2026-10-08 - Planning Commission
Summary
Built from the agenda outline posted on the City's meeting system and from YouTube auto-generated captions; the posted summary and minutes were not read. Names and figures are as captioned and may be misspelled. The captions do not show the election of officers listed on the agenda.
- Conflicts of interest: the commission voted to excuse one commissioner from the 1150 Adams Street SE case, citing a role with Habitat for Humanity, a project partner, and another from the Front Avenue case, citing work on the project.
- 3127 Plainfield Ave NE drive-through: the commission approved the special land use and site plan for a new fast-casual restaurant with a drive-through; there was no public comment and the motion carried by voice vote. Conditions included removing the non-conforming pole sign at the rear, adding a walkway to employee parking, verifying and maintaining the fence, and swapping some shrubs for additional evergreen trees. See 3127 Plainfield Ave NE Drive-Through.
- 2110 E Beltline Ave NE PRD amendment: the commission recommended approval of a major amendment to the Village at Knapp's Crossing PRD to allow a pickup-only drive-through window for a proposed Chipotle, raising the drive-throughs in the development from two to three. There was no public comment, and conditions covered landscaping of the barrier and a relocated trash enclosure. See 2110 E Beltline Ave NE PRD Amendment.
- 1155 Front Ave and 1058 Scribner Ave NW parking lot expansion: the commission approved a special land use to demolish the building at 1058 Scribner Avenue and expand Mercantile Bank's surface parking lot by 51 spaces to 283, above the maximum for the city center district. One commissioner voted no, saying the expansion conflicts with the recently adopted master plan and rezoning; approval rested on documented parking demand and a transportation demand management plan. See 1155 Front Ave and 1058 Scribner Ave Parking Lot Expansion.
- 1150 Adams Street SE townhomes (Boston Square PRD): the commission approved the final site plan review for the townhome phase of this affordable homeownership project, with conditions that the buildings match the renderings for varying heights, parapet and brick-recess details, and that mechanical equipment not be placed on patios. Discussion also covered exposed foundations and window wells within a 10-foot setback, which the commission said it cannot waive through site plan review. See 1150 Adams Street SE Townhomes.
Related: 3127 Plainfield Ave NE Drive-Through, 2110 E Beltline Ave NE PRD Amendment, 1155 Front Ave and 1058 Scribner Ave Parking Lot Expansion, 1150 Adams Street SE Townhomes
Agenda
- Election of officers
- Hearings: 3127 Plainfield Ave NE; 2036 Suite A (2110) E Beltline Ave NE PRD amendment; 1155 Front Ave and 1058 Scribner Ave NW parking lot expansion
Sources
- Agenda: https://grandrapidscitymi.iqm2.com/Citizens/Detail_Meeting.aspx?ID=7880
- Meeting page: https://grandrapidscitymi.iqm2.com/Citizens/Detail_Meeting.aspx?ID=7880
- Video (City of Grand Rapids YouTube channel): https://www.youtube.com/watch?v=hkcDIy_Eo8g
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
00:16[music]
00:21[music]
00:26Heat. Heat.
00:30[music]
00:36[music]
00:47>> [music]
00:53[music]
00:58[music]
01:04>> Heat. Heat.
01:06[music]
01:14>> [music]
01:21[music]
01:28>> Heat. Heat.
01:34Heat. Heat.
01:48[music]
01:53[music]
01:54Heat. Heat. N.
01:59[music]
02:09[music]
02:15[music]
02:16Heat. Heat.
02:25[music]
02:30[music]
02:39>> [music]
02:47[music]
02:52[music]
02:58[music]
03:02>> All right, welcome everybody to the city
03:05of Grandpa's planning commission meeting
03:06for October 8th, 2026.
03:09Um we have a few public hearings today
03:12and a site plan um review. Um but before
03:16we start, I'll go through kind of our
03:17process here. Um for every case, um a
03:20member of the staff will come up and
03:22give us their staff report. Um after
03:24we've had an opportunity to ask them
03:26questions, the applicant come up can
03:27come up and give us additional
03:29information. Um we'll then open up the
03:31public hearing. If a member of the
03:33public would like to provide comments on
03:35a case, they can come up to the
03:36microphone, introduce themselves, and
03:38address commission with their comments.
03:40Um after the public hearing, the
03:42applicant will have an opportunity to
03:44address any comments from the public
03:46hearing and then um planning commission
03:48will deliberate and make a decision. Um
03:52we are being streamed live on Facebook
03:55and YouTube just as an FYI. And um and
04:00then one last thing. So if you see one
04:03of the commissioners reading when we're
04:05making resolutions, um staff has
04:08provided us with language, draft
04:10language both with findings for and
04:12against um that we are able to modify as
04:15we see fit based on um the case. And but
04:18I just want to let you know if you see
04:20us reading, folks may be reading, but no
04:22decisions have been made ahead of time.
04:24Um, with that, we'll get back to the
04:27agenda and start with conflicts of
04:29interest.
04:33>> Uh, I have a conflict with the 1150
04:36Adams case and that I sit on the board
04:38and executive team and uh, for Habitat
04:41for Humanity was a partner in that
04:43project.
04:47>> Discussion on that motion.
04:50I think this is consistent with how
04:52we've treated this historically.
04:55>> I would move that um Commissioner Yoner
04:58does have a conflict of interest.
05:00>> Support.
05:01>> All right. Motion support. Any other
05:02discussion? All those in favor say I. I.
05:05Any opposed?
05:07>> Motion carries.
05:10Uh, I have a potential conflict or a
05:12conflict with um our third hearing or
05:15third public hearing 1155 front for
05:18Merkantile Bank because I'm working on
05:19the project
05:21>> and thus have a potential financial
05:24stake in it. Yes.
05:25>> Hope so.
05:25>> Yeah. Okay. Well, then I'd definitely
05:28like to hear a motion for that one.
05:32>> I'll motion to approve the conflict.
05:36>> Second.
05:37>> All right. Motion support. Any
05:38discussion? All those in favor say I.
05:41>> I. Any opposed? Motion carries. Okay.
05:45So, now any others?
05:48All right. We'll get started with our
05:49first case. 3127 Planefield AB
05:52Northeast.
05:57Our
06:03first case is a request for a drive-thru
06:06uh with a new fast casual restaurant. A
06:09drive-thru in the MCN zone district is
06:13the excuse me, the MCN commercial, a
06:17mid-century neighborhood commercial zone
06:18district is a special land use. The
06:21subject property is on the north side of
06:23Planefield. It is flanked on the the
06:26north and east and part of the south
06:28sides with I 96 roadway um and
06:33commercial to the south and lowdensity
06:35residential to the west. This project um
06:39has been on the agenda and postponed
06:41several times. Um the applicant was
06:44waiting on a traffic study that was
06:46requested by MDOT. um anytime there's a
06:49vehicle oriented use um that may have
06:52impact to the adjacent roadway system um
06:56traffic studies often are a requirement.
06:58In this case, because um much of the
07:00adjacent roadway system is controlled by
07:03MDOT, it was imperative that they um see
07:07the traffic study and um approve the
07:10potential impact that a development may
07:12have. So the traffic study was completed
07:15and submitted both to MDOT and the city
07:18traffic engineer. Um the study was
07:20reviewed and it was determined by both
07:23MDOT and the city of Grand Rapids that
07:25the anticipated impact of traffic
07:29resulting from this development will
07:31will have will not be impactful to the
07:33adjacent roadway system.
07:36So that is why this case is before you
07:39today. Everything has been completed and
07:41was given the green light to go forward.
07:44The subject property is approximately
07:4761,000 square feet in area. It has 225
07:52linear feet of street frontage on
07:54Planefield and the the property is
07:57mostly level. Um, as you can see in this
07:59image, it's already developed and there
08:02is a slope on the north and the east
08:04sides, a steep slope just off the
08:06property as that that goes down to the I
08:0996 corridor.
08:11You can see uh south of the property
08:14across Planefield is an on-ramp and
08:17off-ramp to I96.
08:19And that ramp is aligned with a single
08:22curb cut that provides access to the
08:24property. And there's a traffic signal
08:26there that um controls the traffic um on
08:30planefield and exiting the subject
08:33property and then entering or exiting
08:35that on-ramp and offramp.
08:39Here's a just a street view image to
08:41show that where the signal is. The the
08:43I96 ramp is to the right of this image
08:46and the subject property is to the left.
08:50And this is a survey of the existing
08:53conditions. Um, as you could see, it is
08:56improved with an approximately 4,000
08:58square foot building that was a former
09:00Denny's restaurant.
09:03There are there's a retaining wall on
09:06the the east side of the property line
09:09and then a fence on the north um to
09:12delineate the property from the MDOT
09:14roadway or the M dot right ofway and M
09:17dot property.
09:19There are two pull signs on the
09:20property.
09:22Um, there's a pole sign at the back of
09:25the property visible from the freeway
09:28and there was one at the front of the
09:31property. As you can see in this image,
09:32you can see the top of the pole behind
09:34the building. The cabinet has been
09:36removed from both of the poll signs.
09:39This zone district does allow a poll
09:42sign at the front of the property. Um,
09:44the pole sign at the rear is considered
09:46to be nonconforming.
09:48And so when the zoning ordinance says
09:51with redevelopment any non-conforming
09:54signs including pull signs would be
09:56removed. So one of the questions for the
09:58planning commission today is um
10:01consideration of whether or not the pole
10:04sign um at the back of the property must
10:07be removed. The cabinet has been
10:09removed. Typically, when cabinets are
10:11taken down, um anything replaced must
10:14conform to the zoning district um and
10:16the zoning ordinance standards.
10:23This is a site plan of the proposed new
10:26development. Um approximately 4,100
10:29square ft building will be constructed
10:32on the westerly side of the property. Um
10:35there will be surface parking generally
10:37to the east. That surface parking lot
10:39will have two drive aisles and three
10:42rows of parking. Um, and the drive-thru
10:45will enter at the north side and travel
10:47in a counterclockwise motion around the
10:50west side of the building exiting out um
10:53to Planefield.
10:55And there is a 32 seat outdoor patio
10:59seating area um between the building and
11:02Planefield Avenue.
11:04Um, this project went to the board of
11:07zoning appeals in July for two specific
11:10requests. One was to allow parking in
11:13the front yard. This zone district does
11:15not permit front yard parking. The board
11:18of zoning appeals approved that request
11:20on the condition that they reduce the
11:22number of parking spaces from what was
11:24proposed to be 30 parking spaces and um
11:28it should be reduced. um
11:31seven seven of those spaces were
11:33required to be removed. The applicant
11:36pushed the building closer to Planefield
11:38Avenue um and was able to remove 10 of
11:41those front yard parking spaces. So um
11:44now there are 20 spaces considered to be
11:46in the front yard that are allowed by
11:49that variance approval.
11:52The second variance request um that was
11:55approved was the parking lot exceeding
11:5750% of the lot width. A condition of
12:01that approval was that the the drive
12:03aisles in the parking lot and the depth
12:06of the parking spaces be reduced to the
12:09minimum standard allowed in the zoning
12:11ordinance. That was that was
12:13accomplished and that reduced the width
12:16of the parking lot by 10 ft. That
12:19additional 10 feet increased the the
12:22sideyard buffer on the east side of the
12:24parking lot by 10 feet.
12:29And as you can see in this image, um the
12:33building is oriented to the parking lot.
12:36The zone district um does require that
12:39the building building orientation face
12:41the street. Um the planning commission
12:44has the authority to approve an
12:47alternative entrance location um where
12:50consistent with adjacent development.
12:54We'll go back to the overhead image
12:57there. The adjacent commercial
12:59development is across the street um on
13:02the south side of Planefield. There is a
13:04gas station and um a building that has
13:07been a number of things, most recently a
13:09medical office. Here
13:19are the proposed building elevations.
13:21Um, I'd like to take note of the
13:23building materials. The materials to be
13:26used are architectural aluminum cladding
13:29panels, um, stone veneer and ephus.
13:33The front of the building facing
13:35planefield is this south elevation
13:39second from the top. The main building
13:42materials on this elevation facing the
13:44street is it is the aluminum cladding
13:47and the stone veneer
13:50and the ephus that on the front of the
13:52building facing Planefield is used as an
13:55accent around the windows. There are
13:57fabric the blue on these images are
13:59fabric awning on the windows.
14:03The zoning ordinance allows um the
14:05planning commission to approve metal
14:08siding as a main um primary material
14:11where combined with a masonry foundation
14:14a minimum of 2 ft above grade. So one of
14:18one of the questions for the planning
14:19commission today is um if whether this
14:23requirement is met. So the the metal uh
14:27panels may be used as the primary
14:29material on the front. The sides of the
14:32building, the primary material is ephus
14:36um with aluminum cladding accents and
14:39stone veneer. Um in this zone district,
14:42ephus may only be used as an accent
14:45material. However, the planning
14:47commission does have the authority to
14:49approve other materials um if found to
14:52be appropriate.
14:54Um, and if we'll talk for a minute about
14:57transparency, the minimum transparency
15:00requirements on the sides of the
15:01building, the east and the west sides,
15:04that is met on the front. Again, we're
15:07talking about the south elevation,
15:09second from the top. A minimum of 40%
15:12transparency is required. 38% is
15:15provided. Um again the planning
15:18commission has authority to allow for a
15:20reduction um in the amount of
15:23transparency that is provided. Um
15:26typically a reduction is granted where
15:28the transparency
15:30um additional transparency would be
15:33detrimental to operations or the
15:35security of um the business.
15:41This is the floor plan of the proposed
15:43restaurant. Um the main entrance um
15:46facing the parking lot is at the bottom
15:48of the page
15:50and there's a secondary entrance at the
15:53top of the page that is adjacent to the
15:56drive-thru pickup window.
15:59So we'll talk about the drive-through
16:00operations next.
16:03There will be two order lanes um that
16:06will filter into one drive-thru lane.
16:10Um the the amount of stacking provided
16:13is will accommodate 13 vehicles and to
16:17the west of the drive-through lane
16:19there's additional pavement to provide
16:20an escape lane.
16:23On this image as well at the after the
16:26drive-through window there are six pull
16:28ahead spaces and I'll let the applicant
16:32describe the operations for those pull
16:34ahead spaces.
16:35The use requirements for a drive-thru um
16:38are intended to minimize potentially
16:42adverse effects on surrounding
16:44residential properties, pedestrians, and
16:46traffic flow.
16:48Um some of the roo some of the use
16:51requirements um speak to lot area and
16:54depth, hours of operation, and stacking.
16:57All of those requirements are met, and
17:00so I won't go into those details.
17:03the [snorts]
17:04um drive-thru lanes
17:07and the the the vehicle stacking and the
17:10menu boards, speakers, and the service
17:13window. Um the zoning or ordinance
17:15prohibits those to be on a um street
17:18facing side or within 25 ft of a
17:21residential property. In this case, all
17:24of those elements are set back more than
17:2625 ft.
17:28The pavement of this escape lane is
17:31closer than 25 ft, but that's not
17:34intended to be the drive-thru lane. The
17:37drive-thru lane is 25 ft um at least 25
17:41ft from the neighboring residential
17:43properties.
17:46The menu board and speakers while they
17:48are positioned on the west side of the
17:50property close to the residential um
17:53properties, they have been positioned um
17:56to face as far away from the residential
17:59properties as practicable
18:03and pedestrian walkways are required
18:06through um to provide safe passage
18:08through and across drive-through lanes.
18:11There is a new walkway proposed to
18:13connect the the building walkways to the
18:16public sidewalk. I will note that this
18:19walkway at the south side of the
18:21building runs between two of the
18:24pullthrough parking spaces. Um, I would
18:27like the planning commission to consider
18:29um the practical safety of having a
18:31walkway between two two vehicles that
18:34may be pulling ahead and whether this um
18:38last pull ahead space might be
18:40eliminated from the plan.
18:44I will also note that there are four
18:46parallel parking spaces um in the
18:49northeast corner of the development.
18:52These are intended to be employee
18:55parking spaces. And I would also like to
18:57the planning commission to consider
18:59whether a walkway to connect the
19:02building sidewalk to these parking
19:04spaces should be incorporated in the
19:07plan.
19:10The use requirements for drive-throughs
19:12also um speak to the landscape
19:15screening. A minimum of a 10-ft buffer
19:17is required. In this case, the buffer is
19:2018 feet, exceeding the 10- foot
19:22requirement.
19:2419 new trees will be planted, and there
19:27is an existing 6-ft wood privacy fence
19:30that will remain.
19:33Um, the landscape plan does not show um
19:36all of the required shrubs that would be
19:38needed and um the the landscaping will
19:42need to meet the minimum standards. I
19:44would ask the planning commission to
19:46consider if um the minimum minimum
19:49standards for landscaping is adequate to
19:51screen the drive-thru use from the
19:53neighboring residential properties to
19:55the west.
19:58And then the last site plan element I'd
20:00like to discuss is the exit from the
20:03property. The traffic study um described
20:07that um there will be a single exit lane
20:11as you see here and that is controlled
20:13by the signal. Um 68% of the vehicles
20:17exiting the site will need to wait for
20:18that signal change to either go straight
20:21onto I96 or turn left to go north on
20:24Planefield.
20:25And at peak times when um there's
20:29anticipated
20:30potentially 45 vehicles per hour, um I
20:34would like the planning commission to
20:35discuss with the applicant um any
20:37potential uh traffic conflicts or
20:42circulation conflicts that might occur
20:44if vehicles are queuing to wait for that
20:46signal change to exit the site.
