  • Opening: The chair announced that a commissioner had resigned for professional and family reasons; one commissioner was absent. The agenda was amended to turn items 6 and 7 from 15-minute briefings into 45-minute study sessions, and the September 9 meeting summary was approved. No counted votes were taken on the study-session items.
  • Public comment: Two speakers. One urged tighter tree code enforcement, independent verification of arborist reports paid for by applicants, and a city arborist in the 2027-2028 budget, and flagged three drafting conflicts; the other raised building height, stormwater, housing quality and pedestrian-friendly design.
  • Tree Code Update: Lauren Anderson, Senior Planner, presented the timeline, the changes between draft 2 and draft 3 and earlier Commission questions, with a consultant from Facet online. Canopy was 37 percent in 2023 against a 40 percent target. The draft sets a fee-in-lieu of $450 per credit, similar to Kirkland, and cuts the removal cap on the largest lots from 8 to 5 trees. Commissioners worried about the 97-page length and asked for readability, usability and enforceability, and the Commission added two public questions to its issues matrix: how the city verifies hazard-tree determinations by private arborists, and who oversees lot-coverage decisions that lead to tree removal. They also discussed where penalty money goes, non-monetary penalties, stormwater effects and a fix for the 30-inch threshold. See Tree Code Update.
  • Neighborhood Connections Maps Repeal: Staff proposed repealing five outdated maps (Bear Creek, Education Hill, North Redmond, Southeast Redmond and Northeast Rose Hill) now covered by the Transportation Master Plan. The chair questioned the piecemeal process, since the neighborhoods element was not substantively reviewed under Redmond 2050; staff offered approve, deny or delay, and the item was held for staff to propose a path. See Neighborhood Connections Maps Repeal.
  • Transportation Facilities Plan Update: Michael Hints presented a minor update adding two shared-use paths, on NE 40th Street between 158th and 156th Avenues NE (tied to the Avalon Redmond Tech Station project and credited against impact fees) and on NE 70th Street between 188th Avenue NE and the Evans Creek Trail, and widening a NE 72nd Street project to include a path. The projects are not prioritized. See Transportation Facilities Plan Update.
  • Dates: Public hearing October 14; a possible extra study session November 4; study session and recommendation November 18 for the tree code; a recommendation on the other items anticipated October 28; City Council review January to March 2027. Staff will advertise for the vacant seat.

Issues discussed

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:22All right. Welcome to the September

00:2423rd, 2026 meeting of the Redmond

00:26Planning Commission. I'd like to call

00:28this meeting to order. We'll start with

00:30a roll call. Commissioner Aarna,

00:33>> present.

00:33>> Commissioner Coleman,

00:35>> present.

00:35>> Commissioner Gier,

00:38>> present. Commissioner Gong

00:40>> present.

00:41>> Vice Chair Woodier

00:42>> present.

00:43>> And I am Chair Weston. Commissioner

00:45Vanimman is absent. Um I'd like to just

00:48quickly um conclude our roll call with a

00:50note to the community. Uh Commissioner

00:52Copley has resigned due to mix of

00:54professional and family obligations and

00:56I just want to take a moment to thank

00:57him for his time and hard work. Um he

01:00did a great job on the Redmond Planning

01:01Commission and we're going to miss

01:02working with him.

01:05Um I'd like to thank the following staff

01:06for being present tonight. Odra

01:08Cardennis, Becky Fry, Lauren Anderson,

01:10Cameron Zapata, Michael Hints,

01:12Franchesca Labbertie, um Philly Marsh,

01:15and Chris Chris Wyatt. Before we approve

01:18the agenda, I'd like to update two

01:20items. Um items sixes items six and

01:23seven were listed as 15minute briefings,

01:25but they should have been listed as

01:27study sessions and 45 minutes each, so

01:29we have time to start our work before

01:30the public hearings. With that, I look

01:33for a motion to approve the amended

01:34agenda.

01:35>> So moved.

01:36>> Second. Oh, sorry.

01:38>> Second. [snorts]

01:39>> All in favor?

01:40>> I

01:40>> I

01:41>> I

01:42>> is approved. And any corrections to the

01:45meeting summary from last time?

01:48>> Um, in that case, I look for a motion to

01:50approve the meeting summary from

01:52September 9th, 2026.

01:54>> So moved.

01:55>> Second.

01:55>> All in favor?

01:57>> I

01:57>> I

01:58>> And that is approved.

02:02All right.

02:05Next up is our time for public comment

02:07and items for the audience. Who do we

02:09have tonight?

02:10>> Uh, good evening, commissioners. We have

02:12two people signed up for to speak. The

02:14first one, David Morton.

02:16>> All right. Um, and as usual, if you

02:19could please keep your comments to three

02:20minutes and start with your name and

02:21address.

02:30>> Hold on just a second. Do we have mic?

02:33>> Yes.

02:33>> Great. Thank you.

02:34>> Start the timer. I'm speaking on agenda

02:37item five, the tree code, and briefly on

02:40agenda item six, neighborhood

02:42connections map. Thank you for pressing

02:44staff on enforcement of the tree code.

02:47The draft also reaches contractors and

02:49it lets fee inlue revenue pay for the

02:52city to hire or contract a qualified

02:54tree professional. My central concern

02:57remains. Nearly every discretionary

03:00finding still rests on a qualified tree

03:02professional hired by the applicant.

03:05Whether a tree is hazardous, its

03:07condition, whether a tree protection

03:09zone can shrink, and whether retention

03:11is feasible. Third-party review of

03:14exceptions is optional, applicant paid,

03:16and the reviewer is chosen by agreement

03:19with the applicant. Even removing

03:22required replacement trees depends on a

03:24qualified tree professional confirming

03:26that they are dead, dying, or hazardous.

03:29That matters because a hazard finding

03:31has consequences. Hazardous removals

03:34don't count against a property's removal

03:36allowance, and hazardous trees under 30

03:39in need no replacement. I ask the

03:42commission to recommend independent city

03:45verification at these decision points,

03:48starting with hazard determinations and

03:50retention findings, ideally before your

03:52November 18th recommendation, and to

03:55urge council to fund a city arborist in

03:58the 2027 to 2028 budget. Before the

04:02October 14th hearing, three drafting

04:04conflicts need correcting. First,

04:07section 217250D1

04:11makes a risk assessment optional when

04:13photographs suffice, but 217290

04:17A2C requires an arborist report for

04:21hazardous trees and the definition of

04:23hazardous tree in 2178 requires a

04:27qualified professional's written

04:28opinion. Second, the hazard tree

04:31replacement table lists diameters less

04:34than 30 in and greater than 30 in,

04:37leaving unressed a hazardous tree whose

04:40diameter is exactly 30 in, while the

04:43landmark tier begins at 30 in. Third,

04:472172100C2

04:49waves the 35% retention requirement

04:52whenever retention would limit imperous

04:55surface below 85% of the zoning maximum.

04:59Feasibility comes from the applicant's

05:01arborist report and the draft does not

05:04say how that condition is verified. On

05:06agenda item six, the memo proposes no

05:10text changes to the neighborhoods

05:12element. Yet policy text such as NE73

05:17still says as shown in map NER3,

05:21a map slated for repeal. Please ask

05:24staff to reconcile those references

05:26before the hearing and to identify which

05:28infeasible connections were removed from

05:30the transportation master plan map.

05:32Thank you.

05:34>> Thank you.

05:36Who's second?

05:37>> Next, we have Mr. David David Haynes.

05:41>> Great. And if you could also start with

05:43your name and address and keep your

05:45comments to three minutes, please.

