2026-10-22 - City Council Budget Hearings
Summary
Based on auto-generated captions (some misheard names and numbers). Day 8 of the 2027 proposed budget hearings, chaired by Lesli D. Harris, with Matthew Willard and Aimee McCarron asking questions. The captions cover the morning session only and end during the library's presentation.
- Office of Inspector General and Ethics Review Board: claims about $196 million in identified waste since inception and a roughly 360% return; budget falls about $200,000; questions on slide-versus-budget-book discrepancies, travel and legal retainers, and an expedited recycling letter. See Office of Inspector General 2027 Budget.
- Independent Police Monitor: shifting to report and audit goals; no hiring; no questions. See Independent Police Monitor 2027 Budget.
- French Market Corporation: longest discussion; about $13 million in cash, the Upper Pontalba renovation delayed to late May, market-rate leasing practices, Crescent Park handoff, and tenant criticism during public comment. See French Market Corporation 2027 Budget.
- Regional Transit Authority: flat 2027 budget, no city capital money, CEO pick expected at the October 27 board meeting; Youth Opportunity Pass funding ends this year. See Regional Transit Authority 2027 Budget and Youth Opportunity Pass Program.
- Algiers Development District (no general fund use). See Algiers Development District 2027 Budget.
- BioDistrict New Orleans: tax-increment funding, Charity Hospital reuse, medical school, cancer center designation. See BioDistrict New Orleans 2027 Budget.
- New Orleans Public Library: millage-funded, drawing on reserves, staffing losses and aging buildings. See New Orleans Public Library 2027 Budget.
- Public comment came from French Market vendors and a transit supporter.
Agenda
Hearings on Office of Inspector General and Ethics Review Board, Independent Police Monitor, French Market Corp., Regional Transit Authority and others.
Sources
- Granicus agenda: https://cityofno.granicus.com/AgendaViewer.php?view_id=42&clip_id=5648
- Video: https://youtube.com/watch?v=TZFYMZ1kxvM
- Agenda: https://council.nola.gov/meetings/2026/budget-hearings/20261022-proposed-budget-hearings-(day-8)/
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
05:20All
05:34right, y'all. We uh are at 9:31.
05:39Love this for us. Good morning. First up
05:42is the Office of the Inspector General
05:44and the Ethics Review Board.
05:52Good morning,
05:53>> Brandy. You got your green on, too?
06:22The floor is yours.
06:24>> Thank you and good morning.
06:26The New Orleans Office of Inspector
06:28General has a history of mitigating
06:31fraud, waste, and abuse at unprecedented
06:34levels. Um, since our inception, UIG has
06:37identified approximately $196 million in
06:40city funds that were spent in a
06:42fraudulent and/or wasteful manner. We
06:44are continuing and will continue to
06:46identify and mitigate fraud, waste, and
06:49abuse. It's important to note um that as
06:52city council members, your support and
06:54partnerships are central to our work to
06:56eradicate fraud, waste, and abuse. Last
06:59year, for example, DOI identified the
07:02increased need for oversight of about
07:03$122 million in taxpayer allocated
07:06funds.
07:07>> Ed, can you pull the microphone closer
07:09to you?
07:09>> Sure. Last year, for example, the OIG
07:12identified the need for increased
07:13oversight and about $122 million in
07:16taxpayer allocated funds to offices like
07:20the sheriff's office and the Orleans
07:21Parish Communications District.
07:23Following our recommendations, the city
07:25council began drafting an ordinance
07:27requiring these outside agencies to
07:28track expenditures in city brass,
07:30thereby allowing for greater oversight
07:33of taxpayer money. Um this year alone
07:36we've identified about $16 million in
07:39potential economic loss prevented and
07:42given our budget that gives us a rate of
07:44return on the city's investment in us at
07:46about 369% which is a pretty good
07:48investment. Um, at this time I'd like to
07:50introduce my staff. My, um, deputy
07:53inspector general Alli Burls, Chief of
07:55Investigations, uh, Chuck Williams, uh,
07:59Chief Evaluator Patrice, uh, Rose, and,
08:02um, we can go ahead and get started.
08:06>> Good morning. The Office of Inspector
08:08General has four overarching goals. They
08:11cover nine objectives. Goal one is to
08:14prevent and detect fraud, waste, and
08:16abuse. We do this by providing a
08:18citizens academy and departmentwide
08:20trainings to citizens, department
08:23managers and legislators where we
08:25discuss our work and how we can help to
08:27prevent fraud, waste and abuse. We also
08:29investigate allegations of fraud, issue
08:33best practice recommendations, monitor
08:35high-risisk procurements, and work
08:37collaboratively with the Bureau of
08:39Purchasing. Goal two is to focus our
08:42activities on the right issues at the
08:44right time. Our objective here is to
08:47make sure we're directing the
08:49appropriate resources on issues that
08:52have the greatest impact to the city and
08:54its citizens. To this end, we conduct a
08:57risk assessment, develop an annual work
08:59plan, and strive to provide timely
09:02recommendations for positive
09:04improvements. Part of our goal is to be
09:06timely and relative. Part of our goal to
09:09be timely and relative involves making
09:12sure we monitor current event and
09:14emerging trends and maintain
09:16relationships with external partners who
09:18can provide us with critical
09:20information.
09:22>> Morning council. Uh I'll be providing
09:24our goals on providing credible and
09:26accurate reports and communication of
09:27those reports to governance and the
09:29citizens. Our goal three is to provide
09:31credible and accurate reports. We will
09:34uh do so by ensuring that our projects
09:36are performed by independent staff
09:38members. That is they're free of both
09:39professional and personal uh conflict.
09:42We will do that by uh maintaining
09:44organizational independence as required
09:46by the city council or excuse me by the
09:48uh city ordinance and city charter.
09:51We will require our staffs to obtain uh
09:54continuing professional education and
09:55maintain their certifications uh and uh
09:59which would include receiving advanced
10:00degrees and obtaining prior work
10:02experience uh and and then earning
10:04national nationally recognized
10:06certifications. We'll also ensure that
10:08our OIG develops and implements
10:11methodology in accordance with
10:12professional standards to maintain high
10:15degree of quality control by developing
10:17policies and procedures and ensuring
10:19that our personnel understands those
10:21policies and procedures. Then finally,
10:23we will communicate those reports to the
10:25citizens of New Orleans. We will uh
10:28communicate our findings and other
10:29informations with managers and those
10:30charged with governance and uh inform
10:33decision makers of findings, identify
10:35causes of reported problems and work
10:37with decision makers to develop
10:39recommendations that serve as a basis of
10:41improvement. Finally, we will publish
10:43those uh reports and findings to city
10:46governance department managers and those
10:48charged with governance and then finally
10:50to the public.
10:53>> And as you can see here, our office has
10:55grown significantly. We now have 25
10:57employees.
