Based on auto-generated captions; names, numbers and speaker attributions may be misheard (board member surnames in particular vary in the captions). The recording starts at 11:34 and the first captioned speech is at 17:19, when the chair opened the meeting; the captions end at about 2:25:38 as the chair adjourned. Between 42:09 and 43:40 the hearing paused briefly while AT&T's remote presenter could not be heard; that stretch is not counted as discussion.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| AT&T Tier 2 Wireless Facilities in Public Right-of-Way | 110 | 87% |
| Other business | 17 | 13% |
- Thursday, October 15, 2026.
- All five board members were present: Chair Adcock, Vice Chair Rosenberg and Board Members Chen, Jojola and Hirsch.
- Adjourned at about 2:25:38 on the recording.
AT&T Tier 2 Wireless Facilities in Public Right-of-Way
23:41-42:09, 43:40-2:14:46
- Quasi-judicial public hearing on AT&T's request to add antennas, radio units, 7-foot fiberglass extensions and equipment to two city-owned wood utility poles, near 670 Guinda Street and next to 754 Homer Avenue. Staff recommended that the board recommend approval to the Director of Planning and Development Services.
- Planner Kambakamba said a third site (804 Boyce Avenue) was withdrawn, the 90-day federal shot clock runs to December 15, 2026, and the earlier objective standards (including exclusion areas near homes) were repealed, so the board was reviewing against architectural findings and general development standards. Its purview is aesthetics, not location.
- Board questions: whether General Order 95 applies, pole heights, exclusion areas, and what revised materials arrived the day before. Staff said the project is not yet deemed complete.
- AT&T's program manager said only eight of about 500 noticed residents attended its community meeting, defended the coverage and capacity gap, and said the 7-foot extensions and shroud size are driven by General Order 95 clearances and ventilation, with no fans.
- Board follow-ups centered on the 3-inch coax conduit (several members thought it oversized), shroud size, "approved equivalent" wording, gray versus brown on plans, and missing conduit and equipment on drawings and photo simulations. AT&T agreed to look at a smaller conduit.
- Public comment: five speakers, including United Neighbors of Palo Alto and its attorney, and two area residents. They asked for sites farther from homes, concealed or underground equipment, shorter poles and complete drawings, and raised noise and health concerns. AT&T said its drawings do show the conduits and that a resident had told the community meeting its AT&T service was poor.
- Staff said there is no citywide undergrounding effort and these poles are not in a planned undergrounding area.
- Closing comments: members said the board's options are limited, AT&T had improved the design and dropped the third pole, and the cluttered poles are already unattractive; one member said the approach should be rethought.
- Motion to approve the project as presented carried 5-0.
Other business
17:19-23:36, 2:14:46-2:25:38
- Roll call (quorum), no agenda changes. General public comment: a United Neighbors representative gave an update on the AT&T facility at 1661 Page Mill Road approved in October 2025 (radios mounted on the wrong side of the pole, emergency shutoff sign unverified, an unshown tangle of wires at the top, no as-built plans submitted) and asked to be notified of cell tower hearings.
- Staff report: no new submittals since the last meeting; the November 5 meeting is canceled, leaving three more meetings this year; a planned absence by Chair Adcock at the last December meeting.
- Minutes of August 20 approved 5-0 with a one-word correction; minutes of September 3 approved 4-0-1 (Board Member Jojola abstaining, having been absent).
- Closing public comment: an attorney for United Neighbors urged the board to weigh stealth and underground options and warned about federal limits on later modifications; a second speaker made remarks unrelated to the agenda. The chair noted the board's purview is aesthetics and design; the board adjourned and expects to meet again in about four weeks.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
11:34Mhm.
17:19>> Good morning. Welcome to the October
17:2215th Architecture Review Board meeting.
17:24Should we have a roll call, please?
17:25>> Uh Chair Adcock.
17:27>> Present.
17:28>> Vice Chair Rosenberg.
17:30>> Present. I am hearing a bit of an echo,
17:32so I just want to
17:34>> Um if we I believe board member
17:36Hershey's mic is
17:38>> on.
17:40>> Thanks.
17:40>> Is that No, still echoing.
17:42>> Uh if you
17:44>> Yeah, I I I can call roll call and then
17:46I can actually go troubleshoot real
17:47quick. Yeah. Um Chair Chen.
17:50>> Here.
17:51>> Uh Chair
17:52um uh
17:52Board member Chen.
17:54>> Okay.
17:55Yeah, present.
17:56>> Board member Jojola.
17:59>> Present.
17:59>> Board member Hershey.
18:01For the record, we have quorum. And then
18:02I will go and check the iPads real
18:04quick.
18:20>> Checking. Much better. Perfect. Thank
18:22you so much.
18:35Does that sound better?
18:36>> Yes, much better. Thank you.
18:39All right. Let's go on to agenda
18:41changes, additions, and deletions.
18:47>> No changes planned for this meeting.
18:50>> Thank you.
18:52Next we have um
18:54in-person public comment. This is a time
18:56for members of the public to speak on
18:58any item that is not on the agenda.
19:03So, seeing once you're settled, do we
19:04have any
19:05>> Agenda.
19:05>> Uh
19:06>> Uh uh Chair, we do have one request for
19:08speak for general public comment. Uh our
19:10Our speaker is Genie F.
19:12>> Right? Yeah.
19:13>> You're welcome to come up to the
19:15>> Uh
19:16Genie Fleming.
19:25>> Thank you. Um please state and spell
19:26your name for the record and you will
19:28have 3 minutes to speak.
19:29>> Uh Genie Fleming. J E A N N E F L E M I
19:33N G.
19:34And I'm speaking on as an update on the
19:37last cell tower that you considered at
19:391669 Page Mill Road.
19:41This tower was approved in October 25,
19:44approved in a rush
19:46because the right person at AT&T had
19:49somehow failed to sign the agreement to
19:51extend the shot clock by the morning of
19:54the ARB hearing.
19:56While AT&T and staff were rushing the
19:58ARB, they were in no hurry themselves.
20:01AT&T did not begin construction on 1661
20:05Page Mill until close to a year later.
20:08And the company sought and was granted
20:10by the city multiple extensions
20:12themselves.
20:14Where are we now on this facility? Well,
20:16this is what we know.
20:18First, the radios were installed on the
20:20wrong side of the pole.
20:22I spoke to AT&T's Ms. Stack about it
20:25and she tells me the problem either now
20:27has been
20:28or is about to be corrected.
20:31Second, we still don't know if the
20:33emergency shut off sign accurately
20:35directs emergency workers to the shut
20:37off switch. Ms. Stack tells me she'll
20:40send me a photo of the sign, I haven't
20:42received it yet.
20:44Uh third, Ms. Stack tells me she doesn't
20:46believe there were any design changes,
20:48but she's checking on this. Um I can
20:51tell you, however,
20:52um that what's actually installed on the
20:54top of the 1661 pole is a tangle of long
20:59wires, a tangle that was not depicted in
21:02the material AT&T provided to the ARB. I
21:06don't know about any other design
21:07changes because obviously I can't see
21:10the equipment on the pole very well. In
21:12some cases at all.
21:14Fourth and finally, as built plans have
21:17not yet been submitted to the city
21:19although construction has at least
21:21nominally been completed.
21:24That's where things stand on 1661 Page
21:26Mill.
21:27Final comment, I regret to report that
21:30United Neighbors of Palo Alto
21:33was never informed of the two summer ARV
21:35hearings regarding establishing a list
21:38of objective standards so called for
21:41cell towers. Needless to say, had we
21:44known the hearings were taking place, we
21:46would have been there.
21:48So please consider this my formal
21:51request to the city of Palo Alto to be
21:53kept informed of hearings, meetings and
21:56so on that involve cell towers. I have
21:59made this request before numerous times
22:02but apparently it has now been
22:03forgotten. Thank you.
22:08>> Thank you.
22:08>> Thank you. The chair has no other
22:10requests to speak for general public
22:11comment.
22:12>> Thank you.
22:16All right, we will
22:19move on to a city official reports.
22:25>> Good morning.
22:27Just wanting to note here that there
22:29were no recently recently submitted
22:32items since the last meeting.
22:34Um
22:35there has been a little bit of
22:37some changes
22:39we were anticipating having a project
22:41coming at the November 5th meeting
22:44but we are planning on canceling that
22:46meeting due to the items and staff
22:49needing some more time to
22:51prepare that
22:53get it ready for the board.
22:55There are remaining five meetings
22:57scheduled for the year and as we get
23:00closer to the holiday season, if you
23:02would please direct any planned absences
23:05to staff's attention and we'll note
23:07that. And just for the record, we have
23:09at the last December meeting a planned
23:11absence from Chair Adcock. So.
23:16And I can take any questions.
23:18>> So sorry, just to confirm, the November
23:205th is cancelled?
23:21>> Yes, November 5th is cancelled.
23:23>> Thank you.
23:25That leaves us three more meetings for
23:27this year.
23:28Um any other questions for staff?
23:34No?
23:36All right. In that case, we shall move
23:39on to
23:41the first agenda's item for the day,
23:44which is a public hearing quasi
23:46judicial,
23:48a request by AT&T for review of two tier
23:51two general wireless communication
23:52facilities
23:53to um collocate new antennas, remote
23:56radio units,
23:587-ft fiberglass pole extensions, and
24:00associated equipment and exist on
24:03existing city-owned wood utility poles
24:06in the public right-of-way.
24:07One is near 670 uh Ginda Street, and the
24:11next one is
24:13next to
24:14um 754 Homer Avenue. SEQUA status exempt
24:18pursuant to California's
24:20uh
24:20environmental quality act guideline
24:22section 15 15301,
24:25zoning district not applicable public
24:27right-of-way.
24:28Um so, the recommendation to the board
24:31is uh that the architectural review
24:33board conduct a public hearing and take
24:35the following action. Recommend that the
24:38director recommend that the director of
24:40planning and development services
24:42approve the tier two general wireless
24:43communication facility application for a
24:46colocation of new wireless equipment on
24:48two city-owned wood utility poles in the
24:51public right-of-way
24:52based on the architectural review board
24:54findings and general applicable
24:55development development standards set
24:57forth
24:58in attachment B and the conditions of
25:00approval in attachment C.
25:03So, with that um
25:05Nishita, would you want to start your
25:06presentation?
25:08Thank you.
25:08>> Yes. Thank you. Um good morning
25:10everyone. Uh my name is Nishita
25:12Kambakamba. I'm a planner. Uh I'm the
25:14project planner for this project. Um
25:17So, I'll go ahead and get started and
25:18give you a brief overview um of what was
25:21previously submitted and the change of
25:22scope. Um so,
25:25previously AT&T had submitted uh three
25:27sites for the review um for tier two
25:29general in the public right-of-way. Um
25:32the 804 Boyce Avenue site has since been
25:34removed. Um I tried to cross out as much
25:36of that information off from the project
25:38description letter and all the
25:39associated and supplemental documents.
25:42Um and in this um
25:44application, we're only going to be
25:46talking about um the remaining two sites
25:48as um 670 Guinda Street and 754 Homer
25:52Avenue.
25:54Next slide, please.
25:58Um both of these sites are located in
26:00the uh University South neighborhood um
26:04and the Homer site, as you can see, has
26:05been removed from the scope of work.
26:08Um each of these sites, sorry, next
26:10slide.
26:14Each of these sites has the um proposed
26:17wood pole installations including a 7-ft
26:19fiberglass pole top extension um at the
26:22top of the existing wood utility poles,
26:24um one omnidirectional canister antenna
26:27at the top of each pole, um equipment
26:30enclosure at the pole face consisting of
26:32two radio units and the power supply
26:34unit, um one service disconnect um at
26:38approximately 7 ft from grade, um and
26:40all the associated conduit cabling and
26:42equipment.
26:45Next slide.
26:47Um the first site that I'll be talking
26:48about is the um 670 Guinda Street site.
26:52Um, this one is a quick rendering of
26:55what's existing and what will um, the
26:57pole look like once it's been installed.
27:00Next slide.
27:02I've also included um, an elevation that
27:05was provided as a part of the radio
27:07frequency emissions reports. Um, so that
27:09just shows the heights relative to the
27:11adjacent properties. Um, so as you can
27:13see on the right side is actually the
27:14street. Um, so there's no immediate um,
27:17properties there, but on the left side
27:18there are homes. Um, and the the topmost
27:22part of the home um, the roof is at 18
27:24ft from grade.
27:26And the pole itself is over 50 ft.
27:30Next slide.
27:32Um, this is the 754 Homer Avenue site.
27:35Again, on the left, this is the existing
27:37pole um, as it exists today and then
27:39what it will look like once the wireless
27:41equipment has been installed.
27:45Next slide.
27:47And again, an elevation drawing um,
27:49showing the adjacent roof height at 15
27:51ft. Um, and on the left side is the
27:53street.
27:56Next slide.
27:57I've also included um, a color swatch of
28:00what all the equipment will be painted
28:02to match the existing pole um, in
28:05Sherwin Williams Sable um, in a
28:07non-glossy finish.
28:10Next slide.
28:12Um, a quick overview of the federal
28:14regulations. Um, so all wireless
28:17projects are um, subject to shot clock
28:20timelines. That means that all the
28:21permitting associated permits um, and
28:23review processes have to be completed
28:25within a certain timeline for different
28:27types and different um, thresholds of
28:29projects.
28:30Um, for the purpose of this project, um,
28:33both the sites at um, both these
28:35locations will be um, a tier two general
28:37application. Um, what that means is
28:40they're adding new wireless equipment on
28:42a pole that currently does not have any
28:44equipment.
28:45Um, and it will be subject to a 90-day
28:47shot clock, um, wherein all permits have
28:49to be issued.
28:51Um, since a timely notice of incomplete
28:54was sent to the applicant within the
28:5630-day period, um, the shot clock was
28:58paused on day 27 of the shot clock. Um,
29:02so on September 10th, 2020 6, not 2024.
29:06Um, the revised materials were submitted
29:09by the applicant yesterday. Um, so the
29:11shot clock will officially begin, um,
29:13which brings us the 90-day shot clock
29:15to, um, December 15th, 2026, which will
29:18be the 90-day end, which is when all the
29:20permitting and everything would have to
29:21be completed for the project.
29:24Um, the applicant has also provided the
29:27radio frequency emissions report, um,
29:29and we've provided that under attachment
29:31F of the packet. Um, essentially, this
29:34states that there's, um, all the
29:36equipment that's being proposed will be
29:38within the allowable radio frequency
29:39emission thresholds set by the, um,
29:42Federal Communications Commission, or
29:44FCC.
29:47Next slide.
29:50Um, we have received a, um, large volume
29:53of summary, uh, sorry, of public
29:55comments, and I've provided a quick
29:56summary of them on the next two slides.
29:59Um, one of the primary concern from the
30:01residents has been the, um, location of
30:04the proposed wireless facilities being
30:05very close to residential properties.
30:08Um, they've also talked about the impact
30:11of the wireless equipment on the
30:13character of the neighborhood, um, and
30:16not really appealing to aesthetic
30:17standards of these neighborhoods.
30:20Um, they've also asked, um, AT&T to
30:23provide some clarification on whether
30:25alternatives were considered for the
30:26poles, um,
30:28and whether there's been, um, any
30:30coverage gap that was studied to better
30:32understand how these different poles
30:34were chosen to actually place the
30:36wireless equipment.
30:45>> Um, one of the other concerns that was
30:47brought up was the concerns regarding
30:49potential health concerns or health
30:50risks that the wireless equipment could
30:53pose for the nearby residents.
30:56Um, and also in terms of the size of the
30:58equipment, whether this equipment would
31:00produce any noise, um, and if there's
31:02any construction-related outages or
31:04anything that are going to occur, um, as
31:06a part of the installation.
31:08Um, and also finally they've brought up,
31:10um,
31:11a question about whether this approval
31:14would in the future bring,
31:16um, any future facilities to be
31:18automatically approved on these sites,
31:20and the answer is no.
31:26Um, we had held, um, ARB study sessions
31:30in July and August of this year to
31:32discuss, um, the new review criteria for
31:35wireless projects in the public
31:37right-of-way. Um, that has not yet gone
31:40to PTC and Council. So, right now what
31:42we have, um, and what we'll be reviewing
31:44these projects against, um, are the
31:47architecture review findings as well as
31:49the, um, generally applicable
31:51development standards that have both
31:52been provided to you in attachment B of
31:54the staff report.
