2026-10-20 - Finance Committee Regular Meeting
Summary
Based on auto-generated captions; names, numbers and speaker attributions may be misheard. The recording starts at 1:59 with about ten minutes of hold music and technical checks; the chair called the meeting to order at 12:16, and the recording ends at 2:15:29, right after adjournment.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Electric Grid Modernization Revenue Bonds | 75 | 61% |
| Regional Water Quality Control Plant Reserve Policy | 45 | 37% |
| Other business | 3 | 2% |
- Tuesday, October 20, 2026.
- All three committee members were present (Council Member Burt, Council Member Lu and Council Member Lauing).
- Adjourned at about 2:15:29 on the recording.
- Both action items passed 3-0.
Electric Grid Modernization Revenue Bonds
13:05-1:27:56
- Staff asked the committee to recommend that the Council authorize the City's first electric revenue bonds, not to exceed $100 million, with a cap of 6% on the true interest cost (down from 6.5% in the earlier report), to be sold by negotiated sale with JP Morgan as underwriter.
- Staff direction also holds the revenue requirement to the equivalent of a one-time 1% electric rate increase, which matches the Utilities Advisory Commission's guardrail. About $7.2 million a year in debt service is the ceiling for that; staff said the plan may shrink toward $85 million if rates rise.
- This is the first of three planned tranches (about $330 million in all); projected spending through fiscal 2029 is $123.5 million, including $28.7 million already spent and eligible for reimbursement. Sale targeted for mid-January 2027, with Council consideration in early December.
- The financial advisor said rates rose about 60 basis points since late July, then fell about 20 in the last week; they remain below 45-year averages. A triple-A rating is considered unlikely for an electric utility; double-A is the target, and a single-A rating would add roughly 5 to 15 basis points.
- Toolbox for a rising market: reduce the size, shorten the final maturity, delay the sale, shorten the call period, or borrow from the electric special project reserve (which could hurt the credit rating).
- Council Member Burt and Council Member Lu asked staff to explain more clearly why the work is needed (aging 1950s and 1960s transformers, reliability, electrification) before the Council hearing; Council Member Lu also asked about oversight of the tools and about using reimbursement to the capital reserve as a lever.
- Reserves: the capital reserve is about $5.9 million against a target of over $7 million (the Council set a temporary lower guideline); the operating reserve is about $54 million against a $38 to 76 million target.
- Public comment: one resident, Hamilton H., supported the full $100 million, a 10-year or shorter call, and opposed delaying the sale as a gamble. Members echoed concern about trying to time the market.
- Motion to forward the staff recommendation (as revised in the supplemental memo) carried 3-0. The item must go to Council as an action item (not consent) under state law because it exceeds $100,000.
Regional Water Quality Control Plant Reserve Policy
1:30:06-2:15:15
- Public Works staff and consultants presented a new reserve policy for the regional wastewater treatment plant; the existing policy is more than 30 years old and has no way to collect reserve contributions from the partner agencies.
- Recommended reserves: operations and maintenance (20% of annual operating cost plus 100% of the minor capital authorization), capital (average annual five-year capital plan plus 10 to 20% of debt-funded projects), and debt service (matching loan covenants). The rate stabilization reserve would be eliminated.
- Initial target is $34.4 million by fiscal 2033, phased in over five years at a fixed percentage increase starting fiscal 2029. Current reserves are about $7.8 million, of which about $2.6 million is rate stabilization.
- A 10-year phase-in would not meet debt covenants once the secondary treatment project is complete in 2029, according to staff.
- Rate impact: utilities staff modeled about 1.9% a year for Palo Alto sewer customers (roughly $1.67 a month on a typical residential bill), cumulative over five years.
- Members asked for modeling of a phase-in between 5 and 10 years, more flexibility (for example a 5 to 20% capital range, or funding the debt reserve faster than the others), and a question about moving partners from quarterly to faster billing, which would need contract amendments with all five partners.
- No public comment.
- Motion to approve the framework (recommendations 1 and 2, plus a tentative five-year phase-in as item 3) for the Council carried 3-0. Staff will return to the committee with additional scenarios.
Other business
12:16-13:03, 2:15:15-2:15:29
- Roll call and general public comment (none requested in person or online); adjournment.
Agenda
Finance Committee regular meeting (agenda via PrimeGov).
Sources
- Video: https://youtube.com/watch?v=CC-dZp62BgM
- Agenda: https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=20562&compileOutputType=1
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
01:59Mhm.
03:38>> Passing.
03:40>> Hi, I'm here. I can hear you. Can you
03:41hear me?
03:42>> Yes, I can hear you. Thank you. We'll
03:44come down right now for um passing.
05:49>> Mhm.
07:44>> Mhm.
09:39>> Mhm.
11:34>> Mhm.
12:16>> Good afternoon. I'd like to welcome you
12:18all to the Finance Committee meeting of
12:22uh the 20th of October of 2026.
12:25Uh the clerk will please call the roll.
12:28>> Council member Bert.
12:29>> Here.
12:30>> Council member Lu.
12:31>> Here.
12:32>> Council member Lowing.
12:34>> Here.
12:34>> All present.
12:35>> Okay.
12:38First off, we'll see if there's any
12:39public comment of items not on the
12:41agenda.
12:42>> We do not have any requests to speak for
12:44in-person general public comment.
12:48>> Okay, and we'll do oral or offline at
12:51the end of the meeting.
12:52Okay.
12:54So, we have a couple of
12:55media items today.
12:57Um
12:59something to do with $100 million in
13:01bonds, so we'll turn this over to
13:03Director Light.
13:05>> Uh good afternoon, Chair, committee
13:07members. My name is Lauren Light, the
13:09Chief Financial Officer for the city.
13:10This is a really important and exciting
13:12item before you. Um through our budget
13:15and also our planning for capital, we've
13:17talked about the critical infrastructure
13:19improvement for a grid modernization,
13:21right? Updating the aging infrastructure
13:24and also expanding for the increasing
13:26demand. So,
13:28the time is here and now. We actually
13:30are going to talk about financing. We've
13:32talked about it for a bit. Um,
13:34and I think importantly as you know, but
13:36for the sake of the committee members
13:39and also for the sake of the community,
13:42we are being very strategic and smart.
13:44You may recall we're doing three
13:45tranches. What that means is that we're
13:48only going to borrow what we need when
13:50we need it. It also helps us deal with
13:53um, rates because they vary. And so,
13:56that helps us also address the
13:57volatility and the concerns around
13:59rates. So, wanted to set the table there
14:01with that. Appreciate the utilities
14:03advisory committee 2 weeks ago. They had
14:05a really robust conversation on this
14:08topic.
14:09Um, really diving into financing, but
14:12importantly also is the impacts on rates
14:14and ratepayers, right? There's a lot of
14:16concerns around that. Really appreciated
14:18that conversation and also they uh, they
14:20helped us put guardrails around what
14:23we're doing.
14:25Uh, we sharpened our pencils some more
14:26and staff has submitted a supplemental
14:28report to incorporate some of that
14:31feedback.
14:32Staff continues to talk internally to
14:35look at what is realistic um, and what
14:38is imperative. Um, what is imperative
14:40from the utilities team perspective is
14:42that we need cash flow in early 2027.
14:46Um, that's really important.
14:48Um, with that said, we also want to
14:49acknowledge, you know, the impacts on
14:52rates. The UAC has put a 1% guardrail on
14:56that.
14:57We've done the math. We've recalibrated
15:00the um,
15:02TIC, right? Basically, that's the cap on
15:05cost of financing, the interest rates
15:07including all expenses.
15:09We recalibrated that to 6%.
15:13It was previously 6 and 1/2.
15:15Um, we're hoping that's going to be
15:17feasible.
15:18Um, time will tell.
15:20Uh, we will continue to monitor the
15:22market conditions um, and also look at
15:25different levers. Christine will go
15:27through that this afternoon for Finance
15:29Committee to understand the foundation
15:31of our work and some opportunities that
15:34we will have. As you know, with all of
15:37our financing, it's an iterative
15:38process. So, this afternoon Finance
15:41Committee will look at it. Hopefully,
15:43will support and recommend advancing
15:45this to Council um, which is scheduled
15:47for December 6th. The reason why I bring
15:50that up is between now and December 6th,
15:52we'll continue to monitor the market.
15:55Um, if interest rates change
15:59and departs from the 6% TIC, I just want
16:01us to be realistic that we do want to
16:04continue to advance the recommendation
16:06to finance, but we may need to continue
16:09to update Council on where the market
16:11stands.
16:13So, this afternoon, uh, Christine will
16:15unpack again the foundation of our work
16:17um, and we hope that you will support
16:20the recommendation. And importantly, I
16:22represent to you that we have a great
16:24team working on this, not only city
16:26staff, but the consultants that are
16:28involved in such a complex financing
16:31transaction, and we're all here to work
16:33in the best interest of the city. So,
16:35with that, I'll turn it over to
16:36Christine.
16:38>> Thank you, Director Lay. Um, we have
16:40with us online Darren Hodge of PFM and
16:43Fred Dilly. Uh, you may recognize them
16:45from the water bond transaction. So,
16:47next slide, please.
16:50Today's presentation covers a variety of
16:52topics. And like Lauren said, this is a
16:54very heavy, complex matter.
16:57Um, we're going to discuss the UAC's uh,
16:59feedback and how we incorporated the
17:02additional analysis in our supplemental
17:04report.
17:05Uh, we're going to cover the background
17:07and funding needs of the grid
17:08modernization project. Um, the proposed
17:12debt structure and the estimated costs.
17:14And we were able to update our um,
17:16interest rates for interest rates as of
17:19yesterday.
17:20Um, so you have the latest information.
17:23Uh, we did a comparison of what was in
17:25the 2027
17:27utility forecast and a sensitivity
17:31analysis.
17:32Uh, we ran a total of reimbursements of
17:36cost that incurred to date.
17:39Um, we also wanted to present and have a
17:42discussion of financing mechanics and
17:45some structure considerations to think
17:48about.
17:49And then also just finally the next
17:51steps for council authorization.
17:53So, next slide, please.
18:00Okay.
18:01At the October 7th meet meeting, the UAC
18:04expressed concerns about rising interest
18:07rates, the timing of the issuance, and
18:09ensuring rate impacts remain contained.
18:12Overall, the commission supported moving
18:14forward with the issuance, but
18:15recommended policy guardrails to
18:17minimize customer rate impacts.
18:21In response, this we provided analysis
18:24in the supplemental report including the
18:26sensitivity analysis for the bonds, a
18:29comparison of debt service costs um, to
18:33what's in the financial plan, and a
18:35discussion of the reimbursement of cost
18:37to date.
18:39Next slide.
18:43Thanks, Kristy. Um, real quick, an
18:46overview and background of the project.
18:48So, grid monetization is a long-term
18:50investment to prepare the electric
18:52system for future demand including EV
18:55adoption, electric vacation, and
18:57increases in customer-owned
18:59generation.
19:01The total investment ranges between $0.3
19:04and $0.4 billion over the next 8 to 10
19:06years.
19:07And current revenues and reserves cannot
19:10support this scale, which is why
19:12long-term bond financing is necessary.
19:15Um the council adopted a reimbursement
19:17resolution in December 2024, enabling
19:20reimbursement of approximately 28.7
19:24million in project costs to date.
19:26Next slide.
19:29This slide shows projected capital
19:31funding and and spending and funding
19:33sources. Costs increased significantly
19:36and the planned bond issuance fills the
19:38funding gap not covered by rate revenue.
19:41Projected spend um through 2029 is 94.8
19:46million, including the 28.7
19:49already spent in fiscal year 25 and 26,
19:53the total reaches 123.5
19:57million by fiscal 2029.
20:00Cash and cash and reserves will cover a
20:02portion, however, the the remainder
20:04requires bond find financing and staff
20:07is seeking authorization up to 100
20:09million for the first tranche of bond
20:11financing.
20:12Next slide.
20:15I acknowledge this is a very heavy
20:17slide. There's a lot of information. So,
20:19if you have any questions, let's let's
20:21talk through, but this is basic this
20:23slide basically s- outlines the
20:26structure of the issuance and its
20:29administration.
20:31Um
20:32First, I just want to note um the 2027
20:35bonds are the electric utilities
20:37first-ever issuance and will be sold via
20:40a negotiated sale
20:41method where we've um solicited for an
20:45underwriter that assists with bond
20:47structuring, investor outreach,
20:50materials that and other materials that
20:52are all important for a utility without
20:55market history.
20:57Uh we selected JP Morgan as the
20:59underwriter out of 10 proposals that we
21:02received.
21:04Um and you'll also note that in the
21:07latest um 2009 water bond refinancing,
21:11um we didn't use a underwriter because
21:15the water utility already had
21:16established market history. So, um a
21:19little bit different situation here.
21:22Regarding the city's debt policy, um the
21:25debt service cost must not exceed 15% of
21:28the annual expenditure budget, and our
21:31proposed financing strategy is in
21:33alignment with that policy.
21:36Interest rates will be set in January
21:392027, and the table on this slide
21:41reflects the estimates as of yesterday,
21:44including the true interest costs and
21:46all-in
21:48TIC.
21:49The TIC includes all borrowing costs,
21:52including the coupon rate and any
21:54premium and discounts in today's
21:56dollars, while the all-in TIC includes
21:59that plus administrative and issuance
22:02costs.
22:04The administrative the issuance costs
22:06are approximately um 0.6 million.
22:10Um please also note that um these
22:14interest rates as of yesterday decreased
22:16by 12 basis points compared to what's
22:18reflected in the supplemental memo. So,
22:22as Lauren mentioned, this is very
22:23dynamic market, and you know,
22:25fortunately for us there was an interest
22:27rate decrease within a week.
22:31Um
22:32going back to the left-hand side of the
22:34slide hand sla- side of the slide,
22:37um the financing strategy is planned in
22:40three tranches issued every 3 years with
22:42timing dependent on project needs and
22:44pace.
22:46Um staff and PFM will present to rating
22:51uh present to two rating committees in
22:53early December with ratings expected to
22:55be received mid-December.
22:59As we noted in the supplemental report,
23:01the debt service assumptions and the
23:02sensitivity analysis we presented assume
23:05a trip double A category rating
23:08and a 10-year call option on the bonds.
23:12Um I just want to note, too, also just
23:15uh managing expectations that receiving
23:18receiving a triple A rating for an
23:21electric utility is uncommon due to
23:23inherent operational regulatory
23:26regulatory and commodity market risk in
23:28the sector.
23:30The estimated basis point spread between
23:32a double A and triple A rating for
23:34comparable issues is approximately 5 to
23:3710 basis points.
23:38And if we were to receive a rating below
23:41double A, it could be a more significant
23:43spread.
23:45Next slide.
23:48This is staff's um sent
23:52uh sensitivity and uh now comparison to
23:54the 2027 forecast that was adopted by
23:57council in June.
23:59Um first off, the 2027 forecast had
24:02different assumptions for bond sizing.
24:05The forecast assumed a total of 348
24:07million of project financing
24:10while our revised strategy assumes 330
24:13million.
24:14This results in an estimated debt
24:16service
24:18an estimated annual debt service cost of
24:206.5, 7.1, and 7.1 for tranches 1, 2, and
24:243,
24:25reaching maximum annual debt service to
24:27of 20.7 million in 2033.
24:33Based on staff's rate model, for every
24:35approximately for every 2 million in a
24:38debt additional debt service above the
24:412027 forecast
24:43will result in a 1% rate increase.
