2026-10-29 - Planning and Zoning Commission Special Meeting

Summary

Summary built from YouTube auto-generated captions only; the official minutes have not been read (the town's agenda and minutes portal could not be opened). Names, figures and tallies may be misheard; voice votes are not tallied, and carried means the chair announced it carried.

  • Single topic: site plan 26-13-83, Ryan Companies (Project Husky); no decision was taken. See Ryan Companies Project Husky.
  • The applicant described a roughly 1.23 million sq ft warehouse and distribution building, about 50 ft high, with 58 dock doors, trailer parking for 370 and 729 vehicle spaces against 616 required. It said the use is allowed by right in the Business Park district.
  • About 76 acres of the site would go into a conservation easement, plus adjoining land the applicant proposed to convey for conservation. Wetland mitigation was raised to 82,800 sq ft, a 3.59 to 1 ratio, and the applicant said only four isolated wetlands are affected.
  • Stormwater would be handled by catch basins, separators, underground detention and filters. The applicant's blasting consultant described rock cuts up to about 40 ft and a voluntary 1,500 ft pre-blast survey radius against a 250 ft code minimum; commissioners asked for the geotechnical and groundwater data.
  • The applicant proposed signals at two intersections near the I-395 ramps and turn-lane changes; state traffic review was said to be ongoing. The noise consultant said the project meets the 61/51 dBA limits, with residences more than 1,500 ft away; commissioners asked for clearer noise contours.
  • Commissioners questioned lithium-ion batteries in the robotic storage system and fire suppression, retaining wall heights against the 50 ft limit, snow storage, truck signage and emergency access.
  • The applicant asked to disturb up to 30 acres per phase rather than the zoning standard of five, saying smaller phases would add about four to five months. Commissioners questioned whether more than 10 acres could be allowed.
  • The commission's peer reviewer (Tighe & Bond) responded to the intervenors' engineering comments, agreeing with some and rejecting others. The applicant's Oct. 28 response had not reached the commission's packet, and commissioners complained about late filings.
  • The intervenors' expert said the proposed treatment would remove only about 64% of suspended solids, below state targets, and that chloride cannot be removed by stormwater treatment.
  • A third intervenor petition was granted on the same limited terms (erosion and sediment control, stormwater), over the applicant's objection. The town attorney said the intervenors carry the burden at the threshold, but the applicant carries it on the site plan standards, and promised a memo before deliberation.
  • The applicant extended the decision deadline through Nov. 16, offered a maximum through Dec. 25, and cited the extra 35 days that follow a wetlands decision. The matter carries to Nov. 16.

Agenda

Agenda items not yet read.

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

00:23Okay. Call the meeting order.

00:25>> Thank you.

00:26>> This is a hybrid meeting. Citizens can

00:27attend by WebEx or in person.

00:30Uh meeting number 28698574422.

00:35Password PZC. here.

00:39>> I'm sorry.

00:45>> Password PZCZ

00:48102926.

00:49Join by phone 415655001.

00:53Call to order. Roll call, please.

00:57>> Brian Card

00:58>> here.

00:59>> Norman Farren,

01:00>> present.

01:01>> Michael Hugo,

01:02>> here.

01:03>> John Serenopoulos

01:04>> here. and Keith Thurlo

01:06>> here.

01:08>> Okay, we don't need any alters. We don't

01:10have any. So, unfinished business site

01:13plan application 261383 Ryan Companies.

01:17Uh, somebody want to speak introduce

01:20yourself please for the record. And

01:22>> Mr. Chair,

01:22>> ma'am,

01:24>> just for a point if you want to just

01:27>> Sorry.

01:28>> Um, you have one uh intervenor petition

01:31that came in after the last meeting. If

01:33you want to really quickly take um that

01:35under consideration, it's for Diana

01:37Weber. It is essentially um the same as

01:40the other interveners uh petitions that

01:43came in. Uh so similar to last time, it

01:45it would be limited in scope uh to

01:48erosion and sedimentation control and

01:49storm water. Um so if you guys want to

01:51take a vote on that to allow that

01:53petition in.

01:54>> Okay. Um,

01:56do we any do we need any discussion on

01:58it other than

01:59>> I can also add counsel for the record

02:02review didn't have the same advice that

02:04we we provided. It's a close call, but

02:05we recommend that for the the two

02:07limited uh aspects of your regulations

02:11um that um we would think it would be

02:14sound to find uh intervention status uh

02:17to present evidence limited to the

02:18things that relate to those specific

02:20sections of your regulations.

02:25Mr. Chair, may I just note for the

02:26record,

02:27>> excuse me, please take over.

02:33>> Uh, good evening, members of the

02:34commission, Evan, Seaman, Robinson, and

02:36Cole on behalf of the applicant, and I

02:38just wanted to note our objection to

02:41this petition for the same reasons as

02:42before, and I will leave it at that.

02:44Thank you.

02:46>> All right. Thank you.

02:48Um,

02:49>> so does anybody want to make a motion to

02:51anything with that other intervenor

02:53status that we just got?

02:55>> Yeah.

02:56>> I mean, the recommendation would be to

02:57accept it under the same conditions as

02:59the previous

03:00>> Yeah, I'll make that

03:01>> intervenor statuses. Okay. John makes

03:03that motion. Do we have a second?

03:05>> I'll second.

03:06>> Second by Norm. Any discussion?

03:10>> All in favor say I. I.

03:12>> I.

03:12>> Opposed?

03:15one out of the office.

03:19>> I'm sorry. Apologize.

03:23>> So, we are aware

03:24>> we accepted it. Same conditions as last

03:26time.

03:26>> Okay.

03:28Did you want to do any other discussion

03:30on the other interveners at [snorts]

03:32this point or

03:34>> No, I think you can hear from the

03:35applicant, pose questions to them, then

03:38let the intervenors do any presentation

03:40they may or may not have. The applicant

03:42then gets um to ask questions of the

03:45intervenors expert. Um and then at that

03:47time, Attorney Slater will advise you if

03:49we get to that point um if you want to

03:52act on those um interventions tonight.

03:54So, we'll see if we get that far in the

03:56process, but uh we'll guide you when we

03:58get to that point.

03:59>> Okay.

04:01Go ahead, sir. Apologize.

04:03>> No problem. Thank you. U me Mr. Chair,

04:05members of the commission, Evan Seaman,

04:06Robinson, and Cole on behalf of the

04:08applicant, Ryan Companies, US Inc., Uh,

04:11we do have some slides that I believe

04:13we're trying to load right now. So, I'll

04:16just wait a moment for that to be done.

04:22There we go. Um, so uh this is an

04:26application for uh site plan review. um

04:30approximately 340 acres uh known as the

04:33project site, 76 of which are proposed

04:35to be uh put in conservation as part of

04:39of a wetlands application pending before

04:41the inland wetlands and water courses

04:42commission. There's an additional 216

04:45acres of land that's also proposed to be

04:47put in into conservation. U this

04:49property, as you know, is in the

04:50business park zoning district again uh

04:53for a warehouse and distribution center

04:56uh uh to be developed on this property.

04:58uh we appeared before the commission uh

05:01uh 10 days ago on intervention and prior

05:03to that on I believe September 21st uh

05:07given the late hour we kind of gave an

05:08abbreviated presentation about 25

05:10minutes or so. So the intent tonight is

05:12to go through our full presentation. Um

05:14here is a slide that has our agenda and

05:18attendees. Uh so I'll give a a brief

05:20introduction uh and then uh Tim Unurko

05:23from Langen uh project engineer going to

05:26uh discuss site design overview uh storm

05:29water management and erosion control.

05:31>> Go ahead.

05:33>> We have uh Andy Defor and Dave Valvy um

05:37who will be discussing our blasting

05:39plan. Uh we have uh our architects here

05:42to discuss uh the architectural elements

05:44of our project.

05:46>> Chris Summers to discuss fire

05:48protection. and Ben Mueller to discuss

05:50the sound study. Uh Mark Veruchi, our

05:53traffic engineer, uh and then Tim Murko

05:55to discuss a couple other uh uh matters

05:57pending before other agencies. Uh

06:00following that, I'd like to uh briefly

06:02discuss uh zoning compliance. Um and uh

06:06we will also discuss the TIG bond um

06:09review comments and the process uh that

06:11we have ongoing with Tigen Bond. uh and

06:14we will also address the the intervenors

06:16and um the the report that has been

06:19submitted. So, next slide, please.

06:22So, I discussed this a bit last time and

06:24I wanted to we're doing our full

06:26presentation again, so I thought uh it

06:27would be beneficial to uh talk a little

06:29bit about the plan of conservation and

06:31development and how we got where we are

06:32today. So, as this commission knows, the

06:34the POCD is the town's long range

06:36planning document. Uh by statute, the uh

06:40municipalities in Connecticut are

06:41required to adopt this plan every 10

06:44years, which sets the the long range

06:47goals and policies that the town hopes

06:49to achieve. Uh the POCCD is not a

06:51regulatory document. It's a guidance

06:53document. And you have some quotes from

06:56the PC on this slide, uh which we

06:58believe, uh are help is is helpful

07:01contextual information about how we got

07:03here. Uh the PCD specifically calls out

07:06this land in the business park district

07:08uh adjacent to I395 not only for

07:11development but for development uh using

07:14uh trucks to transport goods and and uh

07:16this will also um advance the the over

07:20one of the overarching goals of the PCD

07:22to encourage and promote business

07:23development uh particularly in the

07:26business park district which was uh

07:28established in about 2000 and has

07:30remained largely vacant since then. Uh,

07:32next slide, please. So, here's the town

07:35zoning map. So, when the POCD discusses

07:39the business park zoning district, as I

07:41uh just went over on that prior slide,

07:43it's it's uh ident it's discussing the

07:46the the parcels identified on this slide

07:48on your zoning map in green. This is the

07:50only business park zoning district in

07:52the town of Killingly. It's adjacent to

07:54I395. So when the POCD is discussing uh

07:59uh land that is appropriate for you

08:03>> who made the complaint here I don't want

08:04to disrupt but we got called

08:07>> there's a complaint that was made

08:09>> somebody

08:11>> I was told that Mr. Daniels approached

08:13the attorney attorney

08:15>> that's that's correct

08:17>> the the gentleman in the back

08:19>> there's multiple gentlemen

08:21>> um the reg Mr. Daniels, right? That man,

08:25>> M. Mr. Daniels, you just want to come

08:26out and talk to us real quick.

08:31>> And then did one of you guys call? Who's

08:33the one who called?

08:35>> I called the town manager. So,

08:37>> okay. Do you mind if you come out and

08:38talk to me and take

08:47>> Please proceed. Thank you. Um so as I

08:50was saying the land uh this is the

08:52official zoning map of the town. So when

08:54the PCD is discussing the business park

08:56zoning district it's specifically uh

08:58talking about this land in green which

09:00is the subject of this application. Uh

09:03when the PCD is uh uh identifying uh

09:06long range goals of um uh development of

09:10the business park district for uses such

09:12as uh uh transporting goods uh via

09:15truck. It is uh specifically discussing

09:18this land identified in green. Next

09:20slide, please.

09:21>> I guess you come out and speak to us

09:22because this is all.

09:25>> Can we take our recess?

09:27>> All right, we're going to take a short

09:29recess. A motion for that.

09:32>> Motion.

09:32>> Second.

09:34>> Second.

09:34>> All in favor say I. I opposed.

12:13back to me to order.

12:16[clears throat]

12:21>> All right. Thank you. Um, again for the

12:23record, Evan Seaman. Um, so I had just

12:25gone over before the recess the plan of

12:27conser conservation and development. And

12:29as I noted before, the POCD is not a

12:32regulatory document. It sets guidelines

12:34longterm goals and policies that the

12:36that the town hopes to accomplish. So

12:38um, in looking at the POCD, the town

12:40then took steps to advance those goals

12:42and policies in of the plan and

12:44conservation and development in two

12:46ways. First, in 2022, um a uh private

12:50[clears throat] land owner who owns

12:51three parcels in the business park

12:52district totaling about 200 acres

12:55submitted a text amendment application

12:56to this commission. Um at the time, the

12:59business park district had uh pretty

13:02ownorous uh restrictions on warehouse

13:04and development uses. Um they were uh

13:06limited to 40,000 square feet in size by

13:09special permit um accessory, I believe,

13:12to uh research facilities. So they were

13:15not allowed as principal uses. There

13:17were also uh very ownorous setback

13:19requirements of about 750 ft or so. So

13:22as part of that application, the

13:24commission approved a tax amendment to

13:26allow warehouse and warehouses and

13:28distribution centers as principal uses

13:31with no limitations of size. No more

13:3340,000 foot limitation. Uh and it

13:36reduced the setback requirement from 750

13:38ft u to what they are presently along

13:41with some other changes. Uh that was a

13:43very public process. Notice in the

13:46newspaper um members of the public

13:48attended uh and there were public

13:50hearings held. Um following that um

13:54approval, the the town then uh uh

13:57considered additional amendments to the

13:59business park zoning regulations. This

14:01was the town's text amendment. It wasn't

14:03it wasn't an application of a private

14:05land owner. Uh many workshops were held

14:07over the course of almost a year.

14:09Probably eight or nine workshops in

14:10total. uh members of the public

14:12attended, members of the EDC attended,

14:14town council members attended. Um and um

14:17as part of that process um the business

14:20park district um was further amended and

14:23as it relates to warehouse and

14:24distribution centers, there were um

14:26standards and criteria that were um

14:29revised and and created. And um one of

14:32the other changes as part of that

14:34application is that um warehouse and

14:36distribution centers were changed from

14:38special permit uses to site plan uses.

14:41Next slide please.

14:43So this is I think helpful in providing

14:45some context. This is from the town

14:47attorney's memorandum as part of the

14:48first site plan application that was

14:50before you for the approximately the

14:52first half of the year. Uh this is a

14:54memorandum uh June 27th 2026. This is

14:57the memorandum on the intervention

14:58petitions and uh there's some helpful

15:01discussion in there about the site plan

15:03review process and um as noted by the

15:05town attorney uh site plan review is the

15:08lowest lowest burden and least

15:09discretionary form of zoning review

15:10available in Connecticut. And then

15:12moving down to the second paragraph um a

15:16warehouse distribution center use in the

15:18BP district is a use permitted requiring

15:20only site plan review. Uh the commission

15:23therefore exercised no discretion over

15:24whether a warehouse use belongs on this

15:26parcel as that legislative judgment was

15:29made when the use cases of warehouse and

15:31distribution uh were uh listed as

15:34permitted by right. Um so we think that

15:36provides some helpful context. Again uh

15:38as part of this application um it's not

15:42whether the warehouse and distribution

15:44uh is an appropriate use or not. that as

15:47noted by the town attorney that decision

15:49has already been made uh by virtue of

15:51the text amendment adopting

15:54warehouse and distribution centers by

15:56right. Next slide please.

15:58And then before passing this uh it over

16:00to Timurko there is one other matter I

16:03wanted to um highlight and I know as far

16:05part of the first application process

16:07there was a lot of discussion about um

16:09off-site traffic impacts and other

16:11things and I thought it would be helpful

16:13um to provide this slide. This is this

16:16is a a quote from a case and the case is

16:18called UW Vintage Lane 2 LLC versus

16:22Planning and Zoning Commission. It's a

16:23case out of South Windsor. Uh it was a

16:25case in the land use litigation docket

16:27which is the specialized land use docket

16:28in Connecticut. And that case involved a

16:30warehouse and dist distribution center

16:32and that warehouse and distribution

16:34center was denied by the planning and

16:35zoning commission for uh off-site

16:38traffic impacts and other other issues.

16:41And the court said uh you know that's

16:43not proper. you know, the planning and

16:44zoning commission uh because that in

16:47that case a warehouse and distribution

16:48center was also permitted by Wright uh

16:51the the planning and zoning commission

16:54um uh couldn't consider uh off-site

16:57traffic impacts and for that reason the

16:58court reversed the decision uh and uh

17:01ordered that the that the permit be

17:03granted for the warehouse and

17:04distribution use. So this is a quote um

17:07uh from that case and it relies on

17:08Supreme Court uh cases and and to quote

17:12one of the Supreme Court cases, it

17:14relies on uh uses uh designated by

17:17zoning commission as a permitted use in

17:19a specific zone uh establishes a

17:21conclusive presumption that such use

17:23doesn't adversely affect the district

17:25and precludes further inquiry into its

17:27effect on traffic, municipal services,

17:30property values, or the general harmony

17:32of the district. So, I know there was a

17:33lot of discussion during the first

17:35application and I thought it would be

17:36helpful uh to point um the commission uh

17:40to this uh this case and the the Supreme

17:42Court cases it relies on. We've provided

17:45a letter to the town attorney um uh

17:47previously as part of the first

17:48withdrawn application and and also with

17:51this application. So, if if the town

17:53attorney or town planner if you have any

17:55questions for them, uh we'd welcome

17:56their input. But, um

17:58>> put a question to you.

17:59>> Yes, sir. Isn't it also true that the

18:01plan must must meet all written

18:03standards?

18:05>> Yes.

18:07Well, isn't it uh also true that uh

18:11and just give me a minute here because I

18:14think this is an important issue.

18:21Um

18:23that it must meet 4713 standards of

18:27approval which is within the site plan

18:30document.

18:32>> Yes sir, we agree.

18:33>> Okay. And it says that uh in reviewing

18:36and acting upon an application for site

18:38approval, the commission shall take into

18:40consideration the health, safety,

18:42welfare of the public in general and the

18:45immediate neighborhood in particular as

18:47well as the following factors and it

18:49lists them. So how can you say that uh

18:52uh that uh you conclusive presumption?

18:57I mean that that's a stretch, isn't it?

19:01>> We don't believe it's a stretch. That's

19:03from the Connecticut Supreme Court.

19:04That's the connect that's that's the

19:06Connecticut Supreme Court considering

19:07this very issue. And if the town

19:09attorney would would like to provide

19:10input, we welcome it. Well, how can you

19:12how can you square that, you know, when

19:16our regulations say that this is a part

19:18of the process

19:20and you're trying to say that that uh we

19:24have to pick and choose in this

19:26particular case all the things that

19:28we're charged with with uh uh enforcing

19:32the regulations of this community that a

19:34section of them in in your particular uh

19:37application doesn't apply.

19:40That's that's the that's correct. Your

19:41site plan review criteria do not include

19:44consideration of off-site traffic

19:46impacts. So, uh because of that and

19:49because of it's more than one case, it's

19:51many cases including case multiple cases

19:53before the Connecticut Supreme Court.

19:56These these are issues these issues on

19:58this on this slide as noted in this case

20:02um are for by uses uses permitted by

20:05site plan review um are there is that

20:09conclusive presumption that conclusive

20:10presumption applies.

20:13>> Well, look at you know uh you've got

20:15you've got this thing that you handed us

20:18concerning uh uh inland wetlands, right?

20:22and they talk about issues in there that

20:24go off site and yet they apply. How come

20:28this doesn't apply when you know we're

20:31not we're not disputing uh the site plan

20:33itself or I'm not I'm speaking for

20:37myself. However, you know uh

20:42sound for an example sound isn't just on

20:45that site. Whatever sound is generated

20:48affects the surrounding area. uh just

20:51like traffic

20:53>> pollution.

20:54>> So addressing sounds, we we did provide

20:56a sound report, a sound study. Um it's

20:59actually not required by your

21:00regulations. We we we provide it for

21:02information purposes.

21:04>> According to our regulations, it does

21:06though because this 470 is within the

21:10content of uh of site review.

21:14>> A sound study is not required by your

21:16regulations. It's been provided and we

21:18have a brief presentation to provide to

21:19you uh this evening. But um you're

21:22right, section 470.13 are your site plan

21:24review standards. Later on in the

21:26presentation after we go through the

21:28site design and all of all of the um uh

21:31experts are going to discuss their

21:33various reports and studies, I will

21:35address section 470.13

21:37and I will address some of the other uh

21:39uh criteria in the business park zoning

21:41district. But um sound is is regulated

21:46by the town's noise ordinance, not by

21:47the commission.

21:49>> But it still affects I don't care who

21:51regulates it, but it affects more than

21:53just the site itself, does it not?

21:58Just like water. I mean, if you're if

22:00you're polluting water on site and it's

22:02going off site,

22:04>> okay,

22:05>> you know, so how can you exclude

22:07them from being a part of of whatever is

22:10taking place? I don't understand that.

22:12>> So,

22:13>> no.

22:14>> And there's only one other thing and you

22:16know, uh, this is all a hat because you

22:18guys have gotten all of the records

22:20that, you know, you, uh, requested, but

22:23I've done some and I don't think it's,

22:26uh, I think I'm I'm doing my fiduciary

22:30responsibility is being on this

22:31commission and and looking into all of

22:34these various matters and getting

22:37whatever information I can in addition

22:39to what's being provided to us. whether

22:40it's to the public or or from legal

22:43counsel. Uh I've seen a lot of uh uh

22:47evidence out there where this thing is

22:49not, you know, a conclusive

22:53situation where uh there are

22:56circumstances where

22:59where these things apply. The only

23:02things that don't apply is contesting

23:06its use, his designation, which I don't,

23:10you know, I haven't said anything that

23:12>> yeah, as far as that's concerned.

23:15>> So, uh, you know, that's not what the

23:17Connecticut, as I mentioned, the

23:18Connecticut Supreme Court disagrees with

23:20that. I'm not sure um what what evidence

23:24uh you've looked at or

23:25>> I've gone I've gone on these sites uh

23:26that are numerous today and

23:29>> Well, you haven't tell me that look this

23:32thing is not you know cut in stone that

23:36in the majority of cases yes it's it's

23:39out of bounds but it's not conclusive

23:43>> in this case our position is it's also

23:45not appropriate

23:46>> that's your position

23:47>> that's that's and if and if you or the

23:49commission would like further guidance

23:50>> and this thing is also going to go

23:52before the connected transportation

23:54board again

23:55>> before they approve it am I correct

23:57there

23:58>> OSA yes

23:58>> yeah good all right

24:00>> that's correct and we do have our

24:01traffic engineer, but I wanted to

24:03provide that background. A traffic

24:04impact study has been submitted to the

24:06record. Um it's being reviewed by OSA.

24:09Uh Mark Fertuchi from Fuss and O'Neal is

24:11going to um as part of our presentation

24:13address um the status of the OSTA

24:16process and and again the traffic impact

24:18study has been uh submitted for

24:21uhformational purposes as part of this

24:23uh this application.

24:26Uh, Ken, could you could you comment on

24:28this back and forth?

24:31>> Well, I I prefer to defer to it because

24:33I my expectation wasn't you weren't

24:35going to be del actually deliberating

24:36it. Now, there's I think the ultimate

24:38answer I think the planner is preparing

24:40a staff memo on it. I plan to present a

24:43memo on it. Um, and I think there's

24:45truth in both things that are being

24:46bandied about. One is that there are

24:48standards in the regulations. Those have

24:50to be followed as as uh Commissioner

24:52Serenopoulos had said. That said, there

24:55is also a lot of case law that talks

24:57about what kind of off-site

24:59considerations can you take in take into

25:01account such as can you have a permitted

25:04uh by right uh permitted use, not it's

25:08not a special permit. You're not asking

25:09for a zone change or having a special

25:11kind of a zoning tool. And if the use is

25:13determined has been allowed, there's

25:16case law that would say that a

25:17commission can't say, well, you're

25:19creating too much traffic. You're going

25:20to adversely impact the neighborhood.

25:22That's the conclusive presumption that

25:24basically when a use is determined,

25:27somebody wants to build a single family

25:28home in a single family residential

25:30neighborhood, someone can't say that

25:31that home is going to have an adverse

25:33impact on the environmental on the

25:35neighborhood. Uh that there's case law

25:37on that, but I expected I'll I'll flesh

25:39that out in more detail in a in a memo

25:40to be presented to the commission um

25:42before it actually deliberates.

25:44>> Okay. I'm sorry.

25:47>> No, thank you. Um, so with that, I'd

25:50like to now ask Tim Anduro from Lang to

25:53come up and uh start our presentation.

25:59[clears throat]

26:06[clears throat]

26:10Okay.

26:12Good evening to Manduro, professional

26:14engineer with Langan. Uh what we have up

26:17on the screen is a a rendered site plan

26:19showing uh aerial uh imagery with

26:23surrounds to to give you some

26:24perspective of where we sit in terms of

26:27building parking and truck court. Uh

26:30north in this case is to the left of the

26:32image. So we are turned [clears throat]

26:3490 degrees from the cardinal direction

26:36and I 395 goes across the bottom of the

26:39page Westcot Road uh up and down on the

26:42very extreme right hand side. proposed

26:45building is 1.23 million square feet. It

26:48has 31 uh dock spaces for parking at the

26:52back of the building and has 58 dock

26:55doors, so rollup doors that allow

26:57tractor trailers to park at the

26:58building. Uh we have parking spaces on

27:01the east and north side of the building

27:04for 370 trailers and the front parking

27:07field uh which in this case would be on

27:10the west side of the building provides

27:12parking for 729 vehicles uh and per the

27:16zoning regulations uh 616 are required.

27:19So we have a surplus of spaces to meet

27:21the operational needs of the facility.

27:26Uh

27:27>> so 729 vehicles is all that

27:30>> that is

27:31>> passenger cars or combination.

27:34>> Uh it is passenger cars I believe ADA

27:37spaces and I think eight motorcycle

27:39parking spaces. So

27:41>> not the trucks.

27:41>> Not the trucks.

27:42>> Okay.

27:43>> That is just uh vehicles for passengers

27:46and and employees. And uh what we have

27:49up on the image here is the parcel map.

27:52and Attorney Seammons spoke to this a

27:55little bit. Uh what we've got in yellow

27:58is the existing hunt club. Uh that land

28:02uh totals about uh 215 acres or so. Uh

28:08of that existing 215 acres, uh somewhere

28:11between 95 and 100 acres is kind of

28:14currently actively cleared, managed, and

28:17used by the hunt club. that those yellow

28:20parcels uh would be conveyed to the town

28:23uh to use as open space and the hunt

28:25club activity would cease on that land.

28:28The blue parcels uh the blue blue area

28:31is uh the proposed development area

28:34which has uh about 340 acres. 76 of uh

28:41the eastern acres would be protected uh

28:44in a conservation easement and of the

28:47remaining land about a less than a third

28:50would be used for the proposed

28:52development program. So uh 215 acres in

28:56yellow 340 in blue totaling um uh just

29:02over 500 acres. Next slide.

29:05Now, if we kind of merge the two, uh,

29:08yellow again is the the hunting preserve

29:12or hunt club, you can see their cleared

29:15land and and active activity uh, within

29:18the yellow boundary and the blue

29:20boundary is the development parcel. The

29:23orange is the area proposed on site uh,

29:27for conservation easement. So, that's

29:29the 76 acres. The uh pink or magenta is

29:33the proposed building footprint, parking

29:36area, truck court, and the uh call aqua

29:40color is the limit of disturbance that

29:43it takes to construct the facility um

29:46from start to finish. So uh that that

29:49aqua area is uh under 100 acres uh

29:53whereas the the blue is somewhere around

29:56340 if that gives you a sense of scale.

29:59Next slide.

