2026-10-26 - Planning Commission Meeting

Summary

Built from the posted agenda and the meeting video captions; minutes are not yet posted. Vote tallies are omitted because attendance was unclear in the captions.

  • Quorum was reached with three commissioners absent at the start; the consent calendar (minutes of October 12 and excused absences) was approved.
  • CUP 2026-0011, 1029 E. Fourth St (Verizon): renewal for 10 years of an existing 60-foot wireless facility disguised as a tree. Staff recommended approval as conditioned. Commissioners asked about equipment fire risk, safety signage and landscaping. The applicant asked that the property owner, not Verizon, be responsible for parking lot repaving and restriping under condition 1A, and staff agreed to modify the language. A commissioner asked about coverage gaps affecting students and suggested using service-gap maps in future renewals. Approved with the modified condition. See Wireless Facility CUP Renewals at 1029 E. Fourth St and 711 S. Grand Ave.
  • CUP 2026-0012, 711 S. Grand Ave (ATC Sequoia): renewal of an existing 58-foot monopine facility. Staff recommended approval. Questions covered ownership of the tower versus antennas, safety, 24-hour contact signage and upgrade frequency. No public comment. Approved.
  • 2361 N. Riverside Dr (Wright-Bachman House) and 2365 N. Riverside Dr (Harwood-Schwarm House): each asked to be placed on the historic register as contributing and to enter a Mills Act agreement (staff recommended approval). Commissioners asked about owner occupancy, staff monitoring capacity, converting a historic garage to an ADU, the self-certification process and the city's benefit from Mills Act agreements. Both were approved. See Mills Act historic property agreements.
  • Commissioner comments: a reminder about the upcoming Santa Ana Zoning Code Update, with staff asked to relay to the Council the Commission's earlier extensive discussion of the residential industrial overlay; a commissioner asked staff for an example of a denied Mills Act application; commissioners encouraged residents to vote.

Agenda

  • Consent calendar: approval of minutes of October 12, 2026
  • CUP 2026-0011: renewal of 60-foot wireless facility, 1029 E. Fourth St (Verizon)
  • CUP 2026-0012: renewal of wireless facility, 711 S. Grand Ave (ATC Sequoia)
  • Historic register and Mills Act agreements: 2361 N. Riverside Dr and 2365 N. Riverside Dr

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

00:0026th to order.

00:02Will the secretary please call roll?

00:05>> Commissioner Guzman.

00:07>> Here.

00:07>> Commissioner Leo.

00:09>> Here.

00:09>> Commissioner Oliva.

00:12Commissioner Pham.

00:14Commissioner Woo.

00:15>> Present.

00:16>> Vice Chair Benninger.

00:18>> Present.

00:18>> Chair Ramos.

00:21Vice Chair, the quorum has been reached

00:23at 5:32 with Olive

00:27Oliva and Pham

00:31and Chair Ramos missing. Absent.

00:34>> Very Very good. Thank you.

00:36Let's start with the pledge of

00:37allegiance. Jacqueline, could you please

00:39lead us?

00:44>> I pledge allegiance to the flag of the

00:47United States of America

00:49and to the republic for which it stands,

00:51one nation under God, indivisible, with

00:54liberty and justice for

01:02>> Before we begin, I'd like to remind my

01:04fellow commissioners to turn turn your

01:06mic on and off off I'm I'm when speaking

01:08and off when you're not.

01:10And when speaking, please place the

01:11microphone within 4 in away from you.

01:15Members of the public may attend the

01:17planning commission meeting either in

01:19person or via the Zoom.

01:21I now invite the secretary to describe

01:23how the public can access and

01:25participate in this meeting.

01:30>> This meeting is being live streamed via

01:32our portal at www.santaana-

01:37pa- dot primegov.com

01:42/public/portal

01:44and on our YouTube at

01:45www.youtube.com/cityofsantaanavideos.

01:50If you'd like to provide a public

01:52comment, you may also do so in the

01:54following ways.

01:56Join the meeting via Zoom. Enter the

01:58meeting ID number 87879481068.

02:04When the item you wish to comment on is

02:06being discussed, please select the hand

02:08icon to indicate that you would like to

02:10speak. Once called upon, remember to

02:13unmute yourself and state your name for

02:14the record.

02:16You can also join the meeting by calling

02:18669-900-6833.

02:22Enter the meeting ID number 87879481068.

02:29When the item that you would like to

02:30comment is being discussed, press nine

02:32to let us know you would like to speak.

02:35You'll be called upon by the last three

02:36digits of your phone number.

02:38After you are called upon, you may press

02:41*6 to unmute yourself. For those who are

02:44attending this meeting in person and

02:45would like to provide public comment,

02:47please fill out the request to speak

02:49form and turn it in to the recording

02:51secretary.

02:52All speakers will have 3 minutes to

02:54speak. I will alert you when your time

02:56is up.

02:59>> Thank you. Moving on to public comments

03:01on non-agenda or non-public hearing

03:04items, secretary, does anyone wish to

03:06speak?

03:11>> No, we don't have any

03:13speakers at this time.

03:15If you're attending this meeting in

03:16person and would like to comment on

03:18non-agenda public hearing items, please

03:20fill out the request to speak form and

03:22turn it in to the secretary.

03:24If you're participating via Zoom and

03:25would like to comment on non-agenda or

03:27non-public hearing items, please select

03:29the hand icon to let us know that you

03:31would like to comment. If you're calling

03:33in and would like to comment on

03:34non-agenda or non-public

03:37hearing items, please dial *9 and then

03:40*6 to unmute yourself. I will wait a few

03:43seconds.

03:47Chair, we do not have any speakers at

03:49this time.

03:51>> Thank you.

03:53Moving on to consent calendar, looking

03:55for one motion. Is there a motion to

03:57approve the item A, which is minutes

03:59from the October 12th meeting, and item

04:01B, excuse absences?

04:03>> I move.

04:04>> Second.

04:05>> So moved by a Commissioner Wu and and uh

04:08seconded by Commissioner Guzman.

04:10Secretary, please take roll call.

04:13>> All right.

04:15Commissioner Guzman.

04:16>> I.

04:17>> Commissioner Leo.

04:19>> I.

04:20>> Commissioner Oliva.

04:23Commissioner Pham.

04:26Commissioner Wu.

04:27>> I.

04:28>> Vice Chair Benninger.

04:29>> I.

04:30>> Chair Ramos.

04:38Motion approved

04:40by majority vote

04:42with Commissioner Oliva, Pham, and Chair

04:46Ramos absent.

04:49>> Okay, that concludes the uh consent

04:51calendar items. Moving on to public

04:54hearing.

04:55I will now review the uh

04:58procedure for the public hearing so that

04:59everyone knows what to expect.

05:03Staff will provide presentation and

05:05answer questions from the the

05:07commission.

05:08Public hearing will be opened. I promise

05:10to do it this time, Commissioner Leo

05:12Leo.

05:13The uh applicant will be given

05:15opportunity to speak and limited to 15

05:16minutes.

05:18Members of the public will be given

05:19opportunity to comment, limited to 3

05:21minutes.

05:23The applicant will be given opportunity

05:24to respond to the public comments,

05:27limited to 5 minutes.

05:28Public hearing will be closed.

05:30Then discussion will return to the

05:32commission with formal action to be

05:34approved, denied, or continued.

05:38Please when

05:42when presenting your presentation,

05:43please state your name address, and

05:45that's voluntary.

05:47State clearly whether you support,

05:48oppose, or neutral to the proposition

05:51proposal.

05:52Your statement should include all

05:53pertinent facts within your knowledge.

05:59Please Please note decisions on these

06:01matters are final unless appealed within

06:0310 days.

06:04Any interested individual or party

06:07by any individuals or party

06:08recommendation on these matters will be

06:10forwarded to the city council at a later

06:12date for final decision.

06:16This is the time and place for

06:18conditional use permit

06:202026-0011

06:23for the property located at 1029 East

06:274th Street located within the transit

06:29zone code Pacific Development 9084

06:34zoning district.

06:35Before we begin, do any commissioners

06:37have anything they would like to

06:39disclose with regards to this item?

06:44Okay.

06:45See none.

06:47The case planner Natalie Wu

06:50Lu will provide a brief presentation.

06:59>> Thank you, Vice Chair Benninger.

07:07Tonight's first item is a conditional

07:10use permit 2026-0011

07:14for Verizon Wireless at 1029 East 4th

07:17Street. The request is for the approval

07:20of a conditional use permit to renew the

07:22entitlement for an existing 60-ft tall

07:25major wireless facility disguised as a

07:27mono eucalyptus.

07:29Staff's recommendation

07:31is to adopt a resolution approving CUP

07:35number 2026

07:37-11 as conditioned.

07:43The site's general plan land use

07:45designation is urban neighborhood medium

07:48low and the property is located in the

07:50ST84 transit zoning code within the

07:54urban neighborhood two sub district.

07:57The surrounding land uses include

07:59industrial outdoor storage to the north,

08:02recycling facilities to the east and the

08:04west and a multi-family residential

08:07development and mini warehouse storage

08:09directly to the south.

08:11The lot size is approximately 1.18 acres

08:15and includes an 8,000 square foot

08:17existing restaurant building.

08:22The original CUP number 2015-20

08:27was approved by the planning commission

08:29on December 14th, 2015.

08:32It allowed the construction of a 60-foot

08:36mono-eucalyptus, ancillary ground

08:38equipment, equipment closure, as well as

08:40landscaping.

08:42Pursuant to the municipal code section

08:4541-198.3B,

08:48it requires that major wireless

08:51communication facility uh renew every 10

08:54years.

08:59The existing site is occupied by

09:02Taqueria El which is an existing eating

09:04establishment with outdoor dining that

09:07has been in operation since 1997.

09:10Permits were obtained in 2020 and 2023

09:13to replace equipment associated with the

09:15wireless facility to maintain cellular

09:17service.

09:21Here are a few photos of the existing

09:24facility as viewed from the southeast

09:27and east elevations.

09:34Here is a partial site plan um

09:37with north pointed towards the top of

09:39the screen. The wireless facility sits

09:42near the northern portion of the site

09:44and is at the rear of the existing

09:46restaurant.

09:52Here is also a snippet of the equipment

09:55area plan. The equipment is existing

09:58already and it's about 114 square feet.