20:49And then lastly, the application um was
20:52pre presented to the Cresten
20:54Neighborhood Association. Um the Cresten
20:58board is supportive of redevelopment and
21:01an active use on this site. Um however,
21:03they did not submit a letter um because
21:07they were not comfortable supporting a
21:10drive-thru use.
21:14So in some
21:17I would like the planning commission to
21:18consider the the consistency of the
21:21project with the recommendations of the
21:23community master plan, the building
21:25materials, transparency and orientation
21:29that are presented um whether they are
21:32in line with the purpose and intent of
21:33the MCNC zone district. whether the the
21:37site can support the use given this
21:39constraints of the irregular shape and
21:42the fixed drive entrance
21:45and the drive-thru regulations whether
21:47um potential negative impacts to
21:50neighboring residential properties um
21:52has been minimized. Are there any
21:55questions for me?
21:57Thank you, Laura. Any questions for
21:58Laura?
22:02Nope. Okay, we will welcome the
22:04applicant up.
22:10Hello, my name is Gary Kilgore. Um, I
22:12will be the operator for the property if
22:14we were granted uh the use for it. Uh,
22:16just wanted to come up really quick and
22:17put the the face to the project up here.
22:19Um, I'm a local of Grand Rapids. I grew
22:21up in Rockford, graduated out of Lel.
22:23Uh, spent six years living between
22:25Easttown um on Paris Street. Uh, two
22:27years living up in the Crestston
22:28neighborhood up on Aberdine. Um, still
22:31have friends and family that live around
22:32Huff Park through the Riverside area. Uh
22:34currently I'm the owner of the Culver's
22:36in Greenville, Michigan and Rockford,
22:38Michigan. Uh both my restaurants have
22:40been consistently recognized as top of
22:41system. We're currently 10% the top of
22:43guest satisfaction. Uh multiple
22:45operational and hospitality awards
22:47throughout the years. Um just really
22:49excited to get through the area. We've
22:50been working a long time on this
22:51project. We started working on uh
22:52Planefield Avenue in uh 2019. Uh so
22:55about seven years we've been working on
22:56this project, trying to get something in
22:57the area. Um we're committed to it. Uh
22:59my family lives here, my friend lives
23:01here. Um I'm excited for everything that
23:02we can do for the community. Um, one
23:04thing that Culver's requires is 1% of
23:06gross sales goes back to uh, community
23:08organizations. Um, the average Culver's
23:10does between four and $5 million a year.
23:12Uh, 1% of that would be 40 to $50,000
23:15per year uh, into local charities,
23:17nonprofits, uh, youth athletics, things
23:19like that that we do on a consistent
23:20basis. Um, and things we love to
23:22support. So, um, really excited for the
23:24project. Um, the wonderful things we can
23:25do with you guys. Um, looking forward to
23:27it. Thank you. [snorts]
23:32My name is Matt Cole. I'm with Rosin and
23:34Associates. I'm the engineer for the
23:36project. So, uh, appreciate everything
23:38that Laura explained. So, that leaves a
23:40lot less for me to cover. I just wanted
23:42to kind of recap a little bit that, um,
23:45for this site, we have, uh, when we
23:47develop it. Currently, it's a vacant
23:49Denny's building. And while we've been
23:52developing this and the plans, we've had
23:54calls from the police. There's people
23:56out there, uh, taking equipment off the
23:58roof. Uh we went there to check on the
24:00condition of this existing signpole
24:02along the expressway. There's there were
24:04seven homeless people sleeping out in
24:06the parking lot. So I definitely think
24:07it'd be good for this property to get
24:10developed as soon as possible. So um
24:13that's one thing that I just wanted to
24:14touch on. And then also when we went
24:17with this layout, we didn't try and go
24:19for the minimum on anything. Uh as Laura
24:21mentioned, we have um more green space
24:25along the west property line uh than
24:27were required. We moved the drive-thru
24:30farther away from the west property line
24:32uh than required. We understand that,
24:35you know, having the drive-thru right
24:37next to those residences might not be
24:39ideal. Um but because of the layout
24:41constraints on this, I mean, we worked
24:43with city staff. We brought multiple
24:45different layouts with the building
24:47shifted to the north and trying
24:49something on the east. this is really
24:51the only thing that would work well
24:53operationally and meet the requirements
24:55from the the ZBA to get that building as
24:57close to the road as possible. So,
24:59that's kind of where we're at now. Um,
25:02and as Laura mentioned, we don't have
25:04all the shrubs along the west. What we
25:06did is we put more trees than required
25:08because our thinking is a three-foot
25:10shrub on our side of a six foot high
25:12solidwood fence isn't going to do the
25:14neighbors any good. So what we did is we
25:16swapped out those shrubs and put in
25:18additional evergreen trees which will
25:20help benefit the neighbors with that
25:22buffering. So that's kind of how we
25:23approached that. Again, if city says,
25:26you know what, let's do less evergreen
25:28and throw in shrubs, we'll definitely do
25:29it. We just try to give the neighbors
25:31the best that we could. Um, also wanted
25:34to talk to uh oh, explain our
25:38drive-through lanes. So I'm not sure if
25:39you're all familiar or not, but Culver's
25:41what they do. Unlike a a Burger King or
25:43a Denny's which might have prepared the
25:45food ahead of time, they don't make
25:47anything until you order it. So, you go
25:49through the drive-thru, you place your
25:51orders, you go up to the window, you
25:53pay, and then unless you're just getting
25:56a beverage or maybe an ice cream, you
25:58pull up, and then the runners will will
26:00bring the food out to you. And that's
26:01why we need those six pull- ahead spaces
26:04that we show on the plan that maybe your
26:06typical uh restaurant wouldn't have. Um,
26:09and that's because they'll pull up and
26:11that way we can keep the orders going
26:12and then they'll have the runners bring
26:14out the food. And then Culver's has 15
26:17to 18 employees where, you know, maybe a
26:19typical restaurant has closer to six.
26:21And so that's why we have we needed more
26:24parking on the site than than what we
26:26might normally have. So that's why we'll
26:28have those four in the back. The
26:29thinking is that'll be staff and um
26:33staff will park there. It won't have as
26:35much turnover. there'll be less conflict
26:37with uh with the drive-thru. Um so
26:41that's kind of how we laid that out
26:42there. Um and then this is having a
26:46drive-thru in these pull ahead lanes.
26:48This is typical for Culver's. And so I I
26:50know Laura touched on the fact where
26:51we've got uh access from the sidewalk
26:54system coming up and and going through
26:56that drive-thru. That that's typical. We
26:59have to do that just because the
27:01drive-through has to go around the
27:02building. and and so what our thoughts
27:04were on how we laid it. Originally, we
27:06had additional pull ahead spaces on the
27:08south side of that drive. City asked us
27:10to remove those, so we did. Um, but as
27:14far as safety goes, we're thinking it's
27:16safer to have that extra pull ahead
27:18space on the other side of the of the
27:21walkway because if a car is sitting
27:23there waiting to get food, then
27:25someone's not able to blast through that
27:27area as quickly. Um and so and
27:30operationally we need every bit that we
27:33can get for those pull- ahead spaces. So
27:34that's why we've um requested that one
27:37to stay. Uh let's see what else we have.
27:40I just wanted to touch on the previous
27:42use that was open 24 hours. This we're
27:45not even open in the morning. So it'll
27:46be a lot less hours and a lot less time
27:50of impact to the neighbors. Um we did
27:53get positive feedback uh from the
27:55Crestston Neighborhood Association. We
27:58did go out door to door on all the
27:59neighbors and knocked. Uh the people
28:01that weren't there, we left a business
28:02card and request if they had any
28:05questions to let us know. We talked to
28:06three people while we were there.
28:08They're all for the project. They all
28:10were excited about it and and mentioning
28:12that they love to be able to just the
28:14fact that they can walk over and not
28:16have to drive. So, we haven't had any
28:18negative feedback on this project at
28:20all. So, that's been great. Um
28:24and then trying to think if there was
28:27anything else. Oh, and then to touch on
28:30the the traffic. So the track we did
28:32provide a traffic study to both the city
28:34and M DOT. Um it shows that there will
28:39not be a negative impact and that the
28:42most the peak hour the traffic we see
28:45leaving the site will be about 63 cars
28:47an hour. So just over one a minute. and
28:51we went out there and they they timed
28:53the traffic signal and it's about a 100
28:55second cycle. So, worst case scenario,
28:57you're looking at two cars leaving per
28:59light. Uh, and so again, that's why we
29:02look at the driveway and and it's not a
29:04long throat, but on our busiest hours,
29:07just needing to have two cars get out
29:09that light, we think that's absolutely
29:12fine and sufficient. So, um, I'm here to
29:14answer any questions that you may have
29:17and that's it.
29:19>> All right. Thank you. questions.
29:22>> Um yeah, uh thanks for your explanation
29:26and for the plan. Um I
29:29I'm wondering about the um the traffic
29:33leaving. Like it looks like there's two
29:35lanes coming into the parking lot. Is it
29:38possible to make one coming in and two
29:40going out if if that's where the delay
29:42is going to be? Um, and then wondering
29:45about uh pedestrian connection to those
29:48four spaces up at the top. Uh, where
29:51would they essentially enter the
29:53building and are they crossing through
29:57the drive-thru to do that? And also the
30:00additional
30:01uh pedestrian connection at the bottom
30:04going through those two um pull ahead
30:07spots as well.
30:09>> So let's see the first one regarding
30:11traffic. Um, MDOT was very clear. They
30:14didn't want us to change that driveway
30:16entrance. They said they want one out
30:18and one in. So, we said, "Okay, that's
30:20it. That's the existing width that's out
30:22there right now." You're right. It is a
30:24wide in and a narrower out, but we said,
30:28"Okay, you're you're the pros on this.
30:30We won't touch it. We understand that
30:32there's 30 plus thousand cars a day, so
30:34we kind of kept it as is." Um, as far as
30:38to the north, if if city, again, our
30:41thoughts are four cars out there,
30:44workers only. So, someone crossing, you
30:46know, every four hours or so or four
30:49four cars every four to six hour shift.
30:51If if you desire a sidewalk out that
30:54way, we could take that sidewalk uh that
30:56goes past the dumpster and we could
30:58extend that out. That that's not a deal
31:00breaker. And then lastly, I kind of
31:03touched on it already, but that pull
31:04ahead spot. We really need that
31:06operationally, and we think actually
31:08having it, it's safer for people who
31:10have to walk across the drive-thru
31:12anyway, but now you've got another car
31:14there to make sure that traffic stays
31:16slower.
31:20>> And I guess one other question is the
31:22the six foot fence that's along the west
31:25side of the property, does that run the
31:27entire length of the property?
31:29That's my recollection. Yes.
31:31>> Okay.
31:33>> Thanks.
31:34>> I had a question about the fence as
31:36well. Do we have any What's the
31:38condition of the fence?
31:40>> My understanding is it's uh in good
31:42condition. Okay. So, that's why because
31:44the other thought was, well, do we tear
31:46it down and we put a new fence up on the
31:48property line because it's inside our
31:49property 5T. the fence appears to be in
31:52good condition and we thought we didn't
31:54want to upset any neighbors by all of a
31:56sudden them perceived losing five feet
31:58of land. So we thought well we can keep
32:00it there and that's another reason why
32:02we made that green space buffer on that
32:04side of the property bigger to make sure
32:06we get trees in there still got
32:11>> I have a question about the transparency
32:13on the southside. It sounds like you're
32:152% away from conforming. Is there an
32:17opportunity to get to conforming?
32:19>> Yes, I talked to the architects. They
32:20said there's two windows they can widen
32:22four to six inches to meet that. So that
32:23won't be a problem.
32:24>> Thank you.
32:29>> Yeah, I'm glad that you answered the
32:31transparency. It seems like an easy one.
32:33Um is there a reason that your materials
32:36are not meeting the requirement um
32:38material requirements of the zone
32:40district?
32:41>> Uh the these are the standard ones. Um
32:45usually Culver's um the buildings look
32:48really really nice. So if there's
32:50something that needs to change, we can
32:53go ahead and address that.
32:54Unfortunately, I'm not the architect, so
32:56I'm not the expert on that, but I can
32:57relay the message.
32:59>> Was there an attempt, you know, to
33:01>> So So my understanding, and I guess
33:03Laura can correct me if I'm wrong, is
33:04the south side of the building meets
33:06them as long as you're okay with the
33:08stone being a substitute for the
33:10masonary. And then on as far as the the
33:13other side of the building, I guess the
33:15question is, is the ephus too much? And
33:18I know that um I think they have Hardy
33:21Plank or or something else that we could
33:23put in if Ephus is seen as not
33:25acceptable.
33:26>> Thanks.
33:34>> Go ahead. Uh the two spaces to the
33:38closest to playing field there that are
33:40kind of on the one the right hand side
33:42of that drive out, are those intended to
33:44be parking spaces or are those part of
33:46the sort of uh the what do you whatever
33:48you call them where you wait for your
33:49food, right?
33:50>> Pull ahead. Yeah.
33:50>> The thought is if we need those as pull
33:52ahead, we'll use those. We have that
33:55option. But um if we don't, then they'd
33:58be parking because like I said, because
34:00we have 15 to 18 employees, we need a
34:02lot more parking than a typical. So,
34:04this is low for us, but it it's what we
34:07have.
34:08>> Yeah. Okay. And then
34:09>> we had other ones, but we had to change
34:10it for the PBA. [clears throat]
34:12>> Yeah. Yeah, that's right. Okay. Uh, and
34:15then I I know you said some stuff about
34:18parking. I know there's a study in
34:19there. It's it's it's
34:21deep. Um,
34:24talk to just if you could help me
34:25understand again the exiting. So, you
34:27have a light that has a 100 second cycle
34:30approximately.
34:31>> Yes.
34:31>> So, you're getting
34:34What? Two to three cars out.
34:36>> One to one to two on the peak hour. Yep.
34:38On average.
34:38>> Okay. How many? And And are you certain
34:41that the the amount of traffic that
34:43you're processing at a peak time isn't
34:45going to end up with five cars in three
34:47different directions trying to get out
34:48of that parking lot?
34:49>> Yeah, that's what the numbers say. So,
34:52let's assume that the first car that
34:54gets there, you know, because only what,
34:55a third of them, I think this traffic
34:56study said, will turn right. So,
34:58assuming they want to go straight or
34:59left, they're going to block it until
35:01they get out. But again, the peak hour,
35:04we only have 63 cars leaving and we've
35:06got a green light every 100 seconds. So
35:09that's why we're like, "Okay, so we'll
35:11have two cars. It turns light green and
35:14and they can go ahead and pull out."
35:16>> Yeah. Okay. All right. I'm set.
35:20>> Um I have a question on the the front of
35:23the building there, the south side. Is
35:26that outdoor seating in front?
35:29>> Yes. And is there an entrance to the
35:32building from there?
35:33>> There isn't. Um, again, I don't know if
35:36you're familiar with a lot of Culver's,
35:37they like to have them come in because
35:40obviously when people come in, either
35:41they need the restroom or they're
35:43placing an order generally. And so
35:45that's why they have those those doors
35:47closer to the order. So that way if
35:48you're sitting in the front,
35:51it's a little bit quieter, right? Not as
35:53chaotic. You're not trying to eat dinner
35:54and you have a ton of people walking
35:55right by. So that's why they they don't
35:58put that that door there. They have them
36:00to go to the patio. You go out the side
36:02and then come down from either end. So
36:04usually if someone goes out there and
36:06they're waiting for their food, um the
36:08door on the drive-through side is where
36:10staff will run out and bring their food
36:12to them.
36:13>> Um and then that's how that's usually
36:16facilitated.
36:19>> Okay.
36:22>> Other questions?
36:26Nope. Okay, then you may have a seat.
36:28Um, I will open up the public hearing.
36:30If you would like to make comments on
36:32this case, please approach the
36:34microphone.
36:39Seeing none, I will close the public
36:41hearing um and turn to commissioners.
36:54Fine, I'll start. Um, so I think I think
36:59important things to consider here is
37:00this is a pretty unique situation. It's
37:03stuffed between an expressway and
37:06residential housing. So,
37:09um,
37:13yeah, I don't know if appropriate is the
37:15right word, but I think it's okay for
37:16this location. Um, I think [snorts] the
37:19use is acceptable for this location
37:20given it's
37:22um straight off of an offramp from an
37:24expressway and [snorts]
37:26be really difficult to develop outside
37:28of
37:30a large mixeduse project. Um, you know,
37:34I don't think there's very much
37:37I don't think there's very many uses you
37:39would see in this location that would um
37:42be more ped, you know, be pedestrian
37:44oriented and serve the surrounding
37:46residential. So,
37:48um I think I'm okay with use
37:51the
37:54I think for the landscaping and the
37:56fence. I think as long as the fence
37:58stays and it's in good repair, that I
37:59think that solves a lot of you headlight
38:01issues amongst other things. Um and so
38:06>> looks like it's in good repair from the
38:07Google Maps.
38:09>> Yeah. So, I think um I don't have any
38:11issues meeting the minimum standards for
38:13landscaping as long as the fence remains
38:15in place.
38:16>> [sighs]
38:17>> Um what were the other things we were
38:20supposed to talk about? Uh certainly
38:22don't have any issue with the
38:26um the emergency lane or the pass the
38:28bypass lane crossing over that 25 ft
38:31barrier. Uh the number of cars that lane
38:34shouldn't have cars sitting there idling
38:36like you might have in a drive-thru. And
38:38I'm assuming that's the concern.
