- Home
- US
- North Carolina
- Winston-Salem
- Issues
Water Shortage Response and Stage 1 Conservation
At a glance
- What: voluntary Stage 1 water conservation measures in Forsyth County, implemented in mid-2026.
- Where it stands: Stage 1 continues as of August 10, 2026.
- Next: no later status is in these documents.
Background
- The Water Shortage Response Plan was discussed at the July 13 meeting (per the minutes printed in the August packet).
August 10, 2026 report
- Bill Brewer reported that W. Kerr Scott Reservoir levels had recovered through recent rainstorms.
- North Carolina remained in drought status and Forsyth County would remain in Stage 1.
- Water production was 1.9 million (gallons, as written) higher than the year before because of the drought.
Log