31:56And, um, the project will also be
31:58subject to, um, the conditions of
32:00approval, um, as provided in attachment
32:03C.
32:08Um, staff recommends ARB to conduct a
32:10public hearing, um, and take the
32:12following action, um, to recommend that
32:14the director of planning and development
32:15services approve the two tier two
32:18general wireless, um, facilities, um,
32:21for co-location of new wireless
32:23equipment on two city-owned existing
32:25wood utility poles in the public
32:27right-of-way based on the findings, um,
32:30generally applicable development
32:31standards as well as the conditions of
32:33approval.
32:35Alternatively, um, next slide, The ARB
32:38may recommend approval of the project
32:40with modified findings and conditions.
32:43Continue the project to a date certain
32:45with the applicant's consent, which may
32:47require a tolling agreement. And or
32:50recommend project denial based on
32:51substantial evidence in the record, um,
32:54supporting revised findings.
32:58All right. Thank you.
33:02>> Do we have any questions for staff?
33:06>> Yeah, I do have a couple of questions.
33:08Uh, so first I want to clarify since we
33:11received lots of comments for the this
33:13item today. And a number of them, uh,
33:17concerned about the location. So I want
33:19to verify whether for ARB today's
33:22discussion,
33:23the location, is it part of our
33:26discussion or we only focused on the
33:28pole design?
33:31>> ARB's purview is limited to the
33:33aesthetic standards of the design, you
33:35know, equipment and the proposed
33:36equipment, um, and AT&T actually does
33:39have coverage maps that they can that
33:41they review, um, that they provide as a
33:42part of their application. We do have
33:44representatives from AT&T here today who
33:46can speak to that. Um, and in terms of
33:49the, um, purview for ARB and AT&T, we
33:52also have, um, Eileen Balier, um,
33:55available online to answer any
33:57questions.
34:00>> And and another question is, as you just
34:02mentioned in your slides that the
34:04utility pole the the utility poles are
34:06owned by the city. So I want to know
34:09whether the GO 95 applies in both
34:12locations in this case.
34:15>> Uh, sorry, could you repeat the last
34:16part?
34:17>> Uh, the GO 95, the the one that requires
34:21the antenna to be raised over 6 ft above
34:25the
34:28>> Um, I will confirm with the utilities
34:29department and follow up with you. Okay,
34:31thank you.
34:35David, did you have a question as well?
34:38>> Yeah, um
34:41wanted to know if uh
34:44the the
34:45pole on Gwenda, does it have an
34:47extension in between the pole and the
34:51antenna?
34:55>> Both of the sites have a 7-ft tall pole
34:57that's being attached to the top of the
34:59existing wood um pole.
35:01And then the antenna will be mounted at
35:03the topmost part of that 7-ft extension.
35:07>> And was there
35:08any way that you verify the height of
35:10the pole there?
35:12Do you know exactly what the height is
35:14of the existing pole?
35:16>> Um we've used the information provided
35:18by um
35:19the applicant, and the utilities team
35:21has reviewed it to confirm compliance
35:23and um
35:25>> They confirmed the height height of the
35:26pole as well?
35:27>> Correct. Yes.
35:28>> Um
35:30Did they
35:32Did you have a chance to look at it
35:33relative to the areas you're excluding
35:36in front of houses? Eat both of those
35:38poles.
35:40Have you Have you reviewed that aspect
35:42of it?
35:50The obviously the one on the corner
35:52isn't in front. It's
35:54uh on Gwenda. But the other one, have
35:56you had a look at that to to make sure
35:59it's doesn't uh
36:02isn't an area of exclusion on Homer.
36:11>> The area of exclusion is a part of the
36:13objective um standards, and those were
36:16repealed last year. So at this time, the
36:18area of exclusion does not apply to
36:20either of the projects. So until the new
36:22standards are adopted, we don't have an
36:25area of exclusion. Um but that could be
36:28something that ARB can comment on today.
36:30>> Okay.
36:32>> I suppose to comment on those, just
36:34sorry, and David does a follow on that.
36:36Do we know where it is relative to
36:39what could have been the area of
36:40exclusion?
36:43>> We don't have that information, but I
36:45can quickly look up the site plan to see
36:47if we can measure it.
36:50>> Um, just, uh,
36:52in general, have have you
36:56planning department reviewed the
36:59each of these poles as to what is
37:01presently existing and the
37:03reasonableness of attaching all of the
37:06new
37:07uh, equipment for AT&T?
37:10>> Yes, um, planning looks at each of the
37:12poles independently. Um, we look at the
37:14area coverage maps that have been
37:16provided, um, and try to understand if
37:18there's alternative locations, which is,
37:20um, which information is provided by the
37:22applicant, and then we review each of
37:25the poles separately to see if it's
37:26placed in the pole, and also the the
37:29poles aren't new. They're keeping the
37:31existing poles, so the installation is
37:33limited to where it can be installed
37:36since they're using existing poles.
37:39>> And do they evaluate the condition of
37:41the existing poles to make sure that
37:42it's, uh, suitable for, okay.
37:44>> Yes, um, utilities have some standards
37:47that they would have to meet, um, before
37:49they're allowed to put new poles,
37:51especially with the structural stability
37:53of the pole, um, and right now this
37:56existing wireless infrastructure on the
37:58poles, um, and AT&T has given their
38:00approval, um, to install the wireless
38:02equipment on these poles.
38:05And if the, um, if utilities did
38:08determine that a new pole would be
38:10required, then that is a separate
38:11contract they would have to establish
38:13with AT&T.
38:16>> Um,
38:21uh, I wonder if, if
38:23whether who who should comment on the
38:25fact that these two poles are located
38:28just a couple of blocks from each other
38:30in that neighborhood. Will you leave
38:32that up to AT&T or can you explain
38:35something why that in fact this
38:38uh, something about the coverage, let's
38:40say, you know, of the neighborhood.
38:43Is that is that going to be, you know,
38:45we're going to see a lot of poles coming
38:47in later on, right? So,
38:50how how in fact do we judge something as
38:53to the
38:55relationship and coverage of a
38:57neighborhood?
38:58>> Absolutely. Um, we do have a
39:00representative from AT&T and Nexedge uh,
39:03who's representing AT&T from um, uh,
39:06here at the ARB today. Um, area coverage
39:08and how they determine to choose these
39:10specific poles, um, they can speak to.
39:13>> Okay, so I should wait until I we hear
39:15that
39:16>> Yes, they do have an applicant
39:17presentation and they'll probably cover
39:19that as a part of their application.
39:20>> Uh, as the presentation.
39:24>> Okay. Um,
39:27I have some photos. I wonder if I could
39:29somehow rather figure out how to get
39:31them on to the
39:33I haven't had a chance to do that
39:34before.
39:40>> Uh, if you may, you can send the photos
39:43um, via email to myself or or Sam and
39:47then we can share screen.
39:49>> Well, let's see if that works.
39:51>> All right. In the meantime, I have a
39:53couple of questions for Mr. Jess.
39:54>> Yes.
39:55>> Um, so, uh, you received a revised
39:58material yesterday and based on the
40:01report, it was uh,
40:04if I remember correctly, responses to
40:06um, or uh, notes from community meeting
40:10and then uh, some responses. So, can you
40:12clarify what was received and
40:15uh, I understand the project is still
40:17not deemed complete.
40:19>> That's
40:19That's correct. So, um, there was a
40:21couple of incomplete items uh, noted in
40:24their previous submittal. Um, as a part
40:27of any public um, right-of-way projects,
40:30uh, the applicant is required to host a
40:32community meeting, um, and the community
40:35meeting materials were not provided as a
40:37part of the application since the
40:38community meeting hadn't been held since
40:41uh, when they submitted the application.
40:42Um, so they AT&T has since provided the
40:46summary of the comments that were
40:47received at these meetings, um,
40:50and they also provided the digital or
40:52the color swatch of the material of the
40:54color that they'd be painting these
40:55materials, um, which I included in the
40:57slide deck. Um, besides the planning
41:00comments, um, besides the completeness
41:02comments, they also had some additional
41:03comments from utilities, um, regarding
41:06some clarification on like the conduits,
41:09um, which have since been clarified. Um,
41:11these wouldn't really affect the
41:13aesthetics of the pole in any way. These
41:15are more just, um, details that
41:16utilities needed from the applicant.
41:22>> Sorry. Uh, I understand not quite our
41:25purview on location and all, but based
41:27on the comments that we have received,
41:30um,
41:31I'm curious if you even Maybe it's too
41:34soon since you just received it
41:35yesterday, any summary of the community
41:37meeting and meeting notes. Um, is that
41:40anything outside of what we you
41:42summarized for us?
41:43Um, as public comments.
41:46>> Yeah, the summary that I provided on the
41:48slides included all the comments, um,
41:50that were provided at the community
41:51meeting as well as everything that was
41:52received via email.
41:55>> Thank you.
41:56Any other questions?
41:57All right, so then let's move on to
41:59applicant presentation.
42:01And you will have 10 minutes, and
42:03please, um, start with uh, stating and
42:06spelling your name. Thank you.
42:09>> Do you believe, uh,
42:10we have Courtney Perlow as a panelist
42:13on Zoom that is prepared to speak.
42:22Courtney, are you
42:25>> Yeah, I believe you'll need to unmute
42:26yourself, Courtney.
42:34Courtney, you're still on mute.
42:43You're unmuted, but can you speak again?
42:45We can't really hear you.
42:52Unfortunately, the audio is not coming
42:54through.
43:06We can't hear you, Courtney.
43:12If anyone following along in the
43:14outsider in the back of the chambers, we
43:16are getting a situation dealt with with
43:18David and the photos, and we are trying
43:20to figure out the audio here with AT&T.
43:22So, if you'll bear with us for just a
43:23moment.
43:30>> She's unmuted.
43:32Okay.
43:34Uh, hopefully that that will change. In
43:36the meantime, I I
43:38am prepared to start, so
43:40Um.
43:41>> Um, so this starts AT&T's presentation
43:44time. Uh, you have 10 minutes between
43:46all present presenters. Please start
43:48with spelling and stating your name.
43:50>> Sure, my name is Mark Grabisch, uh, g r
43:52a b i s c h. I am the program manager
43:56for small cells for AT&T.
43:58I thank the board for your time to
44:00consider these applications. I did want
44:03to point out that we did hold a
44:05community meeting, and at that community
44:07meeting there were eight residents out
44:10of 500 that were noticed. Uh most of the
44:13residents there were there to speak in
44:15opposition to the poll number four,
44:17which we have removed um to reconsider
44:20based on the feedback that we heard from
44:22the residents. And the there were no
44:24other residents that were there to
44:27um
44:28place opposition to the two nodes that
44:29are before you today.
44:31Uh I would like to point out that the
44:34letter that was submitted yesterday
44:38really
44:39totally dismisses the detailed RF
44:42statements that were provided in our
44:43application along with the coverage maps
44:45that show
44:47exactly the gap that we're trying to
44:48fill from a 4G LTE perspective. The fact
44:52that we sell an air internet product
44:55does not
44:56uh
44:57mandate or guarantee any certain level
44:59of service. It's no different than when
45:01we have coverage maps that show we have
45:03service.
45:04Uh we we do have service in the area.
45:06Our what we're saying is that service is
45:08not sufficient to uh for a customer to
45:12make and receive an in-building phone
45:14call, which is the standard that the
45:15courts have accepted. Uh the fact that
45:17they say that 911 is available as a
45:19backup through another carrier's network
45:21is not a guarantee that any customer
45:24would be able to make and receive a 911
45:25phone call. And obviously in a time of
45:28emergency that is an absolute last
45:30resort that a customer would have to
45:32rely on another carrier's network versus
45:34being able to make and receive an
45:36emergency phone call from within their
45:37home, which is the standard we're trying
45:39to build to here.
45:41Um
45:42the the significant gap in service is
45:44based on sophisticated modeling that
45:47takes into account a lot of different
45:49factors. We do have an RF engineer here
45:51who can speak to all of the the service
45:53levels, but for sure that gap exists and
45:57is verified through those
46:00the maps in the statement.
46:02Additionally,
46:03um
46:05the
46:075G service, again, in order to be able
46:10to provide an internet product, we do
46:12need the additional capacity. So, the 5G
46:14layer would provide that additional
46:16capacity. So, not in addition to filling
46:19a service coverage gap, we're filling a
46:21capacity gap that would be met by this.
46:24And the opposition would presume to uh
46:29actually tell us how to develop our
46:31network and service our gaps. But,
46:32removing that 5G equipment would be a
46:34material inhibition of the services that
46:36we're trying to provide and um
46:39the gap that we've presented. So,
46:41it
46:42the Verizon equipment was designed um
46:46for a different network need that
46:47Verizon has and it's not appropriate for
46:49the service gap that we're trying to
46:51fill here and the network uh that we're
46:53trying to
46:54um provide. Additionally, underground
46:57equipment, as we've already discussed,
46:59is not appropriate in the right-of-way.
47:01We have a hard enough time finding space
47:03to fit 1-in conduits to service the
47:05power and fiber to these sites. Even in
47:08the pictures that were presented in the
47:10opposition, it is clear that those
47:12vaults that I haven't verified actually
47:14exist or or how they were built, but
47:17they clearly approach upon private
47:18property and are not appropriate for the
47:20right-of-way for the same reasons that
47:22we've already mentioned underground
47:24facilities are are not appropriate.
47:28Um
47:29the design that we have before you today
47:31is based on feedback that we have heard
47:34from the ARB in multiple occasions, um
47:37starting with our application for the
47:40Pagel Road site. And um
47:44you know, we're using high-quality
47:46materials here. The
47:47shroud that we're enclosing the
47:49equipment in is designed so that it has
47:51sufficient airflow inside of it because
47:54it's an enclosure. It we don't want the
47:56equipment to overheat. It does need
47:58space for air flow. So, um it's designed
48:02to provide that spacing.
48:04And also provide some architectural
48:07flair to it. It's got rounded edges
48:09instead of being a a regular square box
48:11that you've typically seen on these
48:12facilities. So, this is the first of our
48:14kind that we're deploying here in Palo
48:17Alto. Um it will not require fans. So,
48:21no noise producing elements.
48:23They would also have you see, you know,
48:25say that the future modifications would
48:27allow this to to grow, but it still has
48:30limitations under 6409
48:32being in the right of way. Um it for for
48:35one, anything that requires a pole
48:37replacement under 6409
48:39would not be eligible. So, um in in this
48:44case on a utility pole, General Order 95
48:47is um
48:49required under the CPUC. So, even though
48:51it's Palo Alto Utilities, they still
48:54these utility poles are still governed
48:55by the General Order 95 of the
48:56California Public Utilities Code. And
48:59there are all severe restrictions as far
49:01as what the structural capacity on these
49:03poles can hold
49:05in addition to the equipment that we're
49:06already deploying. So, we do have a
49:08structural analysis that has um showed
49:11that these are safe for installation. We
49:13have reviewed these sites with Palo Alto
49:15Utilities and
49:16um they are appropriate for these
49:18facilities.
49:19The um
49:21Additionally, as you may be aware, a lot
49:24of all almost all modifications that we
49:26have recently made, we have
49:28significantly reduced the footprint
49:30that's on these poles. In the case of
49:32Page Mill Road, we removed an equipment
49:35cabinet that we could have left there
49:36for future growth, but it was no longer
49:38needed and we didn't, you know, feel it
49:41was appropriate to remain there. On the
49:43modifications that we did from our
49:45original ODAS conversions, we removed
49:47noise producing elements, removed
49:49removed battery backup. And again,
49:52reduced footprint rather than grew the
49:54footprint on all the poles. We are
49:56responsibly deploying these and
49:58providing
49:59the absolute best designs that we have
50:00available for the technology that we
50:02need in order to fill the service gap.
50:06Um even our maps, we have we did perform
50:09alternative analysis. That's also in the
50:11packet. The alternative analysis
50:13um identifies what was evaluated and
50:19we still feel that the location that
50:21we've the locations we've presented are
50:23the least intrusive means to fill this
50:25gap. The one uh that's at the
50:28intersection. Intersections typically
50:30have more infrastructure in there,
50:32whether that be stop signs. In this
50:34case, there's also a fire hydrant. Um
50:38and it is further away from being
50:40directly in front of people's homes.
