  • The meeting started about 9:24 a.m. with three members present at roll call (Aldermen Schweitzer and Cox Antwi, and the Chair), and a quorum; two others joined later. Minutes of the July 24, 2026 meeting were approved by roll call, 3-0.
  • The only agenda item was Board Bill 51 (committee substitute), presented by the Comptroller's office: it authorizes up to about $500 million in airport revenue bonds and a third amendment to the airport's restated indenture of trust. The airport's financial advisor and co-bond counsel presented.
  • Projects: about $375 million of projects, including roughly $91 million for airfield work (such as demolition of a terminal-area structure and runway reconstruction), about $240 million for Terminal 1 and 2 infrastructure enabling the planned consolidated terminal, and about $33 to $34 million for parking and roads. Amounts are tentative. The advisor said about 85 percent of the airline-approved third approval program will have been financed after this issue.
  • Financing: the issue is estimated at about $434 million, possibly $450 to $460 million, with about $300 million for new projects and about $75 million to reimburse a subordinate line of credit. Posting of the offering documents was set for October 14, pricing for October 21 and closing for November 4. Figures are preliminary given rate volatility.
  • Indenture changes (worked on for about two and a half years): convert the debt service stabilization fund into a rolling coverage account, allow a common debt service reserve fund (or none) instead of one per series, and add flexibility to issue other types of securities. Bond insurers consented two days earlier. The 2026 bonds will be issued under the existing structure via a supplemental indenture; the amended indenture covers later bonds.
  • Questions: Alderwoman Schweitzer asked about energy efficiency, alternative energy and drainage in the terminal and road projects, and whether skipping a reserve fund could raise costs for customers; the advisor will report back on efficiency components and costs. Alderwoman Cox Antwi asked about the two exhibits and the supplemental indenture.
  • Vote: the committee adopted the committee substitute and then passed it out with a "do pass" recommendation by voice (previous roll).
  • The chair noted that bills on the airport director's salary are pending at the Civil Service Commission, whose next meeting is in October. The committee excused an absent alderman and adjourned.

Issues discussed

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:12the Transportation and Commerce

00:13Committee will now come to order. Madame

00:15Clerk, please call the role.

00:19>> Alderman Odenberg,

00:22Alderman Orion,

00:25Alderwoman Schwitzer,

00:27>> present. Alderwoman Coxi

00:30>> present.

00:31>> Chair Conn

00:32>> present.

00:33>> Alderman Odenberg, Alderman Orion, three

00:36present. We have quorum.

00:38>> Thank you, Madame Clerk. And I'll uh

00:40note that we started at 9:24 with a

00:43slight delay. Appreciate everyone's

00:45patience uh while we waited to get the

00:48meeting started here. Um this morning we

00:51have a couple things on the agenda. The

00:54first item on the agenda is the approval

00:55of our meeting minutes from Friday, July

00:5724th, 2026. I'll entertain a motion on

01:01approval of the meeting minutes.

01:03>> I move to approve the meeting minutes

01:04from Friday, July 24th, 2020.

01:07>> Second.

01:08>> It was moved by the alderwoman from the

01:10first, seconded by the alderwoman from

01:11the 8th. That we approve our meeting

01:13minutes from Friday, July 24th. Madame

01:15clerk, please call the role. Alderman

01:17Odenberg,

01:19Alderman Orion, Alderwoman Schwitzer,

01:22>> I.

01:23>> Alderwoman Coxantu,

01:25>> I.

01:26>> Chair Conn,

01:27>> I.

01:28>> Alderman Odenberg, Alderman Ryan,

01:32three I votes.

01:34>> By your vote, you have sustained the

01:35motion of the alderwoman from the first

01:36to approve our meeting minutes. And uh

01:39the next item that we have on the agenda

01:41and the only other item that we have on

01:43the agenda uh for discussion today is

01:46board bill 51. Um board bill 51 is uh

01:50being presented today by the

01:52comprollers's office, Mr. Gavaglia.

01:55Um these are related to bond dentures

01:57for the airport. And so without further

02:01ado, I'll turn it over to Mr. Gavaglia.

02:04>> Okay. Well, thank you Mr. Chairman,

02:06members of the committee. Good morning.