38:41>> Um
38:42>> building materials. I knew somebody's
38:45going to make me talk about building
38:46materials. I don't know if I have a good
38:47answer about that yet. So, I'm going to
38:49sit on that one and let somebody else
38:50talk.
38:54>> I can I I think um you know I mean I
38:57know ephus is sort of a dirty word and
39:01um
39:02however I think it can be done well. Uh
39:06it can be done appropriately. Um, and I
39:09and I
39:11the the the Culver's that is on
39:14uh M37 East Belt Line between Burton and
39:1728th Street um has instead of Ephus, it
39:21is all I think it might be Hardy. It it
39:24looks though like it's vinyl sided and
39:26to be honest with you, I don't think
39:27that's better. Um, so I think for me,
39:30I'm I'm comfortable with this. I like
39:32the differing materials in there. The
39:35three, you know, really four with the
39:37with the awnings. Um, I think the other
39:40culvers that I've seen, a little older
39:42variations, have more of a a broad
39:45consistency of materials, and I don't
39:47think it it provides the same detail um
39:51or appearance that this does. So, I
39:53think I'm comfortable with the Ephus um
39:57given that and it's not on the front
39:59facade, uh which will be the primary,
40:01you know, that you'll see as you drive
40:03by. So, I I think I'm comfortable with
40:04it. I like the idea of increasing the
40:07transparency just ever so slightly to
40:09match that. um
40:12somewhat concerned if I lived in one of
40:14those three houses there um with the
40:17with the uh drive-thru speaker until
40:2111:00 p.m. Um
40:25but I don't know that there's, you know,
40:27too much way around that and I think
40:28they're they're doing a pretty good job
40:30given the situation they have to work
40:31with. So, um, and I would like to see
40:36the sidewalk, uh, extend from the
40:39dumpster area to at least the curb on
40:42the south side of where the drive-thru
40:43starts to give an employee. They're
40:45going to have to, you know, kind of run
40:47across the drive-through lane there.
40:49But, um,
40:51you know, I don't think of that as the
40:53same as even running across a parking
40:54lot. They're people are generally, you
40:56know, moving a little slower, pretend
40:58silly queued there. So, I think with
41:00caution and it's not and it is employee
41:03like most likely using that spot. So,
41:04I'm okay with that. Although, I do think
41:06it'd be nice to have that sidewalk
41:07extend just so they don't have to go
41:09through the whole parking lot.
41:11Um, and on the south side, the sidewalk
41:13between the between the um sort of
41:16stacked cars there, I don't think that
41:19bothers me either. I do think that car
41:21that's that's going to end up east of
41:24that of that crosswalk,
41:26I I buy it. I think it it does give you
41:30pause if you were not going through the
41:32drive-thru. If you went into the
41:33restaurant and you're pulling out there,
41:34there's a car sitting there. I think
41:35you're going to hopefully um move
41:37through that space a little slowly
41:39because of that car stack there. So, I
41:41think I'm pretty comfortable with that
41:43as well.
41:51Yeah, I generally agree with my fellow
41:54commissioners. I also don't have a
41:55problem with the use of the materials
41:57here. Um, and as far as like the
42:02entrance being on the side of the
42:04building and not the front of the
42:05building, I'm also okay with that given
42:08the use and um the way the the the front
42:13is designed with the awnings um and the
42:17and the the seating out front. So, I I
42:19don't have a a problem with that either.
42:22and I generally yeah approve of the
42:25plan.
42:27>> I agree with thoughts of other
42:31commissioners. My one of my main
42:33concerns is the just that the condition
42:35of the fence is such that it provides
42:37adequate screening. So I don't know if
42:39that's something we make up one of the
42:42conditions without having any I mean
42:44without having any graphic depictions of
42:47what it currently looks like. Um,
42:51I didn't hear any mention of the poll
42:53signs in the so wondering how we feel
42:57about I mean I I personally kind of
43:00echoing Commissioner Swam's statements
43:02of the unusualness of the parcel itself
43:06and where it's located. I really don't
43:09personally have an issue with them
43:11keeping both pull signs.
43:17I feel the other direction.
43:19>> Same. Yeah.
43:21>> Yeah. You you don't get an opportunity
43:22to get rid of non-conforming pole signs
43:24very often. And if we have them, I think
43:26that we should take them
43:33others.
43:36I uh am in support of this project as
43:38well. I'm noticing a draft condition uh
43:41about one of the pull ahead spaces being
43:44removed. I'm just curious about that as
43:45we've not discussed it.
43:50>> Yeah, the one on the trying to get my
43:53orientation. I think the east side of
43:54the walkway. Yes.
43:56>> Yeah, that was the intent, right, Laura?
43:58Yep.
44:00Right.
44:00>> So, I think we've heard some folks are
44:03comfortable with it as is. If there are
44:06others that
44:09would like to see it. Yeah, go ahead. If
44:11you
44:11>> No,
44:13>> okay. Sorry that I missed that.
44:15>> All good.
44:21>> I can make a motion for
44:23>> Fantastic. Yeah.
44:25>> Okay.
44:32Forgive me.
44:33Now therefore be resolved the planning
44:35commission approves the special land use
44:36and site plan review requests of KR
44:38restaurant group Michael Brand to
44:40construct a drive-thru for proposed fast
44:42casual restaurant at 3127 Planefield
44:44Avenue Northeast for the following
44:46reasons. The proposed use will be
44:48consistent with the purpose and intent
44:50of the master plan and zoning ordinance,
44:51including the zone district because the
44:52proposed use will support the 2024
44:54community master plan intent of a
44:56community activity center to provide
44:58places to live, work, and shop around
44:59key intersections and will reflect the
45:02purpose and intent of the MCNC zone
45:04district to accommodate vehicles at an
45:06appropriate level while still
45:08emphasizing the importance of
45:09pedestrians in public transportation in
45:11the built environment.
45:13Proposed use will meet the site plan
45:14review standards of section 5.12.0e. and
45:16OEE because the proposed development
45:18will not impede the normal and orderly
45:20development or improvement of
45:21surrounding property. Drive aisles and
45:23other elements are designed to promote
45:24safe and efficient movement within and
45:26existing
45:30the within and exiting the site to the
45:32public roadway and safe and convenient
45:35and well- definfined vehicular, bicycle
45:36and pedestrian circulation within and to
45:38and from the site will be provided.
45:42The proposed use will be compatible,
45:44harmonious, and appropriate with the
45:46character and uses of the neighborhood,
45:47adjacent properties, and the natural
45:49environment because the intensity of the
45:50use and site layout are appropriate to
45:53its surroundings and the building
45:54materials transparency and orientation
45:56are appropriate.
45:58Proposed use will not have adverse
45:59effects on the neighborhood because the
46:01landscape buffer will adequately screen
46:02the drive-thru use from the adjacent
46:04residential uses and adequate vehicular
46:06stacking will be provided.
46:09The proposed use will not be
46:11detrimental, hazardous, or disturbing to
46:12existing or future uses or to the public
46:14welfare by reason of excessive traffic,
46:16odors, or noise because the city traffic
46:18engineer in MDOT concurred with the
46:20conclusions of the traffic study. That
46:22the new drive-through would not
46:23adversely impact the surrounding roadway
46:25system as a significant portion of
46:26visits to the site will be from vehicles
46:28already traveling to the site by the
46:30site. and the position and location of
46:32menu boards and speakers will be and the
46:35proposed landscape buffer will
46:36effectively mitigate the effects of
46:38noise and glare from the drive-through
46:40use on the adjacent residential
46:41properties. Proposed use would not
46:44adversely affect the walkability of the
46:45neighborhood, impair pedestrian
46:46circulation patterns, disrupt the
46:48continuity of the urban street, or
46:49otherwise hinder the creation of a
46:50pedestrian oriented environment because
46:53pedestrian sidewalks will provide
46:54additional connections to and within the
46:57site.
46:595 A, adequate public or private
47:00infrastructure and services do already
47:02exist and will be provided at no
47:04additional cost. And 5B, the proposed
47:06use would not be detrimental to the
47:08financial stability and economic welfare
47:10of the city because the proposed
47:12improvements will encourage additional
47:13investment in the neighborhood.
47:16Be it further resolve the following
47:18conditions of approval shall apply to
47:19this project. Standard condition set a
47:21approvals. One that the application plan
47:24submitted by the applicant and signed
47:26dated in stamp by the planning director
47:27shall constitute the approved plans
47:29except if plan elements do not meet
47:30ordinance requirements and or as amended
47:32in this resolution. Two, that the use
47:34shall operate according to the
47:35application and per testimony. Three,
47:38that this approval does not include any
47:40proposed signs or in any future signs
47:42shall be subject to the requirements of
47:43article 15 of the ordinance and permits
47:45received prior to installation.
47:48Four, that a land use development
47:49services, LUD's permit, building permit,
47:51and all other required permits be
47:52obtained from the city of Grand Rapids
47:54prior to construction, demolition, or
47:56operation. Five, that any expansion of
47:58this approved special land use requires
48:01an additional special land use review
48:02and approval by the planning commission.
48:05Six, that the proposed use will comply
48:07with all other applicable city
48:09ordinances and policies and all state
48:11laws. Seven, that this approval should
48:13take effect 16 calendar days after the
48:15date of the planning commission's
48:16decision.
48:18uh and two that this approval shall
48:21permit the following building elements
48:22consistent with submitted elevations.
48:26Uh I'm going to strike A. So A will be
48:28primary building materials including
48:29architectural aluminum cladding, stone
48:31veneer as a masonry base and ephus on
48:33the building sides and B primary
48:36building entrance and orientation to the
48:38east facing
48:40to the east facing the parking lot.
48:43I'm going to strike two. So, three, that
48:46a pedestrian walkway to connect the
48:48northerly employee parking spaces in the
48:50building walkway shall be incorporated.
48:52Four, that the landscaping west of the
48:54fence adjacent to the residential
48:56property shall meet the buffer
48:57requirements of section 5112.
49:00I'm going to add to that that the fence
49:02uh verify the fence is in good repair
49:04and uh repair uh missing
49:08panels as necessary.
49:12maybe better language for that. But and
49:14then five, that the non-conforming pole
49:15sign at the rear of the property shall
49:17be removed.
49:22>> Did you Oh, sorry. That's okay. Um, did
49:26you want to modify for um I didn't hear
49:30concern with the elimination of some
49:32shrubs and supplemented with trees? And
49:35so if if we're comfortable with that um
49:39proposal, then I think you can strike
49:41that condition
49:43with the and then supplement for that
49:46the 6ft tall solid fence along the west
49:49side lot line shall remain and shall be
49:51kept in good condition.
49:53>> That's fine. I would accept that
49:54modification.
49:57>> Okay.
49:58Okay. Motion in support. Any additional
50:00discussion?
50:02All those in favor say I. I. Any
50:05opposed? Motion carries. Thank you very
50:07much.
50:10Okay, our next case is 2036 Sweet Aka
50:182110 East Belt Line.
50:22And
50:25Elizabeth, walk us through this.
50:34Okay.
50:37A major amendment is requested to the
50:39village at Naps Crossing Development, a
50:42mixeduse commercial development approved
50:45as a PRD in 2014. The request is to
50:51increase the number of drive-throughs
50:53within the development.
50:59The development is at the northeast
51:03corner of Nap in the east belt line.
51:07Uh it's anchored um by a uh DNW uh store
51:13and then um we have uh a a large strip
51:16center and a number of out um out
51:20buildings. Um and it is uh one of the um
51:25the outlots that we'll be discussing
51:27today. Um, in 2014 when this was
51:32approved by the city commission, the
51:35adopted ordinance for the planned
51:37redevelopment district allowed the
51:40project to incorporate a maximum of two
51:44nonrest drive-thrus. Um, they could be
51:47food related but lower um lower volume.
51:51One of them is a pot belly and we
51:55allowed that because it's not like a
51:57McDonald's or something like that that
51:59has that higher volume. Um, and then the
52:02other one's a PNC bank. So, we already
52:05have two drive-throughs within the
52:08development.
52:10Um, and uh, the drive-thru that is being
52:15proposed today operates a little bit
52:19different than um, some of the typical
52:22drive-thrus. I mean, it actually uh
52:24operates differently than the Culver's
52:26that we just heard about where uh you go
52:29there, you put in your order, and then
52:30they make the food. In this case, um uh
52:34Chipotle is proposing um an online or
52:38mobile app ordering only and then you um
52:42you pick up your food at the window. So,
52:45there'll be no ordering associated with
52:49this setup.
52:57the [sighs] let's see here the
53:01let's see here um
53:06I'll actually go I described I was
53:10describing um some of the um the the way
53:16that um the operational procedures um
53:19like I Um everything will have to be
53:21ordered online um through the app and
53:24everything will be uh paid for in
53:26advance. Um they're calling it the
53:29Chipotle lane and uh in the in the
53:33packet there is a a traffic study or a
53:37queuing analysis I should say that was
53:40uh prepared um by looking at other um
53:46other fac uh similar uh Chipotle
53:48facilities. Um and because of the way
53:52they operate, only four vehicle stacking
53:58spaces are being proposed.
54:02We did pass that by our um traffic
54:07safety engineer and he did concur with
54:10the findings that the four spaces should
54:14be sufficient.
54:16Uh let's see here. Um,
54:20as I mentioned previously, we have two
54:22other drive-thrus. Um, we have the pot
54:26belly uh restaurant, we have a PNC bank,
54:30and then uh the building that I'm
54:32pointing to um building L is the subject
54:38building. It uh contains three
54:41storefront suites. It previously held a
54:45physical therapy
54:47um
54:49uh office um that uh the Chipotle will
54:53replace. There's a hair salon in the
54:55middle and then a mattress store on the
54:58end.
55:00The building has parking on three sides.
55:04Um I don't know which one I can see
55:07best. Um you can see parking in the
55:09front and on this um and on both both
55:13sides.
55:20The back of the building is currently
55:23improved uh with uh two dumpster
55:26enclosures. So we've got back of house
55:28operations at the back. [snorts]
55:37The way this operation um is intended to
55:41work is that I think it will be better
55:43if I go to the next slide. Um that
55:47traffic will enter in the back. the um
55:50one of the uh trash enclosures will be
55:53removed. Um and uh customers will will
55:57enter at the back, drive around the side
56:01and then pick up their meal and exit.
56:05To facilitate this, all the parking
56:07spaces on the north side as well as
56:12several in the front will be removed. Um
56:15that is a total of
56:19uh 16 um shared parking spaces will be
56:24removed. In addition, two of the parking
56:28spaces in the front will be designated
56:31for pickup parking spaces.
56:34Uh a uh a nice outdoor seating area is
56:38proposed in front of the building.
56:42The trash enclosure that will need to be
56:45removed is proposed to be replaced at
56:49the end of a parking aisle um just east
56:53of the building. Uh it uh it is
56:57identified on the plan that um it will
57:01be landscaped but the that treatment has
57:04not been identified.
57:08Um, additionally, I would like some
57:11clarification about um the nature of the
57:15the barrier. I believe it's going to be
57:18a raised curb. Um, and I'm going to
57:21assume that it will be landscaped, but
57:24I'd like some clarification on that.
57:35Um
57:37I think I have gone over everything that
57:40I need to. Um so in some we're looking
57:44at what is a major amendment to a
57:49planned redevelopment district to allow
57:52a pickuponly drive-thru lane for a
57:55proposed Chipotle. Do you have any
57:58questions for me? Thanks, Elizabeth. Any
58:01questions?
58:03Nope. All right. Um, I'll invite the
58:05applicant up to give us some additional
58:07information.
58:12I'm Bill Mast. I'm with the I'm one of
58:15the owners in the development. Yeah, we
58:18took this over for the failed state it
58:19was in with Steve Benner 14 years ago or
58:22so. and uh feel like we've
58:25we've been told we've done a nice job of
58:27building it, maintaining it, filling it,
58:29and keeping it a quality addition to the
58:31area. Um it it's it is a pickup window,
58:36not a drive-thru. You drive through the
58:40area, but it's to pick up your food
58:42that's already been ordered and
58:43prepared. So, it will it's only supposed
58:45to have the one car at the window for in
58:48Q. Uh the reduction of 14 spaces
58:52is nonconsequential. We're I think on
58:56the whole 32 acre project of quarter
58:58million square ft or so we're 471 cars
59:01overparked over the requirement right
59:03now. So it does not uh affect that. Uh I
59:07I in my write up answering the standards
59:11number 2A
59:13I realize that I I did a drawing. Does
59:16this thing work on the ceiling?
59:20No.
59:21>> Show a drawing.
59:22>> I did a little drawing that shows what
59:25any house on Dunigan would be able to
59:28see between DNW and the next building to
59:30its north. Two houses 930 ft plus away
59:35behind trees might be able to see the
59:37back of that building. And I guess if uh
59:40if they could see that in the dead of
59:42winter, they would see effectively, I
59:45guess, 12 fewer cars than they could see
59:47today in the 14 parking spots that get
59:49eliminated.
59:50>> If you want us to look more closely at
59:52it, you can pass it down the dis. Yeah.
1:00:00Uh I did just for context, I did a
1:00:03little drive through study the other day
1:00:05and in the northwest
1:00:07uh quadrant of that intersection. I
1:00:10counted in the Celebration Village area.
1:00:12I counted 20 food service related
1:00:14establishments for a total of four uh
1:00:18drive-through windows.
1:00:20And it not all for drive through for the
1:00:23food service, but there are four
1:00:24drive-throughs and there are 20 food
1:00:26service establishments. That includes
1:00:28what looks to be a Lake Michigan Credit
1:00:31Union replacing the IHOP. The Southwest
1:00:34and Meer area, eight food service, six
1:00:36windows. We have nine food service with
1:00:39this. Uh this would be a total of three
1:00:41for us.