50:43But in the case of lower poles that were
50:45presented by in the letter,
50:48in order to achieve the same service
50:49objective and coverage, we'd have to
50:52change a light pole that's roughly 25 ft
50:55and bring it up to roughly 50 ft in
50:57order to achieve the same service
50:59objective, which is a significantly more
51:01intrusive option than just doing a short
51:04extension on an existing pole.
51:07Same with the other utility pole that is
51:09roughly a 30-ft utility pole that would
51:11then need to be extended another 20 ft
51:13approximately in order to
51:16meet the same service objective. So,
51:17those would be significantly more
51:19intrusive options.
51:21In the case of the pole that has
51:23transformer on it, uh PG&E actually, for
51:27their safety requirements, do not allow
51:30us to attach to poles with transformers
51:32as a safety concern that they cite. And
51:35we just assume, you know,
51:37uh follow that safety guidance here. So,
51:40whether Palo Alto Utilities would allow
51:42us to
51:43relocate on that pole or not, we would
51:46assume that it's a safer installation if
51:48we do not go on a pole that has an
51:50existing transformer.
51:52Um
51:53when if we were to go with lower poles,
51:56so rather than extend, again to meet
51:59that service gap, we would end end up
52:00meeting more facilities than we're we're
52:03current currently proposing in order to
52:05fill that gap.
52:08Uh the other the opposition has also
52:10noted to apply tier three criteria to
52:13these sites. However, it is clear that
52:15this is clear a tier two application.
52:19And the fact that it's not a small cell,
52:22because it exceeds the 50-ft requirement
52:24to be classified as a small cell, the
52:26equipment cabinet is only 13 cubic feet,
52:29which is significantly smaller than the
52:3128 cubic feet that would be allowed for
52:33a small cell. Additionally, the antenna
52:35is smaller than the 3 cubic feet that is
52:37also allowed for small cells.
52:40And you could have multiple antennas. In
52:42this case, we only have one antenna. So,
52:44this really is
52:46as minimal an installation as possible.
52:49These are low-powered from an EME
52:51perspective. They're about 1% at ground
52:53level for public exposure. We also note
52:56that
52:57our our RF report does discuss arbor
53:00safety. And in this case, none of the
53:03surrounding trees fall within that
53:05public safe zone. So, the signage also
53:09puts people on notice that they were to
53:11enter into that public safe zone
53:12exposure
53:14area that there is a sign there to give
53:15them the warning. And we do have
53:19shut down procedures that can be
53:20followed to turn that RF emission off.
53:25Um
53:26and I think that concludes
53:30our presentation. Happy to answer any
53:31questions that you may have.
53:35>> Thank you. Um do we have any questions
53:38for
53:39applicant?
53:42You don't mind coming back to the
53:44podium? No, you're you're not you're not
53:45off duty yet. Come on.
53:47>> [laughter]
53:50>> Um I have two quick questions. You had
53:53mentioned there's no fans so there's no
53:54noise from fans. Is there any other
53:56noise, any associated buzzing,
53:58electrical current noises, anything like
54:00that?
54:00>> Nothing that would not that would be
54:03audible for, you know, people in their
54:05homes or on the ground or that wouldn't
54:08meet the city's noise ordinance.
54:09>> Well, city's noise ordinance is a very
54:11different thing than someone living in
54:13their house and hearing that slight
54:14buzzing all day every day.
54:16So, in theory, if you were walking on
54:17the sidewalk underneath it, you should
54:19not, in theory, hear any noise from
54:22this. Okay.
54:23Um the coverage map that we saw that was
54:26sort of the red it's the green coverage.
54:28Nishita, if you don't mind pulling that
54:29back up. The green, orange, the greens,
54:32yellows, and a little bit of red. There
54:34we go. That one. Um is this So, this is
54:36basically saying that the two new poles
54:39are going to provide this additional
54:40amount of coverage. Is that correct?
54:41>> Correct.
54:42>> And this is not including that third
54:43pole. Or is this evaluation for the
54:45third pole?
54:46>> Okay.
54:47Um where'd you go?
54:51And then I'm understanding that
54:53I'm understanding that one.
54:54>> Each location has its own coverage map
54:56to show the gap
54:57>> Okay.
54:58>> current and then pre and then post.
55:00>> So, this is the corner pole and then do
55:02we have another map for the other pole,
55:05the second pole? Okay, I understood. So,
55:08each one of these has its own coverage
55:09map. It looks like it's almost like two
55:10square blocks.
55:13About
55:15>> And they are designed to overlap in
55:17coverage because you do need to have a
55:21an ability to hand off call as you're
55:23traveling from one side through the
55:25other.
55:27>> And so, that third pole that has been
55:28dismissed would have been located about
55:29in that area. I think you can see that
55:31right there.
55:32About in that area, if I understood
55:34correctly. And that would have picked up
55:36some of that coverage, but since it's
55:38not a viable solution based on public
55:41feedback, um that one will not be
55:43evaluated, correct?
55:45>> We are going to come back with an
55:47alternate location in the future that
55:49would still
55:51um
55:51cover the gap that currently exists, but
55:54also
55:56fill an additional gap that was pointed
55:58out by the resident in addition to the
56:00fact that, you know, they were
56:02concerned about it being in front of the
56:03residential house, and we agreed that we
56:06should be able to find a better
56:07alternative.
56:07>> Okay. Thank you very much.
56:12>> Any other questions?
56:14>> Sir,
56:15could you Yeah, could you uh
56:18explain uh
56:20the reason for the extension of the
56:23pole.
56:25What factor for you technically do you
56:26need to do that, or are there variables?
56:30Could you put a shorter extension on it
56:32on the pole versus the full extension
56:35that you get uh at the top of the pole?
56:37>> So, that is a general order 95
56:40requirement that there's 6 ft of
56:42separation from the top of the primary
56:46power lines and the bottom of our
56:48mounting
56:49of the antenna.
56:52And in in some cases, right, I've heard
56:54the ARB notice mention that the higher
56:56up these antennas are the better. So, we
56:59didn't consider that as being
57:00necessarily a bad thing, but the only
57:02reason that we have that additional
57:04height is to meet the general order 95
57:06clearances.
57:07>> And that general order comes from who?
57:09>> The California Public Utilities Code.
57:12>> Mhm.
57:13Okay. So, it's a separation on the uh
57:16on the Gwindo one, is uh is there a a uh
57:21possible conflict, and therefore you do
57:23need that there
57:25at the top of that pole?
57:26>> It's It's required for both in order to
57:29maintain the necessary clearances.
57:32>> But I'm asking specifically to that one,
57:35is it close to
57:36uh the electrical output that you're
57:38saying is a problem?
57:42>> Yes.
57:43If we were to we we would don't have
57:45sufficient clearance on the pole as it
57:47exists today
57:49in order to meet the
57:51clearance that's required from the
57:53primary power.
57:56>> So you're looking at a image here and I
57:59see the antenna.
58:01Okay. And the distance is how much? 6 ft
58:04approximately?
58:05>> It's 6 ft from the
58:08um top of the bottom of our antenna
58:10mounting bracket.
58:12>> 6 ft in in all situations that's the
58:15distance you need to have separation.
58:18>> Correct.
58:19>> Uh-huh.
58:21And and you're saying that on the on
58:23this particular pole
58:26>> [clears throat]
58:27>> the electrical that is the conflict is
58:316 ft below the present extension.
58:36>> The primary power.
58:38Yeah.
58:40Yes.
58:41>> So
58:42and I see a crossbar on the lower part
58:45of that diagram then. Is that is that
58:48carrying the
58:50questionable current in it that would
58:53cause you to do a an extension like
58:55that?
58:56>> That's correct.
58:58There's two cross arms. The upper cross
59:00arm is the one that we're concerned
59:01about from the electrical lines.
59:03>> Okay.
59:04All right.
59:06>> Yeah, it's a little hard to see from the
59:08photo because you can see the heavier
59:10lines of wiring on that lower crossbar,
59:12but that upper crossbar has wires as
59:14well.
59:17>> Correct.
59:17>> That that upper upper one is carrying a
59:21current that would
59:22interfere potentially interfere with
59:25your service.
59:27>> It's not an interference issue, it's a
59:29safety it's a worker safety issue.
59:31>> Oh. Worker safety for your your people
59:34that's
59:35>> or for the general or 95 requires a
59:38minimum of 6 ft of separation from high
59:41voltage lines. So, the lower the voltage
59:44the
59:45lower the distance needs to be, but in
59:47this case we need 6 ft based on the
59:50voltage of the lines.
59:52>> Okay, so that upper upper line is is a
59:54higher voltage.
59:55>> Yes.
59:57>> Okay, and the crossbar etc. that carries
59:59that that's where that is fastened to.
1:00:02>> Yes.
1:00:04>> I'll take your word for that. Okay, um
1:00:09Just let me think about it for a second
1:00:11here. On the base of the of that
1:00:13particular pole
1:00:16I noted that it is kind of
1:00:18cheek to jowl to concrete on the
1:00:20perimeter.
1:00:22Could you explain
1:00:23uh for your grounding what what do you
1:00:26have to do at the base of the pole?
1:00:29There are two actual inserts into the
1:00:31ground at that point kind of those round
1:00:34elements
1:00:35that that you build into the ground.
1:00:38>> Correct.
1:00:38>> Correct.
1:00:39One of them is uh the ground goes into
1:00:42that. The other one is what is that for?
1:00:46>> What?
1:00:47Um
1:00:48the the grounding rods.
1:00:51>> Mhm. Well, the ground there's one
1:00:53grounding rod I guess through the whole
1:00:56for that facility, right?
1:00:57>> Correct.
1:00:58>> Uh-huh. But, there it seemed to be that
1:01:00there are two
1:01:17>> The there are Yeah, so these are ground
1:01:20test wells, but that is just a
1:01:22requirement for electrical safety. Then
1:01:24again, that's reviewed with Palo Alto
1:01:26Utilities
1:01:27to ensure that um the proper grounding
1:01:30is at the site for our equipment.
1:01:32>> Mhm. Okay, but
1:01:36you have looked at the pole to determine
1:01:38that those since we're approving this
1:01:41particular area, if we do approve it
1:01:43today,
1:01:44um
1:01:45you looked at the ground situation uh
1:01:48for inserting those groundings into that
1:01:50area?
1:01:51>> Correct. If if the cement flag needs to
1:01:53be removed, it will
1:01:56um
1:01:56be restored to the same condition.
1:02:00>> Okay. And there's no interference with
1:02:03the sewer connection or the water, you
1:02:06know, those in the street.
1:02:08>> Correct. We do USA mark the sites to
1:02:11ensure that there are no other utilities
1:02:14that would be interfering in the ground
1:02:15well.
1:02:16>> Mhm.
1:02:18Um as to the directional area where you
1:02:22put the radio facilities on the pole,
1:02:27do you alter that based on what other
1:02:29facilities there are above and
1:02:32below it?
1:02:34>> It's it's typically again, that's
1:02:35another General Order 95 requirement
1:02:38that there be climbing space available
1:02:41on the pole. Not that most I don't know
1:02:44many people that are climbing poles
1:02:45these days, but that is still a
1:02:46requirement that uh safe climbing space
1:02:50is maintained on the pole, and that
1:02:51typically dictates the quadrant that we
1:02:53place the equipment on.
1:02:55>> Okay. And from that point, the
1:02:58the wires come out of the box and go up
1:03:01to the uh
1:03:03antenna?
1:03:04>> Correct.
1:03:04>> And you pick the shortest route, or do
1:03:07you actually vary it based on what what
1:03:10might be in between your
1:03:13location of the radios and the the
1:03:16center point, let's say, of the radios
1:03:19and straight up to the antenna at the
1:03:21top.
1:03:22>> It It It will be based on that path that
1:03:24is available up to the antennas, and
1:03:26they all the coax will be concealed in a
1:03:29conduit.
1:03:31>> Okay. Um
1:03:34Uh on on the one that's
1:03:37on Homer,
1:03:39have you looked at carefully at that and
1:03:41which location? I'm being detailed, but
1:03:44you're here, so I think it's better to
1:03:46ask you the questions that sort of came
1:03:48to my mind.
1:03:49Um it seems that there is some other
1:03:52interrupting materials if you have the
1:03:56radios
1:03:57uh in the direction of the
1:04:00towards the
1:04:01residence, let's say. Okay,
1:04:03perpendicular there.
1:04:09Um
1:04:11So, it's these the one on the
1:04:14Okay, so This is This is the one
1:04:17uh on
1:04:19Yeah, okay. I I got it.
1:04:22So, up at the lower area of the and I
1:04:25have an illustration of that, too. I
1:04:27think it's on that part. On the back
1:04:29part of the pole, there's a there isn't
1:04:31I don't know what it is. Something is
1:04:34there.
1:04:35So,
1:04:37if you look at that pole closely, and
1:04:39maybe you could
1:04:40uh also
1:04:42Can you
1:04:44put that image that that we sent you
1:04:47uh
1:04:48but somewhere on
1:04:49>> We didn't receive that email. It just It
1:04:52didn't go through to us, so I'm not sure
1:04:55what's happening with that.
1:04:56>> I'll just talk about it, then.
1:04:58>> Okay.
1:04:59>> Looking at it at that side, there is
1:05:01some object on the pole that's further
1:05:03up.
1:05:04You know, um
1:05:07and your
1:05:08and your wiring
1:05:10is going to have to
1:05:12miss it, whatever it is.
1:05:17>> In some cases, if we do need to avoid
1:05:20something that's on the pole, we would
1:05:22shift the conduit to a different
1:05:25quadrant and the rest of the way up, it
1:05:27would follow that clear path.
1:05:29So, there are opportunities
1:05:32to
1:05:33>> I think I've heard you doing that
1:05:34>> run and then come up.
1:05:35>> Well, unfortunately, these things get to
1:05:37be pretty ugly poles by the time you get
1:05:39everything on them. Um
1:05:42and I wonder if it would be worth your
1:05:44while taking another look at that pole
1:05:46to see if this is in fact the best
1:05:48location when you have have to to
1:05:51disturb the whole line of it and have
1:05:54extra wires
1:05:56uh kind of hanging around the perimeter.
1:06:01>> Yeah, I I it would still be a conduit
1:06:04that the wires are contained within,
1:06:06>> Mhm.
1:06:07>> painted to match the pole.
1:06:08>> Mhm.
1:06:08>> So, um
1:06:10I I don't suspect that it would be that
1:06:13noticeable, particularly relative to
1:06:15typical risers that you see on poles
1:06:16that are
1:06:17>> They're all over the place.
1:06:18>> or gray
1:06:19>> Mhm.
1:06:19>> rather than painted brown to match.
1:06:22>> Ahem.
1:06:23>> [clears throat]
1:06:23>> Which sort of asks
1:06:26why
1:06:27we as a city are not considering the
1:06:29other things that are on a pole,
1:06:32the actual electrical connections uh
1:06:35that are enclosed in a
1:06:38enclosure on, for example, the Gwinnett
1:06:40pole
1:06:41is a I think is a white material,
1:06:45doesn't didn't try to match.
1:06:47So, in this case, you're trying to do a
1:06:49better job, so I do agree that's a good
1:06:52idea.
1:06:55Um
1:06:57>> Any other questions, David, or
1:06:59>> No, that's that's it for the moment.
1:07:01Yeah.
1:07:02Uh I think. Yeah.
1:07:05>> Any questions?
1:07:06>> Uh
1:07:06>> Sure.
1:07:07>> Um
1:07:09Uh just just a quick
1:07:11uh question actually, too.
1:07:13On like sheet D1,
1:07:16I was looking at the micro radio shroud
1:07:18and I can uh and it's quite large.
1:07:22Like 4 ft tall, 2 ft wide,
1:07:2510 in deep. Like is that like really
1:07:27necessary for the equipment you're
1:07:30putting in like right now?
1:07:32Or are you reserving some space in there
1:07:34for future things?