02:08Um, a little bit of housekeeping. We

02:10have co-bound council Karen Jordan,

02:14madame clerk, who is trying to get in as

02:17a presenter. If you see her,

02:22>> Mr. Stinfield.

02:23>> Uh, no, we have actually co-bound

02:25council Karen Jordan is

02:28um I've gotten text message that she is

02:30trying to come in as a presenter.

02:34No, I don't show see her here trying to

02:37get in on the attendee side.

02:39>> Okay. Um then um if you do see her,

02:42would you mind letting her come in at at

02:44some point? Uh but uh this morning um

02:49Mr. Chairman, members of committee, we

02:51have for your consideration board bill

02:5351, committee sub, which is um

02:58authorizes uh the issuance of

03:00approximately up to $500 million in

03:05airport revenue bonds. Uh we also this

03:08bill will also seek to authorize and the

03:11execution of at the third amendment to

03:15the restated indenture of trust which

03:17governs um the airport's indebtedness.

03:21Um we have with us today the airport's

03:26financial advisor Mr. David Senfield

03:29virtually as you can see. Um we also

03:33have with us um in person we have

03:37co-bond council for the proposed bond

03:40sale um Mr. Charles Salsbury with

03:43Salsbury and Associates and if she is

03:45able to make the meeting um our other

03:48co-bond council um Miss Karen Jordan and

03:52she's with the law firm called Dentons.

03:54Um

03:56Mr. Chairman, uh, with your permission,

03:59uh, I'd like to ask Mr. Stenfill to walk

04:03us through a very short presentation

04:05which will go a long way to explaining

04:07the bill.

04:09>> Yeah, please.

04:13>> Is he going to be showing this online

04:15for the

04:16>> He will be sharing his watching.

04:19>> Good morning, Alderman Con, and

04:20distinguished members of the

04:23>> morning and thank you for joining us

04:24remotely. I I know that we had a prior

04:27scheduled meeting that uh ended up not

04:30being heard. Uh and so I I appreciate

04:34your flexibility and being able to be

04:35here.

04:37>> I appreciate you saying that, Alderman

04:40Cohen. And no worries. I enjoyed a uh a

04:43nice evening in St. Louis um on the

04:4615th, which was low pressure because I

04:50didn't have to uh present. So, no

04:53problem at all. Um, I'm just going to

04:55figure out how to make this full screen.

04:58Bear with me one second. I think it's

05:00few

05:02full screen load.

05:05Um,

05:07Alderman Cohen, if you could just let me

05:09know if you can see this.

05:10>> We're able to see it. Thank you.

05:13>> Okay, perfect. So, I'll with no further

05:16ado, I'll jump right in. Again, good

05:17morning, Alderman Cohen and other

05:19distinguished um members of the

05:20committee. Um as well as uh those in the

05:25the crowd today. Um thank you so much

05:27for taking the time this morning for

05:30this presentation. My name is David

05:32Stinfel. I serve as um Mr. Gelia said as

05:35the lead financial adviser for the

05:39airport and I've been in this role for

05:41about 11 years now. My firm, SE William

05:44Shank, uh, covers airports around the

05:47country, um, in the Midwest. Some of the

05:50airport clients that we cover outside of

05:52St. Louis include, um, Kansas City

05:55International, Detroit, um, metropolitan

05:58Wayne County, O'Hare, Midway, uh,

06:02Indianapolis International, um,

06:05Cincinnati, Northern Kentucky, and many

06:07more. We also um own and operate some

06:11airport terminals through an affiliate

06:13of my firm, for example, JFK Terminal

06:15One, which is currently under

06:16construction.

06:18With respect to St. Louis, uh this

06:20upcoming transaction, as you know, will

06:22be the largest transaction in um recent

06:27times for the airport within the past 20

06:29years. It's scheduled to price in mid

06:33October and close in November. Here on

06:36this page, page one, we have just a

06:38highle overview of some of the projects

06:41that the airport are contemplating

06:43completing with the proceeds of the

06:46upcoming issuance.