30:02Uh again, similar to what we talked

30:05about when the uh color rendering was

30:07up, yellow is the parking lot for

30:10associates and employees. Red is areas

30:14for tractor trailers and loading

30:17operations at the backside or east side

30:19of the building. And uh the site shares

30:23a common driveway, but as soon as we uh

30:26make it a good distance in, we try to

30:28separate passenger cars and uh trucks as

30:32soon as possible. And on the right hand

30:36side of the image is the main uh guard

30:39shack or truck court that uh processes

30:42the tractor trailers to enter the back

30:44of the facility, head to the loading

30:46docks, and pick up trailers to leave.

30:48Um, and the the yellow parking field is

30:51kind of symmetrically split uh off of

30:54the main entrance, which is that bump

30:56out in the bottom center of the building

30:59itself.

31:04Uh, one thing that, and if you've had a

31:06chance to, um, read some of the, uh,

31:09correspondence we've had with your third

31:11party peer review is making sure that we

31:13had accommodations for snow storage and

31:16kind of how snow is managed on a site

31:18like this. Uh, we've identified areas in

31:21the purple hatch here. Apologize, it's a

31:23little hard to see on the the screen,

31:25but the hatch areas identify areas

31:27specifically uh left as open space uh so

31:31that in winter months snow could be

31:33stored there. Uh totals somewhere around

31:36uh 7 to 8% of the total impervious uh

31:40parking area on site. Um and we have uh

31:44are continuing the dialogue uh with your

31:46peer reviewer on identifying additional

31:48areas that may be used um that are uh

31:52underparked or or underused by trailers

31:55if additional on-site storage was

31:56needed. Um and then at some point uh

31:59until you have a large enough snowfall,

32:01the snow removal contractor actually

32:02would remove snow from the site. um as

32:05is common in most commercial plazas as

32:08as you reach a a level of snow storage

32:10that exceeds the on-site storage. So um

32:13that those areas are noted on the site

32:15plan and uh there is correspondence with

32:17your peer reviewer uh on the topic.

32:20>> So do you have any way of pointing from

32:22your student? [clears throat]

32:27>> Probably not. Oh, there you go. So um

32:30you want to point to the the purple that

32:32purple that you see. So, there's three

32:34areas kind of uh right there on either

32:37side. And then at the northern end of

32:39the employee parking lot, there's an

32:42area in the um Yep. And then there's

32:45another area around the back in the

32:47trailer court. And then at the other

32:49corner of the building, um another spot,

32:53too. So, ability to move snow off of

32:56paved areas.

32:58And as we'll we'll get into um storm

33:01water management, snow that melts from

33:04those areas drains to areas that are

33:07treated by the storm water management

33:09system. Uh so all of those areas are

33:12contained by the infrastructure that

33:15protects downstream waters. So um we've

33:18got a a couple of slides on that that

33:20we'll get to in a minute. So those areas

33:21were specifically chosen um so that as

33:25the snow melts, one any debris that

33:27might be in snow is is captured and the

33:30actual runoff from the snow melting um

33:32is treated through our storm water

33:34management system.

33:39Uh we have spent some time with the fire

33:42marshall in identifying vehicle

33:46movements for uh fire apparatus on the

33:50site. Uh the fire marshall provided us

33:52with a template for the vehicle that he

33:55would like to see modeled. And um we've

33:58included this in in correspondence as

34:01well that uh the we've made sure that

34:04all of the site improvements allow the

34:07movement of the fire truck both in the

34:10areas where tractor trailer moves which

34:12I would expect would not be difficult

34:14for a firet truck relative to the scale

34:16of a tractor trailer but also in areas

34:20where we typically have passenger cars.

34:22So, the four uh bumps that you see

34:25across the front of the building are

34:27employee parking and drop off areas.

34:30We've modeled that firet truck movement

34:33to make sure that the truck can move

34:34through those areas, get approximate to

34:37um the building. Uh and we've also on

34:41this plan identified where the uh fire

34:43command center is. That's the call out

34:45in the middle of the building at the

34:46front doors. um and uh think we've we've

34:50worked closely with the fire marshall to

34:52alleviate any concerns and comments he

34:54might have on this configuration. Um and

34:58have included just just to let you know

34:59that we've had that discussion and have

35:02completed that coordination.

35:06Uh another item that and there's the uh

35:08template of the uh aerial truck that we

35:11were asked to model and and move through

35:13the site in our uh traffic modeling

35:15software. One item that we have also

35:18spent time with on the fire marshall uh

35:20was the design of the bridges that enter

35:23the property from Westcot Road. And as

35:26part of that, the fire marshall had

35:28asked for a straight median in between

35:30the inbound and outbound lanes as you

35:32enter the property from uh Westcot Road.

35:36And this is reflected in this section.

35:38And and again this has been reviewed

35:39with the fire marshall uh to provide the

35:42adequate width um for emergency access

35:49utilities. Um we have uh a number of

35:52buried [snorts] utilities. Nothing is

35:54overhead here. Power supplied by

35:56Eversource. Water um would be supplied

35:59by Connecticut Water. As part of that

36:02coordination with Connecticut Water,

36:04they would be extending a water mane up

36:06Westcot Road from the west side of 395

36:10to our site driveway. And then the water

36:12mane would be carried up uh into the

36:14property to serve the building. And uh

36:17we have two uh different types of

36:20treatment for sanitary waste from the

36:23site. We have a connection to the town

36:27sanitary sewer system uh at a level less

36:31than what is currently draining to the

36:33town sanitary sewer system via the

36:35existing homes uh at the front of the

36:38property that would be taken down. So

36:40the existing homes generate somewhere in

36:42the order of 1,600 gallons per day of

36:46sanitary waste to the municipal sewer

36:49system. And as part of the plumbing

36:52design, we have designed um components

36:56that contribute less than a,000 gallons

36:58a day to the municipal system. And that

37:02would be floor drains, uh any condensate

37:05from uh HVAC equipment as well as um

37:10essentially the mop, bucket, sink, uh

37:12for lack of terms, a scrubber bucket. uh

37:15for any floor cleaning. Any of the

37:19toilet and sink waste would go to an

37:22on-site uh septic system. To call it a

37:25septic system is a bit of an

37:27understatement. There's an on-site

37:28wastewater treatment facility that

37:31polishes and renovates the water and

37:33then uh discharges that water to a

37:35leeching field. That system because of

37:37its size is administered by Connecticut

37:40DP. uh and we are working through kind

37:43of technical comments with them uh as

37:46part of that review. Uh that process

37:50similar to OSA is lengthy and technical

37:54um but continues on uh as we uh develop

37:58the project.

38:02We have included as part of the site

38:04plan submission a lighting plan. This is

38:07a phototric plan to show uh zero light

38:11spill at property lines. And um we do

38:15have uh I think one or two comments in

38:17the staff technical report um

38:20specifically about uh showing compliance

38:23to uh dark sky standards as well as the

38:27lights for the flag pole. Uh some towns

38:32have an exemption for uplighting with

38:34flag poles. does not appear that

38:37Killingly does. So, we have to flip our

38:39light to light the flag uh from the top.

38:42So, um a technical comment that if you

38:44had a chance to read the staff report,

38:46we'll be working through. Um but, uh

38:48otherwise, a phototric plan includes

38:50foot handle measurements as well as the

38:52cut sheet of the fixtures proposed on

38:54site.

38:58Moving on to storm water management. Uh

39:01we have a number of components that make

39:04up the storm water management system. We

39:06have pipes in light blue that move water

39:09from uh parking area and truck court as

39:13well as the roof. We have uh those kind

39:16of dark blue circles are hydrodnamic

39:18separators or kind of the first line of

39:20defense. Those systems swirl the water

39:24to remove floatable material. They also

39:27help to settle uh larger particulate and

39:31sediment. From those we then move the

39:34water into underground detention

39:36systems. These systems capture the water

39:39from the roof and parking and allow us

39:42to meter its discharge so that we can

39:45control how much water leaves the pipes

39:47at the end of these systems to mimic

39:49existing conditions from before uh the

39:52project is constructed. On the outside

39:55or the downstream side of those

39:58attention systems, we have a media

39:59filter system. Their brand name is

40:01called Jellyfish. Um, we've spent some

40:04time um talking about those and there's

40:08technical review by your third party

40:10peer reviewer on the topic. And then

40:13ultimately move uh the water after it's

40:16been filtered to level spreaders where

40:19we allow it to infiltrate and spread to

40:22lower its velocity and uh place it back

40:26mimicking the existing uh flow paths

40:29that um the water takes today on site uh

40:33as it heads down the hill uh mostly from

40:37uh east to west.

40:41So what do those components look like?

40:43They they move in a train. Uh we the

40:46first stop is a catch basin which

40:49probably familiar with. Uh those catch

40:51basins have a sump at the bottom that

40:54allows it to capture some of the biggest

40:55material. Uh the hydrodnamic separator

40:58is the image in the top middle. That's

41:01the swirl chamber that helps to make

41:03material float to the top and make

41:05sediment sink to the bottom. The uh

41:08upper right hand image is what the

41:10underground attention system looks like.

41:12They're concrete cubes that allow water

41:14to come in, be stored, and then metered

41:16on the discharge out. And the image in

41:19the bottom middle is the jellyfish

41:21filter. So this is truly a filter media

41:25that filters the water before it's uh

41:27discharged. And then the last step in

41:30the train there is level spreader uh

41:32where you see in the lower right hand

41:34corner uh large rip wrap stone and curb

41:37to slow the velocity of water allow it

41:40to infiltrate and move down uh

41:42downstream on site.

41:46Uh in addition to the the fact that

41:49those components all exist, there is

41:51ongoing post construction operations and

41:54maintenance. we've included in our storm

41:57water report and operations and

41:58maintenance manual. Um that's been

42:00amended as part of the discussion with

42:02your peer reviewer. Um but it talks

42:05about what components exist on site. So

42:07if you were to show up 3 years after the

42:10site is built, you would know where to

42:11look, what to look for, what the

42:13components are, how you maintain them,

42:16what are you looking for in terms of

42:17sediment buildup, what requires action.

42:20Uh and uh here we've included kind of a

42:22sample of one of the the maintenance

42:24checklist. Uh but a full uh

42:26post-operation storm water and

42:28maintenance uh manuals in the um storm

42:32water report. Uh and due to the size of

42:35the site with more than five acres of

42:37imperous coverage, we would be required

42:39to apply for a commercial general permit

42:42with Connecticut DP where they have kind

42:45of oversight authority on uh larger

42:48parcels and can uh ensure that the the

42:51ongoing operations and maintenance are

42:53are being conducted.

42:56Uh as part of the submission, we

42:59included phase soil erosion and sediment

43:02control plans. Uh in addition to the

43:05fact that we prepare plans uh as part of

43:08the municipal submission, we also must

43:10apply to Connecticut deep for a

43:13construction general permit. Uh that

43:16permit uh essentially regulates storm

43:20water during construction.

43:22uh because of the size of our site, we

43:25would uh require third-party review of

43:28any materials that we submit as part of

43:30that uh application prior to

43:32construction. And that third party is

43:34completely independent of the current

43:36design team. We wouldn't be able to use

43:38time bond who reviewed it as uh part of

43:41your work. So an independent third party

43:43would review our plans including the

43:45soil erosion and sediment control plans,

43:47any inspection and monitoring

43:49requirements and they have to provide a

43:51third party sign off to Connecticut deep

43:54before we could issue be issued the

43:56permit to commence on-site struct

43:58on-site construction uh and disturb

44:00soil. And um

44:04while the the work is ongoing, that

44:07permit requires weekly or better uh

44:10inspection. And if I think if you go to

44:12the next slide, Dustin, uh something

44:15like this where we prepare a compliance

44:17report, we walk the site, we take

44:20photos, we look at items of where work

44:23may be moving, we will look at where

44:25work has been completed. uh if we notice

44:28that a portion of silt fence was damaged

44:31that would be noted for repair and we

44:33also come back at the ne next inspection

44:36to ensure that the items that were noted

44:38for action and remediation previously

44:40had been completed. So um these reports

44:44live on site in the trailer Connecticut

44:46deep could uh complete an inspection at

44:49any time. Uh and uh you this is just a

44:52sample of one to show you what that

44:54regular uh ongoing observation looks

44:57like while the the site is under

44:58construction.

45:23Good evening. Um, good to see everybody

45:26again. So, uh, we don't have any new

45:28material tonight, so hopefully we can

45:30>> continue to for the record introduce

45:32yourselves.

45:32>> Yes, my name is Andy Dufour. I'm with

45:34Meling and Blasting.

45:35>> Dave Alvi, Manger Blasting,

45:37>> and we'll jump right into it.

45:39[clears throat] Uh, this first slide

45:40here, uh, is what we call a rock cut

45:42map. Um, as you can see the the areas in

45:46red are where the construction is.

45:48That's where we anticipate a rock

45:50removal to be required by explosive

45:52methods. Um, that area there, the darker

45:55the red, um, the deeper the rock cut,

45:57the lighter the red. Um, so it's some

46:00people call it a heat cut map, but

46:01that's generated by analyzing

46:03geotechnical reports and we compare

46:05those against uh, the design plan and

46:08um, that's how we do our quantity

46:09takeoffs. Uh so we then overlay that

46:12onto this aerial photo here so we can

46:14compare it to the closest structures um

46:17which you can see on there. Uh there's

46:19two lines um shown on this map. Uh the

46:23first one's in red. That is a 250 foot

46:27offset to the closest bore hole where

46:29rock removal will be required. Um what

46:32that line is is uh it's a code line. So,

46:36for us to pull a permit, we have to

46:38prove that we've done pre blast

46:40inspections of any existing structures

46:42within that um zone. Uh the orange line

46:46is what this project specific

46:48requirement is for us to do. That's a

46:501500 ft line. Um so, you know, 250 into

46:54to 1500, right? That's six. So, I don't

46:56know if that's six times um the amount,

46:59but that's what's going to be required

47:00for us to to go out and do our work

47:02before we pull our permit. Um so just

47:05wanted to point that out here but uh how

47:07um far beyond the regulation we have to

47:09do for pre-blast surveys.

47:13Next slide. Uh so this slide here is um

47:16a slide we presented before because we

47:19wanted to show uh the environmental

47:21impact or address the environmental

47:23impact. Um so like we said before we

47:26didn't want to come up here and tell you

47:27what we can and can't do, right? but

47:29show you what we have done and where um

47:32rock fragmentation by explosives

47:34methods, you know, can be used safely

47:35because it's used uh quite frequently.

47:38But this was a um a job in Abington

47:40where they had to expand their their

47:43reservoir. Um so the scope here was more

47:45than 900,000 lbs of explosives were

47:48used. Uh and blasting took place below

47:51the water table, you know, directly

47:52directly adjacent to the actively used

47:55existing reservoir. Um, so that top

47:58picture in the uh in the photo split

48:00there, you can see the the existing

48:02reservoir right there with the active

48:05blasting going on in that light brown

48:07area while that reservoir was in

48:10existence. Um, and then the the photo

48:12below is is current day. So that

48:15reservoir was expanded um by the use of

48:17blasting.

48:19>> Excuse me. Can you explain if that's

48:21Abington Mass? Abington.

48:22>> It's Abington Mass. It's Abington Mass.

48:24Yes.

48:28>> [clears throat]

48:29>> Um, in blasting, we are obviously

48:31heavily regulated by federal, state, and

48:33local authorities. If you look on the

48:35right, that is a sample blast report

48:36that actually came from a project we did

48:38in Killingly earlier this year. Um, we

48:40did get a permit from the fire marshall.

48:43This project was different than the one

48:45we are currently looking at. Um, this

48:47was in a neighborhood in close proximity

48:48to houses and obviously school, trails,

48:50and the rest of it. Safety is our

48:53priority. Um and we will comply with any

48:56and all regulations.

49:01This is a seismma graph. So this is our

49:04report card. This will measure ground

49:06response as well as uh air over

49:08pressure. These will be set up all along

49:10the project. Um they record actual

49:13events. Um and they are used throughout.

49:16They'll be surrounding the project

49:17probably on all four corners.

49:22And again, this is a notification we um

49:24offer to anyone. Um so there is a phone

49:27number up there you can call if you

49:28would like to be on the call list and

49:31that will be at one hour before each

49:32blast.

49:37>> Thank you.

49:38>> Thank you.

49:39>> So quick question for you. Please step

49:40away, please.

49:41>> You mentioned the geotech report. What

49:43geotech report did you review?

49:46>> Um we've got that actually from the

49:48customer. So it's basically a boring

49:49log.

49:50>> I'm sorry. It's what

49:51>> basically a boring log. Well, they'll

49:52actually go do borings pits.

49:54>> I don't I don't recall that in the

49:56record seeing any geotech report with

49:57boring logs.

49:58>> Um I can double check. My engineer put

50:00that together for me, but I can get you

50:02that information if you like.

50:02>> And what's the maximum depth of your

50:04blasting?

50:05>> Sorry, not blasting but rock cut.

50:06>> Sure. It's approximately 40 ft give or

50:08take. They're off a little bit. Um once

50:11it's stripped, we'll have a much better

50:12idea.

50:13>> And how much under blast are you doing

50:14below the below the finish grade?

50:16>> Uh varies. Um minimal sub drill in the

50:19building footprint. Um, we'll actually

50:21do test drilling with that. So, we'll

50:23excavate after a test blast to make sure

50:24that we achieve the grade we wanted. Um,

50:26but we do want to basically just go

50:28about a foot to two feet under the

50:30building footprint.

50:31>> Okay. And what was that blast line that

50:32was on the um western side below the uh

50:35retaining wall?

50:36>> That's So, if you're looking at the red,

50:39that's the 250, which is code.

50:40>> No, no, no. The a little bit of blasting

50:42occurring there.

50:44>> Oh, that's just uh for retaining walls

50:45or fill walls, I believe.

50:47>> Okay.

50:48you know material that has to lay back.

50:50>> Yeah, that's fill in the wall.

50:52>> Those are shallow cuts down there.

50:55>> If you kind of look at the top, you can

50:56see those dark reds as Andy spoke to.

50:58And that's that's where the majority of

50:59the rock is.

51:01>> And how many how many private or public

51:03wells are inside your 1600 foot radius,

51:06you said?

51:07>> Yes, that I don't have.

51:13>> Should that be in your blasting plan?

51:15Uh, we would get with Randy on that, but

51:16for us to get private wells, I don't I

51:18don't know if that information is

51:20readily available to us.

51:22>> Do we know how many residents are in

51:23that side zone?

51:24>> Uh, I believe there's eight total.

51:32>> Okay, thank you.

51:35>> Dustin Curran, Ryan Company's director

51:37of real estate development. Uh maybe you

51:39can clarify too just on the 1500 ft

51:41radius that that is a voluntary

51:43extension beyond the code required. So

51:46we're doing that voluntarily outside of

51:48the code uh to expand on our monitoring

51:52um of the site. So it's beyond code

51:55undership. There's also some deep

51:57guidance out there too that you didn't

51:59mention at all here that we talked about

52:00I believe at one point in time. Some can

52:02get deep guidance on blasting

52:06>> from the state itself.

52:07>> Yeah. Uh yeah, we would follow all

52:09regulations with the state.

52:10>> Sorry, it's a guidance memo on blasting

52:11and effects on groundwater quality.

52:14>> So actually I'm glad Andy brought that

52:15up. So if you look at the IME which is

52:18on the Abington slide, that's best

52:20practices and that's how we do not

52:23contaminate any type of water with

52:24nitrates.

52:28That's not our standard. That's theirs.

52:34and uh Commissioner Card Timurko with

52:37Lang and um I had I had I believe before

52:40the uh the main drilling folks were here

52:43I had provided the uh the quotes from

52:45the deep guidance. We'll find those and

52:47and provide them. Off the top of my head

52:49I believe the range is somewhere in the

52:525 to 600 foot is the the offset at the

52:55maximum extent from deep guidance on uh

52:59on testing. So, it's larger than, I

53:01believe, the code requirement for the

53:02250 ft, but well below the the 1500

53:06proposed there. But I I'll I'll clarify

53:07that.

53:08>> Yeah. And I'm more concerned. I'd like

53:09to see whatever geotech information

53:10they've um based their drilling on. Um

53:13that's been one of my comments for a

53:14while now, especially it relates to the

53:16gravel rules. So, um we have not seen a

53:19full geotech analysis in my as far as I

53:21know in the record. Any

53:28other questions?

53:30>> Thank you.

53:30>> Thank you very much.

53:39>> Good evening everybody. Juan Bernui with

53:42McGregor.

53:44The proposed LZD1 facility is a modern

53:48industrial and logistic development

53:50designed to support distribution

53:52operations to the efficient side

53:55circulation

53:57trailer storage employee parking support

53:59infrastructure.

54:00The project includes a board warehouse

54:03building along with a main office

54:06component that incorporate employees

54:08amenities

54:10training facilities and administration

54:12functions.

54:14The building consists on 1,186

54:18984 square footage warehouse facility

54:21with a building footprint measure around

54:2364 ft by 1,848 ft. The facilities

54:28include a second level mezzanine with

54:31approximately 1,35,270

54:35square footage, 36,000 square uh foot

54:40main office bamount and three ancillary

54:42buildings uh two uh guard houses and one

54:47pal fire pump house. Uh the building

54:50height is 50 feet that is in compliant

54:52with the current code. Um the building

54:56is designed

54:58utilizing low bearing insulated pre-cast

55:01uh concrete wall panels with interior

55:03structural steel framing system. The

55:06roof structure is of steel bar joist and

55:09joist griders. Also the build the

55:12facility will be fully heated and

55:14conditioned to maintain

55:18interior temperatures and also will be

55:21include fire protection system uh that

55:24it will be discussed later um for

55:27security

55:29sustainability was a key consideration

55:30for this building. to the design. The

55:33project incorporates low carbon concrete

55:36f foot foundations footing and slab and

55:39gr construction with a targeted of 8%

55:42reduction in involved carbon along with

55:45low carbon structure steel targeting an

55:47additional 10% reduction. Building

55:50systems are fully electric including

55:52HBAC system to support to reduce the

55:54operational emission of the building.

55:57Water conservation is achieved through

56:00the use of lowflow domestic plumbing

56:02fixtures while energy efficient is

56:05encased to the high efficiency LED

56:07lighting through the interior and

56:09exterior of the facility. Coupling

56:12daylight harvesting control to reduce

56:14lighting demand when natural day is

56:17available. The project also supports

56:19transportation certification by

56:21providing EV charging infrastructure

56:23within the trunking core. During the

56:26construction, a comprehensive waste

56:28manage program will be divert 80% of the

56:30construction waste from landfills

56:32furthering reducing the products

56:34environment impact and supporting

56:36sustainable building practices.

56:41Any questions?

56:47Thank you.

56:49Um Durko, professional engineer with

56:52Langan. Uh also included uh in the plan

56:56set is a planting plan that identifies

56:58on-site plantings uh as well as

57:00restoration to areas that are disturbed

57:02outside of the the truck or associate

57:06parking area. Um plant size and species

57:09are uh included in the plan set to to

57:12show what they are. Um this is a a mix

57:15of uh native vegetation with a a good

57:19diversity of species. So we don't have a

57:21monoculture on site uh including trees

57:23and bushes and shrubs.

57:28>> Do you want me to talk about signage

57:30here? Sure. U uh on the site plan we

57:33identify at the site entrance to uh the

57:36property from Westcot Road that there

57:38would be a monument sign. Uh specifics

57:42are included in in the plan set. Uh hard

57:44to read of the dimensions up there. I

57:47don't know if you can see them on your

57:48screen, Dustin. Looks like 12 feet wide

57:49and

57:51eight and 8t tall. Thank you.

57:56>> You got a location for this sign more

57:59specific?

58:00>> Yes.

58:02I don't know if you want to

58:05try and point to it. So, uh, call it,

58:08uh, adjacent to the D off of WCOT. So,

58:11it's right on the side of the driveway.

58:13Yes, thank you. Yeah, it would be right

58:15at the side of the entrance drive on

58:17West. Do

58:18>> you have a detail on in the drawings of

58:20exactly where it's going to be located?

58:21>> Yes, the site plan does show exactly

58:23where the sign is located.

58:24>> The lighting.

58:25>> Yes.

58:26>> For it as well.

58:27>> Yep.

58:29>> And was that the actual sign that's

58:31going to be used?

58:32>> Yes.

58:32>> So, there's going to be labeled

58:33fulfillment center. Well, the the box uh

58:37the box to the left would have the uh

58:39the Amazon name next to the fulfillment.

58:41>> I'm more worried about the word

58:42fulfillment. It will have fulfillment

58:44there.

58:46>> I don't know the exact wording that

58:48would be on the sign, but we'll get it

58:50for you.

58:51>> Thank you.

58:56Uh as part of the prior application, we

58:59spent some time uh looking at sight

59:01lines and cross-sections from

59:03surrounding roads and properties to the

59:06building itself. Uh we prepared six

59:09crosssections

59:10labeled A through F here. Um and we'll

59:15start at the top with A taking you from

59:19Mockingbird Lane. This is on the north

59:21side of the site to um to the proposed

59:25building recognizing that the dimensions

59:28are very small at this scale but from

59:31the building uh which is the Amazon on

59:35the right hand side to the nearest home

59:37uh on mockingb bird is 3,280

59:40ft and as you can see the existing

59:43topography is represented there as well

59:45as the existing um trees and vegetation.

59:49So the building would not be visible

59:51from the north.

59:53>> So that section of the building is that

59:55the rooftop we're looking at

59:57>> that that is that section. Yep. That

1:00:00little guy at the the right hand side

1:00:02that is cutting through the the building

1:00:05profile. So that is a 50 foot tall

1:00:08building uh on site. The grades you can

1:00:12see there's a call out for truck court

1:00:14immediately to the left of the building.

1:00:17you then uh enter um undisturbed land.

1:00:22You would actually cross through a

1:00:23function of uh somewhat yeah right

1:00:26around there you're in the um the the

1:00:29hunting preserve uh some of their

1:00:32clearing and then eventually you you

1:00:34head to uh the private property on the

1:00:36left hand side. So over 3,000 ft of

1:00:39separation between uh building to

1:00:42building.

1:00:46uh similarly prepared a section. This is

1:00:49kind of heading diagonally in the

1:00:51northeast direction uh to Cook Hill

1:00:54Road. Uh again, you've got a separation

1:00:58distance of 2,692

1:01:01ft building to building. And uh because

1:01:05of the cuts that we have along the

1:01:08eastern side of the building, you can

1:01:09actually see that the building sits down

1:01:12relative to existing grade uh and is

1:01:14blocked by topography and existing

1:01:17vegetation as you run along that entire

1:01:19section. Portions of that today are

1:01:22actively cleared and managed by the hunt

1:01:24club. And uh that clearing and activity

1:01:27would stop once the um the hunting club

1:01:30was closed. And just on these

1:01:32cross-sections, what's the source of

1:01:34your uh vegetation elevation?

1:01:37>> Uh a typical ochre maple, I think, at 50

1:01:40to 60 feet.

1:01:42>> So, are those scaling at 60 ft or or or

1:01:46taller in uh in some cases? So, they're

1:01:50mature growth trees uh between

1:01:53properties

1:01:54>> and that's representative of what's out

1:01:56there.

1:01:56>> Yes.