1:07:36>> It It's necessary for the equipment that
1:07:38we're installing right now based on
1:07:41again having the airflow cuz we have a
1:07:44power
1:07:45service unit that's there to convert AC
1:07:48power to DC power to um
1:07:51connect to the radios and that does
1:07:53generate heat, so uh again, the
1:07:56dissipation is is required. We do have
1:07:58the ventilation in there, but um air
1:08:00airflow within the unit helps ensure
1:08:03that they don't overheat.
1:08:05Uh so that we wouldn't need to install
1:08:07fans.
1:08:09>> You said you have ventilation in there.
1:08:11Like
1:08:12>> There's perforations on the outside.
1:08:14Right.
1:08:15>> And then
1:08:17uh related to the size question, I see
1:08:19there's a 5-in offset from the pole.
1:08:22Um is there a way to make that less?
1:08:26>> That is another General Order 95
1:08:28requirement.
1:08:29>> a requirement.
1:08:31Okay. Uh then um
1:08:34uh just another quick question. On the
1:08:36same
1:08:37um
1:08:38detail like detail number four,
1:08:42it says Ericsson multi-radio shroud BFL
1:08:45etc. or approved equivalent.
1:08:49So I just want to make sure that
1:08:51you know, if you you know,
1:08:54make some recommendation here that
1:08:56assumes this shroud,
1:08:59you don't They come back and just put
1:09:01something more ugly there. Like so what
1:09:03is what are the guardrails for or
1:09:05approved equivalent? I don't know where
1:09:07is the question.
1:09:09For you are you?
1:09:10>> I I Our intention is to deploy this
1:09:12cabinet and if it were
1:09:14an equivalent, it would have the same
1:09:17look, size, and shape.
1:09:19>> Oh, I see. I see. Okay. Thank you.
1:09:23>> Actually, if I can follow with the same
1:09:25uh question on the same image, the note
1:09:27on the drawing says color gray, which is
1:09:29the box on the left and on the your
1:09:31rendering it's brown. Which one is the
1:09:34correct intent?
1:09:35>> It will be brown painted to match the
1:09:37pole.
1:09:40>> Um I'll ask some kind of some uh
1:09:42questions in the same vein. Or Kendra,
1:09:44do you want to go next?
1:09:46>> I
1:09:46>> Um so as uh because these are wood
1:09:50utility poles, all wiring would be in
1:09:53conduits that are exposed on the
1:09:55outside. Right? Um
1:09:58so is it just one conduit? I know you
1:10:00you're trying to show those on the
1:10:01renderings. Is it one conduit and what
1:10:04size that goes up pole?
1:10:06>> It is It is one conduit that goes up the
1:10:08pole. I think the There's a size of the
1:10:10conduit in the drawings.
1:10:13I imagine it wouldn't be any larger than
1:10:142 in, but I'm not sure.
1:10:26>> I looked through your drawings. I didn't
1:10:27really find information on that.
1:10:28>> It's a
1:10:30I think it's 3 in.
1:10:31It's a 3-in conduit. Sorry.
1:10:34>> Okay. And that's from
1:10:36the ground
1:10:38up. So where does it start being
1:10:40exposed? Is it coming out of the ground?
1:10:43Like where Where does it come out?
1:10:44>> It's It's coming out of the cabinet
1:10:46itself.
1:10:49>> The cabinet the
1:10:52uh microwave radio shelf cabinet or
1:10:54>> Yes.
1:10:55>> Okay.
1:10:56So where does the
1:11:00So, from the
1:11:02power
1:11:03um
1:11:04cabling coming to it
1:11:06isn't that
1:11:08coming from somewhere else?
1:11:09>> The power itself is delivered by Palo
1:11:12Alto Utilities, which is coming from a
1:11:14from an existing power lines. Yes.
1:11:17>> Um
1:11:18and so the 3-in conduit goes all the way
1:11:21up to the pole to your fiberglass
1:11:25uh pole addition.
1:11:26>> Correct.
1:11:27>> And is the conduit encased within the
1:11:30fiberglass extension above that or is it
1:11:32also exposed?
1:11:33>> It's also exterior to the fiberglass.
1:11:36>> Okay. So, then when we look at I don't
1:11:39know if you can get us
1:11:41to the drawing sheet D1.
1:12:02Yeah, um if we can zoom in to detail
1:12:05seven.
1:12:06Um so, that's the antenna bracket. So,
1:12:10outside of this
1:12:12Yeah, if you could keep it right there.
1:12:14Thank you. So,
1:12:15um
1:12:16so, you have conduit
1:12:20here somewhere, 3-in conduit that comes
1:12:22off the side and then somehow enters the
1:12:25antenna. Is that correct? Or do we have
1:12:29>> There it will um
1:12:31come out from the conduit at that point
1:12:34to
1:12:35connect to the ports on the antenna.
1:12:40>> Okay. So, um we did hear concerns from
1:12:44the neighbors as the or community as
1:12:46well about, you know, exposed cable,
1:12:49spaghetti of stuff up there. Is that
1:12:51what we're expected to see here as well?
1:12:53Or like is it
1:12:55all concealed between conduit to
1:12:57antenna?
1:12:58>> What it will come out. Typically,
1:13:00there's a requirement um and I I
1:13:04not sure exactly with Palo Alto
1:13:06Utilities, but we can confirm and get
1:13:08back to you
1:13:10that uh PG&E has a requirement that
1:13:12they're able to see the coax
1:13:14the coaxial cables as they connect to
1:13:17the antenna so that
1:13:19they can't be shrouded. Um but the
1:13:22distance that it would come out and be
1:13:23exposed is minimal.
1:13:25Um they can be painted to match like a
1:13:28brown color. But we do require tape
1:13:31that's on there that identifies which
1:13:33cable carries which frequency and signal
1:13:37so that we can
1:13:38verify that.
1:13:41>> Um and uh so another question earlier,
1:13:44uh there's a question about the noise.
1:13:46Um so is it
1:13:48the the radio shroud
1:13:51um I know you said there's no fan, but
1:13:52is there any in the conversion from DC
1:13:55to AC or vice versa?
1:13:57Is there any noise produced from that
1:13:59equipment?
1:14:01>> There I mean I
1:14:03my understanding is that there is no
1:14:06noise because there won't be
1:14:09um
1:14:10elements that are producing the noise
1:14:13and being within that cat within a
1:14:16shroud, if there is any noise, it would
1:14:18be muffled by the shroud itself.
1:14:21>> All right.
1:14:23Um thank you. Any other questions,
1:14:25Yushi?
1:14:25>> Yeah, I also have a question related to
1:14:27the size of the radio shroud. So um
1:14:30based on your answer to uh board member
1:14:33Burgess, it seems like it related to the
1:14:36radio selection and there are certain
1:14:37clearance you need to provide it for
1:14:40ventilation or whatever else it is. So I
1:14:43want to know for the radio um
1:14:46selection, is it the only one that we
1:14:48can choose or the size are about the
1:14:50same? Is there like
1:14:52smaller radio that we can apply in this
1:14:56case? Because when we see the rendering,
1:14:58the
1:14:59the
1:15:00the radio shroud, it looks kind of like
1:15:02oversized and bulky attached to the wood
1:15:06pole.
1:15:08>> Uh the
1:15:09if we use smaller radios, that would
1:15:12reduce the power and then again have an
1:15:14impact on the number of nodes that we
1:15:16would need to fill the gap. The
1:15:19alternative radios are they're roughly
1:15:20the same size that Ericsson produces.
1:15:24Um the other thing is most of this coax
1:15:27that we discussed
1:15:29is concealed within that shroud, too.
1:15:31So, what's not depicted in there is the
1:15:32fact that there will be all of those
1:15:34connections within that shroud as well
1:15:37as it
1:15:38or routes out into the conduit.
1:15:41>> Thank you.
1:15:43>> You want to continue on this particular
1:15:46aspect of it here, the connections in
1:15:48the shroud. That that 3 in is a pretty
1:15:51big
1:15:52big circumference there, you know, a big
1:15:55diameter for for a pole. So, it's going
1:15:58up the outside of the pole because it's
1:16:00bringing power down to your radios,
1:16:03right?
1:16:04>> No, that is just for our connection from
1:16:07the radio to the antenna for the RF
1:16:10signal.
1:16:11>> Uh-huh. Okay, so
1:16:13then the where does your electricity
1:16:16come from?
1:16:17>> It will come from Palo Alto Utilities
1:16:19from the existing lines that are on the
1:16:21pole.
1:16:22>> So, it's brought down from the existing
1:16:25line in inside of what?
1:16:28>> Uh
1:16:29whether they have a conduit for it or
1:16:31not, I'm I'm not sure that is their
1:16:34design.
1:16:34>> You're I see. So, you're connecting from
1:16:36a city facility facility there in into
1:16:40your radio.
1:16:41>> Correct.
1:16:41>> Comes into the back of the radio, back
1:16:44back of that whole enclosure.
1:16:46>> It goes into an RF safety switch so that
1:16:49it can be powered down.
1:16:51Um and then goes from that into the
1:16:53radio.
1:16:53>> Into the radio within the enclosure. All
1:16:56that happens within the enclosure.
1:16:59So there'll be two lines really. One
1:17:01will be coming out of
1:17:03the
1:17:05uh
1:17:05and the radios
1:17:08and connected within the box.
1:17:10>> How was that done?
1:17:12>> How are the the
1:17:13>> Yeah, where are are the two radios
1:17:15connected within the box?
1:17:17>> Yes.
1:17:18So the
1:17:19>> And one line coming to the antenna.
1:17:22>> Well, there are multiple lines
1:17:25for the transmission of the frequencies
1:17:27into the antenna ports.
1:17:30But those those connections are all made
1:17:32within the enclosure.
1:17:33And then they're routed into the conduit
1:17:35from the enclosure. So as it goes up the
1:17:37pole, it's just that 1 3-in outer
1:17:40diameter conduit and then it comes back
1:17:44out
1:17:45to make the connections to the antenna.
1:17:47>> At the point of the antenna under the
1:17:49antenna. Correct.
1:17:51Okay, is there a shroud around the base
1:17:53of the antenna that connects it to the
1:17:55extension?
1:17:57>> Um
1:17:59>> pole extension. You know there are
1:18:01two pieces that come up there. Is that
1:18:03an open area?
1:18:04>> It is an open area and again that
1:18:07is typically a requirement that they can
1:18:10see the connections as opposed to having
1:18:13a shroud for
1:18:14>> Uh-huh.
1:18:15>> these types of facilities on utility
1:18:17poles at least.
1:18:17>> Okay. I mean the drawings that we saw
1:18:19did not include any
1:18:21indication of a connection of sort of a
1:18:24tunnel down in
1:18:26to meet the diameter of the extension
1:18:30piece itself. But the extension is
1:18:32filled with foam of some sort, right?
1:18:35>> The fiberglass extension?
1:18:37>> Mhm.
1:18:38The
1:18:38the pole extension.
1:18:40>> Right.
1:18:41>> Yeah, that the inside of that is a kind
1:18:43of a
1:18:44filled up, right?
1:18:46>> It's
1:18:47It's not hollow if that you know, again
1:18:50it it does have to support the
1:18:52structural load of the
1:18:54>> Yeah, yeah,
1:18:54yeah, that's true. So, what is it?
1:18:57>> It's fiberglass. I don't know if it if
1:18:59it it's entirely fiberglass through and
1:19:01through, but we can find out if that
1:19:04>> Well, I think I read somewhere that it's
1:19:06it's enclosed inside of it is some kind
1:19:08of a foam.
1:19:10So, but in any case, you know, the
1:19:13>> If you slide up, sorry to interrupt,
1:19:14slide up to
1:19:16detail 10, it says structural foam.
1:19:19>> Yeah, okay.
1:19:23>> So, if it's in
1:19:26Is it conceivable to run the
1:19:28some wiring through that versus it going
1:19:31on the side of this extension piece?
1:19:36Make a neater connection up there, you
1:19:38know, if it went straight up at the
1:19:39inside of the tube.
1:19:41>> It I'm I I don't I'm not an expert, but
1:19:45I would venture to guess that is going
1:19:46to compromise the structural integrity
1:19:48of
1:19:49the extension because again we're the
1:19:52antenna and the coax
1:19:55has weight. These are engineered
1:19:58specifically to support that that way
1:20:01and if we make structure modifications
1:20:03to it, that's
1:20:05going to reduce the structural
1:20:07integrity.
1:20:08>> So, this
1:20:10nicely colored
1:20:13extension of the pole
1:20:16is going to have a 3-in
1:20:19conduit running all along the outside of
1:20:21it.
1:20:22>> Correct.
1:20:23>> And you haven't explored that in any way
1:20:25to to determine if there is a way to
1:20:27make that better looking because of
1:20:30>> It It would still if if were to run it
1:20:33internally
1:20:34then
1:20:35you're there's going to be a transition
1:20:37point where all of the coaxial cables
1:20:40are exposed and then curved routed to
1:20:44try to get through the bottom of that
1:20:46unit. So
1:20:48I I think at the end of the day you're
1:20:50still going to you might be left seeing
1:20:52more coaxial cable
1:20:55>> Yeah.
1:20:55>> than what you're currently going to get
1:20:57with the conduit going all the way up. I
1:20:59would also argue that the you know, I
1:21:02think if I saw if I remember correctly
1:21:04the opposition letter stated that
1:21:06it doesn't have a transition because
1:21:08that is a more narrow
1:21:10the the
1:21:12extension is more narrow than the pole
1:21:14itself. And if you add that conduit on
1:21:17the outside then it becomes closer to
1:21:19the circumference of the existing pole
1:21:21too.
1:21:22>> I would also be curious about how um
1:21:24maintenance would be available to wires
1:21:27that are inside there. Like let's say
1:21:28something happened to the wire. If it's
1:21:30much more of a headache to have to pull
1:21:32it out from the inside of a pole rather
1:21:34than remove a shroud from a conduit. And
1:21:36um
1:21:37I mean I also would assume that this
1:21:39conduit whatever it is is painted the
1:21:40same sable color.
1:21:42>> Correct.
1:21:44>> All right. Well, I agree with you, Ed.
1:21:47These These poles get filled with junk
1:21:50that looks
1:21:51pretty bad, I think.
1:21:53It's unfortunate, but uh
1:21:56>> And just to note proportionately this
1:21:59shroud um sorry, the pole extension is
1:22:02is 7 to 8 in diameter.
1:22:04And then 3-in conduit outside of it is
1:22:08>> Ugly.
1:22:08>> almost 50% of that dimension. So I think
1:22:11not that we can do anything about it,
1:22:13but I think it'd be useful if those were
1:22:15drawn just because it's such a big part
1:22:17of the overall look.
1:22:19>> Understood. So actually any work on the
1:22:21wiring you have to get inside of that
1:22:24enclosure that you're the 3-in
1:22:26enclosure.
1:22:28>> [clears throat]
1:22:28>> Is your wiring really that much that it
1:22:31has to be that big?
1:22:34>> In order to propagate the signal and
1:22:37provide the service level that we're
1:22:40identifying here, yes.
1:22:43>> So, if if I can jump in here and just
1:22:44say I think that basically you're
1:22:46correct me if I'm misstating this, but I
1:22:47think, you know, we'll we'll probably
1:22:49see you again, right? I assume there's
1:22:51going to be more poles at different
1:22:52times over the course of the next
1:22:53several years. So, in future, I think
1:22:56the ARB is requesting that you guys draw
1:22:57on these conduits. We really want to
1:22:58understand what's going on here and
1:22:59leaving out something that's 50% of the
1:23:01width of a extension pole is a is a
1:23:03pretty big leave out. Um, on that same
1:23:06note, just in the packet pages, um, I
1:23:09don't know if you can It's not part of
1:23:11the actual package, it's part of the
1:23:13smaller one, and it's packet page 72. On
1:23:17this color drawing, again, they sort of
1:23:19show the pole extension up top, but they
1:23:20don't show the boxes down below. They
1:23:22don't show the radio box below. They
1:23:24don't show the shutoff switch. They
1:23:25don't show any of that. So, again, in
1:23:26these sort of detail drawings, we would
1:23:28expect to see that. Just as a future
1:23:30reference, it's not going to make or
1:23:31break anything here today, but just
1:23:34word for the future presentations, we
1:23:35would appreciate seeing all the details.
1:23:37So, thank you.
1:23:38>> Understood.
