  • Regular meeting of Tuesday, October 20, 2026, about 1 hour 48 minutes of video. Ed Hooks presided.

Time on topic (from transcript timestamps; approximate, includes side talk; the 6-minute recess is excluded):

Topic Minutes Share
7 Brew Wilson Road Rezoning 31 30%
Gardens on 11th Rezoning 29 29%
Downtown Social District Expansion 12 12%
Wilson Road Extension Escrow 10 10%
Beachcraft Drive Street Lighting 7 7%
Invocation, proclamation, consent agenda, closing remarks 7 7%
Tupelo North Annexation 2 2%
Downtown exterior improvement grant 2 2%
Mebane and Graham Mediation 1 1%

Beachcraft Drive Street Lighting

6:48-13:21

  • Residents Lynn Boyd and Colleen Maher of the Mebane Town Center townhome community on Beachcraft Drive (developer captioned "Keystone") said phases 2-4 have no street lights and staff proposed only six more.
  • They said staff cited a 500-foot city standard that they could not get in writing, argued the city's own UDO (section 4-7-3) and other North Carolina towns use roughly 200-300 feet, and said the original plan showed 27 lights. Ms. Maher cited a shooting, a break-in and vandalism, and an unlit mailbox area.
  • The mayor said staff would look at it again. No vote.

13:24-14:18

  • Approved without discussion: September 8, 2026 minutes; governor's highway safety program renewal; allocation of federal equity sharing funds for police capital items; Alamance County Rescue Unit resolution of support; Johnson Chapel AME Church lease at Giles and McKinley Street Park.

Gardens on 11th Rezoning

14:18-43:18

  • Public hearing on a conditional rezoning of a 13.96-acre South 11th Street site from one R-8 conditional district (51 townhomes approved in 2021) to a new R-8 conditional district for five three-story apartment buildings with 120 units. Presented by Ashley Ombi; applicant team Robin McAdoo of TMTLA Associates for Toledo Builders, with Earth Centric Engineering.
  • The request included a payment in lieu of public recreation area of just over $112,000 and permitting all 120 units' sewer in one year, which differs from the city's 72-units-per-year wastewater policy (see Water and Sewer Capacity).
  • Council members questioned why the plan changed from townhomes to roughly double the density, the three-story layout, and parking lots placed away from the buildings (staff noted 13 spaces above the UDO minimum, and that state law is pushing the city to drop parking minimums). The engineer said soils on the east side were poor for foundations.
  • No one from the public spoke. Council denied the rezoning as presented for lack of consistency with the Mebane 2045 comprehensive plan.

7 Brew Wilson Road Rezoning

43:23-1:14:03

  • Public hearing on rezoning less than an acre at 3970 Wilson Road (Roger Shields property) from R-20 to B-2 conditional district for a drive-through 7 Brew beverage stand of about 500 sq ft with two lanes. Annexation is still to come.
  • Conditions: a 10-foot type B buffer instead of the UDO's 20-foot type C, a larger and taller pole sign (30 ft by 10 ft), Wilson Road extension, sidewalks, and signal changes at the Garrett crossing intersection at the developer's cost. Attorney Nathan Duggins and franchisee representative Davis Weaver presented, with a traffic engineer.
  • Main concern was queuing: the site holds 16 stacking spaces, based on a study of 10 high-volume 7 Brew locations. The operator said it adds staff on busy days but would not accept that as a condition. Council asked that Chief McKenna be warned of any big events, and that the certificate of occupancy depend on the road and signal.
  • The mayor said he had urged NCDOT to study left-turn signalization on Mebane Oaks Road; staff clarified that this is not a condition of the rezoning.
  • Approved as consistent with the Mebane 2045 plan (regional commercial place type).

Recess

1:14:07-1:20:12

Tupelo North Annexation

1:20:14-1:21:59

  • Public hearing on a voluntary annexation of 87.73 acres off Lebanon Road in Orange County requested by Lebanon Road 3 LLC. Lawson Brown presented; no public comment. Adopted.

Downtown Social District Expansion

1:22:02-1:33:44

  • Sarah Williams of the Downtown Mebane Development Corporation asked to move the social district from Thursday-Sunday, 11 a.m.-10 p.m. to every day, 10 a.m.-10 p.m., with no change to the boundary.
  • Police and public works had no objections; she cited a merchant survey (96% in favor, 23 responses, about three-quarters reporting more foot traffic) and similar districts in Elon, Burlington and Gibsonville. Business owner Peyton Rice (spelling approximate) spoke in support.
  • Council members praised the trial period's results. Approved, effective on adoption.

Downtown exterior improvement grant

1:33:46-1:35:43

  • Grant of just over $9,000 for facade work (windows, masonry, lighting) at 105 West Clay Street, the former barber shop. Approved.

Wilson Road Extension Escrow

1:35:45-1:45:26

  • Council considered releasing $200,000 paid by Hendon Tiller (captioned "Henden Tiller") in 2024 for extending Wilson Road, now to be reimbursed to Roger Shields or his developer.
  • Council members worried the staff motion required only land dedication; the approved motion makes release conditional on deeding the land, completing the road and satisfactory proof of payment. Without a road in five years the money would revert to the city.

Mebane and Graham Mediation

1:45:29-1:46:44

  • Lawson Brown said Graham will send its mayor and mayor pro tem to November mediation in the Graham versus Mebane case and recommended Mebane do the same. Council voted to send the mayor and mayor pro tem.

Other business

0:19-5:42, 1:46:48-1:47:59

  • Invocation by Pastor Erin Hayworth (approximate spelling) of Mebane United Methodist Church; the mayor proclaimed October 28, 2026 National First Responders Day, including public works crews.
  • Closing remarks promoted Halloween, Letters to Santa, Santa's arrival and the Reindeer Run, and urged voting during early voting (see November 2026 Municipal Election).
  • The rail replacement project and the Public Works bids did not come up in the recording.

Sources

Video

Watch the video

The city titles this video only "City of Mebane Council Meeting October 2026"; the date Oct 20, 2026 is inferred from the mayor's proclamation in the captions.

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:19Good evening everybody. Welcome to our

00:21council meeting

00:23for the first month. It seems like

00:25forever. It seems like forever since

00:27we've had a council meeting, but uh good

00:29night. Good night. Good uh good evening

00:32to everybody and glad everybody's here.

00:34Uh as it is our custom, we're honored

00:36tonight to have the Reverend, excuse me,

00:39Pastor Erin Hayworth of the Meban UN UMC

00:44and his beautiful young

00:47I sidekick Mary Jane.

00:51This is an honor.

00:53>> Yes. Thank you to uh to the council and

00:56uh greetings from the the Meban United

00:58Methodist Church to everyone else here.

01:00Uh I see that our our friends at Johnson

01:02Chapel AM made the agenda. So we send

01:04you a special uh greeting anytime your

01:07church has to come before a civ civic uh

01:09organization. You uh you put some work

01:12into that. So I invite you now to uh ask

01:15God's presence with us. Uh God, we

01:18invite you here. uh be with each and

01:20every person gathered here as they

01:21represent the interests uh not only of

01:24themselves but of their neighbors. Uh

01:26Lord, help us to in humility serve

01:29others and to uh look to embody those

01:32virtues of faith and hope and love in

01:34our day-to-day life. uh be with all

01:37those that you call to to civic service

01:39especially in this uh season of

01:41elections that we might with uh charity

01:45and love uh serve the least of these

01:47among us. Uh God um be especially with

01:51the children in the public schools and

01:53keep them safe. Uh be with all of our uh

01:56servants in uh the diff various aspects

01:58of our uh meban uh government. And we

02:02ask that you would give us uh open

02:05hearts to hear what uh each other have

02:07to say and take an deep and abiding

02:09interest in working for the welfare of

02:10our brothers and sisters. We ask this in

02:13your name. Amen.

02:14>> Thank you.

02:15>> Thank you.

02:16>> Bye Mayor Jane.

02:21>> That's a great name.

02:23>> All right. It is uh it is my honor to

02:26recognize our first responders today is

02:29uh the month is national uh first

02:31responders day. Uh and so

02:36okay would all f uh first responders

02:39come to the front please.

02:42Even the old

02:43>> even the old ones that's old guys.

02:46Even you bud.

02:55>> Even the last Yeah,

03:00>> that was funny.

03:18That voice

03:26>> from the office of the mayor

03:27proclamation actual first responders day

03:30October 28 26 whereas first responders

03:35including public works professionals

03:38firefighters police officers emergency

03:41medical technicians 911 operators

03:44paramedics and Other emergency personnel

03:47stand on the front lines of our

03:49communities, selfishly serving and

03:52protecting the citizens of heaven in

03:54times of crisis. Whereas first

03:57responders respond swiftly and

03:59courageously to emergencies, often

04:02putting their own lives at at risk to

04:05ensure the safety and well-being of

04:07others, whether in natural disasters,

04:10accidents, medical emergencies, public

04:14health, and safety threats. Whereas it

04:16is the public interest for the citizens,

04:19civic leaders, and children of the city

04:20of Mean to gain knowledge of and

04:24maintain an ongoing interest and

04:27understanding of the importance of

04:29public works and other first responder

04:31efforts in their respective communities.

04:34And whereas as of 2019,

04:37US Senate

04:39uh has included language recognizing

04:42public works uh alongside fellow other

04:45first responders. Whereas resolved, I

04:48mayor Ed Hubs to hereby designate

04:51October 28th, 2026 as National First

04:54Responders Day, urge all citizens to

04:58join with representatives of the

04:59American Public Works Association,

05:02government agencies, and in activities,

05:05events, and ceremonies to pay tribute to

05:07our public works, first responders

05:10alongside law enforcement, firefighters,

05:13paramedics,

05:14emergency medical technicians,

05:17911 operators and other emergency

05:20personnel to recognize the substantial

05:23contributions they make to protecting

05:25our national health, safety, and

05:27advocating the quality of life for all

05:30here in ME. And witness thereof, I

05:33hereby set my hand and call the city of

05:36Mean to be a fix. I adopt the 20th day

05:38of October, 2026, Ed mayor.

05:42Congratulations, guys.

05:54ordering from my

06:48All All right, it's now not now now time

06:50for public comments. Um, and before they

06:53come up, uh, everybody's given three

06:55minutes and, um, we appreciate

06:58appreciate adhering to that. The first,

07:01uh, on the thing is Lynn

07:03Boyd.

07:09>> That's your address. And

07:11>> thank you. Good evening, Mayor Hooks and

07:14council members. My name is Lynn Bour. I

07:16live at 1055

07:18Beachcraft Drive and that's in the Meban

07:20Town Center here in Mebban. My neighbors

07:23and I are here tonight because we're

07:24concerned with the lack of street

07:26lighting in our neighborhood. And I

07:27would ask all my neighbors who are here

07:29tonight to stand up so you can see who

07:31is here.

07:33We really just want to talk about street

07:35light standards and parody.

07:38In a recent meeting with staff, and we

07:39do appreciate staff meeting with us,

07:41they told us that the city standard for

07:43street lights is 500 ft. Although they

07:46have yet to provide us, despite repeated

07:48requests, with any document that shows

07:50that standard or any document showing

07:53that it's ever been adopted by the city.

07:56And in fact, the city's own UDO

07:58contradicts that standard. in section

08:014-7-3

08:03provides for street lights of no more

08:05than 300 or 350 feet apart in town homes

08:11in multif family dwellings and also in

08:13manufactured homes and I quote from the

08:16ordinance preferably at intervals of 30

08:20to 50 feet for pedestrian scale lighting

08:24when you look at municipalities across

08:26North Carolina and we did provide a

08:28handout you'll see a comparison with

08:31other jurisdictions in North Carolina on

08:32the first page and you'll see that

08:34throughout North Carolina the standard

08:37is typically two to 300 feet apart not

08:39the 500 ft that staff alleges is a

08:41standard here

08:45additionally Duke Energy has a standard

08:48while they defer to the municipal

08:49standard their standard is for 15t poles

08:53and that's what the the Meban Town

08:56Center has is 15t poles that the the

08:59standard should be 75 to 150 ft apart.