06:48Um there's estimated to be approximately

06:50about 375 million of projects that are

06:53completed with 91 million being for

06:56airfield projects about 240 million

06:58being for terminal one and two

07:00infrastructure and then about 33 to 34

07:03million for parking and roads and

07:04parking and roads projects. I should

07:07note here that these project amounts are

07:10tentative. As the airlines continue to

07:13operate with the city's airport, there

07:15could be adjustments to project sizes um

07:19particularly as there's inflation and

07:21cost inflation, service inflation across

07:23the country.

07:25So these are indicative numbers.

07:28Turning to page two as part of the

07:32upcoming issuance, an important

07:34component is the modernization of the

07:37senior lean general airport revenue bond

07:39indenture. This page here describes some

07:42of the major changes that are

07:44anticipated

07:45with the modernization of the indenture.

07:48And the indenture is a document that

07:50describes exactly the relationship

07:51between the city/ airport, the trustee

07:56and bond holders.

07:58The changes that we have been working on

08:00for the past two and a half years are

08:02primarily designed to, as you can see at

08:03the top left, lower capital costs for

08:06the airport and the airlines, increase

08:08future financial flexibility,

08:11and to modernize the provisions

08:13throughout the indenture such that they

08:14are consistent with current market

08:16standards across airports of similar

08:18size and scope. The three major

08:21components that are being modernized,

08:22and I won't go through them exactly

08:24today, are um starting on the left of

08:27this table,

08:29changing the debt service stabilization

08:31fund into a rolling coverage account in

08:34the middle of the table, changing the

08:36debt service reserve requirement from an

08:37individual seriesbased requirement to

08:39what's called a common debt service

08:41reserve fund. And then on the far right,

08:45the additional big picture changes

08:46include clarifying technical amendments,

08:49increasing flexibility to issue

08:52different types of securities such as

08:54verb debt or um shorter structures or

08:58sort of federally linked structures and

09:00such and to just modernize terms

09:03throughout the indenture. Moving to the

09:05bottom of the slide, the next steps that

09:07we anticipate

09:09are to um achieve the legislative action

09:12such as today's presentation to the

09:14transportation and commerce committee to

09:16allow for the indenture amendments to

09:17pass. We've uh just two days ago

09:21received also consent from the bond

09:23insurers to move forward with these

09:25indenture amendments

09:27and then finally to effectuate the

09:29actual oper operization of these

09:32indenture amendments uh through a

09:34multi-step process postclosing with the

09:36city and the controllers's office in the

09:38airport.

09:40Turning to page three, we have a highle

09:42overview of the financial results for

09:46the transaction. And I should note here

09:48that there's been a tremendous amount of

09:50volatility since we've started working

09:52on this transaction. As many of you have

09:53seen, the Federal Reserve recently

09:56increased interest rates just last week

09:59and that's been along a long line of

10:02other market moving changes that we

10:04antic that have happened and that we

10:06anticipate to continue happening all the

10:08way through pricing. Saying that, just

10:10to note that these numbers are certainly

10:11preliminary and subject to change. Um,

10:15as you can see here, currently the

10:17transactions estimate to be around 434

10:20million. I anticipate it probably be a

10:22little higher around maybe 450 to 460

10:24million when all said and done based on

10:26changes to rates and project sizes.

10:28Um, most of the proceeds you can see on

10:31the upper right table under the blue row

10:34that's called uses. Most of the uses are

10:36going to the project fund. Those

10:39proceeds will about 300 million will be

10:40used for new projects and then about 75

10:43million will be used to reimburse the

10:45subordinate junior lean PNC line of

10:47credit.

10:49There will be some amount of capitalized

10:51interest as well as funding reserve fund

10:54in the transaction. And on the bottom

10:56graph you can see the actual proforma

10:59impact of the new debt service on the

11:02city's existing debts. The city's

11:04existing debt is shown in light blue and

11:06the new debt is layered on across the

11:09three series in the colors orange,

11:10purple, and blue. You can see that most

11:14of the debt advertises on the long end

11:17and medium-term.

11:19There is some small amount that

11:20advertises between 29 and 31, which is

11:23the peak debt service years of the

11:25city's general airport revenue bonds.

