2026-09-22 - Parks and Recreation Commission Regular Meeting
Summary
Based on auto-generated captions, which start about 13 minutes in and have a gap of roughly 12 minutes near the two-hour mark; names and numbers may be misheard.
- Public comment: A Bike Palo Alto steering committee member invited commissioners to a family bike event on October 4 at a local school.
- Routine business: No agenda changes. The minutes were approved by a unanimous roll call. The Council liaison was absent.
- Department report: Community Services staff said summer movie nights drew 250 to 500 people each. The 49 special interest camps brought in about $450,000, a 5% increase over summer 2025, and the department's 320 in-house camps served 3,747 campers with about $1.85 million in revenue as of July 21. Upcoming events included Pancakes in the Park on October 3, a Moonlight Run and Walk and the Bryant Street Teen Center reopening. Capital work: a Mitchell Park restroom replacement, El Camino Park turf replacement aiming to reopen in early November, and Hopkins tennis court resurfacing in October.
- Playground synthetic turf guidelines: Staff and the ad hoc subgroup presented draft guidelines. Council direction had covered non-athletic synthetic turf but the work plan was narrowed to playgrounds. Speakers from the Sierra Club Loma Prieta chapter urged enforceable standards rather than guidelines, citing PFAS and health concerns and limited outreach. Commissioners were split between flexible guidelines and a policy to prohibit plastic turf in playgrounds. Staff said this was a feedback item with no vote; the Commission asked the ad hoc committee to strengthen the guidelines, with clearer evaluation criteria, and bring them back. See Playground Synthetic Turf Use Guidelines.
- Foothills Nature Preserve improvements: Public Works staff presented a revised access and safety plan for the park improvement ordinance. Of eight crosswalks originally proposed, six were replaced with crossing signs on posts; speed humps went from seven to five, there is no tree removal, and parking is gravel. Existing parking is 292 unreserved and 83 reserved spaces. Staff said the project remains exempt from environmental review, with Council adoption targeted for November 2026 and construction in fall 2027 outside bird nesting season. A former commissioner asked for added trail segments (not included now). The Commission approved the ordinance by unanimous roll call with added language requiring construction outside the nesting season. See Foothills Nature Preserve Access Safety Improvements.
- Future agenda: Revisiting the playground guidelines, a joint presentation with Friends of Palo Alto Parks on Foothills exhibits, a turf pilot update, green stormwater infrastructure and the election of a chair and vice chair.
Issues discussed
- Playground Synthetic Turf Use Guidelines
- Foothills Nature Preserve Access Safety Improvements
- FY2027 Commission Work Plans
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
12:53Parks and Recreation meeting on Tuesday
12:569:22 20226.
12:59I would like to call the meeting to
13:00order and start with a roll call.
13:05>> Commissioner Brown
13:07>> here.
13:07>> Commissioner Smith. Yes. Here.
13:10>> Uh, Vice Chair We
13:14Chair Freeman
13:16>> here.
13:18Uh, Commissioner Axelrod
13:20>> here.
13:20>> Commissioner Klein House.
13:22>> Yes.
13:23>> And Commissioner Dan
13:24>> here.
13:29>> Okay. So, now we'll open it up for
13:32public comments on non-aggenda items. If
13:36you're here in person and would like to
13:38speak on an unaggenda item, uh please
13:41fill out the uh speaker card and hand it
13:44to the clerk. If you're joining us on
13:47Zoom, uh for an item not on the agenda,
13:50uh just raise your hand and the clerk
13:52will call you on we'll call on you. But
13:55uh due to a recent policy change, uh
13:57we'll hear Zoom comments at the end of
14:00the agenda. Any speakers?
14:03>> We currently have one inperson speaker.
14:06Thank you.
14:08Uh, David C.
14:16Good evening, commissioners. My name is
14:17David Cole. I'm on the bike powto
14:20steering committee and I wanted to just
14:22invite you all to our event on October
14:254th at Fair Meadow School from 1 to 3. I
14:29have some flyers here.
14:35The event is a familyfriendly event.
14:39There's three different routes, actually
14:41four. They're all um less than 10 miles.
14:44There's treat stops on each route,
14:47and we go through and find all the nice
14:50ways to get around Powalto. That's what
14:52makes Powalto a bike friendly city. Um,
14:57at the event site there's registration
15:00and maps and we have helmet fitting and
15:04bike index and bike mechanics to help
15:06you get on your ride. So I enjoy invite
15:09you all to come out and join us either
15:11as a participant or as a volunteer and
15:14if you have any questions all the
15:16information is on the website by
15:18bikepowto.org
15:20and I hope to see you all out there.
15:22Thank you so much. Any
15:25other speakers?
15:27>> There are no more additional speakers at
15:28this time.
15:29>> Okay. Thank you uh for your uh those who
15:32spoke today. We appreciate uh taking the
15:34time to uh share your comments.
15:37Now we'll move to agenda changes,
15:39additions, and deletions. Uh before
15:43we get started, I'd like to like u let
15:45the commission know that um to
15:47accommodate those who wish to attend the
15:49meeting in Zoom. Well, we already
15:52addressed that.
15:53So, are there any changes to the agenda
15:56changes or deletions?
16:02Okay, that'll be a no.
16:05Okay, we'll move to um the official
16:08business. The council last time was not
16:11here tonight, so we'll move right.
16:14>> Chair, would you like to uh for the
16:16approval of the minutes for July 20th?
16:19>> Oh, I did something tonight. Okay,
16:21that's what we get for having a meeting
16:23and then Okay, approval of the minutes.
16:25I'd like to have a vote on the a motion
16:28to approve the minutes for uh July 28
16:3226. Do I have a
16:34>> motion to approve?
16:36>> I have a second.
16:37>> Sure.
16:38>> Okay, that's
16:40okay. Take a vote. Okay. Uh,
16:43Commissioner Brown,
16:44>> yes.
16:46Commissioner Smith,
16:49Chair Freeman, yes. Um, Commissioner
16:52Axelrod,
16:53>> yes.
16:54>> Commissioner Klein House,
16:55>> yes.
16:56>> And Commissioner D,
16:58>> yes.
16:58>> Okay, motion carries.
17:08Now, we'll move to city official
17:09reports. Um, as I said, the council
17:12lesson is not here tonight uh due to
17:15another obligation, we'll start with the
17:17department reports.
17:21>> Yes, thank you, Chair Freeman. Um,
17:25while the department report is getting
17:28pulled up, um, I want to say good
17:30evening. My name is Sarah Robastelli.
17:32I'm the division manager for community
17:35services. We have quite a few updates um
17:39since last month we did not hold the
17:42meeting. Um so we'll start with a summer
17:45recap um go on to upcoming events and
17:49then uh look at some several capital
17:52projects and projects that were
17:54completing in the parks. So, first of
17:57all, um today is fall equinox and um
18:01Uncanny, we're we've wrapped the summer
18:04movie nights. Um it was another very
18:07successful season of the family movie
18:09nights. It continued to be a great
18:11opportunity for families to come
18:13together and enjoy our parks, uh our
18:17community spaces. In addition, um we
18:22throughout the series we had about 250
18:26to 500 attendees per movie. It ranged um
18:31depending on movie and also weather. So
18:35if we advance to the next slide, we have
18:37several um community events coming up
18:40over the next couple of weeks. Um we on
18:44Thursday, it will be our second annual
18:46cornhole tournament. will be on
18:49California A this Thursday
18:52um from 5 to 7 in conjunction with
18:55Thursday live. Uh so that's that's
18:59exciting. And then this Friday is going
19:02to be a very busy day. We have a total
19:05of three uh special events happening.
19:09So, right in the middle of your screen
19:11there, um we will have the PaloAlto
19:14Weekly Moonlight Run and Walk starting
19:16at the Bayands Athletic Center. Also on
19:19Friday is the Bryant Street Teen Center
19:23grand reopening. The Teen Center closed
19:26over the summer and officially reopened
19:28on September 8th. Friday's event is an
19:31opportunity to celebrate the reopening
19:33and invite the teens back. Um,
19:36experience the center and learn more
19:38about what it has to offer. The teen
19:41center is currently open from 3:30 to
19:436:30, which is a slight shift um to the
19:49to later hours. And um for Friday's
19:53event, the celebration will run from 5
19:55to 8:00 p.m.
19:58So if you advance to the next slide, our
20:01our other um opportunity to keep you
20:04busy this Friday is uh the Sister City
20:08Grove tree planting. This is in
20:10partnership with Neighbors Abroad,
20:13Canopy, and the city. Um there will be
20:1610 native red bub trees that will be
20:19planted in the area between the JMZ and
20:23Lucy Stern building. Uh commissioners as
20:26well as the community members are
20:29welcome and invited to attend.
20:33And then um in the middle of your screen
20:35there on Saturday, October 3rd, there
20:38will be a second annual pancakes in the
20:41park. So no need to come cook breakfast.
20:44come on over to Rinkanada Park and um
20:48from 9 to 11 members of the police and
20:51fire will be uh cooking up pancakes and
20:55we'll have also free face painting and
20:57children's entertainment. So, it's
20:59another great community event. And then
21:02finally, um we wanted you to save the
21:06date for the Jacko J uh which will be
21:09held at Linton Plaza Friday, October
21:1230th. Um, and we'll have more
21:15information as we get closer to that
21:16event.
21:19So, special interest classes for the
21:22summer camps. This was a really
21:24successful summer. And our special
21:27interest camps, which are held by
21:29independent contractors,
21:31um, had a really successful season. We
21:34offered 49 special interest camps and uh
21:39the total revenue approximately $450,000
21:44which represents a 5% increase over
21:46summer of 2025.
21:50Uh woodworking, cooking, and building
21:53your dream city continued to be
21:56particularly popular programs.
21:59And if you advance to the next slide,
22:02these are our in-house camps. Um, so
22:05across the department, we offered a
22:07total of 320 camps and served 3,747
22:14campers.
22:16Um, I believe I gave this number, but
22:18just as a reminder, as of July 21st, we
22:21had approximately 1.85
22:24million in revenue. Um some of our
22:27highest demand programs included
22:29included zoo camp, woodworking,
22:33um 2w week theater camp, Jurassic camp,
22:37camp kinetic camp paloalto. Um the
22:41photos kind of give you a variety of
22:43some of the camps we've had through the
22:45summer. Um and looking ahead, staff will
22:49be um continuing to explore more
22:53opportunities for some of the popular um
22:56options. So moving on to the in
22:59progress, the natural grass pilot. Um
23:04these photos are from currently from
23:07Greer Park and show a recent aeration
23:10work that just took place as part of the
23:12pilot. Um staff is continuing to monitor
23:16the field conditions as we plan to
23:19provide a more detailed um update during
23:22your November meeting.
23:26And then some of our capital work that
23:28um is in progress. We have two projects
23:31that are currently in progress. Mitchell
23:34Park for uh four stall restroom
23:36replacement project is anticipated to
23:39open to the public the first week of
23:42October once the contractor completes
23:45the remaining electrical utilities work
23:47and required inspections are completed.
23:51And then on the right hand side of your
23:53screen at El Camino Park, the turf
23:55replacement project mobilized earlier
23:58this month following um an independent
24:00PAS testing which was completed with
24:03results showing no intentionally added
24:05PAS which supported the manufacturer's
24:08claim. The soccer field and a portion of
24:12the parking lot are currently closed
24:14during construction and we're targeting
24:16a reopen uh for early November.
24:22And um we're happy to report that we
24:25also have some other highlights for
24:27Greer Skate Park. The that maintenance
24:30work has been completed and this shows a
24:34before and after photo. We've also heard
24:37from skaters and they're really excited
24:39about the improvements and said the
24:42skatability is um much better now. So
24:45there's that. And then to the right of
24:47the screen, the city and regional
24:49partners recently celebrated the
24:51completion of the natural um based
24:55horizontal
24:57levy and we included a photo from the
25:00ribbon cutting.
25:02And then advancing at the golf course,
25:05we have recently completed a replacement
25:07of the fencing surrounding the
25:09irrigation pump system. Um, previously
25:13the wood fencing has degragated
25:17um and we partially removed part of it
25:20for access due to a water mane break.
25:23Um, it now has been replaced with slats,
25:26chain link fence and a maintenance gate
25:29to improve access. Um, and this shows
25:32the before and after.
25:35Okay, so now on to upcoming capital
25:38improvement work. Um the Adobe Loop
25:41Trail repaving is currently um being
25:44scheduled for um October to November. Um
25:48currently it's slated to start
25:50midocctober.
25:52um uh not on this page but wanted to
25:56include Valley Waters Tiegate project is
25:59advancing
26:00um and it's wrapping up next month uh
26:03with the flapgates replacements and um
26:06is scheduled currently for reopening of
26:10that of Tiggate access um around midmon
26:15in October so the 15th
26:18and then to the right of the screen um
26:21Linton Plaza The fountain grate
26:23replacement is um
26:26all of the water river rock that you see
26:29that are not mortared in um are being
26:33removed and we're adding just a grate um
26:38the since the movable rocks are able to
26:42be moved um we thought it would be best
26:46uh as a safety um to remove those and
26:50then have it just a standard rate. So
26:53that project will um be starting midmon.
26:57And then if you advance to the next
26:59slide, finally um the Hopkins tennis
27:03courts will be resurfaced. We're
27:06anticipating this work to start in
27:09October. And this concludes the
27:12departmental report. As you can see,
27:15there's been a lot going on and a lot
27:17coming up. Um, and we're happy to answer
27:20any questions you may have.
27:28>> Okay, thank you. Uh, there's definitely
27:31a lot a lot going on. Um, I do have a
27:35couple of questions. Um, thanks for the
27:37invite to the uh just for the
27:40commissioners to attend the sis sister
27:42Sister City Grove uh tree campaign. Um,
27:45if you can provide us more information
27:46on that, that'd be great.
27:48Um, and
27:51you mentioned about the uh so uh for
27:55these summer camps you mentioned a
27:58figure of 450,000.
28:00Was that revenue that was collected for
28:03that time period?
28:04>> Correct. Revenue collected and that
28:07actually is just the figure is inclusive
28:13in the 1.85.
28:15So that's not in addition to um and that
28:18is gross revenue.
28:20>> And how does that compare let's say with
28:22the last three or four years? Um do we
28:25see it increasing decreasing or
28:28>> but I but I assume that you've also
28:30added additional programs. So that
28:32number might be slanted a little bit.
28:35>> Yeah. Um in terms of the numbers, we
28:38still haven't kind of closed out the
28:40final number. So, we can bring that back
28:42next month um to see how it compares. Um
28:46and then to your uh first question, um
28:51the tree planting that is taking place
28:54this Friday, uh September 25th, it
28:57starts at 1:30 p.m. And um if you park
29:03in and around Jamzy or Lucy Stern,
29:06you'll be able to see it. There will be
29:08quite a few dignitaries as well as
29:12council members of course. I believe um
29:15Josh Becker will also be there. Um and
29:20the I believe a proclamation will be
29:24read. So it I believe the run of show is
29:28is maybe about 30 minutes and then
29:31planting will start. So, um, canopies
29:34organizing the planting and, um, there
29:39will be, uh, I believe coffee as well as
29:43snacks. So, um, we hope you can make it
29:48>> 1:30.
29:49>> Okay. Okay. And, um, the bathrooms at
29:54Central Park, I was actually there
29:55today. Looks like everything is really
29:58coming together. So, good job on that.
30:01Um can you give us a status of I know we
30:05put in temporary um facilities in which
30:10park was that was that
30:12>> the so um thanks to the friends of uh
30:17PaloAlto parks we will we do have
30:19temporary restrooms and they have been
30:22there for quite some time. Those will be
30:25removed once the project is completed or
30:28at least we're intending to remove
30:31those. Um,
30:33so we're we're targeting early uh
30:37October for the opening.
30:39>> Okay, good job. Okay, I'll pass it on to
30:41any other other commissioners with any
30:43questions. Your lights, please.
30:46>> Commissioner D,
30:48>> I have a follow-up question on the
30:50bathroom. I heard after the metro park
30:52then we will have um new bathroom at
30:55aleno party right
30:57>> that's correct um so actually we will be
31:02involving the commission the full then
31:04as a next step once this is completed um
31:09the public works engineering staff um
31:12will be holding a community engagement
31:15um piece um and that will be you'll be
31:19invited we'll update you were targeting
31:22um this fall. So in the upcoming months,
31:27Eleanor Party
31:35Commission.
31:37Okay.
31:39>> Okay.
31:40>> Commissioner Prom.
31:47Yeah. to push.
31:52>> I I just wanted to comment the sounds
31:54like the uh Linton Plaza is going to be
31:56a real nice addition. And uh do you know
31:59if anyone's working on a a
32:03pingpong bringing back the ping pong
32:06tables?