1:00:43Um,
1:00:45I don't know that I have a lot more to
1:00:47add from what Elizabeth said so
1:00:49succinctly and but I'd be happy to
1:00:51answer any questions.
1:00:53>> Would you confirm the um the nature of
1:00:57that barrier along the
1:00:58>> Yeah, that'll be just 6 in curb and we
1:01:00can land we will find the landscaping
1:01:02within it. And then so
1:01:05we had the queuing study which I
1:01:07appreciate and in our in our staff
1:01:10report it says both that the length of
1:01:15the queue length of four cars or fewer
1:01:17is expected approximately 98% of the
1:01:20time but then it also says the queue
1:01:22exceeds four cars for approximately four
1:01:24hours a day which seems pretty
1:01:27>> four hours a day
1:01:28>> seems like a
1:01:32Uh that's that's
1:01:34>> staff report.
1:01:35>> That's their study. So they would know
1:01:36it better than we do because uh they've
1:01:38studied many many
1:01:39>> Oh 15 minutes. Okay. I see that. Okay.
1:01:42>> It must have just been a typo that I'm
1:01:44seeing. All right. Thank you for that.
1:01:46No, that's fine. Thank you.
1:01:50>> Oh, and I I did uh get emails that both
1:01:53engineering and traffic have uh noted no
1:01:55issues with this application.
1:01:58>> Great. Great.
1:01:59>> Not not not our engineers, the cities.
1:02:01>> Thank you. Any questions for the
1:02:04applicant at this time?
1:02:07>> No. Okay, you can have a seat. Um, we'll
1:02:09open up the public hearing. If you would
1:02:12like to provide comments on this case,
1:02:14please approach the microphone.
1:02:23Seeing none, I will close the public
1:02:25hearing. commissioners.
1:02:32>> I think non-consequential was the word
1:02:34that he said that I'm like, you know,
1:02:36it's
1:02:39that development is fully commercial
1:02:41suburban. Like that that area is so
1:02:44overparked. It's not to Elizabeth's
1:02:47point a drive-thru like McDonald's that
1:02:49has this constant kind of fast food
1:02:52feel.
1:02:55Um I I just don't see any major negative
1:03:00impact over time on this though I invite
1:03:04my fellow commissioners to disagree if
1:03:06they do.
1:03:08>> I I agree with Commissioner Hendrickk. I
1:03:12I don't see I mean that's it's within
1:03:14the character of the overall
1:03:17development.
1:03:19Um I don't have any issues with it
1:03:21personally.
1:03:23I think where we've uh struggled a
1:03:25little bit with maybe Chipotle
1:03:26specifically is that the uh zoning
1:03:28ordinance is is pretty clear about what
1:03:29the definition of a drive-thru is. Um
1:03:32whereas drive-thru operations have
1:03:35changed perhaps since the time that this
1:03:37original PRD uh was created. And so it
1:03:41it's operates quite a bit differently
1:03:44than what the Culver's case that
1:03:45Elizabeth referenced um where you go and
1:03:48you sit and you order and you wait where
1:03:50now everything is done ahead of time. Um
1:03:53and so the impact is is different than
1:03:56what a traditional uh fast food
1:03:58drive-thru is and yet our ordinance
1:04:00definition isn't quite as nuanced um as
1:04:03perhaps maybe we would like it or
1:04:05certainly the applicant would like it to
1:04:06be. Um, so we have struggled with that
1:04:08and I I think that that's something to
1:04:10keep in mind as we um look at how we
1:04:13either create PRDS with such
1:04:15restrictions andor look at our
1:04:17definitions moving forward to be able to
1:04:19give a little bit more flexibility or
1:04:21discernment um between uh in this case
1:04:24drive-throughs that don't operate the
1:04:27same as maybe what we have traditionally
1:04:29thought of as a drive-thru.
1:04:38Is that something that you want us to
1:04:40articulate in the motion that like the
1:04:43scale of why it's appropriate for this
1:04:46type of drive-thru?
1:04:49Well, I presume that that would be
1:04:50something that's um a part of the the
1:04:52findings already um is that it is
1:04:55operating a little bit differently. I
1:04:57guess I'm just feeling um hearing you
1:05:01use the word inconsequential and such.
1:05:03I'm just trying to explain why it's
1:05:05before you and it's because of how
1:05:08>> the ordinance reads and perhaps also how
1:05:10we originally created the approval um in
1:05:1420 what was it 2014 um way back when
1:05:17when things were different. So maybe I'm
1:05:18just feeling a little bit sheepish about
1:05:20>> feeling like I'm putting an
1:05:22inconsequential project before you and
1:05:24and time in an application process.
1:05:26>> And I guess I should say I think we do
1:05:28need to make, you know, serious consider
1:05:30considerations of drive-throughs and the
1:05:31way that they impact
1:05:34projects as a whole, but for this
1:05:36specifically this scale, this scope,
1:05:38what they're doing on in the
1:05:41consideration of the whole site, it does
1:05:43seem appropriate.
1:05:49Excellent. Um, yeah, seeing consensus
1:05:53around. Yep.
1:05:56All right. Now therefore, it be resolved
1:05:58that the planning commission recommends
1:05:59approval of the request of East Belt
1:06:01Line Development 2 LLC William Tass for
1:06:04a major amendment to the Village of
1:06:06Knaps Crossing Planned Redevelopment
1:06:07District to allow a drive-through pickup
1:06:10window for a proposed fast casual
1:06:12restaurant at 2036 Sweet Aka
1:06:162110 East Beltline Avenue Northeast for
1:06:18the following reasons.
1:06:213A and 3B. The proposed mix of uses and
1:06:25design of the amended PRD are consistent
1:06:27with the master plan and the purpose and
1:06:29intent of the zoning ordinance because
1:06:31the use reflects the site's designation
1:06:33in the 2024 community master plan as a
1:06:36[clears throat] community activity
1:06:37center intended to provide places to
1:06:39live, work, and shop around key
1:06:41intersections and along corridors. The
1:06:44intensity and mix of uses are consistent
1:06:46with the site's designation as a town
1:06:47center commercial node in the northeast
1:06:49belt line overlay district. The
1:06:52relatively low intensity of the
1:06:53drive-through lane comports with the
1:06:55intended character of the development.
1:06:583D. The proposed PRD amendment will
1:07:01ensure efficient development on the
1:07:03property and will result in a logical
1:07:05and orderly development pattern in the
1:07:07neighborhood because the existing
1:07:08vehicular connections to the public
1:07:10street and the adjacent development will
1:07:12remain as they are and all queuing will
1:07:14be accommodated on the subject property
1:07:16and will not impede traffic within the
1:07:17larger development.
1:07:20Two, the proposed use will meet the site
1:07:22plan review standards of section
1:07:235.12.8.e
1:07:25because the capacity of the drive-thru
1:07:27will be adequate for intended operations
1:07:30and the site is designed to minimize
1:07:31conflict with traffic operations within
1:07:33the existing development. The site is
1:07:35designed to promote safe and efficient
1:07:37movement within the drive-through lane
1:07:39and at its access point. 4. A the
1:07:42proposed development will be compatible,
1:07:44harmonious, and appropriate with the
1:07:45existing or planned character and uses
1:07:47of the neighborhood and adjacent
1:07:48properties because the intensity of the
1:07:50use and site layout are appropriate to
1:07:52its surroundings and the use will
1:07:54enhance the mix of uses and vitality of
1:07:56the development. 4 B. Potentially
1:07:59adverse effects arising from the
1:08:00proposed development on the neighborhood
1:08:02and adjacent properties will be
1:08:04minimized through adequate vehicular
1:08:06stacking and on-site parking and
1:08:07additional landscaping. foresee the
1:08:10proposed development will not be
1:08:11detrimental, hazardous or disturbing to
1:08:13existing or future adjacent uses or to
1:08:16the public welfare by reason of
1:08:17excessive traffic, noise or visual
1:08:19clutter because the use is anticipated
1:08:21to be used by many patrons already
1:08:22within the shopping center and the
1:08:24number of vehicles queuing is
1:08:25anticipated to be minimal. 4 D
1:08:28pedestrian and vehicular connections
1:08:30will be provided between buildings,
1:08:32uses, and amenities within the property
1:08:34as well as connections to and from the
1:08:36surrounding properties. and 6A, adequate
1:08:39public or private infrastructure and
1:08:40services already exist or will be
1:08:43provided at no additional cost.
1:08:466B, the proposed development will not be
1:08:48detrimental to the financial stability
1:08:50and economic welfare of the city because
1:08:52the project will bring a vacant tenant
1:08:54space back into productive use and the
1:08:56proposed improvements will encourage
1:08:58additional investment in the
1:08:59neighborhood. Be it further resolved
1:09:01that the following conditions of
1:09:03approval shall apply to this project.
1:09:05One, standard conditions set a approvals
1:09:08striking items five and seven. And two,
1:09:10that the barrier separating the
1:09:12drive-through lane and adjacent parking
1:09:13lot drive aisle and the area surrounding
1:09:16the relocated trash enclosure be
1:09:18landscaped consistent with other
1:09:19landscaping within the development.
1:09:23>> Support.
1:09:24>> All right, we have a motion and support.
1:09:26Any discussion?
1:09:28All those in favor say I. I. Any
1:09:30opposed? Motion carries. Thank you.
1:09:36Okay, moving right along.
1:09:41We'll go to 1155 Front Avenue and 1058
1:09:46Scriber Northwest.
1:09:48And yes, Brian already left.
1:10:00The applicant is requesting approval to
1:10:03demolish the existing building at 1058
1:10:07Scribner
1:10:09to expand the existing Merkantile Bank
1:10:12surface parking lot. This will result um
1:10:15in an addition of 51 spaces for a total
1:10:19of 283 parking spaces.
1:10:29property is located on south side of
1:10:31Leonard, east of 131, west of the river.
1:10:36And now we've just changed our
1:10:37orientation. So um uh north is to the
1:10:41left here. So, um, we've got, uh, the
1:10:46Merkantile uh, bank and that's a
1:10:49fourstory 74,000
1:10:52square foot building. It's on about 2
1:10:55and 3/4 acres. It has a surface parking
1:10:59lot. It's very nicely landscaped
1:11:03and there are approximately 173 parking
1:11:06spaces.
1:11:081058 Scribner is about a half an acre.
1:11:13It has an 8,200
1:11:16square foot building
1:11:18um with three separate units and it has
1:11:22surface parking of about 17 parking
1:11:25spaces on site kind of squeezed in
1:11:28there.
1:11:30Um there is transit um along um on
1:11:35Leonard um along uh the West Leonard
1:11:39route, Rapid Route 7 runs along Scrier
1:11:43and does stop um within a quarter mile
1:11:47of the subject property and there is
1:11:49paved bicycle lanes on on front um and
1:11:53there's no street parking in the
1:11:54vicinity and I'm bringing that up
1:11:57because of the nature of this request.
1:12:00because they are asking for an increase
1:12:02in parking over and above what they are
1:12:05allowed. Okay. So, I'm just setting the
1:12:08stage of what kind of facilities are
1:12:10there. So, I'll let um the applicant um
1:12:15talk about um their uh their operations
1:12:20there, but what I know is they are uh
1:12:23adding about 67 work stations in the
1:12:27existing building.
1:12:29And uh apparently they are experiencing
1:12:34uh a dire need for parking. They even um
1:12:39uh rent some parking spaces across the
1:12:41street at 10 I think it's 1050 Scriber.
1:12:45And now I can't is is it this 1060
1:12:51>> 1060? Is it this building here?
1:12:54>> Yeah. Okay. Um, [laughter]
1:12:58I got disoriented so I couldn't find it.
1:13:00Um, so they they rent some parking
1:13:03spaces um on this site um for their
1:13:06employees and um they want to add more
1:13:10employees uh to uh this building um
1:13:14where they already have a parking
1:13:15problem. So, in order to do that,
1:13:18they're proposing to um demolish the
1:13:22adjacent building and add more parking.
1:13:26It will result in uh a net of uh 51 uh
1:13:33spaces
1:13:35for a total of 283 spaces.
1:13:39This is relevant because for the size of
1:13:42the building about 74,000 square ft
1:13:46they are allowed
1:13:4874 parking spaces because it's in the
1:13:52city center zone district
1:13:55and um where it it it's in the city
1:13:58center zone district where there is no
1:14:01parking requirement. Um, I do want to
1:14:03mention that at the time this building
1:14:05was built, uh, it wasn't in the city
1:14:08center. The city center has moved um,
1:14:11west and um, uh, I think, well, you know
1:14:16what? I'm not sure what the zoning was,
1:14:18but I I know that they needed a variance
1:14:20for something when this was built. Um, I
1:14:23don't know if it was for use or for
1:14:25height, but they did get they did get a
1:14:27variance. Um uh the
1:14:30city center has expanded and so now no
1:14:35parking is required but we're here on
1:14:38the fringes a little bit. Um so a
1:14:42maximum of 88 parking spaces is allowed
1:14:46120% of the of the required um if they
1:14:51want to provide parking. So only 88 is
1:14:54what is allowed and they're asking for
1:14:57um 283
1:15:01parking spaces. Now because of um the
1:15:05nature of this request parking in excess
1:15:08of what uh is uh allowed they are
1:15:12required to submit a parking demand
1:15:14study which they did. Um, and
1:15:19the I I'll let the applicant go into
1:15:22details, but suffice it to say um the
1:15:26the parking demand study did find high
1:15:31uh usage of uh both their own parking
1:15:34lot, I think it was 95%
1:15:38um and then um the uh parking lot uh
1:15:42across the street an average of 60%. %.
1:15:47So, um, you know, their own parking lot
1:15:50is for all intents and purposes at
1:15:53capacity.
1:15:54Um, so
1:15:57for those reasons, the applicant is
1:16:00asking um for this uh
1:16:05waiver for additional parking.
1:16:08So in the planning commission's
1:16:12um consideration, we would ask um you to
1:16:16consider, you know, is this warranted?
1:16:19Um
1:16:21are there any other options for the
1:16:24applicant uh to pursue? And I'll let you
1:16:27uh I'll let them talk about what they
1:16:29have done. Um, and um, I I do also want
1:16:34to add, I probably should have started
1:16:35out with this, that because this is in
1:16:37the city center, the city center um,
1:16:40generally um, the the community master
1:16:44plan as well as the GR Ford plan
1:16:47generally does not um, advocate for an
1:16:50increase in the surface parking. So,
1:16:54those are the things that we would ask
1:16:56the planning commission to um consider
1:16:59and balance in making your decision.
1:17:03>> And I'll be happy to turn it over to our
1:17:05applicant.
1:17:06>> Thank you.
1:17:09>> Good afternoon. My name is Scott
1:17:11Satlock. I'm the chief operating officer
1:17:13of Merkantile Bank and my office is
1:17:15located at this site on Leonard. Thanks
1:17:18for the opportunity to share our project
1:17:20with you. Merkantile has been a part of
1:17:23the city of Grand Rapids since we were
1:17:25founded on North Division in 1997. In
1:17:282003, we acquired this Leonard site and
1:17:32we have continued to invest in it, the
1:17:34Westside, and the city of Grand Rap
1:17:36Rapids ever since. Today, Merkantile is
1:17:40the largest bank headquarter in the
1:17:42state of Michigan. We have over 800
1:17:44employees and over 50 locations.
1:17:47We remain we remain committed to the
1:17:49city and are seeking your support to
1:17:51allow us to grow in place both in the
1:17:53near and the long term. Would mention
1:17:56that the fact that this is our
1:17:57headquarters is relevant. Um it is not
1:18:00only our headquarters uh but it also is
1:18:03a retail branch and so part of the
1:18:05parking is designated for our clients
1:18:06that come in. Much of our commercial
1:18:09banking activities also happen from this
1:18:11site. Um and um and we invite every new
1:18:16employee that's hired throughout the
1:18:17state to come into the city of Grand
1:18:18Rapids, start their training here. We
1:18:20host number of meetings from this site
1:18:22as well, all adding to the demand for
1:18:24parking.
1:18:26But fundamentally, our request today is
1:18:28about supporting continued job growth in
1:18:30the city of Grand Rapids. We do plan a
1:18:33renovation at this site uh that will
1:18:35allow us to accommodate 67 additional
1:18:37employees. Um, however, we have already,
1:18:41as stated by Elizabeth, an immediate and
1:18:43documented need for parking as it is.
1:18:46Without solving for that parking, we
1:18:48won't be able to add these additional
1:18:49employees. And in fact, last year, we
1:18:52did relocate 36 employees out of this
1:18:54site to a a location in Kentwood. Our
1:18:58desire is to avoid future relocations
1:19:00out of the city.
1:19:02At the same time, we recognize that the
1:19:04city has important goals related to
1:19:06transportation choice, walkability,
1:19:09reducing dependence on surface parking,
1:19:12and we support these goals. In fact, we
1:19:14have surveyed our employees to better
1:19:16understand their willingness to consider
1:19:18alternative transportation, transit
1:19:20incentives, car pooling programs,
1:19:22off-site parking options, and bicycle
1:19:24related incentives. While interest
1:19:27exists, it is not enough to offset our
1:19:29overall parking demand and uh our
1:19:32planned employee growth at this time.
1:19:35One of the challenges, primary
1:19:37challenges we face in this uh scenario
1:19:40is that the transportation and parking
1:19:42infrastructure surrounding our
1:19:44headquarters does not yet provide
1:19:46practical alternatives for a significant
1:19:48portion of our workforce. About 86% of
1:19:52our employees at this site live more
1:19:54than 5 miles away.
