- Public hearing, body art zoning amendment: The board heard a proposal to delete the zoning section that keeps body art establishments 500 feet from each other, schools, playgrounds and houses of worship. Staff noted the Board of Health already licenses and regulates these businesses. No one spoke for or against. The board recommended the amendment to the City Council by roll call, 5 yes with 2 members absent. See Body Art Establishments Zoning Amendment.
- Public hearing, Overlook Ridge Drive public way layout: The proponent asked for a recommendation to lay out the relocated Overlook Ridge Drive as a public way. The new entrance would sit about 300 feet toward Route 1 from the current one, on the far side of the fire station, with a new traffic signal on Salem Street, an emergency signal for the fire station, and pedestrian accommodations. The presenters said the work is funded by a $4 million state MassWorks grant and is the state-required mitigation that unlocks 617 more housing units (the first affordable ones at Overlook Ridge) and about 10,000 square feet of retail, now planned as two buildings of roughly 5,000 square feet. The current entrance would be abandoned. The presenters said the city fire chief, the public works superintendent and the city engineer had reviewed the plans and approved them. See Overlook Ridge Drive Public Way Layout.
- Board questions: Members asked about the Route 1 ramps, which would stay as they are in this phase. The presenters described a later second phase, a new Route 1 interchange at the Malden end of Overlook Ridge Drive, which would need a separate state permit process and more funding and is not part of this request. They said sewer service goes through Malden, which they said has told them it has capacity, and that the site has about 1,900 units today.
- Vote: The board voted to recommend the public way layout to the City Council, 5 yes with 2 absent. The proponent is scheduled before the City Council on October 26. The vote does not accept the road or the easement.
- Regular meeting: A member asked that seven items be written into the minutes for the earlier decision on 1290 North Shore Road Wonderland Overlay Variances, including soundproofing, a traffic drop-off plan, a front entrance plan for the Wonderland station, a parking plan, a trash room and collection plan, mechanical equipment, and final occupancy requirements. Staff said the project has about 90 resident parking spaces, that residents would otherwise use the transit station lot for a fee, and that the plan includes valet parking under the building. Staff agreed to add the items. The meeting then adjourned.
Sources
- Issues: Body Art Establishments Zoning Amendment, Overlook Ridge Drive Public Way Layout
- Video: https://youtube.com/watch?v=55W8lxufYwQ
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:12Good evening and welcome to the meeting
00:14of the planning board. Today is
00:16September 29th, 2026.
00:19Frank, do you want to begin us?
00:23>> Roll call. Um, Mr. Abrams
00:27>> present.
00:28>> Mr. Cassanzer is absent.
00:32Mrs. Hoffman
00:33>> present.
00:34>> Present.
00:36Mr. Rivera
00:37>> here.
00:38>> Present.
00:39Uh, Miss Simmons Hurling
00:41>> here.
00:42>> Present. Mr. Tamatopoulos absent. And
00:46Mr. Sullivan
00:47>> here.
00:47>> Present. Okay.
00:53First order of business is a public
00:55hearing
00:57on a zoning amendment regarding body art
01:00establishments.
01:02If I can pull it out.
01:07It's um this is section uh 176.048A
01:15is is deleted. This section is going to
01:17be deleted in its entirety. And what
01:20that section reads is that uh body
01:23establishment may not be located less
01:25than 500 feet from each other uh 500
01:29feet from schools, playgrounds, and
01:32houses of worship. So uh the board of
01:36health since we're allowed body out
01:38establishments in the general business
01:39district that would preclude any body
01:42establishments getting a certificate of
01:44occupancy because of these strict
01:46regulations. So uh the this hearing is
01:52basically to amend that section to
01:54eliminate it in its entire its entirety
01:56and that's that's all it is simple that
01:58one sentence.
02:00So um
02:04>> thank you. Are there proponents to speak
02:06on this here tonight?
02:10Hearing and seeing none. Are there
02:11opponents here to speak on this tonight?
02:16hearing and seeing none.
02:19Do members of the board have any
02:20questions on the body art change?
02:24>> Do we have any body art or tattoo paras
02:27here presently in rea yet?
02:29>> Not off the top of my head. Frank, do
02:31you know?
02:31>> Yeah, the board of health has had uh
02:34proved a few already that exist,
02:37>> but they're not already developed.
02:39>> They weren't regulated under the
02:40ordinance. Now we have an ordinance that
02:42regulates where they could go. And um
02:46>> what section of rea
02:48>> now? They're allowed in the general
02:49business district, which is basically
02:51Broadway, Shirley Avenue, uh Highway
02:54Business, Squire Road, and those areas.
02:57So,
02:58>> what are the hours of a tattoo or a body
03:00art place?
03:01>> Can't be open later than 11
03:04p.m. And they're regulated by the board
03:06of health. Um
03:09and um a lot of the beauty salons do
03:14tattooing now, which is included in the
03:17body art establishment because they do
03:19the eyebrows and this and that. So
03:22that's all covered now. It's not the old
03:25tattoo days where you go in and get a a
03:29tiger on your shoulder or something like
03:31that.
03:31>> Barbers also or just beauty salons?
03:34>> Uh anybody who undertakes that? Yeah.
03:37could be a barber. Yeah. Hair stylist,
03:40>> butianicians usually. So this so body
03:45art establishments are now kind of equal
03:47to that type of establishment and you're
03:49seeing more and more of those in the
03:51city. So they wanted to make it uh less
03:55difficult for them to start a business
03:57in rever.
04:02>> We don't have one. All right.
04:05>> We
04:07We do [music]
04:08>> the board of health has issued licenses
04:10but only to like buticians to do like
04:13body piercing and uh you know the uh
04:17eyebrow piercing and that sort of thing
04:19but this as a regular
04:21body art establishment allow people to
04:23go in for tattooing of other their body
04:26parts.
04:28>> So there is a a policy already in place.
04:30>> We already have an ordinance that's been
04:32adopted.