05:47>> Hi, my name is David Haynes. Uh, I

05:50wanted to ask maybe you guys could

05:51resolve the issue with the uh the parcel

05:54and consider connecting to the city

05:57storm water drain if you have it instead

05:58of allowing the water of the front of

06:01the house of 14 ft to absorb it and then

06:04go into the wetlands. I just want to

06:05come down here to complain today because

06:07the planning commission needs to realize

06:09that we need to take the restrictions

06:10off the comprehensive plan and allow for

06:12people to build higher because I've been

06:14looking for an apartment by Mary Moore

06:16Village and those cheap lowquality

06:19buildings that seem to have like a

06:21parking garage structure as the

06:22foundation with a cosmetic pitification

06:24like warehouse echo quality don't have

06:28the strength and sturdiness and I guess

06:30the allowance to build higher to allow

06:32for like a a rooftop view. Why would you

06:36not allow for a rooftop view in Marymore

06:38Park? I don't get it. And then in the

06:40back of it, it's all these gravel

06:42dustified and denied fresh air sometimes

06:45when people drive through there. And I

06:46don't get that. The planning commission

06:48is supposed to provide 21st century

06:50first world quality housing and like

06:53commercial buildouts that are not

06:55accommodating the 20th century car

06:57ccentric laziness of the modern wheel

06:59that drives through every building. One

07:01of the worst places across from the

07:03Charles and all those apartments where

07:04the RVL and all the other ones are it's

07:07like a symphony from hell of all of the

07:09dumpsters picking up right outside

07:11people's residential communities and

07:13just ruining the mental health

07:14destroying like the quality of living

07:17because you have too many roads driving

07:19through all these like little

07:20neighborhoods. It's almost like you got

07:22to take over some of the roads and have

07:23a robust robust buildout, but you got to

07:26allow for bigger floor spaces for the

07:28grace of personal space and to go higher

07:31so people can enjoy living in their

07:32building instead of trying to get out of

07:34it as soon as they sign the lease

07:36because of the warehouse echo or the

07:38like the wall shaking when you slam the

07:40door like and it's a brand new building

07:41and you're wondering why the quality is

07:43not there. But the planning commission

07:45seems to not like well I don't I don't

07:48want to criticize too much. You know, I

07:49know some people want to weaponize the

07:50tree ordinance. It's important for the

07:52tree owners, but sometimes you got to

07:53take away the road, the asphalt and

07:56concrete heat islands and make it a

07:58living hell to go out and all you're on

08:00is concrete and asphalt, but you see a

08:02couple trees here and there, but it's

08:04not enough. But you have to realize that

08:06you still need robust housing buildouts

08:08without weaponizing the tree ordinance,

08:10but you have to stop accommodating the

08:12road and the service road. Sometimes you

08:14ruin the quality of living because you

08:16force the trash pickup right in the

08:18center of like five residential

08:21different buildings. It's like who the

08:23hell's thinking about that type of

08:24planning? You know, 21st century first

08:26world quality based on the pedestrian

08:29ccentric neighborhood that's resident

08:31friendly where you go and walk and

08:33you're not on the side of the road rage.

08:35It might be a walkable sustainable green

08:36build with more houses in the middle of

08:38some sort of particular like

08:39neighborhood. But anyway, I I thought

08:42that like you guys were discussing a

08:43parcel of land and people don't want

08:45them to build in all that, but it just

08:47seems like they should at least be

08:49allowed to build some sort of rooftop

08:50view if they're going to be allowed to

08:51do it. But if you could connect and

08:52bypass the requirement to absorb the

08:54front, that'd be great. Thank you.

08:56>> But I do appreciate your comment. Thank

08:58you so much for coming in.

09:01>> We have additional That's it. That's it.

09:04Thank you.

09:06Um at this point um we are going to

09:09start our study session on the tree code

09:11update and this is with Lauren Anderson

09:14and Cameron Zapata

09:40All right. Uh, good evening everyone.

09:43Uh, so tonight I will be going over the

09:46tree code update uh, which is primarily

09:492172.

09:51Um, I'm Lauren Anderson, senior planner.

09:55And just to clarify, is um Cameron

09:58Sapata with us tonight or is she not?

10:01>> She is not. Um but I am accompanied um

10:04online by Kim Frappier um from Facet.

10:08>> Great. So if we can ever correct that um

10:11in our minutes, that would be great.

10:13>> Okay. Yes. Thank you. We'll

10:14>> do.

10:18So here is our agenda for this evening.

10:20Uh so first I'll go over the timeline

10:24and then go over the key changes and

10:27comparison uh from the current code to

10:30the uh newest uh also known as version

10:34three. Um and then highlight the key

10:37changes from V2 to V3.

10:40um and then go over the previous

10:42questions from the planning commission

10:45um back in July and August

10:48and then go over next steps and then

10:50open it up for questions and comments.

10:56So we have our timeline here. So uh

11:00February through April of this year we

11:03uh started working on drafting the code

11:05and doing some research. May through

11:08July, we did community engagement and

11:10continued to draft the code. Uh July, we

11:14introduced uh to the planning commission

11:16and city council the new code. And then

11:19August through September um began the

11:23planning commission process as well as

11:25uh took this to the technical committee.

11:28And then um September 16th we received

11:32technical committee recommendation of

11:34approval um to the planning commission

11:37which is in the report. Um and then

11:40August through December will be the

11:42planning commission process and then

11:45next year January through March uh will

11:48be the city council uh process with

11:51adoption and then um post adoption um

11:55hosting public learning sessions and

11:58making sure that there's training for

12:00staff and the public. And then um also

12:04hoping to have a um delayed um effective

12:08date by around 3 months. So then that

12:10way it would give um the public and

12:13staff enough time to learn the new code.

12:19So next I'll go over the major changes.

12:26So, here's a comparison of the current

12:30Rebin zoning code sections and the

12:33proposed.

12:34Um, so we did add additional subsections

12:39um to hopefully add more clarity and

12:41make it easier to find uh which

12:44regulations apply for what item.

12:47[snorts]

12:52And as you can see here, we have um lots

12:54of new sections uh which we're hoping

12:57will make it easier for the public and

12:59applicants to find uh the requirements

13:02that apply for either the project or

13:05non-development.

13:10We also added some new uh definitions

13:15um and updated definitions. Uh so that's

13:19Redmond zoning code 2178.

13:22Uh so added uh nuisance tree, heritage

13:25tree, uh definition for hedge versus

13:28tree and then tree condition.

13:34So here is a comparison of the current

13:38and proposed tree code regarding tree

13:40removal not associated with development.

13:43Uh so we still have um limits based off

13:46of the lot size um but it is adjusted

13:50um to be slightly less um for the larger

13:54lots. So um the larger lots um that are

13:5830,000 square ft 30 sorry 30,01 square

14:02ft and greater um that was reduced from

14:07um 8 to five. And then we also added in

14:12the table here um a minimum and maximum

14:16number um to ensure that um people don't

14:20end up clearcutting their entire

14:22property.

14:25And then we have the replacement Oh, if

14:28you go back. Thank you. Um and then we

14:31have the tree replacement requirements

14:33comparison.

14:35Um so ultimately the larger the tree

14:39that was removed um the diameter at

14:41breast height the more replacement trees

14:44are required. Um and then we also added

14:47a requirement that hazardous trees um

14:51that are landmark or heritage require a

14:56onetoone replacement whereas the current

14:58code doesn't require any replacements.

15:06And then we have a comparison of the

15:08tree removal associated with

15:10development.

15:12So currently it's based on the quantity

15:15of trees on site and it's a minimum of

15:1935% significant trees need to be

15:22retained and we're switching to a new um

15:27credit system. Um so the formula here is

15:31on the slide. So it's the tree canopy

15:34site area times the credit multiplier is

15:37the minimum required tree credits. And

15:40then we have um the credits based off of

15:45um the location of the zoning district.

15:48And then also the type of development.

15:52So the more dense areas have a lower

15:55credit.

16:00And then this is the tree removal

16:02associated with development continued.

16:04Um and then one of the major changes

16:08from the second to the third draft is we

16:12added um so we had the in the second

16:16version we had the 35% required tree

16:18credits must be achieved through

16:20retention of existing trees and then

16:23with the third draft we added that um it

16:26would be exempt for lots that are less

16:29than 3,000 square ft. So smaller lots um

16:33wouldn't need to meet that 35%

16:36minimum. And then also we added that um

16:40it would be exempt if development

16:42reduces the allowable impervious surface

16:44to below 85% of the zoning district

16:48maximum.

16:51And then we kept the credits for

16:54retained trees. Um so the larger the

16:57DBH, the higher the credit. and then

17:00still adding that higher credit for

17:03caniferous trees um as we're

17:05prioritizing those.

17:12So here's a comparison of the

17:15replacement trees for landmark and

17:17heritage trees.

17:19Um so we didn't add any changes to this

17:23from the last version that you all saw.

17:26Um and this is located in 2172040

17:33uh landmark and heritage tree

17:35requirements.

17:43And then we added a new section for

17:46hazardous trees and nuisance trees to

17:49make it very clear for everyone um that

17:52these requirements apply in this

17:54situation.

17:56Um and then also added

18:01um a new process on how to remove the

18:04trees and um so that includes having the

18:08hazardous tree declaration form um in

18:12order to remove the tree um and then

18:15updating the hazardous tree definition,

18:18adding the new nuisance tree definition

18:21um and then having the review permit

18:24type and review authority under 2172070.

