2026-08-04 - Transportation Committee
Summary
Written from auto-captions with no speaker labels. Source: the August 4, 2026 Transportation Committee upload.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Fisher Ferry and Holly Hill Signal Removal | 14 | 87% |
| Other business | 2 | 13% |
- Minutes were approved.
- No vote was taken on the signal.
- The chair said a street paving update will come in the coming months, and the meeting adjourned.
Fisher Ferry and Holly Hill Signal Removal
1:13-15:14
- NCDOT Division 9 Traffic Engineer Ryan Newcomb and Deputy Division Engineer Mazie Tucker (captioned spelling) proposed replacing the traffic signal at Fisher Ferry Street and Holly Hill Road with an all-way stop.
- The pole-mounted signal cabinet has been struck repeatedly and sits about 2 inches under power lines; fixing it properly would cost roughly $400,000 to $450,000, against a division secondary-signal maintenance budget of about $360,000 a year for all of Davidson County.
- Counts show volumes no longer meet signal warrants, and there were five red-light-running crashes by Holly Hill traffic in 12 months.
- An all-way stop would cost under $5,000 and model slightly better.
- NCDOT promised a press release, message boards two weeks ahead, 48-inch stop signs and flagged stop-ahead signs, and said it would leave the signal equipment in place at first, as it did in Mocksville.
- Members worried that drivers already treat the road as a racetrack and that the planned Fisher Ferry bridge replacement (held up with the railroad) will make approaches faster.
- One resident of the intersection said removing the light would make it worse.
Sources
- Video: https://youtu.be/WSpjcfNK93k
Video
Transcript
These are auto-generated YouTube captions with no speaker labels, so names and numbers are likely misheard.
Transcript
00:06Michael, you need like a clapper.
00:09Like for movies.
00:11Ooh.
00:12And it's like and action.
00:15>> It's like clapper?
00:17>> Yeah.
00:19No, like
00:21>> Or we could get those hands.
00:22>> Ooh, even better.
00:24Those are clappers.
00:27No, like one of these numbers.
00:30>> [laughter]
00:31>> No, that's a hook. You need a hook for
00:33that one, babe.
00:34>> That would be the wrong thing to do.
00:36Didn't I think Kelly used to have a
00:40He had a hook and say
00:42>> Oh, that's fun.
00:51>> [snorts]
01:00>> We are now ready to go if you guys are
01:01ready.
01:02>> All right, I'm going to call the
01:04Transportation Committee meeting to
01:05order. Can I get a motion to approve
01:07minutes?
01:08>> I'll make a motion [snorts] that we
01:10that we approve the minutes.
01:12>> Second.
01:13>> Thank you. Those are approved. We have a
01:15presentation by NCDOT about a stoplight
01:19removal. I want to remind everybody
01:20we're all friends here. We're going to
01:22have a nice chat.
01:24Learn what we need to. Thank you.
01:27>> Good morning. My name is Ryan Newcomb.
01:28I'm the Division 9 Traffic Engineer for
01:30NCDOT Division 9. I'm also here with
01:32Mazie Tucker who's our Deputy Division
01:34Engineer. So, Michael asked us to come
01:38present to you all about a
01:40proposal we had sent to him a few weeks
01:42ago regarding the intersection of Fisher
01:44Ferry Street and Holly Hill Road here in
01:45Thomasville.
01:47Those are SR 2813 and SR 2060.
01:51So, just briefly I have some slides to
01:53kind of give you some background about
01:55how we got here.
01:56So, this intersection um has been
01:59signalized for a long time.
02:01Um, if you are familiar with the area,
02:03you probably know that the uh signal
02:05cabinet is pole mounted
02:07uh and has been struck uh by vehicles on
02:09several occasions.
02:10Um, it's currently uh in a state of uh
02:13somewhat disrepair and needs to be uh
02:16replaced.
02:17Um, and that's what sort of started
02:19driving this conversation. Um,
02:21so uh as my staff brought this issue to
02:24my attention, I um you know, started
02:26looking into what it would take for us
02:27to get this cabinet off of the pole and
02:30get it ground mounted uh away from
02:32traffic. Um, some of the things that
02:34we've identified at this location is
02:36that uh right-of-way is limited. Um, it
02:38looks like on the tax map that we are
02:40are pretty pretty tight. Uh, generally
02:42speaking, where the uh utility poles are
02:44located generally serves as the
02:46right-of-way line, so
02:47uh you can see how close they are to the
02:49pavement, uh which would give you an
02:50indication that uh in order to resolve
02:53this, we'd probably have to acquire some
02:54sort of right-of-way or easement uh from
02:56the one of the adjacent properties.