10:59This is our org chart. Um we have four
11:01departments. Audit, inspections and
11:03evaluations, investigations, and IT and
11:06intelligence analysis.
11:15No, I
11:17>> Okay. Um this
11:20>> Oh, yes. So, so we have several projects
11:23underway. Um and we're going to continue
11:24to ensure the city's limited resources
11:27are used in in efficient and effective
11:29manner. Um you know we we just don't
11:32have the money uh to not ensure that our
11:36limited resources are being used in the
11:38most efficient and effective manner. Uh
11:40for instance our recent review of
11:41equipment maintenance division fleet
11:43operations revealed that the uh city
11:45purchased software to the tune of about
11:47$500,000 and uh that software was never
11:50installed on about 60% of city vehicles.
11:53So, we can't spend $500,000 and not have
11:56that money put to good use. And, you
11:58know, as as an aside to that, the 64% of
12:01the vehicles that weren't installed on
12:03were police vehicles. And as you know,
12:05we have multiple police investigations
12:09um involving where the the police
12:11officers themselves are the subjects of
12:12payroll fraud. So we cannot continue uh
12:17to we we we we must continue to ensure
12:20that the city's limited resources are
12:21used in the most efficient and effective
12:23manner. Um
12:26sometimes um our reports hit on
12:28financial operational as well as
12:30organizational risk. Um sometimes they
12:32hit on one, sometimes they hit on all
12:34three. Um recently we produced a report
12:36on Nord um which identified that Nord
12:39was not consistently conducting proper
12:41background checks to ensure the safety
12:43of our biggest resource, our children.
12:45Um UIG will continue to aggressively
12:49identify fraud, waste, and abuse and
12:50hold public officials accountable uh
12:52whenever we find them abusing their
12:54office for personal gain. Um we have any
12:57other slides? One more.
12:59>> And um this is our budget with the
13:01original numbers we were given. Since
13:02you all know our budget is actually
13:04fixed and it will be going down by about
13:06200,000 this year.
13:10>> Certain questions you may have.
13:12>> Yeah, there's a disparity between the
13:14budget book and your presentation.
13:16Brandy, you might be able to explain
13:17this. On page 358, the 2026 adopted
13:22budget total is 3.9 million, but the
13:25presentation notes that it's 4.4
13:27million. And the same for the 2027
13:30proposed budget. The budget book is 4.2
13:33whereas the presentation is 4.4.
13:36>> So I didn't complete the presentation.
13:37I'll start with that. The adopted budget
13:40is correct for adopted. Their budget was
13:42amended because if you recall the um
13:45revenues went up for general fund and so
13:48these agencies, the OIG independent
13:50police monitor, they get a certain
13:51percentage of the budget. So we had to
13:52increase their budget. So their amended
13:54budget did change for 2026 but the
13:56adopted budget did not um change. I
14:00cannot speak on why the proposed budgets
14:02taste this in their presentation. I
14:03defer to the department.
14:06>> Do you have any insight on that?
14:08>> Those were the number we were told I
14:10think from budget to put it.
14:13>> I we don't this but who did you speak to
14:15about your presentation? I can talk to
14:17you offline but the budget book is the
14:20factor and you all should have access to
14:21Qua to pull your data.
14:23>> Okay.
14:24>> This is this is for many of the agencies
14:26appearing today. the ethics review board
14:29um office of independent police monitor.
14:32>> So those offices we don't work directly
14:34with them because they're external from
14:35the um administration and so like the
14:38other agencies who came yesterday they
14:39get their data should come from the
14:40budget book.
14:41>> They always give us the number to use
14:43for this is the previous year's budget.
14:46>> Okay, y'all figure it out. What but what
14:49number are we working with?
14:51>> Our budget went down 200,000. We had we
14:54did not have a budget number until after
14:57the powerpoints were due.
14:58>> Yes. So I will say that the request that
15:00goes to the outside agencies is before
15:02the budget book is out and the budget is
15:05finalized. So some departments are using
15:08past numbers because the request from
15:10council comes a little earlier.
15:11>> I mean the good news about many of the
15:13agencies you guys are a percentage of
15:15the general fund budget. So
15:17>> it is what it is. Do you have a surplus
15:20that you're running? So um in the past
15:23years we have had a surplus and we've
15:25returned that surplus but as we um in in
15:28the past couple of years we have hired
15:30to our capacity. So um in the last
15:32couple of years we've given back
15:34anywhere from 500,000 to 2.5 million. Um
15:37but for the coming year we won't be
15:39giving back as much because we've hired
15:41more employees and we are operating
15:44within our budget. So the numbers that
15:45we're given we are continually ensuring
15:47that we obviously are not overspending.
15:50>> Okay. Well, let's stay in touch on your
15:52surplus because we might have to sweep
15:53that. Council member Willard.
15:56>> Thanks, Madam Chair. Just a couple of
15:58questions. Uh, thank you guys for being
16:00here today. Um, I noticed that there's a
16:0335,000 budgeted for conventions and
16:05travel. Um, could you touch on that?
16:08We're really trying to limit that across
16:10the city.
16:11>> Yeah, sure. So, um, the Office of
16:12Inspector General is unlike any other
16:15city employee.
16:16>> Sure. Um, so when we produce reports,
16:19our reports are highly technical. Um,
16:21and when we produce reports, they are
16:23never disputed because the people that
16:26write our reports are JDs, PhDs, um,
16:30accountants, CPAs. They're either CIGA,
16:33CIG, um, or myself, um, CIGA and and CIG
16:37certified. So, um, it takes an
16:39inordinate amount of training and
16:42subject matter expertise to continue on
16:44in those professional design. continuing
16:46education to Okay.
16:48>> And and and if we don't have those
16:50continuing education credits, um we um
16:54it impacts our certification.
16:55>> Sure. And then um 100,000 for outside
16:59legal services. Is that in preparation
17:02to write the reports or
17:04>> No. So So we have a general counsel. We
17:07we haven't spent that. We don't
17:08anticipate on spending that, but
17:10>> Okay.
17:10>> But it's a retainer in case we need it.
17:13>> Okay. cuz I it looked like the last
17:15couple of years you you didn't have
17:16that.
17:17>> Um well, we had it but we didn't I think
17:20the last year we used 20,000 in outside
17:23services. So it's what happens at the
17:25end of the year. We just give the money
17:27back. We don't need it. But I'd rather
17:29have it and and designate it um cuz
17:32people like to question our activity
17:35mainly the the the people that are we
17:37are holding accountable for their bad
17:39behavior. So, I need to make sure that I
17:41have fees and money for legal
17:43representation to ensure it through.
17:45>> Okay, sounds good. Um, like I said, we
17:48we frequently give enormous amounts of
17:50money back in identified about 20
17:53million so far this year. So, our rate
17:55of return is about 360%.