32:07>> Um you know what? I I will have an
32:11update for you. Yes. But the answer is
32:15yes. And we can talk offline.
32:18>> That's right. And it was fun for the
32:20state of the city. The mayor had the
32:22pingpong and you were there. They had
32:25the pingpong and these people were they
32:28were from here to the the fence over
32:30there. So it was really fun to see.
32:32Thank you very much,
32:38>> Commissioner. Has
32:41always a lot of amazing events going on.
32:43So, congrats to staff on getting it all
32:46going. And a couple of questions. One is
32:48on the Linton uh Plaza fountain grading.
32:52So, I know Linton Plaza has a lot of
32:54events and a lot of them are kid-
32:55centric and I see a lot of kids playing
32:57around and walking over the rocks
32:59getting a little bit wet. So if that all
33:02disappears, have we thought about either
33:04community outreach to see or some other
33:06kid engagement stuff because the maybe
33:10I'm just not understanding the issue,
33:11but it seems like yeah, rocks can move
33:13around, but that's part of the fun and
33:15walking over them is probably a lot more
33:16fun than walking over metal grading for
33:18the little ones.
33:21>> Yeah, I think it all comes back really
33:23to a safety concern that um that has
33:26taken place. So that's why we're
33:28planning to um update with a slip
33:32resistant as well as removing rocks that
33:36can that are moved daily um by people
33:39who frequent uh Linton Plaza and also
33:43you know rocks can also be thrown. So
33:47there's there's for lots of reasons this
33:49is just best practice and we're planning
33:52to move forward with that. um we once we
33:56have a more specific timeline, we will
33:58be reaching out to all businesses
34:01um to do to complete the work and make
34:04sure that everybody's aware of it.
34:08>> I guess I would just encourage to also
34:10see if there's other little kid
34:12engagement opportunities that would also
34:14meet the safety requirements so that you
34:17know as they circulate around it's a
34:19great place to interact with it. So
34:21there may be other options out there.
34:24And uh the other question I had is about
34:26summer camp. So it's great to get the
34:28feedback on that. I remember we had some
34:29discussions about specialist providers
34:32versus generalist ones that do stuff.
34:35Well, have we collected some feedback on
34:38that for the providers? Uh are we
34:41leaning into the ones that have the best
34:43feedback on the courses to do more with
34:45them? I'm just wondering if there's any
34:47dynamics there or we think we're happy
34:49with the setup and are you just going to
34:50repeat it next summer?
34:53>> I think um staff always evaluates
34:57um how camps are being run and if
35:02feedback is collected. They always
35:05consider that about how to program for
35:09the following um year.
35:12But I can also check back in with them.
35:16I will on my list I have, you know, a
35:19benchmarking how we did um from this
35:23year to last year and see if there's any
35:26trends. So maybe I can ask any more
35:28specific questions to our recreation
35:30managers as well.
35:32>> Awesome. Thank you. Yeah, if there's any
35:34particular vendors that have amazing
35:36feedback, if we can try to see if we can
35:38work with them to have more offerings. I
35:41think
35:42>> kids of the city would love it.
35:44>> Thanks for the great work. That's it.
35:48>> Mr. Lar,
35:49>> thank you and thank you for the
35:51wonderful uh full report. Not to add to
35:55it, but um I do have a request is that
35:58based on um some comments that we'd
36:00heard regarding the signage in the
36:02parks. I was just wondering if it might
36:04be um appropriate and I'll leave it to
36:06the chair and staff to decide to include
36:09uh sort of a summary of the sign
36:12replacement program and then maybe an
36:14updates as signs are replaced in town in
36:17the department report moving forward.
36:19But just so just food for thought, you
36:21don't have to answer right now. You guys
36:22can decide.
36:25>> Yeah, I think that's an excellent idea.
36:26Right. Also, like you know, when you
36:29mentioned the rock replacement, um I
36:32think knowing why there's some
36:35background on why that's being replaced,
36:37have you had excuse me, any issues with
36:41rocks being thin or safety issues? Why
36:43would is that one of the reasons? And so
36:45I would the signage that you're going to
36:48be putting I guess after you meet with
36:51um some of the um folks around that area
36:55I would imagine you're going to put some
36:56signage to say why it's happening and
36:59then kind of what the replacement's
37:01going to be that the intent.
37:05Um, no. We're we're
37:08um sending out standard information and
37:11we're working with the city manager's
37:13office, with the economic development
37:15team um to engage with our uh business
37:20partners and make sure that they're
37:22aware and we can get ahead of um
37:26informing them um making sure that
37:28they're aware of the timeline and and
37:31any um impacts to their business so we
37:35could help mitigate that ahead of time.
37:41>> Commissioner House,
37:43>> I have a followup question on uh
37:45Commissioner Axelro's question. Has
37:49there been any accidents? Did people
37:52fall down and get seriously injured? Or
37:55is it a preventative measure to replace
37:58the fun with
38:00blood not functional from a play point
38:05of view? Surface.
38:10>> Um
38:12I there has been rocks thrown and uh and
38:17infrastructure damaged based because of
38:20the rocks. So that's why we're replacing
38:22them.
38:24>> Can you just stabilize them so people
38:27can't throw them?
38:32>> Um,
38:36no. We're planning to move forward with
38:38the design that has already taken place
38:41and the replacement of the custom grate.
38:44We've worked with the designer who
38:46designed Linton Plaza in addition to the
38:49Linton the Friends of Linton Plaza on
38:51this.
38:54>> Thank you.
38:57>> Okay. Um and then my last question on
38:59the uh I think the bathrooms in look for
39:03Linton I mean for Elena Part A Park
39:05there's a temporary bathroom there and
39:07you're saying that's going to have to be
39:09new and will be started towards the end
39:11of the year.
39:12>> Um
39:14Commissioner Deng um asks a similar
39:17question. So, we're going to start
39:18engagement with um on for Eleanor Party
39:23this fall. So, in the upcoming months,
39:25we'll make sure to bring that forward in
39:27the departmental report and you're
39:29you'll hear about any um community
39:32engagement as as the process starts.
39:36>> Okay. All right. Thank you. All right.
39:40Good report. We'll move on now to ad hoc
39:43committees and last on updates. Any
39:46commissioners with any updates from
39:50their ad hocs or last months?
39:56Uh
39:58looks like a no. Okay, we'll move on to
40:03the business item uh number five which
40:06is to review the proposed playground
40:08synthetic turf. I'm sorry
40:11>> there was one
40:12>> um that we met with um it JMZ
40:17um not staff u volunteers just about
40:22exploring
40:24the core of it is sort of food options
40:26near around Frankenatada and so looking
40:30at potential uh solutions there it's
40:34very early in the process but just that
40:36that came up as a need kind of jointly
40:38with JMZ Aquat products park users and
40:42so um staff and uh the JMZ board
40:48representatives uh will be evaluating
40:50that that issue further further.
40:54>> Okay, thank you. Anyone else?
40:58Okay, we'll move on to the business item
41:00number five which is the review of the
41:02proposed playground synthetic tur use
41:05guidelines.
41:09So that's the presentation.
41:11>> All right. Good evening, commissioners.
41:12I got the honor of presenting this item
41:14tonight. Ben Einstein, assistant
41:16director for open space, parks, and
41:18golf. Uh so tonight, we're bringing
41:21forward a work plan item uh to discuss
41:24the proposed playground synthetic turf
41:26use guidelines uh for your discussion
41:29and feedback. This is the first time
41:30this work plan item has been brought to
41:32the U commission. So we'll be seeking
41:34your feedback on our proposed approach.
41:38Uh but it's up for discussion. Um and we
41:41certainly want to hear your feedback and
41:42questions uh to to determine how we move
41:46forward. We're not asking the commission
41:48to take any action tonight. It'll come
41:50back at a future time. Uh next slide,
41:52please.
41:55So just some more background. Uh in
41:58February, the commission adopted its
42:00FY27 work plan uh which included
42:02priority work to advance the natural
42:04grasp pilot project. Uh then in April
42:07when the work plan went to council uh
42:10for approval uh uh commissioner rectal
42:13requested that the commission study
42:15whether the city should prohibit the use
42:17of artificial turf and playgrounds and
42:19other non-athletic city facilities.
42:22There was some deliberation on that and
42:24the uh matter was uh referred to the
42:27commission uh to discuss further and
42:29that's the purpose um tonight uh to do
42:33that. In response to that direction, um
42:35the city the commission revised goal
42:37four of the work plan to call for a
42:40playground synthetic turf policy as part
42:42of the natural grass pilot effort. And
42:45over the summer, staff and the ad hoc
42:48committee, Commissioners Brown and
42:50Commissioner Axelrod work through the
42:52scope um and intended outcome of that
42:54work. Uh so the question before us
42:56tonight is whether the proposed
42:58guidelines and the approach we've uh
43:01developed provide an appropriate way to
43:04carry this work forward. Uh next slide.
43:09So one of the important developments in
43:11this process has been a shift from a
43:14policy approach to guidelines. Uh the
43:16original work plan called for developing
43:18a policy regarding synthetic turf and
43:20playgrounds. uh as staff in the ad hoc
43:23committee worked through the scope and
43:24intended outcome uh to talk about it in
43:27detail, we found that a more uh project
43:31specific framework might be a better
43:33fit. Rather than establishing a
43:35city-wide rule that determines whether
43:37synthetic turf is permitted or
43:40prohibited in playgrounds, the proposed
43:42guidelines would establish consistent
43:44criteria for evaluating its uh use when
43:47a specific playground project is being
43:50developed. So, it's really a refinement
43:52of the work product. It gives us
43:54something that can be applied
43:55consistently from project to project
43:58while still allowing us to consider the
44:00specific needs, conditions, and intended
44:02use of each playground. Uh the goal is
44:05to ultimately to limit synthetic turf to
44:08applications where its characteristics
44:10provide, you know, a clear and
44:12appropriate benefit. Next slide.
44:17So, tonight staff is uh requesting
44:19feedback. Um, we're not trying to decide
44:22[clears throat]
44:23whether synthetic turf is inherently
44:25appropriate or inappropriate. We're
44:27trying to establish a consistent way to
44:29ask a more useful question. Um, is
44:32synthetic turf appropriate for this
44:34particular application? And if so, why?
44:37Uh, so tonight we're asking um really
44:39four things from the commission. Is the
44:41proposed scope and overall approach
44:43appropriate? Second, are the evaluations
44:46consider considerations we've identified
44:48in the guidelines? the right ones. Uh
44:51third, do the guidelines provide an
44:53appropriate framework for future
44:55projects? And finally, are additional
44:58considerations or stakeholder input um
45:01needed? Uh so again, tonight is a
45:04discussion item. No action is being
45:05taken. Um we're not asking the
45:07commission to approve a playground
45:09project or select a particular surfacing
45:11material. Um purpose is to get feedback
45:14on the framework and overall approach
45:16before we continue uh refining it. Next
45:19slide.
45:22So before getting into the guidelines, I
45:24think it's useful to establish what we
45:26currently have in Palo Alto and kind of
45:28dive into surfacing a little bit. The
45:30city has 28 playgrounds and play areas
45:33throughout its many parks. Some parks
45:35have multiple play areas within one
45:37park. Um we've already used a variety of
45:40surfacing materials including engineered
45:43wood fiber uh or wood mulch. Um it's
45:46designed for use in playgrounds. sand,
45:49poured in place rubber, bonded rubber
45:50mulch, rubber tiles, and synthetic turf.
45:53Uh synthetic turf in particular is used
45:56at three locations. Mitchell, uh Bware
45:59and Rinkata Park. Uh an important point
46:01is that each of those locations, in each
46:04of those locations, um synthetic turf is
46:06used in combination with other surfacing
46:09materials. Uh so the discussion we're
46:11having isn't necessarily about choosing
46:14m one material for an entire playground.
46:17In practice, playgrounds um as as you
46:21might suspect and already know um use
46:23different surfaces for different
46:25functions and different areas for a
46:27reason. Mitchell Park is a good
46:29illustration point. The uh picture
46:31displayed is the magical bridge
46:32playground in in Mitchell Park has a
46:35variety of surfacing materials. Uh next
46:37slide. Also at Mitchell Park, uh there's
46:40there's uh six playground areas total,
46:43including uh the Magical Bridge
46:45playground. uh which include a splash pl
46:48as well and incorporates all of them
46:50incorporate se several different
46:52surfacing materials. Uh there's sand,
46:54engineered wood fiber, poured in place,
46:56bonded rubber mulch, and synthetic turf.
46:59Uh pictured before you are like a few of
47:02the um other play areas throughout
47:04Mitchell Park. Uh so again, when we're
47:06talking about evaluating synthetic turf,
47:09we're not necessarily talking about an
47:11all or nothing decision. A future
47:13project could use uh different surfaces
47:16in different areas depending on the play
47:18function, accessibility needs, site
47:21conditions or other considerations. Uh
47:24so that is one reason staff believes a
47:26project specific framework can can be
47:28useful. Um next slide please.
47:32So the same concept applies to Ber and
47:36Ricinada which are the other two
47:37locations that have synthetic turf um in
47:40playgrounds. uh they used it's used in
47:43combination with other surfacing
47:44materials. Uh our existing playgrounds
47:48demonstrate that different surfacing
47:50materials can serve different purposes
47:52within the overall play environment. Um
47:55and the proposed guidelines are intended
47:57to build on the project specific
47:59approach rather than establish one
48:01universal surfacing standard or
48:03predetermine the surfacing used on a
48:05future project. Next slide.
48:10Uh this is just like a deep dive into
48:12surfacing in general. Um it's it's
48:15surfacing serves multiple functions. Um
48:18surfacing isn't just about what material
48:21is on the ground. It can affect a number
48:24of different aspects of a playground
48:27such as fall protection, accessibility.
48:29Uh it can influence the types of play
48:31that are possible and the overall user
48:33experience. The the kind of picture
48:35before you is a good example of a unique
48:37application of it. uh type of play uh
48:40for using port in place rubber not
48:43synthetic turf but that's PIP as
48:46sometimes we call it um it can affect
48:48the surfacing can affect drainage
48:51maintenance durability heat sanitation
48:54aesthetics life cycle costs as well um a
48:58surface that performs well for one
48:59purpose may create limitations in
49:01another area so the basic premise behind
49:04the proposed guidelines that we'll be
49:06going over in a little bit uh is that
49:08there isn't necess necessarily one
49:10surfacing material that is appropriate
49:13for every playground or every
49:15application. Um the material material
49:18considered excuse me in relation to what
49:22um should be considered in relation to
49:24what we're trying to accomplish in that
49:25particular area. Next slide.
49:30Uh so I also want to be clear that these
49:32guidelines aren't intended to replace
49:34existing safety requirements. There are
49:36a number of requirements and standards
49:38that apply to public playgrounds uh
49:40listed before you. Those include ASM
49:43standards, the consumer product safety
49:46commission's public playground safety
49:48handbook. It's quite a mouthful. Uh
49:50California health and safety code
49:51requirements and certified playground um
49:55uh inspections. And we have a couple uh
49:58certified playground inspectors on on
50:00staff in our maintenance team that
50:02perform those inspections in the city.
50:04Uh so those requirements establish the
50:06baseline for selecting a surfacing
50:08material. Um the proposed guidelines are
50:11intended to supplement those
50:13requirements by giving us an additional
50:15framework for evaluating um the broad
50:18the broader project considerations. So
50:21one example from the um consumer safety
50:24handbook is guidance that loose fill
50:27materials like engineered wood fiber
50:29should be avoided for playgrounds
50:31intended for toddlers or children. um
50:33who may frequently place objects in
50:35their mouse. So that illustrates that
50:38surfacing decisions can involve
50:39considerations beyond simply whether a
50:42material is technically meets a
50:43particular safety standard. Uh next
50:46slide.
50:49Uh then accessibility is um
50:53more more than minimum compliance. We we
50:57you in our our parks master plan and our
50:59city priorities accessibility and
51:01inclusivity is is a a priority goal. Um
51:07engineered wood fiber can meet
51:10applicable accessibility requirements.
