2026-10-08 - Zoning Board of Examiners and Appeals
Summary
Based on uploaded (human-made) captions; speaker names are not labeled and some board member surnames are rendered inconsistently (for example Beazley also appears as Mosley or Easley, and Shooting is as captioned), so those members are named by surname only. Private residents are not named.
Time on topic (from transcript timestamps; approximate, includes side talk; a pause of about 3.5 minutes during the bridge variance, with almost no captioned speech, is not counted):
| Topic | Minutes | Share |
|---|---|---|
| Case 2026-0125 Northland Road Stream Setback Variances in Girdwood | 146 | 95% |
| Dimensional variance and minor modification criteria | 2 | 1% |
| Procedural and other business | 5 | 3% |
- Thursday, October 8, 2026, Zoning Board of Examiners and Appeals.
- The recording runs from the call to order at 0:31 to adjournment at about 2:37:00.
- Minutes of Sep 10 were approved by unanimous consent, no disclosures were made, and there were no appearance requests or unfinished business.
- The only public hearing, case 2026-0125, took nearly the whole meeting.
Dimensional variance and minor modification criteria
2:03-3:32
- The consent agenda held two resolutions (listed on the agenda as Resolution 2026-011 and Resolution 2026-012). No item was pulled and it passed by unanimous consent with no discussion; the captions do not describe the resolutions' contents.
Case 2026-0125 Northland Road Stream Setback Variances in Girdwood
3:57-2:09:37, 2:13:10-2:33:43
- Staff: 164 notices were mailed on Sep 14, 8 public comments were received, and the Girdwood Board of Supervisors commented. The petitioners sought three dimensional variances for a rebuilt single-family house and an addition (4.5 feet into the 25-foot stream setback), a detached garage with an accessory dwelling unit (14 feet into the stream setback, plus 5 feet into the side and front setbacks), and a covered footbridge in the streamside zone. Staff found standard H (minimum variance) only partially met for the stream setback requests and so had to recommend denial unless the board found all eight standards met; staff recommended approval of the garage side and front setback request (variance 3) with two conditions.
- Board questions: how the nonconforming (1975) house can be rebuilt with a small added triangle in the setback, the Girdwood code that bars accessory dwelling units over 15 feet tall from using side-setback flexibility, flood levels under the bridge, lot coverage (24% against a 30% limit), and whether the votes could be divided. Staff and the board agreed the board may vote on parts separately.
- Petitioners (two owners and their architect) described a family and workforce-housing plan, the mapped stream that crosses the lot, a design revised four times with the city's watershed office, moving the footbridge pilings farther from the stream, steel construction, and roofs sloped away from the stream.
- Public testimony: four residents opposed, and one adjacent owner also spoke for a spouse. Concerns were downstream flooding and runoff, an unmapped second channel along the east and north edges, sheet piling and vegetation loss in the setback, house size far above others on the road, parking and snow storage, a covered bridge acting as a dam, and a self-imposed hardship. A former Girdwood Board of Supervisors member added that large homes there often end up as second homes or short-term rentals. The petitioners rebutted on house size, utilities and the watershed mapping.
- Procedure: Board Member Beazley moved to treat all three variances as one; it failed 2 yes, 4 no, with Board Member Shooting speaking against it. Jason Norris then moved the first variance and moved to split it; the split carried 6 to 0.
- Variance 1, house and addition (4.5 feet into the stream setback, with the staff condition): granted, no votes against.
- Variance 1, detached garage with accessory dwelling unit (14 feet into the stream setback): denied, 2 yes and 4 no. Shooting said the hardship was self-imposed and standard H was not met; Beazley worried that denying it would force a redesign of the whole project; Craig Bennett noted lot coverage was under the allowed 30%.
- Variance 2, footbridge across the stream: moved by Shooting, seconded by Craig Bennett, granted 6 to 0 so the house keeps a way to reach the parking area.
- Variance 3, garage and accessory dwelling unit, 5 feet into the front and side setbacks: moved by Craig Bennett, seconded by Brian Bennett; failed 3 to 3. Four votes were needed because one member was excused for a conflict of interest (the chair first said five and was corrected). Shooting and Beazley objected that the garage's footprint was now undefined and the code limits side setbacks for tall accessory units.
- Appeal: parties have 30 days from distribution of the decision to appeal to superior court.
Other business
- Reports by the chair and secretary: none; the secretary suggested there may be no meeting next month. Board members thanked staff, the petitioners and the public for testimony. Adjourned on a motion seconded by Brian Bennett.
Agenda
Consent agenda: Resolution 2026-011 (review of draft ordinance amending dimensional variance and minor modification criteria) and Resolution 2026-012 (dimensional variance for side-setback encroachment by a single-family residence).
What happened
The meeting also held a public hearing on case 2026-0125, which the posted agenda did not list: Case 2026-0125 Northland Road Stream Setback Variances in Girdwood. Video: 2026-10-08 - Zoning Board of Examiners and Appeals.
Sources
- Video: https://youtube.com/watch?v=XJn9uD_08O4
- Agenda: https://meetings.muni.org/AgendaOnline/Meetings/ViewMeeting?id=6606&doctype=1
Video
Transcript
These are uploaded (human-made) English captions; minor errors are possible.
Transcript
00:31municipality of Anchorage
00:33Zoning Board of Examiners and
00:34Appeals meeting of October 8th
00:352026.
00:36>> Well, secretary please call
00:37the roll.
00:38>> Now Im. Okay. Here, Brian
00:42Bennett here, Craig Bennett
00:43here, Jason Norris here easily
00:45here, Christopher shooting
00:47here under our goal. Jonathan
00:51laying and John Le Carre
00:52excuse you have a crime. Thank
00:53you. Thank you.
00:55>> Next item on the agenda are
00:56minutes. We have. Minutes for
01:00September. 10th 2026. They
01:02have a positive motion.
01:02Please. Mr. Lee moves. Are
01:16there any? is start shooting,
01:25moved. Ainslie seconded. Are
01:32there any corrections to the
01:33minutes? Seeing none. Any
01:39opposition to approval of the
01:40minutes. Seeing none. The
01:47minutes are approved by
01:48unanimous consent. And the
01:53next item is a special order
01:54of business. Executive
01:56sessions disclosures. Are
01:57there any disclosures this
01:57evening? The board members?
02:03Moving on the consent agenda.
02:09On the consent agenda. We have
02:102 resolutions for approval.
02:12They have a positive motion.
02:13Please.
02:23>> second.
02:28>> Second, you Mark Minds
02:30Frozen 2
03:01move again. Marc
03:04moved Should a second. That
03:13anyone wish to remove any of
03:14the items on the consent
03:15agenda for further discussion.
03:23Is there any opposition to
03:24approval of the consent
03:24agenda? And the consent agenda
03:29is approved? Passes by
03:32unanimous consent. It's not
03:36large. She Next item is
03:49parents requests. We don't
03:49have any appearance requests.
03:52Unfinished business. No
03:54unfinished business. Nothing
03:55on the regular agenda. Which
03:57brings us to public hearings.
04:00Case. 2026 Dash 0, 1, 2, 5,
04:10Petitioner is Alaska.
04:10Serendipity LLC. Well, the
04:20staff please describe the
04:21notice given in this case.
04:24Point of order, did you want
04:25to? Give
04:28>> minutes? They have to
04:28speak. To the chair on
04:41September 14th, 2026, a total
04:42of 164 public hearing notices
04:44were mailed in accordance with
04:45the procedures of AMC. 21 0,
04:473, 0, 2, 0 h notice. 8 public
04:52comments have been received.
04:53The Girdwood Board of
04:54Supervisors provided comments
04:55on this case found in your
04:56supplementary packing number
04:57one.
05:00>> Are there any objections to
05:01the sufficiency of notice in
05:02this case? Seeing none. Will
05:10this staff please present the
05:11case? Thank you. Madam Chair.
05:15The applicant is requesting
05:18three-dimensional variances
05:18one AMC. 21 0, 7,
05:20>> 0, 2, 0. Be 9 table. 21 0,
05:237, dash one minimum stream
05:26setback with her side to allow
05:28the existing structure with
05:30proposed addition. Tim Crouch,
05:314.5 feet in the proposed
05:32detached garage with an EDU,
05:35Tim Crouch, 14 feet into the
05:3725 foot side. 25 foot stream
05:41setback. Number 02:00AM, C 21.
05:440, 7, 0, 2, 0, be 9 Little d
05:46Roman Numeral 3 streamside
05:50zone to allow foot bridge to
05:51cross the stream and variants
05:52number 03:00AM, C 21. 0, 9, 0,
05:566, 0, be table. 21 0, 9 dash 5
05:59table dimensional standards.
06:01Goodwood residential districts
06:03to allow proposed detached
06:04garage with to you to encroach
06:085 feet into the into the side
06:08and front setback. There's a
06:13listed 4th variance request
06:14listed on the application for
06:2021, 1, 3, 0, 4, 5, This is the
06:21nonconforming section of code
06:23related to structures
06:23encroaching into the
06:24streamside zone. There's no
06:25variance for nonconforming.
06:28Structures. It already has a
06:30nonconforming, determination
06:33the property was developed in
06:361975. Before municipal
06:36protection setbacks existed.
06:38Stream setback requirements
06:40were later established through
06:4285. 57 in May 1985. creating a
06:4625 foot setback from the
06:47ordinary high water line
06:49because the original structure
06:50was built prior to this
06:51regulation. The owner obtained
06:53a nonconforming determination
06:53to legally recognize the
06:55existing encroachments into
06:56the stream and site setbacks.
06:59This determination ensures the
07:00owner can reconstruct the
07:02building while maintaining
07:03compliance with title. 21
07:03regarding nonconforming
07:05structures, the applicant
07:06purchased the property in
07:082021. with the intent to
07:10remodel and update the home
07:10during planning Signet
07:12significant structural
07:13instruction issues were
07:14discovered. The complete
07:15rebuilding of the existing
07:16structure became necessary as
07:18part of that process. The
07:19current has built survey
07:21result existing encroachments
07:22into both the stream and side
07:24setbacks. These encroachments
07:26recognized and legally
07:27validated under the
07:27nonconforming determination.
07:31The lot size location of the
07:32stream and the placement of
07:33the original 1975 structure,
07:35significant significantly
07:35limit available buildable
07:37area. The proposed homes
07:39reconstruction will will
07:39remain in the same location,
07:43Tomane to maintain compliance
07:43with the nonconforming rights
07:44and avoid creating new or
07:45additional stream impacts. The
07:48applicant designed the new
07:49edition is far away from the
07:50stream as possible while
07:51staying within all other
07:51required zoning setbacks.
07:53Although the original
07:54structure encroached into the
07:56site setback and a 10 foot
07:58utility easement along the
07:59East property line. The
07:59propose rebuild will eliminate
08:01these encroachments this
08:03corrective action reduces
08:04longstanding nonconforming
08:05issues and aligns more closely
08:06with the current zoning
08:07standards. The applicant
08:09proposes a detached garage
08:10with to you where the existing
08:11gravel pad is located within
08:12the southwest corner, the
08:15garage is intended to provide
08:16needed vehicle storage and
08:18housing support, which are
08:19common. Unexpected uses in the
08:20GR to district due to cite
08:23constraints. The garage cannot
08:24be placed outside all setback
08:24areas while still meeting
08:26reasonably reasonable design
08:27and safety standards. As a
08:29result encroachments into the
08:31front side and stream setbacks
08:32are necessary to accommodate a
08:33garage with to you. That is
08:34typical for the neighborhood
08:37to connect the updated main
08:39structure safely and
08:39efficiently to the proposed
08:40garage. The applicant proposes
08:41a small footbridge within the
08:43streamside zone. The bridge
08:44will be fully contained within
08:46the 25 foot setback and is
08:47required ensure adequate year
08:48and access between the 2
08:51structures in order for the
08:52Zoning Board of Examiners and
08:53Appeals to approve the
08:54variance. The estate with
08:58particular the the relief
08:58sought him a specified, the
08:59facts or circumstances that
09:00are alleged to show that the
09:02application substantially
09:03meets the following 8
09:03standards. is met for both 1,
09:092, 3, dispersal contains
09:10exceptional physical
09:12circumstances. That's
09:13significantly limit
09:14development options. The
09:16property has an average s****
09:17of approximately 6% in an
09:18unnamed stream that originates
09:19near the Northland Road at the
09:21southeast corner of the lot
09:23inflows Northwest by setting a
09:24substantial portion of the
09:26property because the stream
09:28runs directly through the
09:29site. The required stream
09:30prediction setbacks, reduce
09:31the use of Larry of this
09:31parcel. The presence of a
09:35stream traversing. The lot is
09:35an extraordinary physical
09:37condition that imposes
09:38constraints not commonly found
09:38throughout the zoning
09:40district. Well, some of their
09:41parcels in the district may
09:42have streams are similar.
09:44Natural features. This is not
09:45characteristic of the
09:47district. As a result, the
09:48physical circumstances
09:48affecting this property are
09:49exceptional and justly can
09:51justify consideration of the
09:52request of variance. Standard
09:56be variances. 1, 2, 3, are met
09:59the stream setback which
10:00bisects the parcel combined
10:01with the standard zoning
10:02setbacks applicable to the
10:04property, reduce the total
10:05bill. area, but more than 86%,
10:08these constraints limit what
10:09type and size and structure
10:10can be accommodated. These
10:13combined physical
10:14circumstances create an
10:15exceptional and undue hardship
10:15for the property owner without
10:18relief, strict application of
10:19the code would effectively
10:19prohibit the applicant from
10:21constructing a home in
10:22associated accessory,
10:22structures in a manner
10:24consistent with what is
10:26commonly permitted and enjoyed
10:26by other properties within the
10:27same zoning district as such
10:30the request of variances are
10:31necessary to allow a
10:32reasonable use of the property
10:34commonly joined by other
10:34properties within the same
10:35zoning district. Standard. See
10:38variances, 1, 2, 3 are met.
10:41The physical hardship
10:42experienced on this property
10:43is not self-imposed location
10:43of the Stream Channel is
10:46entirely outside the control.
10:46The property owner and its
10:48alignment across the lot
10:49severely limits the available
10:50space for redevelopment. The
10:52street by 6, the person, the
10:54way that restricts
10:54construction options for both
10:56the single-family dwelling and
10:56the proposed detached garage
10:57with an ad you the applicants
11:01actions have not created the
11:03special conditions, the
11:03constraints that right solely
11:04from the natural placement of
11:05the stream and the useful
11:06stream protection setbacks.
11:09Although the applicant has
11:10rented the home to incorporate
11:12Rock River rep wrapping gravel
11:13to stabilize the building pad
11:16measures taken in response to
11:16past flooding and structural
11:18undermining these efforts to
11:19not create hardship. Instead,
11:20they address preexisting
11:24environmental challenges while
11:25the detached garage with an
11:2580, you could be moved
11:27slightly closer to the front
11:28property line to reduce the
11:29stream setback. Encroachment
11:30doing so would increase
11:31encroachment into the front
11:32setback. He went beyond what
11:34is reasonable? Such a shift
11:36would not eliminate the
11:37hardship of merely transfer it
11:37from one setback to another.
11:40Additionally, the stream
11:41divides the person to 2
11:41distinct areas creating a
11:42physical access barrier to the
11:45northeast portion of the law
11:46without the proposed
11:46footbridge. Access to the area
11:49could only be obtained by
11:50crossing adjoining properties,
11:51which is not feasible. These
11:54conditions reflect true
11:55physical limitations, not
11:57inconvenience and support the
11:57conclusion that hardship is
11:58not of the applicants making.
12:03Standard E variances. 1, 2, 3,
12:04are met. The existing
12:05structure has encroached into
12:06the stream setback since its
12:06original construction in 1975.
12:09and the proposed redevelopment
12:10will reduce non can 40's
12:11rather than increase them. The
12:13removal of the east side
12:15setback, encroachment and the
12:16placement. The new addition
12:17entirely within the required
12:18setbacks ensures that the
12:19property to the east will not
12:20experience any adverse impact
12:21from the requested variance.
12:24Similarly, the proposed
12:26detached garage with an ad you
12:27encroachment along the West
12:27and South property lines.
12:29Well, not negatively affect
12:30the adjacent western parcel.
12:33The garage will maintain a 5
12:33foot separation from the
12:34Westside property line
12:36dimension consistent with
12:37standard setback. Allowances
12:39in the municipality of
12:40Anchorage maintaining this
12:42buffer ensures continued
12:43privacy, separation and
12:43compatibility with neighboring
12:45land uses. As a result, the
12:47request variances do not
12:48impair or diminish the
12:49permitted use of any adjacent
12:50properties. Standard E
12:53variances 1, 2, and 3 are met.
12:57This does not change the
12:57character of the zoning
12:58district and is not permitted.
12:59Use not otherwise permitted in
12:59the GR 2 zoning District.
13:01Standard F. Variances 1, 2, 3
13:06are meant to date. The
13:07existing encroachment has not
13:08created any adverse effects on
13:09the health safety or welfare
13:10of the community. There are,
13:12however, weather patterns and
13:13climactic events beyond the
13:14control. This property owner
13:16and beyond control all
13:17girdwood residence that may
13:18affect the flow of the stream
13:18and others in the area. Such a
13:22natural conditions can present
13:23potential impacts, but they
13:23are not caused or exacerbated.