04:33>> Okay.
04:33>> Okay. Okay. And this is a small tiny
04:35amendment to that ordinance.
04:44>> Do you want to take roll call on that
04:45one?
04:51>> We have a motion to
04:52>> Yes. Motion to take role on that.
04:55>> Is there a second by anybody? We have a
04:58second.
04:59>> Second.
05:04Okay. Um,
05:07[clears throat]
05:07on the motion to recommend to the city
05:09council uh
05:12the amendment of section 171648A
05:16by deleting it in its entirety.
05:19Mr. Abrams,
05:20>> yes.
05:21>> Mr. Cassan is absent. Miss Hoffman,
05:25>> yes.
05:26>> Mr. Rivera,
05:28>> yes.
05:28>> Miss Simmons Hurley,
05:30>> yes.
05:31>> Mr. Timtopolis is absent and Mr.
05:33Sullivan.
05:33>> Yes.
05:34>> Yes. So audited. So that recommendation
05:36will go to the city council. They have
05:38public hearing I I think was last
05:40evening. So it'll go to the council for
05:42next week.
05:47Okay.
05:50The second public hearing
05:51[clears throat]
05:52is held with respect to
05:55um
05:57the uh overlook ridge drive uh layout to
06:03be adopted as a public way as shown on
06:06the plan uh and Malden dated July 1st
06:102025 prepared by 225 prepared by Hancock
06:14Associates.
06:16So, this is a layout for Overlook Ridge
06:19Drive. Right now, they have uh a
06:22temporary uh curb cut and driveway on
06:25Salem Street. The master plan
06:30provided a uh a new
06:33thoroughfare
06:34uh cutting right through Overlook Ridge
06:36Drive. And it's basically eliminates the
06:39existing curb cut and creates a new curb
06:41cut and driveway entrance right in front
06:43of the fire station. on Salem Street.
06:47So, uh this is important for the city to
06:51uh accept this layout uh as a public way
06:55because Mass Highway Department uh the
06:58city received a $4 million grant from
07:00Mass Highway Department to design and
07:02construct the intersection and in the
07:06layout of that driveway. So, um,
07:12that's the that's a little bit about the
07:14history of it. They've gone through a uh
07:17and and the proponents will probably
07:19explain it thoroughly. Gone through a uh
07:22um an intense environmental review
07:24process and review by Mass Highway
07:27Department. So, I'll I'll leave it up to
07:29any other bonus want to speak on it.
07:32>> Thank you. Let's do the opponents first.
07:34Are there any opponents here to speak on
07:36this this evening? Hearing
07:39seeing none, are there any proponents
07:42here to speak this evening?
07:48>> Feel free to come up and share.
07:58>> Whatever you prefer is okay.
08:1111 by 17.
08:24>> Thank you.
08:29Sure.
08:31[clears throat]
08:37>> Okay.
08:42>> Could you state your name and for
08:45record?
08:45>> Absolutely. My name is Sam Rand.
08:50I'm also joined by Jen Schultz.
08:55>> Sorry.
08:56>> Press that button for the mic. Right
08:58under the base of the microphone there
09:00would be a button.
09:02>> Yes.
09:02>> Thank you. Thank you.
09:03>> Okay, I'll start over. Um, my name is
09:06Sam Randall. I'm representing the
09:08proponent. I'm also joined this evening
09:10by Jen Schultz, our legal counsel, as
09:13well as Wayne Amo. He is our project
09:15engineer, transportation engineer. Um,
09:18so I will need the cord. [clears throat]
09:22>> Yeah.
09:26>> Sorry to make you work.
11:45Okay, great. So, it looks like he's able
11:48to zoom in.
11:49>> Stand to the side. Um, so we have a
11:51brief presentation this evening. Um,
11:55there we go.
11:57As Frank mentioned, we're here tonight
12:00to request the planning board's
12:02recommendation to city council for the
12:04layout of parcel A1, which I'll walk you
12:06through. Um, this project is um has been
12:10in the planning stages and
12:12implementation stages for many years. It
12:15started in 2001
12:17um with the um master planning of the
12:21previous Corey site. Um so since that
12:25time about 2,000 residential units have
12:28been built out at Overlook Ridge Drive
12:31and part of that um initial planning
12:34phase required MEEPA review. So
12:37Environmental Protection Agency review
12:39since 1999. There have been a series of
12:42updates to that permitting. We're
12:45actually at notice of project change
12:46number five at this point which was
12:48issued in January 2024. Um, so the
12:53process to date specifically regarding
12:56this the relocation as Frank mentioned
12:58of Overlook Ridge Drive from its
13:00temporary location into its what will be
13:02its permanent location um started um if
13:06you go back putting Meepa aside for a
13:08minute in 2023
13:11the [clears throat] joint planning task
13:12force which um included representatives
13:15from both River and Malden approved the
13:17new drive location as it's proposed uh
13:20this evening.
13:21Um at the end of that same year, the
13:23city of Revier wrote a letter to Meepa
13:25supporting notice of project change five
13:27as well as the associated roadway
13:29improvements. Um we were also in
13:33parallel working with Mass Dot as Frank
13:35mentioned on permitting. Um because this
13:38requires a new state highway layout.
13:40It's quite an in-depth process with Mass
13:43Dot. So it required a 25% design
13:46submission which occurred in June of
13:492024
13:51followed then by a 75% design submission
13:54to Masdot which was um at the end of
13:57June of this year. Um I should mention
13:59that both of those design milestones
14:01were reviewed by River as well as Malden
14:05um because this project touches both
14:07municipalities. So we we were sure to
14:09have sign off before we submitted to
14:11MASDOT with those designs.