1:19:56Our need is real and immediate. While
1:19:59many of the long-term transportation
1:20:01solutions the city is pursuing will take
1:20:03some time to develop.
1:20:06We understand that removing a building
1:20:08for surface parking is not generally the
1:20:10preferred parking solution. At the same
1:20:12time, the condition of the subject
1:20:14building is important context.
1:20:16Although the building has an entrance on
1:20:18Front Street, it is set back from the
1:20:20sidewalk with paved parking between the
1:20:23sidewalk and the facade of the building.
1:20:26So its relationship to the street is
1:20:28already primarily autooriented rather
1:20:30than pedestrianoriented.
1:20:33We are not removing a building that
1:20:35currently uh strongly contributes to the
1:20:37future pedestrian character envisioned
1:20:40for this area.
1:20:42Furthermore, I think it's important to
1:20:44note that the current site is entirely
1:20:46impervious and we will add green space
1:20:48and canopy.
1:20:50The proposed surface lot may be less
1:20:53than ideal land use, but allows us to
1:20:55address our immediate need while
1:20:57improving the site with a
1:20:59well-maintained, professionally
1:21:00landscaped parking area integrated into
1:21:02our current campus. This site will
1:21:05include landscaping, fencing, lighting,
1:21:07and maintenance standards that are
1:21:08consistent with our current parking lot.
1:21:11Importantly,
1:21:13we do not view this proposal as an
1:21:15excessive request. We view it as a
1:21:17necessary step to address our need that
1:21:20allows us to continue growing jobs and
1:21:21investing in the west side while looking
1:21:24for and working together for long-term
1:21:26solutions in this area. We met with
1:21:29every neighbor within 300 ft of both our
1:21:31current and proposed site. Our
1:21:33discussions were uniformly positive and
1:21:36no opposition was noted. In fact, most
1:21:38wrote letters of support that were
1:21:40submitted with our application.
1:21:43As our campus evolves in the future, we
1:21:45do anticipate the need to evaluate
1:21:48structured parking. We also anticipate
1:21:51the need to consider additional office
1:21:53space
1:21:56and we are hopeful that at the time the
1:21:59city's uh parking and transportation
1:22:01initi initiatives and infrastructure
1:22:03will mature around this site when that
1:22:05time comes. We've been a long-term
1:22:08partner in this corridor and we intend
1:22:10to remain one. We respectfully ask for
1:22:12your support so that we continue
1:22:14investing in our headquarters, create
1:22:16the capacity for these additional
1:22:17employees in the city, and remain a
1:22:20strong contributor to the economic
1:22:22vitality of Grand Rapids and the west
1:22:24side.
1:22:25I'd invite Jack from Neville to come up.
1:22:30Jack with Neerville. quickly. Um,
1:22:32driving home the point of there's really
1:22:35not a public either on street parking
1:22:39component in this area or structured
1:22:41parking in this area. There's just
1:22:42nothing available for them to uh rent
1:22:45spaces or buy spaces for their
1:22:47employees. And then I'll just say from a
1:22:50uh a landscaping standpoint, you know,
1:22:52that the existing parking lot is well
1:22:54done with uh fencing and screening
1:22:56around the perimeters that would also um
1:23:00be expanded on this new parking area.
1:23:03And of course, we'll we've met with uh
1:23:06storm water engineer and all the
1:23:07engineering folks at the city and um we
1:23:11have no problem complying with all those
1:23:12types of things if you approve this.
1:23:14Thank you.
1:23:16>> Great. Thank you. Any questions for the
1:23:20applicant? Go ahead, Kristen.
1:23:22>> I was just wondering if you could come
1:23:23back up because I I felt like the
1:23:24convers Yeah, sorry. um conversations
1:23:26that we've had. Um, I think the detail
1:23:31around the the training and the um,
1:23:36community meetings and such is important
1:23:38because I I I don't think that I think
1:23:41it might be a little bit more impactful
1:23:43than maybe what the planning commission
1:23:45might understand if they're not familiar
1:23:47with the site because I I feel like in
1:23:48our early conversations they're they're
1:23:50quite frequent that you have a number of
1:23:52individuals in addition to the employee
1:23:54count.
1:23:55>> Yeah. So I that might be helpful for you
1:23:57to expand on that.
1:23:58>> Yeah, thank you. Um so on our first
1:24:00floor um within the building we have a
1:24:03100 and 50 person capacity community
1:24:06room. We uh of course use that for
1:24:09internal purposes but and inviting
1:24:12employees from around the bank to come
1:24:13in. Um but we host a number of outside
1:24:17parties and organizations to use that
1:24:19room. A lot of nonprofits a lot uh right
1:24:22here in Grand Rapids. And so of course
1:24:25their meeting times often are um in in
1:24:28the middle of the day when we're already
1:24:29using our parking uh as we would for
1:24:31operational purposes. And so um when we
1:24:35expanded our building um so we have
1:24:37expanded this building once in uh in
1:24:402019. That was the time when we
1:24:42introduced the least parking across the
1:24:44street um to both accommodate the growth
1:24:46in workstations at the building but also
1:24:48to help accommodate the needs that come
1:24:50with such a community room. And so we're
1:24:53pleased to offer that to the community.
1:24:55We're pleased uh to build relationships
1:24:57through that space. Um but it is already
1:25:01very difficult sometimes navigating the
1:25:03traffic constraints uh that uh or the
1:25:06parking constraints that come from uh
1:25:08welcoming people into our building.
1:25:11>> What are the frequency of of some of
1:25:13those either employee trainings or the
1:25:16community meetings that you have? Yeah,
1:25:18you know, if I were to look back, you
1:25:19know, year to date, we're using that
1:25:21training room uh probably three out of
1:25:23five days a week. Um sometimes more,
1:25:25sometimes less, but I'd say that would
1:25:26be the average. And I would say the it's
1:25:28not always 150 people. I'll be clear on
1:25:30that. But I would say usually the the
1:25:33it's 20 to 50 people um 80% of the time
1:25:37and then 20% of the time it's more than
1:25:39that.
1:25:42>> Thank you. I I just remember that
1:25:44sticking with me from our conversation.
1:25:45And so I wanted to make sure the
1:25:46planning commission was aware of the
1:25:48intensity of of the employee training at
1:25:51the headquarters as well as the
1:25:52community meetings that do tend to have
1:25:55um a number of individuals that come to
1:25:57the site during regular operations.
1:26:00>> Yeah, that context's helpful. I do have
1:26:02a couple questions if you wouldn't mind
1:26:04staying up.
1:26:05>> Um
1:26:07are you keeping those leased spots?
1:26:10>> Our intention is to keep the lease
1:26:12spots.
1:26:12>> Okay. Y
1:26:13>> um and then I want to say that I
1:26:15appreciate the effort that you took to
1:26:17survey your employees to get a better
1:26:19understanding of the specific
1:26:22um needs and potential for alternatives
1:26:24here at this site. I am just curious
1:26:26about what incentives you explored as
1:26:30part of that survey process.
1:26:32>> Yeah, the survey question proper was
1:26:35pretty broad. Um, would you consider
1:26:38some form of a stipend to park either
1:26:40offsite or um or to carpool or to take
1:26:44other means into the building? We did
1:26:46not tag anything monetarily to that. Um,
1:26:50but uh we found that there is indeed
1:26:53some interest but not enough to offset
1:26:55um kind of the demand or the the the
1:26:58crunch that we have. Um, but what I
1:27:01think it gives us is it it plants the
1:27:02seed and it gives us I think hope that
1:27:04as we continue to grow employees at this
1:27:06site and continue to grow as an
1:27:08organization beyond our c what will be
1:27:10our new capacity um that we will have
1:27:13options especially if some new
1:27:14optionality comes into this area from
1:27:16both parking and transportation. You
1:27:19know the dash route was reduced and so
1:27:22that kind of came out of our area a bit.
1:27:24So that was one less option that we've
1:27:26had um for our employees. And again,
1:27:28very few employees live within even a
1:27:31five mile area.
1:27:33>> Thank you.
1:27:33>> Yep.
1:27:35>> Any other questions?
1:27:39Okay, I will open up the public hearing.
1:27:41If you would like to provide comments on
1:27:43this case, please approach the
1:27:44microphone.
1:27:46Great.
1:27:52>> Good afternoon. [clears throat] I'm Paul
1:27:53Hendris. I'm a neighbor um right across
1:27:56the street 1150. If you look on the map,
1:27:58I'm towards the top of the screen there.
1:28:00So, I've been in front of here and uh
1:28:03you know um been we our um business has
1:28:07been there since 1998 and we were up
1:28:09Front Street before that. Um their
1:28:12building is beautiful. They were the
1:28:13anchor of this area. If you if we really
1:28:16think back to the area and what it was
1:28:18like, they came in and built the
1:28:19building and uh um I really support
1:28:23their um their work here. You know, we
1:28:25uh uh when they built this uh they were
1:28:28able to do four stories. the planning
1:28:29commission has done a great job and
1:28:31actually the the zoning and and um and
1:28:35got the ability for them to go uh now
1:28:38people to come in and maybe go higher
1:28:39with higher densities and stuff, but
1:28:41they're just looking to um be able to
1:28:43utilize their existing building and do
1:28:45the parking for that while you know
1:28:47things are in transition there. The
1:28:49zone, we talk about the zoning, but it
1:28:50actually just changed and they're part
1:28:52of the legacy, you know, how it was
1:28:54before and uh we can't just think that
1:28:56that's going to happen overnight. My
1:28:58experience at my own company is is we're
1:29:00seeing some of those folks bike to work,
1:29:03Uber, you know, some busing. It's coming
1:29:05slow. There's also some physical
1:29:07barriers there with the uh connection to
1:29:10the west side of the highway. If you've
1:29:13ever been over there, we don't have
1:29:14anybody able to really walk between
1:29:16there very easily now. Bike between the
1:29:19bike, there's not really a bike lane
1:29:20there. It's kind of it's kind of crazy
1:29:22in that intersection. So, we're still
1:29:24seeing like some adoption, but just not
1:29:26at scale. So, we just want to be able to
1:29:28see these folks be able to use uh use
1:29:30the building that they have acquire this
1:29:32and if they keep growing like they're
1:29:33growing, you know, we kind of anticipate
1:29:35that this is going to be like their, you
1:29:37know, be able to be used as their
1:29:38campus. And hopefully we can take
1:29:40advantage of some of the new uh um
1:29:42zoning that's there and put a nice tower
1:29:44in and have uh um you know, the ramp
1:29:46that uh that they're going to need in
1:29:47the future. So, I'd strongly recommend
1:29:49that uh that we allow this to happen as
1:29:52we go through this transition here and
1:29:54uh um and uh know that Mercantile's just
1:29:57been a great neighbor and um and their
1:29:59their space is very very nice. So, and
1:30:01we we really like having them. Thank
1:30:03you.
1:30:04>> Thank you.
1:30:06Anyone else?
1:30:09Okay, I will close the public hearing.
1:30:12Commissioners.
1:30:24>> Yeah, I generally don't, you know, love
1:30:25surface parking, but I also love that
1:30:27they're headquartered here and they want
1:30:29to continue to grow here and invest in
1:30:31the city. And um given the area where it
1:30:35is right next to the highway and the
1:30:38changes in zoning coming like I and
1:30:41their their look towards future growth
1:30:44um I would feel comfortable approving
1:30:46it.
1:30:52I I feel like it's not as cut and dry to
1:30:55me. I'm I guess there's a little bit of
1:30:58um
1:31:01frustration thinking about like the
1:31:03development process for cannabis and how
1:31:04we have these standards that people try
1:31:07to promote um
1:31:10hiring local and
1:31:13building density and we did reszone this
1:31:15area to city center. There is definitely
1:31:18some transportation challenges with the
1:31:21highway but we have icon on bond. We
1:31:24have Michigan State um new buildings
1:31:28right there. We have this building that
1:31:30just turned into residential apartment.
1:31:32We have way too much office space in
1:31:35this area generally. Um and it's there's
1:31:38not a lack of office space that could be
1:31:41utilized for expansion. I understand
1:31:46the convenience of having everything in
1:31:47one place and I think that the neighbor
1:31:49made a really good point about this
1:31:51being an incremental step that you have
1:31:53a parking lot and then potentially you
1:31:55could build there later. It just
1:31:59it feels like a huge
1:32:03direct 180 from the goals of our master
1:32:05plan and reszoning this area to CC
1:32:08to city center to then go and approve
1:32:13parking. And I feel like I need more
1:32:20I I need more of a reason why I would
1:32:22vote yes to this. And maybe my vote
1:32:23doesn't make a difference, but I don't
1:32:25feel like it meets the requirements of
1:32:27the it meets the goals and objective of
1:32:29the master plan that we just did, and we
1:32:31just reszoneed this area. Um,
1:32:38I mean, there was a survey,
1:32:41but it seems that that's always kind of
1:32:42how it is. Like, we did a survey and it
1:32:45just wasn't enough. So, it didn't work
1:32:46in our business plan and it just so
1:32:49we're not going to do it. and then
1:32:52plans move in the direction of the
1:32:55easiest path forward for that business.
1:32:57But maybe not looking at the entirety of
1:33:00what we're trying to do. Our master says
1:33:02our master plan says that we want to add
1:33:0410,000 units to the downtown. We need
1:33:08density here. We need people to live
1:33:09here to be able to frequent the
1:33:12businesses. And then we're saying, well,
1:33:13that's okay. We'll just make more
1:33:14parking for people that live 5 miles
1:33:16away because this business has been
1:33:17here. There's things I feel like need to
1:33:20be considered, especially being a city
1:33:21center zoned to property.
1:33:26Sorry for my rant.
1:33:28>> No, I I I think you raised important
1:33:30points. um you know h having had maybe a
1:33:34bit longer to to think about this in in
1:33:37previous meetings um you know I I I
1:33:40think I started where you were as well
1:33:42um a little bit challenged by the
1:33:44efforts we're trying to make and and
1:33:46where I ultimately I think landed in my
1:33:48review of this was
1:33:51the city center reszone and the vision
1:33:53to expand is a in in planning and zoning
1:33:57world a very it's it's still little baby
1:33:59right like it it it's really new and we
1:34:02have um a solid anchor business that is
1:34:07going to and has helped this area of the
1:34:09city move forward and stabilize it. And
1:34:12it's in an area of the city, this is on
1:34:14my way home every day and there are some
1:34:17really challenging mobility um um
1:34:21disconnects in this area to make it
1:34:24inhospitable to pedestrians. And I don't
1:34:28know that adding parking uh for this
1:34:30particular user is going to uh
1:34:32exacerbate that. I I think it's more of
1:34:33an city infrastructure issue as well as
1:34:37a a land use issue with the the lack of
1:34:39density in this location. Um I think
1:34:42it's it's still a challenge when it
1:34:45comes to uh mobility for bikes and of
1:34:47course the dash uh no longer circulates
1:34:50through here. And so for me, I I almost
1:34:52look at it as, you know, you take two
1:34:54steps forward and and one step back
1:34:56sometimes in order to make progress and
1:34:58progress isn't always clearly uh us
1:35:00moving forward. Um sometimes we we have
1:35:04to look holistically at what's really
1:35:06happening and providing support to
1:35:08institutions that are um hugely critical
1:35:10to the stability of of this area and in
1:35:14light of all the other mobility
1:35:15challenges that we know exist in this
1:35:17location. So, I guess that would be a
1:35:19little bit counter again just from me
1:35:22having the benefit of being able to
1:35:23think about this for um quite a bit
1:35:25longer than than what you've had it
1:35:26before you.
1:35:30>> I wonder if um I'm reflecting back on a
1:35:33on a similar proposal that we rejected
1:35:37I don't know in the last 18 months or
1:35:38so. Um,
1:35:42and
1:35:46uh, I I don't know that the facts of
1:35:48this are much different. Um, and so I
1:35:51wonder I'm not not just for director
1:35:54Turkelson, but just for others who were
1:35:56on the commission at that time, maybe
1:35:58you could help me understand or or help
1:36:00me help clarify some of the differences
1:36:02in the in the cases and the ideas behind
1:36:05this.
1:36:08Well, I I can start if if you'd like me
1:36:11to. Um, for me, I I think some of the
1:36:14significant differences are um we now we
1:36:18understand with this particular site
1:36:20what is the actual occupancy and usage
1:36:23of this parking and it's it's heavy. Uh
1:36:25you can see that um and the data
1:36:28supports that. um we have information
1:36:31from the operator, from the business
1:36:34owner, um better understanding what the
1:36:36needs and desires are um of their uh
1:36:40employee base. Um I don't think any of
1:36:43that information was uh provided or
1:36:47available to the planning commission
1:36:48with um other applications that were
1:36:51maybe similarly situated. Um and by that
1:36:54I mean just the nature of the request. I
1:36:56I also think the physical location of
1:36:59this is significantly different. Um
1:37:01being adjacent the highway that Leonard
1:37:04and and Turner the Leonard and um front
1:37:07intersections are challenging at best.
1:37:10Um so I think it's physical constraints
1:37:13here are different than um what we saw
1:37:16with a previous application on the other
1:37:18side of the river. That would be where I
1:37:20would start. Others may have different
1:37:22thoughts.
1:37:23>> Can you remind me what the other
1:37:25location was? I don't know if I was on
1:37:26the commission then or not.
1:37:29>> I I think the most recent example would
1:37:31be uh Corwell's request uh for the
1:37:34demolition of structures in the Monroe
1:37:37North area um just uh north of here um
1:37:41and the construction of surface parking.