09:04We were recently provided a drawing from

09:07the staff and that's the second document

09:09you'll you'll see in your your packet

09:11here. Uh the proposed lighting plan

09:14lights have been installed in phase one

09:16of our development but not in phases two

09:19which is fully complete, three which is

09:21under construction and four which is not

09:23started. They're proposing for all of

09:26phases 2, three, and four only six

09:28additional street lights. We would note

09:31that some of these lights are more than

09:32500 ft apart. So, in violation of the

09:34city standard. Um, plus the lighting

09:38plan does it does not comply with the

09:40lighting plan that was submitted for

09:42this development.

09:48If we would include or have the

09:51developer put in the lights that are

09:53shown on the lighting plan, they would

09:54be no more than 200 to 300 feet apart.

09:58We looked at Keystone's other

09:59communities. There's one in Burlington

10:02in High Point and also Kfax and there

10:05the lights were 2 to 300 feet apart.

10:07When we also look at our neighbors, the

10:09villas at Fifth, the lights there are

10:112003 300 feet apart.

10:14Our community is being treated

10:16differently. I do just want to know my

10:18time is up, but very briefly, we

10:20provided you with um some photographs.

10:24Another issue in the neighborhood is the

10:25lack of lighting

10:27um at our mailboxes. There's no lighting

10:30at our mailbox even though it's shown in

10:31the lighting plan or and there's

10:34pictures of other communities that show

10:36the lighting. Thank you very much. Thank

10:38you.

10:38>> Happy to answer any questions you have.

10:43All

10:46right, the next uh speaker is Colleen

10:49Magger.

10:54>> Good evening everyone. Thank you for

10:56taking

10:57>> your address. And

10:58>> my name is Colleen Maher. I live at 1027

11:01Beachcraft Drive in Nbinstown

11:05community. Now, my daughter and I um

11:08purchased a town home there a year ago.

11:11I will let you know that it was a

11:13significant investment for us to move

11:16into that neighborhood. I will tell you

11:18over this past year, a lot of things

11:20have not been done and most um

11:24disturbingly and for our safety is the

11:27lights in our neighborhood. I myself

11:29live in phase one. I'm not directly

11:32affected as much as the rest of my

11:34neighbors. We have six lights in phase

11:37one. They plan to have six lights

11:40additional for the rest of our entire

11:43community. Now, when the plans were

11:46drawn for this, as requested by

11:48Keystone, submitted to Duke, they

11:52designed our neighborhood to have 27

11:54lights. 27 lights. Now, you are reducing

11:59us to less than half. I will tell you,

12:02with the no lighting, we have increased

12:04crime. We've had a shooting. We've had a

12:07breakin. We've had vandalism. It is

12:10becoming very unsafe for our

12:12neighborhood to go without any lighting.

12:15We have no lights at our mailbox, which

12:17is again very, very dangerous. Now,

12:20we've come before the staff and we've

12:22expressed our concerns. And we've

12:26brought the maps and everything that was

12:29appropriately designed for our

12:31neighborhood. what it is marketed as an

12:35upscale luxury neighborhood now to

12:38reduce our lights to less than half

12:41is not appropriate and it's a safety

12:44issue for everybody in our neighborhood.

12:47And we're asking everybody to have a

12:49harder look at it, readress it, and

12:52please give us significant and

12:55appropriate lighting for our

12:57neighborhood in comparison to everybody

13:00else around us.

13:02So, I appreciate your time. I hope

13:05you'll take a few minutes and look at

13:06those drawings

13:07>> and what was submitted and you you'll

13:10understand what we're looking at. So,

13:13thank you very much.

13:14>> Thank you. We will have staff look at it

13:17again and uh thank thank both of you for

13:21the the uh input. All right, we're

13:24moving on to the uh consent agenda. Uh

13:28we have approval of minutes for the

13:30September

13:328th, 2026 regular meeting. Renewal and

13:35resolution of North Carolina Governor's

13:37Highway Safety Program. Allocation of

13:40federal equity sharing funds for the

13:42purchase of police capital items.

13:44Alamance County Rescue Unit resolution

13:47of support Johnson Chapel AM Church

13:51lease agreement Giles and Mckenley

13:53Street Park. Uh any comments or anybody

13:56want to pull any agenda item off

14:01for discussion?

14:03If not,

14:05>> motion to approve the consent agenda.

14:07>> We have a motion.

14:09>> We have a second. Any further

14:10discussion? If not, all those in favor

14:13say I.

14:14>> I.

14:14>> Any opposed? Motion carries. All right,

14:18moving into public hearings. The first

14:19one is a conditional reszoning

14:21uh TMTa Associates Gardens on 11th 13.96

14:27acre property on South 11th Street R8 to

14:31RHCD

14:33to allow for a multif family development

14:35of 120 units. Our own Ashley Ombi

14:39development director.

14:40>> Good evening.

14:44Before you is a request by the property

14:46owner. Um they're being represented by

14:48TMTLA Associates. Um the property owner

14:51is Toledo Builders. This property is

14:54just under 14 acres. It's currently

14:57zoned R8 CD. That's a conditional zoning

15:00district with a sight specific plan and

15:03the requested zoning is also R8CD, but

15:05it would have a different site plan and

15:07different conditions associated with it.

15:10You can see that the surrounding zoning

15:12is largely residential. There are some

15:15additional zoning districts in the area.

15:18Um, R8 conditional district is south of

15:21the site, north of the site, and also

15:23west of the site. Um, we do have R10

15:26conditional district and R20 and R12

15:28around the site as well. And then there

15:31are some areas with heavy manufacturing

15:33zoning reflecting

15:36a previous idea for this area that has

15:38grown more residential.

15:42This site is currently in our city

15:44limits in Orange County and utilities

15:46are available to serve the project.

15:50It is undeveloped but entitled to a

15:52development of 51 town homes that was

15:54approved in 2021.

15:56Surrounding uses include multifamily

15:59town homes, single family, and also some

16:02vacant land.

16:06In our meban 2045 comprehensive plan,

16:09this area is identified as urban

16:12neighborhood which supports a variety of

16:14housing types and a more compact type of

16:18development.

16:22The proposal is for a multifamily

16:25development of five buildings with 120

16:28apartment units. Um, this would have

16:30just over three and a half acres of

16:32private open space. You see a lot of

16:35that is over here where there is a creek

16:38that would be protected.

16:41And then just approximately 2.5 acres of

16:43private recreational area. There's a

16:46long list there. I won't review

16:47everything, but it includes a community

16:49building, a pocket park, um a playground

16:52area, and then you'll see here in some

16:54of this protected open space, a

16:56multi-purpose field.

17:01Sidewalk is required along the

17:03property's frontage and this development

17:06would also be responsible for a

17:07crosswalk for um sidewalk that is under

17:10constructed and expected with a minor

17:13subdivision occurring across the street.

17:16The number of units did not warrant a

17:18traffic impact analysis by the city

17:20standards or NC DOT standards and that

17:24warrant um memo is included in your

17:26packet

17:28for the conditions of the request. The

17:30sight specific plan is applicable and

17:32anything shown there would apply. In

17:35addition, the applicant is requesting to

17:37provide a payment in lie of public

17:39recreation area which totals just over

17:42$112,000

17:44and also permitting of sewer for the

17:46entire project of 120 units in a single

17:50year which is different than our current

17:52wastewater policy.

17:55Are there any questions for me at this

17:57time? Mi, should we view this in the

18:00light of the previously approved plan or

18:02should we just treat this as a fresh

18:05proposal because you haven't referenced

18:07the previous plan and I you know I don't

18:10remember it but in my mind I want to

18:12compare the pros and cons and what what

18:15is improved and what's different but is

18:17that not the way we should view it?

18:20>> Um I don't think necessarily you have to

18:22view it that way. There's a choice to

18:24view it that way. Um

18:28the proposal which the applicant may

18:30also present on included a similar

18:34street network but it looped all the way

18:36around here. So it would have had town

18:38homes on this side and also town homes

18:41throughout here. Um

18:44>> how many town homes?

18:45>> It was 51 town homes. It was a larger

18:47footprint in terms of area that now is

18:53envisioned for recreation space or open

18:55space. The town homes were taking up a

18:57greater footprint of the entire site.

19:05>> Any questions?

19:06>> Yeah, the gardens on 11th, uh, was that

19:09the name of the original development,

19:12Gardens on 11th? It was called Oakrove

19:14Trails and so it was by Meritage Homes

19:16who's developing the Oakwood subdivision

19:18south of the site. So they have town

19:21homes immediately south here which is um

19:24where this driveway would connect to a

19:26public street that is under construction

19:28by that development.

19:30>> The uh

19:32laid out land on the right that's not

19:34buildable anyway, is it? Where the creek

19:35goes through?

19:37No, the creek um was not shown as being

19:39disturbed in the other, but it was a

19:41different configuration here. There were

19:43town homes shown where the pond is

19:48>> that um vertical

19:51part of the road on the right hand side

19:53of the street structure. Yes.

19:56>> There's no those parking spaces aren't

19:59serving any units, right? That's just

20:02kind of o overflow. I mean

20:07>> that might be better addressed by the

20:09applicant. They're meeting our parking

20:11requirements and so I'm sure they

20:13weren't able to fit everything as

20:15approximate to the buildings.

20:20>> Madam director, can you talk to me about

20:21urban neighborhood in the 2045 plan?

20:26>> We have a few different residential

20:27place types. Um, so urban neighborhood

20:31is one of the denser residential place

20:34types. Um, it allows for a mix of

20:38residential uses and the R8 zoning

20:41district ties to that particular place

20:44type in the appendix of the MEB 2045

20:47plan. It's predominantly um

20:51I think described as single family with

20:54a mix of apartments and town homes being

20:57possible in the area. Just want to make

20:59sure this is read. It is compromised

21:00predominantly of single family detached

21:02on small lots but may include single

21:04family units such as town homes,

21:05duplexes, and a small amount of multif

21:08family

21:11>> backful for me. So, okay. Just want to

21:13make sure I'm on the same page.

21:15>> Okay.

21:17>> Any other questions?

21:26May books and council. Thank you for

21:29taking the time.

21:30>> I'm Robin McAdoo from TMTLA Associates

21:34representing Toledo Builders and I'm

21:37joined by Tim McCabe and Sean Sidner

21:41from Earth Centric Engineering.

21:43>> Your address?

21:45>> 1702 Maryland Avenue, Durham.

21:58So,

22:00um, Ashley did a great, very thorough

22:03presentation. I'm just going to be a

22:06little bit redundant and fill in a

22:08little, flesh it out a little bit. Um,

22:11obviously the site for the gardens on

22:1311th is located on the east side of

22:15Meban in Orange County, south of Highway

22:1770 and at the intersection of South 11th

22:20Street and East Oakwood.

22:24currently zoned for R8 CD conditionally

22:27approved for town homes hoping to

22:29reszone for multif family housing.

22:32As you know, Mebban the in Mebban the R8

22:36residential district is established for

22:37moderate to high density two family and

22:40multif family residences along with

22:42limited public and semi-public and

22:45commercial uses that are compatible with

22:46highdensity housing.

22:49In addition, the future land use map

22:51plans for urban neighborhood use on this

22:53site, which is listed as a mixed

22:56residential place type designed to

22:57support compact, walkable, and

22:59intergenerational communities.

23:02We believe our site design meets the

23:05stated desires of both the R8 zone and

23:07the urban neighborhood use by connecting

23:09all buildings with sidewalks, making

23:11parking easily accessible, allowing

23:14cross access to adjacent neighborhoods,

23:16providing multiple open space amenities,

23:20excuse me, of diverse types and

23:22providing a community building that will

23:23connect the residents socially as they

23:25check their mail and meet for various

23:27activities.

23:32The regions in purple are zoned heavy

23:35manufacturing which we share our east

23:37boundary with. The area between our

23:40residential buildings and the east

23:41boundary line is and will remain wooded

23:44with a protected creek and riparian

23:46buffer on both sides. We believe this is

23:49an asset that provides a natural

23:51boundary as well as the opportunity to

23:53locate a nature trail along the creek

23:55for exercise contemplation and for the

23:58community to remain aware of and pay

24:00attention to the natural environment

24:01nearby.

24:05As you can see, the site is currently

24:06wooded and between two neighborhoods and

24:09apartment cluster to the north and town

24:11houses to the south.