10:07Here is an elevation of the existing

10:10mono eucalyptus wireless facility as

10:12viewed from the east elevation.

10:21The facility provides a benefit to Santa

10:24Ana residents, businesses, and motorists

10:27who use mobile services by providing

10:30cellular and data capacity in the area.

10:33The applicant is proposing the following

10:35improvements to the site, which include

10:37repaving and restriping of the existing

10:39parking spaces, installation of two new

10:41Brisbane box trees, and replacement of

10:44all deteriorating and or faded stealth

10:47branches or needles, and refreshing of

10:49antenna socks as needed.

10:52The facilities equipment and antenna

10:54area are adjacent to the existing

10:56commercial building on site with the

10:59location being optimal to provide the

11:00necessary wireless coverage.

11:07The project is consistent with the urban

11:09neighborhood medium low general plan

11:10land use designation. This facility will

11:13continue to comply with all height,

11:16location, screening, and stealth design

11:17standards.

11:19The project is also consistent with

11:21several general plan land use goals and

11:24policies that emphasize the preservation

11:27and improvement of the existing

11:28neighborhood and districts, promoting

11:30compatibility with the surrounding built

11:32environment, supporting a clean and safe

11:34environment for residents, workers, and

11:36visitors, as well as providing cellular

11:38data services to the surrounding area

11:40while still being compliant with

11:41development standards.

11:44In accordance to the California

11:46Environmental Quality Act and CEQA

11:47guidelines, this project is exempt from

11:49further review as it is an existing

11:52facility. Notice of exemption

11:54environmental review number 2026-25

11:57will be filed for this project. There is

11:59no fiscal impact associated.

12:03Staff recommendation is that the

12:05Planning Commission adopt a resolution

12:07approving conditional use permit number

12:082026-0011

12:11as conditioned.

12:15This concludes staff presentation. Staff

12:18is here alongside the applicant to

12:19answer any questions.

12:22>> Thank you, Natalie. Does any

12:23commissioners have any questions for

12:25staff?

12:28Commissioner Wu?

12:30Um,

12:31yeah.

12:33But

12:33>> I just have a quick question for staff.

12:36Um, in your PowerPoint presentation and

12:38in the staff report it states that

12:40um, the improvements will include the

12:43box trees, um,

12:45the replacing the faded stealth branches

12:47and refreshing of antenna socks as

12:49needed. Is the as needed referring to

12:52the antenna socks?

12:54>> Yes, it is.

12:55>> Okay, and who determines whether they're

12:56needed?

12:58>> That would be, I would say based off of

13:01a site visit if there is branches that

13:05are falling off or if there if there's

13:07clear like fading of the existing

13:10screening, then the request would be

13:12that the applicant replaces them.

13:14>> And and have has staff gone to inspect

13:18the Okay. And will the recommendation be

13:20to replace the antennas?

13:22>> Based off of a site visit, it looks like

13:25the facility is still in

13:28I would say good condition at this time.

13:30I would not say it was it would be

13:31necessary.

13:32>> Okay.

13:33And then I have another question, but I

13:34don't know if you can answer this. In

13:36the updated zoning code

13:39CUPs are going to be moved to director

13:42level approval. Is that correct or am I

13:44mis- misremembering that?

13:47>> Thank you, Commissioner um brand new

13:49CUPs will still be brought forth before

13:51the planning commission.

13:53But CUP renewals or renewals for

13:56facilities such as these would be at the

13:58director level.

14:01>> Thank you. I was misremembering it.

14:02Thank you.

14:03Or maybe remembering it correctly. Thank

14:06you.

14:07>> Thank you, Commissioner Guzman.

14:08Commissioner Liu.

14:11>> No questions.

14:12>> No questions.

14:13Uh I do have a couple of questions. One

14:14of them um

14:16not knowing all the equipment that's

14:17down on the ground

14:19is there any batteries in any of this

14:21this equipment that's on the ground?

14:29What my question is here is really

14:30concerned a fire seeing that we've

14:32recently had a a charging station go up

14:36um

14:37at a facility and actually one went and

14:39the other one went.

14:40Is there any equipment down in that

14:42ground level could that could result in

14:43a a fire like that?

14:45>> Thank you, Vice Chair. It's our our

14:47understanding no batteries. Um however,

14:50the applicant is here if they want to

14:52provide any clarification on the level

14:54of specificity for equipment there.

14:56>> Very good. Also, looking at first time I

14:58looked at Eucalyptus as tree type. It

15:01really does a good job to me hiding the

15:02antennas and what have you. Um

15:05is that very common with this type of

15:06design with the Eucalyptus tree type

15:08trees?

15:11>> I would say it's

15:13fairly common on sites where maybe a

15:17monopole which is more common isn't

15:19necessarily

15:21fits with

15:22the other tree types. I would say

15:24oftentimes it's proposed as an

15:25alternative.

15:26>> Yeah, cuz with the pines you obviously

15:28have an antenna so pine is stick out

15:29away from the branches and obviously you

15:31can tell what that is. This one you had

15:33to look twice to see that wasn't a

15:35a real tree on it which I I like that

15:38that design. Okay.

15:40All righty.

15:43Through with questions? Is it now time

15:44to open the public hearing?

15:46Would the applicant like to speak on the

15:48matter?

15:53>> Good evening, Commissioners. My name is

15:54Sonal Takwer. I'm with New Wave Com-

15:57Communications. My point of

16:00contact information is on file.

16:03I am here today representing Verizon

16:05Wireless as well as the underlying

16:08property owner,

16:09DeAnda.

16:11Um first of all, I'd like to thank

16:13Planner Natalie Lu for being very

16:15cooperative and helpful throughout the

16:17entitlement process.

16:19Um

16:20Verizon Wireless has and the property

16:22owner have reviewed the conditions of

16:24approval. We are amenable to them.

16:26However, there is a condition of

16:29approval that we would respectfully

16:31request that some of the verbiage would

16:33be changed

16:35um or modified.

16:37Specifically for condition of approval

16:40number one,

16:42it specifies that the applicant, which,

16:46you know, in the staff report does refer

16:49both to Verizon Wireless as well as the

16:51underlying property owner,

16:53for item 1A, it says that the applicant

16:57would be responsible for the repaving,

16:59repairing, restriping and of the

17:02existing parking lot and parking spaces

17:04on site.

17:06Our request is that this specific

17:09verbiage for 1A be modified and updated

17:13to specify that it would be the

17:15underlying property owner's

17:16responsibility, so there's no

17:19misunderstanding in the future um that

17:23this would be the responsibility of the

17:24wireless facility. This is an existing

17:28unmanned wireless facility. It does not

17:31encroach um or utilize any of the

17:35parking. It's an unmanned facility.

17:37Um so that parking is primarily utilized

17:40by the patrons of the Takumiya and the

17:44uh excuse me, Takumiya Away

17:46establishment.

17:48While there may be minimal visits by

17:52network operations with Verizon, it

17:55would probably be limited to

17:57I don't know

17:59four or five visits a year for a very

18:01limited amount of time if it was

18:03something that could not be addressed

18:05remotely or let's say there was some

18:08foliage from the faux eucalyptus tree

18:10that fell or that needed to be replaced.

18:12Then of course, that's only reason that

18:15we would go to that facility.

18:17There's not an established or assigned

18:19parking space there. So since

18:22the wireless facility itself does not

18:25generate

18:27parking or impact that kind of

18:29circulation we would respectfully ask

18:32that 1A

18:34has something that very clearly states

18:37the upkeep of the parking lot, and the

18:40striping, and those conditions

18:43remain the responsibility of um the

18:46property owner.

18:48This is something that we did um

18:52briefly discuss with staff. I do

18:54understand that this type of verbage is

18:56probably

18:57um

18:58standard in the newer conditions of

19:00approval.

19:02However, condition of approval nine

19:05in this same draft resolution does

19:06specify that

19:08it's the owner of the wireless facility

19:10that would be responsible for removing

19:12the facility if it ever decommissioned.

19:15So, similarly,

19:16since that condition is able to point

19:19out who in the applicant bears that

19:21responsibility,

19:23we would ask if the commission would

19:25consider making that change.

19:28As far as installing the new two

19:30Brisbane boxes, maintaining the wireless

19:33facility, and replacing any,

19:36you know, branches,

19:37um

19:40eucalyptus socks, all of that, we we

19:42know that's our responsibility and we'll

19:44continue to do that.

19:46Other than that, I am available um for

19:48any questions.

19:50Actually, I do Sorry, I did remember you

19:51had a question about the equipment. Um

19:55the facility itself

19:58has been reviewed both by the building

20:00department, fire department, um so there

20:03shouldn't be any concerns about

20:06batteries causing a fire. However, if

20:09some natural disaster was to occur and

20:11there was ever an issue, the contact

20:13information for Verizon's network

20:16operations is available there. There are

20:18also alarms in place that would, you

20:20know, send messages to network

20:22operations to address

20:24um that issue, and the hope would be

20:27that approximate residents or passersby

20:30would also

20:32reach out to the fire department. So,

20:34there are safety measures in place

20:36if that was to happen, but it's very

20:38unlikely.

20:42>> Question.

20:44>> Wait.

20:45Go ahead, Commissioner.

20:47Um my question is

20:51the

20:52tree,

20:53>> Yes.

20:54>> right? And the equipment is all yours,

20:57right?

20:58>> Correct.

20:58>> Okay. And and your your wireless uh

21:01uh uh

21:02company.

21:03>> Correct.

21:05>> But when you get down to the bottom,

21:07it lands on the land, right?

21:09>> Yes.

21:09>> So, do you have any easement or any

21:13direct title or how how is that acquired

21:16for you to be able to occupy that little

21:19space where the round hole is?

21:21>> Uh so, Verizon Wireless a little bit

21:24over 10 years ago actually acquired that

21:26property by reaching out to the

21:28underlying property owner that they own

21:30does and proposing this wireless

21:33facility and they have a lease

21:35agreement in place that clearly

21:37specifies, you know, what the lease area

21:39is for Verizon and then everything else

21:42around it that would

21:44become the responsibility or maintain

21:47the responsibility of the property

21:49owner.

21:49>> And correct me if I'm wrong,

21:52in our zoning update, we're trying to

21:56improve properties uh regarding

21:59regardless the ownership, but if you're

22:01leasing it the store or whatever,

22:04uh when uh condition or use permit come

22:07before us, I think what we're trying to

22:09do is consistently apply that to

22:12everyone say, "Well, this is a good

22:14opportunity and time for us to make sure

22:17that the properties are all um uniformly

22:20kept up."