13:25Biden requested variance. The
13:28proposed encroachment into the
13:29front side setback for the
13:30detached garage with did you
13:31does not present any known
13:32adverse effects on the help
13:34safety or welfare of the
13:34people. The municipality, the
13:37setback productions occur
13:38outside environmentally
13:39sensitive areas and no
13:41conditions have been
13:42identified. That would create
13:43a health safety or welfare
13:44impact to the people or the
13:44municipality. Standard is not
13:47applicable to variants. 1, 2,
13:503, ADA accommodations do not
13:51apply to single family
13:52residential development.
13:55Standard. H Vance is one in 2
13:56are partially met with
13:59creative design. The law could
14:00potentially comedy to single
14:02home single family home, a
14:03detached garage with an ad.
14:04You reducing encroachments
14:06into both the stream
14:07protection setback and the
14:07required building setbacks,
14:09such an alternative
14:10configuration could be
14:10achieved by decreasing over a
14:11building footprint. We're
14:13shifting structures or
14:14increasing the height.
14:18shifting searchers further
14:19from the stream protection
14:20setback paired with requesting
14:21variances to encroach into the
14:23building setbacks instead of
14:24Instead, this approach could
14:25reduce impacts the stream
14:28protection area and better
14:29preserve the hydraulic
14:31hydrologic ecological riparian
14:32vegetation and a static
14:33functions. That water courses
14:35provide. However, practical
14:36constraints, limit these
14:37options, the property contains
14:39existing 10 for utility
14:40easements along the North East
14:41and west boundaries. In
14:45addition, she got Electric
14:45association cea overhead power
14:47lines and polls are located
14:48within the easement from the
14:50north and east sides of the
14:52parcel these utility easements
14:54and power infrastructure
14:55significantly restrict the
14:56ability to relocate or
14:59redesign structures without
14:59creating new conflicts,
15:00conflicts of violating
15:01established easement limits as
15:03a result, although looks
15:04alternatives exist. And Perry,
15:06they're not feasible in
15:07practice to the physical and
15:08regulatory constraints present
15:09on the site. For standard
15:13variance. 3 is met. This is
15:14the minimum minimum variance
15:15that will allow the property
15:16owner to construct a proposed
15:18detached garage with to you,
15:19however, an increase in the
15:20front encroachment would
15:21reduce the stream setback.
15:22Encroachment for the
15:22structure. Review Natick
15:26Agency comments are included
15:27in attachment 3 starting on
15:29Page. 8 of the staff report
15:32Emily Watershed Management
15:32Services provided comments
15:33regarding the encroachment
15:34into the stream and the foot
15:35bridge crossing the stream.
15:38Therefore for variants one.
15:39The department finds that
15:41Standard H is partially met
15:42and be C D E F and G are met
15:48there for the department must
15:49recommend denial of the Vance
15:50if after public hearing the
15:51board finds that all 8
15:52approval criteria are met,
15:54approval should be subject to
15:56the following 2 conditions
15:59variance to the department
16:00finds that centered H is
16:02partially met and standards
16:03ABC, D E F and G are met.
16:06Therefore the department must
16:07recommend denial of the
16:08variance if after a public
16:09hearing the board finds it
16:10all, 8 approval criteria are
16:12met than the approval should
16:13be subject to the following.
16:142, 3, conditions. Vance, 3,
16:18the department finds that all
16:18its standards are met there
16:19for the department recommends
16:20approval of the variant
16:21subject to the following 2
16:22conditions. I can answer any
16:23questions that the board may
16:25have and the petitioner and
16:27the representative are in
16:27attendance.
16:31>> Are the questions staff by
16:32the board, Mr. Mosley.
16:35>> All right. Question chair,
16:37Mr. Mason, this for us. Thank
16:39you. I guess what
16:43>> cited procedural question.
16:45Our are we too approve or
16:48disapprove this application as
16:50a whole or are we allowed to
16:53divide the issues among the 3
16:54fit for variances? To the
16:58chair board member? Mainly due
16:59to actually, actually vote on
17:00all 3.
17:00>> They'll be separate votes
17:01for each each variance. Thank
17:02you. You're welcome.
17:05>> Mr. Bennett, Mr. Brian
17:06Bennett.
17:11>> First of all, thank you for
17:12sending me the reply to my
17:13question earlier. Expert
17:19expedited response. But I
17:20would like to know how the
17:22documented noncompliance
17:23influence is a grandfather for
17:24not following the same
17:25dimensions in the
17:25reconstruction. The note that
17:26you sent to me included a pair
17:28include a sentence which says
17:29the Structure is reconstructed
17:33with the same dimensions. And
17:34that's not happened here. As I
17:36understand the problem. That's
17:38the first of my questions.
17:42Would you like others and
17:42sense? Would you like to
17:43answer one of the time?
17:45>> If I may, would like to
17:45answer one of the time threw
17:47the chair, mister Brian
17:47Bennett.
17:50>> The existing structure
17:51encroaches.
17:53>> I do not have an actual
17:54dimension. Extensively and
17:59then the existing structure
17:59can be rebuilt due to the
18:02nonconforming determination.
18:06The addition of a very small.
18:10Square triangle, actually, if
18:12you turn to page. All right.
18:19Looking first drawing. No, it
18:24is on Page. 57 0, 4, I'm
18:33looking at it. Yes. So the
18:37only new part of the addition
18:38that is encroaching in the
18:38stream setback is that very
18:41tiny little triangle. It's got
18:43a different hatch pattern. I'm
18:44not sure if you can see that
18:44or not. That's what the 4 and
18:47a half foot encroachment for
18:48variants. One is for. Because
18:51the rest of the structure has
18:52nonconforming rights and is
18:54not considered encroaching,
18:57but it's not conforming only
18:58in the sense that if you
18:59reconstructed, you have to use
19:00the same dimensions.
19:01>> And they're not doing that.
19:05The petitioners not doing that
19:08understand it.
19:08>> Correct. They are using the
19:09existing.
19:14>> They're expanding on the
19:14existing facility, hence the
19:15need for the variance.
19:17>> For that portion, only.
19:27>> To answer that question to
19:28my colleagues are right. The
19:29use of the word and in the
19:31petitioners, various petitions
19:33for any of the what amounts to
19:34be. 32. Criteria standards. If
19:38any of those does not meet the
19:40standard 10, all of for
19:42because the use of the word
19:42and all of that. Variances
19:44must be declined. According to
19:49Robert's Rules of Order and
19:49Miriam Webster. When you take
19:52when you use the word and it's
19:55both were none. For all 3 or
19:58none. Actually in this case.
20:05So if any of any of the
20:06criteria are met with the
20:06denial. The whole thing goes
20:10down in flames. As I
20:11understand the word and
20:14>> I do not understand it that
20:15way. And given that the
20:18application has reference to
20:194, even though it's just 3 the
20:21applicant actually applied for
20:223 different variances.
20:25>> Robert's rules of Order
20:26Page 6, 56 7. They have an
20:30explanation of the difference
20:31is between him and and or
20:34minus the 10th Edition.
20:42>> Well, I appreciate Robert's
20:43rules of The application for a
20:45variance can have multiple.
20:47Portions and B. Approved or
20:51disapproved, which you which
20:52this board has done in the
20:53past. They've approved one
20:54port, one variants and not
20:55approved a second variance.
20:56When there was more than one
21:00>> But I'm not talking. But
21:00between variances of talking
21:01about within the first
21:02variance. The description is
21:03a. O for 2 to encroachments.
21:09correct. That's correct. 0.5
21:10feet and proposed crashed
21:11AirAsia. Yep. That is correct.
21:13So that would be that it still
21:14be the same variance.
21:16>> So if if you have a problem
21:17with any of the values for
21:19either of those 2 structures,
21:20plus a covered bridge, then
21:23the host cyst that whole
21:24variants must too
21:29>> That is correct. Well, the
21:29bridge itself is one variants
21:32the to encroachments of the 2
21:33structures in the stream
21:35setback or one variants and
21:35the front side setback. Irwin
21:38variance.
21:39>> But if you're climb the
21:39variance for the garage and
21:41the ad you then there's no
21:42need for the covered wagon for
21:42the covered bridge. you can
21:47can't establish a need. And
21:49there's no reason to approve
21:50variance for this covered
21:51bridge.
21:54>> No, you can still approve
21:55the variance for the bridge to
21:56the bridge would just be still
22:00access to even if that's too,
22:02if the once if the atu was not
22:03constructed, you'd still be
22:03able to construct the bridge.
22:04If you prove variance. So we
22:06would have a bridge to nowhere
22:07know you have a bridge from
22:09there.
22:10>> Current gravel parking area
22:11to existing structure.
22:17>> is already present on
22:17street. But not in the same
22:21place.
22:28>> Move on to another question
22:28here. What are the points of
22:33measurement for establishing
22:34the height of the structure?
22:37other words, is to peak of the
22:37roof?
22:41>> Threw the chair Mr. Brian
22:43Bennett, it's from grade to
22:43the midpoint. Some great to
22:46wear midpoint. The high to the
22:51building is meeting at the
22:51midpoint of it has meant it is
22:52measured the midpoint. Yes.
22:56Did you did you by chance to
22:57the email I sent out earlier?
22:58I did look at. For the X.
23:03>> I read the though that you
23:04sent to me. About differences
23:08and variances. Okay.
23:11>> There was another. There
23:13was an extreme Elsa now to the
23:14board members because one
23:15board member had a question
23:16exactly on that on with the
23:18height.
23:18>> Okay. So does that have OK,
23:19that
23:27>> Anybody want Mr. Craig
23:32Bennett. Couple
23:37clarifications. One is this
23:3930%. Max lot coverage in this
23:41area. Threw the chair. Get me
23:47one second, Mr. Brown and Mr.
23:48Treatment. think it is. But I
23:51from it. varies if it's larger
24:00than a certain size. That's
24:00the criteria. And then. Kind
24:06of in response to. Tony
24:11Bennett. 25 1% for lots larger
24:13than 15,000 square feet. 30%
24:15otherwise, OK, 30. So you're
24:16correct? Yes. Clarification
24:22too. The other been a
24:22question. This site, the area.
24:28That this building is
24:32streamside setbacks, the same
24:33shape except for the small
24:34triangle and its larger
24:37outside of the setback threw
24:38the Mr. Craig Bennett,
24:43correct. Assuming the existing
24:43encroachment is greater than
24:44the small addition,
24:48encroachment that they're
24:48proposing in this small corner
24:49and I'm sure they could
24:51probably design it out of it
24:53if they had to and still
24:54maintain the existing
24:55footprint and then stay
24:56outside of all the setbacks,
24:56UK. That's everything. Thank
24:59you. Thank I was going to
25:09reference page 69 of the
25:10packet. And I was looking at
25:14the elevation above ordinary
25:15high water mark.
25:17>> 4 feet, 7 and a half. On
25:22the lower right, site section
25:23bridge through the chair board
25:27member Norse. I am not 100%
25:28sure. And I will the fault
25:31too. The petitioner in the
25:33representative because they
25:34probably have bigger plans
25:35that. And probably know that
25:38exact get. And is that OK? But
25:42thank I hate to ask a super
25:44nerdy question here. do we
25:46know if that is outside of one
25:49percent flood level? Do we
25:50have a recurrence where that
25:52would back up the stream? I do
25:54not know the answer to that
25:55question. Understood that
25:58watershed did not provide
25:58anything. Reflect that it
26:01would be or wouldn't be. And
26:03they did do a site visit to
26:06the site. Yeah. So they went
26:07out and delineated and thank
26:18Just a quick clarification for
26:21staff or the petitioner since
26:22they have bigger plans set
26:26page. 45 of our packet is
26:28zeroed out one from the
26:30architects. It seems to
26:31indicate that the West, the
26:35utility easement located on
26:36the west edge of the property
26:37is vacated but throughout the
26:40staff packet, there are
26:42references to utility
26:42easements on all 3 sides, West
26:45North and east. Which is it is
26:47that is that. Is that correct?
26:52Paul threw the chair, Mr.
26:54Shooting 45. Is that super
26:58concept plan which actually
26:59even a different couple
26:59different encroachments which
27:01are not what they're building.
27:01So they eliminating the 5 foot
27:04encroachment into the
27:07Eastside. 10 foot utility
27:08easement. Concept actually
27:14showed them going all the way
27:14back to 10 feet. Rear setback
27:18and they change that to
27:19actually maintain the 15 foot
27:21rear setback. So there's no
27:23there's no variance needed for
27:23the rear. They were getting
27:25rid of The design was to
27:28eliminate that and I'm sure
27:29the representative can can
27:31talk about that a little bit
27:32more. I did want to point out
27:35there is part of code 4
27:39girdwood that's unique to
27:41girdwood. And I don't know if
27:41everybody, if all the board
27:42members know about it or not,
27:44and not that they're not
27:45necessarily doing this in this
27:47case. But you can switch. Your
27:51site setback. So currently in
27:52the GR to its a 10 foot side
27:54setback, you can. To 15 feet
27:58and 5. They're not necessary
28:03doing that. I'm just saying
28:04that's where that's where the
28:055 feet comes from for the atu
28:07because if they had 15 feet on
28:08the side, they could then have
28:10were not being an encroachment
28:12for the 5 feet on the West
28:13side. But because of stream
28:15and all that other stuff
28:19that's just for informational
28:19for everybody. In case you
28:20didn't know that one. thank
28:23you. actually, you you took
28:25the bus where I was going to
28:27drive it anyway, which asking
28:28that question. So
28:30>> you need to guard what is
28:31special limitations on
28:32accessory dwelling units over
28:33certain height when it comes
28:35to introducing flexibility in
28:37the side. Setbacks like that.
28:38You as you just described, how
28:41is that not the case in this
28:42property?
28:46>> Through the chairman's it's
28:47not just because the existing
28:47structure is right at that 10
28:48foot. And so they if they were
28:49to it. That could shift the
28:53main house because they be
28:54going more into the stream.
28:56They could reduce it somehow.
28:57I guess but that's not the
29:00current plan is its to
29:01eliminate the existing
29:02encroachment. And of the 10
29:06foot setback. Stay at 10 feet
29:07and ask for the 5 feet on the
29:08West side. So let me ask
29:13again, okay. They're asking
29:15for the 5 feet on the West
29:16Side. West side should be 10
29:19feet correct?
29:19>> Because the West Side is
29:20where the accessory dwelling
29:21unit is being built. Am I
29:25misunderstanding the girdwood
29:26section on would preclude them
29:29from taking advantage of the
29:30flexible side back side
29:32setback. Excuse me. And that
29:35for the rest of my body, I'm
29:38referring to and see 21. 0, 9,
29:400, 5. Those subsection 3 h to
29:472 or 3 items specific to any
29:48use and guard was very
29:49different from from Anchorage.
29:50But it it does specifically
29:53number one you shall not
29:54encroach into any required
29:57setback. And number 2 side and
29:59rear setback flexibility
30:00allowed table. 21. 0, 9 dash 5
30:02show that apply to accessory
30:02dwelling. It's taller than 15
30:04feet. And earlier question
30:05about height. So I get I guess
30:07my question is, is that not
30:10applicable here? And if not,
30:11why? Threw the chair? What
30:24part of code was that Mr?
30:25Shooting? Oh, boy. 21. 0, 9,
30:330, 5, 0, 5. I probably missed
30:36a letter in there somewhere. I
30:37apologize by 15 minutes off
30:38the top your head. It's the
30:40it's the chapter 9 section on
30:4180 use. there are 3 specific
30:50prohibitions or I guess
30:51constraints on 8 e U.
30:54Development and good with that
30:55are different than Anchorage.
30:59I think I'm missing a letter
31:00in there somewhere. Maybe it's
31:00H 3. could have a It's h
31:06setbacks in 80. You shall not
31:07encroach into any required
31:09setback. The side and rear
31:10setback flexibility allowed in
31:12the table shall not apply.
31:15Took 6 accessory units taller
31:16than 15 feet. So you are
31:18correct. So this wouldn't even
31:19apply. You wouldn't unless it
31:22was less than 15 feet tall,
31:23which we know it's not this.
31:25They would not be able to use
31:26the flexibility even if they
31:26had the 15 feet, which
31:29probably confusing everybody,
31:29which I'm sorry. So no, they
31:31would not be able to flex
31:32this. But I'm just it wasn't a
31:36city of flex that I was
31:37talking about. It was just
31:37that 5 feet is not an uncommon
31:38side. Setback. In Girdwood.
31:42Realizing they're not they
31:45don't have the option to make
31:46it that way. It's just not an
31:47uncommon thing in the girdwood
31:48area. Okay. Thank you that
31:50that helps. And just to put a
31:52bow on my line of questioning.
31:54So thank you for clarifying
31:56that. It was conceptual site
31:56plan. I was looking at that.
32:00It seems to document that
32:01they're going to encroach 5
32:01feet in that 10 foot side
32:03setback. But you're saying no,
32:04that was conceptual. They do
32:05not intend to. So this section
32:07of code specific to you then
32:08would not apply. To the chair.