14:14We also held Wayne and I held a fire
14:18chief uh joint meeting um which I
14:20thought was an important milestone here
14:22back in March of 2025 to review the new
14:26design as well. So that all led us to um
14:30last month when we made this
14:32application. One of the requirements as
14:34part of the MASDOT permitting is that
14:37this little stretch of roadway, so
14:39parcel A1, be deemed public, and it's
14:42really because the the infrastructure
14:45that we're putting in that road just it
14:47needs to be in a public way. It requires
14:50um signalization. That's really the main
14:52driver behind it. will have um
14:54signalization for the fire station to
14:56allow them to eress in in a an emergency
15:00situation safely out onto Salem Street.
15:04So, I think I covered this one. I think
15:06the key from this slide is just that
15:08like I mentioned, we're on notice of
15:09project change number five, which did
15:11require this roadway redesign.
15:15The roadway redesign itself. What does
15:17that entail? So, it's essentially
15:19realigning Overlook Bridge Drive to meet
15:21Salem Street on the other side of the
15:23joint fire station. Um, it's the
15:26signalization of that same intersection
15:28with turn lanes widening pedestrian and
15:31bicycle accommodations as well as MBTA
15:33bus stops. Um to reiterate, the location
15:36of the the relocated Overlook Ridge
15:39Drive was approved in 2023 by the joint
15:42planning task force which was actually
15:44established back in 2001 when this
15:46master plan develops development um
15:48begun through the land recla reclamation
15:51agreement. Frank also mentioned this
15:53also relevant is that we do have a $4
15:55million massworks grant to fund the
15:58signalization and these transportation
15:59improvements. So, it's notable that
16:02neither city will have to pay for any of
16:04these improvements um since we have a
16:06grant for it. Um the signalization is
16:10necessary because it unlocks 617
16:13additional residential units on the
16:15remaining to be developed parcels at
16:17Overlook Ridge Drive. Um and it's
16:19notable because there are currently
16:21actually no affordable units out in
16:23Overlook Ridge Drive today. And this
16:24will add a significant number of
16:26affordable home ownership units as well
16:28as rental units. But the signal has to
16:31be done before we can actually build
16:32those.
16:35So the request um so you can see in the
16:38presentation actually on the cover sheet
16:40I highlighted parcel A1. So we are just
16:44asking tonight um that the board
16:46recommend to the city council that this
16:49parcel um be laid out as a public way.
16:53Um it will Oh, the other thing I should
16:56mention is obviously that um
17:00it will result in a safer intersection.
17:02This intersection has been studied
17:04widely and it's not currently very safe
17:07and I think everyone has experienced the
17:09traffic in that area. So the idea here
17:11is a much safer intersection with the
17:14signalization which helps with traffic
17:15queuing as well.
17:17Um, I mentioned the housing that it will
17:19unlock that no city funds will need to
17:21be expended. Um, there are some other
17:24community benefits that we put here just
17:26um that have been as a result of the
17:28master plan community. I don't need to
17:30spend a lot of time on that. Um, so I'll
17:33just flip back to this. This just gives
17:34you um the it's really the ANR plan that
17:38was approved um in both Rivere and in
17:41Molden because you can see the city line
17:42sort of um touches on the corner of
17:44parcel A1. So, it's really just what's
17:47highlighted in yellow that we are asking
17:49for action on tonight.
17:52The proposed intersection, like I
17:53mentioned, we have our transportation
17:55engineer here tonight if there are any
17:57questions, but it's really just a new
17:58signalized intersection, marked
18:00crosswalk, so an improved pedestrian
18:02experience, um bus stops um MBTA bus
18:06stops um on the road as well as um being
18:11coordinated with the Route One
18:12northbound um off-ramp and fire station.
18:15So that was important to make sure that
18:17coordination um happened way well ahead
18:20of the design.
18:23Um, so I don't need to um say this
18:26again, but it's really the layout now is
18:28what we're asking for. So this board to
18:30recommend that the city council layout
18:32parcel A1 is a public way. And that
18:34meeting is scheduled for October 26th.
18:37Um, and that will allow us to really
18:41utilize the Mass Works funds that we've
18:44been granted to improve this area. Um,
18:48this vote does not accept the road or
18:49the easement. just the recommendation to
18:51city council. Um and then ultimately
18:54city council would vote on the layout
18:56acceptance. We would be able to
18:57construct and signalize the new drive
18:59once we have full sign off from Mass DOT
19:01which we're in the process of obtaining
19:04and then we would ultimately return to
19:06the council for acceptance of a public
19:08access easement which would happen over
19:10parcel A1. So that's kind of how the
19:11sequence of events will happen.
19:14And that is it. That is the end of the
19:18presentation. Thank you. Does anybody
19:21have questions?
19:23>> Um, parcel A1, is that right now
19:26currently owned by Overlook Ridge since
19:28it's not a public way or
19:30>> Yes, it's it's owned by an Overlook
19:32Ridge entity.
19:33>> Okay.
19:38So, basically this is alone Salem
19:40Street, right? That's right. Is that
19:42correct?
19:42>> So, this is not the main entrance that
19:44you're talking about.
19:45>> Uh, it will be. So, it's not the current
19:48main entrance. The the current main
19:50entrance is actually like at the top of
19:53the plan. You can kind of see where it
19:54says it says drive. Um, but we are
19:58proposing to relocate it as part of this
20:01process.
20:04So that main entrance will be abandoned
20:06once [clears throat] this new driveway
20:08is driveway is completed and it's new
20:11roadway layout is completed and that
20:14space will now become uh developable for
20:18commercial development. I think what's
20:21proposed there is roughly 10,000 square
20:24feet of of commercial space.
20:27So there'll be a landscape buffer zone
20:29between Salem Street and this
20:30development and it would be accessed by
20:33the Overlook Ridge New Overlook Ridge
20:35Drive.
20:37>> So if you go to part um page seven, it
20:39it might actually identify it a little
20:41bit easier for you. So
20:44um I call it plan right. So all the way
20:47to the right of that plan is the current
20:49Overlook Ridge Drive location that will
20:51be abandoned as Frank just described to
20:54allow additional commercial development
20:56of 10,000 square feet in that area. And
20:59then the new intersection
21:02um is darker. It's kind of like in the
21:03middle of the plan on the other side of
21:05the fire station, if that makes sense.