22:22And and so

22:24>> Yes.

22:24>> that lease you have, you know, I'm and

22:27I'm not a city attorney. I'm going to

22:28ask staff for advice later about that,

22:31you know,

22:32uh seems to apply also to you sharing

22:35the road. Now, how we state that uh

22:38there's still is a responsibility there

22:40where even though you're not using the

22:42parking space, etc. I I I understand

22:44that. And that's sort of my my thinking

22:47and direction at this time that I will

22:49have further questions of staff of how

22:51that would work, but I just wanted to

22:53let you know

22:55you're not [snorts] specifically be be

22:57um

22:58penalized, but we have a lot of these

23:00that keep coming up.

23:01>> Right.

23:02>> Uh for for for renewal and all that and

23:05we're going to try to get something go

23:06forward with.

23:08>> Right. Is it okay if I respond back to

23:10you?

23:10>> Please.

23:10>> Okay. Um I completely understand that

23:13Verizon understands that as well. I

23:15think in this situation it's Again, we

23:17want to do our part to maintain the

23:21integrity, the um aesthetics of the

23:23property, but we also want to be mindful

23:27of the nexus in relation to our wireless

23:30facility and make sure that Verizon or

23:33any carrier is not being

23:38does not have a condition that puts an

23:39undue burden on them in relation to how

23:42they operate their facility. So, for

23:45this reason, yes, the uh installation

23:48and maintenance of the two new Brisbane

23:50box trees as well as the irrigation

23:52there.

23:53Of course, in maintaining our wireless

23:55facility.

23:56Now, if this was a

23:58project where let's say our equipment at

24:01grade was encroaching into two parking

24:04spaces or

24:05utilize more parking, which we know from

24:07a planning standpoint, we never want to

24:09remove parking.

24:10But, if we were doing

24:13something along those lines, I think

24:16you know, we wouldn't really be pushing

24:18on this condition or let's say if it was

24:20a land um establishment and a project

24:22where

24:23um

24:25it was a multi-tenant commercial use and

24:27we were going into the uh

24:30establishment that was adjacent and we

24:32also were another restaurant or retail,

24:35then I think it would be appropriate to,

24:39you know, say all the applicants or

24:40tenants would be responsible. But, just

24:44knowing how we operate and that we don't

24:46actually bring patrons to the site, we

24:49just provide coverage for the community,

24:52first responders,

24:53our ask would be just like condition of

24:56approval number nine to just specify 1A

25:00is the responsibility of the owner.

25:02Owner and Verizon know that. It's

25:04understood in their lease. We've

25:05actually talked about this. But because

25:08of the way this resolution is written

25:11and that it, you know, reiterates that

25:13this is for the lifetime of the permit

25:14and the applicant here is defined as

25:16Verizon and um the property owner, we

25:20just want to protect ourselves. Verizon

25:22wants to protect itself in the future

25:24if, let's say, this commission, this

25:26planning

25:27um department or the members of staff

25:30that are here today are no longer

25:31working there, we don't want a situation

25:33where now

25:35let's say also if ownership changes,

25:37that comes up for debate.

25:39>> And we have the same go in there. Hear

25:40you.

25:41>> Yeah. Thank you.

25:45>> Commissioner Fan, any questions?

25:48>> I mean, I think um

25:50it'll be more a question for staff, but

25:52uh in general, I think I heard you

25:54mention that um the property owner is uh

25:58in agreement with you that they will

26:00take full responsibility for the site.

26:01Is that what I'm hearing? Cuz

26:03>> With with regards to the parking and

26:05all, I mean, uh

26:06again, with the parking, maintenance of

26:08the the site now with regard to the

26:11landscape, that is

26:13um

26:13the two trees around this existing

26:17facility and of course maintaining the

26:20uh cleanliness and um signage associated

26:24with the wireless facility, that is

26:26Verizon's responsibility. And of course,

26:28if anything was not um

26:32you know, being maintained, the the

26:34property owner of course would contact

26:36us and say, "Hey, this, you know, you

26:38need to have somebody come out here to

26:39address the situation."

26:41>> Uh with specific

26:43uh specifics to uh condition one, I just

26:46want to make sure that if we were to

26:47entertain that request, that we're not

26:50um

26:52you know, revising a condition that the

26:54property owner who's also a party to

26:56this agreement hasn't been kind of

26:59um

27:00brief of it, right?

27:02>> I can say on the record the property

27:04owner is in agreement. We've had

27:05conversations about this and he has not

27:08had any resistance or issue with it.

27:10>> Yes.

27:11>> Yeah.

27:11>> Thank you.

27:15>> Mr. Guzman, any comments?

27:18>> I have a question, but I think I have a

27:19question for staff.

27:21>> Very good.

27:21>> Um was the property owner

27:26uh contacted about this? I know that the

27:30applicant mentioned that she had

27:31conversations with staff about changing

27:33this, but was the on the the property

27:35owners the land list, were they

27:37contacted about this change or

27:40has staff had any communication with the

27:42land list?

27:43>> Staff has had communication with the

27:45property owner who noted that they would

27:48be re-striping the parking lot.

27:52>> And I have a question for the applicant.

27:54Um when you say that you lease from the

27:56from the property owner, what's the

27:59area? Is it just the area where the cell

28:01tower and everything that was shown in

28:03the diagram tonight is

28:06right? All the space

28:08>> Correct. So it's it's the the cell No,

28:10no, no, you're you're fine. It's the

28:12cell tower, but it's also the um

28:15the accessory equipment that's behind

28:17the the um wrought iron vents in the

28:20EMU.

28:21>> So to confirm, you Verizon is not

28:24leasing into the parking area, correct?

28:26>> Correct.

28:27>> Okay.

28:33>> No questions.

28:35Okay.

28:36Couple of questions. Uh one

28:40>> um Chairwoman entered at 6:00 p.m.

28:43>> Thank you.

28:44Um what is the voltage in in those

28:46electrical panels at the base of them?

28:50>> Um

28:51I can look at the plans to see if that's

28:54there, but unfortunately I'm not the an

28:56electrical engineer. I don't know that

28:58off the top of my head. What I can tell

29:00you is that anything that is proposed

29:03would be compliant with what again the

29:07uniform building code allows and you

29:09know, any modifications or equipment

29:11that is there is required to go before

29:14the building department, the fire

29:15department and plan check just like any

29:17other project. So

29:19Um I can tell you that

29:20>> way rather looking up. Have you ever had

29:22an experience with a fire in any of

29:24those boxes?

29:25>> I have not.

29:26>> Okay. Okay. Um

29:29Also,

29:30is there any I don't know if we we

29:32require this or or not. So this could go

29:35both places, but is there any

29:37requirements to have a telephone number

29:39or emergency number on the fence to

29:41call?

29:42>> Yes, that is a requirement. It's already

29:45there. It's also

29:46reiterated as a condition of approval in

29:49this resolution as well as the one that

29:51was passed by planning commission in

29:532015.

29:54>> Okay. And two questions, is it readable

29:57and is it correct?

29:59>> Correct. Yes, it's printed on formalized

30:01signage.

30:03It's legible and not only does the city

30:06of Santa Ana require it and the building

30:08department, but the FCC requires all

30:10that information be posted and

30:12maintained at all times.

30:16>> Very very good. It is now codified in

30:18our zoning update.

30:20And they show diagrams

30:22about the size and requirement.

30:26>> Um just checking. I've had experience

30:28where you found the wrong the uh number

30:30was wrong.

30:31Okay.

30:33All right. That's that is my questions.

30:35Um

30:36Chairman Ramos

30:39>> No questions at for time. Thank you.

30:41>> Very good.

30:42>> I you.

30:42>> Chair, our chair Ramos, I have a

30:44question.

30:45>> Go go ahead, Commissioner Goodman. Go

30:46ahead.

30:46>> Actually, I have a question for legal

30:47counsel.

30:49Sorry.

30:50Um

30:52are is this commission allowed to

30:55uh impose a condition on the

30:58non-applicant, i.e., the landowner,

31:01via this action? I because what I'm

31:03hearing is that we're going to impose a

31:05requirement on somebody who's not the

31:07applicant of the conditional use permit.

31:09>> Um that's a very good question. Um so,

31:11this is a conditional use permit and

31:13it's it it runs with the land. So, it is

31:17something attached to the property. It's

31:21not necessarily attached to an

31:22individual. Um

31:24in some cases, you can bind other

31:26individuals, not property owners, but

31:29ultimately, the condition just has to

31:30relate to the property. Um it's up to

31:33staff to do our best to identify who

31:36would be the person that that's

31:37responsible or more than one person.

31:40But, um the ultimate the the key is that

31:42it relates to the property. So, if you

31:44are imposing you can impose a condition

31:46for repair repaving, repairing, um and

31:49it could be specific to the property

31:51owner, if that's who staff determines

31:53appropriate.

31:54>> Okay.

31:55>> So, in ordinary language, that means

31:58that the language that staff propose uh

32:01does that because it's binding to the

32:03property and not specifically to the

32:06applicant for the CPUC.

32:09>> Yes, that's correct.

32:10>> Okay. So, we don't need an additional

32:13language or change.

32:14So,

32:15that will be handled administratively.

32:18Right.

32:19>> If you want to be more specific, like I

32:22said, you can you can identify who you

32:25believe is responsible, but ultimately,

32:27the condition just has to be complied

32:29with. Whether it's complied with by the

32:30property owner or the applicant is

32:33really up to them to determine that. It

32:35does make sense to be clear about who

32:38you believe should be responsible, but

32:40it's it's a condition that is required

32:42for use of the conditional use permit

32:44and it's about the property.

32:46So it's it's it's your discretion.

32:53>> Okay. Uh any other questions?

32:56Do we have any anyone that would like to

32:58speak on this matter?

33:01Thank you, applicant.

33:02>> Thank you.

33:09Chair, we have not received any public

33:11comments. If you are attending this

33:12meeting in person and would like to

33:14comment on this item, please fill out a

33:16request to speak form and turn it into

33:18the secretary. If you are participating

33:21via Zoom and would like to comment on

33:23this item, please select the hand icon

33:25to indicate that you would like to

33:27speak. If you're calling in and would

33:29like to comment on this item, please

33:31dial star nine and then star six to

33:33unmute yourself. I will wait a few

33:36seconds.