02:58Um, the other things we've identified
03:00here is that the exist existing single
03:02span uh is currently too close uh to uh
03:06the existing overhead power. Uh, there
03:09Duke Energy other power utilities have a
03:12standard uh separation from their
03:14neutral lines uh that's supposed to be
03:1630 in away. Right now, we're mounted um
03:19about 2 in underneath it along with the
03:21other communication facilities that uh
03:24ride on the same pole line.
03:26And uh like a lot of intersections, um
03:28you know, it's been a long time since
03:30this one was re-re-rewired, rebuilt.
03:33Um, and so it could probably use a
03:35complete overhaul.
03:37So as we started uh pricing those
03:39things, and in this photo, you can see
03:41uh how close we are to the power
03:43attachments.
03:44Um,
03:45to just acquire a corner clip that would
03:47be wide enough to get a uh a cabinet
03:51ground mounted, um,
03:53talking with our project development
03:55team, our right-of-way unit, um, we put
03:57a placeholder there $15,000. It's not a
03:59lot of square footage, but should we run
04:01into a property owner that doesn't want
04:03to negotiate or we have to get an
04:05appraisal done, uh, you know, or heaven
04:08forbid file a condemnation, uh, just for
04:10a small clip, um, we put a buffer in
04:12there for that. Uh, the big ticket item
04:15is the utility relocations to get taller
04:17poles put in on two corners. Uh, you
04:19have to go back down the line from the
04:21intersection. Uh, those poles, uh, the
04:24height that we would need, uh, generally
04:26run in the 40 to 50,000 dollars per, uh,
04:29pole range. And so, uh, that would be a
04:32a heavy expense to try to get the
04:34utilities, uh, elevated here.
04:36Uh, we would need some engineering work,
04:38uh, for both the survey of the
04:40right-of-way acquisition and then
04:42updating the signal plan. And then
04:44rewiring, uh, and ground mounting the
04:46cabinet would be, um, about 130,000
04:49dollars. So, all told, uh, we're looking
04:51at a potential 400 to 450,000 dollar
04:54endeavor, uh, to try to get this cabinet
04:57removed off of the pole, uh, and on the
04:59ground.
05:00So, when I see a number like that,
05:01knowing that my entire budget for
05:04secondary signal maintenance in all of
05:05Davidson County is approximately 360,000
05:08dollars a year, um, I started asking
05:11some more questions and we started, uh,
05:13pulling some more data at this location.
05:16Um, so what we found is that, uh,
05:18average, uh, annual daily traffic
05:20volumes on the approaches, uh, we have
05:22some, uh, count stations in close
05:24proximity to the intersection on both
05:26both routes. Uh, those ADTs, uh, have
05:29declined year by year, uh, you know, for
05:32more than the last 10 years.
05:34We did a turning movement count, uh,
05:36back in November of 2025 when this issue
05:38first arose, um, and based on that
05:41turning movement count, uh, looking at
05:43AM, midday, PM peaks, um, looking at the
05:46full 4-hour and 8-hour warrants for
05:49traffic signals, the current volumes at
05:51this location don't meet the the
05:53warrants for a traffic signal. So, in
05:54other words, in other words, if we
05:56didn't have a signal there today and and
05:58we were asked to analyze this
06:00intersection and consider it,
06:02we wouldn't put a traffic signal there
06:04because it doesn't meet the volume
06:05warrants.
06:07And so, I took the the the volume data
06:09and we modeled the intersection as it
06:12currently is as a traffic signal and
06:14then we considered what it would be like
06:15in an all-way stop condition.
06:18And one of the reasons that I leaned
06:20towards an all-way stop is that in the
06:21last 12 months, we've had and and our
06:26friends here from the police department
06:27can probably attest to this,
06:29we've had five crashes where vehicles on
06:31Holly Hill have actually run the red
06:33indication. And looking at 5 years'
06:36worth of crashes, that pattern has it
06:39carries over from year to year. And so,
06:41one of the ways that we could
06:42potentially curtail that, knowing the
06:45volumes that we have at this location
06:46would be to implement an all-way stop.
06:48It's much more likely that I could avoid
06:51the collision of someone who's not going
06:52to stop at that stop sign if I'm already
06:54at a stop condition versus driving
06:56through on a green indication.
06:59We've also had some left turn same
07:01roadway crashes here
07:02on both streets and so again, an all-way
07:05stop could help curtail those crashes.
07:07Um
07:08So, we feel like it would be a safer
07:10alternative.
07:12And the volumes that we have out there
07:14today, the all-way stop would function
07:16actually slightly better than the signal
07:18currently functions and part of that's
07:20because um
07:22running just minimum green times on your
07:23main lines, when there's not a lot of
07:26traffic there, you're sort of
07:27arbitrarily delaying the side streets.
07:30Whereas, if I pull up to an all-way
07:31stop, there's no one coming on the other
07:33approaches, I I can proceed.
