2026-10-05 - City Council Budget Hearings
Summary
AI-drafted from auto-generated captions and fact-checked by Claude; names, figures and spellings may be misheard.
- Day 3 of the council's hearings on the 2027 proposed budget, opened around 9:30 with a single councilmember present and a plan to finish early because of the evening football game; it ran about 3 hours and adjourned. Presentations covered the capital plan and several departments.
- Capital Improvement Plan 2027-2031: City Planning Commission staff said 27 agencies submitted 187 requests; the plan proposes no new general obligation bond proposition, and the $510 million approved by voters in fall 2025 is split across three sales. The commission recommended prioritizing maintenance and renovation and amending the infrastructure list; council members questioned the scoring matrix against department priorities and deferred maintenance.
- Capital budget: 389 projects worth about $1.7 billion, most funds already encumbered; a June 2026 bond sale raised more than $154 million for infrastructure and stormwater; the street repair program was extended to June 2028 under a $365 million program. Council Q&A covered the Municipal Auditorium FEMA extension, library HVAC bids over budget and a lot awaiting FEMA clearance.
- Capital Projects Administration 2027 Budget: a small general-fund reduction offset by moving positions to bond and grant funds; council asked how the cost-tracking software and bond-funded salaries will be sustained. See also 2027 budget personnel reductions and civil service process.
- Property Management 2027 Budget: revenue efforts including cemetery tours that are at capacity, parking contracts and lease management; Q&A on a fund for Gallier Hall, building electricity and chilled-water costs, and water and air-conditioning problems at the low-barrier shelter.
- Public Works 2027 Budget: about 50 new paving hires by the end of October, bond-funded staff, CDBG funds for signals and striping, in-house electricians, and a drive to cut street light wait times from over 450 days on average; the city maintains 170-plus state-route signals and is pursuing a cost share with the state.
- Public comment: one French Quarter business owner asked whether the city collects occupational licenses from transient and foreign businesses and how much revenue results; the council said it would respond.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
01:20All
01:27right, guys. It is 9:31.
01:30The Saints are playing the Falcons, so I
01:33know that we will be closing shop early.
01:35So, why don't we get started? Ashley, if
01:38you could start with the roll call.
01:40>> Yes. Well, [clears throat]
01:41up first is the Well, you're the only
01:42council member present. We don't need to
01:44do roll call. Um, up first is the 5-year
01:46[clears throat] capital plan.
01:50All right, please introduce yourselves
01:52and we can get ready to go.
01:54>> Good morning. My name is Laura Brian.
01:56I'm from City Planning Commission. I'm
01:58here with my colleague Cameron.
02:01Um we will talk about the 2027 through
02:04the 2031 capital improvement plan.
02:14>> All right. So this is the contents of
02:15today's presentation. We're going to
02:17walk you through the background,
02:18development process, funding sources,
02:20submissions, and recommendations.
02:25The charter requires that the city
02:28planning commission prepare the capital
02:30improvement plan and assist the chief
02:32administrative officer in the
02:33preparation of the annual capital
02:35budget. The capital improvement plan
02:37includes 5 years of proposed capital
02:39expenditures from 2027 through 2031.
02:43Staff reviews each project to ensure
02:46consistency with the master plan, the
02:48plan for the 21st century. A project is
02:50consistent with the master plan if it
02:52furthers or does not interfere with the
02:54goals, policies, and guidelines in the
02:56land use element of the master plan, or
02:58the project is compatible with the
02:59proposed future land use. While some
03:02projects do not have specific addresses,
03:04they are consistent by contributing to
03:06goals or policies in different chapters
03:08of the master plan. The CPC works
03:10collaboratively with the Capital
03:12Projects Administration and the Capital
03:13Budget Office to prepare the plan. And
03:16the submissions were due on May 1st and
03:19[clears throat] the public hearings were
03:20held from May 18th through May 27th for
03:23departments to present the requests.
03:27So the CIP development process, the
03:29submissions are submitted to us via a
03:32software platform online. The process
03:35kicks off in April with a webinar for
03:37city agencies and then each agency works
03:39with capital projects liaison to
03:41coordinate their submissions. This year
03:44we used Questica. Once all the requests
03:47are submitted online, the staff collects
03:49and reviews each request and then holds
03:51public hearings.
03:53We also had it develop a public facing
03:56dashboard with the information to
03:57provide more clarity to the public about
04:00the requests. Staff then reviews each
04:03request for the master plan consistency
04:05and compiles them in the capital
04:06improvement plan.
04:09There are four main funding categories.
04:11There are general obligation bonds,
04:13self-generated funds, intergovernmental
04:16funds, and federal grant funds.
04:24The overview of the funding requests,
04:26there were 27 agencies that submitted a
04:28total of 187 requests.
04:32Uh the majority of projects in this
04:34year's CIP are requests for
04:36self-generated funds which come from a
04:38small group of agencies. The New Orleans
04:40Aviation Board and French Market
04:42Corporation for 774 million.
04:45Intergovernmental requests make up 3.5
04:48million. And then there are US DOT and
04:51EPA grant fund requests. The the
04:54majority of the request is for the
04:56general obligation bonds for 2.1
04:58million.
05:02uh project types. So projects are
05:05requests for capital funds fall short
05:07for a number of categories. Staff spent
05:10time this year coordinating the
05:13different project types and reviewing
05:14each project to confirm it was a certain
05:17specific request.
05:21So there are several different projects
05:23we categorize them into. Uh first
05:25there's planning which are generally
05:28requests that refer to to design work,
05:31feasibility analysis or pre-construction
05:33activities before a project can move
05:35forward. Renovation or continuing
05:37maintenance requests involve repair,
05:39rehabilitation, replacement or ongoing
05:41upkeep of existing facilities and
05:43infrastructure. Equipment requests cover
05:46the purchase of or replacement of major
05:48items such as vehicles, machinery, or
05:50specialized operational equipment.
05:52Technology requests include hardware,
05:54software, systems or infrastructure that
05:56support public services and
05:58administrative operations. And then
06:00there are new construction requests for
06:02building new facilities or major
06:03additions. While land acquisition
06:05requests involve per purchasing property
06:08needed for future use and the majority
06:10of requests are for repair, continuing
06:12maintenance of existing facilities.
06:14That's what I'm talking.
06:18So the analysis of the submissions as it
06:20as it pertains to the scoring and the
06:22ranking during the process developments
06:24rank their projects in two ways. The
06:26first way is by identifying which
06:28projects are of the highest priority to
06:30the department. The second is by ranking
06:32each project against 19 criteria to to
06:35generate a score within that evaluation
06:38matrix. Upon analysis of the department
06:40priorities versus the CIP matrix scores,
06:43the data revealed that the projects that
06:45scored the highest with departments were
06:47not always the highest scoring CIP
06:48[clears throat] matrix projects. The
06:50data showed that the nature of the
06:51highest ranked projects by department
06:53tends to relate to immediate operational
06:56needs and deferred maintenance. While
06:58the CIP matrix favors asset longevity,
07:01resilience, and multi-benefit public
07:03infrastructure.
07:05This slide shows the highest matrix
07:08scoring projects, the amount requested,
07:10the score, the department that submitted
07:12the project, and these projects are
07:14separated into different funding tiers
07:17to reveal the true scope and
07:18distribution of capital needs.
07:22During the CPC review period, staff also
07:24conducted three site visits to the Nola
07:26Crime Lab, the public safety warehouse,
07:28and the Mirbu water gardens. While many
07:31of the issues are general maintenance
07:32for the Nola Crime Lab, a part of the
07:34request is to redesign the fourth floor
07:36to allow for compliance with federal
07:38regulations in order to gain access to
07:40an FBI database. This would allow the
07:43department to conduct nationwide DNA
07:44searches inhouse. Currently, the
07:47facility is inadequate in its design to
07:49receive such access. The public safety
07:51warehouse is has a request to increase
07:54capacity and improve the existing
07:55facility to further support the needs of
07:57our emergency services NOFD, EMS, and
08:00NOPD. And the Mirabu Water Gardens has
08:03made significant progress and the public
08:05park portion of the site is slated to
08:07open soon. A portion of the site is
08:09still under construction at this time.
08:13So, overview of capital improvement plan
08:16priorities and recommendations in the
08:18plan. And unlike last year, the amount
08:19of bond funds that are available to be
08:21allocated were $0 as they've already
08:23been attributed to projects. Last year,
08:26the CIP informed the bond proposition
08:28that went to the voters in the fall of
08:292025 and was approved for 510 million
08:32divided into three categories. The
08:34proposition that went to the voters
08:36includes the list for infrastructure
08:38grouping of projects in the storm water
08:40and green infrastructure grouping of
08:41projects and then an affordable housing
08:44grouping was to be determined by the
08:45housing trust funds advisory committee.
08:47So there is not a new bond proposition
08:50being proposed for this year. So the
08:51bond funding request received a a Z
08:54funding allocation.
08:57While there's not a new proposal going
08:59to the voters, the administration is
09:01preparing two more sales, one in 2028
09:04and one in 2030 to complete the 510
09:07million approved by the voters. While
09:10the projects are predetermined by the
09:11lists, those lists may be amended by the
09:14city council and there have been two
09:15amendments to the infrastructure list.
09:17Thus far, staff has two main
09:19recommendations for the continued bond
09:21allocations. The first is that the
09:23administration prioritize projects
09:24focused on continuing maintenance and
09:26renovations. And second, that the city
09:28council consider amending the list to
09:30add back in projects that were
09:32previously removed and to add in new
09:34projects from this year's CIP so that
09:36they could be considered for future
09:37sales.
09:41So, next steps. The city planning
09:43commission adopted the capital
09:44improvement plan and submitted it to the
09:46mayor and the plan informs the capital
09:49budget which is being developed and
09:51you'll hear about next.
09:54That concludes our presentation.
09:56>> Great. Thank you. Um, I just want to
09:58understand on page four, um,
10:03of the general obligation bonds sold,
10:06three sales re resulted, sorry, in one
10:10$198 million.
10:12Are you saying that the next two sales
10:14will be uh held in 2028 and 2030?
10:18>> That's the direction that we received,
10:20but I would I would confirm with the
10:22capital budget team directly.
10:25>> Okay. Is there anyone from that team
10:26here who can discuss? Kyle, you want to
10:29come up?
10:35>> You right, Kyle?
10:36>> Yes. Good morning.
10:37>> Happy Monday morning.
10:38>> Yes. Um, yes, that's still currently the
10:41plan to do uh the two additional sales,
10:44one in 2028, one in 2030, and just
10:47evenly splitting uh the 510 across those
10:50three sales. Do we think that we're
10:51going to generate the uh balance of 312
10:55million?
10:56>> We hope uh more due to the premiums. So,
10:59as we you know do better with the
11:02financials, hopefully get a higher uh
11:04credit rating, bond rating, then we'll
11:06be able to uh get additional premiums
11:09with those uh sales. But it depends on
11:12the economic situation.
11:14>> Okay. And uh a couple more questions on
11:16actual projects. So the retrofit of the
11:19crime lab of approximately $9 million
11:22that's slated to happen.
11:24>> So that was not included in the list of
11:27the proposition that was approved by
11:29voters last fall.
11:30>> All right. So that's what your
11:32recommendation is is to update that
11:34list.
11:35>> Yeah.
11:37>> We do you think that the list should be
11:39updated to reflect all of the requests
11:42that were submitted to us this year? Um
11:44there are a number of requests and al
11:47although you know the voters voted on
11:49the ones previously there are new ones
11:52that we think would warrant potentially
11:54funding as well.
11:55>> Okay. And then I also see on here 24
11:58million approx for a new low barrier
12:00shelter. Is that budgeted for? Are we
12:03going forward with that?
12:05>> That was uh that wasn't included either.
12:07Uh this was the first year that request
12:09was included.
12:10>> Okay. So, we need to update the list is
12:12what the bottom line is.
12:15>> Yeah, your heads are shaking, but
12:17>> Well, well, we think that would be
12:19something, yeah, that should be
12:21considered. There's a lot a number of
12:22requests that come to us um you know,
12:24from all different departments for all
12:27different types of priorities. And so,
12:28taking a close look at that when the
12:30year comes around in 2028, I think would
12:32make sense.
12:33>> Okay. Thank you, Council Member Willard.
12:38>> Thank you. Uh just just one question. I
12:41noticed in your slides that there seems
12:43to be a a discrepancy. The departments
12:45prioritize operational needs um and
12:50things that are more immediate deferred
12:52maintenance and your scoring matrix
12:54seems to prioritize asset longevity,
12:57resilience, and multi-benefit public use
13:01of uh of these capital dollars. Are we
13:04doing anything to better align right
13:06there or how do you deal with that?
13:09uh that that is
13:11>> it just caught my it just caught my
13:12attention.
13:13>> Yeah, that's an ongoing thing. The way
13:15that we've developed the matrix, the
13:17scoring matrix that we've been using for
13:19a long time, we sort of discovered that
13:21it may not be prioritizing things in the
13:24way in which other they they might need
13:27to be prioritized. Um so the departments
13:30rank each of the requests when they
13:32submit them and the way that they fall
13:34in the scoring matrix may be different
13:36than the way they rank them. And so
13:38we're trying to take a deep dive into
13:39looking at that and to figure out if
13:41there's a way in which we should remedy
13:43these things and how how to look at it
13:45going forward. But you're right.
13:48>> Okay. Are y'all looking at possible
13:50changes to the scoring matrix or
13:53>> Yes, definitely.
13:55>> Okay. Yeah. In the legislature, deferred
13:57maintenance was a a theme every session.
14:00And um you know the neglect of deferred
14:03maintenance over time just ends up
14:05costing you more money because once you
14:07finally take action it's it's urgent.
14:10It's you know something broke and you
14:13know it just it costs more money because
14:15now you have a tighter timeline to do
14:17it. You can't really prepare plan for
14:19that. So um I' I'd be interested in
14:21seeing what you guys come up with.
14:23>> Okay. Great.
14:24>> Thank you.
14:25>> Any other questions?
14:27Uh, Council Member McCarron.
14:30>> Yeah. Going back to what Council Member
14:31Willard was talking about because
14:33there's a a case in point of the JJIC
14:36HVAC system that needs repair. I mean,
14:39they had waited a really long time to
14:41get uh they have two of them that need
14:43to be repaired. They were able to get
14:44one and then the other one is still
14:46needing to be repaired. Do we do we have
14:48any like allocation to deferred
14:51maintenance that we do every year in the
14:53capital budget? I mean, maybe that's
14:56something that we could consider that we
14:57could be a little bit more nimble with
14:59some of these things for what's an
15:02obvious
15:04capital expense but not budgeted because
15:08it has to go through this 5-year capital
15:10planning process,
15:12>> right? Um the JJC is kind of a unique
15:14situation because some of the requests
15:16that were previously included were
15:18removed for other requests and so that
15:20is one thing we would like for them to
15:22be back on the list to receive funding.
15:25Um and you're right the there are
15:28deferred maintenance issues and and
15:30often times um a really large um
15:34expenditure
15:35could happen but could have been
15:37mitigated by sort of smaller
15:38expenditures. And so I think it's it's
15:41it would be a good exercise to really
15:43take a deep dive into looking at each of
15:45the requests coming from the different
15:47departments. Yeah, agreed. I think it if
15:49we can be a little bit more nimble with
15:51some of these funds for these, you know,
15:54smaller things but are are have large
15:56impact uh would give everybody some
15:59flexibility on not having to wait to do
16:01these things.
16:03>> Thanks.
16:04Any other questions? If not, we can move
16:07on to number one. Thank you for
16:08appearing today.
16:10>> Up next is the capital budget.
16:44Good enough.
17:03All right. Uh good morning. Um welcome
17:07uh to the capital budget presentation.
17:13So the current capital budget uh we have
17:15a total of 389 projects currently in
17:19different phases uh totaling 1.7 billion
17:23uh in funding. Uh so you can see it's
17:26split out between the different
17:27departments that are uh managing these
17:30projects. And just want to note that OOS
17:32is the office of sustainability.
17:36Um just want to show some pictures too.
17:38We have the milling machine uh that DPW
17:41recently had a demonstration on. Um and
17:44then also we have uh Perry Rome
17:46renovations and I believe this is Willie
17:49Hall.
17:53And so the current capital budget is
17:55broken down into many different funding
17:57sources. So we've grouped them into
18:00different categories. As you can see, uh
18:03the majority of the funding is through
18:05uh federal grants. So the majority of
18:08that is our FEMA public assistance
18:10program, uh which is J and other uh
18:14repairs to damages from disasters. Uh
18:18next up is going to be bonds uh which is
18:21about half of that and then you have
18:23these smaller amounts which are
18:24miscellaneous capital property insurance
18:27sew and water board and state funding.
