  • The meeting focused on the consultant's 20-year facilities plan for the Water Pollution Control Facility and on a draft amendment to the sewer moratorium. See WPCA Plant Expansion.
  • The consultant said the plant is out of capacity now. Maximum-month flows run around 5.5 million gallons per day, and the secondary clarifiers cannot handle flows above roughly 7.7 million gallons per day with no easy fix identified. Operators plan to take one primary clarifier offline to test improvements.
  • On nitrogen, the plant is slightly over its waste-load allocation and buys credits, which were described as stable at about $5.60 each. Keeping the existing process was recommended over a more advanced one, whose roughly $620,000 20-year credit savings would not cover the added infrastructure. An anaerobic zone for biological phosphorus removal and space for future upgrades were recommended, and tertiary filtration was projected to be needed within about 10 years.
  • Three expansion alternatives were presented: a conventional design with new aeration tanks and secondary clarifiers, a similar design with a rehabilitated roughing filter, and a membrane bioreactor design that would eliminate secondary clarifiers and give better effluent quality.
  • No decision was made on the facilities plan. Members generally endorsed the direction and await cost figures, which the consultant expects to present at another workshop around the end of October.
  • On the moratorium amendment, members found the draft needed updates, including a typo. The Authority voted 5-0 to update the draft, send it for legal review, authorize the legal expense, and bring it back at the next meeting, about four weeks out.
  • The meeting adjourned by voice vote.

Agenda

Agenda items not yet read.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:25Okay, I'd like to call this um special

00:28meeting of the Killingly Water Pollution

00:30Control Authority

00:32uh on September 23rd

00:35to order. It's uh 502.

00:38And um as far as our members here, we've

00:43got uh all of our members except for

00:45Brian.

00:47He um called me and told me he's running

00:49a few minutes late, but he uh he should

00:52be here shortly.

00:55So item two is citizen participation.

00:58Any citizens uh wishing to um speak or

01:03would be welcome to do so now.

01:07Mr. Grandski.

01:09>> Yeah, I think this is a a you know,

01:11bringing this presentation forward. It's

01:13a it's a it's a good opportunity to see

01:15what's going on and uh I hope we're

01:18going to make some headway. Um at the

01:21last meeting, we had, you know, a number

01:22of individuals that were looking and

01:24saying the economics uh economic

01:26development is kind of at a standstill

01:28because we we got to get this project

01:31moving on. So

01:34this is the right direction. Thank you.

01:38>> Okay, Mr.

01:38>> Thurlo,

01:41>> where does turn this on and is it on

01:43automatically?

01:46>> Can you hear me?

01:51>> So, I just want to acknowledge that it's

01:54nice to see everybody here at the town

01:55hall. I know you're not exactly fans of

01:58it, but it lets everybody see what's

02:00going on. lets the town know what you're

02:03doing and uh what we're all about. I

02:06mean, you do got a $6 million budget and

02:08I mean, let's face it, at the last

02:09meeting, you guys spoke about having u

02:13uh transparency

02:15and this would add to your transparency.

02:18You were concerned with transparency

02:19when it came to legal legal uh on legal

02:23line items on your budget

02:26and uh this adds to the whole whole

02:29thing. So, uh, I'm just glad to see it

02:32and hope it stays this way. I know you

02:34don't want it that way, but I think it

02:36should.

02:39>> Thank you. Please, yeah, just state your

02:42name as you come up.

02:43>> Uh, Bill Chance. I'm uh, you know, 25

02:46Huntingber way. Um, David, I'm killing

02:49the EDC chairman. Um uh I stand you know

02:52say I attended you know the couple you

02:54know WPCA you know the meeting talk

02:56about it you know so small business in

02:59town is say the um change of use. So um

03:04WPCA is pretty much a limited you know

03:07say opportunity to grow in downtown or

03:10in killing me any small business that

03:13come in wherever that person use the

03:15building you pretty much you can change.

03:19So um I have a couple question to ask.

03:22So what is the outcome and how long are

03:24the way and um next you know say um you

03:29know the project expansion

03:32when you look into that and say the 10

03:34year 20 year I live in town 42 year I

03:37don't see much change but definitely is

03:40a change a lot since the 1984 come to

03:43today you see the traffic you see the

03:45people moving in from uh triate area you

03:49know from New York I'm also another head

03:51is I'm a realtor. So we see the people

03:54coming in. Yes. So we got to change up

03:57with the time and see how we can do

03:59better for the future.

04:02I don't know as a um uh the warehouse

04:05project will have a sure line is a make

04:08a change. So that is a key word is a

04:11look forward for how long maybe you you

04:14got to you know the five year or 10 year

04:16you all fill it up. So the decide what

04:18is a you know got to be up to the you

04:20know the up to the day you know say what

04:22we need. Thank you.

04:30Anyone else want to care to speak?

04:34So we're going to hear more about the

04:35facilities plan. That's what the uh

04:37primary focus of this meeting is on

04:40tonight. Our consultants are going to

04:41give a presentation and uh it's based on

04:45a 20-year plan.

04:48Okay.

04:50All right. Are the um is right Pierce?

04:58>> Good afternoon. Can you hear me?

05:00>> Yeah. Hi Dylan.

05:03>> Hey. Yep. [clears throat]

05:06So, we're just we're um if you could go

05:08through the you know the workshop plan

05:10that you like you presented it uh back

05:14um two weeks ago that would be great.

05:21>> We can get your slides up too.

05:24>> Yeah, for for sure. For those of you who

05:26I haven't met in person, um my name is

05:28Dylan Atkins. I'm the one uh primarily

05:32working on the evaluations for the

05:34Killingly water pollution control uh

05:37facility.

05:39Um I've been in the wastewater industry

05:43for over 15 years. I started pumping

05:46septic tanks for my father and uh now I

05:50currently work in the wastewater

05:53executive committee for Wright Pierce

05:56which means I am primarily uh working in

06:00on the biological treatment systems uh

06:03not necessarily designated to an

06:04individual state or area. So with that,

06:08I'm going to share my screen and get

06:10into the presentation I uh gave in

06:13person previously.