21:11Uh Sam, a question has been brought up
21:13to me uh regarding the northbound ramp
21:17uh from Route One onto Salem Street and
21:20will that be signalized as part of this
21:23plan?
21:25>> Wayne, do you want to answer?
21:26>> The bottom of Salem Street.
21:31>> Hi guys. Uh Wayne Amo uh from VHB. For
21:34the record, uh yes, to answer Frank's
21:36question, that will be signalized. uh
21:38the intersection as proposed on sheet
21:40seven as Sam noted um there'll be a a
21:43signal uh on Salem Street and there'll
21:45be an emergency signal in front of the
21:47fire station on the new relocated
21:49Overlook Ridge Drive and all of those
21:51approaches would will have signalization
21:53and uh pedestrian uh accommodations. I
21:56bring that up because it removes what's
21:58currently a a severe safety hazard with
22:01traffic that coming off that ramp. Uh
22:03visibility and sight distance is very
22:05low and vehicles coming onto Salem
22:08Street from Route One [clears throat]
22:10conflict with vehicles heading uh west
22:13uh on Salem Street. So, it's a it's it's
22:16a another additional safety feature to
22:19this plan.
22:22Are you going to have railings for the
22:24pedestrians on the ramp?
22:26>> Railings?
22:27>> Yeah.
22:31>> Can you repeat the question?
22:33>> Would there be railings for pedestrian
22:35when they go down the ramp
22:37>> from Overlook Ridge?
22:38>> Yeah.
22:39>> Uh, no.
22:40>> There's no railings necessary based on
22:42the grade of the road.
22:47>> I'm a little confused. Maybe you can
22:49help me out. I always thought in front
22:51of the fire station
22:53it was North Salem Street and then Salem
22:57Street would be adjacent to Bennett
23:02Highway.
23:04That's the way I always thought it was.
23:05>> I think if I if u memory serves me
23:08correctly, North Salem is coming from
23:11Lynn
23:13and then it turns into Salem Street in
23:16this area at the town line.
23:19Does that make sense? Or
23:20>> from Lynn?
23:22>> Yeah,
23:22>> I'm stuck in Maldin. How did you get to
23:24Lynn?
23:25>> Sorry. From from the direction of Lynn.
23:27>> Oh, Lind Street.
23:28>> Lindsald
23:30Street.
23:31>> I thought he was talking about city of
23:32>> L. No, I I didn't say that correctly.
23:36>> All right. So, Lind Street. So, I know
23:40the you're coming out of Sus. You go by
23:43the fire station. That's North Salem.
23:45And then you go underneath the highway.
23:47Isn't that North Salem?
23:50>> No, Salem. Salem ends at the uh
23:53>> at the town line.
23:54>> Town line. Yeah. And then it picks up.
23:56It's Lind Street. So, it's the same
23:58continuous roadway, but it changes names
24:00from Salem to Lind Street as it crosses
24:03the town line.
24:03>> Sorry if I confused you, but I think
24:05>> don't ask me why.
24:09>> This the way it's it's right here. It's
24:11showing
24:13North Salem going to from the fire
24:16station towards Malden. And then if you
24:18want to go on the highway, that's Salem
24:20Street.
24:22>> Yeah. Because you're still in Revier.
24:24>> It's still Salem Street.
24:25>> Yeah. And not in Salem Street. If you go
24:28down Salem Street, you have cars coming.
24:32I believe you have cars coming off the
24:34highway and cars going on the highway.
24:37Is that what you're talking about? beast
24:40traffic controls.
24:42>> You don't have you don't have
24:43>> no
24:44>> Google maps.
24:45>> You familiar with the the site where
24:48where the fire station is now?
24:50>> Yeah. It says it's not Salem Street.
24:52>> Yes. Okay.
24:54>> Google Maps.
24:55>> That fire station driveway would now
24:56become Overlook Ridge Driveway.
25:00>> So, it not only accommodates the fire
25:02apparatus coming in and out of the site,
25:04it it accommodates
25:05>> that's it right there. all traffic going
25:07in and out of uh Overlook Ridge.
25:09>> We're going to try to bring up a map to
25:11go over this a little easier, but what
25:13Frank said is accurate. In essence,
25:16where the existing Overlook Ridge
25:17driveway is, where people are heading
25:19northbound, they take a left to go into
25:22Overlook. Now, that driveway will be
25:25abandoned. It'll be moved about 300 ft
25:27towards Route One.
25:29>> Okay?
25:30>> And there'll be a new intersection
25:31created there. the route one offbound
25:35ramp will be realigned slightly and
25:36there'll be a traffic signal put at that
25:38location.
25:39>> All right. Now,
25:42presently
25:44there is a
25:47there if you go if you're on route one
25:50and you want to go
25:52to overlook there is a down ramp that
25:55takes you more or less in front of the
25:57existing fire station.
25:58>> That's right. If you go further,
26:01probably another 50, 100 yards,
26:04people come on off of I'm calling it uh
26:07well, Salem Street, and you take a right
26:10and you go onto the highway.
26:12>> Correct.
26:13>> What is going to happen at that? That is
26:15also called Salem Street, isn't it?
26:18>> That um I think it's You may be right.
26:22Technically, I think it may actually be
26:24an extension of Salem Street that turns
26:26into Vining Street at the end.
26:28>> Yes. And so that roadway, that section
26:31of roadway and those ramps under this
26:32project will remain as they are.
26:35>> Nothing happening there because there's
26:37no real if you're going on the highway,
26:43people just there is no yellow light,
26:47red light, uh you just go on the
26:49highway,
26:50>> correct?
26:50>> And they there is no stopping there.
