2026-10-20 - City Council Special Meeting
Summary
Based on auto-generated captions; names, numbers and details may be misheard.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| New Development Services Department | 46 | 100% |
- Tuesday, October 20, 2026, called to order at 6:15 p.m. with a hard stop at 7:00 p.m. for the regular business meeting.
- The captions list six councilmembers present: Council President Stewart, Vice President Nuevacamina, and Councilmembers Forsythe, Kritzer, Parsi and Prakriya.
- Mayor Birney presided over a staff panel.
- The recording runs from 0:21 to about 46:24 with no gaps.
New Development Services Department
0:37-46:24
- Question-and-answer session only (no presentation, no vote), continuing questions from the previous Tuesday.
- Kritzer and Parsi asked why service level agreements (SLAs) and an empowered new public works or planning director could not fix permitting without a new department, and whether it creates silos. Staff said a unified team under one director is the foundation and SLAs would still be needed for cross-department coordination.
- Chris Stenger (name approximate) explained upfront public and private coordination, a Marysville comparison, Growth Management Act targets and why public works emergencies slow development review.
- Parsi asked for a smaller scoped start and for other options to be evaluated first; she compared the plan to replacing a car when the problem is a flat tire.
- Prakriya questioned the $2.5 million startup estimate; Cochran (Finance) said it is a worst case that may not be needed. He also asked about permit data; staff said the permitting software can report permit times now and later.
- Nuevacamina asked who championed the plan and who dissented, and questioned adding management layers with eight administrative positions; the mayor described an iterative process after the October 2025 Matrix study, and staff said supervisors and administrative support would raise productivity.
- Stewart said she has process and size concerns but considers the direction right; Kritzer and Prakriya also leaned in favor.
- Close: the mayor hopes for at least four councilmembers in support and said time is set aside in Thursday's budget meeting. Councilmembers did not agree whether to use it for budget implications or more questions; the meeting adjourned with the item scheduled for Thursday.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:21I'm calling this meeting to order. This
00:22is a Redmond City Council special
00:24meeting held on Tuesday, October 20th,
00:262026 commencing at 6:15 p.m. Council
00:29members in attendance are Council
00:30President Stewart, Council Vice
00:31President Noeva Camiña, Council members
00:33Forsyth, Kritzler, Pearcy, and Prakriya.
00:37This meeting is being held for the
00:38creation of a new department to support
00:40improved development service functions,
00:43and I have the team here uh to take
00:45questions from Council. We don't have a
00:47presentation this evening, but we wanted
00:48to continue the conversation that you
00:50had last Tuesday. Um and prior to that
00:54as well. So, um I'd love to open it up
00:56to Council members uh to have your
01:00questions answered. I will remind
01:02everyone that we do have a hard stop um
01:03at 7:00 for our regular business
01:05meeting.
01:07So, anyone uh with a question and I will
01:09go around the table so everyone will
01:11have an opportunity to ask a question.
01:13I'm going to make sure everyone gets an
01:14opportunity before any second questions
01:16are asked.
01:31Council member Kritzler.
01:33>> I'll kick us off. Um thank you so much.
01:35I appreciated the the follow-up on the
01:37questions that we asked in the last uh
01:39meeting.
01:41A few questions that um kind of stood
01:43out to me um following up on some of
01:45those. Um in particular, I you know, I
01:47um the question that I had asked around
01:50how do we make sure we're not creating
01:52new silos
01:54um and the response about the SLAs that
01:57that'll be set up in that that
01:59structure. I guess um one follow-up
02:01question that I had on that um and then
02:04maybe I'll I'll pose a similar question
02:06related to it. Um
02:08>> [clears throat]
02:08>> is
02:10in moving to this structure I guess the
02:13question is
02:14if
02:15if we can create SLAs to address the um
02:20uh
02:20any silos that might get created, why
02:22don't we just use SLAs in our current
02:25structure um to be able to address those
02:28issues instead of moving everyone
02:29together in one place and then creating
02:32a whole new set of SLAs
02:34um going another way. Um
02:38and similarly, I think one of the other
02:40answers to a question around um
02:43uh you know, the
02:44the importance of of moving to this new
02:46department and creating this new thing
02:48was specifically to have one director
02:51who could make decisions.
02:53And I guess my question is is also um
02:56related to that, why couldn't we use our
02:58current structure and just give
03:00authority to someone, especially since
03:02we're currently hiring
03:04a new public works director and a new
03:05planning director.
03:07Could we hire for
03:09one or the other of those that has the
03:10skillset to be able to be the person to
03:12make those decisions? Um and and I
03:15really am asking this as a curiosity if
03:17you can explain why you think that that
03:20both of these things would be better
03:21with the new structure and with with a
03:24with an additional leader on top of
03:26that.
03:28>> Jeff, would you like to answer that
03:29since you've had some history?
03:32>> I I can start. I think uh
03:36a partial answer to both questions is
03:37that
03:39you want to have the the foundational
03:40structure in place to give
03:42staff the the best chance possible of
03:45success.
03:47And I think having a
03:49uh
03:50a unified team under one director um is
03:53part of that and and starting there,
03:58um you develop SLAs to address the
04:01cross-departmental coordination that
04:03that is still going to be required in
04:05any in any setup. Um I think one thing
04:07that that I know from experience is that
04:10we have
04:11done reorganizations in the past and not
04:15set up service level agreements and that
04:18has resulted in um
04:21a a considerable amount of
04:23friction in process.