06:29>> Can you all see the presentation?

06:34>> Yes.

06:39All right, great.

07:05Okay. So the agenda for this

07:07presentation

07:09uh is going to go over the facility

07:11flows and loads

07:13the effluent treatment go the effluent

07:16goals that impact the the treatment

07:18analysis and the decisions we're making.

07:21uh I looked at uh some interim capacity

07:25increase and then some mainstream uh

07:28capital improvement cap capacity

07:30increases.

07:32I got about 40 slides. I'm going to try

07:34to go through them fairly quickly and

07:38I'm aiming for about an hour to an hour

07:40and a half presentation with questions

07:43uh afterwards.

07:48And so uh we're going to start with the

07:50the flows and loads.

07:53We did draft a detailed technical

07:55memorandum

07:57and

07:58distributed uh to the

08:03water pollution control authority.

08:05And uh that goes into much more detail

08:09than what I'm about to cover in the

08:10slides. I'm just going to hit on the

08:12major topics and uh from that memo that

08:14impact the analysis that I've done.

08:18So the facility

08:20ranges from about 1 mgd to 7 mgd on a

08:25daily flow uh total gallons treated. Um

08:30the average is around 3.4 4 MGD

08:34and uh maximum month flows or maximum

08:3830-day rolling averages are around uh 5

08:41and a half MGD.

08:44The loads, that's really what we care

08:46about treating. Uh

08:48we have the uh biochemical oxygen demand

08:51and the total suspended solids that we

08:53have to treat. Uh this figure shows a

08:56the trend of 30-day average BOD and TSS

09:01loadings. The uh the key here is that

09:05the maximum 30-day average or the

09:07maximum month that we have to treat

09:09right now is around uh 16,000 lbs per

09:12day. It occurs when the wastewater is

09:15relatively cold and uh around 14C. So

09:20those are the conditions that we're

09:22really looking uh that that really

09:24control the biological process.

09:30Um

09:31I just wanted to highlight that this is

09:33a facility that gets impacted by uh a

09:38known industry. the the industry uh

09:41Fredo Lelay contributes about twothirds

09:43of the uh average load to the facility.

09:50When when we design uh and perform these

09:55uh facility plan evaluations,

09:57we're not necessarily uh concerned about

10:00just what is the existing load. We need

10:01to factor in what the future growth is

10:03going to be. And so at this particular

10:06facility, we have a an allocated growth

10:09for residential load, commercial,

10:11industrial, uh the town of Brooklyn, and

10:14then uh some extra reserve capacity for

10:16freed. So that gets us into the going

10:19from our current average load of 9,400

10:22lb per day to around 15,000 lbs per day.

10:29As I said before, the maximum month

10:32condition is really what we need to

10:33treat because we have 30-day limitations

10:36on our effluent quality.

10:38So, I'm not really necessarily concerned

10:41about that 14,800 lb per day on average

10:44so much as that future maximum month

10:46condition where we estimate we can be up

10:48to around 22,800 lbs per day.

10:56>> [clears throat]

10:57>> These figures

11:00are in here to kind of highlight the uh

11:02to give some perspective of what is

11:05happening

11:08outside of freed.

11:11So if we take free delay out of the

11:13equation, the projected

11:172,800 lb per day growth is about 40% of

11:20what we estimate the existing

11:22residential, commercial, and industrial

11:24users are.

11:27When you factor in the future 9,800 lb

11:29per day design for

11:34uh the users outside of Freedolay, that

11:362,800 lb per day is about onethird of

11:39that that load.

11:45Okay. So that's all on the influence

11:47side of things. I can't change that. Uh

11:50what I can do though is affect uh what

11:52leaves the plant. So

11:55uh what really drives the processes I

11:58evaluate and uh the calculations I do is

12:01about what I need coming out of the

12:03plant.

12:06And at this facility, nutrients are

12:11uh of concern. The first one that we do

12:14have a hard limit on is the total

12:17phosphorus limit.

12:20This is an 18 pound per day limit that

12:23can leave the facility no matter what

12:25the flows are. At the design average

12:28flow,

12:30that 18 pounds per day backs into about

12:3204 millgrams per liter.

12:38So a a big question that we have to

12:40answer is can I get down to 0.4 milligs

12:44per liter using the existing method of

12:49adding a chemical to precipitate

12:51phosphorus out and let it settle in

12:54settle by gravity or can I do I need

12:58some other method to take the phosphorus

13:01out other than gravity i.e. like a

13:03filter.

13:05Uh so to answer that question

13:08I I evaluated what we are currently

13:11doing at the facility.

13:17The facility

13:20gets down to about 0.4 which is our

13:23target.

13:25The

13:29the only issue with this is that there's

13:33no safety factor. And and to be able to

13:35say 100% we are going to be below 18

13:38pounds per day, well, we really have to

13:40be below that 0.4 milligs per liter.

13:45And

13:47so

13:49at some point,

13:51uh, tertiary filtration is going to be

13:53required.

13:58to kind of uh

14:02display

14:04the

14:06relationship between the flow of the

14:08facility and the effluent phosphorus and

14:11how that impacts the mass that leaves

14:13the facility. I put this figure

14:16together. So on the x-axis what we're

14:17looking at is the

14:21effluent phosphorus

14:23leaving the facility

14:26and

14:31given that effluent concentration and a

14:33given flow rate i.e 3.4 4 4.5 5.5 mgd we

14:39can calculate what the mass is leaving

14:42the plant and so that's what each of the

14:46curves

14:47or the lines represent

14:50associated with each flow rate and

14:55let me see if I can get my pointer going

14:57here

15:00okay so

15:03if I have 0.5

15:05milligrams per liter leaving the plant

15:08and I have a 3.4 mgd flow rate, the mass

15:13of phosphorus leaving the facility is

15:15going to be around 13 pounds per day. So

15:18that's how you read this figure.