33:40Uh vice chairs, we do not have any

33:41speakers.

33:44>> Okay, then I'm going to go ahead and

33:45close the uh

33:47uh testimony part of this

33:49public hearing and return it back to the

33:51to the commissioners.

33:54>> Uh can I have a question?

33:56Or can I just

33:57>> Uh

33:58go ahead.

33:58>> Go ahead.

33:59>> I just want to give staff an opportunity

34:01to chime in. Um

34:03are you amenable to what the applicant

34:06uh has suggest because I

34:08you know, you probably had the

34:09opportunity to change the language prior

34:11to having it show up here.

34:13Uh unless you know, this is the first

34:14time you've heard about it, then that's

34:15a different question.

34:17But I want to make sure that

34:19that's something that that you're

34:20interested in pursuing as well.

34:23>> Thank you, commissioner. We believe the

34:24language as is covers what the city

34:26needs as far as the condition being met.

34:29However, we are amenable to changing

34:30that condition from its stating

34:32applicant to property owner.

34:38>> I kind of like that question. Why do we

34:40put it in there in the first place? Was

34:41there a certain reason that we put it in

34:43back when this was approved

34:45approved 10 10 years ago?

34:50>> Thank you, Vice Chair. So,

34:52the way the text is drafted is a

34:54standard way that we draft conditions.

34:56Um and also, as Melissa was mentioning,

34:58we look at who the most appropriate

35:00person would be for satisfying the

35:02condition of approval in any

35:04discretionary action. However, for this

35:06uh particular condition, um like I was

35:09mentioning,

35:10we're amenable to it stating property

35:12owner rather than applicant.

35:18>> Do we have any other comments? Uh

35:19Commissioner Lee.

35:24>> It's a It's a question for staff cuz we

35:25have another one on on here. When when

35:27we

35:28when we renew these,

35:31and they bring in little bit new

35:32technology, it covers a little more

35:33folks, do we have the map

35:37from COVID

35:39where the school district had no

35:41coverage

35:42for their students?

35:44And the reason I ask

35:46is if we are upgrading these facilities

35:48throughout city,

35:51is there a way to take the map where the

35:53students were unable to access Wi-Fi

35:55from their apartment or wherever,

35:57if these new facilities that we're

35:59installing, the new equipment,

36:01is it helping cover those

36:04gaps or those blind spots in the network

36:07in the city? Cuz we've all driven

36:08through the city and had a call drop.

36:11So, the question is, as we install as

36:13you guys renew these, cuz they're not

36:14going to come back to us very very soon,

36:17the question is, are we covering the

36:19city so there are no drops? And that

36:21someone who lives in a complex apartment

36:23complex can access the Wi-Fi to do his

36:26or her homework

36:27That were gaps in the system prior to

36:29COVID. And that would mean contacting

36:31the school district, finding out where

36:32the gaps were. But as we could do these

36:34and we renew these for the city every 10

36:36years,

36:37we make sure that

36:39the community benefits from the

36:40coverage.

36:41Uh that's why I didn't ask any questions

36:43of the applicant cuz they're installing

36:45new equipment. Question I'm asking is,

36:47as you guys see it, are we covering the

36:49city so the residents benefit from these

36:51leases that the private property owners

36:53are benefiting from?

36:55And that's my question. You don't have

36:56to answer it, but if you can get a copy

36:57of the map from COVID, the school

36:59district should have it. There were many

37:01places where students could not access

37:03Wi-Fi, where there was their house

37:05didn't pay for the cable box, or the

37:07apartment complex didn't have it. I'm

37:09sure we had it in many complex areas. So

37:12that's my question. So as you guys go

37:13through this over the next year or so,

37:16and they upgrade facilities cuz they're

37:17all going to do it,

37:18cuz eventually you're we're going to go

37:19from 5G to 6G.

37:22Question is, do we have enough coverage

37:23for the residents of Santa Ana? That's

37:25just a general question.

37:26Um and

37:28I'd like to make a motion

37:31uh to approve the item along with a

37:33change in the language

37:35that would make it amenable

37:37that staff is amenable to for the

37:40applicant.

37:43>> [clears throat]

37:44>> Do we have any other commission comments

37:45or questions before we take the motion?

37:49As seen uh we have a motion from

37:51Commissioner Leo. Do we have a second?

37:52>> it.

37:53>> We have a second from Vice Chair

37:54Benninger.

37:56Secretary, can you please call for a

37:57roll call vote?

37:59>> Commissioner Guzman?

38:01>> I.

38:01>> Commissioner Leo?

38:02>> I.

38:04>> Commissioner Oliva?

38:06Commissioner Pham?

38:07>> I.

38:08>> Commissioner Wu?

38:09>> I.

38:10>> Vice Chair Benninger?

38:11>> I.

38:12>> Chair Ramos?

38:13>> I would be abstaining as I was in

38:15present for the entirety of the public

38:16hearing.

38:18>> Motion approved by majority vote.

38:21With commission members

38:23Oliva absent

38:26and Chair Ramos abstaining.

38:30>> Thank you.

38:31We're now moving on to item number two.

38:33This is the time and place for

38:34conditional use permit number 2026-0012

38:38for the property located at located at

38:41711 South Grand Avenue located within

38:45the light industrial M1 zoning district.

38:47Before we begin, do any commissioners

38:49have anything they wish to disclose with

38:50regard to this item?

38:53Seeing as there are no disclosures, we

38:55will continue. The case planner Natalie

38:57Liu will provide a brief presentation.

39:04>> Thank you, Chair Ramos.

39:06Tonight's second item is conditional use

39:08permit 2026-0012

39:12for ATC Sequoia LLC at 711 South Grand

39:16Avenue.

39:17The request is for the approval of a

39:20conditional use permit to renew the

39:21entitlement for an existing 58-ft tall

39:24major wireless monopine communications

39:26facility.

39:28Staff is recommending to adopt a

39:30resolution approving CUP 2026-12

39:34as conditioned.

39:37The existing site's general planned land

39:40use designation is industrial and the

39:43property is within the light industrial

39:45M1 zone.

39:47The surrounding land uses include

39:50railroad tracks and a mobile home park

39:53directly to the north and the east and

39:56to the south and the west there is

39:58warehouse, wholesale, and an auto repair

40:00use.

40:01The lot size is about 1.68 acres and has

40:05an existing approximately 16,000 square

40:07foot warehouse building on site.

40:12The original conditional use permit

40:14number 2014-07

40:16was approved by the planning commission

40:18on April 28th, 2014.

40:22The approval allowed the construction of

40:24the 58-foot monopine, ancillary ground

40:27equipment, equipment enclosure, and

40:30landscaping.

40:31Per the municipal code, the facility

40:34does require renewal every 10 years.

40:39The site is occupied by Parkhouse Tire,

40:43Incorporated, which is an existing

40:45industrial tire warehousing use that's

40:47been in operation since 1992.

40:50In 2022,

40:52the applicant submitted uh acquired

40:55permits for the removal and replacement

40:57of antennas and equipment associated

40:59with the wireless facility.

41:04Here are a few photos of the existing

41:07facility as viewed from the northwest,

41:10one being directly adjacent to the site,

41:12and the other photo being taken directly

41:14offsite as viewed from Grand Avenue.

41:23Here is the site plan with the north

41:25arrow pointed towards the top of the

41:26screen. The wireless facility is cited

41:29on the eastern portion

41:31of the site at the rear of the existing

41:34warehouse. Grand Avenue is directly

41:36towards the left of the screen.

41:43Here is a snippet of the equipment area

41:45plan.

41:50The

41:51existing equipment area is about 920

41:54square feet.

41:59Here is an elevation of the existing

42:01monopine as viewed from the west

42:03elevation.

42:11The facility provides a benefit to Santa

42:14Ana residents, businesses, motorists who

42:16subscribe to mobile phone services by

42:18providing cellular and data capacity in

42:20the area.

42:22The applicant is proposing the following

42:24improvements, including the installation

42:26of two Hikyu box trees, replacement of

42:30all deteriorating and faded stealth

42:32branches or needles, and refreshing of

42:35antenna socks as needed.

42:37The facility's equipment and antennas

42:39are directly adjacent to the industrial

42:41building. This location is optimal for

42:43them to provide the necessary coverage

42:46for existing and expanding services.

42:51Similarly to the first item, this

42:54project is consistent with the

42:56industrial general plan land use

42:57designation, and the facility will

42:59continue to comply with all standards.

43:04The project is also consistent with all

43:07land use goals, similarly to the first

43:08project, with emphasis on preserving

43:11existing neighborhoods, compatibility

43:13with the built environment, providing a

43:16clean and safe environment, as well as

43:18still complying with development

43:19standards.

43:24In accordance to CEQA, the project is

43:27exempt from further review as it is an

43:29existing facility. A notice of exemption

43:322025-86

43:33will be filed for this project, and

43:35there is no fiscal impact associated.

43:41Staff recommendation is that the

43:42Planning Commission adopt a resolution

43:44to approve conditional use permit

43:462026-12

43:48as conditioned.

43:53This concludes staff presentation. Staff

43:55is here alongside the applicant to

43:57answer any questions.

44:03>> Thank you. Does the Commission have any

44:05comments or questions for staff.

44:12With that, the public testimony portion

44:14of the public hearing is now open. Would

44:16the applicant like to speak on the

44:17matter?

44:26>> Good evening. Emily Murray on behalf of

44:28the applicant. I would just like to take

44:29a minute to thank staff for all of their

44:32hard work on this site and I'm available

44:34this evening to answer any questions any

44:36of you may have.

44:39>> Thank you.

44:40Does the commission [clears throat] have

44:41any comments or questions of the

44:42applicant?

44:44Go ahead, Vice Chair Banager.

44:46>> Um

44:47Verizon owned the equipment in the first

44:50and who owns your your your equipment?

44:53>> So, American Tower owns the tower and

44:54then leases space on the tower for the

44:58antennas themselves and in this case

44:59Verizon actually owns the antennas on

45:01this tower as well.

45:04>> Thank you.

45:05And I assume that the

45:07my question to the first tower is that

45:09again, your voltage and what you have

45:11down below is not a hazard has not

45:13caused a hazard.