17:57And that doesn't include all the people
17:58that have been arrested, indicted, and
18:00convicted of using their public office
18:01for personal gain. So, we continue to be
18:03a really good asset for the
18:04>> Okay. Um, and then how do you guys
18:06decide where where you go next? what
18:09departments to look into, what
18:11contracts, services.
18:14>> Yeah. So, um, does somebody like um give
18:18you a lead or
18:20>> So, so we have a um and and I'll let um
18:23the deputy talk about it a little bit
18:25more, but we have a um a risk assessment
18:27process. And our risk assessment process
18:30focuses on operational, organizational,
18:33um reputational, and now more than ever,
18:37financial risk
18:38>> because every dollar counts.
18:40>> Absolutely. Um, we used to do every year
18:43we'd select 25 entities and we'd have
18:46them fill like a survey and we'd go do a
18:48deep dive. We'd meet with them. We'd
18:50kind of do like an analysis and give
18:53them a risk score, but now we dedicated
18:55one employee to do that full time. So,
18:57we're going to be hitting up all the big
18:58departments every year.
19:00>> We also rely on tips that come in as
19:01well.
19:02>> Okay. Awesome. Well, keep up the great
19:04work. Thank you.
19:05>> Thank you. Appreciate it.
19:06>> I do have one more question. And I see
19:07you have in the queue a 2027 report on
19:10recycling services. Given the fact that
19:13that might be in dispute during this
19:15budget season, is there any way to
19:17expedite that report?
19:18>> Yes, it should be coming out soon.
19:20>> Okay. Soon as in before budget season's
19:23over. Can we get a preliminary
19:24>> budget season over?
19:26>> November 9th. Soon. November 19th.
19:29>> We'll try. Okay.
19:41Um,
19:42>> will it come out before 2027?
19:45>> Yes.
19:45>> What was the question?
19:47>> Recycling.
19:47>> Recycling
19:49>> that Adam is doing.
19:50>> Oh, Adam is he's we have an evaluator
19:53who's working on sanitation and it will
19:56include a little about recycling, but
19:58it's it will not be out before the end
20:00of this year.
20:01>> It will not be
20:02>> not the end of this year. Is there any
20:04way, my question is, is there any way to
20:06expedite that given the fact that we are
20:08in the middle of
20:10>> deciding on budget and that might be
20:12some important information to have.
20:14>> Well, it it's possible we can pull that
20:16particular issue out maybe and uh pre
20:20present a letter just specifically on
20:23recycling. I'm natural to speak with him
20:25about we may be able to pull some of the
20:27information out into an expedited
20:29letter, but please keep in mind when we
20:32write these reports, we have standards
20:33for the GAO that have to be completed.
20:35>> We have to have a comment period and all
20:37that, but we will have a letter out soon
20:39and recycling.
20:40>> Thank you.
20:41>> Thank you.
20:41>> All right, Ashley.
20:44Up next is the office of the independent
20:46police monitor.
20:50Heat.
21:03Heat.
21:28Yeah, that one.
21:36>> Oh, the keyboard.
21:47Good morning.
21:48>> Good morning. Thank you for this
21:50opportunity to address the council and
21:53the public on the office of the
21:54independent police monitors budget for
21:562027. I'm Stella Cement, the independent
22:00police monitor for the city of New
22:02Orleans. And I'm joined today with
22:04Cricelle Williams, our deputy police
22:06monitor, and Renee Livius, our office
22:09and budget manager. She's sitting right
22:11there.
22:17There we go. Our presentation today
22:20starts with the status of our stated
22:22goals for 2026.
22:30In 2026, the Office of the Independent
22:32Police Monitor expanded our mediation
22:35programming and services. We increased
22:37our community district pilot program,
22:40which provides mediation services to the
22:42community to resolve disputes that would
22:45otherwise demand police officers time
22:47and attention. Similarly, we expanded
22:50the post investigation mediation program
22:53to include cleared by body camera cases
22:57and we've received over 40 referrals to
23:00this program so far this year. Due to
23:03budgetary issues that we faced in 2026,
23:06we did elect to push our recruitment and
23:09training of our new class of mediators
23:11to 2027
23:13when we will be able to accommodate this
23:15in our operational budget. The
23:17recruitment of a new cohort of mediators
23:20occurs every two years, but in light of
23:22our budget in 2026, we elected to do
23:25this um on a three-year um interval, and
23:30we will be providing that in-depth
23:31training to the new mediators in 2027 as
23:35well. In 2026, the OIPM completed the
23:39virtual public archive, which is now
23:41available on our website. We continue to
23:44make significant progress with our
23:46public facing database with officer
23:49force award and discipline data and the
23:52beta is now done. We're trying to
23:54finalize this um this interface before
23:58the end of the year so it could be
23:59publicly released. We're working with
24:01NOPD on that goal. In 2026, due to
24:05budgetary issues, we ended the monitors
24:07mic radio show. The monitor's mic was
24:10designed to provide more transparency
24:12and information to the public about the
24:15way that they're policed and give the
24:17and give them a platform to engage with
24:19leadership and stakeholders making
24:21policing decisions. Our final show was
24:24an interview with Chief Kurt Patrick. We
24:27thank all of the partners, elected
24:29leaders, stakeholders, NOPD, and
24:33community members for coming on to the
24:35show and all of our listeners for tuning
24:37in. you can now access the shows
24:39effectively as podcasts on our website
24:41and on Spotify. So that way we're adding
24:45to um institutional memory regarding
24:47policing.
24:49We're happy to report that the majority
24:51of our goals were completed or are
24:52currently in process and we anticipate
24:55that we will um be done with some of
24:57those goals by the beginning of next
24:58year.
25:00There are some goals that will be
25:02carrying into 2027 and we'll discuss
25:04that later.
25:07Sorry.
25:10Come on.
25:13Next, I will provide a brief overview of
25:15our personnel.
25:17This chart, this chart provides an
25:19overview of OIPM's personnel. Um, these
25:23are our full-time employees. We do have
25:26some vacancies, but we will not be doing
25:28any hiring in 2027.
25:34Looking to our organizational chart in
25:362026, we have our full-time staffing was
25:39consistent. However, our general
25:41counsel, who is a contractor, left and
25:44we've been unable to replace her through
25:46the RFP process. It is a goal to replace
25:49this contractor position in 2027.
25:52Um, and I believe that RFP is still live
25:55right now. So, if anybody is watching,
25:57please apply. In 2027, if we do lose a
26:01full-time employee, we will seek to
26:03replace them if our budget allows and
26:05the hiring freeze is lifted. I will flag
26:08for the council that the OIPM does carry
26:10a $100,000 wage reserve in our personnel
26:13budget. And if we're required to, as we
26:16were in 2026, we may tap into some of
26:18that personnel fund to supplement our
26:20operational budget if needed.