1:02:00So between B and C,

1:02:04right in the middle, you you pick that

1:02:06area to go to B

1:02:08>> and but right in the middle.

1:02:09>> Yeah.

1:02:10>> Perpendicular. Correct.

1:02:11>> Yeah.

1:02:12>> So about how far is that road from the

1:02:14building?

1:02:16>> Uh farther than 2,692

1:02:20ft.

1:02:21>> So it's further out.

1:02:22>> Yeah. We we went to closest points which

1:02:24were on the corner. The distance spreads

1:02:27farther. Um, and that's that is markover

1:02:30preserve land uh from there uh there to

1:02:34the east.

1:02:34>> So the residences on in the section that

1:02:37I'm talking about would be further out

1:02:39than in

1:02:40>> we we we yes we picked these sections to

1:02:43find closest homes. So uh I think when

1:02:45we first started our presentations early

1:02:48in the year um we didn't have a section

1:02:50going to A. We added A. Um we had left

1:02:53it off because it was closer but or it

1:02:56was further away. um but have now kind

1:02:58of hit the spiral around. If there was a

1:03:01desire for us to cut another one, more

1:03:02than happy to do that. Um but think we

1:03:05kind of representatively kind of swung

1:03:07the pendulum around in all directions.

1:03:10Uh C is uh to mash and tuck. Uh this

1:03:15distance is uh 1,943

1:03:18ft. And here you've got again existing

1:03:21vegetation. you have um

1:03:25uh quite a bit of topography change too

1:03:27that u prevents sight lines between

1:03:30structure to the proposed building. We

1:03:34then go to Wescott. Uh this is this is a

1:03:37long run kind of mimicking the length of

1:03:40the driveway. And here we've got uh

1:03:432,920 ft from the building out to the

1:03:48property. And this property is actually

1:03:49on the far side of WCOT Road in that um

1:03:53the homes on the north side of WCOT Road

1:03:57uh are part of the application property.

1:03:59So uh you can see the property line in

1:04:01red there on the lefth hand side. You'd

1:04:03have then crosscott and then uh get to

1:04:05that far structure. And then uh our last

1:04:08section, our second to last section is

1:04:11E2. And this crosses from uh the western

1:04:17side of the site across the 395 corridor

1:04:21to the homes uh on the on the far side

1:04:24of 395. And that distance is 1,650

1:04:28ft. Uh and through vegetation uh

1:04:32specifically the vegetation on the uh

1:04:35west side of 395, the the building and

1:04:38site improvements would not be visible.

1:04:40Um, this is also an area where we can

1:04:42point Dustin, um, on the top of the

1:04:46retaining wall on our site. Uh, uh,

1:04:49Commissioner Thurlo, I believe you, we

1:04:51had spent some time as part of the prior

1:04:52application talking about, uh, the

1:04:55desire for triple row screening that's

1:04:57included here, a mix of species so that

1:05:01we have both, um, quick growth as well

1:05:04as long-term visual and audio

1:05:07protection. Uh so using a mix of furs

1:05:10and spruces. We know furs grow quick but

1:05:13then they become limmy down below. So

1:05:15we've uh chosen a mix of trees with

1:05:18heights uh varying from 6 feet to 14 ft

1:05:21at planting. So you get a full spread uh

1:05:23in multiple rows as well as the fence

1:05:25that exists behind the retaining wall.

1:05:27So um that continues to be carried

1:05:29through as part of this application

1:05:31after our discussion um at length about

1:05:33that as part of the prior application.

1:05:35and that those trees are reflected um

1:05:38with heights and species on the

1:05:39landscape plan.

1:05:42And then um the the last section we have

1:05:45here is from the intersection of WCot

1:05:47and Mash and Tuck uh through the the

1:05:50southern side of the property showing uh

1:05:53a separation distance of 3,170

1:05:58ft from uh the nearest home uh at that

1:06:02intersection.

1:06:16Hello. Uh my name is Chris Summers. I'm

1:06:17a fire protection engineer with HGI.

1:06:21[clears throat]

1:06:22Excuse me. Uh this building is going to

1:06:25be protected uh complete with a fully

1:06:27automatic uh sprinkler system that's

1:06:30been designed uh based on a

1:06:32performance-based design specific to the

1:06:35um commodity and storage arrangement

1:06:38with the ASRS system in this building.

1:06:41Um there are also going to be two

1:06:43independently um sourced and powered

1:06:46diesel fire pumps. one on the um

1:06:52northeast corner of the of the site and

1:06:54also on the southeast corner of the

1:06:56site. This provides 100% fire flow for 4

1:06:58hours which is uh double the code

1:07:01required uh for this building. Um and

1:07:05also for uh an S1 building um there's

1:07:08minimal fire fire audio and visual

1:07:11alarms. This building has a complete

1:07:13NFPA72

1:07:14uh fire uh fire alarm system which uh is

1:07:18above and beyond the code minimum. Uh

1:07:20the performance base design um which is

1:07:23based on fullscale fire testing in

1:07:24Uwell's labs in North Brook, Illinois.

1:07:27Um that design report has been submitted

1:07:31and approved by the Connecticut State

1:07:33Fire Marshall. Um and that

1:07:36correspondence has has gone to the fire

1:07:38marshal uh Killingly Fire Marshall as

1:07:40well.

1:07:43So the building uh utilizes uh what

1:07:46essentially looks like a Roomba. It's a

1:07:48uh automated storage and retrieval

1:07:51system with uh thousands of robots

1:07:55working throughout the robotic storage

1:07:56field. Uh these robots are um have

1:08:00battery management systems that uh

1:08:02maintain the health of the and of the

1:08:05unit itself. There are no lithium ion

1:08:08storage on site for this facility. Any

1:08:11problem for this uh robot would be

1:08:14handled offsite uh triggered by that BMS

1:08:17system. Um

1:08:20Amazon utilizes those throughout their

1:08:22all their facilities across the the

1:08:24United States and and the world.

1:08:27Um like I said before, this uh

1:08:29performancebased design um it's it's

1:08:31based on full scale fire testing. I was

1:08:33just there this week in Chicago myself

1:08:35doing full-scale fire testing. Uh,

1:08:40basically what it is is it it it we we

1:08:43light this stuff on fire in the in a

1:08:45worst case scenario against the exact

1:08:47same sprinkler system that's going to be

1:08:49putting the the fire out. Um, minimally

1:08:52code requires you contain a fire. Uh, we

1:08:54we get it down to suppression. Okay. So,

1:08:57if a fire starts within two minutes,

1:08:59it's suppressed. And that's the same for

1:09:01this type of facility as well.

1:09:03Um there's also another code uh path

1:09:06that we use for the uh performance

1:09:08performance-based design and that is uh

1:09:10egress. Uh we use uh computer modeling

1:09:13to make sure that there is full egress

1:09:16uh within a within a uh 20-minute period

1:09:19which is well within the uh the

1:09:22parameters of this building as well.

1:09:25>> Any questions?

1:09:28>> What kind of batteries do you use? You

1:09:30say that you don't use lithium ion.

1:09:32>> No, there's no lithium ion storage. I

1:09:34said in this in this facility that the

1:09:36batteries do use lithium ion in within

1:09:38the

1:09:38>> So you they are being used then. You

1:09:41just don't store them there. Is that it?

1:09:43>> That's correct. There's no storage.

1:09:44>> Okay.

1:09:49>> Where are they charged?

1:09:50>> The charged self-contained the the

1:09:53batteries are self-contained within the

1:09:54units and they're they're charged

1:09:56similar to the how you would charge a

1:09:58computer. They're uh they have uh

1:10:00charging stations throughout the uh

1:10:01spread throughout the facility.

1:10:03>> Have you considered making a charging

1:10:06room?

1:10:07>> That has not been a consideration.

1:10:10>> Could it be?

1:10:12>> I don't know that I could answer that.

1:10:13That that would be an operational uh

1:10:15Amazon question for sure.

1:10:18I like that to be brought up that if all

1:10:22the battery if you're charging in one

1:10:24area and you can segregate that room if

1:10:27something happens to the battery you're

1:10:29not all over the place.

1:10:32>> I would argue that that would create a

1:10:35storage type situation which would be a

1:10:37beyond what we're doing. Uh by

1:10:40scattering it throughout you're you're

1:10:41limiting the uh the load to that

1:10:46to your concern. So,

1:10:47>> right, but if you got a fire,

1:10:50if you got a segregated room and you can

1:10:52segregate it, shut it off from, you

1:10:55know, stop the oxygen, it'll kill the

1:10:56fire.

1:11:00>> I I guess I disagree with you.

1:11:04>> Okay. Just something I wish somebody

1:11:06would look at. And do you have will then

1:11:10that's operation and that's uh

1:11:12guidelines as far as accountability. If

1:11:15there is a fire

1:11:18you need to accountability for the

1:11:21personnel inside.

1:11:24>> Yeah, I agree completely. My my whole

1:11:26design is based on accountability for

1:11:28fire safety. That's what we want.

1:11:30>> Okay.

1:11:31>> We're going to design it. This building

1:11:33is very robustly designed. It's It's

1:11:35above and beyond any building you're

1:11:37you've been in before, I promise. So,

1:11:41>> plus the accountability for personnel,

1:11:43make sure everybody's out.

1:11:44>> Yeah. And that's that's covered with the

1:11:46uh the smoke modeling. That's an egress

1:11:48modeling um computerized software that

1:11:51that models how long it takes for an

1:11:54individual to to get from where they

1:11:56need to be or from where they are to

1:11:58where they need to be. And that even

1:11:59includes the storage fields which don't

1:12:01contain uh people. So, we've designed to

1:12:04a spot uh even beyond where the uh where

1:12:07the members will be.

1:12:10>> Okay.

1:12:10>> One followup question. You said you

1:12:12could fire out.

1:12:14>> You could put the fire out fast.

1:12:16>> Yep.

1:12:17>> I saw where a Tesla truck burnt the

1:12:20other day and the thing kept on burning.

1:12:23They couldn't put it out. How what's a

1:12:25process that you use to put out a

1:12:27lithium ion barrett?

1:12:28>> We don't store Tesla trucks.

1:12:29>> You don't what? We do not store Tesla

1:12:32trucks.

1:12:33>> I didn't uh

1:12:36>> they didn't store they don't store Tesla

1:12:38trucks.

1:12:40>> No batteries.

1:12:41>> The fire load is completely different.

1:12:42>> I'm assuming that they use lithium ion

1:12:44batteries. That's why I mentioned it.

1:12:46Correct.

1:12:47>> And that thing was on the road. It

1:12:48caught fire. Or if you had a fire in

1:12:51your warehouse with one of those

1:12:52batteries, you said that you can put it

1:12:55out in a hurry. They couldn't put that

1:12:57thing out in a hurry. How do you put it

1:12:59out in a hurry? That's my question.

1:13:01>> So, for for

1:13:04historical purposes, these uh the

1:13:06lithium-ion batteries, which are

1:13:08generally smaller than a garden tractor,

1:13:10are within the uh robotics unit. It's

1:13:14high dense plast. It's contained within

1:13:15highdense plastic and metal, which is

1:13:18limited or non-combustible materials.

1:13:20We've actually tried to light some of

1:13:23these on fire during our fire testing.

1:13:25it's we're unsuccessful even in even

1:13:27creating the combustion for that. So

1:13:29they're self-contained. If there if they

1:13:31had any issue where it may get close to

1:13:34having an issue, whether it's

1:13:35temperature, some sort of battery

1:13:36mismanagement, the battery management

1:13:38system takes, you know, shuts it down in

1:13:40place, sends an alert to one of the

1:13:42associates. The associates will take it

1:13:44take care of it in their manner. They

1:13:46send it off site to be reconditioned or

1:13:49fixed. in that regard. They have over 10

1:13:53million of these units and they have not

1:13:54had a single one light on fire.

1:13:59>> Okay.

1:14:04>> Is that it? Thanks.

1:14:15>> Good evening. Ben Muller with Ostard.

1:14:19Um so ju just for uh we're going to walk

1:14:21through the stages we did in our sound

1:14:23study. Um keep it high level but we we

1:14:27look at all these any project regardless

1:14:29of whether it's a warehouse or or any

1:14:31other type of project. But we're going

1:14:33to look at what our our code limits are.

1:14:36We're going to do acoustical modeling of

1:14:38our site sound emissions and then uh to

1:14:40compare it to those ordinances and then

1:14:42assist with development of any necessary

1:14:44mitigation in order to bring that into

1:14:45compliance. Next slide please.

1:14:48Um, we've seen several slides of the

1:14:50site and its layout uh throughout the

1:14:52evening. So, I won't belabor it. Um, but

1:14:55we're fully within the BP uh business

1:14:57park district. And I bring that up

1:14:58because we have codes that relate to the

1:15:01zone. Um, and then as we just heard with

1:15:03our sighteline discussions, all

1:15:05residences are in excess of 1500 feet

1:15:07away uh from the proposed building. Next

1:15:10slide.

1:15:12Uh, so going over our regulations. So,

1:15:14under the state, the Connecticut state

1:15:16code, which sections 22A,

1:15:19um it's going to be limited based on the

1:15:21source, the receptor use, not the zone,

1:15:24and the time of day. And it's going to

1:15:26apply at the receptor uh beyond our

1:15:29property line. For residences during the

1:15:31day, the daytime hours between 7 a.m.

1:15:34and 10 p.m. is going to be 61 dBA. dB

1:15:38being the uh abbreviation for decibel

1:15:40and A signifying the A waiting uh which

1:15:42is the common metric to evaluate

1:15:44environmental noise during the nighttime

1:15:46that limits decreased by 10 dB down to

1:15:4851 and that's to be more accommodating

1:15:51for uh the sensitivity increase during

1:15:53sleeping hours the provision the codes

1:15:56also have um flexibility or or

1:15:59discretion to allow for higher sound to

1:16:03be um emitted for short periods of time

1:16:07and that's no different than what we

1:16:09experience on a daily basis when a car

1:16:10plane passes by or a vehicle passes by

1:16:13and so the human response to sound is

1:16:16going to be more tolerable if it's in a

1:16:17short duration. Uh so just as there are

1:16:20se several different um adjustments that

1:16:23can be done. The one that would apply to

1:16:26the s to this activity on site would be

1:16:29that we can increase the sound uh limit

1:16:31by 3dB for periods of less than 15

1:16:34minutes.

1:16:35There's also u other noise ordinances

1:16:38for impulsive sounds which are are the a

1:16:40clap a sound shorter than one second. So

1:16:43that would be your coupling to coupling

1:16:45uh or other types of of of uh a short

1:16:48duration air brake release would be

1:16:50another example of on-site impulsive. I

1:16:53won't belabor that because it's done

1:16:54using a different uh metric. Um and

1:16:58we're really not at any uh have any

1:17:00issues with compliance with that. Uh

1:17:02lastly to point out that the specific

1:17:05sound emission ordinance does exclude

1:17:07motor vehicles. Those are regulated

1:17:09separately. And well when they say then

1:17:12well what does it apply to? Uh it would

1:17:14apply to all stationary noise sources.

1:17:16So that would be your HVAC and the

1:17:18Connecticut code also goes into detail

1:17:20about how that would apply to any

1:17:22unloading and loading once the truck is

1:17:24positioned in the dock and turned off.

1:17:26We move on to uh motor vehicle ordinance

1:17:29under 14-8A.

1:17:32Um here the vehicles are regulated by

1:17:36their sound emissions based on a

1:17:37distance from the vehicle and their

1:17:39speed and the type of surface they're

1:17:41on. Um when you look at that, that makes

1:17:44the noise code [clears throat] relative

1:17:47to the vehicle. And so a vehicle can

1:17:49kind of travel anywhere it's permitted

1:17:51to and still comply with that code. So,

1:17:54uh, we find that not only do modern

1:17:57vehicles fully comply with th those

1:17:58limits, uh, but they're also not useful

1:18:01in an evaluation, um, such as what we're

1:18:03trying to do, which is determine if

1:18:05there's any impacts to the surrounding

1:18:06area. Uh, just as an example here, for

1:18:09heavy trucks, the sound limit for the

1:18:10state code would be 86 at 50 ft, and

1:18:13that's for a truck going under 35 miles

1:18:15per hour. So, that's one of the more

1:18:17stringent limits, and you'll see when we

1:18:19talk about the actual on-site activity

1:18:21that they're all well below that. Next

1:18:23slide. Can you uh before you go uh can

1:18:25you can you identify what your source

1:18:27and receptor classes are that you put up

1:18:29there?

1:18:30>> Um

1:18:32class of vehicle you're saying?

1:18:34>> No. As far as the top line. So basically

1:18:36the red the limits that you provided

1:18:38right it's limit based on source and

1:18:39receptor use. Right.

1:18:40>> So would that be a class C source to a

1:18:42class A receptor?

1:18:43>> Yes. Correct.

1:18:44>> A class E source is defined as what

1:18:46>> as uh would be industrial sources

1:18:48>> and Okay. And what's a what's a class B?

1:18:50B is uh commercial and A would be

1:18:53residential or noise sensitive.

1:18:54>> Should this use be more a class B

1:18:56receptor, a class B source even though

1:18:59it's a business park and and also more

1:19:02commercial in nature versus industrial?

1:19:04>> Uh I don't I don't think so. Um when you

1:19:06have you can look at the different types

1:19:08of uses. I know industrial by definition

1:19:11is that you have to make something. Um

1:19:14however when we look at the class of the

1:19:17quantity of vehicles and the caliber of

1:19:19our modern warehouse uh professionally I

1:19:21would put it into an industrial category

1:19:24>> right but vehicles are separate. So what

1:19:25would be the limits if it was a class B

1:19:26to a class A.

1:19:28>> Um

1:19:31I don't have that on hand. Um I

1:19:35I'd have to dig it out for you. Uh

1:19:37actually hold maybe I do have it written

1:19:39down here.

1:19:56No, I don't have that uh handy, but I

1:19:58can look into that. You're you're

1:20:00implying that it would be a a a more

1:20:03stringent

1:20:05>> uh criteria.

1:20:06>> Yes,

1:20:06>> correct. Yes.

1:20:07>> Um understood. Um, but number one, I

1:20:11guess I would believe my opinion is that

1:20:14this is an industrial source. And number

1:20:17two, uh, despite there being changes in

1:20:20those criteria, uh, the the limits that

1:20:24we're talking about here, 51 at night is

1:20:27more than protective for, uh,

1:20:29residential communities. Um, we see that

1:20:31practiced in various municipalities. My

1:20:35office is based in New Jersey. Our state

1:20:37code for night is 50. Uh I I believe in

1:20:40in my opinion the class B to class A

1:20:43difference is because when you have a

1:20:46purposeful

1:20:47um commercial area, maybe your your main

1:20:50street or your you know retail uh office

1:20:53type use that are adjacent to houses

1:20:56that is more stringent because

1:20:57businesses are often used as a

1:20:59transitionary

1:21:01um zone between residences and u and

1:21:05businesses. Would you not believe that a

1:21:07business park zone is a commercial is is

1:21:09a purposeful commercial zone?

1:21:11>> No, I I don't believe so. I mean, the

1:21:13zoning regulations uh allow for all all

1:21:15kinds of things and we heard a lot of

1:21:17testimony earlier on this evening that

1:21:19warehouses are permitted use. Uh so

1:21:22business park as the modern definition

1:21:23goes has expanded to be different kinds

1:21:27of businesses.

1:21:28>> Right. But to and just going back to

1:21:29your own words so I was clear. an

1:21:31industrial class C industrial zone is

1:21:33usually defined as something a business

1:21:34that makes something correct.

1:21:36>> Yes. Per definition. Yes. In in most

1:21:39ordinances and from a noise point of

1:21:41view, uh I kind of consider I would

1:21:44consider industrial to be a

1:21:46classification of of caliber.

1:21:49>> Right. Thank you.

1:21:50>> Mhm.

1:21:52Um so moving on to the local ordinance,

1:21:54uh we have article four of the killingly

1:21:57uh code. It it uses the same limits that

1:22:00the state does uh but it's regulated by

1:22:02zone, not by use. So that would mean

1:22:04that if you had a resident in a

1:22:06non-conforming um district, then that

1:22:09the local code wouldn't provide

1:22:11protection for that receptor. Uh we have

1:22:15again the 61 uh and 51 ordinances. Uh

1:22:19similar to the state, the local

1:22:20ordinance also provides this exception

1:22:22to allow for um slight exceedences for

1:22:25short durations. Uh the local code also

1:22:28defers to the state ordinance for motor

1:22:31vehicle and there other exclusion of

1:22:34relevance here is warning devices such

1:22:36as backup alarms.

1:22:38Next slide.

1:22:41So how do we look at all of this? Right?

1:22:43We have some things that are clearly

1:22:44regulated. We have some things that are

1:22:46are not regulated or in the in the event

1:22:48of motor vehicles, they're regulated in

1:22:50a manner that is uh different compared

1:22:54to how sight sound emissions are looked

1:22:55at. So for our steady noise sources, our

1:22:58stationary, which would be our HVAC, it

1:23:00would be the loading and loading once

1:23:02trucks in a dock. Uh those are clearly

1:23:04defined per both state and local

1:23:05ordinances. And we would uh look at the

1:23:0861 and the 51 as our criteria for motor

1:23:12vehicles. where we discussed that the

1:23:14code is relevant to the vehicle. And so

1:23:16you could have a situation where it

1:23:18could be in full compliance no matter

1:23:19where it goes to. Uh so that doesn't

1:23:22help us in in comparing whether or not

1:23:24that this type of development at this

1:23:26location would pose any dramatic

1:23:28changes. Uh so what we did was we just

1:23:31adopted that state and local noise code

1:23:33ourselves as a project goal. Uh so

1:23:35realizing that it's not code-driven uh

1:23:38but rather we think it'd be uh

1:23:40appropriate to have on-site trucks

1:23:42comply with those limits as well.

1:23:46We did two different acoustical models.

1:23:48First we looked at HVAC. We looked at

1:23:50what the collection of the proposed

1:23:52system would be um on the rooftop of the

1:23:55building. Uh roughly 168 different types

1:23:58of HC units, exhaust fans, RTUs, mega

1:24:01bear units, etc. uh anywhere from five

1:24:05horsepower, sorry, five tons to 40 tons.

1:24:08So, we looked at what those specific uh

1:24:11calls are on the roof plan to model them

1:24:14appropriately. Uh sound levels, sound

1:24:16power levels uh range from 63 to 93. So,

1:24:20little guys to to big guys. When we get

1:24:23into our trucks, then for comparison,

1:24:26um maximum trucks driving around a site

1:24:29will produce levels of 74 at 50 ft. when

1:24:32we have our higher level events, which

1:24:35would be backup alarms, uh, coupling to

1:24:38decoupling, which is connecting or

1:24:39disconnecting trailers, uh, or air brake

1:24:42release, we can have maximum sound

1:24:44levels slightly higher, 79 at 50 ft. So,

1:24:47you can see already that both of those

1:24:49fully comply with the Connecticut state

1:24:51motor vehicle limits. Um, idling truck

1:24:54is going to be significantly lower in

1:24:56level. I I typically don't focus on

1:24:58idling trucks. We we are aware that

1:25:00there are are state ordinances. um

1:25:02curtailing or or per uh allowing for

1:25:05certain durations of idling and the site

1:25:08would fully comply with those from a

1:25:10noise point of view. Uh they're kind of

1:25:12a very low level uh entity. Next slide

1:25:16please. So this is we'll call it a heat

1:25:19map but this is not a temperature

1:25:21gradient but rather sound gradient. And

1:25:24so we look at the noise source um the

1:25:27strength of the HVAC noise is is

1:25:29propagated into the model. All the blue

1:25:31pluses that we see in the center are

1:25:34representative of different HVC

1:25:35equipment and we look at how that sound

1:25:38falls off with distance through roof

1:25:40edge shielding uh through affecting or

1:25:43interacting with the geometry. Uh all

1:25:46the elevation contours are included in

1:25:48the model. Uh hard to see at this

1:25:50distance but they're shown in in a teal

1:25:53uh lines on the drawing. The red line

1:25:56shows the property boundary. And then

1:25:58when we look at the color contours, the

1:26:00one that we're really most focused on is

1:26:01going to be the gray. And that is the

1:26:0450dB color contour. And so with a

1:26:07nighttime limit of of 51, uh that's what

1:26:10we're looking at. So you can see that

1:26:12with the rooftop equipment that the 50

1:26:15doesn't even spill off uh beyond the

1:26:17site property line. Uh when we look at

1:26:19our residences, which we said are over

1:26:211500 feet away, um maximum sound

1:26:23emissions of 32 to to 38 depending on on

1:26:27your uh relative distance and uh

1:26:30location to this. So no concern about

1:26:33compliance with HVAC. I know that we

1:26:36didn't include loading and unloading in

1:26:38this, but we're going to discuss that in

1:26:39the next slide if we go to there.

1:26:42[snorts] So this is the one that's of

1:26:44more interest. Um this is the the site

1:26:48fully populated with a variety of

1:26:50driving trucks as well as multiple uh

1:26:52what we'll call truck events which are

1:26:54the 79 DBA source. So your backup alarm,

1:26:57coupling to coupling, etc. And we took

1:27:00an approach here to to really throw the

1:27:03kitchen sink at this site. I know that

1:27:05we're going to hear traffic testimony

1:27:07and you're going to hear the number of

1:27:08vehicles. Uh but from an acoustical

1:27:10standpoint, because all those noise

1:27:12sources are not only mobile, right?

1:27:14they're driving and they're coming and

1:27:15going. Uh, but they're also all dynamic.

1:27:17So, in other words, when an event

1:27:19occurs, the noise is contributed and

1:27:21then it goes away, right? When the truck

1:27:24finally goes into position and turns

1:27:25off. So, what we've done here from to be

1:27:28conservative is we modeled all of these

1:27:30entities occurring at exactly the same

1:27:32time and we showed that we can fully

1:27:34comply with the nighttime noise

1:27:35ordinance for the state and local uh uh

1:27:38code limits. Um I think also what's

1:27:40important here is to show that the site

1:27:42not only has substantial distance uh but

1:27:44we also we talked about uh from the

1:27:46blasting discussion before about how to

1:27:49the northeast there's going to be a

1:27:51substantial amount of of removal. So you

1:27:53can see then how to the northeast the

1:27:56sound propagation is is is muted. Uh how

1:27:59the color contours fall off a lot

1:28:00quicker. Uh that's purely due to that

1:28:03screening and shielding that's provided

1:28:05by the cut um to the west across the

1:28:08395. You can see that that isn't kept in

1:28:11because we have the opposite where we're

1:28:13going to be a taller noise source. Uh

1:28:15but still distance attenuation prevails

1:28:18and we have no issues with uh full

1:28:20compliance uh by the time we get off of

1:28:22our property.

