2026-10-21 - Conservation Commission
Summary
Based on auto-generated captions; street names and numbers may be misheard.
- Six commissioners present, meeting held on Zoom; several items (7 through 12 and 16) were continued to November 18. Economic development director Eliza Wilson told the commission the city owns 571 parcels, 121 with buildings, and asked to work together on future development. One notice of intent was withdrawn at the applicant's request.
- Sewer Infiltration and Inflow Remediation Phase 5: exemption letter approved.
- 159 Tory Street Golf Course Cart Bridge: order of conditions issued with special conditions.
- 99 Alger Street Certificate of Compliance: continued to November 18.
- Conservation Marker Signs and Certificates of Compliance: three certificates issued (Zero Oak Hill Way, 325 Thatcher Street, 239 Belleview Avenue); a porch replacement determination was issued for 32 North Alden Street.
- Minutes from August onward are still unapproved; a new planning department admin will draft them.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:07Good evening. It being 6:30 p.m. on
00:10October 21st, 2026.
00:13I call this meeting of the Brockton
00:14Conservation Commission to order. This
00:16meeting is being conducted remotely in
00:18accordance with Governor Hilly's open
00:20meeting provisions extension signed on
00:22March 28th, 2025,
00:24which extends access to certain remote
00:26and hybrid meetings until June 30th of
00:292027.
00:30Realtime public participation and
00:32comment can be addressed to the
00:34conservation commission utilizing the
00:36Zoom virtual meeting soft meeting
00:38software for remote access. If you wish
00:41to comment during a public input portion
00:43of the hearing, please use the raise
00:45your hand function to be addressed at
00:47the appropriate time. For those of phone
00:50only, please press star 9 to raise your
00:53hand. Please note, all comments made a
00:56public record and should be made in a
00:58way that is respectful to others. Should
01:01personal or inflammatory remarks be
01:03made, the host reserves the right to
01:04mute the speaker. A copy of this
01:06recording will be posted on the city of
01:08Brockton's web page. All votes will be
01:10done via roll call to ensure count
01:12accuracy. Um, so we're looking for a
01:14roll call vote, please.
01:21My first one is I think Glanceon's
01:22first, right?
01:26>> Yes.
01:32>> You muted, Liam.
01:34>> Sorry, Leon. Eyes
01:37>> green here.
01:39map here.
01:42>> Boris here.
01:44>> Talbert here.
01:47I believe we have quorum.
01:48>> Yeah. Uh quum is just for us. Yes.
01:51>> Okay. Can I just make a quick note and a
01:53comment on this? Uh item agendas
01:567 8 9 10 11 12 and 16 will be continued
02:02to the Wednesday, November 18th meeting.
02:10you're on mute.
02:12>> Oh, I was muted. And then before we dive
02:14into the agenda, um Dr. Eliza Wilson,
02:16who is the director of economic
02:18development with the planning
02:19department, um has asked to say a couple
02:20words at the at the start of the
02:22meeting. So, uh through the chair, if
02:23that's all right.
02:24>> Absolutely. Good evening, Dr. Wilson.
02:26>> Hi. Uh thank you. Thank you all for
02:28letting me join your meeting um after
02:31the agenda was posted. Um, so I just
02:34wanted to say thanks for all you do. And
02:37just as a heads up, one of the um, focus
02:41areas of economic development I've been
02:43really looking at is [clears throat] our
02:45greatest asset, which is 571 city- owned
02:48parcels in the city of Brockton. Um, 121
02:51of them currently have uh, buildings on
02:53them. And so as we begin to think about
02:55what's next for our city relative to the
02:58constraints that we may already have in
03:00place in terms of certain regulations,
03:02zoning variances and so forth that we
03:05can constructively work together to
03:07arrive at the new development uh
03:10happening in Brockton. So I just nothing
03:13is happening right now. Um, but as we
03:15continue to look at what could be, um, I
03:18know we're going to ask maybe for
03:21applicants coming before you that maybe
03:23ask for variances on other items and so
03:25forth. So, just want to say thank you
03:27for being a partner in creatively
03:29thinking about how we can get uh, the
03:32business of advancing Brockton done
03:33together.
03:36>> Thank you.
03:38I think we're all on board with you.
03:40We're here to assist the city of
03:42Brockton.
03:44Thank you,
03:46>> Kyle. You uh
03:49agenda item number one, the NOI has been
03:51withdrawn, correct?
03:52>> Uh yeah, and this is just an kind of an
03:54announcement. Uh so this was withdrawn
03:57at the applicant's request. We added it
03:58to the agenda just so if anyone were,
04:00you know, covering this from u meeting
04:03minutes or agenda to agenda that they're
04:04aware that this was withdrawn at the
04:06applicant's request. There's no vote or
04:07anything required here. Just more of a
04:09public service announcement.
04:11>> Okay. Thank you. Uh, agenda item number
04:13two, utility notices, is the Brockton
04:16sewer system rehabilitation project.
04:19>> Uh, yeah, I've got a couple people here
04:21with uh, CDM Smith that I'm going to
04:23promote to talk to you briefly about uh,
04:25this sewer rehabilitation project. Um,
04:29I'm going to promote Chad Kershaw and
04:32uh, Magdalina Lost.
04:47Good evening all. Can Can everyone hear
04:49me?
04:50>> Yes.
04:51>> Yes.
04:52>> All right. Awesome. Let me share my Oh,
04:56am I allowed to share my screen?
04:59>> Um, yes. If you have trouble, let me
05:00know and I'll see what I can do on my
05:02end.
05:02>> Okay. I just sent the request.
05:05>> Okay.
05:16All right, awesome. Thanks,
05:18>> perfect, perfect. Yeah, good evening
05:21all. It's nice to see everyone again.
05:23Um, my name is Chad Kershaw. I'm a
05:26project manager with CDM Smith. Then
05:28also on the call is is Maggie Alstead
05:31who's our senior wetland scientist. Um,
05:34I'll just give a brief project
05:36background,
05:38um, project summary, and then Maggie can
05:40discuss the the hopefully project
05:43exemption and answer any questions that
05:45that, um, the commission may have. So,
05:48this this is a project for DPW. It's
05:51part of their II remediation program and
05:54and basically you know in the northeast
05:57all communities with sewer systems they
06:00they battle II um which stands for
06:03infiltration and inflow. Um infiltration
06:06is clean water which is typically
06:08groundwater which enters the sewer
06:10system through defects you know cracks,
06:13breaks, separated joints in the sewer
06:15mains in the sewer manholes and in sewer
06:18services. Um, so infiltration because
06:21it's groundwater induced, it it's coming
06:24into the system 24 hours a day, seven
06:26days a week, potentially 365 days a
06:29year. Um and then inflow is is clean
06:32water which is typically uh rain water
06:34which enters the sewer system through
06:36illegal connections um such as the catch
06:39basin in a roadway or on the private
06:41side maybe a subpump connection in your
06:44basement uh roof leaders tied to your
06:46sewer service foundation drains things
06:48like that. Um and this just causes a lot
06:52of issues for the DPW. Um it it could
06:55cause an exceedence in their discharge
06:57permit at the wastewater plant. um it
07:00results in higher maintenance costs at
07:02the wastewater plant and at their
07:03pumping stations and um kind of the
07:06worst case scenario is during large
07:09rainfall events um such as the one we
07:11had last month, it could be a potential
07:14overt taxing of the sewer system, which
07:16can lead to what we call a sanitary
07:18sewer overflow. So that that's a
07:20basement backup um or potentially sewage
07:23coming out of the ground. You know, it's
07:26things that we want to avoid at all
07:27costs. Um, and just to kind of put
07:30things in perspective, in Broxen's case,
07:32because it's an old system, um, mostly
07:35clay pipe, on an annual average, half of
07:39the the sewage that the treatment plant
07:42sees is sewage and the other half is is
07:46clean water. So, it's roughly 50/50. Um
07:50certainly in the summer months it it's a
07:52much higher percentage of sewage, but in
07:54the spring months when you have a high
07:56ground water and those big rainfall
07:57events, the majority of the water that
07:59they're treating is is clean water. Um
08:03so the city back in 2017, they started
08:06this II remediation program where they
08:09break their sewer system into these 72
08:13sub areas that I'm sharing on my screen.
08:15Um, it just makes it a more manageable
08:18area to investigate and and through flow
08:21meters that are put in the ground, we
08:23can determine how much infiltration and
08:25inflow is coming from each sub area. And
08:28then the city identifies those worst sub
08:30areas for rehabilitation.
08:33Um and and rehabilitation is essentially
08:37uh fixing the sewer mains through
08:39trenchless installations or fixing the
08:41manholes to make them watertight and to
08:44reduce that that infiltration um and
08:46inflow.
08:49So um they started in 2022 with phase
08:52one. They've they've done a phase
08:54through a rehab every year. So we're
08:56presenting on phase five um tonight. So
09:00phase five focuses on um three sub areas
09:05that are highlighted on my screen. Sub
09:07area two um which is between Pearl
09:10Street and Route 24 kind of north of
09:12Pleasant Street. um sub area 26 which is
09:16like in the west Chestnut Street, Campo
09:19Street area and then sub area 35 which
09:23is um the north part of the city just
09:26west of North Main Street uh north of
09:29Oak Street and south of south of Avon.
09:33So
09:34the majority of the work that we are
09:37proposing as part of this rehab and and
09:39similar to previous phases is what we
09:41call cured in place pipelining.
09:44It's um it's a trenchless rehabilitation
09:48where a liner is put into the sewer
09:52system. It's a felt material. It's it's
09:55soaked in a resin and then it's it's
09:58cured via steam or hot water. and
10:02essentially just creates a new pipe
10:03within that old pipe. Um, so it's it
10:07becomes a new watertight pipe. It
10:09becomes a new structural solution. So it
10:11it's essentially
10:14uh you know taking a pipe which is
10:16probably past its useful life and and
10:18adding 50 60 years to it. And as I
10:21previously mentioned, the best part is
10:22it's it's a trenchless install. There's
10:24there's no digging as part of this work.
10:27Um, so that's the majority of the work.
10:30And between these three sub areas, it's
10:31about five miles of um cured in place
10:35pipelining that we're recommending.
10:42Scroll down here.
10:45So, this is sub area 2, the one in the
10:47northwest corner of the city. Um, it's
10:50probably hard to see, but just to give
10:53you an idea, um, the the the green pipes
10:57and green manholes just represent
10:58existing sewer pipes and manholes in the
11:01sewer system.
11:03Uh, the pipes that are highlighted in
11:05blue are recommended for that cured in
11:07place pipelining. And then the pipes
11:09recommended uh or highlighted in yellow
11:12are recommended for what we call heavy
11:13cleaning where they have to just put a
11:16jitter in the sewer system and clean it
11:18out first. Um and then a cured in place
11:21pipelining to follow uh right after
11:23that. Um so just to give you an idea you
11:26know like all all the works happening in
11:29streets for this sub area 2. Um if I if
11:33I go down to the next sub area 26
11:37again it's a lot of blue and yellow
11:39which just means we're cured in place
11:41pipelining these sewer mains. Um
11:45it looks like all of them occur in city
11:47streets
11:49except there's a couple reaches here
11:51just off of West Chestnut um that we're
11:55hoping to line
11:57as this sewer pipe ties into this this
11:59uh cross country interceptor which runs
12:02west to east um along along the page.
12:08And then sub area 35 a lot more blue and
12:11yellow. Um this is the North Main Street
12:13area where we're recommending um cured
12:15in place pipelining in heavy cleaning
12:18with with follow-up cured inplace
12:20pipelining.
12:21And I believe all of that work is again
12:24in in existing streets.