26:27Now looking to our 2027 OIPM goals,
26:33we will pivot to more report and audit
26:36based goals for the next year, such as
26:38prioritizing reports that we started in
26:412026, but will finish and release this
26:43next year. That includes reports on
26:46facial recognition, technology, criminal
26:48investigations, lawsuits, and claims.
26:52For example, in 2026, we submitted our
26:54first truncated case review to the NOPD.
26:58In that, we critically reviewed a use of
27:00force investigation regarding an arrest
27:02that occurred in the French Quarter
27:03where strikes against the individual
27:05being arrested were not recorded in the
27:07force statement. This case review will
27:10be eligible to be released to the public
27:11at the end of October. But in 2027, we
27:15will continue to expand these case
27:17reviews in order to provide more timely
27:19reviews of NOPD's formal disciplinary
27:22investigations and use of force
27:24investigations.
27:28As mentioned earlier, in 2027, the OIPM
27:31will recruit and train a new cohort of
27:34mediators for the community police
27:36mediation program. All selected
27:38mediators from the community will
27:40participate in an intensive 50-hour
27:43training that will help prepare them to
27:45mediate the three types of mediation
27:47that our office currently provides,
27:50which includes the traditional police
27:52community mediations,
27:55mediation between community members, and
27:58mediation between NOPD employees and
28:01NOPD employees and supervisors.
28:05On that note, in 2026, the OIPM started
28:08drafting the process and the policy for
28:11the expansion of the mediation program
28:13to include these mediations between NOPD
28:16employees and NOPD supervisors and
28:19subordinates. This draft policy is
28:22currently under review at NOPD and will
28:24be provided to stakeholders in the city
28:26attorney for review before being
28:28implemented in 2027. We look forward to
28:32formally adopting and launching this
28:34program in 2027. Though I will flag that
28:36in 2026, the OIPM informally led two of
28:40these mediations for the NOPD already.
28:49In 2027, the OIPM will be completing an
28:52audit into public integrity bureau
28:55classifications of formal disciplinary
28:57investigations that we started this
28:59year. Additionally, we will audit case
29:01refusals and evidence exclusion that is
29:04recorded under chapter 1.2, paragraph 16
29:07of NOPD's policy to determine if there's
29:10officer misconduct or illegal searches
29:13and seizures that are threatening the
29:14ability for successful prosecutions to
29:17occur in criminal district court. And as
29:20we do each year, we intend to continue
29:22to expand our community engagement. And
29:25this includes our work with the police
29:27community advisory boards, which I will
29:30highlight we are still very interested
29:32in coordinating and would love to work
29:34with the council and with city
29:36leadership on um on that endeavor.
29:40All of these goals that we listed are
29:42budget dependent. However, we will
29:44continue to be responsible stewards of
29:46taxpayer dollars that we are funded with
29:49and make necessary decisions to pivot or
29:52cut costs as needed while still
29:54achieving our mission and serving the
29:56public.
30:04So moving on to our budget summary and
30:06our proposed budget for 2027.
30:11The OIPM receives.16%
30:14of the general fund each year pursuant
30:16to statute. Additionally, in the coming
30:19year, the OIPM intends to explore grant
30:21opportunities. I anticipate that we will
30:24be able to address this more in our
30:26publicly released 2027 work plan by the
30:29end of the year.
30:35Thank you for hearing from the office of
30:37the independent police monitor and we
30:39welcome any questions.
30:41>> Thank you. Any questions? No. Thank you
30:43for your presentation. Thank you so
30:45much. Thank you.
30:46>> Up next is the French Market
30:48Corporation.
31:05Thank you.
31:17That's okay.
31:34Heat. Heat.
31:52Y'all ready for us? Okay. Good morning,
31:54Hudat. I know everyone's minds are in
31:57Paris right now, but we're going to keep
31:58it here for a few minutes.
32:04All right. So, I'm going to start with a
32:05review of our goals from 2026.
32:08Completing building E was one of the
32:10biggest goals that we had. So, some of
32:12you are not as well versed in this um
32:15haven't been through the trenches. So,
32:16we'll bring you in a little bit. So,
32:18after during IDA, there was major damage
32:20to building E, which is our main
32:21administrative building. What was found
32:24was that it wasn't specifically IDA
32:26related damage. It was building issues
32:28from when the building was built in in
32:30the 1970s. And so, French Market had to
32:32go into our coffers, into our reserves
32:34to rebuild that building. So, there was
32:36a big push to get us back into that
32:38building. It ended up being about a $7
32:40million project. So that all came from
32:43French Market reserves. Typically
32:45speaking, French Market, as you all
32:46know, has a franchise agreement with the
32:48city. And so we give $100,000 in rent
32:51payment or 20% of our um net revenue,
32:54the greater of. We've always loved to
32:56give money back to the city given given
32:58this situation and the upper pentalaba.
33:01We haven't been able to give as much
33:02recently. So one of our kind of
33:03overarching goals is let's get back to
33:05that place. Let's get back to the place
33:06where uh we can be giving money back.
33:08So, with building E, there was a huge
33:11push to get that project done, to get it
33:13done right so that we could get back in.
33:15A couple highlights I just want to say.
33:17Uh, we moved back in in August and we
33:19already have had some community meetings
33:21hosted in the building. Uh, FQMD has
33:23hosted some of their meetings in the
33:24building. So, we really take it
33:26seriously that it is a public asset and
33:28we're always looking for ways to share
33:29that with the community. So, we're
33:30excited and we also think that that can
33:32drive down costs for other community
33:34agencies who may be paying rent
33:35somewhere to uh to host a meeting.
33:41the Upper Pentala project. So, as you
33:43all know, graciously city council
33:45assisted FMC in using 8 million uh
33:47dollars in bond funds for this project.
33:49So, this was a long-standing project. It
33:51had been out bid out several times. All
33:53these projects kind of came together. Uh
33:55there was balcony repairs that were
33:57needed. There was roofing work that was
33:58needed. There were there were water
34:00intrusion issues that were a problem.
34:02And it was costing us a tremendous
34:04amount in maintenance. And so, uh,
34:06Leslie Ally, the former director, really
34:08worked with city council. We're super
34:10grateful, um, to get that $8 million.
34:12Does not cover the cost. Uh, it's going
34:13to be about a $12 million project all
34:15in. But, um, again, we're working really
34:18hard. We have about a million dollars in
34:20revenue from residential tenants in that
34:23building annually. So, having them out
34:24of the building is hurting our bottom
34:27line. But, that's something that you're
34:28going to see in the budget as we move
34:30into 2027. We're anticipating
34:32reoccupying that building about halfway
34:34through. And so we'll be able to start
34:36bringing that residential rent back
34:37online. We're already working with
34:39people. Um the the board just approved
34:41the appraisal for the um to set the
34:44baseline from for market rents. That
34:46appraisal or the RFP should be going out
34:48next week and then we'll start we'll get
34:50that the board will approve those rents
34:52and then we'll start sending those out
34:54to people. We have a waiting list for
34:55that building. So we're confident that
34:57once we can get through this project uh
35:00we can move forward.