24:14Our project consists of five threestory

24:18apartment buildings, each with 24

24:20apartments. One and two and

24:23three-bedroom units will be available

24:25throughout each building, thus supported

24:27the intergenerational community goal of

24:29the urban neighborhood use. As stated

24:32earlier, a community building will be

24:34included near the entry to the site that

24:37will provide a space for neighbors to

24:39gather, pick up their mail, and work

24:41with staff to manage a new property.

24:44Buffers and street yards will meet the

24:46city of Neban requirements with existing

24:49vegetation and will be supplemented to

24:51meet those opacity objectives

24:54necessary.

25:00Amenities will include a playground,

25:04an outdoor seating area, a dog park, a

25:08fitness area, a volleyball court, a

25:10multi-use playfield, and a nature trail.

25:14Sidewalks will be along South 11th

25:16Street and throughout the project with

25:18accessible parking and bike racks as

25:20well, helping with the pedestrian

25:22connectivity with the boundary within

25:24the boundaries and to the surrounding

25:26communities.

25:28We've extended the public street from

25:30the south and provided a public rideway

25:33for emergency and sanitation vehicle

25:35circulation and access. That's Ashley.

25:38Do I

25:40Yeah, this right here is taking the stub

25:44from the subdivision to the south,

25:47bringing it up and allowing

25:49um vehicles to turn around and return.

25:52It is also possible to exit to 11th

25:55Street, but the public portion of that

25:58development, that was a goal to make

26:01sure we connected to the to the

26:03neighborhood to the south.

26:10>> Um,

26:11>> what's the current status of the

26:12neighborhood to the south

26:14>> under construction?

26:17Tim, I'll let Tim speak to the the

26:21utilities and breeding.

26:25>> Good evening, Mayor Council. Uh my name

26:27is Tim McKavin from Earth Centric

26:29Engineering.

26:31I'll speak to just um some of the

26:33underlying infrastructure for the site.

26:36Um

26:39uh we'll be

26:44There we go. Uh we'll be installing a a

26:48sewer network. Uh first of all, there's

26:51existing sewer uh that comes through the

26:54site like this. Um it's relatively

26:57shallow. Uh we'll be connecting the

27:00western portion of the site to that and

27:03then we will be connecting new sewer uh

27:05to the neighborhood to the south. We'll

27:07be extending it through the site and

27:09then we'll be extending it to the north

27:12uh to provide connectivity for uh

27:14neighbors to the north in the future. Uh

27:17the sewer will stop there and then we

27:19leave an easement uh to provide access

27:22to all of that outfall to the north.

27:26Uh water manes will connect at 11th

27:29Street and to the new development here

27:31to the south. uh that will allow the

27:34water to be looped uh which will just

27:36provide better fire protection and more

27:39uh consistency in the water pressure.

27:43Um

27:45uh Councilman White, the one of the

27:47reasons for the the change from the town

27:50houses was it was found that the soils

27:53along this eastern part of the site were

27:56less conducive uh to uh supporting

27:59building foundations than everything to

28:01the west.

28:03Uh hence we're keeping the buildings on

28:06this portion of the site and we're using

28:08this for parking play area and uh for

28:12the large storm water detention pond

28:16there. So that's some of the reason for

28:18the change uh from the townhouse

28:20development to this is just suitability

28:23of the site.

28:26Um

28:28again we'll have our storm water

28:30management facility here. All the

28:31impervious uh from the site will be

28:33directed here. Um

28:38oh thank you.

28:41Uh obviously it stays outside of the

28:44repairing buffer for the stream. Um and

28:46then they'll Oops. Sorry.

28:58Sorry, there we go.

29:01Uh anyway, uh again, storm water

29:03detention here, uh with the wet pond, um

29:07outletting, uh through a control

29:09structure into the repairarian buffer

29:11and then protecting all of this. Um,

29:14again, we've got large uh tree safe

29:17areas here where there used to be a

29:19culde-sac and more uh town houses here.

29:23Um, and storm water wise also throughout

29:26the park we have or throughout the site

29:29we have a lot of parks and pvious areas

29:32intermingled with the buildings.

29:44And following that, this is the proposed

29:47building materials and model and style.

29:51Thank you. Um that is intended by the

29:56the owner to be built.

29:59Um as you can see here, we intend to

30:00provide a building project that will

30:02make the residents comfortable and proud

30:04with attractive materials, balconies,

30:06patios, and landscaping.

30:09And now we're available for any

30:11questions.

30:11>> So what are the is it onebedroom,

30:14two-bedroom, and threebedroom choices or

30:16just two and three?

30:17>> All three.

30:18>> All three.

30:21>> So uh you changed you changed from uh

30:25according to Tim's comments, you you

30:26changed from town homes to apartments

30:29because you couldn't put town homes on

30:31the right hand side. That did that

30:34didn't have anything with more than

30:35doubling the density and the change?

30:39>> No. Um the builder actually built

30:43apartment buildings two lots up and it

30:45worked as a nice model. It's been very

30:48appreciated and so when this property

30:51came for sale, he thought let's that's

30:54that makes a lot of sense. We also think

30:56it's a good idea to keep all the

30:58development to the west to allow a large

31:01portion of the property to the east to

31:04be retain its natural possibilities.

31:07That would have obviously from the town

31:09homes that was not possible.

31:12>> Well, those those apartments up to the

31:14east were there before

31:16the the previous submission on from town

31:19homes. Why didn't he decide that he

31:21wanted to do do apartments the first

31:24time we came before the council?

31:28>> A different builder. Am I understanding

31:30the question correctly?

31:33>> Oak Grove Trails was by Meritage Homes.

31:36The 51 town homes approved on the site.

31:39So, they sold the property to Toledo

31:41Builders. Toledo Builders built um the

31:44apartments just north of here. It's 48

31:47units on 11th Street. um that were

31:49recently coed in the last I'd say 18

31:52months. So it was both a change of

31:56developer and a change of plans from

31:59town homes to apartments. It's not

32:01exactly an exciting proposal for me to

32:04go from uh 51 units to 120 to town homes

32:10which people purchase to apartments that

32:13are threetory and uh cracked in as much

32:17as you can get on that little portion of

32:19the land over there. I mean, to me, the

32:23even and and we can't really get into

32:25aesthetics, but it's just not

32:26aesthetically pleasing, but it's double

32:29the density in an area that's already

32:32very dense. Uh, I just kind of curious

32:35what was wrong with the first plan that

32:37was presented.

32:44>> Any other questions?

32:48There was mention of the area to the

32:51right not being suitable. Was that what

32:54prevented the previous owner from

32:56developing it or is that you know it was

33:00five years ago we approved this?

33:02>> I can't.

33:02>> You wouldn't know. I understand.

33:04>> I honestly don't know.

33:05>> Yeah.

33:10>> Any other questions?

33:12>> How many apartments are in Cedar Court?

33:15uh Cedar Court or Cedar Apartments. Do

33:18you know?

33:21>> I don't know.

33:21>> They've been there a while,

33:22>> but

33:23>> they have been It seems to be

33:26It is It is a dense area both north and

33:29south of this area.

33:32>> I do feel like um the apartment complex

33:35that this developer has done um if I'm

33:39not mistaken, I feel like each building

33:41had 16 units.

33:43>> Yes. um two story unit two story and

33:46these will be three story.

33:48>> Okay, that's the difference.

33:51>> They're threetory. Is that what you

33:54said?

33:54>> Yes,

33:54>> these will be

33:55>> we're going the original plan to the the

33:58development to the north of what you see

34:00here. They were twotory buildings and

34:03these will be three story.

34:04>> Is it elevators?

34:06>> No.

34:07>> Okay.

34:08That is also the demand for parking

34:12is greater because we have more units

34:15and therefore we we put as many as we

34:17could as close to the buildings and then

34:20had overflow.

34:23>> Talk talk about the parking and Mr.

34:25White alluded to it earlier. There's

34:26some very peculiar parking on the east

34:29side, northeast side. Can can you expand

34:31on that?

34:32>> It's city demand for parking. There's a

34:34minimum number of parking spaces

34:36required and we've met we have not gone

34:39over that amount. We've met it exactly.

34:44>> Yeah. I mean the general idea for

34:46parking though is the parking space is

34:48allocated to a unit or near the unit,

34:51not just a parking lot stuck somewhere

34:52on the piece of property so you can jam

34:56as many units and the rest of the land

34:58as possible, which is what it looks like

35:00to me on the drawing. I'm not a I'm not

35:03a huge fan of using every square inch of

35:07property for buildings.

35:09>> I understand.

35:11>> But it looks like to me they you jammed

35:13all the apartments on one side. You

35:14couldn't get the parking number of

35:16parking lots associated with it in in

35:19front of the unit. So you stuck a

35:21parking lot out on the right and you

35:22stuck a parking lot back. Well, actually

35:24there well stuck a parking lot on the

35:27rear, too.

35:28>> Yeah. I have I have concerns about if

35:31you're in that first building like right

35:33off of um coming in like there's only a

35:40few spots right in front of

35:43the building.

35:45Um

35:47I could see that being a real problem

35:50with with residents.

35:52>> Excellent point. You

35:52>> better get home early.

35:54>> Yeah.

35:55Yeah. And how many units per building?

35:5724.

35:59So there there are 24 spaces near each

36:03building.

36:07>> Sure. 24 near um are they assigned to

36:10each building,

36:12>> right? We don't

36:12>> That makes sense.

36:13>> We're at zoning. We we certainly can

36:15look deeper into the SEDDS.

36:23>> All right. Any any other questions? All

36:26right. It is a public hearing. Anybody

36:28from the public would love to talk,

36:31now's your chance.

36:38>> Yes.

36:39>> I was just looking at the site plan data

36:42and they are 13 spaces over what our UDO

36:46requires. We'll also be bringing

36:47mandatory text amendments to you all. Um

36:50the general assembly has told us to get

36:51rid of our parking requirements. So, um,

36:54soon we will have no minimum

36:57>> really.

36:59Well, it does fit in the area. Uh, I

37:02think we would have ra rather had town

37:04homes, but um um it is what it is. So,

37:08uh it's it's a continuation of what is

37:10already there and uh in my opinion and

37:15um but nobody from the public wants to

37:18speak. Do I have a motion to close

37:19public hearing? So move

37:21>> have a motion and a second. Any further

37:23discussion? If not, all those in favor

37:25say I.

37:26>> I.

37:27>> Opposed. All right. Public hearing is

37:29closed. Uh would you like to say

37:31anything else or do we have any

37:33questions for the developer engineers?

37:39>> I think we're set unless someone has

37:41questions.

37:42>> Anybody got questions? Nope.

37:46All right. What's the pleasure of the c

37:47of the council?

37:53>> I'm struggling with this one because,

37:55you know, I think part of the appeal

37:57that I had with the um

38:01the plan that had come before us with

38:03the the um property that's just a little

38:06bit north had um you know, 16 units per

38:11building. And I liked the the concept of

38:15having kind of a a smaller community um

38:20you know multif family

38:23uh neighborhood, right? Um,

38:29so and then I I also I have a lot of

38:32concerns about the layout of with this

38:35plan

38:38>> and um

38:39>> for the usability for residents.

38:41>> Then France, I noticed your um your

38:44technical review uh memo

38:47states that we only permit 72 units per

38:50year.

38:52and you looked at it and stated um well,

38:55they requested

38:57a um

39:00a deviation from the UDO um because we

39:03typically do 72 units per per year, but

39:06they wanted to do all 120.

39:10>> That's your paper flow policy that we

39:12adopted um several years ago, a few

39:15years ago. And um so recently uh as some

39:20of these proposals have come before you

39:24uh we've made it a part of if that's

39:26what they wanted to do or plan to do we

39:28made it a part of the approval that city

39:31council understands

39:33that uh this is a condition of the

39:36approval

39:38all of it being done at one time.

39:41>> Would that be detrimental to our system?

39:44uh we are far along in our uh expansion

39:47of our wastewater uh treatment facility

39:51and uh so more recently we've been uh

39:55allowing those type of requests to come

39:57before council.

40:00>> Thank you.

40:03Also

40:06they're requesting the payment in lie of

40:08public recreation.

40:15So you have private recreation is what

40:17you have.

40:34All right. What's the What's the

40:36pleasure of council?

40:42>> I can

40:44is it am I allowed to still speak? Um, I

40:48do want to reiterate the amount of open

40:51space and open space activities that we

40:53have included. Um, the trails open

40:57space. I know it's private.