11:29And then finally, just quickly going

11:32through the calendar and participating

11:34firms that are serving the city and the

11:36airport. We're anticipating pricing or

11:39excuse me, posting the preliminary

11:40official statement and the investor

11:42presentation on October 14th.

11:47Shortly thereafter, we anticipate

11:48pricing the bonds on October 21st in St.

11:51Louis

11:53and then uh closing shortly after

11:55election day on November 4th.

11:58And again, the firms that are serving

12:00the airport, many of whom have um worked

12:03with the city and the airport on various

12:07transactions over the year are described

12:09below.

12:11Thank you again for taking the time for

12:13this presentation. I'll pause there to

12:16see if there are any questions or

12:17clarifications that I can provide or

12:19that um my fellow team members that are

12:22serving the city on this transaction or

12:24in the room or on the line can provide.

12:27Thank you.

12:29>> All right. Uh any questions from the

12:32committee?

12:33Alderwoman

12:34>> Schwitzer's

12:36here.

12:37>> Oh, al Ald alderman Oldenberg has joined

12:40us uh virtually. Alderman Oldenberg.

12:43>> Thank you, Chairman. No questions at

12:45this time.

12:46>> Is Alderman Norion online? No. Okay. Uh

12:51Alderwoman Schwitzer,

12:53>> thank you so much. I appreciate the

12:54presentation. Um I'm always really

12:56interested to hear more about the

12:57projects uh that that this is um that

13:01this will be funded. So if we could go

13:03over that page, I believe page one just

13:05a little bit more about what we're

13:06talking about and any difference between

13:08this and bonds that had been issued uh

13:11in 2024 2025 and I believe there were

13:15bonds issued last.

13:20>> That's that's a great question. Thank

13:21you for the question.

13:24Um at a high level what I can describe

13:28is that these projects are part of the

13:31continuum from the 2024 issuance in that

13:35a large portion of them are for enabling

13:38projects for the anticipated

13:40consolidated terminal plan. Um, I can

13:44also note that they're in the same

13:45continuum as the 2024 projects in that

13:48they're part of the third

13:51uh uh approval process with the airlines

13:54that has been negotiated. I think after

13:57this issuance probably about 85% of the

14:01third approval process has been will

14:03have been financed. Um, and there'll be

14:05a small amount remaining that hasn't

14:07been financed. Um, as you can see on

14:10this page, most of the projects that

14:12line share are going to be for both the

14:16terminal one and two again enabling

14:18projects preparing for the CTP. And then

14:21there's a number of airflow projects. I

14:24think the probably the biggest of them

14:26is the demolition of the mowing as well

14:29as the um design and reconstruction of

14:32runway 12 L30R and runway 624.

14:38Okay. Regarding um electrical, power

14:41equipment, lighting, climate control,

14:43plumbing, and um these sound like

14:45incredibly costly projects. Are those

14:48the the most costly in that terminal one

14:50and two infrastructure

14:53>> update?

14:54>> It's a good question, Alman. I'd have to

14:57um do some additional research to come

15:00back to you on the specific

15:03uh amount that's associated with those

15:06components within that project.

15:08>> I'd be very interested in the the

15:09efficiencies of those systems too. um

15:12just with making those sort of upgrades,

15:14wanting to see the airport, you know,

15:16doing this in a way that is um you know,

15:19taking into account uh just efficiency

15:22um the any sort of alternative energy

15:25systems that can be put on with a new

15:28roof. That's something that I would be

15:29very interested in in knowing um in

15:32terms of what the airport plans to do

15:33there for if there such a big investment

15:36is being made wanting it to be the most

15:37efficient and um you know up-to-date

15:40technology possible.

15:44Um, that's a great question, Alderman.

15:45If the committee would allow for it, I'd

15:47love to be able to come back to you with

15:49a report that details the specific um,

15:54you know, power, lighting, climate

15:56control, energy efficiency components

15:59and cost associated with uh, the

16:02terminal project.