18:35And here's the tree fee inlue. So, this

18:38did not change uh from the last time we

18:40brought it forward to you all. Um,

18:43however, the inloo fee rates,

18:47um, we did add a for the credit fee,

18:50it's $450 per credit, um, which is

18:54similar to the city of Kirkland's, um,

18:57code.

19:03And then we have the culturally modified

19:05trees. Uh, we didn't make any changes to

19:08this section as well.

19:15And then we have the tree protection. Uh

19:17so we have the TPZ also known as the

19:20tree protection zone. Um this is

19:23unchanged uh from the last version as

19:25well.

19:32And then we have um the comparison of

19:35for regarding slow deforestation. Um so

19:39this was a a topic about um addressing

19:42that. Uh so we added into the code um

19:47that no development permits uh 12 months

19:52after tree removal

19:55and then no development permits 24

19:57months after landmark tree removal.

20:01And then we added credits for smaller

20:05previous uh replacement trees.

20:08And then um so that's a new change. And

20:12then from the last version uh

20:14non-development replacement trees cannot

20:17be removed unless deemed dead, diseased

20:19or hazardous.

20:26So we have enforcement and penalties. Uh

20:30so we added a reference to the RMC 1.14.

20:35Um so we're going we propose to remove

20:38the fees from the RMC and add them into

20:43a fee schedule. That way they can be

20:46continuously updated every year um and

20:50adjusted for inflation and um any you

20:53know best available science. and then um

20:57repealing RMC 1.1460B3

21:10and then the exception request criteria.

21:13Um so we did add clarity

21:17um on what requirements um apply. So we

21:21added that um that the applicant would

21:24need to meet one of criteria

21:28uh 1 through three and [snorts] that

21:31they have to meet criteria 4.

21:35And then we also made it clear that

21:37mitigation is a requirement.

21:46So we uh received some questions from

21:48the planning commission back in July. Uh

21:53so the first question was how does the

21:56current draft help address the urban

21:58heat island effect? Um so I'll speak to

22:02that question first and then I'll pass

22:05it off to Kim. Uh so street trees are a

22:09requirement as a part of development. Um

22:12and if you refer to slide eight, uh the

22:15tree replacement requirements, um we are

22:19now requiring replacement trees for

22:21landmark and heritage tree removal and

22:24mitigating loss by requiring replacement

22:27trees. So ultimately, the larger the

22:29DBH, the more replacement trees are

22:32required. Um there are also development

22:34flexibilities to incentivize retaining

22:37more trees and protecting the existing

22:40canopy. Um so these flexibilities

22:42includes um additional floor area height

22:46um variable setbacks

22:49and then we are tasked with balancing

22:51meeting our statemandated growth targets

22:54and meeting our tree canopy goal. So the

22:57tree code is only one part of meeting

23:00the canopy goal. There are other city

23:02efforts on meeting that canopy goal.

23:07Pass it off to Kim.

23:11Thanks, Lauren. Yeah, and I'll just add

23:13that the provisions that are currently

23:15in the proposed code will all be

23:18contributing to mitigating urban heat um

23:22including the protection of existing

23:25matured trees, retention standards, you

23:28know, during development projects, the

23:30protection of landmark trees, um

23:34replacement plantings, um and

23:36specifically the preservation of canopy

23:39that's adjacent to or over imperous

23:41purposes like roads, sidewalks,

23:45um driveways and and adjacent to

23:48buildings. Um

23:50these will all essentially help in

23:54mitigating

23:55uh the thermal uh you know the thermal

23:59load and the comforts for residents um

24:01you know as the city continues to grow.

24:08>> Right. So the second question,

24:09>> back to Oh, go ahead, Lauren.

24:11>> All right, thank you. Uh, so the second

24:14question, uh, what does prioritizing

24:16conifers look like and why are we

24:18prioritizing them? Uh, so conifers are

24:22required to be replaced with conifers.

24:25Uh, conifers receive a higher credit

24:28value for development for both retained

24:31and replacement trees. And then I'll

24:34pass it off to Kim.

24:40Yeah, and I'm essentially speaking to

24:42the why we are prioritizing them in the

24:45code. And um there are a couple of

24:47reasons why. You know, one is that um

24:50our conifers um provide yearround

24:54um ecosystem service benefits such as

24:57you know, carbon sequestration, storm

24:59water

25:01um mitigation,

25:03you know, and although

25:06um

25:07you know, our deciduous trees are

25:09critical and really important

25:11uh features of the urban canopy. um our

25:15conifers are providing that those year-

25:17round benefits um and are longer lived.

25:20And so those are some of the reasons why

25:24um when we start talking about urban

25:26tree canopy resilience and longevity uh

25:29we're prioritizing we're adding some

25:31incentives and pri some incentives in

25:34place to promote um the conifer

25:36retention and replacement for those

25:38reasons.

25:42>> Right. Thank you. Can [snorts] I ask one

25:44question? Um, just going through these,

25:46I think, um, sometimes it's hard to just

25:49listen out loud and I do want to make

25:52sure that we have a lot of time for

25:53building our actual matrix for council.

25:56So, is it possible um to do concise

25:59answers on these so that people know if

26:01they need to follow up further?

26:04>> Yeah. Yeah, I can share. I think

26:06everyone read the draft and we're um

26:08focusing on what's in that and then

26:10build

26:11>> like the actual packet that we'll bring

26:13to council.

26:14>> Okay. So maybe like a sentence or two.

26:17Is it possible to do that?

26:19>> Um yeah, we can shorten our responses to

26:22move to the uh comments and questions.

26:25>> Thank you so much.

26:26>> Yeah.

26:29Uh so the third question is what is the

26:32science behind the hierarchy of trees?

26:35I'll pass it on to Kim.

26:42>> So, this specific question was in

26:44regards to why we are prior again

26:47prioritizing

26:49conifers over some specific species of

26:53deciduous trees. Um, and I know you

26:56wanted me to keep this short and

26:58unfortunately my draft was a little

26:59long. Um

27:02but uh I'll just say that in terms of

27:05the hierarchy of trees, we're trying to

27:06promote um landmark trees and heritage

27:10trees at the highest level. So those

27:13trees that um provide the most ecosystem

27:16service benefits are considered high

27:17value. Um a couple of trees as you know

27:21are called out to receive less credit.

27:23Those were red alders and cottonwoods.

27:26Um and the reason behind that is because

27:29those are um kind of early successional

27:33fast growing species that often have

27:36proved to have infrastructure conflicts

27:38in the built environment. And so I can

27:41speak to that more if you want me to,

27:42but perhaps I'll just leave it at that

27:44and then I can follow up if needed.

27:46>> Um people look confident with that

27:47answer, so thank you.

27:53Right. Uh so the um is there capacity

27:56for off-site replacements? Uh yes there

27:59are. Um those locations are managed by

28:03Tom Hardy and public works and staff is

28:06looking into creating either a GIS layer

28:09or having a way to make it available to

28:11the public. And then the second question

28:15is what's the city's canopy coverage

28:17today? Um, so it's currently at 37% as

28:21of 2023.

28:23And then if you want more information,

28:25um, we have a link to our tree canopy

28:28web page.

28:30And then question number three, um,

28:33clarify segmentation of conifer species

28:36and whether credit values vary by type

28:38and size. Uh, so the code doesn't

28:41specify conifer species and assign

28:43different credit amounts to different

28:45species. All conifers are treated the

28:48same. We wrote it this way for usability

28:52um of the code for both the applicant

28:54and staff.

28:58Kim, did you need to add any anything?

29:01>> Um I don't I don't have much to add

29:03there. Only that this is a this is what

29:06we're seeing um with our countywide

29:08research um that we've done that this is

29:11also this is consistent with other

29:13jurisdictions

29:14locally.

29:16Great. Thank you.

29:19Question number four, um addressing

29:22categories for large lots, so 30,000

29:25square feet and above and how

29:27requirements scale for even larger

29:29parcels.

29:31Uh so in table 21720901,

29:36um we have the non-development tree

29:37removal. Um so if someone would like to

29:40exceed the maximum number of tree

29:42removal um they can apply for a tree

29:45exception request.

29:48[snorts]

29:50And then question number five, ensure

29:53tree removals are treated with

29:54appropriate distinctions hazardous

29:57versus elective.

29:59Um so hazardous trees need to either be

30:03clearly a hazard as shown in a photo and

30:06if it can't be determined by a normal

30:08person then an arborist report is

30:10required.

30:11Um

30:15and then we can move to the next one.