04:25Um and
04:28And so so it is in in any scenario, I
04:31think important to to set those up for
04:34all the cross-departmental coordination,
04:36but fundamentally, I think you need to
04:37start with the
04:39the organizational structure that is
04:42uh
04:43going to give you the best shot at
04:45success for for the work that needs to
04:46be done.
04:50>> And I appreciate the question, council
04:51member Kreutzer.
04:53I think most importantly, we have to
04:54understand that overall, generally,
04:56we're looking at the economy of time
04:57here. And when we have everything under
04:59one umbrella, we do have that single
05:01decision-maker, and as things do get
05:04handled at lower levels, however, if
05:05there's something that needs to be
05:06deconflicted, they're all warehoused in
05:09the same location or
05:11officed in the uh same location, and we
05:13think that uh
05:15by having that, it's going to work a
05:17little bit more cooperatively, so we
05:19won't have those silos, and then again,
05:21capitalizing on that economy of time and
05:23making more than certain that we get to
05:24the decision-maker if necessary to
05:27deconflict whatever has to be done.
05:30>> Thank you. And if if the chairwoman, I
05:32I'd love to make a comment. Um and I I
05:35appreciate those answers.
05:37Um and I I did some thinking since our
05:39last conversation, and I just wanted to
05:40share my current perspective on this,
05:42which is you know, it seems like the
05:44team and we we have a really smart team
05:46of people here at the city have thought
05:48through a an ongoing problem and how it
05:51is that we do uh improve this. And I
05:54have heard from from folks about
05:57projects that just have never happened
05:59because they've gotten so stalled
06:00through our different processes and
06:02we're trying to do something different.
06:04And in doing something different, it may
06:06take doing something bigger. And so I
06:08just I just also want to express
06:09appreciation for
06:11thinking through what we could do
06:12differently and it I guess recognizing
06:15it may not all work out exact and I I
06:17like the idea of the change management
06:19and making sure that we kind of know
06:21what we're we're looking at as the
06:22risks.
06:23Um but I I guess I just want to say that
06:26I I appreciate moving towards trying
06:28something um to to get to the outcome
06:31that we're that we're looking for.
06:33Thank you.
06:34Um we'll go to Council member Parsey and
06:37then Council member Prakriya.
06:40>> Thank you. I wanted to follow up on the
06:42question that Council member Kritser
06:45asked. Um so we are in the effort of
06:49unifying one department around
06:51permitting. We are um creating some
06:55other silos from other departments and
06:58we're breaking up existing work. Um I
07:01share the same concern around um that's
07:05it looks it feels like solving one
07:07problem but potentially um creating and
07:10not addressing fully, maybe partially
07:13with SLAs, um many more um
07:18fragmentations that we're creating. So I
07:22am concerned with how um kind of
07:27your answer was that we are this is
07:29giving us the best chance of success and
07:31I understand that this is getting giving
07:33us the best chance of success for
07:34permitting specifically,
07:36but um if we step back and look at the
07:39process more holistically, chance of
07:41success for the whole city and all the
07:44other departments is also really
07:45important to take into account. So, um
07:48right now, I haven't
07:50quite seen the evidence yet. Um and I
07:54hear that there is SLAs in process and
07:56progress and they have been discussed.
07:58Um but I
08:01am concerned about the um gaps that
08:04potentially will be created as a result
08:06of this.
08:08Um and similarly, again, following up to
08:10go a little bit more in detail, um
08:12adjacent to the the comment that you
08:14shared, uh Council Member Kreitzer, um
08:18and previously raised by Council Member
08:20Nury Martinez, I do have some concerns
08:23around the layers of management and just
08:26how large this organization is going to
08:29be. And I am very curious if we can
08:32start much smaller with a scoped um
08:34problem um with a prioritized list of um
08:38problem areas that we're going to tackle
08:40first, um so that we can establish
08:43success, we can prove that we're we're
08:45going towards the right direction before
08:47we um
08:49we invest further in this problem. So, I
08:52think having those would give me a lot
08:54more confidence in absence of evaluating
08:56in front of the whole council other
08:58options. Um you know, we have only
09:00looked at one option so far, and I think
09:02in absence of evaluating other options,
09:05especially from other cities, what they
09:07have done, what other things we could
09:09do, um what are other low-cost options
09:11we had, I think um those are some of the
09:13concerns that I don't have fully
09:16addressed yet, and I would love to hear
09:17if you can share a little bit more um to
09:20that.
09:21>> Yeah, I'd like to address some of that.
09:23Um and thank you for the the uh
09:25the comments and the question. I think
09:27that um
09:29when we were working to put this uh
09:32this new
09:33uh division or department together,
09:35um we did talk about size and scope and
09:38how
09:39you know, how big this was going to be,
09:41but we didn't want to set ourselves up
09:42for failure.
09:44And we're always going to have an
09:45opportunity
09:47to scale back at some point, but we
09:50wanted to give ourselves the greatest
09:51opportunity for success.
09:53And bringing people over into this
09:55department because these things are
09:56already functioning and happening, we
09:58felt we would give ourselves the
09:59greatest level of success that way.