24:47So therefore, remaining maintaining a
24:49rate increase below at one 1% or below
24:53requires that the annual debt service
24:55stay at or below 7.2 million.
24:59Which is that 2 million increase between
25:02that 5.2 that's highlighted on the
25:04slide.
25:08The revised strategy assumes a 20 basis
25:12point interest rate increase
25:14between
25:16the 2027 forecast and a 15 million
25:21increase in bond principal.
25:23So, you'll see here
25:25on the 2027 line we have 85 compared to
25:28the 100
25:30and then 4.6 compared to
25:334.8 today's rates.
25:36And so, that all equates to a increase
25:40of debt service of 1.3
25:42and an approximate
25:440.7 rate increase.
25:49Okay, next slide.
25:52This is our sensitivity analysis.
25:54Um, the team has also prepared using
25:57both an 85 million and a 100 million
26:00dollar bond size.
26:02This calculates what would happen if to
26:05debt service costs
26:07TIC and all-in TIC if the market were to
26:10increase by 50 basis points
26:12and 100 basis points.
26:15So, you'll see here based on sizing of
26:18based on sizing the debt and a 100 basis
26:21point market increase, debt service can
26:24range between 5.5 million and 7 million.
26:28And as noted earlier, just keep in mind
26:31a 7.2 million debt service would be a 1%
26:36electric rate increase.
26:38And that's based on a 100 million.
26:43Um,
26:45I think now I'll turn the next slide
26:47I'll turn over to Mr. Hodge at PFM to
26:51go through some historical
26:53um, interest rates going back to 1981,
26:56which might be helpful context as we
26:59think about issuance costs around this
27:03debt issuance. So, I'll turn it over to
27:05you, Darren.
27:06>> Perfect. Thank you, Christine. Can you
27:08hear me just fine?
27:09>> Yes.
27:10>> Excellent. So,
27:12appreciate the opportunity to speak
27:13tonight. And
27:15as Lauren mentioned at the outset, an
27:17important factor that we take into
27:18account when developing our finance
27:20plans is interest rate levels. And
27:22before I talk about where we currently
27:24are, let me take a step back and talk
27:26about where we've been over the last
27:28several months. So, in June, we hit we
27:31were at levels that were for the year
27:33the low levels. And then in July,
27:36unfortunately, what occurred is the
27:38situation with Iran
27:40reignited. And when the conflict with
27:43Iran amplified, what occurred was that
27:46the investors became concerned about oil
27:48prices.
27:50Along with oil prices increasing, that
27:52drove concerns with regards to higher
27:54inflation. And anytime we have concerns
27:57about higher inflation, what that does
27:58to interest rates, it puts upward
28:00pressure on interest rates. Investors
28:02demand a greater return because
28:05inflation is reducing the overall value
28:07of their holdings. And so, what we've
28:09seen over the last 2 and 1/2 months is
28:12an overall increase in interest rates.
28:15And when we're looking at our
28:16transaction, our transaction has an
28:18average life of about 20 years. And in
28:21that maturity range, we've seen interest
28:23rates increase by about 60 basis points
28:25between today and where we were in late
28:28July. Now, as Christine mentioned, we
28:30have been fortunate over the last week,
28:32we've seen an improvement in interest
28:34rates anywhere to the tune of about 20
28:36basis points. And so, that's been very
28:39helpful for us, and we'd like to see
28:40that continue.
28:42Now, anytime that we talk about interest
28:45rates, it's important that we put
28:47interest rates in perspective of where
28:49are we right now and comparing it to
28:51historically where we've been. And the
28:54best way that we like to look at
28:56historical averages is going back as far
28:58as we can. And so what you're looking at
29:00on this slide is a representation of
29:04interest rates along the interest along
29:06the yield curve going back to June of
29:081981. So about 45 years of information.
29:12And what this shows is this is the
29:15index, the tax-exempt index that we use
29:18to price our bonds. And there's various
29:20spots along the yield curve. So 1 2 3 4
29:235 7 10 all the way out to 30. And what
29:26you'll see is these gray bars for each
29:28spot along the yield curve. That
29:30represents the range at which that spot
29:33yield has moved over the last 45 years.
29:37And then you'll see two color lines
29:39right there. The green line represents
29:41where we currently at and then the
29:43orange line represents over the last 45
29:46years, what has been the average rate
29:48for each of these spot spot rates along
29:50the yield curve.
29:51And what you can see is that for a
29:53majority of the yield curve, basically
29:55from about three years on out, currently
29:58we're below 45-year averages. So even
30:02though we've seen an increase in
30:04interest rates which we're very
30:05cognizant of, when you look at it from a
30:07historical perspective, we're still
30:09below that 45-year average. And so
30:12that's why we talk about
30:14even though we have tools in our tool
30:15belt to help address the interest rate
30:18movements and volatility, we always like
30:20to take a step back and look at where we
30:22are versus a historical context to put
30:24it all
30:26in relativity.
30:28Christine, with that I'll turn it back
30:29to you.
30:33>> Thank you, Darren. That was very
30:35helpful.
30:37Um
30:38let's transition to the next slide,
30:40please.
30:42And this slide is a summary of
30:46total
30:47capital costs to date
30:49that are eligible for
30:52reimbursement from bond proceeds. We
30:54just wanted to give you a quick update
30:56and summary there.
30:57So, next slide.
31:01Um
31:03to issue these bonds, Council will need
31:04to adopt a formal resolution for
31:07authorization and approve several legal
31:09documents that are listed here.
31:12Um these documents will be reviewed by
31:14the Council on December 7th.
31:17Um UAC's recommendation included
31:20specific guardrails around minimizing a
31:23rate increase to 1% and due to
31:25complexities of a rate analysis
31:28including a 1% rate uh increase limit in
31:32Council's resolution would introduce
31:35ambiguity during the pricing of the
31:36bonds. So, rather than including a rate
31:39cap in the resolution
31:41um staff recommends based on our
31:44analysis a 6% TIC cap um in Council's
31:50resolution.
31:52And that would provide a finite and
31:54objective parameter
31:56um that ensures Council's policy
31:58direction is implemented
32:01consistently at the time of sale.
32:04Once the city may proceed to market once
32:06all these documents are approved by
32:08Council.
32:10Um and then here for the next slide,
32:12I'll turn it back to Darren.
32:15Um we we
32:18we staff and PFM met to
32:22um figure out what a toolbox would be
32:25that can be considered relevant in a
32:27rising rate environment. Um and Darren,
32:30I'd appreciate if you'd review these
32:32with the committee.
32:33>> Yeah, absolutely. So, as I mentioned
32:36earlier, anytime we proceed with a
32:38transaction, one of the things we look
32:39at is what are the tools in the tool
32:41belt, as Christine mentioned, that are
32:43available to us. And so, as we're
32:45discussing this and analyzing what may
32:47or may not transpire over the next
32:48several months, we came up with a number
32:50of tools that we wanted to discuss. And
32:53so, the first is right now we're
32:55anticipating a not to exceed par size of
32:57a hundred million dollars, but one of
33:00the tools available to us is to
33:02potentially reduce the size of the
33:04issuance.
33:05The advantage of reducing the size of
33:07the issuance is that we're borrowing
33:09less in today's market, and so if
33:11there's an expectation that rates will
33:12decrease, then we're borrowing less in a
33:16higher interest rate environment. So,
33:17that would not only um potentially defer
33:21uh some of our bonding needs, but just
33:23by the fact that we're issuing less
33:25debt, it would lower our debt service.
33:27Now, the risk of this is that if we
33:30reduce the amount of bonds that we sell
33:32today, again, essentially what we're
33:35making a call on is that interest rates
33:36will be lower in the future. If interest
33:38rates are not lower, then it could be
33:39more expensive for us to borrow. In
33:42addition, we would then need to, with
33:45the follow-up bond transaction, proceed
33:46with another sale of bonds. We'd have to
33:48go get ratings, um update legal
33:50documents. There might be efficiencies
33:52that we could try to realize by um
33:56essentially selling the second tranche
33:58together with the next sale of bonds
34:00we're looking to sell, but there's
34:02considerations.
34:03The other aspect is the final maturity.
34:05We can always shorten the final
34:07maturity.
34:08The downside of shortening the final
34:10maturity is that it compresses the the
34:13debt service that we have to pay. So, it
34:15could increase our average annual debt
34:18service because we have a
34:20shorter amount of time with which to
34:22repay the bonds that we're borrowing.
34:24Um the advantage of it is that if
34:26obviously if we shorten our final
34:28maturity, we're going to be borrowing
34:30shorter on the yield curve, which means
34:32we're going to be borrowing at a
34:33uh lower overall uh interest rate.
34:36The second tool that we looked at was
34:38delaying the sale if it's warranted by
34:40market conditions.
34:42Um the advantage of delaying the sale is
34:44that if the market is inhospitable when
34:47we're looking to sell bonds, that we
34:49could wait for the market to stabilize.
34:52And and obviously kind of the implied
34:56forecast there is that we're guessing
34:58that interest rates in the overall
34:59market environment would be better when
35:01we came back to market. But we would we
35:03would do is we'd call we'd go
35:04day-to-day. So, we would schedule a
35:07pricing date and then say if we're not
35:09going to price the bonds on that day,
35:11then we will monitor the market on an
35:13ongoing basis and wait for market
35:15conditions to improve and they'll and
35:17then sell bonds. The downside there is
35:19obviously if market conditions don't
35:21improve, at some point we will need bond
35:23proceeds for the project and so then
35:25we'd be subject to borrowing in the same
35:27high interest rate environment.
35:30Another option that we have available to
35:32us is looking at the call option. As
35:34Christine mentioned, it's standard in
35:37our market to sell bonds with a 10-year
35:38call. What that means is that 10 years
35:41after we sell the bonds, we have the
35:43option, it's at our discretion, where we
35:46can refinance the bonds if interest
35:47rates are lower. One of the things that
35:49we're looking at is potentially
35:51shortening that period. Instead of
35:53having it 10 years, maybe selling and
35:55structuring our bonds so that we have
35:57the option to refinance our bonds in 7
35:58years, 8 years, or 9 years. The
36:01advantage of that is that we'd have, if
36:03interest rates are lower in the future,
36:05the ability to refinance the bonds we
36:07sell today
36:08earlier. The downside is that if
36:10interest rates aren't lower, that call
36:12option, that shorter call option, costs
36:15us money over time. And so it's a math
36:17equation that we analyze to figure out
36:19is the risk worth the reward at the time
36:22of pricing.
36:24And the last option that we looked at
36:26and that's available in the tool tool
36:27chest is a loan from the electric
36:29special project reserve. Now, the
36:32advantage of this is it's quick
36:33short-term liquidity for the project to
36:35keep construction on schedule. The
36:37downside to this is that there's a
36:39potential impact to our credit rating
36:41due to the fact that we're reducing our
36:43cash position. Cash is one of the
36:45important considerations that the rating
36:47agencies take into account when they
36:48analyze our credit and so we want to be
36:50very careful to make sure that we have
36:52very strong liquidity to try and get
36:54that um credit rating as high as
36:56possible.
36:58And with that, I'll turn it back to
36:59Christine.
37:01>> Thank you, Darren.
37:03Next slide, please. Um and this
37:06basically concludes our presentation and
37:09summarizes our
37:10recommended action by the committee,
37:12which is to um
37:14forward to council the resolution
37:17authorizing staff to
37:19sell the electric revenue bonds for a
37:22principal amount of not to exceed a
37:24hundred million with a TIC of 6%.
37:28Approve the electric revenue bond
37:31indenture for
37:33Basically, what's listed at
37:35item number two in my your packet so
37:37heavy this week.
37:39Um and direct staff to structure the
37:422027 bonds such that the resulting
37:45revenue requirement is consistent with
37:47and does not exceed the equivalent of a
37:50one-time
37:511% rate increase. So, that captures the
37:55UAC's uh recommendation.
37:58And that concludes our presentation.
38:06>> Okay.
38:09Good news is it matched the packet very
38:10well.
38:12So, I think we're
38:15I think we're ready to uh
38:18I mean the packet with the supplement. I
38:19think we're ready to have some uh
38:21questions or should we just do a a round
38:23of top line questions and then dig down
38:25through?
38:29Who's that?
38:30Pat, you want to go?
38:32>> Sure.
38:33Um so starting at the end for so
38:37the
38:38the recommendation in the presentation
38:43is slightly different than from the
38:44recommendation in the packet.
38:47>> That's correct and we revised the
38:49recommendation via the supplemental
38:51report.
38:51>> Yeah.
38:52>> Yeah. And um
38:54so that
38:55third aspect you you basically think
38:58that
38:59indirectly
39:01um
39:04well we would either
39:06achieve that
39:08uh not exceeding the 1% rate increase
39:11or we might issue
39:13less bond amount. Is that how we'd stay
39:15under? Is that
39:16the other way that
39:19we assure that we
39:21um do not exceed the 1% increase?
39:25>> There's kind of a couple Did you want to
39:27Sorry.
39:29There's a couple levers. There There's
39:31either
39:32Well,
39:33the interest rate's the interest rate.
39:35It's whatever the market is reading at
39:36the time and to stay within a 1%
39:41um
39:43rate increase
39:45we wouldn't we our limit would be 7.2
39:49million in debt service. So
39:53if we wanted to achieve that, then we
39:56would have a 6% cap and also
39:59structure the debt such that, you know,
40:02it could be up to 100 million or or we
40:05can lower it to stay within that 1% cap.
40:08>> That's what
40:09>> Yeah.
40:09>> Yeah, that's what I was asking. So um
40:12if
40:13if we get the interest rate we're
40:15hoping, then we can do the full 100. If
40:18not, we need to reduce that a little bit
40:21to stay within the 1% cap.
40:23>> Yes.
40:23>> Okay. So, our
40:26I couldn't find where we we've been
40:28using reserves for the
40:31expenditures to date. I guess the 27
40:33million it is. Is that right? And
40:36and we'll have some additional
40:38capital expenditures before
40:41we would receive the bond funding. And
40:45did I read somewhere that might take us
40:47up to 34 million or something?
40:49Maybe I'm trying to recall that, but
40:52something like that, huh?
40:56>> I think it's on slide five.
41:00Where through 2029
41:03and including what we've already spent
41:06in 25 and 26
41:09total spend is 123.5
41:12million.
41:14>> Yeah, but
41:16when do we expect we'll we'll receive
41:19the bond funds?
41:21>> We would close late January. So, we'd
41:24have it for sure by beginning of
41:26February.
41:26>> the 27 million, how much do we think
41:30we'd spend on the capital? Maybe not so
41:32much between now and
41:34less than six months.
41:36>> Are you referring to slide 10, which is
41:38the schedule of costs incurred?
41:41I think he's asking how much in
41:43additional would we spend between now
41:46and when we find get the bond proceeds.
41:48I think that's what he's asking.
41:49>> taking from reserve.
41:50>> Yeah, Alan, I don't know if
41:52>> By the time we get the bonds.
41:53>> staff is available to respond to that.
41:58>> So, when I look at table on table five
42:00on page five, so, you know, that that is
42:02our expenditure amount. Um so,
42:07the
42:08it really depends on the lag. And now I
42:10hate I hate to make it more complex than
42:12necessary, but when we look at the
42:13projects here, this is our baseline in
42:16terms of
42:17what we actually think we're going to be
42:18spending over those years.
42:20And a lot of these projects are really
42:22buying transformers.
42:24And the transformers is going to be
42:26really highly dependent on what we have
42:27to put down to purchase these
42:29transformers.
42:30So, I can try to give you an answer to
42:31that, but it could change.