35:02Um
35:03it's a historic building, so we know
35:05there's exposure. We've had a few things
35:07come up along the way, but we're holding
35:09things pretty tight. Uh we anticipated
35:11kind of a a larger amount for change
35:12orders on that project. Um so we're
35:14continuing to move through and we're
35:16pleased with the progress. Tuna was a
35:17low bid on that and we've been really
35:19pleased with their work on this. They've
35:20really been working with us. They've um
35:22dealt with some hurdles. The the mill
35:24work operator went out of business in
35:26the middle of it and they stepped up and
35:27they're making it happen. So very
35:29grateful. We're really excited to bring
35:31this building back online uh in its true
35:33glory of what it should be as a historic
35:35asset for the city.
35:38One of our big goals for 2026 was just
35:40really increasing local engagement
35:42specifically in the French Quarter. And
35:44so as we've stepped back and we've
35:45looked at kind of changing market needs
35:47and retail and just kind of how people
35:49are engaging with the city, what we
35:51realized in interviewing people was that
35:53there was a disconnect and that people
35:56had once really felt a connection to the
35:58French market and we're not seeing that
35:59as much. And so we wanted to start close
36:02and kind of build our way out, you know,
36:03and so I'm a firm believer that every
36:06resident of the city of New Orleans um
36:08is a part owner of the French Quarter
36:11and that we all, you know, it belongs to
36:12all of us and that everyone should feel
36:14that way. So it was really important for
36:16us to start close. And what that meant
36:17was we've done a lot of survey work with
36:19our with our vendors and our tenants and
36:21the people who visit the market. uh we
36:23we've worked on a strategic plan for the
36:26market itself where we had uh Truckwise
36:28who does great work in the city uh
36:30literally come table and just talk to
36:32people who are moving through the market
36:33and ask them what they're looking for.
36:35And so as one of our goals um or one of
36:39one of the things we heard was that the
36:40the kind of big festivals that we were
36:42doing were actually taking away from the
36:44market and not adding to it. So
36:45obviously Creole Tomato we're going to
36:47keep that. Uh that's our signature
36:49event. So we had our 40th annual this
36:50year and it was amazing. We did um a
36:53Miss Creole Tomato contest at Oz. And so
36:56the winner um got to be Miss Creel
36:58Tomato and was the MC for the festival.
37:00It was really fun. It engaged a totally
37:02different population that we than we've
37:04usually usually engaged with. Um we
37:07engaged with some influencers and then
37:08what we saw is because it was June, it
37:11was kind of a slow news week and so we
37:13had a lot of influencers coming who just
37:15needed to generate some content. And
37:16then day two of the festival we had all
37:18these college kids come which was great
37:21because you know we've been talking a
37:22lot with Tulain about the fact that
37:24there's a real disconnect between our
37:25you know between Xavier Lyola Tolane you
37:29have these kids who are coming here and
37:30they're getting this great education and
37:32they're not getting that investment in
37:33the city. So we've been really excited
37:34to see some of these projects that we've
37:36been working on are actually working. Um
37:39I will note the bouquet is this weekend.
37:41So if you're you know watching um or you
37:45guys here. So this is really an event
37:47for locals. So um on Saturday 11:00 to
37:514:00 it's a free event. Kids come in
37:53costume. We had 700 kids show up last
37:56year which is typically all local kids.
37:58And we do free trick-or-treating. We do
38:00face painting. Um there's a petting zoo.
38:03It it's just a really fun local event.
38:06Our vendors love it. They all have a
38:08balloon on their store. If you have a
38:09balloon on your store, that means
38:10there's trick-or-treating inside the
38:11store. So, it's just it's one of those
38:13things that it's nice to see the
38:15community come together and show up.
38:21So, the shift in marketing efforts when
38:23when I came to French Market, most of
38:25our marketing was print advertising.
38:28And not to not to disparage print
38:31advertising, but what we recognize is
38:33there's a real shift to online
38:35engagement. And so we've worked really
38:37hard with both local influencers, media,
38:40and media companies to start to move
38:43that online. And so we've worked with um
38:45some locals like Quinn Bishop on
38:47Orleans, Diane Honory, uh Buku Local to
38:51really get our messaging out and hit
38:53people that we haven't been hitting to
38:55say, "Hey, there's something for you
38:56here as well."
39:00Um, and so just kind of by the numbers,
39:02so one of one of the partnerships that
39:04we've had is with NextStar Media, and
39:06they are very data techsavvy. And so
39:09what we did with them is really looked
39:11at targeting specific audiences to see
39:14who is engaging with our advertising.
39:17And so we kind of broke it up into
39:18different advertising campaigns. So
39:20you'll see here we did a 50 plus, 20some
39:23family audience. And then this Houston
39:25Atlanta. So, the Houston Atlanta was
39:26actually a secondary campaign that we
39:29ran. And I'll just draw your attention
39:31to the fact that we had almost a million
39:33impressions on social media. And so,
39:35when we're talking about, you know,
39:36we're hearing a lot in these in these
39:37budget hearings and just across the
39:39board of like how do we sustain and we
39:41have to create a great city for our
39:44citizens, but we also know that bringing
39:47in outside dollars is really useful to
39:49us. And so that's why we knew that those
39:51were two groups that are regional
39:53travelers who like to come to New
39:55Orleans. And so that's why we targeted
39:57those so that when they're coming,
39:58they're knowing, oh, hey, I can come. I
40:00can spend money here. Here we're telling
40:02them how to engage with our city. And so
40:04we're really proud of that. Uh the other
40:06thing I want to point out is just
40:07between July and September, we had um
40:10over 2 million views on our Facebook
40:12page, which is a huge increase. And I uh
40:14credit that a lot to you know our
40:17marketing team has working been working
40:18really hard and that's something that
40:20we'll be working more on in the future.
40:25So
40:27excuse me one of our other major goals
40:30was to fill vacancies. Right? So I
40:31talked about building E. When we were in
40:33building E, what that meant is that
40:35French market offices were occupying two
40:37groundf flooror retail spaces in the
40:39upper pentala which is critical retail
40:41space. And so it was really important to
40:44us to get out of that building so we
40:45could get retailers into those spaces.
40:47Um and so and then there was also a
40:50vacancy in the farmers market. So we've
40:51had some of these vacancies come up and
40:53so we we've been really excited to
40:55engage and to get people into these
40:57spaces. Um and so I kind I just put this
41:00chart together for you guys cuz I
41:01thought sometimes just easier to see
41:03kind of the the totals and the numbers.