10:02You also talked about the
10:04potential to create silos and um,
10:08I concur that there is the potential
10:10there, but we have to be intentional
10:11about making sure that we don't do that.
10:14While at the same time making sure that
10:15we go towards where that that sound is
10:17that where people are hurting and right
10:20now we're addressing the issue of, you
10:23know, permitting
10:24and making sure that we address that
10:26right now and that's part of this whole
10:28development.
10:30While at the same time making more than
10:31certain that we don't create silos
10:35elsewhere.
10:36Um,
10:37you mentioned SLAs. We're going to have
10:40SLAs here, but um, we already have
10:43service agreements in the city and we'll
10:45we'll have more and we'll be
10:48attentive to making more than certain
10:50that we do it appropriately and making
10:52more than certain that we don't create
10:53more problems when trying to solve a
10:55problem.
10:56Um,
10:57we don't propose to have all the answers
10:59at this point, but we have a pretty good
11:01idea about what we're doing.
11:03Uh, but there's always room for
11:04refinement, right? We can trim in
11:06flight, so to speak.
11:11>> I was going to add when we looked at
11:13this problem originally, you always hear
11:15the term development and permitting.
11:18Now, it's a whole and when you look at
11:20that org chart, it's a whole lot more
11:21than just development. The development
11:24cycle includes the permitting, the
11:26inspections,
11:28the construction, the land use,
11:30the real estate side of the house.
11:33Uh, development itself, you have public
11:36and private.
11:38Um,
11:38currently right now, we're seven ways to
11:41Sunday, um, when we're looking at, uh,
11:44public and private, uh, when it when it
11:46comes to alignment. Uh, normally on the
11:48capital side, you look at that as the
11:50the the public side of the house with
11:52the with the CIP.
11:54Um, private side, um, it's normally the
11:57homes and some of the developers and
12:00they're
12:01they interconnect. However, you know,
12:03part of that, uh, process leg is the
12:06director, um,
12:08public works director, we'll put it at
12:10at this way, not only has to be a
12:14I wouldn't say a barrier, but part of
12:16that decision of approving development
12:19and waiting,
12:20um, they also have to balance the
12:22operation and maintenance and delivering
12:25those city services,
12:26um, as as a competitive priority, which
12:30slows down the process. Taking a look at
12:32this this new department in that
12:34one-stop shop and that one
12:36decision-maker,
12:37um, they can focus on that development
12:40cycle.
12:42We can have these SLAs where we interact
12:44and work at the the, uh, asset
12:47management that we're getting into,
12:49which I call the infrastructure life
12:50cycle. So, um,
12:53from that development,
12:55we can have that upfront coordination
12:58between all them subject matter experts
13:00that deal with the private and the
13:01public, where our city main hits those,
13:05uh,
13:05you know, the apartment building main,
13:07whether it's water, sewer, wastewater,
13:10um, that department will have all those
13:12decisions upfront
13:15and coordinate all that upfront in this
13:18new structure where it doesn't currently
13:20exist because
13:22our engineers, um,
13:24they provide, uh,
13:26on the utility side, they provide the
13:29overview of the public and then later on
13:32in the point of private development gets
13:34approved then we we go into modeling.
13:36So, some of that upfront coordination
13:39will save time and efficiency not only
13:41for developers but for for our public
13:44projects itself. So,
13:47there there is a more holistic thing
13:49than just, you know, hammering permits
13:51through based off House Bill 5290.
13:54There is a strategy and
13:57a case, you know, when we're looking
13:58through here
14:00because you know, we're not the only
14:02municipality in Washington state that
14:04has to deal with this.
14:06One of the
14:08similar examples that you can, you know,
14:10reference is the city of Marysville.
14:12They originally I believe had a public
14:14works department which is now a
14:16utilities and maintenance services
14:18division that solely focus on operations
14:21and maintenance.
14:22And they have an engineering services
14:24division that focuses on development,
14:26capital projects and I believe
14:28transportation engineering is in that
14:30group well that they seen that need for
14:32that focused of the development cycle.
14:36And then that focus on the service
14:38delivery and that maintenance and
14:39operations aspect of maintaining our,
14:42you know, our last check I think we're
14:44at in the $4 billion of infrastructure
14:47and then having those tie-ins in between
14:49to where we work together
14:52on, you know, our water systems plans or
14:54comprehensive plans we work we'll work
14:56together on the capital projects and
14:59feed that system there. So, it was more,
15:02you know, when you were in that room it
15:03was more than just looking at getting
15:06permits through on a
15:07on a different timeline and you know,
15:10the discussions came up service level
15:12agreements. You know, when I worked at
15:14the county
15:16for facility management division we had
15:18various service level agreements with
15:20the department signed by the county
15:22executive, and then the two department
15:24directors would go there. And those
15:27service level agreements have the
15:29established um
15:31working structures on what side we would
15:33provide to this department, where the
15:35escalation matrix would would be, the
15:38feedback loops, and the continuous
15:40continuous improvement, because they are
15:43living documents.
15:45Um the state provides new mandates that,
15:48you know, will affect this work. So, you
15:50have to have these systems in place in
15:52order for them to be effective, and we
15:54identified that that in previous
15:57reorgs, where things were pulled out, um
16:00that was a gap. I mean, it was a gap
16:02when I came in here
16:04uh
16:04a few years ago and, you know, said,
16:06"What what if we could we could get to
16:08this?" And this was a an opportunity to
16:12look beyond just
16:13um
16:15uh
16:165290 and what the matrix report uh
16:18outlined out there.