45:14>> That that's correct. I don't have the

45:16exact figure on the voltage but we don't

45:18have any history of fires. The we have

45:20sign prominent signage for who to call

45:23if there are any concerns and yes, no no

45:27history, nothing dangerous happened.

45:28>> And this may sound silly but I need to

45:30ask it and that's 20 as a 24-hour number

45:32so that we don't catch you up when you

45:34sleep.

45:35>> Yes, I

45:35>> Okay, thank you.

45:38>> Thank you, Vice Chair Banager. Are there

45:40any other questions? Go ahead,

45:42Commissioner Leal.

45:43>> As the technology changes,

45:47how often do do they come to you and say

45:49we need to change? Cuz technology is

45:51changing quickly. I know 6G is already

45:53out in some places. We're at 5G now. How

45:56often does it change over and I know

45:57that sometimes there's multiple

45:59carriers on on one antenna. So, I'm so

46:02I'm just wondering kind of how often

46:03that happens cuz now the technology is

46:05coming much quicker.

46:06>> Yes, sir.

46:07>> And so, I'm just kind of wondering how

46:09you guys evaluate and how it happens

46:11because of the needs of of our community

46:13in general.

46:14>> Uh yes, so I I believe this tower has

46:16been in operation for about 11 years.

46:18There's already been one upgrade, I

46:20believe, in 2022 in staff's

46:22presentation, and I'm sure you're right

46:23that that those upgrades may

46:25uh happen more frequently, and we

46:27process those through an application to

46:29staff and and replacement or renewal of

46:31that equipment uh consistent with the

46:33conditional use permit.

46:34>> Okay, thank you.

46:37>> Thank you, Commissioner Leo.

46:39Do we have any other questions for the

46:40applicant?

46:45I don't think we have any additional

46:47questions at this time. Thank you.

46:48>> Thank you very much.

46:49>> Recording secretary, have we received

46:51any written communication, or is there a

46:53member of the public that would like to

46:54comment on this item?

46:58>> Chair, we have not received any public

47:01If you're attending this meeting in

47:02person and would like to comment on this

47:04item, please fill out a request to speak

47:06form and turn it in to the secretary. If

47:09you're participating via Zoom and would

47:10like to comment on this item, please

47:12select the hand icon to indicate that

47:14you would like to speak.

47:16If you're calling in and would like to

47:17comment on this item, please dial star

47:20nine and then star six to unmute

47:22yourself. I will wait a few seconds.

47:28Chair, we do not have any speakers.

47:33>> Thank you.

47:34Are there any final comments for the

47:36applicant before I close the public

47:37hearing?

47:39Seeing as there is none, uh the public

47:42testimony portion of the public hearing

47:43is now closed. Is there a motion on this

47:46matter?

47:50>> There's a question there.

47:55>> I move to approve a resolution.

47:57>> We have a motion from Commissioner Wu.

47:59Do we have a second?

48:01>> Second.

48:02>> We have a second from Commissioner

48:04Guzman. Secretary, can you please call

48:06for a roll call vote?

48:08>> Commissioner Guzman?

48:10>> Aye.

48:10>> Commissioner Leo?

48:12>> Aye.

48:12>> Commissioner Oliva?

48:15Commissioner Pham?

48:16>> Aye.

48:17>> Commissioner Wu?

48:18>> Aye.

48:19>> Vice Chair Benninger?

48:20>> Aye.

48:21>> Chair Ramos?

48:22>> Aye.

48:24>> Motion approved by majority vote with

48:27Oliva absent.

48:29Commissioner.

48:31>> Thank you.

48:33We're now moving on to the historic

48:34preservation matters.

48:36We're moving on to item three.

48:38This is a time and place for historic

48:40resources commission application

48:41application number 2026-7,

48:45historic

48:46historic register categorization number

48:482026-8,

48:51and historic property preservation

48:52agreement number 2026-9

48:56for the property located at 20 at 2361

48:59North Riverside Drive, located within

49:02the single family residence R1 zoning

49:04district. Before we begin, do any

49:06commissioners have anything they wish to

49:08disclose with regard to this item?

49:11Seen as there are no disclosures, the

49:13case planner Pedro Gomez will provide a

49:14brief presentation.

49:18>> Uh thank you, Madam Chair.

49:48Okay. So, good afternoon and um

49:52the third item on tonight's agenda

49:54tonight's agenda is a request to place

49:55the property addressed as 2361 North

49:58Riverside Drive on the historic

50:00register,

50:02to categorize it as contributive, and to

50:04execute a Mills Act agreement with the

50:06property owner.

50:13And as a reminder, the contributive

50:15category can be assigned to a building

50:17that contributes to the overall

50:19character and history of a neighborhood

50:21or district, and is a good example of

50:24period architecture.

50:28This specific property is being referred

50:30to as the Wright-Bachman House, and it's

50:32located in the Floral Park neighborhood.

50:35It's architecturally significant as an

50:37intact example of a Tudor Revival style

50:40in the city of Santa Ana. It's a

50:41contributor to the Floral Park National

50:43Historic District, as well.

50:46The original building permits indicate

50:48that the property was constructed in 19

50:5026 for the owner Walter Wright. Uh by

50:531927, the Bachmans resided at the

50:55property, where they remained until

50:57circa 1933.

50:59From the mid-1930s through the 1940s,

51:02the property was occupied by several

51:04residents, including local business

51:05owners Louis Dance of Dance-Schmidt

51:08Music Store,

51:09Darwin Scott of Scotty's Malt Shop,

51:12and the Griswold family subsequently

51:14resided at the property from

51:15approximately 1942 to 1966.

51:20The Wright-Bachman House qualifies for

51:21listing on the Santa Ana register under

51:23criterion one as an intact example of a

51:26Tudor Revival style in the city,

51:29and the recommended categorization is

51:30contributive because it contributes to

51:33the overall character and history

51:34[clears throat]

51:35of the neighborhood, and it's a good

51:36example of period architecture.

51:42Uh on this slide, we have additional

51:43photos of the house.

51:45Character-defining features include, but

51:47are not limited to, the asymmetric main

51:50facade that's on the south, the brick

51:52and stucco siding, the steeply steeply

51:56pitched cross gabled roof form,

51:58the historic glazed wood panel front

52:00door,

52:01the glazed wood secondary entrance,

52:04tripartite windows, wood casement

52:06windows, the brick chimney on the

52:09southeast facade,

52:11the bay windows, and then the stucco

52:12vent openings on the south gable.

52:15And you can see some of those features

52:17here on these photos presented.

52:22The property has no identified

52:24unauthorized modifications, and upon

52:26consideration of the application, it's

52:28recommended that the city enter into a

52:29historic property preservation agreement

52:31subject to the completion of future

52:33improvements as described in the work

52:35plan.

52:36So, here on the screen we have a few

52:38items of the work plan, and that's

52:40you know, assessing the condition of the

52:41historic wood entrance doors,

52:44assessing the exterior brickwork,

52:47assessing the condition of the wood

52:49windows,

52:50and this includes the tripartite

52:52windows, the casement windows,

52:54and includes the sashes, the frames, the

52:56glazing, and anything associated with

52:58the the window, including sills.

53:03The work plan also includes assessing

53:04the condition of the exterior brick

53:06chimney,

53:07the condition of the cross gabled roof,

53:10assessing the detached historic garage,

53:15and then lastly, assessing the

53:16hardscaping, which includes the

53:18driveway, walkways, front porch, patios,

53:21and steps for any cracks, settlement, or

53:24deterioration that the property owner

53:26can repair and or replace in kind.

53:29Staff is going to ensure that the

53:30proposed work is done sensitively and

53:32will maintain the property's character

53:34defining features throughout the

53:36lifespan of the Mills Act agreement.

53:40Uh with that, staff recommends that the

53:42commission adopt a resolution to approve

53:44HRCA number 2026-7,

53:47HRC number 2026-8, and recommend that

53:50the city council authorize HPPA number

53:532026-9.

53:56Uh that concludes staff's presentation.

53:58I do want to note that the property

53:59owner is in attendance or

54:01representatives of the property owner

54:02are in attendance today should there be

54:04any questions directed to them.

54:08>> Thank you.

54:09Does the commission have any comments or

54:11questions for staff?

54:13Go ahead, Commissioner Woo.

54:15>> Um

54:16in researching uh the Mills Act and and

54:20our zoning update, I find the only

54:22mention regarding historical uh

54:25uh district property is on uh article 5,

54:29page uh 50 uh 32, uh item D, which only

54:33talks about lot split. Uh but in also uh

54:37the city of Santa Ana,

54:40want to get this right.

54:42Uh hold on a second.

54:45Uh

54:47the the Mills Act applies to a contract

54:50to the specific product uh property as

54:53outlined in the conditions that you

54:55have.

54:56And

54:57um

54:58the the

54:59the assessment of the um

55:02work to be done uh to to main- maintain

55:05that characteristic of the Mills Act and

55:08for us considering uh

55:10uh approving that contract

55:14uh seems

55:16not a problem in itself to one property.

55:19My question was like to look at they're

55:21they're also applying for another

55:23property, which is happened to be next

55:24door.

55:25So, that raised a question. Hm.

55:27You have two houses. Are you going to

55:29live in both houses? Are you going to

55:30put the dog in one and, you know, live

55:32in the other one? You know, um I don't

55:35know. I I think that's one question I

55:37have for

55:38uh the property owner. What What is

55:40their intention? Then there's the the

55:42the question about

55:45are we flipping a house here in term of

55:48a quick sale? And and staff answered

55:51that question by listing the the

55:54assessment of the of work that might

55:56need to be done. So, administratively,

55:58according to our rezoning update, staff

56:01has directed to set up the

56:03administrative condition in order to

56:06monitor

56:08the the the contract of the the mill.

56:10So, we're going to lean heavily on on

56:13staff for that administrative. So,

56:16my question then

56:18>> Sorry, Commissioner. Well, quickly, a

56:19point of clarification for staff. To

56:21what extent, if any, should we be asking

56:23questions about agenda item number four

56:25while we're on agenda item number three?

56:29>> I'm I'm getting to your question, you

56:31know,

56:33>> I I just want to make sure we're not

56:34listing we're not mentioning another

56:37the next agenda item if we should not

56:40be.

56:40>> Thank you, Vice Chair.

56:42>> [clears throat]

56:42>> Um the questions posed for this item

56:44should be limited to the items presented

56:46for this item.