15:21And

15:22if you go down to the 0.4 that we're

15:25currently getting at the 5 1/2 mgd, we

15:28are going to be at the 18 pound per day

15:30limit. Therefore,

15:33if we're at 5 1.5 MGD, we really need to

15:36be less than 0.4 to have any sort of

15:40safety factor below our limit.

15:45If you interpolate the existing flows to

15:49the projected flows over 20 years

15:52and you want to upgrade the facility

15:54before you get to the 80% limit, 80% of

15:58your limit, you're looking at a tertiary

16:02phosphorus

16:03uh system needing to be implemented in

16:06about 10 years.

16:12Now

16:14nitrogen is different than the

16:17phosphorus in the sense that it's a

16:20uh it's not a hard limit. It's a waste

16:22load allocation.

16:24So if we have a total nitrogen mass

16:30at the end of the year that's above our

16:34allocation, we have to pay credits to

16:38balance the nitrogen load out. And if

16:41we're below the mass limit, then uh we

16:45can sell our credits.

16:48To put things in perspective,

16:51the the facility currently averages just

16:53slightly above the waste load allocation

16:56and is uh buying credits

17:00um between $2 and $3,000 a year uh on an

17:05estimate.

17:13So

17:14similar to the phosphorus evaluation, I

17:18I looked at the existing total nitrogen

17:21removal performance of the facility to

17:23identify what is a total nitrogen

17:26concentration

17:29that I can guarantee to be under to

17:31evaluate what uh cost of future credits

17:33may be if we either keep the existing

17:37process or upgrade to a more uh

17:41efficient total nitrogen removal

17:44technology or process.

17:46Um,

17:48for those of you that

17:51are not familiar with the

17:55process at the treatment facility, I'll

17:57I'll get to that in a minute. It's it's

17:59called the MLE process or modified blood

18:02edinger process.

18:07Um,

18:08I wanted to look at the cost of credits

18:10to identify whether it would be

18:12beneficial to

18:15upgrade to a more uh efficient nitrogen

18:17removal process. Uh, and the the key

18:22takeaway that I found is that the over

18:23the last 10 years, the nitrogen credits

18:25haven't really fluctuated

18:27uh or inflated in a significant manner.

18:31They're they're fairly stable around

18:32$5.60

18:34uh per credit.

18:38So when I look at the the cost of buying

18:40credits or selling credits depending on

18:43the the process I have I looked at the

18:45bard info process or the MLE/ A2O

18:48process. The MLE/ A2O is going to

18:52perform similar in total nitrogen. The

18:54MLE and the A2O are slightly different

18:56in that the A2O will have more

18:58biological phosphorus removal. The bardo

19:01process uh

19:04has extra zones on the back end of it

19:09that further remove nitrogen.

19:12And over

19:14uh 20 years I can look at what is that

19:17cost balance of implementing a a more

19:20advanced process or keeping the existing

19:22MLE. And so what I did is I I looked at

19:25each year and I said if I have the MLE

19:29uh process or the B info process, what

19:32is that nitrogen balance at the end of

19:34the year? And what each of these blocks

19:36represents is the the amount

19:40uh

19:42paid or

19:45uh returned from buying or selling

19:50credits.

19:53So

19:55annually with the MLE process, you're

19:57you're looking at buying credits

20:01between 10 and $40,000 a year depending

20:04on the the future flow rate and how much

20:07mass you're over your allocation. And

20:10then uh if you're selling credits with

20:14the B info process, what you end up

20:18is and is at it about selling them for

20:20about a,000 to $7,000 a year. And so I

20:23can add up the the total amount gained

20:27from implementing the B info process and

20:29I can add up the total amount uh spent

20:33by buying credits with the MLE process

20:36and I can look at the total delta. The

20:37total delta is around $620,000

20:41over 20 years.

20:44And the the key takeaway is that we

20:47can't implement a B info process and put

20:50in the infrastructure the equipment

20:54required

20:55for anywhere close to $620,000.

21:00And so our recommendation is to move

21:01forward with the MLE process that you

21:04currently have. and um

21:09uh leave space in the future for the

21:11ability to add on the extra B info zones

21:15should the allocation become a hard

21:18limit.

21:23So real quick on that uh recommended MLE

21:26A2O process I I do recommend putting in

21:29the the upfront anorobic zone of the A2O

21:33process. So the existing facility has an

21:36existing anoxic zone followed by an

21:39airrated zone and then secondary

21:42clarifiers. The the airrated zone gets

21:46recycled into the anoxic zone to promote

21:49denitrification.

21:51And this anorobic zone is recommended to

21:54be uh implemented to promote biological

21:59phosphorus removal and and potentially

22:01get that 0.4 four that we're getting out

22:03of the facility down just a little bit

22:05lower. And so that we can as we uh as we

22:10move forward over the next 10 years and

22:12start approaching that

22:15um phosphorus limit, we might be able to

22:17push that upgrade off uh if we can start

22:20getting better performance out of the

22:22biological phosphorus removal.

22:28Okay.

22:30So

22:33going through the influent flows and

22:34loads, the effluent requirements and how

22:37that impacts what specific process we

22:41are designing around or evaluating the

22:43facility around. And um

22:48that's that's all good and all, but the

22:51the facility is out of capacity now,

22:53right? And so we wanted to look at

22:55potential

22:56ways to increase the capacity.

22:59And

23:01the two

23:07places in the facility to potentially

23:10increase the capacity revolve around the

23:12uh or what really limit the capacity

23:14currently are the primary clarifiers and

23:17the secondary clarifiers.

23:21Uh the primary clarifier is currently

23:26remove solids

23:30less than what the industry standard is

23:33and that impacts the organics that are

23:35removed in the clarifi in the primaries

23:37as well. Um

23:40the secondary clarifiers at the facility

23:42are susceptible to occasional wash out

23:45due to high flows. And so I wanted to

23:47look into those two places. uh

23:50specifically.