1:37:46Yeah, I tend to agree with um everything
1:37:49that Director Turkelson said here in
1:37:52terms of what's being provided in this
1:37:54case versus what was provided in the
1:37:56past. I think
1:37:58talking specifically about the most
1:38:00recent other example,
1:38:04we had asked for some of that
1:38:05information regarding
1:38:08an actual understanding of where
1:38:10employees are coming from or how far and
1:38:13potential for different um for
1:38:15alternatives or study of different
1:38:17alternatives and did not receive that
1:38:19information. Um so that is
1:38:24I think a substantial difference here in
1:38:28addition to the constraints and
1:38:31different kind of context um that has
1:38:34already been talked about.
1:38:38>> Yeah. Yeah, and I I understand
1:38:40Commissioners Hendrick's concern about
1:38:42um saying there's plenty of office space
1:38:44available, but they are currently in the
1:38:46space and there's a huge cost incurred
1:38:48with trying to move and relocate
1:38:50employees and all that type of thing.
1:38:51And they've already lost we've already
1:38:53lost 30 employees to Kentwood. I mean, I
1:38:55love our neighboring city, but I would
1:38:57rather have them in the city and paying
1:39:00taxes here and working here and
1:39:02contributing to the life um and vitality
1:39:04of the downtown area. And so if this
1:39:07helps them do that, um, you know, I
1:39:10think it's another financial,
1:39:13um, I guess it's it contributes to the
1:39:16financial viability of the city to to
1:39:18have them here and to have this business
1:39:21headquartered here.
1:39:32Others
1:39:34Would
1:39:38anyone like to make a motion?
1:39:44>> I will make a motion.
1:39:47Now [clears throat] therefore, be it
1:39:48resolved that the planning commission
1:39:49approves a special land use and site
1:39:51plan review approval request of
1:39:53Merkantile Bank Scott Setlock to
1:39:55demolish the building at 1058 Scriber
1:39:58Avenue to expand the bank's existing
1:40:00surface parking lot at 1155 Front Avenue
1:40:02in excess of the maximum number of
1:40:04spaces allowed for the following
1:40:05reasons.
1:40:07Number one, the proposed use will be
1:40:09consistent with the purpose and intent
1:40:11of the master plan and zoning ordinance,
1:40:13including the zone district, because the
1:40:15request supports the goal of 2024
1:40:17community master plan, a strong economy
1:40:20goal to offer a range of employers and
1:40:23job choices.
1:40:25Number two, the proposed use will meet
1:40:27the site plan review standards of
1:40:29section 5.12.8.E
1:40:33E because the site is designed to comply
1:40:36with all provisions of the zoning
1:40:39ordinance and safe, convenient, and
1:40:41well- definfined vehicular, bicycle, and
1:40:43pedestrian circulation within and to and
1:40:46from the site will be provided. 3A. The
1:40:50proposed use will be compatible,
1:40:51harmonious, and appropriate with the
1:40:53character and uses of the neighborhood
1:40:56and adjacent properties because adequate
1:40:58parking will be provided
1:41:00on site to meet anticipated parking
1:41:02demand and a TDM transportation demand
1:41:05management plan is already in place and
1:41:06intended to encourage strong encourage
1:41:09alternate modes of transportation.
1:41:11Street parking is not available on front
1:41:13or scrib necessitate necessitating
1:41:17additional on street parking and several
1:41:20neighbors have written letters of
1:41:21support for the addition.
1:41:24Potentially adverse effects arising from
1:41:26proposed uses will be minimized because
1:41:30the need for additional parking has been
1:41:32demonstrated based on land use and a
1:41:34development character of the area
1:41:36including the relative intensity of uses
1:41:38requiring parking availability of
1:41:40transit, proximity of nearby employment
1:41:43centers and residential uses and
1:41:46adequate parking will adequate parking
1:41:49lot screening and landscaping will be
1:41:52provided. The proposed use will not be
1:41:54detrimental, hazardous, or disturbing to
1:41:56existing or future uses or to the public
1:41:58welfare by reason of excessive traffic
1:41:59noise, smoke, or orders because
1:42:03no public testimony in opposition has
1:42:05been provided. And the proposed use is
1:42:07not anticipated to result in excessive
1:42:09noise, glare, or visual clutter. The
1:42:12proposed use will not adversely affect
1:42:14the evoc walkability of the
1:42:16neighborhood, impair pedestrian
1:42:17circulation patterns, disrupt the
1:42:19continuity of the urban street wall, or
1:42:21otherwise hinder the creation of a
1:42:23pedestrian oriented
1:42:25environment because site improvements
1:42:27will result in removal of several cur
1:42:29curb cuts on both street frontes in the
1:42:32surface. Parking lot will be
1:42:34appropriately landscaped to enhance
1:42:36neighborhood walkability.
1:42:38The proposed use will not be detrimental
1:42:40to the financial sta stability or
1:42:42economic welfare of the city because the
1:42:44use is not anticipated to result in
1:42:45nuisances that require police or code
1:42:48enforcement
1:42:51actions. And the use will support the
1:42:54expansion of an office use and encourage
1:42:58other investments in the area and
1:43:00potentially more uh employers or
1:43:03employees in the in the building as
1:43:05well. Be it further resolved that the
1:43:08following conditions of approval shall
1:43:10apply to this project. Standard
1:43:12conditions set a approvals as on the
1:43:16screen and that is it.
1:43:22Support. All right. We have a motion and
1:43:25support. Any additional discussion?
1:43:28All those in favor say I. I. Any
1:43:31opposed?
1:43:32>> I.
1:43:33>> Okay. One opposed. Motion carries. Thank
1:43:36you very much.
1:43:39All right. Will you have Brian come back
1:43:40in?
1:43:56Yes, we'll take a five-minute break.
1:44:04[music]
1:44:21>> [music]
1:44:27[music]
1:44:34[music]
1:44:42>> Heat. Heat.
1:45:15>> [music]
1:45:56[music]
1:46:02>> Heat. Heat.
1:46:23Heat. Heat.
1:46:45Heat. Heat.
1:47:13>> [music]
1:47:56[music]
1:48:06[music]
1:48:21>> Heat.
1:48:27Heat.
1:48:30Heat. Heat.
1:48:56>> [music]
1:49:07[music]
1:49:17>> get back to it. Um, we have a site plan
1:49:20review, including a public hearing for
1:49:221150 Adam Street Southeast.
1:49:26So, our last case today is a final site
1:49:30plan review for the town home
1:49:31development area of the Boston Square
1:49:34Planned Redevelopment District. Um this
1:49:37PRD is part of a larger we this the town
1:49:41home development is a part of part of a
1:49:43larger development plan um for the
1:49:46Boston Square business district known as
1:49:48Boston squared together. Um the PRD um
1:49:52you can see in this screen is the area
1:49:55shaded in green was adopted by city
1:49:59commission on August in 2020
1:50:02and then it was amended earlier this
1:50:05year. um to allow for some changes to
1:50:08the down the town home um development
1:50:11area. The property is located east of
1:50:14Kalamazoo Avenue and bounded by Adam
1:50:16Street to the north and Fuller Street to
1:50:19the east. Um their um surrounding
1:50:22property is lowdensity residential to
1:50:24the north. uh traditional business
1:50:26district to the west and south and MDR
1:50:30mixed um density residential the Grand
1:50:33Rapids Housing Commission is directly to
1:50:35the east.
1:50:37So this project the PRD is in
1:50:40development. The Boston Square community
1:50:42hub the is open and operational. It is
1:50:46technically not part of the PRD but it
1:50:49is part of the overall Boston Square
1:50:51Together development. The um there are
1:50:53two family buildings, the F1 and F2
1:50:57building, um, excuse me, the F2 and F3
1:51:01buildings. And so it's mixed use,
1:51:03residential and commercial. The F2
1:51:06building, you can see, um, that the
1:51:09certificates of occupancy have been
1:51:11issued for that building. Construction
1:51:12is complete. And in this, um,
1:51:15construction area at the where my cursor
1:51:18is is where the F3 building is currently
1:51:20underway. Construction of that building.
1:51:24This image shows the general plan for
1:51:27development to um occur from south to
1:51:29north just for the entire PRD. That's
1:51:33the intent of development. And this plan
1:51:36is the plan that was approved as amended
1:51:39earlier this year. It should look
1:51:40familiar to most of you as you uh I
1:51:44think we're all part of that um
1:51:46amendment approval.
1:51:48The town home development area is the
1:51:51northern area of this PRD. Um, in this
1:51:55site, um, I've included this because it
1:51:57it shows the where shared use agreements
1:52:01will be in place for different elements
1:52:03elements of the entire PRD,
1:52:06um, including the internal drive running
1:52:08through the town home um, portion of the
1:52:11development.
1:52:13The existing site, as a reminder, is um
1:52:18currently improved with a school
1:52:20building and there's a slope running
1:52:22from um Adam Street to the south.
1:52:27[snorts] And part of that slope allowed
1:52:29for the development to um to provide
1:52:33zero entry accessible units from that
1:52:36internal drive. And so the the this
1:52:40development is taking advantage of that
1:52:41for the benefit of the future residents.
1:52:46The approval included three three-story
1:52:50buildings fronting Adam Street. They
1:52:52will be two stories at Adam Street and
1:52:55three stories from the internal drive.
1:52:57The T4 and T5 buildings on the south
1:53:00side of the internal drive will be
1:53:02twostory buildings with basement.
1:53:06There are sidewalks on both sides of the
1:53:09internal drive
1:53:12and this future um the future
1:53:15development will connect the internal
1:53:17drive to Fuller Avenue
1:53:21as a condition of the amendment
1:53:23approval. Um the planning commission
1:53:25required additional streetscape elements
1:53:27to be included in the plan. Um
1:53:30specifically to um along the internal
1:53:33drive to provide appropriate physical
1:53:36separation from the town home units
1:53:38fronting the drive to to the drive
1:53:40itself enhance pedestrian sa safety and
1:53:44resident visibility and to bring the
1:53:46internal drive closer to the vital
1:53:49streets standards overall.
1:53:51the [snorts] window wells in the T1
1:53:54through T3 buildings um at Adam Street
1:53:56were required to meet the setback
1:53:58requirements and the final site plan
1:54:02review should would include the building
1:54:04elevations as well. So those are some
1:54:06things we're talking about today
1:54:08regarding the landscape or regarding the
1:54:10site plan. three bulbouts um two on the
1:54:14north side of the drive and one on the
1:54:16south side of the drive were added to
1:54:18the plan um to help provide some of that
1:54:21separation from the drive to the public
1:54:24sidewalk and also to help align the
1:54:26pedestrian crossings across that
1:54:28internal drive. the T4 and T5 buildings
1:54:32were shifted south
1:54:35um to allow for a new parkway to be
1:54:37installed between the p the public
1:54:40sidewalk and that internal drive.
1:54:43And within that 4 foot wide parkway, um
1:54:46it allows for landscaping including 11
1:54:49new street trees.
1:54:52The shift of these buildings, T4 and T5
1:54:54buildings south um placed the T5
1:54:57building a little bit closer to this
1:55:00retaining wall at the edge of this uh
1:55:02the uh parking lot to the south of that
1:55:05building. It is now approximately just
1:55:08shy of 8 ft from that retaining wall. Um
1:55:11another result of moving these buildings
1:55:13south was that there were originally
1:55:15patios
1:55:17uh planned uh for these units. Those
1:55:19patios have now been removed
1:55:27on this plan. Also, you can see that
1:55:29there are future sidewalk connections to
1:55:32connect the town home development to the
1:55:35uh additional um future development to
1:55:38the south. And a roll out dumpster
1:55:42enclosure or trash enclosure is located
1:55:46just west of the parking spaces that are
1:55:49provided on the south side of the
1:55:50internal drive. Um you the planning
1:55:53commission may wish to confirm with the
1:55:56applicant how that will work given the
1:55:58slope of the street and the curb and
1:56:01sidewalk that are between the the the
1:56:04trash enclosure and the street itself.
1:56:12So, if we move on, oh, one last thing
1:56:14about the plan. This is a landscaping
1:56:16plan. You can see the new street trees
1:56:18that have been added in the parkway. And
1:56:20also on this plan, you'll notice that
1:56:22there has there's landscaping that has
1:56:24been pro been provided on all of the
1:56:27sides or on the sides and between the
1:56:31buildings. Um, I will also add that move
1:56:36shifting the T4 and T5 buildings to the
1:56:38south has allowed for additional
1:56:40landscaping to be provided between each
1:56:44unit and the public sidewalk.
1:56:47And the the small um walls delineating
1:56:52each private patio of the northerly town
1:56:55homes um are identified as planters. So
1:56:59there can be additional landscaping in
1:57:01those in those little walls.
1:57:06So now if we can shift and talk about
1:57:08the building elevations. There's a
1:57:10conceptual conceptual plan or rendering
1:57:14of of the buildings from Adam Street.
1:57:18The front of the buildings will be clad
1:57:20with brick and the sides and the rear of
1:57:22all the buildings will be engineered
1:57:24wood siding.
1:57:26The egress windows at the front of the
1:57:28buildings fronting Adam Street have been
1:57:30removed.
1:57:32So that was to eliminate the
1:57:35the needing to meet that setback.
1:57:41And here are the elevation drawings for
1:57:43the the T1 through T3 buildings. We'll
1:57:46start with those first. So the egress
1:57:49windows in the basement have been
1:57:51removed. Um instead there are plans the
1:57:55plans indicate that um a future bathroom
1:57:58will be included in the basement level
1:58:00of those units. Um I will note that
1:58:03removal of the egress window eliminates
1:58:05the possibility of having a separate
1:58:08sleeping area um to be constructed in
1:58:11that space. And so that might be a
1:58:13conversation to have with the applicant
1:58:15of the intent of the use of that lower
1:58:18level and the inclusion of the future
1:58:20bathroom and how um residents may want
1:58:23to use that space and um anticipating
1:58:26any potential um conversions that the um
1:58:31owners of these units might want to
1:58:33implement in the future.
1:58:38The front porches of these units um you
1:58:41can see the front of these buildings are
1:58:43shown in the bottom image on the right
1:58:46hand side. I'll go back to the
1:58:48rendering.
1:58:50You can see the front porches of the
1:58:51units will be recessed
1:58:55and the architectural plans. The
1:58:58elevations indicate that there will be
1:59:01um
1:59:03aluminum rails along the front and along
1:59:06the stairs.
1:59:10I'll zoom in here a little bit. You can
1:59:13see that there is at at the top of each
1:59:17recessed front porch and at the top of
1:59:19each building there's a brick soldier
1:59:21course to provide some architectural
1:59:23interest to those elements.
1:59:26And um I also will make note that the
1:59:29building foundation
1:59:31um there is no landscaping shown on the
1:59:34on the civil plans or the landscape plan
1:59:37at the front of the buildings and it
1:59:39would appear that the foundation may be
1:59:41exposed at the front of the buildings.
1:59:43So that would be um a talking point with
1:59:45the applicant whether whether there's
1:59:47treatment planned at the front of the
1:59:49buildings to mitigate um the exposed
1:59:52foundation.
2:00:01If we look at the the um the back of
2:00:06these units along Adam Street, um I
2:00:09would like to also mention that there
2:00:12are um the mechanical
2:00:16um the mechanical um equipment is
2:00:20intended to be located within the
2:00:23private patio area. Um I um wonder if
2:00:28the planning commission could ask um why
2:00:31the inclusion in the patio rather than
2:00:33on the roof. Um and whether or not the
2:00:38um the location of the mechanical
2:00:40equipment and that's really only on the
2:00:41internal units, the units on the on the
2:00:44ed the end units of each building, the
2:00:46mechanical equipment is on the side of
2:00:48the building and um screened by
2:00:50landscaping.
2:00:53But if all of the equipment were to be
2:00:56located on the roof of the buildings,
2:00:58then there would be no um loss of patio
2:01:01space for those internal units at the
2:01:05rear of the building. Now, I'll go back
2:01:06to the the renderings.
2:01:11Shows this very well. At the back of
2:01:12these buildings, there are um downspouts
2:01:16running the the length from the roof to
2:01:19the ground to help provide um separation
2:01:22or you know delineation between the
2:01:24units.
2:01:29The um elevations show that there will
2:01:33be um a notch in the parapet between
2:01:36units to provide that separation or
2:01:38delineation and that there will be um
2:01:44a a a gap um a recessed area of brick.
2:01:50um the details of that aren't specific
2:01:52and it's not consistent between the the
2:01:55civil plans and the architectural plans.
2:01:57And so that's one detail that I I we ask
2:02:01that the planning commission discuss
2:02:03with the applicant to determine exactly
2:02:06how that might be um finalized. And it's
2:02:10my understanding that's still um they're
2:02:12still trying to make a determination of
2:02:14how to provide that delineation between
2:02:17units.
2:02:19The plans also um say that the building
2:02:24heights, you can see in this rendering,
2:02:26the building heights vary to accommodate
2:02:29for the slope on the street. Um the the
2:02:32civil plans and the building elevation
2:02:34and the architectural plans do not
2:02:37demonstrate how this will be
2:02:38accomplished. Um the planning commission
2:02:41may wish um to consider a condition of
2:02:44approval that the the final um product
2:02:49might match what's illustrated in the
2:02:51renderings or discuss alternatives with
2:02:53the applicant. Um the building
2:02:55elevations and the civil plans show all
2:02:57the buildings at the same height. But I
2:03:00I believe that that also is a detail
2:03:02that is still um being deliberated.