26:53Isn't that where most of the accidents
26:55happen that you're talking about? Um I'm
26:58not sure of the actual number of
27:00accidents but as part of this project uh
27:05the mitigation that was mandated by MEPA
27:08was to signalize this location. Um there
27:12is a future phase of the project if the
27:14cities decide to go forward that tries
27:16to alleviate some of the congestion on
27:18Route One and those existing ramps, but
27:20that's not what we hear about tonight.
27:22Tonight it's just the Salem Street at
27:25the re uh at the reoriented Overlook
27:27Ridge entrance.
27:29>> But when Overlook first came, when they
27:31took over Rose Quarry,
27:33if I remember correctly, wasn't there
27:35supposed to be an off-ramp that you had
27:38proposed to build?
27:40>> That's what I just referenced. There's a
27:41second phase of this project.
27:43>> It's now a second phase that was a
27:45primary phase when you first were
27:47looking for
27:48>> I I don't know all the history. Well, I
27:50would I would say it it's evolved
27:52through the MEEPA approvals. So, that
27:54may have been true, you know, back in
27:551999 when the initial MEPA certificate
27:58was issued. I'm not sure. I wasn't I
28:00wasn't working on the project at that
28:01time, but based on what I reviewed, I I
28:04do know that the mitigation has evolved
28:07as the project has evolved. Originally,
28:09Overlook Ridge was going to have more
28:11commercial space as an example. Now,
28:14it's more residential in nature. So,
28:16MEEP always analyzes how the projects
28:19change and and they tell you basically
28:21what the required mitigation is.
28:26>> If I can, the second phase is an a new
28:30interchange at the northern end of
28:32Overlook Ridge Drive in Malden. So, you
28:35know the curve as you come around Route
28:37One just before you hit Cappies
28:39>> where the Soio signs are with little
28:41billboards. There would be a new
28:43interchange there for
28:45>> so residents in Overlook Ridge Drive can
28:48get onto Route One North.
28:50>> When you say interchange, you going on
28:53route one on on off Route One into the
28:56site and onto Route One.
28:58>> So there is entrance and [music] exit.
29:00>> Okay. All right.
29:01>> Two separate ramps
29:02>> and that's on the second phase now.
29:04>> Yes.
29:05>> How how long ago how how long
29:07>> I can sort of speak to that.
29:09>> Okay.
29:10Um,
29:11>> sorry to bring it up.
29:12>> No, that look this is a 25 year and
29:15counting project jet so we understand.
29:18>> Um, so I I think the most relevant um,
29:22you know, piece to what you're asking is
29:25what happened in the most recent uh,
29:28MEEPA updates to the project by a
29:31project no project change followed by a
29:34certificate from MEPA working with DOT
29:36is it ended up splitting. So this came
29:38from MEPA and DOT. It sort of split the
29:40mitigation itself into two pairings with
29:46what would be developed and then the
29:48mitigation that would be tied to that
29:49phase of the development. And so what
29:51happened I think Sam mentioned 617
29:54units. So, in order to unlock this next
29:57phase of housing, the 617 units and then
30:00the 10,000 square feet of retail that
30:03Frank was describing that could
30:05ultimately be, you know, sort of on the
30:07far side of the fire station. The
30:09requirement, Meepa, called it local
30:11roadway improvements, even though it's
30:14actually a state highway layout. We'll
30:16just use their noclature. And so it's
30:18that is the phase that we're talking
30:21about now is in order to unlock the 617
30:25units of housing, the retail um at that
30:28intersection area, the all of this
30:30signalization, widening, reorienting of
30:33the roadways, that's what's required.
30:35And then if a um final or further phase
30:40of the project does come forward because
30:42there is still developable land on sort
30:45of the far end um you know we call it
30:49lot 15 but
30:50>> is that re or I'm sorry excuse me okay
30:53I'm sorry sorry sorry to interrupt you I
30:55just want to know where
30:56>> no no that's fine the the majority of
30:59the future you know final potential
31:02phase is in molden with roadway
31:06crossover into river. And so if the um
31:11developer or future developers of sort
31:14of the final piece that has been master
31:16plan approved comes forward and says I
31:19really do want to build this now then
31:21there is a requirement to do um the
31:25other sort of ramping um and roadway
31:28mitigation. So hopefully I made that
31:31better not worse.
31:33>> We're almost there. Let's go.
31:35>> So, how many units presently are
31:39are underneath the uh corporation real
31:42estate?
31:42>> It's it's about 1,900 units currently.
31:45>> And you're looking for phase two to be
31:48another 650.
31:50>> 617, right?
31:52>> 617.
31:53>> Yes.
31:53>> Okay.
31:54>> That's on three different development.
31:56So when you build
32:01well in order to get into the area for
32:05the 617 proposed units, will this phase
32:092 roadway be built or will it have to
32:13wait again until you finish the 617
32:16units?
32:18>> So we are allowed to build the 617 units
32:22under just the signalization. If we want
32:25to build over and above that 617, it
32:27would require the second phase that Jen
32:30described of the the on andoff ramps.
32:32>> And how many more units would be on the
32:34second phase?
32:36>> That um well, it unlocks a commercial
32:38building, an additional commercial
32:40building that would actually be in
32:41Malden
32:42as well as I want to say it's like I
32:45think 150.
32:47>> I was going to say 150. Let's say give
32:49or take 150 units are master plan
32:52approved at this point. Meepa approved
32:54but are not individually site planned
32:57approved. And then as Sam said there is
32:59a commercial lot uh that cannot be
33:02residential. It's been restricted. Um
33:05but sort of TBD what it might eventually
33:08be. What would it take to get more
33:12concrete answers on the uh signalization
33:17and what we were talking about for phase
33:19two to move it up? Uh right now it's
33:22still
33:25it never was built for over the,900
33:27units and it wasn't it's not going to be
33:30built with the 617 units
33:34and I always thought that was one of the
33:36most important parts of the proposal
33:39from the the beginning when you started
33:41taking over Rose.