23:55So what I did is I plotted out the

23:57primary clarifier performance the uh the

24:01TSS removal and the BOD removal uh is

24:07uh in the orange and blue line

24:09respectively.

24:13The key here is that orange line is is

24:16hovering right around that 40% for most

24:19of the uh time frame evaluated.

24:23Um

24:24the BOD

24:26is actually right around 0% removal and

24:30uh oftent times actually adds load to

24:33the secondary process.

24:36And so

24:40the

24:42there's a few things that can impact

24:43that and that's recycle loads from the

24:46solids handling process

24:49and uh potential fermentation of sludge

24:51within the primary clarifiers

24:53themselves.

24:55Um,

24:58if I want to increase the performance of

25:00these clarifiers, there's the potential

25:02that I could add some uh metal salt to

25:04it to to help precipitate out um solids.

25:10Uh that does add more chemical to the

25:14existing process and the facility and

25:17we're going to try to stay away from

25:18that uh initially. Um

25:22the the other thing that I can do is

25:25kind of look and see like hey is there a

25:27potential fermentation

25:29developing within the the the clarifiers

25:32themselves from the the sludge sitting

25:34in there. And so what I wanted to do was

25:38I wanted to look at uh the capacity of

25:41the primary clarifiers

25:43and uh whether we have the ability to

25:46decrease the amount of sludge sitting in

25:48the clarifiers all the time and uh thus

25:52reduce the potential of fermentation.

25:55And so working with operators, we've

25:58decided to take uh one primary clarifier

26:01offline initially and start sampling

26:06uh before and after the clarifier to

26:08evaluate uh how the process

26:13modifications

26:15uh affect the performance of the

26:17clarifiers. And and the the big picture

26:20here that we need to uh focus on is if I

26:23can take out

26:26you know, a thousand more pounds of BOD

26:28in the primary clarifiers.

26:30Well, then I can accept a thousand more

26:32pounds of BOD on the influent. Um the

26:38the the thing to remember here though is

26:43we have to see a sustained improved

26:45performance

26:47before

26:49we can make any adjustments of uh

26:53influent loadings that we can accept. So

26:57while this is an interim capacity

26:59increase analysis, there's no guarantee

27:01that taking a unit offline

27:05is going to

27:07uh

27:09result in a BOD

27:11uh load decrease to the secondary

27:14process.

27:16It's just the only things that we have

27:19at our uh you know abil you know that we

27:21have ability to control that that may

27:23help us. So, we're working with

27:26operators now and uh we're kind of going

27:29down this investigative road to to see

27:31if we can squeeze a little bit more

27:33capacity out of the existing facility.

27:37Um

27:38the secondary clarifiers was the the

27:41next spot that I wanted to look at. And

27:45for these clarifiers in particular, when

27:48you're designing them, you need to have

27:50so much of clear water on top of the

27:52sludge blanket in the clarifier.

27:55The amount of clear water required can

27:57be calculated for any given flow rate.

28:00And so if I what I've plotted here

28:04is

28:06for any given flow rate, how much clear

28:09water do I need on top of my sledge

28:11blanket?

28:13for the clarifiers to keep all the

28:15solids without wash out.

28:18So at 2 MGD

28:21I go up to my curve I can say I need 4T

28:23of clear water space. Well if I have 8

28:27foot total sidewater depth of the

28:28clarifiers that means my sludge blanket

28:30can be 4T deep before I at 2 MGD before

28:33I start blowing out solids. And you can

28:36look at that for any given flow rate.

28:37And what you find is that at 7.7 MGD,

28:41you need 8 foot of clear water depth.

28:42And the clarifiers are only

28:478 ft tall.

28:49So

28:51I can't no matter what I do at 7.7 MGD,

28:58I run out of space for my sludge blanket

29:00and I'm going to have solids wash out.

29:03So

29:05there is no like easy fix for that uh or

29:09anything we can do um on the biology

29:12side to stop that from happening.

29:16Uh what I can do potentially and it cost

29:22is

29:26if I have a twoft sledge blanket

29:31and

29:35that means I need 6t of clear water

29:37depth and I can only go up to 4t. If I

29:41can take my two foot sludge blanket,

29:43densify it, compact it down into one

29:46foot, well then I can go up to this 7

29:49foot

29:51of clear water depth and go from four to

29:54almost, you know, 5 1/2 mgd of capacity

29:58before I start experiencing wash out. So

30:06what that looks like

30:10is

30:13when high flows come through. If I had a

30:15twoft blanket before, I would lose some

30:18solids. I might be able to maintain them

30:20a little bit better, make it a little

30:22more resistant to scouring. But once I

30:24hit a certain value, a certain flow

30:26rate, no matter what I do, I'm I'm

30:28blowing solids out of these clarifiers.

30:38Okay. So, if I want to identify the

30:41sludge, there's a couple complications

30:44with it. Um,

30:47I have to first purchase one of these

30:49pieces of equipment that uses uh

30:52cyclones to separate

30:56lighter matter in the sludge from denser

30:58matter in the sludge. And then when I

31:00waste out of my process here,

31:04I'm only wasting

31:06the the light stuff and I keep the

31:08heavier stuff in in the process tank.

31:13Uh

31:16these aren't calculations that are

31:19textbook in terms of if I add one of

31:22these, how dense can I get my sludge?

31:25because a lot of it relies on the

31:27bacteria of the sledge itself and the

31:29influent characteristics of the

31:30wastewater.

31:32And so

31:33there's a a high cost.

31:37Uh we we would have to in install uh

31:41infrastructure piping to make this

31:43system work. Um you can't just rent this

31:46unit and try it out for like a month and

31:48see if it works. It's that's uh a little

31:50more complicated than that. Um, so this

31:54path isn't really recommended uh for the

31:57facility and we kind of just have to

31:59live with those secondary clarifiers

32:01uh the way they are right now and really

32:03focus on the primary clarifiers if we're

32:05trying to squeeze a little more capacity

32:06out of the facility.

32:11Okay.