18:31Uh and just want to note in June 2026 uh
18:34the city sold that first trunch of bonds
18:36from the 510 million uh through the
18:39three different propositions that voters
18:41approved in 2025 and that generated more
18:44than 154 million for infrastructure and
18:48storm water and drainage capital
18:49improvements. Uh this excludes the
18:51funding for affordable housing.
18:56Um, so of that current 1.7 billion in
18:59funding, 1.4 billion is encumbered. And
19:03so just so that everyone's aware, um,
19:05encumbered mean it's been set aside for
19:07purchase orders, contracts, or other
19:10agreements, uh, for payments that are
19:12about to be, uh, coming up. Um, so about
19:1683% of that funding is already
19:18encumbered. And of that 83 that is
19:21encumbered, 982 million has already been
19:25spent. So there's only 765
19:29uh million uh remaining to be paid out.
19:32Um included on here is uh Lincoln Beach
19:36at the top right uh the new uh splash uh
19:40splash pad at Val Gilles and then a
19:43roller for uh DPW.
19:47Um so some highlights for capital
19:49projects. So these are going to be the
19:51horizontal construction. So this year we
19:54received the extension from FEMA for uh
19:57damage repairs, Katrina damage repairs
19:59at municipal auditorium. So we recently
20:02issued the NTPs for those two contracts
20:05to complete the uh remaining interior
20:08and exterior repairs with a balance of
20:10funds and we're still waiting for the
20:12extension for the municipal yacht harbor
20:14restrooms project. Um so this year we
20:18also opened the new Gold Ring Woolenberg
20:20Riverfront Park. um uh through a ottoman
20:24commission. The city had a $15 million
20:26commitment through bonds. Um so they
20:28received the last $5 million payment
20:30this year. And then we also opened that
20:33new NOFD headquarters on City Park
20:35Avenue. Um this year we also installed
20:39two new splash pads, one inless and one
20:41in Cutoff. And we completed roof, HVAC,
20:45and other repairs at several libraries.
20:47And we just had the recent uh ribbon
20:49cutting at the Children's Resource
20:51Center on Saturday. Um and we're also
20:54currently in under construction on
20:55projects at Norman Park, Samson
20:58playground, and uh the new sanitation
21:00field operations office and warehouse,
21:03including many other projects.
21:06So some upcoming projects for capital
21:09projects administration will be uh I IDA
21:12damage repairs across multiple city
21:15facilities,
21:16criminal district court jury
21:18deliberation room renovations,
21:21HVAC repairs at NMA, improvements and
21:24repairs to multiple facilities uh ran by
21:27Nord and Parkway. So Richard Lee Park,
21:30Adil Davis, Geredi Playground, and Sam
21:33Bonard. We'll do we'll be doing
21:35renovations at the Pan Grove Recreation
21:38Center um and doing installation of
21:40generator and development of a micro
21:42grid at Joe Joe Brown Park.
21:46So you can see here uh at the top left
21:48is uh George Washington Carver
21:51playground. In the middle we have
21:53Richard Lee Park uh plans. At the top
21:56right is the children's resource center.
21:58Uh it looks very nice. Um bottom left we
22:02had uh the new windows at uh criminal
22:05district court. Uh the bottom middle is
22:08the new NOFFD headquarters and the
22:10bottom right is the new sanitation field
22:12operations warehouse.
22:16So moving to some highlights for the
22:17department of public works through the
22:19capital budget. Uh we hired nearly uh 50
22:22new employees for internal capital
22:25improvement teams and I believe we'll
22:26reach that 50 next week.
22:30We initiated heavy equipment purchases
22:32to build out the patching and paving
22:34team. So, new mill and overlay machines,
22:37trailers, and similar equipment. And
22:39then uh we had uh two main uh bond
22:43projects, the citywide asphalt and the
22:45citywide concrete. And so these are just
22:48some highlights of different uh road
22:50segments that were addressed through
22:52those contracts.
22:56And here's some pictures of those
22:58contracts and uh the improvements that
23:01came along with those.
23:05So, some upcoming projects for DPW. Uh
23:08we have the citywide sidewalk and
23:10citywide specialty sidewalk uh bids out
23:13currently. Uh we have the pavement
23:15condition assessment. We recently chose
23:18uh the uh the vendor and we are
23:21negotiating a contract with them
23:23currently. Uh we have major and minor
23:27streets for districts A and B that I
23:29believe is currently out for bid. And
23:32then we have uh major minor streets for
23:34districts D and E and a separate minor
23:37streets for district C that will be
23:39going out for advertising soon.
23:43Uh we have a current Morrison Road
23:45construction project that continues
23:47through construction. We'll be doing an
23:50RFQ for design on Carolton Avenue
23:53between Washington and Orleans.
23:56We'll be doing a procurement for roadway
23:59light lighting safety supplemental. It's
24:02going to be identifying areas where
24:04there's uh we need to have uh new street
24:07lights installed. Um and that is going
24:10to be accompanied by the street light
24:12master plan.
24:15Uh speaking to the JIO pro JIR program,
24:19uh we received the extension uh from
24:22FEMA through June 2nd, 2028. Um and we
24:25recently received in our update with CDM
24:28Smith, the program management offices
24:30office that the uh all the contractors
24:33are committing to meeting that deadline.
24:36So that will move their schedules up uh
24:38a couple months. So currently those
24:41projects that are in active construction
24:43uh we've completed 173 of those blocks.
24:47135 are in construction and we have 338
24:52remaining. So that uh represents a total
24:55uh investment of 365 million of which 78
25:00have been million has been invoiced
25:02leaving 287 million remaining in the
25:05program.
25:08And here's a map of all the current JR
25:11projects um and the impacts that will be
25:14having across the council districts.
25:19There's also going to be upcoming bridge
25:21projects. So we have Orleans and South
25:23Brock, both expected to go out for bid
25:26in Q4 of this year. In addition, we have
25:29Filillmore, which is also across Bayou
25:31St. John and then Mayo at uh Mayo at
25:34Morrison. Uh both estimated for design
25:38beginning this year or the RFQ to go out
25:41this year.
25:42Um in addition we have holiday drive at
25:45general de Gaulle and Tulus uh crossing
25:47the drainage canals also being planned
25:50currently.
25:54Moving then to the office of
25:55sustainability which manages most of our
25:58storm water and our resilience projects.
26:01So we began design on Lincoln Beach
26:04phase one. Uh the phase one has been uh
26:07separated into three different packages
26:09to allow that first package to advance
26:12into construction by the end of this
26:14year. Uh this year we executed four
26:17gentilly resil uh resilience district
26:20through the national uh disaster
26:22resilience grant uh construction
26:24contracts. So some of those include the
26:26JR leverage. Um, and then we're
26:30continuing advancing construction for
26:32the Mirabu Water Gardens Phase 1, the
26:35DPS uh drainage uh system 01 Broadmore
26:39drainage improvements project and Willie
26:42Hall.
26:43uh they recently completed the upper
26:45ninth ward uh drainage study and
26:47identified 11 potential storm water
26:50management projects and we're continuing
26:53advancing design for the I think that
26:55should be hung her heritage garden storm
26:59uh storm water project. Um and they
27:01recently issued the design contract for
27:04Florida Park
27:07and so here's some pictures of uh Bunny
27:10Friend. So, I believe this would be the
27:12upper ninth ward uh design. Uh bottom
27:16left, Lincoln Beach. Here in the center,
27:18you have the Bunny Friend uh park, which
27:21was identified through the Upper 9th
27:23Ward, and that's a FEMA FMA project. And
27:26then on the bottom right, I believe
27:28that's Mirabu Water Gardens, and the top
27:31right, I believe, is Willie Hall. Um
27:36so, that's a highlight of uh the capital
27:39budget. Thanks, Kyle. I have some highle
27:41questions and then I have some district
27:43B specific questions. Um, so if you go
27:46back to page four, your grand total of
27:48general obligation bonds included in the
27:51current budget is 535.9
27:55million. Um, and again, the voters
27:57approved 510 million. What is the plan
28:00to make up that variance?
28:02>> So, this represents the 2026 and prior
28:05year box. It does not include 2028 or
28:082030.
28:08>> Okay. So this is bond money that we had
28:10left over from
28:11>> this. Yeah, this is are currently
28:14planned. It's going through different
28:16phases of projects
28:17>> and I'm excited about the 50 positions
28:19that have been hired uh at DPW. But what
28:22is the plan going forward uh once the
28:25capital budget is exhausted or do we
28:27have money to continue?
28:29>> That's a key part of those those
28:30discussions with the legislative auditor
28:32and our bond council is we don't want to
28:34set up with one quote unquote one-time
28:36money. So we've set aside a decade's
28:38worth of those salaries at a budget of 7
28:41million a year for those personnel.
28:43>> And I have the same question about the
28:44JIR projects. This is in a later slide
28:47for DPW, but we have 11 FEMA funded
28:50positions that go through JIR. What
28:53happens to those positions once that
28:54money is exhausted?
28:55>> Yeah, great question. So we are in the
28:57process of scoring a request for
28:59qualifications for a consultant to
29:01support us for the next two years
29:03because what we what we don't want to do
29:04is have a whole bunch of upstaffing with
29:06our project management and then have
29:08this vacancy. Those project managers on
29:10the JIR program are developing some
29:12really strong habits and what they're
29:15learning around scheduling and
29:16implementing. I want that duplicated
29:19with the city. So, we're going to use a
29:20consultant for the next two years who we
29:23will then, you know, and it's very clear
29:24in the RFQ, this is just a two-year
29:27engagement. We're going to have spaces
29:28for those that want to come come work
29:30with DPW when that program ends.
29:32>> Do we have a budget for that consultant
29:34position?
29:35>> Uh, yes.
29:36>> What is that?
29:36>> That'll be part of the bond uh we have.
29:39Yes.
29:39>> All right. Great. Um, okay. So, these
29:41are District B specific uh questions.
29:44the citywide specialty sidewalk repair
29:47work. Does that include historic bricks
29:49in neighborhoods?
29:50>> Yes, that is part of that intention is
29:52to be able to do brick, slate, and other
29:55types of sidewalks that aren't concrete.
29:57>> Okay, great. Um, for the Benville
29:59project, can you talk about the
30:01coordination between SWNO for utility
30:03and lead line replacement that would
30:05take place? [clears throat]
30:06>> Yeah, so we we've had a number of
30:08meetings with the sewage and water board
30:09around their around their lead service
30:10line replacement program. Um they have a
30:13bid package that will be going out
30:15sometime in Q4. Uh and we will be
30:17coordinating very closely. I've made it
30:19very clear to my team that we will not
30:21be doing mill and overlay or paving uh
30:24unless we are certain that there are not
30:26lead service lines underneath that
30:27paving.
30:28>> Perfect. I hate to see uh new newly
30:31constructed streets ripped up
30:34>> um by another agency. So I'm I'm glad
30:35for that coordination. Um, the South
30:38Broadidge, I know we delayed that a
30:40little bit, but it is slated for Q4 of
30:422026. Do we know the construction, the
30:45timeline of that construction?
30:47>> I don't have an exact duration on that.
30:49I will have to get that for you. I'll
30:50text our project manager right now.
30:52>> That'd be great. And then on um page 17,
30:55Megan, this is probably for you. The
30:56Saratoga lot, I'm going to keep asking
30:58about it. Um, did we get the green light
31:01from FEMA to begin work on that yet, or
31:03are we still waiting?
31:04>> We have not received the green light. I
31:06checked on it uh Friday, I believe. So,
31:09we're going to try and schedule some
31:10time this week to discuss it with GOEP
31:12and see if there's some
31:14>> something we can do.
31:15>> Um we it just seems like there's just
31:17been silence so far from FEMA on it, but
31:20we've done our due diligence. We're just
31:22checking in as frequently as possible
31:23>> and I'm going to keep bothering you
31:25about the maintenance of it. I mean, you
31:27know, it was cut down once uh by parks
31:29and parkways. I just it can't get
31:32overgrown again. We have people living
31:34back there. It's it's just really not
31:36fair to the neighborhood to be living
31:38around. Um
31:39>> yeah, I'll I'll talk to Parks and
31:40Parkway. Uh typically we don't take over
31:42a site until shovels are in the ground,
31:44but I'll talk to Parks and Parkway and
31:46see if there's something we can figure
31:47out in the interim until we can get
31:49shovels in the ground to actually start
31:50reconstructing it.
31:51>> Perfect. Thank you, Council Member
31:52McCarron.
31:53>> Thank you, Madam Chair. Um, Steve, and
31:56this might be a DPW thing too, but I
32:00want to talk about the coordination
32:02between Sewage and Water Board and
32:04Capital and DPW going forward with
32:07specifically with drainage point repairs
32:10and as we start to review their capital
32:12budget, which I I don't think they have
32:14any money in in their budget for
32:15capital. So, for for drainage point
32:17repairs. So, it's something that we're
32:19going to have to see because I see
32:21consistently in my district and I'm sure
32:22the rest of the council members see that
32:25they are cleaning catch basins. However,
32:28um they're clear, but then they're
32:29discovering a lot of drainage point
32:31repairs that need to be made. So, how
32:35are we going to coordinate between
32:38prioritizing streets and drainage
32:42when we are doing our in-house paving
32:44program to make sure if there's a street
32:47that is on that list that also needs a
32:50drainage point repair? How are we kind
32:52of addressing those types of situations?
32:55>> Yeah, good question. And as with all
32:57things, coordination and ensuring the
32:59subsurface infrastructure is in good
33:01condition is a must prior to doing a
33:03mill and overlay or some other paving
33:05project. Um your point [clears throat]
33:07is well made and it's it's been a
33:09challenge with sewage and waterboard for
33:11the funding for point repairs
33:12specifically. Um with that said, there
33:15was an ordinance that council passed
33:17last Thursday that will allow us to
33:18transfer $2 million in capital funding
33:21to DPW. Um the bulk of which it it's
33:25capital related funding. So, that should
33:26go to fund some of those critical point
33:28repairs. I know that Dave Capel uh and
33:31Caitlyn over there at the board have
33:32been mapping those locations for where
33:35point repairs are needed. And one of the
33:38things that I've asked my team and that
33:39we're assessing is making sure that we
33:41get uh confirmation from the sewage and
33:44water board that subsurface drainage,
33:46sewer, and water lines are in good
33:47condition before we do any sort of
33:49paving.
33:49>> Okay, great. And I'm assuming that'll
33:51all go into the ICC dashboard, too?
33:53>> Yes, absolutely.
33:55>> Okay.
33:56um for uh the in-house staff for for
34:02electricians and also uh paving and
34:04that's that's all coming out of capital.
34:06Correct. Our bonds.
34:08>> Correct. Yes.
34:08>> How many employees have we been able to
34:10hire in those positions in the in the
34:13paving and the electrician?
34:15>> Yeah. So, as of as Kyle alluded to this
34:18morning, uh the mayor made the
34:20commitment that we would have 50 new
34:21paving employees. Um we are at 47 as of
34:24today. The next three start next Monday.
34:26So that's 50 on the paving side. And as
34:29of 3 weeks ago, we were at 88 new hires
34:32uh in a in total. Um so we will probably
34:36be somewhere in the neighborhood of 95
34:38to 100 new employees. That includes
34:40frontline paving employees, that
34:42includes new electricians, additional
34:44inspectors. We've got two EITs starting
34:47and those aren't in that list, but
34:48they're starting within our traffic
34:50engineering group so that we can cut
34:52back on the backlog for traffic studies.
34:55Uh also, uh within our chief of
34:57engineering's team so that we can review
34:59permits faster. So, all of these things
35:01together, uh we should be somewhere in
35:03the neighborhood of 100 new employees
35:05here, certainly before the end of the
35:07year, and then next year we'll look at
35:09can or should we hire another 50 paving
35:11employees.
35:12>> Great. Great. Yeah, I mean I think we
35:13we've seen improvement on getting on
35:16things happening faster. So I think
35:18that's directly attributed to your
35:20ability to hire additional additional
35:22folks in house and not have to worry
35:24about
35:24>> that. If I may, this narrative that
35:27there aren't people out there, you can't
35:28fill positions. We had 250 applicants
35:31for those paving spots. And that's as of
35:33about a month and a half ago. And we'll
35:36talk about this in the DPW presentation,
35:38but Scott Bole is our deputy director, a
35:41chief traffic engineer with a PTOE.
35:43There are qualified people that want to
35:45come to work here.
35:46>> Awesome. Great work on that. Thank you,
35:48Council Member Willard. [clears throat]
35:52>> Thank you. Um, Kyle, you mentioned the
35:54libraries. Um, do you have a status
35:56update on those, the the HVAC system
35:59repairs? And
36:00>> Miguel,
36:01>> I was just curious.
36:05Good morning. Miguel Berry, senior
36:06project manager. Um that this is the um
36:10Justin's uh HBAC project. I believe
36:14there were be bids received and they
36:16exceeded the budget cost. So I think
36:19they're going back to the board to see
36:21if they have to rebid. So I think that's
36:23the status of it right now and we can
36:25follow up. Um
36:26>> so the bids came back higher than what
36:28we had budgeted.
