  • Public hearing, body art zoning amendment: The board heard a proposal to delete the zoning section that keeps body art establishments 500 feet from each other, schools, playgrounds and houses of worship. Staff noted the Board of Health already licenses and regulates these businesses. No one spoke for or against. The board recommended the amendment to the City Council by roll call, 5 yes with 2 members absent. See Body Art Establishments Zoning Amendment.
  • Public hearing, Overlook Ridge Drive public way layout: The proponent asked for a recommendation to lay out the relocated Overlook Ridge Drive as a public way. The new entrance would sit about 300 feet toward Route 1 from the current one, on the far side of the fire station, with a new traffic signal on Salem Street, an emergency signal for the fire station, and pedestrian accommodations. The presenters said the work is funded by a $4 million state MassWorks grant and is the state-required mitigation that unlocks 617 more housing units (the first affordable ones at Overlook Ridge) and about 10,000 square feet of retail, now planned as two buildings of roughly 5,000 square feet. The current entrance would be abandoned. The presenters said the city fire chief, the public works superintendent and the city engineer had reviewed the plans and approved them. See Overlook Ridge Drive Public Way Layout.
  • Board questions: Members asked about the Route 1 ramps, which would stay as they are in this phase. The presenters described a later second phase, a new Route 1 interchange at the Malden end of Overlook Ridge Drive, which would need a separate state permit process and more funding and is not part of this request. They said sewer service goes through Malden, which they said has told them it has capacity, and that the site has about 1,900 units today.
  • Vote: The board voted to recommend the public way layout to the City Council, 5 yes with 2 absent. The proponent is scheduled before the City Council on October 26. The vote does not accept the road or the easement.
  • Regular meeting: A member asked that seven items be written into the minutes for the earlier decision on 1290 North Shore Road Wonderland Overlay Variances, including soundproofing, a traffic drop-off plan, a front entrance plan for the Wonderland station, a parking plan, a trash room and collection plan, mechanical equipment, and final occupancy requirements. Staff said the project has about 90 resident parking spaces, that residents would otherwise use the transit station lot for a fee, and that the plan includes valet parking under the building. Staff agreed to add the items. The meeting then adjourned.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:12Good evening and welcome to the meeting

00:14of the planning board. Today is

00:16September 29th, 2026.

00:19Frank, do you want to begin us?

00:23>> Roll call. Um, Mr. Abrams

00:27>> present.

00:28>> Mr. Cassanzer is absent.

00:32Mrs. Hoffman

00:33>> present.

00:34>> Present.

00:36Mr. Rivera

00:37>> here.

00:38>> Present.

00:39Uh, Miss Simmons Hurling

00:41>> here.

00:42>> Present. Mr. Tamatopoulos absent. And

00:46Mr. Sullivan

00:47>> here.

00:47>> Present. Okay.

00:53First order of business is a public

00:55hearing

00:57on a zoning amendment regarding body art

01:00establishments.

01:02If I can pull it out.

01:07It's um this is section uh 176.048A

01:15is is deleted. This section is going to

01:17be deleted in its entirety. And what

01:20that section reads is that uh body

01:23establishment may not be located less

01:25than 500 feet from each other uh 500

01:29feet from schools, playgrounds, and

01:32houses of worship. So uh the board of

01:36health since we're allowed body out

01:38establishments in the general business

01:39district that would preclude any body

01:42establishments getting a certificate of

01:44occupancy because of these strict

01:46regulations. So uh the this hearing is

01:52basically to amend that section to

01:54eliminate it in its entire its entirety

01:56and that's that's all it is simple that

01:58one sentence.

02:00So um

02:04>> thank you. Are there proponents to speak

02:06on this here tonight?

02:10Hearing and seeing none. Are there

02:11opponents here to speak on this tonight?

02:16hearing and seeing none.

02:19Do members of the board have any

02:20questions on the body art change?

02:24>> Do we have any body art or tattoo paras

02:27here presently in rea yet?

02:29>> Not off the top of my head. Frank, do

02:31you know?

02:31>> Yeah, the board of health has had uh

02:34proved a few already that exist,

02:37>> but they're not already developed.

02:39>> They weren't regulated under the

02:40ordinance. Now we have an ordinance that

02:42regulates where they could go. And um

02:46>> what section of rea

02:48>> now? They're allowed in the general

02:49business district, which is basically

02:51Broadway, Shirley Avenue, uh Highway

02:54Business, Squire Road, and those areas.

02:57So,

02:58>> what are the hours of a tattoo or a body

03:00art place?

03:01>> Can't be open later than 11

03:04p.m. And they're regulated by the board

03:06of health. Um

03:09and um a lot of the beauty salons do

03:14tattooing now, which is included in the

03:17body art establishment because they do

03:19the eyebrows and this and that. So

03:22that's all covered now. It's not the old

03:25tattoo days where you go in and get a a

03:29tiger on your shoulder or something like

03:31that.

03:31>> Barbers also or just beauty salons?

03:34>> Uh anybody who undertakes that? Yeah.

03:37could be a barber. Yeah. Hair stylist,

03:40>> butianicians usually. So this so body

03:45art establishments are now kind of equal

03:47to that type of establishment and you're

03:49seeing more and more of those in the

03:51city. So they wanted to make it uh less

03:55difficult for them to start a business

03:57in rever.

04:02>> We don't have one. All right.

04:05>> We

04:07We do [music]

04:08>> the board of health has issued licenses

04:10but only to like buticians to do like

04:13body piercing and uh you know the uh

04:17eyebrow piercing and that sort of thing

04:19but this as a regular

04:21body art establishment allow people to

04:23go in for tattooing of other their body

04:26parts.

04:28>> So there is a a policy already in place.

04:30>> We already have an ordinance that's been

04:32adopted.

04:33>> Okay.

04:33>> Okay. Okay. And this is a small tiny

04:35amendment to that ordinance.