1:23:39Um, you know, just sticking with this
1:23:41for a second, it wouldn't it wouldn't
1:23:44you be able to find some way to make a
1:23:47connector on the outside of it and run
1:23:49that all the way up where it's going to
1:23:51have to go anyhow to the antenna?
1:23:54So, it isn't just another one of those
1:23:56kind of pieces that's kind of
1:23:58attached. You You haven't shown any any
1:24:00idea for that attachment in the drawings
1:24:03that I have seen.
1:24:05That [clears throat]
1:24:06it ought to be maybe in its in its own
1:24:08designed element that attaches to the
1:24:12extension itself.
1:24:14I mean, there is no consideration of
1:24:16really what what it's going to look
1:24:17like.
1:24:18A 3-in is pretty big element.
1:24:22I mean, there are
1:24:25from a personal perspective, we have a
1:24:28number of installations already that
1:24:31have the same conduit coming up on
1:24:35extensions.
1:24:36I drive by them every day
1:24:38and I don't even notice them.
1:24:40I mean, I
1:24:42I I could be, you know, cuz I'm I'm in
1:24:45the carrier, but my kids swim at
1:24:47Rinconada pool and I pass by these
1:24:48facilities all the time. I'm constantly
1:24:51looking at them and the I
1:24:54hardly ever notice the conduit going up
1:24:56the pole even as it um goes up on the
1:25:00extension itself.
1:25:02>> Well, that's pretty high up, of course.
1:25:05Um
1:25:06but that also is going to be a conduit
1:25:08that's enclosed in something that's
1:25:10painted the same color.
1:25:11>> Correct.
1:25:13>> Uh-huh. So, it'll look like the tube
1:25:15that's on the outside of there.
1:25:17>> Well, Ashley, let me get clarification
1:25:19on that. Conduit is the enclosure.
1:25:21You're not covering it with something
1:25:22else, are you?
1:25:23>> Correct. The The conduit is just
1:25:26covering the the cable connections.
1:25:29>> Okay.
1:25:30Um cuz I have seen on some of the other
1:25:32poles that um I think it's electrical
1:25:34that has a kind of a galvanized sheet
1:25:37metal Mhm. Covered around it. Not what
1:25:39you cover. You're not doing that. You're
1:25:41just putting
1:25:41>> It's a PVC
1:25:42>> Yeah. Conduit.
1:25:44PVC conduit with brackets every so many
1:25:47feet.
1:25:48>> Correct.
1:25:48>> Okay.
1:25:52Um
1:25:53>> are really three conduits, right? So,
1:25:55there is there is a 3-in coax, there is
1:25:57a 2-in fiber
1:25:58fiber.
1:26:00Uh you know, both of those go up to the
1:26:04antenna, right?
1:26:05>> The fiber comes from the communication
1:26:08line.
1:26:09>> Com com communication all down. Okay.
1:26:11>> Mhm.
1:26:12>> Um yeah, to be honest, I'm not
1:26:14100% convinced of that 3-in
1:26:17coax PVC, like you know, you said
1:26:20you know, for the
1:26:21you know, whatever uh service
1:26:24you know, you need it, but I mean, 3-in
1:26:26is so much, like
1:26:28I don't I don't like, you know, I'm
1:26:31you know, I'm I'm not an expert, but I
1:26:32mean, I see a fair bit of construction,
1:26:34and I mean, it's extremely rare to see
1:26:363-in
1:26:38conduits for um
1:26:40uh you know, for anything not
1:26:42that's that's power. Um
1:26:45So, I I mean, that would be I would love
1:26:48if you could clarify like how many
1:26:51cables are in that conduit, and how big
1:26:53those cables are, and like why is it
1:26:54really necessary to do 3-in?
1:26:56I understand it's easier to run it, you
1:26:58know, the bigger the conduit, it's the
1:26:59easier to run.
1:27:01Like, you know, I wonder, could those
1:27:03cables fit in into a 2-in
1:27:05conduit? You know, maybe with a little
1:27:07bit more work, but, you know, they might
1:27:10still fit.
1:27:11>> Uh we we always we use the smallest
1:27:14co-actual cable size. Typically, it's a
1:27:17quarter to 3/8 of an inch
1:27:20for each of the connections to the
1:27:21antenna.
1:27:22Um and again, anything smaller, then you
1:27:27start losing your signal over the run of
1:27:29that coaxial cable. So,
1:27:31>> How many of those do you have? 3/8 wire?
1:27:35>> I I I believe we have
1:27:38at least eight.
1:27:41Um because we'll we have two radios,
1:27:44each of them should have four
1:27:46um
1:27:47cables that are coming out and
1:27:48connecting to the antenna, so we have
1:27:50eight total.
1:27:51>> I mean, those should be those should fit
1:27:54into an inch and a half uh conduit.
1:27:56Like, why do you need
1:27:57>> Um there's a 40% fill limit, right? Is
1:28:01are you hitting the 40% fill?
1:28:03>> This is low voltage.
1:28:05>> Even then, that's
1:28:07>> We can evaluate if if we can evaluate if
1:28:10a smaller conduit could be used. Um I
1:28:13have no I mean
1:28:15I trust that my construction drawings
1:28:18and the team that architectural team
1:28:20that's developing them is using the
1:28:22minimum sized elements.
1:28:24If for some reason they oversize this,
1:28:27we're happy to
1:28:28go back and reduce it to whatever is the
1:28:32minimum size needed.
1:28:33>> Through the chair,
1:28:35we've not taken public comment. So, just
1:28:37wanted to remind you.
1:28:38>> So, thank you for reminding us.
1:28:41Um
1:28:42this is still question time. Are we done
1:28:44with questions for the applicant and can
1:28:46we
1:28:47All right, so let's move on to public
1:28:48comments. You may sit down.
1:28:52>> Yeah.
1:28:52Um through the chair, we have um
1:28:56five requests to speak. And if there's
1:28:57any members on
1:28:59uh Zoom that would like to speak, I'd
1:29:01ask that you please raise your hand.
1:29:04Or
1:29:05yeah. Or push if you're calling in, you
1:29:08can also press star nine.
1:29:10Um our first speaker will be uh Genie
1:29:12Fleming.
1:29:16>> Please state and spell your name again,
1:29:18please.
1:29:19And you'll have 3 minutes.
1:29:20>> Genie Fleming, F L E M I N G. Um
1:29:24I'm here on behalf of United Neighbors.
1:29:26Um sheets that were passed out to you
1:29:28before, that's a partial list of the
1:29:30Palo Altans who've written to you
1:29:32objecting
1:29:33to what AT&T has in mind. If you haven't
1:29:35seen all 38 of their letters, just ask
1:29:38me and I'll I'll forward them to you.
1:29:41Uh what we're asking you to do this
1:29:43morning is three things. First, we hope
1:29:46you'll direct AT&T to return with sites
1:29:48for these two cell towers that are
1:29:50significantly uh further away from
1:29:52residents' homes. The tower on Miranda
1:29:55is less than 33 feet from a residence
1:29:58and the one proposed on Homer is even
1:30:00closer.
1:30:01AT&T has better alternatives including
1:30:05locating a macro tower on a nearby
1:30:07commercial building on Middlefield Road.
1:30:10And to be clear, citing is well within
1:30:13the ARB's aesthetic purview.
1:30:17When City Council restored subjective
1:30:19standards and public hearings for cell
1:30:21towers last year, they made it a point
1:30:23to say they wanted cell towers to be
1:30:25located as far as possible from homes.
1:30:28That was unanimous, by the way.
1:30:30Unfortunately, AT&T has not heeded them.
1:30:34Second and separately, we hope you'll
1:30:36direct AT&T to return to you with a
1:30:39design that conceals the bulky,
1:30:41attention-getting hanging cabinets they
1:30:44proposed. Undergrounding that equipment
1:30:47is most definitely feasible. It's done
1:30:49in other cities, including by AT&T.
1:30:52Undergrounding is just more expensive
1:30:54than slapping all this stuff up on the
1:30:56side of a pole.
1:30:58There are other alternatives as well to
1:31:00the unsightly cabinets AT&T has
1:31:02proposed.
1:31:03For example, right around the corner on
1:31:05Middlefield, Verizon installed a
1:31:07combination radio antenna on the top of
1:31:09the pole. This is a general Ericsson
1:31:12product, by the way, that is
1:31:15certainly can be modified for AT&T or
1:31:17any other carrier.
1:31:19Third and finally, we ask you to direct
1:31:22AT&T to not use the 52-ft poles they're
1:31:25proposing. Uh that's 52 ft plus a
1:31:28lengthy pole top extension. These giants
1:31:31are disharmonious in this residential
1:31:33neighborhood, to say the least.
1:31:35Uh my understanding, by the way, is that
1:31:37PG&E stopped allowing this type of
1:31:39extension over 10 years ago. Why would
1:31:42Palo Alto continue to permit this unsafe
1:31:45and unsightly practice?
1:31:47Members of the ARB,
1:31:49we are asking you to please hold AT&T to
1:31:52the standards in our municipal code.
1:31:54That is why City Council unanimously
1:31:57removed cell tower review from the
1:32:00planning director's sole control and
1:32:02returned to you as the arbiters of
1:32:04aesthetics in our city the job of
1:32:07ensuring that cell tower applicants do
1:32:09not continue to scar our neighborhoods
1:32:13with their on-the-cheap eye sores. Thank
1:32:16you.
1:32:18>> Our next Our next speaker is Observer.
1:32:21Observer, you may now speak.
1:32:25>> Hi, good morning. Sorry about the name
1:32:27designation. My name is Ariel Strauss.
1:32:28I'm an attorney representing United
1:32:30Neighbors. Am I coming in clear?
1:32:32>> Sorry to interrupt. Yes, could you
1:32:34please state and spell your name?
1:32:36>> Yes, A R I E L, last name S T R A U S S.
1:32:43Thank you. Now, I want to point out
1:32:45something critical we heard today from
1:32:46staff, which is that this application is
1:32:49not deemed complete.
1:32:51That means that the information that
1:32:53staff received yesterday, I assume
1:32:55they're reviewing it to determine if
1:32:56that makes it complete, and then once
1:32:58that determination is made, which they
1:33:00have 10 days to do, then the shot clock
1:33:02will then restart with that 90-day
1:33:04period. That means there's a
1:33:06considerable amount of time from now
1:33:08until one of these needs to be made that
1:33:09can allow this board to bring back this
1:33:12application and address any questions
1:33:14that you have. I want to point out an
1:33:16additional critical incompleteness item
1:33:18that I included in my letter. I hope you
1:33:20were able to look at that detailed
1:33:22letter.
1:33:23And one of those items is the failure to
1:33:26identify and map within 600 ft any
1:33:28existing facilities by any carrier. The
1:33:31preference in the code is for
1:33:33co-location. That information is not in
1:33:35the application.
1:33:38Uh as Ms. Fleming said that it is
1:33:40critical that this board consider uh the
1:33:42location. Location is one of the most
1:33:44important aspects of aesthetics. Uh one
1:33:47of the problems we're seeing in this
1:33:48application is that
1:33:50AT&T has treated these two sites as
1:33:52separate
1:33:54gaps to fill. In actuality, they're
1:33:56talking about between these two sites
1:33:58roughly a 5 by 4 block area.
1:34:00And there are numerous ways to fill that
1:34:02gap. They're also requesting or at least
1:34:05intending to put in roughly another 11
1:34:08sites.
1:34:09And they are now constraining
1:34:11what they're asking you to consider on
1:34:13assumption about how those other sites
1:34:14will be configured and how they hope
1:34:16those other sites will be configured.
1:34:17But, that's not part of this
1:34:18application. That may never happen. So,
1:34:21what's necessary to do is to step back
1:34:24from that those that 200-ft radius
1:34:26constraint they're imposing and asking
1:34:28what options are available to partially
1:34:31fill this site within the constraints of
1:34:33the design guidelines. The pole
1:34:35attachments are ugly, they're intrusive,
1:34:37they're inherently low quality.
1:34:39The 53-ft height towers over anything
1:34:42else. There's no consideration of street
1:34:44trees, which is something the ARB
1:34:46considered in 2012 and 2013 and imposed.
1:34:50The box-like radios, they hover over the
1:34:53sidewalk. The right way to do this is to
1:34:56first look at what can be done from
1:34:57Middlefield and from
1:34:59rooftop options, which is preferred, to
1:35:01look at co-location, to consider those
1:35:05other sites that are slightly shorter on
1:35:07the standard stub pole, or better yet, a
1:35:10stealth facility inside a light post
1:35:13standard because those stealth
1:35:14facilities cannot be
1:35:16uh changed without ARB design review.
1:35:21The ARB should bring this back to
1:35:24require AT&T to do analysis of
1:35:27undergrounding
1:35:29and stealth option.
1:35:32I'm happy to answer any questions.
1:35:36>> Our next speaker is Nathaniel S.
1:35:38Nathaniel S, you may now come to mic.
1:35:43>> Hello. Uh my name is Nate Saul, S A A L.
1:35:46Uh couple relevant pieces of
1:35:47information, uh born and raised here in
1:35:50Palo Alto. Um
1:35:52uh I own the home at 670 Guinda
1:35:55and I'm also an AT&T mobile customer.
1:35:58So, I I feel their pain.
1:36:00Um,
1:36:01a couple things. One,
1:36:04the images they've sent out, I think are
1:36:06incomplete. As a
1:36:09neighborhood member community,
1:36:11um,
1:36:12they're not showing all the equipment
1:36:14that they're sending to me saying this
1:36:15is what it's going to look like it's not
1:36:17what it's going to look like. And, um,
1:36:20I respectfully disagree with
1:36:23Rosen
1:36:24Rosenberg's statement that next time
1:36:26they should provide more more
1:36:27information. They don't get a pass. I
1:36:29think this time they should come back
1:36:31provide all the conduit up and down that
1:36:34means power conduit, radio conduit,
1:36:37fiber conduit with renderings of the
1:36:40radios, with renderings of the antennas
1:36:43so that we really know what this is
1:36:44going to look like. There's already, as
1:36:45you mentioned, member Hirsch,
1:36:47a white conduit sticking off of that
1:36:50pole at the corner.
1:36:51Not very pretty.
1:36:53Um, the location of the house literally,
1:36:56you know, 5 ft to the property line less
1:36:58than
1:36:59about 30 ft to the kitchen. There's a
1:37:01beautiful bay window looking out at the
1:37:04corner looking at the pole.
1:37:06Um, that will be a significant eyesore.
1:37:09Um,
1:37:11uh,
1:37:12you know, also if you look at those
1:37:13pictures they have these nice long shots
1:37:15of the pole. The reason they can do the
1:37:17long shots of the pole is because
1:37:18there's no tree coverage. There's
1:37:19nothing blocking that pole at the
1:37:21corner.
1:37:22There as I was driving from my home
1:37:24here, I was noticing all the the poles.
1:37:27Lots of poles that can be used where
1:37:30they're more
1:37:31protected, let's call it, they're less
1:37:33of an eyesore than the one at the corner
1:37:36of
1:37:37of Forest and Guinda.
1:37:39Um,
1:37:40I'm also very concerned about noise.
1:37:43Um, I would love to see a decibel
1:37:45reading measurement based on the
1:37:47equipment that they're going to install
1:37:49so we know what the actual noise level
1:37:50is. I was also concerned hearing that
1:37:53they can swap out or improve and put in
1:37:55other equipment without putting some
1:37:57kind of a um,
1:37:59requirement on noise level.
1:38:02Um,
1:38:03the
1:38:05uh, extension, excuse me, the exclusions
1:38:08that we had in term that uh,
1:38:11I guess there seems to be some gap in
1:38:13um, you know, what are reasonable
1:38:14exclusions. Um, I don't think we should
1:38:17sort of allow something to slip in.
1:38:19Um,
1:38:20and I think one other really important
1:38:22thing is I think there was a a
1:38:23presentation that showed the existing
1:38:25structure, but my concern as the owner
1:38:28is not just the existing structure, but
1:38:30my ability to build on that site in a
1:38:32future structure and
1:38:35what exposure levels might be if there's
1:38:37a two-story residence um, there. And so
1:38:40I it feels like that's infringing on my
1:38:42ability to use my space.