36:29>> Yes. Okay.
36:30>> Yes. Yeah. So, I know there's an initial
36:32contract that has proceeded. So, there's
36:35some that has already been completed,
36:37but we'll get more information and reach
36:39out to you with that.
36:40>> Okay.
36:41>> We're working through that.
36:42>> Okay. Uh the next question I wanted to
36:44ask, we have the extension, we have the
36:472028 deadline for JIR projects. Um how
36:51how confident are we that we'll be able
36:53to meet that deadline and still get the
36:55work done?
36:56>> Yeah, the contracting community is
36:58heavily engaged. I'm confident we're
37:00going to make that time frame. We have
37:01to. We don't really have a choice. So,
37:04um, we're at a place where we've got to
37:06be able to spend about $20 million a
37:08month. And the contractors, uh, that are
37:10a part of this, we have six contractors
37:12on seven different contracts. Uh,
37:14they're doing well. The coordination is
37:15very strong. We have a good leadership
37:17team. Those 11 DPW employees as well as
37:19CDM Smith are doing a really good job,
37:21and I'm confident we're going to get
37:23there.
37:23>> Okay. Uh, last question. You had a slide
37:26about the bridge uh projects that are,
37:29you know, going to be kicked off soon.
37:31The holiday drive uh bridge didn't have
37:34an RFQ date listed. Uh is there a reason
37:37for that or are we still working on it?
37:39>> Yeah. So, the holiday drive bridge, I
37:41did get an answer. It's Q2 of 2027. We
37:43should have the Broad Street overpass
37:45finished for the holiday drive bridge.
37:47Um, we're working on one last there's a
37:51question with with the Army Corps of
37:53Engineers that's related to that project
37:55on de Gaul. Um, we could either go back
37:57with an earthen channel or a concrete
37:59flume. My desire would be to see us go
38:01back with a concrete flume. It'll be
38:03easier to maintain and more robust. And
38:06we just need to get a schedule from them
38:09on when and how that can be completed.
38:11And I believe they're opening bids on a
38:13related project here within the next 6
38:15to 8 weeks.
38:16>> Okay. So when we had met in December, it
38:19was a 2-year time frame. It's somewhere
38:22between 2 and 2 and 1/2 years from this
38:24last December when that project will be
38:26complete.
38:27>> Okay. So it's about 2 years to
38:29completion.
38:29>> Correct. And that's because they have to
38:31finish off that General DeGal project
38:33before the bridge can go in.
38:35>> Okay. All right. Thanks, guys.
38:36>> Thank you.
38:37>> Thank you, uh, Council Member Green,
38:39followed by Council Member Moral.
38:41>> Good morning, and thank you for, um,
38:43your presentation today. I um am going
38:45to be straightforward. I just want to
38:48thank you for the infrastructure
38:49coordinating committee meetings and the
38:51most important thing is that when we
38:53leave that meeting, I've seen some
38:54results happen and I appreciate that and
38:57the residents appreciate it. That's why
38:58we bring it up. We have a number of
39:00years to work together. So, if we can do
39:02one project at a time, it'll be
39:04appreciated. I also want to um say that
39:07many times um the knife board has been
39:10excluded from development from
39:12investment but um during this time it is
39:17great and I use that word great loosely
39:20to be able to see construction blocking
39:24streets in the ninth ward. People are
39:26happy. I just want to let you know
39:27whether it be Metropolitan Cluit, Johnny
39:31Jackson, um, Piety Street and the like
39:34in the knife ward, the work that's going
39:36on is being seen and it's it's
39:38appreciated. I also appreciate, um, Mr.
39:40Nelson, the addressing of the issue that
39:43was at the corner of Louisa and North
39:45Dian across from the park. It's under
39:48construction right now, but it has sat
39:50there for a long time and had been
39:52ignored. when I asked you about it, you
39:54are someone went by and there's work
39:56being done across from what is now a
39:58park that is being developed um by the
40:02locket well the former locket school
40:05which is now being developed by Mars
40:06Jeff school so that was an important
40:08project the community sees it and
40:10everybody who comes to that park sees it
40:12so I'm going to focus on the ninth ward
40:14I also appreciate the fact that we've
40:17looked at and have considered projects
40:19that are involving storm mitigation
40:23Bonnie friend and the like. Um, could
40:25you just tell the public what one of the
40:27challenges is in terms of moving forward
40:30on those projects? I want them to hear
40:32it from someone other than myself
40:35because those are great projects and
40:36they can make a big difference, but
40:37there's something that has to be done on
40:39a level that's higher than ours.
40:41>> Sure, I can take that. On the the storm
40:43water front, um, some of the biggest
40:45challenges are uh jurisdiction. With a
40:49lot of the areas that we've looked in,
40:50there are often uh multiple agencies
40:53that have some sort of jurisdiction, be
40:55it city, sewage and water board, the
40:58state um and sometimes even the railroad
41:01uh depending on how close we get to the
41:02railroad. So, uh and dealing with the
41:05railroad is is never easy. So, one of
41:07the biggest factors is jurisdiction. Two
41:10is funding. um we've been able to study
41:13the area to figure out where we need to
41:15go to do the projects, but to be able to
41:17design and construct them uh costs money
41:19as well. Um but a lot of the issues uh
41:22some of the the areas that we've looked
41:24at are blighted properties that would be
41:27great for storm water mitigation and
41:29we've all heard uh a lot over especially
41:32over the last couple weeks about
41:33blighted and adjudicated properties and
41:36how much of a nuisance they can be in
41:38our area. So, uh, while they may not
41:40always be the best to develop in those
41:42areas, we can utilize them for storm
41:44water management on that front. Uh, this
41:47has been supported by all federal funds
41:49so far to do the studies and identify
41:52where we can do the projects and we'll
41:54keep going after federal funds as much
41:56as possible, but that that pot of
41:57funding is exceptionally small these
41:59days.
41:59>> What do you see in terms of the forecast
42:01for getting some of those federal funds?
42:04will be we'll be able to maybe proceed
42:06with a couple of the projects if not
42:08all.
42:08>> Uh probably not all at one time. Uh but
42:11what we are trying to do is at least get
42:13design funding for some of the projects.
42:15Sometimes it's easier to request funding
42:18for design rather than construction. So
42:20we we are trying to do it sort of in
42:21bite-sized pieces rather than asking for
42:24several million dollars at one time. So,
42:26we're trying to uh prioritize which are
42:28going to have the most uh benefit to the
42:30community right now and then based on
42:32that we can determine which of the
42:34federal grants it would fit best under.
42:35>> Okay. I look forward to moving forward
42:37in the direction of getting some of
42:39those projects done. Those bio swells do
42:41work. Want to let you know that I can
42:42tell you from experience um my church
42:45for example in Puncher Train Park. There
42:46was some times when we would not be able
42:48to leave the church because it would be
42:50flooded in front of us. But since the
42:52bio swell's installation, um that bioil
42:55has captured a lot of water on Princess
42:57after major storms. So I want to let you
42:59know that that and a combination of
43:01cleaning out the drains nearby works. So
43:04I hope those projects can happen in the
43:06night guard. But thank you for the work
43:07that you're doing. Some of those
43:08projects, Willie Hall and the Gentilly
43:10Resilience District, the Blue Green
43:12Corridor are amazing projects in terms
43:14of what their future potential is for
43:17our city. So thank you.
43:18>> Thank you.
43:18>> All righty. And Steve, I have one other
43:20um point for you. I want to ask for your
43:23help. Um very visible in the ninth ward
43:26are the Almanaster Bridge and also the
43:28France Road Bridge. The railings, the
43:31lighting, um anything that we can do to
43:34maybe within the next year or so get
43:36that um get those two bridges looked at.
43:39in terms of especially the railing. If
43:41we can't get the railing, we put up some
43:43um warning so that people when they're
43:45walking across understand that they need
43:47to stay away from the edge. And of
43:49course, we've got the large um nine time
43:52second line coming up soon. I'm asking
43:54specifically that at areas where there
43:57is no railing because unfortunately the
43:59thieves have taken them um that who who
44:02are concerned about nothing other than
44:04themselves because they are thieves and
44:06criminals. When you take a railing off
44:08of a bridge where someone can walk um
44:11where someone is supposed to be walking,
44:13you're saying you don't care if they
44:14fall over whether they're elderly,
44:16whether they're young or the like. So um
44:18please stop that. But at the end of the
44:20day, we don't have the railings to
44:21replace them now. But please let us use
44:23the warning tape to remind people to
44:25stay away from those railing. Okay? So
44:27that's the Almanaster and also the
44:29France Road Bridge. But going back to
44:30where I started, it's good to see
44:32progress. the public doesn't see the
44:35hundreds of projects that are going on
44:37because many times it's spread out over
44:39a relatively large um geographical area,
44:42but um especially in my district, I see
44:45them and appreciate the communication
44:46and see you at the next joint
44:48infrastructure committee meeting.
44:50>> Yes, sir. Thank you.
44:51>> Thank you, Council Member Green, Council
44:52Member Moro.
44:54>> Thank you. Good morning, Steve.
44:55>> Good morning.
44:55>> Uh pardon my tardius. I got a couple of
44:57questions to cover uh Munipal
45:00Auditorium. My understanding is that we
45:02actually secure secured the extension
45:05for us to move forward with that.
45:06Correct.
45:07>> We did through February of 2028.
45:09>> Okay. And what is the status of that
45:11process? Cuz obviously we probably won't
45:13get another extension considering the
45:14way things have been going.
45:15>> That's correct. As with the roadway
45:17projects that council member Willard
45:18mentioned, these are the last extensions
45:20we are likely to receive. Uh so making
45:22sure that we get that work completed is
45:24paramount. All of the contracts are
45:27active. Uh the roof contract is
45:29essentially complete. It's all but
45:31finished in
45:32>> the roof contract will be finished in
45:34November and we started the design
45:38administrative process with the second
45:40package with Patco Construction for the
45:42exterior envelope and we have a third
45:45NTP that was issued for the third and
45:47final package for the interior. Uh that
45:50won't be effective until May of 2027
45:53because of the way it needs to be
45:54sequenced with the other projects. So,
45:57we're currently actively underway with
46:00the second package into construction.
46:02>> And you're still working with the SOS
46:03group on all this, I'm assuming.
46:05>> Yes, we've uh I know that I believe it's
46:07Jeff Schwarz in the mayor's office has
46:09been working with SOS on the status of
46:11that.
46:12>> Okay. And so my understanding is with
46:13that project, with the federal money,
46:16we're essentially white boxing the
46:18building for all practical purposes
46:19because the amount of money that we're
46:20being given is not enough to redevelop
46:22it, but is enough to secure the
46:23building, prevent further deterioration,
46:26and prepare it for a larger purpose. So
46:28that's going to require probably
46:30subsequent money after we're able to
46:32figure out and get the building
46:33situated. Correct.
46:35>> Yes. the the intent is to get it into a
46:37place where uh a new tenant can build it
46:39out, which my understanding is that's
46:41desirable. Uh it'll have some HVAC uh
46:45components installed so that we can have
46:47moisture control, uh humidity control,
46:49and then to use your term, it'll
46:51essentially be white boxed. It'll be
46:53ready for a new tenant to come in and
46:55build it out in the manner that they see
46:56fit.
46:57>> Okay. uh in regards to new city hall
46:59like say new city hall um I am aware
47:03that we've had all the meetings across
47:05the city on the new city hall I'm aware
47:07of the tremendous amount of money and I
47:10do think the amount of money we have
47:11allocated currently in my conversations
47:13with New Orleans Building Corporation
47:15probably isn't even adequate if you want
47:17to build a governmental complex similar
47:20to what they have in Jefferson Parish on
47:21the West Bank a concise consolidated
47:24governmental complex I know that there
47:26have been some robust conversations
47:28about annexes as in like sub buildings
47:31um throughout the city, particularly one
47:32in New Orleans East. Are annexes
47:36contemplated as being a good use of that
47:39New Orleans City Council New Orleans new
47:42city hall chunk of money? Is that
47:44included in there or is there a separate
47:46fund for annexes?
47:48>> My understanding is that's all part of
47:50the planning right now. So, I think it
47:52would probably all be a component of
47:54that single chunk that we've got for
47:57city hall right now, but we will have to
47:59I'll have to get back to you on the
48:00specifics of whether or not it's that
48:01one component or if there are separate
48:02ones.
48:03>> Okay. I mean, I think that certainly for
48:06our practical purposes, I do not know
48:09with the sheer need of
48:14I don't know what the current needs of
48:16our capital budget if an of an
48:18investature of a third of a billion
48:21dollars to a billion dollars is a is a
48:24well spend for a new city hall. I know
48:26that the mayor is investigating other
48:28possibilities such as um bifurcating uh
48:33looking at reusing existing office
48:36buildings, bifurcating the need for new
48:38council offices and the mayor's office
48:40and looking at separately the courts and
48:41just seeing what is the best use of
48:43money. But I think that with our current
48:45budget wos, though we do have a bit of
48:47more wiggle room and capital, dedicating
48:50that amount of capital to a building
48:52that would take I mean the last time I
48:54spoke to Annie, she said it take 8 years
48:56to build it. I think that that just
48:58doesn't seem like a a feasible thing,
49:00but I will continue conversation on
49:02that. Um, with the money allocated for
49:06the new low barrier shelter, my
49:08understanding that's a retrofit, right?
49:09We're not building a new one or are we
49:11building a new one?
49:12>> Correct. the the plan right now is
49:14retrofit as opposed to a new build.
49:16>> Right. And that and my understanding is
49:18that was in conversation with the
49:20sheriff's office. Correct.
49:21>> There are conversations ongoing with the
49:23sheriff's office about an alternate
49:24location. Yes.
49:25>> Okay. Cuz once again, I think that if we
49:27can if we can find existing space, it's
49:30[snorts] a it's easier to get it get it
49:32retrofitted versus building it and we
49:34can see some immediate benefit to having
49:36that done. So, I would certainly hope
49:38that perhaps maybe at community
49:40development you could come back as you
49:41get further along on that and give a
49:43more detailed briefing on what that
49:44retrofit looks like because people need
49:46to know kind of what's going on with
49:47that.
49:47>> And let me clarify that was a that was
49:50just a request for funding. There is no
49:52money identified currently in the uh
49:55capital budget for that.
49:57>> Well, I think that probably is begs that
50:00we have a more robust conversation on
50:02that then because there needs to be
50:03there needs to be money allocated for
50:05that purpose. I think that um we need a
50:08safe, secure, and easily accessible
50:11facility to address that issue. I think
50:13any efforts we can do to retrofit a
50:16building to get it done quicker would be
50:17very, very helpful. And like I said, I
50:19think it'd be great if y'all could come
50:20to community development. I know I'm
50:22voluntary Matt's committee, but that's
50:24the appropriate committee for it to go
50:25to to give a briefing on what the need
50:26is and where the capital dollars
50:29potentially come from. Uh next, sewage
50:30and waterboard. So, I know the mayor has
50:32a two-year plan essentially, Steve, to
50:34kind of bring sewage and waterboard into
50:37and under the city. Um, is it your
50:39anticipation that future capital outlay,
50:42capital budget proposal meetings will
50:44include sewage and waterboard issues as
50:46well and more of a combined
50:47presentation?
50:48>> Yes, absolutely. We had a talking point
50:50earlier today about drainage point
50:52repairs as an illustration. We're
50:54working to send $2 million ostensibly
50:57this week or next to the sewage and
50:58water board for drainage point repairs.
51:00And that's one of those areas where the
51:01city has bonding capacity for capital
51:04but our operating cash is short. The
51:06board is sort of in a in a opposite
51:09position. They have no bonding capacity
51:11but enough to keep running the pumps and
51:13on and m so working together on joint
51:15presentations in the future over the
51:17course of the next year 2 years will be
51:19the norm.
51:20>> And has there been any conversations
51:22about trying to address some of the
51:24catch basin issues similarly to how
51:26you're dealing with street repairs? cuz
51:28I mean we look at I know with catch
51:29basin cleaning that's a one-time
51:31terminus thing but when you're looking
51:32at catch basin damage catch basins that
51:36were I mean I know at one point in Lake
51:38View under the last uh administration we
51:41had contractors who the overflow of the
51:43cement had literally blocked um catch
51:46basins. Is there any conversation with
51:48sewage and water board to perhaps look
51:50at kind of your creative financing that
51:52you did with the patch repairs to maybe
51:54look at seeing if we can use something
51:56similar to deal with some of the catch
51:57basin issues because they can be
51:58multi-year issues that could meet that
52:00qualification?
52:01>> Yes, that catch basin repair. If you're
52:03replacing a catch basin or making a
52:05point repair, replacing a line, the life
52:07on that should be longer than 10 years,
52:09which would fit within that capital time
52:11frame. Um, I know the drainage
52:14department, Dave Capell and his team
52:15have been identifying breaks versus
52:17where you need cleaning. And so that's
52:19what uh this $2 million should be able
52:22to address some of those capital
52:24repairs.