04:44>> Do you want to take roll call on that

04:45one?

04:51>> We have a motion to

04:52>> Yes. Motion to take role on that.

04:55>> Is there a second by anybody? We have a

04:58second.

04:59>> Second.

05:04Okay. Um,

05:07[clears throat]

05:07on the motion to recommend to the city

05:09council uh

05:12the amendment of section 171648A

05:16by deleting it in its entirety.

05:19Mr. Abrams,

05:20>> yes.

05:21>> Mr. Cassan is absent. Miss Hoffman,

05:25>> yes.

05:26>> Mr. Rivera,

05:28>> yes.

05:28>> Miss Simmons Hurley,

05:30>> yes.

05:31>> Mr. Timtopolis is absent and Mr.

05:33Sullivan.

05:33>> Yes.

05:34>> Yes. So audited. So that recommendation

05:36will go to the city council. They have

05:38public hearing I I think was last

05:40evening. So it'll go to the council for

05:42next week.

05:47Okay.

05:50The second public hearing

05:51[clears throat]

05:52is held with respect to

05:55um

05:57the uh overlook ridge drive uh layout to

06:03be adopted as a public way as shown on

06:06the plan uh and Malden dated July 1st

06:102025 prepared by 225 prepared by Hancock

06:14Associates.

06:16So, this is a layout for Overlook Ridge

06:19Drive. Right now, they have uh a

06:22temporary uh curb cut and driveway on

06:25Salem Street. The master plan

06:30provided a uh a new

06:33thoroughfare

06:34uh cutting right through Overlook Ridge

06:36Drive. And it's basically eliminates the

06:39existing curb cut and creates a new curb

06:41cut and driveway entrance right in front

06:43of the fire station. on Salem Street.

06:47So, uh this is important for the city to

06:51uh accept this layout uh as a public way

06:55because Mass Highway Department uh the

06:58city received a $4 million grant from

07:00Mass Highway Department to design and

07:02construct the intersection and in the

07:06layout of that driveway. So, um,

07:12that's the that's a little bit about the

07:14history of it. They've gone through a uh

07:17and and the proponents will probably

07:19explain it thoroughly. Gone through a uh

07:22um an intense environmental review

07:24process and review by Mass Highway

07:27Department. So, I'll I'll leave it up to

07:29any other bonus want to speak on it.

07:32>> Thank you. Let's do the opponents first.

07:34Are there any opponents here to speak on

07:36this this evening? Hearing

07:39seeing none, are there any proponents

07:42here to speak this evening?

07:48>> Feel free to come up and share.

07:58>> Whatever you prefer is okay.

08:1111 by 17.

08:24>> Thank you.

08:29Sure.

08:31[clears throat]

08:37>> Okay.

08:42>> Could you state your name and for

08:45record?

08:45>> Absolutely. My name is Sam Rand.

08:50I'm also joined by Jen Schultz.

08:55>> Sorry.

08:56>> Press that button for the mic. Right

08:58under the base of the microphone there

09:00would be a button.

09:02>> Yes.

09:02>> Thank you. Thank you.

09:03>> Okay, I'll start over. Um, my name is

09:06Sam Randall. I'm representing the

09:08proponent. I'm also joined this evening

09:10by Jen Schultz, our legal counsel, as

09:13well as Wayne Amo. He is our project

09:15engineer, transportation engineer. Um,

09:18so I will need the cord. [clears throat]

09:22>> Yeah.

09:26>> Sorry to make you work.

11:45Okay, great. So, it looks like he's able

11:48to zoom in.

11:49>> Stand to the side. Um, so we have a

11:51brief presentation this evening. Um,

11:55there we go.

11:57As Frank mentioned, we're here tonight

12:00to request the planning board's

12:02recommendation to city council for the

12:04layout of parcel A1, which I'll walk you

12:06through. Um, this project is um has been

12:10in the planning stages and

12:12implementation stages for many years. It

12:15started in 2001

12:17um with the um master planning of the

12:21previous Corey site. Um so since that

12:25time about 2,000 residential units have

12:28been built out at Overlook Ridge Drive

12:31and part of that um initial planning

12:34phase required MEEPA review. So

12:37Environmental Protection Agency review

12:39since 1999. There have been a series of

12:42updates to that permitting. We're

12:45actually at notice of project change

12:46number five at this point which was

12:48issued in January 2024. Um, so the

12:53process to date specifically regarding

12:56this the relocation as Frank mentioned

12:58of Overlook Ridge Drive from its

13:00temporary location into its what will be

13:02its permanent location um started um if

13:06you go back putting Meepa aside for a

13:08minute in 2023

13:11the [clears throat] joint planning task

13:12force which um included representatives

13:15from both River and Malden approved the

13:17new drive location as it's proposed uh

13:20this evening.

13:21Um at the end of that same year, the

13:23city of Revier wrote a letter to Meepa

13:25supporting notice of project change five

13:27as well as the associated roadway

13:29improvements. Um we were also in

13:33parallel working with Mass Dot as Frank

13:35mentioned on permitting. Um because this

13:38requires a new state highway layout.

13:40It's quite an in-depth process with Mass

13:43Dot. So it required a 25% design

13:46submission which occurred in June of

13:492024

13:51followed then by a 75% design submission

13:54to Masdot which was um at the end of

13:57June of this year. Um I should mention

13:59that both of those design milestones

14:01were reviewed by River as well as Malden

14:05um because this project touches both

14:07municipalities. So we we were sure to

14:09have sign off before we submitted to

14:11MASDOT with those designs.

14:14We also held Wayne and I held a fire

14:18chief uh joint meeting um which I

14:20thought was an important milestone here

14:22back in March of 2025 to review the new

14:26design as well. So that all led us to um

14:30last month when we made this

14:32application. One of the requirements as

14:34part of the MASDOT permitting is that

14:37this little stretch of roadway, so

14:39parcel A1, be deemed public, and it's

14:42really because the the infrastructure

14:45that we're putting in that road just it

14:47needs to be in a public way. It requires

14:50um signalization. That's really the main

14:52driver behind it. will have um

14:54signalization for the fire station to

14:56allow them to eress in in a an emergency

15:00situation safely out onto Salem Street.