41:01We certainly have enough

41:04people living in this area to utilize

41:07all the the playgrounds, the pavilions,

41:09the dog park, the

41:13volleyball court, the pocket park, just

41:16and we're providing a space where they

41:19can gather in inclement weather. Um,

41:24and we're providing enough parking

41:27in a in a way that allows people to have

41:31one car and there's public

41:33transportation near M by and the goal of

41:35being connected to a to a larger area

41:40doesn't mean you necessarily have to

41:42have a car. So, it's quite possible you

41:44only have one car. Town homes also

41:47require they had

41:50two parking places per town home which

41:54increased the amount of impervious. So

41:56in that way the impervious was actually

41:59great good deal greater and the

42:01amenities and open space was a good deal

42:04less under the town home development.

42:08>> Thank you.

42:10Also,

42:12Montrina, I believe, is um was pointed

42:14out at planning board and and Ashley

42:16possibly you can help me remember. Um,

42:18one of the planning board members

42:20pointed out that our our payment in lie

42:23uh for uh public recreation under the

42:27previous uh design five years ago, the

42:31uh property was valued very differently

42:33and it was a something on the order of a

42:35$20,000 uh payment in L and I believe

42:38ours isund 120

42:41>> or 112. So it's a it's a fairly

42:44substantial uh payment in Lou. Um,

42:48uh, for the public recreation part,

42:56>> I make a motion to deny the R8 CED

42:59reszoning as presented due to lack of

43:00consistency with the objectives and

43:02goals of the MEBIN 2045 comprehensive

43:04plan.

43:05>> Second.

43:08>> All right, we have a motion and a

43:10second. Any further discussion?

43:13>> If not, all those in favor say I. I I

43:16>> any opposed?

43:18>> Motion carries to deny. Thank y'all.

43:23All right. Next up is conditional

43:25reszoning.

43:27Uh Roger Shields 7 Brew. Uh not quite an

43:31acre on 3970 Wilson Road, R20

43:35residential district to B2 general

43:37business condition for a drive-thru

43:39beverage restaurant known as Seven Brew.

43:44this ombi.

43:45>> Yes. This is a request by the property

43:47owner for a portion of a 5. Acre

43:50property that has front end on Meban

43:52Oaks Road. It's currently zoned R20,

43:54which is the least dense residential

43:56zoning district in Mebban. And the

43:58request is to reszone the property to BT

44:01B2CD, which is general business

44:03conditional district. As you can see on

44:05the map, most of the properties that

44:08have frontage on Meban Oaks Road are

44:09already zoned for general business.

44:12either the general zoning district or a

44:15conditional district. There are

44:17residentially zoned properties in the

44:19area. Um, particularly the neighborhood

44:22behind Mr. Shield's property is zoned

44:24R20.

44:28This property is in our extr territorial

44:30jurisdiction in Alamance County.

44:33Annexation is required with connection

44:35to city utilities which do require some

44:38extension to reach the site.

44:41It is currently a vacant, undeveloped

44:43piece of land. Surrounding uses include

44:47a lot of retail and commercial medical

44:50dental offices, restaurants with

44:52drive-throughs, as I mentioned, the

44:54single family neighborhood that's

44:55nearby, and also some undeveloped land.

45:01This property is identified as regional

45:04commercial in the Meban 2045

45:06comprehensive plan. And this regional

45:09commercial place type supports

45:11autooriented land uses.

45:16The proposed development is also

45:19consistent with the Meban Oaks Road

45:20small area plan. Um this is the small

45:24area plan that was adopted in the early

45:262000s and I've just highlighted here.

45:28The darker green color is what's been

45:30constructed or is under construction. Um

45:33the peach color is what was been

45:35approved by the Creek Side Village.

45:37They're starting site work, but the road

45:39does not exist yet. Um it's hard to see,

45:41but the small red area, it's what's um

45:44proposed with this site development. And

45:47then the gray area that remains um is

45:50the gap

45:55as a conditional zoning district. This

45:57is um

46:00proposed to follow a sight specific plan

46:02and the plan shows just over a 500

46:05square foot building with two

46:07drive-through lanes.

46:09A traffic impact analysis was completed

46:11and also a queuing study was provided by

46:14the applicant. Extension of Wilson Road

46:17is required. Um that extension includes

46:20appropriate pavement markings and also

46:22stop signs. Sidewalk is required along

46:25the front edges of the site and any

46:28modifications that are required to the

46:30traffic signal that currently exists at

46:33the Garrett crossing intersection would

46:35be the responsibility of the developer.

46:40Conditions of the request include a

46:4210-ft type B perimeter buffer and that

46:45is along this perimeter. The requirement

46:48by the UDO is a 20 foot type C. Type C

46:52is aesthetic buffer, not as many

46:55plantings. Type B is semiopekc. So

46:58though they're reducing the width,

46:59they're also increasing uh the number of

47:02plantings.

47:04And then the applicant is requesting for

47:07the allowance of a freestanding pole

47:09sign with a larger sign area and a

47:11greater height. They'll detail that um

47:14sign more in their presentation.

47:17Are there any questions for me at this

47:19time?

47:20Just to reconfirm. So the the piece that

47:24we're looking at connecting, it's not

47:26the entire

47:28gray piece. It's the part that's dotted

47:31or had the like red dots around it.

47:34>> Um it's just this little portion from

47:37where Wilson Road currently dead ends to

47:40where the stub at the traffic signal

47:42dead ends.

47:43>> Okay. Thanks.

47:44>> So we'll complete the loop.

47:46>> Yes, the loop there. Um, it will not

47:48connect to the Creek Side Village

47:50development. So, it will not go to Old

47:52Hillsboro or Bowman Road.

47:54>> But if someone were to make a left turn

47:56off of Most Road, they won't get to the

47:59dead end, have to turn around.

48:03>> Any other questions?

48:07>> Okay.

48:11>> Good evening, Mr. Mayor, members of

48:13council. on Nathan Duggin, 400 Bellam

48:16Street, Greensboro. Happy to be in front

48:18of y'all tonight. Uh, let me do a couple

48:21introductions and I'm going to go

48:22through our slide presentation. Davis

48:25Weaver is with us with Pedmont Beverage

48:27Company out of Spartanber, South

48:29Carolina. They're the developer uh, and

48:31are in the process of developing a

48:33number of seven brews across the Carolas

48:36uh, hopefully this one in the future.

48:39Caitlyn Jackson's always here with me

48:40with Tugle Duggins and Dion Brown is

48:43with me with Davenport Engineering

48:46Answer Traffic Questions. She was the

48:48author of the TIA that uh that Ashley

48:51mentioned. All right, let me get queued

48:54up here. All right.

48:56All right. As um Ashley mentioned, yeah,

48:59current zoning is R20. So, there'll have

49:02to be an annexation. That's not for

49:03tonight, but there'll have to be an

49:04annexation down the road. uh moving to a

49:07B uh two uh general business conditional

49:10uh and and Ashley's already mentioned

49:12the two conditions. I'll talk about

49:13those in a few minutes. Uh and the

49:16proposed use is the seven brew uh

49:18product there on the corner.

49:22I want to go back. Can I go back? No, I

49:25can't go back.

49:27Oh,

49:27>> here we go.

49:29to answer a question that was asked

49:32earlier.

49:36What we're completing is that red right

49:39there.

49:40>> Miss Burke Holder, do you see that? I

49:42think that was your question.

49:43>> Yes. Thank you.

49:44>> And it was being shown on the site plan

49:46which was more zoomed in. But

49:48>> what what's not being completed is that

49:50gray piece that

49:52>> I'm not going to be able to see. Can I

49:54draw it up there? That gray piece right

49:55there. Um, we represented the developer

49:59that has proposed and has is in the

50:02process of uh building the orange. I

50:06don't think it's I hadn't been out

50:07there. I didn't drive down that far

50:10today, but um that's in the process and

50:12I think the council approved that maybe

50:14sometime last year. Um, so I just wanted

50:18to answer that question real quick. So,

50:21all right, site plan. So, couple things

50:24to lift up about the site plan. And

50:25Ashley stole my thunder a little bit on

50:27the buffer. Um, we spent a lot of time

50:30on the site plan. Um, particularly with

50:33staff and with NC DOT. We had originally

50:36had the the building which is in the

50:38middle of the site now.

50:42The building is here now. Okay. It's a

50:45modular building. I'm going to show you

50:47a picture of it in a second, but it was

50:49sitting more towards the front of the

50:50site. Okay. And in working with staff,

50:54we we quickly determined that it was

50:56better from a stacking standpoint to

50:57move the building back to the middle of

50:59the site so that you could have more

51:02onsite stacking storage if you will

51:05around the building. And it also made

51:07the interchange here, this is Wilson,

51:09what we call Wilson Road extended. Um,

51:12and to Mrs. perholders uh question. This

51:16right here and then around this corner

51:18to about right here is what will be new

51:21construction. Uh and um as Mr. Bradley

51:26pointed out, you'll you you can go

51:28straight through. Now when this is done,

51:30you would be able to drive uh behind the

51:32Chick-fil-A, behind the Wendy's, behind

51:34the Aspen Dentl turn, you know, stop

51:36sign here, right turn, and then of

51:39course you all know there's a light

51:40that's down here. Okay. So, that's it's

51:42going to be a big improvement to the the

51:45functionality of uh all of the retail

51:48that's happening uh that's already been

51:51built and is is is currently in place

51:54along Mean Oaks Road. And of course,

51:56hopefully uh one day will be the

51:59ultimate connection uh between Wilson

52:01Road all the way down to Old Chapel Hill

52:03Road.

52:05All right. Oh. Oh, let me go back to

52:07that real quick. So, let me speak to the

52:09condition related to the buffer. Um, in

52:12our process with staff and with NC DOT,

52:15we did we are asking for a a 10-ft

52:18buffer, more opaque buffer, thicker

52:20buffer uh to the north uh so that we

52:24could make the site a little wider,

52:26which gave us some more storage on site,

52:28which which I think we've achieved. Um,

52:30the Chick-fil-A, I looked earlier

52:32tonight. The Chick-fil-A also has a 10-

52:34foot buffer between it and uh it's its

52:37neighbor uh to the site.

52:40>> Which business is immediately to the

52:42north?

52:42>> I think the Verizon

52:45>> it's Verizon.

52:47>> Aspen. I mean, it's going from one

52:49commercial to another.

52:50>> Correct. Correct.

52:52>> Um I'm going to show you a picture of

52:54the sign, but for y'all's uh benefit,

52:57the sign is here.

52:59uh and would be consistent with other

53:01signs that sit on Meban Oaks Road.

53:05Here's a a illustrative purposes only uh

53:09version of a seven bruise. It's a it's a

53:13small building. It's built modularly. Uh

53:15it can be built very quickly or put in

53:17place and installed very quickly. Um,

53:20and uh, I think that's one of the

53:22advantages of of the modular building is

53:24that you can do the site work, bring the

53:26modular building out and have the

53:27building up and the and the and the

53:30retail location going pretty fast.

53:33Pretty fast. This is the pylon sign. Uh,

53:37your UDO allows city council to uh, ex

53:41extend the height. You see, we're asking

53:43for a 30 foot tall, 10 foot wide, seven

53:46brew on a pylon. That's consistent with

53:48the signage that you see down there

53:50through Leon Oaks. Right now,

53:55as Ashley lifted up, this is consistent

53:57with your comprehensive plan. On the

53:59left, you see um your you know the the

54:03commercial running down Mean Oak's uh

54:06road. On the right, a more fuzzy picture

54:09of the same picture that Stacy showed

54:11with the connectivity. The star is the

54:14site and the connectivity um of Wilson

54:17Road. Um

54:20again, we're excited about this site.

54:21We're excited about Wilson Road

54:22extension uh being constructed here to

54:26ask any answer any questions. Um Mr.

54:29Weaver and of course Dion are here for

54:31traffic questions.

54:33I think one of my main questions um is,

54:37you know, Chick-fil-A came and has

54:40renovated,

54:42I think, two times since their original

54:45construction. So, um I know traffic and

54:50and frankly like just the level of

54:52business and success that they've had in

54:54that site

54:55>> caught them off guard. So I think my

54:58main thing is just making sure that we

55:00factored in with the traffic analysis um

55:04you know the the highest likely you know

55:10flow possible.