52:25>> Okay. My last thing, um, Gentilly
52:28Resilience District as a whole. Uh, as
52:30you know, I know we have our we have our
52:33our our leader in back. Um, it was very
52:37disappointing under the last
52:38administration that we were identified
52:40as a slow spender because we were given
52:43tremendous amounts of money and that
52:45money was not spent in a timely basis. I
52:47applaud the fact that you guys have
52:50really um picked up the pace on things
52:53like the Mirabu Gardens project, but
52:55there's a tremendous amount of money
52:57left to be spent. Are we on timeline to
53:00spend that money? So there's going to be
53:03a significant uptick in spending now
53:05that we have four additional contracts
53:07in construction. That's where you'll see
53:08the bulk of the spending happen is in
53:10construction. So our goal is to
53:12consistently move the rest of the
53:13projects into construction by the end of
53:152027 so that it will be uh fairly
53:18exponential that you'll see that number
53:20start to catch up to where we should be.
53:22So, we've uh worked really closely with
53:25our contractors, with our um our
53:28consultants and our engineers to
53:30finalize the projects and get them into
53:32construction. That's where you're going
53:33to see the most benefit and see that
53:35change in uh that namesake of a slow
53:38spender start to change.
53:39>> Yeah. And I think that I know that there
53:41is a tremendous uh bit of construction
53:43on Alleion Fields near Fillmore. I do
53:46think it would be worthwhile
53:49to have a bit more outreach to those
53:51surrounding communities just because
53:52they don't know what's they know
53:54something's going on but not what it is.
53:56I've gotten a lot of inquiries about it.
53:58I think that if we could even have a
54:00short video or some other explanation
54:02regarding specific projects just so that
54:05we could send to neighborhood groups or
54:06send it out to interested parties just
54:08so they can know what's going on and
54:10what the timelines are because I think
54:12that that would
54:14there's a tremendous amount of concern
54:16whenever they see construction because
54:17we have PTSD from years ago where
54:20construction opens and then 8 years
54:21later it closes. I know that's not what
54:23we're doing now, but I think constant
54:25communication about when the expected
54:28timelines are for when construction will
54:30start and end will at least give people
54:32the comfort that they see construction,
54:35they see progress, but because we're
54:37operating in a different way, there's a
54:39new day. This will actually have an end
54:41date and what that end date roughly will
54:42be would be helpful.
54:44>> Yeah, [snorts] we're happy to do that.
54:45Uh we did do some direct outreach to the
54:47businesses along the Alleia Fields
54:49corridor and we'll plan to do the same
54:51thing along the Allen Tucson corridor as
54:54well. Um we had a community meeting last
54:56week for the start of two new
54:58construction projects. So one is
54:59actually starting today and one is
55:01starting next week. So we'll amp up our
55:03construction uh communications a lot uh
55:06so that we can avoid some of those
55:07pitfalls.
55:08>> Yeah. I mean I think um in many ways the
55:11city has almost everybody's email that
55:13exists. I think that if we can push out
55:15emails with videos maybe some
55:16documentation saying hey here's an
55:18update of these certain projects um we
55:20have enough uh technological now how to
55:23geoence and figure out generally people
55:24are I think it just be helpful and more
55:26communication is better than less so
55:28>> yeah absolutely
55:29>> but I appreciate you guys have really
55:31put the pedal to the metal on a lot of
55:33those projects they're moving
55:36expeditiously compared to how they were
55:37moving previously that's all I have
55:39thank you madam chairman
55:40>> council member Hughes followed by
55:41council member
55:44Thank you, Madam Chair. Good morning,
55:46uh, Director Nelson. Um, let me start.
55:49Um, Richard Lee, uh, Geredi, Sam Bard,
55:53Pan Grove, and the Joe Brown micro grid
55:56are all identified as upcoming projects,
55:58but the capital report still lists each
56:01in design. For each one, when will
56:03design be complete? When will it go to
56:06bid? And is the current appropriation
56:08sufficient to get each through
56:10construction?
56:12Yeah. So, for each of those, I'll have
56:13to get back with you on specifics. I
56:15don't have uh the specific schedules
56:17right off hand, but I will be certain
56:19certain to get those schedules to you uh
56:21within the next day or two. Uh the
56:24dollars and cents should be sufficient
56:26to get us through design and into
56:28construction on the scopes as they are
56:30lined out. Uh but I'll have to look at
56:32each individual project and and would be
56:34again happy to provide you with an
56:35update on that.
56:36>> All right. Um for K Grove in particular,
56:39we've been now talking about this over a
56:41span of this is now the third council.
56:44Uh that money was initially dedicated
56:46for the residents of District E and was
56:48robbed to build phase three of a jail.
56:51So um residents are still anxiously
56:54anticipating uh that long overdue
56:57project. Let me now shift to Forgotten
56:59City, the Lower 9th Ward. We've been
57:01celebrating a lot of great projects in
57:03New Orleans East, but thus far we
57:04haven't celebrated much of anything for
57:06the Lord 9th ward. Uh but a lot of
57:08promises. Sam Bernard uh has 2.5 million
57:12appropriated and about 222,000
57:15encumbered. Uh about 66,000 expended and
57:18no completion date listed. Uh what is
57:20the status of the CA and how close are
57:23we to groundbreaking?
57:25>> Kyle, do you have any update on that
57:27one?
57:28No, we'll have to get back to you on
57:30that. Uh the director Jerry Harris is
57:33not was unable to attend today. Um and
57:35so we'll have to get more information,
57:37but we do have some information on the
57:39other projects.
57:40>> Yeah, my apologies. I do have that
57:42before me if I if I may. Um so for Odal
57:46Davis, uh updates to the drawings and
57:47the scope, uh we'll push this to the
57:49first quarter of 2027. for Gerretti
57:52which is funded out of 2026 bonds. This
57:54should be out to bid within the next is
57:56it 30 within the next 90 days. Pon Grove
58:00uh the project does require design. Uh
58:02it's about 45% complete. Um that will be
58:06ready to go to bid uh in the first or
58:08second quarter of 2027. Uh Sam Bonard,
58:12it's anticipated that this will have 95%
58:14construction documents completed by next
58:16week for review and there has been
58:19discussion with the council member
58:20yourself related to the scope of the
58:22project. Um we may need to be we need to
58:25be sure that the scope is correct in the
58:27next 90 days so that we can uh make sure
58:29that the bid package has the proper uh
58:31amount of scope and then there are some
58:33other item repairs but that's updates as
58:35I have them from the director.
58:36>> All right. Uh thank you. I I just want
58:38to, you know, say in the lower ninth
58:40ward, everything just seems to be stuck.
58:42San Bernard seems to be stuck. Clawless
58:45seems to be stuck. We're not moving much
58:47of anything and the residents are deeply
58:49frustrated as am I. So, uh, we we've got
58:52to act with a greater sense of urgency
58:54for the lower 9th ward. Uh, because
58:56since January 12th of this year, uh, we
58:59haven't accomplished much of anything
59:01for those residents. Uh, let me now
59:04shift to Lincoln Beach. uh has about
59:0722.76
59:08million appropriated uh 6 million
59:11encumbered and 4.73 million expended. Uh
59:15the presentation says the first phase 1
59:17construction package is intended to
59:19advance by the end of 2026. Megan, as
59:23you know, uh get questions on daily
59:26basis by about Lincoln Beach. So, can
59:28you just state on the record? Are we
59:30still on track
59:32of Lincoln Beach?
59:32>> We are still on track. We're in the
59:34midst of the final negotiations for that
59:36first package, which is the parking lot.
59:38Uh, and I anticipate that contract
59:40routing by the end of October to start
59:43construction for this year. So, and that
59:44was the purpose of uh going back to what
59:46I said previously of splitting it into
59:48the smaller packages so that we could we
59:51could build what is designed first. So,
59:52we are still on track as of today.
59:54>> I appreciate your continued work on
59:56that. As you know, the residents are
59:58just eagerly awaiting that and and very
1:00:00excited. So, thank you. Uh let me now um
1:00:03touch on the district de street package
1:00:06which has 7.383
1:00:08million appropriated and 6.9 encumbered
1:00:11with no expenditures recorded. The
1:00:14presentation identifies North Mero
1:00:16Street, Fats Domino Avenue and Lake
1:00:18Forest Boulevard for Q1 of 2027. Uh what
1:00:22was that? What does the 6.9 million
1:00:24encumbrance represent and when will
1:00:27construction actually begin? Yeah. So,
1:00:30those bid packages are slated to be
1:00:32opened on October 27th through the 29th
1:00:35at this point. And those there are uh
1:00:38right of way roadway construction
1:00:41packages uh that will include mill and
1:00:44overlay concrete street repairs,
1:00:46sidewalks, uh and various other repairs
1:00:48on the streets that are listed in that
1:00:50in that list that you put forward. I
1:00:52know that uh Mohamad in our office has
1:00:54been working with your staff to make
1:00:55sure that we've got the the right list
1:00:57of projects and those should start uh Q1
1:00:59of 2027 again with coordination with the
1:01:02sewage and water board to ensure that
1:01:04any lead service lines are replaced
1:01:05before we do the repair. All right. Um
1:01:08while we're talking about Lake Forest,
1:01:10Director Nelson, I do once again uh want
1:01:12to flag um Lake Forest and Reed.
1:01:17>> Uh the dip there continues to get worse
1:01:19and worse and worse. And I I just am
1:01:22fearful that one day we're going to see
1:01:24that major intersection where heavy
1:01:26buses and you know heavy vehicles travel
1:01:29on a daily basis uh is going to end up
1:01:31collapsing. So definitely want to bring
1:01:33that uh back up to the top. Um let's
1:01:37talk about the Mayo Bridge at Morrison
1:01:39Canal. Uh has roughly 2.6 million
1:01:42appropriated with no incumbrances or
1:01:44expenditures recorded. While the
1:01:46presentation says the design RFQ is
1:01:49expected in Q4 of 2026, uh what does the
1:01:52current appropriation covered and what
1:01:55additional funding will be needed to
1:01:57reach construction?
1:01:58>> Uh for the Mayo bridge, that incumbrance
1:02:01should be able to get us through design
1:02:02and get the repairs necessary to get
1:02:04that bridge open. Uh the designer will
1:02:06have to help us through ensuring that we
1:02:07get the right package out to bid and
1:02:09then that'll of course be driven by what
1:02:11the contractor's bid results are. Okay.
1:02:14uh connecting New Orleans East has
1:02:16roughly 2.23 million appropriated and
1:02:19about 2.33 million encumbered creating a
1:02:22negative calculated balance of about 92
1:02:26um 92,600.
1:02:28What caused commitments to exceed the
1:02:30current appropriation and does the
1:02:32project require additional funding to
1:02:34stay on schedule?
1:02:36>> Yeah, I don't believe additional funding
1:02:37is required at this point. The key for
1:02:39that project is finishing off the design
1:02:42and then ensuring that we are pursuing
1:02:44construction funding. So I know we've
1:02:46been in discussions with regional
1:02:47planning commission on how to get some
1:02:50construction dollars for the lighting,
1:02:51the paths, etc. in New Orleans East. Uh
1:02:54but that's at least 2 to 3 years off. So
1:02:57uh we need to look at some other options
1:02:59if this should be part of a 2028 bond
1:03:01sale or something so that we could pull
1:03:03that project to the left and go from
1:03:05design to construction.
1:03:07Um, Diamond Road in Lincoln Beach
1:03:09Boulevard is in contract closeout, but
1:03:12the capital report shows both a negative
1:03:15calculated balance and a negative cash
1:03:17balance. Uh, what remains unresolved
1:03:19before the project can be fully closed?
1:03:23>> Ah, there's an underrun on that project,
1:03:25so we've got to reconcile the paperwork
1:03:26on that.
1:03:28>> Okay. Um, the citywide asphalt and
1:03:31concrete program includes Lake Forest
1:03:33from Mayo Boulevard to East Overdrive.
1:03:35what is the construction schedule for
1:03:37that segment and what amount of the
1:03:39current citywide program is committed to
1:03:42that work.
1:03:44>> So that again those projects are going
1:03:46out to bid uh opening Q uh excuse me
1:03:5010:27 to 10:29 at this point. Uh so
1:03:53we'll be in construction over the course
1:03:55of next year sometime Q2 Q3 would be uh
1:03:59where if I'm trying to remember that
1:04:00specific location. Um each of the
1:04:03council districts has a similar amount
1:04:05of funding allocated across the district
1:04:07um for that specific stretch of street.
1:04:09I don't have a percentage out of the
1:04:11whole citywide off off hand, but I would
1:04:13be happy to get that for you.
1:04:14>> All right. Um Justin will follow up on
1:04:16that. And then finally, I don't expect
1:04:18you to uh know this off the top of your
1:04:20head, but Justin will follow up on this
1:04:22as well. JIR shows a $365 million
1:04:26budget, 78 million invoice, 287 million
1:04:30remaining, 135 blocks under
1:04:33construction, and 338 blocks upcoming um
1:04:37with as was referenced earlier, the FEMA
1:04:39extension now through 2028. Um I'd like
1:04:42to know what is the plan to deliver the
1:04:44remaining work before that deadline. And
1:04:46in particular, I'd like to know what
1:04:49district escopes uh are next. So, um, if
1:04:52you don't have that, Justin, uh, we'll
1:04:54follow up with you.
1:04:55>> Yeah, we'll be happy to follow up. And
1:04:56Council Member Will had mentioned this
1:04:58earlier. It's absolutely imperative that
1:05:00we meet that deadline of June 2028. Um,
1:05:04we have a cash flow projection. We have
1:05:06a blockby projection. Uh, we have
1:05:08costloaded schedules. The program
1:05:10managers and our internal team have
1:05:12worked very very hard with the
1:05:13contracting community to make sure that
1:05:15we have critical real critical path
1:05:18schedules that lay out progress
1:05:20milestones on a monthly basis from now
1:05:23until June of 28 because we cannot turn
1:05:25those dollars back. We've got to put
1:05:27that to good use for the city. I know
1:05:29the slide Kyle has up on his screen
1:05:31right now shows the blocks that are
1:05:33within District E and we want to be sure
1:05:35that we provide that to your offices as
1:05:37well. And if any residents have
1:05:39questions, if there's anything else we
1:05:41can provide, we are at your disposal.
1:05:43>> Well, thank you. Um, in closing,
1:05:44Director Nelson, I just want to say on
1:05:46the public record since I've been in
1:05:47this office on January 12th, um, you and
1:05:50I have had a strong, extraordinary
1:05:52partnership. Um, and we have seen
1:05:54progress, um, you know, throughout
1:05:56District E with lights, um, you know,
1:05:59with with some milling overlay work. We
1:06:01both know we have a long way to go. Um,
1:06:03but you know, residents can visibly see
1:06:06that we're moving in the right
1:06:07direction. And I just want to thank you
1:06:09for your leadership. I want to thank you
1:06:11for always being responsive. Um, and the
1:06:13residents of District E know who you are
1:06:16because you have been boots on the
1:06:18ground um on on so many times. So, from
1:06:21the bottom of our hearts, I just want to
1:06:23say thank you for your leadership and
1:06:25your partnership.
1:06:25>> Thank you.
1:06:26>> Thank you, Madam Chair.
1:06:27>> Thank you, Council Member Green.
1:06:28>> Thank you, Mr. Nelson. Um, I asked
1:06:30questions earlier about the resilience
1:06:32district, but since it was brought up,
1:06:33if you could come for a second, could
1:06:35you describe because we included in our
1:06:37newsletter and you've been very, very
1:06:39generous about going to all of the
1:06:41neighborhood association meetings that
1:06:43ask you to attend. Could you describe
1:06:45the blue green card, the project on
1:06:47Alleian Fields, what some of the
1:06:49benefits are and what some of the
1:06:50timelines are for? the the blue green
1:06:53corridors project uh spans Elleian
1:06:55Fields from Filillmore to Allen Tucson
1:06:58and then Allen Tucson from the [snorts]
1:07:00London Avenue canal to I believe St.