32:12You're talking about the
32:15existing structure. Do you
32:15view the atu is still going to
32:16encroach 5 feet? What is yes,
32:21okay. But the existing a
32:23conceptual. Yes. Yeah. Just
32:23talking with the atu here. So
32:25okay. So I guess that's not a
32:26bow. Last one, I promise given
32:34the specific language used in
32:36that with section of code on
32:3780 use, what are we allowed to
32:40do? I mean, I my understanding
32:43is we don't have the authority
32:46necessarily to waive code and
32:47it seems pretty written pretty
32:48specifically to preclude an 80
32:52you in that site setback. So
32:53what are we able to do with
32:57that? Threw the chair Mister
32:58Xi. That's whether they need a
33:00variance that that okay. So we
33:01are able to correct. Thank You
33:01bet. Mr. Mason. Thank you to
33:11the chair. I just wanted to
33:12some clarification on my
33:13original question. Which was
33:16can we divide the question
33:18when we go to vote on this?
33:20>> In light of what Mike
33:23colleague, Mr. Burnett was Mr.
33:24Bennett was talking about.
33:27Which seemed to lean more
33:29toward. We have to approve the
33:30application as a whole or deny
33:32it as a whole. To the chair
33:36board actually, that is
33:39completely up to you. If you
33:40feel the chief want to amend
33:45or change the motion you can
33:48amend the motion or changed
33:49votes or by for Kate is
33:49actually what it's called
33:52Lowrie has that capability to
33:53hit The Buy for Kate Button
33:54right there in the thing. If
33:55you want to buy for Kate, any
33:57of these variances by any by
33:57any means. Thank Also the
34:04question of lot coverage was
34:05brought up. What is C?
34:09>> Actual lot coverage for for
34:12this proposal.
34:13>> Threw the chair board
34:14member Maisie. I will leave
34:14that up to the representative.
34:15I'm sure they have that
34:16number. At at their
34:20fingertips.
34:20>> And and you said that since
34:21the property is less than a
34:24certain square footage that
34:26the 25% would apply or the
34:2630%, 30%, 30%, yet.
34:35>> Anybody else? Any other
34:37questions for staff?
34:40>> Seeing none. We'll move on.
34:48Would the
34:48>> petitioner or the
34:49petitioners representative,
34:49please come forward. State
34:50your name for the record. And
34:54stomach.
35:00>> Hello, my name is Richard
35:01Todd Kessler and the one of
35:02the petitioners. move up. My
35:06name is Richard Todd cast and
35:07one of the petitioners.
35:11>> Hi, my name is Wendy Mail
35:12and I'm one the petitioners.
35:13Okay. Do you have any
35:15questions of staff? Not at
35:19this time. Okay. Then would
35:21you please present your case?
35:26Ok? So or so pardon have and
35:29stumble a little bit here. But
35:32so this is my wife, Wendy. His
35:36life-long Alaskan volunteer
35:37Alyeska ski club. What I'm
35:38skier at Alyeska my name is 37
35:44years in construction. I'm in
35:45vertical vertical in civil
35:46construction. The civil PM
35:49general contractor,
35:50environmental consultant,
35:52primarily and I respond to
35:53spill. Emergency response
35:56contaminated sites. Cleanup is
35:57my primary line of work. We
36:00have a family of 7. Our
36:01youngest is 7 years old. Our 2
36:05oldest children went through
36:05the mighty mites program at
36:06the Alyeska Ski Club. And our
36:082 youngest children are
36:09currently engaged in scheme
36:09program there as well. So what
36:13is the purpose of this
36:13construction? We want to
36:18establish a generational based
36:19for a family to live in ski
36:19and recreate. We want to
36:22upgrade aging housing. We want
36:25to continue provide affordable
36:27housing to local girdwood
36:29workers. We want to preserve
36:33stream setback and overall
36:34natural feature qualities to
36:35purposeful and minimal impact.
36:36Construction. The setback
36:41variance for this exists for
36:42the existing gravel parking
36:44lot would provide the least
36:45impact to the property and
36:46still provide local housing
36:48and reasonable commonly
36:48enjoyed rights. Inflicted a
36:52lot alternatives here and in
36:54one would be the use by right
36:55where we could install a
36:55covert over the stream and
36:59access via road. But we just
37:00didn't feel that that was
37:01appropriate to preserving the
37:02character of the of the lot.
37:06And one of our other purposes
37:09here as to contribute
37:10positively to the neighborhood
37:10to the community and to the
37:11municipality. And so we came
37:16up with the development
37:16strategy with are planning
37:17approach. We went to a
37:20thoughtful process considering
37:21many points. We want to
37:25preserve the acoustic visual
37:26environmental stream and
37:28property qualities. We want to
37:30preserve along affordable,
37:31long-term local housing before
37:32and after construction. We
37:36want to integrate with our
37:37neighbors and our
37:37neighborhood. We want to
37:40develop a family home plan
37:43that's for our current and for
37:44future generations. We want to
37:49utilize the most qualified
37:50architects and builders for
37:51design and construction of
37:53this project. We've used
37:55Willow Ridge construction for
37:56the initial design in our
37:57initial variance package in
37:592024. weve got personal past
38:01performance with their design
38:02and construction. That's going
38:04very well. And they have years
38:05of experience of building
38:06homes in Girdwood. They have
38:10construction techniques. They
38:11employ that such as low-impact
38:15sensitive Area Foundation's
38:16using both vehicle and driven
38:17piles, whichever work the best
38:20and then associated framing
38:21structures, which we tend to
38:21plan to employ. We also have
38:25brought on as the architects
38:26with Mark a long time. design
38:29firm. He's helping to this
38:31facilitate this plan. This
38:33proposal and to help us with
38:35variance process. And so we've
38:39considered lots alternate
38:40plans and approaches the EU
38:43itself has been revised 4
38:44times in conversations with
38:46watershed with the
38:47municipality to try to find
38:47the very best way to situate
38:49us the structure so and we
38:55also engage the municipality
38:55or Leon to work
38:56collaboratively plea with the
38:57variance process. We prepared
38:59and submitted the variance in
39:022024, we've received the staff
39:03report and we took those
39:05comments and we decided to
39:07revise our proposal and to
39:11resubmit. And so we spend a
39:12couple more years doing some
39:14real good. Thank you. We did
39:16present our initial design
39:17package to boss you see
39:20solicited public comment at
39:22that point on that, you boss
39:23had a litter of non objection
39:24following the meeting. We
39:28received comments and we
39:29reconfigured are conceptual
39:29plans after initial meetings
39:35we also invited watershed to
39:37come and look at the sidewalk
39:39it together. We've had
39:40numerous meetings and their
39:41office and at the site to talk
39:42about the ways that we can
39:44preserve that the integrity of
39:46the property and not affect
39:47any hydrologic processees and
39:50also allow that the
39:50construction to occur. And
39:52then we also we received the
39:56nonconforming determination
39:57for the House to be able to
39:58proceed. That's where we're
39:58doing here. And then we
40:02prepared and submitted the
40:052026 variance request and
40:07thereafter we went to it that
40:08pass me again presented are
40:09are project again and
40:11solicited public comment at
40:11that point. And then that
40:16that's kind of the history of
40:17what where we get. gets us to
40:20would like to talk about the
40:21staff report, the discussion
40:22specifically focusing on
40:24Standard H since the staff
40:27report voted in favor of all
40:28the other remaining standards.
40:31Just want to make sure that we
40:32clarify her a little bit. What
40:32some of the standards are and
40:35the the language is the
40:37variance. Granted is the
40:38minimum variance that will
40:38make possible a reasonable use
40:39of the land. And so the staff
40:42reporting indicates the
40:43standard is partially met. So
40:45with the variance request one.
40:49The garage in the ad, you
40:50would simply occupy the
40:51existing bill to parking area
40:54and would not require greater
40:56vegetation, modifications. So
40:58there's previously existing
40:59gravel parking lot. That is
41:02the same footprint that we
41:03would use for the atu. So
41:06we're not modifying any grade.
41:06No vegetation, nothing of
41:08that. And similarly not with
41:11the hydrologic There's nothing
41:13that would change with this
41:14design the U.S. tablets
41:19established function and
41:19footprint of the property is
41:21not being changed by this
41:21request. the staff report. A
41:26garage and housing are common
41:26and expected uses within the
41:28GR to district. The
41:30structures. The minimum size
41:33that we could find to
41:34facilitate a garage in an ad
41:35you. The to you is actually
41:39smaller than the existing
41:42house and going even smaller
41:43would reduce workforce housing
41:43space, even more. feel very
41:48strongly that are variance
41:51request as well. Reasoned
41:52practical, minimal in keeping
41:54with municipal code and
41:54watershed management
41:56objectives. Watershed
41:56management does not object. To
42:01the encroachment as long as
42:02all existing needed vegetation
42:03remaining between the gravel
42:04pad in the stream is preserved
42:06and the remaining stream
42:07setback or means vegetated,
42:08which is what we plan. So
42:20we've looked at this. We've
42:21talked with watershed and we
42:23we find that there's there's
42:24no appreciable hydrologic
42:25impact from this stream that
42:27would result from granting
42:28this variance. There's no
42:28construction that would go
42:31inside of what's not already
42:32used the stream is fed by a 16
42:38inch diameter culvert that
42:40enters from the northwest or
42:41from the southwest corner of
42:42the property through the under
42:45Northland Avenue, the maximum
42:47flow rate through 16, it's
42:48colder at easing Manning's
42:50equation is 4.2 cubic feet per
42:52second. So that's the maximum
42:53flow that could come through
42:54that COVID at any given time.
42:56If we look at the drawings
42:58cross Section 3, we can look
42:59at that. It would take about
43:0020 times the maximum flow to
43:02that covert to impact the
43:03structure in any way. In the
43:07event of flooding. We would be
43:08the first in line to suffer
43:09the consequences of reportedly
43:10decide structure, but we don't
43:11want to do and we do not want
43:14that to occur for us or any of
43:16our neighbors. And I would
43:20Hield not the rest of my time
43:21for rebuttal. have about 2
43:29minutes of rebuttal and I and
43:31I I did forget to do
43:34something. So. You get a
43:39little bit of leeway anyway. I
43:40was supposed just describe the
43:42procedure.
43:42>> For the public testimony. I
43:47apologize and the procedure by
43:48which the public may speak to
43:50the board at this meeting is
43:54after the staff presentation
43:55is complete on public hearing
43:56items. The chair will last for
43:56the applicant to state their
43:57case. She did it. The
44:01applicant, including all of
44:02his or her representatives has
44:0210 minutes for the
44:04presentation a reserve time
44:05for rebuttal at the end of the
44:07public hearing throughout the
44:09proceedings, the burden of
44:10proof rests upon the applicant
44:11must convince the board by a
44:12preponderance of evidence that
44:13that variant should be granted
44:17concurring voted of the
44:18majority of the fully
44:18constituted membership of the
44:20board. Minus those excused by
44:21conflicts of interest shall be
44:23required to grant a variance
44:26for the variance to be
44:26granted. All 8 standards must
44:27be substantially met on the
44:30conclusion of the applicants
44:32presentation, the board
44:34members and the staff made
44:36then direct questions to the
44:36applicant through the chair.
44:38The chair will then open the
44:39public hearing to public
44:40testimony on the issue,
44:43persons who wish to testify
44:44will follow time limits
44:45established in the rules of
44:47procedure. Representatives of
44:49groups, Community council's
44:52PGA's cetera, have 5 minutes
44:53and individuals have 3 minutes
44:55when your testimony is
44:56complete, you may be asked
44:57questions by the board. You
44:59may only testify once issue
45:01unless question by the board.
45:02Time is kept by the secretary.
45:05The display at the front will
45:06be green to within one minute
45:07of the time allowed and then
45:09turn yellow at this time. You
45:11should begin to sum up your
45:12testimony and at the end of
45:13the allowed time, the light
45:14will turn red and a tow most
45:15out. An individual may have
45:19appeal rights relating to any
45:19action. The board. The zoning
45:22Board of Examiners and Appeals
45:24takes the parties have 30 days
45:26from the date of mailing or
45:27other distribution of the
45:28decision to file an appeal to
45:29superior court. And sorry, any
45:35part affected center? Are
45:44there any questions? Of the
45:47applicant by the board
45:48members? Mr. Should. Thank
45:55you. First, I want to make
45:55sure can you all hear We've
45:57been having technical
45:58difficulties. I can't always
45:59hear out of the speaker, but
46:00if you can hear us, that's
46:01great.
46:02>> Also can talk very loudly.
46:05I wanted to ask a question
46:06about a statement you made
46:08towards the end about the
46:09visit. You made our visits
46:10made by watershed management I
46:14appreciate that. They that you
46:15work with them closely. They
46:15know. Wet stuff in girdwood
46:19pretty well. I was just I just
46:21wanted to ask if one of the
46:25items they highlighted as a
46:26concern, at least as included
46:27in our packet is related to
46:31pilings propose for the foot
46:34bridge it sounded like
46:37generally they were OK with
46:38it. But there are concerns
46:39about the pilings on the bank
46:42on the outside of the bend
46:44where Channel forces channel
46:46erosion forces are typically
46:47the greatest. I guess this is
46:48on House side. Have you have
46:51you been able to address that
46:52in the design?
46:54>> We have following that
46:55comment. We've spoken with
46:55watershed and we plan to
46:57modify the plan accordingly.
46:58Okay. Thank you. question, Mr.
47:06Shooting. Yes, my question.
47:07Okay. The also the side. Mr.
47:12Bennett, Mr.
47:20>> question a couple of
47:21questions actually about the.
47:22First of all, the the bridge
47:25is one of my concerns out here
47:26to say that the the the impact
47:29of the big integrity. But I'd
47:32also like to ask you about the
47:33drawing on a 1, 0, 1, 1.1,
47:35which is the floor plan. It
47:38appears that the building.
47:42Mall. On the West side for the
47:45connection to to the bridge.
47:52You're either having an
47:53outside unsupported corner.
47:56That you're going to have a
47:57bridge turn on to where you're
47:58going to modify the foundation
48:00wall underneath the bill
48:01underneath the bridge to
48:02accommodate that bill. I think
48:05it's but between 2 on one side
48:06and 4 feet on the other side
48:07on the house and the same
48:09thing occurs down on ad. You.
48:11The bridge is not connected
48:13directly to the House. There's
48:16a supporting underneath that
48:16somehow it that outside
48:17corners. It's Marcus Carr.
48:25>> And see next interview.
48:28>> Marco, can you move closer
48:29to the mike? could hear me
48:31now, John. Every state. My
48:33name. there. hi, my name is
48:37Mark was a car. Was the
48:37architects have been assisting
48:38with this process with Todd
48:42and Monday. So right now, the
48:44if you look at a 0.3, which is
48:46a site plan which should be
48:47reflective of with 1.1, which
48:48is also good 4 plan. We show
48:53the pilings underneath the
48:56bridge and what we're going to
48:57do is move those pilings to
48:59that corner joint to get them
49:03further away from the stream
49:05setback to Crest Watershed
49:06management concerns at this
49:10point we were planning on a
49:10wood structure, but I have to
49:13go to a steel structure to
49:14spend up our. And to the
49:19earlier question, Clarence
49:20underneath the bridge is about
49:224.7 and that's established by
49:24watershed management mapping
49:25of the stream which we had a
49:28surveyor market their We have
49:32pretty good idea where actual
49:33high water, ordinary high
49:34water Mark S.
49:39>> I'd like to ask about on
49:42the Are we on Page 62 of our
49:43packets. 56.2 page. 89.
49:55>> It's 29. That's where
49:57should management. Again, it
50:03was looking actually at
50:04drawings that they provided
50:051.0 that is page 62.
50:10>> Yes, So, yes, I I got a
50:15good mix. Yes, you're correct.
50:17So on page, 62 a 1.1 It shows
50:22that current pilings, those
50:25retreat from the stream right
50:26now. They're currently outside
50:29the stream.
50:29>> which is shown on Page.
50:33Age. 57. You can see the site
50:37plan and so you can see where
50:44to map stream with island's
50:47actually. 56 shows that a
50:48little bit better. The colors
50:51on the great.
50:54>> would be basically moving
50:55the piers, all 4 of them. Yes,
50:57away from where in the center
50:58of the stream. Yes, flow.
51:02>> The other currently just
51:02outside of ordinary high water
51:03mark. But we're going to get
51:05them as far away as watershed
51:09management
51:09>> I was looking more at the
51:10twist on the big bridge of an
51:12unsupported corner. Well, put
51:13comms underneath You're not
51:14going extend the foundation of
51:15to to those points.
51:17>> No, in fact, right now
51:21we're discussing putting the
51:22atu completely on pilings.
51:24>> Just to reduce the
51:26potential for impact because
51:28there's concern about tree
51:32roots. A lot from our neighbor
51:33to the West. And and we're
51:34trying to do everything we
51:35can. To mitigate that. We've
51:38talked to will a bridge
51:39construction about putting
51:40that on pilings to medicate
51:42any impacts to the site and a
51:45gravel removal and leaving
51:46that the existing gravel pad
51:50that gripped just existing
51:51gravel pad almost exactly as
51:52it is. So that's under
51:57>> can I move your document?
52:012.2, 8 or the H one document
52:04page 16. quotes they're the
52:11only way we can come to a
52:12point of not objection is the
52:14building is completely within
52:15the existing gravel PED vs. It
52:17is largely confined within.
52:22The yes.
52:23>> So sir. So originally.
52:27we've gone through a number of
52:28iterations. The site plan. And
52:33the in January we came up with
52:34iteration was larger than it
52:41is now and so watershed
52:43management said please map out
52:46the existing travel pad. So we
52:47brought the survey are back,
52:49mapped out the existing gravel
52:50pad in show watershed
52:53management where the existing
52:56gravel pad was under the
52:57proposed earlier atu design.