1:38:45Um, and aesthetic, um, you know, of the
1:38:47house with a giant pole with a radio
1:38:49boxes uh, on top of that. So again, I I
1:38:52I think we should reconsider. They were
1:38:54willing to reconsider another location.
1:38:57Um,
1:38:57>> Thank you. Please conclude your time.
1:38:58>> Thank you.
1:39:01>> Our next speaker is Bob W.
1:39:05>> The yeah.
1:39:07Bob Wiedemeyer. That's right, right?
1:39:09Yeah. Uh,
1:39:10w e d e m e y e r. Um, I live at the 827
1:39:16Guinda Street. My wife and I have
1:39:19lived there for about 35 years. Raised
1:39:21our kids in Palo Alto.
1:39:23Um,
1:39:24so I was at the meeting the other day
1:39:26over here on University where we met
1:39:29with members of AT&T. There were I guess
1:39:31there were about eight of us. There were
1:39:32about six of them. And but anyway, and
1:39:36there were AT&T users there and they had
1:39:39said there was no problem with their
1:39:40service or anything. So, they were
1:39:42wondering why we needed additional
1:39:44service or new service or whatever.
1:39:47So, anyway, um
1:39:49the um
1:39:51things that I find kind of curious, I
1:39:53mean, we we have I guess what I
1:39:55understood from today is in we are going
1:39:58to still have three antennas within a
1:40:00few blocks of each other, which again, I
1:40:02just don't get, you know, that why they
1:40:04have to be so close together and why we
1:40:06need so many of them. Uh
1:40:08with respect to undergrounding, um
1:40:11one of the things I noticed in Palo Alto
1:40:13and maybe you've noticed it as well. I
1:40:15noticed it right in front of my house
1:40:17the day after we went to that hearing,
1:40:20AT&T was pulling giant black I I'm
1:40:23assuming fiber optic cables. I think
1:40:25that's what they said. And they're
1:40:27pulling them from the pole in front of
1:40:28my house and then which by the way stops
1:40:30there and then goes underground.
1:40:32But anyway, they're pulling cable all
1:40:34the way down the street. I noticed
1:40:35elsewhere in Palo Alto along Alma and
1:40:38other places. Maybe you've noticed it as
1:40:39well, but they're these big giant heavy
1:40:42black cables that are being draped
1:40:44everywhere. Okay. So, one of our
1:40:46concerns at this meeting the other day
1:40:48was when we look at at all of that and
1:40:50we think of AT&T and then we think of
1:40:52T-Mobile, we think of Verizon, we think
1:40:54of all these other companies. Are all
1:40:56these other companies going to be coming
1:40:58through draping heavy fiber optic
1:41:00cables? Uh are they going to be wanting
1:41:03to put antennas at the end of those
1:41:04cables? Uh what's all this where does
1:41:07this end? Uh and in fact, I was hoping I
1:41:09I was thinking I've been observing this
1:41:12for years that the city of Palo Alto is
1:41:13actually moving in the other direction
1:41:16aesthetically, which is to get rid of
1:41:17telephone poles, underground stuff, have
1:41:20just a light pole,
1:41:22maybe, you know, something off of that
1:41:24if you need to have an antenna, but you
1:41:26don't have all of this
1:41:28this stuff everywhere. I mean, it's just
1:41:31getting to me it's just getting out of
1:41:32hand, you know, and so it's not just
1:41:35these poles and the the towers and
1:41:36stuff, but it's also the the cabling and
1:41:39stuff like that. So I guess that's
1:41:42that's just basically my comment is
1:41:44where are we going with this, okay, and
1:41:46is there an end in sight or is it just
1:41:48going to continue?
1:41:50But like I said, I now have a nice big
1:41:52black cable running, you know, in front
1:41:54of my house to the pole there. It's
1:41:56already stuffed with stuff, you know,
1:41:57all kinds of things.
1:41:59So anyway, that's all I had to say.
1:42:01Thank you.
1:42:03>> Our last speaker is Henry E. Henry E,
1:42:06you may now speak.
1:42:11>> Am I Do you hear me?
1:42:13>> Yes, we can hear you.
1:42:14>> Very good.
1:42:16So I'm Henry Eskridge,
1:42:18Neighbors for Environmental and Social
1:42:20Justice.
1:42:21As a sociologist for comparative
1:42:23purposes, I'd like to take you to two of
1:42:26the neighborhoods. One is the diplomatic
1:42:28quarter of Stockholm. I say Stockholm
1:42:31because Ericsson was mentioned, which of
1:42:34course is a Swedish radio television
1:42:37radio corporation
1:42:38supplying electrical equipment in
1:42:40Sweden. And I was there in Sweden as a
1:42:44member of the
1:42:46Swedish business and policy organization
1:42:49that interfaces with universities, large
1:42:52corporations. So I was sitting there
1:42:54with the CEO of Ericsson. And in the
1:42:57diplomatic neighborhood, well,
1:43:00it looked like the older section of Palo
1:43:02Alto, there were no poles.
1:43:04And then let me take you to another
1:43:06neighborhood where I grew up in the
1:43:08Bronx in the early 1940s. We'd be called
1:43:11to the window to look out at the
1:43:13lamplighter lighting the gas lamps on
1:43:15the streets.
1:43:17And through the gas lamps you could see,
1:43:19we called them telegraph poles, lining
1:43:21the streets with those repeaters above
1:43:25and
1:43:26wires going across. But we went away to
1:43:29summer camp, say about 1950. And one
1:43:32time when I came back for camp, there
1:43:35were no poles.
1:43:36The streets were clear.
1:43:38Now, what is going to be the future of
1:43:40Palo Alto? Is it going to be the
1:43:42diplomatic neighborhood of
1:43:44of Stockholm or is it going to be 1940s
1:43:47Bronx?
1:43:48Well, I predict
1:43:51well, it's going to be
1:43:531940s Bronx because we're building squat
1:43:56buildings in Palo Alto up to the
1:43:59building line in San Antonio. So, we're
1:44:02going backwards to the to the Bronx,
1:44:05which has gone forward. There are no
1:44:07poles on that street in the Bronx. I
1:44:10want to see the old neighborhood
1:44:11recently and librarian in Stanford got
1:44:14me on the site and we looked down the
1:44:16street.
1:44:17And the main change has been that the
1:44:19small stores have been replaced by a
1:44:21supermarket.
1:44:23And then we looked up to where I used to
1:44:24live on the second floor of an apartment
1:44:27house. And you know what?
1:44:30The air conditioner that my family had
1:44:32bought in the 1950s was still sticking
1:44:36out of the window.
1:44:37Now, that was sturdy equipment. Uh it
1:44:39probably still worked, but we don't
1:44:41know. I've meant to go back to the
1:44:43neighborhood, uh but so for sure, there
1:44:46are no poles. Now, you're not the real
1:44:48AT&T, of course. The real AT&T, you're
1:44:51baby bell and you took over the name and
1:44:54uh
1:44:55you're just spoiling Palo Alto for no
1:44:57reason whatsoever because the technology
1:45:00has superseded what you are doing. Uh
1:45:02this is absurd that we're sitting here
1:45:05today in 20s 26 and Jean and her
1:45:08neighbors have to spend all this time to
1:45:11try to get rid of a technology that's
1:45:12been superseded elsewhere in the world,
1:45:15even in the Bronx.
1:45:17Thank you.
1:45:19>> Uh did you just want to make a comment?
1:45:25>> Thank you. Um if the applicant wanted to
1:45:28respond to any of the comments.
1:45:34No?
1:45:36Do you
1:45:37Do you want Yeah, no. Applicant, do you
1:45:39want to respond to any of the public
1:45:41speakers?
1:45:43>> Um
1:45:44I I I did want to point out that
1:45:47we do have the
1:45:50all of the conduits are shown in the
1:45:52drawings.
1:45:53I understand that the photo simulation
1:45:56may be lacking them. It is difficult to
1:46:00fit that fine detail when you're showing
1:46:03a pole that's 50 ft high. Um
1:46:06in order to get that whole pole in what
1:46:08is a photo simulation, it's going to be
1:46:10difficult to point out all that fine
1:46:12detail, but we will definitely make a
1:46:15better effort to to do that, but the
1:46:18drawings do depict the conduits that are
1:46:20going to be
1:46:21on the pole running up um for power for
1:46:24fiber and for electricity. Additionally,
1:46:27one of
1:46:28one of the residents uh at the community
1:46:30meeting actually
1:46:32noted that they had AT&T service. They
1:46:36recognized that AT&T service is
1:46:38deficient in the area and that required
1:46:40them to switch to Verizon. So, um one of
1:46:43the residents that did come to the
1:46:44community meeting acknowledged that they
1:46:46did have a gap in service and that that
1:46:49forced them that shouldn't be the case
1:46:50that we have to lose customers because
1:46:53we can't provide sufficient service for
1:46:54people to use their phones again within
1:46:57their homes to make emergency calls to
1:46:59um conduct, you know, business if they
1:47:02choose to work from remotely. So, our
1:47:05investment in Palo Alto is to bring, you
1:47:08know, the 20th century communications
1:47:10and connectivity that uh customers
1:47:13expect and rely upon within the city of
1:47:16Palo Alto, which is, you know, a leading
1:47:17edge of Silicon Valley. So, thank you.
1:47:22Sorry if you didn't say for a minute. Uh
1:47:25Can you point out to Nishita what
1:47:26drawing page we should pull up with the
1:47:28conduits?
1:47:30>> A4
1:47:31>> For everybody's information.
1:47:32>> A4
1:47:51>> That is not the A4 in front of me.
1:48:01I have A4 open in front of me and it
1:48:03looks different. Is that Is this a
1:48:05resubmission of A4?
1:48:09>> These are the revised plans that were
1:48:11submitted yesterday that I have
1:48:12downloaded it and up on the screen.
1:48:15>> Yeah, those would have been on in the in
1:48:16original plans as well.
1:48:19>> Well, which one or which one are we on?
1:48:21>> Well, which one are we
1:48:23Which one are we on?
1:48:24>> 70
1:48:25>> Oh, okay. And we have
1:48:27>> Yeah, we've got two in here.
1:48:28>> On page
1:48:31A4
1:48:33for the Gwenda application.
1:48:35The conduits are shown with a 3-in
1:48:38a 2-in and a 1.5-in.
1:48:41One noted for coax, one noted for fiber,
1:48:45and one noted for power.
1:48:46>> Okay. So, it's shown on the Gwenda A4
1:48:49but not in the Homer A4.
1:48:51>> Do you have Can you pull up Homer?
1:49:05>> I think it's because it's on the other
1:49:06side.
1:49:09>> Is there no other
1:49:11No, because it's coming off the other
1:49:12side over here.
1:49:15>> Wait, look up here.
1:49:17It's just on the backside.
1:49:20Like three.
1:49:25>> It does look like it was admitted from
1:49:27the
1:49:28>> Yeah, so for those at home, it's what
1:49:30we're talking about here and I'm going
1:49:31to try and make my panel a little
1:49:33thicker is this sort of line right here
1:49:36running down the side showing the
1:49:37conduit.
1:49:43>> The city has the opportunity within the
1:49:4510-day period of review to
1:49:50notice that as an incomplete item and we
1:49:52can address it.
1:50:01>> Thank you. Um, all right, so I got a
1:50:04quick question for staff if you don't
1:50:06mind. Um, one more question for staff
1:50:08and again, you may not be able to answer
1:50:10this. This is sort of a
1:50:11larger question.
1:50:14Does the city of Palo Alto have plans or
1:50:17a associated board or anything like that
1:50:19that intends to underground power lines
1:50:22and things in the future? So I
1:50:23specifically live in a neighborhood
1:50:25that's built in the '80s. Everything's
1:50:26underground.
1:50:28Um, so when we have communication poles,
1:50:30it's like we've got one wooden pole you
1:50:32know, a block from my house that has the
1:50:34the tower on top very similar to this.
1:50:36Um, but our power lines are not
1:50:39above ground. It's only these specific
1:50:41items that have to be above ground or
1:50:42above ground.
1:50:43Is there any intention or any sort of
1:50:46committee that's working on
1:50:48undergrounding the above ground lines?
1:50:51>> Not that I'm aware of. In case of in
1:50:54certain cases,
1:50:56um, if there is new development coming
1:50:58in, there might be a reason why lines
1:51:01would be undergrounded, but there's no
1:51:03wholesale effort to underground all of
1:51:05the lines in Palo Alto. That would be
1:51:07incredibly expensive.
1:51:11>> Okay. There is such a project. I'm I'm
1:51:13sorry. I apologize. I can't speak it.
1:51:16Any length to it, but but in fact this
1:51:19has been a long-term goal in Palo Alto
1:51:21that's on the book
1:51:22books now for
1:51:24>> I believe the public comment period has
1:51:27>> Yeah.
1:51:27>> lapsed.
1:51:28>> Apologies. We cannot take
1:51:30public comment, but I would urge staff
1:51:33to look into this.
1:51:34>> Just
1:51:34>> Yeah, just for us to better understand
1:51:36because if this is something that's
1:51:37going to come up over and over again,
1:51:39it's something that's useful for us to
1:51:40know if there's I mean, understand maybe
1:51:42there's no committee that's
1:51:44doing this and and also understand it
1:51:45from our limited experience working in
1:51:47Palo Alto when a new development comes
1:51:49up, they do typically underground the
1:51:51poles. It's not you know, anytime I have
1:51:53a new house that's undergrounded, right?
1:51:55Um, that's a requirement. So, the
1:51:57question is if all of these poles are
1:51:59going to be going up in the downtown
1:52:00area because it's old wiring that
1:52:02happens to be overhead versus in some of
1:52:05the newer areas or newer development
1:52:06areas where it will have to figure out
1:52:09an underground solution,
1:52:11that's worth noting that this is
1:52:13something that's going to be in conflict
1:52:14down the road. So, obviously, it's not
1:52:15something we can assess today at this
1:52:17meeting per se, but again,
1:52:20for future, it'd be good for staff to be
1:52:21aware of that and that that the ARB
1:52:23could be aware of that as well.
1:52:25>> You know, I have
1:52:26a house that's recent recent enough, 10
1:52:29years old already and it I have a
1:52:32overhead
1:52:33um
1:52:34>> Was it a brand new?
1:52:36>> Brand new house, of course, yeah.
1:52:38>> The last I can't tell you how many
1:52:40houses I've built
1:52:41that have if it's a brand new house, it
1:52:43has to be undergrounded utilities. They
1:52:45will not connect it overhead anymore.
1:52:47>> I think that's just the service from the
1:52:48street to the house, but the pole
1:52:50itself.
1:52:51>> Oh, correct.
1:52:52>> Correct.
1:52:53>> That's different.
1:52:56>> If you if if you pay for it, you can get
1:52:59it.
1:52:59>> You can get it either way.
1:53:01>> But I made a decision actually perhaps
1:53:04that I wanted to actually see it since
1:53:06it's all over the neighborhood that way.
1:53:08>> But they allowed you to run from the
1:53:10pole and again I started a little off
1:53:11topic.
1:53:11>> from the pole directly to the house and
1:53:13you
1:53:14>> They have not allowed me to do that in a
1:53:16very long time.
1:53:17So maybe it changed 10 years ago, but
1:53:19every brand new house
1:53:20>> 10 years
1:53:20>> Yeah.
1:53:21>> It's possible.
1:53:21>> I mean I have a house that I have to
1:53:23have its own transformer on site.
1:53:25>> Which means you're underground, you're
1:53:26tunneling all the way to the house.
1:53:28>> That's not the case. I mean that could
1:53:30be the case only in a scenario where
1:53:32there wouldn't there's not enough
1:53:34capacity based on what you were
1:53:36proposing, but it's not a general
1:53:38requirement to put a transformer for
1:53:39every
1:53:39>> Exactly. It's sort of an exceptional
1:53:41situation and I understand that, but
1:53:43it's definitely one of those things
1:53:44where they're the overhead lines unless
1:53:45it's a remodel addition, we're not
1:53:47seeing that that you guys are sort of
1:53:48requiring from the pole to the house is
1:53:50at least underground. So again, just on
1:53:53the note of topic Yeah, so I'm trying to
1:53:55trying to bring it back to where we were
1:53:56is that the question is if this is
1:53:57something that's going to just be, you
1:53:59know, they've got large swaths that are
1:54:00going to be underground and it's good to
1:54:02know. And if that's not the case, great.