55:11>> Sure. Dion you want to get and speak to

55:14that

55:17>> and as as she's coming up Miss

55:19Burkholder let me mention that was part

55:21of the iterative process that we went

55:22through with the staff. the previous

55:24site had less storage and then in

55:27working with staff, hey, let's see if we

55:29can

55:30>> narrow that buffer from from 20 to 10

55:33and and that really helped with our

55:35stacking and also moving the building

55:37backwards. But I'll let Dion speak to

55:39the to the storage issue.

55:40>> Absolutely.

55:44>> Good afternoon, Deion Brown, Davenport,

55:484600 Marriott Drive, Raleigh. Um,

55:54we have to do some traffic basically to

55:58see how traffic moves along the

56:01intersections. Um, we also accounted for

56:05those who might want to reroute to the

56:08signal now that it will be available to

56:11them. So, we did some factors of that as

56:13well. Um,

56:18everything worked at a level service

56:29D or better

56:33and

56:38make sure

56:41yes or better for all the intersection.

56:44Um the signal worked well with the new

56:48traffic in the extended lane or ex

56:53connection. Um and even the intersection

56:57to the north.

57:00No, don't get me to tell you a story. Uh

57:03Forest Oaks and uh Wilson improve

57:07because of the rerouting of the traffic

57:08to get to the signal.

57:11Um, and I feel like you've been before

57:15us several times with several times

57:17traffic impact analysis studies. So, I'm

57:20assuming that you are also factoring in

57:23the new developments that are coming

57:25into the south with your your current

57:28analysis.

57:28>> Yes, I've worked on those actually.

57:30>> Yeah.

57:32>> Yes. All all of those developments uh

57:34were factor in. We of course do a scope

57:37of meeting with NCDOT and the city to

57:39make sure that we have all of the right

57:41um approved developments included.

57:43>> Great. Thanks.

57:44>> The scope of your traffic analysis is

57:46just on the roads. You're not analyzing

57:49how much business 7 Brew is going to get

57:52and how backed up their drive-thru is

57:54going to be. That's outside of your

57:55scope or that's part of your scope. for

57:58this project. We did not, but they did

57:59have an independent um

58:02report from a different consultant that

58:04did several of their uh developments

58:07that did the queueing to determine that

58:09they probably needed to move their

58:10building

58:11>> because I'm more concerned about the

58:12stacking on the property itself than the

58:14traffic on the roads around it because I

58:16think this is going to help the roads

58:18roads around it. I think we all

58:19recognize that. But I'm just concerned

58:22that this business is going to be very

58:25successful and we want businesses in

58:27Maven to be very successful but to the

58:29point that um people are going to become

58:33very frustrated at this successful

58:35business. So, so could somebody speak to

58:37us about how you analyzed the expected

58:41business compared to other seven brews

58:43in the area and what you've learned and

58:47have you ever tried to shoehorn a seven

58:49brew onto a piece of property like this

58:51before?

58:52>> Introduce yourself.

58:54>> Davis Weaver uh from uh 169 Ivy Street

58:58in Spartanberg, South Carolina. I work

59:00for the franchisee that's developing

59:02this this project and uh owns and

59:04operates a number of seven brews across

59:06the Carolinas and and Georgia as well.

59:09Uh so as has been referenced, Kimley

59:13Horn uh did a comprehensive traffic

59:16study on uh I think they included

59:20upwards of 10 different seven brews that

59:22are already in operation. Um, and so

59:25that that traffic study determined that

59:28we needed at least eight stacking spaces

59:31uh in each of the two lanes uh for a

59:34total of 16, which is what we've

59:36accomplished with this site plan to

59:38accommodate, you know, uh I think it was

59:40up to 95% or if not 100% of of all times

59:45with with traffic uh and and the amount

59:48of demand. Um, and to your question,

59:51we've developed on uh a number of sites,

59:54you know, smaller and more compact than

59:56this. And, you know, we we wanted to

59:59accommodate uh as much stacking as

1:00:01possible uh within the bounds of of this

1:00:04property. And I think we've we've done a

1:00:06good job of accomplishing that. So your

1:00:08other seven brews are comparable with

1:00:11the with the estimate or uh you've

1:00:14learned how many people

1:00:17you know are coming to the coming to the

1:00:19site. Yes sir. Good.

1:00:21>> Yes sir.

1:00:22>> So you said you analyze 10 other seven

1:00:24brew. So how does that work? Do you take

1:00:26the average or do you try to make this

1:00:29>> took took the maximum of the maximum of

1:00:31>> Yeah. We looked at I mean they broke

1:00:33down into I can't is it 10 or 12?

1:00:36>> 10.

1:00:36>> 10.

1:00:38Yeah, perfect. Uh, so it's it's 10

1:00:40different properties all across the

1:00:41United States and they broke them down

1:00:43into three different categories of high

1:00:45volume, medium, medium volume and low

1:00:48volume. And uh looking at the results

1:00:52the the we looked at the high volume

1:00:54stores and the maximum uh stacking

1:00:57needed to accommodate uh the de demand

1:00:59at those high volume stores.

1:01:02>> Where are those stores located? Uh, I

1:01:04can read all uh

1:01:06>> yeah uh Kenosha, Wisconsin, Sinking

1:01:09Spring, Pennsylvania, Independence,

1:01:11Missouri, Witchah Falls, Texas,

1:01:13Sterling, Illinois, Boone, North

1:01:15Carolina, Huntsville, Alabama,

1:01:17Shelbyville, Indiana, Dallas, Texas, and

1:01:20Columbia, South Carolina.

1:01:22>> That's quite a

1:01:24>> That's quite an an area. That's pretty

1:01:26cool.

1:01:27>> Carolina was boom.

1:01:28>> Uh yes, ma'am. Yeah,

1:01:30>> you get I think I saw a new one in

1:01:33Newburn. Did y'all build just build one

1:01:35in Newburn?

1:01:36>> That that is a different franchisee.

1:01:37There is I believe there is one

1:01:39>> in seven brews on so it's not

1:01:41>> it it's it is a seven brew. We that is

1:01:43not part of our franchisee territory. Uh

1:01:46so I can't speak to you that store u you

1:01:49firsthand knowledge but yes there is a

1:01:51store in Newurn that is a seven brew.

1:01:53Yes ma'am.

1:01:53>> Thank you. I if I'm not mistaken, I

1:01:56think Huntsville was recognized as like

1:01:58one of the fastest growing

1:02:00municipalities or like suburban

1:02:02communities in the country um a year or

1:02:05two ago.

1:02:06>> Yes, ma'am.

1:02:07>> I have family that lives there, which is

1:02:08the only reason that I remember that.

1:02:10But um but I would imagine that site

1:02:13actually sees a fair number of traffic.

1:02:15>> Uh yes, ma'am.

1:02:20So what happens if you're just way more

1:02:24successful than your models predict?

1:02:26What do we do?

1:02:28>> Uh when we have, you know, busy periods

1:02:32or or you know uh bit promo days or any

1:02:34kind of special um

1:02:38events that we anticipate uh increased

1:02:40traffic or if a store has you know

1:02:43higher traffic than you know a standard

1:02:46site can can handle. We uh we bring in

1:02:49extra staff to you know actively manage

1:02:52the traffic and flow around our sites

1:02:54and you know we we'll staff up to to run

1:02:58um you know to to increase throughput uh

1:03:00as as much as possible.

1:03:03>> Is that a voluntary condition?

1:03:06uh that is operationally or

1:03:11how we how we operate our source but uh

1:03:13that is not something that we would uh

1:03:15look to have as a condition.

1:03:19>> I'm I'm not going to add this as a

1:03:20condition but I am adding this as just a

1:03:23general note as we learned um when a

1:03:26bookstore had a very successful 50th

1:03:29anniversary. Um, if you anticipate

1:03:32anything like that, please communicate

1:03:34with Chief McKenna ahead of time.

1:03:37>> Understood. That's part of our standard

1:03:38operating procedure.

1:03:39>> Thank you.

1:03:40>> Yes, ma'am.

1:03:43But just for the council, I have met I

1:03:45met with the district manager um or

1:03:48district engineer of district 7 um and

1:03:52implored him to do a traffic um

1:03:58signalization study to improve

1:04:00particularly the left turn in

1:04:03signalization.

1:04:04Um and then obviously some of that crowd

1:04:08uh will will cars will go down to the

1:04:11light and go that way because a lot do

1:04:13that anyway and make a Uturn u in a on a

1:04:17deadend street. So uh with the

1:04:19signalization and I have it has not been

1:04:22done yet that that was two weeks ago. So

1:04:25um we are we're waiting for that and

1:04:28with the opening of this road I think it

1:04:31according to uh everything we we know

1:04:34with traffic in impacted us it is going

1:04:36to improve that whole Maven Oaks plateau

1:04:41uh a lot. Um it is uh with people

1:04:45pulling out of the the uh offramp and in

1:04:49in the line of traffic and parked

1:04:51because the left turn going in. So, uh,

1:04:54it's going to give us some alternatives,

1:04:55particularly, um, um, Diane, we're

1:04:58looking forward to, uh, it, it took a

1:05:01special company to buy this lot. And,

1:05:05um, y'all were, y'all were um, for one

1:05:09of a better word, a godsend in the fact

1:05:11that it does fit that, you know, that

1:05:14piece of property. And, uh, you know,

1:05:16it's uh, um, Thank you. Thank you.

1:05:20>> I have a question. Will the CO um when

1:05:22the uh if we approve this and the

1:05:24building is built, will the CO be tied

1:05:27to the um the road being opened and the

1:05:31light being functional

1:05:33>> before the CO being issued, not we're

1:05:37going to do it later and then we have

1:05:39all this catastrophe going on with it's

1:05:42got to be tied to that CO and have it

1:05:44functioning.

1:05:45All I can speak to is our all our our

1:05:48only access point to our site is is

1:05:50through that road and so the road will

1:05:53have to be operational.

1:05:54>> You can make it a part of the condition

1:05:55is a conditional use, right? Is that

1:05:57right, Lawson?

1:05:59>> Well, they wouldn't really as I

1:06:02understand the plans if you don't finish

1:06:03that road, you don't have access to your

1:06:05property for business.

1:06:07>> Yes, ma'am. You know what we face?

1:06:09>> Oh, I know.

1:06:11>> Yeah. and and and I'm looking at uh

1:06:13we're also taking responsibility for any

1:06:15modification to the signal too and all

1:06:17that will be required before we open the

1:06:20store.

1:06:20>> Thank you.

1:06:21>> One one of the things that impressed me

1:06:23about the design was there's no

1:06:24intention of bringing traffic on to Mean

1:06:26Oaks Road from that propert.

1:06:28>> Absolutely.

1:06:29>> So it all has to come around. Yeah.

1:06:31because that's that's a that's one of

1:06:34the issues now people trying to get out

1:06:36from uh the two other properties and

1:06:39with the with the traffic jam and and if

1:06:42I can just speak quickly to the Kimry

1:06:43Horn the report that Davis was reading

1:06:46from um I think y'all know Chuck Edwards

1:06:49by reputation. Yes.

1:06:50>> Um he he he is a uh a safety first

1:06:55traffic guy. NC DOT, you know, he's

1:06:58we've worked with him a lot on this

1:06:59corridor. Um and uh he was holding our

1:07:02feet to the fire on this one. Uh and and

1:07:04really appreciated the report they had

1:07:06generated which was kind of speaking to

1:07:08Mr. White's question about what what you

1:07:10know what's the high use what what does

1:07:12a seven brew generate in terms of so

1:07:15that really helped him zone zoom in on

1:07:18that and answer some questions he had.

1:07:21>> Can you tell talk to us about the

1:07:22signalization and the progress moving

1:07:24forward? I'm hoping there's going to be

1:07:26one two maybe even three iterations or

1:07:28reviews. Oh, as as

1:07:31>> yeah, NC dot will absolutely basically

1:07:34control the modification to the Are you

1:07:36talking about the signal that on the

1:07:38>> Yeah. Just to try make make me oaks a

1:07:39little bit smoother.

1:07:40>> Absolutely. Yeah. And and the hope is

1:07:42that over time you'll have more traffic

1:07:45coming down to the second signal and not

1:07:47going back to the first signal. Right.

1:07:50And that'll help with with with the

1:07:52traffic flow. But yeah, we'll work we're

1:07:54going to work work very closely with NC

1:07:57DOT as we as we do that.