53:00And then they said the only
53:00way that we could support.
53:03This very uncertain. Having on
53:05objection is if you reduce the
53:09size of the atu. So completely
53:10on top of the existing gravel
53:12pad. And so then we reduce the
53:14ad you saw fits. On the crest
53:18of the existing gravel pit,
53:19right where the parking lot is
53:20now. And you can see that your
53:24page number. 56.
53:28>> We fortunately you got it.
53:29You haven't eaten by 11.
53:31>> But if you look closely,
53:35there's there's heavy wind.
53:36That's the toe of the gravel
53:37pad. And then there's dashed
53:40line and board of that. And
53:41that's top of the gravel had.
53:43So any place. Inside the
53:47stream setback? Where that
53:52gravel pad exists. We have
53:54reduced the atu to only occupy
53:56that area. Now outside of the
53:56stream setback. The building
54:03is larger than the gravel pad,
54:04but we're outside the stream
54:06setback. So that's not
54:06watershed management concerned
54:08that point.
54:08>> If you look to the to the
54:11left and educate it's out that
54:14heavy dashed line a spring
54:15setback on. So.
54:18>> We've done extensive
54:19mapping of the property. cars
54:22on Ali, an Lee to try to make
54:26sure that we didn't have
54:28hydrologic impact to the
54:29existing grades. So rich
54:31connection is actually
54:31sticking out into the.
54:34>> Under the toe of the gravel
54:34pad.
54:38>> Yeah. So would be supported
54:39at the toe of the gravel pad,
54:40but on pilings. So.
54:46>> The other question is on
54:47also on that page. This is
54:50that you have a full
54:53understanding and compliance
54:54with difference. You're that's
54:55why you're here is to because
54:55you're not in compliance.
54:57You're looking for a variance.
55:02you want to respond to that
55:02with your statement that?
55:06Fight?
55:07>> Understand the question
55:07completely. Could you please
55:09repeat that? It's a matter to
55:10matters. Semantic said Lee.
55:13You're not. And you may
55:14understand that you're not in
55:15full compliance. That's why
55:16you're here. get a variance
55:19for the non-compliance of the
55:20design.
55:24>> I think that you know,
55:26you're correct. Maybe a
55:26slight. The statement. We
55:30understand the issues on the
55:31and the buildings don't fully
55:36comply.
55:37>> So that's why we're asking
55:38for a very that's my point.
55:38Yes, okay. Ok, thank you.
55:43Anybody else? Mr. Shoot.
55:49Sorry, I'll take another bite
55:50the app because this line of
55:51questioning has think about
55:52something else.
55:56>> And maybe it not normal in
55:58the course of business for
55:59watershed management or for
55:59designers to consider this.
56:01But you know, if if
56:04constructed as proposed we're
56:05creating. Significantly more
56:09non permeable surfaces, are
56:10there today. Which is normal.
56:12When you build something. Have
56:16you guys modeled or thought at
56:19all about what impact, if that
56:21kind of construction and
56:23changing the natural
56:24environment to that degree
56:24would do with water. It was
56:28hard to tell from the really
56:29cool looking drawings, Marco,
56:30but I don't know which way
56:32different elevations of the
56:33roof slopes that are where
56:34that snow is dumping.
56:37>> I apologize. I should have
56:40put down arrows on the slopes
56:40so that if you go to sheet,
56:4161. We purposely. There's
56:50large shed rose on full
56:52structures and then there's
56:53flat roofs on all structures.
56:56>> The large said you know,
56:57say on primary house slopes to
57:03northeast and that the roofs
57:05slow cruise ships are
57:07purposely s**** away from
57:08stream. To do that. The
57:11majority of that water runs
57:14away from the stream and that
57:15can drop into a pious. Well,
57:18fortunately, Todd
57:19environmental engineer. And
57:23he's he's calculated the
57:24drainage district to make sure
57:26that we're lot of what we
57:27pass, but also we all of our
57:31flat roofs will be internally
57:32grain and then they will.
57:33Graham and the office
57:34>> Side of the building and
57:38probably going drainage our
57:38place well well. And I talked
57:41to our client about that fully
57:45agree. That's great strategy
57:46slow the runoff from the
57:49House. Us into the street.
57:51fact, the existing house
57:52inside the stream setback is a
57:53cable rough half of which
57:55dumps straight into the
57:56spring. So police on that with
58:02our thought actually going to
58:03slowing the runoff into the
58:04street. Now on the atu side,
58:09of course, it's a gravel path,
58:10but are parking so water close
58:10the ground. There. So I don't
58:13know if we're going be
58:16speeding it up or slowing it
58:16down. But we will be getting
58:17the water away from the
58:18street. So most
58:20>> Which direction does that
58:21won't slow?
58:26>> You if you look at age, 61.
58:33>> start point to right.
58:37That's why Mike pointed right
58:37at the other house. That's the
58:42highest low. So the the low
58:43edge of the slow fled the
58:46Below. It a slow kiss on the
58:47West. all cases, we have
58:53corrected the water off the
58:54roofs as far as way from the
58:57stream possible because that
59:00was that in the first go
59:00around. 2024, that was a
59:05comment we received from the G
59:07O s I believe on their word
59:08about speeding up front office
59:10spring. So we designed the
59:12rooms, specifically press
59:13home.
59:22>> Mr. Craig. Them. Yeah.
59:24Through the chair. I just did
59:28some rough numbers. And I
59:29think the lot coverage of the
59:30for The coverage of the house
59:33like 20%. This kind So I if
59:39you like, I just wanted to
59:42kind of more comment. Just
59:44kind of confirm that it's
59:45around 20 and you're allowed
59:4730's who are well under yet.
59:47It's actually 24%. Okay with
59:50Cambridge, EU. So I put tax
59:55reg. To you house 24%. long
1:00:0330%.
1:00:05>> Okay.
1:00:06>> And for our core area
1:00:06ratio.
1:00:10>> 0.5 4.4 Okay. Let's all
1:00:13thank you. Im a good with
1:00:22questions but that he's happy.
1:00:34>> Are there any questions of
1:00:35the applicant by staff? No.
1:00:39Madam Chair, thank you. Open
1:00:42the public hearing so we can.
1:00:45Is there month from the
1:00:46public? Wishing to testify and
1:00:51case 2026 Dash 0, 1, 2, 5,
1:00:52Anyone at all. Please come.
1:00:59I've got a couple of handouts
1:01:02tonight. there a way in which
1:01:02you can take a look that?
1:01:06Start around starts right
1:01:07here. I want
1:01:27Please come
1:01:27forward copy. We'll see what
1:01:30we can What you got. You got
1:01:30and should be an extra.
1:02:05>> Okay. And state and spell
1:02:07your name for the record.
1:02:08Please. You got.
1:02:12>> Good evening. My name is
1:02:13Derek Brewer. And along with
1:02:14my wife's Where the owners of
1:02:17one 51 McGee, Michelle Road
1:02:20number one 2 lived there for
1:02:21over 30 years. Hang on to say.
1:02:24>> Thing.
1:02:26>> Paul has a map. That he can
1:02:32this play that will show us.
1:02:37>> Where you are relation to
1:02:38ever go.
1:02:42>> That was the address again.
1:02:43So one, 51. Yeah. this one
1:02:44right here. That's it. And
1:02:46this is the subject properties
1:02:47for Manos. So these are this
1:02:48is where you're okay. Start
1:02:56again. All right. So we live
1:02:57there. Want to one. We're the
1:02:59adjacent property. Okay.
1:03:13You've got your whole 3
1:03:15minutes ago. Go. All right.
1:03:16Here we are. So if providing
1:03:19you a couple paper, still the
1:03:21straighter points of formal
1:03:22objection to particular case,
1:03:242026. Oh 1.25 Page one, the
1:03:30green boundaries are alyeska.
1:03:31Sarah deputies, existing
1:03:33structure.
1:03:34>> Uses a rental in its red
1:03:34lines are then multiple.
1:03:35Proposed structures. These are
1:03:41self imposed design
1:03:41constraints, petitioners.
1:03:44Hardships in this case are
1:03:44delusional. The applicant is
1:03:49attempting to maximize density
1:03:50on unknown constrained lot by
1:03:52squeezing a larger primary
1:03:53house. A new detached garage,
1:03:59a new and a new covered bridge
1:04:01onto a site that is known to
1:04:02buy sacked stream at the time
1:04:04of purchase. The need for
1:04:08variances driven by
1:04:10architectural ambition, not by
1:04:12an inability to build a
1:04:13reasonable code compliant
1:04:13home. The Petitioner Unknown
1:04:18Project engineer with
1:04:19professional environmental
1:04:20engineering and consulting
1:04:22Company reported that after
1:04:23the purchase, the existing
1:04:26house in the summer of 2021
1:04:29and in the fall, the structure
1:04:30was discovered to have
1:04:31multiple critical functional
1:04:32issues. The most basic of home
1:04:38inspections would have easily
1:04:40have shown these functional
1:04:40issues prior to buy it. And no
1:04:43undue hardship. This place up
1:04:46on that owner. In the ammo. A
1:04:51staff report October first
1:04:522026. With creative designed a
1:04:56lot could potentially
1:04:59accommodate a single-family
1:05:00home, all reducing
1:05:01encroachments into both the
1:05:03stream protection setback in
1:05:04the required building
1:05:06setbacks. The report also
1:05:08noted the property continues
1:05:10existing 10 foot utility
1:05:11easements on the North, which
1:05:12borders our property. I got to
1:05:15speed up. Go to page 2 plays
1:05:16flip the page over the photos
1:05:18we've submitted show recent to
1:05:23get electric power line
1:05:23failure from the summer. Do to
1:05:26high winds and historically
1:05:28unstable year-round, visible
1:05:29wetlands between our
1:05:32properties. The use that you
1:05:33get electric heavy equipment
1:05:34reaching established easements
1:05:37have required unobstructed
1:05:38access. No fewer than 3 times
1:05:39a year. Confirming a staff
1:05:44report observations. The
1:05:47Greene boundaries identify the
1:05:48petitioners. Current residents
1:05:50and the proximity to those
1:05:51power poles. Finally, the
1:05:55water course protections of
1:05:57the multiple code exists to
1:05:59prevent development that
1:06:00compromises watershed
1:06:01integrity, shifting drainage
1:06:03onto adjacent properties.
1:06:04That's our biggest issue. The
1:06:06significant volume of water at
1:06:09the confluence of 2 fish field
1:06:11streams historically crossing
1:06:12that street Northland present
1:06:16serious wrist to adjacent and
1:06:17downstream properties. Thank
1:06:19you for your time. questions
1:06:22and Is there a chance that I
1:06:28can speak briefly for my wife?
1:06:29She doesn't particularly care
1:06:30for public. Speaking very
1:06:31brief. Allowed. Make sure when
1:06:42let's that's getting Mr.
1:06:43Shooting in here. First, I'm
1:06:44sorry to ask you a question
1:06:47show. Go ahead. thank Before
1:06:49you pass the mic.
1:06:53>> Thank you for your packet
1:06:55and for your testimony and for
1:06:57photos of that you got work
1:06:58from this summer. a little
1:07:01familiar with the area, but
1:07:02not super familiar. But you
1:07:05live there generally speaking,
1:07:07would you say that the grade
1:07:11from southeast to northwest is
1:07:12pretty steep? In other words,
1:07:13is it. Is that a 5 e enough to
1:07:17wear? There is significant
1:07:21drainage occurring from north
1:07:21from south to North.
1:07:24>> I would agree with that
1:07:25statement. there is
1:07:25significant. And I think
1:07:29alright. He's gonna can speak
1:07:30to that much better than I can
1:07:31because she's going to be more
1:07:32impacted than
1:07:34>> Okay. And then last
1:07:36question and I'll let testify
1:07:37for your wife.
1:07:42>> The existing easements all
1:07:42have power poles within them
1:07:43now, including the east side.
1:07:46>> Well, you can see him on
1:07:46that picture. Great it out. So
1:07:52ours that runs from. Yeah.
1:07:53There you go. That one runs
1:07:53right there and then that one.
1:07:54And then it goes all the way
1:07:55through, OK, pass to the south
1:07:57side of my house. Ok? Thank
1:07:59Thank you. Yeah. That power
1:08:02pole tipped over hold that 12
1:08:05hours. We're out power
1:08:09>> Yeah. Thank you, sir.
1:08:12You've said that any
1:08:12inspection would have.
1:08:15Revealed the structural
1:08:16deficiencies as that. Is it
1:08:17your assertion they didn't get
1:08:18on?
1:08:25>> I'm not making it a
1:08:26surgeon. What I'm saying is
1:08:28that a person with a
1:08:30construction background would
1:08:31look at welding in the
1:08:32condition that it's an and
1:08:34would it would be suspect to
1:08:36them. I have a construction
1:08:38background. He has a
1:08:40construction background. It
1:08:41would not be a mystery to walk
1:08:42up to that building and the
1:08:44condition that it was and is
1:08:45in. And say there are issues
1:08:49to this building that our that
1:08:53need a deeper look. thank you.
1:09:01Okay. So by the way, no one's
1:09:01integrate disagreement. I
1:09:03don't think that something
1:09:04needs to be done with the
1:09:05House. I. Behind that. So now
1:09:09the size of that house
1:09:13testified Pre-K lie beyond my
1:09:16if you want to testify for
1:09:17your wife, you need to
1:09:18specifically state that you
1:09:19are doing that. And yes, her
1:09:20name. Yeah. speaking on behalf
1:09:23of my wife. Cindy Shake.
1:09:30Slightly different. I'm going
1:09:31switch gears on here. You
1:09:33know, I've been working with a
1:09:34group of people 2 try and work
1:09:40cooperatively West's this
1:09:42issue that we've had. You
1:09:47know, we're we're highly
1:09:48educated group of and
1:09:49everybody's got a Ph D are. We
1:09:50got one person with a Ph D we
1:09:54got multiple people with
1:09:55master's degrees and bachelor
1:09:56degrees and this process as
1:10:00been one of the most
1:10:02frustrating things we have
1:10:03done in a long, long time. And
1:10:04I got some had knots from you
1:10:05guys. Wow. We've got to come
1:10:08up with a better system.
1:10:12Something that simplifies a
1:10:14flow I Q and a portal. I don't
1:10:16know what. Frustrating. Dead
1:10:21ends. It's been a it's been a
1:10:27process. I can't imagine that
1:10:28we're the only ones. I don't
1:10:30know what the answer is and
1:10:32give some suggestions. I'm
1:10:37sure you guys know what I'm
1:10:38talking about. But anyway. Any
1:10:43questions, any other
1:10:44questions? Associated? less
1:10:52question more statement just
1:10:54maybe to help you feel at
1:10:55ease. We did receive comment
1:10:57from your wife. It was
1:10:58included our packet. I think
1:10:59mail comment came through.
1:11:01>> So please don't feel like
1:11:03he didn't have a to voice your
1:11:06opinion. We did see it. Okay.
1:11:08Excellent. Thank you. And you
1:11:08know, you never know who saw
1:11:10Thank you for your time.
1:11:11Appreciate it.
1:11:13>> Anyone else? Wishing to
1:11:15testify. Handouts as well.
1:11:39>> Hello, my name is Nancy
1:11:40A-Rod. 1, 7, initiative road
1:11:43girdwood. 25 years might hang
1:11:47on. I'm civil engineer. I
1:11:48worked on grade and rain in
1:11:50Alaska for 25 years. First, I
1:11:54appreciate that the commission
1:11:55was thus far denied knot
1:11:56variance under Standard H. But
1:11:59in my view, the application
1:12:00also fails to satisfy others
1:12:02banners and continues to fail
1:12:04standards Dnf as it did in
1:12:062024 at that time, the
1:12:07commission described the
1:12:10areas, quote, environmentally
1:12:11sensitive stream area under
1:12:12standard at the principal
1:12:14change now is that the
1:12:15applicant remove the Ripper
1:12:15out from. That in the setback
1:12:20in the stream setback in
1:12:21proposes she piling at the
1:12:23setback boundary as well as in
1:12:24the setback. According to the
1:12:26survey in the application lot
1:12:30survey know 2 states, the
1:12:32unnamed stream with Varys
1:12:33delineated by Emily Watershed.
1:12:37She piling in. This location
1:12:38will constrict the channel
1:12:38flow during storm events in
1:12:40this movie will stream. It
1:12:43looks like about 70 feet. A
1:12:45sheet piles proposed with the
1:12:46hinge point angle to the
1:12:46northwest. There's no way it
1:12:49being on the set back in that
1:12:51it won't end up being in the
1:12:53setback. The applicant just
1:12:54stated that they have thing
1:12:57pretty good idea where the
1:12:57high watermark us I'm not
1:13:01aware of a comprehensive study
1:13:01for watershed. So I mapped it
1:13:06stream corridor between north
1:13:07and a muggy viz, a levy on
1:13:08exhibits, wetland
1:13:08characteristics. And great if
1:13:13someone else would do one. But
1:13:13I think the hydrology is
1:13:15obvious. We are already
1:13:17getting flooding and the
1:13:18photographs I provided
1:13:20documentary flooding that
1:13:21occurred after the recent
1:13:21development. One 72 North Lamb
1:13:24that they are from last year,
1:13:25not 2021, our property is
1:13:28already being devalued. We
1:13:29cannot accept any more water
1:13:30from upstream development.