1:28:24Um next slide. So, just in summary,

1:28:27right, we're able to show that this

1:28:29project uh can fully comply with state

1:28:31and local ordinances. We've adopted our

1:28:34own project goals to apply to on-site

1:28:36trucks uh which I think is prudent,

1:28:38right? We wouldn't want to I would not

1:28:40take a stance that because it's exempt

1:28:42under certain ordinances uh that that

1:28:45wouldn't uh somehow potentially create a

1:28:48nuisance. Uh we've shown here though

1:28:50that it it doesn't and in fact it's

1:28:52below those limits by a wide margin. Um

1:28:55we've also showed uh to touch upon the

1:28:58loading and unloading right when we talk

1:29:00about loading unloading um activities

1:29:02are going to be levels that are lower in

1:29:06in in level than what we've shown for

1:29:08driving trucks and the coupling

1:29:10decoupling activity that was fully

1:29:12modeled. So I'm fully confident that if

1:29:14if we were able to show the level that

1:29:16level activity as being compliant that

1:29:19if we were to specifically model loading

1:29:20and unloading and include that in the

1:29:22HVC model again that we would have full

1:29:24compliance. Um

1:29:28while not included as part of the code

1:29:30because the code is absolute uh just

1:29:31pointing out that we know that we're

1:29:33along um 395. 395 has its own presence

1:29:37and so especially for the receptors that

1:29:39are closer to either welltraveled roads

1:29:42or 395 um our sound emissions will be

1:29:47are expected to be equal to or lower

1:29:48than that. uh in other words allowing

1:29:50for greater compatibility because uh

1:29:52there are other elements that exist

1:29:54currently that will be subsume our site

1:29:57sound and then the conclusion from all

1:30:00of the above is then that we're not

1:30:01going to have a negative impact uh from

1:30:04this site.

1:30:08>> Thank you. Any questions?

1:30:09>> Can [clears throat] you go back a slide,

1:30:10please?

1:30:12>> What's what's happening up on that

1:30:14eastern side where it looks like you

1:30:15have a break line?

1:30:16>> Sure. So there's a steep elevation

1:30:18change there. So what you're seeing

1:30:19there is how that ridge is providing a

1:30:22natural buffer for the the propagation

1:30:24of sound.

1:30:28>> Okay. Is there is there varying shades

1:30:31on your color map as well? Because it

1:30:33seems like your scale colors are not

1:30:35matching the colors on the on the

1:30:36drawing itself.

1:30:37>> Uh correct. Good good uh good question.

1:30:40So what we do is we've provided the the

1:30:42actual saturated color in 5dB increments

1:30:46um along the legend. However, the actual

1:30:50uh contour increments are in one

1:30:51decibel. So for example, if we just talk

1:30:54about the difference between um the gray

1:30:57and the orange which are adjacent to

1:31:00each other uh or or or peach I should

1:31:02say you then have um if gray is 50 and

1:31:07um peach is 55 then we have a 51 that

1:31:12becomes a part gray part peach right a

1:31:14transition as it goes to that. Um so the

1:31:16each contour can be counted. So when you

1:31:19find the the gray 50dB contour, you can

1:31:22count 49, 48, 47, etc. Uh by the rings

1:31:25like you would on a topographic map. Uh

1:31:27but that's the see that has been deemed

1:31:31the easiest way to kind of relay the

1:31:34complexities of what we're talking about

1:31:35here in in a nice visual package.

1:31:37>> It's actually very confusing when you're

1:31:39looking at the color map.

1:31:40>> Okay.

1:31:41>> Um is there a note you can put on there?

1:31:43Is there different scales or just

1:31:44something else you can put in a report?

1:31:46Because I'm trying to match up your

1:31:47colors. Sorry. Like I'm trying to match

1:31:50up your colors um on the bottom here

1:31:52with the color scheme and some of them

1:31:54actually look like the 20 scale when

1:31:56you're looking at from a color

1:31:57perspective.

1:31:58>> And I know it's not 20. Um so again,

1:32:00when you're looking at the color scheme

1:32:01and the differentiation between the

1:32:02colors seems to be a little bit

1:32:04misleading when you're looking at the

1:32:06the scale compared to the color map.

1:32:08>> Um understood. uh in in

1:32:13I mean

1:32:13>> either that or label the contours do

1:32:15something to identify what those

1:32:17contours are.

1:32:17>> I can I can look into that. Uh I mean

1:32:19the the limitations are that there's

1:32:21only so many colors in the rainbow. Um

1:32:23that we're not trying to be misleading

1:32:25by having 20 dB be a very pale yellow

1:32:28and 45 be a a more banana yellow. Um I

1:32:32understand your point. There's also a

1:32:34widespread difference between those two.

1:32:36So

1:32:37reasonably, we wouldn't see 20 cropping

1:32:40up in the middle as we're going through

1:32:4250 and and 44 or sorry 40. 40 is green

1:32:46and 50 being gray. Uh I mean I could

1:32:49remove the 20. There are no 20 dB

1:32:51contours um shown on this this uh these

1:32:55results at all. That's just beyond the

1:32:57the level of

1:32:58>> No, but you can see what I'm saying. If

1:32:59you look at that 20, you look at the

1:33:00map, it looks like there's 20 across the

1:33:02map.

1:33:02>> Sure. if you're trying if you're trying

1:33:04to match up the colors because someone's

1:33:05just looking at your scale and looking

1:33:06at the map, they're like, "Oh, wait a

1:33:08minute."

1:33:08>> And for for to assist in that, we have

1:33:11our discrete locations A through G that

1:33:13are are at the surrounding receptors,

1:33:16residential receptors. And then the

1:33:17table on the the bottom left side

1:33:20tabulates what exactly you don't have to

1:33:22do any interpretation of the the the

1:33:24contours, the limit, the levels that

1:33:26it's contributing are right there.

1:33:28Right. But it but it's not a straight

1:33:29it's not a straight for a better term a

1:33:32straight line reduction in sound. You do

1:33:33have sound jumping just like that issue

1:33:36we talked about on the east side. Right.

1:33:37You do have sound jumping over that

1:33:39issue to the other side. You have higher

1:33:40sound on the other side. So again you

1:33:42can't just extrapolate down based on the

1:33:44points

1:33:45>> right and say okay it's higher as I go

1:33:46in because the sound may jump.

1:33:48>> So just something to clean it up

1:33:51identify.

1:33:51>> There's no jumping per se. Uh but

1:33:53elevation does factor in

1:33:56>> I'm I'm using simple language. I know

1:33:58the sound doesn't jump but the sound

1:33:59will jump it will move over certain

1:34:01topographies right and you might get a

1:34:03lower sound in the valley and a higher

1:34:04sound than a higher peak that's simply

1:34:06essentially jumping the valley if you

1:34:08want to call that understood.

1:34:09>> Um but again so becomes a little bit

1:34:11misleading if someone's looking at this

1:34:12from a general public point of view. So,

1:34:14I'm looking at a way for you at to fix

1:34:17this a little bit or put some additional

1:34:18contours or notes or whatever or

1:34:20nomenclatures on those contours to help

1:34:22the public and us all right look at this

1:34:25and make sense of it.

1:34:27>> Okay.

1:34:27>> Because not everybody's going to

1:34:28understand that piece of what they're

1:34:30looking at pick up on that scaling. I

1:34:32>> I guess also the um on on our in our

1:34:35defense, we're presenting this and I'm

1:34:37working through a a substantial report.

1:34:39So if you were to read the full context,

1:34:42it it it walks through that in a in a

1:34:44more logical way,

1:34:46>> but I believe the maps are the same in

1:34:47the report.

1:34:48>> They are. They are, but but the content

1:34:49is there to explain that better than

1:34:51perhaps I'm trying to uh do in a concise

1:34:54manner.

1:34:54>> Yep. And I've read the report and again

1:34:57I'm still asking you to fix it.

1:34:59>> Thank you.

1:35:00>> If I may, Tim Mandurko, professional

1:35:01engineer with Lane, would would the idea

1:35:03of major essentially major contours be

1:35:06helpful? I think to to see those

1:35:08transition points. I'm trying to think

1:35:11of like how I would compare to a

1:35:13topographic map and sometimes major

1:35:14contours are helpful in seeing the

1:35:16progression. Something along those

1:35:18lines. Is that what you're you're

1:35:19thinking?

1:35:20>> Again, as a professional engineer,

1:35:21that's what I would do. Um again, but

1:35:23I'm leaving it for you guys to decide

1:35:24how you would approach it to let the

1:35:26public understand what it is. So,

1:35:32>> question double is going to be going

1:35:34into that site.

1:35:35>> I'm sorry. What?

1:35:36>> Doubles.

1:35:38>> You mean tandem trailers?

1:35:39>> Trailers, doubles hooked together.

1:35:43>> Like a a tandem, right?

1:35:44>> Tandem. Yeah.

1:35:45>> Yeah. One one cab, two trailers

1:35:47connected.

1:35:47>> Yeah.

1:35:48>> Uh the traffic engineer could talk about

1:35:49that, but acoustically it's the cab that

1:35:52is causing the noise.

1:35:53>> Pardon?

1:35:53>> It's it's the it's the truck that

1:35:56>> you're going to you're going to have

1:35:56more activity. I mean, you got to break

1:35:59those things down and put them back

1:36:00together. I mean,

1:36:01>> right. And we included a a sub.

1:36:03>> Was that included in your studies?

1:36:05>> Coupling decoupling was. Yes.

1:36:07>> Yeah.

1:36:11>> No, no reefers. It's not cold storage

1:36:13here.

1:36:31Uh, good evening folks. Dean Gustin,

1:36:33director of environmental services,

1:36:34senior wetland scientist, All Points

1:36:36Technology, Waterford, Connecticut. Uh,

1:36:39I'd like to provide the commission with

1:36:41a brief summary of our current

1:36:42application to the Inland Wetlands

1:36:44Commission. Next slide, please.

1:36:48Um

1:36:49the project will not result in any

1:36:51impacts to the highest functioning

1:36:53wetlands and streams on the subject

1:36:54property and will actually uh subject

1:36:58those areas to preservation through

1:37:00conservation easement of the protective

1:37:02measures. Uh the project is limited to

1:37:05wetland impacts to four isolated

1:37:07wetlands that support minimal functions

1:37:10and values. In fact, the project

1:37:12received an approved jurisdictional

1:37:14determination from the New England

1:37:16District or the Army Corps of Engineers

1:37:18that those wetlands are in fact not

1:37:20regulated as federal wetlands. Our

1:37:22current wetland application has

1:37:24incorporated notable changes to the

1:37:26project including

1:37:28uh minimization and reduction in

1:37:30building size, reduction in impervious

1:37:33surfaces and stormwater runoff

1:37:34discharges to wetlands. Uh and

1:37:37particularly significant increase to the

1:37:39wetland mitigation plan. Uh we've

1:37:42increased that mitigation plan by 87%

1:37:45um from the original plan and have

1:37:47brought up the wetland mitigation area

1:37:50to 82,800 square ft. Uh which represents

1:37:54a 3.59 to1 mitigation ratio. Uh that far

1:37:59exceeds the town's 1:1 mitigation ratio

1:38:02policy. Um so the project has gone to

1:38:05great lengths to protect and preserve

1:38:07wetland resources on this project. Uh,

1:38:10and we find that it adequately addresses

1:38:12and satisfies the town's wetland

1:38:14regulations.

1:38:16So, that concludes my piece. Happy to

1:38:18answer any questions.

1:38:25>> Yeah. Um, I don't know if you're the

1:38:27right person for this question, but I'm

1:38:29wondering about um like uh salt

1:38:32treatment on the in the parking lot, how

1:38:34that might affect wetlands if there's

1:38:36some way to remove the salt once it's

1:38:38dissolved into the runoff water. Is that

1:38:42going to be removed somehow or is that

1:38:43go in into the uh wetlands and then the

1:38:46aquifer?

1:38:47>> I think that quite it's a great

1:38:49question. Number one, I think that's

1:38:51most appropriately addressed by Tim

1:38:53O'Neo as part of the storm management

1:38:55system controls.

1:39:19Uh good evening. I'm Mark Fertuchi. I'm

1:39:21a senior transportation engineer at

1:39:23Fussen O'Neal. Uh we're located at one

1:39:25financial plaza in Harford. I'm also a

1:39:28registered professional engineer in

1:39:30Connecticut and a registered

1:39:32professional traffic operations

1:39:33engineer. Uh as you know Fussen O'Neal

1:39:36did prepare a traffic study uh for this

1:39:38proposed development. I want to briefly

1:39:40describe uh what we did as part of this

1:39:43study. Um give you a high level overview

1:39:46of the uh the findings and also update

1:39:49you on where we are with the DOT and

1:39:52state traffic administration review

1:39:54process. Um first of all again just to

1:39:57orient you with the study area. Um, you

1:40:01know, the site is essentially located

1:40:03here in the northeast quadrant of the

1:40:05Westcot Road I395 interchange. So, it

1:40:09provides excellent access, um, direct

1:40:11access to the interstate highway system,

1:40:14uh, with the site driveway proposed just

1:40:16a few hundred feet off to the east of

1:40:19the 395 ramps. Uh, the access proposed

1:40:25uh, on Westcot Road is opposite the

1:40:27Reynolds and Hillside View intersection.

1:40:30Uh Wescott Road is a is designated as

1:40:33state highway 607. So it uh is a state

1:40:36road. It is under the purview of the

1:40:38department of transportation. Um as

1:40:40obviously is the uh the 395 ramps and uh

1:40:44Gothier Avenue also is a state roadway.

1:40:48We did review eight intersections in the

1:40:51study area. Uh they are denoted by the

1:40:54green circles uh on the map. So, we

1:40:57looked at obviously the site driveway

1:40:59intersection with Reynolds and Hillside

1:41:01View. Uh the 395

1:41:04uh northbound

1:41:06on-ramp and Knox intersection, the 395

1:41:09southbound off-ramp and Gothier Avenue

1:41:13intersection. Uh and then we added some

1:41:15additional study intersections that were

1:41:18uh requested as part of the Tyenbond

1:41:20peer review. In the initial application,

1:41:23uh, we extended our study area over to

1:41:25Route 12, Main Street, Wescott Road

1:41:28intersection. We looked at Westcot at

1:41:30Mashant Tuck Road, Knox at Killingly

1:41:33Drive, Gothier at Killingly Drive, and

1:41:35the 395 northbound off-ramp intersection

1:41:39uh to Knox and Lome Street. Uh, so all

1:41:43of these eight intersections were uh

1:41:45analyzed in the background and the build

1:41:49condition.

1:41:51Um so just going to explain briefly here

1:41:53what we did uh scope-wise as part of

1:41:56this study. Uh we began uh with an

1:41:58operational analysis. We did uh traffic

1:42:01counts at all of these intersections. Uh

1:42:04the the ones included in our initial

1:42:06study were done in March of 2025 and the

1:42:10additional intersections that I

1:42:12mentioned uh as a result of the tie and

1:42:14bond peer review were done in December

1:42:17of 2025.

1:42:19We did grow those counts uh to the 2027

1:42:22build year with a growth rate provided

1:42:24by the department of transportation.

1:42:27Uh we also then calculated uh the

1:42:30traffic we expect to be generated uh by

1:42:33this development using empirical data

1:42:35from Amazon. Uh the rates were highly

1:42:39conservative as we use peak seasonal

1:42:41rates. Uh we also uh did not adjust

1:42:49We also did not um adjust those rates uh

1:42:53downward for the latest uh development

1:42:56plan that is proposed. So the the

1:43:00initial plan had a higher square footage

1:43:02uh and parking uh numbers than what uh

1:43:05we currently have. So when that size of

1:43:08the development was reduced, we did not

1:43:10uh take credit for that in our

1:43:12calculation. So again, very very

1:43:13conservative with the trip generation

1:43:15rates. I did want to note all of these

1:43:19uh traffic volumes uh what the counts

1:43:22and the trip projections have been

1:43:24reviewed and approved by the DOT

1:43:26planning division. So at each of these

1:43:29study intersections then we we analyze

1:43:31them uh in the background uh 2027

1:43:34condition without the proposed

1:43:36development and then again in the 2027

1:43:39build condition with a proposed

1:43:40development and we compared uh the

1:43:43findings uh the before versus the after

1:43:45findings to determine where we had

1:43:47impacts and where we needed mitigation.

1:43:51Uh we also conducted a thorough safety

1:43:53review

1:43:55um of the study area. We confirmed u

1:43:58acceptable sight distance at the

1:44:00proposed driveway. Uh we also examined

1:44:04crash history at all of the study

1:44:06intersections to identify any abnormal

1:44:08crash patterns or frequencies. And then

1:44:10from there we developed our

1:44:11recommendations to mitigate operational

1:44:13impacts and ensure the driveway location

1:44:17and each of the intersections uh can

1:44:19maintain safe and efficient operations

1:44:22in the build condition.

1:44:24On the next slide, I'll explain the uh

1:44:28what we found in uh as the findings of

1:44:30this study as well as our

1:44:32recommendations. But I first want to

1:44:33give you a brief uh history of the

1:44:35submissions uh of this traffic study.

1:44:38Our initial submission uh is as part of

1:44:41the um earlier application. Uh the

1:44:45traffic study had two driveways. uh one

1:44:48driveway at the present Baker location

1:44:51uh and another the the second driveway

1:44:54is is the location of the current sole

1:44:56sole access to the site opposite

1:44:58Reynolds and Hillside View. Uh we

1:45:01received comments uh from OA and the

1:45:03peer reviewer Tyen Bond u requesting

1:45:07that that site access be consolidated to

1:45:10a single driveway. So, our second

1:45:12traffic study submission uh incorporated

1:45:16uh those comments and reviewed the

1:45:17single drive option. And then our latest

1:45:20traffic study submission uh earlier this

1:45:23month uh as part of the current

1:45:25application uh updated the building

1:45:28square footage and parking

1:45:31as well as some minor comments we've

1:45:32received from from Ostas so far. Um but

1:45:35again, we did not change the analysis.

1:45:37uh we maintained uh a conservative

1:45:40approach there using the larger square

1:45:42footage and parking as I mentioned a few

1:45:44moments ago.

1:45:47So the recommendations of our study uh

1:45:50were to and I'll show these on a graphic

1:45:54in a moment but uh first recommendation

1:45:57was to replace the traffic signal at

1:46:00WCOT road I395 southbound off-ramp and

1:46:04Gothier Avenue. um that will help to not

1:46:08only mitigate the traffic uh from the

1:46:11development but also improve the safety

1:46:13of uh operations there.

1:46:16Uh we're also proposing to implement

1:46:19traffic signals um at Knox and the site

1:46:23driveway intersection as well to

1:46:24facilitate uh safe uh and efficient

1:46:27operations. Uh that those plans, as I

1:46:30said, are currently being reviewed by

1:46:32DOT.

1:46:33Uh we're proposing the addition of an

1:46:36eastbound left turn lane at the site

1:46:38driveway. So that will require some

1:46:40widening of Westcot uh road near the

1:46:43site. And we're proposing the addition

1:46:46of a westbound left turn lane on Westcot

1:46:49under the 395 overpass. Uh that will be

1:46:53accomplished with a with a restriping of

1:46:55the road. No widening required there. Um

1:46:59so with the implementation of these

1:47:02improvements

1:47:04uh we did find that all of the

1:47:06intersections in the study area will

1:47:09operate at an acceptable level of

1:47:11service. Um our site distance

1:47:13measurements uh did confirm that the

1:47:16site driveway can provide safe and

1:47:18efficient egress uh for both passenger

1:47:21cars and tractor trailer uh trucks.

1:47:25Um the following slide,

1:47:27I'm just going to show you again a

1:47:29graphic of these improvements I was just

1:47:31describing. So this is the site driveway

1:47:33intersection with Westcot Reynolds and

1:47:36Hillside view where we're currently

1:47:38proposing a traffic signal and uh an

1:47:40eastbound left turn lane on WCOT road

1:47:44entering the site. Uh the site driveway

1:47:47egress would have two lanes, a left turn

1:47:50lane and a right turn lane out and uh

1:47:54sterns would be um converted to one way

1:47:57away from the intersection. Although

1:47:59that road will essentially have no

1:48:01volume um following um the uh this

1:48:04construction is there there's there's

1:48:06nothing that will the property is

1:48:08currently on the north side of Sterns.

1:48:10uh would not be there anymore once this

1:48:11project is in place. And the chamber

1:48:14there has access directly off of WCOT.

1:48:18Uh and then moving to the west. Um these

1:48:22are the uh the offsite improvements on

1:48:24WCOT under the 395 at the 395

1:48:27interchange and underneath the overpass.

1:48:29Again, there's that westbound left turn

1:48:32lane proposed with the restriping onto

1:48:35Gothier and the placement of the traffic

1:48:39signal at Gothier and the 395 southbound

1:48:41ramp and the new traffic signal at Knox

1:48:45and the 395 northbound on-ramp

1:48:48intersection.

1:48:51>> Sure.

1:48:57>> Yes. Do you know the distance of the

1:49:00road underneath on Westcot underneath

1:49:03the 395?

1:49:06>> Yeah. Let me just so I don't misspeak.

1:49:08I'm going to go to my Q table.

1:49:16[snorts]

1:49:30Yeah. So the distance about 550 ft.

1:49:34>> No, I mean the the width.

1:49:36>> Oh, the width

1:49:38>> width of uh what Wescott is underneath

1:49:41the bridges.

1:49:42>> Yeah. Uh that is

1:49:47uh I believe we have the three lanes

1:49:49there. We're we're roughly somewhere in

1:49:52the 30 36 to 40 foot width range.

1:49:55>> What's what's existing now?

1:49:57>> What's existing now?

1:50:00>> It's the same. We're not we're not

1:50:02proposing to change the width. It's a

1:50:03it's a rest.

1:50:05>> Currently, the two the two lanes

1:50:07underneath are are wide. They have wide

1:50:09shoulders. So, it's a restrip.

1:50:12If you stop

1:50:15and trucks coming off of 395, they're

1:50:18close to where you stop. It's they're

1:50:21not that wide. I'm going to

1:50:23>> I'm going to have to

1:50:24>> So, what what we're proposing here there

1:50:27go ahead.

1:50:27>> Please be quiet.

1:50:31>> I I know what you're proposing that it's

1:50:34going to come to about 34 feet and I

1:50:36don't know if there's 34 feet there.

1:50:39>> Yeah. Yeah. there there there's

1:50:41sufficient width there and the wid the

1:50:43lanes that we're showing um 11 to 12

1:50:45foot lanes are resistant for

1:50:47>> we can go out and measure that. Thank

1:50:49you.

1:50:51>> They are what we're proposing does meet

1:50:53uh DOT criteria for lane widths on a

1:50:56state road. So I just want to make that

1:50:58um clear the three lanes underneath

1:51:00there and they and the state has

1:51:02reviewed it and um they are in agreement

1:51:04with the installation of that turn lane.

1:51:06>> Okay.

1:51:13Um so again just want to mention it's a

1:51:16good segue into where we are with the

1:51:18state um review process.

1:51:21Uh so as you know this uh development

1:51:23does qualify u for an OTAA review state

1:51:28traffic administration. Uh we did submit

1:51:30to OSA for a scoping level review before

1:51:34we even submitted a formal application

1:51:36to get some preliminary comments from

1:51:37them. Uh went then went in with our

1:51:40formal step one submission. Uh that was

1:51:43approved. All of our traffic volumes and

1:51:45trip projections were approved as I

1:51:46mentioned earlier. We then went and

1:51:49submitted step two which was the full

1:51:51traffic study. Uh all of our off-site

1:51:53improvement plans. Uh we that was

1:51:56reviewed by the department. We got a

1:51:58round of comments from them. Um, we have

1:52:01addressed those comments resubmitted.

1:52:03Uh, we've got some now additional

1:52:06comments from them that we're working

1:52:07through uh with them right now. So,

1:52:10we're we're nearing the end of the step

1:52:12two uh review process. Once we get

1:52:14through that, uh it'll be the formal

1:52:16step three certificate application,

1:52:18which um is really a formality at that

1:52:21point and typically takes anywhere from

1:52:23from one to two months to get approval

1:52:25once you're into step three.

1:52:28Um should this get OSA approval and

1:52:31approval by this commission u we would

1:52:33then go into the encroachment permit

1:52:35review process. So this is where uh the

1:52:39off-site improvement plans would be

1:52:41advanced into detailed design plans uh

1:52:44construction documents. Um they would

1:52:47then get submitted to the DOT district 2

1:52:49office for review. there'd be a

1:52:52preliminary semi semi-final and final

1:52:54design uh review process. Uh so three

1:52:58rounds of reviews there. Um and when we

1:53:01get approval, the encroachment permit

1:53:02would be issued allowing the contractor

1:53:04to complete the work in the state right

1:53:06away. So um to give you a level of

1:53:09comfort, six total rounds of review

1:53:12here. The DOT is going to be looking at

1:53:15this very thoroughly. They already are.

1:53:17They will continue to be looking at

1:53:19this. um as we move forward and complete

1:53:22this uh review process

1:53:27and this is largely um I've already

1:53:29covered this Dustin. So that that

1:53:31concludes my remarks on traffic. Um I

1:53:34can either answer any additional

1:53:35questions now or we can continue. I

1:53:37think we have a few more things to cover

1:53:40in the presentation.

1:53:42>> Couple questions. Uh what use

1:53:44classification did you use again for

1:53:46your trip generation?

1:53:47It was not an uh IT land use um

1:53:51classification. It was the um uh

1:53:55empirical data we received from Amazon.

1:53:57So they they provide data on hourly

1:54:01um passenger car truck volumes

1:54:04throughout the day. Um we compared that

1:54:07to um several different IT land use

1:54:10codes and the Amazon numbers in every

1:54:12case were higher. So, we went with the

1:54:15with the empirical data from Amazon.

1:54:17>> That was going to be my question. Next

1:54:19question was what was the comparison?

1:54:21So, do you not I don't think that

1:54:23comparison was in your report, was it?

1:54:25>> I don't believe we include that. No. And

1:54:28I and I um I can get you that for the

1:54:30next meeting. I don't have the exact

1:54:32number written down, but I'm happy to

1:54:34get you that.

1:54:34>> It'd be interesting to see that that

1:54:35comparison compared to the standard

1:54:37classification codes if you could. Uh

1:54:39there was a comment made I believe at

1:54:40the first meeting that this this

1:54:43particular facility will not have any

1:54:44local deliveries.

1:54:46>> Right. Um so my next question would be

1:54:48if local deliveries were included how

1:54:50would that change the analysis and did

1:54:52the Amazon numbers that you said were

1:54:54provided

1:54:55>> was that from a facility that included

1:54:56local deliveries or was that just

1:54:58tractor trailer loads going in and out

1:55:00and employees in and out?

1:55:01>> Yeah. So we we were you we use the most

1:55:04conservative data from them. So um peak

1:55:07as I mentioned earlier peak uh seasonal

1:55:10rates which don't occur most of the

1:55:11year. Um we also were conservative and

1:55:14using the higher numbers than the size

1:55:16of the development currently proposed.

1:55:18Um those numbers all include what we

1:55:21would call flex drivers. So um drivers

1:55:24that uh would deliver locally even

1:55:27though that's not proposed in this

1:55:28development. It's not the intent of this

1:55:30development right now. the numbers,

1:55:32factor those in if they were ever to be

1:55:35added in the future, which they would

1:55:37have to come back to this commission if

1:55:39that were proposed.

1:55:41>> That information I don't think wasn't

1:55:43clear in the report as to what was

1:55:45included and what wasn't included. So,

1:55:46if that could be outlined

1:55:48>> um

1:55:48>> and amended, please.

1:55:54>> Okay.

1:55:58Uh Tim Mandurko, professional engineer.