33:44How long do we have to wait for that
33:46improvement?
33:49So tough tough question to answer um
33:53because I think it's a combination of
33:56and you probably remember this that this
33:59sort of all began with DOT having very
34:03grandiose visions of all the realignment
34:05of Route One everything that they wanted
34:07to do and then from the DOT
34:10perspective I mean and I can't say what
34:12led into their thinking but what we saw
34:15and experienced was oh no we're not
34:17going to do that we're going to do
34:18something else. And then it became this.
34:21And then DOT over the course of the last
34:24three, four years, they have been solely
34:26focused and will only talk to us about
34:28the Salem Street intersection with what
34:31will be Overlook Ridge Drive. And so I
34:35can't say from do the DOT piece of it of
34:38what it will take for them to even say
34:42if they still would approve
34:45um new on and off ramps [clears throat]
34:46to their highway. I I don't know because
34:49they will not talk to us about anything
34:51other than what is in front of them
34:53right now. uh from the development
34:55perspective it's I am going to presume
34:58it's market driven of when and if a
35:01commercial development can be absorbed
35:03um you know or [snorts] sort of
35:05supported there and whether there is any
35:09desire by a developer and the cities to
35:13want further an additional housing in
35:15the site
35:16>> the last thing I would mention is also
35:19the funding of the roadway improvements
35:21um we as I mentioned we have a grant
35:24um from the state to construct the
35:28roadway improvements [clears throat] at
35:29the intersection of Salem Street, but
35:31this would require a f you know further
35:34significant grant because there is a lot
35:36of ledge in that area where the on
35:39andoff ramps would would occur at the
35:41end of Overlook Ridge Drive. So I think
35:43the funding is another relevant piece to
35:46the p of the puzzle
35:48>> and that will be on on Malden's side,
35:51right?
35:52>> That's right. Yes, that's right. So as
35:54of right now what you're saying is that
35:56first you got to relocate the entrance
36:00and after that you will work on the
36:0210,000 square feet of uh retail.
36:05>> That's right. Yes.
36:05>> And then from there you will go to the
36:08300 something units
36:1115. Is that is that correct?
36:13>> Actually the 10,000 square feet of
36:14retail and the 617 additional units can
36:18happen in tandem. So
36:20>> 1700 is that what you're saying?
36:23>> 67.
36:25Yeah.
36:25>> Where is that going to go exactly?
36:27>> I can show I can actually pull that up.
36:29So there is Is it okay if I
36:31>> Yeah. Yeah. Yeah.
36:32>> Okay. Go ahead.
36:39This is the current
36:45drive the relocite
36:59and then another
37:04which will be 310 units of residential
37:09and then the remaining develop
37:13and this is where the on and off
37:16if it happens.
37:19>> Yeah, but you you're saying 17 I mean
37:21617
37:23>> that will go you're talking about that
37:25on the last part of Rivia is only 310.
37:28So where's the other 37?
37:31So it's three buildings. It would be one
37:34here, one here and then one
37:37approximately here. And those are being
37:39done by wind.
37:48>> So that'll be done by when and this one
37:50will be done by who?
37:51>> So currently it's
37:56that is proposing it.
37:59They may build it. I don't know. I
38:01actually don't know when.
38:05>> All right. And the other thing that now
38:07that you have that open then we can use
38:08it. So what he was talking about
38:10earlier, right, is when you go on route
38:12one and you take that exit to go into
38:15the overlock when you come down the ramp
38:17that's facing maybe directly to the fire
38:20department. And then what is it like
38:23about uh maybe 60 uh feet? That's what
38:26the other entrance is going to be.
38:28Relocated.
38:28>> It's about right here.
38:30>> Yeah. Now, when you go down the ramp,
38:32they're going to put a signal in there
38:33or anything like that.
38:35>> Which exit is this now?
38:37>> So, wait, I don't know if you know it by
38:39sight. So,
38:44>> oh, so overlook is on the right.
38:46>> Yes.
38:46>> And the current entry
38:48>> is right up a little bit. Yeah. Yeah.
38:52specific question. It's probably easier
38:54to refer to this on
38:58this show.
39:00>> We try to look at it. It's kind of
39:01small.
39:05>> Are your monitors on on your desk?
39:07>> Mine?
39:07>> Yeah,
39:08>> it is on.
39:09>> No, no, I mean your monitor. So, can you
39:11see what I
39:12>> No,
39:16>> I can see on this one.
39:22I don't think it's working. Oh, it just
39:24came up. Thank you.
39:26>> Which button, Chris?
39:28>> The last one to the right.
39:30[clears throat] So, if if you look at
39:32sheet seven,
39:35um to the right part of that plan sheet,
39:40let's call it, you see some dash lines
39:43going up to the left. That's where the
39:45existing Overlook Bridge Drive is now.
39:48>> Right. The proposal is to relocate that
39:51about 300 ft to the left where you see
39:53the vertical lines going straight up
39:55from Salem Street
39:56>> on the other side of the fire
39:57department. Right.
39:57>> On the other side of the fire station.
39:59Correct.
39:59>> Fire station. Yes.
40:00>> Slightly realign the northbound offramp
40:03to Salem Street and put a signal at that
40:05location. So all of those act all of the
40:08approaches will be signalized and the
40:10fire station will have its own emergency
40:12signal and they'll be connected. The two
40:14signals will be connected.
40:17All right,
40:22>> Frank, if you can explain this to them.
40:25This is where I'm interested in. Please,
40:28I'm sorry,
40:31my days are hopping over
40:34>> here is the fire station.
40:38>> Then when you take this right, this is
40:40the area right here. The these
40:45is that going to be redone? Is that
40:46phase two right here? See how you This
40:50is how you get back on the highway.
40:52>> That would be eliminated.
40:54>> That's going to be eliminated
40:55>> once the new interchange is to the north
40:58of the site
40:59>> as part of phase two. As part of phase
41:01two, that would be eliminated.