12:31Um and then in addition to the curl
12:33place pipelining, we we're also
12:35recommending um some manhole
12:37rehabilitation.
12:40It's It's not exactly shown on this map,
12:42but if I
12:45flip to this map, um the manholes that
12:48are highlighted in red, we're
12:50recommending for some type of rehab. Um
12:53in most cases, it's just opening up the
12:56frame and cover, going inside, and just
12:59installing a cement liner on the inside
13:02walls of the manholes to make it
13:03watertight. Um, I believe there's about
13:0635 to 40 manholes where we're
13:08recommending cement lining. Again,
13:10that's that's a trenchless uh
13:12installation. It's it's done all inside
13:14the manhole. Uh, but there are, I
13:17believe, five manholes, framing covers
13:20that we're recommending for replacement.
13:22You know, the framing cover is cracked.
13:24It's in the road. Um, maybe a snow plow
13:28hit it over the years or something like
13:29that. So, it needs to be replaced and
13:31and made watertight. And then there's
13:33about six or seven manholes that are
13:35buried underneath pavement um that need
13:39to be essentially dug up and then reset
13:42just at a higher elevation so they're
13:44they're level with the uh the ground
13:46surface. So in those cases the for like
13:49the 12 or 13 manholes that we need to do
13:51frame and cover work, there is some
13:53minor excavation um probably 12 to 8 18
13:57inches down just to to get the frame and
14:00cover out of the asphalt and and
14:02replace.
14:06But that you know that's that's that's
14:08the project. Um, oh, one thing I forgot
14:10to mention is there there are two
14:13reaches where we're recommending for
14:15what we call chemical root control. In
14:18those cases, um, we're not recommending
14:22the pipes for for lining because
14:24structurally they're sound and there's
14:25no infiltration, but we notice that
14:28there's fine roots that have entered um
14:31the sewer pipes through through uh
14:34through joints. So, for those for those
14:37two reaches, what we're recommending is
14:39a uh it's like a foaming um
14:45I don't know exactly what it is, some
14:47type of herbicide, foaming herbicide
14:49that's just sprayed in the pipe and it's
14:51just it rests on the roots and it will
14:54um slowly kill the root that's inside
14:56the sewer pipe and then we'll come
14:58through uh with the cleaning equipment
15:00and it will um it'll remove the roots
15:03because if if a cleaning company came in
15:06and just cut the roots out, it's not
15:08going to take long for the roots to come
15:10back and grow again. So, by putting this
15:12herbicide in there, um, you know, it it
15:16essentially kills the root and then we
15:17cut it out and it's, you know, it
15:20eventually will come back, but it'll
15:21take much longer than if we just cut it
15:23without any kind of treatment. Um, it's
15:26a very small aspect of the project. It's
15:28it's just two reaches as I mentioned.
15:34But that's that's it. Maggie, is there
15:37anything I missed?
15:39>> No, no, thank you for that. I think that
15:40that was great. Um so the reason for uh
15:44us providing this written notification
15:46is because it's because the city is
15:48seeking u state revolving funding from
15:50mass D and um you [clears throat] know
15:54some of the um work although it's within
15:57existing streets and parking lots uh is
16:00within the 100t buffer zone but as Chad
16:03mentioned there's very very uh few
16:06manholes where there will be some
16:07excavation. Um there's an exemption in
16:10the Mass Wetlands Protection Act as well
16:12as in the regulations um that allows for
16:15maintenance uh repair or replacement of
16:19public uh utilities. So, we're um
16:22seeking that exemption from from the
16:24commission and um the uh mass DPSRF
16:29program has sort of been requesting us
16:32to um get um written confirmation from
16:35the conservation commission that our
16:37project meets this exemption. So, that's
16:39what we're looking for.
16:42Um I think that's all we have for
16:44presentation. So, any questions?
16:49U Maggie and Chad. Thank you, Kyle.
16:52>> Um I don't really have anything to add.
16:54I you know, I'll echo what Magdalena
16:56just said that, you know, I I agree that
16:58this does meet that exemption. Um which
17:00basically states that um activities
17:03conducted to maintain, replace or
17:05repair, but not substantially change or
17:07enlarge an existing and lawfully located
17:09structure or facility used in the
17:11service of the public uh and used to
17:13provide gas, electric, water, in this
17:15case, sewer, and there's more. um
17:18basically doesn't need to to file a
17:19notice of intent. So um I agree with
17:22them uh that that this qualifies as
17:24exempt work. Um so my recommendation
17:26would be that the commission, you know,
17:28uh issue a letter stating that the
17:31project meets that exemption and u I can
17:34send that off.
17:38>> Commissioners, any questions?
17:43>> No. Uh Kyle, do we need a vote on this?
17:46>> Uh you may as well. We'll have it in the
17:47minutes and I'll uh I'll draft the
17:48letter for you.
17:50>> Okay. I'm looking for a motion to
17:53approve Kyle to write a letter of
17:55approval.
17:58>> Thank you very much.
18:01I make a motion to uh
18:05issue the uh letter of approval for the
18:06Boston system rehabilitation project.
18:10>> I second that.
18:11>> Uh motion has been made and seconded for
18:13approval. Uh roll call vote, please.
18:16Leon I
18:18>> green I
18:20>> map I
18:25>> Talbot I
18:29>> I did see Ruby.
18:32>> Oh, is Ruby here?
18:36>> Did you guys hear me?
18:38>> We can hear you now.
18:39>> Oh, okay. Yes, I said I play I
18:43>> that goes through and passes. Thank you
18:45guys.
18:47>> I appreciate it.
18:48>> Thank you.
18:48>> Thank you everyone.
18:52>> Commissioners on item agenda number
18:53three, which is 97 AM Street. It's a
18:56transformer replacement.
18:59>> Um yeah, and I don't think anyone is
19:00here from uh National Grid to talk about
19:04this, but it's a very similar type of uh
19:06of of of ask. Um the the app well
19:10National Grid is not looking for a
19:11letter from the commission. This is more
19:12just a utility notice, but um there is a
19:15substation an electrical substation at
19:1797 Ames Street um and the transformer
19:20the existing transformer there needs to
19:22be replaced. Um so this is just a letter
19:24to the commission. It's in the file
19:26under 97 AS basically saying that they
19:29plan on you know replacing this
19:30transformer. Um, and it's just kind of a
19:33courtesy notice. And they also fall
19:34under the the same exemption, uh, the
19:36same language that we referenced in the
19:38in the last agenda item for the sewer
19:40system replacement, but in this case,
19:41it's for an electrical substation.
19:45>> So, since this is exempt cow, we don't
19:47need a voter.
19:47>> Yeah, there's no there's no vote or
19:49anything here. It's just a so you are
19:50all aware, so the public is aware. Um,
19:53and if you guys want to get more
19:54information about what's being proposed
19:56here, um, it's in the public Google
19:58Drive file, uh, maintained by the
20:00planning department under the
20:01Conservation Commission page. Um, and
20:03you can just navigate and find 97 AM
20:05Street there and there's a letter, um,
20:08that that they just submitted earlier
20:10this month.
20:12>> Commissioners, any questions?
20:14>> No, thank you.
20:16>> Okay. Uh, agenda item number four is an
20:19RDA for 32 North Aliden Street.
20:31>> Kyle, I think you're muted. Thanks,
20:33Justin. Is there anyone in the attendees
20:35list uh here to speak to 32 North Leaden
20:38Street?
20:42>> Uh, please raise your hand if you are.
20:45Um, I don't see it. There's not a ton of
20:47names in the attendees list, so I can
20:49talk about this. Um, let's see here. Um,
20:54okay. So, uh, this RDA is, uh, for an
20:59inkind porch replacement, and we've done
21:01a few of these, uh, through the years.
21:04Um, this property, uh, falls within the
21:07flood plane, and, uh, you know, or in
21:11the context of the commission, it's
21:12bordering land subject to flooding. Um
21:15the big concern with construction within
21:18bordering land subject to flooding is
21:19that we don't want to change the flood
21:21storage capacity of of that resource
21:23area. So, um, historically when we've
21:27had porches, uh, patios being rebuilt,
21:30um, within the flood plane, we've
21:33allowed applicants to file an RDA and
21:36get a a determination allowing them to
21:38proceed, uh, if the work is inind,
21:41meaning they are replacing it with
21:43within the same footprint. They're not
21:45adding any volume or any extra addition.
21:48It's just, you know, might be a
21:50foundational issue. uh might be just the
21:52the the deck or the railings or
21:55whatever, but they're just replacing a
21:57railing with another railing, same
21:58location. Um and that's what's being
22:00proposed here at 32 North Leaden Street.
22:02Um I've got a couple photos I can share
22:04with you uh when I went out to the site
22:06a couple weeks ago. So I'll do that real
22:08quick here if that's all right.
22:15Um
22:16and so this is the the property here at
22:1832 North Leaden Street. I was hoping
22:21someone would be on the call tonight
22:22because I don't know the exact extent of
22:24what they're proposing if it's just like
22:26the stairway out in front or if it's the
22:29entire kind of covered patio. Um, and
22:33that's not really clear in the
22:34narrative. So, I was hoping for some
22:36clarification there. Um, here are just
22:39some more photos uh of the property. And
22:42then again, you can kind of see that
22:43that patio kind of uh is is this portion
22:47of the of the build there. So, um,
22:51outside of the flood zone, uh, this is
22:53250 ft away from the nearest wetland.
22:56So, we're really just looking at, um, at
22:58that BLSF. Um, and I think this is
23:02something that the commission could
23:03approve. Um, historically, when we've
23:05done this, uh, we've issued two
23:07determinations. Uh the first one would
23:09be a positive 2B determination stating
23:12that we are not confirming um the
23:16resource areas that are shown on the map
23:18provided. In this case, that would be uh
23:20the bordering land subject to flooding
23:22and bordering vegetated wetland. Uh in
23:24addition to the positive 2B
23:26determination, I would also recommend um
23:28that the commission issue a negative
23:30three determination uh which states
23:32effectively that a notice of intent is
23:34not necessary uh subject to the
23:37following conditions.
23:39And when we've permitted things like
23:40this in the past, uh we have had a
23:43special condition requiring that, you
23:45know, post construction photos be
23:48submitted to the commission so we can
23:50ensure that what was done uh was in the
23:54same effective footprint uh as what was
23:57there before what we're looking at
23:59today. So, um, again, I was hoping for
24:02some clarification from the applicant as
24:03to the exact extent, but, um, I don't
24:07know that that's necessary that we know
24:09that information. If it is replaced in
24:11kind and we do get those photos
24:13submitted after the construction is
24:15completed, uh, we can, you know, confirm
24:17at that point that they didn't expand
24:19the scope of the replacement. And
24:21that's, I think, what we were mostly
24:23looking at when we've looked at this
24:24historically. Um, any questions for me?
24:30Go ahead, Jayce.
24:32>> So, you don't need any plans or anything
24:33like that. Just a verbal discussion of
24:36what the plans will be. You don't need
24:38any
24:39>> Right. So,
24:40>> plans.
24:41>> So, and this is the the the line that
24:43the commission's kind of walked before
24:45because,
24:47you know, um oftentimes when when when
24:50people are applying for a building
24:52permit for this type of work, they don't
24:55have a site plan associated with that.