1:56:01Just wanted to come back to the comment

1:56:03on salt. Um so you may not have had a

1:56:06chance yet, but um as part of the

1:56:09updated submissions, we include in the

1:56:12storm water and uh the stormwater

1:56:14maintenance plan a um winter deicing and

1:56:18anti-icing standard operating practice

1:56:22document. uh that was requested by uh

1:56:24the peer reviewer as part of the

1:56:26intervenor petition. Uh that outlines

1:56:30how sand and salt should be used. Uh and

1:56:33that is based on uh statewide

1:56:37um call them lessons uh for lack of a

1:56:41better term. Uh DEP and DOT run a

1:56:45training program for both municipal

1:56:47snowplow operators. So individual towns

1:56:50can send snowplow operators to a full

1:56:52day training uh session to understand

1:56:56when salt is appropriate, when sand is

1:56:59appropriate and how um brine solution

1:57:03which you see more prevalently used uh

1:57:05ahead of storms and they also offer the

1:57:08same testing program same the teaching

1:57:11program to private contractors. Um, this

1:57:14is all based on a program run by the

1:57:16state of New Hampshire. In the state of

1:57:18New Hampshire, in order to be a private

1:57:21contractor for snow removal, you have to

1:57:24essentially be licensed and uh follow

1:57:26that state code. Uh Connecticut adopted

1:57:29it uh and uses as training, but it's not

1:57:32state law like it it is in New

1:57:34Hampshire. So uh as part of that we

1:57:36included um you know the the best

1:57:38management practices from that training

1:57:40program identified that the snowplow uh

1:57:44operator subcontractor for the site

1:57:46would be required to participate in that

1:57:48training. Uh and it outlines a a pretty

1:57:51robust uh guidance on how do you uh

1:57:56prevent icing and use the minimal amount

1:57:58of salt. So actually following

1:58:02guidelines in terms of what is the

1:58:04pavement temperature, what is the

1:58:06condition outside, you can reduce your

1:58:08salt usage by about 50%. Um we often

1:58:11here, well, we'll just use sand, but the

1:58:14the state Connecticut D and DOT actually

1:58:17don't recommend sand in a number of

1:58:19scenarios, essentially above 30° when

1:58:21you're kind of at that cusp of wet and

1:58:24and cold. So if you you get a chance um

1:58:28we can certainly go into it in more

1:58:30depth the the next meeting. Um but there

1:58:32is a full document included in the

1:58:33operations and maintenance plan. Uh and

1:58:36again that is uh it includes best

1:58:38management practices for the actual

1:58:40application of sand and salt. Um as well

1:58:43as what should you do to calibrate your

1:58:45equipment? What should you do to make

1:58:47sure your conveyors are working? Your

1:58:48spreaders are throwing at appropriate

1:58:50widths. So that similar to if you've

1:58:52ever fertilized your lawn, the bag has a

1:58:55recommendation on pounds per thousand

1:58:57square ft. You would set the spreader to

1:58:59to meet those um those standards.

1:59:02Similar um criteria applies to salt and

1:59:05sand spreading uh in parking lot

1:59:07operations. So um we included that. We

1:59:10expect that um the third party peer

1:59:12reviewer would be reviewing it as part

1:59:14of the resubmission from this week. Um

1:59:17but wanted to to follow up on that point

1:59:18and let you know that that's included.

1:59:21Okay. And so uh basically saying that um

1:59:25you use uh the the minimum required

1:59:28rather than but um I guess there there

1:59:31it doesn't exist the technology anywhere

1:59:35uh to actually remove dissolve salts

1:59:38from the runoff water before it gets

1:59:41into the ground. That's nobody addresses

1:59:44that at this point.

1:59:45>> No. when um you know from a kind of a

1:59:49topography and drainage standpoint uh I

1:59:51don't know what the number is off the

1:59:52top of my head but say 90% of our site

1:59:55drains to the side of 395. So we are

1:59:58flowing in a direction of a state

2:00:00highway that Connecticut DOT applies

2:00:02sand and salt. Our goal would be to

2:00:04minimize the amount that we use on site.

2:00:07uh you know if if sand and and one of

2:00:09the reasons that you often see in storm

2:00:12water standards about suspended solid

2:00:14removal a tss term that you hear is by

2:00:18grabbing the sediment you get all the

2:00:21stuff that typically sticks to sediment.

2:00:23So while we are are not able to you know

2:00:26boil the water to remove the salt the

2:00:29the fact that we are removing sediment

2:00:31in both the hydrodnamic separators as

2:00:34well as the filter units. Yes, there is

2:00:36salt dissolved in water. There is salt

2:00:38dissolved in water on any highway, any

2:00:40shopping center in town. But the plan is

2:00:43best management practices to minimize

2:00:45the amount you use. The um the operating

2:00:48procedure also talks about postevent you

2:00:51go and clean up. If the clump fell, you

2:00:54you know have a maintenance program too

2:00:56to make sure that you're keeping the

2:00:57minimum amount amount on the ground.

2:00:59Using more salt than you need is

2:01:01essentially a waste of capital. It's not

2:01:03free. So um while there is not the

2:01:05ability to remove dissolved salt the the

2:01:08management practice by deep and doots to

2:01:11minimize the amount you need uh I like

2:01:13to say the solution to pollution is

2:01:15dilution. We also have a number of areas

2:01:17on site where salt is not applied. We

2:01:19have a mill million square foot roof

2:01:21water that also coingles with the

2:01:23parking lot and truck court water where

2:01:25you are further diluting uh any

2:01:28concentration of a pollutant that might

2:01:30be in it. So, um there there is not at

2:01:33this point a way to to safely, you know,

2:01:36keep a driveway and a parking lot um

2:01:39safe without the use of some salt and

2:01:42sand, but doing it appropriate we think

2:01:43is the the best method.

2:01:45>> Thank you.

2:01:48>> Oh, still me. Uh Tim Madurero with Lang

2:01:51again. uh other reviewing agencies

2:01:54um

2:01:56shipo uh uh I think there was some

2:01:58discussion in our prior application. So

2:02:01in order to secure a state permit you

2:02:04have to is specifically the storm water

2:02:07general permit you have to show um that

2:02:11your site is in compliance with a number

2:02:13of uh components regulated by other

2:02:16agencies. Uh Shipo is one of those

2:02:18agencies. Over the course of the summer,

2:02:21uh we dug 1,272

2:02:24test pits across the property or shovel

2:02:27tests to look for historic usage uh and

2:02:32historic artifacts on the property in

2:02:34coordination with Shipo. Uh there were

2:02:37no significant findings and on September

2:02:4029th uh Shipo gave us an allclear letter

2:02:43uh for the development as it's currently

2:02:45designed and we can use that letter to

2:02:48check the box as part of our um deep

2:02:51permits. Connecticut water uh as I

2:02:53mentioned earlier we continue to work

2:02:55with them on the design of the water

2:02:57main extension and the pump house that

2:02:59goes with it. Um that on that work is

2:03:02ongoing while they're not really a reg

2:03:03regulatory agency. They're important

2:03:05part of the project. Um, and Connecticut

2:03:07Deep, as I mentioned, is the regulatory

2:03:09body for the septic system. Uh, we

2:03:12continue to coordinate with them. We did

2:03:14some additional testing in October per

2:03:16their request and continue to um model

2:03:19the design to um move forward in that

2:03:21application process.

2:03:25>> Do you have a a sewer letter?

2:03:28>> You mentioned that's different. Um, this

2:03:30time you said you're actually connecting

2:03:32to the sewer for I think you said 1,000

2:03:34gallons a day. Yes.

2:03:34>> Do you actually have an approved sewer

2:03:36letter for that connection?

2:03:37>> Uh, I don't know if we have a letter or

2:03:40we have correspondence with the town

2:03:42engineer, but we we'll get something for

2:03:44the record.

2:03:46>> And when you say Connecticut deep

2:03:48applications, which one are you

2:03:49referring to there?

2:03:50>> That is for the um the wastewater

2:03:52treatment, the the um the sept

2:03:54essentially the septic system. So the

2:03:57the project generates more than 7,500

2:03:59gallons per day of waste water. So it is

2:04:02not a septic system regulated by the

2:04:03health department. We get flipped to the

2:04:05state and they take full control of

2:04:07that.

2:04:08>> And that application has been submitted

2:04:10based on that comment.

2:04:11>> Yes, we submitted to them in the

2:04:13beginning of the year. They came back

2:04:15with comments. Um they have a kind of a

2:04:18limited window of how long you have to

2:04:20respond. We had to go do additional

2:04:21testing. So, we withdrew the application

2:04:24to not run out the clock and then we'll

2:04:26be resubmitting back to them with the

2:04:27updated testing material that we um

2:04:29completed this month.

2:04:31>> And what was that additional testing?

2:04:32>> Uh some more hydraulic conductivity

2:04:34testing uh in the area of um the the

2:04:38leech the leech field. So, uh we did a

2:04:40couple days of additional borings and

2:04:42laboratory testing to give some more

2:04:43data points.

2:04:49Oh, and real quick uh for Commissioner

2:04:51Card, uh there is Geotech data in

2:04:54appendix I of the stormwater management

2:04:56report. Uh it includes uh boring logs,

2:05:00test pit logs, as well as a location

2:05:02plan that shows the location of those

2:05:05test pits and borings.

2:05:15Thank you again for the record, Evan

2:05:16Seaman. I know we've been at it for

2:05:18about two hours, maybe a little bit

2:05:19more. I want to make sure that the

2:05:20commission is okay to continue. Um,

2:05:23we're near we're getting close to the

2:05:24end of the presentation and I wanted to

2:05:26make sure uh now is a good time to

2:05:27proceed rather than short break. Thank

2:05:29you. Next slide, please.

2:05:34So, I want to um go over [clears throat]

2:05:36some of the sections of the regulations

2:05:38which I have highlighted here. Um on the

2:05:40right um is an image of the first page

2:05:42of uh your staff report that you

2:05:44received which I think is uh very

2:05:46helpful. It provided a comprehensive

2:05:48review of of the of the uh application

2:05:51documents. Um there are um some requests

2:05:54for additional information and and

2:05:56clarification on issues that we're

2:05:57working to um update right now and we

2:06:00will be providing that. Um we're

2:06:02confident we can respond to those. Uh

2:06:04they seem to be relatively minor in

2:06:05nature. Um so uh section 436 which deals

2:06:09with the business park district, section

2:06:11450 in table A which are the dimensional

2:06:13requirements. Section 470 site plan

2:06:16review standards. Section 530 off

2:06:19streetet parking and loading. So

2:06:21[clears throat] site plan uh review

2:06:22standards. The first standard deals with

2:06:24uh the plan of conservation and

2:06:26development um which is uh point A and I

2:06:30addressed that earlier in the

2:06:31presentation and and the zoning

2:06:33regulations recognize that the POCD is

2:06:35just a guidance document. It doesn't

2:06:36control but uh that is a consideration

2:06:38and and I went over that a little bit

2:06:40earlier in the presentation. Uh uh next

2:06:42subb the arrangement of building

2:06:44structures and uses on the site and um

2:06:47we went over this as part of uh Mr. and

2:06:49Durko's review of the civil engineering

2:06:51plans, but all building structures and

2:06:53uses on the site have been uh located to

2:06:55take advantage of the natural dense

2:06:56vegetation and screening on the site um

2:06:59along with the proposed

2:07:02uh conservation space, the 76 acres

2:07:04proposed within the project site along

2:07:05with the 216 acres or so which are part

2:07:08of the uh pending wetlands application

2:07:11uh as well as I395 to the west. Um uh as

2:07:16noted in the staff report uh there's

2:07:18compliance with all dimen uh dimensional

2:07:20requirements area bulk height setback

2:07:22requirements um have been met. Uh the

2:07:24sighting of the proposed building uh uh

2:07:27to on this point uh frontage and

2:07:29setbacks significantly exceeds the

2:07:31existing requirements. So uh minimum

2:07:34setback from street uh front street line

2:07:36115 ft required more than 2,000 ft

2:07:39proposed. uh uh set back from uh the

2:07:42sideyard 65 ft required 425

2:07:46uh proposed. Uh in the rear uh setback

2:07:4965 ft required, 509 ft proposed. Um

2:07:54outdoor trailer storage is located on

2:07:56the north and east sides of the

2:07:57building. Um as adjacent properties on

2:07:59those sides are undeveloped and heavily

2:08:01treed with natural vegetation. Uh and

2:08:04that's uh in addition to that the 216

2:08:06acres of lands um which the applicant

2:08:08proposes putting in conservation uh

2:08:11includes lands on the north and east of

2:08:12the project of the project site. Uh

2:08:15similarly truck loading docks are

2:08:18located um uh only on the east side of

2:08:20the building. They don't face any public

2:08:21streets which is a requirement of your

2:08:23zoning regulations. Um and uh land in

2:08:26this area is also heavily treated. Um

2:08:29the next uh criteria is uh uh subc which

2:08:33deals with interior vehicular

2:08:35circulation which we went over a little

2:08:36bit earlier. Um the site has been

2:08:39designed to provide for safe and

2:08:40convenient interior vehicular uh

2:08:42circulation. [clears throat]

2:08:43Um truck turning movements are included

2:08:45in your plan sheets. U the staff uh

2:08:48report did ask for um additional truck

2:08:51route signage which will be provided. Um

2:08:54and um that's in addition to the

2:08:57wayfinding uh uh uh uh directional uh

2:09:01locationational signs that are already

2:09:02included. Employing parking is designed

2:09:05with speed bumps, crosswalks, and wheel

2:09:06stop protection and sidewalks.

2:09:08>> Can I Yes.

2:09:09>> Can I interrupt you for just a minute?

2:09:12>> Uh signage. You're going to add all the

2:09:14stop signs onto the site plan.

2:09:18Also, on exiting the

2:09:23facility, you want you you said you

2:09:26rather they use 395 than Wescott. So, is

2:09:32it possible to put a sign saying right

2:09:34turn only for trucks, right turn only so

2:09:38they don't take a left onto Ecot?

2:09:44Yes, we can we can uh provide that

2:09:47information.

2:09:49>> And you were in the crosswalks.

2:09:52You were saying there you go to speed

2:09:53bumps and everything. The crosswalks to

2:09:56the sidewalks presently are every other

2:09:59one on the employee parking lot. Can we

2:10:03do everyone? Is it possible to do

2:10:06everyone? Because if there's no

2:10:09crosswalk, what you know, the safety

2:10:11reason just be safer for everybody.

2:10:16>> We'll take a look at that.

2:10:18>> And can you give me the the dimensions

2:10:21of the sidewalk? I didn't see it on the

2:10:24drawings.

2:10:25>> I believe this was a comment uh of yours

2:10:28in the first application. Six. Yeah. Um

2:10:30it if it's not six feet, it will be

2:10:32supposed to be six, but your comment

2:10:35said it was five. I just, you know,

2:10:37please clarify that.

2:10:40>> Okay. The rest I can wait.

2:10:43>> Thanks. Um, can I I'll since we had a

2:10:46pause, I'll jump in because I was going

2:10:47to bring it up when when you finish, but

2:10:49I was going back and looking at the

2:10:50dimensional requirements rule again. So,

2:10:52450.3 and 450.6 and the table A. And as

2:10:56I was looking at your site plan, you

2:10:57guys have an engineered retaining wall

2:10:59on the western side, correct?

2:11:02>> Southeast West.

2:11:03>> Yes.

2:11:04>> Right. And that engineering wall is

2:11:06greater than 50 ft in multiple

2:11:07locations. Correct.

2:11:09>> Yes.

2:11:10>> So I can't wrap my head around how that

2:11:13does how that complies with 450.3 in

2:11:16table A because our 450.3 in table A

2:11:19says that no structure shall exceed 50

2:11:21ft. And that engineered wall is a

2:11:24structure.

2:11:29Okay. We'll look into the definition.

2:11:32It's a structure. It's an engineered

2:11:34structure.

2:11:35>> Some towns. It's an engineered

2:11:37structure.

2:11:38>> No matter what rule you look at, it's an

2:11:39engineered structure.

2:11:40>> Okay.

2:11:40>> And by engineering standards, a

2:11:42structure.

2:11:43>> Okay.

2:11:44>> 450.

2:11:46>> You were citing 458.

2:11:47>> 450.3.

2:11:48>> 450

2:11:49>> which is structures. Well, building

2:11:51height. 450.6 is business park building

2:11:54height and also talks about structures.

2:11:55And then table A says no structure shall

2:11:58exceed 50 feet in the building building

2:12:00park district.

2:12:03Thank you. We will uh look into that and

2:12:05provide a response.

2:12:05>> And is there any other area on your site

2:12:07that has any because in your details you

2:12:09have two details. You have a rock wall

2:12:11face, right? And you have the engineered

2:12:13structure for Gabian retaining wall. Is

2:12:16there anything that's an open rock face?

2:12:20>> The the uh the the engineered face on

2:12:23the east side could be exposed rock

2:12:26depending on the depth of overburden and

2:12:28and material.

2:12:29>> Okay. So our gravel rags say that no

2:12:31nothing can exceed 2 and a half to one.

2:12:35>> Okay.

2:12:36>> So if it's an open rock face, it has to

2:12:38be filled back in two and a half to one.

2:12:40It cannot be left at one to one.

2:12:41>> This is a

2:12:43the category is a like a for gravel

2:12:46>> under our 570 which which complies

2:12:49anything over a thousand cubic yards of

2:12:50removal which would imply to the site

2:12:52plan review right as one of the finished

2:12:54performance criteria is nothing can be

2:12:56left at greater than two and a half to

2:12:58one.

2:12:59But is that for gravel?

2:13:01>> That would It's under the gravel rules,

2:13:03but that section applies to site plan

2:13:05review. Okay. Anything that has greater

2:13:07than a thousand cubic yards of earth

2:13:09removal.

2:13:09>> Okay.

2:13:10>> Which your site object obviously does.

2:13:12>> Yeah. Take a look.

2:13:13>> So

2:13:15that was 570 point.

2:13:17>> It's section 570. I can't give you 570

2:13:19point what it is, but if you get 570,

2:13:20look at the performance criteria.

2:13:22>> Thank you.

2:13:28Uh so moving on in the the site plan

2:13:30standards in section 470. I I uh we just

2:13:33uh discussed interior vehicular

2:13:35circulation. Uh next is uh uh safe

2:13:38pedestrian movement. Um uh complies

2:13:42there. This isn't open to the general

2:13:43public. No pedestrians will be accessing

2:13:45the site. As you heard from Mr. Veruchi,

2:13:48uh there are off-site uh proposals that

2:13:50are currently under review by OSA. Um,

2:13:53uh, point E, adequacy of emergency

2:13:56vehicular access. Um, we've been working

2:13:58with the the town's fire marshall, as

2:14:01you know, as part of the first

2:14:02application, he, Mr. Bashard, issued a a

2:14:05letter. Um, and we've taken his comments

2:14:07into account, and the project has been

2:14:10designed to ensure adequate um, access

2:14:12for emergency vehicles. Um, Mr.

2:14:14Bashard's letter is dated June 18th,

2:14:162026. It's part of the record. Uh and he

2:14:19also provided dimensional information to

2:14:21use for our truck uh plan sheets which

2:14:23are included in the materials uh and and

2:14:26have been

2:14:28>> what's that?

2:14:30>> Could you say that again please?

2:14:31>> Yes. The town fire marshall provided

2:14:33dimensional information to use for the

2:14:35fire truck vehicle movements um which he

2:14:38identified as the largest and most

2:14:39restrictive emergency vehicle for the

2:14:41site and those dimensions have been

2:14:43incorporated into the design for the

2:14:44site

2:14:45>> plan. So they they also meet your

2:14:47tractor trailer rate standards, your

2:14:48class 8 vehicles

2:14:50as well.

2:14:53I mean, you know, this the fire marshall

2:14:54has got access. He's his control is fire

2:14:58safety, access to fire equipment, but

2:15:00your your site has to maintain also

2:15:03access for obviously the tractor

2:15:05trailers, the class A vehicles, the

2:15:07personal vehicles. There's a lot more to

2:15:09it than just fire access.

2:15:11>> Correct. and and our uh employee

2:15:15passenger car vehicles are designed for

2:15:17passenger cars as well as the firet

2:15:20trucks. Any of the truck tractor trailer

2:15:22areas are designed for the 80,000lb

2:15:25tractor trailer whatever be road legal.

2:15:28Uh and those areas also provide the

2:15:30necessary clearances and movements for

2:15:32the fire truck. So, tractor trailers

2:15:34dictate sizing and weight requirements

2:15:38uh in those areas, but um there are a

2:15:40number of specific requirements from the

2:15:42fire marshall on clear height uh and

2:15:44vehicle movement that may be different

2:15:46than what you would have for tractor

2:15:47trailer and we're compliant with his uh

2:15:49request for those. So, yes, we we

2:15:52understand that we're not ne just

2:15:54designing to the firetruck. We've areas

2:15:57that will have tractor trailer

2:15:58trafficics are designed to to

2:15:59accommodate those. Well, you keep

2:16:01repeating, you know, that access is for

2:16:04the fire marshall and access for fire

2:16:06trucks.

2:16:07>> Yeah.

2:16:07>> You know, we kind of keep hearing it and

2:16:10Okay. So, okay. Does that make sure we

2:16:11meet

2:16:12>> all the stuff that you're trying to do?

2:16:14>> And what

2:16:16>> stupid, but when you hear it so

2:16:17repetitively, you have to keep

2:16:18questioning.

2:16:19>> Sure. and and what is often kind of the

2:16:22opposite in that you have areas designed

2:16:24for passenger cars and then you go and

2:16:26drop a template on for a firet truck and

2:16:28it doesn't it doesn't work because

2:16:29you've been designing for 18t cars and

2:16:32not a 40 foot long fire truck. So, um we

2:16:36we bring that up because safety and and

2:16:39coordination with the fire marshal is an

2:16:41important part of the site plan

2:16:42application. Uh and just wanted to make

2:16:44sure it's clear that we've gone through

2:16:45that with them.

2:16:48>> I'm sorry. And just for the record, I

2:16:50have to step back. I can't remember if I

2:16:51told you 570 or 560 for earth removal. I

2:16:53just want to make sure I It's It's the

2:16:55earth removal rags. I'm trying to

2:16:56remember the number off top of my head

2:16:57right now. Thank you. Five. Did I I

2:16:59think I said 570, right?

2:17:00>> 560.

2:17:01>> Yeah. So, I wrote down 570. It didn't

2:17:03look right.

2:17:03>> Thank you.

2:17:04>> Just want to make sure for the record I

2:17:05didn't get.

2:17:05>> I appreciate that. Thank you.

2:17:08>> Um, so the next consideration is

2:17:11>> you're still on 470, right?

2:17:12>> Yes, sir.

2:17:13>> 13. Yeah. I'm going to tell you, uh, I

2:17:16don't think you've addressed, uh, the

2:17:18opening statement where it says the

2:17:20health, the safety, and the welfare of

2:17:22the public in general, uh, should be,

2:17:25uh, dealt with, and you're not doing it.

2:17:28Uh, and as far as, uh, presumption,

2:17:35uh, you know, the statement where you're

2:17:38continuously saying it's a conclusive

2:17:41presumption. Maybe it's a presumption of

2:17:44compatibility at the very best, but not

2:17:47uh as you people have uh tried to

2:17:49interpret this uh in order to exclude uh

2:17:53that from being a part of this

2:17:55discussion.

2:17:56>> I want that on the record.

2:17:59>> Sure. And it's

2:18:00>> I'm object I'm objecting to it.

2:18:02>> What are what in particular? Well,

2:18:05you just had an engineer up there go

2:18:07through what uh uh all these studies

2:18:11you've conducted offsite concerning

2:18:14traffic. We're dealing with a unique

2:18:16situation where you've got access roads

2:18:20the south either going in or going

2:18:22towards the south. It's a unique

2:18:24situation and you've got neighborhoods

2:18:27in that area that are going to be

2:18:29adversely affected by it. and you're

2:18:32telling us that uh uh hands off yet

2:18:36you're doing studies on it and trying to

2:18:39give us information. uh you know I think

2:18:41it's uh

2:18:44it's uh it's a big problem and I'm and

2:18:49by objecting to it if nothing more maybe

2:18:52the state uh transportation when they

2:18:54take a look at it will uh give that a

2:18:57little more weight but uh that is

2:18:59certainly going to adversely affect that

2:19:03and it it it's actually the whole length

2:19:07of the burrow that's going to be

2:19:09affected.

2:19:11and beyond going up on Lum Street and

2:19:14everything. Uh, I think there's an easy

2:19:16fix. Takes money, but that should be a

2:19:20true four-way intersection right there.

2:19:23And those high those access roads should

2:19:25be eliminated. That's

2:19:29that's what would make this all work. Uh

2:19:32but as it is now, you're asking us to uh

2:19:36completely avoid

2:19:38uh this uh area in the conversation and

2:19:42uh as far as I'm concerned, you're

2:19:43putting that whole area at risk.

2:19:46>> Yeah. Well,

2:19:49>> the the

2:19:53Thank you. So,

2:19:56I hear your concerns. What I repeated,

2:19:58what I discussed before was it's it's

2:20:01not us telling you that you can't

2:20:02consider this. This is the Connecticut

2:20:04Supreme Court. The Connecticut Supreme

2:20:06Court, it's it it's multiple cases of

2:20:09the Connecticut Supreme Court in the

2:20:10case that I noted on that slide. I hear

2:20:14your concerns. We hear your concerns.

2:20:15It's going to be reviewed by OSTA. OSTA

2:20:17is the agency that has authority over

2:20:20off-site traffic impacts. Uh and this

2:20:22issue was reviewed as part of the first

2:20:24withdrawn application. This Tigen Bond

2:20:26was involved in that process. Their

2:20:28traffic engineer was involved by in this

2:20:30process. Their traffic engineer was here

2:20:33addressed the commission. We

2:20:35>> saying that there wasn't a problem.

2:20:37>> Correct.

2:20:37>> Yeah.

2:20:38>> Correct.

2:20:38>> As far and I'm no engineer, but I just

2:20:41have to look at it and I can see whether

2:20:42there's going to be a problem. uh the

2:20:44figures that were initially given to us

2:20:47uh and I'm not an expert at math either,

2:20:50but the math I did every nine minutes

2:20:53there's going to be a truck going in or

2:20:55out of that facility. I mean, uh

2:21:00they're going to get nine eight and a

2:21:02half minutes of sleep in between people

2:21:05living in that neighborhood. Trucks are

2:21:06noisy, you know, and I'm going to be the

2:21:09first one to tell you if you got it, a

2:21:11truck brought it to you. I'm not

2:21:14condemning transportation. I'm not

2:21:16condemning your site. You know, I think

2:21:18you're doing a great job uh with what we

2:21:20ought to do there, but this is a unique

2:21:24situation

2:21:26uh uh 395 and I don't know why they ever

2:21:29did that uh and putting those access

2:21:32roads in, but for for the volume that

2:21:35this is going to create, it's not

2:21:37workable. Uh and

2:21:41uh I would be a bit uh remissed if I

2:21:44didn't

2:21:45>> We understand your comment and and this

2:21:47is being this is part of the uh the

2:21:49Oster review process. You're welcome.