15:04So, I think I covered this one. I think

15:06the key from this slide is just that

15:08like I mentioned, we're on notice of

15:09project change number five, which did

15:11require this roadway redesign.

15:15The roadway redesign itself. What does

15:17that entail? So, it's essentially

15:19realigning Overlook Bridge Drive to meet

15:21Salem Street on the other side of the

15:23joint fire station. Um, it's the

15:26signalization of that same intersection

15:28with turn lanes widening pedestrian and

15:31bicycle accommodations as well as MBTA

15:33bus stops. Um to reiterate, the location

15:36of the the relocated Overlook Ridge

15:39Drive was approved in 2023 by the joint

15:42planning task force which was actually

15:44established back in 2001 when this

15:46master plan develops development um

15:48begun through the land recla reclamation

15:51agreement. Frank also mentioned this

15:53also relevant is that we do have a $4

15:55million massworks grant to fund the

15:58signalization and these transportation

15:59improvements. So, it's notable that

16:02neither city will have to pay for any of

16:04these improvements um since we have a

16:06grant for it. Um the signalization is

16:10necessary because it unlocks 617

16:13additional residential units on the

16:15remaining to be developed parcels at

16:17Overlook Ridge Drive. Um and it's

16:19notable because there are currently

16:21actually no affordable units out in

16:23Overlook Ridge Drive today. And this

16:24will add a significant number of

16:26affordable home ownership units as well

16:28as rental units. But the signal has to

16:31be done before we can actually build

16:32those.

16:35So the request um so you can see in the

16:38presentation actually on the cover sheet

16:40I highlighted parcel A1. So we are just

16:44asking tonight um that the board

16:46recommend to the city council that this

16:49parcel um be laid out as a public way.

16:53Um it will Oh, the other thing I should

16:56mention is obviously that um

17:00it will result in a safer intersection.

17:02This intersection has been studied

17:04widely and it's not currently very safe

17:07and I think everyone has experienced the

17:09traffic in that area. So the idea here

17:11is a much safer intersection with the

17:14signalization which helps with traffic

17:15queuing as well.

17:17Um, I mentioned the housing that it will

17:19unlock that no city funds will need to

17:21be expended. Um, there are some other

17:24community benefits that we put here just

17:26um that have been as a result of the

17:28master plan community. I don't need to

17:30spend a lot of time on that. Um, so I'll

17:33just flip back to this. This just gives

17:34you um the it's really the ANR plan that

17:38was approved um in both Rivere and in

17:41Molden because you can see the city line

17:42sort of um touches on the corner of

17:44parcel A1. So, it's really just what's

17:47highlighted in yellow that we are asking

17:49for action on tonight.

17:52The proposed intersection, like I

17:53mentioned, we have our transportation

17:55engineer here tonight if there are any

17:57questions, but it's really just a new

17:58signalized intersection, marked

18:00crosswalk, so an improved pedestrian

18:02experience, um bus stops um MBTA bus

18:06stops um on the road as well as um being

18:11coordinated with the Route One

18:12northbound um off-ramp and fire station.

18:15So that was important to make sure that

18:17coordination um happened way well ahead

18:20of the design.

18:23Um, so I don't need to um say this

18:26again, but it's really the layout now is

18:28what we're asking for. So this board to

18:30recommend that the city council layout

18:32parcel A1 is a public way. And that

18:34meeting is scheduled for October 26th.

18:37Um, and that will allow us to really

18:41utilize the Mass Works funds that we've

18:44been granted to improve this area. Um,

18:48this vote does not accept the road or

18:49the easement. just the recommendation to

18:51city council. Um and then ultimately

18:54city council would vote on the layout

18:56acceptance. We would be able to

18:57construct and signalize the new drive

18:59once we have full sign off from Mass DOT

19:01which we're in the process of obtaining

19:04and then we would ultimately return to

19:06the council for acceptance of a public

19:08access easement which would happen over

19:10parcel A1. So that's kind of how the

19:11sequence of events will happen.

19:14And that is it. That is the end of the

19:18presentation. Thank you. Does anybody

19:21have questions?

19:23>> Um, parcel A1, is that right now

19:26currently owned by Overlook Ridge since

19:28it's not a public way or

19:30>> Yes, it's it's owned by an Overlook

19:32Ridge entity.

19:33>> Okay.

19:38So, basically this is alone Salem

19:40Street, right? That's right. Is that

19:42correct?

19:42>> So, this is not the main entrance that

19:44you're talking about.

19:45>> Uh, it will be. So, it's not the current

19:48main entrance. The the current main

19:50entrance is actually like at the top of

19:53the plan. You can kind of see where it

19:54says it says drive. Um, but we are

19:58proposing to relocate it as part of this

20:01process.

20:04So that main entrance will be abandoned

20:06once [clears throat] this new driveway

20:08is driveway is completed and it's new

20:11roadway layout is completed and that

20:14space will now become uh developable for

20:18commercial development. I think what's

20:21proposed there is roughly 10,000 square

20:24feet of of commercial space.

20:27So there'll be a landscape buffer zone

20:29between Salem Street and this

20:30development and it would be accessed by

20:33the Overlook Ridge New Overlook Ridge

20:35Drive.

20:37>> So if you go to part um page seven, it

20:39it might actually identify it a little

20:41bit easier for you. So

20:44um I call it plan right. So all the way

20:47to the right of that plan is the current

20:49Overlook Ridge Drive location that will

20:51be abandoned as Frank just described to

20:54allow additional commercial development

20:56of 10,000 square feet in that area. And

20:59then the new intersection

21:02um is darker. It's kind of like in the

21:03middle of the plan on the other side of

21:05the fire station, if that makes sense.