16:21>> Councilmember Prokopiak.
16:25>> Um thank you. I'm looking at the um
16:27the section on startup costs, and it
16:29says, "We estimate one-time startup
16:31costs of 2.5 million."
16:33Um uh this this includes the cost of
16:36onboarding new staff
16:37and creating new documentation and
16:39communications materials.
16:41Um
16:42I just that number seems very, very
16:44steep to me. Uh 2.5 million for that,
16:46particularly because, you know, that's
16:49um
16:50more by over 25% than the cost of
16:52actually
16:54funding all eight FTEs for an entire
16:56year.
16:57Um so, I'm just wondering like why does
17:00it cost more to onboard
17:02um
17:03our new staff than it does to pay them
17:05for an entire year?
17:09>> Dr. Cochran's coming up.
17:14>> Good evening. Uh that [clears throat]
17:162.5 million is what we estimate sort of
17:18the worst case scenario of what we may
17:21need to use um to get the department um
17:25up and running. It includes an estimate
17:28of what we what may be needed in order
17:30to um implement changes due to fire
17:33negotiations. So, it's a it's a pretty
17:36broad estimate. Um we It's It's quite
17:40possible that we may not need any of it
17:42depending on how well we continue to do
17:46with um development activity coming in
17:48the door. Um if we see revenues stay
17:52high, we may not need it. It's sort of
17:54this worst-case scenario um
17:56that we just need to make sure you're
17:58aware of.
17:59>> I would say some of the um when we um
18:02even move people around, there are costs
18:04in facilities of new desk space, new
18:07office space, uh moving all of that
18:09around. That is actually a
18:10surprisingly expensive um as well as any
18:13other upstart costs with that. Um but,
18:15this is really the high level that we
18:17would need and as Director Cockran
18:19mentioned, we're hoping to not have to
18:21use much of it.
18:27Um Anyone else that hasn't asked a
18:28question? Count Council Vice President?
18:30>> Thank you.
18:31Um I'm curious about
18:35We're talking about work charts. We're
18:36talking about budget. And I want to back
18:38us up just a little bit before we get
18:41there.
18:42I'm curious about the process of how we
18:45got here. We've had the matrix report
18:47for just about a year at this point.
18:50Um
18:52I'm interested to know who who on the
18:54team was championing who had some
18:57opposition. What did some of the
18:59conversation look like before we got to
19:01this point?
19:05>> Well, I can start by saying the reason
19:07um the that the matrix report was in the
19:09budget this biennium was because we knew
19:12this was an issue that we needed to deal
19:13with and so we started with that. So
19:15this has been an ongoing concern for
19:17many years.
19:18So that was part of the beginning of the
19:20conversation. Then I pulled a team
19:22together and I think Jason is not here
19:25today.
19:27But I think
19:28the team here can talk about
19:30the conversations that they had over
19:33quite a few months and
19:35the opportunities that they saw before
19:37them. I don't know if Kelly if you want
19:39to talk a little bit about choices that
19:41were made during those conversations.
19:43>> I will. Thank you. So I joined the team
19:46late. I think I was one of the last to
19:49one of the couple last to join the
19:50conversation and
19:52when I
19:55did as I tend to do I asked for a little
19:58bit of orientation to how we
20:01we had gotten to where we gotten to at
20:03that point.
20:06And asked to spend a little bit of time
20:09on
20:10root cause analysis sort of that five
20:15whys and why and why and why and
20:18in my first interactions with the team
20:22and and doing that um
20:25we could see where
20:28the initial proposal being tossed about
20:30at that time which was really much more
20:32focused on development services
20:36kind of as we know it but
20:39like improved.
20:41Addressed a lot of the things that
20:44Matrix called out and some it didn't but
20:47were kind of an extra
20:49bonus in there.
20:50But they didn't get to
20:53the solutions that
20:55weren't as broad as you're seeing now
20:58didn't get to some of that
21:00root cause of
21:03why.
21:04And
21:05I guess what I would say that is that
21:10the ultimate
21:12why was that we have many departments
21:16responsible
21:18for
21:20um
21:21making decisions about our city's built
21:24environment and our infrastructure.
21:27And
21:28it was similar to many years ago when
21:32the finance department was split from
21:34the TIOS department because we could
21:37recognize at that time that technology
21:39needed one owner. Someone to
21:43implement um develop strategies,
21:46implement a strategy, keep um all of the
21:49principles
21:51um and things in place as the program
21:54grew. And
21:56um so the solution that you see now is
21:59intended to um get to those root causes,
22:02which is
22:03the multiple different
22:06um
22:07decision makers that are currently
22:09involved in the
22:11gaps that that can create um for
22:15our projects, um our customers, um the
22:18community.
22:21The end.
22:22>> Thanks, Gwen.
22:27>> I don't know if anyone want Go ahead,
22:28Chris.
22:29>> I can add.
22:30Um
22:31you know, when I was putting that room
22:34uh we always talk about House Bill 5290.