1:13:32Despite being outside. The
1:13:36stream set back the one 72
1:13:38North Undeveloped has
1:13:39compounded effects of
1:13:40increasingly frequent and
1:13:40unpredictable storms and melt
1:13:41cycles. The commission must
1:13:46assess to impacts and
1:13:47development across the
1:13:48watershed. Although revise the
1:13:51current plan remains nearly as
1:13:51large as original peers move
1:13:55more vegetation, including
1:13:57mature trees reduce flooding
1:13:58in the stream corridor. extent
1:14:01of Phil is unclear. The large
1:14:03shed roof strip lines in the
1:14:05setbacks will just intensify
1:14:06the run off the dime. Design
1:14:07is not improve. This proposal
1:14:09does not comply with several
1:14:12title. 21 requirements,
1:14:13including restrictions and
1:14:15erecting runoff on to Jay
1:14:15since properties. I
1:14:19respectfully ask the board to
1:14:20deny the variance require
1:14:23construction the existing
1:14:23building footprint to protect
1:14:25the stream neighboring
1:14:25properties and downstream
1:14:27infrastructure. This decision
1:14:28is important. Not only to the
1:14:31affected residents and this
1:14:32watershed, but also to the
1:14:35review of future development
1:14:36proposals throughout Girdwood.
1:14:43And then you have, I do have
1:14:44comment from my husband, Larry
1:14:45Siegel of I could do that,
1:14:48too. there's any questions.
1:14:49Thank you. Any questions the
1:14:53Mr. Nicely. I noticed on your
1:15:00drawing here on the front, you
1:15:00have a
1:15:04>> section of the stream that
1:15:06goes off along
1:15:07>> eastern lot line. And yes,
1:15:08it in use along the north lot
1:15:11line. Yes. What is that? Is
1:15:13that another streamer? Is is
1:15:18just something that was drawn
1:15:19in there?
1:15:20>> It is a stream as far as I
1:15:22know. And I think the Brewers
1:15:26might attest to that to runs
1:15:27behind their property and it's
1:15:28got it's about like at least
1:15:3014 inches deep. And it's it's
1:15:35year-round.
1:15:36>> And is that a is that a
1:15:37stream that would be subject
1:15:37to the same setback
1:15:40requirements as it's not
1:15:41because it's on named its top
1:15:42defined by watershed. But in
1:15:46my opinion, it needs to be
1:15:47that whole area needs to be
1:15:48really looked that closely.
1:15:48Cause. You know, I live are
1:15:52they all converge and I see at
1:15:55least 3 define come into the
1:15:56pond where I live. Okay. So I
1:16:01just verifying that that.
1:16:05>> Section of the stream there
1:16:06is based on your research.
1:16:08It's not something that's
1:16:09actually incorrect catalog,
1:16:10but that's reality. Gotcha.
1:16:16Any other question this? All
1:16:17right. Mr. Shooting. Thank
1:16:23you. First, like the previous
1:16:25speakers wanted to let you
1:16:26know that we did receive copy
1:16:27of your of your written
1:16:28testimony as well. So feel
1:16:32heard. appreciate what we
1:16:32definitely appreciate getting
1:16:33those comments. Following on
1:16:37the same lines as Mr. Ma's
1:16:39Lee, you know, the watershed
1:16:41mapping you provide is
1:16:42different than the resources
1:16:44available to us through water
1:16:45shed mapping surfaces or
1:16:46washer, watershed management
1:16:47services.
1:16:47>> Yes, and it sounds like
1:16:51this year this year in
1:16:52Girdwood much like an
1:16:53Anchorage. It was a very wet
1:16:55year with a lot of excess.
1:16:56Snow melt running late to the
1:16:59year. So I know here in the
1:17:00city, certainly we
1:17:01experienced. Flows in places
1:17:03that we didn't. We don't
1:17:05normally so. Is that far East
1:17:12side where the where you've
1:17:13documented the channel on the
1:17:17eastern edge of the property
1:17:18actually into the neighboring
1:17:18property. Is that one? That is
1:17:23more ephemeral, not constantly
1:17:25full of water, but this year,
1:17:25perhaps because of the
1:17:26flooding or that water flow.
1:17:30It was.
1:17:31>> You know, I wouldn't want
1:17:32to
1:17:33>> confirm that. But, you
1:17:36know, I've looked at it a few
1:17:37times and it's always flowing.
1:17:37And I see it. So, yeah, yeah.
1:17:42>> It's a challenge with So in
1:17:44full disclosure, I was part of
1:17:46the original 2018 to rewrite
1:17:47the stream setback codes and
1:17:50one of the most challenging
1:17:55conversations during that
1:17:56entire period was defining
1:17:58what's ephemeral and what's
1:17:58not, because changes year
1:18:01after but but at some point,
1:18:02you know, I think watershed
1:18:06management on the municipal
1:18:08side. Watershed management has
1:18:09done the best they can to
1:18:09present I think what our the
1:18:13known channels, the most
1:18:14frequent channels and so this
1:18:17is certainly supplementary to
1:18:20that. And they're mapping.
1:18:21Doesn't address the downstream
1:18:23impacts you talked about in
1:18:24your presentation about
1:18:25sitting in the pond, a
1:18:26surrogate it's just it's
1:18:29helpful. Thank you to prove
1:18:30that for you to provide this
1:18:31additional information. Mr.
1:18:37Thank you. Am your I
1:18:41appreciate the the drawing
1:18:42that you brought. And I was
1:18:42just wondering, did you?
1:18:47>> Received confirmation from
1:18:48Myshake, Mr. Brewer that
1:18:49believe there's a stream going
1:18:49through as well. I did. All
1:18:51right. Thank you.
1:18:56>> Constant with fish. Okay.
1:19:04And now you want to give
1:19:05testimony for your husband.
1:19:08Oh, state, his name Larry
1:19:10Siegel, 1, 7, 3, mission of
1:19:12Road Goodwood. 25 years. I'm
1:19:18disturbed and saddened by the
1:19:20changes seen in the fish pond
1:19:21during and after construction
1:19:22of the development. One 72
1:19:23Northland, there were piles of
1:19:24still with trash littered in
1:19:26it during the construction of
1:19:27that project. Considering a
1:19:29stream said very is difficult
1:19:32to understand with Gerd Woods,
1:19:34multimillion dollar investment
1:19:35and fish habitat, including
1:19:37the new fish Passage, Colbert,
1:19:40Comedy Road, all trees and
1:19:41other streamside vegetation or
1:19:42central components of that
1:19:43habitat. We are required to
1:19:47upgrade our driveway. Culvert
1:19:49when we replace it to meat,
1:19:49fish. Passions standards. We
1:19:51should not bear that cost
1:19:53because the pros development
1:19:54create additional flooding
1:19:56that Knesset to set
1:19:56replacement. I believe any
1:20:02additional encroachment on the
1:20:03stream setback will normally
1:20:04negatively affect the
1:20:05ecosystem. Construction poses
1:20:08a serious risk to the stream.
1:20:12For stream setback variance.
1:20:14The plan should show runoff
1:20:16and sediment will be control
1:20:17during construction to protect
1:20:19neighboring properties.
1:20:19Photographs taken during
1:20:23construction at one 72 north
1:20:24Linn document said of men and
1:20:24a breeze in the pond showing
1:20:25that the silk fence failed to
1:20:27provide adequate adequate
1:20:28pollution control. The
1:20:31existing building footprint at
1:20:34one 50, not 8 north and is
1:20:35about 35% larger than ours.
1:20:38Our property is nonconforming.
1:20:39As a builder, I believe
1:20:42thoughtfully designed home of
1:20:43thoughtfully designed home can
1:20:44fit within that footprint
1:20:45while remaining compatible
1:20:46with the surrounding
1:20:46environment. The proposed
1:20:52design is not suitable for the
1:20:53lot. Furthermore, the Spurs
1:20:56proposal is disingenuous to
1:20:58tack spares and funding
1:21:00agencies that are investing in
1:21:03fish habitat and girdwood. I
1:21:04respectfully urge the board to
1:21:05deny the stream setback
1:21:05variance and allow no further.
1:21:07Phil vegetation removal within
1:21:08the setback. Thank you. Any
1:21:15questions for the husband, Mr.
1:21:16Segal. Mr. Shooting. Thank
1:21:21you. feel like I'm not placing
1:21:24I'd like to just ask for some
1:21:26clarification on the statement
1:21:27you read on behalf of your
1:21:31husband.
1:21:31>> Are were you were for it
1:21:32for the new construction
1:21:34impact that you describe. Are
1:21:35you referring to 1, 7, to
1:21:38Northland on your? But yes,
1:21:39right. And so this is updated
1:21:40the applicants application has
1:21:44>> historical. The other house
1:21:45that was there. So that
1:21:47probably should be updated.
1:21:49But that is correct. That's
1:21:50how it looks now.
1:21:56>> Any other questions? No one
1:22:04else wishing to testify in the
1:22:04case. 2026. 0, 1, State and
1:22:12spell your name for the
1:22:13record. Please. Will Brennan?
1:22:17>> I live on 1, 5, 3,
1:22:18Northland Road across the
1:22:18street. want to speak today
1:22:30about why the request of
1:22:31variances are not the minimum
1:22:33required for reasonable use of
1:22:34the affected property. And
1:22:36he's not similar to other
1:22:37developments in the
1:22:38neighborhood. Why any
1:22:40perceived hardship the
1:22:40petitioners faces, in fact,
1:22:42self-imposed. Why would not be
1:22:43prudent for your board to
1:22:44issue these variances? The
1:22:48petitioner proposes to
1:22:49construct 4700 square feet of
1:22:50living space within 5300
1:22:51square feet of building area
1:22:52on their constrained law. My
1:22:55wife and 2 kids and I lived
1:22:55full-time across the street
1:22:57and 1500 square foot home.
1:23:00Currently the largest home on
1:23:01Northland Road has 2600 square
1:23:02feet of living space on the
1:23:04property. There's currently
1:23:05only to you on our street and
1:23:07it is a small mother-in-law
1:23:09basement apartment proposing
1:23:10to construct well twice the
1:23:11size of anything on our street
1:23:12is not the minimum reasonable
1:23:13use of the property. This is
1:23:16especially true when factoring
1:23:17in the site constraints new to
1:23:18this lot. To build the largest
1:23:21home in the neighborhood on a
1:23:22lot with the constraints is
1:23:23not reasonable. While the
1:23:25existence of the creek is not
1:23:28self-imposed purchasing the
1:23:30slot with the plan to develop
1:23:30to the scale is self-imposed.
1:23:33The petitioner claims that
1:23:34when they purchased the
1:23:34property in 2021, the intended
1:23:35to simply renovate not
1:23:38realizing the structural
1:23:39deficiencies would require a
1:23:39full rebuild as currently
1:23:41proposed. I remember when this
1:23:42property come up for sale, it
1:23:43was clear as day that both the
1:23:46homeless structurally
1:23:47deficient and the existence of
1:23:47the creekwood significantly
1:23:49affect the options for
1:23:52reconstruction. The Zillow
1:23:53listing still viewable online
1:23:53and the photos paint a
1:23:54picture. The seller even
1:23:56stated in all caps, cash only
1:23:57offers one can imply why the
1:23:59petitioners, a license of
1:24:01winds near it stretches
1:24:03credulity to suggest they did
1:24:03not understand what they're
1:24:04purchasing. Furthermore, it is
1:24:08particularly unreasonable to
1:24:09issue these variances in this
1:24:10location. This property is
1:24:10situated at the base of
1:24:12Alyeska home of unique
1:24:14microclimate the mix. This one
1:24:15of the snowiest and wet us
1:24:16neighborhoods in the country
1:24:18go to experiences. Extreme
1:24:19weather events with increasing
1:24:21regularity. This proposed
1:24:22development seems disregard
1:24:24that fact constructing a new
1:24:25home on this property is not
1:24:27unreasonable. Constructing
1:24:27this home on this property is
1:24:28unreasonable. The petitioner
1:24:32could construct a home
1:24:33similarly sized to all others
1:24:33on our street without seeking
1:24:353 variances. Look at the
1:24:36architectural drawings of this
1:24:37home. It clearly is not the
1:24:40minimum reasonable use of this
1:24:42property. The extreme shape of
1:24:43the home gives away the game.
1:24:45Their intention is to build to
1:24:47the maximum extent possible.
1:24:47And then some building within
1:24:503 setbacks and right up to the
1:24:51boundaries of all other
1:24:52setbacks on this particular
1:24:53lot with these environmental
1:24:55factors is unreasonable. It
1:24:59sort of put the petitioners
1:24:59requesting to construct a 10
1:25:00pound home on an 8 pound lot.
1:25:02Your board should deny this
1:25:04request doing so does not
1:25:05preclude the petitioner from
1:25:06constructing on the property.
1:25:08It only not just them to
1:25:09construct something reasonable
1:25:11taking into the account, the
1:25:12constraints of the property
1:25:12that they purchased. Any
1:25:16questions to Mister Burr, Mr.
1:25:18Mosley. Thank you, sir.
1:25:24Appreciate you coming in today
1:25:24and telling us about this.
1:25:27>> Would you categorize your
1:25:29objection? Mostly to the house
1:25:30and the size of the House?
1:25:34>> The addition of the garage
1:25:35in a and covered bridge.
1:25:37>> I would. I would saige up
1:25:39to all that.
1:25:42>> The ad you will be
1:25:45>> within the front and side
1:25:46setback there's nowhere to
1:25:50park. Yeah. So presumably
1:25:51there's going to be too. 3
1:25:53full-time residents there. 2,
1:25:57maybe to renters. And they do.
1:25:58You family in the primary
1:25:59home. There is no parking.
1:26:02There's a garage and the only
1:26:02other place to park is
1:26:04immediately in front of the
1:26:05garage there by what your
1:26:06tenants are going to block the
1:26:07primary residence. The you
1:26:08have to ask them move every
1:26:09time. The only one where the
1:26:10park is in the street, the
1:26:13street that, you know, my kids
1:26:14playing that I have to backing
1:26:15out of my driveway. There's
1:26:17nowhere for left for snow
1:26:19storage. The only place to
1:26:19reason we store snow with
1:26:20design is either in the creek
1:26:22exacerbating the hydrologic
1:26:24issues or on my property or
1:26:26one of the other neighboring
1:26:29properties. The home's size is
1:26:30totally uncharacteristic of
1:26:31the neighborhood and again,
1:26:32unreasonable looking up the
1:26:34lot. mean, it's clearly has
1:26:36site constraints and they're
1:26:37just trying to figure out
1:26:38every possible way too. Work
1:26:42around the constraints
1:26:44unreasonable. I'm also
1:26:46concerned about the hydrologic
1:26:46effects. I am upstream but,
1:26:49you know, I fought all winter
1:26:53building up a little temporary
1:26:54dams to keep overflow from
1:26:55hitting my slap. I understand
1:26:58my downstream neighbors, their
1:27:00concerns, the fact that this
1:27:01is a a covered enclosed bridge
1:27:07again, we're at the base of
1:27:08alyeska. There's extreme surge
1:27:10events melt, rain and snow
1:27:11events if typically during a
1:27:15surge event, water would
1:27:17overflow the decking of a
1:27:18bridge in this situation. I
1:27:19don't know what would happen.
1:27:20It's attached the 2 dwellings
1:27:20that turn into a dam that
1:27:22backs up onto the road. I've
1:27:24heard no, there's there's
1:27:28there's no way for me to know.
1:27:28As a non expert, whether or
1:27:31not that would be concerned
1:27:32but seems concerning to me.
1:27:34Yeah, there's I have plenty of
1:27:37reasons to be opposed to this.
1:27:40Okay. And just in fairness to
1:27:42the applicant, the drawings
1:27:43that we have show the garage
1:27:44and a D U.
1:27:48>> Encroaching into the side
1:27:48setback but not necessarily
1:27:51different. Said.
1:27:51>> I know the drawings that
1:27:52you have your fear looking at
1:27:54the most recent drawings they
1:27:55encroach into both the front
1:27:55and the set. So there's
1:27:59nowhere to store snow. There's
1:28:00nowhere to store vehicles
1:28:00except blocking other
1:28:01vehicles.
1:28:06>> Any other questions, Mr.
1:28:07Brennan, Mr. Shooting. Thank
1:28:09you for coming down.
1:28:12Appreciate that. I also
1:28:13appreciate your acknowledgment
1:28:14that you're not an expert
1:28:15either. My but you live there
1:28:16and you've got eyes. And so I
1:28:17want to ask you about your
1:28:18observations. Are the past
1:28:20winter.
1:28:20>> It's my understanding that
1:28:21there is currently a bridge of
1:28:24some kind, a walkway elevated
1:28:28walkway that connects from the
1:28:28current home to the gravel
1:28:29pat. Is that correct? Correct.
1:28:33And this past winter, which we
1:28:36all know was spectacular. Did
1:28:37you observe any of the damning
1:28:39situations like you described
1:28:40that are possible? At that
1:28:42property? In other words, it's
1:28:46almost like a foot bridge,
1:28:48right? Currently gathered
1:28:49birds that were there. Those
1:28:53surges where water would back
1:28:55up during may be one of the
1:28:56rain, rain and snow events in
1:28:58and that foot bridge caused
1:28:59any sort of damning in its
1:29:00current condition. I did not
1:29:02see that this winter. I will
1:29:04say the bridge has been
1:29:06relocated within the last 2
1:29:08years. sure there's been
1:29:09issues over the years, but no,
1:29:10I didn't see any sort damning.