16:03>> Yeah, I appreciate that. I think people,

16:06you know, really want to see our

16:09government, you know, owned buildings

16:11and the um when we do these major

16:14upgrades that we're really thinking not

16:16just about the status quo and replacing

16:18it as is, but thinking about making our

16:22our airport, you know, one of the

16:23future. Um so with even in the parking

16:26and roads project um you know if there

16:30if there's work already happening what

16:32kind of work with with MSD with drainage

16:35and um different flooding uh controls

16:38and um just the type of uh

16:41infrastructure that's available now that

16:44could not only make our airport look

16:46better and and be a better uh airport

16:48but also uh just um one that is is

16:52taking into account the you know changes

16:54we need to be prepared for. Um so I'd

16:56love more information about about that.

16:59Um

17:03then regarding um the additional big

17:06picture changes of the indenture says

17:09clarifying and technical amendments. Um

17:13can you go over a little bit more about

17:15what that would mean?

17:18Page two.

17:20>> Yes. I think that's probably a good time

17:22for me to defer perhaps to my colleague

17:25who's in the room, Mr. Charles Salsbury,

17:29who can maybe talk through some of those

17:31changes. Um, and there's there's

17:34numerous ones throughout the indenture.

17:36>> Sure.

17:38>> It's a big thing to to change.

17:41>> Good morning. It's a pleasure to share

17:43this meeting with you all. Um as um

17:47David mentioned earlier, we've been

17:49working on updating the indenture for

17:52about two and a half years.

17:54>> Uh and what we've done is this. We've

17:56taken a look at not only our our

17:59existing indenture, but we've also

18:01surveyed indentures from around the

18:04country so that we could have have at

18:06our fingertips the best models for us to

18:10guide us through this process. Because

18:13what we're trying to do is to create a

18:15document that can look toward the future

18:18and and put the city in a position to

18:21where it can take full advantage of

18:23changes that might occur down the line

18:25in terms of financing techniques. And so

18:28in terms of technical type of of

18:31improvements that we've tried to put

18:33into the into the document, uh for

18:36example, when you issue new bonds, you

18:39have to satisfy certain tests in order

18:41to be able to move forward. Tests that

18:43would include additional bonds tests

18:45that would uh satisfy certain financial

18:49uh covenant compliance and also project

18:52the ability to actually service that new

18:55debt. Uh we have put in place with the

18:58new indenture uh some streamline

19:01approaches that will make it easier for

19:04the airport to be able to finance future

19:06projects but at the same time providing

19:10a great deal of comfort to the rating

19:13agencies and to uh prospective

19:16purchasers of bonds that in fact the new

19:19new bonds will be issued in in a way

19:22that's going to be affordable for the

19:24city and the airport. Uh so uh rest

19:27assured that the indenture that we're

19:29asking you to approve today is one that

19:32is modern that that has been challenged

19:35in other areas of the country. Um uh for

19:38example, we we leaned heavily on on the

19:41the new indenture that's in place in

19:44Atlanta uh that allows the Atlanta

19:47airport to expand and to grow in in a

19:50mean meaningful ways. Um, so, uh, we're

19:53very proud of the product that we've put

19:55out there and, uh, we still have a few

19:58tweaks to make to it before it's it's ab

20:00absolutely finalized, but it is a

20:02document that I think you all will be

20:04proud of and a document that will be

20:06able to move into the future as as as we

20:11propel ourselves forward with this

20:12project and look toward the potential

20:15for the uh, unified terminal.

20:19>> That's that's very interesting. I

20:21thought the the piece also in the the

20:23second column debt service reserve fund

20:25requirement um that a series can be

20:28included the common reserve account to

20:29be secured by its own individual reserve

20:31or have no reserve at all. I thought

20:33that was very interesting. No reserve at

20:35all. Is that unusual?

20:37>> That's a very good question. Um the

20:40short answer is that um we're trying to

20:44come up with flexibility.