41:05These are the 2026 leases that we have
41:07executed. And so we have um the
41:10collective shop which at 528 St. Peter
41:12was vacant and so we were able to
41:15activate that space. Um only coffee in
41:18the farmers market and so that space was
41:20formerly um French market produce and so
41:23we've been able to to move forward in
41:25that as well. The soul study which is
41:29kind of a a personal favorite just
41:31because it really hits what we were
41:32trying to do. So um Christian Davenport
41:35is a poet and he's also an artist. And
41:37so you go in and he writes a custom poem
41:39for you, but it's in this very immersive
41:41environment. And what we've done is we
41:43realized through this strategic leasing
41:45process that we've been in since 2023.
41:48People are looking for something more
41:50than they can just do Google Lens and
41:52buy it on Amazon. They're looking for an
41:54experience. They're looking for a
41:55one-of-a-kind moment. And so that's what
41:57we're trying to get to is, yeah, you're
41:58still going to have your stores. People
42:00still want to buy stuff. You know, the
42:01sock store uh does about $1,000 a square
42:04foot in sales. I mean, they they're just
42:06it's amazing. But people are looking
42:08for, hey, I can't get this anywhere
42:10else. So, we're really excited about
42:12some of these. And so, that was one,
42:14too. There was a vacant space. Actually,
42:15an RFP was done on that space. The lease
42:18fell through on that RFP before I
42:20started. Um, and so it was vacant and we
42:22went back out, we put it on the market,
42:23we were able to to do this lease. Um,
42:26Paradise Garden, it was actually, and
42:28I'm sorry, there's a typo here, that
42:29should say 16200, not zero. Apologies,
42:32but the numbers on the bottom are
42:33correct. um she was actually in a larger
42:36space in the district and really
42:38couldn't handle it and was paying well
42:40below market rent. And so we said, "Hey,
42:43your space is going out, but there's
42:45other spaces available." And so I I
42:47talked to her yesterday and she's like,
42:48"Casey, it's so great. I didn't even
42:50realize how good it was going to be." So
42:52it's it's nice to see like yes, some of
42:54this change is uncomfortable, but then
42:56to see people who are succeeding in it
42:58is really exciting. So, we're making
43:00more, you know, we're doing more in
43:02revenue, but she's also doing more in
43:04sales. And so, everybody is winning.
43:06It's uncomfortable at the beginning.
43:07I'll I'll admit that. You know, we're
43:09making big changes, but is exciting to
43:11see that, hey, we were trying to make
43:12these changes and now we're seeing them
43:14work. Um, Home Studios is that is a a
43:18local artist. He has a book he does. And
43:21so, again, kind of same. And then
43:23Pelican is one of the newer leases. That
43:25space was vacant in the ground floor of
43:27our administrative building. So that
43:30that space has been vacant since 2015.
43:33So to put that space back online at over
43:36$100,000 a year is something for us all
43:38to be really proud of. Um Southern Paw,
43:41which is has decided they wanted to put
43:43their flagship store, they closed their
43:45Riverwalk store because they wanted
43:46people and neighbors to be able to walk
43:48their dog into the store. So really
43:50enhancing that neighborhood feel in the
43:52upper Pentala. Um and then Cinjun
43:54Collectibles, which is a is a jewelry
43:56store. again, you know, that was one
43:57that had gone out for RFP. We couldn't
43:59get responses. We put it on the public
44:01market. We were able to use broker sites
44:03to really advertise it and and bring it
44:05online and and, you know, increase our
44:07our revenue. So, we're really excited to
44:09present this to you. And part of why we
44:11present this to you is because, again,
44:13with that goal of we want to start
44:15turning money back over to the city,
44:17these increased rents are making a
44:19difference.
44:25So on our personnel um you know we are
44:29kind of tightening things up. We have a
44:31total of 44 folks. You know it's largely
44:34laborers and maintenance team for us. Uh
44:37we have a pretty small administrative
44:39staff. Uh we are working to fill some
44:41positions right now. We had a ton of
44:42exposure with upper pentalaba building E
44:44under construction. And so we held off
44:46on some hiring. Um, but now that we're
44:49starting to ramp back up, we are
44:50starting to do some of those interviews
44:52and hire people into these positions.
44:55Um, and you can see from our org chart,
44:56you know, there have been some some
44:58changes where we've brought in kind of
44:59outside consultants where we realize
45:01there's a significant savings and using
45:02a consultant that maybe it's a position
45:04that doesn't need a 5 day a week person.
45:06Maybe it's something where we just kind
45:08of need one off. Um, I will note that
45:10you'll see that with uh the real estate
45:12brokerage services. So, right now we
45:14have several leases on monthtomonth,
45:15which has been one of the goals is to
45:17get those off monthto- monthth and into
45:18longer term deals. Um, so you'll see in
45:22in the budget for this year that those
45:24services are higher. I think we have a
45:25budget about $135,000 for commissions.
45:29That'll drop in the next year cuz once
45:30those are signed, then you don't need,
45:33you know, you don't need a budget for
45:34that as much. Um, but that gives us that
45:37flexibility. We're not just holding
45:38someone on payroll for no reason.
45:43Okay, so our 2027 goals, it's just a
45:46quick review of our 26. So I'll just um
45:48move into 27.
45:52So again, completing upper pentala,
45:53right, building was that was the big
45:55goal for this year. Upper pentala is the
45:56big goal for next year. Um we're
45:59confident that we can get it done and
46:00and get people moved back into the
46:02building. Um restoring that residential
46:04occupancy, you know, it's just immediate
46:06revenue back into the pocket of the
46:08ultimately the city. um strengthening
46:11the public market. So, as I noted, we
46:13did this strategic planning effort for
46:16the market specifically, and so now
46:18we're working on um really advertising
46:20and getting new vendors in and getting a
46:23stronger vendor population.
46:25Um advancing strategic leasing
46:27initiatives. So, like I said, you know,
46:29we've been on this journey for some time
46:31now and continuing that so that we can
46:33move into getting those spaces under
46:35longerterm leases um so that we can kind
46:37of scale back on the need for that
46:39intense leasing effort. Um expanding
46:42digital marketing efforts, taking what
46:44we've done and moving it forward and
46:47then um strengthening our cultural
46:48partnerships. So, we've been meeting a
46:50lot with the French Quarter locals and,
46:51you know, the cultural partners in the
46:53French Quarter to really say, "Hey,
46:55let's all tell our story together and
46:56not be telling it individually.
47:05So, I'll just kind of go over the quick
47:07highlights. So, on our personnel
47:09services, um, there is a decrease of
47:1282,000 that is actually attributed to
47:14the grounds patrol. So, we have, uh, I
47:17think they were here yesterday." So
47:19ground we use grounds patrol officers
47:20and what we did is we really looked at
47:22the actuals from last year and so this
47:24is more in line with what it should have
47:26been. So that's it's the same budget.