1:29:11But again.
1:29:11>> The current bridge is open
1:29:14air. If there was any sort
1:29:15surge, it could floor over.
1:29:16What I'm concerned about is,
1:29:20you know, those fully enclosed
1:29:20on 3 sides words ago except
1:29:21upstream onto the road and
1:29:24also state for the record, the
1:29:28you know, all Anchorage
1:29:30experienced, you know, more
1:29:31precipitation from
1:29:31understanding that the typical
1:29:33winters Alyeska actually had
1:29:34its second lowest snow year on
1:29:35record. Going back into the
1:29:3760's. So all we had a cold
1:29:40winter and we're dealing with
1:29:40ice overflow. We didn't have
1:29:41as much water as is typical.
1:29:42So other years it could be
1:29:46much different than what we're
1:29:47already dealing with this
1:29:47winter. Any other questions
1:29:51Mr. Brennan?
1:29:57>> Anyone else wishing to
1:29:57testify.
1:30:07>> State your name for the
1:30:08record. Please show Hello. My
1:30:09name is Mike Edgington. That's
1:30:10G I N G to it. I'm also a good
1:30:15rest not an immediate
1:30:16neighbor. You'd have to zoom
1:30:17out a little about said of the
1:30:18mile foot of a mile.
1:30:19>> To the Southeast Southwest
1:30:20from that. I served and a half
1:30:26years on that could double to
1:30:28supervise with responsibility
1:30:29for land use and housing
1:30:31policy. So I've got a lot of
1:30:32interest in topics that come
1:30:33up tonight. As I said,
1:30:37probably thousands of times
1:30:39during 2 months since
1:30:40Anchorage is a good. He's not
1:30:42Anchorage. We have about 2 and
1:30:43a half times the rainfall.
1:30:44Anchorage bould us the not
1:30:47very funny joke about good is
1:30:48everywhere. Inside the 2, 2
1:30:49steeple too wet to build.
1:30:54There's about 60 square miles
1:30:57catchment. Aaron. The
1:30:58watershed funneled into a very
1:30:59narrow valley. So they're all
1:31:01streams everywhere. I have a
1:31:03stream dissecting property. I
1:31:04was very surprised to hear.
1:31:05It's unusual because I would
1:31:05say it's pretty common. A tree
1:31:06in this area. While this
1:31:10specific diagonal aspect to
1:31:11that stream is so unusual,
1:31:13having streams crossing
1:31:13properties. Very common. The
1:31:15thing that rain, is very
1:31:17common, both in terms of
1:31:19private property impact to
1:31:20those 2. The impact local
1:31:23roads. And I know this is area
1:31:24where there's been history of
1:31:25problems in both. I was also
1:31:29like Mr, Shooting those who
1:31:30very involved in the 2018
1:31:33rewrite. Strip setback with my
1:31:34my focus was the impacts
1:31:35within good. And what I recall
1:31:39the prior code basically said.
1:31:41Even if you have existing
1:31:43structure, you base the
1:31:44kennel, it impacts stream
1:31:45setbacks. The the new code
1:31:48strikes. I think a very nice
1:31:50ball game. It says you can
1:31:52still impact if you have a
1:31:53structure which impacts that
1:31:54backs in part to stream
1:31:56setbacks. As long as you make
1:31:58a net you can still basically,
1:32:01you know, do that. You can
1:32:02still impose that. You can
1:32:05still have encroachment as
1:32:05long as there is a net
1:32:06benefit. I think that's a
1:32:10great dog. And I think that's
1:32:12enabled a lot construction
1:32:14within good. But of course,
1:32:14that's not what's happening
1:32:15here. What's happening here.
1:32:16But previous speaker said the
1:32:22the intent to absolutely
1:32:23maximize the size the
1:32:24structure of this is what
1:32:25500,000 square feet is by far
1:32:26the largest structure in that
1:32:28area. One of the largest in
1:32:29that you all to Sunday require
1:32:36To maximize that structure
1:32:37size is what's causing these
1:32:38problems. That's what's
1:32:39leading to the variance
1:32:40request is nowhere close I
1:32:43would say reasonable use the
1:32:45land. One final thing I'd like
1:32:49to say is I heard a lot of I
1:32:51think probably the majority of
1:32:52the applicants. Testimony was
1:32:56about aspects of housing and
1:32:56how it could meet housing.
1:32:59Absolutely true. And I have no
1:33:02question I've no doubt in the
1:33:03sincerity of that that
1:33:04applicant, I put that dozens
1:33:06of times as well in nearly
1:33:08every single case when an
1:33:09applicant has come for
1:33:10variances conditional, use
1:33:12what that resulted in what
1:33:13we've seen at the end is a
1:33:13very large empty home. Second
1:33:17home, short-term rentals.
1:33:17That's just what happens in
1:33:19good. Very last point I
1:33:22actually wrote the code.
1:33:24That's a nice to shoot.
1:33:25referred to only about to you.
1:33:28>> Height restrictions. If
1:33:28there are new questions about
1:33:29reasons for that. So the
1:33:30justification of happy to
1:33:31those. Thank you. Mr. Friend.
1:33:45Mr. Shooting. Now it is that
1:33:49down. really like to ask him
1:33:50questions. Come on, Mike, get
1:33:51away that easy. The first
1:33:56one's an easy one. Just thank.
1:33:56Thank you for first. Yeah.
1:34:00Just to clarify, you're
1:34:01opening description of your
1:34:02pet of your previous rules.
1:34:03You're no longer on Okay? My
1:34:06friend of Times. was going to
1:34:11ask you a question about the G
1:34:11boss letter, but I guess I
1:34:13can't you know you can also
1:34:13buy don't have the outset.
1:34:19Questions. Thank, you know,
1:34:22think, you know, you. are
1:34:24steps. Anybody else wishing to
1:34:27testify. We came
1:34:53Does the
1:34:53staff any rebuttal? And, you
1:34:58know, Madam Chair. Does the
1:35:03applicant have any rebuttal? I
1:35:04think 2 minutes left.
1:35:14>> So with regards to our
1:35:15neighbors, we appreciate their
1:35:16comments and their concerns.
1:35:18And we we want to be good
1:35:20stewards of this property and
1:35:20for neighbors as well. The
1:35:24property at one. 73 make Eve.
1:35:29She had indicated that her
1:35:30place is smaller than our
1:35:31existing place right now,
1:35:32which is incorrect. Our
1:35:34current structures, 1128
1:35:39square feet of living space
1:35:39and her says 1824 and I'd also
1:35:47like to mention there was
1:35:48comment about the power poles
1:35:50failing or power lines
1:35:52failing. Actually our
1:35:55neighbor's tree cotton wood
1:35:56fell over onto the lines and
1:35:58took electrical lines out onto
1:36:00our property and ripped are
1:36:02electrical box off or tenant.
1:36:06That's currently Rodin. And
1:36:07you should have an email from
1:36:08them since we bought the
1:36:09property. And 21, we have not
1:36:13spent one night in our
1:36:14property. We rented it out
1:36:16long term to hardwood and
1:36:20people and girdwood employees
1:36:22workforce. We're there to
1:36:23support girdwood and we don't
1:36:24want to take any housing away
1:36:26from hardwood, but we would
1:36:27also like to be able to enjoy
1:36:28the property ourselves with
1:36:32regards to our neighbor across
1:36:34the street and the setback
1:36:36that we're asking and that
1:36:37front, it's actually from what
1:36:41we understand 20 feet from
1:36:42where the garage door would be
1:36:43to the edge of that, the road
1:36:46where it's built right now.
1:36:49And so there would be room for
1:36:50us to have off road parking as
1:36:54well as a kind of triangulate
1:36:57right there. So it gives a
1:36:57little bit more space onto our
1:36:59property to park cars. Again,
1:37:02we we want to be good stewards
1:37:03of this. We will. We
1:37:07experience constructing art.
1:37:09We will clean up our trash. We
1:37:11are not people that go in and
1:37:13just let our contractors trash
1:37:15our areas and leave trash
1:37:16behind.
1:37:17>> We will be.
1:37:25>> Let him finish.
1:37:30>> It's so I mean, we just we
1:37:34understand that, you know, our
1:37:38neighbors are worried about
1:37:39the impact that are billed
1:37:41going to do. But we are. We've
1:37:42studied yet. We've worked long
1:37:44and hard with the
1:37:45municipality. We've done
1:37:48everything that's been
1:37:48requested of us to try to
1:37:50minimize any impact on our
1:37:51neighbors. And this area and,
1:37:54you know, again, with the
1:37:56construction we used Willow
1:37:59Ridge before and our property
1:38:01was pristine and we went to
1:38:03the build as well, our self
1:38:04and cleaned up if there was
1:38:06any trash on, you know, our
1:38:09property. We have high
1:38:11standards for this build and
1:38:14we want to make sure that, you
1:38:15know, we don't impact our
1:38:16neighbors downstream or
1:38:18upstream. Or across the
1:38:23street. That's not what we
1:38:23want to do with this bill. We
1:38:24just want to be able to, you
1:38:28know, build responsibly and
1:38:28enjoy this property. And we've
1:38:30got at extreme hardship more
1:38:34than neighbors, you know,
1:38:37around us because our property
1:38:39is dissected with a creek
1:38:40right down the middle of it.
1:38:49Not unless somebody wants to
1:38:52hear it, Mr. Bennett would
1:38:53like to hear Go ahead.
1:38:57>> as far as the streams
1:38:58outlined in this diagram.
1:39:03Watershed management, Kyle
1:39:04Cunningham came to the site in
1:39:04May 2024. and purposely picked
1:39:08a month. The pipes. Wow.
1:39:12Access mountain snowpack melt.
1:39:14So we Piccolo Loeffler monthly
1:39:16pick a high flow month. Cal
1:39:19Cunningham walked the entire
1:39:20site and marked out the high,
1:39:22ordinary high water mark and
1:39:25as a result of that effort,
1:39:28the stream actually became
1:39:28whiter than what we had
1:39:30previously been looking at,
1:39:34because it was we're looking
1:39:34at the original surveyed
1:39:38mapping. And then once we
1:39:38surveyed in that actual
1:39:39ordinary high water mark, the
1:39:44encroachment on of the stream
1:39:45on the right originate 50
1:39:47people. I-25 feet either side.
1:39:51Now it varies. And in some
1:39:53places, it's much more than 50
1:39:53people And so we actually lost
1:39:58a significant amount of
1:40:01buildable area as a result of
1:40:03that mapping effort that we
1:40:05voluntarily yet Kyle
1:40:05Cunningham. So that's our
1:40:09comment to this is that we've
1:40:10done this. I you know, I don't
1:40:13doubt that there's a fair
1:40:16streams that pop I mean, I
1:40:17live in Garner died looking
1:40:17car, but 60 years I've seen
1:40:24streams everywhere. Some
1:40:25sometimes that there's some
1:40:26things that are not You know,
1:40:29the streams, we as builders
1:40:32developers, designers have to
1:40:35go with what watershed
1:40:36management tells us.
1:40:40Otherwise, it's just flat out
1:40:40moving target that you can
1:40:41never. And down. I so almost
1:40:44impossible standard to live
1:40:45with. And then the only other
1:40:49comment I had on this document
1:40:51is that.
1:40:51>> These are very old
1:40:53diagrams. The impact on the
1:40:56site is much less are
1:40:56proposing now shown on that
1:40:58Iran and also. The Greene try
1:41:01rectangle or rectangle around
1:41:06existing going doesn't show
1:41:07front we're proposing private
1:41:11deck the exact same location
1:41:12and size. That's what's there
1:41:13now. So just little bit
1:41:18misrepresented have if you go
1:41:19to. 56 of staff report. You
1:41:24can see the actual pot all
1:41:34right to close the public
1:41:34hearing. And the matter rest
1:41:37of the board.
1:41:41>> So there's been some
1:41:41question about how we're going
1:41:42to address this.
1:41:44>> And
1:41:45>> We're going to take each.
1:41:48>> Variance one of the time.
1:41:50Unless I have. Ocean. To do it
1:41:56otherwise. Mr.
1:42:00>> No didn't. Any little bit
1:42:03of looking real quick. I think
1:42:07if I understand the question,
1:42:09Miss Mr. Ryan Bennett opposed
1:42:09it was with variants, one
1:42:12having and and And therefore
1:42:16the 4 and a half foot on the
1:42:16houses. Tied to. The garage
1:42:21and 80 you request as well.
1:42:25What what I'm a proposed,
1:42:28should someone moved and
1:42:29second, someone then could
1:42:30move to divide the question so
1:42:31that they could be taken up
1:42:32separately. Thank you. I make
1:42:39a comment. Okay.
1:42:43>> My comment was for the and
1:42:44is basically. You can divide
1:42:48the variances and take them
1:42:49individually. But if you're
1:42:50going to write a statement.
1:42:53Variance, one, you have to
1:42:55include you can't break that
1:42:56down less. You're going to
1:42:56make a whole new motion. A new
1:42:58variants and justify to get in
1:42:59a different manner. That's my
1:43:03objection is that it's not
1:43:04about variances 2, though, I'm
1:43:05surprised that they were
1:43:06written in this way. Variance
1:43:11one has the and in it and
1:43:12thing you have to take it as
1:43:12it as it states. And vote on
1:43:16it and that in this sense of
1:43:17voting on a single variance
1:43:18variance, one. And then if you
1:43:21wanted fly that. 2 others,
1:43:25criteria to the others
1:43:26variances. Then that's your.
1:43:31That's a choice that each
1:43:31individual can make. But as
1:43:36far as a variant as it's
1:43:37written, you have to take that
1:43:39as as whole. I think unless
1:43:40you're going to make a little
1:43:41emotion inevitable, start the
1:43:41process again from scratch.
1:43:43The way the I speak of this in
1:43:48terms of the public
1:43:49parliamentarian here as
1:43:50opposed to a membership. And
1:43:52just minutes.
1:43:56>> I think we have to. Realize
1:44:00what the place of Robert's
1:44:01rules is in our procedures.
1:44:05It's it's. Secondary to what
1:44:08it says in the code. And it
1:44:13specifically states that in
1:44:13the code that if it's that the
1:44:17code rules and if if if
1:44:18there's something the coach
1:44:20doesn't address, then we'd
1:44:20fault. Robert's rules of
1:44:22order.
1:44:25>> So you're going to take
1:44:26various women divided into 2.
1:44:29Variances address them
1:44:30individually know.
1:44:32>> I'm just stating. Robert's
1:44:36rules. applies within the
1:44:40code. Mr. first So can make a
1:44:52motion at this time. If you're
1:44:55going to make a motion wait,
1:44:56OK? Mr. Doris, thank you,
1:45:03ma'am.
1:45:04>> going to turn to Page one
1:45:0430 here. Section 5, if a
1:45:11pending main motion are
1:45:12pending amendment contains 2
1:45:13or more parts capable of
1:45:14standing a separate questions.
1:45:17The assembly can vote to treat
1:45:19each part individually in
1:45:21succession. Such a course is
1:45:23proposed by the motion of a
1:45:23division of a question. And it
1:45:27would be my assertion for
1:45:29variants one given the and and
1:45:33for them being 2 different
1:45:34encroachments from 2 different
1:45:36structures. Robert's rules.
1:45:38This could be a split
1:45:38question. Divided question.
1:45:40Well, thank you. And we can do
1:45:42whatever we want to do. So
1:45:42correct. But but the
1:45:47parliamentarian was very
1:45:47concerned about Robert's
1:45:48rules. So I thought I support.
1:45:52>> I want to read your book
1:45:52later Note later on later on
1:45:53later on.
1:45:54>> Mr. Beazley. Positive
1:45:56emotion.
1:46:00>> I wasn't going address the
1:46:03question at this time. What I
1:46:03was going to do was to get
1:46:06some clarification on how
1:46:07we're going to address this
1:46:10issue. My motion would be to
1:46:12treat the application is one
1:46:13question.
1:46:16>> All 3 variances as one.
1:46:20Well, you can make the motion
1:46:20and will can vote on it. If
1:46:21that's second, Well, he could
1:46:34make the motion we can vote
1:46:35on. We can discuss vote on it.
1:46:39Is there a second? I seconded.
1:46:43Okay. It has been moved and
1:46:45seconded. That will take all 3
1:46:45variances. Any discussion. Mr.
1:46:52Shooting.
1:46:56>> Yeah, thank I no offense to
1:46:57my colleagues, but I do intend
1:46:58to vote against this because I
1:47:00do think there's greater
1:47:01utility in considering the
1:47:01variance request individually.
1:47:04but the offense park.
1:47:07>> Any other discussion? So.
1:47:17It has been moved and
1:47:18seconded. That we take all 3
1:47:21variances as one. Will the
1:47:28maker of the motion please
1:47:29speak to your motion, Mr.
1:47:29Beazley.
1:47:32>> Yes, I think it gets. I
1:47:34think it gets overly
1:47:36confusing. When you have a
1:47:38single application with
1:47:39several parts to it and you're
1:47:42not considering the
1:47:42application as a whole. It
1:47:45would almost be like if there
1:47:49was a a 5 foot encroachment.
1:47:53And we said no, it can't be 3
1:47:55feet. And it's it's
1:47:59contradictory to the
1:47:59application itself. To break
1:48:03it down into its individual
1:48:07parts and try you know, try to
1:48:10create something of our own
1:48:13construct. That wasn't the
1:48:14intention of the application.