20:46>> Okay. Um when you market bonds uh

20:49dependent upon a project uh there are

20:52instances in which the uh the the

20:55prospective purchasers want to see a

20:58debt service reserve fund. There are

21:00instances when purchasers are not as

21:02concerned about that. And what we want

21:04to be able to do is have the flexibility

21:06to put in place a standalone deb reserve

21:10fund or uh if if market conditions allow

21:14not to even have a death service reserve

21:15fund. Uh currently we are with with our

21:19current indenture we can only put in a

21:21series debt service reserve fund. So

21:23each series that we issue will have a

21:25debt service reserve fund for that

21:27series. The other thing about this

21:29common debt service reserve fund that

21:31we're now allowing for going forward is

21:33that it permits us to a to actually size

21:37that debt service reserve fund as bonds

21:39are paid off paid down and and to and to

21:42uh limit the size of of the best debt

21:44service reserve fund which once again

21:46puts the city in a position to where it

21:48will not necessarily have to put uh keep

21:52as as much money in in that fund as it

21:55as it currently does. Uh so uh again

21:58what we're trying to do with the new

22:00indenture is to allow for uh flexibility

22:03and to permit us ourselves to be in a

22:06position to where uh we can take

22:08advantage of of of limiting the amount

22:10of money that the city needs to put into

22:12that. David, did you want to also

22:13comment on that?

22:16>> Yes, thank you so much Charl Charles and

22:18thank you for your question. um

22:20regarding the reserve fund. Um

22:25right, specifically around the uh the

22:29notion of potentially not funding a

22:32reserve fund. uh funding a reserve fund

22:35for revenue bond type issuers like

22:37airports, water, sewer, utilities for

22:39example, enterprise type credits as you

22:42know we call them in the financial

22:43documents

22:45over the long course of history has been

22:48ordinarily a practice that was

22:51considered to be sacrosan which was if

22:54you were going to issue a revenue bond

22:56to fund a project in a city you would

23:00have to fund some sort of reserve fund.

23:03to protect bond holders.

23:06About 15 years ago, the utility space,

23:10which issues a lot more bonds than the

23:12airport space because they're just more

23:14utilities, started to reduce the

23:18requirement to have a reserve fund

23:21associated with the issuance of bonds.

23:24And the reason being is that

23:27utilities like many airports are often

23:30times monopolies and they control their

23:33rate making ability

23:35>> usually through a a a um a board that's

23:39associated not with a municipality but

23:41only with that particular utility. And

23:43the rating agencies came around to say

23:46you know what these utilities haven't

23:48defaulted in mass ever

23:52even for the lower rate utilities and as

23:54such we agree with the notion that a

23:59utility shouldn't need to necessarily

24:00fund a debt service reserve fund and for

24:04utilities debt service reserve fund

24:08uh funding of that utility I mean

24:10funding of that reserve fund came out of

24:12the rate base so rate payers, you know,

24:14mom and pop are paying for it.

24:17That change happened about 15 years ago

24:19and since then utilities have stopped

24:21issuing with reserve funds. The

24:23conversation that's been happening now

24:25with respect to airports is very similar

24:27to the conversation that happened about

24:2815 years ago with utilities in that

24:32large airports that have tremendous O&D

24:36demand or origin and destination demand

24:39meaning they're not primarily serving

24:40connecting passengers

24:43uh that have a strong diversity of

24:45airlines

24:47have started to have this conversation

24:48about the fact that they're rated very

24:51highly. They have extremely strong

24:53liquid liquidity and have extremely

24:56strong demand from passengers.

24:59So who are those airports specifically?

25:02Atlanta Hartsville Jackson International

25:04Airport which is the busiest airport in

25:06the world is now actively having

25:08discussions about eliminating the

25:10reserve fund requirement.

25:13Los Angeles International Airport is

25:14another client of mine who's actively

25:16having discussions currently about

25:17eliminating the debt service reserve

25:20requirement because the thought is that

25:22these airports are so strong in terms of

25:25their passenger demand, their ability to

25:27raise prices

25:29that they may need to they can obate

25:31potentially the need to have a reserve

25:32fund. And typically when I've seen these

25:35changes happen, they happen at the

25:37strongest

25:38issuers and municipal bonds and then it

25:40kind of rolls down through the rankings.

25:43So there could be a we anticipate that

25:46there could be a world in the future

25:49where St. Louis and other airports of

25:51similar size, scope, and mix of airlines

25:56may not need to issue with reserve fund.

25:58It may become antiquated.

26:00and including this provision in the

26:01indenture allows for that to happen

26:03without having to go through another

26:05mandatory a mandatory process. Excuse

26:07me.

