23um include the um uh PTC in that reply.

1:52:28Similarly, we do not um include the city

1:52:32council when we respond to those city

1:52:33council mailboxes just to keep the

1:52:36traffic, you know, done. But we we do

1:52:38follow up on those. So I would say if

1:52:40there is one that you see and you don't

1:52:42need to do this, but from time to time

1:52:44if you are curious, hey, did staff ever

1:52:45follow up on this? You can certainly

1:52:47shoot us an email and we can we can let

1:52:48you know what this

1:52:49>> Okay. Thank you. And then is that done

1:52:51timing wise? Is that done? So a lot of

1:52:54times we don't receive like if for

1:52:58example there's a twoe gap between our

1:53:00our last meeting and our next meeting we

1:53:03might not receive the comments

1:53:06um that are

1:53:08like there's no urgency I would imagine

1:53:11for Mr. Tivera to be batching them for

1:53:13us. But if there isn't that urgency, is

1:53:17somebody still reviewing these comments

1:53:19on a regular basis um kind of in that

1:53:23two week interim?

1:53:25>> Yeah, we're not waiting for the twoe

1:53:27batch to to look at the emails. We we

1:53:29monitor that

1:53:30>> and they get forwarded on to and then

1:53:32they'll get forwarded on to not just

1:53:36planning staff but transportation staff

1:53:37if it's relevant. Correct.

1:53:39>> Correct.

1:53:39>> Okay. Thank you.

1:53:41>> And if there's like project specific

1:53:43questions for an item coming before the

1:53:45PTC, those will go to the project

1:53:46planner. But again, we don't want to

1:53:48engage this the commission in a dialogue

1:53:50about that.

1:53:51>> Yeah. No, I I just uh this last batch

1:53:54had three or four transportation

1:53:57specific

1:53:58um questions that kind of requested a

1:54:01response and it wasn't on something that

1:54:03was coming to PTC and it wasn't really

1:54:05something that PTC could answer either

1:54:08because they alluded to prior action

1:54:10taken with in this case office of

1:54:13transportation. So yeah.

1:54:15>> Okay.

1:54:16>> Can I can I just add to that? I mean the

1:54:20P2C is not the

1:54:23appropriate customer service channel for

1:54:26these departments as well. We are an

1:54:28escalation point and visibility point.

1:54:31Um but I don't think that we are the

1:54:34primary ingress to reaching staff. So I

1:54:39think you know just I not for you I'm

1:54:41not telling I I know we know here but

1:54:43just to say for anybody who's in the

1:54:45public that wants to um reach out to us

1:54:48what what what we want to do is engage

1:54:50the public on things that are coming

1:54:52before this commission. Um if somebody's

1:54:54reaching out about something that's not

1:54:57in front of us needs to reach staff. It

1:54:59sounds like that's being handled and

1:55:01it's good to verify that.

1:55:03uh just you know make sure if you're out

1:55:05there in the public um that our domain

1:55:08is generally what's in front of us or to

1:55:11escalate and make sure there's

1:55:12visibility on issues that are being

1:55:14raised.

1:55:14>> Right. And through the chair, sorry to

1:55:16cut in. Um the specific messages you

1:55:19referred to in dispatch, um just like in

1:55:21other times, um those were forwarded to

1:55:23office of transportation. Uh Director

1:55:25Armor was aware of them and we made sure

1:55:27that they got them so that they could

1:55:29reply to those people that were

1:55:31requesting feedback or comment.

1:55:34>> Right.

1:55:35Thank you.

1:55:38>> Uh we've got Vice Chair G and then Yeah,

1:55:40Vice Chair G. So I guess that might be

1:55:44an indication to staff that maybe the

1:55:46public isn't finding the appropriate

1:55:49ingress that we are having. So I'm not

1:55:51sure what that looks like, but maybe it

1:55:55means advertising the email for

1:55:56transportation to user or something. I

1:55:58don't know. Just food for thought since

1:55:59they're coming our way.

1:56:01>> Uh you know, we've talked about this

1:56:03before and we have never had the

1:56:05privilege of having director late here.

1:56:07So, now's the chance for us to just make

1:56:11sure, you know, uh, we really want this

1:56:15whole emailing scenario thing to be

1:56:17worked out. And we keep, um, being told

1:56:19it can't handle the truth. No, I'm just

1:56:22kidding. Um, they we keep being told

1:56:24that they they don't know how to manage

1:56:26um, groups and aliases uh, and having

1:56:29public access. So, what we're asking for

1:56:33and and this was very subtle. Uh, Vice

1:56:36Chair G, I appreciate that so much. Um,

1:56:39is if people were to write in to the

1:56:42planning commission, but probably should

1:56:44be also made aware through a we've

1:56:48received your email. Here's an

1:56:50autoresponse of other ways to

1:56:52communicate with us. That would be

1:56:54great. The reason that they're bypassing

1:56:56that because that doesn't exist. they're

1:56:59going directly to all of us and they're

1:57:00not getting that kind of um you know

1:57:03autoresponse from the body if that makes

1:57:05sense.

1:57:06>> So emails are coming into the PTC

1:57:08mailbox, no response because it's

1:57:10related to something or or not issues.

1:57:13>> Yeah. Uh and then they'll follow up

1:57:14individually with uh commissioners on

1:57:17>> they bypass it. Well, or they sometimes

1:57:19bypass it or they just direct copy based

1:57:22on

1:57:23>> the emails that we have on the PTC

1:57:25website and our bios and contact

1:57:27information because

1:57:30>> well, so full disclosure to everybody

1:57:32else. So, I've been

1:57:34director late heard this because we

1:57:36mentioned some of this in the um I

1:57:39mentioned some of it at the work plan

1:57:42>> uh presentation to council, but also

1:57:45I've been emailing with Chris Jensen

1:57:48uh to try and understand within the

1:57:53limits of Brown Act and public

1:57:54disclosures of public comments, how can

1:57:57we be more responsive to the public and

1:57:59they're [clears throat] working it out.

1:58:02Yeah.

1:58:02>> Okay. Uh, thank you for the comment.

1:58:04I'll I'll follow with Jennifer and

1:58:06>> responder

1:58:08for generic inboxes that has your

1:58:10generic inboxes, too. [laughter]

1:58:12>> Thank you.

1:58:16>> All right. Uh, any other comments or

1:58:19questions from commissioners?

1:58:21Okay. And now it's time for virtual

1:58:24public comment on items that are not or

1:58:28were not on the agenda tonight. Is there

1:58:30anybody who would like to speak?

1:58:32>> Uh if there's any members on Zoom that

1:58:34would like to speak uh for virtual

1:58:36public com.

1:58:40>> There are none.

1:58:41>> Okay, great. Uh so with that we are

1:58:44ajourned. Thank you everyone.

```*