07:35Um and so, here are some numbers that
07:37kind of kind of back that up a little
07:39bit. I've got uh of service grades, uh
07:42you know, A, B, C, and D, um and then
07:44the associated vehicle uh a delay per
07:47vehicle, seconds per vehicle that we we
07:49got from the model. Uh looking at the
07:52existing signal condition today, we see
07:55uh anywhere from, you know, two to even
07:57more than that seconds uh per vehicle
07:58delay improvements, um
08:00particularly on the the westbound Holly
08:02Hill approach, uh where again you're
08:04you're uh stopping that movement, um if
08:07even if there's nobody coming until
08:09the signal gaps out.
08:11So, uh in light of the the fact that uh
08:13it performs a little bit better, um and
08:16then also still with the volumes we see
08:18today, uh the all-way stop would have
08:20some capacity. Uh so, in other words, if
08:22we start to see growth in this area, if
08:25uh things redevelop, uh for instance,
08:27and we start to see traffic pick up, the
08:29all-way stop would still function pretty
08:31well before we would be back in a
08:32situation where signalizing the
08:34intersection might be required.
08:36Um and so, from our vantage point, we
08:38can implement this all-way stop for
08:40probably less than $5,000.
08:42Um and uh that that would include uh
08:45wrecking out uh some of the signal
08:47equipment once the all-way stop is
08:48implemented. So, from a dollars and
08:50cents standpoint, uh as a department, uh
08:53knowing the numbers we see from a
08:54traffic standpoint and how it models, it
08:56just made sense to us uh to go forward
08:59with this. And so, we wanted to present
09:00this information to you, kind of make
09:02you aware of what's uh what we found and
09:04what we've seen, and then try to answer
09:05any questions that you might have.
09:12>> So, thank you for the presentation, but
09:14when a uh change or shift is made in
09:16this kind of area, where it's been uh
09:19traditionally a light for so long, what
09:21kind of procedures are put in place to
09:23help ensure people that just have some
09:25of that muscle memory,
09:26>> Sure.
09:27>> that might not even really realize that,
09:29you know, it's a four-way stop, just
09:30because they've just been here so long.
09:32What what are we putting in place to
09:33ensure that, you know, um we're curbing
09:35some of that?
09:36>> Yeah, absolutely. Good question. So, we
09:37would first off do a press release. We
09:40would put up variable message signs on
09:41each approach probably 2 weeks in
09:43advance to say new traffic pattern
09:45coming. And then when we do a new
09:46implementation like this, we always add
09:49stop ahead signs on each on the
09:50particular on the approaches that you
09:52know are not the main line the main line
09:54that's used to having that green
09:55indication. But we'll do stop aheads on
09:57all approaches. And then you know, your
10:00average stop sign if you were to go
10:01through the the neighborhood, you'd
10:03probably see stop signs that are 30 in
10:05uh maybe a 36-in wide stop sign. When we
10:08do an implementation like this where
10:10we're doing a drastic change, we'd
10:11probably start with our 48-in stop sign.
10:13So, I call them the big boys. So, we'd
10:16put the big boys out there. We'd
10:17probably put 36-in wide stop aheads.
10:20We'd have flags on them as well for the
10:21first month or so of the implementation
10:23just to so that it stares you in the
10:25face when you approach the intersection.
10:29>> I'm not going to be able to speak
10:30intelligently about this, but I'm
10:31remembering conversation
10:34about Fisher Ferry and there are plans
10:36to straighten it out
10:39at some point.
10:41Yes?
10:45Yeah.
10:46But it's not near this. I mean, it's
10:48near it. It's on the same road. But my
10:50concern, and I know this is just going
10:52to happen and it's going to be fine. I'm
10:54concerned and maybe this is something
10:55that our folks our police need to be
10:57aware of. When we straighten that out
10:59and make it a runway to this
11:00intersection
11:02that we're going to have issues
11:05um with people approaching that much
11:07faster without a light. But I just
11:09wanted to
11:10to put that out there
11:12because I don't know when that's going
11:13to happen. I feel like they've been
11:14talking about it for 300 years.
11:16>> Yeah, I'm not sure about the
11:19Okay.
11:24Okay.
11:25>> I think people are going to fly.
11:27>> They already treat it as a racetrack.
11:30>> [laughter]
11:30>> It's going to get worse. Yeah.
11:33>> At least from the city.
11:35>> Okay.
11:37>> Is that part of the bridge replacement
11:39project?
11:39>> that's what it
11:40>> Okay, the bridge replacement project
11:41there. Okay, that's where we I think
11:43we're still
11:44I think we're still facing some
11:45challenges with the railroad if I'm not
11:47mistaken.
11:47>> Classic.