51:12It's often considered um it is
51:14considered an accessible surface when
51:16when maintained properly. Uh but actual
51:19performance can be affected by things
51:20like compaction, displacement,
51:22unevenness, intensity of use and
51:24weather. um even if it is maintained
51:27perfectly, there is a distinction
51:29between uh when we're talking about
51:31engineered wood fiber in particular,
51:33there's a distinction between meeting
51:35minimum technical standard for
51:37accessibility and providing the same
51:39practical experience for every user. Um
51:42we've included a few examples from a dis
51:45disability and accessibility
51:47organizations to illustrate that
51:49distinction. Um the point is that a
51:52surface can be um technically accessible
51:55but still more difficult for some people
51:57using wheelchairs or other mobility
51:59devices to navigate. Uh so that's one
52:02reason inclusive playgrounds often
52:04incorporate substantial areas of unitary
52:06servicing and also the trend in the
52:09industry is is to um incorporate
52:12inclusive elements in every playground
52:14rather than having you know standalone
52:17inclusive playgrounds, destination
52:18playgrounds like we have at Magical
52:20Bridge. Um we want to provide that same
52:23inclusivity principle apply that towards
52:26all playground projects. That's the
52:28that's kind of the direction. um going
52:31on in the industry or in the world. So
52:35when we're evaluating surfacing, we want
52:37to look at accessibility not just as a
52:40compliance question uh but also as a
52:42question of actual usability and
52:44inclusive play. Uh next slide.
52:49Uh so getting into the guidelines. Um
52:53this brings us to this slide. The the
52:56core uh uh proposed core of the proposed
53:00guidelines. The the basic approach is to
53:03evaluate synthetic turf based on the
53:05needs and conditions of specific
53:07playground project. Uh so we've grouped
53:09the considerations into four broad
53:11categories. Uh the first is user and
53:13function. What the area is intended to
53:16do. uh who will use it and what
53:19accessibility and inclusive play needs
53:21exist. The second is site and
53:24performance uh things such as drainage,
53:26shade, environmental considerations,
53:28heat um are there trees in the area or
53:30not. So surface temperature, durability,
53:33intensity of use. The third is uh
53:36operations and life cycle um including
53:38maintenance and sanitation replacement
53:40costs. And uh finally there are design
53:43and community considerations of course
53:45um including aesthetics, alternative
53:48surfacing materials and and community
53:50and stakeholder input are also very
53:51important. Uh the intent is not to
53:53create a a mathematical formula where
53:56every factor gets a score. Um it's to
53:58make sure these questions are considered
54:00consistently when a project is being
54:02developed. Next slide.
54:06Um, this is one of the more important
54:08concepts in in the guidelines. We want
54:11to evaluate the application rather than
54:13simply deciding whether synthetic turf
54:15as a material is is good or bad. Uh, for
54:18example, a hight traffic area may have
54:20different needs than a nature oriented
54:22play area. An accessible route may have
54:25different requirements than a fall zone.
54:27um a particular play feature may require
54:29a certain type of ball protection and
54:32making a certain surfacing uh type u
54:35appropriate for that play feature.
54:38Another area may in the same playground
54:40may be better suited to a natural
54:41looking or or loose fill surface. Uh
54:45there's an example of a playground that
54:47incorporates multiple surfacing types
54:49depending on on the application. I don't
54:51know if you can see, but there's kind of
54:53like a a toddler area with board place
54:57on the left. And then the bigger kid
55:00area with taller structures has
55:02engineered wood fiber which is a great
55:04fall zone surface. Um, and there's
55:07concrete pathways also for for
55:09accessibility. So, the point is that the
55:11same playground can potentially have
55:12several different appropriate surfacing
55:14applications. Um, and this just kind of
55:17illustrates um some of the
55:19considerations and what what examples of
55:21what surfacing may be appropriate for
55:23those considerations.
55:25Next slide.
55:27Uh, so synthetic turf since that's the
55:30subject of of kind of this this work
55:32item. Um, so it has some characteristics
55:36that are particularly useful in certain
55:40situations. Um it can provide a
55:43consistent firm surface that can support
55:45accessible routes and inclusive play
55:48areas. Uh this picture is a u from
55:52magical bridge uh where uh they has a
55:55little grassy null and kids like to use
55:58the um synthetic turf to get like a
56:01piece of cardboard and and slide down
56:03it. Um so no other surfacing would
56:05really provide that same functionality.
56:08Uh and it also doubles as a suitable
56:12fall protective surface um if if the
56:15kids take a tumble. Uh so it has a
56:18unique functional applications. It can
56:20also it's also very durable in high use
56:22areas where other natural surfaces may
56:25become may wear or become uneven. Um but
56:29those benefits should be weighed against
56:32the site's condition uh the intended
56:34function uh the environmental
56:36considerations and available
56:37alternatives. Um certainly we don't want
56:41to see a mono culture of synthetic turf
56:43and in a in a playground. Uh so that's
56:46where the proposed statement comes from
56:49in the guidelines. We want to limit the
56:51use of synthetic turf to applications
56:53where its characteristics provide a a
56:56clear and appropriate benefit. Next
56:58slide.
57:01Uh so we engaged with the magical bridge
57:04foundation. Uh consider them key
57:06stakeholders in this. Uh they helped
57:08inform our project specific evaluation
57:10approach. Uh one of the things that was
57:13useful from that engagement was seeing
57:15how multiple surfaces can be
57:16incorporated into a a single playground.
57:20uh to serve different purposes. And this
57:21is a picture of the Magical Bridge um
57:24park uh playground under construction um
57:28right before it opened. Uh so that
57:31reinforced the idea to staff and the ad
57:34hoc committee that this
57:37um doesn't have to be a decision between
57:40one material or another for an entire
57:42site. Instead, it can be about
57:44understanding the needs of different
57:46areas and determining what surfacing
57:48best supports those needs. Uh, next
57:51slide.
57:53A few more. So, we've also heard a range
57:56of perspectives through public input and
58:00some commenters have expressed uh
58:02support for prohibiting synthetic turf
58:04altogether. Uh, others have expressed a
58:06preference for engineered wood fiber and
58:08other natural materials. Uh we've heard
58:11concerns about heat material composition
58:13and potential health impacts. Um
58:16environmental and life cycle
58:17considerations, maintenance and uh
58:19replacement considerations. Uh we've
58:22also heard questions about the
58:23accessibility of alternative materials
58:26and interest in broader stakeholder
58:28engagement. Uh so these comments are
58:30important because they raise a a larger
58:33policy question at the crux of what
58:36council referred us to do in this body
58:39and that is to um consider whether the
58:42city should continue to evaluate um
58:44synthetic turf on a project specific
58:46basis for a guideline approach like this
58:49is proposed or whether the city should
58:52establish a broader citywide policy um
58:54that prohibits its use. The proposed
58:57guidelines um are focused on the first
58:59question on that project specific
59:01framework. Um how do we establish the
59:04question in the guidelines is how do we
59:06establish a consistent transparent
59:09project specific evaluation process.
59:12Uh next slide please.
59:17So this slide lays out the distinction
59:19between those two approaches. Uh the
59:20proposed guidelines would establish uh
59:23project specific evaluation criteria.
59:26They would consider the site's
59:27conditions and intended use and retain
59:29flexibility for the actual product
59:31project product used in the project. Um,
59:35a city-wide policy by conspir by
59:37comparison would establish broader
59:39citywide direction and could establish
59:42uh permitted or prohibited materials.
59:46uh staff's recommendation is the
59:47guidelines approach uh because it allows
59:50us to establish consistency in how we
59:52evaluate these projects without
59:54predetermining the answer for every
59:57future playground um which would you
1:00:00know impact user experience and
1:00:01functionality um
1:00:04to name a few accessibility as well
1:00:08important this approach doesn't mean
1:00:09that synthetic turf would be selected
1:00:11whenever it provides some benefit um the
1:00:14intent is specifically to limit its use
1:00:16to applications where there its
1:00:18characteristics provide a clear and
1:00:20appropriate benefit while also
1:00:22considering alternatives. So we are
1:00:24asking commission tonight whether this
1:00:26refined scope appropriately fulfills the
1:00:29work plan um direction um and intent of
1:00:32the council referral. Next slide please.
1:00:36U how these how it might work in
1:00:38applying these guidelines to a future
1:00:40project. Uh the guidelines would inform
1:00:43the decision. they would not make the
1:00:44decision. If we have a feature
1:00:46playground project, we would first
1:00:47identify the play functions and user
1:00:49needs. We would evaluate the site
1:00:51conditions. We would identify the
1:00:52appropriate surfacing options for those
1:00:54particular applications. This is all
1:00:56kind of like landscape architect work.
1:00:58Um we would apply the guidelines then
1:01:01and evaluate the benefits, limitations
1:01:03and alternatives. Uh community and
1:01:05stakeholder engagement would be
1:01:07incorporated as appropriate. Uh
1:01:09ultimately the project team would
1:01:10develop a recommendation for the project
1:01:12that would go through the appropriate
1:01:14PRC and city review and approval
1:01:16processes that we typically do um for
1:01:19each each project. Uh so the guidelines
1:01:21are essentially a framework for that
1:01:23analysis um before a project
1:01:26recommendation can be made. Next slide.
1:01:31Uh so the guidelines what they do not do
1:01:34what they do. Uh so they do again this
1:01:36is maybe um just just to reiterate they
1:01:39do not require synthetic turf. They do
1:01:42not prohibit synthetic turf. They
1:01:44establish um they don't select a
1:01:46material for a future project. Um they
1:01:49don't establish a universal surfacing
1:01:51standard which is consistent with
1:01:53prevailing safety handbooks, regulations
1:01:56and best practices for designing
1:01:57playgrounds. They don't commit us to as
1:02:00a city to feature expenditures.
1:02:02Um what they do is establish consistent
1:02:05considerations for future projects. Uh
1:02:08they encourage al evaluation of
1:02:10alternatives and um emphasize project
1:02:14specific conditions. They they encourage
1:02:16the designer to limit the use of
1:02:19synthetic turf and explore you know
1:02:22alternative servicing considerations. Um
1:02:25so it supports a more transparent
1:02:26decision making process overall. um
1:02:29reinforces the principle that synthetic
1:02:31turfs should be limited to applications
1:02:34where it provides a clear appropriate
1:02:36benefit. Um so this is really intended
1:02:39to provide structure around future
1:02:41decisions without making those decisions
1:02:43in advance. Next slide.
1:02:47Uh so so this is the second to last
1:02:50slide and um staff is seeking it the PRC
1:02:55input tonight on on these questions to
1:02:58kind of guide the discussion. Um do do
1:03:01the prop pro do the proposed guidelines
1:03:03approach appropriately address the work
1:03:06plan direction? Uh second content um are
1:03:10there evaluation considerations we've
1:03:12identified um
1:03:14are they appropriate and complete? Uh
1:03:17third application does the framework
1:03:19appropriately balance project specific
1:03:21flexibility with the goal of limiting
1:03:24synthetic turf to applications where it
1:03:27provides a clear and appropriate
1:03:28benefit. Uh and fourth is stakeholder
1:03:31input. is additional stakeholder
1:03:33engagement appropriate before we
1:03:35finalize the guidelines. Uh and finally,
1:03:38there's the broader policy question. Uh
1:03:40does the commission want to further
1:03:42consider a city-wide policy regarding
1:03:45playground synthetic turf beyond the
1:03:47proposed guidelines framework? Um keep
1:03:50in mind that the answer to that question
1:03:51could impact the ability to um advance
1:03:54this item in one year. And if that's the
1:03:57kind of feedback from PRC, P the
1:04:00commission should confer on I recommend
1:04:02the commission confer on what that would
1:04:04take. Um if if it's a higher level of
1:04:07effort um that we're hearing is desired.
1:04:11Um so we're interested in hearing the
1:04:13commission's direction on each of those
1:04:15areas. Uh next slide.
1:04:18Uh and so following tonight's
1:04:20discussion, we'll evaluate the PRC
1:04:23feedback. Um,
1:04:25we'll revise the proposed guidelines and
1:04:28our overall approach as appropriate. Um,
1:04:31we'll conduct any additional stakeholder
1:04:33engagement. Um, we'll return to the PRC
1:04:38um with revised guidelines if if that's
1:04:41um a desire uh for further consideration
1:04:46like final recommendation.
1:04:48Um upon final recommendation of
1:04:50guidelines, we would inform city council
1:04:53and incorporate the guidelines into
1:04:55practice. Um if it changes into more of
1:04:58a policy level effort, that would um
1:05:00impact next steps.
1:05:04And with that, I will open it up for
1:05:07feedback.
1:05:10>> Okay. Thank you. And thanks to uh thanks
1:05:12to staff and the ad hoc for the report.
1:05:15Uh before we go to public comments and
1:05:18um commissioners for clarifying
1:05:21questions and see if the ad hoc uh has
1:05:24anything they'd like to add to the
1:05:26report
1:05:28to the presentation.
1:05:37Um, so I think in evaluating what we've
1:05:41been sent to do is to see can we um make
1:05:46some kind of recommendations on
1:05:48artificial turf and playgrounds. I think
1:05:50we've worked with staff and my take on
1:05:53it I don't know if you want to have a
1:05:56different it's not realistic looking
1:06:00forward at an item to outright ban any
1:06:03material because there are circumstances
1:06:05where it may be the best option. So I
1:06:07think what we're looking at is where do
1:06:10we want to fall in the scale from the
1:06:13complete it's one of the options and
1:06:15it's all a case by case basis to you
1:06:18know there's a slight preference to
1:06:20material of last resorts to outright
1:06:22ban. So, what we're trying to get in the
1:06:26conversation over here is how far on the
1:06:29spectrum we uh think that we should
1:06:32land.
1:06:37>> I think that was very well said by
1:06:39Commissioner Axel Rod and it's um
1:06:42similar to the concepts that were
1:06:44grappled with regarding turf with
1:06:47playing fields in terms of playability.
1:06:49This is usability, inclusiveness.
1:06:51there's some more factors to consider
1:06:53and um I think while the menu remains
1:06:56open this was a good starting point for
1:06:59the commission to provide feedback of uh
1:07:03there there's ways to make this more
1:07:06stringent there's ways to make it more
1:07:08flexible and what does the commission
1:07:10feel comfortable with recommending
1:07:12moving forward.
1:07:15>> Okay, thank you. Um before we um go to
1:07:21I'll open it up to the commission for um
1:07:23any clarifying questions. I but before
1:07:26we do that I have a couple well at least
1:07:28one one clarifying question I'd like to
1:07:30ask before we move to the rest of the
1:07:32commission. So, the April 28th staff
1:07:35report in the packet uh describes the
1:07:37council direct directed as the
1:07:41development of broader nonplaying field
1:07:44synthetic turf policy addressing
1:07:47applications such as playgrounds,
1:07:50landscaping, and the golf course driving
1:07:52range. However, the report um before
1:07:55limited is limited to uh synthetic and
1:08:00synthetic turf guidelines. So, could
1:08:02staff or the ad hoc explain whether this
1:08:05item is intended to satisfy the full
1:08:08council direction or only the playground
1:08:10portion? And if if it addresses only the
1:08:13playground portion, will separate
1:08:15guidelines or policies for landscaping
1:08:18and the golf course, driving range
1:08:21return to the commission at a later
1:08:22date? Those those are my kind of my
1:08:26clarifying questions on that. Yeah, I
1:08:28think it would similarly those those two
1:08:31those landscaping applications and the
1:08:34golf course driving range the project
1:08:38specific decision framework would apply
1:08:40to those projects too. Um this report is
1:08:45emphasizes playgrounds admittedly. Um so
1:08:48we could further refine um you know the
1:08:52work product to include those in more
1:08:54detail but it it would fall back to the
1:08:57same principle of um evaluating it on a
1:09:00project specific basis.
1:09:02>> Yeah. I'm just thinking that's I mean
1:09:03that's what the council had asked for
1:09:05and I think it's just a matter of
1:09:06integrating that in with the rest of
1:09:09your report. I mean, um, if we're going
1:09:12to go back to the council, uh, with the
1:09:14work plan because those those two may
1:09:17those two items are actually missing
1:09:19from the report. It's just report
1:09:21focused primarily on on playgrounds and
1:09:24not and not the other items that were
1:09:27defined in the um, council directive.
1:09:30Right. Need to flush that out a little
1:09:31more. Okay.
1:09:33>> Any other commissioners clarifying
1:09:35questions?
1:09:41Um okay. Um
1:09:46I I do have so
1:09:48uh you you mentioned in the report that
1:09:50you participated in the discussion with
1:09:52the chair.
1:09:53>> Yes. Actually, I I wanted to just go
1:09:56back to that for just one minute because
1:09:59I think this report is focusing also on
1:10:04uh advancing your work plan and
1:10:08specifically for project goal number
1:10:11four for the natural grass pilot and
1:10:14synthetic playground. synthetic turf uh
1:10:18use policy is specifically
1:10:22um language around playgrounds. So
1:10:26that's why um this report is is
1:10:29fulfilling that specifically on
1:10:33playgrounds and I think that's why um we
1:10:38focused on that and that's that was
1:10:40agreed to at an earlier PRC meeting. Um
1:10:45when once the referral came from the
1:10:50city council, there was another we held
1:10:53another meeting to discuss adding that
1:10:56to the work plan.
1:11:00>> So you're saying we I I don't remember.