24:56they have the the the construction specs
24:58for the the buildout or or whatever
25:01they're doing. Uh but the site plan
25:03generally isn't something that they're
25:04needing to use to apply for that
25:06building permit. So this got flagged by
25:10me because it's in the bordering land
25:11subject to flooding. And you know this
25:14is Brockton. You know a lot of people
25:16that are trying to make these home
25:18improvements they don't have a lot of
25:20just spare you know cash. Uh so what the
25:23commission's done historically is allow
25:24them to submit um you know assuming that
25:28it is inind replacement. We've allowed
25:30submission of just like a uh an aerial
25:33view from Massmapper or Google Earth or
25:35whatever showing the location of the
25:37home and where the work is being
25:39proposed on that property. So this is
25:42right next to the roadway. Uh again it's
25:44very very far away from any other
25:46resource areas other than it just being
25:48within the flood plane. So, you know, we
25:50can continue. Uh, that's an option. If
25:52you want to get more information, have
25:53the applicant be here in November. Um,
25:56we can issue those determinations. Um,
26:00it's really kind of up to you if you
26:01think what we've got satisfies the
26:04commission as far as what you think is
26:06appropriate. But in the past, we haven't
26:08required a formal plans like a a like a
26:11site plan because that that's additional
26:13cost uh uh burden on the applicant. uh
26:16you know site plans you need to be put
26:18together stamped uh by either an
26:20engineer or a uh land surveyor and and
26:23that certainly drives up the cost of the
26:26application.
26:29>> Thank you.
26:31>> So ultimately we have two options. We
26:32either as a commission continue or we
26:35issue the two determinations which is a
26:37M a negative three and a positive 2B. Is
26:40that correct?
26:41>> Yeah. Yeah, that's correct. and and you
26:43know, I mean, it would be nice to get
26:46some clarification if it's just the
26:47stairs or the the rest of the patio
26:49here, but ultimately if it's replacing
26:51kind, I don't know that it matters a ton
26:54uh compared to what we've approved in
26:56the past. So, we can certainly get
26:58clarification uh when I issue this
27:01permit from the applicant and I can make
27:02a note of that in the file. Um, but if
27:05you're not comfortable issuing those,
27:07uh, determinations without that
27:09information, you're certainly well
27:11within your, you know, rights here to
27:13continue to the next month.
27:17>> Commissioners, what are we thinking?
27:20What's our thoughts? I think it would
27:23have been nice if the someone from the
27:26um, applicant the construction company
27:29were here, but
27:37I agree with that. But I also um I think
27:40I'm also not think I am okay with
27:43issuing the negative3 and positive um
27:48is it negative I'm sorry negative3 and
27:50positive
27:51>> 2. Yes.
27:53>> 2B. Okay.
27:57>> Positive 2B
27:59with Kyle um informing them,
28:02[clears throat] you know, like to see
28:03their plans before they go forward.
28:16I mean, we also have that special
28:17condition too that you wanted to add in
28:19tile so that we can we can include the
28:21photo after construction as well.
28:23>> Yeah. And you know, you can we we're not
28:26limited just to that request for photos,
28:27you know, you can add other conditions.
28:29So, if you want the applicant to clarify
28:32the exact scope of the incind porch
28:35placement before construction begins and
28:38have them submit that information to us,
28:39that can be included as a special
28:41condition, a special condition as well.
28:44That might be a good way to kind of, you
28:46know, thread the needle here and get
28:48best of both worlds and we can just kind
28:49of move forward with the issuance
28:51tonight.
28:52>> Certainly.
28:53>> Yeah, I think that makes sense.
28:58>> Okay. So, I'm looking for a motion to uh
29:02I guess approve the RDA with for a
29:05negative three and a positive 2B
29:07determination with the stipulations
29:10stated by Kyle, Leon, and the rest of
29:12the commissioners.
29:23>> We doing those together or we doing
29:24those separate, Kyle? Um it can all be
29:27one motion. Um so so effectively what
29:30you're doing is so the the RDA is a
29:32request for determination of
29:34applicability and uh when the commission
29:36is is issuing a determination which is
29:39what we're doing today. There are
29:40several different types of
29:42determinations that that can be issued.
29:45So we're selecting two of the you know
29:47proposed or whatever that 10 that are
29:49available. So, we will be issuing a
29:51negative three determination um
29:54requiring photos of the the post
29:56construction work and uh a letter
29:58clarifying the scope of the porch
30:00replacement.
30:02>> And this is inind, but we're just we
30:05want to know exactly how much is being
30:06replaced. Then the positive 2B would be
30:09that we're not confirming uh the
30:11resource boundaries for bordering lands
30:13subject to flooding or bordering
30:14vegetated wetland. Okay.
30:20So I make the motion then to issue the
30:23um RDA for 32 North Lenon Street with
30:25the positive 2B determination the
30:28negative three determination with those
30:30special conditions about the um
30:32[clears throat] letter before the work
30:33confirming the exact scope of the inind
30:36placement and the submitt of submission
30:38of the post construction photos to the
30:40commission.
30:43>> A second. Thank you Lily.
30:46A motion has been made and seconded. Can
30:48I have a roll call vote, please?
30:51>> Clay, I
30:56>> Matt I,
30:57>> Boris I,
30:58>> and Tal I. That motion carries.
31:02Uh, next is new filings. Uh, number five
31:06is a certificate of compliance for 99
31:08Alga Street.
31:10>> Yeah, I'll see if anyone's here to speak
31:12to this. Um,
31:14I don't see anybody. So, this is a
31:18application that's been put in by JK
31:19Holgrram Engineering. Uh, there's a
31:22little bit of history. I'll pull some
31:23photos to share with you. Um, 99 Alger
31:26Street, uh, they started a septic
31:28replacement a couple years ago. Uh, and,
31:31uh, it's within the buffer zone to a
31:34little pond in the back of the property.
31:36And, uh, they they they began that work,
31:39uh, without filing a notice of intent
31:41with the commission. Um, so I think
31:43there was either a notice of violation
31:44or an enforcement order issued requiring
31:47an after the fact notice of intent. Uh,
31:49they did that. Uh, and the commission
31:51issued an order of conditions. Uh, and
31:53so now they're looking just to wrap that
31:54that order up. Uh, when we issued the
31:58order of conditions, the the septic
32:01system was already installed. It just
32:02hadn't been backfilled. Um, so the work
32:05is is now complete. Uh, and they're
32:07looking for uh that certificate of
32:09compliance.
32:11Um, so I went out to the site uh
32:14yesterday. Um, let me pull up some
32:17photos to share with you.
32:26>> Um, so you know, uh, this is the home
32:29here. They've I think they're selling
32:31it. Um, so they've added some new
32:32asphalt here. Uh, the septic system was
32:35on the opposite side of the structure
32:36from where we're looking at it now.
32:37>> Oh, I don't think you're sharing. Oh,
32:40thank you for letting me know. Let me
32:42try that again.
32:44All right. How about now?
32:47>> Yes.
32:47>> Okay, great. So, here's the home. The
32:49subject system is on the opposite side
32:51of the structure that we're looking at
32:52now. Um they've just recently done some
32:54asphalt work out um in front of the
32:56house here. Um I'll pull up the site
32:59plan here, too. The the the resource
33:00area is back behind these trees. So, um
33:04we're the the 100 foot buffer zone kind
33:06of cuts right in front of the home here.
33:08So anyway, um so this is where the
33:11septic system was installed and you can
33:13see the the ventilation ports here. Um
33:16and the the resource pond, the resource
33:18area is back over this way. Uh when I
33:21was out on the site, you know, one of
33:24the conditions is conservation markers.
33:26And these are the the markers that were
33:28installed. These are, you know, an older
33:30type of marker that we uh used to allow.
33:34Um, and
33:36the verbiage in the uh
33:42the order of conditions doesn't specify,
33:44you know, we we've kind of changed the
33:45the language that we include um in more
33:49recent orders of conditions uh that
33:51specify it's, you know, conservation
33:55markers in of a design approved by the
33:57commission to kind of give us some some
33:58leeway. That language is not in there.
34:01So, you know, whether we want to, you
34:03know, require them to change the type of
34:05markers is one question for you all
34:07tonight. Um, here's just another shot of
34:10the home here and the septic systems
34:12right here. I'm going to kind of skip
34:14through a couple of these photos. So,
34:15here's all the erosion controls that
34:17that are just piled up here. So, all
34:19this obviously needs to be removed. You
34:21can see a few of these markers kind of
34:23along uh this kind of rock uh boundary
34:27here. Um, this fence was pre-existing.
34:30Um, and I think, you know, I didn't have
34:32a chance to go back and review the
34:34actual video footage of the meeting
34:36where we discussed all of this, but um,
34:39I don't think that the the markers are
34:41kind of in the location that was the
34:44intent of the commission. So, I'll kind
34:46of show you what I mean here in a
34:47moment, but um, there's a lot of trash
34:50back here as well. Uh, here's just more
34:52of that that sock. Um, so that first
34:57photo that I took with the the piled up
34:58erosion controls was kind of back in
35:00this corner. It's kind of hard to see
35:01here, but the erosion controls kind of
35:03follow the green sock down this way and
35:06then up here. And there's one marker
35:09here. It's kind of in the middle of the
35:10lawn. So, I'm not sure why that's there.
35:13The language in the order of conditions
35:14said, you know, conservation markers
35:18every 25 or 35 feet along the 35 foot
35:22buffer to the bank of the pond back
35:25here. And I think the intent there was
35:27that we didn't want the markers in the
35:29middle of the lawn, but 25 foot, which
35:32is normally where we have those markers,
35:33is like well beyond the the the the
35:35pre-existing wooded lot line. So, I
35:38think the intent was to put conservation
35:40markers up at the extent of the existing
35:42lawn. Um, and and you know, we didn't
35:46necessarily clarify that in the order of
35:47conditions. So, there was some ambiguity
35:49there. Um, I'll I'll pull up the site
35:51plan so you can kind of get an idea of
35:52where these markers actually are on the
35:54full layout, but it certainly doesn't go
35:56around the entire like boundary of that
35:58of that pond area.
36:01So, um, they've also done some, you
36:03know, receding and maybe some grading in
36:04the back, uh, of the lawn, but this this
36:07all, as far as I've been able to tell,
36:09uh, this was already like kind of a lawn
36:11area before. They've just added some lom
36:13and and they've receded it back here.
36:16So, I guess that's it for the photos for
36:18now. I'm going to pull up the site plan
36:20uh, real quick uh, that was submitted
36:22with the uh, request for the certificate
36:24of compliance.
36:27So, this is the asbuilt
36:37Maybe.
36:48>> Okay. So, um it's a long lot. Uh we saw
36:52the uh the home initially up here. Um,
36:55all that new like lommed area is is back
36:58behind the sheds over here. Um, and the
37:02the conservation markers kind of begin
37:04from this corner and they go about right
37:07here. Um, and they but they don't extend
37:10around the rest of the property, which I
37:12think was the intent of the commission.
37:13So, at this point, my recommendation
37:15would be to continue this uh until the
37:18November hearing to allow the rest of
37:21the conservation markers to be
37:22installed. And um I would also like the
37:26commission to weigh in on if we think
37:28the the markers that were utilized
37:30already are going to be sufficient or if
37:32we want them to use a different type of
37:34marker um
37:36or or or kind of what your thoughts are
37:38on that. Additionally, I didn't really
37:40have any good photos of this, but uh
37:42this wooded area that's around this this
37:44kind of pond back here, there's just all
37:47sorts of like debris and trash and stuff
37:49that, you know, should probably be
37:50cleaned up while they're back there and
37:53trying to sell the property. So, uh that
37:55would be my recommendation is that we
37:57continue this to allow the applicant
37:58opportunity to clean the site a little
38:00bit and add the additional markers. And
38:02then if the commission wants different
38:04types of markers, we can also convey
38:06that to the applicant after the meeting
38:08tonight.
38:10What is the distance from the um the the
38:12septic system to the pond?