56:47>> Yeah, yeah, but I'd like to ask that

56:49question, too.

56:50Uh I'm not asking question about both

56:52property. I'm just going to point out

56:54that there's two separate items

56:56for the property. It just happened to

56:58have the same owner. And that under

57:01our current

57:03regulation in the Mills Act, there's

57:05nothing to prevent that. Okay? And I

57:07just want to eliminate that as a part of

57:09the discussion. Okay?

57:11So,

57:13I'm sorry. Did I cross the line again?

57:17>> No, I I just I'm not clear on your

57:18question, but I will concur with staff

57:22that we want to make sure that the

57:23questions that we're asking relate to

57:25this item and not to the next item,

57:28which we have not gotten to that public

57:30hearing yet.

57:31>> And that's where I'm going with this.

57:33So, um

57:34it since

57:35assessment staff did

57:37since it is in the historical district

57:41that it is a two Tudor Revival style

57:44with sufficient

57:46architectural um

57:49uh

57:50items that we need to pay attention to

57:52to to fit the Mills Act, right?

57:57>> Uh thank you, Commissioner.

57:59So, [clears throat] what's been

57:59presented before you today is staff's

58:02recommendation for listing

58:04the property on the historic register,

58:07categorizing as contributive,

58:10and then for the planning commission to

58:11make a recommendation to the city

58:13council that we should enter into Mills

58:14Act agreement. That's based on staff's

58:16review of the property, our assessment,

58:19and working with a consultant, and we've

58:21deemed that there's enough historical

58:22integrity for it to be eligible for

58:24listing,

58:25um which is why we're presenting it

58:27today.

58:28Um to us, it it doesn't matter

58:31the property owner if they own two,

58:33three, four. We're assessing each

58:36property individually

58:38based on chapter 30 and based on the

58:40Secretary of Interior standards.

58:42And so, the recommendation before you

58:44today is is solely on that.

58:46>> So, one of the thing I want to ask the

58:48homeowner

58:49uh a property owner is uh

58:51what what is their intent Are they going

58:53to occupy the property or the current

58:55occupants? So, I'll ask that when they

58:58when when it's open to discussion with

59:01the owner.

59:02>> Thank you.

59:05>> Thank you, Commissioner Woo. Do we have

59:06any other questions for staff?

59:08Commissioner Guzman.

59:10>> Thank you, Charles.

59:12This question is for Mr. Gomez.

59:14Um

59:15I have a question about what our role is

59:17in or a reminder, I guess, a refresher

59:19on what our role is when we're assessing

59:22these.

59:23I know the standard is a little

59:25different um

59:27for these historic homes versus when

59:30we're doing conditional use permits or

59:33development plans, etc. So,

59:35are we looking at whether

59:38these are truly historic homes? Are we

59:41Are we assessing whether what's been

59:43provided to us and recommended to us is

59:45correct? I I I'm kind of at a loss here

59:48what we're supposed to be evaluating,

59:50and then I have a second question

59:51regarding staff.

59:53>> Of course.

59:54>> [clears throat]

59:54>> So, similar to the land use matters,

59:57uh, the land use matters of the city is

59:58regulated by chapter 41 zoning.

1:00:01So, the historic matters in the city are

1:00:03regulated by chapter 30. And so, chapter

1:00:0530 identifies, um, criteria for

1:00:07selection for listings and standards,

1:00:10one of which is the property has to be

1:00:12minimally 50 years old to be eligible.

1:00:14And then there's certain standards, you

1:00:16know, the property has to be associated

1:00:18with notable figures in the city or has

1:00:20to retain enough integrity of a specific

1:00:22style, um, for us to make a

1:00:24recommendation. So, what staff does is

1:00:27we do all of that work, compile it into

1:00:29a report, and then what's called the DPR

1:00:31form,

1:00:33and we present that information to the

1:00:34commission. So, the commission's role is

1:00:36to review that information based on

1:00:38chapter 30, and either agree or disagree

1:00:41with staff that this property should be

1:00:43listed, should be categorized with the

1:00:45category that's being recommended, in

1:00:47this case it's contributive,

1:00:49and that we should enter into Mills Act

1:00:50agreement. If for some reason

1:00:53the commission disagrees,

1:00:55you'd have to provide information to

1:00:56staff as to why you disagree. It could

1:00:58be like, I don't think the person

1:01:00associated with this was significant

1:01:01enough to be,

1:01:03um, mentioned or or the reason why we

1:01:05listed or I don't think this is a great

1:01:07example of period-correct architecture,

1:01:10or I think the modifications are too far

1:01:12beyond that it it's lost its integrity.

1:01:15These are all examples of of reasons why

1:01:17you could disagree with staff and make a

1:01:18recommendation to not list it.

1:01:21Um, so.

1:01:23>> And the other [clears throat] question

1:01:24is just generally, I know that staff is

1:01:28once these Mills Act agreements are

1:01:30entered into, staff has to monitor this.

1:01:32Is there a dedicated staff that does

1:01:35historic I mean, this is

1:01:37the ninth agreement if we approve it

1:01:40that's going to be sent out to the

1:01:43City Council. Is there enough I mean, is

1:01:44it dedicated staff? Who does the

1:01:46approving is my question. The resources

1:01:48are used to go and monitor for whether

1:01:50the Mills Act agreements are actually

1:01:52being um

1:01:54maintained in proper form and all that.

1:01:57>> [clears throat]

1:01:58>> Every city does it differently.

1:01:59Um, the City of Santa Ana has one

1:02:02sometimes as much as three staff people

1:02:05uh staff persons that um help monitor

1:02:07and process applications because there's

1:02:10so many um

1:02:12it's just infeasible to to expect staff

1:02:15to do that. So, we we're talking about

1:02:17revamping the program which we've talked

1:02:18about for a couple years to introduce

1:02:20the self-certification um application

1:02:23where every 5 years or so whenever it's

1:02:25up for um certification, property owners

1:02:28would be prompted to tell us what

1:02:30improvements they've made based on the

1:02:33work plan. And if anything kind of comes

1:02:35up that's concerning or property owners

1:02:37are non-responsive or not making the

1:02:39improvements that um

1:02:41that's in the agreement, then there'd be

1:02:43follow-up sort of um inspections or

1:02:45visits to ensure that they're complying

1:02:47with what they're supposed to be

1:02:48complying with.

1:02:49Um, but yes, to go out and do

1:02:50inspections for over four 500 properties

1:02:53is it's just not possible.

1:02:58>> Thank you, Commissioner Guzman. Do any

1:03:00other Commissioners have any questions

1:03:02for staff at this time?

1:03:04All right, seeing as there are none,

1:03:06we're going to go ahead and open the

1:03:09public testimony portion of the public

1:03:10hearing. So, that is now open. Would the

1:03:13applicant like to speak on the matter?

1:03:24>> Good evening, commissioners. Uh my name

1:03:26is Tim Simon. This is my wife, Martha.

1:03:28Um I'd like to thank Pedro for walking

1:03:30us through this process, which has been

1:03:32a lengthy one. We're here representing

1:03:33my mother-in-law, her mother, who is

1:03:36nearing 96 years of age and has has a

1:03:38mobility issue. She lives in this house.

1:03:42The house has been in possession of the

1:03:44family since 1966. If you recall the

1:03:47presentation of who has lived there, it

1:03:49ended in 1966, and that's when her

1:03:51family took possession. They have no

1:03:54um consideration. They are not

1:03:56considering selling this property or

1:03:57flipping it as you you made reference

1:03:59to.

1:04:00Um some of these assessed

1:04:03observations have been made. There's

1:04:05been a good deal of work upgraded on the

1:04:07house in order to pass

1:04:09uh the inspection to get to this point.

1:04:11So, um if you have any other questions,

1:04:14please talk to us.

1:04:16>> Thank you. Does the commission have any

1:04:18comments or questions for the applicant?

1:04:23I don't think there are any right now.

1:04:24Thank you.

1:04:25>> Thank you.

1:04:27>> Recording secretary, have we received

1:04:29any written communication or is there a

1:04:31member of the public that would like to

1:04:32comment on this item?

1:04:35>> Chair, we have not received any public

1:04:37comments. If you are attending this

1:04:39meeting in person and would like to

1:04:40comment on this item, please fill out a

1:04:42request to speak form and turn it in to

1:04:44the secretary.

1:04:45If you're participating via Zoom and

1:04:47would like to comment on this item,

1:04:49please select the hand icon to indicate

1:04:51that you would like to speak. If you're

1:04:53calling in and would like to comment on

1:04:55this item, please dial

1:04:57star nine and then star six to unmute

1:04:59yourself.

1:05:01I will wait a few seconds.

1:05:06Chair, we do not have any speakers.

1:05:10>> Thank you. Are there any final questions

1:05:13for the applicant before I close the

1:05:14public hearing?

1:05:17Seeing as there are none, the public

1:05:19testimony portion of the public hearing

1:05:20is now closed.

1:05:23Is there a motion on this matter?

1:05:28>> I'll make a motion that we approve.

1:05:30>> We have a motion from Vice Chair

1:05:31Benninger. Is there a second?

1:05:34>> I'll second the matter.

1:05:36>> Thank you. We have a second from

1:05:37Commissioner Leo. Secretary, can you

1:05:39please call for a roll call vote?

1:05:42>> Commissioner Guzman?

1:05:43>> I.

1:05:44>> Commissioner Leo?

1:05:45>> I.

1:05:46>> Commissioner Oliva?

1:05:48Commissioner Pham?

1:05:50>> I.

1:05:50>> Commissioner Wu?

1:05:51>> I.

1:05:52>> Vice Chair Benninger?

1:05:54>> I.

1:05:54>> Chair Ramos?

1:05:55>> I.

1:05:57>> Motion approved by majority vote with

1:05:59Commissioner Oliva absent.

1:06:02>> Thank you. Congratulations.

1:06:05Now moving on to item four. This is a

1:06:06time and place for historic resources

1:06:08commission application number 2026-6,

1:06:12historic register categorization number

1:06:152026-7,

1:06:17and historic property preservation

1:06:19agreement number 2026-8

1:06:22for the property located at 2365

1:06:25North Riverside Drive, located within

1:06:28the single family residence R1 zoning

1:06:30district. Before we begin, do any have

1:06:32Do any commissioners have anything they

1:06:34wish to disclose with regard to this

1:06:35item?