21:11Uh Sam, a question has been brought up

21:13to me uh regarding the northbound ramp

21:17uh from Route One onto Salem Street and

21:20will that be signalized as part of this

21:23plan?

21:25>> Wayne, do you want to answer?

21:26>> The bottom of Salem Street.

21:31>> Hi guys. Uh Wayne Amo uh from VHB. For

21:34the record, uh yes, to answer Frank's

21:36question, that will be signalized. uh

21:38the intersection as proposed on sheet

21:40seven as Sam noted um there'll be a a

21:43signal uh on Salem Street and there'll

21:45be an emergency signal in front of the

21:47fire station on the new relocated

21:49Overlook Ridge Drive and all of those

21:51approaches would will have signalization

21:53and uh pedestrian uh accommodations. I

21:56bring that up because it removes what's

21:58currently a a severe safety hazard with

22:01traffic that coming off that ramp. Uh

22:03visibility and sight distance is very

22:05low and vehicles coming onto Salem

22:08Street from Route One [clears throat]

22:10conflict with vehicles heading uh west

22:13uh on Salem Street. So, it's a it's it's

22:16a another additional safety feature to

22:19this plan.

22:22Are you going to have railings for the

22:24pedestrians on the ramp?

22:26>> Railings?

22:27>> Yeah.

22:31>> Can you repeat the question?

22:33>> Would there be railings for pedestrian

22:35when they go down the ramp

22:37>> from Overlook Ridge?

22:38>> Yeah.

22:39>> Uh, no.

22:40>> There's no railings necessary based on

22:42the grade of the road.

22:47>> I'm a little confused. Maybe you can

22:49help me out. I always thought in front

22:51of the fire station

22:53it was North Salem Street and then Salem

22:57Street would be adjacent to Bennett

23:02Highway.

23:04That's the way I always thought it was.

23:05>> I think if I if u memory serves me

23:08correctly, North Salem is coming from

23:11Lynn

23:13and then it turns into Salem Street in

23:16this area at the town line.

23:19Does that make sense? Or

23:20>> from Lynn?

23:22>> Yeah,

23:22>> I'm stuck in Maldin. How did you get to

23:24Lynn?

23:25>> Sorry. From from the direction of Lynn.

23:27>> Oh, Lind Street.

23:28>> Lindsald

23:30Street.

23:31>> I thought he was talking about city of

23:32>> L. No, I I didn't say that correctly.

23:36>> All right. So, Lind Street. So, I know

23:40the you're coming out of Sus. You go by

23:43the fire station. That's North Salem.

23:45And then you go underneath the highway.

23:47Isn't that North Salem?

23:50>> No, Salem. Salem ends at the uh

23:53>> at the town line.

23:54>> Town line. Yeah. And then it picks up.

23:56It's Lind Street. So, it's the same

23:58continuous roadway, but it changes names

24:00from Salem to Lind Street as it crosses

24:03the town line.

24:03>> Sorry if I confused you, but I think

24:05>> don't ask me why.

24:09>> This the way it's it's right here. It's

24:11showing

24:13North Salem going to from the fire

24:16station towards Malden. And then if you

24:18want to go on the highway, that's Salem

24:20Street.

24:22>> Yeah. Because you're still in Revier.

24:24>> It's still Salem Street.

24:25>> Yeah. And not in Salem Street. If you go

24:28down Salem Street, you have cars coming.

24:32I believe you have cars coming off the

24:34highway and cars going on the highway.

24:37Is that what you're talking about? beast

24:40traffic controls.

24:42>> You don't have you don't have

24:43>> no

24:44>> Google maps.

24:45>> You familiar with the the site where

24:48where the fire station is now?

24:50>> Yeah. It says it's not Salem Street.

24:52>> Yes. Okay.

24:54>> Google Maps.

24:55>> That fire station driveway would now

24:56become Overlook Ridge Driveway.

25:00>> So, it not only accommodates the fire

25:02apparatus coming in and out of the site,

25:04it it accommodates

25:05>> that's it right there. all traffic going

25:07in and out of uh Overlook Ridge.

25:09>> We're going to try to bring up a map to

25:11go over this a little easier, but what

25:13Frank said is accurate. In essence,

25:16where the existing Overlook Ridge

25:17driveway is, where people are heading

25:19northbound, they take a left to go into

25:22Overlook. Now, that driveway will be

25:25abandoned. It'll be moved about 300 ft

25:27towards Route One.

25:29>> Okay?

25:30>> And there'll be a new intersection

25:31created there. the route one offbound

25:35ramp will be realigned slightly and

25:36there'll be a traffic signal put at that

25:38location.

25:39>> All right. Now,

25:42presently

25:44there is a

25:47there if you go if you're on route one

25:50and you want to go

25:52to overlook there is a down ramp that

25:55takes you more or less in front of the

25:57existing fire station.

25:58>> That's right. If you go further,

26:01probably another 50, 100 yards,

26:04people come on off of I'm calling it uh

26:07well, Salem Street, and you take a right

26:10and you go onto the highway.

26:12>> Correct.

26:13>> What is going to happen at that? That is

26:15also called Salem Street, isn't it?

26:18>> That um I think it's You may be right.

26:22Technically, I think it may actually be

26:24an extension of Salem Street that turns

26:26into Vining Street at the end.

26:28>> Yes. And so that roadway, that section

26:31of roadway and those ramps under this

26:32project will remain as they are.

26:35>> Nothing happening there because there's

26:37no real if you're going on the highway,

26:43people just there is no yellow light,

26:47red light, uh you just go on the

26:49highway,

26:50>> correct?

26:50>> And they there is no stopping there.