42:33>> I
42:33You know, I'm I'm assuming if we know
42:35that we've got the 27 million or so to
42:38date uh and that was over how many
42:41years?
42:43>> The last few years doing that is $28
42:45million and the cash financing and the
42:47sources is we spent about 33 million.
42:49>> Yeah, okay. That That's ballpark. That's
42:51all we're trying to get. Okay.
42:53Um
42:55and I couldn't find our
42:58in here where we are on our current
43:02reserve level from having drawn off that
43:0528
43:06uh soon to be maybe 33 million
43:10versus
43:11>> on the operators
43:11>> our reserve target and
43:15um and our current amount.
43:20>> So, I might turn to Lisa Belyea to give
43:22us an update on the current status.
43:24>> Yeah, and I think that of the amounts
43:25for the council that's an
43:26>> That will be helpful to understand
43:28because we are um at our higher levels
43:30in our operating reserves and at least I
43:32can go through the the capital reserves
43:34as well.
43:35>> So, this is Lisa Belyea, Assistant
43:37Director Utilities Resource Management.
43:40And we are currently evaluating the
43:42year-end reserve levels in all of all of
43:45the utilities. So, um right now the
43:48reserve levels I don't we're going to be
43:51bringing that forward to the UAC and
43:53Finance Committee over the next couple
43:54of months, so I'm uncertain whether now
43:57is
43:57I don't think I have the the complete
43:59information to give you.
44:01Um
44:01but uh
44:03I can tell you that the operations
44:04reserve at the end of 2026 is at a high
44:07level
44:09um
44:09and so I don't think there's a concern.
44:12>> So first off
44:14what are what are our goals?
44:16And then where are we approximately?
44:18>> Okay, the dollar amount
44:19>> And then third is what's the
44:21relationship you're talking about
44:22operation reserve this is capital
44:25and what's the relationship between
44:27those two for this purpose?
44:28>> Sure, why don't we pull up give us a
44:30moment to pull up the report that we
44:32just did on the reserves so that we make
44:33sure we're consistent with that. Give us
44:35a second.
44:36>> Okay, so while you do that
44:39um
44:45Sorry.
44:52Just looking at my various notes
44:54um
44:58the
44:59I'll just say that I'm
45:01I I think it's really valuable if we
45:05have a a section in greater detail
45:08on the use why we're doing this grid mod
45:11and we've talked about this several
45:13times. My understanding is that we have
45:16three purposes and a number of the
45:20capital investments may hit two or even
45:23three of those purposes at once.
45:25So we have our reliability that we want
45:29to improve. We have aging equipment that
45:31we would have to replace anyway.
45:34And then we have
45:36uh
45:37uh expansion of capacity for
45:39electrification.
45:41And
45:42we even within the reliability we've
45:44talked about you know
45:46needing to have clearer goal setting if
45:49we're moving toward electrification not
45:51just the historic reliability but even
45:54better yet reliability.
45:56Um
45:57so when when we have these tables on the
46:01capital spending sources of funding.
46:05I'd find it very valuable, and I think
46:08the public and my colleagues on the
46:10council would as well, to be able to see
46:14the each of these line expenditures.
46:17This one hits
46:19uh is for capacity, or this one's for
46:21capacity and reliability.
46:23Um because we're just not telling a
46:25story as to why we're doing this.
46:28Uh and it This is a lot of money
46:31skipping over the why. We we at a high
46:34level, we say, "Well, it's cuz of grid
46:35mod." But what does that mean to our
46:38rate payers who are saying, "Well, I'm
46:39having to pay for this. What do we get
46:41for?" This is sounds like a massive
46:44dollar amount. Of course, it's spread
46:45over 30 years on the payments, so it's
46:47not so bad when we spread it, but it is
46:50a big expenditure, and we're really not
46:53explaining the why very well.
46:55So, that's
46:57a request more than a question, but
46:58Alan, go ahead.
46:59>> Yeah, now I you've actually taken my
47:01notes here. I had the age of the
47:03infrastructure, the goals of increasing
47:04reliability, and the council goals of
47:06resiliency, and that
47:08modifying and adjusting for the
47:09increased electrification.
47:11Um we have told that story, but we need
47:13to tell it again. We need to tell it
47:14again about looking at the grid
47:17modernization, extending the time frame,
47:19building it as people develop, as we see
47:22electrification happening in in our
47:24utility.
47:25Done a real deeper dive in looking at
47:27that grid modernization, breaking up the
47:2912 district projects, but bringing that
47:31all back and and taking it home to
47:33saying, "This is the
47:34investment that the community is making
47:36and why, and what it does for you." And
47:38it's replacing transformers that were
47:40from the 1950s and '60s. It's, you know,
47:43making it more resilient. So, when we do
47:44have outages, we have ability to switch
47:46you from one sub substation to another.
47:48So, telling them what the value and
47:49benefit is is absolutely has part of
47:51that story. So, we can bring back and
47:53call back from some of those previous
47:55reports that we've provided, and then
47:57and then
47:58update it with the latest information.
48:00>> reports were hit those subjects, but in
48:03my mind they were too cursory in
48:05explaining it. So, they didn't go deep
48:07enough and in this one we we we really
48:09don't as of yet touch on it. I think
48:12when it gets to council and we'll have
48:15greater public scrutiny, it'll be that
48:16much more important. But I I I don't
48:19want to just reiterate the previous
48:21reports because I don't think they
48:22explained it well enough. They did more
48:24than we do here.
48:26Okay. For for right now, that's good for
48:28me.
48:32>> I just want to ask one one question
48:34before
48:36George.
48:37You did a lot of work as a result of the
48:40UAC recommendations and it sounds like
48:42you're in agreement with them. I just
48:45wanted to make sure if you had any
48:46separate reports or except for this
48:48point we agree or anything like that
48:50just so I know where everybody stands.
48:54>> Um yes, overall we appreciate the
48:56conversation, the concerns, and the
48:58guardrails. We just want to be cognizant
49:00that we are working with the dynamics of
49:04the market.
49:06>> Yeah.
49:06>> And so, should rates evolve to the point
49:09where we cannot stay within the 6% TIC,
49:12we will bring that back to council,
49:14especially if we forecast that before
49:16June before December 6th. We will
49:19continue to calibrate, structure, do
49:22what we can to meet that expectation,
49:26but that is an area that we are more
49:29concerned about than less.
49:33>> Yeah, and you already noted that, so I'm
49:34glad you put put an underline on it.
49:38At some point in time, if we need the
49:40money and it's going a little bit
49:41higher, I would think that council's
49:42going to have to have some discretion
49:45a year from now to make some
49:46adjustments. I pick a year out of the
49:48out of the sky, but
49:50>> Correct. And we could reduce the
49:51principal if we needed to
49:54to stay within that 1%
49:58rate payer impact guardrail. If that's
50:01the predominant concern, there are other
50:03ways of adjusting it.
50:04>> Yeah. Okay. Good.
50:07George, do you have questions? And then
50:09we'll go to public comment after that.
50:11>> All right. Thank you. Uh
50:13good to see updates here, and I also
50:15really appreciate the nimbleness with
50:18uh updating the 2027 forecast, having
50:20bond market updates, responding to the
50:22UAC recommendations.
50:23Um
50:25uh
50:26yeah, keep keeping this fresh is really
50:28appreciated. Um I guess the big picture
50:32question is how do you
50:35how are you going to evaluate the
50:37financing structure considerations in
50:3912? I think
50:43uh you know, clearly we're going to
50:45optimize around the 1% rate limit
50:47increase. We're going to try to optimize
50:49around the 6% TIC.
50:51Um
50:54but
50:55uh
50:56I mean, all of these options sort of
50:58seem reasonable. Like, how do we
51:01like, do we need any council oversight
51:04or uh
51:06uh input on how you actually use these
51:09tools and prioritize between them?
51:15>> I think if um council's sitting at the
51:17policy level of, "Okay, 100 million,
51:21do not exceed in 6% TIC." But I think
51:23perhaps maybe it would be helpful,
51:25Darrin, if you described kind of
51:27how the structuring
51:30process works when we're closer to
51:32pricing and how we work with the
51:34underwriter on that. That might help
51:35shed some light on this.
51:38>> Absolutely. Thank you, Christine. And
51:40thank you for the question. So, just to
51:42make sure I'm understanding the
51:43question, your question was within the
51:45tools in the tool belt we were talking
51:47about, as we get closer to pricing, how
51:50do we decide which one of those tools to
51:52use at the time? Did
51:55I send the question correctly?
51:56>> Yeah.
51:57>> Yeah, so I think the first item is that
52:00we we have the uh not to exceed TIC. So,
52:03that's kind of the parameter that if
52:05we're fitting within that, then we have
52:06the option to sell the bonds as they're
52:08currently structured. As we get closer
52:10to pricing, the way that the transaction
52:12process works is we will set a sale
52:15date. And right now we are scheduling
52:18that sale date to be mid-January. And in
52:21the the months leading up to pricing, we
52:23will have regular updates as we have
52:25been doing with the city and staff, just
52:28talking about here's what we're seeing
52:29in the markets, here's what the TIC's
52:32looking like. And if we start to see the
52:34TIC trend up to that 6% interest rate,
52:38then at that point we will have
52:41conversations about, all right, which
52:44one of these tools do we want to use?
52:45Because each one of them will have their
52:48own set of considerations. In other
52:49words, let's just take the 6%. If we see
52:52the TIC increasing above 6%, really the
52:56options that we have are to either delay
52:58the sale or to potentially look at
53:01reducing the size of the final maturity.
53:04And what we'll do is we'll take stock of
53:07what is occurring in the market at that
53:09time.
53:10Is the situation that caused rates to
53:11increase above 6% something that we feel
53:14is a temporary market reaction to an
53:17exogenous event, or is it something more
53:20systematic that we think is going to
53:21drive rates higher for a longer period
53:24of time? If that's the situation, then
53:26we would probably choose to reduce the
53:28size in the final maturity to get us
53:31under that 6% not to exceed to allow us
53:34to sell the bonds.
53:36If we feel that the reason that we're
53:38above 6% is because it's a kind of a
53:40short-term market reaction to an event
53:42that we think will subside,
53:44then it probably makes more sense to
53:46delay the sale by a few weeks or a month
53:50to see if market conditions improve. So,
53:52it's tough to prioritize exactly because
53:55they're tools that are used in very
53:56specific situations, but hopefully that
53:59helps you give or hopefully that helps
54:00give a little insight into how we think
54:02about that.
54:03>> Yeah. I guess one tool that was
54:05mentioned in the supplemental report as
54:07on the table and likely happening was
54:09reducing the
54:11uh principal amount to around 85
54:13million. And so,
54:16uh
54:17that
54:19um
54:22uh is that the sort of default plan? I
54:24guess I wasn't totally clear between
54:26this presentation and staff report how
54:29those pieces like how we're sort of
54:31determining that amount.
54:35>> It's one of one of the options we have
54:38to stay within the
54:41um 1% rate increase. Um when speaking
54:46with utility staff, we were talking
54:48about, "Okay, what's the ultimate
54:49minimum we can have?" And 85 million,
54:53you know, that aligns with the forecast
54:56was was the
54:57range.
54:58>> Okay.
54:59>> Yeah.
55:00>> So,
55:01related to that, how confident are we in
55:03the project costs? Because, of course, I
55:05noticed that almost all of them are
55:07rounded to the nearest $500,000.
55:10Does our contingency baked in? Like
55:12like, you know, uh
55:15can you elaborate?
55:16>> Absolutely, great question. I appreciate
55:18that as well. So, yes, we actually took
55:20a look That's why we took the projects
55:22and broke them up into 12 separate
55:24discrete projects.
55:25I can also bring up Tara Corley here,
55:27but we also looked at some of the costs
55:30of like projects in PG&E service
55:32territory and what they were seeing in
55:34terms of what the what we should be
55:37expecting in terms of those
55:39investments
55:40and then put those projects over time.
55:42So,
55:43as you look at the projects on that
55:45previous slide is these conversions of
55:48our substations happen over several
55:50years. You have to purchase the
55:51materials. You have to purchase the long
55:53material items. So, you'll you'll be
55:55able to see, you know, frankly, what the
55:58market is and and how it is changing.
56:00But yes, we put those costs in there.
56:01They do include some contingencies and
56:05estimates.
56:06Um it's just the the nature of the work
56:08that we do.
56:09>> Okay, so if we actually go out for 85
56:11million, we're not
56:14putting a bunch of risk on our reserves
56:15cuz we're taking the minimum amount.
56:17Like we're taking 85 million based on
56:19these projects and these projects have
56:20some contingency and we would actually
56:23feel good about landing closer to that
56:25number.
56:25>> Correct. And then there's levers we can
56:27we can pull in terms of the pace of
56:30electrification. So, if you look at some
56:31of these projects, the critical ones are
56:34updating our aging uh substations that
56:37are, you know, with transformers from
56:39the 1960s.
56:41Um some of the projects that we would
56:43able to to look at modifying is our
56:45distribution improvements cuz that's
56:47based on the pace of electrification. We
56:48have a lot of good AMI data that be
56:50coming in. We have some uh
56:53subtransmission projects are in here.
56:56Those are looking at some of the the
56:58higher voltage lines. Um so, we would
57:01we would shift those out and focus
57:03really on the high priority items, which
57:05are are the substations. So, if we need
57:08to make adjustments in the the nature of
57:11the projects, we have that ability to
57:13prioritize the ones that are are
57:15critical for increasing reliability,
57:18um
57:19affordability, frankly, and resiliency
57:21of the system. So,
57:22>> Okay.
57:22>> those projects we have defined and we've
57:24actually looked at those if we have to
57:26have some reduced.
57:27>> Okay, so
57:29I can wrap up this round and come up
57:31back soon. but one taking ways that 85
57:33million-ish is enough that the projects
57:37have some contingencies already
57:40and if we if things get unexpectedly
57:42more expensive, we can delay some of the
57:45distribution projects, which seems to be
57:49half or more of the of the cost in this
57:52initial set of projects
57:55uh
57:55so that we can make the 85 million
57:57dollars work even if there are
57:59unexpected
58:00>> elements. Yeah, so so to be clear, we
58:01started at I think 85 million, we went
58:04to 100. If you look at the table that
58:05was presented in the report, it is still
58:07100 million dollars with the projects.
58:10>> Okay.
58:10>> Um and when you take off, you know,
58:12potentially
58:14um
58:14our levers of looking at distribution
58:17improvements and and phasing those out
58:19over time, um those are about a third of
58:22all the projects on here. So, if we
58:24needed to to, you know, make
58:26adjustments, those are probably where we
58:28would make those adjustments.
58:30>> So, the recommendation of or or
58:33sorry, recommendation is too strong for
58:35it, but where the staff report says
58:36we'll probably we'll likely end up
58:38closer to 85 million than 100 million,
58:40that's actually sort of changing the
58:43plan a little bit on slide five.
58:45Uh the that's sort of already assumed to
58:48be a
58:50>> Yeah, the bond financing here is is up
58:51to 100 million dollars. Again, there's
58:54going to be some some play in terms of
58:56what we use for cash and what we use for
58:57bond financing.
58:58>> Sure. Okay. Um
59:01Uh yeah, I can uh
59:04pick up some of my questions later.
59:06Thank you.
59:08>> I had a couple more before we go to
59:10public comment. Um
59:12I was reading in the as I read the
59:14document, it seemed like you were
59:15suggesting that a double A rating might
59:18be a stretch. Did I read that right? You
59:20didn't quite use those words here in the
59:22presentation, but I just wanted to
59:24check. And and and then what is the
59:25downside?