1:06:38There are no disclosures. The case

1:06:39planner Pedro Gomez will provide a brief

1:06:42presentation.

1:06:43>> Thank [clears throat] you again, Madam

1:06:44Chair. And you'll have to get forgive

1:06:46me, part of the screen is being obscured

1:06:48by um the Zoom tools, so

1:06:51Uh the fourth item on tonight's agenda

1:06:53is also a request to place the property

1:06:56right next door, 2365 North Riverside

1:06:58Drive, um on the register and to execute

1:07:02a Mills Act agreement with the property

1:07:03owner.

1:07:05So, like the previous property, the

1:07:06property is being recommended to be

1:07:08listed as contributive.

1:07:10And I'll cover it again just in case,

1:07:11but a property can be designated as

1:07:14contributive if it

1:07:16>> [clears throat]

1:07:16>> contributes to the overall character and

1:07:19the history of a neighborhood, or if

1:07:20it's a good example of a period

1:07:22architecture.

1:07:25So, the property is being referred to as

1:07:26the Harwood-Schwarm House, and it's

1:07:28located in Floral Park. It's

1:07:30architecturally significant as an intact

1:07:33example of a Spanish Colonial Revival

1:07:35style house in the city.

1:07:37And it's also been identified as a

1:07:38contributor to the Floral Park National

1:07:40Historic District.

1:07:43The property was constructed in 1927 for

1:07:45F.R. Harwood, and early occupants

1:07:48include E.A. Schwarm and local

1:07:50residential contractor.

1:07:51And the property subsequently had

1:07:53several residents between 1930s and

1:07:551950s, including Ernest L. Spencer, the

1:07:58co-owner of radio station KVOE, and John

1:08:01Ashby, a Bank of America employee.

1:08:04The house qualifies for listing in the

1:08:06Santa Ana register

1:08:07under criterion one as an intact example

1:08:10of a Spanish Colonial Revival style

1:08:12home. And the recommended categorization

1:08:14is contributive because it contributes

1:08:16to the overall character and the history

1:08:19of Floral Park, and it's a good example

1:08:21of period architecture.

1:08:24So, here again we have photos of the

1:08:27property, additional photos. And

1:08:29character defining features include the

1:08:32um

1:08:33asymmetric composition, the stucco and

1:08:37rubble stone siding.

1:08:39It includes a front gable roof form clad

1:08:41in terracotta barrel tiles, the flat

1:08:44roof form with terracotta coping.

1:08:47The historic entrance patio,

1:08:49the double sash windows, the nine over

1:08:52nine wood frame double hung sash

1:08:53windows. And along the east elevation

1:08:56entrance patio, the shed roof and the

1:08:58terracotta tiles with stucco door

1:09:00surrounds.

1:09:05The property has no unidentified

1:09:07unauthorized no identified unauthorized

1:09:09modifications.

1:09:11And then upon consideration of the

1:09:13application, it's recommended that the

1:09:14city enter into a historic property

1:09:16preservation agreement subject to the

1:09:18completion of the future improvements

1:09:20described in the work plan. And those

1:09:22include removing the existing metal

1:09:24security screen door for the primary

1:09:26entrance.

1:09:27Assessing exterior stucco and rubble

1:09:29stone cladding for any cracks,

1:09:32deterioration, or inappropriate

1:09:34patching.

1:09:35Assessing the exterior wood elements

1:09:37including the doors, door surrounds, the

1:09:39decorative trim, and other wood

1:09:41features.

1:09:44And then continuing on, it'd be

1:09:46assessing the exterior painted surfaces

1:09:48and finishes for peeling, cracking,

1:09:50fading. Assessing the condition of the

1:09:52original wood sash windows including the

1:09:54frames, the sash, the glazing, the

1:09:57hardware.

1:09:58Assessing the hardscaping including the

1:10:00driveway, walkways, and entrance patio

1:10:03steps.

1:10:04And then

1:10:06the last slide here is assessing the

1:10:07condition of the roofing including the

1:10:09terracotta

1:10:10barrel tiles, the coping, the flashing,

1:10:13and associated roof components. And then

1:10:15assessing the detached garage garage,

1:10:18excuse me, including the stucco,

1:10:19terracotta, and then the wood tilt-up

1:10:21garage door.

1:10:24Again, staff will ensure that the

1:10:26proposed work is done sensitively and

1:10:28will maintain the property's

1:10:29character-defining features intact as

1:10:31part of the Mills Act agreement for this

1:10:33property.

1:10:35And then

1:10:36with that, staff recommends that the

1:10:37commission adopt the resolution to

1:10:39approve HRCA 20266 and HRC number 20267.

1:10:44And recommend that the city council

1:10:46authorize HPPA 20266.

1:10:50Again, I'm available for questions and

1:10:53the property owner representatives are

1:10:55also in attendance to answer questions.

1:10:59>> Thank you.

1:11:00Does the commission have any comments or

1:11:01questions for staff? Commissioner Leo.

1:11:05>> Pedro, I have a question about um

1:11:08the detached garage. And it's more of a

1:11:11a process than it is wondering whether

1:11:13or not So, if they maintain the exterior

1:11:17the his- the historical

1:11:19attributes of the exterior

1:11:21could they convert the garage into an

1:11:23ADU? It's detached from the house.

1:11:26As long as the exterior's kept the same.

1:11:29It's a wood tilt-up garage as it says in

1:11:31the application. Could they convert it

1:11:33to an ADU and still be considered

1:11:35historical? Because there's This is not

1:11:37the only property that's got detached

1:11:39garages in that neighborhood.

1:11:41Is that Is that doable? I mean, is that

1:11:43possible? Because since it is a

1:11:45structure, but if you don't change the

1:11:46exterior of the structure

1:11:48and remove its historical

1:11:50characteristics, I assume you could do

1:11:52it.

1:11:53>> Uh in short, yes.

1:11:54Uh there is also state laws that um

1:11:56prohibit

1:11:58denying ADUs. Um

1:12:00what they do allow is for us to impose

1:12:02standards that we normally wouldn't

1:12:03impose as part of this type of review

1:12:06for say um what's called a HEMA

1:12:08application, which

1:12:10before these recent changes to chapter

1:12:1230

1:12:13would have um

1:12:14meant that the planning commission

1:12:15reviews any exterior changes.

1:12:18So

1:12:19in this case, because we're staff is not

1:12:21allowed to have any sort of

1:12:23discretionary action on ADUs, if someone

1:12:25needed to say remove a garage door,

1:12:27which is identified as a

1:12:28character-defining feature and original,

1:12:30they could. And what we could do is ask

1:12:33for that to be filled in with stucco to

1:12:35match like for like. Um wood windows to

1:12:38match maybe something that was original.

1:12:40It'd have to be distinct enough to not

1:12:42create what's called a false sense of

1:12:43history, but in short, they can and we

1:12:45can regulate a little bit to make sure

1:12:48that the um

1:12:49alterations are compatible.

1:12:51>> Thank you. That's my only question,

1:12:53Chair.

1:12:54>> Thank you, Commissioner Leo. Do we have

1:12:56any other comments or questions for

1:12:57staff? Go ahead, Commissioner Woo.

1:13:00>> Um the city conducts a 5-year

1:13:02self-service certification inspection

1:13:04process process on these um

1:13:07uh Mills Act properties, right?

1:13:12>> [clears throat]

1:13:13>> We've developed a self-certification

1:13:15process. The city has not um

1:13:18had the opportunity to start that

1:13:19process.

1:13:21So, we haven't sent notices to property

1:13:22owners to do the self-certification.

1:13:25>> Uh

1:13:25uh is the applica- uh applicant going to

1:13:28be owner occupied?

1:13:32>> So, representatives of the property

1:13:34owner uh mentioned that they currently

1:13:36reside in one property.

1:13:38It'd be a question for them, but I doubt

1:13:40that they also reside in this one.

1:13:42>> Thank you.

1:13:45>> Do we have any other comments or

1:13:46questions for Go ahead, Commissioner

1:13:47Pham.

1:13:48>> Uh this is more of a general question.

1:13:51What is the benefit for the city

1:13:53to engage in all these contracts as you

1:13:55you mentioned it's over 4 to 500 uh

1:13:58contracts that we're currently engaged

1:14:00in. Obviously, like you mentioned, we're

1:14:03short-staffed. We won't be able to um

1:14:07administer these contracts.

1:14:09Um

1:14:10So,

1:14:12is there like a physical physical

1:14:14benefit or a cultural benefit for us to

1:14:17maintain these historical districts?

1:14:22>> Uh in short, yeah.

1:14:24Yes.

1:14:25Uh the cultural benefit mostly.

1:14:27So, in a city like Santa Ana that is

1:14:29absent natural resources like other

1:14:32cities, you know, streams, coastal

1:14:35access,

1:14:36um we're limited in what resources we

1:14:38have to preserve and

1:14:41sort of um

1:14:43emphasize. And so, historic is one of

1:14:44them. So, our history, our abundance of

1:14:47historical properties is one thing that

1:14:49we can celebrate and um the policy um

1:14:53decision-makers have established that

1:14:54this is something that they would like

1:14:56um to have for the city. And so, it is

1:14:59at a loss. So, each Mills Act agreement

1:15:01is a property tax reduction for the

1:15:04property owners and that ranges

1:15:06uh by property anywhere between 40 to

1:15:0860. Uh but the county does the

1:15:09assessment, so it is at a loss for

1:15:11property tax revenue for the city.

1:15:13So, the benefit though is that property

1:15:15owners are incentivized to upkeep their

1:15:17homes, invest the money into the

1:15:19properties, and then hopefully and

1:15:22collectively that helps sort of restore

1:15:24these neighborhoods and keep them

1:15:25intact, and help with the sort of

1:15:27cultural celebration, and the historic

1:15:29celebration, and hopefully drive

1:15:31other ways of money coming in. That's

1:15:34That's what I would say the benefit in

1:15:35in high-level.

1:15:37>> And then these um sorry, do these

1:15:39contracts they're um

1:15:46They're not obligations, right? Meaning

1:15:48um if a property not this project

1:15:50specifically, but in general if a

1:15:52property was sold to a different owner,

1:15:54and the owner decides that they

1:15:57uh do not want to engage in the Mills

1:16:00Act, and it's uh completely um

1:16:03um

1:16:04option- optional, they can exit the

1:16:06agreement, or is it a binding agreement

1:16:08that carries with the land and not um

1:16:11the actual owner at that time?