1:08:00>> I have a few more questions about the

1:08:01site plan. Go ahead.

1:08:02>> I think there was one little side

1:08:04comment

1:08:04>> to

1:08:04>> your question, Council Member Yuan. If

1:08:06you're referencing what the mayor said

1:08:07about the synchronization,

1:08:09>> that is not a requirement or condition

1:08:12of Seven Brew, Mr. Dugens um uh client,

1:08:17but the city staff and city chief

1:08:19elected official has had discussions

1:08:21with um NC DOT that that that we would

1:08:26like that to be looked at in general,

1:08:27but also with this new traffic pattern

1:08:29opening, we felt like it especially

1:08:31needed to be looked at again. But I just

1:08:33wanted clarification.

1:08:34>> Thank you for that. Yeah, I just want to

1:08:35make sure I appreciate the mayor uh

1:08:37working with DOT. Appreciate staff

1:08:39working with DOT. It's just I know a lot

1:08:41of activities happening on Mean Oaks.

1:08:43So, I really appreciate everyone. My

1:08:44apologies.

1:08:45>> Well, Min Oaks is is is uh well

1:08:48traveled, but when you compound people

1:08:51getting off the interstate and parking

1:08:53in the lanes, waiting for a left turn

1:08:57into so if they would solve the

1:08:59signalization of the left turn

1:09:01particularly and and when they turn to

1:09:04green, that will help a lot. And um once

1:09:07people realize that you can go

1:09:09particularly local, if they if they're

1:09:10going to Seven Brew, they'll go the

1:09:12other way if they're smart. And uh so

1:09:16anyway,

1:09:18we've implored them to um to do it and

1:09:20do it quickly.

1:09:21>> Sink in those lights as we go south.

1:09:23>> Yes.

1:09:24>> And south is to your right on this

1:09:27presentation, but you can you can see

1:09:29obviously where the interstate is there.

1:09:32>> I have a few questions on the site plan.

1:09:34First is about employee parking. Is

1:09:37there sufficient? What is the plan

1:09:39there? Second is there's this third pass

1:09:42through lane, but it doesn't go all the

1:09:44way around, and I don't understand the

1:09:46purpose for that. And then the third is

1:09:48it looks like you're doing some

1:09:51interesting things with sidewalks to

1:09:53maybe have a walk up counter. I don't

1:09:55really understand that. So, talk me

1:09:57through those three things.

1:09:58>> Let me ask Davis to come back up and

1:10:00answer those questions.

1:10:03the passroughs, employee parking, pass

1:10:06through and uh walk up traffic.

1:10:08>> Got it. Davis Weaver. Uh again, uh so

1:10:13employee parking, yes, we have optimized

1:10:16this site as best as possible to fit as

1:10:19many parking spots as as we can possibly

1:10:21fit. And uh with with the eight on-site

1:10:25parking spaces that that should be

1:10:27sufficient for uh even our our you know

1:10:30largest shifts um you know of employees

1:10:34uh pass through lane. Um so that is to

1:10:38accommodate any larger vehicles that

1:10:40come through that can't fit under the uh

1:10:44the canopy. Um is is one of the driving

1:10:47factors there. and you know if a car

1:10:50comes in and decides that they don't in

1:10:52fact want to you know order anything and

1:10:54want to you know get out of line it's

1:10:55kind of an escape lane for for them as

1:10:57well. Um

1:10:58>> okay

1:10:59>> so those those are the you know primary

1:11:00p purposes for that um and in busy times

1:11:04can you know help with additional

1:11:05capacity uh if we can use that third

1:11:08lane as well. um the sidewalk uh that

1:11:12was driven by requirements

1:11:15um from from the UDO uh NC dot I

1:11:19believe.

1:11:20>> Well, I see two sets of sidewalks here.

1:11:21It looks to me it looks like sidewalks

1:11:23along Meban Oaks, but then this other

1:11:26strange sidewalk that goes right up to

1:11:28your building.

1:11:28>> See the one up here will we have walk up

1:11:31traffic is I think the question. Uh yes,

1:11:34we are it is laid out and I believe it

1:11:36was a code requirement to you know have

1:11:39direct access for pedestrians for

1:11:42pedestrian walk up and yes we we can uh

1:11:45and will serve uh walk up customers.

1:11:48>> Okay. Okay. Because many drive-throughs

1:11:49won't serve

1:11:50>> yes customers.

1:11:52>> Yeah. You've got the, you know, primary

1:11:54um, you know, service area that services

1:11:57the drive-thru lanes, but there is also

1:11:59a kind of walk up u window and area on

1:12:03the uh, plan north side of this building

1:12:05that could serve um, the walk up

1:12:09customers.

1:12:10And did I address all the questions?

1:12:16>> Any other questions?

1:12:19Um there's been some conversation about

1:12:22and maybe you're going to get to this uh

1:12:25money that we have in escrow for

1:12:27$200,000 blah blah blah. Can you talk us

1:12:30through that?

1:12:30>> Yeah, I think I've talked to uh city

1:12:33council uh city council city attorney.

1:12:37Um and uh it's it is later on your

1:12:40agenda. Um, so I think we'll if we can

1:12:42just address it then I think that'd be

1:12:43fine.

1:12:45>> So, so you will stick around for

1:12:48Thank you.

1:12:50>> All right. Any other questions?

1:12:52All right. If not, it is a public

1:12:54hearing. Anybody like to speak?

1:13:02All right. Make a motion we close public

1:13:04hearing.

1:13:04>> Got a motion.

1:13:06>> Got a second to close the public

1:13:08hearing. Any further discussion?

1:13:11If not, all those in favor say I. I.

1:13:13>> Any opposed? Motion carries to close the

1:13:16public hearing.

1:13:19>> Motion to approve the B2 conditional

1:13:22district zoning resoning is presented.

1:13:25Find the applicant as consistent with

1:13:26the objectives and goals of the Meban

1:13:292045 comprehensive plan. Specifically,

1:13:31the request as for property

1:13:35identified as regional, commercial, and

1:13:37future land use. U map

1:13:40Second. We

1:13:40>> We have a motion.

1:13:42>> Second.

1:13:43>> Second. Any further discussion?

1:13:45>> I just want to highlight to seven brew

1:13:46that we expect you to be very very good

1:13:48neighbors. We're if this approved, we're

1:13:50excited to have you, but you have some

1:13:52responsibilities on you to pull this off

1:13:54in a very very excellent way and we

1:13:57expect you to do that.

1:13:59>> Any further discussion? If not, all

1:14:01those in favor say I.

1:14:03>> Any opposed? Motion carries.

1:14:07All right, let's uh let's call a fivem

1:14:09minute break.

1:20:12All right, let's move on to the next

1:20:14public hearing is a uh ordinance to

1:20:17extend the corporate limits. U Mr.

1:20:20Lawson Brown.

1:20:22>> Thank you, mayor, mayor, members of the

1:20:24council. This is a ordinance to extend

1:20:26the corporate limits uh filed by the

1:20:29owner Lebanon Road 3 LLC uh for the

1:20:33Tupelo North development. It's a

1:20:36voluntary contiguous annexation of 87.73

1:20:40acres located in Orange County off

1:20:42Lebanon Road.

1:20:45Last month, uh you accepted the petition

1:20:47and certificate of sufficiency of the

1:20:50clerk and set a date of public hearing

1:20:52for tonight. It is staff's

1:20:54recommendation that this uh land be

1:20:58annexed into the city of Meban. I and

1:21:01staff are ready, willing, and able to

1:21:03answer any questions that you might

1:21:05have. It is a public hearing.

1:21:10All right. Any questions for Mr. Brown?

1:21:17If not, it is a public hearing. Anybody

1:21:20in the audience like to speak?

1:21:25If not,

1:21:26>> I make a motion to close the public

1:21:27hearing. Second. We have a motion and a

1:21:29second to close the public hearing. Any

1:21:31further discussion?

1:21:33>> If not, all those in favor say I.

1:21:35>> Any opposed?

1:21:36>> Motion carries to close the public

1:21:38hearing.

1:21:40Pleasure to council.

1:21:42>> I move to adopt an ordinance to extend

1:21:43the corporate limit city, North Carolina

1:21:45to include the plus or minus 87.73 acres

1:21:49on Lebanon Road. Second.

1:21:52>> We have a motion and a second. Any

1:21:53further discussion? If not, all those in

1:21:55favor say I.

1:21:56>> I.

1:21:57>> Any opposed?

1:21:59>> Motion carries. All right. Uh carrying

1:22:02on downtown social district ordinance

1:22:05amendment schedule adjustment. Our own

1:22:08Sarah Williams, DMDC Executive Director.

1:22:12>> All righty. Thank y'all for having me on

1:22:14behalf of uh my board and our

1:22:16organization and myself. We really

1:22:18appreciate you considering this request,

1:22:20which we think will be a benefit to our

1:22:22wonderful downtown.

1:22:24So, a little history, it's brief. just

1:22:27been uh in place for 2 years, but as you

1:22:30all probably recall back in May of 2024,

1:22:32you all agreed to adopt this for a

1:22:34one-year trial, and that was on

1:22:36Thursdays to Sundays from 11:00 a.m. to

1:22:3810 p.m. Then, when the concerns weren't

1:22:41realized, we saw the economic benefit.

1:22:44There was public support, we came before

1:22:46you all again a year later in May of

1:22:482025, and you all amended it to make it

1:22:51permanent, as well as enlarge the

1:22:52boundary to include additional

1:22:54businesses. Uh, so it's the building

1:22:56that Shuffle and Roll is in off of Fifth

1:22:58Street. They actually came to us and

1:22:59requested that and then you preemptively

1:23:02added um, as you all probably recall,

1:23:04the third and clay pocket park uh, that

1:23:07was going to be constructed. The entire

1:23:09time of the district, we've had a

1:23:10management and maintenance plan in place

1:23:12with our partners. So, it's us, we have

1:23:14MEP and PD with uh, support of it and

1:23:16public works staff as well so that we

1:23:19can make sure everyone is informed and

1:23:20stays safe and our downtown remains

1:23:22clean and beautiful. Couple of things

1:23:24we've done on our behalf with that plan

1:23:26is the stickers we initially put down on

1:23:28the sidewalk were temporary and some of

1:23:30them had been ripped and torn up. So,

1:23:32we've replaced those. We also did a

1:23:34re-education campaign on social media

1:23:36and through our newsletter both um ahead

1:23:38of Autumnfest and Dogwood when we see a

1:23:41higher use of the district with the big

1:23:42events. And so, we have done those

1:23:44things. We'll continue to do them if

1:23:46this expansion goes into place.

1:23:50So existing map and times I am going to

1:23:53state for the record. I apologize in

1:23:55being so fixated on the schedule and

1:23:58other data for this presentation. I

1:23:59failed to realize that that presentation

1:24:01has the initial map, not the amended

1:24:042026 map. So you'll see at the break I

1:24:06placed a printout copy so you have that

1:24:08in front of you. Um and again it

1:24:10includes the pocket park as well as the

1:24:12building off of Fifth Street. and the

1:24:15current times our schedule is Thursday

1:24:17to Sunday 11:00 a.m. to 10:00 p.m. So

1:24:20the proposed expansion is no change to

1:24:22the boundary. The footprint would stay

1:24:24the same and then we would propose that

1:24:26the schedule adjusts to be every day of

1:24:28the week from 10:00 a.m. until 10 p.m.

1:24:32There are a few reasons for this

1:24:34request. First and foremost, we have

1:24:36seen it uh as an economic boost to our

1:24:38downtown. I've got data from the

1:24:39businesses I'll share a little bit

1:24:41later. And so we just believe that

1:24:42additional days will lead to additional

1:24:45economic revitalization and support for

1:24:47our downtown and its businesses. Second

1:24:49is pretty obvious. It's easier to

1:24:51remember. Even some folks on our board

1:24:53were like, "What what was the day?" And

1:24:54you know exactly the time. And so just

1:24:55to keep it simple um for businesses,

1:24:58police officers to enforce it, visitors

1:25:00to enjoy it. We believe it'd be simpler

1:25:02to keep it 10 a.m. to 10 p.m. daily. And

1:25:05then the reason we bumped it up to 10:00

1:25:07a.m. that additional hour in addition to

1:25:10being, you know, easier to remember

1:25:11saying 10 to 10 was mostly so that it

1:25:14could align with our big events, many of

1:25:16which start at 10:00 a.m. So, for

1:25:18example, we just had Autumn Best and

1:25:20Bright Penny was one of our vendors.