30:19So question number six um strengthen

30:22civil penalty options uh penalties for

30:25professionals restrictions on working in

30:28Redmond and share responsibility between

30:30homeowners and true removal companies.

30:34Um so this language um in the code is

30:38under 2172180C2.

30:42Um it states that any person or

30:44professional contractor who aids or bets

30:46in the violation may be considered to

30:48have committed a violation for purposes

30:51of fines.

30:55And then question number seven regarding

30:57replacement trees.

30:59Um so we do have size requirements for

31:03the plant stocks and then currently

31:06currently on our true web page we have

31:09resources

31:11about selecting the right tree based on

31:14the mature height and the amount of

31:16light it requires to survive. We also

31:19[clears throat] have a web page about

31:20right tree right place that goes into

31:22detail about where and how to plant.

31:27And then question number eight, I'll let

31:29Kim speak to.

31:33>> Um, [clears throat] yeah. So, I would

31:34say that the tree protection zone is

31:39um the variables that influence that is

31:42both the on-site development and the

31:44conditions, size, species of the trees

31:48themselves. So in some cases I would say

31:51yes driveways or roads um are definitely

31:55considered in most cases they are

31:56considered as part of um the tree

32:00protection zone. Um however sometimes we

32:03find that tree roots can grow underneath

32:06driveways and um and so it's really

32:10sight specific and has to do with you

32:13know what the on-site conditions and the

32:15proposed design are.

32:21And this is based and this is based on

32:22ANC 300 standards um that are that are

32:28followed by UN certified arborists.

32:34>> Thank you. And then question nine um

32:37consider developing a parcel viewer with

32:40automatic tree credit multipliers.

32:43Um, so we recommend against having a a

32:48layer like that um that applicants

32:51should base the calculation off of a

32:53survey. Um, because our layers uh don't

32:57have um the private easements and only

33:00have the estimated critical area

33:02locations. Um, our goal is to create um

33:05a calculator so people can plug in the

33:08information and calculate the minimum

33:10credit requirements

33:17and then um determine whether fees

33:20collected will also fund enforcement. So

33:22code enforcement is funded by the

33:24general fund um not these fees. And then

33:28the last question tonight um how do you

33:31strike the right balance between

33:32mitigation and deterrence and are the

33:36inloo fees sufficient enough? Uh so the

33:40inloo fees are consistent with regional

33:43practice in neighboring cities. The fee

33:46amount uh recoups the cost for the plant

33:49soil prep maintenance and survivability.

33:51Um, and then we have a link on the slide

33:53here, um, which has the King County

33:56jurisdictional tree code summary

33:58spreadsheet to see how other

34:00jurisdictions,

34:02um, have their tree code lined up for

34:04fees and penalties.

34:11And then we have next steps. [gasps] Uh

34:14so we have the public hearing coming up

34:18um October 14th

34:21and then we have November 4th available

34:23for another study session if needed. And

34:27then November 18th is scheduled for

34:29study session and recommendation.

34:35And then now we can open up to questions

34:38and comments.

34:39>> Great. So I think what we're going to do

34:41is start building our issues matrix. Um

34:45so um as usual if your question is ever

34:48not for the issues matrix please specify

34:51that but otherwise we'll just assume

34:52that they all are. Um and we will go

34:55around and I already see commissioner

34:56aarna's hand raised so she can start.

35:01>> Thank you chair. Um thank you Kim. Thank

35:04you. So for me it's like I like the

35:09intent of this whole code but I think

35:12it's extremely complicated. Um I'm used

35:16to reading the code and for various

35:18purposes I'm used to reading dense

35:21technical information and even I found

35:23it difficult. Overall, I think

35:26readability could be improved. And for

35:29me, I also see I understand the need for

35:32a tree credit system, but I think it is

35:37I'm not sure how complex the more

35:40complex we make the entire system, the

35:42harder it is going to be to enforce. Uh

35:44mistakes will be made by public who will

35:47not understand it, who will be

35:48frustrated. Uh developers who will come

35:52several times to the city trying to

35:53figure this out. and enforcement is

35:56going to be a real pain in the wrong

35:59place. Uh, pardon the language, but um I

36:02I wish there was a way to kind of clean

36:06this up. The intent is awesome. I really

36:09think we could get there. Um, maybe

36:11simplify, maybe comb through the whole

36:14thing to simplify. Um, for the listening

36:17public, I have sent several questions uh

36:20breaking some of my concerns down to

36:23staff already.

36:24>> I actually um so I want to make sure

36:26that we're getting um just everyone a

36:29chance to go around. Is this related to

36:31the question of readability or are these

36:33additional topics?

36:35>> Uh no. So it's uh I just want to kind of

36:37say that I've broken the readability

36:40down into several questions in my email.

36:42So, um, it sort of branches out into

36:45more specific asks. So, I, uh, I just

36:48want to let the public know that I've

36:50sent out the questions. I request staff

36:53to please address them in the issue

36:54matrix.

36:55>> Could you just, could you just quickly

36:57summarize them? So, you mentioned um

37:01that the replacement was one of them.

37:03What else?

37:04>> Uh, so I think knowing how it works with

37:09each parcel is key. not knowing that

37:12without that you're flying blind. Uh we

37:14need to have the scenarios which were

37:17explained earlier. The code needs to

37:19reflect the scenarios. Uh we need to see

37:23where um this tree credit is going. Um

37:27that's not clear either for the

37:29readability of the e efficacy of it. So

37:33I'll just leave it with those three top

37:36questions. Not to mention enforcement

37:40issues along the complicated lines that

37:43we have set up.

37:45So I don't want to take up everybody's

37:47time, but I think I've broken it down.

37:50I'm hoping to see more clarity along

37:53that. So thank you.

37:54>> Thank you.

37:56>> Who else?

37:59Um I'm going to jump in here. I would um

38:04actually I have a few. I'm going to

38:05start with something that's very

38:06similar. So, um, I have real qualms

38:10about 97 pages of code as a minimum to

38:13understand the scenario for a homeowner.

38:16So, I think when we're talking about

38:17developer audiences, they might be able

38:19to wade through this. But what we when

38:22our goal as a city is to work on our

38:24tree canopy and preserve some of our

38:26older trees, I really want to make sure

38:29the people coming in can quickly locate

38:32themselves and find their answer and

38:34head out. So, and their answer would be,

38:36"Can I take this tree down?" Right? When

38:38we're um 97 pages to understand that

38:41question is way too long and so, and I

38:45think we've also seen this like the

38:46state update its plain language

38:48standards in 2023. Um basically saying

38:52like people should be there shouldn't be

38:53jargon, people should be in and out,

38:56like there should only take one read to

38:58understand the answer to government

39:00communications. And I know this is code,

39:02so it's much more technical, but I still

39:04think those rules should apply because I

39:06don't think we're going to get the

39:08outcomes that we're hoping for if it's

39:11this complicated and this long.

39:15>> Commissioner Coleman,

39:16>> I just want to add to that a little bit,

39:17and I'm sure this is a solution, but

39:19it's an observation, which is as we move

39:21forward, people are able to access and

39:23assess complex um detailed documents

39:29with AI. Is there some form of other AI

39:32um querying

39:34solution that the council is considering

39:37or thinking about in how people

39:39interact? It's a it's related to this,

39:41but it's maybe a larger question, which

39:43is this might be completely fine if you

39:45have the ability to ask the question

39:47that's going to take you to the answer

39:48you need quickly.

39:50>> That's that's that's where I go to

39:51because there's so many other places now

39:52you can do that.

39:55>> That might be a larger question. Mr.

39:58Woodyear.

40:00>> Um, your comment, um, Chair Wesson,

40:03really resonates with me. As someone who

40:05struggled to get an answer from the city

40:08as to whether my dying tree could be

40:10taken down, I feel the pain. And I also

40:13would would echo the the need for

40:16finding a way to mitigate tree loss

40:18while also making the answers to simple

40:23questions easier. But I do have a

40:25question that's that's separate if I may

40:27please.

40:28>> Um, we're you mentioned that we're at 30

40:3237% tree canopy and that's that's and

40:35that's probably I don't know whether

40:37that's upward or downward given our our

40:4040% target.

40:42Has this has the city done any modeling

40:45to really understand the trajectory of

40:48canopy loss or [snorts] or or

40:52maintenance? Um and and I asked this

40:55question because when I think about our

40:582031 goals, you know, we have capacity

41:00for housing. We are we we still h as

41:04that capacity converts to production.