59:27>> Um, that's correct. Um, a AAA rating for
59:31electric utility is quite a stretch. I
59:34know that I hate to kick it over to
59:36Daryn constantly, but Daryn, you had
59:38some really good um,
59:40color on this
59:42um, the why because staff had asked you
59:45um,
59:48>> Yeah, absolutely. Happy to address that.
59:50I actually invite one of my colleagues
59:51um, Mike Berwanger on who uh, can also
59:54add some additional color, but
59:56just given the operational and the risk
59:58profile of electric utilities in
1:00:01California, particularly with the
1:00:02relation to wildfire, etc. We don't see
1:00:05a lot of AAA utilities. And so, it's a
1:00:08little bit different than the water side
1:00:10where water is uh, different in its risk
1:00:13profile. And so, when we look at what
1:00:17might be possible with the electric
1:00:19side, we think something in the double A
1:00:21category is probably more likely. But
1:00:23Mike, if you're available, maybe you can
1:00:25share us some additional insight into
1:00:27um,
1:00:28uh, the rating agencies view of the
1:00:30power utilities.
1:00:31>> Yeah, they just view it more risky than
1:00:33water. Um, yeah, I think I agree with
1:00:36what you just said, Daryn. I would just
1:00:37add that uh, we're not aware of a AAA
1:00:40rated public power electric utility in
1:00:43the country. So,
1:00:45uh, but we do feel that the somewhere in
1:00:48the double A category, it's always tough
1:00:49to nail down uh, the rating analysts.
1:00:52We're about to start on that process and
1:00:54we'll have better information as we get
1:00:56along and get further into that, but by
1:00:58all accounts, the somewhere in the
1:01:00double A category is definitely
1:01:02achievable.
1:01:04>> And if we dropped to A,
1:01:07what does that mean
1:01:09in terms of the whole sales process?
1:01:12>> So, if we dropped to a single A rating,
1:01:15what that really means is that the
1:01:17interest rates that we're going to pay
1:01:18are going to be higher. So, right now
1:01:20what we estimate is if you're in the
1:01:22double A category, the cost of dropping
1:01:25from let's say double A to double A
1:01:27minus is approximately five basis
1:01:29points. If you drop to a single A, then
1:01:33the increase might be more than five. It
1:01:36might be between five and 15 just
1:01:37because there is a
1:01:39differentiation between investors who
1:01:41want double A minus versus A plus rated
1:01:43paper, but that would all be encompassed
1:01:46within our not to exceed interest rate
1:01:48of 6% within the resolution. So, we
1:01:51would still have to fit within that.
1:01:53We would just have less cushion.
1:01:56>> Okay.
1:01:58And then just for the public, can
1:02:00somebody recap what's in the 600K of
1:02:04expense to issue?
1:02:09That money That money doesn't come to us
1:02:11and it's cost of doing business, but I
1:02:13think we should articulate that to the
1:02:14public.
1:02:15If you need more time on that, we can.
1:02:18>> Thank you, uh chair.
1:02:21That would include fees for bond
1:02:24counsel, so Jones Hall,
1:02:26disclosure counsel, which is Stradling,
1:02:29our municipal advisor PFM, the
1:02:32underwriter JP Morgan,
1:02:35and credit ratings from two agencies.
1:02:40>> Yeah, I I knew that was in the report,
1:02:41but I wanted it to be spoken out to the
1:02:43public, so
1:02:44if you want to add any other detail, you
1:02:46can, otherwise that's good for now.
1:02:48Okay.
1:02:50Let's go to public comment, please.
1:02:55>> We currently have one request to speak.
1:02:57Our first speaker is Hamilton H.
1:03:02>> Can you hear me?
1:03:03>> Yes, we can.
1:03:05>> Thank you. I have a couple of comments.
1:03:07Palo Alto needs to modernize its aging
1:03:10electrical infrastructure, improve
1:03:12reliability, and accommodate growing
1:03:14electricity demand.
1:03:16The benefits do need to be much more
1:03:18clearly articulated by utility staff to
1:03:22the city council for this bond raise and
1:03:25going forward to the UAC.
1:03:27I support authorizing the full 100
1:03:30million, not the 85 million in grid
1:03:33modernization bonds with appropriate
1:03:36financial safeguards since each bond
1:03:38raise takes considerable time and effort
1:03:42Darren presented tools, but we need a
1:03:45strategy.
1:03:46Using these to protect rate payers
1:03:49against significant increases or
1:03:52decreases since we cannot predict which
1:03:55way they will go. And of course they
1:03:57will fluctuate over time.
1:03:59I believe the strategy is
1:04:02raising the full amount of 100 million
1:04:04to protect against rates increasing
1:04:08and absolutely require a 10-year or
1:04:12shorter call provision so we can finance
1:04:16if rates drop. I do not support waiting
1:04:19till pricing or offering to decide if we
1:04:22should extend the call provision beyond
1:04:2410 years. We will have two more rounds
1:04:27of bond financing at 150 million each
1:04:31which also essentially acts as cost
1:04:33averaging the interest rates which is
1:04:36another reason I do not support raising
1:04:3985 million because if we raise 85
1:04:42million now and the rates go up we did
1:04:45ourselves a lot of damage. Things like
1:04:48delaying the offering because rates is
1:04:50high is just a pure gamble.
1:04:53So let's have a comprehensive
1:04:55well-thought-out financing strategy that
1:04:58will protect us since we cannot predict
1:05:01the future about both increasing rates
1:05:04and decreasing because they could
1:05:05increase a lot, they could decrease a
1:05:07lot.
1:05:08Thank you and thank you for for me share
1:05:10my comments.
1:05:13>> That concludes public comment on action
1:05:15item one.
1:05:19>> Okay.
1:05:21Back to the committee. Second round of
1:05:23folks.
1:05:24Beth, did you want to go?
1:05:25>> Thank you. Um
1:05:27so first uh could you address the
1:05:30question that uh Hamilton Hitchings
1:05:33raised about whether we should have a
1:05:35shorter uh call period?
1:05:38>> Um I'll attempt to and then Darren,
1:05:41chime in if you can. Um as we look at
1:05:43trying to manage and minimize costs of
1:05:45issuance, each strategy will prompt an
1:05:48anticipated market response. Reducing
1:05:51the call period, i.e. being able to
1:05:54refund and call over all our debt
1:05:56earlier is a benefit to us as a
1:05:58borrower. It's a disadvantage to the
1:06:01lender and for that reason, those
1:06:03features will cost us more.
1:06:06Typically, um it is a 10-year standard.
1:06:09Anything below that will cause a
1:06:11reaction and therefore our cost of
1:06:13borrowing will go up for that benefit.
1:06:15Darren, did you want to add to that?
1:06:18>> Yeah, absolutely. Thank you, Lauren and
1:06:19I think I agree with everything you just
1:06:21said and the reason that we make this
1:06:23decision closer to pricing is because
1:06:26when the market's volatile like it is
1:06:28right now, the
1:06:30benefit or the cost that investors will
1:06:32charge us for a shorter call can vary.
1:06:34For instance, right now when we're
1:06:35looking at an 8 and 1/2 year call versus
1:06:38a 10 10-year call,
1:06:40investors are charging us about four
1:06:41basis points on the TIC.
1:06:44However, if the situation changes and
1:06:47investors are instead demanding 10 basis
1:06:49points, well then the cost benefit may
1:06:52not work in our favor and so that's why
1:06:55our plan our current plan is a 10-year
1:06:57call, but we're going to have these
1:06:59tools that we have available to us that
1:07:00we've analyzed and figured out what is
1:07:02the break even that we're willing to
1:07:04accept in terms of the cost for a
1:07:06shorter call so that we're prepared to
1:07:09make that decision at pricing based off
1:07:11what we're hearing from investors.
1:07:13>> Okay, so
1:07:15by approving
1:07:16the staff
1:07:18proposal
1:07:20we would be allowing a shorter call
1:07:22period if it was warranted.
1:07:27>> That's correct.
1:07:28>> Okay. All right.
1:07:30Um
1:07:31and then
1:07:33were folks able to
1:07:35pull up any information on
1:07:37where we are on our reserves?
1:07:40>> Yes. So,
1:07:41the two reserves that we talked about
1:07:43with the committee and I think that
1:07:45you're referring to are both our
1:07:46operating and capital reserves. Our
1:07:49capital reserve is at about five These
1:07:51are projected for year the end of this
1:07:54year FY 2027.
1:07:56Um so, we're estimating about 5.9
1:07:59million in the CapEx reserve.
1:08:02Uh the target is over 7 million.
1:08:05Uh the OpEx reserve is currently
1:08:06estimated at 54 million.
1:08:09And the target for that is between 38
1:08:11and 76 million.
1:08:14>> And in this context, why does the
1:08:16operating reserve have any relevance? Do
1:08:19we
1:08:19>> It doesn't. I just wanted to make sure
1:08:21that we gave it to you given how large
1:08:23it is that someone could perhaps
1:08:25criticize that we hid them all.
1:08:26>> So, as we've been paying this 28 million
1:08:30in projects last couple years, we were
1:08:32feeding that capital fund and so, we
1:08:35weren't really draining the reserve very
1:08:37much. Just
1:08:38a couple million.
1:08:40Is that right?
1:08:40>> I would say it's pretty low.
1:08:42Um
1:08:43the
1:08:45CIP reserve, we're at the minimum. The
1:08:48CI current CIP reserve maximum, if I
1:08:51were to look at the target, is 28
1:08:53million.
1:08:54>> Oh, I
1:08:55maybe I misheard what you had said. I
1:08:57thought you said we were 5.something and
1:08:59our target is 7.
1:09:01>> Um so, the council at the last meeting
1:09:05gave a current minimum guideline to stay
1:09:08with that, which would be 7 million.
1:09:11Um, and so the annual depreciation,
1:09:14which staff recommended in our last
1:09:16meeting, was a 13.6 million dollar
1:09:18reserve. So if
1:09:20Sorry, there's a lot of numbers floating
1:09:21around as we're actively changing our
1:09:23reserve target.
1:09:24>> you know, what do we really
1:09:26>> Yeah.
1:09:27>> think we should be at long-term, and it
1:09:30sounds like what we authorized was a
1:09:33near-term agreed down
1:09:36until we got this bond issue.
1:09:38>> That's correct.
1:09:38>> Okay. So, that's part of the story. I
1:09:41think we we need to explain that as we
1:09:42go back to the council.
1:09:44Um,
1:09:45and it's it's it's reasonable. Uh, there
1:09:48were decisions made, but
1:09:50we're we're kind of diving back in
1:09:52without the context.
1:09:54And it
1:09:55I I just want to revisit um, a little
1:09:57bit one more time on
1:10:00the values that we'll get from this grid
1:10:02mod, um,
1:10:04because uh, the
1:10:07from the limited amount of research I
1:10:10was able to the
1:10:11see, the
1:10:13um,
1:10:14>> Uh-huh.
1:10:15>> Okay.
1:10:18Um,
1:10:19what is that
1:10:21uh, just the age of the transformers
1:10:24really degrades their uh, reliability a
1:10:26lot.
1:10:28And then we have
1:10:30contemporary transformers versus 50
1:10:33years ago are different materials. They
1:10:36have
1:10:37um,
1:10:38uh, they're smarter systems.
1:10:40They have surge protections.
1:10:43Uh, all of those leading to advantages
1:10:46primarily in reliability.
1:10:49Is that correct?
1:10:50>> Yeah, that's absolutely correct. I mean,
1:10:52if you look at our our system, we have
1:10:54two substations that are 4 kV islands.
1:10:56So we're not able to if those if those
1:10:59substations fail that's the second
1:11:01>> that's the the reliability. But, yes,
1:11:02the modernization of the equipment so we
1:11:05can have advanced PLCs, we can have
1:11:07controls, we can monitor the system,
1:11:09we'll have the ability to do advanced
1:11:11switching where we have to do manual
1:11:13now. It really opens up a lot of doors
1:11:15for us in terms of modernizing system
1:11:17and then restoring customers sooner.
1:11:20So, we're really looking forward to
1:11:21those investments.
1:11:23Um but, yes, we can do better explaining
1:11:26that to the city council on what the
1:11:28value is of these investments that the
1:11:31the city is making.
1:11:32>> And you jumped to that second major
1:11:34category. So, in addition to the both
1:11:36the pole mounted and the ground mounted
1:11:38transformers being
1:11:41newer and not having lost every year
1:11:44losing significant reliability for every
1:11:46year they're in service. And I I was
1:11:49surprised how much they lose based on
1:11:51just the age.
1:11:53Then, they're better designed today
1:11:56in several significant ways than 50
1:11:58years ago.
1:11:59And um
1:12:00and then lastly, what you were leading
1:12:02to is switching from the four to the 12
1:12:04KV and really reminding everybody
1:12:07because I know you had explained that
1:12:09before, but why that is, what are the
1:12:12multiple values from that. So, good.
1:12:15>> And we have about 2,900 customers on
1:12:17those two substations. So, really
1:12:18getting them to be able to have
1:12:20resiliency and be able to for us to
1:12:22switch in case of any failures um is
1:12:25really
1:12:26critical important to us.
1:12:27>> Great. And I I recall
1:12:30uh and we we haven't revisited this in a
1:12:32while, but when we had
1:12:34significant outages in was it
1:12:372021 or 2021-22
1:12:41um
1:12:41uh a good portion of those were
1:12:44substation equipment based. And um I
1:12:48think we did some
1:12:50some replacement on a more urgent basis
1:12:53if I recall but not this systematic
1:12:55approach. Is that
1:12:57generally correct?
1:12:58>> So, you know, we did take a look back at
1:13:00a lot of the the outages in terms of the
1:13:02the types of outages and the cause and I
1:13:04believe and uh Terry will correct me if
1:13:06I'm wrong is about 38% of the outages
1:13:09were caused by equipment failures. So,
1:13:11that's a real telltale sign that uh we
1:13:13do need to reinvest in those
1:13:15replacements
1:13:16um and as they reach end of life.
1:13:18>> Yeah, and implicitly
1:13:20we'll take that 38% down a lot, not to
1:13:23zero
1:13:24uh but uh this will take it down a lot
1:13:27and that that's there there goes to this
1:13:30estimate of how much improvement in
1:13:32reliability we'll get just from that.
1:13:34Okay, thanks.
1:13:39>> George.
1:13:40>> Okay, a few uh
1:13:43extended questions on reserves. Um
1:13:48can you refresh me a little bit on the
1:13:50point for uh reimbursing the capital
1:13:53reserves? So, we are at 5.9, target is 7
1:13:58to 28 I believe I heard. Um
1:14:01when we uh
1:14:04how much of the uh bond financing would
1:14:07we potentially actually use for the
1:14:08reimbursement?
1:14:12>> I think Christine has the um
1:14:15reimbursement number somewhere in the 20
1:14:18to 30 million figure.
1:14:20>> I I right, the the total amount of work
1:14:22that could be reimbursed is 28.7
1:14:25million.
1:14:26>> Mhm.
1:14:26>> And our capital
1:14:29reserve max range is or I mean target
1:14:34max range obviously we
1:14:35could have more is around 28 million, is
1:14:38that what I heard?
1:14:39>> At present, but you're obviously
1:14:40currently reviewing that.