11:48>> Yeah, so
11:50>> [laughter]
11:51>> Shocker there. Um
11:52No, this is on the record here. Um
11:55>> [laughter]
11:55>> So, um yeah, so I'm I'm not sure what
11:57the timeline is, but I don't I don't
11:59believe uh
12:00it may it may be programmed in this
12:02current fiscal year.
12:04Um but, you know, at this point uh my
12:06staff uh you know, we're ready to to
12:09implement this. So, the the silver
12:10lining there would be is that we could
12:12get this condition in place before that
12:14work happens. Uh so, that hopefully
12:16traffic that uses this route regularly
12:17would be used to the always stop
12:19condition. Yeah.
12:22>> I mean, they they already use that area
12:24right there as
12:27a race track.
12:29I mean, my concern is I mean
12:32my concern is that if you put the
12:34four-way stops up there, I mean, they're
12:36not going to stop and somebody's going
12:38to get seriously hurt there. I mean,
12:39there was just a wreck there the other
12:41day
12:42at that intersection.
12:44>> I live at this intersection, and it's
12:47horrible.
12:48And I think that if you remove the stop
12:50light, it's going to get even worse. And
12:52my husband is a police officer in
12:54Thomasville, so
12:57he's already
12:59issued concerns about it as well, so
13:02>> Yeah, so um again, one of the things I
13:04mentioned was that the crash pattern
13:06that we've seen here
13:07um it is actually the things that are
13:10happening there could actually be based
13:12on, you know, the research we have at
13:13the state, could be actually curtailed
13:16by an always stop. Now, whether you have
13:18a red light or you have a stop sign,
13:19there isn't a lot that can be done from
13:21a police officer standpoint or traffic
13:23engineer standpoint about someone who's
13:25going to disregard that traffic control
13:26device. So, we run that risk no matter
13:29what kind of traffic control device we
13:31install there.
13:32But, the pattern we have seen there is
13:34actually from the what we would consider
13:36the minor street approach, the one
13:38that's not getting the green time all
13:39the time, Holly Hill, is is people
13:42running that red light. And and what
13:45happens there is if I'm coming on Fisher
13:46Ferry and I see a green indication, I'm
13:48going through that intersection. And I
13:50don't know that that guy coming down
13:51Holly Hill is not going to stop at his
13:53red, and he's going to plow into me. Um
13:55but, the silver lining there would be if
13:57I've come to a complete stop at a stop
13:59sign, I'm going to look and gauge that
14:01traffic, and potentially have the
14:03ability to avoid that crash. Could
14:05something serious still happen there?
14:06Absolutely.
14:08And that's something that we would
14:09consider,
14:10and that's something we would continue
14:12to observe. We wouldn't wreck the signal
14:14equipment out day one, just so you know.
14:16We implemented one of these in
14:17Mocksville a couple months ago
14:19at their request of the town,
14:21and we left the signal equipment in
14:23place just to make sure that we weren't,
14:25you know, opening a can of worms,
14:27and needed to turn that thing back on.
14:29But, thankfully, that always stopped at
14:31a at a intersection that's actually got
14:32some pretty weird geometry, the way the
14:34legs attach,
14:36has been working very well. And the town
14:38actually informed us last week that they
14:39went ahead and removed the signal
14:41equipment. So,
14:42so we have, you know, seen this in some
14:44other areas within the division where it
14:45just made sense to implement it,
14:48and it's worked.
14:49But, so I certainly understand the
14:51concerns.
14:51>> So, was that something that we're going
14:53to do? We're going to leave it up to see
14:55how it functions.
14:55>> Yeah, we would we would not, you know,
14:57wreck out the equipment day one. Yeah,
14:59definitely.
15:00>> I appreciate you coming and sharing that
15:02with us. It's not something we've always
15:03had in the past, so I appreciate it and
15:06hearing our our thoughts on it.
15:07>> Yep.
15:07>> Yes.
15:08>> Thank you.
15:10>> Thank you.
15:10>> You're welcome.
15:11>> Yep.
15:13All right.
15:14You got any other business?
15:16>> No other old business.
15:19>> Cool. I don't get to transportation
15:20committee very often, so this has been
15:22fun. Thank you for being here. Um I did
15:25talk to Michael and we're going to get
15:26an update in the coming months about
15:28street paving because I know it's going
15:29to look different this year cuz our
15:31budget looks different this year, but
15:33they're working on getting that. It's
15:34not happening right now or pressing, so
15:38we will hear from them later, but I
15:39think that's it. Can I get a motion to
15:41adjourn?
15:42>> Second.
15:43>> So moved.
15:45>> You're not on there.
15:46>> You got two.
15:47>> Um I make a motion that um
15:51we adjourn.
15:52>> Second.
15:53>> All right, we're adjourned.
15:54>> Good day.
15:56>> Let's take a break.
15:58>> [laughter]
16:03>> No, that one is. We're going to go to
16:05buy now.
16:05>> Okay.