38:14>> Uh it's over 50 feet. Um which is
38:18>> right here. The 50 foot buffer is is is
38:20this red line. Another thing that like
38:22>> I'm not thrilled about. I don't think
38:24this uh the limit of clearing uh that's
38:26depicted on this asbuilt actually
38:28reflects what's on the site. Um and
38:32obviously that that that that vegetation
38:35ends here uh doesn't continue on down.
38:38So like there are some things they could
38:40do to improve the asbelt as well, but
38:43you know um my my biggest concern was
38:45the uh the conservation markers.
38:50>> I I don't you think that I I personally
38:52believe they should be much more visible
38:53and taller? Um they don't seem to have
38:56>> the ones that we've the ones that we've
38:59um always approved that we've sent out,
39:04>> right? you know, and I think that that's
39:06certainly something that we can we can
39:07ask. I just want to, you know, clarify
39:09that that's kind of a newer thing that
39:11we've been requiring the last couple
39:13years. And I I think this was issued
39:15before we kind of
39:17>> set settled on that new standard. You
39:20know, doesn't mean we can't
39:21>> How tall are the ones that they have?
39:23>> They stick out of the the ground at
39:24least a foot and and they are painted,
39:26you know, orange uh with spray paint,
39:28but it's just a it's a it's a it's a
39:30rebar that's been pounded in the ground.
39:32There's just that cap on it that says
39:33>> Yeah. Rock and Conservation Commission,
39:35you know, limit of work.
39:37>> I can see those getting overgrown very
39:40quickly, personally.
39:41>> Yeah,
39:42>> especially if they're up against the
39:43wooded area. They're going to be
39:47>> easy. And it's was Mr. It was Homer,
39:50right, that was doing the this work.
39:52>> Yeah.
39:52>> I'm surprised he didn't suggest more,
39:57>> but that's my personal feeling.
40:01So, we could ask,
40:02>> couldn't we ask for the trash to be
40:04cleaned up as well?
40:05>> Yeah, I think so. I think that's
40:06appropriate.
40:08>> And then just continue.
40:09>> Uh, yeah, but I would like
40:10clarification. Are are is the commission
40:12okay with them utilizing that type of
40:15marker for the rest of this or would you
40:17like them to use like the newer the
40:19newer style that we're kind of looking
40:21at with it's more of a sign?
40:23>> Yeah, the newer style.
40:25>> I mean, I think we're trying to keep
40:27consistency now, right? So, I think we
40:29would like the newer sign. I mean,
40:31that's my opinion. And obviously,
40:32cleaning up the trash would be a big
40:34deal, too.
40:35>> Okay. And and we'll ask them to do the
40:37markers basically along the the existing
40:39limit of clearing
40:41>> to kind of the 35 ft is kind of a weird
40:44arbitrary like distance. Um,
40:47which is but that's what the language in
40:48the order of conditions states.
40:50>> So, below you see where the coupe is.
40:52>> Yeah. Is is that uncleared? I mean, you
40:54would still want it to continue down by
40:56the coupe. No.
40:57>> Yeah. Yeah. Right. like like like right
40:59now. Uh let me see if I can pull up an
41:01aerial real quick. Um
41:12>> so the pond's back here, right? Um the
41:15the the existing limit of clearing kind
41:17of meanders like this and it and it cuts
41:19back here. This area is the area that's
41:22been re loed and seated to grass. So
41:24there's just a bunch of stuff back here
41:25before. Yeah. Um, but I'm kind of
41:28thinking if we have them put the markers
41:29just basically along the the limit of
41:31clearing,
41:32>> um, that should be sufficient, but we
41:34want the new new style.
41:37>> Mhm.
41:37>> Okay.
41:43All right. Um, so yeah, I guess if
41:45there's no more discussion, um, we can
41:47continue this to next month and I'll
41:48convey that, uh, to the to the
41:50applicant.
41:52I move to continue 99 Alder Street to uh
41:56the November meeting.
41:58>> I'll second that.
41:59>> Second that.
42:00>> A motion has been made and seconded to
42:02continue the certificate of compliance
42:04for 99 Al Street to the November 18th
42:07meeting. I need a roll call vote,
42:08please.
42:16Yon I
42:18>> I
42:19>> play I
42:20>> map I
42:23>> and Talbot I that motion passes and be
42:25continued.
42:27Uh agenda item number six is a request
42:29for certificate compliance for zero
42:31Oakill way.
42:43Hi, Tracy. I've promoted you uh to kind
42:46of talk to the commission about this. Um
42:50Tracy's with MBL Land Management
42:55>> Land Development.
42:56>> Thank you. That was close.
42:57>> Yep.
43:01>> Um so, hi, good evening everyone. Tracy
43:03Dor with MBL here on behalf of Lou
43:06Tarantino
43:08of LJDE LLC for Zero Oak Hill. Um, so if
43:13you remember, I believe it was just at
43:14last month's hearing that we approved
43:16the order of conditions for the new site
43:18work at the site. So we're here tonight
43:21trying to uh essentially close out the
43:23original order of conditions. Um, as we
43:26had been, you know, putting that on hold
43:27so that we kept a a permit intact or
43:29active until the new one was issued. Um
43:32the original permit um was for what they
43:35called phase 1A of the project which was
43:38essentially the driveway and the culvert
43:40coming into the site, utilities coming
43:42into the site and two of the drainage
43:44basin. So that work was mostly done.
43:46They didn't pave the road coming in but
43:47all that new work um is going to get
43:49finished under the new order of
43:51conditions that was just issued. So
43:52really just seeking to close out the old
43:54order tonight.
44:00So I can I can share. I don't know if
44:01you guys need to see the original design
44:02plans or the asbuilt or have any
44:04questions.
44:06>> Could we see the site plans, please?
44:09>> You mean the the old uh from the old
44:12order of conditions choice? Is that what
44:14you're asking?
44:15>> Tracy, do you have those handy? I can
44:17dig them up if
44:18>> I do. I have the phase 1A plans if you
44:20want.
44:20>> Yeah. Great. Thank you.
44:32Are you able to see it now?
44:34>> Thank you.
44:35>> Yes.
44:35>> Okay. Um, so these were the plans. This
44:38is where uh the the Oakillway ends, I
44:41should say, and you come into the site.
44:42This is the Edson Brook. So there was a
44:45open bottom cover that was proposed.
44:47This was originally proposed to be a
44:49paved driveway under phase 1A with a
44:51gravel turnaround. Um these two storm
44:54water basins were part of phase 1A in
44:57the catch basins and manholes that drain
44:59to it as well as bringing the utilities
45:01into the site. Um this uh previous
45:06proposed building and parking area were
45:08part of like a phase 1B that was not
45:10under the current approval. So that was
45:12never done. And then I can show the
45:14asbuilt plan.
45:16>> Thank you.
45:19>> Pardon? And our north arrow is up in
45:20this which is different than the design
45:22plan. But this is where you let me go to
45:24the page before. This is where you come
45:26into the site. That's the culvert that
45:29they installed over the Edson Brook and
45:31the retaining walls. The driveway that
45:34was put in was just gravel. The paving
45:36of it was part of the new order of
45:37conditions. They didn't complete that
45:39under the previous.
45:41And then
45:43what they installed was just the gravel
45:45driveway, not really the full with the
45:47turnaround. These two basins were
45:50installed
45:51and we're utilizing them as part of that
45:53new development
45:56and then originally there was a little
45:57bit of flood storage lost for the um the
46:00basins, one of the basins. So there was
46:02a compensatory storage area that was
46:03approved on the phase 1A and that was
46:05done. So all mitigation had already been
46:08done. Um and they did bring the sewer
46:11and the drainage I'm sorry sewer and the
46:13water into the site but they never
46:14brought in the gas and electric. So that
46:16will be done under the new order of
46:17conditions.
46:28>> Tracy, thank you. Um, commissioners, any
46:31questions?
46:37>> Kyle, I have a question. This just this
46:38just so we're on the same page. This is
46:39to approve the old order of conditions.
46:42Correct.
46:43>> It's to close out the
46:44>> close. Yeah, I'm sorry. Close on. Yes.
46:46>> Yeah. So, the idea was that we we knew
46:48there was this new project that we
46:49already approved, you know, last month,
46:51and we wanted there to kind of be a
46:52seamless transition, as Tracy said, as
46:54far as having an active permit the
46:56entire time, but then also, uh, when the
46:59applicant initially proposed this new
47:01order of conditions, uh, they also filed
47:03for that certificate, the certificate of
47:04compliance that we're looking at today
47:06at the same time. And uh I advise that
47:09we wait uh and close out that the the
47:11old order that we're looking at today
47:13till you know simultaneous or after we
47:16have already issued that new order. That
47:18way if there's any like design uh
47:21overlap that needs to happen so these
47:22things can work well together that we
47:24can kind of do that all at once. So
47:26PAR's already kind of looked at all of
47:27this. Uh this is more just you know uh
47:29kind of closing out the old order. Um,
47:32yeah. So, my recommendation would be
47:33that the commission issue a complete
47:35certificate of compliance for the old
47:37order of conditions for zero killway
47:40with the file number 1180724.
47:47Thanks, Kyle. Commissioners, questions
47:49motion.
47:55>> I have no questions.
47:59>> No questions. I'm sorry, Kyle. You said
48:01again it's a issue a condition. Is that
48:04what you said?
48:05>> Uh, issue a complete certificate of
48:07compliance.
48:08>> Complete certificate. Okay.
48:13>> What was the file number? 118
48:16>> 1180724.
48:25I move to uh issue a complete order of
48:29conditions
48:30for zero Oak Hill way parcel SE1180724
48:37>> Joyce Jessica if I you made a motion to
48:40do a certificate of compliance
48:43complete certificate of compliance
48:46>> COC isn't that what a COC is
48:47>> I think you said an order of conditions
48:50>> oh did I I'm sorry I meant a I'm sorry I
48:53meant certificate of compliance. Thank
48:55you.
48:57>> We knew what you were saying.
48:58>> Thanks. See, that's why I don't do this
49:00anymore. That's why you have that.
49:04>> I second that.
49:07>> A motion has been made and seconded to
49:10issue a certificate of compliance for
49:13Zero Oakill Way
49:15uh number SE118-0724.
49:19A roll call vote, please.
49:21>> Clay I. Leon I,
49:24>> Green I,
49:26>> Matt I,
49:27>> Horse I,
49:28>> and Talbert I. That motion carries or
49:30passes.
49:32>> Thank you.
49:34>> Thanks, Tracy.
49:36>> Thanks.
49:38>> Uh, next item on the agenda is a
49:40certificate of compliance for 325
49:43Thatcher Street.
49:46>> Um, yeah, and I don't think there's
49:48anyone here to talk about this either.
49:50So, we discussed this last month. Um,
49:54and this is another septic system
49:56replacement. Uh, last month, uh, the
49:58commission asked that the the corner
50:01conservation marker that, uh, originally
50:04was a wooden stake and then changed to a
50:05PVC. Uh, the commission asked that it be
50:08changed to that um, kind of, you know,
50:10like an aluminum signpost, which which
50:12has been done. So, I'll go ahead and
50:13share a photo uh, real quick with you
50:15all. Um, there's not much else to see
50:18here other than this post and and the
50:20the the marker. Um, so I think we're in
50:22good shape here and I would recommend
50:23that we issue the complete certificate
50:25of compliance. This was the one ask that
50:27we had at the at the meeting last month
50:30that the post be changed.
50:33All right.
50:35Any questions?
50:39No. All right. We're looking for a
50:40motion to uh
50:44I lost myself here. for a certificate of
50:46compliance for 325 Thatcher Street.
50:50>> I move to issue a certificate of
50:52compliance
50:53>> for 325 Thatcher Street.
50:55>> I second that motion.