1:14:42>> Yes. Right. So, if we
1:14:47reimburse
1:14:48and we have
1:14:50uh
1:14:51not quite six in right now, then we are
1:14:55reimbursing
1:14:56or then we are potentially having going
1:14:59straight to the very high range in a way
1:15:01that
1:15:03we are paying interest on it potentially
1:15:05in an avoidable way. And so, I didn't
1:15:07see that as a strategy and I'm just not
1:15:10sure whether
1:15:11uh it's something
1:15:13we'd want to consider as a strategy uh
1:15:15in the financing structure
1:15:16considerations. Um
1:15:18In some ways, that feels preferable than
1:15:20delaying distribution upgrades, for
1:15:22example,
1:15:23uh
1:15:24as far as the trade-offs we could make.
1:15:26>> Absolutely. And I think that's one of
1:15:27the tools that would enable staff to go
1:15:30down to that 85 issuance 85 million
1:15:32issuance level with minimal impacts to
1:15:35the project versus if they were to go
1:15:37further,
1:15:38um
1:15:39there would be more significant project
1:15:40impacts. So, to your point, depending on
1:15:44uh tools that we used to strategically
1:15:47make this investment, um we could choose
1:15:50lower reimbursement target
1:15:53um for the reserves and then make that
1:15:55up through our general rate making on an
1:15:58annual basis.
1:15:59>> Yeah, I would definitely be interested
1:16:01in certainly having that option sort of
1:16:03more explicitly on the table.
1:16:06Um can you also fill me in on the
1:16:09ex- electric special project reserves,
1:16:12which are 30 million
1:16:14and uh
1:16:16contemplated as sort of filling in some
1:16:18potential short-term cash flow needs,
1:16:21uh
1:16:21which I understand has some trade-offs.
1:16:25Can you talk one about some of the
1:16:26flexibility in the
1:16:28and flexibility in that reserve and its
1:16:32target levels? And can you also talk
1:16:34about um
1:16:36let's say we did go for a lower amount
1:16:39uh and then
1:16:42costs unexpectedly change at the back
1:16:44end, could we also just use that to
1:16:48provide some buffer
1:16:52>> Sure.
1:16:54The special projects reserve and I may
1:16:56need Lisa and Alan's help is
1:16:58um
1:17:00specific use reserve. There's actually a
1:17:02council resolution
1:17:05that guides guides and governs how those
1:17:07funds can be used. So, short-term
1:17:09borrowing from it is obviously something
1:17:11that we'll do to help manage the
1:17:13nimbleness within it, but in terms of
1:17:16full on dedicating monies from those
1:17:19reserves, we staff wouldn't do that
1:17:21unless it's in alignment with the
1:17:23original resolution intention. And
1:17:25ultimately it was intended to do a major
1:17:29investment in in
1:17:31our transmission, frankly. I think
1:17:34um
1:17:35because we needed more redundancy
1:17:38for our transmission since we have a
1:17:40single point of failure or we have a
1:17:42single point of failure
1:17:43and transmission projects are extremely
1:17:45costly.
1:17:48>> Um
1:17:51>> I would also like to add that um we
1:17:54would want to analyze reducing some of
1:17:56our reserve balances as you may recall
1:17:58in the our water rate
1:18:01um
1:18:01setting and the
1:18:04the rating report from S&P, they did
1:18:06note that one of the things they look at
1:18:08is our liquidity, which means a
1:18:10measurement of our reserve levels. So,
1:18:12there would be some correlation between
1:18:15reserve levels and bond rating and going
1:18:18back to, you know, AAA, AA, single A and
1:18:21what that could do ultimately to our
1:18:23borrowing costs. So, it could become a
1:18:25circular
1:18:26problem. I'm not saying there's a direct
1:18:29line, but these are the different things
1:18:31we'd want to analyze as we
1:18:33move things around to
1:18:36cobble together a sound strategy.
1:18:38>> Yeah.
1:18:41Uh
1:18:42and transmission improvements are not
1:18:44included in this first set of projects.
1:18:48Uh
1:18:49are they? And so would not naturally be
1:18:52a fit for the ESP reserves.
1:18:55>> Yeah. So um
1:18:57sorry to be the the
1:18:58jerky engineer, but so these are sub
1:19:00what they call subtransmission projects,
1:19:02so 60 kV or below. I don't want to
1:19:04confuse that with the transmission
1:19:06project that uh the CAISO authorized to
1:19:09bring a second transmission uh to to
1:19:11Palo Alto and we're you know working
1:19:13through that process as well.
1:19:15>> Okay.
1:19:16>> But that is separately funded and not
1:19:18part of this funding here.
1:19:19>> Yes, and the ESP is for that and so uh
1:19:22okay. Uh
1:19:24good to understand.
1:19:27And um
1:19:29and it's also good that it's listed as
1:19:31an option, but I now way better
1:19:33understand some of the limitations and
1:19:34issues there.
1:19:36Um
1:19:37uh
1:19:40just because my comments are somewhat
1:19:43brief, uh maybe I'll just sort of do a
1:19:46quick
1:19:47round of that now. Um
1:19:51uh
1:19:52yeah, I think uh
1:19:55looking at reimbursement
1:19:57uh as a lever is something we should
1:19:59certainly at least explicitly
1:20:00contemplate.
1:20:02Um I agree with the public commentary
1:20:06that
1:20:07we should not necessarily delay issuance
1:20:10or overpay for or or pay for nonstandard
1:20:13options
1:20:15uh in the sense that
1:20:16we would pay a premium to
1:20:19uh and or be trying to time the market
1:20:22in a way that may not be necessary if we
1:20:25already have two more tranches of debt
1:20:27that
1:20:28phased over years sort of naturally
1:20:30diversifies us to interest rate risk. Um
1:20:35uh
1:20:37and
1:20:39uh
1:20:41I guess the last point is that uh and
1:20:44maybe this is just like a quick question
1:20:45for Nods. Like we would like how much
1:20:48more specific would we actually get when
1:20:50we get a staff report in
1:20:53mid-December for the actual sign-off on
1:20:56this? Would we have more specifics about
1:20:58what financial structures we're actually
1:21:00leaning towards at that point?
1:21:04>> I think Darren, I'll defer to you
1:21:06because there is still a spread between
1:21:08December, I think it's December 7th, and
1:21:11potential sales at the end of January.
1:21:14So, please comment to the extent you're
1:21:16comfortable and confident.
1:21:18>> Perfect. Thanks, Lauren. Yeah, you hit
1:21:20the nail on the head. We'd still have a
1:21:21month before we're looking to price, but
1:21:23I we we would have an update on kind of
1:21:26where we stand from a TIC basis.
1:21:28And some of the impacts of some of the
1:21:31things that have happened that will
1:21:33happen between now and then such as the
1:21:34election. So, we'll have a better
1:21:37comfort with regards to where the TIC
1:21:39might be, but in terms of the final
1:21:41structure, to Lauren's point, we'd still
1:21:43have a month until we sell, so we'd want
1:21:45to make sure that we retain that
1:21:46flexibility, but we could come back with
1:21:49a little bit more refined information.
1:21:52>> I think having some more elaboration and
1:21:55loose prioritiz- or loose prioritization
1:21:58or at least discussion of how these
1:21:59tools will be used and also including um
1:22:03uh reimbursement levels on previous
1:22:05projects as a tool uh
1:22:09would be important for me in uh
1:22:12in the next phase. Like uh
1:22:15softly right now with incomplete
1:22:17information, I'd lean toward
1:22:18slightly smaller amounts, not trying to
1:22:20time the market, not trying to pay
1:22:23uh too much more for non-standard
1:22:24options, uh
1:22:26potentially looking at reimbursement
1:22:27rates. Like these things are all in my
1:22:28mind, but uh um
1:22:31uh
1:22:32it's hard to see how they fit cohesively
1:22:34as a whole until
1:22:36uh
1:22:37maybe we get them in a staff report in
1:22:39December. And so that's what I'd like to
1:22:41see then.
1:22:42Um
1:22:44uh but and yeah, those are my comments.
1:22:46Uh I
1:22:48uh
1:22:49otherwise think that
1:22:51this generally make or that this makes
1:22:53sense.
1:22:58>> Okay, I had a couple questions back way
1:23:00back on the slides.
1:23:01Uh
1:23:02I wasn't quite sure about the sort of
1:23:04the materiality of slide number nine.
1:23:06We're talking about the interest rates
1:23:07and where they were historically. Is
1:23:08that just to keep us relatively
1:23:10comfortable that they're not going to go
1:23:12to 10%? Is that really
1:23:15>> I mean, I'll talk to that. We it's one
1:23:18of the requests from the utilities
1:23:20advisory commission.
1:23:21Um and the discussion with them is uh
1:23:24they wanted a better understanding of,
1:23:26you know, where are we in the market? Um
1:23:28and not trying to
1:23:30>> Okay.
1:23:30>> Well, play the market. Maybe someone to
1:23:32play it. I'm not sure, but just really
1:23:34have that better understanding since
1:23:36uh you know, where we are today versus
1:23:38in 3 months from now versus the last 30
1:23:41years.
1:23:41>> Okay.
1:23:42Uh and then on nine, your slides your
1:23:45slide was slightly different than the
1:23:46packet. Is that cuz you updated 2 hours
1:23:48ago? So
1:23:50>> Yes.
1:23:50>> Okay. Just
1:23:51>> This is one of them.
1:23:52>> Confirm that.
1:23:54Okay.
1:23:55Um
1:23:57Yeah, I I I would like to second uh
1:24:00Commissioner Burt's Burt's motion on the
1:24:03level of storytelling that we need to
1:24:05do. Um
1:24:06because it's just so valuable for folks
1:24:09to know it
1:24:10I don't want to use the word in detail,
1:24:12but in in in in a substantial
1:24:14presentation on all the good stuff this
1:24:15is going to do. There's still a lot of
1:24:17folks out there that think that we don't
1:24:18need most of this financing because it's
1:24:20going to be used for more EV chargers
1:24:23and
1:24:24um taking away my gas stove
1:24:26for you know retrofit of homes and some
1:24:30of it we hope is going to be used for
1:24:31both of those things because of the
1:24:33reliability and the whole structure and
1:24:34all all that but
1:24:37the point about how much of this we
1:24:38would have to do anyway
1:24:40and get the reliability factor in there
1:24:43is really important and then just all
1:24:45the other good stuff that we can feel
1:24:46more comfortable about in the whole
1:24:48utility
1:24:50is a good story and we should we should
1:24:52we should tell it in in detail.
1:24:57Let's see.
1:25:00Also back on that
1:25:03in the packet that where you you're
1:25:05you're
1:25:06showing the evaluation stuff and the
1:25:08financing structures where you reduce
1:25:09the size or delay the sale. As I went
1:25:12through that a couple of time each time
1:25:13I did on on number two when I got the
1:25:15number two delay the sale I always wrote
1:25:16no.
1:25:17I just think that should be sort of as
1:25:20last a last resort as we would probably
1:25:22get. Now I understand from some of the
1:25:24comments from our consultants that that
1:25:26means delaying the sale two weeks
1:25:28potentially or
1:25:29but you know substantially we shouldn't
1:25:31even have that in our mind because we
1:25:33need to finance this thing. I also think
1:25:35that
1:25:37we're all in the business of trying to
1:25:38guess at market rates and interest rates
1:25:41and so on and some of us are better than
1:25:43others but you never you never really
1:25:44know until it happens so I think Mr.
1:25:46Hedges point is well taken there too
1:25:48trying to kind of guess on that versus
1:25:50let's get this done so we can build what
1:25:53we really need here for the next 20
1:25:55years or so
1:25:56is is really the core point so that's
1:25:59sort of a
1:26:00key comment that that I wanted to make.
1:26:03And you also pointed out in that same
1:26:05section
1:26:06that you have a short-term backup plan
1:26:08with the
1:26:09electric special projects reserves so
1:26:11that gives us a little bit there if if
1:26:13we need to but not nearly what what we
1:26:15want.
1:26:18So I think it was a very
1:26:20thorough
1:26:21presentation with a lot of authorities
1:26:24here being able to to present it to us.
1:26:26I appreciate the UAC input
1:26:29as well and uh
1:26:30glad that you guys were able to
1:26:32incorporate that in time for this
1:26:33meeting.
1:26:37Any other comments from the committee?
1:26:42Okay, then we'll entertain a motion.
1:26:47>> I will move the staff recommendation.
1:26:51>> The three points?
1:26:53>> Yes, the uh
1:26:55updated one in this
1:26:57in the slides.
1:26:59>> In the supplemental memo?
1:27:00>> Yeah.
1:27:01>> Yeah, also in the slide though.
1:27:03>> Yeah, yeah.
1:27:03>> Second.
1:27:05>> Okay, if there's no other conversation,
1:27:07we take a vote, please.
1:27:12>> Council member Lawie?
1:27:13>> Yes.
1:27:14>> Council member Lu?
1:27:15>> Yes.
1:27:16>> Council member Burt?
1:27:17>> Yes.
1:27:17>> Motion carries unanimously.
1:27:20>> Uh thanks a lot to staff and outside
1:27:22consultants as well and
1:27:24let's keep hopeful on interest rates.
1:27:26>> Well, I guess a question given that this
1:27:28was unanimous, uh are we recommending
1:27:31that it go forward as a consent item?
1:27:35>> Rather than
1:27:36>> Oh, unfortunately, um
1:27:39it can't. It has to be on action per
1:27:41state law.
1:27:42>> Oh, good.
1:27:43>> over 100,000
1:27:44>> Because
1:27:44>> it has to be on action.
1:27:45>> All right. I I was going to question
1:27:48whether it shouldn't be on action, so by
1:27:51default it is. Thank you.
1:27:52>> Yeah, and including telling the story.
1:27:55>> That's right.
1:27:55>> Yeah.
1:27:57Okay, thanks.
1:28:12>> Thank you.
1:30:06>> Okay, we're going to move to our second
1:30:08agenda item for this afternoon,
1:30:11uh which is uh a couple recommendations
1:30:13on the
1:30:15regional water quality control plant.
1:30:19So, we'll turn that over to
1:30:20>> Yes, and good evening Chair Vaelen and
1:30:23committee members. Uh I'm Brad
1:30:25Eggleston, director of public works.
1:30:28Uh so, the topic before us tonight, uh
1:30:30wastewater treatment fund reserves, are
1:30:33a very important topic for the financial
1:30:35health of the regional water quality
1:30:37control plant, uh and also for rate
1:30:40planning by Palo Alto and our other
1:30:42partners.
1:30:43And our team has really been doing a lot
1:30:46of work on this topic over the past
1:30:48year,
1:30:49including multiple discussions about the
1:30:52recommendations with the partners,
1:30:54and we're very glad to re- have reached
1:30:57this milestone of having this discussion
1:30:59with the committee on those
1:31:00recommendations.
1:31:02Uh so, with that brief introduction, I'm
1:31:04going to turn it over to Tina Pham, uh
1:31:06senior engineer at the plant, who's
1:31:08played a key role in developing these
1:31:10recommendations. Uh she'll also be in-
1:31:13introducing some of the other staff and
1:31:14consultants who are here who have been
1:31:16participating.
1:31:19>> All right, thank you, Brad.
1:31:21Um
1:31:22as he mentioned, I'm a senior engineer
1:31:23with the RWQCP, and over the last year,
1:31:26we've been working very closely with our
1:31:28program manager, Wedren Klaren, and
1:31:30Raptelis, uh who is a consultant
1:31:32specializing in financial planning for
1:31:34local governments to update our reserve
1:31:36policy. I'm happy to present, and
1:31:38sitting next to me is Greg Sands from
1:31:40Wedren Klaren, and on Zoom is Sudhir
1:31:43Partiwala. Um both of them were critical
1:31:45in developing uh these recommendations,
1:31:47and will be available to help me answer
1:31:49uh questions you guys may have.