1:54:05But either way we would want a firm
1:54:06answer on on knowing what our policy
1:54:07>> Again, I'm I'm not aware of anything. Um
1:54:10certainly we have
1:54:11uh you know, electrification work going
1:54:14on and we have fiber optic fiber to the
1:54:16premises project going on.
1:54:19Um and in some cases there might be
1:54:21areas where
1:54:23uh lines could be undergrounded, but
1:54:24it's
1:54:25I'm not aware of any wholesale effort
1:54:27effort to underground all lines in Palo
1:54:30Alto.
1:54:31But
1:54:32>> I
1:54:33Sorry, we can't take public comment.
1:54:35>> But uh related question. Because at this
1:54:38these streets
1:54:39um in question have light fixtures that
1:54:42are off of the wooden poles,
1:54:45is there a plan to have
1:54:47the as light fixtures get changed over
1:54:49time that they would be on their own
1:54:51independent metal pole?
1:54:53Is that
1:54:54uh
1:54:55the thing or not?
1:54:57>> Yes, I mean, you know, it it's just to
1:54:59add to that, it's pretty clear that when
1:55:02you have a metal pole,
1:55:03you can have internal connections of all
1:55:07the wiring
1:55:09through through the middle of the pole
1:55:10that, you know, in those neighborhoods
1:55:12you don't see
1:55:14any external
1:55:15uh wiring on on poles that are metal
1:55:18poles.
1:55:21In the downtown area, of course,
1:55:22everything is hidden.
1:55:25>> I I don't know the answer to that
1:55:26question. I'm sorry.
1:55:28>> Um no worries. So, um Nisha, another
1:55:30question for you uh also about the the
1:55:34radio
1:55:35box, which is very large and like within
1:55:38kind of just above fence lines of
1:55:40neighbors and very visible.
1:55:43Is that as
1:55:45the height of these radios, is that
1:55:48can they be any higher, do you know,
1:55:50like to be less visible and
1:55:53from people's windows, for instance?
1:55:56>> Um I believe AT&T can speak to that, but
1:55:58per my understanding from previous
1:56:00applications, um
1:56:02there is a distance wherein the radio
1:56:05the distance between the radio and the
1:56:06antennas has to be minimal um in order
1:56:09for the signals to get through to the
1:56:10antennas. And I think there's like a
1:56:12um
1:56:13preferred distance that they have. Um I
1:56:16don't know if maybe AT&T has like a
1:56:17specific number they can speak to, um
1:56:19but that's my understanding. Um
1:56:23>> And and the mounting height of those
1:56:25radio poles, so that the shutoff switch
1:56:27is 7 ft and then those radio shroud is 2
1:56:3114.
1:56:33And then basically it
1:56:35in theory, would people want it to go
1:56:37higher to get it out of the visual field
1:56:40or
1:56:41I mean, what's what's the goal of the
1:56:42question of the height of the height of
1:56:43mounting this? Is that are we trying to
1:56:45get it lower higher or higher? Like if
1:56:46they can be 30 ft off the ground, that
1:56:48would be outside of the visual range of
1:56:50um people outside of windows. Is that a
1:56:52possibility?
1:56:53>> I think there's also a structural
1:56:55component to this wherein we wouldn't
1:56:57want the weight of the pole to be
1:56:59heavier at the top. Um
1:57:01but that's something that utilities and
1:57:02AT&T would have to speak to. Um
1:57:07Yeah.
1:57:08>> Can we uh
1:57:10for staff, can we ask AT&T to respond to
1:57:13this or since we've closed Okay. Yes,
1:57:15please answer the question.
1:57:17>> So, typically on a utility pole, the
1:57:20space above 18 ft is reserved for
1:57:23communication carriers, fiber optic
1:57:25cables, um the AT&T wireline, Sonic, you
1:57:29name it. And the portion up to that is
1:57:33considered the structural zone where
1:57:35typically equip ancillary equipment to
1:57:38these poles is installed. So, at 14 ft,
1:57:41we extend up to the 18 ft, which is
1:57:44typically reserved above that for
1:57:45communication lines. So, that is the one
1:57:48of the restrictions in terms of the
1:57:49height.
1:57:51>> Thank you.
1:57:52That's helpful.
1:57:56All right. Um I think we will now close
1:57:59for
1:58:00comment for questions and other
1:58:03comments. So, that's final thoughts from
1:58:05the board.
1:58:08Who wants to start?
1:58:14Martin, do you want to start?
1:58:15>> Uh
1:58:17Not that I want to. Again, I can start.
1:58:21So, yeah, I think
1:58:23um
1:58:26kind of our hands are, you know, a
1:58:27little tight here, you know, with this
1:58:29project. I I think
1:58:31you know, for the you know, for the
1:58:32neighbors, I think
1:58:35um
1:58:36you know, nobody likes these uh these uh
1:58:38these these posts, and I think you
1:58:40believe that, you know, the city has a
1:58:42lot of power to
1:58:44move locations and change uh you know,
1:58:46dimensions, things like this. I In
1:58:48reality,
1:58:49I think our ability to influence things
1:58:51is very limited.
1:58:53Um
1:58:56And
1:58:57um
1:58:59I think you know, over the past few
1:59:01meetings, I think
1:59:02uh you know, AT&T came back with kind of
1:59:05various improvements to their to their
1:59:08um to their setup, which
1:59:10I mean, you know, these drawings
1:59:13>> We got a 4.5 earthquake in Sacramento,
1:59:16so just in case things start shaking.
1:59:17This is the second time this has
1:59:18happened during an Arab conference.
1:59:24All right, sorry.
1:59:25>> So, yes, I think the the current setup
1:59:27they are showing is is you know, is is
1:59:30is better than what we have seen, you
1:59:31know, before and
1:59:34um
1:59:35you know, like while
1:59:39the best solution is no antenna and you
1:59:42know, no AT&T equipment,
1:59:44uh I I think
1:59:47you know, we are
1:59:48starting to move towards that is that is
1:59:50you know, that is that is better and
1:59:53I think we need to acknowledge to AT&T
1:59:55that they they did try to make an effort
1:59:57to
1:59:58um
2:00:00you know, to make these installations,
2:00:01you know, better.
2:00:04And um
2:00:07um you know, from the conversation
2:00:08today, I think that the one
2:00:12improvement that I could see is is is
2:00:14the conduit size.
2:00:16Um
2:00:18I think
2:00:19um
2:00:20you know, improve the documentation of
2:00:21the you know, of the project
2:00:24cuz even even for home, you know, for
2:00:26going down the street, you you are
2:00:27showing the
2:00:29the in the coax PVCs, all three of them,
2:00:33but you know, they are not drawn to
2:00:34proportion, like they are not, you know,
2:00:36drawn as you know, 3-in PVCs. They are
2:00:39more like
2:00:40maybe 2-in or you know, 1-in. So, I
2:00:42think it would be better to document
2:00:44better, not just in the
2:00:46the first in the drawing and second in
2:00:48the simulation.
2:00:50But then I was like really try to go
2:00:51back and and and and verify, do we
2:00:53really need a 3-in you know, coax PVC? I
2:00:56don't think so.
2:00:58Um
2:01:00And also for the fiber, 2-in PVC for the
2:01:03fiber I mean the fiber is so thin like,
2:01:05you know, maybe you can reduce that,
2:01:07too.
2:01:08Um
2:01:11So, I think uh you know, trying to you
2:01:13know, reduce those
2:01:15uh you know, would be would be good. And
2:01:17apart from that, like I appreciate you
2:01:19canceled, you know, that third uh pole
2:01:21that, you know, based on
2:01:24um
2:01:26on the public uh public comments. I
2:01:28think that's that's
2:01:30uh you know, that's good.
2:01:32Um you know, these these two
2:01:35um
2:01:37Yeah, I don't I don't I don't I don't I
2:01:39don't see an obvious way to you know, to
2:01:41make you make it better if you relocate
2:01:43it to any of the other locations that
2:01:46you've shown.
2:01:48Um you know, on the on the alternative
2:01:50maps.
2:01:52I'm I mean you know, I I know
2:01:54unfortunately you came here cuz you own
2:01:56the house
2:01:58in front of it. Now, if they relocate it
2:02:01in front of another house, there will be
2:02:02another resident here,
2:02:04you know, saying the same thing. So, I
2:02:06don't know how to choose like I don't I
2:02:08don't
2:02:09uh I don't think we have the power
2:02:11uh I mean you know, to to to to to weigh
2:02:13it uh even if it's put on the
2:02:16top of a of you know, of the commercial
2:02:19building on Middlefield, you know, that
2:02:21building has a neighbor, too.
2:02:23So, you know, whether the the antenna is
2:02:25on top of the commercial building
2:02:2715 ft away, you know, from the neighbor
2:02:30or whether it's on the on the pole,
2:02:32that's
2:02:33you know, it's going to be
2:02:36kind of very similar. So, I think
2:02:38uh the options are very limited.
2:02:41Um
2:02:43Practical options are limited. I think
2:02:45the legal options are limited.
2:02:48Um
2:02:50so I think all all all I think we can do
2:02:52is to ask AT&T to try to make it
2:02:55kind of you know, as pretty as possible.
2:02:57And I think they have already
2:02:59you know, improved things over time. And
2:03:01there's still opportunity,
2:03:03uh you know, to go further. So, that
2:03:05would be my my my my request. So, as far
2:03:08as
2:03:09you know, uh as far as you can,
2:03:12um
2:03:14um
2:03:15I mean, try to try to further improve
2:03:18the design and the documentation.
2:03:23>> If I may through the chair. So, uh I
2:03:25just want to um we were able to get some
2:03:27information from our utilities to answer
2:03:29your question about undergrounding. So,
2:03:31there is no wholesale for across the
2:03:34entire city to underground, but there
2:03:36are areas where the
2:03:39um that have been identified as areas
2:03:42where we'd like to work towards
2:03:44undergrounding. The
2:03:46um
2:03:47uh and those there is a website that we
2:03:49have that shows those areas. These poles
2:03:52are not within an area that is planned
2:03:55for undergrounding. So.
2:03:58>> Thank you.
2:03:59Sorry.
2:04:00Comments from
2:04:02Closing comments from
2:04:04>> Okay. Thank Thank you again for your
2:04:05presentation and
2:04:07and the comments from the public. So, uh
2:04:10at first when when I saw the renderings
2:04:12and the information that uh we received,
2:04:17I do have to say that the the pole got
2:04:19really tall and the the radio shroud
2:04:23kind of bulky compared to the wood pole.
2:04:26Uh however, based on the information we
2:04:28received today, it seems like there is
2:04:31really limited things we can do.
2:04:34Uh
2:04:35first we we cannot lower the the antenna
2:04:39because of the general order 95 and also
2:04:44um based on the information we got, the
2:04:46radio
2:04:47uh
2:04:48is already one of the smallest and the
2:04:51shroud
2:04:52probably is about the same size.
2:04:55And so
2:04:59I feel just based on the information we
2:05:01got
2:05:03it's although it's not ideal, it's not
2:05:07that pretty, but
2:05:11do we have any other better choices? I
2:05:14I just don't see it.
2:05:17So
2:05:18yeah.
2:05:21>> It's okay, though.
2:05:22>> Um yeah, I have to admit that when I
2:05:25first saw this, I just was it was very
2:05:28neutral. It wasn't super offensive. Yes,
2:05:30it's taller, but there's of course, you
2:05:32know, physical restrictions that we're
2:05:33required to sort of abide by their
2:05:34safety concerns with power
2:05:37in my mind I looked at this and I was
2:05:38like, well, that's as basic as it gets.
2:05:41Um so kind of unoffensive in my mind out
2:05:43of the gate. Now, of course, we have
2:05:45questions about conduits and things like
2:05:46that. Yes, because there's little things
2:05:48that add up at the end, like the one on
2:05:50Page Mill, when there's a whole bunch of
2:05:51wires and spaghetti as they said
2:05:53sticking out of the top that's
2:05:54unexpected. That's that's a hard hard
2:05:57part for us. So if this really ends up
2:05:59looking the way that it does even in the
2:06:01one of the the photo renderings, I
2:06:03didn't even see the radio box at first
2:06:05cuz it blended in with the tree.
2:06:08So there's in my mind I just this was
2:06:10there's nothing so incredibly offensive
2:06:13um visually speaking. I think that the
2:06:15color choice is acceptable. I think the
2:06:17height is yes, it's taller, but
2:06:19in the grand scheme of things it's kind
2:06:21of arbitrary to begin with. We're seeing
2:06:22buildings that are coming in eight
2:06:23stories tall when we're used to being a
2:06:25four-story tall city. So the height
2:06:28limit in and of itself doesn't really
2:06:30offend.
2:06:31Um
2:06:33again, we want to make sure you guys are
2:06:34being complete and honest and as
2:06:35forthright as possible with things. Uh I
2:06:37did appreciate your comments regarding
2:06:39the sizing of the cubic square footage
2:06:41and things like that versus what it
2:06:43could be otherwise. And knowing that
2:06:44these are sort of a smaller situation
2:06:46than what it could be is definitely a
2:06:48benefit and I appreciate that. Um
2:06:51again, anytime it could be even smaller,
2:06:53we absolutely appreciate that. But I
2:06:55think that all things said and done,
2:06:57this is
2:06:58one of the lesser offenses of projects
2:07:00we've seen, so I don't really have a
2:07:02visual opposition to it.
2:07:04And to I do want to touch base on board
2:07:07member Joe George's comment that
2:07:09unfortunately, based on location,
2:07:13like he said, it's sort of this location
2:07:15will have
2:07:16these wonderful residents here. A
2:07:19different location will have another set
2:07:20of wonderful residents here. And another
2:07:22location will have another set of
2:07:23wonderful residents here. And And
2:07:25there's sort of It doesn't matter where
2:07:26it goes, there will be someone affected.
2:07:28And that's the hard part. Cuz these do
2:07:30need to go someplace or we just don't
2:07:32have cell coverage and that's, you know,
2:07:33is what it is.
2:07:36So there's a little bit of that where
2:07:37it's a little bit of a rock and a hard
2:07:38place where
2:07:40trying to find the best solution is is
2:07:43we're never going to fully win in that
2:07:45regard. We're never going to find the
2:07:47most ideal perfect situation for where
2:07:49these poles are located. Now, we do have
2:07:52a significant amount of trust in the
2:07:53city and in the um AT&T community for
2:07:58finding the ideal situations for these
2:07:59pole locations um based on coverage. Um
2:08:03and I do appreciate the fact that you
2:08:05actually reserved the third pole based
2:08:08on community feedback. The fact that you
2:08:10guys are listening to our residents is a
2:08:12big deal for us. Um
2:08:14so I did want to point that out and say
2:08:16thank you for that.
2:08:18Um
2:08:19I don't really have any further
2:08:20objections or questions, so I'm going to
2:08:23pass this along. Thank you for your
2:08:24time.
2:08:26>> Uh
2:08:30This is a
2:08:31We're all caught between a rock and a
2:08:33hard place, frankly, here.
2:08:35Uh the poles are
2:08:37filled with
2:08:39additional garbage, really, to be honest
2:08:42about it.
2:08:43Um
2:08:45I've been thinking about this for quite
2:08:47a while. I'm the only I'm the only
2:08:49member here who's been on this committee
2:08:51since
2:08:5219 when the when we all split on this.
2:08:56And there was a lot of discussion about
2:08:57ingrounding and the problems that had
2:09:00would happen if you had to inground a
2:09:02whole facility.
2:09:04>> [clears throat]
2:09:05>> Uh but we were at the time trying to
2:09:07figure out a way to to lessen the impact
2:09:10of this on on a pole that's already
2:09:13filled with years of changes that have
2:09:17caused it to really be a kind of an ugly
2:09:20situation in
2:09:22very nice residential neighborhoods.
2:09:25Seemed to me that
2:09:26uh
2:09:28way off way out of the scope of this
2:09:31particular consideration.
2:09:33It would have been maybe nice to look to
2:09:35imagine that you have a whole new
2:09:37technology here that you're bringing in
2:09:39or increase in technology that allows us
2:09:42to get better signals throughout the
2:09:44city.