1:11:03So you're saying the playgrounds where
1:11:04the landscaping and the golf coursing
1:11:07golf course driving range wasn't.
1:11:09>> I think it was limited because we
1:11:11realized that it was a lot to do
1:11:14>> and although perhaps that was something
1:11:18that the commission didn't feel at the
1:11:21time could take on for advancing it in a
1:11:25year. So I believe the scope was
1:11:27narrowed and be um on your work plan
1:11:32it's specifically only limited to
1:11:34playgrounds.
1:11:36>> Okay. I'm just saying when we go back to
1:11:38the council it's that was a question
1:11:40that came up from um I think council
1:11:43member Real and so we have to be able I
1:11:48think in some way be able to address
1:11:50that if we're going to go back to the
1:11:52council with that as a work plan item.
1:11:55It was um in the minutes um council
1:11:59member Rectal requested that PRC study
1:12:01whether the city should prohibit the use
1:12:03of artificial turf and playgrounds and
1:12:05other nonathletic city facilities and
1:12:08sound like in subsequent deliberations
1:12:10in this body. We um had discussions
1:12:13around that and uh limited the use
1:12:17limited the work plan um for to be more
1:12:21manageable in in one year. Now, if we
1:12:24went back to council and did we we could
1:12:27expand the scope, but that would
1:12:29actually um create a situation where it
1:12:32might take longer than a year and it
1:12:34might take more resources to um bite
1:12:37that off, so to speak.
1:12:40>> Through the chair, did the council
1:12:42approved that work plan?
1:12:44>> No, it was not approved and that was the
1:12:47one item that was added to the board
1:12:50plan. what which is one of the reasons
1:12:52that we added it to the work plan. So
1:12:55eventually we will have to go back to
1:12:57the council
1:12:58with that as an item and but I'm just
1:13:01saying it it it right now it's those
1:13:04those things are the missing elements
1:13:07and but you know I don't know if Council
1:13:10Rectal is going to remember but it that
1:13:13he was the one that brought it up and
1:13:15why we added it to the work plan. I
1:13:18>> so I don't I don't think your plan
1:13:19really has to be refined that much. It's
1:13:21just a matter of adding that it does
1:13:24support not only playgrounds but some of
1:13:27the other areas as well.
1:13:29>> I I would add that that Council Member
1:13:32Rectal kind of punched it to PRC to
1:13:35really determine what needs to be looked
1:13:38at um as well um whether it should be a
1:13:42policy decision or not um what it should
1:13:46include. And so that's kind of we we
1:13:49refine the work plan for it to be more
1:13:51manageable, but it's all up for
1:13:53discussion, too.
1:13:55And and I would just add that I think
1:13:58staff would want to do more research um
1:14:02specifically if the scopes expanded to
1:14:06other um locations cuz within this
1:14:11report we just focused on uh
1:14:14playgrounds.
1:14:16>> Yeah. Yes. That was my question. So, no,
1:14:19>> but we could approach all, you know, all
1:14:22non-athletic services through the um
1:14:25project specific framework.
1:14:29>> Okay. Um any other clarifying questions?
1:14:33If not, we'll go ahead and open it up to
1:14:36public comments.
1:14:39>> Uh yeah, we do have one public comment
1:14:41via Zoom.
1:14:43Um, so [clears throat]
1:14:46Dashel L's
1:14:49in here.
1:14:54Good evening. Uh, my name is Dashel
1:14:55Leeds. I'm the conservation coordinator
1:14:57for the Sierra Club Lum Prieta chapter.
1:14:59Uh, yesterday we sent in a letter urging
1:15:01this commission to rework the guidelines
1:15:03into actual standards as within the
1:15:05purview of the commission as discussed
1:15:07by council and listed in the work plan.
1:15:09Um, guidelines, as we know, they're not
1:15:11enforceable. They really cannot
1:15:13meaningfully limit the use of artificial
1:15:15turf, especially in situations where
1:15:17that use is harmful. We would like to
1:15:19see enforceable standards on plastic
1:15:21turf, which is a matter both of public
1:15:22health and environmental pollution. As
1:15:25weak as guidelines are to begin with as
1:15:27a category, uh the evaluation
1:15:29considerations listed in these current
1:15:31guidelines are minimal and ambiguous.
1:15:34For example, the term environmental
1:15:36considerations lacks specificity and
1:15:39public health is not even listed in the
1:15:41guidelines. Uh similarly on the slide in
1:15:44the presentation describing what
1:15:45playground surfacing can affect public
1:15:48health is not listed there either. Um so
1:15:50POS and other toxic and forever
1:15:52chemicals that can be found in plastic
1:15:54turf and rubber. These can pose serious
1:15:56threats to public health and the health
1:15:57of children. The topic is worthy of
1:15:59serious consideration that shapes
1:16:01meaningful standards. But as written you
1:16:03can get through the entire suite of
1:16:05guidelines without ever considering POS
1:16:07or public health. So, I really don't see
1:16:09how the guidelines would limit or even
1:16:11meaningfully inform decisions that are
1:16:13being made. Uh, more public stakeholder
1:16:15input is needed on this. Engaging just
1:16:18one single playground vendor is just not
1:16:20sufficient. There are plenty of
1:16:22residents, community- based
1:16:23organizations, environmental groups, and
1:16:25subject matter experts whose input would
1:16:27seriously benefit this process. So, in
1:16:30conclusion, matters of public health and
1:16:31environmental pollution, they really
1:16:33deserve standards, not guidelines. And
1:16:35the language of this policy should
1:16:37specifically address POS and other
1:16:38chemical pollutants. And the process of
1:16:41creating this policy should engage more
1:16:42stakeholders. And standards doesn't
1:16:45automatically mean a blanket ban, by the
1:16:47way. It just means you draw the line of
1:16:48enforcement somewhere. Uh but as
1:16:50written, the gates are completely open
1:16:52to artificial turf being used without
1:16:54any consideration of PAS or health.
1:16:56Thanks for your time and consideration.
1:17:00>> Thank you.
1:17:03Um, up next we do have Susan H.
1:17:11Hello, good evening. My name is Susan
1:17:13Hinton and I'm the conservation chair
1:17:15for the Sierra Club LMA Pria chapter.
1:17:19Um, in addition to what Dashel has just
1:17:22said, I would like to point out that
1:17:24there is no fully inclusive playground
1:17:27of any type. For example, I just spoke
1:17:30to a father whose daughter has a latex
1:17:33allergy. The daughter probably would not
1:17:36be able to play on a porn play surface
1:17:39or possibly on an artificial turf
1:17:42surface.
1:17:44Um, also other disabilities include
1:17:47things like a cocklear implant, which is
1:17:50a surgically placed device for people
1:17:52with significant hearing loss. They must
1:17:55avoid surfaces prone to elect
1:17:58electrostatic discharge and this
1:18:00includes playground equipment made from
1:18:02molded plastic and porn inplace rubber.
1:18:06Um, as for wheelchairs themselves, they
1:18:09can be safely pushed over many surfaces,
1:18:12including engineered wood fiber. Um, ADA
1:18:16fall protection is meant to address
1:18:18falling from a height, not rolling in a
1:18:20wheelchair. Otherwise, the sidewalks
1:18:22would all need to be reconstructed.
1:18:25It is possible engineered wood fiber has
1:18:28been used for quite a long time and
1:18:30nobody uh the the parks that have them
1:18:35don't say that they're out of
1:18:36compliance. Nobody has complained about
1:18:39the difficulty of taking care of them
1:18:43until J very just recently. Um
1:18:48there's also when it besides PAS just
1:18:51today a new research article was
1:18:54released um there's something called an
1:18:56aromatic amine which are industrial
1:19:00chemicals found in dyes pigments rubber
1:19:02plastics tobacco smoke and diesel
1:19:05exhaust. um they've been known to be
1:19:08probable or possible human carcinogens,
1:19:11but this particular study showed that um
1:19:15these particular means actually um harm
1:19:19infants.
1:19:20It shows that uh in in mother infant
1:19:24pairs that have been exposed to plastic
1:19:27that contains this um are uh they have
1:19:32um
1:19:34they were linked to infants taking
1:19:36longer to become familiar with a visual
1:19:39image, a sign of poor attention. Um and
1:19:42two particular chemicals in them were
1:19:45linked to poor attention spans. Um, one
1:19:48of them was linked to something called
1:19:51novelty preference, a sign of poorer
1:19:53memory.
1:19:54We are experimenting on our children by
1:19:58using these surfaces. We don't need to.
1:20:01We can use engineered wood fiber. We can
1:20:03use grass. We can use sand.
1:20:06Thank you very much.
1:20:12>> There are no more uh speakers at this
1:20:14time.
1:20:15>> Thank you. And thanks to everyone who
1:20:17spoke today. We appreciate you taking
1:20:19the time to uh share your comments. We
1:20:22now open it up for general questions
1:20:24from the commission. We'll start with
1:20:26Commissioner Brown and then work your
1:20:27way down here.
1:20:30>> If it's okay, you can start with others
1:20:32that weren't on the ad hoc to get their
1:20:34input before me.
1:20:36>> Okay. We'll start with Commissioner Den.
1:20:44Yeah, I do have a few questions.
1:20:48First of all, I want to mention that our
1:20:51California OE HA published their uh
1:20:55synthetic turf study.
1:20:58I think the result is the crown rubber
1:21:00infill uh has no obvious health risk.
1:21:04Did we include that? Because I don't
1:21:07given that they already have this health
1:21:09risk assessment of crump rubber infill.
1:21:13Should our guideline explicitly include
1:21:15public health um like the two comments
1:21:18suggested and human exposure and should
1:21:21we distinguish among different turf
1:21:23systems and infield materials rather
1:21:26than treating synthetic turf as one
1:21:28category?
1:21:37>> Yes, interesting question. the um the
1:21:40guidelines don't um attempt to you know
1:21:44study the public health um impacts of
1:21:48any any given material. Um they
1:21:53assume that the desire is to limit
1:21:55synthetic turf for
1:21:58for those concerns but we don't dissect
1:22:02it further than that. And I' I would
1:22:05point out that when a project comes um
1:22:08to the PRC, the PRC has the ability to
1:22:12um weigh in on does that design use too
1:22:15much synthetic turf. Um so the
1:22:18guidelines are meant to provide a
1:22:20framework for the designer. Um, but
1:22:22there's multiple like
1:22:26uh ways that a project can be then
1:22:29rejected and then refined based off of
1:22:32PRC's input if it's not meeting the
1:22:34guidelines. Um, so that's that's another
1:22:36like quality control step uh to ensure
1:22:39that the guidelines are being applied
1:22:41applied correctly.
1:22:47>> Yeah. Uh, also I think we do we did list
1:22:50some of the good um recommendations
1:22:53there including heat and child safety.
1:22:57But if we list that as a consideration,
1:22:59do we have a actual temperature standard
1:23:02or threshold that would tell us when
1:23:05synthetic turf is inappropriate or
1:23:08particularly in playground areas because
1:23:11you know children may sit or crawl or
1:23:13have direct skin contact with the
1:23:16surface.
1:23:18Yeah, I think that would be up to like
1:23:20the landscape architect to determine
1:23:22that. But just based off of um you know
1:23:25my limited knowledge, I would I would
1:23:28say that the the site the site
1:23:31constraints factor into what surface
1:23:33material is used. So if there are no
1:23:35trees in the area or no no trees being
1:23:39planted and it's a hot exposed area, um
1:23:42it probably wouldn't be a good idea to
1:23:43use synthetic turf. um where we have it
1:23:46in in Palo Alto for the most part um
1:23:49it's in shaded situations like magical
1:23:51bridge um there's big tall statured
1:23:53trees around um rinkinatada the same
1:23:56thing so that gets factored into the
1:24:00decision- making if if a material is
1:24:03appropriate or not
1:24:07>> I I mean I agree we have a list of
1:24:09considerations but there's no weighing
1:24:11or decision framework
1:24:14would it be helpful to identify some
1:24:16factors as minimum requirements
1:24:19particularly for safety, accessibility,
1:24:22heat and environmental standards rather
1:24:25than treating every factor equally.
1:24:29I think it's it's something that or
1:24:30discussion.
1:24:32>> Right. Right. I have one last point I
1:24:34want to make. Um
1:24:37well, as we develop those guidelines,
1:24:39have we looked at a best practices from
1:24:41neighboring cities or other comparable
1:24:44communities?
1:24:50>> We have not looked at other neighboring
1:24:52cities. We're um using just prevailing
1:24:55um safety guidelines uh that we uh
1:24:59showed in the slide um such as the
1:25:02safety handbook that goes into design
1:25:04considerations
1:25:05um as as the guiding documents for
1:25:09determining um playground servicing. And
1:25:11that's something that all cities would
1:25:14incorporate as well um because they're
1:25:16meant to regulate and provide guidance
1:25:18for how playgrounds are designed across
1:25:21the board.
1:25:23So that that provides some consistency
1:25:26um indirectly um comparability to other
1:25:29cities because they're all using the
1:25:30same standards,
1:25:32>> right? Also now we already have three
1:25:34playgrounds that's using synthetic turf.
1:25:38Have we learned any data from those
1:25:41examples?
1:25:46there there are some um lessons learned
1:25:49uh for sure like with with Magical
1:25:51Bridge. Um I know that some materials
1:25:54were changed since it opened just based
1:25:57off of um maybe installation issues or
1:26:00you know seams coming up. Um so actually
1:26:03I I know at the Magical Bridge
1:26:04playground there was um some areas of
1:26:07synthetic turf that seams were coming up
1:26:09and that was converted to port in place.
1:26:12uh but they still left some synthetic
1:26:14turf. So we also have lessons learned
1:26:18with like equipment that we put in and
1:26:21then later realized hey that's not the
1:26:23best equipment or it got damaged or the
1:26:27use of the site um overwhelmed with the
1:26:30equipment was designed to take because
1:26:32that sometimes we're a victim of our own
1:26:34popularity.
1:26:36Magical Bridge is a great example where
1:26:38the site is just so well loved and so
1:26:41used um that the issues we face uh in
1:26:46terms of wear and tear are because of
1:26:48the the amount of use it gets because
1:26:50it's such a well designed uh playground.
1:26:53So we're always learning about what's
1:26:55more durable, what um you know what
1:26:58would work better and that's just an
1:27:00ongoing kind of feedback loop and then
1:27:03we take that into consideration for the
1:27:04next project. Okay, let's not use that
1:27:07surfacing in that application or let's
1:27:09not use that piece of type of equipment
1:27:11because we've had issues with it in the
1:27:13past. Um, more so practical
1:27:15considerations.
1:27:18>> Yeah, thank you. And one last question.
1:27:20I I noticed the dock park at B Park was
1:27:25also turf, right?
1:27:28Yeah. Did we hear any feedback about
1:27:31that?
1:27:36Um, we've had mixed feedback. Oh, I
1:27:40don't know. We've had mixed feedback on
1:27:44uh that application. And
1:27:47I know actually
1:27:50we I it is something that we can uh I
1:27:56guess work with our partners in public
1:27:58works engineering to see if they've
1:28:00heard more. Um but I can say once it was
1:28:04installed, we did hear from the
1:28:05community um surrounding Bware that um
1:28:10they would have encouraged a lot more
1:28:13transparency which is something that as
1:28:17as Ben mentioned as we move into uh new
1:28:21park development and um changes that we
1:28:25plan to engage in more community
1:28:28engagement [snorts] um opportunities and
1:28:30make sure that surfacing becomes a part
1:28:33of um those those slides.
1:28:38>> Thank you, Sarah. Yeah, I think
1:28:40stakehold um stakeholder input are very
1:28:43important especially where dealing with
1:28:46children and parents and caregivers. If
1:28:48we can engage them, that would be great.
1:28:50Thank you,
1:28:52Mr. Clanhouse.
1:29:02Thank you. Thank you for a comprehensive
1:29:04explanation and report as to why um
1:29:08stuff in the ad hoc decided to go this
1:29:10way. I would go back to the council
1:29:14direction and then talk about a few of
1:29:16the things that I learned afterwards. So
1:29:18the council direction was indeed from uh
1:29:22council member Regal supported by
1:29:24council member Bert whose main concern
1:29:27was actually public health and the
1:29:29health of children and uh in part that
1:29:33was a response to very strong opinions
1:29:39from some of the Bware neighbors. Two of
1:29:42them wrote to us today who were so upset
1:29:46about the plastic turf that they um
1:29:48asked council to in to help them make
1:29:52sure that it doesn't happen again. So
1:29:54the direction was to propose language
1:30:01for playground
1:30:03synthetic turf policy. they wanted a
1:30:06policy
1:30:08and I'm sorry I'm I'm a little ahead of
1:30:11myself. So when the city council asked
1:30:16to uh provide a policy for can we stop
1:30:21using artificial turf and they didn't
1:30:24include all plastic surfaces. They
1:30:26specifically talked about artificial
1:30:28turf and partially that's because kids
1:30:31can pick up the blades and eat them.