1:31:51Um so, the work is particularly
1:31:53important because our existing reserve
1:31:55policy is more than three decades old
1:31:57and does not include a framework for
1:31:59direct contributions from our partner
1:32:01agencies to fund our reserves.
1:32:05Um next slide.
1:32:06So this slide um is our
1:32:09staff uh one slide back. This slide is
1:32:12our staff recommendations as presented
1:32:13in the staff report and we would like
1:32:15Finance Committee to review them and
1:32:16provide direction.
1:32:18Next slide.
1:32:19Um this slide is a more detailed version
1:32:23um
1:32:24of our staff recommendations
1:32:25specifically showing the calculation for
1:32:27each reserve type and I'll go through
1:32:28that fairly quickly. For the O&M
1:32:30reserve, the calculation is made of two
1:32:33parts. First part is 20% of the annual
1:32:36operating cost. Second part is 100% of
1:32:39the minor CIP annual authorization. For
1:32:42capital reserves, also two part um to
1:32:45this target, it would be 100% of the
1:32:47average annualized five-year capital
1:32:50plan excluding minor CIP. And the second
1:32:53part is 10% up to 20% of one year
1:32:57average of the annualized five-year CIP
1:33:00um for debt-funded projects.
1:33:02For our debt reserve, we are simply
1:33:05recommending to match our debt covenants
1:33:07requirements. And for rate stabilization
1:33:09reserve, because the plant has partners
1:33:11who are individually responsible for
1:33:13setting their rates, um we uh
1:33:17which are informed by our plant
1:33:18forecast, um we are recommending to
1:33:20eliminate them uh eliminate the rate
1:33:23stabilization reserve.
1:33:25Next, to implement these reserves, um
1:33:27our staff is proposing a five-year
1:33:29phasing schedule um where reserve
1:33:32contributions are increased by a fixed
1:33:34percentage with collection starting in
1:33:37fiscal year 2029.
1:33:39Next slide.
1:33:42So here shows our reserve amounts. The
1:33:44idea is that the reserves would result
1:33:46in amounts recalculated each year as
1:33:48they evolve through time. As you can
1:33:50imagine, our O&M costs change, our CIP
1:33:52program evolves, and loans are initiated
1:33:54and executed and paid off. And so the
1:33:57amounts here are based from information
1:33:59from our fiscal year 2027 forecast and
1:34:03assumes contributions as I mentioned
1:34:05starting in fiscal year 2029. So here in
1:34:07this slide you'll see two charts. The
1:34:09top chart is a blue chart showing the
1:34:12initial RWQCP reserve targets for each
1:34:15reserve part and each reserve type.
1:34:18The first row represents plant-wide
1:34:20reserve target
1:34:22by fiscal year 2033.
1:34:25Made up of debt reserve and capital
1:34:27reserve and these two are based on fixed
1:34:30capacity shares. The O&M reserve will be
1:34:33based on each partner's flow and load
1:34:35share which is updated annually based on
1:34:37data collected from flow meters and
1:34:39samples from the collection system. This
1:34:41split aligns with how costs are actually
1:34:43distributed between the agencies.
1:34:45Second row is Palo Alto specific reserve
1:34:49target amount in fiscal year 2033. The
1:34:52bottom chart shows the five-year phase
1:34:54in timeline to reach the target amount
1:34:56using a fixed rate of increase. You will
1:34:59see the RWQCP reserve targets and the
1:35:02Palo Alto specific amounts as well. Next
1:35:04slide.
1:35:06So working back to
1:35:08how we are making these recommendations,
1:35:10the reserve
1:35:11the current reserve policies are not
1:35:13specific to RWQCP
1:35:15and its partnership model and the
1:35:17associated partner agreements. And
1:35:19that's one of the main reasons why we
1:35:21wanted to do this reserve study. Looking
1:35:23forward though, we sought to develop an
1:35:25updated reserve policy that would meet
1:35:27the current need but also our future
1:35:28needs. Keep in mind that our future
1:35:30capital program is being looked at as
1:35:32part of our long-range facility plan
1:35:34update currently underway and we're
1:35:36anticipating to finish that work up next
1:35:38year in 2027.
1:35:40In addition, we know that Baker Tilly's
1:35:42has extended considerable efforts and
1:35:45our utilities department has as well on
1:35:48citywide reserve policies.
1:35:50And we have reviewed their work and we
1:35:52are working to align the reserve policy
1:35:54recommendations where applicable. Next
1:35:56slide.
1:35:57So, for consistency and clarity, we want
1:36:00to provide some working definitions so
1:36:01we're all using the same vocabulary.
1:36:03These are in the staff report and I'm
1:36:05happy to refer back to them if needed.
1:36:07Next slide.
1:36:09So, over the past year, we've worked
1:36:11hard to analyze several different
1:36:13reserve types
1:36:15um and several different alternatives,
1:36:16several different phasing timelines, and
1:36:19the means of how to increase those
1:36:20amounts um
1:36:22and how they're funded toward the
1:36:23initial reserve targets. We looked at a
1:36:25lot. And so, the check marks summarize
1:36:27the results of the alternatives analysis
1:36:29and reflect the alternative staff have
1:36:31decided to carry forward within our
1:36:33recommendation.
1:36:34So, again, O&M capital debt rate
1:36:37stabilization reserves were assessed
1:36:39over 5, 10, and 15 years um and
1:36:44uh we also looked at the increase types
1:36:46over time.
1:36:48It's very quickly um evidence says that
1:36:5015-year phasing timeline would not work
1:36:53um especially to achieve some of our
1:36:55targets and our increasing capital
1:36:57program that we're expecting. And so,
1:36:59that uh phasing timeline was eliminated
1:37:02early on.
1:37:03Next slide.
1:37:05So, this slide gives the reasoning for
1:37:07our reserves. The conclusion um of the
1:37:10reserve types analyzed identified the
1:37:12need for an O&M reserve in order to
1:37:14mitigate risk and expense of the current
1:37:17billing practice practices and make sure
1:37:19that the plant had sufficient working
1:37:21capital required. Capital reserve is
1:37:23needed in order to respond to unforeseen
1:37:26issues and emergencies. And also, a debt
1:37:28reserve is needed to meet our loan
1:37:30commitments. Again, we found that rate
1:37:32stabilization was not applicable uh to
1:37:34us as a regional entity as we're not
1:37:37responsible for setting rates. Next
1:37:39slide.
1:37:40So, phasing schedule was very important
1:37:42to us and we worked very carefully with
1:37:44our partners to land on our
1:37:46recommendations here.
1:37:47Staff assessed both 5- and 10-year
1:37:49timelines for meeting the initial
1:37:51reserve targets and we found that 5-year
1:37:52timeline best positioned our plant to
1:37:55meet the potential 10-year forecast
1:37:57based on what we knew at the time last
1:37:59year.
1:38:00So, five the 5-year timeline also
1:38:02increases the overall reserve amount
1:38:04quicker, which is anticipated to help
1:38:06provide better financial ratings and
1:38:09therefore could provide better borrowing
1:38:10terms for future debt issuances.
1:38:14Fixed rate or percent increase was
1:38:16determined to be more favorable than
1:38:18fixed amount increase. The fixed rate of
1:38:20increase keeps the year-over-year
1:38:24impacts predictable and this is
1:38:25important to our partners and it
1:38:27simplifies the incorporation of the
1:38:28policy into a multi-year rate setting
1:38:31process and it helps ensure proportional
1:38:33growth in contributions as operating and
1:38:36capital budgets evolve.
1:38:38Next slide.
1:38:42So, this slide shows how the 5-year
1:38:43phase-in timeline
1:38:46compares in blue to the 10-year
1:38:48alternative in red. Both for both the
1:38:51fixed amount increase to the initial
1:38:54target and the fixed percentage increase
1:38:56to the initial target. As a reminder,
1:38:58the initial total reserve target is 34.4
1:39:02million represented by the solid gray
1:39:04line. So, as you'd expect, we we're
1:39:06reaching the target amount quicker with
1:39:08the 5-year alternative, accelerating the
1:39:10timeline that the policy provides the
1:39:13plant with access to capital in order to
1:39:16respond to emergencies and access to
1:39:18working capital to best align with the
1:39:20plant's billing practices.
1:39:22Next slide.
1:39:23So, this slide compares the dotted line
1:39:26to the solid line
1:39:28and it's meant to
1:39:30show how we analyze the fixed amount
1:39:33type of increase versus the fixed
1:39:35percentage. So, staff is recommending
1:39:37the fixed rate increase. This approach
1:39:40allows for more gradual initial
1:39:43increase, giving partners time to plan
1:39:45for the reserves into the rate
1:39:46projections. This is particularly
1:39:48important to some of our partners who
1:39:49set rates for 5 years, and the rate
1:39:52increase will also favorably position
1:39:54the plan to respond to higher reserve
1:39:56target values if and when capital
1:39:58projects are being added to the capital
1:40:00program, as I mentioned as part of our
1:40:02long-range facility plan update.
1:40:04Next slide.
1:40:06So, this chart shows how the reserve
1:40:08balance will grow toward the target
1:40:11during the phase-in timeline. For each
1:40:13year, there are three different shades
1:40:15of gray representing the three reserve
1:40:17types that would get funded in that
1:40:19year. Starting in fiscal year 2030,
1:40:21you'll have, um, you know, the second
1:40:24year of the phase-in timeline.
1:40:25Also shown are the gray amounts,
1:40:28um, which reflect the reserve balances
1:40:30carried over from prior years. And
1:40:32ultimately, in fiscal year 2033,
1:40:35the, um,
1:40:37RWQCP treatment fund reaches 34.4
1:40:40million in reserves.
1:40:43Next slide.
1:40:45So, there's a lot to this slide, I'm not
1:40:46expecting to go through it, but the
1:40:48purpose of this slide is to show our
1:40:49work, um, as we reviewed Baker Tilly's
1:40:52recommendations as well. Um,
1:40:54and in general, both approaches are
1:40:56pretty similar.
1:40:58Um, we have a similar total reserve
1:41:00target, but there are a couple key
1:41:01differences that I want to highlight.
1:41:03So, staff recommendation for O&M reserve
1:41:05is tailored to how the plant actually
1:41:07does its billing cycles to the partners,
1:41:09and also pro- and and provides the
1:41:12associated working capital we need. Um,
1:41:14the capital reserve is also tailored to
1:41:16the plant. The majority of the plant's
1:41:19capital projects are debt funded. So,
1:41:21basing capital reserves solely on
1:41:23cash-funded projects would not, um,
1:41:26provide significant enough reserves.
1:41:28Instead, staff are proposing to keep
1:41:30Baker Tilly's recommendation for
1:41:31cash-funded projects in this policy, and
1:41:33then add 10 to 20% of the annualized 5
1:41:37year CIP to the reserve.
1:41:40Our debt funded our our our debt funded
1:41:42reserve essentially is the same between
1:41:44us and Baker Tilly, basically meeting
1:41:45our debt covenants requirements.
1:41:47And as mentioned previously, we're
1:41:49eliminating the rate stabilization
1:41:50reserve.
1:41:52Next slide.
1:41:54So a key component to our reserve
1:41:56management will be governance and
1:41:58tracking that will be needed to include
1:42:00it in our partner amendments. We
1:42:02currently meet with partners at least on
1:42:04a quarterly basis and they've been very
1:42:06involved in the development of these
1:42:07recommendations. Working with our
1:42:09partner agencies, we will need to
1:42:11memorialize the means by which the
1:42:13reserve balances will be tracked, how
1:42:15the targets will be updated, and the
1:42:17basis for each partner's contributions,
1:42:19and the means to replenish these funds.
1:42:22So we haven't figured all this out yet.
1:42:24We're working on these items over the
1:42:26winter and developing
1:42:28recommendations for the committee as
1:42:30part of our next steps. Next slide.
1:42:33So here's a simplified version of the
1:42:35timeline for our next steps for our
1:42:38RWQCP wastewater treatment fund
1:42:40policies, but also the Palo Alto
1:42:42wastewater collection fund reserve
1:42:44policies as well. This chart was in the
1:42:46staff report. We know both groups are
1:42:48working in collaboration and will
1:42:49continue to do so. And we also know our
1:42:51recommendations today will impact Palo
1:42:53Alto collection system's reserve policy
1:42:55and rate setting process.
1:42:59Next slide.
1:43:00So this again is the recommended action
1:43:02side.
1:43:03Again, we're hoping to have your review
1:43:06and direction
1:43:08on our reserve
1:43:10categories and targets.
1:43:12Any questions?
1:43:20>> I'm sure we have a bunch.
1:43:23Uh
1:43:24not as many as the last item.
1:43:26Um
1:43:27so
1:43:30our our current reserves, can you
1:43:32refresh that uh us what we have there
1:43:35including the one that we're going to
1:43:37eliminate on the rate stabilization?
1:43:40>> Yes. So,
1:43:422026 unaudited financials reflect 7.8
1:43:46million dollars in total reserves. And
1:43:49we looked in the past, our reserves in
1:43:52the last 3 years have been around that
1:43:54amount between 5 to 7 million roughly.
1:43:58>> And how much of that is the rate
1:44:00stabilization versus us?
1:44:02>> Rate stabilization, I believe is about
1:44:05currently
1:44:072.6 million of the 7.8.
1:44:10>> Okay.
1:44:11So, then on
1:44:13slide 11 where we see a 2029
1:44:17starting point on the increases
1:44:22um
1:44:23I'm assuming that that's approximately
1:44:26reflecting
1:44:28what we have in the other reserves or
1:44:30what we're going to bleed down from the
1:44:31whole 7.8.
1:44:33>> Yes, we expected that you would ask this
1:44:35question.
1:44:37We know of our current 7.8 million
1:44:40dollars in reserve amount. This analysis
1:44:43does not include
1:44:46that amount because when we ask for
1:44:48contributions will be more than 3 years
1:44:50from now
1:44:51and we're trying to message to our
1:44:52partners ahead of time. When it comes
1:44:54down to it, when we actually initiate
1:44:56these reserves, we'll of course roll
1:44:58over whatever is left into the reserve
1:45:00amounts.
1:45:01>> I'm just trying to understand
1:45:04how rolling that over will impact the
1:45:08contributions we need to make each year
1:45:10to the reserve and leading into my next
1:45:13question is what that's going to mean on
1:45:16rate increases.
1:45:17>> So, we're currently trying to have the
1:45:20committee develop or approve a
1:45:22methodology of how we calculate our
1:45:24reserves. We're going to have to
1:45:24calculate every year, but because we're
1:45:28a regional facility and we're trying to
1:45:30give our partners a head and we do
1:45:32forecasting out for 10 years for them
1:45:34and we provide that forecast for them in
1:45:36November. We're trying to build that
1:45:38into
1:45:39into their rate their they can build
1:45:41into their rate models going forward. So
1:45:43what we anticipate is is that will going
1:45:46in 2029 will look at what we have
1:45:49and then
1:45:50anticipating what we we also think that
1:45:54potentially rates will
1:45:56go our our operating costs may go up
1:45:58over time by 2029 our capital may go up
1:46:01over 29 and so we're going to have to
1:46:03recalculate it every year and so then
1:46:05we'll be lumping that 7 million plus
1:46:08whatever our our target will be and
1:46:11we're going to have to recalculate it
1:46:12for our partners, but we needed the 34
1:46:14million target right now in fiscal year
1:46:1623 is what was based off of the current
1:46:19the current forecast we had.