22:37Uh
22:37we tend to um forget about uh the Growth
22:41Management Act
22:43and what uh
22:45goals Redmond has put upon them
22:48for development and bringing jobs into
22:50Redmond. Uh you know, I'm just I had to
22:53I had to look it up here, so
22:55correct me if I'm wrong on the numbers,
22:57but uh 20 24,000
23:00homes, roughly around there. That's a
23:03substantial increase, population
23:07increase,
23:08and a job increase. I'm looking at the
23:10numbers here. So, by 2044, 20,000. By
23:142050, 24,800
23:17additional housing units. Additional
23:19jobs, 24,000.
23:21Which is 2044, 29,760
23:25by 2050. A population increase of 35,666
23:31and about 400 44,700
23:35by 2050. It's right around the corner.
23:38Um and I I believe that's why some of
23:40these municipalities are taking a look
23:42at a different way of the traditional
23:44way because uh
23:46those
23:47are substantial increases in
23:49development, in population. And you
23:52know, as Redmond always says, we're
23:53going from a suburb to a city.
23:56Um and sometimes you have to think um
23:58with that city mind in in ways of um
24:02solving problems and then removing
24:04barriers to those problems and then
24:06having
24:08I don't call them silos, I call them
24:09centers of excellence that work together
24:12with documented, memorialized agreements
24:15like the service level agreements on
24:17there. Uh
24:18because that that is a a substantial
24:20increase in in uh businesses and homes
24:23and in population that we have to um
24:27take a look at now in 2026 cuz those
24:30those dates are right around the corner.
24:33>> Mayor, if I may.
24:34>> Yes.
24:35>> Um my apologies, I wasn't direct enough
24:37in my question. Okay.
24:39Um
24:41Matrix report was done
24:43in October of 2025.
24:45That's when we got the results back.
24:48The team was convened
24:50February-ish.
24:52Council didn't see anything for 4 months
24:54after that
24:56about any direction of this.
24:59This is a huge ask for a hundred plus
25:02position team.
25:04$52 million.
25:06I'm trying to have a better
25:07understanding of who is championing this
25:10so that then there's
25:11directions for when we're asking very
25:14direct questions. We know like, "Okay,
25:16Chris Stinger, acting deputy of of of
25:20public works is going to have this. This
25:21is going to go to finance. This is going
25:23to go to Chief Shepherd over in and in
25:25fire."
25:27Because it feels rushed
25:30from our from Let me not speak for the
25:32council as leadership. From my
25:34perspective, it feels very rushed that
25:37we we had this information and now we're
25:40we're sitting here around the table
25:43and we're identifying things in the last
25:46meeting I brought up when we increase
25:49rungs on a ladder of a chain of command.
25:52That is not streamlining a process.
25:53That's going to be adding another step
25:55to it. So, it was understanding trying
25:57to have an understanding of going from
26:00what we have, some of seeing some of the
26:02recommendations in the Matrix report,
26:04somebody had to have been the
26:05decision-maker as to what we're going to
26:07follow from the Matrix report, what
26:09we're not, who was that person, what was
26:11some of the dissenting conversations
26:13that was going on so that we can have a
26:15better understanding of the flavor of
26:17those and a better understanding of some
26:20of the problems that we saw inside of
26:22that as well as some of the ones that
26:24we're
26:25we're going to be solving for. Besides,
26:28of course, we want faster permitting.
26:30I don't know anybody who wouldn't want
26:31faster permitting.
26:33But can we are we doing it in the right
26:34way and just having a better
26:36understanding of the how of in the
26:38process?
26:40>> I can answer a little bit of that. So,
26:42we have been as mentioned before, part
26:45of doing the Matrix study was to get us
26:47going in a different direction because
26:49we knew what we were doing wasn't
26:50getting us the goals to our goals that
26:52we needed in Redmond 2050.
26:54Um initially after the study came out I
26:57put together
26:58a few individuals who worked for a bit
27:01and were not making progress
27:04for a lot of different reasons and so
27:07I changed directions so it was under me.
27:09I needed I needed the team to make some
27:13progress and they weren't doing it at
27:14that time
27:15and so we brought in a facilitator and
27:17brought in different team members and
27:19that's when we started to make progress
27:21on the direction we needed to go and
27:23initially we had
27:25someone from planning, someone from
27:26public works, someone from fire in those
27:28conversations and then as we started to
27:31dive in a little deeper we brought in HR
27:33and finance as well to make sure that we
27:35were covering all our bases. We also
27:36brought in TIS
27:38to take a look at some of those issues
27:39that were going on. So it was a
27:42progressive process that we ended up
27:44with and brought in a lot of different
27:47ideas into the mix but the the
27:51proposition to me to move forward had a
27:54few variables but from a wanting to get
27:57the outcomes that the city needs
27:59moving forward with the direction that
28:00we have put before you is the in my
28:02understanding from my experts in the
28:04city the right direction to go to get us
28:07the outcomes that we need. So yes it was
28:09an iterative process. I have been very
28:11clear
28:12since 2020 that I knew our permitting
28:14process needed updating and I don't
28:16think that's a surprise to anybody
28:18but it took some time to understand the
28:20full depth of our challenges I guess I
28:22would say and that's when bringing in
28:25capital into the conversation helped
28:28unleash some of the hang-ups that we've
28:30been having and we we did get a lot of
28:32feedback from development community and
28:34others who have gone through our
28:35processes sharing with us
28:37many of the
28:39problems and bottlenecks that they've
28:41had from single family home home owners
28:43all the way up to big development
28:44community. So all of that went into kind
28:47of the end result that we have. I think
28:49the product you have before you is
28:52the right direction for the city to go.