50:57>> Motion has been made for a certificate
50:59of compliance for 325 Thatcher Street.
51:01Can I have a roll call vote, please?
51:04>> Clay I.
51:05>> Leo I.
51:08>> Matt I set
51:10>> in Tabana. The motion passes.
51:13Uh, next item on the agenda is an NOI
51:16for 159 Tory Street, also known as
51:19Thorny Lee.
51:25>> Uh, yeah. So, this is
51:28a a project uh out at Thorny Lee uh that
51:30that the commission sent out for a peer
51:32review. Um, so I promoted uh the
51:34applicant's representative, the
51:36applicant himself uh and then also uh
51:38Rihanna Summers with Weston and Samson
51:41who did the uh uh the peer review on
51:43behalf of the commission. So, um, you
51:46know, ultimately I think the, uh,
51:49Western Samson is recommending, uh, that
51:50the commission issue an order of
51:52conditions, but I'll defer to to Rihanna
51:54and Brian, uh, who are, uh, the
51:56commission's representative and the
51:57applicants representative to kind of
51:58talk through, uh, that, uh, and to
52:00answer any questions from the
52:02commission.
52:05>> Would you like me to start?
52:09>> Sure.
52:10>> Okay. Uh so thank you very much to
52:14reiterate uh Brian Madden from LEC
52:16Environmental Consultants.
52:18Um we introduced this project back on
52:21August 19th. This is to replace remove
52:25the deteriorating earth and berm cart
52:28path between two uh open water ponds uh
52:33with an elevated timber bridge. Um, we
52:36had described the project uh back in
52:39August and it was sent out for peer
52:42review. Uh, I met out there with the
52:45peer reviewer and Kyle in on September
52:4815th I believe. uh they had submitted a
52:52summary report
52:54uh Weston and Samson did and we had
52:57provided some responses provide some
52:59additional information uh including some
53:02updated plan showing the delineation of
53:05the bank within the vicinity of the site
53:07in addition to uh what was classified as
53:11a perennial stream leaving the ponded
53:14system. Basically, if you remember
53:16there's three intermittent streams that
53:18feed into this system. All three of
53:21those streams are intermittent. Uh but
53:23when they leave the uh southerntherly
53:26pond, they become perennial. So the 25-
53:29foot riverfront area u uh minimally
53:33extends into what we're proposing for
53:35the turtle nesting habitat area as
53:38mitigation uh tucked away from the
53:40project footprint in the golf hole
53:43itself. Um,
53:46but I'd be happy to turn it over to uh
53:49Weston and Samson um to elaborate.
53:55>> Yeah. Um, thanks Brian and hi everyone.
53:58Rihanna Summers from Weston and Samson.
54:01Um, as I usually do for the other
54:02projects, I have a couple slides. Um, if
54:05it's okay, I can share those. Um, just
54:09to kind of go through our comments.
54:12Um, so, um, I won't repeat everything
54:16that Brian's already said, but, um,
54:18essentially it's, um, pretty
54:19straightforward project, replacing a
54:22deteriorating earn burm and paved cart
54:25path, um, between two ponds. Um, so
54:28ultimately this will be replaced with an
54:30elevated timber cart path bridge. Um,
54:33and ultimately the project will be
54:35reducing imperous cover and creating
54:38actually more open water or lane
54:40underwater um, habitat.
54:43So, as Brian noted, we did a site visit
54:45with LEC um and Kyle um on September
54:4915th because it's a maintained golf
54:52course um that's obviously actively used
54:55um the original plans didn't have like
54:58wetland flags on them. So, one of our
55:01initial comments was just like in order
55:03to review the resource area boundaries,
55:04it would be helpful to go out to the
55:07site al together um you know establish
55:10the flags, review them and then so we
55:13did that and then the flags were all
55:14surveyed that same day. Um so a new plan
55:18was submitted um shortly after and that
55:21plan included the top of bank flags um
55:24for the ponds and also the streams. Um
55:29and then we had two rounds of review.
55:32The first round was submitted on October
55:341st and then the second um letter was
55:37submitted on October 8th. Um
55:41as I noted during the site visit, um the
55:44inland bank flags were established. Um
55:46as Brian mentioned, uh there's four
55:49different streams. Three of them based
55:51on the stream USGS stream stats were
55:54small enough to be considered
55:55intermittent. and then one of them um
55:57leaving the southwest side of the um
56:00pond was perennial based on the
56:03watershed size. So the 25 ft riverfront
56:07area was added to the plans. Um and then
56:11one of our comments our comments were
56:12pretty minimal but one of them was um
56:15because there's now riverfront area on
56:17the site that those impacts should be
56:19quantified on like in the NOI and
56:22described. Um and of course the impacts
56:25to riverfront area are very minor. They
56:27just have to do with the construction of
56:30this mitigation feature um which would
56:32be the proposed turtle nesting area um
56:34next to the stream there. So those
56:37updates were made. Um we also had asked
56:40for just a little bit more information
56:42on some of the work that's proposed
56:43within the local 25 foot no touch zone.
56:46Um and obviously due to the nature of
56:48this project um impacts to the 25 foot
56:51no touch zone are unavoidable um just
56:54given the location of the path in
56:56between the two ponds. Um so the
56:58applicant provided some more information
57:01um clarified that there would be about
57:03160 square ft of impact to the 25 ft um
57:07no touch zone.
57:09So we felt that comment was um
57:13satisfactorily addressed. And then um
57:16this is just a photo showing the top of
57:18bank flags that were established during
57:20that site visit back in September.
57:22Um and then I also just wanted to touch
57:24base on the D comments. There were a
57:26couple that were issued. One of them was
57:29just noting that there was a mapped
57:31wetland change area um identified in the
57:34vicinity of the driving range which is
57:36actually technically outside like pretty
57:38well outside of the project area. Um but
57:42during the site visit we actually looked
57:43at that. Um the applicant also provided
57:46some really helpful like historic
57:48imagery, aerial imagery um showing that
57:51there wasn't really any evidence at
57:52least that could be found of any
57:55unauthorized like filling or anything or
57:58or any historic wetlands or anything
58:00that were there. Um and we also looked
58:03at it in the field and couldn't find
58:04anything. So we felt that um we consider
58:08that comment adequately addressed. um
58:10obviously subject to the commission's
58:12discretion. Um the stream classification
58:16um we already kind of touched on just at
58:19um requesting that the riverfront area
58:21be added to the plans and impacts be
58:23quantified which was done in the latest
58:26submission. Um, another one of DP's
58:29comments was just noting that um the
58:32applicant is proposing this as a limited
58:34project under 10.533J
58:38um for construction of and construction
58:40and maintenance of foot bridges um
58:43provided that the structures are
58:44constructed on pilings or post so
58:46they're elevated and they can um they're
58:50reasonably unobstructed flowage of water
58:52um is allowed beneath and then adequate
58:55um light passage to maintain vegetation
58:58and DP's comment was basically just
59:00saying that it's ultimately up to the
59:02commission whether this can be approved
59:04as a limited project based on um the
59:07extent of alternatives that were
59:08assessed impact minimization making sure
59:11that construction BMPs are implemented
59:14appropriately. Um and our comment back
59:17was basically just that we agree that um
59:19the project appears to meet the criteria
59:22for this limited project provision. Um
59:26ultimately, of course, it's up to the
59:27commission's discretion, but um we felt
59:30that it was appropriate.
59:32Um and then the storm water review
59:34obviously was pretty limited um just
59:36given the nature of the project where
59:37they're removing impervious surface. Um
59:40but ultimately
59:43um we found that the applicable storm
59:44water standards were satisfied or
59:46appropriately addressed for
59:48redevelopment and that there's no new
59:50structural storm water treatment system
59:52proposed just due to the nature of the
59:54project where we're not adding any
59:56impervious surface. Um the comments were
59:59pretty minimal, but um the construction
1:00:01period, pollution prevention plan, and
1:00:03long-term operation and maintenance plan
1:00:06have been provided. And the only comment
1:00:09that James um the civil engineer had was
1:00:12he recommended that the illicit
1:00:14discharge statement um should be signed
1:00:17sometime prior to construction. I think
1:00:19that was like his only real um comment.
1:00:23And then after that um like I said, we
1:00:26feel that all of our comments have been
1:00:27adequately addressed. Um, we did include
1:00:31a few recommended special conditions for
1:00:33the commission's consideration in our
1:00:36most recent letter from October 8th. Um,
1:00:38and I just I kind of more formally wrote
1:00:41them out in the letter, but just try to
1:00:42summarize them here. Um, but many of
1:00:45these were discussed kind of on our site
1:00:47visit. Um but one of them was that we
1:00:50recommended that um the contractor
1:00:53should be required to maintain an
1:00:54additional like supply of filter bags
1:00:57during the dewatering. Um they can fill
1:00:59up pretty easily and get kind of clogged
1:01:01with silt, so it's just helpful to have
1:01:03an extra supply on hand. Um and then of
1:01:07course we recommend turbidity monitoring
1:01:09during the um temporary bypass
1:01:12discharge. And then if any turbidity is
1:01:15observed during the dewatering obviously
1:01:17that um [clears throat] the bypass
1:01:20operation should be suspended and the
1:01:22BMP should be changed or corrected um to
1:01:25make sure there's no turbidity being
1:01:27discharged. Um, and then one of our
1:01:30other recommendations was that the water
1:01:32depths and field conditions should be
1:01:34verified before installing the temporary
1:01:37sheet piling or other coffer dam
1:01:39structures.
1:01:40And then um we also recommended that um
1:01:44and I think we discussed this on our
1:01:45site visit too, but we recommend that um
1:01:49temporary sheet piling be prioritized
1:01:51over sandbag dams um just because it's
1:01:54typically a little bit more effective um
1:01:56and minimizing disturbance and also
1:01:58minimizing sediment um migration.
1:02:02And then as I noted um we recommended
1:02:04that an elicit discharge statement
1:02:06should be signed and provided to the co
1:02:08commission prior to construction. Um and
1:02:12then the only other thing was um the wet
1:02:15there are BBW on site that um the
1:02:18applicant acknowledged in their
1:02:19application but because the limits of
1:02:22the wetlands are further out from the
1:02:24ponds and further away from the limits
1:02:25of work there was no formal delineation
1:02:28of the BBW on site. So, we just
1:02:32recommend um that the commission include
1:02:35a finding in the order that clarifies
1:02:37that there are BBW on site, but they
1:02:40haven't been formally reviewed or
1:02:41delineated as part of this project. Um
1:02:44so, the order of conditions isn't um
1:02:47basically approving any specific wetland
1:02:49boundaries. It's just acknowledging that
1:02:51they're there.
1:02:53Um and I think that was all I had, but
1:02:56I'm happy to answer any questions if
1:02:58there are any.
1:03:02Thank you.
1:03:04Uh Kyle,
1:03:06>> uh yeah, I've just got a couple
1:03:07questions and I'm not sure if Brian or
1:03:09Ariana would be best equipped to answer
1:03:10these. So I guess either of you please
1:03:12uh jump in. Um I'm going to I'm going to
1:03:15go ahead and share uh the most recent
1:03:17plan set that was submitted so we can
1:03:19kind of you know arm wave and and talk
1:03:21about different things. So give me a
1:03:22second. Let me share my screen. Um,
1:03:26so, uh, the first thing that I would
1:03:29like to do is, uh, is just kind of walk
1:03:31through, um, now that we have the the
1:03:33site plan pulled up, uh, walk through
1:03:35the mitigation that's that's proposed.