41:08I got to imagine or or or maybe I should

41:10ask you this is going to put a lot of

41:12pressure and a lot of urgency and a lot

41:14of strain on both property owners as

41:16well as developers. And so um so so so

41:20understanding how big the problem is and

41:23how strong our our policies need to be

41:27to mitigate this is really important.

41:29And I'm going to hold off my third

41:31question. So

41:32>> we're going to go back around.

41:33>> Yeah. Hold off on that.

41:37>> Great. Who's next?

41:42>> All right. I'll jump in with another

41:43one. I would like to add um two of Dr.

41:45Morton's questions from the public

41:48comment today to the issues matrix. So

41:50there were these both concerned um how

41:53we know that a private arborist hired by

41:57the property owner is being

42:00or is reaching the same um decision that

42:05we that other people in the city would

42:06reach if they weren't motivated by um

42:10the potential financials for a

42:12particular parcel. And so I think he

42:16brought up two points and I'd like to

42:18know the answer to both of them. How is

42:19the city verifying that hazardous trees

42:23like that decision is actually accurate?

42:26Because and I've seen this in my

42:28neighborhood where any cedar is

42:31qualified as hazard hazardous by many

42:33arborists because they're so big and if

42:35a limb falls then it will cause damage

42:38and that's not a hazardous tree. That's

42:40a healthy cedar. So like really

42:43understanding is this an honest

42:46decision that meets the city's bar would

42:48be helpful. Um and then his other

42:50question about the imper is surfaces

42:53like how do we actually decide if they

42:57require more space on the lot that

42:59requires taking down trees? That's a

43:01currently a private contractor decision

43:03in this code. But should it be should

43:05the city have additional oversight

43:07there? Um, so both of those would be

43:09really helpful.

43:11>> Commissioner Coleman,

43:12>> this might be included in there, but the

43:13other thing we've talked about and I

43:15know has come from this same public

43:16comment is around whether they should

43:18well where there should be a hiring of

43:20an arborist at the council or who is

43:23responsible at the council for this

43:26oversight as a professional. So I I

43:29don't know the answer to that, but that

43:30was a question came up in our last

43:32conversation is in that public comment

43:34three times, I think. And this is going

43:36to be really difficult because we can't

43:39push for that in the code. But having

43:41code that's written in a way that that

43:43sort of programmatic approach would make

43:46sense I think is really important here.

43:53All right. Commissioner Aara.

43:56So um this is to uh Commissioner

43:59Coleman's comment on the AI use. I I

44:03think that's a much bigger conversation

44:06and if we asking listening public to use

44:09AI and they get it wrong

44:12um by parsing the wrong document because

44:16AI can get things wrong and the so I

44:20think we have to tread carefully and

44:22it's a much larger city conversation. Um

44:26the city could be open to lawsuits. Um,

44:30so I I I'm just putting it out there,

44:32but on the enforcement and fee side of

44:35thing, um, I think having I know the

44:38money part is not in our purview, but I

44:41would like to see where that money might

44:44go. Um, like you said, chair, in a

44:47programmatic way. Um, where are all the

44:50penalties going? Um, is there a way to

44:53do this? Um, that's key, right? Uh,

44:56because we need enforcement. We need an

44:59arborist perhaps. I don't know. But that

45:02black hole we shouldn't leave. So that

45:05was I've added that to the question. So

45:08but I did want to bring it up. So thank

45:10you.

45:11>> Great. Thank you.

45:13>> More vice chair.

45:17I would say as we think about where the

45:20penalty money goes, it would be really

45:23nice to see a more uh assertive tree

45:26growth strategy u put in place. Um as I

45:29read through this document, I don't

45:31really have an a clear understanding of

45:32the magnitude of tree loss. Um are we at

45:3530%, are we at 25%. So it's hard to say

45:38how aggressive we need to be. But the

45:41more aggressive we are on tree loss

45:44mitigation, I think we need we we owe it

45:46to our community members um to have an

45:49equally assertive strategy for growing

45:53the um for replacing the loss.

46:00>> All right, I'm going to chime in again.

46:01Um so I appreciate seeing my comment

46:05from this summer um addressed in the

46:08issues matrix and your summaries. Um,

46:10but I wanted to bring it up again

46:12because I still think that the city

46:14should act more strongly here. So when

46:17we come to what is the penalty for a

46:20business that takes down a tree in a way

46:23that violates the tree code, I think it

46:26needs to be way more clear that um both

46:32both that arborists have the information

46:33that they need to make the right

46:35decisions, but then also they really

46:37risk for like further business in

46:39Redmond if they violate the tree code.

46:42And one, the reason that I brought up

46:44business endorsements as a possible

46:46avenue for that that I think should be

46:48included in the zoning code as a penalty

46:51is when you get a business endorsement

46:53from Redmond, it's an opportunity to

46:55actually like with your business

46:57license, you're actually getting an

47:00information packet from the city about

47:01the expectations. And we do this in

47:04other um business types. So to have a

47:07thing for arborists where we're actually

47:08saying here's the rules now about the

47:11tree code and making it clear that there

47:13is more of a penalty um if they're

47:16involved in a situation where a tree was

47:19taken out that shouldn't be. I think

47:20that would have a lot more teeth because

47:22in my experience even for things like

47:25water heaters or other things where we

47:27have permits people are much more

47:30willing to like stay to the line if they

47:33know there's going to be inspection.

47:34they know there's going to be um a

47:37problem for them that they have to spend

47:38extra money and time to resolve. Um

47:42and so I think making it a little bit

47:44more difficult process on the back end

47:47if someone has found to use their

47:49business to take out trees would be a

47:51real step in the right direction.

47:53Commissioner Coleman,

47:54>> you're asking the questions I'm trying

47:55to ask, which is great. No, [laughter]

47:59I'm half joking. I actually wanted to

48:00add a little bit to that. Um, great.

48:02>> Just as an just briefly like in the UK

48:04there was a there was a sycamore tree

48:06cut down at sycamore gap. It's a very

48:08famous tree and was cut down last I

48:10think three years ago and it looks the

48:13two men that cut it down look like

48:14they're going to go to jail and have to

48:15pay £630,000.

48:17I'm not suggesting we have that in

48:19Redmond. [laughter]

48:21What the reason I bring that up is I

48:22mean that's the height of kind of that

48:24kind of um uh vandalism is what I would

48:27call that. In Redmond though, for a lot

48:30of for a lot of people, like there's a

48:31lot of money that goes around in people

48:32rebuilding houses and stuff like that.

48:34And hey, $10,000, well, that's okay.

48:35I'll just pay that. It's just just part

48:37of the tax of removing these trees to be

48:40able to build my house or for the the

48:42developer to buy the lot and do it.

48:44there needs to be strong for me stronger

48:47things to that developer to say you can

48:49no longer develop in Redmond if you do

48:51this and here's here's here's the

48:53background to that because I don't think

48:55money makes a difference in this current

48:57climate in in when it comes to uh this

49:00this this aspect for a lot of people

49:02>> and especially relative to the host like

49:04the home prices

49:06>> it's a just a very tiny amount even

49:08though it sounds big on a paper

49:12>> further comments

49:16I had one more that I just want to chime

49:18in with because I didn't necessarily see

49:20it specifically, although I might have

49:23missed it. Um, one issue um that has

49:27come up in the past just on the

49:29remediation front, it's not just the

49:31tree canopy. It often also with the very

49:34large trees when they're taken out, the

49:36problem is drainage.

49:38Um because if you add like a very large

49:41Douglas fur or cedar or even hemlock

49:44like sucking up all that water out of

49:47the ground and then you remove it like

49:49that can cause major drainage issues on

49:53that property but also on other

49:54properties and also the storm water. So

49:57um I don't know if the city has looked

49:59into

50:01solutions there requirements. Um but

50:04we've I mean Grasson has lost so many

50:07trees as a neighborhood in the last 15

50:09years. Um and there's been a real step

50:12up in

50:14just additional problems related to

50:18water that doesn't really get removed

50:20the same way cuz we don't have

50:23necessarily drainage like in the

50:25property. But if if people are removing

50:27these large trees, it might make sense

50:29to like have an additional requirement.

50:33um especially if they're moving removing

50:35multiple. So I don't know if that's

50:37something that the code should specify,

50:38but it does seem especially with this

50:40the storm water and cross lot problems

50:44that it could be in the city's purview.

50:49>> Look into that.

50:50>> Cool.

50:51>> All right. Are we done? Oh, nope.