1:30:33They said and and staff actually
1:30:36suggested a project by project approach
1:30:40saying we can go to the community every
1:30:43time we have a project see what surfaces
1:30:45they prefer and we can do it that way
1:30:48and the response by uh council member
1:30:51Regal was no we need a policy so I'm a
1:30:54little perplexed at the approach that
1:30:57was actually presented to council and
1:31:00said no thank you we prefer a policy
1:31:03Um so the purpose was to examine whether
1:31:06there's materials that should be
1:31:08prohibited especially in playgrounds
1:31:11because plastic impacts the health of
1:31:13children so pervasively and so that was
1:31:17the concern. So narrowing the scope they
1:31:21did ask to look at prayer guards and
1:31:22other non-athletic city facilities. I
1:31:26I'm not opposed to looking at those
1:31:27separately and looking at different
1:31:29things at different times. But I do
1:31:32think that what we were asked to do is
1:31:34very explicit
1:31:37to and in the work plan it's expressed
1:31:40to develop a policy and instead the
1:31:43staff report says we're not intending to
1:31:45establish a city-wide policy requiring
1:31:48or prohibiting synthetic turf and
1:31:50instead there is a framework of how we
1:31:53can do plastic turf in playgrounds.
1:31:56Exactly. Put it on its head. city
1:31:59council said let's see how we don't do
1:32:01it and this is oh yeah if we have all
1:32:03these considerations so this to me is a
1:32:07big problem um and then
1:32:10the guidelines themselves themselves are
1:32:13a list of things to think about there's
1:32:15no thresholds no hierarchy no health
1:32:19anywhere in that even though that was
1:32:21the main motivation for this whole
1:32:23exercise um there is no
1:32:27it just kind of like Okay, we'll take
1:32:29all of this into consideration and we'll
1:32:31ask the their neighbors or the play, you
1:32:34know, we'll do some some public outreach
1:32:36potentially case by case. But that's
1:32:38what city council didn't asked us not to
1:32:41do. So I think we need a policy. The
1:32:45policy should say don't use it because
1:32:49when you suggest where is my notes that
1:32:52you know that we may need different
1:32:53surfaces for different places and
1:32:55playgrounds that it's all not one
1:32:57uniform. I agree we don't need to use
1:32:59one uniform but with the one material
1:33:02that we should not use in a children
1:33:04playground where they crawl on the grass
1:33:06and pick the grass and they artificial
1:33:09turf is the one thing that we should
1:33:11never use in a playground ever. So this
1:33:14is very strange to me. Um plastic is is
1:33:19we know plastic is harmful to health. We
1:33:21know it's harmful throughout its life
1:33:23cycle from when they make it to when it
1:33:26disintegrates and sometimes recycle and
1:33:28sometimes just goes into the bay in
1:33:30little pieces. So what would I say? I
1:33:34think we need to have a policy and the
1:33:36policy should find how can we stop the
1:33:38use and there it's not that hard. It's
1:33:40just a city. It's not like a proposal
1:33:42that somebody from the outside comes to
1:33:44us and says we really want to put
1:33:46plastic turf. It's our choice. Don't do
1:33:49it. It's not the right material to use
1:33:51in playgrounds. It absolutely is not. So
1:33:55there are exceptions. You can exempt
1:33:58magical bridge or some specific examples
1:34:01if you have a policy, but the policy
1:34:03needs to be a policy, not a set of
1:34:06guidelines. The set of guidelines if you
1:34:08add health to it could be used in in
1:34:11addition when you go to a city and to a
1:34:14community meeting about a public project
1:34:17that we're proposing and you say okay
1:34:20here are all the materials that we might
1:34:22want to use. This is what we're
1:34:24thinking. People will respond to that.
1:34:26So those guidelines may be still okay as
1:34:29part of a public process but that's not
1:34:31a replacement for what we're asked to
1:34:33do. Um
1:34:39I'll stop here. I trying to find the
1:34:42things you asked us specifically to
1:34:44answer. So I took it out of scope. Do
1:34:47they propose guidelines approach and
1:34:50address the work plan direction? No. The
1:34:52work plan direction says measure a
1:34:55success develop a policy content. Are
1:34:58these evaluation considerations
1:35:00appropriate and complete? They don't
1:35:02include health. How can you? That was
1:35:04the motivation for the whole thing.
1:35:06Application. Does the work framework
1:35:08appropriately balance project specific
1:35:10flexibility with the goal of limiting
1:35:13synthetic turf to applications where it
1:35:16provides a clear and appropriate
1:35:17benefit. I don't see how we need that.
1:35:20You need to you not use it. And in very
1:35:23specific examples, you might come back
1:35:26with a way or some considerations where
1:35:30you could wave this prohibition. But it
1:35:34should be a don't use plastic turf
1:35:37stakeholder impact um engagement seems
1:35:41like the only stakeholder engagement was
1:35:44that was done was uh magical bridge and
1:35:47some letters that we got from the public
1:35:50and so broader policy question do we
1:35:53wish to further consider a citywide
1:35:55policy that's what we asked for and
1:35:57that's what we need to do that is what I
1:35:59have to say thank you
1:36:02>> thank Thank you, Commissioner
1:36:05Smith.
1:36:09>> I thought that was good work of you all
1:36:11and the uh ad hoc committee. I I think
1:36:15we covered it and uh I I'm of the belief
1:36:19being precise and flexibility, it makes
1:36:23a lot of sense. So, I compliment you on
1:36:26what your work you've done. Thank you.
1:36:30Okay, Commissioner Axer, anything?
1:36:35Great. So, um, thanks again for all the
1:36:38work and for the public comment and for
1:36:40the fellow commissioners on your
1:36:42commentary. Um, so one shortcoming that
1:36:45I think is uh on me and um the
1:36:51subcommittee is that we got feedback
1:36:53from Magical Bridge and rightly so. it
1:36:56was identified that we did not get
1:36:57enough feedback from other parties that
1:37:00have uh other charters. Um so maybe we
1:37:03can incorporate some more of that into
1:37:07our decision-m and I still think that
1:37:09it's probably worth it for us to come to
1:37:13uh a quorum of where we want to be on
1:37:17the spectrum.
1:37:18here. Uh
1:37:21all the commissioners have viewpoints
1:37:24and I I don't know what the right
1:37:26process is. It seems like policy may be
1:37:29going too far, but even with the policy,
1:37:32you still need a set of guidelines to
1:37:35implement the policy so we can
1:37:36incorporate those into one. And I'd love
1:37:40to get us to a place where we're aligned
1:37:44as to how far we want to go so that
1:37:46staff can take it back because we
1:37:47actually want a policy that's going to
1:37:49be brought back here for an actual vote
1:37:52later. So I think that's an important
1:37:54piece we should get to tonight.
1:37:56Yeah, just ching in on that is that we
1:37:59want to make sure that the whether it's
1:38:01a guideline or a policy that when we do
1:38:06when you do come back to the commission
1:38:08it's clear about what it is that we are
1:38:12you know voting on and that that should
1:38:16be clear to what the council is asking
1:38:19us what the direction is because if
1:38:22we're going back to the council we have
1:38:24to have kind of a clear message that of
1:38:27what we have been able to as a
1:38:29commission to come up with. So I do
1:38:31think that there's some things that are
1:38:33missing. One is that you know we you had
1:38:35your discussion with the magical bridge
1:38:37foundation that's only one stakeholder
1:38:40with a lot of other stakeholders. I
1:38:41think this is big enough where we have
1:38:43to get input from other stakeholders,
1:38:47the community,
1:38:49um, and to, you know, there's other
1:38:53cities that are faced with the same
1:38:54issue. I think one of the commissioners
1:38:56brought it up. Have we, have we spent
1:38:59some time talking with other cities and
1:39:01seeing what they're doing or what
1:39:04guidelines they already have? I mean, we
1:39:06might not even have to, you know, start
1:39:08from scratch if we can already get uh
1:39:10some input um on on what's happening
1:39:13there. Um, could could staff briefly
1:39:17compare have you compared I guess the
1:39:20the principal surfacing materials such
1:39:23as the EWF, the PIP, the bund
1:39:27mulch stand and others in terms of
1:39:29safety, accessibility, maintenance,
1:39:32heat, environmental impact and the
1:39:35expected lifespan. You mentioned that uh
1:39:39magic magical bridge had issues. bill.
1:39:42What were those issues and what were the
1:39:45le the lessons learned from that?
1:39:48Because if there were issues that were
1:39:52that we found with different types of
1:39:54material that was used in magical
1:39:57bridge, then that makes it easy when
1:39:58you're defining what should be going
1:40:01into the guidelines of the policy. But I
1:40:03think the missing components here are
1:40:05getting stakeholder feedback as well as
1:40:10clearly defining what is it that we're
1:40:13putting in the guidelines to address the
1:40:16different types of material surfacing
1:40:18materials that will be used in some of
1:40:21the different parks that we have.
1:40:24Um
1:40:28that's that's kind of what I think we've
1:40:30that's sort of the things that we've
1:40:31gone back and forth here. I think none
1:40:33of no one here is very clear about what
1:40:36has the the guidelines actually
1:40:39defined and does it in fact meet what
1:40:42the council has asked the commission uh
1:40:46to um to address
1:40:49I don't I don't feel comfortable if I'm
1:40:51if I'm the chair we go back to the to
1:40:54the council and address the issues that
1:40:57they asked us to address. So, in
1:41:00preparing for this meeting this this
1:41:03evening, um we staff went back watched
1:41:07watched those meetings um and
1:41:12to for during the work plan
1:41:14conversation, it was very explicit and
1:41:17uh city manager even mentioned this is
1:41:20not intended to be a second turf study.
1:41:23So this is an evaluation very specific
1:41:28not of um all surfacing. This is
1:41:32specific
1:41:33um and very limited and smaller scope.
1:41:37Um because it is such a heavy lift with
1:41:40your very robust work plan already. Um
1:41:44so it's really singularity focus. It was
1:41:48on synthetic turf in playgrounds. Um,
1:41:53so, so there's that component. And just
1:41:56to kind of reiterate this, this is a
1:41:59stakeholder engagement. This is a public
1:42:02meeting. This is why it's a discussion
1:42:05and not an action item this evening. So,
1:42:08all of this information is considered
1:42:11feedback and we will take that along
1:42:14with your feedback this evening and come
1:42:16back um with next steps based based on
1:42:21what we hear this evening.
1:42:24>> Thank you, Commissioner Klein.
1:42:26>> Um Milbury prohibited using uh plastic
1:42:29turf on their properties. So that can be
1:42:31an example to look at why they did it
1:42:33and look at their staff reports and see
1:42:36um and the main concern always is the
1:42:39health of the children and this is a big
1:42:42big missing piece here. So I don't know
1:42:45that you need to have a huge consultant
1:42:47to do that. You can just get you know
1:42:50there's so much already there to show
1:42:52that plastic turf is not healthy for
1:42:55children and should not be used in a
1:42:58playground. just it makes so little
1:43:00sense to even think about doing that. I
1:43:03don't understand. Anyway,
1:43:05>> Commissioner Brown, you have one.
1:43:08>> Yes. Thank you. Um just wanted to echo
1:43:10the comments just regarding the scope of
1:43:12the work plan and I think we tried to be
1:43:15transparent and what could what is
1:43:18realistic and what we could bite off. We
1:43:20could have said yes, we'll look at
1:43:21everything and then only delivered on
1:43:23part of it. But I think just trying to
1:43:26um set expectations on what could
1:43:28actually be done was the goal that was
1:43:30trying to be achieved. Um
1:43:33a couple questions for staff before I go
1:43:35into my comments for how this would be
1:43:37applied. Would staff sort of look at the
1:43:40criteria and make findings for each of
1:43:42them sort of internally as staff and
1:43:45applying those findings for when it may
1:43:47be appropriate in the event that there
1:43:50is almost a demand for the use of
1:43:54synthetic turf um based on community
1:43:58feedback based on the design and based
1:44:00on the sort of needs of the user groups.
1:44:02is that you would sort of look at each
1:44:04of those and make sort of internal
1:44:05findings on those.
1:44:08>> Yeah, I think the guidelines are
1:44:09intended to look at those all those
1:44:11different factors and and make a kind of
1:44:13a qualitative determination. Um, and
1:44:16that's based off of the physical site
1:44:19constraints. It's based off of user
1:44:21feedback as well as based off the
1:44:22intended function of the uh the
1:44:25playground. So, it it attempts to uh
1:44:29develop a framework to examine all those
1:44:31things. um not giving any particular
1:44:34waiting to um any one consideration. Um
1:44:39but we wanted to
1:44:41you know leave some flexibility for the
1:44:44designer um to also uh determine what is
1:44:49and isn't appropriate based off the
1:44:52technical constraints and then go to the
1:44:54community uh of course and which is what
1:44:57we always do. um but not necessarily ask
1:45:00the community what type of surfacing
1:45:03they want from the list of the 10
1:45:06options. Um but to go with with um with
1:45:10kind of an their own expert expertise
1:45:13applied um with the guidelines applied
1:45:16as well. What some of what I'm hearing
1:45:19from the commission is maybe getting
1:45:22more specific in determining like
1:45:25surface temperature and different
1:45:26thresholds, different technical um
1:45:29elements that can determine what's on
1:45:34the table for a surfacing option. And
1:45:36that to me is more in line with like a
1:45:39development standard than um it goes
1:45:42beyond the guidelines. Um and so that
1:45:44would be um a heavier lift to to work
1:45:49with like our you know partners in
1:45:50public works, work with landscape
1:45:52architects and engineers to to create a
1:45:55document like that. So that's that's an
1:45:57option to give more like granularity to
1:46:00these um different considerations
1:46:03uh and certainly on the table as well.
1:46:06um short of uh you know a policy to you
1:46:10know prohibit the use of a synthetic
1:46:12turf there could be development
1:46:14standards um for it as well. Um so
1:46:17there's different flavors and I think
1:46:19the guidelines would um assume that our
1:46:24our our staff can exercise proper um
1:46:29prudence in applying those guidelines
1:46:32which which would then come back to the
1:46:35commission. it will go to council for
1:46:37every project and within our PIO
1:46:40process. Um so there's certainly like
1:46:42checks and balances along the way as
1:46:44well.
1:46:45>> Absolutely. And the hypothetical of
1:46:50prohibiting synthetic turf but creating
1:46:52a carveout specifically for magical
1:46:55bridge and I imagine magical bridge like
1:46:57uses. How would you go about writing a
1:47:00policy like that with that specific
1:47:02carveout for is that something that we
1:47:04could defend with some sort of standard?
1:47:08>> We'd have to take that back and explore
1:47:10that because we're sort of
1:47:12predetermining a a specific entity
1:47:15um and that's may run a foul of certain
1:47:19other um like procurement standards
1:47:22to name a few. So that's something we'd
1:47:25have to explore how we would would do
1:47:27that. I I
1:47:30would would put out there that it's not
1:47:33just magical bridge installing excuse me
1:47:36um exclus inclusive playgrounds it's
1:47:39inclusivity is a principle um applied
1:47:43towards every playground nowadays uh and
1:47:46that's and that's if whether or not
1:47:48magical bridge is the designer or our
1:47:51in-house landscape architect is
1:47:52designing or if we hire another firm um
1:47:56so there may the opportunities with a
1:47:58future project that's not a magical
1:48:00bridge project um to have a lot of
1:48:03creative elements and and certainly we
1:48:06don't want to sort of give like
1:48:08differenceence to one like like vendor
1:48:11provider.
1:48:11>> Yeah. Thank you. Um, so just to echo
1:48:16what uh Sarah commented on the outreach,
1:48:18it was while Magical Bridge was included
1:48:21in the discussion, we did consider input
1:48:24from past park development outreach. So
1:48:27the comments that were heard dur during
1:48:29the development of Bullware Park, for
1:48:30example, and other park projects both in
1:48:34town and otherwise. I know I visited
1:48:36other pro other park and inclusive parks
1:48:39um in the area um and considered those
1:48:42um when sort of formulating the
1:48:44recommendation.
1:48:46Um this is also a venue for public
1:48:49feedback and opinion. So the intention
1:48:51is that this is a the appropriate place
1:48:54to voice your opinion and we've heard
1:48:56some tonight. Um, I think it's not about
1:48:59hearing from specific commenters that
1:49:02were invited by a particular person to
1:49:05have a particular opinion. I think it's
1:49:06more about hearing from the broader
1:49:08community um, and con sort of
1:49:10considering the operational impacts on
1:49:13the the city. Um, and also the safety
1:49:18guidelines. I I think that's a big
1:49:20component of this that was not part of
1:49:22the initial council charge to this
1:49:25commission. Um, but I appreciate the
1:49:27expertise that Ben and Sarah have
1:49:29brought to this discussion on how can we
1:49:32um be safe because really this the
1:49:34conversation started to go way back of
1:49:37this was the this was a charge from the
1:49:38council. What would it look like if we
1:49:40were to ban all non-natural materials?