1:25:22They loaded in at the early we hours

1:25:23with the rest of the vendors, but

1:25:26twiddled their thumbs until 11:00 a.m.

1:25:28before they could serve. So, we think

1:25:29that additional hour will help them

1:25:31economically, any vendors that can sell

1:25:33um at our events. and then any visitors

1:25:36or attendees that would choose to have a

1:25:37beverage at the beginning of the event.

1:25:41So, I reached out to check with our

1:25:43partners. So, Chief McKenna did a review

1:25:46of every incident since we officially

1:25:48began June 28th, 2024 for within the

1:25:51boundary as well as around the boundary

1:25:53of our social district and identified

1:25:55very few alcohol specific violations.

1:25:58and he said the incident history did not

1:26:00indicate a public safety concern enough

1:26:02that he would recommend against this

1:26:03expansion.

1:26:06I checked with Chuck Smith of public

1:26:08works as well and he said of course

1:26:10there will probably be more garbage and

1:26:12recycling with additional days and hours

1:26:14but they could handle that with a shift

1:26:15in operations, a small shift in

1:26:17operations. And he specifically

1:26:19mentioned that littering had been an

1:26:20issue at times, particularly after large

1:26:22events, but they have had a lot of

1:26:24improved support from event organizers

1:26:26to help with that, keeping the streets

1:26:28and sidewalks clean. I'll say

1:26:30specifically uh an example from DMDC. So

1:26:32last year's Autumn Fest, we had a few um

1:26:36cardboard trash cans alongside of the

1:26:38city's downtown. And I myself was even

1:26:40picking up trash that had overflowed

1:26:42from the side of that. Not all alcohol

1:26:44related. It was also just food and such.

1:26:46Um, but to try to prevent that from

1:26:47being a problem, I just doubled our

1:26:49number of cardboard bins this year and

1:26:50we didn't have um much or any trash on

1:26:53the streets. So, we have tried to do

1:26:55that sort of thing. And then a shout out

1:26:57to recreation and parks. Uh, they were

1:26:59helping us with that event. And at the

1:27:01end of the day, we were sweeping the

1:27:02streets. Sai brought a blower. Again,

1:27:04this was not all alcohol related. It was

1:27:06more corn and straw from our autumnfest

1:27:09event, but we did what we could as an

1:27:10event organizer to make sure it wasn't

1:27:12any additional burden on our public

1:27:14works partners.

1:27:17Then of course support for expansion

1:27:18from our downtown merchants. I sent out

1:27:20a survey. We've also discussed this with

1:27:22them in person at our we have a monthly

1:27:23merchant meeting and nearly 96% were in

1:27:26favor. We had a really strong turnout

1:27:28with our survey as well. 23 responses.

1:27:31So that was a high show of support. And

1:27:34there were a few themes that came up in

1:27:35the data from that survey. Uniformity of

1:27:38hours makes it easy to enforce. And they

1:27:40also think it's easier for folks to

1:27:42abide as well when they have clarity on

1:27:44it. And again, no confusion on when it's

1:27:46offered. Another theme that came up was

1:27:48it's an added bonus, but it's also an

1:27:50added value to bringing people to our

1:27:52downtown. When they have folks visit,

1:27:54whether they are residents or from out

1:27:56of town, they have heard that people

1:27:58enjoy that we have a social district and

1:27:59have seen them witnessed them uh

1:28:01enjoying a beverage in the social

1:28:03district.

1:28:05In addition, there was there was several

1:28:07questions on the survey, so I wanted to

1:28:08highlight that nearly threequarters

1:28:10reported an increase in foot traffic,

1:28:12customer engagement, and a positive

1:28:13impact on their business since the

1:28:15social district began. I also just

1:28:17wanted to name that 96 uh down to 74 is

1:28:20a pretty big gap. However, it wasn't

1:28:23that it was negative. So, the people who

1:28:25reported the majority of those other

1:28:26responders, it was not that they had a

1:28:29negative impact. It was just sort of

1:28:30neutral. So, for example, if you're

1:28:32going to do your taxes or fill out

1:28:34insurance, probably not with a beer in

1:28:37hand, right? So, they were um again, 96%

1:28:40approved this and in fact, 20 of the 23

1:28:43responders said they had no issues

1:28:45whatsoever with it. It just didn't have

1:28:47the direct impact um to the foot traffic

1:28:49or customer engagement. Still, we

1:28:51believe three quarters is a really

1:28:53strong um impact of this as an economic

1:28:56driver. Some themes that came up in the

1:28:58data there as well were folks said it

1:28:59allowed for longer dwell time and adults

1:29:01sipping and strolling using the the

1:29:03district. And then another specific

1:29:05thread I wanted to lift up because

1:29:06obviously our huge events we see um an

1:29:09impact with the social district but a

1:29:11lot of them reference instore events and

1:29:12that they hear from attendees that folks

1:29:14linger often longer and tell others even

1:29:18at these instore events that that is a

1:29:20benefit um and a reason they like to

1:29:21attend the events. They also shared in

1:29:24the survey that they have events outside

1:29:25of our current hours. So on a Monday

1:29:27through a Wednesday that would benefit

1:29:29from having this expansion.

1:29:33Also just wanted to reference uh

1:29:34neighboring districts. So we have other

1:29:37social districts with some of our nearby

1:29:38communities. Elon's is exactly what

1:29:41we're proposing. Monday to Sunday, 10:00

1:29:43a.m. to 10:00 p.m. Burlington's is only

1:29:45Fridays and Saturdays, noon to 10 p.m.

1:29:48But I will say uh I did my homework and

1:29:50I watched all of the city council

1:29:52meetings that y'all had regarding the

1:29:54social district. So you all may recall

1:29:56um when Aaron Nettles presented and

1:29:58spoke to you all back in 2024. She said

1:30:00they started with those two days because

1:30:02those were the event heavy days in

1:30:04Burlington. She also said that they

1:30:06planned and hoped to expand it. Um she

1:30:09is no longer there. So, I spoke with

1:30:11their current director, Maggie, and just

1:30:13was making sure like there was not a

1:30:14problem and that they had stayed it uh

1:30:16just Fridays and Saturdays and she said

1:30:18no that to her knowledge they they've

1:30:20had staff turnover and of course have

1:30:22extensive construction going on and that

1:30:24has been their priority. Um which is why

1:30:26this hasn't been revisited. And then

1:30:28Gibsonvilles is nearly identical to

1:30:30ours. So, Monday to Saturday, 10 to or

1:30:32what we propose, excuse me, 10 to 10

1:30:34Monday to Saturday, and then Sunday is

1:30:36noon to 10 p.m. But all of them, when I

1:30:39spoke to the current downtown directors,

1:30:41have reported enhanced events, um, an

1:30:43economic boost for their businesses,

1:30:45majority business support, and few to no

1:30:47issues. So, very similar to what we've

1:30:49seen here in Meban.

1:30:52So, with that, I appreciate you all

1:30:53considering this request and would be

1:30:55happy to try to answer any questions you

1:30:57might have.

1:31:00just want to say my experience has been

1:31:01that y'all have exceeded it. The the the

1:31:04limited number of issues is is well

1:31:09under what I was even remotely expecting

1:31:11and I'm a strong supporter. So just

1:31:13thank you for everything.

1:31:14>> Thank you.

1:31:14>> Yeah. And I was an advocate of that

1:31:16one-year trial period because I just

1:31:18wasn't sure how this was going to work

1:31:19out. But every indication that I've

1:31:21seen, this is this has been positive and

1:31:23I appreciate the carefulness in which

1:31:25you and DMDC and the business owners

1:31:28have made this work.

1:31:29>> Thank you.

1:31:30>> I I appreciate the presentation. You

1:31:33answered most of the questions I had.

1:31:34Very well done.

1:31:35>> Thank you.

1:31:37>> All right. It is a public hearing.

1:31:39Anybody

1:31:41would like to speak that's not on the

1:31:44board.

1:31:48My name is Payton Rice and I am here on

1:31:51behalf of Hen Feathers. Oh, 120 West

1:31:54Clay Street downtown Evan.

1:31:56>> I'm here as Hen Feathers at the Elegant

1:31:58Relic, not as the MTC on the board. Um,

1:32:02I'm not going to beat a dead horse

1:32:03because Sarah covered all of it. We've

1:32:04been very extensive. Um, I kind of

1:32:08helped get on this at the pilot program.

1:32:09We've had meetings for years to get it

1:32:11to this point. Um, I do help plan a lot

1:32:14of the events downtown. And one of the

1:32:17things a few years ago that we all sat

1:32:18down is an event that works for a

1:32:21boutique may not work for a restaurant

1:32:23or may not work for a kids toy store or

1:32:26a bookstore or a bar. Um, so one of the

1:32:29things I feel like years ago where it

1:32:31was a hold up of how do how does Wendy

1:32:34at the Clay Street Tavern and Payton at

1:32:35the Elegant Relic plan an event that is

1:32:38able to benefit both of our businesses.

1:32:40the social district has been something

1:32:41that's really helped bring all of us

1:32:43together to plan those things and help

1:32:45create something that's good for one is

1:32:48good for all. Um, so that's all I wanted

1:32:50to add to it.

1:32:51>> Thank you so much. Anybody else?

1:32:58>> I move we

1:32:59>> not coming up.

1:33:03>> Okay.

1:33:05>> All right. Nobody else wants to come up.

1:33:07We will um I need a motion. Motion to

1:33:10close.

1:33:10>> Second.

1:33:11>> Got a motion and a second to close the

1:33:13public hearing. Any further discussion?

1:33:15If not, all those in favor say I.

1:33:17>> I. It's the pleasure of the council. I

1:33:19>> move that the city adopt the social

1:33:21district expansion as presented to

1:33:22expand the social district to seven days

1:33:24a week, 10 a.m. to 10 p.m. Effective

1:33:26upon adoption.

1:33:28>> Second.

1:33:28>> That sounds like a radio voice.

1:33:30>> I got a face for radio.

1:33:31>> We got a motion and a second.

1:33:34>> Any further discussion? If not, all

1:33:36those in favor say I. I.

1:33:38>> Any opposed?

1:33:40Motion carries. Thank you, Sarah, and

1:33:42your

1:33:44friends. Thank you. Well done.

1:33:46>> All right, that concludes public

1:33:48hearings. Moving to the uh downtown

1:33:50exterior improvement grant award. Uh

1:33:53Miss Obe,

1:33:59>> we have received an application for a

1:34:01downtown exterior improvements grant.

1:34:03Um, this is using funds allocated in the

1:34:06current fiscal year's budget and the

1:34:09applicant has provided two quotes. It is

1:34:11the property owner and all of the

1:34:13improvements appear to be occurring on

1:34:16the building. The property is on West

1:34:18Clay Street and within the area

1:34:20identified in the downtown vision plan

1:34:22and the request is for just over $9,000.

1:34:26It is for facade improvements to the

1:34:29property at 105 West Clay Street. And

1:34:32these facade improvements include

1:34:34improvements to the windows, masonry,

1:34:36and exterior lighting.

1:34:40>> Any questions?

1:34:41>> Is that the old barber shop?

1:34:42>> Yep.

1:34:43>> Yes.

1:34:44>> Great. What's the cozy skiing?

1:34:48>> Um, it's a knitting store.

1:34:50>> Okay, great.

1:34:52I

1:34:54just want to say how excited I am. This

1:34:57building has been sitting empty and I

1:34:59know that the neighboring um businesses

1:35:02have had some concerns about the

1:35:05condition of the building. So, this is

1:35:08in my opinion just an excellent use of

1:35:11our exterior grant program. So, thank

1:35:13you Ashley for bringing this to us.

1:35:16>> Right. We actually participated in a

1:35:18couple site visits um hoping that they

1:35:21would somebody would come. So, somebody

1:35:23came. All right. What's the pleasure of

1:35:25the council?

1:35:27>> Move we approve the request.

1:35:31>> Second.

1:35:32>> We got a um motion and a second. Any

1:35:35further discussion? If not, all those in

1:35:37favor say I.

1:35:38>> I.