50:53Commissioner Coleman,

50:54>> just one very very small thing. Um, and

50:56this was brought up in public comment on

50:58page nine, but it's kind of confusing

51:00the way some of these numbers are dealt

51:02with. So, in the property size, it's up

51:04to 10,000 square feet or 10,0001 square

51:06ft to 20,000 ft. And then you go to the

51:08diameter of individual trees removed,

51:11it's less than 30 in or greater than 30

51:13in. Um, and as the comment was made,

51:16what if it's 30 in? So, could we change

51:18that language here? And maybe it's

51:20elsewhere is up to 30 in and then

51:23greater than 30 in. tiny thing, but it

51:26could make a difference some at some

51:27point.

51:28>> Yes. Yeah.

51:32All right. Great work. So, we will see

51:34you next time for our public hearing.

51:37>> Thank you everyone.

51:39>> Thank you.

51:40All right. Do people want a quick break

51:42before we move to transportation?

51:45>> Yes. Okay. We will take a five minute

51:47break and we'll be back at 7:57.

52:02Heat. Heat.

52:06[music]

52:14[music]

52:27>> [music]

52:36[music]

52:40>> Heat.

52:42Heat.

52:50Hey,

52:59[music]

53:09hey, hey.

53:21>> [music]

53:31>> Heat. Heat.

53:38Heat. Heat. N.

53:40[music]

53:45[music]

53:52>> [music]

53:58[music]

54:04[music]

54:21[music]

54:27[music]

54:40[music]

54:48[music]

55:05[music]

55:11[music]

55:24[music]

56:13[music]

56:24[music]

56:57[music]

56:58>> I need it.

57:06[music]

57:38Heat. Heat.

57:43[music]

58:03>> [music]

58:12[music]

58:18>> Heat. Heat.

58:26[music]

58:28Heat. Heat.

58:45[music]

58:55Heat. Heat.

59:08[music]

59:49Great. Thank you. All right. Next up is

59:52our study session on the neighborhood

59:53connections map for the 2026 2027 annual

59:58docket with Michael Hint and Franchesca

1:00:00Liberty.

1:00:02>> Great. Thank you, uh, planning

1:00:04commission. My name is Michael Hints.

1:00:05I'm the transportation planning manager

1:00:07for [snorts] the city of Redmond. And

1:00:09today um we'll provide an introduction

1:00:12to a docket item that will make a minor

1:00:14update to the neighborhood element of

1:00:16the comprehensive plan by repealing

1:00:18outdated neighborhood connection maps

1:00:21that have been uh replaced with

1:00:23consolidated neighborhood connection

1:00:25maps in the transportation master plan.

1:00:28This will be the first study session on

1:00:30this item in preparation for October

1:00:3214th public hearing. Uh so we will have

1:00:36um scheduled time for any questions and

1:00:38discussion of this item. Staff are

1:00:40seeking a planning commission

1:00:41recommendation to amend the

1:00:42comprehensive plan. The newly adopted

1:00:45neighborhood connections map is included

1:00:47in the pedestrian plan section of the

1:00:49transportation master plan and is

1:00:51replicated in appendix G with larger

1:00:53scale maps.

1:00:56Just as some background, the

1:00:58neighborhoods element was redlined and

1:01:01remaining policies in that element are

1:01:03incorporated by reference into the

1:01:04community development and design element

1:01:06as part of the Redmond 2050 adoption

1:01:09process. This was reviewed and

1:01:11recommended by the planning commission

1:01:13on July 10th, 24th, and 31st in 2024.

1:01:18Future updates to the neighborhood

1:01:20policies are included in the 2026 2027

1:01:24docket as approved by council on August

1:01:263rd, 2026.

1:01:28So, this is really just a minor cleanup

1:01:31item uh in the interim. Um, and with the

1:01:35adoption of the transportation master

1:01:37plan in February 2026, neighborhood

1:01:40pedestrian connections from the

1:01:41neighborhood elements and other city

1:01:43documents have been consolidated into

1:01:45maps within the transportation master

1:01:46plan. These maps are located in the

1:01:49pedestrian plan of the TMP pages 73 and

1:01:5388 and in the uh appendix G page 314.

1:01:59Uh concurrently we want to um these new

1:02:02TMP maps replace the five neighborhood

1:02:04connections maps in the neighborhoods

1:02:06element of the comprehensive plan.

1:02:08Repealed maps include the connections

1:02:10maps for Bear Creek, Education Hill,

1:02:12North Redmond, Southeast Redmond, and

1:02:15Northeast Rose Hill. All of these

1:02:17neighborhoods are shown in newly adopted

1:02:20map in the transstation master plan.

1:02:23References to these outdated maps in the

1:02:25text of the neighborhood elements will

1:02:26be removed as well.

1:02:29So, as next steps following a study

1:02:31session, we will return August uh

1:02:33October 14th with a public hearing and

1:02:35study session. if needed. Uh we

1:02:37anticipate PC recommendation and

1:02:40approval on October 28th.

1:02:43With that, I open up to questions.

1:02:47>> All right. So, I'm going to jump in here

1:02:48as chair for a second. Um so, I

1:02:52unfortunately wasn't able to resolve

1:02:54this before the meeting tonight. Um so,

1:02:57apologize for putting you all on the

1:02:58spot. Um, I have

1:03:02qualms about updating the neighborhood

1:03:05element um, the way we're being asked to

1:03:08do. I do think that this map change is

1:03:10important, but doing it in this location

1:03:12seems like a problem to me. The way that

1:03:15it's been characterized that the

1:03:18planning commission reviewed the

1:03:19neighborhood element as part of Redmond

1:03:222050

1:03:23is not correct. We reviewed the entire

1:03:26document during the omnibus package that

1:03:29happened in summer 2024.

1:03:31There is one page saying that two

1:03:34policies from the neighborhood element

1:03:36that used to exist in Redmond 2030 would

1:03:39be brought over and then but the

1:03:42majority of that content was split into

1:03:45other places as part of the

1:03:47modernization of Redmond's comp plan.

1:03:50And so places that went were community

1:03:52de design and development. We had some

1:03:55things go to a really nicely revamped

1:03:58transportation

1:03:59appendix section and transportation

1:04:01element. Um and my understanding at the

1:04:03time was that things were being moved to

1:04:06the appendixes to make it easier to do

1:04:08updates like this that the city needs to

1:04:10complete its work. Um and then we had

1:04:13some remaining information in the

1:04:15neighborhoods element that will be

1:04:17reviewed later this year.

1:04:20Um when we actually look at the

1:04:22neighborhood element that was in our

1:04:24packet this week, it is very very old.

1:04:26So um most of it was written based on

1:04:29work that happened between 2004 and

1:04:312008. Um almost all of it's incorrect.

1:04:35Some of it's been repealed. I think we

1:04:37had a public comment tonight that

1:04:38alluded to how confusing this is to see

1:04:41ghost maps and ghost policies come back

1:04:45out of the blue from like 20 years ago

1:04:49us. Um, but I just I cannot imagine

1:04:52sending to council a document that's 20

1:04:54years old and removing a few parts of it

1:04:57and putting in other parts that doesn't

1:05:00match what I believe we accomplished in

1:05:03Redmond 2050. So, what I would like to

1:05:05propose is that we have a chance to

1:05:08relook at what the correct places for

1:05:10these maps are. Obviously, they're in

1:05:12the transportation master plan that was

1:05:14passed by the commission and especially

1:05:16by council um last winter. Um and then I

1:05:20understand that they might be

1:05:22appropriate in um the transportation

1:05:25master plan or sorry, excuse me, in the

1:05:28comp plan as well. But then I would

1:05:30actually think that appendix H would be

1:05:32a much more appropriate place for them

1:05:34because that's where we have all of our

1:05:36other pedestrian and bike maps. Um so I

1:05:40would propose instead of appe repealing

1:05:43these maps from a very very old document

1:05:46that instead we add them to appendix H.

1:05:49But I'm open to other solutions. I'm

1:05:51just I'm I'm very very skeptical of

1:05:55using this body to edit and

1:05:59reintroduce a part of we had no revision

1:06:03of this. We've had no revision for the

1:06:0520 sorry for the seven years that we

1:06:07have recorded record of. So it's just

1:06:09this doesn't feel like the right spot.

1:06:12>> Okay. Um I just want to comment on a

1:06:15couple of your comments and then I'll

1:06:17hand it over to Becky to talk more about

1:06:19the process. um the appendices they were

1:06:22referring to in the transportation

1:06:24element, those were all removed as part

1:06:26of the TMP update and that information

1:06:29was either incorporated directly into

1:06:31the transportation master plan or its

1:06:33appendices. So, appendix H no longer

1:06:36exists in in the comprehensive plan. Um

1:06:40and that was part of the transportation

1:06:42master plan update process that we

1:06:45approved that.