1:49:43That's really where the the ad hoc sort
1:49:45of started with on the on one end of the
1:49:47spectrum and then we started looking at
1:49:49the operational and safety constraints
1:49:51and we sort of landed in this area where
1:49:54um it's strengthening it's bolstering
1:49:56our current process
1:49:58um and our current process does already
1:50:01have many of the checks and balances
1:50:02that Ben alluded to. So the staff does
1:50:06the community engagement. there's an
1:50:07opportunity for neighbors and park users
1:50:10to say whether or not they want to see
1:50:13synthetic turf in that project. It goes
1:50:16further. It's recommended to this body
1:50:18for the park improvement ordinance and
1:50:20usually we have multiple discussions on
1:50:21that specifically for Bullware Park. For
1:50:24example, council member Rectal sat on
1:50:26this commission and voted for Bullwware
1:50:28Park at the time and it it was passed.
1:50:31So then it went to council and was
1:50:34approved. So there are many venues for
1:50:36it. I also think the environment in
1:50:38which we operate and think about the use
1:50:40of synthetic turf has changed not just
1:50:42as a city but I think as an industry um
1:50:45in parks and in municipal operations and
1:50:48we're looking at it with a more fine
1:50:50tooth comb. If we want to ban it just to
1:50:52say that we're banning it. I think
1:50:55that's that that's certainly a statement
1:50:57that this commission and the city can
1:50:59make and that's within our purview um if
1:51:02we want to take that stance. This was
1:51:05crafted in a way to not completely shut
1:51:08the door to allow the application in the
1:51:11very sort of perfect alignment of all of
1:51:14the factors that Ben laid out and all of
1:51:17that community engagement. You have
1:51:19people calling for it, demanding it. I
1:51:22don't think at this day and age that
1:51:24staff is going to propose a synthetic
1:51:26turf and try to force it down people's
1:51:29throats or sneak it through or anything.
1:51:31that is not um the intention of this
1:51:33policy. However, the if the rest of the
1:51:36commission wants to see something
1:51:38firmer, that's certainly guidance that
1:51:40we can take and go back as an ad hoc and
1:51:42work with staff to to further refine
1:51:45that.
1:51:48>> Okay. Thank you. Um, Mr. Claus,
1:51:52>> one of our
1:51:53charges is to communicate and with the
1:51:56public and so I think letting the public
1:51:59know about this was part of our job. I
1:52:02want to say one other thing.
1:52:06The class the safety standards are
1:52:10looking at whether a kid might scrape
1:52:12their knee or something like that. What
1:52:14they're not looking at is their immune
1:52:16system. It's not looking at their
1:52:19attention span. It's not looking at
1:52:21their long light,
1:52:24the the impacts of exposure to plastic.
1:52:29And
1:52:31maybe it needs to be modified at a state
1:52:33level. There are studies that show that
1:52:35kids that play in dirt and mud and
1:52:38leaves and [clears throat] tur and and
1:52:40you know all kinds of mosses and things
1:52:43within a month developed much better
1:52:46immune system.
1:52:47more concentration at school, much
1:52:50better outcomes in their everyday life.
1:52:53And I'll tell you one little story about
1:52:55something I witnessed a couple of days
1:52:57ago. I was at Rama Park and I look asked
1:53:00a few mothers that were there about six
1:53:02mothers what they thought about plastic
1:53:04turf. They're all opposed. Um and then
1:53:08uh their kids went and climbed on a
1:53:10tree, not flowered over the playground.
1:53:12Like kids climb on a tree. One kid was
1:53:14up there, the other one pushed him. He
1:53:16fell. He scraped his knee. Big crying.
1:53:18Everybody's upset. The mothers used that
1:53:22as a learning opportunity. Taught the
1:53:24one kid to apologize to the other one.
1:53:26Put them both on the treat so they can
1:53:28make friends. And the scraping of the
1:53:31knee became a real experience for these
1:53:34kids and a really valuable experience
1:53:36for these kids where you can't get it
1:53:38where everything is cushioned to the
1:53:40level that if you fall nothing happens
1:53:43and also your immune system is harmed. I
1:53:46don't know that this is in those
1:53:48guidelines. I and I think that was the
1:53:50intent of trying to prohibit it. I don't
1:53:53expect stuff to start paving our parks
1:53:55and and playgrounds with plastic turf. I
1:53:59don't think that was ever the intent,
1:54:01but I think the idea of saying no, we're
1:54:06not using it is beyond just advertising.
1:54:08It's something to say about the health
1:54:10of the city, the health of it children,
1:54:12and their future. Thank you.
1:54:16>> Okay. So, overall, I believe the report
1:54:19provides a good um starting point for
1:54:21this commission to put the council
1:54:23directive work. Um, however, I do not
1:54:27believe it provides enough direction to
1:54:30ensure that decisions are made
1:54:31consistently and transparently from the
1:54:34playground project uh to another. So I
1:54:38would encourage staff and and ad hoc to
1:54:41consider adding clear uh evaluation
1:54:44criteria, process for documenting
1:54:46decisions and guidance on how competing
1:54:50factors such as accessibility, safety,
1:54:53environmental impact, maintenance and
1:54:55life cycle costs will be balanced.
1:54:58Overall, I think uh there was a lot of
1:55:00good work put into this and I think
1:55:02it's, you know, it's as close to
1:55:05um what the council was uh directing us
1:55:08to do and um it's definitely as clear as
1:55:12to what the um the work plan was uh
1:55:15defined as as you as you mentioned,
1:55:18Sarah. So, thank you for the good job on
1:55:20it. Thanks.
1:55:24Okay, we'll move to item six.
1:55:28There's no other action you expect from
1:55:30us, right, on this?
1:55:32>> Well, yeah. The the the point of this
1:55:35discussion was to um for the PRC to
1:55:37provide feedback, right?
1:55:38>> Um to allow the community to voice
1:55:41feedback as well. Um you know, in the
1:55:45minutes, Council Member Rectal, you
1:55:48know, had an opinion on, you know, the
1:55:50artificial turf. I think the
1:55:52administration should be a policy
1:55:54decision but referred it to the PRC for
1:55:56feedback. So that's really up to this
1:55:59body to determine what the next steps
1:56:02are. Um and then also consider if it's a
1:56:06higher level policy effort, consider
1:56:09what is a realistic um level of of time
1:56:15and effort and how to how we would go
1:56:17about that.
1:56:18um we can certainly go back with the ad
1:56:20hoc and strengthen um these guidelines
1:56:23and try to make more clear evaluation
1:56:25criteria. Um they would still be
1:56:29guidelines. Uh so if that's the kind of
1:56:34direction um we're not taking an action
1:56:37item so we're not going to take a vote
1:56:39but um
1:56:42we're I think just want to walk away
1:56:44with some clear guidance kind of what
1:56:46what is the commission looking for and
1:56:48so if it's to strengthen the guidelines
1:56:51um to add more clear evaluation criteria
1:56:53we can certainly do that. um if it's a
1:56:56desire to develop a policy to ban
1:56:58artificial turf and go to know develop a
1:57:00like an ordinance over that that's
1:57:02that's a much higher level of effort. So
1:57:06um I think
1:57:10we're all maybe not in perfect alignment
1:57:13on the direction but we can certainly
1:57:16discuss with the ad hoc um further and
1:57:19kind of refine our approach.
1:57:22>> Yeah. Yeah. I think that's appropriate.
1:57:25Okay, thank you.
1:57:28Okay, move to item six.
1:57:31>> I think ju just for clarity I think
1:57:34which it sounds after hearing from the
1:57:37commission it sounds like we will
1:57:40reconvene with the ad hoc but currently
1:57:44we will continue working on guidelines
1:57:47is what I've heard and we'll strengthen
1:57:50them and bring it back to
1:57:51>> Exactly. Okay.
1:57:52>> Yeah.
1:57:53>> Okay. Thank you.
1:57:54>> Thank you,
1:57:58>> Mr. CL.
1:58:22Okay, we uh we'll take a 10-minute break
1:58:25and come back and address item number
1:58:29Next.
2:10:41number six, which is a park improvement
2:10:44ordinance recommendation for Quith Hills
2:10:48Nature Preserve Improvement Project.
2:10:52>> Yes. Thank you, chair. Um, good evening.
2:10:55I'm going to introduce uh Mega Ben Still
2:10:58for with the public works department.
2:11:00She's our senior engineer who's going to
2:11:03be walking us through the park
2:11:04improvement ordinance for uh Foothills
2:11:07Nature Preserve improvement project.
2:11:13Good evening chair and commission. Uh my
2:11:16name is Mika Bansil. I'm senior engineer
2:11:19with public works department. Uh joining
2:11:22me today also couple of city staff who
2:11:25are attending this meeting via Zoom. Uh
2:11:28Mike Warers, supervising ranger at
2:11:30Forals Nature Preserve and Chelsea Lexa,
2:11:33project engineer with public works
2:11:35department. So, we are here tonight to
2:11:38present to you the proposed improvements
2:11:40at Filills Nature Preserve and to seek
2:11:43your recommendation to the city council
2:11:46for approval of a park improvement
2:11:49ordinance for this project. Next slide.
2:11:54So, our presentation overview tonight
2:11:56includes u a brief background about the
2:11:59project. We will be summarizing some
2:12:02outreach efforts that guided the
2:12:04improvement of the
2:12:07guided the development of the
2:12:09improvement plan. U also some
2:12:11refinements that staff has made since
2:12:14you have last heard about this item in
2:12:17April of this year. Um and then some
2:12:20timelines and next steps and finally
2:12:22staff recommendation.
2:12:24Next slide.
2:12:27So um as you all know the Filills Nature
2:12:30Preserve was open to the general public
2:12:33in December of 2020 uh which resulted in
2:12:37significant increase in the number of
2:12:39visitors into the preserve and uh this
2:12:43impacted
2:12:44a few things including visitors walking
2:12:48off trail into sensitive areas. There
2:12:50were some safety concerns due to
2:12:52pedestrians sharing the narrow preserve
2:12:55road with vehicular traffic. Also, there
2:12:58were confusions due to lack of signage
2:13:00and unmarked parking areas as well as
2:13:04our rangers have been observing some
2:13:06traffic violations. So, this required um
2:13:10a need for visitors access safety and
2:13:12parking improvement. And this the
2:13:16proposed plan that we have in front of
2:13:18you today aims to improve access and
2:13:21safety while enhancing visitors
2:13:23experience and maintaining preserves
2:13:27natural character. Next slide.
2:13:33So this slide outlines the outreach
2:13:38conducted for this project since 2021. I
2:13:42won't go through all these meetings. Uh
2:13:46however, I would like to highlight some
2:13:49of the recent meetings um that um uh
2:13:54including key high key feedback received
2:13:57from this commission during
2:13:59anformational update in April of this
2:14:02year as well as follow-up uh meetings
2:14:06that we had with open space liaison in
2:14:09June and August of this year and staff
2:14:12made some refinements to address your
2:14:15comments. s which we will be reviewing
2:14:17in the next slide.
2:14:20Next slide.
2:14:23So on this slide you will see the left
2:14:26column includes key feedback from this
2:14:29commission in April of 2026 as well as
2:14:32some uh comments from open space liaison
2:14:36in June 2026. So one of the comment from
2:14:40the commission was to maintain preserves
2:14:43visual character and this was in
2:14:46relation to the crosswalks and speed
2:14:49humps proposed in the April meeting. We
2:14:52originally proposed eight crosswalks and
2:14:56uh seven speed humps
2:14:58which now in response staff has replaced
2:15:02six of those crosswalks with trail or
2:15:05pedestrian crossing signs on wood post
2:15:08without any pavement marking for
2:15:10crosswalks. Um as well as we have
2:15:12removed one crosswalk and removed two
2:15:15speed humps. There was also a comment
2:15:18from the commission in April to review
2:15:21other local preserve guidelines while
2:15:23incorporating these traffic control
2:15:25features and um this and staff has
2:15:29looked at uh some local and regional
2:15:32preserve guidelines including balance uh
2:15:35design guidelines, yuseity guidelines
2:15:37which was specifically mentioned in the
2:15:40previous meeting and also Bear Creek
2:15:43preserve guidelines and the proposed
2:15:46plan that we have is consistent with
2:15:48those guidelines. For example, the we
2:15:53will have lower height signs on wood
2:15:55post. The guidelines recommend having a
2:16:00designated pedestrian pathway separate
2:16:02from vehicular traffic for uh safety
2:16:05which we have in our plan. Also, the
2:16:08parking a areas should not be
2:16:10obstructing natural views. So by
2:16:13removing some of the parallel um gravel
2:16:17parking spaces along Boronta lake we are
2:16:21supporting that um guideline as well as
2:16:24the guidelines support includes includes
2:16:27including traffic coming features. They
2:16:30also do not have any standard design or
2:16:34standard guidelines for those features
2:16:37and they refer to applicable state and
2:16:40federal regulations for traffic safety.
2:16:43One of the comment made by the liaison
2:16:46was to use logs or natural looking wheel
2:16:49stop. Um and staff is utilizing existing
2:16:53logs where feasible as well as some
2:16:56concrete wheel stops.
2:17:00Um the in the second row uh there was a
2:17:02comment made by the commission to keep
2:17:04the gravel parking lot across Boron
2:17:07Lake. So this has been incorporated in
2:17:09the plan. Um the liaison had a comment
2:17:12to remove a section of the pathway uh
2:17:15along the new gravel parking lot across
2:17:18Boronda Lake that has now been removed.
2:17:20Also the liaison
2:17:23uh wanted to to relocate the vehicle
2:17:27turnaround area from the existing
2:17:30Boronda Lake parking lot which has now
2:17:32been relocated as well as the leaison
2:17:36had a comment to implement construction
2:17:38during bird's non- nesting season. So
2:17:41staff is proposing construction during
2:17:43the bird's non- nesting season between
2:17:46September through January.
2:17:49Next slide.
2:17:51So this is the proposed improvement
2:17:53plan. Many of these components are still
2:17:56the same as what you have previously
2:17:59reviewed. However, I will be going over
2:18:02these plan elements. Um and this this
2:18:06draft improvement plan has also been
2:18:09included in the PIO um which is attached
2:18:13to your staff report. So uh the plan
2:18:17includes designated pedestrian pathways
2:18:20uh connecting entrance Boronda Lake and
2:18:23Vista Hill areas which are shown by the
2:18:27pink line. Uh the pathways will be 3 or
2:18:304 ft wide.
2:18:32Um parking improvements includes uh
2:18:36existing parking reconfiguration and
2:18:38striping because most of the existing
2:18:41parking lot are not striped. So clearly
2:18:44delineating parking. Um we will also be
2:18:47removing some parallel gravel parking u
2:18:51near entrance and along Borunda lake as
2:18:56that as called out on this plan.
2:18:59We we are adding new gravel parking lot
2:19:03across Borunda Lake and we previously
2:19:06had a section of designated pedestrian
2:19:10pathway from that Y uh connection at
2:19:14Boronda Lake to the existing Boronda
2:19:17Lake parking that has now been removed
2:19:19per liazison's feedback. Um,
2:19:23additionally we had one accessible
2:19:27parking which is shown by the blue um
2:19:31square at existing Bond Lake. We have
2:19:35also added two additional accessible
2:19:37parking at the lower Vista Hill which is
2:19:40shown by the blue um squares.
2:19:46Um we will be adding additional benches
2:19:49u on Vista Hill which are shown on this
2:19:54plan by
2:19:56by black rectangle.
2:19:59Um additionally we have we will be
2:20:03removing access asphalt on the western
2:20:07side of the Vista Hill as shown on this
2:20:10plan. Um and finally we will have some
2:20:14traffic control features
2:20:17such as one crosswalk instead of eight
2:20:20crosswalks previously proposed at Vista
2:20:23Hill near so I'm sorry at um Boronda
2:20:27Lake near the accessible parking to
2:20:30provide safer access. Um the
2:20:35the the yellow diamond
2:20:38replaced the previously proposed
2:20:41crosswalks and those are the trail or
2:20:44pedestrian crossing signs on the side of
2:20:47the road for u for pedestrian safety. Uh
2:20:53and we will have some directional and
2:20:56trail crossing signs, striping as well
2:20:58as um a dirt curved dirt island at the
2:21:04south of Vista Hill which is shown by
2:21:07this brown um trapezoid
2:21:10um which is basically to enforce oneway
2:21:14traffic at that uh intersection.