2:21:51And we understand also that

2:21:53>> the town attorney um will be and town

2:21:55planner will be addressing this issue at

2:21:57some point as they stated earlier, but

2:21:59>> um uh

2:22:02we're relying on the on those cases. The

2:22:04Connecticut Supreme Court, there is a

2:22:05conclusive presumption. This is a use

2:22:06that's by site plan. It's not by special

2:22:08permit. Special permit uses, the

2:22:11commission has wide authority, wide

2:22:13discretion over any public health and

2:22:15safety concerns. Site plan review is

2:22:17more limited as noted in the town

2:22:19attorney's memorandum of June 27th.

2:22:23>> You cannot deny

2:22:25based on uh

2:22:30and uh you have to bear with me here for

2:22:33a minute. You know, it's true that the

2:22:37uh off-site considerations

2:22:42uh you're not supposed to deny if the

2:22:45pro if the project meets the regulations

2:22:49for site plan.

2:22:51You can't deny it be uh for any reason.

2:22:56That's a right. However,

2:23:01it doesn't exclude completely

2:23:04considerations for other factors.

2:23:07That's my interpretation of it. Okay.

2:23:10And uh

2:23:13I'm going to listen to everybody.

2:23:14>> Thank you.

2:23:15>> As I have,

2:23:17>> but uh I want that on the record.

2:23:19>> We agree. And those factors have to be

2:23:21set forth in the regulations. Those are

2:23:22the factors that I've been going through

2:23:24under section 470 of your site plan

2:23:26review standards. Um and and the next

2:23:29one is storm water management um uh

2:23:32adequacy of storm water management which

2:23:33Mr. Anderero um already went through and

2:23:36there's been coordination back and forth

2:23:37with Tyen Bond on that issue. Um

2:23:42uh the next one adequacy of water sewer

2:23:45uh which we excuse me which we uh just

2:23:48addressed those are being coordinated

2:23:49with other agencies as noted in in the

2:23:52staff report uh number comment number uh

2:23:55or u in the chart number 29. Um outdoor

2:23:59lighting is another consideration of

2:24:00your site plan review standards. Uh we

2:24:03include a full phototric light plan. Uh

2:24:06all uh fixtures are dark sky compliant.

2:24:09Um and uh staff in the staff report did

2:24:12request in comment in number 15

2:24:14additional information which will be

2:24:15provided. Um outdoor storage is point I

2:24:20the next consideration uh there is no

2:24:22outdoor storage other than trailer

2:24:24storage which is permissible um under

2:24:26the a per permissible accessory uh under

2:24:29the regulations and that's noted in in

2:24:32uh number two of the staff report. Um,

2:24:35in addition, I'd like to say outdoor

2:24:37trailer storage is, as I mentioned

2:24:39previously, is located to the north and

2:24:41east sides of the building. Um, and will

2:24:43be where there are uh dense natural

2:24:46vegetation uh um already existing. Um

2:24:50and in that area also the proposed

2:24:52conservation property

2:24:54signage which we discussed already uh is

2:24:58uh point J point K the adequacy of

2:25:01landscaping treatment. Um and the plans

2:25:04as we went through earlier include uh a

2:25:07planting plan. Uh hundreds of trees and

2:25:10shrubs and thousands of ground cover

2:25:11plantings are proposed as part of this.

2:25:13And the staff report uh notes compliance

2:25:16with this in numbers 12 and 13 as well

2:25:18as 23 and 24. Um that's it for the site

2:25:23plan review standards. There are other

2:25:25sections noted up here. Uh the business

2:25:27park

2:25:29um and off- streetet parking. Business

2:25:31park is section 436.2 and I'll go

2:25:33through this quickly in the interest of

2:25:34time. A lot of them are duplicative of

2:25:36the site plan review standards that I

2:25:37just addressed. Uh the first though is

2:25:39enclosed structures. is everything has

2:25:41to incur occur all operations within the

2:25:43building u aside from uh loading and

2:25:46unloading comply with that as noted in

2:25:48the staff report number 10 um outdoor

2:25:52storage which I just addressed the staff

2:25:54which the staff report notes is

2:25:55permissible and number two

2:25:58uh number three uh in section 436.2 two

2:26:01is uh provide access which deals with

2:26:04parcels that are um uh landlocked which

2:26:07does not apply. Um point four which

2:26:10deals with utilities putting all

2:26:12utilities underground we comply with

2:26:14that. Uh all utilities to be installed

2:26:16underground interior circulation is the

2:26:19fifth one address that as part of the

2:26:20site plan review standards. uh bicycle

2:26:23and pedestrian paths. Um Mr.

2:26:25Commissioner Huo, the uh the sidewalks

2:26:28um have to be six feet and they will be

2:26:30six feet per um your comment.

2:26:33Um

2:26:35uh truck parking and building setbacks

2:26:37is uh 7. Uh uh buildings have to be set

2:26:41back 50 ft from any residential district

2:26:43boundary. And um uh truck barking and

2:26:46building setbacks have to be 150 ft ft

2:26:49from a game preserve complies as noted

2:26:51in the staff report numbers 6 through 8.

2:26:53Uh landscaping is the next

2:26:55consideration. Um addressed that

2:26:57previously and the staff report notes

2:26:59compliance with landscaping requirements

2:27:0112 and 13 and 23 in the chart included

2:27:04in your staff report. Any can you can

2:27:07you add a note in there saying any

2:27:10damage to vegetation during construction

2:27:14will be replaced?

2:27:17>> Yes,

2:27:22>> I'm just jotting that down. Yep.

2:27:29>> Um

2:27:32buffering and screening

2:27:34is uh number nine. Um uh the staff

2:27:38report has requested some some minor

2:27:41revisions. Uh plan should include the

2:27:43staff report notes that the proposed

2:27:45conservation space is appropriate to use

2:27:47as buffers and screens. Uh it has

2:27:50requested uh revisions to indicate the

2:27:52limits of clearing no cut buffer which

2:27:54we will be doing. Um lighting is is

2:27:56number 10. The next consideration under

2:27:58the business park uh regulations which

2:27:59were addressed as part of the site plan

2:28:01review standards. Again a phototric plan

2:28:03has been included. There has been one

2:28:05request by uh uh staff to provide some

2:28:08additional information on the on the

2:28:09phototric plan which we will do. Um uh

2:28:12number 11 is refuse enclosures. Um and

2:28:16we comply with that. We have uh

2:28:18dumpsters on site.

2:28:21>> Okay. Seen you're on that. Can we have

2:28:23information on the external compressor?

2:28:27I think it's compactor and the augers.

2:28:30Can we have some information on that?

2:28:32Plus information on the generator.

2:28:36And how what is what how is the

2:28:38generator being powered?

2:28:41>> Uh on a uh a diesel uh

2:28:46subtank. I don't know what the the term

2:28:47is. Uh

2:28:48>> it's it's part of the generator.

2:28:50>> Yeah. The the the generator sits on its

2:28:53own on on its own tank. There's no

2:28:55natural gas service into the site.

2:28:56>> No, I I wasn't sure if it was propane or

2:29:00>> Yeah. Uh a belly tank. That's the term

2:29:02I'm looking for.

2:29:02>> And and it'll be contained.

2:29:05>> It has double Yeah. It's double 110%

2:29:07containment on its storage volume. Yes.

2:29:09We can compile some of that information

2:29:11for you.

2:29:11>> Yeah. If you can get us information on

2:29:13those.

2:29:13>> Yeah. Yeah. Yeah. And I I I think the on

2:29:16the staff report um there was a comment

2:29:18about uh and it sounds like uh

2:29:21Commissioner Huk, you found it. Uh I

2:29:23think in the staff report identified

2:29:25that the compactor trash wasn't found,

2:29:28but it's at the very southeast corner of

2:29:31the building. There are three positions.

2:29:33So we can

2:29:35>> Yes, we can provide information on that.

2:29:41>> So that is 436.2 2 business park uh

2:29:46district regulations and then there's

2:29:47additional regulations in 436.3 for

2:29:50business park uses subject to site plan

2:29:52review. They're really duplicative of

2:29:54everything I've just addressed and the

2:29:55staff report uh notes compliance with

2:29:58them. So uh in the interest of time I am

2:30:00going to uh skip those. We will provide

2:30:02a written submission on on these. Um we

2:30:05recognize tonight is not the final night

2:30:07because the wetlands agency hasn't acted

2:30:08yet. So this commission can act. So, as

2:30:11uh you requested as part of the first

2:30:13application process, Mr. Chair, uh we

2:30:15will provide kind of a a final um a

2:30:19document demonstrating compliance with

2:30:20all of the applicable requirements that

2:30:22have been discussed and that have been

2:30:23raised as part of the questions this

2:30:25evening. Um uh so with that,

2:30:30um the

2:30:33we did want to Yes, Mr. Cart. Again, I

2:30:35don't know why we keep missing it, but

2:30:37section 560 needs to be addressed. staff

2:30:39didn't address it and you guys haven't

2:30:41addressed it yet either. So, there's a

2:30:43section in 560 that I brought up with

2:30:45Tai and Bond for their review as well as

2:30:47you guys before that needs to be looked

2:30:49at related to the amount of excavation

2:30:51and the impacts on the groundwater flow

2:30:52regime. Right. You guys made a cursory

2:30:55comment last time, but you're add you're

2:30:57taking away 40 50 60 feet of fill I'm

2:31:00sorry existing natural drainage area um

2:31:02that's got groundwater filtration and

2:31:04you're putting about 50 acres of

2:31:05impervious area on top of that. There

2:31:07will be a change in the groundwater flow

2:31:09regime and there will be a change change

2:31:10in the groundwater quality that will be

2:31:12impacted that needs to be addressed. I

2:31:15will look at appendix I to see what the

2:31:16test reports show from test pits and

2:31:18boring logs. But um my last review was

2:31:21not sufficient enough to identify and

2:31:23delineate what those potential impacts

2:31:25may be to the groundwater flow regime

2:31:28related to the gravel worth especially

2:31:29when you're moving into that amount of

2:31:30material.

2:31:31>> Sure. Understood. We'll we'll pull some

2:31:34information together. And I think what

2:31:35you'll see is that from ground surface

2:31:38to competent bedrock is about 5 to 6

2:31:41feet maximum in places. So groundwater

2:31:44is about yay thick before you hit solid

2:31:47material. Uh I know this comment came up

2:31:49with time bond. We can pull out that

2:31:51information and provide you some

2:31:52additional

2:31:52>> but it's a large infiltration area that

2:31:54feeds the surrounding areas. So

2:31:56>> yep, again from our perspective and

2:31:57again I'm not going to delve into the

2:31:59wetlands guys, right? But it has an

2:32:01issue on the surrounding area and the

2:32:02drainage paths of that groundwater flow

2:32:03and which way it's going to go and how

2:32:05it may affect those those periphery

2:32:07areas around you that you identify that

2:32:08you are preserving and maintaining.

2:32:11>> Sure. and and that is the you know the

2:32:13the entire design and and maybe some of

2:32:16this discussion we've had with wetlands

2:32:17and what we should bring here too but

2:32:20the the storm water management system is

2:32:22designed uh with this explicit intent to

2:32:25redirect back to those same flow paths

2:32:27to so what we take as part of the the

2:32:30earthwork and removal we get back to

2:32:33those locations so um one of the items

2:32:35and I I can't recall if we've discussed

2:32:37it with you but the outfall locations

2:32:39were GPS located specific specifically

2:32:41to mimic existing conditions. So the

2:32:44outfalls that you see for the storm

2:32:45water management system are specific and

2:32:48explicit based on field conditions of

2:32:50where those areas drain. So we can

2:32:52aggregate all that up but

2:32:53>> it's on the surface water side you need

2:32:55to bring in the groundwater side too.

2:32:57>> Sure. Okay.

2:33:05>> So we we do have we recognize there are

2:33:08interveners in this proceeding. Um, we

2:33:10do, um, I have a couple slides on that.

2:33:12I don't know, um, if now would be an

2:33:15appropriate time for

2:33:17Tagen Bond, your third party peer

2:33:19reviewer, to to go through the review

2:33:21process before we get to the

2:33:22intervenors. Um,

2:33:25>> can I ask?

2:33:26>> Yes, sir.

2:33:26>> Just two uh, two questions. There will

2:33:30be no fueling on site, right? So,

2:33:33>> correct.

2:33:34>> So, they'll have to go to Dave or the

2:33:36new one in Adawan or some place. They'll

2:33:38have to find a spot if they need fuel.

2:33:41Okay. And is there a first aid room

2:33:46>> in the building?

2:33:59>> Is there a first podium, please?

2:34:07And where is it located if there is?

2:34:16>> No. For the programing? No. But we can

2:34:19include it if needed, but it's not for

2:34:21now.

2:34:24>> Nothing.

2:34:26>> You said not not right now, but if if

2:34:28you would like one included. Well, if I

2:34:32think it'd be easier for the ambulance

2:34:34for one, if if something happened, you

2:34:36got to at least they'll know where it

2:34:38should be in the first aid room.

2:34:39>> Okay.

2:34:40>> And it should be on I think that's the

2:34:42west side where the employees parking

2:34:44lot.

2:34:45>> Yes, sir.

2:34:47>> Thank you. [clears throat]

2:34:50>> So, under site plan review

2:34:54that says the site plan should have

2:34:5618inch trees marked out. It was I I'm

2:35:00sorry if they're here. I can't see them.

2:35:04Have they been marked out and with the

2:35:05species and all

2:35:08>> existing trees?

2:35:09>> Yes.

2:35:09>> No, they're they're not

2:35:11>> that's the requirement under 470.7C.

2:35:14>> Okay. I don't know that you need to do

2:35:16700 acres or whatever it is, but but

2:35:20>> yeah,

2:35:21>> the ones close to being

2:35:25um

2:35:27also you talked about how salt off the

2:35:30snow offsite where do you have any idea

2:35:32where you might be putting that or would

2:35:34you at some point

2:35:36because if it's in town or not it's I

2:35:40think it's a area of concern if it's a

2:35:43salt salt contaminated snow or

2:35:46>> No, I don't don't know. It would depend

2:35:49on the the contractor and the vendor.

2:35:50Yeah.

2:35:51>> Yeah. So, but certainly if it was a

2:35:53requirement that we provide that

2:35:54feedback, we could um you know, those

2:35:56those disposal areas are are typically

2:35:58regulated to prevent, you know, dumping

2:36:01from streams and wetlands and all that

2:36:03kind of stuff. But we can compile that

2:36:05information uh and and provide it when

2:36:07uh a contractor is engaged.

2:36:10Um I do a lot of snow plowing have for

2:36:14numbers of years and I just look at your

2:36:17what you were showing on snow plowing it

2:36:19seems very limited. I mean it I mean for

2:36:22the no average snowstorm you're probably

2:36:24sufficient. If you start getting into

2:36:27I don't know the rarities of the 20 and

2:36:2930 inch storms it seems like you want to

2:36:31be having backups and a lot of little

2:36:34more areas. Well, the the trade-off is

2:36:37we go cut down trees to create space for

2:36:42possible snow storage.

2:36:45I guess a trade-off that

2:36:46>> I'm not a forester,

2:36:48>> right?

2:36:49I don't know.

2:36:50>> I mean, you brought it up as snow. I'm

2:36:52looking at it from a snow point of view.

2:36:54That's all you

2:36:56>> It's your job to design you figure.

2:36:58>> Yeah. And it's and I would argue it's a

2:37:01balance of uh of additional site

2:37:05clearing to create more real estate to

2:37:08put lawn there to maybe someday have

2:37:10snow in it. Um we tried to and I I again

2:37:14I think the number is somewhere around

2:37:1610%. I think Ty Bon identified that you

2:37:18know some guidance as around 20%.

2:37:21>> So we're half of that in discrete areas

2:37:24plus some some fluff in the parking and

2:37:27and trailer court. Um, so we're probably

2:37:29not at 20%, but we might be at 15 18%

2:37:33when when you're done. Um, and then I

2:37:36don't know of a you know, again, that's

2:37:38a rule of thumb. Maybe last year it was

2:37:40not enough and this year it's too much.

2:37:42>> Changes we all understand.

2:37:43>> Yeah. But um you know it's certainly a

2:37:45balance of we can create more real

2:37:48estate and and the same same goes true

2:37:50with uh and I think one of the comments

2:37:53uh from the third party reviewer is

2:37:55talking about additional um why not do

2:37:58more above ground storm water basins and

2:38:01more infiltration. The trade-off is we

2:38:04go and cut down another 10 or 20 or 30

2:38:06acres of trees to go dig a storm water

2:38:09basin. Our goal would be to limit

2:38:12disturbance to the maximum extent

2:38:14feasible. We think we've done that with

2:38:16the limited disturbance, keeping it

2:38:17close to the site. That comes at a

2:38:19premium and and putting underground

2:38:21storm water chambers. Um, but I would

2:38:24say the same with snow storage of maybe

2:38:26there's a premium for for hauling it

2:38:28off, but the trade-off is we keep our

2:38:30limited disturbance as tight as

2:38:31possible, maximize the amount of open

2:38:33space we keep, and maximize the amount

2:38:35that we can put into uh conservation.

2:38:38So, but point taken.

2:38:40Um,

2:38:42so access to the parking lot I was

2:38:45looking at

2:38:48the print and it shows I'm just trying

2:38:50to be clear here understanding traffic

2:38:52flows.

2:38:53Um, it shows the the main access road.

2:38:56It looks like it exits. How do you get

2:38:58to the employee parking lot? I guess

2:39:00that's the simplest question.

2:39:02>> Sure.

2:39:09go all the way.

2:39:10>> So, you got a split that goes to the

2:39:11rear. I assume that's the truck traffic.

2:39:13>> Yes. Yeah, I'll get there uh shortly.

2:39:17Oh, that rendering might have been a

2:39:19good one. Okay. So, come in from from

2:39:22Westcot. Uh and then keep moving the

2:39:25cursor right around there. We

2:39:27transition. And so at this point, we've

2:39:29cleared the constraints of the narrowest

2:39:31parts of the driveway, the bridges, and

2:39:34the driveway expands to four lanes.

2:39:37Trucks move to the right lane and

2:39:39continue up along the right hand side.

2:39:42Yep. Keep going right. And that brings

2:39:44you directly back to the uh guard shack

2:39:47to enter the truck court. If you are in

2:39:49the the lefth hand lane inbound, you

2:39:54would Yeah. At the split here, you you

2:39:57would stay straight. The the truck turn

2:39:59is the actual movement off. Uh you would

2:40:03uh head in here, keep going. Uh then you

2:40:07continue on and it brings you to the um

2:40:10the western side of the associate lot

2:40:13where you could then enter um the

2:40:16parking field. Um and then to leave, you

2:40:20would go in reverse. You would head back

2:40:22to the western edge of the associate

2:40:24lot. Uh, yep. Right there. And then

2:40:27continue down the page. Uh, and um, the

2:40:32truck traffic would have merged with

2:40:33you. Uh, when we were at four lanes

2:40:35back. Yep. Thanks. That's the exiting

2:40:37traffic from the main guard shack. They

2:40:39come in and merge into the right-hand

2:40:41lane. Uh, we then head out and down. Uh,

2:40:45we then uh, transition from four lanes

2:40:48to two to get to the bridges and the

2:40:49narrowest part of the site. and then

2:40:51head back out. So, um the other thing

2:40:54that I would point out and um this was a

2:40:56discussion with the fire marshal. Uh if

2:40:59you were say uh to drive an emergency

2:41:03vehicle in and you followed the truck

2:41:06route, keep going. Yep. Uh keep going.

2:41:08Right there, there is a cut over that

2:41:11would allow an emergency vehicle, so

2:41:13mountable curb would allow emergency

2:41:15vehicle to get to the front of the

2:41:18building if that's where they were

2:41:19trying to go. So call it a relief valve.

2:41:21Um that was in coordination with the

2:41:23fire marshall to make sure that his

2:41:25vehicles had another way if say it's

2:41:28your first day driving a firet truck and

2:41:30you came here um and you headed up the

2:41:32truck route, you would still be able to

2:41:33access the front of the building. And

2:41:35the same with leaving a fire truck could

2:41:37use that as an emergency egress route

2:41:39and get to the truck route and uh and

2:41:42head head down and uh west and south.

2:41:45So, um the intent is to split the

2:41:49traffic as as soon as possible. Um but

2:41:53working within the constraints of the

2:41:55existing wetlands and the driveway

2:41:57coming in off of Westcop.

2:41:58>> So the [clears throat] you put the arrow

2:42:01back on the corner.

2:42:03So then that road right there is the

2:42:05two-way traffic for the in and out. And

2:42:08so what's the word to the south of that

2:42:11or west of that?

2:42:12>> Yeah, right there.

2:42:13>> Yep. that that is the exit from the

2:42:16secondary guard check. So, there is a

2:42:18second way uh for trucks around the

2:42:20building. It's not used regularly. Um if

2:42:24there was a maintenance or something had

2:42:26to happen at the primary guard check and

2:42:27that uh impeded the ability for trucks

2:42:30to to get in or out, um we have a uh a

2:42:34second means of moving trucks uh out of

2:42:36the facility. So that is actually grade

2:42:39separated from the the main drive that

2:42:42runs north and south across the bottom

2:42:44of the associate parking lot driveway.

2:42:47So there's a dedicated truck lane there.

2:42:49Uh and it eventually merges in. But um

2:42:52that is uh just another means of egress

2:42:55from the uh the truck court and uh we

2:42:58keep that separated from passenger

2:42:59vehicles for as long as physically

2:43:00possible.

2:43:02So, is there a cross-section on what the

2:43:05design of the pavement structure is?

2:43:08>> I didn't.

2:43:08>> Yes. In the CS500 series, there are

2:43:11details of the

2:43:12>> Do you remember how thick the asphalt

2:43:14is?

2:43:17>> Uh,

2:43:18typically two lifts, generally four to

2:43:20four and a half inches. You know, it's

2:43:23uh, you know, it used to be class two

2:43:25and class one. Now, I think they're

2:43:27super pave mixes

2:43:28>> dimensional. Yeah, it's um and there's

2:43:30typically two sections. There is a a

2:43:32passenger vehicle section and then I

2:43:34call it a heavy duty section uh for

2:43:36areas that take the the truck loading.

2:43:38Um and with that, the pavement thick

2:43:40thicknesses vary as well as the subbase

2:43:43thicknesses.

2:43:45>> So, Robin, would would there be a

2:43:47bonding issue on this project?

2:43:54I mean, it's in the site plan review

2:43:56rags, but I'm just asking if it's

2:43:59>> So, I'll have Ken confirm this, but for

2:44:01bonding under the statute, you can only

2:44:04bond for public improvements.

2:44:06>> Okay.

2:44:06>> This is all private on-site. Um, you can

2:44:09>> I it's on

2:44:12>> um you can bond for erosion and

2:44:14sedimentation control measures. Um, but

2:44:17other than that, you're really limited

2:44:18on a private development.

2:44:20>> Okay.

2:44:21So that's something to consider.

2:44:23>> I don't disagree with that, Mr. Chair.

2:44:25>> I'm sorry.

2:44:25>> I said I don't disagree with that, Mr.

2:44:27Chair.

2:44:30>> Sir,

2:44:31>> I have one other

2:44:33>> uh

2:44:35in this document for tonight's meeting

2:44:38under working list of conditions for

2:44:40consideration. Number 10, it uh it

2:44:45addresses the fact on those access roads

2:44:48where trucks will be prohibited from

2:44:50parking there waiting for access into

2:44:53the facility

2:44:55and uh

2:45:06what's

2:45:08to wait there idle, you know,

2:45:11Uh so again, you know,

2:45:16it seems as though it's it's selective

2:45:20where we're able to talk about certain

2:45:22things and not other things, but uh

2:45:25include that in whatever you give the

2:45:27DOT. You know, that's going to be a

2:45:29problem, too. you know, truckers. Uh uh

2:45:33there's a lack of uh of uh rest areas

2:45:37nationwide

2:45:39and uh

2:45:42somebody's going to have to enforce

2:45:43that, but uh that certainly should be in

2:45:46as a condition of improvement. There's

2:45:48no question about that.

2:45:52>> Sure. We we don't anticipate that's

2:45:54going to be an issue, but it is a

2:45:55proposed condition of approval here. Uh

2:45:57yes, Commissioner Hugo.

2:45:59>> Oh, no. Okay.

2:46:02>> So far,

2:46:03>> thanks.

2:46:06>> So, we discussed earlier about in your

2:46:09first

2:46:11you you said everything that was

2:46:12approved at that time was moving forward

2:46:14into this application from the first

2:46:16application to this application. So, I'm

2:46:19just want to verify like the open space

2:46:21connection

2:46:23for uh to the town's open space. I

2:46:27probably remember

2:46:31the 216 acres.

2:46:32>> Yeah, exactly. Exactly.

2:46:34>> Yes, that's correct.

2:46:35>> Don't see it mentioned. So, I'm

2:46:38>> Make sure we make sure.

2:46:41>> Sure.

2:46:44>> So, on that drawing right there, what's

2:46:46the blue line? The the light blue line,

2:46:48I guess. Yeah, that

2:46:51>> that's the limit of disturbance. That's

2:46:53the area that work needs to take place

2:46:55in to build the improvements. So it's a

2:46:58little bit wider than you know the curb

2:47:01and the walls and the driveways. So

2:47:03accounts for grading um the septic

2:47:06system and any of the storm water

2:47:07outfalls.

2:47:08>> So down off of Baker Street you've got a

2:47:10something what is that connection right

2:47:13there?

2:47:14>> Yeah. So, uh, as part of the first phase

2:47:18of work, um, there is a temporary access

2:47:22proposed to, um, enter from the Baker

2:47:26right away to allow us to get to the

2:47:29back side of the bridge. Uh, that allows

2:47:33the bridge abutment to be built so that

2:47:35we have the ability to have abutments on

2:47:37both sides and build the bridge. So that

2:47:39is an early phase of uh essentially a

2:47:43temporary driveway to allow that

2:47:45backside bridge work and that's

2:47:47abandoned receded uh and then the bridge

2:47:50structures are used to enter and exit

2:47:52the site.

2:47:53>> So

2:47:55that particular section is going to be

2:47:57graveled or stoned or what what are you

2:48:00planning?

2:48:00>> Yeah, it it would be a construction

2:48:02Yeah, non-pave construction driveway.

2:48:04It's um generally steep slopes. for

2:48:07flattening them out in some spots, but

2:48:08that's for uh construction traffic to

2:48:12allow access to the um north side of the

2:48:16the bridge abutman construction. Now, to

2:48:20go back to one of my earlier questions

2:48:22about alternate access, why couldn't you

2:48:25leave that there to provide an emergency

2:48:29access,

2:48:33you know, instead of just the narrow

2:48:34part of the road and the bridge if there

2:48:36something were to happen because it does

2:48:38appear where hooking up the road

2:48:40actually widens out at that point

2:48:44>> on the former Baker Street or Baker

2:48:47Street? Oh, it widens out on your road,

2:48:49your proposed.

2:48:50>> Oh, where we we start a transition to

2:48:52four lanes. I understand the bridge.

2:48:54>> Okay.

2:48:55>> So,

2:48:55>> so evaluate the idea of keeping that

2:48:58temporary access to essentially an

2:49:01>> emergency emergency alternate access.

2:49:03>> Okay.