1:07:03Rock Avenue. So this project uh as part
1:07:06of the Gentelli Resilience District, its
1:07:07main purpose is to mitigate some of the
1:07:09flooding that we've seen. Uh no project
1:07:12in its entirety will completely
1:07:14eliminate flooding, but it will reduce
1:07:16some of the uh extreme burden that we've
1:07:18seen so far. So on Alleian Fields, we've
1:07:21been relocating some of the oak trees
1:07:23that are in the neutral ground. I'm sure
1:07:25the residents have seen a lot of that
1:07:26work happening. Uh [snorts] we have not
1:07:28removed those trees. We have simply
1:07:30relocated them to better fit with some
1:07:33of the storm water management. So there
1:07:34will be a detention pond that flows
1:07:37through the center of the the neutral
1:07:38ground that allows for water to be
1:07:40captured in the neutral ground and then
1:07:42flow into the neutral ground from the
1:07:44surrounding areas as well. There will be
1:07:46some pedestrian bridges as well that are
1:07:48included there. Um on Allen Tucson,
1:07:51you'll see some additional bike lanes
1:07:53that are coming and some additional uh
1:07:55storm water management in the form of
1:07:56detention ponds or linear ponds in the
1:07:59neutral ground as well. In further
1:08:00phases, you'll see some of the uh green
1:08:03spaces and parks reinvisioned um along
1:08:06St. Rock Avenue. Uh there are a couple
1:08:08that we're looking at and along all
1:08:10along Filillmore we're looking at sort
1:08:12of redoing some of the storm water
1:08:14management including some of the tanks
1:08:16under the neutral ground area as well.
1:08:17So we're working very closely with parks
1:08:19and parkways with all of the trees that
1:08:21are uh being touched in any manner to
1:08:24make sure that they remain in good
1:08:25shape. Um so you'll see a lot of
1:08:26benefits in terms of storm water
1:08:28management. Also just uh sort of the
1:08:30ecological nature of the entire
1:08:33neighborhood, adding green space, uh
1:08:35reducing some of the extreme heat that
1:08:37we've been experiencing over the last
1:08:38couple years and giving people a place
1:08:40to traverse through the area in a safe
1:08:43um and protected way.
1:08:45>> Sometimes these are good forums for
1:08:46this. Um we had a meeting the other day,
1:08:49wasn't as well attended as it could have
1:08:52been, but maybe people are comfortable
1:08:53that they're getting the information,
1:08:55for example, through our newsletter. But
1:08:57could you explain the St. Anthony
1:08:59project and what is going to be going on
1:09:00there and the benefit to that community.
1:09:03>> Sure. The St. Anthony green streets
1:09:05project north and south. It's a
1:09:06combination of about 33 blocks
1:09:08throughout the neighborhood. This is a
1:09:10combination of the JIR funds as well as
1:09:13the NDR funds. So you'll see a lot of
1:09:16utility upgrades in this project. Water
1:09:19sewer drainage will all be a part of it.
1:09:21new streets, but you'll also see some of
1:09:23the uh additional storm water benefits
1:09:25in rain gardens and permeable pavement
1:09:27throughout this area as well. The
1:09:29presentation is available on our website
1:09:31if residents do want to go see it. Any
1:09:33notices that go up for any of our
1:09:35construction projects, uh JR as well as
1:09:38for Broadmore are listed on the website.
1:09:40So, traffic closures, uh any water
1:09:43closures that may need to come up, those
1:09:44will all be posted on the website as
1:09:47soon as we are able to schedule them. So
1:09:48residents will always have access to
1:09:50that. They are also able to get um Nola
1:09:54ready alerts if they sign up for the
1:09:55infrastructure alerts. And we also try
1:09:57to make sure that we also send as many
1:09:59of these things to the neighborhood
1:10:00associations as well. Uh so that there's
1:10:03a constant sort of access that residents
1:10:05can have to any and all information on
1:10:07these projects.
1:10:08>> Thank you. Very important projects. But
1:10:10I want to make it clear that you've gone
1:10:11out of your way to make sure that the
1:10:13public knows. We've had public meetings.
1:10:15You've also included information that we
1:10:17shared in our newsletter that goes to a
1:10:19lot of people. So, I just want everybody
1:10:21to know that if you should have a
1:10:22concern with regard to especially any
1:10:25project in the Gentilly Resilience
1:10:26District, you can contact the office of
1:10:28resilience and sustainability and my
1:10:30office because we are in constant
1:10:32communication and are sharing very
1:10:34valuable information. These are very
1:10:36important projects. Could you talk last
1:10:38about the um the monies for these
1:10:41projects? It's 40 $141 million, but that
1:10:44money is in place. So those projects are
1:10:46going to happen, right?
1:10:46>> Yes, that money is still in place. Um,
1:10:48and again, there are several projects
1:10:50throughout the Gentilli Resilience
1:10:51District that are a combination of the
1:10:54NDR funds from the hazard from the uh
1:10:56HUD grant as well as the uh JIR project.
1:11:00So we've leveraged several projects to
1:11:02be able to do this. and we're combining
1:11:04funds rather than having one department
1:11:06do one thing and then another do the
1:11:07other. We've combined them uh several
1:11:09years ago into one cohesive project like
1:11:12St. An the two St. Anthony projects as
1:11:14well as the St. Bernard project that's
1:11:16coming up as well uh that will be
1:11:18throughout the neighborhood and along
1:11:19Bayou St. John. So we've we've leveraged
1:11:22these projects to make sure that we are
1:11:25doing this as comprehensively as
1:11:26possible. Um, and like I said earlier,
1:11:28that will represent that uptick in
1:11:30funding um, and funding expenditures to
1:11:33get us out of that slow spending uh,
1:11:35namesake that we've earned.
1:11:36>> The first major project that people have
1:11:39seen and that is one that is most
1:11:41prominent is the Mirable Water Gardens.
1:11:43What do you estimate to be the
1:11:45completion date for that project? And
1:11:47how are things going?
1:11:49>> Uh, things are going well with that
1:11:50project. We are anticipating December to
1:11:53open the the um the park itself. Uh
1:11:56we're working on some final things with
1:11:59the pump house that's in place. Uh we
1:12:01did experience uh a theft at the site um
1:12:04of some of the electrical equipment. So
1:12:06our contractor's been in the process of
1:12:08of resolving that issue, but uh so far
1:12:11the the site has been working. Um
1:12:13obviously with all of the rain this
1:12:15weekend, we can a lot of the ponds are
1:12:17full. So they've been doing what they've
1:12:19been constructed to do. So all in all,
1:12:21things are going well. The grant ends at
1:12:22the end of this year, so we are
1:12:23obligated to finish it before then. So
1:12:25right now we are pushing for late
1:12:27November, early December to open the
1:12:28park.
1:12:29>> It's amazing the amount of um resources
1:12:32that the city expends in response to
1:12:34thievery to people going into electrical
1:12:37boxes to going into situations where
1:12:39they could be electrocuted. I just want
1:12:41to encourage the people who are doing
1:12:43that to recognize that you're putting
1:12:45yourself at risk. People do get shocked
1:12:47from that and sometimes they lose their
1:12:49lives. But also that you're really
1:12:50holding back on important community
1:12:52work, whether it be lights, whether it
1:12:54be this kind of development, whether it
1:12:56be construction projects, you're having
1:12:58a terrible impact on the city and all
1:13:00you're doing is getting yourself a felon
1:13:02a felony on your record. But um that's
1:13:04the negative side of it. The positive
1:13:06side of it is that sometime in December,
1:13:08people will see the first phase of many
1:13:10phases to come in terms of completion of
1:13:12a gentility resilience district project.
1:13:15Thank you very much for your work and um
1:13:17you know continue to share information
1:13:18and we will do so with the public.
1:13:20>> Absolutely.
1:13:21>> Okay.
1:13:21>> Thank you, Council Member Green. I uh
1:13:23just want to very publicly say that I
1:13:26know that we're looking at uh the
1:13:27temporary detention center as the new
1:13:30low barrier shelter that is located in
1:13:32district B. The current low barrier
1:13:34shelter is located in District B. So to
1:13:37everyone here from the administration,
1:13:39my office needs to be included in those
1:13:41conversations.
1:13:43With that, Mr. Sinceri, you've been
1:13:45sitting here for a long time. I know you
1:13:46have a card, but there's nothing
1:13:48indicated, but come on up and and give
1:13:50us your recommendation. You got two
1:13:52minutes.
1:14:00>> Good morning, uh, Madame Chair,
1:14:02chairperson, and council members. I have
1:14:05to apologize for the way I'm dressed. I
1:14:08uh went to work this morning at 3:30 uh
1:14:11at my business and didn't know this
1:14:15meeting was taking place today. My name
1:14:17is Alison Siri, a 68y year resident of
1:14:22New Orleans, owner of the oldest, one of
1:14:24the oldest businesses in New Orleans, uh
1:14:27P&J Oyster Company, has been in business
1:14:30here for the last 150 years.
1:14:33This is only my second time coming to a
1:14:36New Orleans council meeting because in
1:14:38the past I could call my district
1:14:40council member or council members at
1:14:42large and they would call me back.
1:14:45Unfortunately, that is what brought me
1:14:47here last Thursday and today because no
1:14:50one returned my call nor responded to
1:14:53the request for a meeting when I came to
1:14:55city hall last March to discuss an idea
1:14:58I had. Today I want to publicly tell you
1:15:01about the municipal code ordinance that
1:15:03I found last February that requires
1:15:05transient and foreign businesses to
1:15:08acquire an operational/occupational
1:15:11license if they are doing business in
1:15:13Orleans Parish and provide monthly sales
1:15:16and use tax forms just like any business
1:15:19within Orleans Parish. The only reason I
1:15:23came across the city ordinance was
1:15:25because I noticed trucks every day
1:15:27driving past my business in the French
1:15:29Quarter from out of parish and out of
1:15:32state delivering goods and providing
1:15:34services to the city to those in the
1:15:37city. So my question to all of you is is
1:15:40the city of New Orleans collecting
1:15:42transient and foreign business
1:15:44occupational
1:15:46operational licenses for the businesses
1:15:49or entities that are doing business
1:15:50within Orleans Parish any and if so how
1:15:54many businesses and or entities are
1:15:57there? How much money has the city of
1:16:00New Orleans collected for these licenses
1:16:03this year?
1:16:06>> Thank you Mr. Sincer. your time and
1:16:08someone will get back to you with that
1:16:09information. Thank you, Ashley. Up next,
1:16:13we have the Capital Projects
1:16:14Administration
1:16:16presentation.
1:16:33Kyle, one question. That's 100 mil or
1:16:35100,000.
1:16:37100,000. So that 5.1 million. Okay, got
1:16:39it. Thank you all very much. Steve
1:16:41Nelson, uh, deputy chief administrative
1:16:44officer for U infrastructure, uh,
1:16:47sitting in for Jerry Harris. I have
1:16:49Miguel to my right, Kyle to my left,
1:16:51Brandy at the far right. Thank you all.
1:16:54U, the first, I guess the first slide we
1:16:56have our organizational chart, but I
1:16:58don't know that that's necessary for us
1:17:00to review. These are the personnel. Uh
1:17:02we do have 1 PM supervisor vacancy but
1:17:05by and large uh capital projects is
1:17:07relatively well staffed. Um going to our
1:17:10budget versus adopted. The key here and
1:17:12there will be a note on it on the next
1:17:14slide. You see a reduction in personnel
1:17:16expenses of 188,000 from last year to
1:17:19this year and then a reduction in other
1:17:21operating of 67,000 for a total uh 2026
1:17:26adopted budget of 377 and then a
1:17:28proposed budget of 121 for a net
1:17:31reduction of $255,000.
1:17:33This is in keeping with a theme that you
1:17:35will see throughout the presentations
1:17:36today of switching as many of our
1:17:38salaries to bond funds as is practicable
1:17:41without overly impacting some of these
1:17:43other projects that are that are within
1:17:45the list. So right now uh the big shift
1:17:48is all of the positions that are are
1:17:50within capital projects are now either
1:17:51bond or grant funded and we've been able
1:17:53to reduce non-essential spending on
1:17:56small items like cell phones, office
1:17:58supplies, coffee machines, um water,
1:18:01coffee, etc. uh scraping together every
1:18:03dollar and nickel that we can uh to
1:18:05reduce the overall impact on the general
1:18:07fund and anything that's over $5,000 or
1:18:1010 years in allow usable life we will
1:18:13move to general fund. So moving on to
1:18:16the proposed versus budgeted 27 to 26 uh
1:18:20adopted non-general fund expenditures.
1:18:22You see that increase in the 27 proposed
1:18:25budget of $27,895.
1:18:29Uh a reduction in other operating from
1:18:328.6 million 8,581838
1:18:35down to 5.1 million. And I will break
1:18:37out those two numbers that make up the
1:18:395.1 on the next slide for a total uh
1:18:42reduction of 3,273,943
1:18:46between the 26 adopted and 27 proposed
1:18:50budgets. some key components of the
1:18:53proposed 2027 budget for non-general
1:18:56fund. Uh again, as I mentioned, all
1:18:57positions will now be under the capital
1:19:00fund. We've done a lot of work with our
1:19:02HR department to get ADP set up so that
1:19:04we can have uh line items for employees
1:19:07to be able to charge against to ensure
1:19:08that they're appropriately keeping their
1:19:10time. That 5.1 million that I mentioned
1:19:13before, 5 million uh remains in state
1:19:16capital outlay for the sewage and
1:19:18waterboard power complex project. And
1:19:21then there's $100,000, it's not a h
1:19:23100red million, pardon the typo there,
1:19:25$100,000 in state appropriations as a
1:19:28pass through for the Desire Community
1:19:29Housing Corporation
1:19:32in order to achieve some of our budget
1:19:33efficiencies. Again, all of us are
1:19:35looking to figure out ways to tighten
1:19:37our budgets. Uh we did look at
1:19:39efficiencies as part of 2026. We know
1:19:42that cash is not necessarily budget this
1:19:44year, but if we lay that out
1:19:45appropriately, it will be for 2027. Uh
1:19:48we utilized FEMA and HUD funding teams
1:19:51uh for the general fund uh last year as
1:19:55well as going into 2027. So the reduced
1:19:57personnel has resulted in cost savings
1:19:59again for cell phones, office supplies,
1:20:01other non-essential spending. Some of
1:20:04our 2027 goals I mentioned earlier with
1:20:07the JRR program, making sure that we
1:20:09have slots for those project managers
1:20:11that are working on good habits around
1:20:14scheduling. We want to do the same thing
1:20:16uh using tools like Procore. Procore is
1:20:19a project management, construction
1:20:21management tool uh that we've been able
1:20:23to use extensively within capital
1:20:25projects as well as uh public works. It
1:20:28provides a one-stop location for the
1:20:30tracking of requests for information or
1:20:32RFIs, change order proposals, pay
1:20:34applications, contract documentation,
1:20:38and uh we're looking to expand the use
1:20:40of Procore across our bond funded and
1:20:43other FEMA funded programs.
1:20:45um and include that to support the
1:20:48management of design services and
1:20:50invoicing in addition to construction
1:20:52and expansion of bidding items less than
1:20:54260,000 and expansion of financial
1:20:56management for each uh each and every
1:20:58one of our projects and then uh working
1:21:01on getting FAA certifications for drone
1:21:03operations uh inspections during in
1:21:06construction especially on roofs and
1:21:08roof mounted HVAC is much safer and more
1:21:10efficient if we can do it using a drone
1:21:13under the proper set of circumstances
1:21:14and with the proper controls. Uh this
1:21:17will also help us in documentation for
1:21:19pre and post events. We understand that
1:21:21wind claims and issues around wind
1:21:24events are important and being able to
1:21:26have someone who's able to fly
1:21:28facilities before and after a storm with
1:21:30a drone is very important.
1:21:33We're also looking at uh training and
1:21:35use of 360 degree cameras for facility
1:21:38and construction documentation. So
1:21:41during uh inspection, having cameras on
1:21:44site has been very very helpful for
1:21:46documenting the number of crews, the
1:21:48work being completed uh and ensuring
1:21:50that we get good documentation as a
1:21:52project uh moves forward. Miguel, is
1:21:54there anything that I'm missing there?
1:21:56>> Yeah, just um a tiein between um the
1:21:59three major topics we just spoke about.
1:22:01So, the technology through Procore and
1:22:04the drone and the 360 cameras, um, it
1:22:09all kind of comes together as part of a
1:22:12long-term strategy delivery where we're,
1:22:15uh, tying into asset management, future
1:22:17asset management systems that are
1:22:20currently in development and also that
1:22:22ties into disaster recovery. So all of
1:22:25these things have a broader u spectrum
1:22:28if you consider it in terms of uh
1:22:30long-term strategic planning for our
1:22:33delivery of projects.
1:22:36>> Is that it?
1:22:37>> That's it for our presentation.
1:22:38>> Thank you. Um okay, let me start
1:22:40backwards. The technology that you're
1:22:42using, is that uh paid for by bond
1:22:45funds, the 360, the drones?
1:22:48>> No, we're we're currently paying for
1:22:50Procore through the indirect admin fees
1:22:52from the FEMA program. Okay.
1:22:54>> Um, so that's something after the JR
1:22:56program that we'll need to identify
1:22:58funding for.
1:22:59>> So once J funding runs out, we'll have
1:23:02to figure out how to pay for Procore.
1:23:03>> Yes.
1:23:04>> What is the cost of Procore? Do you
1:23:05know?
1:23:06>> Uh, it's based off of the volume of
1:23:07construction. So certainly once the JR
1:23:09program is over, that volume will go
1:23:13down significantly. So I don't know have
1:23:16an estimate for what it would be
1:23:17postprogram.