2:03:07And if we talk about the the T4 and T5
2:03:11buildings, these in this image are the
2:03:13buildings that front on the internal
2:03:16drive.
2:03:17These buildings have cement block that
2:03:21will be exposed at the back of the
2:03:23buildings. similar to the front of the
2:03:26buildings along Adam Street. Um I would
2:03:29like the applicant to describe any
2:03:31potential um treatment, landscaping or
2:03:35screening that might be um included to
2:03:38help mitigate the exposed foundation.
2:03:45I think that I have summed up all of the
2:03:48changes under consideration. Um, we are
2:03:52looking at specifically the parkway and
2:03:55streetscape changes
2:03:58and the architectural design and
2:04:00materials and whether they are
2:04:01consistent with a TN MDR zone district,
2:04:05the proposed facade treatment to
2:04:07delineate each of the units and the
2:04:10approach to varying building heights and
2:04:13whether the proposed uses are adequately
2:04:15buffered from one another and from
2:04:17surrounding property. Are there any
2:04:19questions?
2:04:21Thank you, Laura. Any questions?
2:04:25Nope. All right. Have you come up?
2:04:30>> Uh, good afternoon, Planning Commission.
2:04:32Uh, been here uh before uh discussing
2:04:34this project a couple of times. Uh
2:04:35really excited about uh how it's
2:04:37progressed over the last uh eight
2:04:38months. We are here uh back this past
2:04:41winter. uh [clears throat] talking about
2:04:42uh the overall site planning concept,
2:04:44talked a bit about uh the community
2:04:46engagement that we did and you know
2:04:48continue to receive great uh feedback
2:04:49from the neighborhood of just how to
2:04:51continue to uh uh create more detailing
2:04:54um in the architecture um and warming up
2:04:56the warm up the buildings a bit. And so
2:04:58uh you'll see that uh in the updated
2:04:59renderings. And so uh there's a lot of
2:05:01great work uh that both uh Pure
2:05:03Architects and Habitat have have led on
2:05:06this project. And I really just want to
2:05:08re-emphasize that this is a an
2:05:10affordable housing uh home ownership
2:05:12project. Um and so I think this is
2:05:14something for us all to be extremely
2:05:16collectively excited about. Um this
2:05:18really sets a high standard for what um
2:05:20affordable housing uh can look like in
2:05:22our community. Um and so as we work
2:05:24through um some of the detailing, I
2:05:26think I just want to continue to center
2:05:27that um in the context of um I think
2:05:30this project still is is very
2:05:31cost-sensitive in terms of how we
2:05:33approach it and making sure that uh
2:05:35we're creating uh true ownership
2:05:36opportunities for folks that uh
2:05:38traditionally do not have the means to
2:05:40do so. Um um I think with that I'll I'll
2:05:42turn it over to Adam um to discuss uh
2:05:44some of the the finer details and some
2:05:46of the questions related to building
2:05:47materials, uh setbacks, windows, and all
2:05:49that good stuff.
2:05:55Good afternoon. My name is Adam Wayne.
2:05:57I'm with Pure Architects. Uh appreciate
2:06:00John's introduction there and Lor's help
2:06:02going through this this project. Uh it's
2:06:04been an exciting one. Uh we've recently
2:06:07gone through community engagement um
2:06:09efforts to get community feedback and
2:06:12make sure that we are meeting the
2:06:14community's expectations about what this
2:06:16project should be. Um, we've tried our
2:06:18hardest to make sure that the look and
2:06:20feel is something that not only matches
2:06:23what's happening with the larger Boston
2:06:25Square PRD, but the the community on
2:06:28both sides of Adam Street and Fuller as
2:06:30well. Um, there are some some concerns
2:06:32about some of the detailing that's going
2:06:34on right now with our construction set
2:06:36and like the recess and then the between
2:06:39the buildings and also the exposed
2:06:41foundations. I would say that, you know,
2:06:43we're working through the construction
2:06:45drawing set right now. So, we're trying
2:06:47to evolve that um while also limiting
2:06:51the amount of going too far in our
2:06:53detailing before we've gotten approval
2:06:55uh on the set. So, we are trying to work
2:06:57through that. And then we've also worked
2:07:00with the planning commission to make
2:07:02sure we have their concerns met um on
2:07:04some of the site detailing as long as
2:07:07like trees, landscaping,
2:07:09um sidewalks, making sure that the the
2:07:13whole site just feels walkable and also
2:07:17a welcoming environment for the
2:07:19community. Um I'm open to answer
2:07:23questions or we can go through sort of
2:07:27further um explanation.
2:07:31>> Great. Thank you. Um I guess maybe just
2:07:35going through kind of the list that
2:07:36Laura had um talked about. Um I know you
2:07:40said you're still working through the
2:07:42details, but in terms of accommodating
2:07:44some of those um potential questions um
2:07:50related to mitigating that exposed
2:07:52foundation with landscaping. Is that
2:07:54something that you all are open to? Yes,
2:07:59definitely. And um so I'll go back to
2:08:01one of the other details about the the
2:08:03window wells that we originally had on
2:08:05the site and then the setback. So that
2:08:08was potentially going to make us have to
2:08:10move all the buildings down into the
2:08:12southeast. So part of that then is the
2:08:16grading and the topography of what
2:08:18happens around those foundation walls.
2:08:19It's kind of the reason we've left it
2:08:20exposed as we're trying to work through
2:08:22this. We felt felt like until we had it
2:08:25solidified, we wouldn't go and show all
2:08:28the landscaping and grading around those
2:08:30foundations. We're open to obviously
2:08:33blocking the foundation wall, making the
2:08:35topography go up a little bit higher or
2:08:37putting uh green space or greenscape
2:08:40around it.
2:08:41>> Okay.
2:08:41>> Um the the window wells themselves, I
2:08:45mean, part of the reason we went away
2:08:47from that is just because of that
2:08:49setback off of Adam Street. you know, if
2:08:52if if that requirement was, I don't
2:08:55know, reduced or something, we could
2:08:58bring those back and that might solve
2:09:00some of the issues that we're having or
2:09:02we're having with uh having to bring
2:09:05those window wells in and the site uh
2:09:07location of the buildings on the site.
2:09:10and then talk about the mechanicals in
2:09:15and yeah kind of how
2:09:18>> how much usable patio is actually
2:09:21available if the proposed is what
2:09:24happens.
2:09:24>> Yeah. Uh there is a building section in
2:09:28the set. Um
2:09:32>> it's pretty deep. It's pretty deep in
2:09:34like a A301.
2:09:37>> There you go. one back.
2:09:40Um, so if you can see on sheet A301 in
2:09:44the top left shows a building section.
2:09:46One of the issues we were running into,
2:09:48uh, we originally looking at putting the
2:09:50units on the roof is that the parapits
2:09:53are not very tall as they are right now.
2:09:56So the all those rooftop units would be
2:09:58visible from probably Adam Street,
2:10:00Fuller, and then even behind the site.
2:10:02So
2:10:04besides like raising those parapits up
2:10:06around the entire building, we thought
2:10:08it'd be a better idea to put them down
2:10:10at the the ground level. Unfortunately,
2:10:13you know, we only have sides of the
2:10:15buildings on top of those units, so we
2:10:16had to bring them back to the patio
2:10:18space. Um, our idea was to enclose them
2:10:21and with a sort of wrap, woodlook wrap.
2:10:26It does reduce the square footage on on
2:10:28the patio space. Uh, but it was kind of
2:10:31lesser of two evils as far as
2:10:34visibility. What we didn't want to do is
2:10:36raise the parapits up so much that the
2:10:38scale of the building doesn't seem
2:10:39appropriate for
2:10:41the community in Adam Street. So, that's
2:10:43kind of where that decision came from.
2:10:46How much how much space is left or like
2:10:49are you going with smaller units to
2:10:51minimize the space that's being taken up
2:10:54by the mechanicals? Like how how much
2:10:56will folks actually be able to use these
2:10:59patios?
2:11:00If I can find a floor plan here
2:11:08um on sheet
2:11:10A101
2:11:14I can zoom in there. Can't seem to zoom
2:11:16in. Um it's it's encroaching maybe like
2:11:19four feet it seems like onto the patio
2:11:22space.
2:11:23>> Can you zoom in?
2:11:24>> Awesome. Thank you very much.
2:11:34Thank you very much.
2:11:38>> Does that that view help um illustrate a
2:11:41little bit about the size of the the
2:11:43patio? There's there's roughly a 10 ft
2:11:48width left after that enclosure. Um,
2:11:55so it takes up a significant portion of
2:11:57it, but it's still a pretty sizable
2:11:59patio space.
2:12:04>> And then, um, we talk about the plans
2:12:06for how you're going to accomplish the
2:12:09variation in building elevation and then
2:12:11also, um, kind of that recessed brick
2:12:14area and gap in the parapets to
2:12:16delineate between units.
2:12:18>> Yes, definitely. So right now in our
2:12:20drawing set, it's just a it's just a
2:12:23simple
2:12:25drawing standard Revit issue that we're
2:12:26dealing with. So it was easier for us to
2:12:30have a replicable unit and they're all
2:12:32shown right now at the same height. Our
2:12:34intention is to drop those down once we
2:12:36are we're moving into the final stage of
2:12:38of development. So
2:12:41it's misleading. It looks like we're not
2:12:43planning to step those units down, but
2:12:45we are.
2:12:52Any other questions?
2:12:55No. Okay. Then um we'll open up the
2:12:58public hearing. If um anyone would like
2:13:01to provide comments, please come up to
2:13:04the microphone.
2:13:09Seeing none, I will close the public
2:13:11hearing. Commissioners,
2:13:16>> um, I'd like to ask the commission. I
2:13:18don't remember us having a conversation
2:13:21about the window wells, but it's very
2:13:22possible that we did. Did we talk about
2:13:24that? And does anybody recall why we
2:13:26made that determination?
2:13:32>> I don't think we made any determination.
2:13:34Yeah. On the window wells
2:13:36>> goes back to the ordinance requirement.
2:13:38Must be at least 10 ft from a front lot
2:13:40line. be a variance like
2:13:42>> it has to be done through variance
2:13:45>> in a PUD even.
2:13:47>> Yeah.
2:13:48>> Yeah, we
2:13:50>> Yeah.
2:13:51>> Okay.
2:13:54>> Did you want John to
2:13:55>> you? Go ahead if you want. Yeah.
2:13:56>> Um if we could get relief, we'd prefer
2:13:58to put the window wells back in there.
2:14:00It's just the 10-ft separation has
2:14:02forced us to remove those and that will
2:14:04impede the ability to have uh bedrooms
2:14:06in the future. So, if there is relief,
2:14:08we would prefer that. Is that something
2:14:10we can do as the planning commission or
2:14:12does that have to go before BZA?
2:14:15>> Um,
2:14:18so it is a PRD so variances layered on a
2:14:21a PRD are are tricky. Um, you do not
2:14:24have the authority to wave it through a
2:14:26a site plan review standard. Um
2:14:30uh the planning commission actually
2:14:33affirmed that 10-foot setback last year
2:14:36when we did have a conversation about
2:14:38what should the setback requirements be
2:14:41and the decision was to provide greater
2:14:44flexibility on window wells when it's in
2:14:46the side or rear yard but not in the
2:14:49front yard. So
2:14:52the more productive path in my opinion
2:14:56for this project would have been through
2:14:58a a policy discussion um unrelated to
2:15:02the project but versus the variance.
2:15:07Anything to add Laura?
2:15:12And and the last thing I I feel like
2:15:15those units not only are going I mean
2:15:18we're sorry we're losing space in those
2:15:21porch areas but they're also loud. And
2:15:22if you have an air condition unit
2:15:25running in your porch if you your air
2:15:27condition is on out inside it's because
2:15:29it's hot already. And then you have an
2:15:31air condition unit being loud and hot
2:15:35right next to you where you're trying to
2:15:36sit. I would prefer
2:15:39to go the route of functionality over
2:15:41aesthetics
2:15:42in that case. I don't know if there's a
2:15:44cost associated to it, but it seems I
2:15:46would rather have exposed units on the
2:15:50roof versus losing that space in my
2:15:54opinion.
2:15:56>> Yeah. Do others have thoughts on that?
2:15:58It's a lot of space to take out of those
2:16:00patios with with I mean that's that's
2:16:03almost half the spa usable space in the
2:16:06patios is taken up by either the
2:16:09enclosure itself or the door swing area
2:16:11of the enclosure. Um I agree with
2:16:15Commissioner Hendrick and Hendrickk and
2:16:17I also think that
2:16:19maybe we should have a policy discussion
2:16:21about those windows. I understand what
2:16:23was done in the past, but
2:16:27when this was most recently before us a
2:16:29few months ago, a lot of the talk was
2:16:31being able to use those basements as
2:16:34potential accessory dwelling units. And
2:16:36now without those
2:16:38egress windows, that that possibility is
2:16:41taken off the the table.
2:16:45>> And to add to that, it's not it's not
2:16:46just a preference. It's almost like, are
2:16:49we incentivizing somebody to do
2:16:51something illegal that would put them in
2:16:53danger by placing, you know, a room in a
2:16:56space without an egress window? It's not
2:16:58just this project. I've seen it on other
2:17:01projects, too, where I understand the
2:17:03site constraints, but
2:17:06I just don't want it, you know, I don't
2:17:09want zoning to impede safety.
2:17:15As far as the mechanical units are
2:17:17concerned, the experience of the
2:17:18homeowner was the first thing I thought
2:17:19of. So, I would love to see them
2:17:20relocated if it's not cost prohibitive
2:17:22to the owner.
2:17:27>> Is uh like centering those things on the
2:17:30roof of those interior units an option
2:17:33without touching the parapits?
2:17:37>> Yeah. Yes, I think we could definitely
2:17:38take a look at um either centering them
2:17:42or pushing them to the back of the unit
2:17:44and see what that would look like. Um
2:17:47but if it's a condition that it's a
2:17:49hangup like I think we could definitely
2:17:51look into it.
2:18:00Is it possible to do egress at least on
2:18:02the end units so that at least maybe
2:18:06like two of them are able to have
2:18:09[snorts] egress windows on the sides.
2:18:22>> Yeah. So what's interesting about these
2:18:23units too is technically you could
2:18:26egress out the rear of each of the
2:18:28units. Mhm. Mhm.
2:18:30>> Where the where the problem is, like you
2:18:32were alluding to, is that if somebody
2:18:35were to construct, let's say, a bedroom
2:18:37on the north side of it, then suddenly
2:18:39you have a bedroom and depending on how
2:18:41you build that out, you don't have
2:18:43direct access or egress out. So, the
2:18:46side units, you were asking if whether
2:18:47you could egress or have a side uh
2:18:50egress on the side. Um, it's possible.
2:18:55It's definitely possible. um we're
2:18:57trying to have consistency between all
2:18:59of the units. So that that's one of the
2:19:02issues um to not create sort of
2:19:06disadvantaged or unfair sort of uh
2:19:09situations between the units. Part of
2:19:12what we're trying to do is get all the
2:19:13streetscape requirements in there too.
2:19:16And so that's we keep moving the you
2:19:18know the whole building and the whole
2:19:19site and layout further south. So we
2:19:22just we've kind of run out of space. Um,
2:19:24there's still a little bit more we could
2:19:26shift it down, but not much. And that's
2:19:28that's kind of the the requirement that
2:19:30we're we're running into. Thank you for
2:19:32that explanation.
2:19:42>> Okay.
2:19:44Well, I don't I don't think we can do
2:19:45anything about the windows with this.
2:19:48>> Can we argue about whether or not it's
2:19:50actually defined like what a window well
2:19:51is?
2:19:52>> Oh, wow.
2:19:54start it off start us off again
2:19:56>> like if there's actually a definition
2:19:57for it in the zoning ordinance
2:20:04>> um I'm not
2:20:07think I'm not thinking that it's best to
2:20:09uh have a interpretation debate on the
2:20:12dis on the fly um
2:20:15>> we're happy to follow up I I don't think
2:20:17from the planning department's
2:20:18perspective we're adamantly against the
2:20:20window wells being in the front here we
2:20:22have a code to apply. Um, and if there
2:20:25we can relook at our interpret uh at our
2:20:28definitions. Um,
2:20:32but I'm I'm not going to do that right
2:20:34now.
2:20:36>> That was a great response.
2:20:39>> Thanks, Kristen.
2:20:40>> Yeah.
2:20:43>> Um, I think um I think this is a great
2:20:45project. I think um there's a few things
2:20:48that
2:20:50I think for clarity I mean everybody
2:20:52knows that I know quite a bit about this
2:20:54project but because of the grade on the
2:20:56site and the zeroep entries uh along the
2:20:59drive that's being created uh
2:21:03you have to step the building. Um
2:21:06there's too much grade to do each one of
2:21:08these on a flat plane. So, uh, unless
2:21:11they're getting rid of zeroep entries or
2:21:15moving way too much dirt, there's no way
2:21:19that each one of these buildings are
2:21:20going to have every unit at the same
2:21:23level. Um, so I would expect the
2:21:27renderings to be more accurate than the
2:21:29elev elevations with regard to that.