1:06:46>> All right. Then maybe the city could

1:06:47update the comp plan online because the

1:06:50full doc still contains it.

1:06:52>> And Glenn Coyle, we we recognize that

1:06:55and he is working on that.

1:06:57>> Wonderful.

1:06:58>> Update that.

1:06:58>> You're ahead of it. Great.

1:07:01>> Yeah. Um just to provide a little bit of

1:07:02background and then a couple of

1:07:04suggestions of ways to move forward. Um

1:07:06the omnibus package that was reviewed by

1:07:09the planning commission in um the summer

1:07:12of 2024

1:07:14included edits and red lines to the old

1:07:17neighborhoods element. Um and we could

1:07:20provide that out via links to the

1:07:22planning commissioners and then it was

1:07:24also adopted by

1:07:25>> sorry I don't want to let that stand. It

1:07:27really didn't.

1:07:30That was not part of We have never

1:07:32reviewed this.

1:07:34>> Uh in I did send you the link.

1:07:36>> That's why the documents yesterday

1:07:38>> and I checked it and it's definitely not

1:07:40there.

1:07:41>> If you can find a time when we have

1:07:43reviewed the neighborhood element from

1:07:462030

1:07:48as part of our Redmond 2050 work, I am

1:07:50all ears. But that did not happen.

1:07:52>> That it was laid out in the email I

1:07:54sent. It starts on page 256 of the

1:07:56planning commission packet link that we

1:07:58sent as attachment B1 for the omnibus

1:08:01package. Um it was also um so it was it

1:08:05was sent to it is confusing because we

1:08:08took what was left of the neighborhoods

1:08:10plan that we couldn't get to because we

1:08:12just didn't have time to get to all the

1:08:14neighborhood plan updates and we said

1:08:15okay we're going to remove it from the

1:08:17comp plan but keep it over here to

1:08:18continue working on it. It's on the

1:08:21docket under the neighborhood plans work

1:08:23ongoing and we intentionally left it in

1:08:26the old format um to make it obvious

1:08:28that we hadn't gotten to it yet. Um but

1:08:31it does it is confusing. The language

1:08:33and the adoption doesn't necessarily um

1:08:36make sense to an average user. So uh we

1:08:39understand and we apologize for the

1:08:41confusion but it did go to the planning

1:08:43commission as a part of the omnous

1:08:44package. It went to council with their

1:08:47final adoption package. It is actually

1:08:49exhibit one in ordinance 3181 for the

1:08:52adoption of the comprehensive plan.

1:08:54Exhibit 2 is the comprehensive plan. Um

1:08:57so it does exist as a as a document that

1:08:59is current but old and we haven't gotten

1:09:02to it yet. Um but that leaves us with a

1:09:05situation with the TMP work created a

1:09:07new map and this one still lives. There

1:09:11are other old pieces that we haven't

1:09:12gotten to yet. So, um, you could choose

1:09:15to move forward and make this edit and

1:09:16strike it so we don't have two maps out

1:09:18there with the same content. Or you

1:09:21could, uh, push it to the edits that are

1:09:24coming to this chapter or the repeal of

1:09:26this chapter, which is a decision that

1:09:28is going to be made under a project that

1:09:30Lauren's leading for the neighborhood

1:09:32planning process that's currently

1:09:33underway. So, we didn't have the

1:09:36capacity to do in the neighborhoods

1:09:37element during Redmond 2050, but it's

1:09:40already started to actually address that

1:09:43that that was a remaining to-do item.

1:09:46Um, but we could package these together.

1:09:49Um, if the planning commission uh

1:09:51chooses to, they could just recommend

1:09:54denial of it because you don't want to

1:09:56touch it. And that's an action you can

1:09:58choose, too. So, uh there are pathways

1:10:00forward. Um but it is it it is a

1:10:03document that if it is to be edited

1:10:06needs to be edited through this process.

1:10:08>> So my question here um would be where in

1:10:12an ideal world would these replacement

1:10:16maps

1:10:17>> well that's already been done.

1:10:19>> Yeah. We're not replacing the maps that

1:10:21are in this old neighborhood element. We

1:10:24we consolidated those connections that

1:10:27were in those maps into the maps that

1:10:29are currently in the transstation master

1:10:30plan. Okay. I just don't see a conflict

1:10:33because we don't even have a link from

1:10:35the comp plan into these old doc. We

1:10:39would have to go line by line and repeal

1:10:43like dozens of items per section if we

1:10:47were actually going to bring this

1:10:48forward. It is so old. So, I'm just I

1:10:52can't

1:10:57The rest of it isn't really standing

1:10:59either. we've overwritten it. That was

1:11:01the work of 2050.

1:11:07>> Well, I guess we have those two options

1:11:10uh in front of us tonight. I don't

1:11:12actually this is a tough one because I

1:11:14don't feel like the planning commission

1:11:16has the authority to bring back this ele

1:11:20like this is this feels very

1:11:23I I'm not totally what I heard was that

1:11:25it was found on the website and that was

1:11:28why

1:11:30the edit are in front of us but like I'm

1:11:33not exactly sure how we got here. Um I'm

1:11:37not even sure we should really spend

1:11:39time on it. What I would prefer to do is

1:11:40come back with the solution, even if the

1:11:43solution is just no, we're good. We have

1:11:45it in the transportation master plan

1:11:47that was passed by council. Um,

1:11:52as part of all of the work that was done

1:11:55last year,

1:11:58but I cannot I just can't see sending

1:12:01this element back in its current form

1:12:03because I think it's confusing.

1:12:05It's like a ghost from the past.

1:12:13Mr. Wier,

1:12:15>> we owe it to our the role that [snorts]

1:12:17we're playing and we owe it to the

1:12:18community to have clarity. I'm

1:12:20thoroughly confused now. [snorts]

1:12:23Um, and I I don't want to weigh in on

1:12:25something else. I have clarity.

1:12:28So, given that, [clears throat] what are

1:12:30what are our options? Could we possibly

1:12:34come back on October 14th with just a

1:12:37plan forward? I understand that there's

1:12:38a public hearing scheduled. Um,

1:12:42but it's we can't really review this as

1:12:45is. I don't I don't think any of us

1:12:47would feel comfortable.

1:12:49>> Well, as I mentioned, the two options

1:12:51for moving forward are you well, you

1:12:54could move it forward with the edits and

1:12:56approve it or recommend approval or

1:12:58deny.

1:12:58>> I'm sorry. I feel like there's been a

1:13:00mistake here and I don't want to treat

1:13:01this with the same process that we would

1:13:04usually use. I tried to resolve it

1:13:06before the meeting. I don't feel like

1:13:09we're hearing each other exactly, but

1:13:11this is not standard for us.

1:13:18So what we can do is next week in or the

1:13:21next planning commission we can put in

1:13:23your packet the the tracking of why and

1:13:25the history of it and um so that all of

1:13:28the planning commissioners can see why

1:13:30it is on the docket and it has been

1:13:32approved on the docket and then we were

1:13:35here for the docket. We understand why

1:13:37it's on the docket. We sent it like this

1:13:40has been a discussion that we've been

1:13:42part of. The question is where is the

1:13:44appropriate place for these maps to live

1:13:46and what documents do we need to touch

1:13:48in order to make sure that's correct?

1:13:50And I don't feel like those questions

1:13:51are really being answered here.

1:13:54>> I I I guess I'm not following your

1:13:58assertion that there's a some other

1:14:00place for these maps to live. We're

1:14:02trying to repeal these maps so that

1:14:04there's no there's not conflicting

1:14:06information between the transportation

1:14:08master plan and what is in the

1:14:10neighborhood elements. That is the sole

1:14:13purpose of this action.

1:14:16So, we're not looking for another home

1:14:18for the maps. We're looking to remove

1:14:20the maps so there's no confusion.

1:14:27>> Yeah, it's just a deletion.

1:14:30>> All right. Perhaps we'll table this for

1:14:32now then and we can get on the same page

1:14:35for the 14th.

1:14:37Um but probably not with a public

1:14:40hearing that day because we won't have

1:14:41time had time to actually understand

1:14:43what we're

1:14:46hearing has been scheduled but if you'd

1:14:48like to continue the public hearing

1:14:50further out you're welcome to do that

1:14:52like a normal

1:14:53>> vice chairuation of public hearings. Oh,

1:14:56pardon, Commissioner Parna.