32:13So,

32:15um,

32:17gone over a lot of information, but I I

32:20really haven't even started to get in

32:21yet on, you know, what do we actually

32:23have to do at the facility to accept

32:24those future flows and loads that I

32:26talked about, knowing that we're out of

32:28capacity now. And, um,

32:32the secondary clarifiers are not ideal

32:34for the flows that we receive at the

32:35facility.

32:37Um

32:40so

32:42from a big picture

32:45uh

32:46what we looked at was uh okay we're

32:49going to look at these conventional

32:50processes the the MLE the A2O

32:52potentially the five-stage bird info. So

32:54I looked at the the sizing of all of

32:55those conventional processes and um I

33:00also looked at uh some a few advanced

33:02technologies uh that may that we thought

33:05may be a good fit here. And really what

33:07we uh zeroed in on was the the membrane

33:10bioreactors.

33:12And um they they are a more complex

33:15technology, but there's key benefits to

33:18the that system that we'll get into that

33:21uh that'll make that'll be self-evident

33:23as to why they were selected for kind of

33:25further evaluation.

33:29Uh but first things first is we got to

33:31get those uh secondary clarifiers

33:33straightened out. Um and and really what

33:36that consists of is uh constructing

33:39three new circular uh secondary

33:42clarifiers

33:44and uh that also comes with a new

33:47distribution box and a return uh waste

33:50act return and waste activated sledge

33:51pump station.

33:53And so in the figure here you'll see

33:55these uh three clarifiers distribution

33:57and a return sledge pump building.

34:05This

34:07is applicable for all of the

34:08conventional alternatives. If we go with

34:10the membrane bioreactors,

34:13you don't need the secondary clarifiers.

34:19Uh back to that future tertiary

34:21treatment that we would be looking at.

34:23Um

34:25typically uh what we will do is we'll

34:27put in cloth disc filters. The flow

34:33submerge the influent flow submerges the

34:35filter. Uh solids remain on the outside

34:38of the filter. Clean water flows to the

34:40inside and then out.

34:43Uh you can you dose your your metal salt

34:46upstream of these filters and they will

34:49uh that'll precipitate the phosphorus

34:51out. And once it's in a solid form, we

34:55can

34:57remove it via the the filtration

34:58barrier.

35:01Uh

35:02this process goes along with backwash

35:06pumps and um depending on the

35:10manufacturer those backwash pumps can

35:11either be inside or outside the

35:12filtration tank itself.

35:19Okay. So that MBR technology that I was

35:22talking about,

35:26instead of

35:29introducing my raw waste water to the

35:31bacteria, letting the bacteria

35:34eat what we don't want in there, and

35:38then settling the bacteria out in the

35:39secondary clarifiers via gravity, we can

35:43actually

35:45uh use a ultrailtration membrane

35:50and uh pump clean waste water from the

35:54mixed liquor through these membranes and

35:57then and then downstream. And what that

36:00does is it it creates a much better

36:02effluent quality. It removes those

36:04secondary clarifiers that I was showing

36:08a couple slides ago. Um,

36:12it also serves as the filter itself for

36:14that tertiary filtration process. So

36:16that that the membranes could

36:17potentially remove not only the the

36:19secondary clarifiers but also the the

36:21future uh phosphorus filtration process.

36:25Um, another benefit, since I'm not

36:27relying on gravity to set out my settle

36:29out my bacteria,

36:31I can uh increase the amount of bacteria

36:35I have in a given unit volume, which

36:39means my mixed liquor is what everyone

36:41talks about, right? I can get my mixed

36:42liquor uh concentrations uh jacked way

36:45up, and that ultimately makes the the

36:48aerration tanks that are required

36:51smaller.

36:54And because of all those uh benefits and

36:58concrete that we can save on by by

37:01installing these membranes, even though

37:02they are more complex and uh require

37:05more uh mechanical equipment, they they

37:08have they have a lot of uh potential

37:09cost savings.

37:14All right.

37:17The Killingly facility

37:20has this roughing filter. This is

37:22upstream of the activated sludge or the

37:25aeration tanks.

37:27And uh how this works is the waste water

37:31gets uh irrigated on the top of it flows

37:34over uh

37:37fixed film grow bacteria on them and as

37:40the as the waste water flows the the

37:42bacteria

37:43eat what we don't want out of the eat

37:46what we don't want in there. Um,

37:50it reduces the organic load and the

37:51ammonia load prior to getting into the

37:53aeration tanks and

37:57it's

37:58it needs refurbishment. It was last

38:02upgraded around 25 years ago. So, if we

38:05want to if we want to take credit for

38:08the the treatment occurring in this, we

38:11really need to bring it up to standard.

38:14And um it serves

38:18uh it it does the same treatment as one

38:21aation tank. So if I keep this, I

38:24upgrade it, I need one less aation tank

38:27uh in in my uh uh

38:32in my facility.

38:35So

38:39with all that I want to introduce the

38:41three alternatives that I am going to

38:44take a deeper dive uh into and and do a

38:48full life cycle cost analysis. So so

38:51talking about um what are all the

38:53capital uh costs associated then also

38:56what are those life cycle costs.

39:00Uh the first

39:03uh process is a conventional process

39:06where we don't

39:08upgrade the trickling filter. So you

39:12still go through the primary clarifiers

39:14as they are now. We upgrade the

39:18secondary process to an A2O where we

39:22have the anorobic zone followed by our

39:24anoxic and our aation zone and we leave

39:27space for that future B info process. uh

39:30should it's should it be required

39:32and then we flow through the uh new uh

39:36circular secondary clarifiers

39:39which then uh

39:42get pumped into a tertiary filtration

39:44process. And so this is what that

39:47facility uh requirements are for those

39:51uh future 20-year uh flow and load

39:54projections that I went out over

39:55earlier.

39:58Um the next alternative that I am

40:01looking at is

40:04keeping the trickling filter

40:09flowing to the A2O process leaving space

40:12for my BNFO and then also having the

40:15disk filtration downstream.

40:18And then the the third alternative that

40:21I am looking at is the MBR technology.