41:02>> All right. So, how far down is this
41:04inter
41:07the interchange going to be?
41:10>> You mean the new entrance? So, this one
41:12is going to be eliminated
41:13>> as part of the phase two where there's a
41:15new offramp and a new onramp to Route
41:17One Northbound.
41:18>> Okay.
41:18>> Those two ramps will come up.
41:20>> All right.
41:23And you're going to be down here
41:24further.
41:24>> Yeah. If you zoom out a little bit, I
41:26can show you. I don't want to touch the
41:27screen. I'll probably
41:28>> Frank, can you move to to the left or
41:30the right so we can see?
41:31>> Same.
41:33>> So,
41:35the new ramp will come like this.
41:37>> Yeah.
41:38>> To the end of Overlook.
41:39>> Okay. from the end overlook and come up
41:41here right before um
41:43>> the cappies.
41:44>> I got it.
41:45>> Okay. Okay.
41:46>> And then when those are once those are
41:48open, these ramps will be removed. This
41:52road will be maintained because it has
41:54residential access. But that will
41:56basically be a dead end.
41:57>> Okay.
42:00So to go back to her question when she
42:02was our statement
42:04um that there's a lot of ledge in this
42:06area which there is.
42:09Do you presently blast or do you chip
42:12chip away or hammer it?
42:14>> Um,
42:16>> it probably depends on the condition.
42:17Yeah,
42:18>> sometimes the whole ram can take it out.
42:20Others other times there'll be blasting.
42:23Realize that's all next to Route One.
42:25>> If phase two goes forward, that'll all
42:27be removed under Mass D's supervision.
42:30There'll be separate blasting permits
42:32through the state and through the fire
42:34marshall local, you know, in this case
42:36probably Maldiny and Reier. uh fire
42:39chief plus the state fire marshal um
42:42rolling roadblocks etc. if blasting
42:44happens there
42:46>> I can add a lot has already been removed
42:48if you go inside the quarry and see how
42:51low it is compared to what it used to be
42:53it's almost at the same elevation as
42:55route one except for that ledge in front
42:58of it.
42:58>> That's right. [clears throat] What will
43:00happen as as part of those ramps if they
43:02go forward is u based on the the grade
43:05at route one if you're driving up there
43:08you can see that the ledge outcrop that
43:09Sam is referring to and as Frank just
43:12noted the site is much lower than that
43:14basically the proposal would be to like
43:16cut a channel through that where the
43:18ramp is going in both on both the north
43:21northbound off and on ramp
43:26>> and I I think it's something like 25
43:28acres that was donated by uh the
43:31developer for the construction of this
43:33interchange.
43:35So uh that saved a lot of money on the
43:38state level because they wouldn't have
43:39to purchase it to construct this
43:41interchange.
43:42>> Sam has a good picture up here if you
43:43look guys look at the screen. Right. So
43:45this is directly at the end of Overlook
43:47Ridge now to the left.
43:51Is it a touch? No.
43:52>> Molden. All right.
43:53>> Yeah,
43:53>> it's Molden.
43:54>> Yeah. So to the left, that northbound
43:57off-ramp would be coming through that
44:00ledge outcrop that you see there in the
44:02distance, and then it would meet where
44:03we were just standing at the end of
44:05these container boxes. Um,
44:07>> you can see the height differential,
44:08[music]
44:08>> correct? And then the on-ramp to to
44:12route one would come from here and go
44:14through that ledge out crop that Sam is
44:16zooming to now, right where that front
44:18end loader is, and then connect into
44:20route one.
44:20>> And that's in this new proposal, or is
44:22that on the phase two? That's phase two.
44:24>> That's that's phase two.
44:26>> All right. So phase two will mostly be
44:31[clears throat] continued or accelerated
44:33because of economic conditions probably.
44:36>> Well, and I think it's also that MASDOT
44:38is looking at them as like two separate
44:40permit projects. So currently we're just
44:43moving forward with the phase one
44:46permitting. At such time that we decide
44:49we want or we need to move forward with
44:51phase two, we would go through this
44:53whole permitting exercise with MASDOT
44:55again. So submitting the 25% design,
44:58fitting uh submitting the 75% design and
45:01then ultimately the final design prior
45:03to construction.
45:06>> So that will be more than
45:09>> that's right. The majority is
45:11>> the majority of it
45:12>> some of it is in rever because part of
45:14that phase two proposal would be to
45:16slightly widen um Overlook Ridge from
45:19where these improvements stop down near
45:21Salem Street up to these new ramps. So
45:24there'd be a little bit of work in both
45:25in both.
45:26>> And just one uh one other final
45:29point of interest. So with the proposed
45:32you have 1,900 units now and you're uh
45:36looking for with this other
45:39uh change that you 617 not counting
45:42another 150. Where is all the sewer
45:46going? Which way is
45:48>> Malden?
45:49>> This is all going to Malden. It's going
45:50down Salem Street.
45:52>> They have a designated trunk store going
45:55to Malden. Ria system cannot handle.
45:58>> No, there's a lot. The agreement has
46:00been that it goes to Malden which is
46:02closer to the MWR.
46:03>> They can handle this
46:04>> connection.
46:06I can't speak for Malden. It's
46:09>> they have told us that they can.
46:11>> Um we we've undergone site plan approval
46:14with Malden for many of the new units in
46:18question and the sewer capacity is not
46:21an issue.
46:23>> So sewer and water is through Malden.
46:27Does Baldin have a pumping station,
46:29Frank, I think, or does it have some
46:30kind of sewer works?
46:33>> Yeah.
46:36>> Yeah. Our pumping station up there could
46:38not handle the additional
46:40>> flow.
46:42Very good.
46:42>> If you're familiar with the area,
46:45>> you know that our trunk saw goes
46:48up from that area. The saw force man
46:50goes underneath the seplane basin
46:54>> to not you know we have a C plane basin.