1:03:37So, um, obviously this is the the earth
1:03:39and the earth and burm that's going to
1:03:41be replaced. Um, we have, uh, erosion
1:03:44controls, uh, proposed along the the
1:03:48existing bank kind of where we'll we'll
1:03:51be accessing uh, the earth and burm,
1:03:53right? on here, here, on the other side
1:03:56there. Uh then we have the sheet piling,
1:03:59which is like like the magenta color
1:04:01that's going to kind of uh segment the
1:04:03the work area from uh the waterway. Um
1:04:07and that's the majority of the the
1:04:09mitigation that's that's
1:04:12around the the work area. Is that
1:04:14correct?
1:04:16>> Correct. Yeah. just uh also you know and
1:04:20this will field conditions will dictate
1:04:22this um based on like water levels but
1:04:25you know maybe there would be a need to
1:04:27install a silt curtain um upgrading of
1:04:31those weir boards that may be a good
1:04:33idea um again if you have adequate water
1:04:37depth um and then secondarily
1:04:41uh we have that proposed staging area
1:04:44that will be encircled by uh straw
1:04:46waddles as well uh to contain any you
1:04:50know equipment but also that's where we
1:04:52would be uh pumping any dewatering
1:04:56um with the filter bags.
1:04:58>> Okay, that was my another one of my
1:05:00questions was if there is dewatering
1:05:01necessary where would that be? So that
1:05:03would be in the proposed aging area.
1:05:05>> Okay. Uh, and then so
1:05:08Brian, uh,
1:05:11are you going to be on site like, uh,
1:05:13kind of monitoring this during the the
1:05:16actual construction or or or like what's
1:05:20who's going to be making that call if
1:05:22the turbidity curtain is necessary by
1:05:24the by the weir boards? Like that might
1:05:26be an additional special condition that
1:05:28the commission might want to uh have
1:05:30there that that that you know that an
1:05:32environmental scientist or someone be
1:05:35present at least while uh this is
1:05:37initially getting set up to make sure
1:05:39that these you know mitigation measures
1:05:42are are adequate uh for the work that's
1:05:45being done. Uh is that I I I just don't
1:05:48know what what your individual plan was
1:05:50Brian. Was someone from LEC going to be
1:05:52there or I mean that's obviously the
1:05:54commission can always do a a special
1:05:57condition to require monitoring and
1:05:59people to be present not just the
1:06:01contractor doing the work, right?
1:06:03>> Yeah. So I think we we would be able to
1:06:05review some of this during a
1:06:06pre-construction meeting and even after
1:06:09post installation if you want to meet
1:06:11out there we can review everything as
1:06:13well. I would certainly defer to the
1:06:15commission to their desire for level of
1:06:18monitoring, but you know, I'm sure the
1:06:20applicant would uh make um themselves
1:06:24and LEC available to perform that
1:06:26service just to make sure it's done
1:06:28correctly with no adverse effect to the
1:06:30surrounding and downgradient resource
1:06:32areas.
1:06:35>> All right, thank you. Um and I've got
1:06:36one final question. Um so we have the
1:06:39the proposed turtle nesting habitat,
1:06:40which is this square down here. Um, are
1:06:43there I I I was kind of looking through
1:06:44the rest of the notice of intent
1:06:45application. Is there like a detail
1:06:48sheet um that kind of talks about what
1:06:50will be done for that turtle nesting
1:06:52habitat. I I just don't know what work
1:06:54is required to
1:06:57uh to to to right now it's just kind of
1:06:59a maintain grass area. So like what are
1:07:02we going to do to to make that a turtle
1:07:04nesting habitat versus just a grass
1:07:06area? So do do you know what that
1:07:08entails?
1:07:10Yeah, good question and apologies I
1:07:12didn't provide any you know further
1:07:14elaboration but basically the existing
1:07:18um grass area and top soil would be
1:07:23removed
1:07:24which you know we have a square
1:07:27footprint here. It's going to be a
1:07:29little bit more field adjusted
1:07:31um to be reflective of on the ground
1:07:34conditions. Uh but that uh you know
1:07:37vegetated root material and the top soil
1:07:39would be removed. Uh presumably we would
1:07:43need to introduce some level of clean
1:07:45sand. Uh which you know this [snorts] is
1:07:47a golf course. Uh a lot of sand
1:07:50associated with the sand traps. We're
1:07:51basically creating a sand trap for the
1:07:54turtles to nest within outside of the
1:07:57course of play.
1:07:59>> So generally we be targeting about like
1:08:0112 to 18 inches of clean sand. And this
1:08:05would be almost like a depression.
1:08:07Um, so we have like a li outer lip. So
1:08:11we're not having any potential for
1:08:14erosion runoff into uh the adjacent
1:08:17stream. This is all a flat area right
1:08:20now. Uh but it will be like kind of
1:08:22concave to keep it contained
1:08:25and make sure it drains well uh
1:08:27vertically for infiltration.
1:08:32>> All right. Well, thank you. Um, so I I
1:08:34guess uh you know I I think that all the
1:08:36recommended social conditions that Won
1:08:38and Samson recommended are good and we
1:08:40should include all of those. Um, let's
1:08:43see. I guess I would maybe like to see
1:08:46uh
1:08:48you know I'm I'm still recommending that
1:08:49we issue the order of conditions tonight
1:08:51but I I think that like before
1:08:52construction um if we could get either a
1:08:55like a statement Brian or or a detail
1:08:58sheet about you know given that we're
1:09:01going to be kind of doing a lot of this
1:09:02design for the turtle habitat in the
1:09:05field. But just an overview of of what
1:09:07that looks like kind of just what you uh
1:09:09spoke about here to be submitted so we
1:09:11can add that to the file. Um, I would
1:09:13also recommend to the commission that uh
1:09:16we install some sort of signage around
1:09:18the turtle monitoring, sorry, the turtle
1:09:21habitat uh just so we don't confuse this
1:09:23sand pit for a sand trap at the golf
1:09:26course and make it very apparent that
1:09:28this is a habitat area that's that's set
1:09:30aside and not meant to be part of the
1:09:32the active use golf course. Um, but
1:09:35beyond that, I don't think additional
1:09:37conservation markers are necessary. you
1:09:39know, we are effectively making a bridge
1:09:42here. Um, so, you know, we want to kind
1:09:45of keep in mind that, you know, people
1:09:46are out here to play golf and it's part
1:09:49of that experience is is kind of getting
1:09:51lost in in in the nature. And I think
1:09:52having a a ton of signs by the entry and
1:09:55exit of that of that pathway would
1:09:59likely take away from that, but I think
1:10:00some signage over by the the nesting
1:10:02habitat uh would be appropriate.
1:10:06>> Yeah, that certainly makes sense. And um
1:10:09yeah, I mean where it's located, it's
1:10:11pretty tucked away from
1:10:13um you you'd be uh in real trouble if
1:10:16you were finding your golf ball.
1:10:17>> Yeah, I mean I I hear you, but I've got
1:10:19a pretty nasty slice, so like it can
1:10:21happen, you know.
1:10:26>> I have a quick question.
1:10:30>> Joyce,
1:10:30>> where where will the spoils go as you as
1:10:33you pull up the burm? where will you
1:10:36just put it right into trucks
1:10:38immediately or
1:10:40>> um I would presume you know this is a
1:10:42golf course there are like other areas
1:10:45where there's lom stock piles uh it
1:10:47would probably just be stored on site
1:10:49for pro for reuse
1:10:52>> and the and the um
1:10:55um the hard top
1:10:57>> yeah hard top would be disposed of
1:10:59offsite uh in accordance with you know
1:11:03local and state regulations
1:11:05And so will you do like removal build
1:11:08removal build in small pieces as you go
1:11:10along the way?
1:11:12>> Correct. Yeah, it will be sequentially
1:11:13built out because you want to use that
1:11:15top surface to excavate and then install
1:11:19the pilings. So it'll be done
1:11:20sequentially.
1:11:21>> How large are the pilings?
1:11:24>> Uh I think
1:11:27I'm forgetting. I can take a look, but
1:11:30um wondering if they're 8 in or 12 inch.
1:11:34I think they're 12 in. Hold on a quick
1:11:36second.
1:11:47See?
1:11:50>> Sorry, I'm just pulling up that plan.
1:11:52>> That's okay.
1:11:56>> Yeah. 12 inch diameter piling.
1:12:01>> Yeah, that's pretty big. Okay.
1:12:05Okay,
1:12:07>> Brian. So, just so I understand I
1:12:09understand the 12 just for future
1:12:10reference for myself in the future. How
1:12:12deep do these pylons go?
1:12:14>> Uh upwards of 25 ft potentially. Uh it's
1:12:19all dependent upon what material they
1:12:21hit. Um, it's pile driven. So, you know,
1:12:24they set it down to proper depth that
1:12:26it's not going to be shifting, that it's
1:12:29secure in place.
1:12:31>> Okay. And to propose off Kyle's bad
1:12:34slice, is the turtle habitat going on
1:12:37the water over the 18th fairway or is it
1:12:40coming back to the 17th green?
1:12:43>> Uh, going out towards the 18th fairway
1:12:46on the the far left. It's it is is
1:12:50really tucked in the corner um that you
1:12:54know you'd already be driving over the
1:12:57the bridge before you even noticed it.
1:13:00>> Okay.
1:13:04Commissioners, any questions?
1:13:07>> How long do you think it would take to
1:13:08go from to actually remove the old BM
1:13:11and get that get that constructed? I'm
1:13:13I'm just wondering about um you know
1:13:16silt and all of that kind of stuff.
1:13:20>> Yeah. You know I I they're anticipating
1:13:22the work to to go pretty quickly.
1:13:25Obviously what there's some weather um
1:13:27>> yeah that I'm sure the weather would
1:13:28make a difference. Yeah.
1:13:30>> But you know the the golf season's
1:13:32winding down. They are looking to get
1:13:34into this in November. Um you know I
1:13:38think it should only take a few weeks um
1:13:41if everything lines up correctly.
1:13:46Okay,
1:13:47>> I I've got another question. Um, if
1:13:50that's all right, Justin. Um, Rihanna
1:13:53and Brian, when we were out on the site,
1:13:54one of the things that we discussed, uh,
1:13:56when we're discuss, you know, when we're
1:13:58looking forward to the project and and
1:14:00we're talking about removal of the
1:14:01existing earth and burm, uh, one thing
1:14:03that we spoke about, uh, was how are we
1:14:06going to, uh, determine the the the
1:14:08appropriate grade or depth of
1:14:10excavation? Um, did we ever like come up
1:14:15with a an answer to that?
1:14:19>> Yeah, I think uh what we talked about
1:14:22was it would be fieldverified so we
1:14:25could, you know, once we start some of
1:14:27that work, I think it would be prudent
1:14:29to have a meeting just to confirm that
1:14:32all right, here's the elevation that
1:14:33we're targeting. Uh, here's how it's
1:14:36going to be consistently applied. you
1:14:38know, the surrounding mudline bottom
1:14:41substrate elevation is 117.
1:14:45Um, you know, it would be in that target
1:14:47range. There may be some a little bit
1:14:49slight variability across, but um I
1:14:53think that can all be fieldverified with
1:14:54a check-in.
1:14:56>> Okay. All right. That seems reasonable.
1:14:58I just didn't know if if if the two
1:15:00parties, not including me, had like had
1:15:03a discussion about that. But yeah, that
1:15:04that sounds okay. Thank you.
1:15:07Yeah, Kyle, that was kind of the
1:15:09intention. I know it's a little vague
1:15:11the way we wrote it, but that was kind
1:15:12of our intention with one of our
1:15:14recommended special conditions, too, was
1:15:15just that there should be basically an
1:15:17on-site meeting um in order to verify
1:15:20the depths before they kind of get
1:15:22started.
1:15:24>> Okay. Yeah. Great. Thank you.