2:09:46And actually not lose your
2:09:49phone on
2:09:50in the middle of a conversation. Um and
2:09:54uh
2:09:55this side of the street
2:09:57where the electrical and everything else
2:09:58is may not be the best place. If you had
2:10:02a pole a metal pole on the opposite side
2:10:05of the street and you
2:10:07brought power to it so that you could
2:10:10make it work for the city.
2:10:12That would be a better way, though. Of
2:10:14course, the installation's going to be
2:10:16significantly more expensive, new poles,
2:10:18new concept, cross the street in with
2:10:22the electrical that's going to be an
2:10:24issue.
2:10:26But at least you'd have one clean, you
2:10:28know, you have the old poles on one side
2:10:30and new pole new pole in very limited
2:10:33areas getting your service out through
2:10:36out the city.
2:10:38Uh I don't want to talk about it anymore
2:10:40because it's not a possibility right
2:10:42now.
2:10:43But this is rethinking
2:10:45upgrading the city in some way here.
2:10:49Um the
2:10:51the existing poles would have to come
2:10:53down at some point when the new concept
2:10:57of moving the facility basically.
2:11:02Um
2:11:03But it it's almost come to the point now
2:11:05I think where
2:11:07we just have too much stuff on the pole.
2:11:10You know, and it's frankly we're going
2:11:12to get to the end of this and
2:11:14aesthetically I think everybody here is
2:11:16not happy on this board that nobody's
2:11:19happy with what we're going to end up
2:11:21with.
2:11:22Because it isn't it isn't going to be
2:11:24really an aesthetic decision and we want
2:11:27to make an aesthetic decision.
2:11:30That's my feeling about it. It's
2:11:33there are minor changes and I think in
2:11:35actuality
2:11:36you've come a long way, you know, that I
2:11:39don't think Ericsson and those smaller
2:11:42elements were really thought of in the
2:11:45very beginning. But now the
2:11:48radios are capable of doing what what
2:11:51the Ericsson is allowing there and I
2:11:53think you've minimized it as best you
2:11:56can.
2:11:57And to that extent I think you're
2:12:00I thank you for
2:12:01going this far.
2:12:03But in my opinion it doesn't really
2:12:05solve the problem aesthetically for us
2:12:08as a board and it doesn't it really
2:12:11solve it aesthetically for
2:12:13where we're going with this in the the
2:12:15itself.
2:12:16That uh uh
2:12:18it has to be it should be rethought.
2:12:21Um
2:12:22the concept of how to provide the
2:12:24service for
2:12:25Palo Alto.
2:12:29>> Thank you, David.
2:12:31Um yeah, just final thoughts. Thank you
2:12:33to staff and applicants for bringing
2:12:35this forward.
2:12:37Um
2:12:38and yeah, we've all kind of echoed the
2:12:41rock and hard place that we are in and
2:12:43honestly, when I look at you before and
2:12:45after pictures, what's offensive is
2:12:47before to start with, right? We have
2:12:49these
2:12:50um like look at the pole at Homer um
2:12:53with
2:12:55all the stuff before you guys even touch
2:12:57it is absolutely hideous to start with
2:13:00and that's what we're working with and I
2:13:02appreciate your effort to do the
2:13:05least amount of damage to already pretty
2:13:09terrible site in on our
2:13:11in our city.
2:13:13Um but I do urge you to, you know, work
2:13:15on if we can get the conduit any smaller
2:13:18cuz bend radius is another thing as
2:13:19David pointed out there are other
2:13:21equipment on the pole that you may have
2:13:23to bend around and that's going to add
2:13:25to the ugliness. Let's not make it
2:13:26worse.
2:13:27I appreciate your painting it to make it
2:13:30as close to the wood pole color which
2:13:32obviously the other utilities
2:13:34on the same poles are not doing. Um and
2:13:38so
2:13:39I would say just, you know, do the best
2:13:41you can and cleanest installation and to
2:13:44the neighbor's point as close to what
2:13:46you're submitting. So, if it means you
2:13:48have to revise the drawings to get
2:13:51closer to, you know, including other
2:13:54equipment, bend radii, and including
2:13:57conduit sizes accurately on both. So,
2:14:00that what is submitted and approved is
2:14:02as close to final installation as you
2:14:04can make it. So, um we do the best we
2:14:07can for our community. Thank you for
2:14:10your presentation.
2:14:12All right, with that uh do we want to
2:14:14have a
2:14:15motion to offer a
2:14:18vote?
2:14:20>> I move to approve the project as
2:14:21presented.
2:14:25>> Second.
2:14:29>> Uh board member Chen.
2:14:32>> Yes.
2:14:33>> Uh board member Jojarth.
2:14:35>> Yes.
2:14:36>> Board member Hirsch.
2:14:38>> Yes.
2:14:39>> Uh vice chair Rosemer.
2:14:41>> Yes.
2:14:42>> The chair Adcock.
2:14:43>> Yes.
2:14:44>> Motion carries 5-0.
2:14:46>> Thank you.
2:14:50All right.
2:14:54So, uh our next item is approval of
2:14:57minutes. We have two um draft minutes to
2:15:00approve. One from
2:15:02August 20th. Do we Does anybody have any
2:15:04comments on minutes?
2:15:09>> And to the chair, uh no one was absent
2:15:11for this meeting, so no need to abstain.
2:15:17>> No corrections?
2:15:18>> Yeah, I have one.
2:15:19>> Okay.
2:15:22>> Um
2:15:26You know, the word bloom should have
2:15:28been blew.
2:15:32>> And board member Hirsch,
2:15:34what packet page?
2:15:36>> I I got the wrong one.
2:15:37>> No, it's
2:15:38>> No, what packet page is it?
2:15:40>> Uh page one.
2:15:41>> Page 68.
2:15:42>> Okay.
2:15:44>> And then for the record, um
2:15:46what was the correction?
2:15:48>> Bloom.
2:15:49>> Bloom?
2:15:49>> And the word was blew.
2:15:51>> Bloom?
2:15:52>> Which paragraph?
2:15:56>> Mr. Soles, chair Adcock, Mr. Soles, vice
2:15:59chair Rosemer, Clay Rabold, Mr. Soles,
2:16:01board member Hirsch.
2:16:02Mr. Soles, Ms. Rabold, board member
2:16:05Chen.
2:16:06>> Which paragraph is it in? Dial us in a
2:16:08little bit here.
2:16:09>> Okay.
2:16:10Fourth paragraph.
2:16:12Board member Hirsch requested more
2:16:13information about the land situation why
2:16:15there's no below grade parking. Board
2:16:16member Hirsch also inquired whether a
2:16:17study had been conducted to determine
2:16:18how much of the site is covered by the
2:16:20flume area.
2:16:21>> Flume. All right.
2:16:22>> Flume.
2:16:23>> All right. Thank you.
2:16:24>> Thanks, Dave. Good catch.
2:16:26>> Okay. We'll search the document for
2:16:29that.
2:16:33>> All right, then I shall
2:16:35motion to approve the minutes with the
2:16:37minor correction.
2:16:39>> Seconded.
2:16:41>> Um Board member Jojarth.
2:16:44>> Yes.
2:16:45>> Board member Chen.
2:16:46>> Yes.
2:16:47>> Board member Hirsch.
2:16:49Chair Rosenberg.
2:16:50>> Yes.
2:16:51>> Um Vice Chair Rosenberg.
2:16:53Uh Chair Adcock.
2:16:55>> Yes.
2:16:55>> Motion carries 5-0.
2:16:58>> All right, next we have
2:17:00um
2:17:00meeting notes from September 3rd. Any
2:17:03corrections, edits?
2:17:05>> And uh I did want to note that Board
2:17:07member Jojarth was absent, so I would
2:17:09need you to abstain when we do that.
2:17:12Vote.
2:17:16>> No corrections?
2:17:17All right, then I
2:17:19move to uh approve as written.
2:17:21>> I'll second.
2:17:24>> Board member Hirsch.
2:17:25>> Yes.
2:17:26>> Board member Chen.
2:17:28>> Yes.
2:17:29>> Board member Jojarth.
2:17:32>> I abstain.
2:17:33>> Uh Vice Chair Rosenberg.
2:17:34>> Yes.
2:17:35>> Um
2:17:37uh Chair Adcock.
2:17:38>> Yes.
2:17:39>> Motion carries 4-0-1.
2:17:43>> Thank you.
2:17:44Um any Board member questions, comments,
2:17:46announcements, or future meetings and
2:17:49agendas?
2:17:52No.
2:17:54All right, so last item um is virtual
2:17:57comments. Do we have any requests to
2:17:59speak on non-agenda items?
2:18:03>> And Miss Miss Perillo from AT&T, you can
2:18:05jump off at any time. You don't have to
2:18:08stay on board until the end of the
2:18:09meeting. Thank you.
2:18:11>> Uh if there's any members of the public
2:18:13that would like to speak on two virtual
2:18:15public comments, uh please raise your
2:18:17hand now.
2:18:20Um
2:18:21it looks like there is one person.
2:18:24Uh observer, you may now speak.
2:18:29>> Hi, good morning. This is Ariel Roth,
2:18:32Council of United Neighbors. I I want to
2:18:35point out that I I have some some very
2:18:37serious concerns about the I think the
2:18:39level of familiarity and awareness about
2:18:42applicable
2:18:44uh telecommunication laws that constrain
2:18:47or in fact much less constrain the
2:18:49board's discretion.
2:18:51And I think this goes far beyond the
2:18:53current applications. I think it's
2:18:54appropriate for general public comment.
2:18:57I I want to point out that there are a
2:18:58lot of open questions here. For
2:19:00instance, the extent to which GO 95
2:19:02applies, the extent to which PG&E rules
2:19:04apply to
2:19:06uh
2:19:07to the city and assumptions about what
2:19:10actually is possible.
2:19:11There are cities that are applying
2:19:13underground. There are cities that have
2:19:16completely stealth facilities.
2:19:18And so I want the board to understand
2:19:19prospectively what's at stake here. And
2:19:22what that is is that a what was called
2:19:256409 by by AT&T's representative is the
2:19:28right of an applicant AT&T now that any
2:19:31other applicant to add
2:19:33multiple additions to this pole or any
2:19:35other pole that's already been built if
2:19:37it is not stealth.
2:19:39That means they can add up to 10 ft in
2:19:40height and 6 ft out of additional
2:19:42attachments as well as ground
2:19:44attachments, and there's no room for any
2:19:46type of discretionary design review.
2:19:50And that's what's called in in in the
2:19:52city's code a tier one application.
2:19:55And so I think what needs to be thought
2:19:57of whenever one of these applications is
2:19:59reviewed, an application for a stealth
2:20:01type attachment, is whether the facility
2:20:03can be made to be stealth. If there
2:20:05aspects of it that can be hidden, so
2:20:07that the discretion of the board going
2:20:09forward can be preserved. Because even
2:20:11if there is a view that this particular
2:20:12site is pretty vanilla or standard,
2:20:16that actually uh has significant
2:20:18ramifications for the next
2:20:21the next application. And that will
2:20:22depend partly on the pole loading
2:20:25capability. So, it can this pole uh
2:20:27physically
2:20:29house this equipment structurally, but
2:20:31most applications, I don't think
2:20:32applications require this, do not detail
2:20:34what whether that is the case or not.
2:20:37And so, there's a lot of uh unaddressed
2:20:38assumptions here. And I think that if
2:20:41those assumptions continue to be
2:20:42accepted, which they should not be,
2:20:44uncritically, there's going to be a
2:20:46proliferation of sites. And those
2:20:47proliferation of sites are going to be
2:20:49added on by other carriers that are
2:20:51going to appreciate the ease of doing
2:20:52so. And it basically is sort of scouts
2:20:55honor on whether they do something that
2:20:57complies or not, because they're
2:20:58entitled to disregard under federal law,
2:21:00they're entitled to disregard all your
2:21:01design preferences, all the the goodwill
2:21:03that you may wish them to to exercise.
2:21:06And I think that perspective is lacking
2:21:08at this point.
2:21:10I also want to point out that their
2:21:11arguments or contentions about different
2:21:13types of uh coverage do not need to be
2:21:16taken uh as gospel. And there needs to
2:21:19be that backup, so that the city can
2:21:20decide, do we want to in fact accept
2:21:23that this constrained single site is the
2:21:25only site. And I think that's going to
2:21:28continue to become much more theoretical
2:21:30going forward if there aren't some
2:21:31changes in the perspective. Thank you.
2:21:35>> Our next speaker is Henry E. Henry E,
2:21:37you may now speak.
2:21:41>> Uh thank you. I'd like to follow up on
2:21:44the last speaker. Uh this time I'll put
2:21:46on my hat as uh
2:21:48uh
2:21:49head of the
2:21:51institute, the Triple Helix Institute, a
2:21:54think tank located in Menlo Park that
2:21:56looks at technology and social
2:22:00organization
2:22:01across the globe.
2:22:04So,
2:22:05here we are in Silicon Valley, where
2:22:07we're known globally as the leading
2:22:09technology site in the world. We're the
2:22:12leader
2:22:13Well, we're the leader in the private
2:22:14sector, but in the public sector, we are
2:22:17well behind.
2:22:19We are not the leader. We have this
2:22:21robust private sector and a
2:22:23poverty-stricken public sector. Not in
2:22:25terms of money, because we have a huge
2:22:28amount of public resources that are
2:22:31wasted in city of Palo Alto,
2:22:34uh and they're not put to good use. But,
2:22:37the bigger point is that our
2:22:40public sector is behind the private
2:22:43sector.
2:22:45Our public sector is back somewheres in
2:22:47the early 20th century. In this
2:22:50technology, in this area, was our
2:22:52private sector? Well, they're up in
2:22:56things like uh Starlink and beyond.
2:22:59So, there's a huge gap. How can we fill
2:23:03this gap between the public and the
2:23:05private sector? Well, clearly, uh
2:23:08we need to change the way that we're
2:23:11organized. Uh we're not connected to the
2:23:14leading technology forces in our region.
2:23:17For example, uh we're separated from
2:23:19Stanford University, which is We grew up
2:23:22together, but now we're separated. We
2:23:25must cure that. We must use the
2:23:27knowledge resources of the university in
2:23:29our city. How can we do that if we're
2:23:31separate? We must unify. We must uh
2:23:35annex Stanford and make them part of
2:23:37Palo Alto, and so we can solve problems
2:23:40together. That's step number one. Uh
2:23:42step number two, we must change the
2:23:45organization of our of our government.
2:23:48We must sit together all of us
2:23:51as a city, the polis.
2:23:55The New England town meeting is the
2:23:56current is still left behind from that.
2:23:59Where I lived in Nantucket, we would
2:24:01come together once a year and we'll set
2:24:03the basic values and priorities of our
2:24:05city. Surely we can do that both in
2:24:08person and virtually using the available
2:24:11technologies and then uh during the year
2:24:14we can have those wishes of the public
2:24:16carried out. So all members of our city
2:24:1916 years or older should sit together
2:24:22for a day or two, even three if it takes
2:24:25that, to do the public business, set the
2:24:28values of our city, and then have that
2:24:30carried out. Right now, we have a city
2:24:33council that carries out the wishes of
2:24:35developers and
2:24:37they're destroying our city.
2:24:39They're doing builders remedies.
2:24:41They're they're making they're making us
2:24:44into the Bronx. Whereas the Bronx has
2:24:47now advanced beyond where we are. They
2:24:49have no telephone poles and the
2:24:51telegraph poles in the Bronx, but we
2:24:53have them here in Palo Alto. That's just
2:24:56the sign of what's wrong that we're
2:24:58having this discussion today. We need to
2:25:01change drastically. That's why I'm
2:25:03running for city council to bring new
2:25:05ideas to Palo Alto, old ideas to Palo
2:25:08Alto, shall we say.
2:25:12>> This concludes public comment.
2:25:14>> Thank you. Um just for the record, I do
2:25:18want to state that
2:25:19uh we are
2:25:21architecture review board's purview is
2:25:23limited to aesthetics and design
2:25:26in within the framework of what is
2:25:28presented to us.
2:25:30Um all right.
2:25:33Uh with that we will adjourn
2:25:36and we will be back in 4 weeks since the
2:25:38next one's canceled. Thank