40:27Some of the nuance to the MBR technology

40:29is we do have to add a fine screening

40:32step downstream of the primary

40:34clarification instead of the roughing

40:36filter. We have a decreased

40:40uh aation uh tank

40:44and MLE process.

40:46We leave space for the future an oic

40:48zone. The the membranes themselves are

40:52airrated so we don't need that that

40:54rearration zone of the barnfo process in

40:56the future. Um

40:58the membranes are expensive like really

41:01expensive. So uh the the approach is to

41:07use

41:09the existing secondary clarifiers that

41:11we're abandoning as uh flow equalization

41:14to dampen out the peak flows going to

41:16the membranes decreasing our capital

41:18cost on the membranes. Since the

41:20membranes are airrated continuously and

41:23we have oxygen in our return sludge,

41:26high amounts of oxygen in our return

41:28sludge, we do want to de oxygenate the

41:31uh the RAZ before sending it into the

41:34biological phosphorus removal anorobic

41:36zone.

41:38So

41:42that's the big picture process flow.

41:45What does that mean in terms of uh

41:47amount of tankage required, level of

41:49treatment? Well, this is a a summary

41:51slide here to for you guys to take all

41:53in. Um that first process where we don't

41:58uh take credit for the roughing filter.

42:01We're talking about three new aation

42:03tanks the same size of the existing with

42:06the three new secondary clarifiers and

42:08that tertiary disc filtration.

42:11Um the second one where we keep the

42:14roughing filter

42:17the uh that does allow me to only

42:20install two new aation tanks uh similar

42:24in size to the existing. I still need

42:26the three secondary clarifiers. I still

42:28need the tertiary disc filters and I do

42:31have to rehab the uh the trickling

42:33filter.

42:36Uh the last alternative, the MBR, the

42:39advanced technology one. We I only need

42:40one aation tank. Uh I need new uh

42:45tankage to put my filters in and I need

42:49uh the new fine screen process. I like I

42:51said I the existing secondary clarifiers

42:54will be repurposed for the flow

42:55equalization.

43:00Uh effluent quality is listed for each

43:04process. We do get better effluent

43:07through the ultra filtration just by uh

43:10the the fear uh the the the fact that

43:14we're um

43:17uh just have a smaller barrier of the

43:19solids uh and the liquid process. Um

43:24>> hang on a minute, Dylan. We lost the

43:26visual.

43:36Let me know when you get it back up. I

43:37just changed the slide to the layouts.

43:48>> Yeah, we're working on it.

43:52>> Any questions while we're taking this

43:54break here? I know I've gone through a

43:55lot so far and when it's in person, it's

43:57a lot easier to interrupt me. Um,

44:10>> Dylan, do all the three options include

44:13tertiary treatment?

44:18>> No. The me M MBR process takes the place

44:22of the tertiary treatment. You get you

44:24get better quality from the MBR. you

44:27just don't need that extra tertiary

44:30treatment. You the the physical

44:32separation of the liquids and solids. Um

44:37>> so essentially in the diagram the disc

44:40filters are the tertiary treatment that

44:42you're talking

44:43>> correct. Yeah.

44:44>> Correct. Okay. Yeah.

44:49And it is a little

44:51uh maybe um misleading thinking that

44:54because you have the tertiary treatment

44:56being the disc filters that you have

44:58better effluent quality.

45:00>> We got the slides back now. Okay. But go

45:02ahead.

45:02>> Okay.

45:03>> Yeah, but the the membrane is actually a

45:05much finer filter than what those disc

45:07filters are.

45:09Okay. So

45:13what I'm showing now is

45:17the uh

45:20alternative where we're demoing the

45:22roughing filter. Uh we'll need a new

45:24aation tank splitter structure. Uh each

45:27tank here is sized in similar fashion to

45:31the existing. Um but this is to give you

45:35a a sense of what the scale is of uh you

45:38know one new aeration tank or three new

45:40aation tanks, right? Um

45:43uh your your three new secondary

45:45clarifiers and then your space for the

45:48return sludge pump building and uh

45:50tertiary filtration uh which would be uh

45:52phased in.

45:56uh if I rehab that filter,

46:00one less aation tank. Um

46:04otherwise uh very similar process flow

46:07and and upgrades uh required. The the

46:10question really becomes you know does it

46:14cost more to rehab that filter versus

46:18the aeration tank?

46:23And then the the last alternative

46:27is the MBR process where we only have

46:30the one new aeration tank. We do have to

46:33put a fine screen uh process in and

46:38uh we will need uh space for the fil

46:42filters to go themselves, the ultra

46:44filters, the membranes. Uh and then uh

46:48it actually requires a fairly large um

46:52process building associated with it so

46:54that uh you can have place for all the

46:56pumps and mechanical equipment

46:57associated.

46:59Um

47:04so

47:07from a treatment and a upgrades required

47:12perspective this is what we're looking

47:14at. Uh I am currently

47:17um

47:19running down all of the costs, you know,

47:21what does it actually cost to, you know,

47:23to put these to implement each one of

47:25these. Uh the membranes have to be

47:27replaced after 10 years. They they take

47:29chemicals to clean them. And so there's

47:31a lot of operational costs that that go

47:33into that process. It's not a slam dunk

47:37uh that it's going to be the best just

47:38because it is the best on the site plan.

47:40Uh but I look at both the monetary and

47:42non-monetary

47:44uh benefits of all the alternatives

47:48and you know that's kind that's where

47:50I'm at now is uh you know continuing

47:53this uh work with the operators at the

47:56facility on their primary clarification

48:00um you know assistance

48:03uh doing that detailed cost analysis of

48:06each of the alternatives and then uh the

48:09goal is to have another workshop uh with

48:13the the facility staff and um develop a

48:20report that summarizes everything that

48:21I've done.

48:24So with that, uh thank you for giving me

48:26this time to present to all of you. Uh

48:29and um yeah, let me know if you have any

48:32questions. I'm happy to sit sit around

48:35and talk.