1:48:17In my mind, the application
1:48:18was submitted for the whole
1:48:19package was submitted for
1:48:22that. increase in the house,
1:48:25it was considered for the
1:48:27covered bridge and it was
1:48:29considered for the garage with
1:48:31the atu. And in my mind that
1:48:34comes package. And it's not a
1:48:37piecemeal pick and choose sort
1:48:38of situation. Mr. Brent
1:48:42Bennett.
1:48:45>> really nothing to add. And
1:48:48second to make sure we could
1:48:49get a vote on it.
1:48:52>> Any other Mars?
1:48:54>> Thank you, I respect, Mr.
1:48:59Ma's position here. I think I
1:49:00will be against. And the
1:49:02reason for that is I do think
1:49:05that there is utility and
1:49:06taking these one by one. And
1:49:11specifically if we were to
1:49:12split question one. And the
1:49:13reason for that is if you look
1:49:14at the proposed house. The
1:49:18actual encroachment into the
1:49:18stream setback is very, very
1:49:19small amount. There are other
1:49:23parts of the property. Other.
1:49:27In comments, if you will. That
1:49:28May 1 million for have much
1:49:29larger impacts. And that may
1:49:34not meet the intent of the
1:49:35criteria by which we're
1:49:36supposed to judge these. So I
1:49:40think that in doing so you're
1:49:41taking one portion which meet
1:49:45all the criteria and mixing it
1:49:46with other portions that may
1:49:47not. And that may lead you to
1:49:49a decision with impact upon
1:49:52the petitioner. So I'll be
1:49:53against thank you. Any further
1:50:01discussion.
1:50:04>> Jennifer, Ready for the
1:50:05question question is. adoption
1:50:08of the motion to consider all
1:50:123 variances as one action. The
1:50:14yes vote. Well, consider them
1:50:19all as one and a no vote will
1:50:19not.
1:50:392 for the affirmative for
1:50:41for the negative. So the
1:50:41motion fails. And we move on.
1:50:46Now. We're going you want to
1:50:49split first Robertson.
1:50:55>> Roberts requires the main
1:50:57motion to be made first and
1:50:58then you can split. we need to
1:51:01make a motion. And then I
1:51:02would move to split. Ok, Mr.
1:51:08Nurse, I'm Make a
1:51:14>> 2 proving I was looking for
1:51:19my my language here. I'm
1:51:25moving case 2, 0, 2, 6, Dash,
1:51:300, 1, 2, 5, 2, approved a
1:51:31variance from AMC 0, 7, 0, 2,
1:51:350. 9.
1:51:36>> Table. 2, 1, 0, 7 Dash one
1:51:40minimum stream setback with
1:51:41her side to allow the existing
1:51:43structure with proposed
1:51:43addition to encroach 4.5 feet
1:51:48and the proposed detached
1:51:49garage with an ad you to
1:51:51encroach 14 feet into the 25
1:51:52foot stream setback. Subject
1:51:55to come to the condition shown
1:51:56on Page 6 of the staff report.
1:51:59>> And seconded by Mister
1:52:00Shooting. It's been moved and
1:52:03seconded that grant a variance
1:52:08to allow the 60 structure with
1:52:10proposed addition to a Crouch.
1:52:134 point. But the the proposed
1:52:15detached garage with an ad you
1:52:16to encroach 14 the into the 25
1:52:18foot stream setback. Mr.
1:52:24Doris, we speak your motion.
1:52:27>> Yes chair. I will. And I
1:52:28move to split the question.
1:52:30With separate variances
1:52:35praline to the proposed
1:52:35addition to encroach 4.5 feet.
1:52:40And then the second part would
1:52:42be the proposed detached
1:52:43garage with an ad you to
1:52:44encroach 14 feet into the 25
1:52:45foot train set back. Okay. I
1:52:49will second that. Okay. It was
1:52:51second. Mr. Shooting you want
1:52:54to.
1:53:11>> You want? has been moved
1:53:12and seconded. That we
1:53:15consider. Splitting. The
1:53:21motion into 2 separate parts.
1:53:31Mr. Norris, will you speak
1:53:32your motion? Yes. Thank you.
1:53:35Chair.
1:53:36>> I do believe that these are
1:53:37separate questions. They are
1:53:40separate structures with
1:53:41separate benefits and separate
1:53:43impacts. I do believe that in
1:53:47relation to the criteria which
1:53:50are proposed, that should be
1:53:51considered separately as it
1:53:54may render a different
1:53:55decision when they are and
1:53:56maybe more equitable for the
1:53:58outcome for everyone. Thank
1:53:58you.
1:54:02>> Mister shooting.
1:54:06>> Thank In addition to the
1:54:06comments made by the mover,
1:54:09I'd also like to highlight
1:54:12that the applicant and their
1:54:14original application also
1:54:16bifurcated the home in the Atu
1:54:17in their application for
1:54:18relief. And so while the staff
1:54:22packet in the presentation
1:54:24today Consolidated both the
1:54:25atu garage structure in the
1:54:27House into a single request
1:54:29for a variance. The original
1:54:30application had them listed
1:54:31separately. So I feel
1:54:33comfortable in considering
1:54:34each one individually we're
1:54:37not straying too far from the
1:54:38original intent of the
1:54:38application. Thank you. Any
1:54:41other discussion.
1:54:47>> Okay. So it has been moved
1:54:48and seconded to buy for Kate.
1:54:50>> The
1:54:50>> variants number one. And
1:54:56>> consider the existing
1:54:57structure with proposed
1:54:58addition to it Crouch. 4.5
1:55:01feet and a second action. To
1:55:06consider that they catch
1:55:06garage with a to you. Is there
1:55:16any further discussion not?
1:55:18>> The yes vote will split.
1:55:22The variance request and no
1:55:24vote will. Keep the variance
1:55:29request as one. Please vote.
1:55:536. Yes votes. So we're going
1:55:54to take them separately. Back
1:55:58to Mister Norris.
1:56:03>> Yes, chair. I would move to
1:56:04approve. I Yeah. Move to
1:56:09approve and case 2026, 0, 1,
1:56:142, 5, to approve variants from
1:56:15AMC to one 0, 7, 0, 2, 0. Be 9
1:56:17table. 21 0, 7 Dash minimum
1:56:20street setback with her side
1:56:23to allow the existing
1:56:24structure with proposed
1:56:25addition. To encroach 4.5
1:56:28feet. Subject to the condition
1:56:32shown on Page 6 of the staff
1:56:33report. Thank you. And while
1:56:40Lori's catching up, I'll go
1:56:41ahead and make that second.
1:56:43Mr. Shouldn't.
1:57:15Mr. Turner's
1:57:15moved.
1:57:20>> You just hit the move. But
1:57:25moved and second. Mr. please
1:57:32speak your motion.
1:57:35>> Yes chair. Thank so on the
1:57:39motion before us, we are
1:57:40considering a very small
1:57:43triangle shaped piece of the
1:57:46main structure and to walk
1:57:47through the approval criteria.
1:57:49I will note that. Variants one
1:57:53as originally proposed met
1:57:57everything except for H where
1:57:59it was partially met. And I
1:58:03will make the assertion that
1:58:05motion as amended our
1:58:07currently stated for that very
1:58:08small portion. In the stream
1:58:09setback. Does meet. H so as my
1:58:17assertion now that all of
1:58:18these criteria are met for the
1:58:20motion before us. Thank you.
1:58:24Mr. Shooting. Thank As
1:58:32similarly has similarly came
1:58:33to the same findings as Mister
1:58:35Norris.
1:58:36>> I do want to point out one
1:58:40of the interesting things
1:58:43about this case is despite the
1:58:45preponderance of water flowing
1:58:47in girdwood parcels as heard
1:58:48from multiple testifiers
1:58:49tonight. I do think that this
1:58:51one in particular is a very
1:58:54unique condition by suspected
1:58:55in a way that does make the
1:58:56site almost on developable.
1:59:00And because of that, I really
1:59:03feel like that is particularly
1:59:05was met and C were met firmly.
1:59:11And so I encourage everyone to
1:59:12to support it.
1:59:23>> Any other discussion?
1:59:28Seeing none? It has been moved
1:59:32and seconded.
1:59:34>> Some you know, they're
1:59:35already did that.
1:59:39>> Any further discussion
1:59:41discussion? If we're ready for
1:59:43the question. And the question
1:59:47is to allow the existing
1:59:49structure with the proposed
1:59:50addition to encroach 4.5 feet.
1:59:55Into the stream setback,
1:59:58subject to conditions shown on
1:59:59Page 6 of the staff report. A
2:00:00yes vote. Will grant the
2:00:04variance. A no vote will deny
2:00:05the variance. Please vote.
2:00:29Affirmative votes. No negative
2:00:31votes. The variance has been
2:00:31granted. Mrs. No, yeah. Make a
2:00:40motion for that. The positive
2:00:43motion for the 2nd half of
2:00:46happy to do so.
2:00:49>> I'm moving case 2, 0, 2, 6
2:00:52Dash, 0, 1, 2, 5, 2, approved
2:00:53a variance from AMC to one
2:00:57Ducks. 0, 7, 0, 2, 0. Be 9
2:01:00table to one Ducks. 0, 7 Dash.
2:01:02One minimum stream setback
2:01:03with her side to allow the
2:01:06existing structure with
2:01:07proposed addition to encroach
2:01:084.5 feet and
2:01:14>> pollen counts. We've
2:01:15already done that part. Yes,
2:01:18sorry in command per side. Her
2:01:25side for the proposed detached
2:01:27garage with an ad you to
2:01:29encroach 14 feet into the 25
2:01:31foot stream setback. Subject
2:01:33to conditions shown on Page 6
2:01:33of the staff report.
2:01:36>> If you could move button.
2:01:39When we get one. And second,
2:01:46it. Mr. Craig Bennett.
2:01:53Cayman's during our speak your
2:01:53motion.
2:01:59>> I moved for discussion
2:02:00purposes but would like to
2:02:01hear from my other members of
2:02:02the board. Please.
2:02:06>> Any other discussion on?
2:02:09Mr. Mosley.
2:02:14>> We want to hear from the
2:02:15second her first. The chair.
2:02:27>> So this is atu. And just
2:02:30looking at the site. For
2:02:36discussion purposes. Typical
2:02:37lot is allowed 30% lot
2:02:39coverage are typical houses
2:02:40and you're allowed 30%. And
2:02:42the of this. Bridge.
2:02:47It's 24%. I feel. Denying it.
2:02:54Encroaches on what everyone
2:02:55else is allowed in the area to
2:02:57go up to 30%. And they're just
2:03:00going to 24. like to keep that
2:03:04in mind as we talk. Mr.
2:03:09Mosley. Thank you. Madam
2:03:11Chair.
2:03:14>> So the reason that I that I
2:03:17moved to treat this as one
2:03:19from the beginning. Is that in
2:03:23my mind, it is it is one
2:03:25structure. It's connected by
2:03:26by a covered bridge. It's.
2:03:30>> You know, all
2:03:32interconnected there. So
2:03:33whether or not technically its
2:03:36its 3 different structures in
2:03:38my mind, it's all one. If we
2:03:40approved the house, which we
2:03:41have. And don't approve the
2:03:48bridge and the Atu garage.
2:03:54That is going to create a
2:03:55situation of confusion in my
2:03:58mind.
2:03:58>> So a new. If they have to
2:04:01come up with a whole new.
2:04:04Design for the structure
2:04:08because the garage in the and
2:04:10the covered bridge are not
2:04:12approved. How is that going to
2:04:15impact? The approval of the
2:04:19house if they have to come up
2:04:20with a new design and they got
2:04:23a variance for that. Now
2:04:25already tonight, are they
2:04:26going to have to go back and
2:04:29reapply for another variance?
2:04:33If the plan for the core house
2:04:35changes as a result of what
2:04:36we're doing here. So just
2:04:38wanted to explain why. I had
2:04:42made a motion to treat the
2:04:43application is one because
2:04:45this one project, it's one
2:04:49building envelope. It's it's
2:04:50one piece of the puzzle. To
2:04:52speak year question on the
2:04:54coverage. Yeah, it is a unique
2:04:59property. And when you look at
2:05:01building coverage. Again in my
2:05:05mind, it might not be the
2:05:06legal definition of it. But in
2:05:09my mind, you're considering
2:05:10the bill double portions of
2:05:12the lot. And if you consider
2:05:13that 50 foot swath through the
2:05:16middle of the lot, that takes
2:05:20overall building area of the
2:05:23lot down to a significantly
2:05:24less square footage and the
2:05:26home that they're putting on
2:05:27there at 2000 Square feet. I
2:05:31think it's fine. When you add
2:05:33the other 800 and something
2:05:35square feet to the 162 Square
2:05:37feet. Covered bridge. It is a
2:05:44lot for the slot and that's
2:05:44not to. We are to say. yeah,
2:05:49that's it's a it's a lot of
2:05:53building area for a lot of the
2:05:55size considering the building
2:05:56on bull up. That's available.
2:06:00Any further discussion. Mr.
2:06:02Shooting. Yes, thank you. I I
2:06:09appreciate the viewpoint of my
2:06:10colleagues about the building
2:06:10as a single structure. I in my
2:06:14mind, even though they are
2:06:15physically connected, I have
2:06:15been thinking of them as
2:06:17separate.
2:06:18>> Pieces of a whole and why I
2:06:22think that is critical to the
2:06:24way I value 8 this case is it
2:06:27focuses primarily on the
2:06:28garage in a tu which while
2:06:31connected by bridge. I still
2:06:33consider to be a detached
2:06:35garage from the primary
2:06:36structure. The primary
2:06:41structure and the design what
2:06:42the applicant was able to do
2:06:45with the existing stream
2:06:46setback in topography inside
2:06:49setbacks is pretty phenomenal.
2:06:50It's it's a very creative and
2:06:51clever way too achieve a house
2:06:59that does not deviate further
2:07:00from the existing
2:07:02encroachment. And in
2:07:05creatively add square footage
2:07:06to it in a way that does not
2:07:07encroach anywhere. I thought
2:07:08that was great. I have a real
2:07:10hard time with the garage and
2:07:14the accessory dwelling unit
2:07:15and my problems hinge on that
2:07:16key word, accessory, given
2:07:20that it's not a primary use of
2:07:21the property that it is
2:07:23accessory. I'm having a hard
2:07:25time justifying satisfaction
2:07:26of criteria age in our code
2:07:31and criteria skews me. C see
2:07:37one stands out. This is the
2:07:37one about hardship that
2:07:38self-imposed. That one stands
2:07:39out to me in particular
2:07:42because unlike the
2:07:43reconstruction of the
2:07:44building, footprint of the
2:07:45primary structure, there is no
2:07:46excess restructure there used
2:07:48to be a shed that the shed, as
2:07:49I understand it is gone and it
2:07:50was only 10 by 12, roughly. So
2:07:55the idea of creating a
2:07:57detached garage in 80 you an
2:07:58accessory use, if you will. I
2:08:01just I have a hard time,
2:08:06feeling that that criteria has
2:08:06been satisfied. It's very
2:08:07clearly self-imposed at that
2:08:08point. And that's that's why I
2:08:11was thankful for my colleague
2:08:13to buy for Kate this issue
2:08:14because considering this so as
2:08:15a single package would make
2:08:16that really tough for me to
2:08:19testify, I think it's creative
2:08:20design. I think it's great
2:08:22design. I think in 80 with a
2:08:24garage. If I let him go
2:08:25without definitely want one.
2:08:27But I just I don't see how the
2:08:30criteria laid out in code has
2:08:31been met and that we could
2:08:31approve. Thank you. Any other
2:08:36discussion. If not ready for
2:08:41the question
2:08:45>> The question is. To approve
2:08:53a variance. For the proposed
2:08:56detached garage with 8 with a
2:09:00view to encroach 14 feet into
2:09:01the 25 foot stream setback.
2:09:05Yes. Vote will grant a
2:09:06variance. A no vote will deny
2:09:07the variance.
2:09:292, yes votes and
2:09:314 votes in the negative. So.
2:09:35The variance is denied.
2:09:37>> And we'll move on.
2:09:39>> Variance to.
2:10:26It's to the
2:10:26bridge.
2:12:383 conditions.
2:13:10>> Positive motion by Mr.
2:13:11Shooting. Just take a motion.
2:13:15Please.
2:13:16>> Yes, thank you, chair. I
2:13:16move in. Case 2, 0, 2, 6 Dash,
2:13:210, 1, 2, 5, 2, approved a
2:13:22variance to allow foot bridge
2:13:23to cross the stream subject to
2:13:25the condition shown on Page 6
2:13:26of the staff report. Can I buy
2:13:32Mr? Craig Bennett. Mr. Should
2:13:37be with you. Speak your
2:13:38motion, please. Yeah, I I'd
2:13:41like to I'd like for the
2:13:42record to reflect that. My
2:13:44motion is in reference to a MC
2:13:4821 dot. '07, Dot 0, 2, 0, B 9
2:13:50D. I I just to make sure that
2:13:56we include the code reference
2:13:57and in the motion. And other
2:14:04than that, I encourage people
2:14:05to prove. Thank you. You're
2:14:07not going to. Address them
2:14:09standards. Yes, absolutely.