28:54It does take It will take effort and it
28:59also will streamline a lot of the
29:00processes that we've been having.
29:02And I think that one of the things I do
29:04want to clarify is one of the things
29:06that I've always been interested in
29:08um
29:09throughout my life is to ensure that the
29:11the decision makers are at the closest
29:14to the problem.
29:15I think by creating this organization in
29:18this way,
29:20we actually give the power back to our
29:22staff at that level that are working on
29:25all of these different issues and give
29:27them the power to make those decisions.
29:29The system we have currently they get
29:32second-guessed just because of the
29:33structure we have. So, I want to make
29:35sure that they're getting the best
29:37result that they can with the experts
29:39that we have and our community gets the
29:40best results for their permits.
29:44Thank you.
29:46Questions.
29:47I have previous question asks. I have
29:50two
29:52Council President, do you have any
29:53questions for now?
29:58Thank you.
29:59I don't have any questions
30:03remaining necessarily.
30:06And I appreciate Mary your comments
30:10to illustrate
30:13how some of the decision, particularly
30:16around capital, maybe occurred.
30:20Um
30:21I want to appreciate that
30:25as Mr. Churchill mentioned, there's a
30:27lot of institutional knowledge that has
30:29grown through a lot of institutional
30:31wisdom
30:32of trying something and learning a lot
30:35time and time again. And I really do
30:37appreciate that that's what's happened
30:39here.
30:40Um in my mind, I'm kind of reframing
30:44this conversation as whether or not the
30:47council will approve direction on a new
30:50org um, as a win in and of itself, but
30:53rather that the win is really are we
30:56reducing time and reducing costs.
30:59Um,
31:00I think my colleagues have articulated
31:02that unfortunately the analysis was not
31:05presented to council in a complete way
31:07and alternatives were not presented and
31:09we weren't brought along. So that is
31:11unfortunately
31:12uh having an impact where trust is a
31:15little difficult.
31:17But I do think it is the right thing to
31:18do.
31:19I think it's the right thing to do
31:21because um, the feedback we've been
31:23hearing for a really long time as the
31:25mayor just said is
31:28homeowners showing up in my office hours
31:30in tears because they are trying to get
31:32that remodel done and they ran into yet
31:34another barrier, yet another permit
31:36review is needed. Um, developers can't
31:39you know, not complete projects that
31:42would have brought great housing choice,
31:43not just more housing, but a different
31:45type of housing even to our city. And so
31:47I think we know the feedback is there. I
31:49think we know the economics of
31:51everything is changing and so in in my
31:53mind
31:55I'm I'm willing to um,
31:58move forward with the new direction and
32:02also work together as one team Redmond
32:07to make sure that we're keeping one
32:08another in the loop, that we're
32:10monitoring the change management, that
32:12council's kind of kept in the loop cuz
32:14that's going to be a long process, too.
32:16What's going on, what is coming next.
32:19Um, if something needs to slow down
32:21because culture matters, that's okay
32:23with me. I just want to know. Um, and I
32:26I think as a policymaker that that will
32:28be important. And as we begin to um, as
32:31as acting director
32:34uh, Lynch said, not just meet the state
32:36standards, but beat them, quite frankly,
32:39cuz this is not a race to the bottom. We
32:40do good work here in Redmond. We have a
32:42>> [laughter]
32:43>> a culture of excellence in our city, and
32:45I do believe that. So, um
32:48I have concerns about the overall size.
32:51We've had a large department before that
32:53has had a lot of
32:55uh
32:55critique around its size.
32:58Um but generally, this is the right
33:00direction, and
33:02um I hope that we are keeping one
33:03another informed as as we move forward,
33:06and if that's what the council chooses
33:08to do. Thank you.
33:10>> Um I'm going to go back to
33:12Council Member Kritzinger. Did you have
33:14your hand up? Are you
33:16>> I did. Yeah. Um and was just reflecting
33:18on Council President's comments. I think
33:20um
33:21>> [cough and clears throat]
33:21>> I guess I'd say in a similar vein, I
33:24think um what I've heard from my
33:26colleagues is the concern about the
33:28process to date, and and that we
33:30probably should have started these
33:32conversations earlier. I think at this
33:34point, we are where we are. And I will
33:36say in terms of where we um
33:40uh
33:40the council's direction, the council in
33:42the last budget did fund the matrix
33:45study in the hopes that we could
33:46actually find some solutions to be able
33:49to address this problem. We also did
33:51pass Redmond 2050 with the goal to uh to
33:55to create more housing and and uh more
33:58jobs and and to look at planning towards
34:01the future. And so, I appreciate what
34:03Mr. Stenger said about um kind of
34:06thinking about the city we're growing
34:08into and making sure that we have the
34:10right infrastructure in our city to be
34:12able to um support that. Um I And And
34:17correct me if I'm wrong from what I
34:18understood from you were saying, Mr.
34:20Stenger, is that this will also help us
34:21to deliver more efficiently our city
34:24capital projects if And this is And this
34:26is that correct?