1:46:22So it's this is where it's a
1:46:24I mean it it's moving, right? It's it's
1:46:26it's can't be static because none of our
1:46:29capital projects are static. Pro-
1:46:31projects change
1:46:33some are delayed
1:46:35some costs increase, so that's what
1:46:37we're also trying to do.
1:46:39But
1:46:40if that makes sense annually we'll be
1:46:42updating the the rate the reserve
1:46:44targets for our partners.
1:46:45>> more
1:46:46more more of a methodology
1:46:48than actually a forecast.
1:46:50>> Correct.
1:46:50>> And if I can add one more point though
1:46:52Councilmember Burke to your question
1:46:55Karen described these factors that will
1:46:57be changing every year.
1:46:59If all things were equal and when we
1:47:02started collecting this we were still
1:47:05looking at a 34.4 million dollar number
1:47:08that would mean that we were we would be
1:47:10collecting less from the partners than
1:47:13is shown in this report. Because we
1:47:15would we would start with already having
1:47:18those funds in the reserves and not need
1:47:20to collect as much.
1:47:21>> Yeah. And I
1:47:22>> But we don't have confidence that will
1:47:23be the case and so this really it is
1:47:26more of a methodology.
1:47:27>> We have this fun slide four we have the
1:47:30under the five-year timeline
1:47:33um
1:47:34uh
1:47:35Palo Alto specific contributions right
1:47:38under that green
1:47:40down to the dollar uh on something that
1:47:43we're really just saying is a formula.
1:47:45Um and what I was trying to understand
1:47:48is
1:47:49do those contributions assume a transfer
1:47:52of existing reserves or not?
1:47:54>> No, it does not.
1:47:56>> Okay.
1:47:58Okay. And
1:48:01appreciating that uh these are estimates
1:48:04and we're really looking at today at uh
1:48:07endorsing
1:48:08an approach um
1:48:11nevertheless do we have because this
1:48:13could inform our feedback on five or 10
1:48:16years um
1:48:18is what do we think are the rate
1:48:19impacts?
1:48:22>> So we worked with our utilities
1:48:24counterparts for collection system and
1:48:26they they assume about a 1.9% increase
1:48:29based on the numbers we provided. Um and
1:48:32so that's per year but it's additive. So
1:48:35it's 1.9
1:48:37and then
1:48:38per um
1:48:40So the way that it's it's
1:48:43they're going to be building it in
1:48:46the way that when we were talking to
1:48:48utilities the first year it's a 1.9%
1:48:51increase and then they're going to have
1:48:54to build it into their over overall
1:48:55model
1:48:56for the based on our fixed rate
1:48:58percentage.
1:49:00And so it may be more than 1.9% the
1:49:03second year.
1:49:04Depending on
1:49:06the target and the other um factors that
1:49:10we have.
1:49:12>> And have you also modeled if it's 10
1:49:14year what the rate increases would be?
1:49:17>> not meet our debt covenant requirement
1:49:18if we do a 10-year. That is why we we
1:49:21are recommending a 5-year.
1:49:23Once our secondary treatment project is
1:49:25completed in 2029, we and plus a few
1:49:27other projects, we need to have money in
1:49:29the bank, which we currently don't have
1:49:31enough of.
1:49:32>> Oh.
1:49:32>> By 2029.
1:49:33>> Is the the slides
1:49:36when we had
1:49:38I'm not sure that was clear when slide
1:49:40seven was explained.
1:49:42That we basically
1:49:45it
1:49:46sounds to me like slide seven should be
1:49:48gray from what you just said. That is
1:49:51it's a non-starter.
1:49:54>> Correct. Correct.
1:49:54>> Okay. So, maybe we should modify that.
1:49:56>> Correct.
1:49:57>> Okay.
1:49:58>> I just also wanted to add to the
1:49:59question about rate impacts. The 1.9%
1:50:02as modeled this afternoon by staff, um,
1:50:05based on a typical residential monthly
1:50:07bill is about a $1.67
1:50:10a month.
1:50:12>> That's better to hear.
1:50:21>> Thank you.
1:50:22Um,
1:50:25I I I think it's still a little bit hard
1:50:27for me to
1:50:28reason about the point about a forecast
1:50:31versus the methodology sort of going out
1:50:33into the future.
1:50:34And so, the
1:50:37uh
1:50:38that the capital assumptions and debt
1:50:41covenants assumptions, how likely do you
1:50:44think those are to change between
1:50:47uh for 2029 to 2033? Like, are we
1:50:51already baking in our assumptions about
1:50:53that we might raise or and
1:50:56sort of larger capital projects that we
1:50:58might add between now and uh when we are
1:51:02next slated to review capital projects
1:51:04in fall 2027?
1:51:06>> Yeah, I can take a stab and then maybe
1:51:08you can add. Um,
1:51:10so, how we calculated 16.9 million for a
1:51:14debt reserve it includes a few projects
1:51:16that we know are already in construction
1:51:19and that the debt covenants requirements
1:51:21will come into place as soon as we start
1:51:23paying debt service. One example for
1:51:25that is STU project. Um so, in 2 years
1:51:29we expect that we will need to have
1:51:31roughly 8 million dollars. Um you know,
1:51:34to cover that debt covenants, but then
1:51:36we also in our modeling include projects
1:51:38that are under design or anticipated as
1:51:40well
1:51:41um that would um
1:51:44you know, potentially need
1:51:46uh
1:51:47money to meet those requirements within
1:51:49the time frame. However, if those
1:51:51projects um extend out or are delayed
1:51:54for whatever reason, we may not need the
1:51:56full amount by 2033, but this is again
1:51:58is our best guess based on our forecast
1:52:01um developed last year.
1:52:03>> Okay.
1:52:04>> So, those are projects that have already
1:52:06been approved in the 5-year capital
1:52:08program that council's already
1:52:10authorized. So, we're not adding any new
1:52:12projects at this point in time.
1:52:14So, so when we look to budget for the
1:52:175-year capital, those are the projects
1:52:19that were included in this current
1:52:20reserve.
1:52:21>> Got it.
1:52:22>> analysis
1:52:23>> Got it. Just
1:52:24>> why we did a 5-year
1:52:25>> Yeah.
1:52:26>> lookout, but we also do forecasting for
1:52:2810. So, there may be projects in there
1:52:30that council has not authorized in the
1:52:32in cuz we only authorize 5 year that we
1:52:34are planning out cuz large-scale capital
1:52:36projects we're now working on a
1:52:38long-range facility plan update for the
1:52:40next 50 years that we'll be bringing to
1:52:42council sometime next year.
1:52:44>> Okay.
1:52:48I think that is helpful uh and just to
1:52:50be more explicit the word in the back of
1:52:51my mind is that in 2028 we or 2027 we
1:52:56uh add an extra
1:52:58100 million dollars in capital projects
1:53:00and then actually the rate increases
1:53:02um
1:53:03might be
1:53:05twice as high if they start in 2029 uh
1:53:08and uh
1:53:09we still need to reach the target by
1:53:102033
1:53:12realizing that
1:53:13uh
1:53:14that a lot of those planned future
1:53:17projects are already baked in but not
1:53:19potentially all of them.
1:53:23I think
1:53:25that is helpful to understand
1:53:28but still a little bit confusing in
1:53:29terms of where we'll actually
1:53:32be in
1:53:34uh in terms of rate increases from 2029
1:53:36onwards.
1:53:39Even acknowledging that the total amount
1:53:40is relatively low per bill.
1:53:45I'm not sure. Is there anything we can
1:53:46actually say or
1:53:49do about that now or is this
1:53:51do we just is the recommendation just to
1:53:53move forward with the methodology you
1:53:54know that some projects might change but
1:53:56we don't expect
1:53:58the total change to be really massive
1:54:00now.
1:54:04>> So we're we're trying So I think some of
1:54:06your questions are going to be answered
1:54:08when we bring our long-range facility
1:54:10plan update which we're anticipating
1:54:12probably mid to late 2027. As you can
1:54:15anticipate doing the last time we did a
1:54:17lot our long-range facility plan was in
1:54:192012 and some of the projects that were
1:54:21that are built into this 5-year
1:54:23methodology are projects from the 2012
1:54:27master plan. So that's how long it takes
1:54:30to give you perspective for large-scale
1:54:32capital projects at this huge treatment
1:54:34plant take to plan design fund and then
1:54:39start construction on. So
1:54:42the anticipation that we're going to get
1:54:44a a project done quickly in 5 years is
1:54:48not going to happen. I wish I wish they
1:54:51would because our plant is 50 years old
1:54:53and falling apart but you can't get
1:54:55capital done that quickly.
1:54:57>> Okay.
1:54:58>> just to calm people down.
1:55:00>> Okay. Right. That's helpful. Um
1:55:03uh
1:55:05I maybe a more detailed and technical
1:55:07question. Can you just sort of help me
1:55:09unpack the
1:55:11capital reserve in the capital portion
1:55:13of the operating and maintenance reserve
1:55:16in particular having 100% of minor CIP
1:55:20and reserves feels like a lot like
1:55:23If we're doing a million-dollar minor
1:55:25project, we would actually
1:55:27have an extra million in reserves like
1:55:29sort of two x
1:55:30>> So so the
1:55:32portion that we have in our operating is
1:55:34actually for cash flow. So we have
1:55:37agreements with all of our partner
1:55:39agencies for minor capital authorization
1:55:42that was from a 1994
1:55:47where it's not a lot of money. It's
1:55:48around I think we're up to 4.4 million
1:55:50dollars. So it's really not a ton of
1:55:52money to do small-scale capital projects
1:55:55without having to go and do a partner
1:55:57amendment for every single project we
1:55:59want to do, but it's to give our cash up
1:56:01front. So we have that money sitting in
1:56:03the bank. So we're not waiting for it.
1:56:06So and that because right now the way
1:56:08that our billing is and that's the whole
1:56:10operating reserve for billing. We build
1:56:13we look at a forecast. We forecast out
1:56:15what we anticipate we'll spend. We bill
1:56:17quarterly on anticipating spends and
1:56:20then at the at the end of the fiscal
1:56:22year our the second quarter we true up.
1:56:27So we might be carrying bills on our
1:56:29books
1:56:31for a little bit and that's why we want
1:56:32that reserve. So we have the money in
1:56:35the bank. Okay. That was the whole point
1:56:37of that. Okay. Does that make sense?
1:56:39>> Yeah, that makes sense
1:56:42and
1:56:44I could imagine some alternate world
1:56:46where we had sort of more agile billing
1:56:48of our partners, but
1:56:51realize that that's probably a minor
1:56:52optimization also not the world we live
1:56:54in and so that makes sense and that
1:56:56clarification is appreciated. Thank you.
1:57:00>> Okay, I have a number of questions. You
1:57:02know,
1:57:04we touched already on this 1.9%
1:57:07and then you say it could be per year
1:57:09for for 5 years a couple of places here
1:57:11in in the packet.
1:57:13So
1:57:14the cumulative number over time could go
1:57:16up like 6 8%.
1:57:21>> And
1:57:21>> So according to utility staff, yes, it
1:57:24could go up over time. So it's a
1:57:26cumulative increase.
1:57:28>> And this is for our actual
1:57:30>> For our actual reserves.
1:57:31>> Not our not our partners in this but for
1:57:33our customers.
1:57:34>> Our customers.
1:57:36>> Uh-huh.
1:57:37Okay, so that's the wrong number.
1:57:38>> So just to be very clear, I think what
1:57:41utility staff is telling us is they're
1:57:44modeling that if you're kind of
1:57:46averaging this out, it's a 1.9% increase
1:57:50every year of the 5 years.
1:57:52So, you know, 5 * 1.9 plus whatever the
1:57:58exponential piece of that is, right?
1:58:02>> Yeah, that's not a trivial number. No.
1:58:04>> It is not.
1:58:06>> Um
1:58:08Okay, and then another thing back on
1:58:11in in the packet where you were going
1:58:13over on
1:58:14Let's see, this is packet page 218 where
1:58:17you're going over the
1:58:18What's this thing headed?
1:58:20It's the beginning of the analysis
1:58:22you're talking about the partners
1:58:23and then how you bill the partners and
1:58:25so on and you have It was one of my
1:58:27questions that you you just touched on
1:58:28right now.
1:58:29Um
1:58:30where you bill on a quarterly basis and
1:58:32then you fill in with um
1:58:35number four which is the emergency
1:58:37response capacity.
1:58:39And that's where you can do some
1:58:40borrowing. But why wouldn't it be easier
1:58:43and then we're building up all these
1:58:44reserves, why wouldn't it be easier to
1:58:46say move to 60-day billing as opposed to
1:58:4990-day billing and get our cash sooner
1:58:52so we don't have to go through quite as
1:58:54many hoops.
1:58:56>> So, that is what our current um historic
1:58:59long I think that the great questions.
1:59:02Um it would just require a partner
1:59:04amendment. So,
1:59:05>> To the contract?
1:59:06>> Yes. So, this is all in our existing
1:59:10long-standing agreements with our
1:59:12partners.
1:59:13>> Yeah, back to 1950 I read, right?
1:59:15>> Many of them are very old.
1:59:17So,
1:59:18>> Uh but it just seems that that was
1:59:20pretty liberal to begin with and maybe
1:59:22just trim
1:59:23pulling that in a little reeling that in
1:59:24a little bit would give us cash earlier
1:59:26and that might change some of these
1:59:28numbers to our advantage.
1:59:30Um I mean I don't know how hard it is to
1:59:32arm wrestle to get those. And and the
1:59:35related question is did you have would
1:59:36you have to get that from all of them?
1:59:39In order to make it
1:59:42>> So, for example, the line of credit,
1:59:44I'll be going to East Palo Alto meeting
1:59:47after this meeting to get that one
1:59:49approved. So, any amendment we do I have
1:59:51to go to all the partners.
1:59:52>> Mhm.
1:59:53>> So, and that's just for the line of
1:59:55credit. So, then we can start pulling on
1:59:56the line of credit that we approved in
1:59:57August.
2:00:00>> Yeah. Yeah, but yeah, your sentence
2:00:02>> Sorry, I think it's great. We definitely
2:00:03can make changes and amendments. It's
2:00:05just it takes time
2:00:07to to do to bring all the partners along
2:00:10cuz we have um
2:00:11five partners.
2:00:13>> Yeah. Well, obviously I've never read
2:00:14that contract, but
2:00:16it seems like we got the water, so
2:00:18that's a good start.
2:00:20I mean the waste water billing.
2:00:22Um
2:00:23but you're you're absolutely correct
2:00:24there that that gives you limited
2:00:25flexibility to respond to emergencies
2:00:27and we have to have those. I mean that's
2:00:28that's that's an easy
2:00:30uh analysis there or an easy easy to
2:00:33agree with that analysis.
2:00:36And then just jumping to in a number of
2:00:38cases here I I was asking about what are
2:00:40the impacts on the partners and you said
2:00:42that it was very positive. So, sort of
2:00:45what what's it going to cost them and
2:00:47they had positive response. How's that
2:00:49going to be incorporated also with
2:00:50contract amendments?
2:00:52>> Yes. Everything needs to So, that's why
2:00:54we factored into 2029.
2:00:57So, when November when we give we
2:00:59provide our forecast for 10 years to our
2:01:01partners for 28 in November and we'll
2:01:04put this in the in their portion of the
2:01:0629 so they can plan out for their rates.