2:14:14thank you for reminding this
2:14:18one was also tricky when
2:14:19thinking about, but I do,
2:14:22Billy, I do believe that they
2:14:25have satisfied all 8 of the
2:14:28standards as laid out in
2:14:29municipal code, a leading me
2:14:30to believe that we can approve
2:14:31this as a variance. Thank you.
2:14:34Mr. Craig Bennett. I agree
2:14:41that all the standards are met
2:14:42and the need to be a way
2:14:46across the creek and be
2:14:49approving Any other
2:14:53discussion. Mr. Mosley. So its
2:14:59my understanding that there is
2:15:02an existing footbridge in
2:15:04place is that actually covered
2:15:06by the end? This might be a
2:15:08staff question is actually
2:15:09covered by the and CD.
2:15:11>> Or is that? In other words,
2:15:16they if they reconstructed the
2:15:18foot bridge where it is, do
2:15:21they need a variance for that
2:15:22or is it covered by the N C D?
2:15:26Threw the chair board easily.
2:15:33If you turn the page. 51 52 of
2:15:36your staff packet.
2:15:45>> don't believe she mentions
2:15:45the bridge. She mentions the
2:15:49house encroaching. The deck
2:15:52encroaching. And the shed. But
2:15:56the shed was removed. Hence
2:16:04the need for the variance.
2:16:19think it's on Page 3 of 6 Paul
2:16:21on the N C page which page?
2:16:27pitches. Get 6.51 Of your
2:16:27staff reporter. Were you
2:16:33seeing it? It's referenced in
2:16:34the has built by Robert
2:16:37Lumpkin. 24 2026 towards the
2:16:37end of that paragraph. That
2:16:42she does not mention it and
2:16:44you need the conclusions. She
2:16:46mentions it. But she doesn't
2:16:46say whether or not it actually
2:16:47has. Nonconforming rates.
2:17:20Yes,
2:17:21she mentions through chair.
2:17:21She mentions that Mr. Shooting
2:17:24said, but she does not. It is
2:17:26not one of the conclusions.
2:17:29The only thing in the
2:17:30conclusions of the the House
2:17:35and the shed. So if it's not
2:17:44covered.
2:17:44>> Then it needs a variance
2:17:45sense it just Caruso, you
2:17:51Again, you know, 3 parts of
2:17:54the same plan spree, parts of
2:17:54the same structure,
2:17:55essentially. If they're not
2:17:59permitted. To rebuild the
2:18:04existing foot bridge under the
2:18:04ncb. Then my my thought would
2:18:09be to grant a variance for the
2:18:11footprint so that they have a
2:18:13method of creating something
2:18:16new there and getting from the
2:18:17House to the parking area or
2:18:19at least having an
2:18:19opportunity. 2. Redesigned the
2:18:26garage in ad you so that it
2:18:26fits within Required building
2:18:28envelope. And I think with
2:18:34with that variance in place,
2:18:37it gives them a leg up on that
2:18:40ability even allows them to if
2:18:42they do choose to have a
2:18:44covered. Bridge that goes from
2:18:47the House to their parking
2:18:48area. I think that's something
2:18:51that we should that we should
2:18:52grant. Any discussion. Mr.
2:18:58Norris. Thank you, chair. I
2:19:03will be in favor of this. I
2:19:05don't think it would be proper
2:19:06for us to give them a house
2:19:07with no way to And
2:19:10>> you are looking at the
2:19:11existing structure. I don't
2:19:11know that it would provide
2:19:12the. Access given its current
2:19:18footprint alignment may not
2:19:22fit with the House has
2:19:23proposed and the variance
2:19:23that's approved. So without
2:19:27this, I think that we would be
2:19:28giving them a house with no
2:19:28way to get to it not. I don't
2:19:29believe that that would be a
2:19:31application of law or policy.
2:19:35And I believe that it meets
2:19:37all the criteria, including
2:19:38this is very minimum to enjoy
2:19:41the the property in a manner
2:19:43that others put. So I intend
2:19:43to support. Thank you. Any
2:19:45other discussion.
2:19:49>> If not. He's been moved and
2:19:54seconded.
2:19:55>> not into that. OK, the
2:19:59question is on the adoption
2:20:05variance to allow a foot
2:20:06bridge to cross the street.
2:20:10Yes, but will grant a variance
2:20:11a no vote will deny the
2:20:12variance. Please vote. 6 votes
2:20:27in the affirmative. No votes
2:20:27in the negative variance has
2:20:28been granted. We'll move on to
2:20:31variants street. And have a
2:20:35positive motion. Please.
2:20:56Moved
2:20:56by Mister Craig Bennett. Would
2:20:59you please State your motion?
2:21:06>> I'm moving case 2026 Dash
2:21:090, 1, 2, 5, to approve a
2:21:10variance from AMC. 21 got 0,
2:21:120, 6, 0, be. Table. 21 Dash 0,
2:21:189 dash 5 table dimensional
2:21:19standards, girdwood
2:21:20residential districts to allow
2:21:22a proposed detached garage
2:21:23with an ad you to encroach 5
2:21:25feet and to the front and side
2:21:26setback. Is there a second?
2:21:40Seconded by Mister Brent
2:21:40Bennett. Mr. Craig Bennett,
2:21:44when you Speak your motion,
2:21:45please. Not sure how this will
2:21:51play out with the. First
2:21:54variance, but the department
2:21:58recommends approval. The
2:21:59department says that. All 8
2:22:01standards are met. And I agree
2:22:05with that. Be voting an
2:22:09affirmative for. Mr. Brendan.
2:22:25The move.
2:22:26>> Motion was seconded so we
2:22:26could move it to vote.
2:22:28>> You have any.
2:22:30>> I really had nothing to add
2:22:31to what's been going on.
2:22:32You're taking consideration.
2:22:34I'm trying to be convinced.
2:22:35Okay.
2:22:36>> Anybody else? Thank you.
2:22:45concur with Mr. Craig Bennett
2:22:45that the staff, it concluded
2:22:49that for a variance, 3, all of
2:22:50the conditions were met. I do.
2:22:54Obviously acknowledged that
2:22:55things have changed quite a
2:22:57bit given how things went with
2:22:58variants one. But I do believe
2:23:00that where the applicant able
2:23:01to design a structure to meet
2:23:07their needs within this small
2:23:09amount of setback,
2:23:10encroachment what's left of
2:23:11the buildable area. I think
2:23:13that is a reasonable I'll come
2:23:16and I wouldn't and support.
2:23:17Thank you.
2:23:24>> further weaken further? Mr.
2:23:27Shooting.
2:23:30>> Thank you. it's a it. This
2:23:35is a tricky like Mr. Norris
2:23:37stated in the earlier vote, we
2:23:42clearly indicated some
2:23:42concerns about the EU's
2:23:43proposed and design. As it
2:23:46relates to the stream setback
2:23:49variance. Request. I have this
2:23:51many of the same concerns with
2:23:51the site setback. One. You
2:23:55heard our conversation earlier
2:23:58between staff and I back and
2:23:59forth as to whether or not we
2:24:01could even we should be
2:24:03granting this kind of variance
2:24:06given 21. 0, 9, 0, 5, C to 3 h
2:24:10longest coats. I never set out
2:24:10loud, but basically. The
2:24:14government code as it relates
2:24:16to 80's is pretty specific
2:24:17that they don't want
2:24:18encroaching into the side
2:24:19setbacks for units over
2:24:20certain height side and rear
2:24:22setbacks and unfortunate. This
2:24:23one is over that height. So
2:24:26feel like we have not
2:24:26satisfied all criteria in
2:24:30particular. I'm hung up on
2:24:33criteria. Age. I do not think
2:24:35that this ad meets that
2:24:36criteria. And if that one is
2:24:37not met, cannot approve. Thank
2:24:38you. Mr. Mosley. I agree with
2:24:47Mister Xi to a certain extent.
2:24:51Once again, we're we're
2:24:52breaking the hold out pieces.
2:24:55you know, this. This
2:24:59particular variants will
2:25:00depend. On how the applicant
2:25:04redesigns the garage and a D
2:25:05U. We've already approved a
2:25:09bridge. Which doesn't extend
2:25:14all the way to the. To the
2:25:16stream setback. And so, you
2:25:20know, might my concern is
2:25:21that? Is the whole design
2:25:26going to have to change as a
2:25:28result of this or are they
2:25:31capable of building a garage
2:25:34and or a D U? That takes
2:25:38advantage of those 5 foot.
2:25:41Encroachments into the
2:25:43setbacks but still does not
2:25:45encroach on the stream
2:25:46setback. And so I think it
2:25:50gets confusing when we when we
2:25:52break a project down into
2:25:52parts like this and it would
2:25:57be counterproductive to
2:25:58approve a variance at this
2:26:01point, which may or may not
2:26:02even be able to be used. So
2:26:12the point of information
2:26:13chair. If I may, I need some
2:26:17clarification, perhaps from
2:26:19staff on that exact point, Mr.
2:26:21Ma's Lee. I think that's a
2:26:21very interesting point. So my.
2:26:23>> My point of information for
2:26:25staff is variances are
2:26:30approved in a property owner
2:26:31elects not to exercise that
2:26:32variance. Is that allowable, I
2:26:35guess.
2:26:40>> chair, Mr. that is correct.
2:26:41So you can. You can request a
2:26:42variance whether or not you
2:26:43build to that. That
2:26:44requirement or not, I don't
2:26:47know if I can add anything
2:26:49just again, the 5 foot
2:26:52setback, encroachment that
2:26:52they're asking for is possibly
2:26:56only 20 something feet long on
2:26:56100 and something for the lots
2:26:57of. That. That's where I was
2:27:01come. That's where the staff
2:27:02report came with it with the
2:27:03age that It was meant in that
2:27:04case. You're talking. 15% of
2:27:09the last link that you're
2:27:09encroaching into. Not 50% or
2:27:11100% of it. So. To the chair.
2:27:25to your question of you have 5
2:27:28bedrooms, 3 Vaz. Excuse me. 5
2:27:31bedrooms, 4 And you only have
2:27:35a 2 car garage. That's not the
2:27:40minimum. By the way, you could
2:27:41have one car garage. And you
2:27:45can also have a minimum house.
2:27:45I've seen them down to the
2:27:46smallest 92 square feet. just
2:27:53want to that came to be, but I
2:27:54was also wondering if we don't
2:27:56approve the garage and it to
2:27:56you. You have a 3 bedroom, 3
2:27:59bath. With major Trees Creek
2:28:03in the front yard and no
2:28:05landscaping allowed. What's
2:28:06not to like about that. Just
2:28:09the thought of. coming. From
2:28:13the result of all this and
2:28:14separating about garage to the
2:28:19covered bridge into the major
2:28:19Innovation. Mr. Mosley.
2:28:31>> I'm also trying to figure
2:28:31out what we're actually
2:28:32granting a variance for. Are
2:28:34we granting a blanket variance
2:28:38for a garage to extend 5 feet
2:28:42into the site. Setback and
2:28:46also encroach 5 feet into the
2:28:48front setback regardless of
2:28:50the size or plan of that
2:28:51garage, which doesn't make any
2:28:52sense to me because you could
2:28:55end up building a garage that
2:28:58extends. You know, all the
2:29:00way. Way up. It could have
2:29:07different dimensions. And
2:29:09again, you know, I hate to
2:29:09keep harping on this, but this
2:29:10goes back to. Breaking up a
2:29:15cohesive design into parts
2:29:18where the parts are not the
2:29:19same as the hall. And so I for
2:29:23denying the variance for the
2:29:25position of this garage. Then
2:29:29everything gets tonight for
2:29:31the garage, including the
2:29:32encroachment to the side and
2:29:35the encroachment to the front.
2:29:36Sorry, I'm losing my voice.
2:29:37But anyway, that's that's my
2:29:41opinion on this. If they want
2:29:42to come back with a new design
2:29:46for the garage in the ad. You
2:29:49then those variances can be
2:29:50addressed at that time. Mr.
2:29:58Pregnant. Thank you. I just
2:30:02like to say again, this is the
2:30:06variance that the department
2:30:07recommends approval of.
2:30:08>> And in this case, going
2:30:15with department's finding. The
2:30:21extension of the 5 feet when
2:30:24it go up past the stream would
2:30:27not keep going it would be
2:30:31restricted to the streams that
2:30:31setback area. But he OK?
2:30:39>> I would. I would comment on
2:30:40that. that doesn't appear to
2:30:41me to be obviously the case
2:30:44because we're approving a 5
2:30:45foot setback. From the side
2:30:49which has nothing to do with
2:30:51the stream. So in this
2:30:53particular drawing the
2:30:54building actually extends.
2:30:57Into the stream setback. And
2:30:59so we're actually proving. A 5
2:31:01foot. Variance for
2:31:07encroachment into the side of
2:31:09the lot. That is actually
2:31:10within the stream setback. Can
2:31:20I ask staff Pena? Threw the
2:31:22chair, mister Craig Bennett.
2:31:26>> Yes, this would be granting
2:31:27a 5 foot variance to the
2:31:29site's epic. But like you
2:31:30said, they still you denied
2:31:32any encroachment into the
2:31:33stream. Setback for the
2:31:33garage. I would say with
2:31:37clever design and with some.
2:31:40Tweaking, you could probably
2:31:41still get some type of the
2:31:42structure within that
2:31:42footprint. But that's that's
2:31:44just what I'm looking at. Mr.
2:31:50Shooting.
2:31:54>> I appreciate the
2:31:55conversation. And
2:31:56unfortunately just generated
2:31:57new question for me. Paul, as
2:32:00it relates to carports and
2:32:03zoning districts which I'm
2:32:04super familiar with. They are.
2:32:07They similarly allowed to
2:32:09encroach side and rear
2:32:10setbacks like the canon
2:32:10acreage.
2:32:14>> Threw the chair mister
2:32:16shooting. Know they cannot.
2:32:16There is a caveat to that
2:32:17because current code refers
2:32:18back to Chapter 5 of Anchorage
2:32:19code. And private garages or
2:32:22car parts can. But only if
2:32:24they're butting. And Ali.
2:32:26That's the cabbie up. And
2:32:29you're gonna ask that when
2:32:29that so I headed up. Any other
2:32:33discussion.
2:32:43>> ready for the question. The
2:32:44question is on the adoption of
2:32:46a motion to grant a variance
2:32:48to allow proposed detached
2:32:49garage with a view to encroach
2:32:495 feet. Into the front and
2:32:51side setback. Subject because
2:32:54nations son shown on Page 6 of
2:32:55the staff report. yes vote
2:32:58approve the variance. A no
2:33:02vote will deny the variance.
2:33:03Please vote.
2:33:23There are 3 votes
2:33:24in the positive and 3 votes in
2:33:27the negative takes 5 votes to
2:33:29approve. And so the variances
2:33:30the night. So that was the
2:33:43only case. Under public
2:33:45hearings. And next we have
2:33:48reports. Reports by the chair.
2:33:52I have nothing reports by
2:33:54this.
2:33:56>> Secretary.
2:34:00>> She thinks maybe there
2:34:01won't be meeting next month
2:34:01years. No committee's board
2:34:04member comments. Mr. Shooting.
2:34:08>> Yeah, because nobody has
2:34:09heard from me tonight. The
2:34:12struggling I want to say thank
2:34:16you to staff and 2 fellow
2:34:18commissioners. This was a
2:34:19particularly interesting
2:34:21night, I believe in the body a
2:34:22short time. But this was by
2:34:22far the most interesting and
2:34:26intellectually challenging
2:34:26meeting we've had thus far.
2:34:28But I really appreciated the
2:34:32conversation and the facts and
2:34:34details provided by staff as
2:34:34well as the applicant. Thank
2:34:38you. if this is what our
2:34:40meetings are like, this is
2:34:40going to be a wild ride. So
2:34:41thank you.
2:34:43>> Mrs excuse me, Mr. Beazley.
2:34:48>> I just had a point of
2:34:49clarification. You had stated
2:34:54that approval requirement was
2:34:555 votes. I think you meant for
2:34:56votes. It's 5. We passed
2:35:01thing. 42. Because we had
2:35:05somebody that wants. On
2:35:07disclosure.
2:35:14>> I can read that part. If
2:35:14you want. Occurring vote, a
2:35:21majority of the fully
2:35:22constitute a membership of the
2:35:24board. Minus those excused by
2:35:25conflicts of interest. And so
2:35:26that particular vote Hannah,
2:35:28someone that was excused.
2:35:31conflict of interest. That's
2:35:32what went down to 4. Mr.
2:35:38>> Yeah. Why not? And they
2:35:42want to say kind of echo what?
2:35:47Mr. Shooting was saying that
2:35:49this was a difficult case
2:35:51tonight and I want to do want
2:35:52to compliment the petitioner.
2:35:54I do believe that you did your
2:35:55level best to work with a lot
2:35:57that you have and it's
2:35:58presents very difficult
2:35:59challenges. And I appreciate
2:36:04everyone coming out make their
2:36:06voices heard. We don't often
2:36:08get a ton of public testimony
2:36:11we've got some tonight to help
2:36:12inform our decision so it was
2:36:16a it was an interesting night
2:36:17and I appreciate everyone's
2:36:18involvement. Thank you.
2:36:23>> that's it. We need.
2:36:25>> A motion for adjournment.
2:36:28>> So moved. Second second.
2:36:33>> Moved by Mister
2:36:36>> Seconded by Mister Bryan
2:36:37Bennett. We are adjourned.
2:37:16>> You registered