47:27It's just we it wasn't we didn't need as
47:30much as we thought we needed. Um so the
47:32same amount of we're not cutting
47:33officers I guess I should say. And then
47:35um on the operating the biggest change
47:37you'll see is that there you know we are
47:40constantly kind of going through and
47:41looking at everything and making sure
47:43things are being accounted for the way
47:45that they need to be. And so there was a
47:47$ 1.1 million correction um related to
47:51depreciation. And I will let you know
47:53that that is not fully my strength. So
47:54if you have further questions on that,
47:56I'll let Robbie answer it. Um but it
47:58just it it's not actually a change. It's
48:01just how we were accounting for it and
48:02and making sure that it's accounted for
48:04properly. Um,
48:07and then I will note too that
48:12there was a precedent set in the
48:14recovery school district with the tax
48:16credits for historic tax credits because
48:18we're a corporation and we're not a
48:20political subdivision. We have the
48:22ability to get tax credits in the in the
48:25project that we're doing for Upper
48:26Pental. And so this was part of the
48:27conversation back when Leslie was here.
48:29Um, and I have the benefit of kind of
48:31carrying that through. But we've been
48:32working with Shipo, which is a state
48:34historic preservation office, um, to
48:36make sure that those tax credits are
48:38reserved. Um, and so that's going to be
48:40about $2.5 million in tax credits.
48:43French Market will receive those, we
48:44will sell them off, and then that money
48:46will be given back as an extraordinary
48:48contribution to the city. So that'll
48:50kind of be our little partial repayment
48:52for the bond funds, but we're excited to
48:54I mean, you know, we think it's a good
48:56thing. So, uh, we're excited to be able
48:58to turn that back over to the city next
49:00year. Any questions? Council member
49:02Willard.
49:03>> All right. Thank you, Madam Chair.
49:05Casey, thank you for coming down and
49:07walking us through all of this. Uh, I
49:09had a couple of questions just on the
49:10rent side. Um, and we, you know, you
49:13presented some stuff about, uh, getting
49:16closer to market rate rents. When's the
49:18last time French Market Corporation
49:20actually adjusted rents?
49:23So to my knowledge so we have CPI
49:26increases annually but at least not
49:29since 2015 if not before then. So I
49:33think what happened is you know French
49:35market can have a high turnover rate in
49:37executive directors um which can mean
49:39that there's kind of a starting up every
49:41time. Leslie Ally was incredible. She
49:43came from a a a lifelong service in in
49:46city government and came in ready to go
49:48and I think what the next day the city
49:49shut down for CO. So literally um so you
49:54know a lot was put on hold and then it
49:57was co you know we were they French
50:00market worked with tenants during co so
50:02that they weren't having to pay rent
50:03during that time so it was actually a
50:04loss for French market um and then Ida
50:06right this is a story we all know um and
50:09so as we kind of climbed our way out of
50:11that in 2023 and again this is kind of
50:13right before I started you know she went
50:15to the board there were a lot of
50:16discussions about setting market rate
50:18rent so that new rents going forward
50:20would be based on that market rate. And
50:22so that process started in 2023. Uh the
50:25board, you know, the the appraisal was
50:27brought to the board. It was put on the
50:29website for review. There was public
50:31comment. Um it was presented again the
50:32real estate committee meeting and then
50:34it was adopted by the board, I want to
50:35say May 2024. Um and so that was kind of
50:38that setting of a baseline and then to
50:40move forward into this process. I will
50:42note though, if it if I may, um
50:46some of those rent increases were so
50:48significant that the question became how
50:50do you do this, right? Like you can't
50:52just take people and say by the way
50:53you're going to start paying double.
50:55Which is why when I came on board um
50:57April 2024, we really looked at how do
51:00we do this? And so that's when we went
51:02to the board and asked to do this RFP
51:04for a strategic leasing consultant and
51:07broker so that we could then have a
51:08professional come in who understood the
51:10market and say, "All right, here's this
51:12baseline that the board has voted on.
51:14Here's how we get get there." And it and
51:16it wasn't necessarily about existing. It
51:18was about when we move into new leases.
51:20Now, as I noted, a lot of our leases
51:22were on monthtomonth. And so we've had
51:24to um kind of you can't do them all at
51:27once because people would think that
51:29something was really wrong if all of a
51:31sudden the whole district went out to
51:32lease at the same time. So that's a
51:34process that we've been moving through
51:35for the past couple years. Um but I
51:37think the evidence shows that it's
51:39making a difference.
51:40>> What did you guys do um I guess to
51:42mitigate with that sticker shock for the
51:45huge spikes? Did was there like a phase
51:48in plan or
51:48>> Yeah. So what so what we did is we and
51:51again so um corporate realy was selected
51:53through our RFP process just so you know
51:55who the um broker of record is um
51:57they've done a lot of work in the city
51:59so what they did is the strate so that
52:01first couple months they were on board
52:03they took the mckenry study which was
52:05the appraisal they reviewed it they did
52:07a blockby-block review in the French
52:09quarter of market rates and they said
52:10okay this is like this is what the study
52:13says this is what the rents the and then
52:16the the next piece of that was they took
52:17the effective rent. So, what the current
52:19tenant and it's our leases, we're trying
52:22to streamline them because you have a
52:24CAM component, there's CPI, there's
52:26percent rent, there's advertising.
52:27People don't know at the end of the day
52:28what they're supposed to be paying.
52:30>> So, we took all of those numbers to look
52:32at them to then say, "Okay, here's what
52:33we're advertising." And so, when it's
52:35advertised on the market, it's
52:36advertised total cost.
52:38>> Yeah. As a set rent and then um
52:43you know, you see what the market does.
52:44And what we've seen is that the market's
52:46responding and people are willing to pay
52:48the rents that we're putting on the
52:49market.
52:50>> Okay. And then on the slide you showed
52:52when they had zero that means that was
52:54an empty space.
52:55>> Correct. So filling vacancies was one of
52:57our biggest goals. We should never have
52:58vacant spaces in the French corner. So
53:01um we're really excited. But when people
53:03see vacant spaces, they get a little
53:05nervous. So those were our our top
53:07priority to get those built. And how do
53:09the um the new leases compare to other
53:13facilities in the French Quarter other
53:14office space?
53:16>> So the French Quarter is really unique
53:18in that it's truly a block by block. I
53:20mean you'll see on one block of Royal is
53:22going to look different than another.
53:23And so these are we believe fair market
53:26rate based on what we've seen what we've
53:29which is why it's not just looking at
53:30the rest of the French Quarter. It's
53:32looking at our existing tenants, what
53:34their sales are, what their neighbors
53:36are doing, and and there's a lot of kind
53:38of number crunching that goes into it to
53:40make sure that it feels appropriate.