2:21:18Uh also we have removed we are keeping
2:21:22five speed humps but we removed two
2:21:24speed humps based on the commission and
2:21:27u's feedback.
2:21:30So we have discussed this plan with the
2:21:33liaison in our August meeting and the
2:21:36liaison were supportive of the proposed
2:21:39refinements and they also supported
2:21:41proceeding with a PIO uh for
2:21:44commission's review. Next slide.
2:21:48So this slide uh just lists the proposed
2:21:52elements um that we just reviewed in the
2:21:55previous slide. I'm not going to go over
2:21:57these but the same information is
2:22:00included in the PIO document u uh with
2:22:04the staff report. Uh so this slide
2:22:07primarily serves as a written
2:22:09description of the proposed plan
2:22:11elements. Next slide.
2:22:14So in the next few slide um I will be
2:22:17going over some um photos illustrating
2:22:21the proposed plan elements. Many of
2:22:24these elements were pre presented to the
2:22:27commission in previous meetings. Um so
2:22:30I'll quickly go over all of these. U so
2:22:33as previously noted the plan includes
2:22:38designated pedestrian pathway in three
2:22:40or four feet wide. Uh the pathway
2:22:43material will be query fines. Um we will
2:22:47be utilizing existing boulders um or
2:22:50asphalt curb as safety bar barrier where
2:22:53feasible. Um as well as there will be no
2:22:58tree removal. Uh wherever there is a
2:23:00conflict with a tree gaps will be
2:23:03provided in the pathway. And the photos
2:23:06to the side are the query fines pathways
2:23:10in the Arashador preserve. Um and the
2:23:14photo at the bottom right corner is
2:23:18showing the gapped curb at Balance
2:23:20Nature Preserve. Next slide.
2:23:24As I mentioned, we will be reconfiguring
2:23:27configuring existing parking um at Vista
2:23:30Hill and Boronda Lake areas. Also, we
2:23:33will be removing the excess asphalt as
2:23:35shown in the left uh photo
2:23:39at Vista Hill as well as we will be
2:23:41clearly delineating parking to improve
2:23:44traffic flow and efficiency
2:23:47as shown in the right two right photos.
2:23:50Next slide.
2:23:53So this photo shows some parallel
2:23:56parking at near the entrance that we
2:23:58will be removing to accommodate new
2:24:00pathways and to provide safer and
2:24:03efficient um access and space. Next
2:24:07slide.
2:24:09This slide shows the existing condition
2:24:12across Bunda Lake and we will be adding
2:24:17a new gravel parking lot that would
2:24:19improve access to the lake as well as
2:24:21compensate for removed parallel parking
2:24:24in the Boronda Lake area. And the photos
2:24:27to the right show a gravel parking lot
2:24:30at Rao Preserve. Next slide.
2:24:35As I mentioned, there will be one
2:24:37crosswalk at Boronda Lake to provide
2:24:40safer access uh from the existing
2:24:43parking to the lake and um we will be
2:24:47using standard city uh crosswalk design
2:24:51which is shown this photo is from
2:24:54Balance Nature Preserve.
2:24:56Next slide.
2:24:59Um so majority of the
2:25:02previously proposed crosswalks have now
2:25:05been replaced with some trail crossing
2:25:08or pedestrian crossing signs. This photo
2:25:12shows
2:25:14example from another location uh that
2:25:17shows the trail crossing sign. This
2:25:19would be on a 5-ft uh pie
2:25:23post wooden post and this is to improve
2:25:27safety. We will not have any pavement
2:25:30marking like previously proposed for the
2:25:32crosswalk.
2:25:34Next slide.
2:25:38So we will also have some speed humps.
2:25:40As I mentioned, we have reduced um the
2:25:44speed humps from 7 to five now. And the
2:25:47speed humps will look similar to the
2:25:51photo to the right is the city standard.
2:25:53This is what we will be using for speed
2:25:55humps in terms of speed hump design. The
2:25:58photo to the left is from another
2:26:01location. Uh the sign would look similar
2:26:05to the left side photo not on a standard
2:26:09metal post but the design will be from
2:26:13the right side photo which is the city
2:26:15standard. Next slide.
2:26:18As I mentioned, there will be a new dirt
2:26:20island with asphalt curb at the
2:26:23intersection south of Vista Hill to
2:26:25enforce one-way traffic and to guide
2:26:28vehicles to stay on designated route.
2:26:31So, the photo to the left shows the
2:26:32location. Also, the right uh with the
2:26:35with the red dot shows the location and
2:26:38the photo in the middle or the exhibit
2:26:40in the middle shows roughly how the um
2:26:44the curved island would look like. Next
2:26:47slide.
2:26:50Uh so this commission also had a comment
2:26:53in the in April 2026 meeting u and the
2:26:58commission asked staff to confirm the
2:27:00squa review for proposed improvements.
2:27:03And as noted on this slide, uh the SQUA
2:27:07exemption for the project to the side uh
2:27:09to the left side, the squa exemption for
2:27:12the project was approved in February of
2:27:152025
2:27:16uh based on the original larger scope
2:27:19for the project and the current plan has
2:27:22been reduced in scope as well as impacts
2:27:26compared to the original plan which is
2:27:28shown on the right side. So for example
2:27:32uh we originally had four to six six
2:27:34feet wide pedestrian pathways along all
2:27:37preserved main roads and now the pathway
2:27:40with have been reduced to 3 to 4 feet
2:27:43and connecting only three areas entrance
2:27:46Borontella lake and Vista Hill which are
2:27:49uh higher use areas as well as the
2:27:52previous plan included tiger teeth
2:27:54spikes on Vista Hill at that oneway
2:27:57intersection now that has been replaced
2:27:59with a dirt island with asphalt curb. Um
2:28:04the original plan included asphalt
2:28:07parking lot across Bond Lake which has
2:28:09now been changed with uh gravel parking
2:28:12lot across the lake. Also we had
2:28:15standard traffic control features eight
2:28:18crosswalks and seven speed humps. So the
2:28:20numbers of the crosswalks and speed
2:28:23humps have been reduced. Uh the original
2:28:26plan included five trees u for removal.
2:28:30We have no no trees will be removed as
2:28:33part of the current plan. Also we are
2:28:35removing extra asphalt um at at Vista
2:28:40Hill. So based on these changes, staff
2:28:42determined that there are no new or
2:28:45significant impacts that would warrant u
2:28:49additional SQA review and staff also
2:28:52reviewed the squa information with the
2:28:55open space liaison in June. Uh so as
2:28:59additional precaution in coordination
2:29:02with the liaison construction for this
2:29:05project will be planned during the
2:29:07bird's non- nesting season between
2:29:10September and January.
2:29:12So next slide. So now some timelines and
2:29:16next steps. Um once the commission
2:29:19recommend the park improvement ordinance
2:29:21to the city council tonight, uh staff is
2:29:24planning to take this PIO for adoption
2:29:28by the city council sometimes in
2:29:30November and the final design and bid
2:29:33document preparation will be completed
2:29:35around spring of 2027 and bidding and
2:29:38contract award would be by September
2:29:412027 and construction in fall of next
2:29:45year.
2:29:46Next slide. So here we have staff recom
2:29:51staff recommendation that the parks and
2:29:53recreation commission recommend adoption
2:29:56and approval of a park improvement
2:29:58ordinance to the city council for access
2:30:01and safety improvements at Foothills
2:30:03Nature Preserve. And next slide. I think
2:30:07that concludes staff presentation and
2:30:10I'll turn it over to you chair for
2:30:13questions and comments.
2:30:16very good report and very good job on
2:30:19the presentation. I especially enjoyed
2:30:22the having that I think it was slide
2:30:24number four number and there was another
2:30:26slide that had comments and refinements
2:30:29that sort of talked about what we
2:30:32recommended during the your visit with
2:30:34us previously and what areas have been
2:30:37addressed. So that made it very clear
2:30:39that also wiped out about 60% of the
2:30:42general question I was going to ask. Oh,
2:30:44that's okay. So, I'll now before we go
2:30:46to public comments, I would like to open
2:30:48it up to the rest of commissioners for
2:30:52any clarifying questions.
2:30:59Okay. Well, I'll start it off with one.
2:31:02Um so the 2023 report um anticipated
2:31:06that the that Vista Hill parking would
2:31:09decrease from 35 to 34 spaces. Veronda
2:31:13Lake uh would increase from
2:31:15approximately 21 25 to 31 spaces and
2:31:19total preserve parking would increase
2:31:21from approximately
2:31:23uh 355 to 360 spaces. Do those numbers
2:31:28still apply to the revised plan? And um
2:31:33could you provide the current and
2:31:36proposed counts at each affected
2:31:40location? But the numbers are pretty
2:31:42close. I maybe that's not necessary.
2:31:48I just want to see if there was a
2:31:49reduction in the number of parking
2:31:52spaces. Uh yeah, I can u u I can answer
2:31:58that question and probably Mike Warner
2:32:00can um also add to that. So the total
2:32:04existing parking um include 292
2:32:10unreserved and 83 reserved parking
2:32:13spaces. And with the proposed uh plan,
2:32:18we are
2:32:23uh I'm sorry, let me just Yeah, we are
2:32:26not changing the reserved parking. In
2:32:29fact, we are not
2:32:32we are Let me just pull that plan.
2:32:52Um, Eric, can you pull slide number 34
2:32:57in the extra slides?
2:33:06Yeah. So this was a plan proposed to the
2:33:10park and rec commission in October of
2:33:132025
2:33:14and at that time we were we removed the
2:33:18proposed
2:33:19new gravel parking lot. So in the
2:33:22Boronda Lake area after removal of the
2:33:26parallel gravel parking spaces we will
2:33:29have no net change in parking. However,
2:33:34in the entrance, we are removing nine
2:33:37gravel parking uh spaces. Those are the
2:33:40only that is the only change in parking.
2:33:43So, we have overall reduction of nine
2:33:45parallel parking spaces because
2:33:48everywhere else in the Boronda Lake and
2:33:52uh Vista Hill areas, we are only
2:33:54delineating existing parking.
2:33:58>> Okay. Thank you. That clears up. Uh and
2:34:01my last cl uh clarifying question, what
2:34:03happened to the um the fencing and re um
2:34:07resource protection measures? Um the
2:34:092023 report identified split rail
2:34:13fencing and um Ronda Lake pedestrian
2:34:16connection as an important measures to
2:34:19prevent visitors from creating hazardous
2:34:22shortcut trails to the sensitive
2:34:25habitat. And so I'm just saying these
2:34:28elements are not clearly maybe I missed
2:34:30them. They're not clearly included in
2:34:32the proposed ordinance.
2:34:34>> Yeah. So the split rail fencing was part
2:34:37of 2023 plan but staff has already our
2:34:41park rangers have taken care of. They
2:34:43have installed the uh split rail fencing
2:34:46and I'm not sure Mike if you are you
2:34:50want to add something to it.
2:34:52Yeah, I'll add um we went ahead with a
2:34:55smaller reduction about 200 feet of
2:34:59fencing down by the Y intersection.
2:35:02the proposed fencing running from the Y
2:35:04intersection all the way to Vista Hill
2:35:08uh was felt that it would be uh too
2:35:10excessive and we've have since put uh
2:35:13boulders along the road and about four
2:35:16or five signs uh asking people to stay
2:35:19out of the area and it's been pretty
2:35:20effective um and we haven't seen the
2:35:23creation of too many social trails.
2:35:26>> So they've been effective is what you're
2:35:28saying?
2:35:28>> Yes. We we we've taken minor corrective
2:35:32actions that are less uh impactful on
2:35:35the landscape.
2:35:37>> Okay. Thank you.
2:35:39>> Okay. That's any other commissioners for
2:35:42clarifying questions? If not, we'll go
2:35:44to public comments.
2:35:51We do have one public comment. Um it
2:35:54will be David M.
2:36:04Thank you, commissioners. Uh, I was on
2:36:06the parks and recck commission for six
2:36:08years ending 2021, just after this park
2:36:11was uh uh open to the public. And it's
2:36:15been six years since we recommended that
2:36:22these safety measures be adopted. And I
2:36:25strongly recommend that you adopt this
2:36:28PIO. It's about time. And I want a
2:36:34little bit of additional stuff put into
2:36:36this PIO so that we don't have to wait
2:36:39another seven years for these additional
2:36:42safety measures. The most important
2:36:45safety measures besides the uh the
2:36:48roadway is that purple line that uh goes
2:36:53uh goes along the pathways, the pathways
2:36:56along the road so that um families do
2:37:00not have to walk into the into the
2:37:02roadway to get from Vista Hill and and
2:37:06the entrance to Bar, but I want an an
2:37:10additional stretch from the bottom of
2:37:12the dam am to Orchard Glenn uh picnic
2:37:16area along the road. It's uh um it's an
2:37:21important additional stretch. In
2:37:24addition, um I want to make sure that we
2:37:27get one of those gravel fine um pathways
2:37:32to complete around the bar lake because
2:37:36many people try to walk across the grass
2:37:40lawn and it's rough and it's wet and
2:37:44it's there are ticks and um it's very
2:37:49difficult for families to get all the
2:37:51way around. and it's a very popular
2:37:53thing to do to mo move around move uh
2:37:56walk around the lake. So those additions
2:38:01um on top of the things that we talked
2:38:03about here are really important and I
2:38:06don't want to wait another seven years
2:38:08for that to happen. And I know some of
2:38:10this was because of u worries about oh
2:38:14we don't want to disturb nature and cut
2:38:17down trees and none of this does that
2:38:20which is wonderful. and the others uh
2:38:23cost and I think it's just another 20 or
2:38:26$30,000 to add that additional stretch.
2:38:30It's not a huge amount of money. So I
2:38:32think between now and the final design
2:38:35in spring, we should add those
2:38:37additional uh safety measures um to this
2:38:42proposal. Thank you.
2:38:47>> There are no more speakers at this time.
2:38:49>> Okay. Uh David, thanks for your comments
2:38:51and also thank you for your service on
2:38:53the uh commission a few years ago. So,
2:38:55thank you. Um I'll open it up now for
2:39:00general questions from the commission.
2:39:03Commissioner Smith,
2:39:06I think what David just mentioned really
2:39:08makes a lot of sense because uh that's
2:39:11one of my favorite things, especially
2:39:12when the kids were smaller to go right
2:39:15around. And you're right, it's it's all
2:39:18the things uh you mentioned, plus it can
2:39:20be slippery and uh so I I would think
2:39:24that would be a nice addition. I would
2:39:26be for that.
2:39:31Uh, Commissioner Klein House. Well,
2:39:34>> this project went through a lot of
2:39:36iterations and the liaison for this was
2:39:39Jeff Greenfield and I and when Jeff
2:39:42Greenfield
2:39:43um turned out then uh Commissioner Axent
2:39:47W and I continued working with staff
2:39:50during that time. Um the city council
2:39:55actually changed the project and staff
2:39:59over many many iterations of what would
2:40:02be the best um project made a lot of
2:40:07changes. Some of those we've seen but
2:40:09there was even one that had a little
2:40:11trail in a wetland like almost in a
2:40:15stream and they removed that. That was
2:40:16good and it didn't really change the
2:40:19time for people to or accessibility.
2:40:22[laughter]
2:40:22Um so
2:40:25given that this is a nature preserve and
2:40:28some of the public comment we heard was
2:40:31about the aesthetics of the place about
2:40:33keeping it natural about minimizing this
2:40:35project. So from six feet we moved to
2:40:39three feet to four to three to four I
2:40:41think and uh the extensive amount of
2:40:45asphalt in some areas was going is going
2:40:48to be removed as part of this project
2:40:50and that's fabulous. There is areas
2:40:53there that kids just go in with cars and
2:40:55just ride around in circles and stuff
2:40:57and that may be fun but maybe not
2:41:00appropriate for a nature preserve. So
2:41:03there are a lot of changes that were
2:41:05made through this process both from city
2:41:09council direction and some work between
2:41:13the liaison and stuff. Um so
2:41:19part of the requests
2:41:22that uh former commissioner Moser has
2:41:26made were actually considered and
2:41:28rejected
2:41:30either by staff or by the commission uh
2:41:34the leazison and um just making things
2:41:39easier for people does not actually give
2:41:42them a natural experience and that was
2:41:45one of the things that we considered but
2:41:48you know you can have staff also respond
2:41:50to the budget issues which was part of
2:41:54it and [clears throat]
2:41:56um to the actual need of where where the
2:41:59problems are. Most people don't drive
2:42:01beyond B on the lake. Most people that
2:42:04walk on the grass, so what? That's what
2:42:07it's there for. It's for them to play
2:42:08and walk. So I think and there is
2:42:12actually a way to go around the lake if
2:42:14you want to because it goes the path
2:42:16goes around the lake. It goes up to
2:42:19where the
2:42:21uh entrance is and then you can walk
2:42:22back on the new to be created path. So
2:42:27anyway, that's my comment on this. It it
2:42:30makes sense if you're not there all the
2:42:32time and I am and a lot really and so I
2:42:36see how people behave and talk to stuff
2:42:39about that and so did Jeff Greenfield.