26:53Isn't that where most of the accidents

26:55happen that you're talking about? Um I'm

26:58not sure of the actual number of

27:00accidents but as part of this project uh

27:05the mitigation that was mandated by MEPA

27:08was to signalize this location. Um there

27:12is a future phase of the project if the

27:14cities decide to go forward that tries

27:16to alleviate some of the congestion on

27:18Route One and those existing ramps, but

27:20that's not what we hear about tonight.

27:22Tonight it's just the Salem Street at

27:25the re uh at the reoriented Overlook

27:27Ridge entrance.

27:29>> But when Overlook first came, when they

27:31took over Rose Quarry,

27:33if I remember correctly, wasn't there

27:35supposed to be an off-ramp that you had

27:38proposed to build?

27:40>> That's what I just referenced. There's a

27:41second phase of this project.

27:43>> It's now a second phase that was a

27:45primary phase when you first were

27:47looking for

27:48>> I I don't know all the history. Well, I

27:50would I would say it it's evolved

27:52through the MEEPA approvals. So, that

27:54may have been true, you know, back in

27:551999 when the initial MEPA certificate

27:58was issued. I'm not sure. I wasn't I

28:00wasn't working on the project at that

28:01time, but based on what I reviewed, I I

28:04do know that the mitigation has evolved

28:07as the project has evolved. Originally,

28:09Overlook Ridge was going to have more

28:11commercial space as an example. Now,

28:14it's more residential in nature. So,

28:16MEEP always analyzes how the projects

28:19change and and they tell you basically

28:21what the required mitigation is.

28:26>> If I can, the second phase is an a new

28:30interchange at the northern end of

28:32Overlook Ridge Drive in Malden. So, you

28:35know the curve as you come around Route

28:37One just before you hit Cappies

28:39>> where the Soio signs are with little

28:41billboards. There would be a new

28:43interchange there for

28:45>> so residents in Overlook Ridge Drive can

28:48get onto Route One North.

28:50>> When you say interchange, you going on

28:53route one on on off Route One into the

28:56site and onto Route One.

28:58>> So there is entrance and [music] exit.

29:00>> Okay. All right.

29:01>> Two separate ramps

29:02>> and that's on the second phase now.

29:04>> Yes.

29:05>> How how long ago how how long

29:07>> I can sort of speak to that.

29:09>> Okay.

29:10Um,

29:11>> sorry to bring it up.

29:12>> No, that look this is a 25 year and

29:15counting project jet so we understand.

29:18>> Um, so I I think the most relevant um,

29:22you know, piece to what you're asking is

29:25what happened in the most recent uh,

29:28MEEPA updates to the project by a

29:31project no project change followed by a

29:34certificate from MEPA working with DOT

29:36is it ended up splitting. So this came

29:38from MEPA and DOT. It sort of split the

29:40mitigation itself into two pairings with

29:46what would be developed and then the

29:48mitigation that would be tied to that

29:49phase of the development. And so what

29:51happened I think Sam mentioned 617

29:54units. So, in order to unlock this next

29:57phase of housing, the 617 units and then

30:00the 10,000 square feet of retail that

30:03Frank was describing that could

30:05ultimately be, you know, sort of on the

30:07far side of the fire station. The

30:09requirement, Meepa, called it local

30:11roadway improvements, even though it's

30:14actually a state highway layout. We'll

30:16just use their noclature. And so it's

30:18that is the phase that we're talking

30:21about now is in order to unlock the 617

30:25units of housing, the retail um at that

30:28intersection area, the all of this

30:30signalization, widening, reorienting of

30:33the roadways, that's what's required.

30:35And then if a um final or further phase

30:40of the project does come forward because

30:42there is still developable land on sort

30:45of the far end um you know we call it

30:49lot 15 but

30:50>> is that re or I'm sorry excuse me okay

30:53I'm sorry sorry sorry to interrupt you I

30:55just want to know where

30:56>> no no that's fine the the majority of

30:59the future you know final potential

31:02phase is in molden with roadway

31:06crossover into river. And so if the um

31:11developer or future developers of sort

31:14of the final piece that has been master

31:16plan approved comes forward and says I

31:19really do want to build this now then

31:21there is a requirement to do um the

31:25other sort of ramping um and roadway

31:28mitigation. So hopefully I made that

31:31better not worse.

31:33>> We're almost there. Let's go.

31:35>> So, how many units presently are

31:39are underneath the uh corporation real

31:42estate?

31:42>> It's it's about 1,900 units currently.

31:45>> And you're looking for phase two to be

31:48another 650.

31:50>> 617, right?

31:52>> 617.

31:53>> Yes.

31:53>> Okay.

31:54>> That's on three different development.

31:56So when you build

32:01well in order to get into the area for

32:05the 617 proposed units, will this phase

32:092 roadway be built or will it have to

32:13wait again until you finish the 617

32:16units?

32:18>> So we are allowed to build the 617 units

32:22under just the signalization. If we want

32:25to build over and above that 617, it

32:27would require the second phase that Jen

32:30described of the the on andoff ramps.

32:32>> And how many more units would be on the

32:34second phase?

32:36>> That um well, it unlocks a commercial

32:38building, an additional commercial

32:40building that would actually be in

32:41Malden

32:42as well as I want to say it's like I

32:45think 150.

32:47>> I was going to say 150. Let's say give

32:49or take 150 units are master plan

32:52approved at this point. Meepa approved

32:54but are not individually site planned

32:57approved. And then as Sam said there is

32:59a commercial lot uh that cannot be

33:02residential. It's been restricted. Um

33:05but sort of TBD what it might eventually

33:08be. What would it take to get more

33:12concrete answers on the uh signalization

33:17and what we were talking about for phase

33:19two to move it up? Uh right now it's

33:22still

33:25it never was built for over the,900

33:27units and it wasn't it's not going to be

33:30built with the 617 units

33:34and I always thought that was one of the

33:36most important parts of the proposal

33:39from the the beginning when you started

33:41taking over Rose.

33:44How long do we have to wait for that

33:46improvement?