1:35:39>> Any opposed? Motion carries.

1:35:43All right. If nothing no other business,

1:35:45I'm sorry. Number seven,

1:35:48release and reimbursement of Wilson Road

1:35:50extension fund. Honorable Lawson Brown.

1:35:54>> Thank you, Mayor, members of the

1:35:55council. U as you discussed earlier, the

1:36:00extension of Wilson Road across the

1:36:02Roger Shields property. Uh Seven Brew

1:36:05and Mr. Shields are extending that road.

1:36:09Uh the attorney for Mr. Shields uh Frank

1:36:13Longest requested uh the council's

1:36:16consideration of release of that money

1:36:19uh consistent with action that you took

1:36:22uh uh several years ago, August the 5th

1:36:25of 24

1:36:27when Mr. Mark Tiller of Henden Tiller

1:36:30LLC uh was uh developing the uh tractor

1:36:36supply and u the minutes from that and

1:36:40the approvals from that and the bond

1:36:42that was placed uh the city has received

1:36:45the $200,000 it was paid for the express

1:36:50purpose of extending Wilson Road and Mr.

1:36:55Tiller made that commitment and talking

1:36:58with Mr. Duggins last week, he talked

1:37:01with Mr. Tiller and Mr. Tiller

1:37:03understood that this money would be used

1:37:04for the extension of the uh Wilson uh

1:37:10drive and uh was in agreement with that.

1:37:14And so because it was a condition of an

1:37:17earlier zoning, the staff and management

1:37:20felt that it was appropriate to bring it

1:37:22before you. uh the concerns that staff

1:37:25and management have is to make sure that

1:37:28one that the rightway is actually

1:37:31dedicated and u I'm suggesting in the

1:37:34suggested motion that I gave you or

1:37:36recommending in the suggested motion

1:37:38that it be the condition that the

1:37:41rightway be dedicated and the street

1:37:43built and it would be a reimbursement to

1:37:46the developer uh either seven brew or

1:37:50Mr. shields uh after uh the expense was

1:37:55incurred. Uh and I'm happy to answer any

1:37:58questions. Mr. Duggin is here and can

1:38:01answer questions as well if you have any

1:38:03for him. But uh uh all is well. It ends

1:38:06well and hopefully this will be the end

1:38:10of the northern extension of Wilson

1:38:13Drive.

1:38:16your the motion uh suggested motion we

1:38:18have uh my cons I had some concerns with

1:38:21that because it didn't appear to require

1:38:24that the road be built only that the

1:38:27land be dedicated for the use

1:38:30>> I'm I'm comfortable with your uh

1:38:34savvy suggestion that it be a

1:38:36reimbursement for the construction as

1:38:38well as the dedication

1:38:41>> that takes care of my concern

1:38:44>> agreed

1:38:44>> thank Does reimbursement imply that it

1:38:46that it won't be paid until the work is

1:38:49complete or until that money is spent or

1:38:51how are we

1:38:52>> until the work is completed and the

1:38:54roads dedicated?

1:38:55>> Okay. All right. And then there was a

1:38:57question about um the original

1:39:02um agreement with Henden Tiller and the

1:39:05background statement here says that uh

1:39:09if the develop if the developer did not

1:39:12use the funds for that purpose which

1:39:15kind of implied the developer Henden

1:39:17Tiller but are we saying that the

1:39:20original plan was if a developer does

1:39:23not use the funds for that purpose? uh

1:39:25the language in those had some concern.

1:39:28That's why I reached out to uh Mr.

1:39:32Duggins on behalf of Henden Tiller and

1:39:35Henden Tiller has authorized

1:39:38uh uh has said that they consent to this

1:39:41money. They've paid the 200,000. they

1:39:44understand that it was going to be uh

1:39:47used for the road and that after the

1:39:49five years from the 24 date that you

1:39:51approved it, it was going to revert to

1:39:53the city for any use. So uh I think

1:39:57consistent with the uh objective of it

1:40:00being used to construct the road. That's

1:40:04what we're suggesting here.

1:40:08>> And releasing it to a property owner

1:40:10just strikes me as a little odd. Can you

1:40:12come I mean

1:40:15>> uh it it is it is released to a uh it

1:40:20was a condition of a zoning. So it's not

1:40:22a private emolment. It was for a public

1:40:25purpose i.e. the extension of Wilson

1:40:28Road. So yes I I I don't have any

1:40:32concerns about it being a private

1:40:34emolement.

1:40:35>> Couple more questions. There's no issues

1:40:37with the or statement right there that

1:40:39we might be involved in a legal quagmire

1:40:41here.

1:40:42>> I don't think so.

1:40:43>> Okay. And since these were public funds,

1:40:45we don't need to go through any normal

1:40:48uh routes in regards to uh putting this

1:40:51out for bid or anything along that line?

1:40:52>> No, sir.

1:40:53>> Okay.

1:40:57>> I see Frank Long is represent uh who's

1:41:01representing Shields. Uh how's he doing?

1:41:05uh seems to be doing really well. He's

1:41:09continuing to work uh well past his 50th

1:41:12year of practicing law.

1:41:14>> Yeah.

1:41:15>> And he doesn't Never mind. Um all right.

1:41:18What's the pleasure of the council?

1:41:19>> Well, my my understanding from the

1:41:21get-go was that the $200,000 was to

1:41:24ensure in the future the road was built

1:41:27and if it was not built within five

1:41:29years, it would go into the city coffers

1:41:32in case the city ever had to build the

1:41:34road. So, I don't have any I don't have

1:41:36any problem with the $200,000 being

1:41:40allocated for the securing of the land

1:41:43or and the completion of the road, but I

1:41:47don't think it should be paid until the

1:41:50road is complete. So, I would I would

1:41:52make the motion that the city reimburse

1:41:54Roger Shields or his develop developer

1:41:57to $200,000 being held for the extension

1:41:59of Wilson Road having been paid to the

1:42:01city by Henden Teller 3.0 O LLC for the

1:42:05limited purpose of the extension of

1:42:06Wilson Road with the city manager

1:42:09finance officer directed and authorized

1:42:11to assure the funds are used for this

1:42:12limit limited p purpose conditions to

1:42:16the release of the $200,000 are the

1:42:20conveyance of the necessary land. The

1:42:22deeding of the land is that the proper

1:42:24term

1:42:26>> that would be appropriate. dating of the

1:42:28land uh and the completion of the uh

1:42:32building of the road

1:42:35of of Wilson Road by Ro Shields and

1:42:37satisfactory proof of payment. Is that

1:42:41cover everything?

1:42:42>> Excellent.

1:42:43>> All right, we have a motion. Is there a

1:42:45second?

1:42:45>> Second.

1:42:46>> You want to speak?

1:42:47>> Uh I was just going to add, Mr. Mayor,

1:42:49if you and council and the city attorney

1:42:51would allow uh Henden Tiller's um

1:42:55attorney will come forward on the record

1:42:57and state that he is in concurrence with

1:43:00what our city attorney said, just to

1:43:02have that on the record.

1:43:03>> Again, Nathan Duggin here on behalf of

1:43:06uh really the land owner tonight. Um and

1:43:09being perfectly frank, um

1:43:13we're here tonight for the reasoning.

1:43:15I've had conversations with Lawson about

1:43:18this. Um,

1:43:21Mr. Bradley's concerns about releasing

1:43:23the money. I had the same questions. It

1:43:25it it in the if you look at the letter,

1:43:27it's it looks like it's released to the

1:43:29developer, right, who was who put the

1:43:31money in. Um, but it's exclusively

1:43:35for the purpose of doing the extension

1:43:38of Wilson Road. Um, and look, y'all can

1:43:42read it. Says if if it doesn't get

1:43:44built, Bebon can use it for some other

1:43:46purpose at the end of five years. So, I

1:43:48can represent that. I've talked to Mark

1:43:50Teller about this. He knows this hearing

1:43:52is tonight. He knows

1:43:55we've got I think Lawson, you sent me

1:43:57the letter from Mr. Shield's attorney

1:43:59that that we got like last week. Yes.

1:44:02So, so everything Lawson said is

1:44:04accurate and we're again excited about

1:44:07cooperating with the city of Mean to get

1:44:09this thing done.

1:44:09>> Well, there is another parcel of land

1:44:13um on on that in that area that I think

1:44:16I don't know if Tiller owns it or not,

1:44:18but um

1:44:18>> Thank you, mayor. Yeah,

1:44:19>> it behooves him to

1:44:21>> he he get it out of the way and and do

1:44:24it.

1:44:24>> I think it's about 1.4 acres.

1:44:26>> Yeah,

1:44:27>> that's to the south of the Chick-fil-A

1:44:29employee parking lot,

1:44:30>> right? um that will benefit from right

1:44:33>> the further extension items. So

1:44:35>> all right we have a motion and a second.

1:44:37We have the conditions the agreement.

1:44:40>> I would just say in uh in uh support of

1:44:44the motion that originally

1:44:47uh Tiller was going to build the road

1:44:49and couldn't. That's why the $200,000

1:44:51was there. So it's not like we're taking

1:44:53money away from him that just because we

1:44:58could. this money was established

1:44:59because he couldn't build the road

1:45:01initially as he promised and it came

1:45:03back and he committed $200,000. That's

1:45:06just that's not in the motion. That's

1:45:08just in support of the motion. But

1:45:10again, I'm not comfortable with the

1:45:12money being released till the road's

1:45:14done and deeded.

1:45:15>> Might actually be a savings to them.

1:45:17>> Oh yeah.

1:45:18>> In the long run. So anyway, we have a

1:45:20motion and a second. Any further

1:45:22discussion? If not, all those in favor

1:45:24say I.

1:45:25>> Any opposed?

1:45:26>> Motion carries. Thank you.

1:45:29>> Mayor, I have one additional item if I

1:45:32might of uh would like action uh for you

1:45:36all to take in the depositions of the uh

1:45:40experts in the Graham versus Meban or

1:45:42Mebban versus Graham case last week.

1:45:45opposing council indicated that the city

1:45:48of Graham had uh designated their mayor

1:45:53and their mayor pro Tim to represent

1:45:57them at the upcoming mediation in

1:45:59November. And I wanted to share that

1:46:03with y'all. And our recommendation, both

1:46:06Mr. Norris and my recommendation is that

1:46:09the city of Meban do the same thing. Uh

1:46:12but y'all had voted earlier to allow the

1:46:14mayor to be the representative at that

1:46:17uh mediation. So I would like y'all to

1:46:20uh consider a motion by the terms of

1:46:23which the mayor and mayor pro Tim of the

1:46:26city of Meban would be uh present at

1:46:30that mediation.

1:46:33>> I make such a motion that the mayor and

1:46:35the mayor prom be present at that

1:46:38>> mediation. We have a motion and a

1:46:40second. Any further discussion? If not,

1:46:42all those in favor say I.

1:46:44>> I. Opposed. Motion carries. Want to uh

1:46:48point out the the fantastic upcoming

1:46:50Meban special events. It's getting close

1:46:52to to snow. Uh to snow. Yeah. Um we got

1:46:56Halloween coming up. Uh letters to

1:46:59Santa, Santa's arrival, snowing in

1:47:01Meban. Uh that's one thing I can say. I

1:47:04can guarantee you it's going to snow

1:47:06that day better than any forecast. uh

1:47:09and the 11th and uh the reindeer run um

1:47:13which I will not be participating on.

1:47:16You know, would you like to sing it?

1:47:18>> Hey, I'll happily take course

1:47:20volunteers,

1:47:21>> sir.

1:47:21>> For the reindeer run.

1:47:23>> Well, I was a judge one year. They

1:47:24didn't ask me back. I don't know why

1:47:27been hurt. Um and then we have last

1:47:29chance snowing. I mean, it like I've

1:47:31said a million times, if you're bored in

1:47:33Melvin, just go downtown. There's so

1:47:35much stuff going on. and um Sarah Cly is

1:47:40certainly doing a great job. So, uh

1:47:42anything else going come before the

1:47:43council.

1:47:44>> Vote, vote, vote. Early voting.

1:47:45>> That's right. Please vote. Um we do have

1:47:48a candidate that we know, but um for the

1:47:52county commissioners, I don't think I

1:47:54can say anything else legally, but uh

1:47:56anyway, if nothing else, this meeting is

1:47:59adjourned.