2:42:42So that's my comment.
2:42:46>> Any other commissioners and general
2:42:47comments? Commissioner Axel right? Yeah,
2:42:51I got involved uh more recently, but I
2:42:53just wanted to uh really commend staff
2:42:56on being responsive to our desire to
2:43:00keep things much more natural uh and to
2:43:04amend the plans to go along with that.
2:43:07Uh I don't think I was privileged to the
2:43:10round the lake discussion but um maybe
2:43:15Mike if you're around because you're
2:43:17there all the time if you can just give
2:43:19a a word or two on your thoughts on
2:43:22people going around the lake.
2:43:25Um the traffic pattern around the lake
2:43:28is pretty popular and that's why we
2:43:30propose the um trail alignment going
2:43:33from the front entrance back along the
2:43:35road to the parking area.
2:43:39um because I think that was in alignment
2:43:42with what was felt by the commission at
2:43:44the time to minimize uh ecological
2:43:47impact and that was that's eventually
2:43:50the route that most people usually end
2:43:52up taking is they come off of the path
2:43:54from around behind the lake and then
2:43:56follow the road back to the parking
2:43:58area. So, we're just trying to get
2:44:00people off of the road in that that
2:44:02area. But either way, I think a a trail
2:44:05either through the turf back to the
2:44:08parking area or along the road will be
2:44:09popular with folks. Um because
2:44:13inevitably seems that humans like to
2:44:16make uh loop trails
2:44:28>> any others commission.
2:44:32Um, thank you for the presentation. I
2:44:34have a safety question. I appreciate our
2:44:37effort to preserve the natural character
2:44:39of foothills, but since we removed
2:44:42several crosswalks and speed humps from
2:44:45the earlier design, um, can you please
2:44:48explain how we determined that the
2:44:50remaining measures are sufficient from a
2:44:53safety perspective?
2:44:57>> Uh, yes. So we did review commission's
2:45:01feedback with office of transportation
2:45:04and for u uh for majority of these
2:45:08crosswalk location we since it is a
2:45:11nature preserve um and lately
2:45:16I know the visitation was significantly
2:45:18higher when we opened the preserve but
2:45:21not um at the same level. So uh with
2:45:25their input we came up with the trail
2:45:27crossing sign as warning signs. There
2:45:30will be some signs here which would um
2:45:33give warning pedestrian crossing ahead.
2:45:35So all of these things are going to
2:45:38provide that safety measures. Uh also
2:45:41the speed humps in two locations that we
2:45:44removed u were not necessarily needed at
2:45:49those locations because we again have
2:45:51some trail crossing signs and uh within
2:45:57a certain distance we have another speed
2:45:59hump. So we have evaluated all of these
2:46:03safety measures with the office of
2:46:05transportation as well.
2:46:08>> Great. Thank you.
2:46:14>> Any other Commissioner Brown?
2:46:18>> Just um thanks for the very wonderful
2:46:21presentation. I also like the format of
2:46:23what we what was heard last time and
2:46:25what was addressed. Um is there any
2:46:28other um comments from staff about the
2:46:31comments raised by former commissioner
2:46:33Moss and I was fortunate to serve with
2:46:35him. So thank you for your guidance then
2:46:37and now. Uh any other comments that
2:46:40staff would like to address on the item
2:46:42raised
2:46:44budget or other considerations?
2:46:47Anything?
2:46:50>> Yeah, I'll I'll just speak. It's also
2:46:52within your packet um because we did
2:46:55receive a public comment um through the
2:46:58commission email. Um and I addressed at
2:47:03length kind of some of some of these
2:47:05items, but um I think one of the key
2:47:08component a lot um Commissioner Klein
2:47:11House addressed um given city council
2:47:14direction to reduce the scope um staff
2:47:17is not recommending adding additional
2:47:19trail segments to the current project at
2:47:21this stage, the pedestrian connections
2:47:25um Mr. moss identified can be um
2:47:28retained and considered at as a part of
2:47:31a future project um and improvements to
2:47:35the preserve at at a later time.
2:47:39>> Thank you. Um no further questions.
2:47:43Thanks.
2:47:44>> Yeah. Yeah, just to tag in on that. I I
2:47:47did see the your comments uh to um David
2:47:51on that. Could you um so and I think you
2:47:55just mentioned that the improvements
2:47:57cannot be included now. Um but my
2:48:01question would be how does staff propose
2:48:03to preserve and evaluate that
2:48:05recommendation for a future phase?
2:48:08of it.
2:48:36Um thank you for bearing with us. I
2:48:39think what um
2:48:43we will con we'll see how uh successful
2:48:46this project is and then we will
2:48:48re-evaluate and um there is a standing
2:48:52line item for further uh foothills park
2:48:55improvements which is already captured
2:48:58in our CIP in a later uh within that
2:49:015-year plan and um could be added at a
2:49:05later time if um that's needed to be
2:49:08incorpor incorporated.
2:49:10>> And let me ask you, do you think is this
2:49:12is the obstacle primarily
2:49:14construction cost, staff time, design
2:49:17and engineering work, environmental
2:49:19review, or
2:49:21>> what's needed for I guess additional
2:49:22>> all of the above.
2:49:23>> All of the above. Yes.
2:49:24>> Okay. So, it's a little bit more
2:49:26involved than what we Okay. But the key
2:49:28here is that
2:49:30>> it's not going to it will be something
2:49:31that um could be resurfaced at some
2:49:35future point in time. Okay. And come
2:49:37back to the commission with that. Okay,
2:49:39great. Good.
2:49:41>> Any Okay, Commissioner CL,
2:49:43>> one comment and a question. The comment
2:49:46is that the extension, this is for our
2:49:50information. It's not really a question
2:49:51for stuff, but you may answer. Uh the
2:49:55area
2:49:57that is further down for the dam
2:50:00is kind of really difficult to to build
2:50:03in and it would cost a lot. It's really
2:50:06a a wet a little wet land along the
2:50:08road. So, it's not easy to fill a
2:50:10wetland and it's not just oh just pave
2:50:14it. There is a lot of um complications
2:50:16to that. But that was just a comment. My
2:50:20question is back to the um commitment
2:50:24to build the project outside of the bird
2:50:28nesting season. So the staff report say
2:50:32says that we're planning to construct
2:50:35construct the project during the
2:50:36September to January non-breeding
2:50:39season. That's great. But the ordinance
2:50:42does not require that timing and since
2:50:46the project was approved by SQUA, if I
2:50:49remember correctly, it was exempt. So it
2:50:52didn't actually require mitigation for
2:50:55the nesting season. So, um I would like
2:50:59to know how do we make sure that this
2:51:02actually is constructed outside of the
2:51:05birding nesting season.
2:51:12We can since the PIO included with the
2:51:16staff report is a draft PIO, we can add
2:51:20that language to the PIO when we go to
2:51:22council for adoption.
2:51:24>> Wonderful. Thank you.
2:51:27Okay, maybe I missed this, but if I did,
2:51:29sorry, it's late. Um, the the uh 2023
2:51:33plan included bicycle parking at the
2:51:36interpreted center, uh, Archery Clan and
2:51:39Vista Hill. Is the bicycle parking still
2:51:42part of the project?
2:51:45If not, was it removed?
2:51:47>> Bike parking is not part of the current
2:51:51plan. However, I believe Mike can speak
2:51:54for it, but uh park rangers have
2:51:57included some bike parking. Mike, would
2:52:01you like to add to that?
2:52:03Yeah, the bike parking. We've added some
2:52:06bike racks both at the interpretive
2:52:08center and a couple of the main parking
2:52:11lot areas within Foothills in um
2:52:15congruent to
2:52:17the I think it was the ad hoc uh
2:52:20committee's recommendations a few years
2:52:22ago um for adding bicycle parking at all
2:52:26of our facilities. Um, so there's
2:52:29there's a couple bike racks located at a
2:52:32few key points, but it wasn't a part of
2:52:35uh if it was, I think we pulled it out
2:52:37because of we're duplicating work um
2:52:40between the ad hoc committee's
2:52:42recommendations and the improvement
2:52:44plan.
2:52:46>> Yeah, thanks for the memory jogger on
2:52:47that one. I was I was only on that one.
2:52:50So yeah, thank you. Otherwise, you would
2:52:52like and I forgot it.
2:52:54So uh my last question would be um how
2:52:56much authority would the ordinance give
2:52:59staff to modify
2:53:01the plan later? You know the or the
2:53:04ordinance says the improvement would
2:53:06generally consist of the listed elements
2:53:09and the attached plan is marked not for
2:53:12construction. Which which elements and
2:53:14locations would be fixed by adoption and
2:53:17what changes be made during the design
2:53:20without returning to the commission or
2:53:22the council?
2:53:32I think um it's that's an interesting
2:53:34question. I think the ordinance is what
2:53:38the city staff will be executing on. Um
2:53:42and I I but however locations I think
2:53:47Mega you want to maybe speak to? Yeah,
2:53:51the locations might be you know those
2:53:55are approximate locations when we do
2:53:57final design the locations of signs and
2:54:01some of those things that's why it is
2:54:03generally included in the PIO so we
2:54:06might need to make some changes based on
2:54:10design constraints or site constraints
2:54:13>> so you do have a little bit some
2:54:14flexibility that you're saying
2:54:16>> I believe so yeah Okay. All right.
2:54:21That's it from me. Anyone else? I again,
2:54:24good job. It was uh Oh, Commissioner
2:54:27Den,
2:54:29>> one last question. Um, so did we
2:54:33establish a baseline safety or visit
2:54:37visitor data now? then maybe you know
2:54:41you can come back and report um after
2:54:44implementation so we can keep tracking
2:54:47if those investments actually worked.
2:54:55I think um I think our park rangers will
2:54:59definitely be evaluating and will be
2:55:02able to provide updates to the parks and
2:55:04recck commission on the plan and as we
2:55:08re-evaluate for our capital plan moving
2:55:12forward. So definitely
2:55:15>> yeah I I understand we're working on a
2:55:17very tight budget. So, I would encourage
2:55:19our staff to leverage maybe a
2:55:22cooperative purchasing policy and if we
2:55:26have any best practices from other
2:55:29neighboring regional
2:55:31areas.
2:55:34>> Thank you. I one other question.
2:55:38>> Sure. That was not obviously not in the
2:55:41scope of this. It's just sort of related
2:55:43to prior discussions and I think it was
2:55:46when David was still on the commission.
2:55:47We were talking about the bathrooms at
2:55:49the front entrance and they were looked
2:55:51into and it turned out to be a much
2:55:53larger endeavor than was anticipated.
2:55:58And I I think it was it was not going to
2:56:02be worth the amount of effort that it
2:56:04was going to take at that time. I just
2:56:06wondered if that was something that came
2:56:07up as part of this discussion with the
2:56:09ad hoc or staff or was being explored
2:56:12out in another avenue.
2:56:17So we do have a hotel uh nature preserve
2:56:21restroom replacement CIP in future
2:56:24years. I believe it is in fiscal year 28
2:56:29through 2030 or 31.
2:56:34>> So at that time we will be evaluating
2:56:37replacement or refurbishment of these
2:56:40bathrooms. All three bathrooms are
2:56:43included in that CIP.
2:56:46>> Great. Thank you. I know it's not
2:56:47directly safety related, but I remember
2:56:49it came up in these discussions um in
2:56:52the past and so I just wanted to check
2:56:54on the status. Thank you.
2:56:56>> Thank you. Thank you. Thanks again for
2:56:58very informative um presentation. So
2:57:01what's needed from us at this point?
2:57:03>> We we need a to call a vote and if you
2:57:06can um Yeah, perfect. And I think
2:57:11commissioner Yeah. So we need a motion.
2:57:15Um a second and then a roll call. And I
2:57:19think capturing it sounds like with um
2:57:24one amendment to the PIO that we heard
2:57:27is just including the outside of the
2:57:32bird nesting season. um adding that to
2:57:35the draft is
2:57:37>> do I have a motion?
2:57:41>> So I'll move to approve the PIC with the
2:57:46amendment about the bird language to be
2:57:50included.
2:57:52>> Do I have a second?
2:57:54>> A second.
2:57:55>> Okay. You want to speak to your motion
2:57:57or
2:58:00either one of you?
2:58:02>> I think we've said what needs to be
2:58:04said. Okay. Thank you.
2:58:06>> I want to say something. I want to
2:58:07really appreciate stuff's work on this.
2:58:10They've been open to so many revisions
2:58:12and so many comments from so many
2:58:14people. That was quite u an effort and I
2:58:18really appreciate how attentive and how
2:58:21they came up with the revisions and
2:58:23walked the area with us and invested a
2:58:26lot of time a lot of effort. Thank you.
2:58:29>> Yeah, I think there was two one ad on
2:58:33was was it one ad hoc that was here on
2:58:35this?
2:58:36>> It wasn't an ad. It's leazison. Oh,
2:58:38sorry. It was so long ago. I don't
2:58:39remember.
2:58:40>> It was um first it was I think only um
2:58:46Jeff Rfields and then it was me too and
2:58:48then it was only me and then it was a
2:58:52lot of
2:58:52>> All right, we got to we got
2:58:53>> a lot of iterations.
2:58:55>> Okay, we go to vote then.
2:58:57>> Yeah.
2:58:57>> Okay. Um Commissioner [clears throat]
2:58:59Brown,
2:59:01>> yes.
2:59:03>> Um
2:59:05Chair Freeman,
2:59:06>> yes. Okay. Uh, Commissioner Axelrod,
2:59:10>> yes.
2:59:12Uh, Commissioner Klein House,
2:59:13>> yes.
2:59:15>> And Commissioner D,
2:59:16>> yes.
2:59:18>> Okay, that is uh 52.
2:59:22So, motion carries.
2:59:25All right, thank you.
2:59:29Okay, we'll move to the next item on the
2:59:31agenda, which is uh commissioner
2:59:34questions, comments,
2:59:36announcements of future meetings and
2:59:38agendas. Anything from commissioners of
2:59:41any announcements that you want to make
2:59:43to the commission?
2:59:45There'll be a no. So, we'll go to Sarah
2:59:48as we talk about future meetings and
2:59:52agendas.
2:59:54>> Um, great. So for next month we have on
2:59:58the slate if we can turn it around the
3:00:01uh we'll revisit the guidelines for um
3:00:04the topic that we discussed this evening
3:00:07for playgrounds
3:00:09um with a Titan criteria in addition to
3:00:13um aformational
3:00:17uh presentation
3:00:19uh that will be joint with staff along
3:00:22with the friends of PaloAlto parks um to
3:00:26to discuss and daylight the foothills
3:00:29improvements
3:00:31um for the exhibits within the
3:00:36interpretive center there. Um so those
3:00:39are the two items that we have uh slated
3:00:43for next meeting. Um, in addition in I
3:00:48[clears throat] know November we have
3:00:49quite a few that um we're looking at
3:00:53which is including uh a turf uh pilot
3:00:57turf natural grass uh turf pilot update
3:01:01in addition to a gsi
3:01:04um discussion a green storm water
3:01:07infrastructure project um that will be
3:01:12um discussed at uh on Briona's Park. Um
3:01:17there's also going to be a um new
3:01:22grouping. So I think we'll need to vote
3:01:25also for chair and vice chair um at that
3:01:29time. So I I those are the items that
3:01:34are slated and upcoming. And then once
3:01:36the new um commissioners are seated,
3:01:40we'll also need to discuss um if
3:01:43December will be a special meeting and
3:01:46moved up and who will be around for
3:01:49that. So um
3:01:53that's what we have for now.
3:01:55>> Think that pretty much covers it. And
3:01:59that could change. I mean, some of the
3:02:00things in November could change, but
3:02:02>> we think that um
3:02:04>> October we're in pretty good shape on
3:02:06that one.
3:02:07>> Okay. Are there any um public comments
3:02:11or items not on the agenda?
3:02:14>> There are no additional comments at this
3:02:15time.
3:02:17>> Okay. Any commission? Oh, I'm sorry.
3:02:20>> Just a request for another update on the
3:02:23um Sleuth Gates and what's happening. So
3:02:26if you can give it I get a lot of
3:02:29requests for that. So please another
3:02:31update.
3:02:33>> Yeah, we can include in the departmental
3:02:36report. We can include that in the
3:02:38departmental report.
3:02:45Okay. Um we're joined.