2:21:33Um,
2:21:34I feel the pain for
2:21:38having to move things around and try to
2:21:39make things fit. So, um, because I tried
2:21:43to do it, too. Um, really this project,
2:21:48uh, shows how much
2:21:52it it's a really good example of, um,
2:21:55how different rules in the city can
2:21:58create very different outcomes. I think
2:22:00accommodating
2:22:02um fire safety rules
2:22:06um came up as a really big deal here and
2:22:09I'm surprised at how much of the site we
2:22:10have to pave in order to accommodate it
2:22:13and the fact that we can't build
2:22:14neighborhood streets like we have
2:22:15everywhere else in the city. [snorts]
2:22:17But so all that to say that I think um
2:22:21in general this is a great project. I
2:22:23I'm not worried about the
2:22:24differentiation between um individual
2:22:27units. I think the renderings do a good
2:22:29job of showing that. Um, I probably
2:22:32should have asked, but I'm curious what
2:22:34the foundation is made of and what is
2:22:36going to be exposed. Um, whether or not
2:22:38it's concrete or something else. I think
2:22:41it said split face block on the
2:22:43elevations. But
2:22:46yes, we're currently showing uh CMU
2:22:49foundation walls. Uh, we're actually
2:22:52still debating with structural about
2:22:54whether that's going to be concrete or
2:22:56CMU. And then uh one of the things that
2:22:59had been discussed was um it's the T3
2:23:02unit, sorry, [clears throat] which is
2:23:04the furthest to the northeast and we are
2:23:08showing um brick actually in the
2:23:10renderings extending down through the
2:23:13foundation wall because that that side
2:23:16unit is going to have the most sort of
2:23:17visibility um from the corner and from
2:23:20Adam Street. So we're still working that
2:23:23detail out, but you can see that in the
2:23:24rendering. So that doesn't quite match
2:23:26up with the the drawings right now, but
2:23:29that that is the intent is what you see
2:23:31in the rendering.
2:23:33>> Is that true for the um separation
2:23:36between the patios too? Like is that
2:23:38intended to be brick or is that going to
2:23:40be siding or something else?
2:23:41>> That um that was going to be siding I
2:23:45believe. Okay. I think that's a issue in
2:23:47the rendering. So,
2:23:53and I just want to make sure you
2:23:54understand too that that that condition
2:23:56was only on the T3 unit on the east
2:23:58side. The we were going to have sort of
2:24:00an exposed foundation uh between the
2:24:03units and
2:24:06just put the cost and the price right
2:24:08there.
2:24:09>> Okay. Is um this is getting really nerdy
2:24:12and you might not know. Uh is the is it
2:24:15going to be flush?
2:24:17Like I'm assuming the foundation wall is
2:24:19going to be holding the brick up.
2:24:20>> It's gonna have to step.
2:24:21>> Okay.
2:24:22>> So there have to be a a transition
2:24:24between the two.
2:24:26>> Okay. [snorts]
2:24:31>> Yeah.
2:24:31>> Thank you.
2:24:32>> Yep.
2:24:38>> So yeah, I think overall the project's
2:24:40great. Um
2:24:43I think they're really good-looking town
2:24:45homes. So, I think most of the time
2:24:46we're not seeing brick, so it's nice to
2:24:48see brick. Um, and I think it'll fit in
2:24:52well.
2:24:55>> Yep. I agree completely. Um, yeah, I'm
2:24:59excited about this project to move
2:25:01forward for sure.
2:25:03Would someone like to make a motion?
2:25:08I guess maybe before we do that, we
2:25:10should take a pulse on some of these
2:25:12potential
2:25:14conditions. Um,
2:25:17so I guess the one I have the biggest
2:25:20question about is the movement of the
2:25:22mechanical equipment. Is everybody
2:25:26wanting to see that move to the roof?
2:25:33>> I don't feel like there's a great
2:25:34answer. I don't want to see I really
2:25:35don't want to see them if I'm driving by
2:25:36on Adams and like see them on the
2:25:38rooftop, but I also don't want to
2:25:42like create a terrible experience for
2:25:44the people using the patios. So,
2:25:46>> right.
2:25:49>> Well, I mean, rooftop mechanicals are
2:25:52common and
2:25:53>> yeah, it's just I think this has that
2:25:55flat roof and I think the just I think
2:25:59you probably will see them driving by.
2:26:00You don't usually see them on top of a
2:26:02residential
2:26:04unit.
2:26:06>> Maybe I'm wrong.
2:26:08>> Yeah, I don't think you're correct at
2:26:10least on new builds in that we do
2:26:12require the rooftop mechanicals for um
2:26:15multi or we try to um for multif family
2:26:18as well. Um it depends on their uh the
2:26:24geography of whether or not the
2:26:25screening or can it be screened by
2:26:27parapits and where they are on the the
2:26:29actual rooftop. if they're central to
2:26:32the building and they're not visible,
2:26:33then sometimes we've had a little bit
2:26:35more flexibility with uh screening
2:26:37requirements.
2:26:39>> Yeah. Well, and I and I think like a lot
2:26:41of multif family are usually more than
2:26:43three stories and they're harder to see
2:26:44from the street, you know? That's that's
2:26:46why I think this would be a little
2:26:48different because of the building
2:26:49height, but I don't have a huge problem
2:26:51with it. So, just my thoughts.
2:26:55So I'm sure that well
2:26:59uh I would guess that Habitat and
2:27:00Amplify care about how these look also.
2:27:03So would it be acceptable to say that
2:27:08if they do some studies like
2:27:11you know standing across Adams on the
2:27:13sidewalk if you can't see the
2:27:16um the units on top of the roof or you
2:27:19can only see a small amount of it. I
2:27:20mean those are really easy drawings to
2:27:22do. Um similarly um you know Amplify may
2:27:26or may not care if you can see those
2:27:27from some of the other buildings in the
2:27:29development. So but you can do those
2:27:31sighteline studies but
2:27:35um and I would think that
2:27:41having usable patios and spending all
2:27:44this money on this private street
2:27:47getting those out of there probably
2:27:49would be ideal also. So, I'm just
2:27:51wondering if we
2:27:53>> leave it up to
2:27:53>> No, I completely Yeah, that's fine. I
2:27:55completely agree. I was just expressing
2:27:57my concern is I would prefer to see as
2:28:00little as possible.
2:28:01>> Yeah.
2:28:03>> Um, so I was just Yeah, I'm wondering
2:28:05what people think about leaving it up to
2:28:06them and using their professional
2:28:09judgment to figure out what the
2:28:10appropriate solution is.
2:28:18What are folks thoughts about that?
2:28:25>> I I am fine with that.
2:28:29>> I can just go on the roof, too.
2:28:32>> Yeah,
2:28:33>> it was just an idea.
2:28:34>> Yeah, I'd like to see them on the roof,
2:28:36personally.
2:28:37>> Yeah, I would, too. I I really don't
2:28:39think they're going to get used at all.
2:28:41I I know how noisy mine is and that's
2:28:44not a place that I would hang out if
2:28:45that were the case.
2:28:50Okay.
2:28:54Everything else I think was addressed in
2:28:56terms of
2:28:59defaulting to those renderings related
2:29:01to the varying heights between buildings
2:29:03and the parapet detail and brick
2:29:05recesses. So, I'm not sure if those
2:29:10conditions still need
2:29:12>> I don't think anybody talked about I
2:29:14don't really want to, but the dumpster
2:29:16situation.
2:29:17>> Oh, thank you.
2:29:18>> Was there questions about that
2:29:20>> about whether there
2:29:22carts or
2:29:26time?
2:29:26>> Okay,
2:29:26>> maybe I'm wrong.
2:29:28>> If everybody's comfortable with the
2:29:30location shown and how it works, that's
2:29:32fine to me.
2:29:35Thanks for reminding us what we're what
2:29:37the question is. Laura, I think just the
2:29:40question of how it will work. Um the the
2:29:43road coming [clears throat] down from
2:29:45Adams is a steep slope coming down and
2:29:49then it has a has a curve. Um there are
2:29:53some
2:29:55um drawings in here that show the
2:29:57turning templates of a truck
2:30:00somewhere in here. Here's one. This is
2:30:03uh showing some of the turning template
2:30:05templates specifically for a fire truck,
2:30:07which is not the type of truck that
2:30:09would necessarily service the trash, but
2:30:12um mostly just clarifying that
2:30:14operations have been thought through and
2:30:16how it will work.
2:30:19>> Thank you. Could someone address that
2:30:21question?
2:30:22>> Yeah, thank you. So, the idea here is to
2:30:25create an enclosure and your typical
2:30:27residential cart that a lot of us have
2:30:29at our home would be what would occupy
2:30:30that, not a dumpster. Cuz putting a
2:30:32dumpster enclosure in there and creating
2:30:34the right angle with the amount of slope
2:30:36we have here for a traditional trash
2:30:38truck to pull in, scoop it and dump it,
2:30:41it's not going to work very well in
2:30:43there. So, we show a sidewalk in front
2:30:45of the dumpster enclosure. We may need
2:30:48to rethink that a little bit about um
2:30:51the curb height there. so that we can
2:30:53get those carts down to degrade or that
2:30:57the carts don't end up occupying the
2:30:58sidewalk space so we can look at that.
2:31:01But that was the intent.
2:31:03>> Okay, thank you for that.
2:31:11>> Okay. Um would anyone like to make a
2:31:14motion?
2:31:19>> I'll do it.
2:31:20>> Okay.
2:31:23Now therefore, be it resolved that the
2:31:25planning commission approves the request
2:31:27of Amplify GR John for final site plan
2:31:32review approval for the town home
2:31:35development phase within the Boston
2:31:37Square planned redevelopment district at
2:31:391150 Adam Street Southeast for the
2:31:42following reasons. The proposed
2:31:44development will meet the purpose and
2:31:46intent of the master plan and zoning
2:31:48ordinance because the site design and
2:31:50general scale of the town home
2:31:52development will reinforce and support
2:31:55the desired character for this area. The
2:31:58town home design, architectural details,
2:32:00and brick/engineered wood materials are
2:32:04consistent with the desired character of
2:32:06the TN MDR zone district.
2:32:112. A the site is not is designed to
2:32:16comply with all provisions of the zoning
2:32:18ordinance because streetscape elements
2:32:21along the internal drive, including
2:32:23bulboutouts, a parkway, street trees,
2:32:26and landscaping have been incorporated
2:32:28to enhance pedestrian safety and
2:32:31resident livability. 2B. The proposed
2:32:34site will be developed so as not to
2:32:37impede the normal and orderly
2:32:39development or improvement of
2:32:40surrounding property for uses permitted
2:32:43by this chapter because the site has
2:32:46been designed to connect to existing and
2:32:49proposed streets and will enhance
2:32:51circulation within the neighborhood. The
2:32:54streetscape elements incorporated into
2:32:56the internal street design are
2:32:58consistent with vital streets standards.
2:33:022 E. All elements of the site design are
2:33:06harmoniously and efficiently organized
2:33:09in relation to topography, the size and
2:33:12type of lot, character of the
2:33:14neighborhood and adjoining property, and
2:33:16the type, size, and proportions of
2:33:19buildings because the proposed buildings
2:33:21will be scaled, masked, oriented, cited,
2:33:25and architecturally designed in a manner
2:33:28sensitive to other development in the
2:33:31vicinity. The proposed building design
2:33:34and highquality materials meet the
2:33:36desired characteristics in the TN
2:33:39neighborhoods.
2:33:413B. Natural features and site topography
2:33:45are incorporated into the proposed site
2:33:47design to the maximum extent practice
2:33:50practicable because the required green
2:33:53space and tree canopy requirements will
2:33:55be met upon completion of the
2:33:57development.
2:33:593D landscape buffers or green belts are
2:34:03provided that ensure that the that
2:34:05proposed uses adequately buffered from
2:34:08one another. That proposed uses are
2:34:11adequately buffered from one another and
2:34:14from surrounding public and private
2:34:16property because landscaping will be
2:34:18provided around and between buildings
2:34:22and the building setbacks. Parkway and
2:34:24proposed landscaping provide adequate
2:34:27physical separation between the public
2:34:29and private realms. 4. A driveways are
2:34:33located to max minimize conflict
2:34:37with traffic operations on abuing
2:34:39streets and the number of driveways is
2:34:42the minimum needed to provide reasonable
2:34:44access to the site.
2:34:474 B. The width of streets and driveways
2:34:50are appropriate for the existing and
2:34:53anticipated volume of traffic because
2:34:55the drive is internal to the development
2:34:58and an adequate width to allow for on
2:35:00street parking for residents of the
2:35:02development.
2:35:054 D off streetet parking and loading
2:35:08areas are provided.
2:35:12Is that R or are not?
2:35:16Are not provided. Correct.
2:35:20>> R I think
2:35:21>> is it R? Okay.
2:35:22>> Y
2:35:23>> off- streetet parking and loading areas
2:35:25are provided with the particular
2:35:26attention to the effects of noise,
2:35:29glare, and odor on adjacent properties
2:35:31in the proposed development because
2:35:34adequate parking located on the internal
2:35:36drive will be provided on site.
2:35:42Safe, convenient, and well-defined
2:35:44vehicular, bicycle, and pedestrian
2:35:46circulation within, to, and from the
2:35:50site will be provided because a
2:35:53landscaped parkway will separate the
2:35:55sidewalk from the internal drive on the
2:35:57south side, and bulbouts are aligned to
2:36:00enhance pedestrian safety and better
2:36:03align with the vital with the vital
2:36:05streets standards. Pedestrian access
2:36:07from the public sidewalk is provided at
2:36:10one or more points.
2:36:11Five, the scale and design of the
2:36:15proposed development
2:36:17will not place an excessive burden on
2:36:20services currently furnished by the city
2:36:23because the project has been found to be
2:36:26satisfactory by the relevant city
2:36:27departments.
2:36:29Be it further resolved that the
2:36:31following conditions of approval shall
2:36:33apply to this project. Number one,
2:36:35standard condition set A approvals
2:36:37striking numbers five and seven.
2:36:45Number two, that the T1 through T3
2:36:49buildings shall incorporate the varying
2:36:52heights between units and buildings as
2:36:55depicted in the submitted renderings.
2:36:59Number three, the front that the front
2:37:02of all buildings shall incorporate the
2:37:04parapet detail and brick recesses
2:37:07between units
2:37:09as described in the narrative and as
2:37:11depicted in the submitted renderings. Do
2:37:15we need to add anything there? I don't
2:37:17think so.
2:37:19Number four,
2:37:20>> I think I think you're fine.
2:37:21>> Yeah. Oh, sorry. No, you're good. Uh
2:37:23number four, that the mechanical
2:37:25equipment shall be placed on the roof.
2:37:29Um
2:37:31did we add any do we want to add any
2:37:35landscaping consisting of
2:37:41>> you didn't really talk?
2:37:42>> I wasn't sure if you were going to go.
2:37:43Um, I think the consensus of what I
2:37:46think I heard was that landscaping shall
2:37:48be used to mitigate um the base of the
2:37:51buildings, the exposed foundations and
2:37:53and we can work with the applicant if
2:37:55you're comfortable with that to
2:37:57>> So we should we just stay
2:38:00uh
2:38:00>> that landscaping shall be added
2:38:02>> landscaping shall be added to the front
2:38:04of buildings T1 through T3 and the rear
2:38:06of buildings T4 and T5 to mitigate for
2:38:10the exposed building foundations. s
2:38:13in conjunction with consultation with
2:38:17city staff.
2:38:20Number six, that this approval shall
2:38:22take effect after the date of the
2:38:23planning commission's decision
2:38:26support.
2:38:28>> Have a motion and support. Any
2:38:30additional discussion?
2:38:31>> Uh just the mechanical equipment on the
2:38:33roof again. Is it all units or do the
2:38:36end units are they still allowed to have
2:38:38it at grade between the units or is it
2:38:41just all the units have the equipment on
2:38:44the roof?
2:38:47>> So I think currently the condition is
2:38:49they're all on the roof,
2:38:51>> right?
2:38:55>> I guess I don't feel strongly either way
2:38:58about that. Um
2:39:01>> I mean I think the main impact is to
2:39:03those units with on the patios.
2:39:05>> Yeah.
2:39:07>> If if that was the concern then you
2:39:08could go on to suggest that the except
2:39:11that the end units may have mechanical
2:39:14units at grade on the sides of the
2:39:16building.
2:39:17>> I'm I'm good with that.
2:39:20>> Just real quick. So, if we end up
2:39:22putting rooftop units up there, we may
2:39:26just do it consistently across T1 and T3
2:39:28just we have the same detailing. Um,
2:39:31there are on the T4 and T5, we could
2:39:33potentially put those units on the grade
2:39:36level in the back of the units because I
2:39:38think those would be much more visible
2:39:40from the corner Adams and Fuller because
2:39:43they're at a lower level.
2:39:45>> So, that's a possibility. Uh, we don't
2:39:47we're not encroaching into the patio
2:39:48there on T4 through T5 because there
2:39:50isn't one.
2:39:53>> Should we just say instead that the
2:39:54mechanical units will not be placed on
2:39:56the patio and then allow them to make
2:39:57the decision about where they go?
2:39:59>> That seems like a smart idea.
2:40:01>> I like that. Let's change it to that.
2:40:03>> Okay.
2:40:03>> Number number four will be that the
2:40:06mechanical units shall not be placed on
2:40:08patios.
2:40:10>> Great.
2:40:11>> Still support.
2:40:12>> Still support. Okay. Any additional
2:40:14discussion? Good catch.
2:40:17All those in favor say I. I. Any
2:40:20opposed? Motion carries. Thank you very
2:40:23much.
2:40:26>> Okay, so now we're on to planning
2:40:28commission discussion. Anything for
2:40:30that?
2:40:32Seeing none, I will open it up for
2:40:34public comment. If anyone wants to make
2:40:36public comment, come on up.
2:40:41Seeing none, I will close the public
2:40:44comment period and we are adjourned.
2:40:46Thanks everybody.
```*