1:23:18>> And is Per Core the best in uh the best
1:23:21in class? Yeah, I've had experience
1:23:24using that with the sewage and
1:23:25waterboard in here. It's a very, very
1:23:27effective program. It makes
1:23:29accountability really easy. So, knowing
1:23:31whose desk any given work item is on is
1:23:35really, really important. So, for
1:23:37myself, if something sits on my desk
1:23:39more than 24 hours, I'm getting pinged
1:23:41and everybody in the world knows that
1:23:43that's been sitting on Steve's desk for
1:23:45more than 24 hours. So, it's a very
1:23:46effective tool.
1:23:47>> That's great. Um, on the people who are
1:23:50budgeted via bond funds or taking them
1:23:53off of general fund via bond funding,
1:23:55again, I'm going to ask the question,
1:23:56what happens when that money runs out?
1:23:58Number one. Number two, are we reducing
1:24:01the amount of money that we're paying
1:24:03towards projects, capital projects by
1:24:06the personnel? Do you get what I'm
1:24:08saying?
1:24:09>> Yeah. So, all of that does fit together.
1:24:11So, if we're spending $100,000 on a
1:24:14salary, that's $100,000 in furniture,
1:24:16fixtures, and equipment or some other
1:24:18thing that that is not going into the
1:24:20into the facility itself. But the
1:24:22challenge that we're in from a budget
1:24:24standpoint, that's the vehicle that we
1:24:26have at hand. Fortunately, we did have
1:24:28the bond sale of that half a billion
1:24:30dollars. Uh making sure that there
1:24:32there's no lack of needs within the
1:24:34city. So I'm fairly I'm quite confident
1:24:37that once we finish with this round of
1:24:39projects, I know that there is another
1:24:41list of projects for that bond sale in
1:24:432028 and then that will continue on
1:24:46again 2030 and and going forward. That's
1:24:49part of part of ensuring that we are
1:24:51delivering and providing a a stable
1:24:52place for folks to work in the future.
1:24:54>> Thank you. You anticipated my last
1:24:56question which is having a more regular
1:24:58cadence of bond sales. So we're looking
1:25:00at every two years now going forward. Uh
1:25:03well I we at least know 2028 and 2030. I
1:25:06my instruction to my team has been spend
1:25:09the money that you have naturally do it
1:25:11efficiently and effectively. But we need
1:25:13those dollars going into the ground. We
1:25:15need streets getting built, sidewalks
1:25:17constructed, buildings renovated. And
1:25:20when the residents of New Orleans see
1:25:22that happening and see increased
1:25:23delivery,
1:25:25they will go to the ballot boxes in
1:25:27future years to be able to approve bond
1:25:30sales or not. So it's incumbent on us to
1:25:32put that infrastructure dollars in place
1:25:35uh effectively and I believe that
1:25:36covering salaries is an important way of
1:25:39doing that. That may change in the
1:25:40future, but for now, that's the vehicle
1:25:42we have.
1:25:43>> And there is the subcommittee of the ICC
1:25:45that is looking at that. And so that's
1:25:47likely going to be a recommendation that
1:25:48comes out of that that there's a steady
1:25:51bond program that can be predictable and
1:25:54so that we can easily plan for these
1:25:56future years rather than in years past
1:25:59where it's been more, you know,
1:26:01>> sporadic.
1:26:02>> Sporadic. Exactly.
1:26:03>> Okay. Um, [snorts] Council Member
1:26:05McCarron, Council Member Green. Um,
1:26:07thank you, Madam Chair. Um uh Steve,
1:26:10does Sewision Waterboard use this um
1:26:12Procore software? Currently
1:26:14>> they do. Yes.
1:26:15>> Okay. Is that one of those future
1:26:17efficiencies that you know licensing
1:26:20costs or whatever can be combined
1:26:22between the two agencies once we're
1:26:24we're incorporating them more into city?
1:26:27>> Yeah, absolutely. And as we've talked
1:26:29about kind of the the time frame of
1:26:31having the surge and water board
1:26:33transition into essentially a city
1:26:36department similar to some of our
1:26:37neighboring parishes. Uh I think that
1:26:39makes it that really will help help uh
1:26:44facilitate that transition as we have
1:26:46visibility on one another's construction
1:26:48management process.
1:26:49>> I think that would be super helpful even
1:26:51if y'all can work out some kind of you
1:26:53know access to both systems.
1:26:55>> Yeah.
1:26:57for the JR projects. Uh there are some
1:27:00that the sewage and waterboard leads and
1:27:01some that the city leads and pro Procore
1:27:03provides a really effective conduit for
1:27:05that. And I think for something like the
1:27:07lead service line and our rightway
1:27:08contracts, this provides a really good
1:27:11opportunity for us to be on the same
1:27:13page. And again, having approvals that
1:27:15have good clean tracking and a clear
1:27:18single place where folks can find
1:27:20information is uh is very effective.
1:27:22>> Great. That was all I had. Thank you.
1:27:24Council member Green,
1:27:25>> could you describe the um the drone and
1:27:28um 360 camera use? What do you uh what
1:27:33obstacles there are to overcome to get
1:27:35staff trained? We don't have any
1:27:37internal issues with drones and 360s.
1:27:40It's just a matter of timing or is it
1:27:41FHA FAA certifications? What's required?
1:27:44Um, I know we had an FAA certified
1:27:46operator at the sewage and water board.
1:27:48And really, it's it's a matter of going
1:27:50through the process, having the
1:27:51equipment and the experience to ensure
1:27:53that you're not violating someone's
1:27:54privacy, that you're operating in in an
1:27:57airspace that's appropriate, uh, and
1:27:59making sure that you've got a pilot u
1:28:02with the appropriate level of skills.
1:28:03Miguel, is there anything additional?
1:28:05>> Um, it shouldn't be too difficult to get
1:28:08certification for each of the members to
1:28:10be able to use it as a normal tool. I
1:28:12mean, it just gives you so much more um
1:28:15ability to look from above and actually
1:28:18look in detail whenever we assess a
1:28:20building. So, it's it's kind of a
1:28:22technology that's
1:28:24>> Well, I see the benefit all the time. I
1:28:25see the benefit of going to the top of a
1:28:27multi-story building with a drone so
1:28:30that you don't have to, you know, so
1:28:31that you can get a real time look at
1:28:33what's going on. It might have saved us
1:28:35in the past with some of the challenges
1:28:37that we had because we would have the
1:28:38ability to go and check ourselves to see
1:28:40if certain things have been done. So, I
1:28:42want to make it clear that I'm a strong
1:28:44um supporter of the drone use and the
1:28:47camera use. And I just want to make sure
1:28:48that the public understands that these
1:28:50are going to be certified users and that
1:28:53they're going to be focused on what the
1:28:55mission is, which is to address and see
1:28:57construction related issues. That's all.
1:28:59So, there are no challenges other than
1:29:01the fact that we need to get together
1:29:03with the FAA to get the certifications
1:29:05done. Right.
1:29:06>> Correct.
1:29:07>> What time what kind of time frame is
1:29:08involved with FAA certification?
1:29:12I don't I don't I don't know if we have
1:29:14the cameras up. Um Kyle, do you know
1:29:17when we're going to be receiving
1:29:19cameras?
1:29:20>> That's included in this year's budget.
1:29:22So, we expect for that training to occur
1:29:24in 2027.
1:29:25>> Okay. Thank you very much. I look
1:29:26forward to hearing that those um
1:29:28operators are trained and that they are
1:29:30in place to help keep our citizens safer
1:29:32by being able to identify construction
1:29:34related issues in advance. Thank you.
1:29:38>> Thank you, Council Member Green. Ashley.
1:29:40Next up,
1:29:41>> next up is
1:29:41>> Thank you.
1:29:42>> I'm sorry. Department of Property
1:29:43Management.
1:30:07Property management.
1:30:17public works or public
1:30:23drive.
1:30:25>> Yeah.
1:30:42Okay.
1:30:59All right.
1:31:07I've never I've never
1:31:21>> Whenever you're ready, you can begin.
1:31:23>> All right.
1:31:25All right. Good morning, council
1:31:27members. U Austin Wilty, director of
1:31:29property management. Uh before I begin,
1:31:32I just want to thank by think uh begin
1:31:34by thanking the hardworking men and
1:31:36women of the department of property
1:31:37management. Um as you know, I've only
1:31:40been in the in the role for 2 weeks now.
1:31:43And uh everybody stops me all kind of
1:31:45asked me how it's going. I think my my
1:31:48kind of response just to paraphrase it
1:31:50is
1:31:52just being amazed by how hardworking the
1:31:54guys are. I think it's a paradox. You
1:31:56often hear, you know, the city doesn't
1:31:58do maintenance uh well, and then you go
1:32:01to some of these facilities on these
1:32:03visits and you see machinery and
1:32:05equipment that looks like it it predates
1:32:07the war. Um, and so somebody's
1:32:10maintaining that equipment and I
1:32:12appreciate their hard work every day.
1:32:14Um, and they really do a great job. Um,
1:32:17I'm joined here by my deputy, Enrico
1:32:19Sterling, to my left and, uh, Director
1:32:22of Property Management, Secretary
1:32:23Whitney Cabierro, who wears many hats,
1:32:26um, and does our budget and finance
1:32:28among other things, and greatly
1:32:30appreciative for their work. Um, all
1:32:32right, first slide, um,
1:32:37is our ORC chart. You go next slide.
1:32:40Um, so as you, this is our general fund
1:32:43slide. Um so you can see this is a tough
1:32:47budget for us. Um first starting though
1:32:50with with the personnel um pleased to
1:32:53report that our personnel is largely
1:32:55intact. Um the increase you see which
1:32:58will be described on the next slide is
1:33:00mainly due to budget accounting for
1:33:02fringe benefits. So uh thank you to
1:33:04Brandy and her team. They all they do a
1:33:06great job. I think you'll start to see
1:33:08this more and more that we are starting
1:33:10to put the puzzle pieces back where they
1:33:12belong and add things where they should
1:33:14go and and accounting for them properly.
1:33:17So, thank you to her diligence of her
1:33:19and her team. Um, and then you'll see
1:33:21that also kind of reflect on other
1:33:23slides um as well. Um, and then other
1:33:26operating, you know, I think Steve um
1:33:29has been drilling this into me. We need
1:33:31to be efficient, proactive. Um, it is a
1:33:33tough budget. Um, there's no easy
1:33:36decisions. um especially in property
1:33:38management where we're where um my guys
1:33:41will often say they they're the front
1:33:42lines for the f front line. So if if the
1:33:45police can't get out of their garage cuz
1:33:46the rollup door isn't open, then then
1:33:48they're not very effective, right? And
1:33:50so um again, just can't thank them
1:33:52enough for the hard work they do. And
1:33:54and we're going to have to have
1:33:55discipline here. And you'll hear in the
1:33:57next slides about our revenue generating
1:33:59opportunities and the efficiencies we're
1:34:01putting in place and how how we plan to
1:34:04make up that uh that decrease on the
1:34:06other on the other operating side for
1:34:08general fund. Next slide.
1:34:12All right. You heard me talk about this
1:34:14already about the fringe benefits, but
1:34:15you see it repeated here. Um you can go
1:34:18next slide.
1:34:21Okay. So non non-general fund. Um, so,
1:34:24so you'll see what looks like a decrease
1:34:26of 600,000. Again, this this is back to
1:34:29to um putting the puzzle pieces back to
1:34:32where they belong and how we want to get
1:34:34we want to get to the same place
1:34:36basically the DPW is now. We're 75% of
1:34:39the year through and they've only spent
1:34:4130% of the budget. And how they've done
1:34:43that is by moving folks off a general
1:34:45fund onto capital. Now, we may not be
1:34:47able to move folks onto capital. Well,
1:34:49we can move some certainly and work
1:34:51towards that, but we also have certain
1:34:53special funds um that that affect the
1:34:55pillars under property management. So
1:34:57whether it be um the the cemetery fund,
1:35:00the Galler Hall fund, um there are other
1:35:04funds too that are fun to look into like
1:35:06Delgato Delgado Albania plantation which
1:35:09I know council me your off is is is fun
1:35:12to um so you know I think just digging
1:35:15into those and trying to to that's a
1:35:18work in progress though. So we'll be be
1:35:20working with y'all especially on the
1:35:21Galler Hall piece, the Gallery Hall
1:35:23special fund piece. Um, and just to flag
1:35:26it, I believe it's section 70415,
1:35:30uh, 269. Currently, it can only be used
1:35:32for maintenance. Um, again, like to
1:35:35thank the Gallery Hall team, the
1:35:36multi-ervices team, including our
1:35:38engineer, uh, Cory. Um, but those folks,
1:35:41I believe, would be ripe to be able to
1:35:43put them on the Gallery Hall fund
1:35:45because a lot of that money is coming in
1:35:47from events and them working and us
1:35:50charging for the direct cost. um
1:35:52especially when they're working
1:35:53overtime. Um so I think that would be
1:35:56appropriate. Would love to work with
1:35:57your offices on that. Um on the other
1:36:00operating side, um just cuz I I don't
1:36:03want to do all the talking. Do you want
1:36:04to take this one, Whitney, and kind of
1:36:06describe OCD and and how we're doing
1:36:08that?
1:36:09>> Sure. So the other operating for
1:36:11non-general funds has an increase of
1:36:13roughly 365,000.
1:36:16This is a portion of um office space
1:36:19that is being um leased by the office of
1:36:23community development and they have a
1:36:25grant that is paying for that lease
1:36:27space. So we no longer have to pay for
1:36:29that out of our general fund that is
1:36:31being paid out of um that grant.
1:36:34And so just like the fringe I think
1:36:36again kudos to Brandy and her team um
1:36:39for finding that and putting it back
1:36:40where it belongs. Um but that's the
1:36:42difference you'll see there. Um, I think
1:36:44we can go to the next slide.
1:36:48And and this just um essentially repeats
1:36:50in writing what what I just said a
1:36:51minute ago about Galler Hall and
1:36:53cemetery.
1:36:55Um, we go next slide and OCD as well.
1:36:59All right.
1:37:02Um so so I think the the budget meetings
1:37:06in the districts this was uh hammered
1:37:08pretty hard but we have our lease
1:37:09management contract with corporate realy
1:37:12uh Jean Booth over there has been great
1:37:14to work with. We've had a number of
1:37:16meetings um and I think um they've been
1:37:20very receptive to our needs in ter in
1:37:23terms of where we are with our finances
1:37:25and have actually come down a little bit
1:37:27on the pricing um and we're working
1:37:30through that but but really appreciate
1:37:33um their uh willingness to to work with
1:37:36us and understand our situation and we
1:37:38believe there's a a number of uh
1:37:41different properties we can go into
1:37:42detail in various districts
1:37:45um which we've already talked to some of
1:37:46y'all about and excited about those
1:37:48opportunities. Uh similarly um again
1:37:52revenue generating so cemetery tours uh
1:37:55you know my personal view cemeteries are
1:37:57a sacred space they belong to families a
1:37:59lot of people are surprised to learn
1:38:00that we manage six cemeteries and uh we
1:38:04do burials at one whole cemetery um but
1:38:08we also just started cemetery tours with
1:38:11PRC and and uh this was something that
1:38:14my predecessor put in place but really
1:38:16led by Miss Jessica Shron who's done a
1:38:18phenomenal job and um really paying
1:38:22reverence and respect to the families
1:38:23and doing the way that uh I believe it
1:38:26should be done um to respect the
1:38:29families in the sacred space that
1:38:31they're on. So um we'll need your help
1:38:34uh council members to try to move that
1:38:36position through. Um I've already kind
1:38:38of flirted with that idea with a number
1:38:40of y'all, but but really would like to
1:38:42um meet again and kind of talk about how
1:38:44we can do that and bring that to
1:38:46fruition.
1:38:47Um similarly, excuse me, uh parking
1:38:52contracts. So, uh maximizing the assets
1:38:55we have, excuse me,
1:38:58apologies. Uh maximizing the assets we
1:39:00have. So, I believe in July and August,
1:39:03the reports came back that just by using
1:39:05the city hall garage, we were able to
1:39:08make about $6,000 in parking. We hope to
1:39:10expand that to the the VA garage as
1:39:13well. Uh and that's not including Kanye
1:39:15and Bruno Mars. So, I'm optimistic with
1:39:17cemetery tours on top of parking, on top
1:39:20of lease management that those are all
1:39:22great opportunities. Um, and they're all
1:39:25in motion. Um, like I said, and then
1:39:28finally, you'll see crossraining
1:39:30employees. Um, really, this is kind of
1:39:32pulling an idea. It's It's not my idea.
1:39:35It's certainly one that you've seen work
1:39:37though in other departments, and we
1:39:38worked with civil service. So, I'm
1:39:40thinking uh safety and permits, right?