26:08>> Sorry for the long explanation, but

26:10that's

26:11>> you you answered my next question within

26:13your answer because my concern was how

26:15how credit rating

26:18view that um and so it seems like it's

26:20becoming more you answered that that

26:22question and I appreciate that. I guess

26:25um whether that's recessionp proof um

26:29you know in terms of the answer then

26:31becomes raising rates and potentially

26:34charging our customers here in St. Louis

26:36more which I don't want to see. Um so

26:38that's that's interesting and I'll be

26:39following that that as it as it moves

26:41through the the the market. So um I'll

26:45yield the rest of my time. I appreciate

26:46all the time you took to answer my

26:47questions both of you. It really means a

26:49lot. Thank you.

26:52Alderwoman Cox.

26:55>> Thank you, Mr. Chairman. Um, and thank

26:57you both for both the presentation today

26:59and for that additional clarity there,

27:01Mr. Charles, as it relates to the

27:03indenture structures. Um, I do have, if

27:05you don't mind, one quick additional

27:07question though, you a lot of my

27:08questions. Um, in response to Alderwoman

27:11Schweitzer's comments, um, speaking

27:13specifically to the mechanics of the

27:15bill, I know you spoke to, um, the

27:17necessity for the third, I believe it's

27:19the third amendment to the indenture,

27:21which you explained, but I also noticed

27:23that there is a supplemental indenture.

27:25I think there's two exhibits. Exhibit

27:27one relates to that that is specific to

27:29the series 26 bonds issuance. So could

27:31you just maybe explain um the function

27:33of that supplemental indicure and sort

27:36of uh the difference between the two

27:37exhibits we see attached here?

27:40>> Uh thank you for that question. Um we

27:43intend to issue the 2026 bonds under the

27:46existing structure. Uh so uh the amended

27:51and restated indenture that you're also

27:53asked to approve is going to be

27:55something that will cover bonds issued

27:57after the 2026 bonds.

27:59>> Okay. So uh under the existing structure

28:02uh we are required by the existing uh

28:06indenture to uh put forth a supplemental

28:09indenture and that supplemental

28:11indenture will have all the details as

28:14to the bonds the 2026 bonds. uh it will

28:18will have its interest rates, its

28:20maturity schedule uh the uh debt service

28:23reserve fund being created um and would

28:26have a mechanism for drawing down the

28:29funds uh that are uh raised through the

28:31bond issuance. Uh so typically when we

28:35have brought before you uh in the past

28:38bond deals, we've only brought the

28:41supplemental inenture in for approval to

28:44to take care of the the bonds that we're

28:45issuing. The difference here is that

28:47we're not only doing that having a

28:49supplemental indenture for the 2026

28:51bonds, but we're also saying, by the

28:53way, in the future, we'd like to issue

28:55bonds under the uh new structure, which

28:57by the way will also require a

28:59supplemental indenture. So um so in

29:02essence what you're what you're asked to

29:03do is to approve the uh supplemental

29:06indenture to issue the bonds uh for the

29:092026 proceeds uh the discussion that

29:11David took you all through and and then

29:14the uh the amended and restated

29:15indentures is a separate matter that

29:17that is going to be looking toward the

29:19future.

29:20>> Okay. Thank you for clarifying that

29:22distinction and that difference. I think

29:24it's really important just understanding

29:25mechanically how the different two will

29:27function. Um and then also as you shared

29:29the reason for having that third amended

29:32and restated mechanism to make all the

29:34improvements that um you guys shared

29:36with us. So I appreciate that. And I'll

29:37just say for the record too, I echo the

29:39the alderwoman's comments as it relates

29:41to the necessity um and the importance I

29:43think the community feels for all these

29:45improvements and upgrades that the

29:46airport is looking to make. Uh we

29:48certainly look forward to hearing more

29:50about um how we'll utilize these funds

29:52and this flexibility in the future. So,

29:54I appreciate you guys being willing to

29:55take the time to come and speak with us

29:57today and explain it all. So, thank you.

29:59And no further questions, chairman.

30:01>> Thank you very much.

30:02>> Great.