1:14:59>> Yeah, I I definitely agree with uh chair

1:15:03and vice chair on this, but I also have

1:15:05another thought. If if the neighborhood

1:15:08element significantly needs updating and

1:15:12for every two little diagrams, you're

1:15:14going to have a a docket item. It makes

1:15:18no sense to me at least. It feels

1:15:21cluttered and peacemeal. uh ideally that

1:15:24whole element whenever the neighborhood

1:15:27plan is ready all of this should come

1:15:30together at that time and uh then it's

1:15:33clarity you moving from old you've

1:15:35already mentioned that it's an older

1:15:37document and so many things were not

1:15:39touched so there's still so many items

1:15:42in the neighborhood element which still

1:15:45have to be touched so why don't we just

1:15:48do the whole thing together it'll also

1:15:51we can check for cohesion We can check

1:15:54for consistency at that point. At least

1:15:56that would be my two penny worth um I

1:15:58don't know if it's making sense to the

1:16:00others, but um doing two maps at a time

1:16:03or two tables at a time makes no sense

1:16:06to me.

1:16:07>> Thank you.

1:16:08>> Yeah, and I mentioned that was one path

1:16:10[clears throat] forward. We could just

1:16:11combine it with the work that Lauren

1:16:13will bring forward to you under the

1:16:14neighborhood planning project.

1:16:16>> All right, so maybe um let's end this

1:16:20item for tonight.

1:16:22um we can figure out or actually I would

1:16:24ask staff to figure out what plan you

1:16:27would like to do going forward and then

1:16:31um I don't see how we can do a public

1:16:32hearing on the 14th given that we

1:16:35haven't published the material yet

1:16:44>> staff will follow up with you after this

1:16:46meeting.

1:16:47>> Great. All right. Thank you for that.

1:16:50And now hopefully something simpler. So

1:16:53next up is our study session on the

1:16:54updates to the transportation facilities

1:16:56plan for the 2026 and 2027 annual docket

1:16:59with Michael Henson and Franchesca

1:17:01Liberty.

1:17:04All right. Hi everyone. I'm Franchesca

1:17:06Liberty, senior transportation planner

1:17:07here at the city of Redmond.

1:17:10Sure I got my slides up. Great. Okay.

1:17:12Today, we'll present uh an introduction

1:17:14to the docket item that will make a

1:17:16minor update to the transportation

1:17:17facilities plan section of the TMP. This

1:17:20will also be the first study session on

1:17:22this item in preparation for an October

1:17:2314th public hearing. So, we will have

1:17:25some scheduled time for questions and

1:17:26discussion.

1:17:30Staff are seeking a planning commission

1:17:32recommendation to amend the

1:17:33comprehensive plan. This small update

1:17:36would be included in the transportation

1:17:37facilities plan section of the TMP.

1:17:40State law requires that comprehensive

1:17:42plans identify state and local

1:17:44transportation system needs to equitably

1:17:47equitably excuse me meet current and

1:17:49future demands. This is fulfilled in the

1:17:51TFP which is adopted by reference into

1:17:53the comprehensive plan via the TMP. Lots

1:17:56of acronyms there.

1:17:59This docket item includes two new

1:18:02projects that would be added to the TFP.

1:18:04Both are shared use paths that would

1:18:06provide additional low stress bicycle

1:18:08and pedestrian infrastructure. Locations

1:18:10include Northeast 40th Street between

1:18:13158th Avenue Northeast and 156th Avenue

1:18:16Northeast, Northeast 70th Street between

1:18:19188th Avenue Northeast and the Evans

1:18:21Creek Trail. And both of these locations

1:18:23are related to adjacent redevelopment

1:18:25projects, the Eve's Avalon Apartments

1:18:28and H Highleberg site, respectively.

1:18:31Uh the project ID number, description,

1:18:33and costs would be added to tables three

1:18:35and four in the TFP, and the locations

1:18:38shown on the reference map on this slide

1:18:40would be added to the maps in the TFP on

1:18:42pages 271- 275.

1:18:45The Avalon Redmond Tech Station

1:18:47development is moving forward. As part

1:18:50of the development agreement, the

1:18:51developer requested that the Northeast

1:18:5240th Street frontage improvements, which

1:18:54include a shared use path, be credited

1:18:56towards the development trans

1:18:58development's transportation impact

1:18:59fees. Carol Heland, while director of

1:19:01planning and community development,

1:19:03determined that they could could with

1:19:04the following rationale. These

1:19:06improvements provide important access

1:19:08and will be used by the broader

1:19:10community uh as they are system

1:19:12improvements and the general goal is to

1:19:14reduce development costs in a

1:19:16challenging development environment. In

1:19:18order to be credited for these

1:19:20transportation impact fees, the

1:19:21improvements need to be in the TFP.

1:19:26In addition, one existing TFP project

1:19:29description would be modified to include

1:19:31the mention of a shared use path.

1:19:34Did I get that? Yeah. Okay. Uh, this

1:19:36project includes the construction of a

1:19:38new street with curb, gutter, sidewalk,

1:19:40landscaping, lighting, and storm

1:19:42drainage on Northeast 72nd Street east

1:19:45of 188th Avenue Northeast. This TFP

1:19:48project would be modified to include a

1:19:50shared use path in the project

1:19:51description as well.

1:19:55Following this study session, we will

1:19:56return on October 14th with a public

1:19:58hearing and and study session if needed.

1:20:00And we anticipate a planning commission

1:20:02recommendation and and approval on

1:20:04October 28th.

1:20:06I'll now open it up for questions and

1:20:08discussion.

1:20:10Okay, great. So, we're going to start an

1:20:12issues matrix

1:20:14for this one. Um, who would like to go

1:20:16first?

1:20:20Um, I'll jump in until I see more hands.

1:20:22Um, so it is so helpful to get the, um,

1:20:26additional detail about the impact

1:20:27statements because I was curious why

1:20:29these are coming in now. Um,

1:20:34just to understand how these fit into

1:20:36the other tables that we've already

1:20:37discussed. Um, when we were originally

1:20:40talking through those tables, we had a

1:20:41lot of questions around prioritization.

1:20:44So, like, are some projects higher in

1:20:46the list than others? Um, and I I

1:20:48remember it being a fairly complex

1:20:50answer at that point. We're not in

1:20:52charge of budget, but in terms of just

1:20:54making sure that this document makes

1:20:56sense when it goes to council, do these

1:20:58have a prioritization weight or is it

1:21:01all one big pot?

1:21:04>> Um, they do not. They're um really on

1:21:08the TFP and anticipation of future

1:21:10development and will be built by that

1:21:12future development.

1:21:14Great.

1:21:16Additional questions, anyone.

1:21:21Um, all right. Any other questions

1:21:26here? All right. 45 minutes was more

1:21:29than we needed here, I think.

1:21:31>> Feeling.

1:21:32>> Yeah. So, as usual, um especially

1:21:36because we're missing one person

1:21:37tonight, I just we will do our usual

1:21:40cadence of if things come to mind in

1:21:42email. Um you could receive one by the

1:21:46end of the week, but we'll try to cap it

1:21:47by Friday. Um otherwise, we'll just head

1:21:50into the public hearing and see if there

1:21:51are any questions there.

1:21:55All right. Thank you. Thank you.

1:22:10All right, now on to staff and

1:22:12commissioner updates.

1:22:13>> Uh, yes. So, we are currently in the

1:22:15process of filling Commissioner Gier's

1:22:17seat and we are hoping to have that

1:22:19filled by November. So, there's a

1:22:21seamless transition there. Uh we will

1:22:24also start advertising for the other

1:22:26vacancy left by Commissioner Copley and

1:22:29we encourage the public to apply uh once

1:22:32we that is um online. Uh next meeting is

1:22:35October 14th and uh we are we've

1:22:38scheduled uh some public hearings. So

1:22:40please let stuff know if you're going to

1:22:42miss any of those the next meeting

1:22:44because we need the quorum. And finally,

1:22:46Lauren Albert is gonna take over for the

1:22:49last quarter of 2026 as um plan

1:22:52commission leazison.

1:22:53>> So, is this your last day?

1:22:54>> Yes.

1:22:55>> Thank you so much for your work this

1:22:56quarter. You've done such a nice job.

1:22:58>> Thanks.

1:22:59>> Always appreciate it.

1:23:01>> Um any commissioner updates?

1:23:05No. All right. Um in that case, I look

1:23:08for a motion to adjurnn.

1:23:10>> So moved.

1:23:11>> Second.

1:23:12>> All in favor? I

1:23:14>> I

1:23:14>> I

1:23:15>> All right, then we are adjourned.