1:15:31>> Any other questions?
1:15:38Rich, would you like to say anything?
1:15:40>> No, I just really appreciate your help.
1:15:42We're looking forward to this project
1:15:43and, you know, it's uh I appreciate all
1:15:47your help and and uh you know, I just
1:15:50want to thank the commission for
1:15:51considering it.
1:15:54>> Okay. Um, so commissioners, I think I'm
1:15:56looking for a
1:15:59motion to issue an order of conditions
1:16:02for 159 Tory Street.
1:16:05>> Could we just have one more review of
1:16:07what the special conditions will be,
1:16:09please?
1:16:15>> Sure. Uh, I'll I'll dive into this. So
1:16:19uh the first thing is that the
1:16:21commission is and and this will be not
1:16:24necessarily special condition. I also
1:16:25include when I issue an order of
1:16:26conditions I issue a findings section.
1:16:29So, in the finding section, uh, we're
1:16:32going to acknowledge that there are
1:16:33BVWs, uh, around the work site, but
1:16:37we're not confirming those boundaries,
1:16:39and those boundaries weren't really
1:16:41submitted for confirmation as part of
1:16:43this filing given that the work is
1:16:45exclusively within this open waterway,
1:16:48and we're really concerned about bank
1:16:50and land underwater rather than the the
1:16:52delineation of the surrounding BBW. Um,
1:16:54and then I'm going to dive into the the
1:16:56five special conditions that Won and
1:16:58Samson uh proposed. Um, so the first one
1:17:01is that uh the contractor shall maintain
1:17:03additional filter bags on site
1:17:04throughout the construction process um
1:17:07to allow for prompt replacement as
1:17:09needed um to maintain effective sediment
1:17:11and turbidity control. Uh number two, uh
1:17:14turbidity monitoring. All discharges
1:17:16associated with temporary water bypass
1:17:17system shall be monitored for turbid
1:17:19turbidity prior to discharge into the
1:17:21pond. Uh if visible turbidity is
1:17:24observed, discharge operation shall be
1:17:25immediately dispended until appropriate
1:17:27corrective measures have been
1:17:28implemented and the discharge is free of
1:17:31visible turbidity. Three,
1:17:33pre-installation field verification.
1:17:35Prior to the installation of temporary
1:17:37sheet piling or other coffer dam
1:17:39structures, a site visit shall be
1:17:41conducted to verify existing water
1:17:42depths and field conditions and confirm
1:17:44the suitability of the proposed
1:17:46installation methods for temporary
1:17:49coffer dam methods. The use of temporary
1:17:51sheet piling shall be prioritized over
1:17:52sandbag coffer dams where practicable to
1:17:55maintain oh sorry to minimize
1:17:56disturbance to wetland resource areas.
1:17:58Introduce the the potential for sediment
1:18:01mobilization during construction. Five
1:18:03elicit discharge statement prior to the
1:18:05commencement of construction activities.
1:18:07The applicant shall submit a signed
1:18:08elicit discharge statement prepared and
1:18:10signed by the project engineer uh to the
1:18:12conservation commission for its records.
1:18:13So those are the Weston and Samson
1:18:15recommendations. In addition to that, um
1:18:18I think that I would like to see the
1:18:20applicant provide uh you know details or
1:18:23a narrative describing how the uh the
1:18:26turbal hab nesting habitat will be
1:18:28constructed before the construction
1:18:30begins. Uh and then then I wanted to
1:18:33clarify the commission's expectations
1:18:35for signage. Uh and I think that it
1:18:37would be appropriate to have, you know,
1:18:39turtle nesting habitat sign of some sort
1:18:42uh around the nesting habitat area. Was
1:18:46there some mention of environmental
1:18:48monitoring?
1:18:49>> Well, that was something that we spoke
1:18:50about. Um, you know, given the,
1:18:53you know, I I think that uh Brian had
1:18:56mentioned, you know, we always do a
1:18:57pre-construction meeting and that's
1:18:58generally before like the erosion
1:19:00controls are installed. Um, so certainly
1:19:02before we uh we add the sheet piling,
1:19:04I'd like to be out there and just kind
1:19:06of over, you know, walk through the
1:19:07entire process and project with everyone
1:19:09involved. But then I think that it would
1:19:11be appropriate to have additional visits
1:19:13and that can be me where I go out after
1:19:16the sheet piling uh has been installed
1:19:18and maybe like when construction has
1:19:20begun. Um or uh if the commission would
1:19:23prefer, we can we can have the uh the
1:19:26applicant uh you know
1:19:29hire an environmental monitor that kind
1:19:31of does that that work and is kind of
1:19:33either on-site you know not necessarily
1:19:35the entire time work's being done but
1:19:37you know uh once a week during the
1:19:39construction period and uh you know
1:19:41that's kind of up to the commission how
1:19:42we want to handle that.
1:19:46I'll keep in close contact with you,
1:19:47Kyle, and whatever you guys decide,
1:19:49we'll we'll we'll go with But I will
1:19:51keep in close contact with you of every
1:19:53step of the project because I,
1:19:56>> you know, and if this is something
1:19:57that's knocked out in two weeks, you
1:19:58know, that's something that, you know, I
1:20:00could get I can get out there once a
1:20:01week and it wouldn't be a big deal, you
1:20:02know. So, I I don't know what the you
1:20:04know, once construction has begun, what
1:20:06do you think the timeline for completion
1:20:09would be?
1:20:10>> Well, I think two weeks is is very
1:20:12aggressive. I mean, because we we're
1:20:14going to be going slow and methodical
1:20:16with it. Um, so, you know, I mean, two
1:20:19weeks would be ideal, but I think it's
1:20:20going to be a little bit longer than
1:20:22that.
1:20:23>> But even two or three weeks, it's not
1:20:24unreasonable to hire an environmental
1:20:26monitor for that period, do you think?
1:20:31>> Or is it?
1:20:32>> Uh, it's costly,
1:20:39>> but it's it's a commission's call. It
1:20:40will definitely add to the project cost.
1:20:43I mean, it's we're already looking at
1:20:46probably, you know, for this project,
1:20:48it's, you know, probably half a million
1:20:51dollars.
1:21:08Um, Commissioner Green has her hand
1:21:10raised.
1:21:12>> This was unrelated to all that, but I
1:21:14guess could be related if you do extra
1:21:16visits. You had mentioned earlier K
1:21:18about the um erosion controls like if
1:21:21additional erosion controls like that
1:21:23were mentioned have to be added just
1:21:24who's on site, who's like confirming
1:21:26that is that also being added as a
1:21:28special condition like clarification or
1:21:30monitoring of that?
1:21:33So I mean
1:21:38gener like so we have standard
1:21:40conditions right and and the the the
1:21:43line that we've got to walk today is
1:21:44that this is not really a standard
1:21:46project right so so our standard
1:21:47conditions are you know uh erosion
1:21:49controls must be maintained uh
1:21:51throughout the life of the project. If
1:21:52you see problems obviously replace that
1:21:54keep additional on on site stockpiling
1:21:56yada yada. Um here, you know, uh very
1:22:01little of this is actually like above
1:22:03above grade erosion control like a like
1:22:06a silt sock, right? Most of this is that
1:22:08sheep piling or the or the coffer dam.
1:22:10Um and that's a pretty catastrophic
1:22:13failure if that were to to you know uh
1:22:15to to fail uh while they're doing the
1:22:17work. So, you know, that's going to be
1:22:20their first and second priority I think
1:22:22all the time that they're working there
1:22:24because this work needs to be done
1:22:25effectively in the dry. So, you know,
1:22:28they they would be the contractor would
1:22:29be very very aware of, you know, if
1:22:32there are problems with the the sheet
1:22:34piling or the or the coffer dams and
1:22:36obviously that would be something that
1:22:37they would they would they would have to
1:22:39uh address like immediately. Um, we can
1:22:42certainly modify the existing language
1:22:45uh that we have to kind of better uh you
1:22:48know uh target and discuss the the sheet
1:22:52pilings and the coffer dams rather than
1:22:54just like silt sock erosion control. But
1:22:56but it would be the same idea I think is
1:22:58what you're getting at, right?
1:23:01>> Yeah. Yeah. And the just to clarify the
1:23:05silk curtain or the turbidity curtain
1:23:07just another name for it is like the
1:23:09fail safe. Uh it's like the discharge
1:23:12point where everything leaves the pond
1:23:15system. Yeah. Exactly.
1:23:16>> Yeah. But down over here by the the
1:23:17turtle habitat, right?
1:23:19>> Yeah. So yeah, in addition to the to the
1:23:21sheet pilings along the the like the
1:23:23limit of work, uh there was discussion
1:23:25of of um the turbidity curtain here. And
1:23:29I guess Brian, you mentioned that we
1:23:30would make that call um in the field at
1:23:33the time of the like the
1:23:34pre-construction meeting based upon like
1:23:36water levels and things like that.
1:23:38>> Correct. Yeah. in to elaborate on the
1:23:43you know the sheet piling that is a
1:23:45pretty
1:23:46um secure installation
1:23:50you know a lot would have to go wrong
1:23:52for there to be some failure there
1:23:58but that you know that's why there's the
1:24:00the backup fail safe as well
1:24:05thank Yeah.
1:24:18>> So, Kyle, we're looking for a vote now
1:24:20to issue an order of condition. Is that
1:24:22right?
1:24:23>> Yeah. With with whatever conditions you
1:24:25deem appropriate. Yep.
1:24:27>> Right. With the special conditions from
1:24:28Weston and Samson and our special
1:24:31conditions. I know Lily has all of them
1:24:33written down.
1:24:35I mean, I do I don't know if we've come
1:24:37to decision with um Commissioner Boris's
1:24:40um question about if we if I were just
1:24:42Kyle doing the monitoring or if we want
1:24:45them to hire an environmental monitor.
1:24:46So, I haven't written that down.
1:24:51I just want
1:24:52>> Kyle join the monitoring.
1:24:54We'll just
1:24:56>> Yeah, I think, you know, if you know,
1:24:59once a week during the actual, you know,
1:25:02construction portion, you know, I I I
1:25:04think that's fine. Brian, would you be
1:25:06there during the the preconstruction
1:25:08meeting, not necessarily ongoing through
1:25:10the process, but at least for that that
1:25:13premeating where we're looking at is the
1:25:14turbidity curtain necessary?
1:25:18Yeah, I I can certainly make myself
1:25:20available.
1:25:20>> Okay. Yeah, I if if if if that's the
1:25:23case, I would be then comfortable, you
1:25:25know, following through on that over the
1:25:28course of the the active construction
1:25:31part of the project.
1:25:33>> So, you would be acting as the
1:25:35environmental kind of watch.
1:25:36>> Yeah. Effectively, it would just be uh I
1:25:38would add language in there that, you
1:25:40know, that the commission uh or its
1:25:43agent will will visit once a week during
1:25:46the active construction. We'll
1:25:47coordinate with the with the applicant
1:25:49uh to to figure that out and um yeah,
1:25:52just kind of keep an eye on things and
1:25:53make sure it's
1:25:54>> long as there's a formal statement of
1:25:55the need for that, that's great. Thank
1:25:57you. Mhm.
1:26:05>> My time to shine.
1:26:08>> Sure, Lily.
1:26:10>> All right. Um, so I will issue the Do we
1:26:13have to close this out before we Wait,
1:26:15no, that's something.
1:26:16>> Uh, well, no, you're you're right. Um,
1:26:18so this is a public hearing. We should
1:26:20uh see if there's any public comment. Um
1:26:22and uh we'll close the hearing before we
1:26:25vote uh on a decision. Thank you. Lily,
1:26:29>> is there anybody
1:26:32there?