2:49:04>> It's already there. I mean,

2:49:07>> okay, take a look.

2:49:09>> The rest of the road is d wide. Yep.

2:49:11>> That's the narrow section. That would be

2:49:13what I'm concerned about as far as

2:49:15emergency access. Okay.

2:49:17Emergency access in a sense of an

2:49:19emergency.

2:49:25>> Any other questions from other

2:49:26commissioners?

2:49:32>> No,

2:49:33>> not right now.

2:49:36>> So, I think we have Are you going to the

2:49:39phasing slide?

2:49:42>> That's probably the best. try to keep it

2:49:43before

2:49:44>> we're going to D. Well, yeah, it's it's

2:49:46hopefully a back and forth to spark some

2:49:49dialogue. Um, so, uh, and forgive me, I

2:49:54don't have the section written down in

2:49:55front of me. Um, but your zoning

2:49:58regulations identify that project

2:50:01phasing should disturb no more than five

2:50:03acres

2:50:04>> uh, at a time subject to um, you know,

2:50:07the discretion of the commission through

2:50:09discussion with the applicant. So we

2:50:11have been looking at the phasing uh with

2:50:15the construction team and the the site

2:50:18contractor that would be executing the

2:50:21work. Um and the this plan uh is is the

2:50:27desired work plan. um where we would ask

2:50:30for the ability to disturb up to 30

2:50:33acres as part of a phase um which is

2:50:38permitted through um Connecticut deep

2:50:42permit but um recognizing your zoning

2:50:44regulations have a a different um value

2:50:47established um and the reason for the

2:50:50request to uh a larger work area um

2:50:54again it [clears throat] would be

2:50:55appropriately um designed in terms of

2:50:58spell erosion and sediment control is um

2:51:02going to a smaller area prolongs the

2:51:05construction process by four to 5 months

2:51:08probably at least if we um were to

2:51:11shrink this to um a 5 acre disturbance.

2:51:14So what we would request the 30 acre

2:51:17work plan is that it allows us to

2:51:21construct the um the site driveway. So,

2:51:25um that is the the finger you see there.

2:51:28Um that from Wescott into the the heart

2:51:31of the site is about 15 acres worth of

2:51:34disturbance. We would then request the

2:51:37ability to conduct blasting and rock

2:51:40removal in a 1 acre increment that moves

2:51:43along uh the eastern side. And with that

2:51:47rock removal, we're able to process the

2:51:50rock, build the fills to allow the

2:51:53driveway to come up to grade and begin

2:51:55the work for the retaining wall um where

2:51:58the the cursor sits. And then as that

2:52:02either of those areas is established and

2:52:05set, we would then move to the north uh

2:52:09and to yeah, basically just to the north

2:52:12on both the eastern and western side. Um

2:52:15again the the reason for the request is

2:52:18we need to move the fill from the

2:52:20interior of the site to establish the

2:52:23roadway grades and to to build the

2:52:25retaining wall. Uh it is possible to do

2:52:28in uh with only 5 acres of disturbance.

2:52:31Um and do you have that slide? And

2:52:34basically uh is there another one that

2:52:37um

2:52:39uh okay it's all right. Um but but what

2:52:42happens is we uh have the we start the

2:52:46blasting work in a oneacre increment in

2:52:49the southeast corner but we are only we

2:52:53are taking some of our disturbed area to

2:52:55establish a hall road and then are now

2:52:57working in a very small area at the

2:52:59entrance to Westcot and then we

2:53:02piggyback and move all the way in. So um

2:53:06doing that again it just uh adds time to

2:53:09the total construction duration. We we

2:53:12don't think that the 30 acres is

2:53:15unreasonable for a project of this scale

2:53:18and uh with the type of construction

2:53:20team that builds these. In my 24 years

2:53:24of being a professional engineer, I've

2:53:26never had a project in the state that

2:53:28was limited to uh five acres of

2:53:31disturbance. If you had a 5 acre

2:53:33disturbance cap, you wouldn't be able to

2:53:35build the lows, you know, uh, in a

2:53:38single shot, you would have to phase it

2:53:40because the building and the parking

2:53:41would exceed it. Even something like a

2:53:43stop and shop would likely exceed the 5

2:53:46acre disturbance. So, um, we wanted to

2:53:48to start the dialogue and recognize we

2:53:51may not conclude it, but, um, and can

2:53:54certainly come back with more detailed

2:53:56information, but, uh, as we've been

2:53:58looking at this, the the ask is, um,

2:54:02from a ability to move the work,

2:54:06you know, minimize the amount of

2:54:07disturbance we have, minimize the amount

2:54:09of time that we have disturbed soil,

2:54:12minimize the amount of time that we have

2:54:13truck and construction traffic. uh

2:54:15moving this in larger phases helps us

2:54:18accomplish that. So uh I'm sure the

2:54:20commission's dealt with this on other

2:54:22>> phases would that be

2:54:23>> uh so at at you know it's call it three

2:54:26and a half it's probably four phases um

2:54:29if we moved at uh 30 acres a clip um but

2:54:32the

2:54:34>> isn't that all part of the uh gravel

2:54:36rags I think isn't five acres

2:54:42>> right?

2:54:44Yes, it's it's in the the zoning

2:54:46regulations or at the commission's

2:54:48discretion is kind of how it's left.

2:54:50Yes.

2:54:50>> And then for a Corey, I think there is a

2:54:53a hard cap at 10. Um

2:55:01so again, recognizing that we've been

2:55:03talking for a long time, but this is an

2:55:05item that we wanted to to get in front

2:55:07of you and begin the dialogue on. Um

2:55:09certainly wouldn't want to you know

2:55:11recognizing it's a balance of how much

2:55:13activity uh you want occurring at one

2:55:16time but also need to balance how long

2:55:19the activity happens for um and don't

2:55:23want to arbitrarily extend um you know

2:55:26site disturbance and construction

2:55:27activity longer than necessary um you

2:55:30know if you have that discretion. So,

2:55:33>> right. Um, also, do you have,

2:55:38forgive me if it's already on your plan,

2:55:39do you got ledge outcroppings on shown

2:55:41on it? I didn't

2:55:43>> uh Yeah, I think on on probably on the

2:55:45survey it it is, you know, surf there

2:55:49are surficial areas where you can walk

2:55:50and and see ledge. Um, I'm not aware of

2:55:54any, you know, rock fa you know, cliff

2:55:56faces. It's um you know the the

2:55:58overburden on the existing bedrock is

2:56:01shallow and the rock itself is very

2:56:04competent. Um so you don't go down far

2:56:07till you hit um near competent rock.

2:56:11>> And one other thing for the water storm

2:56:14water I know there's a there's a big

2:56:17pipe that comes from down here all the

2:56:19way up there. I'm not sure if it goes to

2:56:20that side of the highway or not. It's

2:56:24like a six or nine foot diameter pipe

2:56:26that that goes all the way up. Is that

2:56:28>> there?

2:56:29>> Do you have knowledge of that?

2:56:30>> Yeah, our our survey. So, as part of our

2:56:33storm water analysis, we we got the

2:56:35original 395 drawings that show the the

2:56:39pipe network uh that they installed as

2:56:41part of 395. Um, and I don't have that

2:56:45specific watershed, but everything kind

2:56:47of moves around the bend uh to the north

2:56:51kind of off the page here. And then

2:56:53there's the large culvert that goes

2:56:55under um 395. Uh and then

2:56:59>> so it does start on your side of

2:57:00>> there. Yeah, it it kind of it's on both.

2:57:02There's there is a call it a swale that

2:57:05was constructed on the east side of 395

2:57:08and there's another swale that was

2:57:09connected on the west side of 395. Those

2:57:12all head north together taking

2:57:14intermediate runs and catch basins

2:57:16taking the median of 395. Uh but

2:57:19eventually after you get around the bend

2:57:21there, they all come together. Um and

2:57:23that was some of the analysis that we

2:57:25did. Again, if you had a chance to read

2:57:27the the time bond comment about um they

2:57:30asked us to look at impacts to off-site

2:57:33areas. Um and as part of that we

2:57:35included you know some of that figure

2:57:37but um yeah there is there is large

2:57:40pipes as you uh head north on 395 that

2:57:43take I don't I don't know I' be guessing

2:57:46at the number another 100 acres of 395

2:57:48right away uh including

2:57:50>> So is that whole series is off of your

2:57:52land? I'm

2:57:53>> Yeah, it is on 39. It is on the state

2:57:55right away. The state right away.

2:57:57>> Correct. Yeah. All those pipes uh exist

2:57:59on 395 and the swale itself kind of

2:58:03bounces on the property line. Um I don't

2:58:05know, it's probably hard to see at this

2:58:06scale, but you can see some dark

2:58:08contours right off the shoulder of 395.

2:58:11And then there's a swale that you know

2:58:13as you come up the back side of the

2:58:14swale, you're probably crossing onto the

2:58:17um the private land. But um the

2:58:19infrastructure itself was built as part

2:58:21of the 395.

2:58:22>> Ultimately, all your drainage

2:58:24>> goes

2:58:24>> goes in that same pipe.

2:58:26>> Yes.

2:58:26>> Yeah. for uh call it twothirds of the

2:58:31property there is a small piece that uh

2:58:33heads to the east and then um as you

2:58:36come down the driveway you eventually

2:58:37coingle with the WCOT uh drainage system

2:58:40and what exists in Stern and Baker but

2:58:43um the you know the basically what

2:58:45you're you're looking at there between

2:58:46395

2:58:48uh and the parking lot as well as a

2:58:49parking lot and most of the roof

2:58:52comingle with all that 395 drainage as

2:58:54it leaves our site.

2:58:57Okay.

2:58:59>> And I found the section of the phasing

2:59:01that was being discussed earlier, the

2:59:02five acres versus 30. That's uh section

2:59:05560.7, which is the performance

2:59:07standards. If you go to U of that

2:59:10section, that's the the one that was

2:59:12being discussed,

2:59:13>> but that was in the gravel, right? 560

2:59:15is a gra

2:59:17>> earth and excavation.

2:59:18>> Yeah.

2:59:18>> Yes.

2:59:19>> 560 point

2:59:22>> 560.7. if you go to U all the way at the

2:59:25end of that section.

2:59:29>> Okay.

2:59:32>> So, how does the five acre increments

2:59:33impact your um phasing plans that you

2:59:36have in the set of drawings they

2:59:37provided us?

2:59:39>> We're we're going to do new ones and

2:59:41that was uh some of our response to time

2:59:43bond as we kind of deferred on answering

2:59:46um or completing updates to the soil

2:59:48erosion sediment control plan. Um

2:59:50because is either scenario of if we had

2:59:52to take it from what's currently shown

2:59:54as a full fa a single phase um which we

2:59:58commonly do and if we we met uh at a 30

3:00:01acre threshold we would adjust the plans

3:00:03to reflect that um and if we were um

3:00:06down at 5 acres the plan would look

3:00:08different. So, um, that was one of the

3:00:11items that we, uh, left open in the

3:00:12entire bond response saying we we're

3:00:15work going to work through with the

3:00:16commission on what the the right number

3:00:18is and then adjust the plans

3:00:19accordingly. So, um, those plans will be

3:00:22revised as we work to a solution here.

3:00:25>> Yeah, I don't believe in the rules we

3:00:26have the ability to go above 10, but

3:00:32>> Okay. [clears throat]

3:00:34>> Just I don't remember anything that

3:00:36allows us to go above. I know we can go

3:00:38from 5 to 10. You can go from 5 to 10

3:00:40with commission approval, but I'm not

3:00:41sure we can go above 10.

3:00:45>> The regulation says that rock quaries

3:00:47cannot exceed 10 acres. So that that

3:00:50restriction on 10 acres in this section

3:00:52applies just to rock quaries. It doesn't

3:00:54doesn't address the other uh types of

3:00:57proposed uses.

3:00:59>> So

3:01:01>> without that prohibition,

3:01:02>> I think there's another section

3:01:03somewhere that does scope 10, but that's

3:01:05okay. Yeah.

3:01:09So, what other questions? Other

3:01:12commissioners got any others? Um, I'd be

3:01:14curious what the architect might have to

3:01:16say about the roof like snow loads. How

3:01:18what's the like 30 inch with ice? How

3:01:21how, you know, what would be the maximum

3:01:25that it could take. I only say that

3:01:27because of, you know, we have we don't

3:01:29get it a lot, but we do get where you're

3:01:31shoveling roofs off. Um I I I remove

3:01:36snow in the industrial park and I've

3:01:38been out there a lot of times getting

3:01:39that. So those are would be the extreme

3:01:42situations.

3:01:43That's what I'm kind of referring to

3:01:45when I talk about having the enough area

3:01:48and then or having places to to dump it.

3:01:52I mean I know what we go through to try

3:01:54and find spots to put dump what we have

3:01:55and I work out of the industrial park

3:01:58which is I don't think all of it

3:02:00combined is close to what you guys got.

3:02:03So,

3:02:04it's it to me it's a concern.

3:02:07>> Sure. We'll we'll take a look at that.

3:02:11>> Any other questions for Christian? I I

3:02:13do have one.

3:02:15>> How and where

3:02:17will the snow be removed from the

3:02:20trailers

3:02:22before they leave the premisy premises?

3:02:25>> Yeah. Um what Amazon does in the winter

3:02:27time is they bring in one of the roof

3:02:28rakes uh at the outbound lane to um the

3:02:32guard check. So they don't have a

3:02:33permanent uh you know snow broom or

3:02:35whatever you may call it. Um but they do

3:02:37they do bring it in for the winter uh as

3:02:40needed to pull the snow off the roofs

3:02:41because you can't drive with the

3:02:42unsecured load on top. So um it is a a

3:02:45thing that they do.

3:02:46>> So it will be

3:02:47>> so it will be by the guard checks.

3:02:49>> Yeah. on on the outbound area as

3:02:52[clears throat] you're heading. So, as

3:02:53you're heading to leave the facility,

3:02:54you you'd pass through it

3:02:56>> and then they will be there to remove

3:02:58the snow from the road

3:02:59>> and they'll have to remove the snow from

3:03:01the road or

3:03:02>> or if there's a more appropriate

3:03:04location that allows the truck to spin

3:03:06around. Um, but it would be a temporary

3:03:09structure. It's not permanent. Bring it

3:03:10in for the season. Um, but we've uh as

3:03:13we were coordinating some of the

3:03:15responses uh and you know there was a

3:03:16number of questions about on-site

3:03:17fueling and and you know vehicle

3:03:19maintenance and that you know that does

3:03:22not happen on site. Um but they did

3:03:24Amazon folks did tell us that they do

3:03:26have the snow broom or it's got a brand

3:03:28name I can't think of off the top of my

3:03:29head but um that is brought in for the

3:03:31winter for snow removal off the top of

3:03:33the trailers.

3:03:35>> Okay.

3:03:36>> Okay. Um anybody else at this point? Do

3:03:40we

3:03:42intervene or do we address that? Now

3:03:45>> I I had one question for if I could, Mr.

3:03:48Chair, of of the applicant. Um there was

3:03:51a report that came in last week from the

3:03:53third party reviewer that in in some

3:03:56instances

3:03:57um agreed that the uh interveners

3:04:01consultant Steve Trinkus' requests um

3:04:05were reasonable and there were some

3:04:06things that were requested. Um and I

3:04:08just got the report uh actually just

3:04:11today. Um what's the status of that? Is

3:04:13there going to be because that report

3:04:15was relatively recent. Is some

3:04:16additional information going to be added

3:04:18because if it's related to the you know

3:04:20one angle one thing that could happen

3:04:22tonight depending on how many how long

3:04:24the commission wanted to meet is you

3:04:25could hear from the interveners. The

3:04:27intervenor um I think ms Murphy said

3:04:30last time that they were going to rely

3:04:32on Mr. Trinkus's report. So they might

3:04:34not want to present any additional

3:04:35testimony. So that's one thing you could

3:04:37get clarified tonight whether or not

3:04:39anything in addition is going to come

3:04:40in. Um so I'd suggest doing that um if

3:04:43you were going to continue beyond where

3:04:45we are right now. And then the other

3:04:47thing would be um to get clarification

3:04:50if there is going to be some more

3:04:51information that did relate to what Mr.

3:04:53Trinkus was recommending. Um I would

3:04:56suggest waiting to make the final

3:04:57determination on the issues that were

3:05:00raised by the interveners until that

3:05:02additional information comes in. But you

3:05:04could still use the time tonight to the

3:05:07the extent that the intervenors wanted

3:05:08to present any evidence. Uh give them

3:05:10that opportunity. So that's one

3:05:12recommended course of action you could

3:05:13take.

3:05:15>> And and am I right? Is there additional

3:05:17information that's going to be coming as

3:05:18a result of third party review and some

3:05:20of the comments that were made with

3:05:21respect to the trinkus report? I

3:05:23>> I've made it through page 17 and 25 and

3:05:25uh nothing yet.

3:05:28Um,

3:05:34>> oh, I think I'm getting closer here.

3:05:37>> Yeah, we and um for council this you're

3:05:42referring to our October 28th response

3:05:45to the time bond response to the

3:05:47trinkets letter. Is that the am I

3:05:49chaining that correctly?

3:05:51>> Maybe. Uh so on the 23rd, I've got the

3:05:54report today from the third party

3:05:56reviewer on the 23rd that indicated that

3:05:59there were some some aspects some they

3:06:02didn't they didn't think you needed to

3:06:03provide any additional information and

3:06:04others you did. Um have you responded to

3:06:07the areas where they asked you and

3:06:09provided the additional information and

3:06:11when did the when did we get that? I

3:06:13haven't seen it but when did the

3:06:14commission get it?

3:06:15>> Sure. So um on October 28th we responded

3:06:21to the October 19th time bond letter. So

3:06:26uh Trinkus uh letter was dated October

3:06:291st. On October 19th, Thai Bond uh

3:06:34provided a review uh answered many of

3:06:37the questions or comments and then

3:06:40issued a letter to us on the 19th saying

3:06:44here are a number of items that the

3:06:45applicant can respond on. Uh we

3:06:50finished that response on the 28th and

3:06:53submitted it and I believe there are

3:06:58I want to say yes there are items

3:07:01related to updating the soil erosion and

3:07:04sediment control plans per the

3:07:05discussion with commissioner card on um

3:07:10depending on which way the phasing

3:07:12direction goes from the commission um

3:07:15those plans would need to be revised.

3:07:17But out of the um 41 comments

3:07:23um

3:07:25there may be two or three that relate to

3:07:29the soil erosion and sediment control

3:07:31plans. I believe I'm comment

3:07:34looks like 29 31 39 and so maybe four

3:07:40and 41 all relate to the soil erosion

3:07:43sediment control plan. and we say, you

3:07:45know, our kind of our last paragraph on

3:07:48item number 41. Um, you know, we say,

3:07:51see comment above. Um, and we're

3:07:53requesting planning and zoning

3:07:54commission feedback on the project

3:07:56phasing approach. Upon the feedback,

3:07:58we'll proceed the selected path, review

3:08:00and revise the construction sequence.

3:08:02Um, and with that sequence comes the

3:08:03soil erosion and sediment control plans.

3:08:05Um I would say all of the technical

3:08:08comments with regard to uh storm water

3:08:13all the general comments storm water

3:08:15comments uh were addressed. Um now

3:08:19obviously time bond has not provided a

3:08:22feedback on that yet I'm sure if they're

3:08:23here this evening um but the soil

3:08:26erosion measures uh are are relying on

3:08:29our total phasing acreage that uh we

3:08:31just started discussing.

3:08:33Hope that helps. a lot of words I know

3:08:34but

3:08:35>> um so just for the record I think the

3:08:37issue here is when their response memo

3:08:40came in it is actually not to you guys

3:08:43um it is to uh the in the wetland

3:08:45commission and so it is not in your

3:08:48packets and you have not seen it um

3:08:50because it wasn't to this commission so

3:08:54>> um I know it's hard because it's the

3:08:56same for both but we don't put

3:08:59memorandums to the planning you know

3:09:01that's to the wetlands and the planning

3:09:02and zoning commission packets It's so

3:09:04you really should, you know, change that

3:09:06and then we can put it in the right file

3:09:07for you.

3:09:08>> Okay. So, so with that, I think you

3:09:11should refrain from making the final

3:09:12decision on the the questions raised by

3:09:15the intervention petition. But um the as

3:09:19the the applicant has finished their

3:09:21presentation if the commission wanted to

3:09:24give an opportunity for the the uh

3:09:26interveners if they had anything to

3:09:27present in addition to the reports that

3:09:29they've submitted as again my memory was

3:09:32from the last meeting that they

3:09:33indicated that they were not going to

3:09:34submit anything other than the trinkus

3:09:36report. But I think that as a party who

3:09:38you've granted intervention status for,

3:09:40you should give them an opportunity to

3:09:41present if they have anything else to

3:09:43present and that might be an effective

3:09:45use of their time and it might not take

3:09:46much time.

3:09:48>> Miss Murphy, if you could

3:09:52say it name and address for the record,

3:09:54please. So,

3:09:59>> um, you got to hit the

3:10:03>> on this thing. Hello. There it is. Uh

3:10:06Michelle Murphy, 325 Break Neck Hill

3:10:08Road. Um I just have one thing to

3:10:11submit. We had Al Drain do a uh an

3:10:14explanation of where the waterways are

3:10:16underneath and um where the wersheds are

3:10:20and he like he said he doesn't know

3:10:22exactly what the wersheds are. I'll just

3:10:24submit that it's the other end of Steve

3:10:26Trinkus' report. Steve will talk on um

3:10:29the storm water and the pollution and

3:10:30the erosion and this just tells you if

3:10:32it was polluted that's where it would

3:10:34go. So, I'm just going to submit that to

3:10:35you guys. Steve is on the line because I

3:10:38was told he was there to answer

3:10:40questions. So, he probably will present

3:10:42a little bit that uh when I had said I'd

3:10:45just do the report, it was because I

3:10:48didn't know he had to be here. So, now

3:10:49he's been here for three hours. He's

3:10:51probably going to want to say something.

3:10:52Uh so, Steve, you there?

3:10:56>> Oh, yes, I am.

3:11:01>> Can you hear me, Commission?

3:11:03>> Yes. Go ahead.

3:11:04>> Okay. Yes. Um, for the record, Stephen

3:11:07Trinkus, I'm a licensed professional

3:11:09engineer from Southbury, Connecticut.

3:11:12Um, I did a limited review of these

3:11:14plans because you had Ty and Bond doing,

3:11:17you know, a full civil engineering

3:11:18review. Um, I focused more on the storm

3:11:21water and the erosion. And, uh, just a

3:11:24couple comments on what I heard tonight.

3:11:26Um you know under the connected general

3:11:30permit uh for construction activities

3:11:32deep actually has a limit also of the

3:11:34five acre threshold. If you want to go

3:11:37more than that coverage is not allowed

3:11:40under the general permit based at least

3:11:42how uh deep treated a project of mine

3:11:44about five or six years ago where we

3:11:47wanted to disturb 10 acres at one time

3:11:49and we had to get an individual permit.

3:11:52We could not get coverage under the

3:11:54general permit. Uh that's more of a

3:11:56question for the uh the group at DP. Um

3:12:00however, you know, in the world of

3:12:01engineering and erosion control, the

3:12:03best way not to have problems on your

3:12:05site is to restrict the area that you

3:12:08disturb at one time. To open up 30 acres

3:12:11of a site with shallow soils over

3:12:14bedrock, it will be next to impossible

3:12:16to control the construction water coming

3:12:19off that site. uh silk fence waddles all

3:12:23have limitations and the site is just

3:12:26too huge to prevent the discharge of uh

3:12:30dirty construction water. Um you'll be

3:12:33chasing your tail to try and prevent it

3:12:35from getting offsite or getting down to

3:12:37the wetland areas. Um, another issue

3:12:39before I get into a couple comments from

3:12:41my report of October 14th, uh, to follow

3:12:44up on the chloride issue, um, deicing

3:12:47agents that use chloride, the chloride

3:12:51ion does not come out of storm water in

3:12:54any way. There is no conventional

3:12:56practice. There is no low impact

3:12:58development practice, which is my area

3:13:00of expertise to remove it. Chloride ions

3:13:03simply don't play well with anything

3:13:04else. It stays in solution. it will stay

3:13:08in the soils. Um if you're plowing uh

3:13:12impervious cover um where you put the

3:13:14the brines down first um is it sprays up

3:13:18to vegetation. It will kill uh trees

3:13:21particularly evergreens. Um the only way

3:13:24to avoid the chloride impacts quite

3:13:26honestly is not to put it down to use

3:13:29more sand to use very little amounts of

3:13:32rock salt to melt ice that may form. But

3:13:35the use of uh the brines um even in a

3:13:39you know controlled by contractors it's

3:13:41it's an environmental impact that does

3:13:43not go away and it simply gets worse

3:13:46over time. Um there's no way to prevent

3:13:48the chloride impacts. I wish there was

3:13:51but uh nobody has come up uh with a way

3:13:53to to do that. Um, I think with the

3:13:57applicant making their suggestion of the

3:13:5830 acre threshold, some of my pre-order

3:14:00via erosion comments may be a little

3:14:03moot, but there was also a temporary

3:14:06access shown from um that same access

3:14:09that Tim discussed uh to get to uh on

3:14:12the uphill side of the bridge, but this

3:14:14other access went up to the main body of

3:14:16the construction site. It also had a

3:14:19stream crossing. There was no

3:14:21information on how they were going to

3:14:22cross that stream. Was this temporary

3:14:24roadway nor was there any grading and it

3:14:27did traverse some fairly significant

3:14:29slopes and I do understand they need to

3:14:32lower the actual site of the development

3:14:34to get the material to build the

3:14:36roadway. Um but there's a lack of

3:14:39information on that temporary

3:14:41construction access uh going up there.

3:14:43Um there were also general comments

3:14:46about you know diversion swailes for

3:14:48temporary sediment basins. You know

3:14:50again they've got to convey a certain

3:14:51amount of be able to convey a certain

3:14:53amount of storm water uh for it. The

3:14:56detail also called out a V-shaped

3:14:58cross-section which is not what you want

3:15:00to do because a V-shaped cross-section

3:15:02will have a high velocity in the center

3:15:05of the V. If you're doing diversion

3:15:07swailes, you want to use a trapezoidal

3:15:09or even a parabolic prox, excuse me,

3:15:12cross-section that's fairly wide to keep

3:15:15the flow velocities down so you don't

3:15:17actually erode the soil itself. Um, on

3:15:21the storm water side, I'm just going to

3:15:23briefly focus on water quality. Um, in

3:15:26in the October 14th uh report which I

3:15:29submitted, I prepared what's called a

3:15:31pluton loading analysis. This is a

3:15:33process developed by Tom Scheler from

3:15:36the center of watershed protection um

3:15:39when he was initially there. It's a

3:15:41calculation using published data for

3:15:43pollutant concentrations and then you

3:15:46use removal efficiencies based on field

3:15:49monitoring data and be able to show you

3:15:51know what percentage of the various

3:15:53pollutants you're going to uh remove.

