Wastewater plant primary treatment unit No. 3 painting

At a glance

Based on auto-generated captions; names and details may be misheard.

  • What: contract, not to exceed $90,000, to drain, repair and repaint the third and largest primary treatment unit at the wastewater plant.
  • Why: required maintenance; corrosion and pitting require welding repairs. The same firm did the first two units. Tertiary clarifiers are next.
  • Outcome: approved October 19, 2026 after some debate over cost (firm captioned "Ti and Bond"; the agenda says Tighe & Bond).

Sources

Discussion time

About 5 minutes across 1 meeting (from transcript timestamps; approximate).

Meeting Minutes
2026-10-19 - Select Board 5

Log