1:39:42you you you want to get a an inspection
1:39:45for uh a building, mechanical,
1:39:47electrical, you don't want to call three
1:39:49different inspectors, right? Similarly,
1:39:51when we go out for a job, you often see
1:39:53that, you know, HVAC ties into plumbing,
1:39:55ties into electrical, you know, having
1:39:57that that person crossrained and trying
1:39:59to get with civil service to make sure
1:40:01um that they can be uh amply compensated
1:40:03for those uh certifications that they
1:40:05need uh and will have to perform the
1:40:08work would be something that that very
1:40:09much would like to put in place. Uh,
1:40:11next slide.
1:40:16All right. Um, we touched on this a
1:40:18little bit earlier, but um, working with
1:40:21with Warren Smith and his team, he's
1:40:23already um, you know, this very much
1:40:27work in progress, but I think another
1:40:29way that we can save money would be uh,
1:40:31how we store um, documents, records, um,
1:40:37you know, all sorts of things, right?
1:40:39Uh, central evidence and property. y'all
1:40:41know about that. Um, and again, that
1:40:43goes back to to lease terms and wanting
1:40:45to get favorable lease terms for the
1:40:47city as well as the DPW trailers, which
1:40:50I'm sure Steve will touch on um at some
1:40:52point, but you know, we we pay entirely
1:40:54too much to store things when we have um
1:40:58space. Um, no other way to put it. So,
1:41:01uh, finding a way to to do that uh is
1:41:03certainly a priority.
1:41:05Um,
1:41:08let's see. Galler Hall, I already
1:41:09touched on that. Uh energy efficiency.
1:41:13Steve, I don't know if you want to touch
1:41:14on anything in terms of uh the VA or
1:41:17kind of um exciting things to come. We
1:41:20know you've already touched on it, but
1:41:21go ahead.
1:41:22>> Yeah, just very briefly. I know uh there
1:41:25are a number of different areas where we
1:41:27can achieve efficiencies. You can
1:41:28probably look around this building and
1:41:30see incandescent lights, fluorescent
1:41:32fixtures. Changing those over to LEDs is
1:41:35going to be very the simple things that
1:41:37we can do. the VA hospital. We spend
1:41:39over $350,000 a year on electricity and
1:41:41we really only use about two floors. So,
1:41:43being able to to work on on efficiencies
1:41:47there. Austin and his team are already
1:41:49looking at it. He mentioned uh the
1:41:51cemeteries. They had tours already at
1:41:54capacity uh for those for those uh tours
1:41:57that they had just starting last week.
1:41:59Uh and then the RFQ RFP for the parking.
1:42:02We're looking at the the red light
1:42:04cameras. There's a lots a lot of
1:42:06different ways that we can generate
1:42:08efficiencies through the opportunities
1:42:10that are all around us and Austin and
1:42:12his team are actively looking to do
1:42:14that.
1:42:16>> All right. Um, thank you Steve. Uh,
1:42:19I think you touched on a number of
1:42:21those. Next slide.
1:42:23>> All right.
1:42:26>> Thank you for your presentation. I think
1:42:28you could um maybe get some efficiencies
1:42:30by temperature regulation in this
1:42:32building. It is either freezing or
1:42:35>> hot as hell. Um, so honestly, I'm not
1:42:39kidding at all. Like this been like this
1:42:41for four years, [snorts] 9 months of my
1:42:44time here, and it's either freezing in
1:42:47this specifically this chamber or it's
1:42:50hot. So, you know, taking a look at
1:42:52temperature control, not only in this
1:42:54building, but all the buildings, I think
1:42:55would be helpful.
1:42:56>> Yes, ma'am. Absolutely.
1:42:58>> Thank you. I want to uh start with
1:43:00Lafayette number one. I'm really excited
1:43:02about that being opened back up again.
1:43:04That's been it's been closed for I think
1:43:06over five years. Um so it's really
1:43:08exciting. Do we know how much money or
1:43:10do we anticipate the amount of money
1:43:12that we're going to get from tours?
1:43:15>> And are we splitting that with PRC?
1:43:18>> So currently um in the last couple of
1:43:20days they've been at max capacity for
1:43:22the tours. They run four tours a day at
1:43:2516 people per tour. $30 per person
1:43:27roughly. These are rough estimates of
1:43:29cost. Um, [clears throat] so that's just
1:43:32under $2,000 per day. I believe it's a
1:43:35tiered revenue system. Um,
1:43:37[clears throat] but the lowest tier I
1:43:39believe is 20%. So we were receiving 20%
1:43:41of that. Um, which is just under $400 a
1:43:44day.
1:43:45>> Could we fund a position the cemetery
1:43:47person with that money? Have you done an
1:43:49analysis of that?
1:43:50>> That is the intent to fund the cemetery
1:43:52superintendent from the the revenues
1:43:54that are generated through the chores.
1:43:56>> It's desperately needed. I can tell you
1:43:58I live by Lafayette number two, which is
1:44:00a disaster. And because Lafayette number
1:44:03one was closed for such a long time,
1:44:04people actually toured Lafayette number
1:44:06two. We don't have that same tour guide
1:44:09system in place, but we should
1:44:10definitely think about it.
1:44:12>> Is that anything that's on your radar?
1:44:14>> Absolutely. We've already met to talk
1:44:16about All Saints Day. Um, and there are
1:44:18a number of nonprofits that that, you
1:44:21know, PRC already partners with. Um, and
1:44:24I think um, yeah, I think the
1:44:26opportunity is there. Yes. To answer
1:44:28your question, absolutely.
1:44:29>> Is uh, film the office of film under
1:44:31your department or no?
1:44:33>> It's not. It's under uh, deputy mayor
1:44:34Schwarz.
1:44:35>> I got you. Okay. I'll say my questions
1:44:37for that. Um,
1:44:40are we are you still working with Annie
1:44:43on identifying underused properties and
1:44:46getting them off the books?
1:44:48>> Yes. Um, Annie and I have met a couple
1:44:51times in the last week. um trying to
1:44:54move trying to get unused property is
1:44:56off the books. Um absolutely. If there's
1:44:58any specific ones, I'm happy to answer
1:45:00question.
1:45:00>> Yeah, the old Second District Police
1:45:01Station on Magazine Street again a
1:45:03disaster. It's completely filled with
1:45:05graffiti. It's been sitting there vacant
1:45:07for a long time. My understanding is the
1:45:09roof is falling in because it's not
1:45:10being maintained. So, what plans do we
1:45:12have to get that back into commerce and
1:45:15out of the city's hands?
1:45:17>> So, I know they did an RFP. I I don't
1:45:19want to speak for Annie. Um, I I think
1:45:22given some of the concessions that we
1:45:24were being offered, um, I think it's
1:45:26worth re-evaluating given the land value
1:45:29and would like to talk to her more about
1:45:30our various options.
1:45:33>> Okay. Keep me updated. Again, I get a
1:45:35lot of questions about the Second
1:45:36District Police Station given its
1:45:38prominence on Magazine Street and I know
1:45:40St. Georgees was looking at trying to
1:45:43acquire the building, but even getting
1:45:45the maintenance out of city coffers and
1:45:49to a third party would be helpful. Um,
1:45:53speaking of maintenance, how much money
1:45:54are we spending on the low barrier
1:45:56shelter for the AC, for example? Do you
1:46:00know?
1:46:01>> So,
1:46:05that's difficult. Um, again, and
1:46:09what I was alluding to earlier, I'm
1:46:10trying to think the best way to answer
1:46:12this question. Um, because the CEO's
1:46:14office pays the energy bill. Um, and the
1:46:17total energy costs we've looked at and
1:46:19created a dashboard for, we're trying to
1:46:21make that public facing. In terms of the
1:46:24HVAC, um, you know, I know just this
1:46:26week we're looking at the air handler
1:46:28unit. Um and and but we also had we met
1:46:30with Suj and Waterboard who would also
1:46:32be remiss if I didn't thank because just
1:46:34like um
1:46:35>> you know our labors our our maintenance
1:46:38staff uh they Steven Yang and his group
1:46:40and and back all of them have been super
1:46:42responsive. I know more of that team
1:46:44than than I did two 3 weeks ago by
1:46:4610fold. Uh whether it's Flip or Jordan
1:46:48or whoever they've been awesome uh and
1:46:51can't thank those guys enough. Um but I
1:46:53think um
1:46:54>> you're talking Let me interrupt you.
1:46:56You're talking about the fact that
1:46:57there's there's no water at the low
1:46:59barrier shelter and we had to jerryrig
1:47:01something with sewer and water board to
1:47:03get water into the low barrier shelter.
1:47:05Can you explain what happened there?
1:47:07>> I can. Um, so since I've taken this
1:47:10post, so I was fortunate enough to
1:47:11shadow my predecessor for two weeks, but
1:47:13in the last five weeks, four out of the
1:47:16last five weeks, I've gotten calls on
1:47:17the weekend saying that there is low to
1:47:19no water pressure at the low barrier
1:47:21shelter. The first two times I called
1:47:23sew and water board. They immediately
1:47:25responded and restored water. The third
1:47:28time we were told that um it was not the
1:47:31sew on the sew and water board side of
1:47:32the meter. It was on the city side. And
1:47:34so our internal senior plumber
1:47:36responded, realized that there had been
1:47:38vandalism. He was able to flip the
1:47:40breaker, got the water restored. the
1:47:43fourth time it happened um
1:47:47that we could the pump was running hot
1:47:49when we got there and we we we looked
1:47:51for the valve most of the day to to to
1:47:54say JerryRig I think is a is doing a
1:47:56little bit of a disservice to this
1:47:57contractor who is one of the more
1:47:59brilliant people I've met and how how
1:48:01they found a way to do it within hours
1:48:04he was coming for a lunch meeting with
1:48:05me just because they hold other
1:48:06contracts and they stayed along um Mr.
1:48:10Davalier Mr. Johnny Ball and um Mr.
1:48:14Ernie Anderson stayed from their lunch
1:48:16meeting not knowing they were going to
1:48:17be looking at the low barrier shelter
1:48:19and fixed it by that night. So I think
1:48:22>> so is there running water?
1:48:23>> There is running water. Yes, ma'am.
1:48:24[clears throat]
1:48:25>> Okay. And I'm not I'm not insulting
1:48:26anybody about saying it was dairy. It
1:48:29literally there was no water.
1:48:31>> Something had to happen. Some temporary
1:48:33fix happened. But now there is running
1:48:35water at the library shelter. Look,
1:48:36we're throwing good money after bad on
1:48:38that building. Um, the elevator doesn't
1:48:41work, so if you're disabled and
1:48:42unhoused, you can't get into the
1:48:44building. Um,
1:48:46there have been issues with bathrooms. I
1:48:48mean, it's just it's not a great
1:48:50facility. Um, so to the point about
1:48:53allocating money for a new low barrier
1:48:55shelter, I'm all for it. It's just a
1:48:57matter of making sure that we have that
1:48:59funding that we're not throwing good
1:49:01money after bad. And frankly, I'd like
1:49:02to get that Va building off of the city
1:49:05books, too.
1:49:06um give it back to the federal
1:49:08government if we could.
1:49:10>> I could not agree more. Yes, absolutely.
1:49:12Answering your question, the root cause
1:49:14of why we lost water, it could be
1:49:16anything from vandalism to broken
1:49:18infrastructure. The key now is we do
1:49:20have a reliable source of of portable
1:49:23water for the residents there and we'll
1:49:26continue to do so. we came up with a
1:49:27simpler solution, but your point is well
1:49:29made and we are in full agreement that
1:49:31moving moving the residents of the low
1:49:34barrier shelter to a much more
1:49:35acceptable location is key.
1:49:37>> Okay. And I I did have my team look at
1:49:38Questica um at the lower barrier shelter
1:49:42under fund 4511. There's a million
1:49:45dollars allocated for the AC. Brandy, do
1:49:48you know what that is?
1:49:50>> Allocated for what?
1:49:51>> The air conditioning services.
1:49:54That's in department or 4511.
1:49:57>> 4511.
1:50:03>> I know, as I mentioned before, I think
1:50:04the electricity alone is $350,000.
1:50:08>> It's just not a good scene. Um, okay. On
1:50:09evidence and while you're looking that
1:50:11up, Brandy, and you can get back to me.
1:50:13On evidence and processing,
1:50:15um, what is the plan? Is that lease up
1:50:18for the for the building?
1:50:21So [clears throat]
1:50:23again, we're still evaluating. My
1:50:25understanding is that there was we were
1:50:27looking at a $100,000 rent increase and
1:50:31um I have not had a chance to to yet to
1:50:33meet with the um the other side or their
1:50:36attorney. So would like to try to
1:50:37understand what the terms of the
1:50:39contract better before I opine in a
1:50:41public setting.
1:50:42>> And this is the what I'm talking about
1:50:44just for the thousands of people who are
1:50:46watching. It's the evidence processing
1:50:48where they NOPD brings the the evidence
1:50:51and they've done a yman's job of getting
1:50:53that organized. If you remember when a
1:50:55Kpatrick came in, she was talking about
1:50:56the rats getting high. Um I know that
1:50:58that's not happening anymore because
1:51:00they've really organized uh the building
1:51:02and the evidence there. But my question
1:51:04is how are we going to go forward if we
1:51:07can't renew this lease? What are we
1:51:08going to do with all that evidence?
1:51:10Yeah, I know we're also looking at
1:51:12alternative locations for that building
1:51:14as well. Being that it's leased and not
1:51:16in ideal condition, being able to put uh
1:51:19put the function of that building into
1:51:21another facility is something that we
1:51:22are actively investigating.
1:51:24>> Okay. And the final um question for
1:51:26property management that comes up a lot,
1:51:28I mean thankfully it's October, but are
1:51:31NOPD um stations are is the AC working
1:51:35in all of those stations right now? Do
1:51:37you know? To my knowledge, I have not
1:51:39heard any complaints. Rico, are you
1:51:40>> Rico?
1:51:41>> Yeah, just real quick. I mean, there's a
1:51:43couple that are waiting on uh
1:51:45compressors, particularly uh half of the
1:51:48six. Um and it's just a matter of the
1:51:51compressor being on back order, and
1:51:54we're waiting for them to come in.
1:51:55Apparently,
1:51:57those are really tough items to get.
1:51:59I've told the team for us to look at it
1:52:02and evaluate it in uh January because if
1:52:04you wait till May or June, everyone's
1:52:08get everyone's asking for components for
1:52:10the ACs.
1:52:10>> Yeah, that the sixth district in
1:52:13particular, that AC has never functioned
1:52:15properly from the time it was installed.
1:52:18I keep asking the question, it's been
1:52:19four years of asking the question of can
1:52:21we replace that AC using capital funding
1:52:24as we look forward in 2028 for a bond
1:52:27sale. that AC is is nonfunctional and I
1:52:30know you guys are getting parts off of
1:52:31like eBay and it's just it's not a good
1:52:34good look. Um, so if you could just give
1:52:36me an update on all the police stations
1:52:39in my district, I'd be interested to
1:52:41know if they're up and running.
1:52:43>> All right. Thank you, Council Member
1:52:44Williams.
1:52:45>> Let I know the second is
1:52:47>> The second is good. Good.
1:52:48[clears throat] Thank you.
1:52:49>> At least as of this morning.
1:52:51>> Okay.
1:52:52>> Council member, the $1 million is for
1:52:54the chill water service at the OVA.
1:52:56>> Okay. So that's budgeted for
1:52:59>> Yes.
1:53:00>> Okay. All right. Thank you, Council
1:53:02Member Willer.
1:53:03>> Thank you, Austin. Who's the cemetery
1:53:05tour contract with
1:53:07>> a preservation resources?
1:53:08>> PRC. Okay. Uh and what's the contract
1:53:11for
1:53:12>> for cemetery tours at Lafayette? Number
1:53:14one
1:53:14>> for them to give the tours. Okay. All
1:53:17right. Yes. Um,
1:53:20so in the budget book and on slide five,
1:53:26the FY 2026 budget included funding from
1:53:31the city cemetery maintenance and repair
1:53:33fund and a number of other small trusts
1:53:37and um, cemetery funds like the LOS
1:53:41Freeman Foundation,
1:53:43uh, Mahelia Zimmerman. it doesn't rec uh
1:53:46include any funding from those in the
1:53:482027 budget. Have those dried up?
1:53:52>> I I don't know if they've dried up
1:53:53necessarily and that I was speaking to
1:53:55council member Karen about this is that
1:53:57I think um finances Danielleman's work
1:54:01trying to rebuild those special funds.
1:54:04But this to me this is the 5141
1:54:07discussion. So now we know that the
1:54:09money is going is tied properly to the
1:54:11right accounting string and that it's
1:54:12going there. But I think that was I
1:54:15think we were kind of a little premature
1:54:17in 2026, but I think now we're on the
1:54:19right path to being able to um to to
1:54:22properly budget within that special
1:54:24fund. If I miss anything, Brandy or
1:54:27Whitney, I'm I'm looking at you guys.