33:49So tough tough question to answer um

33:53because I think it's a combination of

33:56and you probably remember this that this

33:59sort of all began with DOT having very

34:03grandiose visions of all the realignment

34:05of Route One everything that they wanted

34:07to do and then from the DOT

34:10perspective I mean and I can't say what

34:12led into their thinking but what we saw

34:15and experienced was oh no we're not

34:17going to do that we're going to do

34:18something else. And then it became this.

34:21And then DOT over the course of the last

34:24three, four years, they have been solely

34:26focused and will only talk to us about

34:28the Salem Street intersection with what

34:31will be Overlook Ridge Drive. And so I

34:35can't say from do the DOT piece of it of

34:38what it will take for them to even say

34:42if they still would approve

34:45um new on and off ramps [clears throat]

34:46to their highway. I I don't know because

34:49they will not talk to us about anything

34:51other than what is in front of them

34:53right now. uh from the development

34:55perspective it's I am going to presume

34:58it's market driven of when and if a

35:01commercial development can be absorbed

35:03um you know or [snorts] sort of

35:05supported there and whether there is any

35:09desire by a developer and the cities to

35:13want further an additional housing in

35:15the site

35:16>> the last thing I would mention is also

35:19the funding of the roadway improvements

35:21um we as I mentioned we have a grant

35:24um from the state to construct the

35:28roadway improvements [clears throat] at

35:29the intersection of Salem Street, but

35:31this would require a f you know further

35:34significant grant because there is a lot

35:36of ledge in that area where the on

35:39andoff ramps would would occur at the

35:41end of Overlook Ridge Drive. So I think

35:43the funding is another relevant piece to

35:46the p of the puzzle

35:48>> and that will be on on Malden's side,

35:51right?

35:52>> That's right. Yes, that's right. So as

35:54of right now what you're saying is that

35:56first you got to relocate the entrance

36:00and after that you will work on the

36:0210,000 square feet of uh retail.

36:05>> That's right. Yes.

36:05>> And then from there you will go to the

36:08300 something units

36:1115. Is that is that correct?

36:13>> Actually the 10,000 square feet of

36:14retail and the 617 additional units can

36:18happen in tandem. So

36:20>> 1700 is that what you're saying?

36:23>> 67.

36:25Yeah.

36:25>> Where is that going to go exactly?

36:27>> I can show I can actually pull that up.

36:29So there is Is it okay if I

36:31>> Yeah. Yeah. Yeah.

36:32>> Okay. Go ahead.

36:39This is the current

36:45drive the relocite

36:59and then another

37:04which will be 310 units of residential

37:09and then the remaining develop

37:13and this is where the on and off

37:16if it happens.

37:19>> Yeah, but you you're saying 17 I mean

37:21617

37:23>> that will go you're talking about that

37:25on the last part of Rivia is only 310.

37:28So where's the other 37?

37:31So it's three buildings. It would be one

37:34here, one here and then one

37:37approximately here. And those are being

37:39done by wind.

37:48>> So that'll be done by when and this one

37:50will be done by who?

37:51>> So currently it's

37:56that is proposing it.

37:59They may build it. I don't know. I

38:01actually don't know when.

38:05>> All right. And the other thing that now

38:07that you have that open then we can use

38:08it. So what he was talking about

38:10earlier, right, is when you go on route

38:12one and you take that exit to go into

38:15the overlock when you come down the ramp

38:17that's facing maybe directly to the fire

38:20department. And then what is it like

38:23about uh maybe 60 uh feet? That's what

38:26the other entrance is going to be.

38:28Relocated.

38:28>> It's about right here.

38:30>> Yeah. Now, when you go down the ramp,

38:32they're going to put a signal in there

38:33or anything like that.

38:35>> Which exit is this now?

38:37>> So, wait, I don't know if you know it by

38:39sight. So,

38:44>> oh, so overlook is on the right.

38:46>> Yes.

38:46>> And the current entry

38:48>> is right up a little bit. Yeah. Yeah.

38:52specific question. It's probably easier

38:54to refer to this on

38:58this show.

39:00>> We try to look at it. It's kind of

39:01small.

39:05>> Are your monitors on on your desk?

39:07>> Mine?

39:07>> Yeah,

39:08>> it is on.

39:09>> No, no, I mean your monitor. So, can you

39:11see what I

39:12>> No,

39:16>> I can see on this one.

39:22I don't think it's working. Oh, it just

39:24came up. Thank you.

39:26>> Which button, Chris?

39:28>> The last one to the right.

39:30[clears throat] So, if if you look at

39:32sheet seven,

39:35um to the right part of that plan sheet,

39:40let's call it, you see some dash lines

39:43going up to the left. That's where the

39:45existing Overlook Bridge Drive is now.

39:48>> Right. The proposal is to relocate that

39:51about 300 ft to the left where you see

39:53the vertical lines going straight up

39:55from Salem Street

39:56>> on the other side of the fire

39:57department. Right.

39:57>> On the other side of the fire station.

39:59Correct.

39:59>> Fire station. Yes.

40:00>> Slightly realign the northbound offramp

40:03to Salem Street and put a signal at that

40:05location. So all of those act all of the

40:08approaches will be signalized and the

40:10fire station will have its own emergency

40:12signal and they'll be connected. The two

40:14signals will be connected.

40:17All right,

40:22>> Frank, if you can explain this to them.

40:25This is where I'm interested in. Please,

40:28I'm sorry,

40:31my days are hopping over

40:34>> here is the fire station.

40:38>> Then when you take this right, this is

40:40the area right here. The these

40:45is that going to be redone? Is that

40:46phase two right here? See how you This

40:50is how you get back on the highway.

40:52>> That would be eliminated.

40:54>> That's going to be eliminated

40:55>> once the new interchange is to the north

40:58of the site

40:59>> as part of phase two. As part of phase

41:01two, that would be eliminated.