2:01:09And then we'll need to work with Kyle to
2:01:11help do the amendment and they'll need
2:01:13to go to all of our partners to get
2:01:15their amendments to get the approval to
2:01:17them build it in.
2:01:18>> Okay, that's the mechanics and why why
2:01:20are they feeling good about this? What
2:01:22are they What are they
2:01:23>> bringing them along. Um they understand
2:01:25the urgency, they understand the age of
2:01:27our infrastructure.
2:01:29Um we've had to do a lot of new partner
2:01:31amendments. Um if you if you remember we
2:01:33will came back to council on the GB01
2:01:36fix.
2:01:37Um the joint interceptor sewer fix where
2:01:39all the waste water comes in. We started
2:01:41the No one understands GB01 but we do
2:01:44cuz we spent the summer trying to fix
2:01:45it. But it's where all the waste water
2:01:47comes in and um we had to do a massive
2:01:51emergency fix on that. And so we've been
2:01:52bringing the partners along. That was
2:01:54millions of dollars. And so the partners
2:01:56understand the urge and the and the
2:01:58urgency of it and they come to our
2:01:59facility and they know it's critical
2:02:01infrastructure. And so we're at kind of
2:02:03a juncture where we're rebuilding the
2:02:04site.
2:02:05>> It It's been interesting at a couple
2:02:07points along the way where at partners
2:02:09meetings we were describing these fixes
2:02:12and the need to
2:02:14we were having to have them go back and
2:02:16authorize more funding on kind of an
2:02:19emergency basis
2:02:21and they're saying to us, "Why don't you
2:02:22have a capital reserve that you can pull
2:02:25from to take care of these items?"
2:02:29>> Right. And I'll also add that they fully
2:02:31understand the debt covenants
2:02:33requirements. Like Palo Alto takes on
2:02:35the debt for
2:02:36um our our WQCP and so they fully
2:02:39understand the need for us to meet those
2:02:41covenants requirements.
2:02:43>> So, if as a policy we came back and said
2:02:46we we just don't think we can
2:02:48I know this is still early stages, but
2:02:50that we can't tolerate 1.9 a year for 5
2:02:53years, then what what do we what would
2:02:55we do to help
2:02:57uh get that lower?
2:03:00>> I I I think the the only option would be
2:03:03changing either reserve targets or the
2:03:06uh ramp-up period.
2:03:10You know, um
2:03:12obviously 5, 10, and 15 are not the only
2:03:16numbers between 1 and 15.
2:03:20So, if if there was more uh work the
2:03:22committee was interested in seeing,
2:03:25we could still look at other options.
2:03:30>> Okay.
2:03:31Uh that's my questions for now, so do we
2:03:33see if there's any public comment,
2:03:34please?
2:03:35>> There are no requests to speak for item
2:03:37two.
2:03:38>> Okay.
2:03:42All right, then just comments from
2:03:44council members. You want to start, Pat?
2:03:45>> Well,
2:03:46just following up on that last uh issue
2:03:48of
2:03:49um
2:03:50Karn had said before that 10 years
2:03:52wouldn't achieve our objectives. Uh I
2:03:55would be interested in uh whether there
2:03:58is somewhere between 5 and 10 that would
2:04:00meet the objectives and would spread out
2:04:03the uh
2:04:04uh the rate increases a little bit. I'm
2:04:06not saying that is what we would choose
2:04:08to do, but uh that would be useful to
2:04:12have modeled that.
2:04:12>> Yeah, options, sensitivity analysis,
2:04:15something like that.
2:04:21>> And just uh plus one to that, but uh
2:04:24also that um
2:04:28I like the uh
2:04:30fixed rate approach in that we can make
2:04:34a game-time decision in 2030 or 2031 if
2:04:38we want to contribute
2:04:40like or can we make a game time decision
2:04:42if we want to contribute slightly less
2:04:44to capital reserves
2:04:47uh
2:04:48in
2:04:49sort of before the exponential
2:04:53uh
2:04:54uh increase of like the fourth and fifth
2:04:57year of the phase in hits or would we
2:04:59not be able to make any of those
2:05:02decisions because it all be already
2:05:04contractually up with all of our
2:05:05partners?
2:05:07>> I think it would depend on how we um
2:05:10structure it if there are some
2:05:12flexibilities.
2:05:13Um I I think we know I I do we'll try
2:05:16and model different scenarios. I do also
2:05:18want us to um think about how this will
2:05:21increase our or decrease our ability to
2:05:24get bonds in the future if we don't have
2:05:26money in the bank cuz we also know that
2:05:28our ability to get SRF is is dwindling
2:05:31for future projects. So we're most
2:05:33likely going to need to bond finance
2:05:34future our capital projects which is
2:05:36another reason why we need a reserve.
2:05:38>> Yes. I understand.
2:05:39>> us to to think about all the different
2:05:41scenarios as to why we did this and
2:05:43we've actually been very fiscally
2:05:44conservative in terms of why the the the
2:05:4734 million's actually um the we were
2:05:49trying to be the smallest amount of rate
2:05:52increase for our partners
2:05:54even though
2:05:55um other places were recommending a 20%
2:05:58for capital and we went to 10. So I'm
2:06:00just I I want the um I want the
2:06:03committee to understand that we actually
2:06:04were really trying to be as lean as we
2:06:06could knowing the potential implications
2:06:09for rate increases cuz we've heard you
2:06:11over the years
2:06:12um but we're also trying to make sure
2:06:13our facility is robust and can um be
2:06:16adaptable especially with the current um
2:06:19El Nino coming down the pipeline and we
2:06:21don't actually have money sitting in the
2:06:22bank for that one.
2:06:23>> Okay.
2:06:23>> Thankfully we have a line of credit but
2:06:25>> I do think I
2:06:27should bring up with the committee. I
2:06:31in the interest of simplicity and having
2:06:33this be something that we can work with
2:06:36more easily administratively, we've
2:06:38shown you scenarios with wrap-ups on a
2:06:41specific timeline.
2:06:43That does raise the issue that Karen
2:06:46described of the debt service reserve
2:06:48and our our needs to meet debt covenants
2:06:51and build that up to a certain level at
2:06:53a certain time.
2:06:54So, we have had some discussion about
2:06:56the potential of funding
2:06:58fully funding the reserves on different
2:07:00timelines.
2:07:02So,
2:07:03we're not thrilled about that, but I'll
2:07:05put it out there that the one thing we
2:07:07could look at is
2:07:09funding the debt service reserve on on
2:07:12the timeline that that allows us to meet
2:07:15that while having a somewhat longer
2:07:17timeline on fully funding the others.
2:07:19>> Mhm.
2:07:21Yeah, I'm very respectful of the fact
2:07:23that our partners have
2:07:25rate payers,
2:07:27um but we have rate payers and partners.
2:07:30So, we have two things to worry about.
2:07:32Um
2:07:33and
2:07:34it's just been a hit it's just been a we
2:07:36as we know our utilities just been a hit
2:07:39year after year after year after year
2:07:40since the pandemic's been over, so
2:07:43um
2:07:46it it's an issue.
2:07:48>> And so, how would there be flexibility
2:07:52or would there not be flexibility if in
2:07:542031 we actually say, "Actually, our
2:07:58capital projects are going really well
2:07:59and uh
2:08:02the uh
2:08:05reserves potentially could be lower than
2:08:07the budget amount or
2:08:09uh maybe we don't need to or maybe
2:08:11something changes about our debt. Um
2:08:13would we be able to say at that point,
2:08:15"Let's stretch it out over another
2:08:17couple of years." or would we
2:08:20uh be pretty boxed in with all the
2:08:22>> So,
2:08:22>> partners?
2:08:23>> I think what we can do is we can
2:08:24probably give um it's based on what your
2:08:27recommendations is we'll go back to the
2:08:29drawing board and see what flexibility
2:08:30we can build in to give some options for
2:08:32you based on what you're requesting. We
2:08:35did try and build in options with the
2:08:38the debt. Um, if you look at the
2:08:39capital,
2:08:40uh, it was a 10 to 20% and we're only
2:08:43recommending 10 right now and we're not
2:08:45recommending 20 until later and that
2:08:47would have give us flexibility. So maybe
2:08:48we look at doing a five to
2:08:5120% right?
2:08:53>> I see.
2:08:53>> So we could give ourselves some other
2:08:55kind of flexibility in there so we don't
2:08:57have to come back and revisit the whole
2:08:59reserve policy but it would give us that
2:09:02flexibility for the committee um, to
2:09:04make some changes or adjustments as
2:09:06needed. So we can we'll we'll do some
2:09:08work on our end and see what we can do
2:09:10cuz I'm listening I'm hearing you and
2:09:12seeing what we can and maybe there's a
2:09:14schedule will make it more work for us
2:09:15but schedule that we need to make our
2:09:17debt covenant. Let's make that but then
2:09:19maybe the other reserves can be on
2:09:21different time horizons and we'll look
2:09:22at those and see what we can come back
2:09:24for you which is great. This is why we
2:09:25wanted this discussion now.
2:09:27>> Yeah, I think having some flexibility
2:09:29that uh, I'm not saying that we will
2:09:31necessarily use because we do want to
2:09:34properly fund this. Uh, would be nice
2:09:37uh,
2:09:38just so we have the optionality and
2:09:39don't need to go back to partners. Um,
2:09:42yeah.
2:09:43>> And then Kyle's going to help us
2:09:45figure out how to put that in our
2:09:46amendments.
2:09:48>> Yes.
2:09:50>> Just not slowly. Go.
2:09:53So, you know, I I think
2:09:55um,
2:09:56you know, we we talked a lot about just
2:09:59how much work goes into uh, any changes
2:10:02to the way the financing of the or
2:10:05finances for the wastewater treatment
2:10:07enterprise work. Um, you know,
2:10:10Corrine talked about how the plant was
2:10:11built 50 years ago and it's kind of held
2:10:14together by
2:10:15you know,
2:10:16band-aids and duct tape and
2:10:18um,
2:10:19>> Oh, not duct tape.
2:10:21>> Uh,
2:10:22I I I think you could you say the same
2:10:23thing about the partner agreements.
2:10:25Um they're they're just very antiquated
2:10:27in the way they contemplate uh how the
2:10:30enterprise is uh run on both uh you
2:10:33know, operations day-to-day basis, but
2:10:35also capital funding. You know, it's
2:10:36it's very much a a hand-to-mouth organi-
2:10:39um operation.
2:10:41And so,
2:10:42um I I think that uh the reserves are
2:10:46are actually going to be
2:10:48uh welcomed by our partners because they
2:10:52add a lot more predictability to, you
2:10:56know, their planning. You know, so we
2:10:58talked about our partners and their
2:11:005-year rate setting. That Mou- Mountain
2:11:01View is the only one with a 5-year rate
2:11:03setting schedule, but but the rest um
2:11:06set their rates annually, but they also
2:11:08have
2:11:09significant capital improvement programs
2:11:12that they are planning. So, all of, you
2:11:14know, the the farther out in advance
2:11:17that we can help them forecast what we
2:11:20are expecting as the treatment component
2:11:23of their sewer rates, the more they
2:11:25appreciate it. And so, um I I think we
2:11:28can
2:11:29These These are all things that we're
2:11:31keenly aware of as we work through our
2:11:33partners and and the partner agreements
2:11:36um and it is it is on the list of things
2:11:38for for my office to do.
2:11:44>> Okay. So, the the motion is to approve
2:11:47the framework of this approach.
2:11:51So, I'm happy to move that on uh
2:11:53page back of page 214,
2:11:56one and two.
2:11:59>> Second.
2:12:06>> Unless there are any other questions, we
2:12:07can put that to a vote.
2:12:10>> All right.
2:12:13We did.
2:12:15>> Rolls.
2:12:16And so, this motion does
2:12:19have that 5-year
2:12:21sort of hardcoded in.
2:12:24But we still want information about in
2:12:27between 5 and 10, and this motion is
2:12:30fine for that. Just to be very explicit.
2:12:32Okay.
2:12:33>> Yes, we under- we understand the ask.
2:12:35>> Yeah. Fair question, George.
2:12:36>> Yeah. And some optionality around uh
2:12:38uh
2:12:39flexibility in ways that we don't have
2:12:41to. Yeah, got it. Okay.
2:12:44>> If I might ask for clarification,
2:12:46um
2:12:47Commissioner Relyea, did you want to
2:12:48include number three
2:12:50of the staff recommendation? I'm only
2:12:52showing numbers one and two cuz I
2:12:53thought that was what I heard.
2:12:59>> Well,
2:12:59>> Number three is the one that has the
2:13:02>> 5-year timeline.
2:13:02>> 5-year.
2:13:05>> Yeah, let's start. Yeah.
2:13:08We'll go back to staff on that question.
2:13:10Do we need three at this point?
2:13:14>> Three is the tentative but direction, so
2:13:17I think we would uh with staff having
2:13:21agreed to look at modeling something
2:13:23between
2:13:25uh five and 10, but uh
2:13:28>> I do think as well that from the the
2:13:30discussion we're having, uh I think we
2:13:33would want to come back to the Finance
2:13:34Committee and show some of uh these
2:13:36materials. So, this motion as written is
2:13:40for a recommendation to the City
2:13:41Council.
2:13:43>> So, we should drop three.
2:13:44>> I I don't think we're we're ready we're
2:13:45there yet.
2:13:47>> So, we're not including three.
2:13:49>> It would be helpful if you included
2:13:51three. Just um
2:13:54the only reason why I'm asking for three
2:13:56is cuz we're going to our to provide our
2:13:58forecast for our partners, but knowing
2:14:00that that's a tentative partner forecast
2:14:03for 2029. Just because And it can
2:14:06change. Cuz we're trying to be as as
2:14:08transparent for our partners, and I
2:14:10don't want to not include a potential
2:14:13reserve target
2:14:15in the November
2:14:17forecast for them.
2:14:19And this is the challenge that we have,
2:14:21but then knowing that it and it will be
2:14:22forthcoming with them knowing that it
2:14:24may change.
2:14:25>> Well, I think we should put in the word
2:14:26tentative then.
2:14:27>> That's fine. And I'm okay with that. I
2:14:29just want something that I can show my
2:14:30partners cuz we've already given them
2:14:32all these numbers.
2:14:33>> Okay. Put in tentative before 5-year.
2:14:36That also addresses your question,
2:14:37George.
2:14:38>> Yeah.
2:14:38>> That'd be great. Thank you. We
2:14:39appreciate that. Thank you.
2:14:43>> So, you're adding three.
2:14:45Oh, you you already did.
2:14:46>> Yeah.
2:14:47>> Faster than we can talk. You had it on
2:14:48the screen. Thank you.
2:14:50Okay. Vote, please.
2:14:53>> Council member Lou?
2:14:54>> Yes.
2:14:55>> Council member Burt?
2:14:56>> Yes.
2:14:56>> Council member Lowing?
2:14:58>> Yes.
2:14:58>> Motion carries unanimously.
2:15:00>> Okay. Thanks.
2:15:02Good iterative discussion and more to
2:15:03come.
2:15:05Thanks to staff for all that.
2:15:08And I think we already have Do we need
2:15:10need to do any look forward on this
2:15:12committee today?
2:15:14I don't think so, right?
2:15:16Okay. All right. Then we stand
2:15:18adjourned.
2:15:19I already asked. Oh, oh, sorry.
2:15:21The open public comment.
2:15:23>> Yes.
2:15:24>> Go ahead.
2:15:24>> There are no requests There are no
2:15:26virtual requests for general public
2:15:27comment.
2:15:28>> Yeah.
2:15:29Okay. Thanks.