1:16:14I just want to make sure I understand

1:16:15kind of the mechanics of the Mills Act.

1:16:17>> Sure. I mean, it is an agreement, so

1:16:18it's binding in that manner. In the

1:16:20agreement, there's specifica- there's

1:16:22specifications like how either the city

1:16:24or a pri- uh private property owner can

1:16:26enter into exiting the agreement, but

1:16:28the first um

1:16:30period is 10 years. And after that, it's

1:16:32a revolving 1 year, so that's um until

1:16:35either the city or a private property

1:16:36owner decide to exit out of it. Um there

1:16:39are potentially, depending on how it

1:16:41works, There's stipulations for

1:16:43penalties for you know, exiting the

1:16:45agreement, but

1:16:47it's possible and I don't think it's

1:16:49happened in the time that I've been

1:16:50here. Certainly not

1:16:51any anyone that I can remember.

1:16:54But it's possible.

1:16:57>> That's all. Thank you.

1:17:00>> Thank you. I also have a question

1:17:03on just what we should be considering as

1:17:05a commission.

1:17:07As a commission does owner should owner

1:17:10occupancy have any

1:17:12impact in our decision-making?

1:17:15>> No.

1:17:16>> Thank you.

1:17:18Do we have any other questions for staff

1:17:20from any of the commissioners?

1:17:23Great. With that, we're going to move on

1:17:24to the public testimony. The public

1:17:26testimony portion of the public hearing

1:17:28is now open. Would the applicant like to

1:17:30speak on the matter?

1:17:37>> Good evening once again. Tim Simon,

1:17:39lawyer for

1:17:40Um

1:17:42I believe there was a question from

1:17:43Commissioner Woo as to the occupancy of

1:17:46the other house. It's occupied by my

1:17:49mother-in-law's grandson and his family.

1:17:52That's who lives there.

1:17:56>> We're doing our due diligence.

1:17:58>> I'm sorry.

1:17:59>> We're doing our due diligence.

1:18:01>> Oh.

1:18:01>> Yeah. That's all.

1:18:02>> I understand.

1:18:02>> Yeah. Nothing personal.

1:18:05>> Thank you. Do any other commissioners

1:18:07have any questions for the applicant?

1:18:11Great. Thank you.

1:18:14Recording secretary, have we received

1:18:16any written communication or is there a

1:18:18member of the public that would like to

1:18:19comment on this item?

1:18:22>> Sure, we have not received any public

1:18:24comments.

1:18:25If you're attending this meeting in

1:18:26person and would like to comment on this

1:18:28item, please fill out a request to speak

1:18:30form and turn it into the secretary.

1:18:32If you're participating via Zoom and

1:18:34would like to comment on this item,

1:18:35please select the hand icon to indicate

1:18:37that you would like to speak.

1:18:39If you're calling in and would like to

1:18:41comment on this item, please dial star

1:18:43nine and then star six to unmute

1:18:45yourself. I will wait a few seconds.

1:18:51Chair, we do not have any speakers.

1:18:54Thank you.

1:18:55Are there any final questions of the

1:18:57applicant before I close the public

1:18:58hearing?

1:19:01Vice Chair Benninger, did you have Okay.

1:19:03Uh with that, the public testimony

1:19:04portion of the public hearing is now

1:19:06closed. Is there a motion on this

1:19:08matter?

1:19:10>> So moved.

1:19:11>> Thank you. We have a motion from

1:19:13Commissioner Guzman to approve.

1:19:15>> Second.

1:19:15>> And we have a second from Vice Chair

1:19:17Benninger. Secretary, can you please

1:19:19call for a roll call vote?

1:19:22>> Commissioner Guzman?

1:19:23>> I.

1:19:23>> Commissioner Yu?

1:19:25>> I.

1:19:25>> Commissioner Oliva?

1:19:27Commissioner Pham?

1:19:29>> I.

1:19:29>> Commissioner Wu?

1:19:30>> I.

1:19:31>> Vice Chair Benninger?

1:19:32>> I.

1:19:33>> Chair Ramos?

1:19:34>> I.

1:19:36>> Motion approved by majority vote with

1:19:38Commissioner Oliva absent.

1:19:41>> Thank you. Congratulations.

1:19:44That concludes the business calendar.

1:19:46We're now moving on to staff comments.

1:19:51>> Thank [clears throat] you, Chair. No

1:19:52staff comments tonight.

1:19:54>> Thank you. We're now moving on to

1:19:56closing comments from the commission or

1:19:59any questions that there may be for

1:20:00staff.

1:20:03Go ahead, Commissioner Pham.

1:20:04>> Um if if possible,

1:20:06uh if there is a case, um

1:20:09could you forward us um you know,

1:20:11distribute to all of us a um application

1:20:14a Mills Act application that was denied?

1:20:16I I just want to review why

1:20:19um an application would be denied cuz

1:20:21obviously when we're when we're sitting

1:20:23here reviewing,

1:20:24uh you know, staff has

1:20:26presented all the kind of conditions for

1:20:29approvals. I want to understand it

1:20:31it

1:20:32it'd be a pointless exercise if you if

1:20:34you present,

1:20:35we

1:20:37approve, you present, we approve, you

1:20:38present, we I want to understand that

1:20:40there there Obviously, we're not aiming

1:20:43to deny an application, but I want to

1:20:45understand that there there is a pathway

1:20:47to deny it so that we understand when we

1:20:51are listening to your presentation that

1:20:53we can keep an an ear out for those uh

1:20:56certain conditions if uh present. Yeah.

1:20:59>> Sure, we can um do a survey see if we

1:21:01can find any. The only thing that I

1:21:03would mention is that a lot of the

1:21:06properties that wouldn't otherwise

1:21:08qualify never made it to HRC or before a

1:21:11body. So, it'd be one of those things

1:21:13where we're trying to find something

1:21:14that didn't happen because it didn't get

1:21:16to the point of the decision-making cuz

1:21:18they got screened out. But, if we do

1:21:20have an example of one where the HRC

1:21:23denied, we'll be sure to share that with

1:21:25the Planning Commission. Do we good?

1:21:26Thank you.

1:21:29>> Thank you, Commissioner Pham. Vice Chair

1:21:31Manager?

1:21:31>> Just following up on the Commissioner

1:21:33Pham's question, very good question.

1:21:35What percentage of applications that you

1:21:37received get rejected?

1:21:42>> [clears throat]

1:21:44>> I'd say close to

1:21:46maybe 40-60.

1:21:48And um

1:21:50it's for reasons of alterations and just

1:21:52not meeting those criteria. So, um

1:21:55Planning Manager Ricardo Solis is

1:21:56correct.

1:21:57Commission doesn't usually see those cuz

1:21:59we've already filtered them out as not

1:22:01eligible.

1:22:02>> So, you have a pretty good filter before

1:22:04it gets to us.

1:22:05>> It's part of the review process that we

1:22:07do. Um it's pretty rigorous. Um the

1:22:10applications that come before you um

1:22:12have gone through the review process

1:22:14extensively.

1:22:16Um and in those instances where we

1:22:18recommend denial, we would recommend

1:22:19denial and advise the property or yeah,

1:22:21property owner that we wouldn't be able

1:22:23to recommend approval.

1:22:25Most cases are like, okay, thank you. I

1:22:27understand.

1:22:31>> Thank you, Vice Chair Manager.

1:22:32Do we have any other comments or

1:22:34questions for staff? I do have some

1:22:36questions, so I was present at the last

1:22:38City Council meeting where the zoning

1:22:40code update study session started. And

1:22:43from what I understood, there may be a

1:22:45second. It was a little confusing

1:22:46understanding exactly what next steps

1:22:48would be. And I also heard a extensive

1:22:50discussion by several council members on

1:22:53the residential industrial overlay. And

1:22:55I know we had extensive conversations on

1:22:57that as well as a commission. So, I

1:22:59would just and I'm sure that it was

1:23:01a part of all of the material that the

1:23:03City Council got. But as those

1:23:05discussions are being had on the dais, I

1:23:07think it would be helpful for staff to

1:23:09also remind the council of the extensive

1:23:11nature of the discussion that was had by

1:23:13this commission specifically on that on

1:23:16the residential industrial overlay,

1:23:17which may change.

1:23:19So, just want to

1:23:20make that comment. And then also just

1:23:22general reminder to everybody to vote.

1:23:24We are 8 days away from election day.

1:23:27Voting centers are now open. They opened

1:23:29on Saturday. We'll be open every day.

1:23:31You can drop off your ballot securely at

1:23:33a ballot box. If you're not registered,

1:23:35you can register same day on site. And

1:23:37if you're in line by 8:00 p.m. that day,

1:23:39then you can vote. So, that's my my

1:23:42closing comment.

1:23:43>> Vice Chair Manager, did you want to add

1:23:44to that?

1:23:45>> following up. I really uh

1:23:48Ali did an excellent job presentation

1:23:50presenting to us the staff.

1:23:53I mean presenting to a council,

1:23:55especially on a busy night that we had.

1:23:57But I thought they did an excellent fair

1:23:58presentation to that. Uh I think now

1:24:01they have a second reading coming with

1:24:03that.

1:24:04I also like to

1:24:06uh

1:24:08follow up with the commissioners to get

1:24:09out and vote. This is our opportunity.

1:24:11If you don't like how something's run,

1:24:13this is your opportunity to make that

1:24:14change. I get several people say, "It

1:24:16doesn't matter anyway." Yes, it does.

1:24:18Every vote counts. So, please get out

1:24:20and and and vote. Thank you.

1:24:23>> Thank you. With that, do we have any any

1:24:25final

1:24:26Go ahead, Commissioner Leo.

1:24:28>> I just wanted to congratulate you on

1:24:30your mother-in-law. She's 96. My parents

1:24:32are in their late 80s. Good luck to you.

1:24:33Good luck to her. And hopefully she

1:24:35makes it to 100.

1:24:40>> Thank you, Commissioner Leo. I think

1:24:42that's a good note to close on. So with

1:24:44that, this meeting is adjourned. Our

1:24:46next regular meeting is scheduled for

1:24:48November 9th, 2026 at 5:30 p.m. Thank

1:24:51you all.

```*