34:28>> Correct. There would be upfront
34:29coordination cuz public always touches
34:32private. it's
34:33when you see a road I I think one of the
34:36biggest complaints that folks see is
34:38they see development they see that road
34:40construction and then 2 years later the
34:43city might be in replacing a utility
34:45line or or whatnot in there that this
34:49provides that coordination up front
34:52there is silo when you're talking
34:54between public and private
34:57unfortunately it happens you know public
35:00public moves ahead they have the capital
35:02projects there's no Nexus of of of
35:04coordination early to where maybe we can
35:07look at you know a
35:09I was trying to talk about last time our
35:11Redmond Town Center and we up zone we
35:14look for 10 to 14 stories we know that
35:17the the capacity isn't there so that we
35:20have the plans and the coordination in
35:22place in front to upgrade that
35:24infrastructure to support folks coming
35:27in for Redmond 2050 support that tech
35:30center you know the employees coming in
35:32and and and bring that in there up front
35:35vice
35:36chasing tail I always call it
35:38you know hey we got development coming
35:40in what do we need to do then we talked
35:42to director Cochran
35:44and then she she asked to take a look at
35:46what capacity we have to fund to keep
35:49our
35:50great um
35:52credit and bond ratings and all all that
35:53in there so
35:55the proactive coordination up front I
35:58believe you know with public and private
36:00development and having capital in there
36:02and having capital embedded into the uh
36:06place that provides the the land use
36:08review and the SEPA and the permitting
36:12up front that the director of this
36:15department
36:16can deal with that staff capacity to
36:19allow that here's for the public here's
36:21for the private right now we're kind of
36:23on a list and you know when we we we
36:26come up you know we'll we'll fit it in
36:28where we can, but it does compete um
36:31just just based off they're not it's not
36:33in the same department. There's no SLA.
36:37Um we move things forward. So, there is
36:38an opportunity to actually
36:42possibly cut some time in capital
36:44projects because they're they're things
36:46are going to be coordinated under that
36:47one director um
36:49on there.
36:50And then we'll always be the customer.
36:52So, right now um public works,
36:56the people that own infrastructure, we
36:57also provide a service, you know, to
36:59fire and parks and anybody else that has
37:02those capital projects. But, this
37:04department
37:06they don't process. They don't own
37:08infrastructure. And they won't have
37:09those competing priorities. That that
37:11they do get in the way on honestly. If
37:13you have an emergency,
37:15um or if you have a main break, the
37:18director has to take the focus off
37:22anything development review because a
37:23lot of things right now escalate up to
37:25that level because in code,
37:28it's a public works director decision.
37:31Under this new department, that
37:32administrative function or that look
37:34will be under the whatever
37:36insert the title of the new director.
37:38And then public works can work on that
37:40service delivery,
37:42focusing on that infrastructure,
37:44um building that asset asset management
37:47plan and putting that data in there at a
37:49at a better rate. We'll have more
37:51attention and focus on that. And you'll
37:54uh
37:54you'll you'll save time on capital
37:56projects with that in that department.
37:58So, that's my long spiel on on that.
38:01>> Go to Councilmember Prokopiak, then
38:03Councilmember Parsey, then Council Vice
38:04President.
38:06>> Uh thank you. Um my question centers
38:09around our current um
38:12data intake process for permits and then
38:14our future um data intake process. You
38:17know, I think that
38:18uh as council, our job is to function as
38:21kind of the board of directors for the
38:23city um and prioritize and deprioritize.
38:27You know, so I am in favor of this
38:29department because I think at a broad
38:31level it prioritizes
38:33permitting.
38:34But, you know, we also need the ability
38:36to
38:38revert
38:39or
38:41um you know, change if things aren't
38:43working the way we expect, right? So,
38:45this is why
38:47my question is, you know, right now um
38:50what level of data collection do we have
38:52about permit times, permit efficacy um
38:56for different types of permits
38:58um in the city and then what level of
39:00data collection will we have for a
39:01future department um
39:03you know, in
39:045 years? I want to
39:06be able to look and say, "Oh, the amount
39:08of time it took to permit a duplex uh
39:10went down by 14% with the new
39:12department." Or maybe it went up or
39:14maybe it went down uh some more, but I
39:15want to be able to answer that question
39:17um and I'm not sure if we can right now.
39:21>> Yeah, I I think the short answer is that
39:23we can. We have we can produce very
39:26granular reports out of the permitting
39:28software system. We can change the
39:31reports that are generated uh based on
39:34the data that is available and we can
39:35and we can build new reports. So, that
39:37that is definitely data that we have now
39:40and will have going forward.
39:44>> Councilmember Parsey, and I know we have
39:46like 5 minutes left of our special
39:48meeting.
39:49>> I will offer some of my
39:51again concerns. Um so, the the way that
39:54I see the problem is that if we have a
39:58car and we potentially have the flat
40:00tire.
40:01And today, I think we all realize around
40:04this table that we have a flat tire in
40:06that our permits are being processed too
40:08slowly.
40:09Um I think we can all agree on the
40:11premise of the problem and that we want
40:13to solve that.
40:14Um Um, the way that I see this um, kind
40:18of department being proposed and the
40:20size of the investment proposed, it
40:23feels like we're replacing the car.
40:25Um,
40:26and it seems like the proportionality of
40:29our investment to the size of the
40:30problem is not quite
40:33is not quite proportionate in my mind.