41:02>> All right. So, how far down is this

41:04inter

41:07the interchange going to be?

41:10>> You mean the new entrance? So, this one

41:12is going to be eliminated

41:13>> as part of the phase two where there's a

41:15new offramp and a new onramp to Route

41:17One Northbound.

41:18>> Okay.

41:18>> Those two ramps will come up.

41:20>> All right.

41:23And you're going to be down here

41:24further.

41:24>> Yeah. If you zoom out a little bit, I

41:26can show you. I don't want to touch the

41:27screen. I'll probably

41:28>> Frank, can you move to to the left or

41:30the right so we can see?

41:31>> Same.

41:33>> So,

41:35the new ramp will come like this.

41:37>> Yeah.

41:38>> To the end of Overlook.

41:39>> Okay. from the end overlook and come up

41:41here right before um

41:43>> the cappies.

41:44>> I got it.

41:45>> Okay. Okay.

41:46>> And then when those are once those are

41:48open, these ramps will be removed. This

41:52road will be maintained because it has

41:54residential access. But that will

41:56basically be a dead end.

41:57>> Okay.

42:00So to go back to her question when she

42:02was our statement

42:04um that there's a lot of ledge in this

42:06area which there is.

42:09Do you presently blast or do you chip

42:12chip away or hammer it?

42:14>> Um,

42:16>> it probably depends on the condition.

42:17Yeah,

42:18>> sometimes the whole ram can take it out.

42:20Others other times there'll be blasting.

42:23Realize that's all next to Route One.

42:25>> If phase two goes forward, that'll all

42:27be removed under Mass D's supervision.

42:30There'll be separate blasting permits

42:32through the state and through the fire

42:34marshall local, you know, in this case

42:36probably Maldiny and Reier. uh fire

42:39chief plus the state fire marshal um

42:42rolling roadblocks etc. if blasting

42:44happens there

42:46>> I can add a lot has already been removed

42:48if you go inside the quarry and see how

42:51low it is compared to what it used to be

42:53it's almost at the same elevation as

42:55route one except for that ledge in front

42:58of it.

42:58>> That's right. [clears throat] What will

43:00happen as as part of those ramps if they

43:02go forward is u based on the the grade

43:05at route one if you're driving up there

43:08you can see that the ledge outcrop that

43:09Sam is referring to and as Frank just

43:12noted the site is much lower than that

43:14basically the proposal would be to like

43:16cut a channel through that where the

43:18ramp is going in both on both the north

43:21northbound off and on ramp

43:26>> and I I think it's something like 25

43:28acres that was donated by uh the

43:31developer for the construction of this

43:33interchange.

43:35So uh that saved a lot of money on the

43:38state level because they wouldn't have

43:39to purchase it to construct this

43:41interchange.

43:42>> Sam has a good picture up here if you

43:43look guys look at the screen. Right. So

43:45this is directly at the end of Overlook

43:47Ridge now to the left.

43:51Is it a touch? No.

43:52>> Molden. All right.

43:53>> Yeah,

43:53>> it's Molden.

43:54>> Yeah. So to the left, that northbound

43:57off-ramp would be coming through that

44:00ledge outcrop that you see there in the

44:02distance, and then it would meet where

44:03we were just standing at the end of

44:05these container boxes. Um,

44:07>> you can see the height differential,

44:08[music]

44:08>> correct? And then the on-ramp to to

44:12route one would come from here and go

44:14through that ledge out crop that Sam is

44:16zooming to now, right where that front

44:18end loader is, and then connect into

44:20route one.

44:20>> And that's in this new proposal, or is

44:22that on the phase two? That's phase two.

44:24>> That's that's phase two.

44:26>> All right. So phase two will mostly be

44:31[clears throat] continued or accelerated

44:33because of economic conditions probably.

44:36>> Well, and I think it's also that MASDOT

44:38is looking at them as like two separate

44:40permit projects. So currently we're just

44:43moving forward with the phase one

44:46permitting. At such time that we decide

44:49we want or we need to move forward with

44:51phase two, we would go through this

44:53whole permitting exercise with MASDOT

44:55again. So submitting the 25% design,

44:58fitting uh submitting the 75% design and

45:01then ultimately the final design prior

45:03to construction.

45:06>> So that will be more than

45:09>> that's right. The majority is

45:11>> the majority of it

45:12>> some of it is in rever because part of

45:14that phase two proposal would be to

45:16slightly widen um Overlook Ridge from

45:19where these improvements stop down near

45:21Salem Street up to these new ramps. So

45:24there'd be a little bit of work in both

45:25in both.

45:26>> And just one uh one other final

45:29point of interest. So with the proposed

45:32you have 1,900 units now and you're uh

45:36looking for with this other

45:39uh change that you 617 not counting

45:42another 150. Where is all the sewer

45:46going? Which way is

45:48>> Malden?

45:49>> This is all going to Malden. It's going

45:50down Salem Street.

45:52>> They have a designated trunk store going

45:55to Malden. Ria system cannot handle.

45:58>> No, there's a lot. The agreement has

46:00been that it goes to Malden which is

46:02closer to the MWR.

46:03>> They can handle this

46:04>> connection.

46:06I can't speak for Malden. It's

46:09>> they have told us that they can.

46:11>> Um we we've undergone site plan approval

46:14with Malden for many of the new units in

46:18question and the sewer capacity is not

46:21an issue.

46:23>> So sewer and water is through Malden.

46:27Does Baldin have a pumping station,

46:29Frank, I think, or does it have some

46:30kind of sewer works?

46:33>> Yeah.

46:36>> Yeah. Our pumping station up there could

46:38not handle the additional

46:40>> flow.

46:42Very good.

46:42>> If you're familiar with the area,

46:45>> you know that our trunk saw goes

46:48up from that area. The saw force man

46:50goes underneath the seplane basin

46:54>> to not you know we have a C plane basin.