48:42Okay, thank you Dylan. Uh, one of first

48:45one question I had when you were talking

48:47about it um on the roughing filter, you

48:50said it provides some reduction

48:53in the uh BOD, but like how how much of

48:58a reduction

49:00and is it you like is it really

49:04functioning? Do we have a good way to

49:06measure that too? I guess would be the

49:08another, you know, related question.

49:12>> So the the complicated thing with the

49:14the roughing filter is the the bacteria

49:17gets mixed in with the primary effluent

49:19prior to going through the roughing

49:21filter. And when you start sampling

49:26uh mixed liquor for BOD,

49:29uh the the BOD test picks up all the

49:32bacteria in the in the sample and like

49:35you have you see like really really high

49:37BOD values. So it's it's very tough to

49:42identify, oh, this went in and this went

49:44out of the roughing filter. Um I have a

49:47biological process model that I can use.

49:51uh that's uh that's based on the mass

49:54balance of the facility where I can

49:58quantify the the BOD removed uh through

50:02it. Um and

50:05when I look at it, I don't really look

50:06at it as like what came in, what came

50:08out, how much was reduced going into the

50:09aeration tanks. I look at it from a a

50:12whole process of like um what does that

50:16resulting load that comes out of it do

50:18to the mass of bacteria in the mixed

50:20liquor tanks? And so it's not

50:23necessarily in terms of the the BOD in

50:26terms of a certain pounds per day that

50:28that's removing. It's it's more of um

50:31you know how does that decrease the uh

50:33the amount of bacteria that's floating

50:35in the aeration tanks.

50:43So [snorts] when you first did the

50:45presentation um the first time you had

50:48made a comment that you wouldn't build

50:50another one probably I mean is this

50:52there are they not really getting built

50:54these days? Is it kind of an outdated

50:56technology or

51:00>> Yeah, it's it's uh uncommon to have a

51:05roughing filter in the process flow of

51:08uh a new facility unless the the

51:10wastewater characteristics

51:13um were

51:16very uh and really the effent goals too.

51:18So like it's more like what what the

51:21tricculine filter does is it takes out

51:22the soluble BOD, right? And um it's

51:28really good for really heavily organic

51:30loaded stuff that may not have like

51:32nitrification requirements downstream.

51:35Um, so I wouldn't put this in at uh say

51:38this facility

51:40um if we were starting from scratch

51:47and we don't

51:51it's not it's not common.

51:56>> Thank you Dylan. Uh if you were starting

51:59from scratch, what technology would you

52:01recommend?

52:05Uh that would be alternative one. Uh a

52:10um

52:12and I I would do I would do the same I

52:16would really just do the same evaluation

52:17without the roughing filter alternative

52:19because um as

52:23uh the technology advances that that

52:26ultra filtration technology advances

52:28we're starting to see it more mainstream

52:30um in treatment plants and especially

52:33where you have uh really stringent

52:35limits and potential um you know reuse

52:39uh requirements uh of the wastewater. Um

52:44so it's it really comes down to that

52:47analysis of

52:50does it cost more to construct all the

52:52concrete for the secondary clarifiers

52:54and the

52:57um tertiary filtration process.

53:00uh if if I didn't have to have a

53:02tertiary filtration process, I would

53:05almost like say it's a slam dunk that

53:07you would just put in the conventional

53:08process with the secondary clarifiers.

53:10The fact that I have to have a whole

53:12another building and uh tertiary

53:14filtration in the future, um

53:18that really is what could could be the

53:20tipping point of uh why the the

53:22membranes would be more beneficial.

53:26So, it may be more cost effective to

53:28install the tertiary or at least plan

53:31for it at this point as opposed to

53:34not planning for it. Is that a true

53:36statement?

53:40>> Um,

53:47can you repeat that question, please?

53:49Would it be more beneficial to plan for

53:52the tertiary treatment at this point as

53:54opposed to not planning for it?

53:58Um

54:05if you if you are going with the

54:08conventional process

54:10you have to have the tertiary filtration

54:12at some point. Uh you will have to plan

54:14for it. Um

54:17if we do the cost anal if I do the cost

54:20analysis and I it it appears that the

54:23membrane technology

54:26uh is more cost effective

54:30then uh the the that extra disc

54:34filtration that just goes away. You you

54:36you build the membranes now it does what

54:39the filters will do 10 years from now.

54:41Um, and you don't even have to think

54:44about putting in the disc filters. It's

54:48it's much more superior filtration

54:50process.

54:52>> Okay. Thank you. Um, last question I

54:55have for you. Um,

54:58any rough idea on how long it would take

55:00you to finalize numbers and come up with

55:03the report? I'm not putting you on the

55:05spot. I'm just trying to get a general

55:06timeline.

55:09Um,

55:11I believe we're looking at the

55:14end of October

55:17to regroup with the workshop and present

55:20costs.

55:25That's the goal.

55:26>> Okay. Thank you.

55:33>> Does anyone else have any questions?

55:37So, I guess what it looks Oh, Joe.

55:42>> Hi, Dylan. Quick question. Um, is there

55:45a Connecticut plant or a Massachusetts

55:47plant that currently uses the MBR um

55:52that has at least five or six MGD daily

55:55flow?

55:58>> Off the top of my head, I'm not sure. I

56:00have to I can connect with the

56:03manufacturers. I did just complete a

56:07design for a Massachusetts plant in

56:10Barnstable of similar flow uh for the

56:13membranes and um it's uh it's not a

56:20um

56:22like uh it's a proven technology.

56:26>> Okay. Cuz uh cuz that's just my concern

56:28that um when our flows are getting up

56:30there if it could handle our flows. So

56:33be nice to have a proven plan.

56:35>> Yeah.

56:40>> So on the the disc filters could

56:42potentially be put in in a second phase

56:46then.

56:46>> Correct. Yeah.