40:35So, I think in absence of evaluating
40:38other options to see how else we could
40:41address this problem, I feel concerned
40:44that this is um, going too fast uh, too
40:48soon and I understand and acknowledge
40:49that it Council has been put in an
40:51unfortunate position to have to make
40:53this decision really quickly. Um, and I
40:55feel like
40:58um, we can I would feel more comfortable
41:01um, with a smaller investment um, to
41:04make sure that we're to establish that
41:06we're proceeding in the right direction.
41:09Um,
41:10so I understand that there is also
41:11different opinions around the table, but
41:13um, that's just how I see um, I see
41:15where we are.
41:18>> Council Vice President.
41:19>> Thank you, Mayor. Um,
41:20it in of similar vein and also um,
41:24Council President Stewart had brought up
41:26about the concern of size of the
41:28department. When we take a look at the
41:30FTEs that are being added, um, it's a
41:33director direct
41:34deputy director um,
41:36manager admin.
41:38Um, all of them are administrative and
41:42they're not increasing capacity of
41:44review. And understanding that the
41:46problem is in permitting times.
41:49Me not being on that side of the table,
41:51um, if in two minutes you can
41:54walk me through walk us through, how
41:57does eight administrative positions
42:01not tactical and and being the decision
42:03makers closer to the problem, how does
42:06that decrease our permit time?
42:13>> Uh, I part of the answer is that
42:15currently staff are under supported. Um
42:18they don't have a supervisor that they
42:20can go to um to help with sticky issues.
42:25And so productivity can be increased
42:27when staff are
42:29adequately supported with supervisory
42:31staff.
42:32Um
42:33the administrative function of any
42:35department really makes the department
42:38um I think of the administrative staff
42:39we have planning as the miracle workers
42:41of the department that really make
42:42things go. Without those administrative
42:44staff
42:45permit processing would would really
42:47grind to a halt.
42:48>> Oh, you're preaching to the choir for
42:49this one because this council
42:51understands not having administrative
42:53staff.
42:54>> So I I think so while there are not uh
42:57permit reviewers necessarily added in
42:59the organizational chart, these are
43:01positions that are essential to
43:03supporting the staff that are doing the
43:05work so that the work can can get done
43:06efficiently.
43:10>> We have 2 minutes left. I don't know if
43:12there was any quick question or if we're
43:15ready to wrap up for tonight.
43:18Council President.
43:22>> I think Mayor Bernie it would be
43:25uh helpful to know if the council needs
43:28further conversation on this or would
43:30like to wrap up with a direction prior
43:33to or very early in our budget
43:35negotiations which begin on Thursday.
43:39>> There is time set aside in that first
43:41budget meeting to um answer any final
43:43questions or do any wrap up around this
43:46um
43:46if there is more time needed. That is
43:49already built into the schedule. Ideally
43:51we would love to be at a place where we
43:54have at least four council members were
43:57good to go with this as it is now
43:59understanding full well that we're still
44:01in process of developing this. We're
44:03waiting to get council go ahead. Um and
44:06that as this moves forward, we'll be
44:09giving very regular check-ins on on the
44:11progress that has been made, too.
44:13So, we can go A or B. I can see if
44:16council is ready to um, end this
44:18conversation for this time, or if they
44:20want to use the time on Thursday to talk
44:23about this anymore.
44:26Who is ready to move forward with this?
44:29I guess I will ask. I'll do the council
44:31budget process.
44:33And who would like to uh, I guess A is A
44:36is we're ready to move forward on this,
44:38um, move forward with the budget. B is
44:40that we want more time during the budget
44:42process on Thursday. Council member
44:44Krisser.
44:45>> I guess I just wanted to clarify that I
44:47think since we have a lot on the agenda
44:50for the council budget deliberations in
44:52terms of the scope of what we we would
44:55likely discuss at this Thursday's
44:57meeting would be talking about the
45:00budgeting for this plan if the council
45:03wants to move forward with this plan. I
45:05I think in terms of the amount that we
45:07have on the agenda for Thursday's budget
45:09meeting to continue with the
45:11uh, additional questions folks may have
45:13about kind of the the management of it
45:16or all those other kinds of pieces that
45:18might need to be dealt with at at a
45:19different time or maybe we we shouldn't
45:21talk to the budget until we've dealt
45:23with those questions. So, I guess I
45:25would also be interested in knowing
45:26where the other council members are at.
45:28I'm happy to facilitate that
45:29conversation and and I'd be okay moving
45:31forward with that, but um,
45:33curious to know if others are in that
45:35place so we can set ourselves up
45:37successful on Thursday.
45:38>> So, your your suggestion is to just talk
45:41about the budget implications of this on
45:42Thursday versus the details.
45:46>> If if the council is wanting to include
45:49it in the budget.
45:50>> Right.
45:52Is uh, can I get the council members who
45:55are interested in discussing the budget
45:57implications of this on Thursday versus
46:00uh, talking to staff more about this.
46:03Who's ready to just talk budget?
46:09So, it looks like we need some more time
46:10on Thursday, then.
46:13Or
46:15or not Thursday. Okay. Well, then we'll
46:17discuss when this fits in, but currently
46:19it is scheduled for Thursday.
46:22Right. Thank you. And with that, uh,
46:24this meeting is adjourned.