47:00So

47:02the the bottom line is that this is

47:05important to to Rever and Malden and to

47:10the development because uh it uh it's a

47:14major improvement over the existing

47:16conditions of that dangerous

47:17intersection that's not unsalized

47:20and moving that driveway entrance

47:23further west or south uh takes it

47:27further away from that nasty curve and

47:29on Salem Street as you're coming from

47:31SUS coming around that curve which is as

47:35soon as you come around the curve you're

47:36right there at the entrance drive right

47:38now. Uh and there's been some accidents

47:41there that have been severe. So now you

47:43have cars slowing down because you have

47:45an intersection that's signalized and

47:48you have an organized driveway entrance

47:50going into the site.

47:54I'd like to thank you for your patience

47:56for this is a new board and we're just

47:58trying to get familiar with some of the

48:00the areas and especially when it's

48:03partly in Saras, partly in Malden,

48:05partly in Ver. But thank you very much

48:08for being patient.

48:10>> When it comes to the retail space, do

48:12you know exactly what's going to go in

48:13there?

48:14>> We don't know yet, but it'll be about

48:1610,000 square feet of retail. It's laid

48:19out um conceptually as two approximately

48:245,000 square foot buildings um you know

48:27more or less side by side which sort of

48:30hits the right size for whether it's a

48:34moderate size convenience store

48:37um or a restaurant cleaner things like

48:41that they when we went through review on

48:44that the commitment was to figure out

48:47what the community needs and

48:49That would be the obvious choice of

48:51built because they would like their

48:52retail to be utilized.

48:55>> Thank you.

48:59>> Okay.

49:00>> Thank you.

49:03>> Are ready to make a motion for roll?

49:10>> So, right now we're looking for a

49:11recommendation to the city council. I I

49:13I can tell you that uh the fire chief,

49:17the TBW superintendent and the city

49:18engineer have reviewed these plans

49:20thoroughly with U BHB and the proponent

49:25and a lot of things have been worked out

49:27and everybody's in agreement now and

49:29this is the plan that they've approved.

49:32>> Great. Okay. Thank you.

49:40So, we have a a motion to favor

49:42recommend this to the city council

49:45public layout.

49:46>> Yes.

49:47>> Second.

49:48>> Motion by Mr. Abrams. Second.

49:50>> Yes.

49:51>> Second,

49:52>> Mr.

49:53Rivera

49:58on the motion. Mr. Abrams.

50:00>> Yes.

50:01>> Yes. Mr. Cassandra is absent. Miss

50:03Hoffman,

50:04>> yes.

50:05>> Yes. Mr. Rivera,

50:07>> yes.

50:08>> Miss Simmons Hurling,

50:09>> yes.

50:10>> Miss Dematopoulos is absent. Mr.

50:12Sullivan,

50:12>> yes.

50:13>> Okay. Vote and so audited. A

50:15recommendation will go to the city

50:16council and you're scheduled to go

50:19before the city council when?

50:20>> October 26.

50:22>> October 26. Okay.

50:25All right.

50:28That ends the public hearing

50:31>> segment. Thank you.

50:34>> We're all set. Motion to adjourn.

50:37>> We're going to regular meeting. We just

50:38need approval of previous meeting

50:40minutes, I think.

50:41>> Perfect.

50:49>> Mr. Rivera can sign them

50:53on the regular meeting minutes.

50:55>> Yeah.

50:57for the was that it the ocean a project

51:00that I I wanted those things inserted

51:04that I forwarded

51:06>> for the meeting meeting minutes.

51:16>> So there was a motion made by myself and

51:18Mr. Sansza that the board grant the uh

51:22and consent to 1290 Northshore Road.

51:26>> Y

51:26>> and we have I think seven things that we

51:30all talked about the proposal on owner

51:32development and if we can have I believe

51:36they did not put their names when they

51:38first came here. We don't really have it

51:40on the minutes

51:42exactly who they were

51:45and the soundproofing to be added.

51:47That's number two. The traffic drop off

51:50plan to be recommended. Front entrance

51:53of Wonderland station plan.

51:56How they get in and out. Parking plan

51:58for the building. What was it? 190. How

52:01many units?

52:03>> 310.

52:04>> 310. I'm sorry.

52:06>> A trash room that we talked about and

52:07trash collection plan.

52:09>> Mechanical.

52:10>> I didn't I didn't have it on there, but

52:12yes, we can put mechanical. We did talk

52:14about it. and the final approval of

52:16occupancy requirements.

52:18>> And the other thing, Frank, have they

52:20had conversations with the T station?

52:24>> Do they have

52:25>> the developer and the T station? Did

52:27they have ongoing conversations?

52:29>> Yes, because they the the parking for

52:33this development is only 90 parking

52:35spaces residents. So, they're going to

52:37have to park at the T-station lot, which

52:40means that it's not going to be free.

52:42they're going to have to pay to park

52:44there.

52:46So if you have a car and you don't have

52:47a parking spot, you either have to pay

52:50for a parking space daily or rely on the

52:54tea and not have a car. And that's the

52:57intent here is a transit oriented

52:58development that more people will use

53:00public transportation have

53:03>> the papers parking spot if it's in the

53:05tad or not.

53:10But there will be valet parking under

53:12the current proposal for the residents

53:14to park underneath the building.

53:16>> So can you include those seven things

53:18that I

53:19>> Absolutely. Well, I I'll add those in.

53:22>> Thank you.

53:23>> Thank you.

53:25>> Oh. Uh just add in mechanical. I I I

53:28forgot I can put that in that you talked

53:29about

53:29>> if you have it here. I'll add uh

53:31>> with the trash room if you could just

53:33write in mechanical.

53:34>> Okay. Sorry about that.

53:38Those

53:43will be added to the minutes.

53:48Um there's no other further business.

53:52We can adjourn the meeting.

53:53>> Okay. Motion to adjourn. Second.