3:15:55Now is the applicant's proposal has the

3:15:57catch basins to the online hydrodnamic

3:16:00separator goes to the underground uh

3:16:03galleries which are basically an

3:16:05underground bathtub to just you know

3:16:07hold the water and then the uh online

3:16:10jellyfish filter. Um both the separator

3:16:13and the jellyfish filter when they're in

3:16:16online configurations are not as

3:16:18efficient contrary to what the

3:16:19manufacturers uh claim. The separators

3:16:23have been around since the mid9s.

3:16:24they've always had an internal bypass uh

3:16:28system. However, what research has shown

3:16:30by both the New Hampshire Stormwater

3:16:32Center um and uh what's called the

3:16:35American Society of Civil Engineers BMP

3:16:37database is field monitoring data of

3:16:41these sites. And what the data shows is

3:16:44there's a significant difference between

3:16:46an online configuration and offline. Um,

3:16:50an online configuration for a

3:16:51hydrodnamic separator will remove about

3:16:5429% total suspended solids. If it's

3:16:57offline where the water quality flow

3:17:00goes through it, that goes up to 75%.

3:17:03The jellyfish filter, there is

3:17:05absolutely no data on uh offline uh

3:17:08versus online. Um, in the analysis I

3:17:12did, I uh that jellyfish recommends it

3:17:15being an offline configuration. So, I

3:17:17used those pollutant removal

3:17:19efficiencies, but as proposed, it would

3:17:21actually be less than we calculated. But

3:17:24the Connecticut D in their 24 storm

3:17:27water quality manual has uh pollutant

3:17:30reduction requirements that we we as

3:17:33design professionals need to meet. They

3:17:35want postdevelopment total suspended

3:17:37solids or TSS reduced by 90%. They want

3:17:41phosphorus to be reduced by 60% and

3:17:44nitrogen by 40. And when you look at the

3:17:48loading analysis, I just did one of the

3:17:50systems on the site. Um you'll find that

3:17:53after going through the catch basins,

3:17:55the online separator, and the jellyfish

3:17:57filter, you're only going to remove 64%

3:18:00of total suspended solids. That's 2/3 of

3:18:04what Deep wants us to meet. You're going

3:18:06to be 40% phosphorus. Again, that's

3:18:09about 2/3 of what D wants. Nitrogen,

3:18:13you're about a little over half. It's

3:18:1524%.

3:18:16So, the design as proposed does not meet

3:18:19the D requirements. Um, additionally,

3:18:23um, when I heard the applicant

3:18:24discussing the discharge points to kind

3:18:26of mimic the natural flows, when you

3:18:29look at the existing conditions maps,

3:18:32the runoff from this site is all

3:18:34occurring as overland flow through the

3:18:35forested environment. what the

3:18:37applicant's proposing with the level

3:18:39spreaders. While a level spreader will

3:18:41provide a instead of concentrated flow,

3:18:44a slightly um shorter overland flow via

3:18:48the concrete beam that they proposed.

3:18:50It's still concentrating the water

3:18:52instead of overland flow that the mother

3:18:55nature currently does on the site. So

3:18:58you really are not mimicking the exact

3:19:00discharge points because as proposed the

3:19:03water is sheeting across you know the

3:19:06forest over a wide length you know it's

3:19:08not going to be under post development

3:19:10conditions it's going to be fairly

3:19:12concentrated um at those points um um

3:19:16while I didn't have a chance to go

3:19:17through the time bond in great detail um

3:19:21one of the comments that I had made was

3:19:23that I believe there should be

3:19:25cross-sections done through the building

3:19:27from the high side through the low side

3:19:29retaining walls to provide the

3:19:31commission with a visual of the extent

3:19:34of the earth moving that's going to

3:19:35occur here. That downgradient wall

3:19:38varies between 40 up to 70 feet in

3:19:41height. And I believe the uphill walls

3:19:43are maybe a maximum of 40 feet give or

3:19:46take. But cross-sections, three or four

3:19:49of them across the uh width of the

3:19:51building, you know, maybe one 100 feet

3:19:53in from each end and one in the center

3:19:56would definitely give the commission a

3:19:58much better view of uh how this building

3:20:01is going to require massive earthwork to

3:20:04fit on this particular site. And I think

3:20:06it's something the commission really

3:20:08should consider uh having the applicant

3:20:10provide. It will provide a lot of

3:20:12valuable uh information for uh your

3:20:15assessing of this project. Um that's all

3:20:17I have to say. I mean all my other

3:20:19comments are in my uh uh October 14th

3:20:22report. Um thank you for the time to

3:20:25share them.

3:20:26>> Thank you.

3:20:34Thank you. For the record, Evan Seaman,

3:20:36um we and as Mr. Ando noted, we did

3:20:39respond to the the Tigen Bonds review of

3:20:42Mr. Trinkus' report um uh to the

3:20:44wetlands agency and and now that will be

3:20:47included in your packet so they can

3:20:48review here.

3:20:49I do want to address some of the the

3:20:51issues in in the report and that were

3:20:53just raised. Under 22A19, which is the

3:20:56intervention statute, the interveners

3:20:58have the burden of proof to establish uh

3:21:01reasonable likelihood of unreasonable

3:21:02pollution to uh natural resources of the

3:21:05state. Um when this commission permitted

3:21:08permitted them to intervene in the

3:21:09proceeding uh the the subject of of um

3:21:13the scope of the intervention is limited

3:21:14to soil erosion sedimentation control

3:21:16and stormwater management issues and

3:21:19their uh alleged impacts to natural

3:21:21resources within this agency's review

3:21:24authority. Uh impacts to wetlands, water

3:21:27courses, wetland dependent wildlife,

3:21:28which is all in Mr. Trinkis' report.

3:21:31That's more appropriate for another

3:21:32agency, not this one. Um what you've

3:21:35heard this evening is um as uh a case

3:21:39called Riverbend has described is uh

3:21:41general concerns and speculation and

3:21:43conjecture. It's it's criticism about

3:21:46non-compliance with a uh with with CTDep

3:21:50guidelines which which Mr. Trinkus has

3:21:53described as requirements. Douglas

3:21:55versus Planning and Zoning Commission is

3:21:57a case that is considered intervention.

3:21:59The issue of intervention under 22-way19

3:22:02and it stated that non-compliance with

3:22:04requirements not just guidelines with

3:22:06requirements is not sufficient uh to

3:22:09carry the burden under is not is not

3:22:11sufficient even to get in under 20 22

3:22:14A19 let alone to to carry the burden of

3:22:16proof. So um can you go pull up the

3:22:19PowerPoint? I do have a couple slides on

3:22:21on the issue of intervention I wanted to

3:22:23discuss.

3:22:27while that happened tonight.

3:22:29Uh Tim Durko, professional engineer, a

3:22:32question to staff. So the October 19th

3:22:35tyin bond response to the intervenor

3:22:38engineering comments was that also

3:22:41provided to the commission to the

3:22:43planning and zoning commission because

3:22:44it is addressed to San Diego. So we

3:22:46might be talking about things that have

3:22:48not made it to this. Was the time bond

3:22:51letter written twice to both uh chair

3:22:56Edgars and Chair Thurlo?

3:23:03>> I have a tie in bond response to the

3:23:07planning and zoning commission on an

3:23:09evaluation of the intervenors

3:23:11engineering comments dated October 23rd.

3:23:15>> Okay.

3:23:15>> Is that what you're

3:23:16>> Yeah. So the o I have a paper copy of

3:23:19the their October 19th letter which was

3:23:22to wetlands. So it sounds like they did

3:23:24a save as on the 23rd and went to this

3:23:27commission. Excellent.

3:23:28>> We're trying to keep them separated. So

3:23:30whomever you are directing them to is

3:23:32the files they're going in.

3:23:34>> Okay.

3:23:37>> Thank you. So, this is one of the I kind

3:23:38of covered this already, but um this is

3:23:41this is actually from uh as part of the

3:23:44first withdrawn application, the town

3:23:45attorney issued a memo to the commission

3:23:47about intervention. And this this is the

3:23:50case law um regarding uh the point that

3:23:53I just made that the intervenors have

3:23:54the burden of proof to establish

3:23:56environmental harm. We as the applicant

3:23:58do not have the burden to disprove what

3:24:00they say. They have to meet their

3:24:02burden. And as you'll see at the bottom

3:24:04here, I believe this is quoting the

3:24:05Riverbend case that I referenced,

3:24:07Riverbend Associates versus Conservation

3:24:09Commission. General environmental

3:24:10impacts, mere speculation or general

3:24:12concerns are not substantial evidence.

3:24:14Substantial evidence is what you need to

3:24:16base any decision on. Substantial

3:24:18evidence is is uh what's required for

3:24:20this agency to to render a decision one

3:24:23way or the other. Next slide, please. Um

3:24:25and this is from the staff report, and

3:24:27we agree with with staff's um assessment

3:24:29of Mr. Trinkus' report. The interven

3:24:32intervenor's engineering submission

3:24:33consists principally of general

3:24:35statements about storm water pollutants,

3:24:36published performance data for device

3:24:39types other than those specified,

3:24:41disagreement with the methodology of the

3:24:432024 Connecticut storm water quality

3:24:46manual and requests for additional

3:24:48information. It contains no sight

3:24:50specific data or analysis showing an

3:24:52unreasonable impact on an identified

3:24:54resource and its single quantitative

3:24:56analysis contains calculation errors and

3:24:58is measured against design targets

3:25:00rather than resource impacts. So again,

3:25:02they haven't satisfied their burden of

3:25:04proof. Um I also have have submitted to

3:25:07the record and I'll hand it out to the

3:25:09commission now.

3:25:20This is a letter. So within the past um

3:25:23two years, Mr. Trinkus has been been

3:25:25involved in in quite a few land use

3:25:27cases that have reached the Connecticut

3:25:29Superior Court's land use litigation

3:25:32docket. The Connecticut Superior Court

3:25:34land use litigation docket is the

3:25:35specialized land use court throughout

3:25:37the state. And I I'll [clears throat]

3:25:39wait till members of the commission get

3:25:41this, but

3:25:44In the past two years, the court has

3:25:47found Mr. Trinkus to be not credible on

3:25:49at least four separate occasions. And

3:25:52this this uh this handout goes through

3:25:55those cases. Um as described below, the

3:25:58superior court has observed that Mr.

3:26:00Trinkus relies on the same comments as

3:26:02part of his opposition work regardless

3:26:05of the project. Uh the first case,

3:26:07Fairfield Housing Corp versus

3:26:09Conservation Commission, is a 2024

3:26:11decision. Um, and these are all quotes

3:26:13from the cases. This is this is not

3:26:15criticism from me, from from anyone on

3:26:19our team. This is quotes from the judge,

3:26:21from the court. Given his inaccuracies,

3:26:23factual incompleteness, and selective

3:26:25omissions, Trinkus' opinions do not

3:26:27constitute a substantial basis of fact

3:26:30to sustain the commission's denial.

3:26:32Bullet two. Therefore, Trinkus'

3:26:34conclusions can only be seen as

3:26:36speculative or conjectural without

3:26:38supporting analysis. Further, Trinkus'

3:26:41views about increased storm water

3:26:42volume, no infiltration and poor water

3:26:45quality were based upon selective

3:26:47citation from the deep manual that

3:26:49omitted parts of the guidelines that

3:26:51when read together demonstrate both that

3:26:53his criticism was not valid and that the

3:26:55work of the plaintiff's engineer was

3:26:56competent. Trinkus' opinion regarding

3:26:59infiltration is similarly flawed as

3:27:01incomplete and selective in its

3:27:02articulation of the deep guidelines.

3:27:05Therefore, the reports and evidence from

3:27:06Trinkist are based on incomplete

3:27:08information that is not substantiated by

3:27:09the record developed during the public

3:27:11hearing and upon which the commission

3:27:12could rely. The next case is 751 Weed

3:27:16Street. Uh the second bullet, therefore,

3:27:19the overwhelming evidence of the record

3:27:21is that evaluation of the pros and cons

3:27:22of plaintiff's proposal fairly and under

3:27:25the statutory standard was a process

3:27:27that took place among the other

3:27:29engineers, not with trinkets. Uh the

3:27:32course review of his July 11th, 2022

3:27:34letter reveals no calculations at all by

3:27:36Trinkus, either to support his positions

3:27:38or to demonstrate that the plaintiff's

3:27:40detailed engineering calculations in the

3:27:42reports submitted were in error.

3:27:44Further, the court observes that

3:27:45Trinkus' testimony in this matter,

3:27:47except for the very last road icing, is

3:27:50nearly identical to his testimony in

3:27:52other matters.

3:27:54Reading the final reading the transcript

3:27:56of the final hearing made one wonder if

3:27:58Trinkus was discussing a different

3:28:00application.

3:28:01Um, next case, Ali versus Wetlands, uh,

3:28:04board. The record is clear that Trinkus'

3:28:07conclusions were factually inaccurate or

3:28:08based on outdated information and that

3:28:10he selectively omitted evidence.

3:28:12Plaintiff's engineers addressed these

3:28:14inaccuracies and defects on the record

3:28:16and Trinkus made no effort to either

3:28:17refute the criticism or even worse to

3:28:19correct his own statements.

3:28:21uh in some Trinkus' views relying upon

3:28:23obsolete partial or false factual bases

3:28:25were clearly unsound given his

3:28:28inaccuracies, factual incompleteness and

3:28:29selective omissions and his failure to

3:28:31provide any detailed analysis to refute

3:28:33that of the qualified engineers he was

3:28:35critiquing. Trinkus' opinions do not

3:28:38constitute a substantial basis of fact

3:28:40sufficient for the board to rely on rely

3:28:43on them to deny plaintiff's application.

3:28:47As this court has previously observed,

3:28:48Trinkus' views are generally consistent

3:28:50with views he's given in opposition to

3:28:52several other developments. And then the

3:28:53last case, which is July 31, 2026.

3:28:58Also, Jacobson Engineering revealed that

3:29:00certain authority Trinka cited could not

3:29:01be found and respectfully disagreed with

3:29:03other sources he cited. In some an

3:29:05examination of the record exposes the

3:29:07stark qualitative difference between

3:29:09Jacobson Engineering's measured tone and

3:29:11detail in its role as consulting

3:29:12engineer to the commission and Trinkus'

3:29:14repetitive conu concl conclusions and

3:29:16accuracies made without supporting

3:29:18detail or analysis. Um similar conduct

3:29:22of Trinkus as an opposition expert in

3:29:24other cases has been observed by this

3:29:25court.

3:29:27The report that he submitted uh as part

3:29:30of this we do not believe it's credible.

3:29:32We we don't believe uh that that he has

3:29:35that the interveners have um sustains

3:29:39their burden of proof. Um there it's

3:29:43just comments about uh requests for more

3:29:46data. No,

3:29:49they don't identify any resources to be

3:29:51impacted. Um they haven't sustained

3:29:54their burden of proof and we'll leave it

3:29:55at that. Happy to answer any questions.

3:30:00>> Commissioners, any questions?

3:30:03Mike [clears throat]

3:30:04>> John Brian respond

3:30:10>> staff.

3:30:12>> No, but I I heard someone in the public.

3:30:14Yes.

3:30:15>> Yeah. We um Mr. Trus is trying to get

3:30:18on.

3:30:18>> Yeah.

3:30:20>> Okay. Mr. Trinkus.

3:30:23>> Yes, I'm here.

3:30:25>> You're trying to get on. You want to

3:30:26comment?

3:30:28>> Oh, yeah. I' I'd like to just, you know,

3:30:30address this issue as attorney Seaman

3:30:33brought this up at the wetlands meeting.

3:30:35Um, I have done land use primarily on

3:30:37the development side of the coin since

3:30:391983

3:30:41um in support of commercial sub uh

3:30:45projects, site plans, subdivisions

3:30:48um and have been found extremely

3:30:51credible. Um, Judge O'Hanlin in the past

3:30:54two years has found in his opinion my

3:30:56testimony is not credible. However, if

3:30:59the commission finds my testimony

3:31:01credible, they're free to make a

3:31:04decision based upon that. And that comes

3:31:06from the Forcel versus Reading

3:31:08Conservation Commission court case,

3:31:10which was an appellet decision that said

3:31:12when you have multiple expert opinions,

3:31:14the commission may listen to the expert

3:31:17they find most credible. And that's what

3:31:20in these other cases occurred. uh the

3:31:23Fairfield Housing Project, the applicant

3:31:27uh engineer was proposing low impact

3:31:29development practices that the 2004

3:31:33storm water quality manual said you

3:31:35could not put in those particular soil

3:31:37types. That was the comment that I made.

3:31:40That's a factual comment. They would not

3:31:43have functioned. Um and I stand by all

3:31:45the comments in all of these particular

3:31:47cases. If the commission finds my

3:31:50testimony credible, that's all I'm

3:31:52concerned about. Um, I'm not really

3:31:54concerned professionally that the judge

3:31:57makes a decision that I'm not credible.

3:31:59The burden in every land use application

3:32:02I have ever done is on the applicant. We

3:32:05must prove that our designs work. They

3:32:08must prove that we do not cause

3:32:09environmental impact. It is not the

3:32:12burden of an intervenor expert to prove

3:32:15the contrary. The applicant's burden is

3:32:18to prove that they fully comply. And

3:32:20what I've given you in the October 14th

3:32:23is clear mathematical evidence that the

3:32:26storm water quality standards that deep

3:32:28wants us to achieve are not being met.

3:32:32And those impacts, the appendix to that

3:32:34letter discusses the environmental

3:32:36impacts primarily to aquatic systems due

3:32:39to these pollutant loads. So it is

3:32:42connecting the dots and that that's all

3:32:44I have to say. Thank you,

3:32:49[applause]

3:32:51>> m Mr. Chairman. Um, on that on that

3:32:53issue of burden of proof, Mr. Mr.

3:32:56Trinkus is not correct. The interveners

3:32:59do bear the burden of proof under under

3:33:01Connecticut law on the issues within the

3:33:03scope of their intervention and that's

3:33:05already been addressed in the town

3:33:06attorney's memorandum.

3:33:09>> Mr. chair. Um, my suggestion continues

3:33:12that that there are some more reports

3:33:15that came in. The third party reviewer

3:33:17did did uh endorse in some some respect

3:33:20some of the things Mr. Trinkus said and

3:33:22it sounds as though that the applicant

3:33:24has responded and provided some more

3:33:26information which the commission doesn't

3:33:27have yet. So my my recommendation to

3:33:29hold off on making the final decision. I

3:33:32have a memorandum that I that I would

3:33:34would be able to go over with the

3:33:35commission tonight if it was going to

3:33:37proceed with the decision on the

3:33:39petitions. Um there are really two

3:33:42different burdens going on. What Mr.

3:33:43Trinkus was just talking about is he's

3:33:45correct. The applicant has the burden of

3:33:48on its on his application, but there's a

3:33:51decision tree under the intervention

3:33:52petition where the intervenor does bear

3:33:55bear a burden and and if the intervenor

3:33:58bears a burden, then you get a feasible

3:34:01and pr prudent alternative analysis that

3:34:03you have to go to. If the intervenor

3:34:06does not sustain his burden, then you

3:34:08proceed to consider the application into

3:34:10the ordinary standards that you apply.

3:34:12But when you look at those standards,

3:34:14the applicant bears the burden of

3:34:15demonstrating compliance with the

3:34:16standard. So there's a couple of

3:34:18different burdens going on. So my

3:34:19suggestion is is await making the final

3:34:22decision on the petition intervention

3:34:24petition. not you've already granted sta

3:34:26uh standing, but now that you've granted

3:34:28them standing, whether or not they've

3:34:30satisfied their burden of proof, um the

3:34:32memo will be in your can be in your

3:34:34package before the the next meeting on

3:34:37uh on following through the steps that

3:34:39you need to for 229

3:34:42petition and that you await making the

3:34:44ruling on that until the next meeting.

3:34:48>> Great.

3:34:50>> Commissioners,

3:34:51>> so I I just got a question, I guess,

3:34:53then for staff. So, we got two memos in

3:34:56our two packages delivered to us. Um,

3:34:59one they both dated October 26. Both

3:35:01address the planning and zoning

3:35:02commission. One was more detailed than

3:35:04the other. So, I assume the more

3:35:05detailed one is the one we should keep.

3:35:09>> Yeah. And we'll be adding to that. So,

3:35:10typically what we do is we have a

3:35:12working staff report. So, as new

3:35:14information comes in, like today there

3:35:17was stuff that came in that clearly are

3:35:18not addressed in yesterday. Um, they

3:35:20will be added to that. A new date will

3:35:22be added to it. You can keep it, but

3:35:24you're gonna get a new one. So, you

3:35:25don't necessarily have

3:35:26>> Again, they're both the same date and

3:35:27they both address the same. So, that's

3:35:28why I'm asking which one's correct. So,

3:35:30I'm gonna keep

3:35:31>> I'm not sure how you got two. I didn't

3:35:32do two different staff reports.

3:35:35>> It's So, we got one again. Looks they

3:35:37look the same, but one came in. I guess

3:35:39I was out of town. One came in yesterday

3:35:40and one came in today delivered.

3:35:43>> I don't know who delivered whatever. Is

3:35:45that the case?

3:35:46>> So,

3:35:46>> I don't know. Well, I think the second

3:35:48one has the tying bond

3:35:51response or their response to tying

3:35:53bond. Sec. Yeah, we had more detail in

3:35:55the second one, but but anyway um so

3:35:57just want to make sure I'm keeping the

3:35:58second, but anyway, in your in in the

3:36:00staff comment under the intervenors I

3:36:02think um the lawyer brought it up or

3:36:04someone brought up staff is making a

3:36:06comment that it's it's um the single

3:36:08quantitative analysis contains

3:36:10calculation errors and is measured

3:36:11against design targets other than rather

3:36:13than resource impacts. No backup. If

3:36:17staff did backup and can prove those

3:36:19errors, can we get that? So that's going

3:36:21to come from Tai and Bon. But my point

3:36:23is and and Ken can add to this is there

3:36:27is nothing in the report from Steve

3:36:29Trinkis that identifies an environmental

3:36:33impact that this commission

3:36:34>> I'm not I'm not arguing that point in

3:36:35your in the memo the staff memo. I'm

3:36:37just asking about the staff is making a

3:36:39statement a specific statement that it

3:36:41contains quantitative errors in the

3:36:42calculations

3:36:44>> does not say time bond identified. It

3:36:46says staff identified

3:36:48>> again for reading through and I I can

3:36:50take that out and just reference Tai and

3:36:52Bond stuff in there. But but the point

3:36:54[clears throat] the point was it was

3:36:55connect it's not connected to a natural

3:36:57resource that you guys have jurisdiction

3:36:59over.

3:36:59>> I just wanted the source. So if we're

3:37:01going to rely on it then we need to know

3:37:02what it is able to see that.

3:37:04>> So

3:37:06I believe Tigen Bond is here this

3:37:08evening too and we do have separate uh

3:37:10comments that we have responded to. I

3:37:12don't know if time permits.

3:37:13>> We we just got all those today. Um, so I

3:37:17not even prepared to even ask time on

3:37:18it. He can go through it all, but it

3:37:20means nothing to me because I haven't

3:37:21seen read or any of it.

3:37:22>> Understood.

3:37:23>> That's the problem with getting stuff

3:37:24the day of the meeting. Um, like the

3:37:26October 29th memo that you guys, well,

3:37:29they just responded to your October 28th

3:37:30memo, which was yesterday again. So,

3:37:33some of us travel for work around town

3:37:34and we can't review that stuff in two

3:37:36hours. So,

3:37:38>> I've got a procedural question.

3:37:43>> Go ahead. So, uh, as I said, I had

3:37:45something that was going to identify the

3:37:47water pathways and the aquifers and how

3:37:50everything travels. Am I Are we still

3:37:52allowed to submit more information? So,

3:37:56I find it difficult that you would make

3:37:58a decision on whether we've met our

3:38:00burden if we're still allowed to put in

3:38:02more information.

3:38:04>> We're not making a decision tonight.

3:38:06We're carrying. Okay. We're

3:38:07>> carrying. Cool. Thank you.

3:38:09>> I think at this point we've had enough.

3:38:12Can I just

3:38:13>> go ahead.

3:38:14>> So just to clarify, so do we have an

3:38:16extension request uh extension?

3:38:18>> He he said he was

3:38:20>> and what is the date you're giving us?

3:38:22>> Yes. So I I previously provided um a

3:38:25letter through your next meeting which I

3:38:26believe is November 16th,

3:38:29>> right? So December because it was

3:38:31comments in the somewhere December.

3:38:34>> It says December 25th is the last

3:38:36possible action date.

3:38:37>> Okay.

3:38:38>> So we would have one more meeting in

3:38:39December.

3:38:42And one thing that could change that is

3:38:44that that there's always the pro when

3:38:47you have inland wetlands and water

3:38:48courses application there's a you can't

3:38:51decide within a certain period of time

3:38:53when they give the decision. So it's po

3:38:55it's possible if their decision was

3:38:56delayed. We've got one in another town

3:38:59where the wetlands commission went on

3:39:00for months and months and months and

3:39:02months uh and so that the planning and

3:39:04zoning commission couldn't act on it

3:39:05because they had to wait. So it's

3:39:06possible that that could impact it. But

3:39:08if just say for the sake of argument the

3:39:10Wellland Commission acted tomorrow, then

3:39:13you're right, that's the kind of

3:39:14extension you'd need need to be able to

3:39:15get into into December. And I'm only

3:39:18asking for for two reasons. One is

3:39:19obviously we another meeting coming up

3:39:21in November, a regular meeting. There's

3:39:22more information coming. Um, do we need

3:39:24to have another special meeting

3:39:25somewhere in between or after to be able

3:39:27to get through all this information? And

3:39:29I prefer not to have that information

3:39:30show up the day of the meeting. like to

3:39:31get it a couple weeks in advance so we

3:39:33can review it, have good questions, and

3:39:35if we do make do need to make a decision

3:39:37at that next meeting, we have to have

3:39:39that information in our heads and go

3:39:41through it. So I don't know what are you

3:39:44guys willing to give an extension to to

3:39:46make sure we understand kind of the

3:39:47timeline.

3:39:49>> Sure. So So currently the extension

3:39:51we've we've provided is through November

3:39:5316th. Um we we are uh willing and able

3:39:58to give the maximum extension through

3:40:00December 25th. Um I believe you meet

3:40:04Christmas Day, but I believe you meet uh

3:40:07a couple days before that. Um, and as

3:40:09Attorney Slater noted under the general

3:40:11statutes 8-7DE,

3:40:13if the wetlands agency doesn't act, uh,

3:40:15in this application is pending and and

3:40:17the time for you to make that decision

3:40:20has expired, that statute gives you an

3:40:23extra 35 days after the wetlands agency

3:40:26acts. So, it it does have that that kind

3:40:28of buffer time in there. Um, so we're

3:40:30we're happy to provide the maximum

3:40:33extension now. We've provided uh

3:40:35currently through November 16th. Um, and

3:40:38there is that statute that offers that

3:40:39additional time as I just mentioned. Do

3:40:41>> you want to just put that in the in in

3:40:43uh in writing to to staff tomorrow?

3:40:45>> Yes, sir.

3:40:47>> Okay. Anything else?

3:40:50Can I have a motion to

3:40:51>> adjourn?

3:40:57If you want.

3:40:59>> No.

3:41:01>> Motion to

3:41:02>> second. Second. Got it. All in favor say

3:41:07I.

3:41:08>> I oppose extensions. None.

```*