56:50>> Yeah. So when I when I do my cost

56:52analysis, I'm going to use that 10-year

56:54time frame that I I mentioned in the

56:56presentation and um I'm going to develop

56:59what those look I'm going to say, hey,

57:02what would the capital cost be right now

57:03to build a disc filtration process? I'll

57:07uh escalate that to 10 years from now

57:09and then I'll add that into the you know

57:11the the 20-year life cycle cost is a a a

57:1510year cost.

57:20Okay, thank you.

57:22Any any more questions?

57:26Okay, thanks Dylan. Yeah, Dave.

57:30Uh, excuse me. Uh, Dylan, um, for my

57:33benefit, if u, I think I'm a little

57:35confused on the disc versus the

57:38membrane, they are they similar? They

57:41achieve similar results. One's just more

57:43efficient. Or could could you explain

57:45the difference between the two, please?

57:49Yeah. Yeah. So, the uh the disc filters

57:53are going to have like a a cloth uh uh

57:58media and um

58:02the

58:04diameter of the the pores on that media

58:07are much larger than what the diameter

58:11of the pores on the membrane are. So,

58:13uh, essentially solids that can get

58:15through the disc filters won't be able

58:16to get through the membranes.

58:20>> Okay. Thank you.

58:29>> Okay. Thank you, Dylan. We look forward

58:32to the uh completed report.

58:37>> You're welcome.

58:43Okay, that completes item A.

58:46>> Yep.

59:05Well, I think before we see the um you

59:07know the cost associated with it, it

59:09would be kind of premature to take a

59:12action on it other than we could just

59:16give a general endorsement that we we

59:19could, you know,

59:21>> that he's we feel he's heading in the

59:23right direction.

59:24>> That was my thought. Yes.

59:27>> And what is the committee, you know,

59:29what do people think about it?

59:49>> It's hard to have an opinion when we

59:51don't look at the costs, but it's uh

59:54it's

59:55desirable to see that we have multiple

59:57options to be looking into. So, I'll

1:00:00have to better equip myself with with

1:00:02some of this in the interim, but I

1:00:05appreciate your time for sure.

1:00:18Joe,

1:00:21Jacob, No.

1:00:24I mean, I think we're heading in the

1:00:26right direction with, you know, getting

1:00:28some plans drafted and getting the

1:00:29price.

1:00:35Okay, that being said, uh, move on to

1:00:40item B, discussion of possible action on

1:00:43amending the resolution to relax the

1:00:45moratorum.

1:00:53Now, we got copies of that, but it's

1:00:55still um

1:01:00it's still labeled as uh

1:01:03the third amendment and it's doesn't

1:01:06have the mention of the what was

1:01:10actually the third amendment in it.

1:01:25Yep, correct. We can certainly make

1:01:27those modifications.

1:01:29Um,

1:01:30I believe this would need to go through

1:01:33legal review before we finalize it, but

1:01:36I don't know if there are any other

1:01:37comments besides those.

1:01:43Yeah, I thought the rest of it looked

1:01:45pretty good except, you know, we just

1:01:47have to be clear in acknowledging that

1:01:48we've already approved um categories 16

1:01:52and 17.

1:01:55But the um you know the table

1:01:59was helpful in kind of summarizing

1:02:03how this um how the

1:02:07capacity is going to be um encumbered.

1:02:15So, do you think you can get it um

1:02:19get that modified to update the

1:02:22beginning portion of it and get it to

1:02:24legal?

1:02:25>> Absolutely. It's not a problem. If

1:02:27again, if those are your only comments,

1:02:29that's simple enough to do. Um just need

1:02:32a motion to that effect and authorizing

1:02:35uh the expenditures.

1:02:48So, does anybody else have any um other

1:02:52comments about it?

1:02:57Pat, just as a reminder about the typo

1:02:59that was in there for the BOD and the

1:03:01TSS.

1:03:24So, is there a motion to uh well

1:03:29to have it updated and then sent to

1:03:32legal that the ex the motion would be

1:03:36needed for the expense of legal? Is that

1:03:38what

1:03:39>> right? Because I mean I can send it to

1:03:42legal with your comments and they can

1:03:44incorporate it. That way we don't have

1:03:46to reproduce it and there might be a

1:03:49different way of phrasing it or

1:03:50something. and it might save some time,

1:03:52but that's up to you.

1:03:56>> Well, did the attorney formulate the

1:03:57last uh a

1:04:00>> uh we did in house, Brian Poa, as well

1:04:03as everybody else, but did go through

1:04:05legal for final review.

1:04:08>> But could this be updated then in house

1:04:10and then sent to the attorney?

1:04:12>> Absolutely. Having to update it?

1:04:14>> Absolutely.

1:04:19Is there a motion

1:04:21or other?

1:04:23>> I'll make a motion to

1:04:26update the final draft for legal review

1:04:30and then um

1:04:33provided to us at the next meeting for

1:04:35consideration for approval.

1:04:39I'll

1:04:42>> Are we confident we'll have a response

1:04:44from legal by the time our next

1:04:46scheduled meeting will take place?

1:04:52>> I think it's four weeks from tonight the

1:04:54next meeting

1:04:56>> because

1:04:57>> I did not ask that question but I would

1:05:00still need authorization to expend

1:05:02funds.

1:05:06Any

1:05:10So we have a motion and a second. Any

1:05:12further discussion?

1:05:15Yes.

1:05:24Hearing no further discussion. Um all

1:05:26those in favor?

1:05:28I

1:05:29>> I

1:05:30>> I

1:05:31>> Okay, it's uh five to nothing unanimous

1:05:34to um approve uh a motion to the motion

1:05:38that was presented by Joe.

1:05:44Well, that the last item on the ag on

1:05:47this special meeting's agenda. So, um

1:05:52with that, we're off to item four.

1:05:57Is there a motion to adjurnn?

1:06:02>> Yeah, I'll make a motion to adjurnn.

1:06:05>> Second.

1:06:06>> Second.

1:06:08>> All those in favor? I I

1:06:10>> I

1:06:12motion

1:06:13passed and meeting is adjourned at 608.