1:26:32>> There there are no uh attendees uh
1:26:34present at the meeting any longer. So,
1:26:37um I don't think there's anyone here to
1:26:38talk to that's not already talking with
1:26:40us.
1:26:41>> So, we're looking for a motion to close
1:26:43the hearing, please.
1:26:45>> I'll make a motion to close the hearing
1:26:46for the notice of on 159 Troy Street.
1:26:53I'll second that.
1:26:56>> Motion has been made and seconded by two
1:26:58people. Roll call voc please.
1:27:03>> Leon I
1:27:05>> three and I
1:27:08>> M I
1:27:10>> Talban I motion uh the hearing is closed
1:27:14and now we're looking for a roll call uh
1:27:16a motion I'm sorry for special order of
1:27:18conditions.
1:27:20Yeah. So, I'll make the motion to issue
1:27:22the order conditions for 159 Choice
1:27:24Street with the special conditions
1:27:26including the filter bags, the turbidity
1:27:29monitoring, the pre-installation field
1:27:31verification, the temporary cough for
1:27:33dare methods, the elicit discharge
1:27:35statement from the rested Simpsons
1:27:36review along with the additional
1:27:39conditions including the statement or
1:27:42detail sheet for the turtle habitat
1:27:44creation, the um discussion about the
1:27:46installation of signage around the
1:27:48turtle habitat and additional visits by
1:27:51um the commission or the agent with
1:27:53constant communication by the applicant
1:27:54during the project.
1:28:03>> I second that motion.
1:28:06>> A motion has been made and seconded to
1:28:08issue a special order of conditions what
1:28:10Lily stated. Can I have a roll call
1:28:12vote, please?
1:28:14Leon I
1:28:16>> I
1:28:21>> Ruby Ruby [snorts]
1:28:24>> Clay I
1:28:26>> Matt I
1:28:27>> hear me
1:28:29>> I
1:28:29>> and Tal I that motion passes.
1:28:33>> All right. Awesome. Thank you.
1:28:35>> Thanks so much everyone.
1:28:36>> Okay.
1:28:37>> Thank you everybody.
1:28:38>> Good night.
1:28:39>> Take care.
1:28:39>> Uh a point of uh I guess fact. I I don't
1:28:43know. We forgot to close the uh the
1:28:45hearing for the RDA that we voted on
1:28:47earlier tonight. Uh 32 North Leaden
1:28:50Street, number four on the agenda. Um so
1:28:52we we we should have closed that before
1:28:56uh we issued that determination. Um and
1:28:58asked for public comment. Again, there
1:29:00was no one in the meeting. Uh but we
1:29:03should maybe make that vote to close now
1:29:05just to kind of do that.
1:29:09>> Sorry about that. No,
1:29:10>> I mean I I missed it too. No problem.
1:29:13So, we're looking for a motion to close
1:29:16uh new filings uh agenda item number
1:29:19four, 32 Leaden Street.
1:29:22>> Make a motion to close uh the hearing
1:29:24for the RDA or 32 North Leaden.
1:29:27>> I second that motion.
1:29:28>> Motion has been made and seconded to
1:29:30close the RDA for 32 North Leaden
1:29:32Street. Can I have a roll call vote,
1:29:34please?
1:29:34>> Clay I. Leon I
1:29:37>> Leon I
1:29:39>> Matt I
1:29:41>> in Talban I
1:29:43>> I believe the last item on the agenda is
1:29:46a request for a COC for 239 Belleview
1:29:50Avenue.
1:29:52>> Uh yeah. Um so I again I don't think
1:29:54there's anyone in the attendees list to
1:29:56talk about this. We we discussed this
1:29:58project last month. Um, and uh the the
1:30:02one outstanding thing uh again uh was
1:30:04the installation of conservation
1:30:06markers. I went out to the site uh a
1:30:08couple weeks ago, took some photos uh
1:30:10and I'll share those with you in a
1:30:12moment. Um
1:30:16let's see. Oh.
1:30:32All right, I'm go and share my screen.
1:30:34Uh, and this is the the kind of corner
1:30:38of the lot that we were looking at last
1:30:40time. And we talked about uh three or
1:30:42four signs uh there. And you can kind of
1:30:44see them here uh in the corner of the
1:30:47the lot. Uh so this is the the sign that
1:30:50was installed. Um, this is not the the
1:30:54sign that I provided the applicant. This
1:30:56is one that that this is the exact sign
1:30:58that they used over at 710 Oak Street.
1:31:01Um, I don't know how they got like this
1:31:04mockup, but they did and they installed
1:31:07it. So, it says Brockton Conservation
1:31:09Commission limited work do not remove.
1:31:10Um, and there are three of them as
1:31:12requested in the locations that we
1:31:14requested them. Um, so I guess
1:31:16ultimately the question for the
1:31:17commission is are we okay with these
1:31:20signs? here or are we wanting to require
1:31:24uh this applicant to utilize the the
1:31:27other design that we have? Now, I do
1:31:29want to say that the the mockup that we
1:31:32approved earlier tonight at the 325
1:31:35Thatcher Street uh was a different color
1:31:37than the sign that we, you know,
1:31:40provided to them. Um I think, you know,
1:31:43ultimately this is up to the commission.
1:31:45Um but I do just want to make a couple
1:31:47comments about these signs. These signs
1:31:49are hard to to get in small batches. Um,
1:31:53right now that's how this is that's how
1:31:55the commission is requiring these people
1:31:58uh go about getting these. So
1:32:01there is not like a stockpile of these
1:32:03signs that people can come and get from
1:32:04me. They're kind of responsible for
1:32:06getting these made themselves uh which
1:32:09is kind of burdensome uh and and
1:32:12challenging. So that said, um you know,
1:32:15again, this is up to the commission on
1:32:17how you want to move forward. Um if this
1:32:20is fine, uh great. And if you want to
1:32:23see them use the other sign, that's also
1:32:24fine. I can convey that to the
1:32:25applicant. Um but it is a challenge and
1:32:28and getting three signs made, um is a
1:32:32challenge. Um it's expensive to get
1:32:34small batches made, you know, custom
1:32:37small batch. So, ideally, uh the the
1:32:41long-term solution here is kind of
1:32:42outside the scope of this project, but I
1:32:44do want to just let you know that I am
1:32:46working towards a solution. Um there are
1:32:49filing fees that uh that are associated
1:32:52with notice of intent filings and like
1:32:54ANRAD filings um amongst other types of
1:32:57filings with the commission. And those
1:33:00filing fees are supposed to be able to
1:33:02be utilized by the commission for
1:33:04administrative purposes. So, a lot of
1:33:06commissions will utilize those those
1:33:09filing fees to purchase signs. Uh, and
1:33:12that can either be given away for free
1:33:14to applicants or uh can be purchased at
1:33:16cost. Um, and that way, you know, we can
1:33:20batch out 500 of these things and it's
1:33:22not a big deal. I mean, it'll cost money
1:33:24obviously, but then we can either recoup
1:33:26that by selling the mat cost or just,
1:33:28you know, spend that money that's
1:33:30supposed to be used for administration
1:33:32on these signs. so they are um uniform.
1:33:36Um so ideally that's what we want to be
1:33:39doing. I'm working with our admin to
1:33:40kind of sort out some complications with
1:33:43uh where that money goes currently. Um
1:33:46and making sure that it's it is set
1:33:48aside specifically for the commission
1:33:50use. Um and so we're not quite there yet
1:33:52and I haven't ordered signs, but long
1:33:54term that's the solution here. But
1:33:57before we're there, we still have to
1:33:59issue cert certificates of compliance.
1:34:01The question is, is this sign okay to
1:34:04you all or are we going to require this
1:34:06applicant uh print out three signs that
1:34:10are of the the design that we've kind of
1:34:13approved
1:34:20>> or or through the chair? Sorry.
1:34:22>> Joyce,
1:34:23>> what material
1:34:25>> what material is
1:34:27>> fine? These signs are fine. You can't
1:34:30get them, right? I mean, we can see
1:34:32them.
1:34:34>> Yeah. But what material are they made
1:34:35out of?
1:34:36>> Uh, I'm not sure if it's a plastic or if
1:34:38it's like printed on like an aluminum
1:34:39sheet or or what. Um, I I don't know.
1:34:43>> Yeah,
1:34:43>> they kind of hit you in the face,
1:34:44actually. But
1:34:46I mean, I don't think you should ask
1:34:49them to be changed.
1:34:52>> They'll do the job.
1:34:54>> Yeah, I agree. I think they're fine for
1:34:56this uh circumstance.
1:35:01All right. Well, if that's the will of
1:35:02the commission, then I would recommend
1:35:03issuing a complete certificate of
1:35:05compliance for 239 Belleview Avenue.
1:35:10>> Commissioners, any more questions on
1:35:11this?
1:35:15>> Know who the sign was that they got it
1:35:17from the car wash?
1:35:20>> I I really I was shocked when I saw
1:35:21these.
1:35:24So, I'm looking for a motion to issue a
1:35:27certificate of compliance for the
1:35:28current signage for 239 Belleview
1:35:30Avenue.
1:35:34>> I make a motion to issue the uh complete
1:35:37certificate of compliance for 239
1:35:38Belleview Avenue.
1:35:40>> Second.
1:35:41>> Motion has been made and seconded to
1:35:43issue a COC for 239 Belleview Avenue.
1:35:45Can I have a roll call vote, please?
1:35:47>> Play I. Leon I
1:35:49>> Le I
1:35:51>> M I
1:35:52>> Bors I
1:35:53>> and Tal I that motion carries and that's
1:35:57the entire agenda.
1:35:58>> I have one quick question. Um does
1:36:01anyone know who Benjamin Smith and
1:36:04Elizabeth Pirates are?
1:36:06>> Uh yes, in fact.
1:36:07>> Oh an AI noteaker.
1:36:09>> Yeah. So Ben works with Brockton
1:36:11Community Access. So he's working with
1:36:13us to stream uh the meeting. And then uh
1:36:16Liz is our new admin with the planning
1:36:18department. So she's here taking notes
1:36:20and uh she'll work on minutes for us
1:36:22moving forward.
1:36:23>> Good. Welcome.
1:36:24>> Just
1:36:25>> welcome and thank you.
1:36:27>> Yeah, thank you.
1:36:28>> You're welcome.
1:36:29>> Speaking of minutes,
1:36:30>> she attended a meeting.
1:36:31>> Are we going to have a backlog of
1:36:32minutes at some point to approve?
1:36:34>> Yeah, I'm hoping at the November meeting
1:36:36we'll have uh all the because I think
1:36:38it's it goes back to August uh that we
1:36:40that we haven't approved [clears throat]
1:36:41in it. So look forward to those in the
1:36:43next few weeks. We'll we'll get them
1:36:45out.
1:36:45>> I won't be here for November. So, I
1:36:47guess Mullins [laughter] and
1:36:50>> not your problem.
1:36:51>> Yeah,
1:36:52>> it's my problem when I get back from
1:36:53vacation. You mean [laughter]
1:36:56make a motion to join the meeting?
1:37:00>> Perfect.
1:37:03>> You ready for that, chair?
1:37:05>> Absolutely.
1:37:08>> I second.
1:37:10>> Motion been made and seconded to adjourn
1:37:12the meeting. Roll call vote please.
1:37:14>> Clay I.
1:37:15>> I.
1:37:16>> Green I.
1:37:18>> I.
1:37:19>> I.
1:37:19>> And Talba. I.
1:37:20>> Okay.
1:37:22>> Everybody have a wonderful night.
1:37:23>> Thanks everybody.
1:37:23>> Good night everyone.
1:37:25>> Good night.
1:37:26>> Good evening.
1:37:27>> Take care.