30:04Excellent questions. Uh, and thank you

30:06for the responses as well. Feel like

30:09we're having a bit of a more robust

30:10conversation than we had at the airport

30:12commission around this uh particular

30:14presentation. So, um, thank you very

30:16much. Um, we do have a committee

30:19substitute for board bill 51 that is in

30:22the uh drive and uh I'm sure my

30:27colleagues have already reviewed it. Um,

30:30but would entertain a motion that we

30:33adopt the committee substitute to board

30:36bill 51.

30:37>> I move that we adopt board bill 51 with

30:40the committee substitute.

30:42>> Second.

30:45Madame clerk, please call the role.

30:48>> Alderman Oldenberg.

30:50>> I.

30:52>> Alderman Norion.

30:54>> Alderwoman Schwitzer.

30:56>> I.

30:56>> Alderwoman Coxantu.

30:58>> I.

30:59>> Chair Conn.

31:00>> I.

31:01>> Alderman Norion. Four I votes.

31:05>> Thank you. With your vote, you sustain

31:07the motion of the alderwoman from the

31:08ETH uh which was seconded by the

31:10alderman from the first. Madam clerk, I

31:12forgot to reference that in my earlier

31:14remarks. Um,

31:16and we have now before us board bill 51,

31:19committee substitute.

31:21Um, is anyone from the controllers's

31:24office wanting to testify uh regarding

31:28the committee substitute?

31:31>> No, Mr. Chairman, all we uh will pledge

31:33to do is get back to you as can

31:36regarding the questions um and the

31:39answers. We'll have to go to the airport

31:40to get the details from Alderman

31:43Schwitzer's questions, but we pledge to

31:44get that to you as soon as possible.

31:46>> Thank you.

31:47>> Wonderful.

31:49Any further discussion or questions

31:52regarding board bill 51 committee

31:54substitute? Alderman Oldenberg.

32:00>> No questions. Thank you, Chairman.

32:01Thanks for everyone's time today.

32:04>> Alderwoman, is Alderman Nyan on yet? No.

32:08Uh, Alderwoman Schwitzer,

32:10>> no further questions. Thank you.

32:12>> Alderwoman Coxantu.

32:14>> No questions. Chairman, thank you.

32:16>> All right. Uh, if there's no further

32:18discussion on board bill 51, committee

32:20substitute, I'll entertain a motion on

32:22board bill 51, committee substitute.

32:24>> I move that we pass board bill 51,

32:26committee substitute, with the due pass

32:27recommendation.

32:28>> Second previous role. It's been moved by

32:30the alderwoman, seconded by the

32:33alderwoman from the first uh that we

32:35pass board bill 51 out 51 committee

32:38substitute out with a due pass

32:39recommendation. There's been a request

32:40for previous role. Any objection to

32:43previous role

32:45hearing and seeing none board bill 51

32:48committee substitute passes out of

32:49committee with a due pass recommend.

32:51>> Thank you Mr. Chairman, members

32:52committee. Appreciate your time today.

32:54>> Thank you.

32:58look forward to the responses. Um,

33:01we don't have any further items for

33:05review on the agenda. I do want to just

33:08make note that um

33:12there are a couple board bills that were

33:14introduced related to the salary for the

33:16airport director. Those are currently

33:19pending over with the civil service

33:20commission. So, we are waiting for their

33:24review and um approval before moving

33:27forward with a hearing on those. Um

33:30their next meeting is in October, so I

33:32don't anticipate any movement on those

33:34until then. Um but we'll keep everyone

33:37apprised uh once we do get uh word from

33:40the personnel director, civil service

33:42commission with respect to those. Um and

33:45then I know we have a few other bills

33:47that are out there. So, I'll be meeting

33:48with the sponsor of the bills to uh see

33:51if they have any interest in having

33:52hearings on those. Other than that, it

33:55looks like we need to excuse the

33:56alderman from the fourth for necessary

33:58absence.

34:00And we'll entertain a motion to adjurnn.

34:05>> I move that we adjourn.

34:07>> Second role.

34:08>> It's been moved by the alderwoman from

34:10the eth, seconded by the alderwoman the

34:12first that we adjourn. There's been a

34:14request for previous role. Is there any

34:15objection to previous role?

34:18hearing and seeing none we stand

34:20adjourn. Thank you everyone.

34:22>> You