53:42>> Okay. So, you looked at all of that when
53:44you were setting anyway. Okay, that
53:46sounds good.
53:46>> All right. Thanks, Casey.
53:48>> All right. Thank you.
53:49>> Hey, Casey, I have a quite a few
53:51questions. um first is walk us through
53:53how uh FMC will evaluate the results of
53:55its leasing strategy.
53:58What additional rent has been actually
54:00collected to date and how have vacancies
54:02changed and how have the cost of tenant
54:05turnover? How are those accounted for?
54:07>> So I I mean I think that's what we're
54:09looking at, right? So when we when we
54:11put it out when we put these things out,
54:13we're looking at a baseline. So we look
54:14at lease years. So we say okay in this
54:16lease year and then we're able to look
54:18at the next one and see um where those
54:21changes are. So when
54:23the intent of getting people on
54:25longerterm leases is when we're
54:27presenting it to the board we're
54:28presenting a 5 10 15 year term. So once
54:31they're signing on that typically we
54:33don't have people who aren't paying rent
54:35right like once once if you're coming to
54:37the table and you're agreeing to these
54:38terms people are willing to pay these.
54:41The variable there that you'll see is on
54:43percentage rent. So, all of these leases
54:45do still, so we we've simplified, right?
54:48Like it's all a base rent. You don't
54:49have CAM, you don't have CPI, you don't
54:51have all these things, but what you do
54:53have is typically 8% um of sales over a
54:58break point. And so there's the only
55:00kind of variable is the additional rent
55:02we could be receiving, but that baseline
55:04is understood from the time that we're
55:05signing the lease.
55:06>> Okay. And so for the people that you're
55:09transitioning from month-to-month leases
55:11into long-term agreements, how do you
55:13promote stability there? And how do you
55:16manage those commitments to get uh to
55:20protect existing tenants and give them a
55:22fair opportunity to remain those
55:24month-to-month tenants as you're
55:26transitioning them into uh long-term
55:30rents? So, I want to be clear that we
55:32are not necessarily transitioning
55:35month-to-month tenants into long-term
55:36leases. We have and I think what had
55:40happened for a long time is that there
55:41were kind of these like renegotiations
55:43that were quietly happening. What we've
55:45heard from the community is I didn't
55:46know I had even an opportunity to
55:48propose on these spaces. So, we've put
55:50it out on a very open market, which is I
55:52mean I've done public bidding for a long
55:54time, so that has always been my
55:56training in the public sector is that
55:58everyone should have a shot. Um we
56:00certainly we have a rubric that we've
56:02developed where we when if an existing
56:05tenant is looking to propose on the
56:08space right their term is up they're on
56:09monthtomonth uh we always go to the
56:11existing tenant first and say hey your
56:13space is you're on monthtomonth you're
56:15no longer under term which they know
56:17already but we go meet with them and we
56:19say hey it's going to be going on the
56:20market we just want to let you know and
56:23you're going to be as long as you're
56:24relatively right and we've been very
56:27loose on this um in good standing
56:30then you're welcome to propose on it.
56:32And so I don't think that we've had
56:33anyone we've told couldn't propose on
56:35this space. Um that rubric that I talked
56:37about, that's where we we have several
56:39things we're looking at. And so one of
56:41the things we look at is is this an
56:43existing tenant in the French market
56:45district and how have they performed. So
56:47out of the gate, they're already going
56:49to get a leg up because they can show
56:50that they can perform in the space. Uh
56:52we look at are you someone who's oper a
56:55French Quarter operator, right? like are
56:56you able because it's a unique uh
56:59landscape to be in the French Quarter.
57:00So that's one of the things that we look
57:01at. We look at is your storefront here
57:04generating additional jobs in the city
57:05of New Orleans. So I use a coffee shop
57:07for example. If you're coming to us and
57:09you're proposing a coffee shop, but
57:10you're going to use locally sourced
57:11beans, well then you're generating more
57:13jobs because it's not just this
57:15storefront. So those are so we're not
57:17we're looking at rent, right? Like
57:19that's one component, but we're also
57:21looking at um we're looking at have you
57:25been here for a long time? Have you been
57:27successful? You know, are you is this
57:30how does this fit in the tenant mix?
57:31Like do we already have a lot of this
57:33item or you know, like do we need
57:35another t-shirt shop? Some would argue
57:37no. So those are the kind we're looking
57:39at that whole mix. And the way it works
57:41is it's put on the market. Um
57:45staff gathers all of the proposals. We,
57:48you know, get the best and final. We
57:50review them and then we make a
57:51recommendation to our board of directors
57:53and, excuse me, our real estate
57:55committee. Our real estate committee
57:57then has the opportunity to take a vote
58:00and decide what they want to do based on
58:01our re and they might not agree, right?
58:03Like, but but that's our job is to give
58:05them that recommendation and then they
58:07vote to advance that to the full board
58:08of directors for consideration.
58:10>> Yeah. I I think the concern is uh making
58:14sure that existing month-to-month
58:16tenants have the opportunity to compete.
58:18>> They do
58:20through that rubric. Is that what you're
58:22saying?
58:22>> They Well, they do in several ways,
58:24right? So, it's an LOI process. And so,
58:27we meet the existing tenant. We meet
58:29with them before we we put it on the
58:30market. So, they're the first person
58:32that knows, okay, you're next in line
58:34for this to go out. and corporate realy
58:37recognizing that
58:40not everyone has maybe the expertise in
58:43submitting an LOI. So they actually have
58:44a word document that they give to people
58:46that they walk through with them. They
58:48talk to them, meet with them if there's
58:49questions. The difference between this
58:51and an RFP is in an RFP system, you fill
58:54out one form wrong and you're out. So
58:57this is we've had a lot more back and
58:59forth doing it like this than and
59:01created a more competitive market than
59:03in the traditional RFP. What we saw when
59:05we did the traditional RFP is that only
59:08people who were in the no got the
59:10spaces. So, and and it's evidenced in
59:12our district. So, we have I think Chapel
59:14Hats has three stores, Cellas has two
59:17stores. Um,
59:20who I mean, we have a couple folks who
59:23have Captain Demon has two. So, we have
59:25people who kind of knew how to get in
59:27and so now they're in the know. And so
59:29it's it's maintaining that balance of
59:32protecting people who have been there
59:34giving them you know like yet Latin's
59:36hand for example they same process we
59:39met with them talked to them put it on
59:41the market there's some other interest
59:43they submitted an L theirs was the most
59:45competitive LOI we presented it to the
59:47board we said this has been an amazing
59:48tenant they're still an amazing tenant
59:50and the board voted to move it forward
59:52because they have that evidence of being
59:53a strong tenant. Okay, I want to turn to
59:56the upper Pontabla renovation. Um, what
59:59milestones support the reopening date?