Fisher Ferry and Holly Hill Signal Removal

At a glance

Details come from auto-captions.

  • What: NCDOT Division 9 proposes replacing the traffic signal at Fisher Ferry Street (SR 2813) and Holly Hill Road (SR 2060) with an all-way stop.
  • Where it stands: no vote was taken August 4, 2026.
  • Next: if it proceeds, NCDOT would give notice by press release, message boards two weeks ahead, 48-inch stop signs and flagged stop-ahead signs, and would leave the signal equipment in place at first.

The proposal

  • The pole-mounted cabinet has been hit by vehicles and sits about 2 inches below power lines.
  • A proper ground-mounted fix would cost an estimated $400,000 to $450,000 (including a corner right-of-way clip budgeted at $15,000 and taller utility poles at $40,000 to $50,000 each), versus under $5,000 for an all-way stop.
  • Counts show volumes below signal warrants, with five red-light crashes by Holly Hill drivers in 12 months.

Concerns

  • Members and a resident worried about speeding.
  • Also worried about a nearby planned Fisher Ferry bridge replacement (delayed by railroad issues).

Status and next steps

  • No vote was taken August 4, 2026.
  • NCDOT would give notice by press release, message boards two weeks ahead, 48-inch stop signs and flagged stop-ahead signs, and would leave the signal equipment in place at first.
  • On September 9 the Fisher Ferry bridge replacement was reported with a let date of May 26 (year not stated), apparently next May, with progress on the CSX railroad issue.

Discussion time

About 14 minutes across 1 meeting (from transcript timestamps; approximate).

Meeting Minutes
2026-08-04 - Transportation Committee 14

Log