47:00So
47:02the the bottom line is that this is
47:05important to to Rever and Malden and to
47:10the development because uh it uh it's a
47:14major improvement over the existing
47:16conditions of that dangerous
47:17intersection that's not unsalized
47:20and moving that driveway entrance
47:23further west or south uh takes it
47:27further away from that nasty curve and
47:29on Salem Street as you're coming from
47:31SUS coming around that curve which is as
47:35soon as you come around the curve you're
47:36right there at the entrance drive right
47:38now. Uh and there's been some accidents
47:41there that have been severe. So now you
47:43have cars slowing down because you have
47:45an intersection that's signalized and
47:48you have an organized driveway entrance
47:50going into the site.
47:54I'd like to thank you for your patience
47:56for this is a new board and we're just
47:58trying to get familiar with some of the
48:00the areas and especially when it's
48:03partly in Saras, partly in Malden,
48:05partly in Ver. But thank you very much
48:08for being patient.
48:10>> When it comes to the retail space, do
48:12you know exactly what's going to go in
48:13there?
48:14>> We don't know yet, but it'll be about
48:1610,000 square feet of retail. It's laid
48:19out um conceptually as two approximately
48:245,000 square foot buildings um you know
48:27more or less side by side which sort of
48:30hits the right size for whether it's a
48:34moderate size convenience store
48:37um or a restaurant cleaner things like
48:41that they when we went through review on
48:44that the commitment was to figure out
48:47what the community needs and
48:49That would be the obvious choice of
48:51built because they would like their
48:52retail to be utilized.
48:55>> Thank you.
48:59>> Okay.
49:00>> Thank you.
49:03>> Are ready to make a motion for roll?
49:10>> So, right now we're looking for a
49:11recommendation to the city council. I I
49:13I can tell you that uh the fire chief,
49:17the TBW superintendent and the city
49:18engineer have reviewed these plans
49:20thoroughly with U BHB and the proponent
49:25and a lot of things have been worked out
49:27and everybody's in agreement now and
49:29this is the plan that they've approved.
49:32>> Great. Okay. Thank you.
49:40So, we have a a motion to favor
49:42recommend this to the city council
49:45public layout.
49:46>> Yes.
49:47>> Second.
49:48>> Motion by Mr. Abrams. Second.
49:50>> Yes.
49:51>> Second,
49:52>> Mr.
49:53Rivera
49:58on the motion. Mr. Abrams.
50:00>> Yes.
50:01>> Yes. Mr. Cassandra is absent. Miss
50:03Hoffman,
50:04>> yes.
50:05>> Yes. Mr. Rivera,
50:07>> yes.
50:08>> Miss Simmons Hurling,
50:09>> yes.
50:10>> Miss Dematopoulos is absent. Mr.
50:12Sullivan,
50:12>> yes.
50:13>> Okay. Vote and so audited. A
50:15recommendation will go to the city
50:16council and you're scheduled to go
50:19before the city council when?
50:20>> October 26.
50:22>> October 26. Okay.
50:25All right.
50:28That ends the public hearing
50:31>> segment. Thank you.
50:34>> We're all set. Motion to adjourn.
50:37>> We're going to regular meeting. We just
50:38need approval of previous meeting
50:40minutes, I think.
50:41>> Perfect.
50:49>> Mr. Rivera can sign them
50:53on the regular meeting minutes.
50:55>> Yeah.
50:57for the was that it the ocean a project
51:00that I I wanted those things inserted
51:04that I forwarded
51:06>> for the meeting meeting minutes.
51:16>> So there was a motion made by myself and
51:18Mr. Sansza that the board grant the uh
51:22and consent to 1290 Northshore Road.
51:26>> Y
51:26>> and we have I think seven things that we
51:30all talked about the proposal on owner
51:32development and if we can have I believe
51:36they did not put their names when they
51:38first came here. We don't really have it
51:40on the minutes
51:42exactly who they were
51:45and the soundproofing to be added.
51:47That's number two. The traffic drop off
51:50plan to be recommended. Front entrance
51:53of Wonderland station plan.
51:56How they get in and out. Parking plan
51:58for the building. What was it? 190. How
52:01many units?
52:03>> 310.
52:04>> 310. I'm sorry.
52:06>> A trash room that we talked about and
52:07trash collection plan.
52:09>> Mechanical.
52:10>> I didn't I didn't have it on there, but
52:12yes, we can put mechanical. We did talk
52:14about it. and the final approval of
52:16occupancy requirements.
52:18>> And the other thing, Frank, have they
52:20had conversations with the T station?
52:24>> Do they have
52:25>> the developer and the T station? Did
52:27they have ongoing conversations?
52:29>> Yes, because they the the parking for
52:33this development is only 90 parking
52:35spaces residents. So, they're going to
52:37have to park at the T-station lot, which
52:40means that it's not going to be free.
52:42they're going to have to pay to park
52:44there.
52:46So if you have a car and you don't have
52:47a parking spot, you either have to pay
52:50for a parking space daily or rely on the
52:54tea and not have a car. And that's the
52:57intent here is a transit oriented
52:58development that more people will use
53:00public transportation have
53:03>> the papers parking spot if it's in the
53:05tad or not.
53:10But there will be valet parking under
53:12the current proposal for the residents
53:14to park underneath the building.
53:16>> So can you include those seven things
53:18that I
53:19>> Absolutely. Well, I I'll add those in.
53:22>> Thank you.
53:23>> Thank you.
53:25>> Oh. Uh just add in mechanical. I I I
53:28forgot I can put that in that you talked
53:29about
53:29>> if you have it here. I'll add uh
53:31>> with the trash room if you could just
53:33write in mechanical.
53:34>> Okay. Sorry about that.
53:38Those
53:43will be added to the minutes.
53:48Um there's no other further business.
53:52We can adjourn the meeting.
53:53>> Okay. Motion to adjourn. Second.
53:56>> Meeting adjourned.