1:54:29>> Maybe we weren't supposed to use those
1:54:31account.
1:54:31>> I think it was ripe to be used. I I just
1:54:34think that practice
1:54:35>> that wasn't the practice we were we were
1:54:37currently um I say sweeping some special
1:54:40funds or consolidated general to pay for
1:54:42things. I think now we're on the right
1:54:43track under this administration as I
1:54:45understand it.
1:54:46>> Okay, that that makes sense. Um, some
1:54:49personnel questions. So, it looks like
1:54:52you're cutting you're reducing the
1:54:54mechanical engine room by six FTEEs
1:54:58and um but the personnel budget is going
1:55:02up by nearly $600,000.
1:55:04Can can one of you explain that?
1:55:07>> Hi. Hey.
1:55:08>> Um, so the personnel budget's not
1:55:11actually increasing. the the difference
1:55:13in those costs are um previously there
1:55:17were personnel funds allocated through
1:55:19the Galleria Hall and cemetery funds
1:55:21which is at 600,000 in 2026 but
1:55:25personnel was actually always being paid
1:55:27out of general funds. We have just
1:55:29reallocated in budget correctly the way
1:55:32that it should have been from the
1:55:34beginning. We are working to get that
1:55:36change like Austin said through the
1:55:37Gallier Hall ordinance to get personnel
1:55:40paid through um Gallier and cemeteries,
1:55:42but we have to build those funds and
1:55:44then get those things passed.
1:55:46>> Okay. Uh and it could be the same
1:55:49situation with this one, but for the VA,
1:55:52um it says we had zero FTEEs budgeted
1:55:54for 2026.
1:55:57Um we're adding three FTEEs for 2027
1:56:01and the personnel budget is being
1:56:04reduced by 60,000. So is it
1:56:06>> So yes, so that's the same. Um I've been
1:56:09in this position roughly 2 years. So
1:56:11this is my second goound with the budget
1:56:13um process and we reallocated positions
1:56:18to the correct location. So positions
1:56:20were not correctly allocated when I came
1:56:22in. We attempted to do it the in the
1:56:25first year from 25 to 26 and we had some
1:56:27struggles and so we did implement those
1:56:30changes this year for 26 to 27.
1:56:33>> Okay. Um what about terminal leave and
1:56:36overtime? Is that accounted for in the
1:56:38CAO's budget?
1:56:39>> Yes.
1:56:40>> Yes. Okay. Um some operating questions.
1:56:44So on in 4511, there's a $1 million
1:56:49cost attributed to a chilled water
1:56:52service contract at the OVA. Was that
1:56:54what uh council member Harris was
1:56:56referring to?
1:56:57>> It it was. Yes.
1:56:58>> Okay.
1:57:00Um same tab. Uh looks like we have six
1:57:04janitorial contracts totaling $1.8
1:57:08million. Have we done an analysis
1:57:11recently to explore if it would be more
1:57:14cost effective to hire those directly
1:57:18with the city as opposed to contracting
1:57:20that out?
1:57:21>> Not not that I'm aware of.
1:57:24We haven't run any analysis, but we did
1:57:26um play with the idea of starting small
1:57:29at Gallia Hall first to see if we could
1:57:31implement internal janitorial through
1:57:33them and get rid of that contract to see
1:57:35how that would um the cost would
1:57:37outweigh the benefits and see how that
1:57:39played out. It hasn't happened yet.
1:57:41We're kind of waiting for the ordinance
1:57:44for Galleria Hall to be able to pay
1:57:46those employees through that fund
1:57:48instead of taking it out of our general
1:57:50fund cost to help reduce the general
1:57:52fund cost side of things. But we have
1:57:55with Austin's predecessor, we did
1:57:57discuss that move.
1:57:59>> Okay. Um and then I see that you guys
1:58:02have generator maintenance uh in your
1:58:05budget, $300,000 for maintenance and
1:58:08repairs. Um any idea of how many
1:58:11generators the city actually owns?
1:58:15>> We have uh roughly 80 or so generators.
1:58:18>> 80. Okay. Um
1:58:21and they're spread out across
1:58:23departments and buildings.
1:58:25>> Correct. Um obviously we have city hall,
1:58:28the police departments, um fire um our
1:58:33uh multi-ervice centers, Galleria Hall.
1:58:35Oh no, Gallery Hall, correction there.
1:58:37But um those are the ones that we have
1:58:39all across the city.
1:58:40>> Okay. And do you guys account for fuel
1:58:43costs in your budget? No. Is that
1:58:46accounted for elsewhere?
1:58:48>> Yeah.
1:58:48>> It's in EMD's budget.
1:58:49>> EMD. Okay. All right. That's all I have.
1:58:52Thank you.
1:58:53>> Thank you,
1:58:53>> Council Member McCarron. Um
1:58:55[clears throat] just again on the
1:58:57Gallier Hall. Um how many So how many
1:59:01employees do you think you could put on
1:59:03on the Gallier Hall um fund?
1:59:08So, I've got one engineer. You want to
1:59:11hear me?
1:59:11>> Yeah. Go ahead, please.
1:59:12>> So, I believe right now we have um one
1:59:15engineer, we have an a supervisor who's
1:59:18over there, and we have two employees
1:59:20under that supervisor over there. Um if
1:59:23we hired, we were thinking maybe two
1:59:26labor maintenance janitorial positions.
1:59:29Um kind of like a combination where we
1:59:31talked about cross trainining earlier.
1:59:32some those laborers who could um work
1:59:36special events but also help with
1:59:37cleanup and things like that. Um I feel
1:59:39like with the money that's generated
1:59:42through Gallier Hall, all of those
1:59:44employees could be paid out of that
1:59:46fund.
1:59:46>> Yeah, I was going to ask do you know um
1:59:48and Brandy this might be for you. How
1:59:50much revenue do we do we receive
1:59:52annually in that fund?
1:59:54>> Roughly 800,000 year to date so far
1:59:57we've had about 540,000 Galia Hall fund.
2:00:00>> Okay. And it has, according to the the
2:00:02last budget report, I think it was
2:00:05uh ending balance as of 831 of 1.15
2:00:08million. Does that sound about right?
2:00:10>> Yes. The same report that I'm looking
2:00:11at. Yes.
2:00:12>> Is there is there any employees on that
2:00:15fund this year?
2:00:17>> No, we can't have them until the
2:00:18ordinance. Correct. Okay. So now it's
2:00:20just used for operating for property
2:00:23management any other department.
2:00:26>> Sometimes we'll use some Migar
2:00:27expenditures if they're specific to
2:00:28Galia. Okay. Yes.
2:00:31>> Okay.
2:00:31>> And [clears throat] I guess Mulpa, I
2:00:33need to uh talk to Liz after this. Like
2:00:35I said, I've been on the job two weeks.
2:00:37Um it sounds like y'all have already
2:00:38maybe worked on that ordinance that I'm
2:00:40referencing. Um and and so that may
2:00:43already be complete or work in progress,
2:00:45but I'll I'll certainly get with Liz
2:00:47Brusso and um follow up with y'all as
2:00:49necessary.
2:00:50>> Yeah. If it's not, let's let's do that.
2:00:52I think, you know, you've heard from all
2:00:53of us on here that, you know, we'd like
2:00:55to be able to have y'all use that since
2:00:58it's it's a funding source and that, you
2:01:00know, you actually have employees that
2:01:01are working on that. So, here's Liz.
2:01:03Okay.
2:01:18>> I understand for this year, I don't know
2:01:20that they can get that done. You know,
2:01:22they could I don't know when you guys
2:01:24can shift people over, but the ordinance
2:01:26itself did pass to open up the language
2:01:28to allow for personnel funding to come
2:01:29out of Galler Hall. If I remember
2:01:31correctly, the cemetery ordinance had
2:01:34already the sentiment to the cemetery
2:01:36fund already allowed for that. But yes,
2:01:38that is something that we did and I'll
2:01:40make sure to circulate the certified
2:01:41copy of that ordinance to y'all.
2:01:43>> Okay. So, if we then if we're already
2:01:45able to do it, then I I would recommend
2:01:47that we make that change in the in the
2:01:50you know, omnibus amendment going
2:01:52forward that Yeah. that property
2:01:54management can use that.
2:01:55>> Thank you.
2:01:56>> Thank you,
2:01:58>> Council Member Green.
2:02:00Hello folks and thank you for your
2:02:01presentation. U Mr. Nelson, I'm going to
2:02:03ask for your assistance in one more
2:02:05area. This is ninth ward day today. As
2:02:08far as I'm concerned relative to
2:02:09projects, a community that's been
2:02:11ignored in the past, I'm going to ask
2:02:13you to specifically go to Desire and
2:02:16Florida, the former city health clinic
2:02:19on the 26th of November. Even though
2:02:21this is not the reason to have this as a
2:02:23goal, thousands of people are going to
2:02:25pass by that location that is owned by
2:02:27the city of New Orleans and it's
2:02:28blighted. And unfortunately, the
2:02:30criminals are using it as a place to
2:02:32dump because they think that the city
2:02:34doesn't care. Help us out with that
2:02:36project. You'll know what to do when you
2:02:38go by. Just send some people by with
2:02:40weed eaters and clean up that dumped
2:02:42area and um let the people see that that
2:02:45community is getting the attention that
2:02:47it deserves.
2:02:48>> Yes, sir. And I'd be remiss if the um my
2:02:52bosses didn't set up. We have a meeting
2:02:54set up with property management, parks
2:02:56and parkways um DPW
2:03:00uh and others um coming up this month
2:03:0210:20. So we can definitely add that to
2:03:04the agenda there about how we're going
2:03:06to combine labor sanitation as well.
2:03:08Sorry. Uh combine labor forces uh to
2:03:11accomplish tasks such as that. I think
2:03:13that's a great one.
2:03:14>> I appreciate it. You all have been on
2:03:15the case with regards to many
2:03:16infrastructure projects. So, I'm asking
2:03:18you specifically on that one. It's
2:03:20embarrassing for people to have to walk
2:03:23in the street to walk past a city
2:03:24property because the grass is overgrown.
2:03:26Not putting you all on the spot because
2:03:28I know between now and November 26,
2:03:30there's probably going to be something
2:03:31done there and it's been a long time,
2:03:33but that's a special project relative to
2:03:35this year when crime is down in that
2:03:37community, when people are building a
2:03:39couple of new houses, where we've got
2:03:41our multi-purpose center rolling, where
2:03:43we've got construction going on streets.
2:03:45Let's address that very obvious eyesore
2:03:48at that particular location and thank
2:03:50you for all of the work that we do
2:03:52combined. I'm asking you for that one
2:03:54specifically.
2:03:54>> Yes, sir.
2:03:55>> Thank you.
2:03:57>> All righty. If there are no more
2:03:58questions, the last department is
2:04:00Department of Public Works.
2:04:20control.
2:04:25Thank you.
2:04:34You going to drive for me, please?
2:04:35Excellent.
2:05:04Um
2:05:06Yeah.
2:05:11>> All right. Last but not least, DPW.
2:05:14>> All right. Very good. Thank you all very
2:05:15much. Steve Nelson, director of public
2:05:17works. To my left, Kyle Hman, our budget
2:05:19director. Brandy, thank you. Thank you
2:05:21for having us here. It is a pleasure.
2:05:23Starting with the org chart, I wanted to
2:05:25touch on a couple of different items.
2:05:27Um, we have, uh, and we've talked about
2:05:29it a couple of times this morning, but I
2:05:31think it bears repeating, 80 employees
2:05:33under underneath the secretary of the
2:05:35Department of Public Works, which is
2:05:37essentially our operations division. DPW
2:05:40has kind of five uh, five primary
2:05:43programs. There's the JIR FEMA program,
2:05:45which has 11 DPW employees. As I've
2:05:48mentioned before, we intend to bring on
2:05:50a project management consultant on the
2:05:52bondf funed side of the house so that we
2:05:54can save slots for those individuals who
2:05:57are being trained, who are delivering
2:05:59this massive uh 300 plus million dollars
2:06:02over the next two years. So, we want to
2:06:03have a good place for those individuals
2:06:05to land when they come over. And we've
2:06:07laid aside, and you'll hear this as a
2:06:09repeating theme throughout this
2:06:10presentation, utilizing bond funds uh
2:06:13and doing so on a recurring basis.
2:06:15setting aside enough bond funding so
2:06:17that we can have the salaries, benefits,
2:06:19materials and equipment for 10 years
2:06:21worth of delivery, not just one year. We
2:06:24don't want to treat this like a singular
2:06:26uh revenue source. Uh the chief of
2:06:28engineering which is run by wind fan
2:06:31this is a group that as across across
2:06:34the department of public works we're
2:06:36growing. We have two new engineers in
2:06:38training or EIT starting next week. our
2:06:41chief traffic engineer, Alyssa Bienn.
2:06:43She has been a critical hire for us this
2:06:45year. We were without a a chief traffic
2:06:47engineer for over three and a half
2:06:49years. Uh she's been with us a handful
2:06:51of months. She has another two tech uh
2:06:53EITs starting next week. Uh so that's
2:06:56four new engineers in training that are
2:06:58going to support our department. Um the
2:07:01uh budget coordinator of course that's
2:07:03Kyle Hman. He does a yman's effort.
2:07:05You've seen him uh this morning as well
2:07:07as a number of different times. He's a
2:07:09great great resource for us and has a
2:07:11very very effective team. And then of
2:07:13course our deputy director uh which is
2:07:15basically our head of operations. That's
2:07:17Scott Bole. He was formerly the region 2
2:07:20district engineer for the department of
2:07:21transportation. Worked there for over 30
2:07:23years. He's been another key hire for
2:07:25us. Um within his group which is all
2:07:29within uh the responsibility of the
2:07:31director of public works is ground
2:07:32transportation bureau. And we'll touch
2:07:34on this a little bit. GTB included
2:07:37parking enforcement up until about May
2:07:39of this year and then parking
2:07:41enforcement was transferred over to
2:07:42NOPD, but the functions around the
2:07:45licensing of cabs, CPNC's and the like
2:07:48remains within the Department of Public
2:07:50Works for now. Um they have uh 17
2:07:54employees. About a dozen of those handle
2:07:57inspections out at the RTA's yard out in
2:08:00the desired neighborhood. Uh and we have
2:08:02about four individuals who are helping
2:08:04with the CPNC licenses. They recently
2:08:06came off a furlow so that we could
2:08:08increase the productivity there and I
2:08:10believe they're doing a lot of work
2:08:11there. That's a group that's led by
2:08:13Delicia Kraton, Yolanda Brownfield. They
2:08:15do really really good work and they work
2:08:17very hard. The Secretary of the
2:08:19Department of Transportation is Tim
2:08:21McConnell. It's been another key hire
2:08:23for us. You'll hear this as a recurring
2:08:24theme. We have around 80 employees right
2:08:26now. Uh that's up uh including as of
2:08:30today we have 47 brand new paving
2:08:33employees. We started the year with
2:08:35about a dozen. Next Monday we will have
2:08:3850 new paving employees. So we will have
2:08:40gone from 12 paving employees to 64 65
2:08:45employees [clears throat]
2:08:46uh by the end of October which is a huge
2:08:48improvement for us. And that group I am
2:08:51so proud of the work that we're doing.
2:08:53uh the first day of the mayor's uh term
2:08:55on January 12th, she said, "Steve, I
2:08:58want us paving concrete." And this
2:09:00sounds like rudimentary stuff because it
2:09:02is, but the Department of Public Works
2:09:04had not mixed and poured its own
2:09:05concrete in-house since before Hurricane
2:09:07Katrina. So, we had a major press event
2:09:10around a 2x3 segment of concrete. And it
2:09:13seemed like a small thing and it was at
2:09:15the time, but it has laid the groundwork
2:09:17for the ability of the Department of
2:09:18Public Works to be pouring hundreds of
2:09:20linear feet of sidewalk each and every
2:09:23week. We're doing it around AL Davis
2:09:25Park. We finished off a really important
2:09:27project there last week. We're in New
2:09:29Orleans East uh down by Park Brittany
2:09:32pouring concrete sidewalk where there
2:09:34was no concrete sidewalk before. We're
2:09:36doing it with in-house personnel. We've
2:09:38got three, four, five crews a day
2:09:41working across the city. And I'm going
2:09:43to talk about some efficiencies that
2:09:45we're gleaning there. On the street
2:09:47light side, we started the year with
2:09:48zero electricians. None. We now have
2:09:52multiple electricians, multiple
2:09:53inspectors, and we're able to do things
2:09:56like canvas the entirety of the lower
2:09:589inth ward so that we can ensure that we
2:10:00capture all of the lights that are off,
2:10:02turn on the street lights, and uh put
2:10:05ourselves in a position where we're not
2:10:06chasing our tail, where we're getting
2:10:08proactive with light replacements. That
2:10:10team has exercised uh they've done work
2:10:12on over 12,000 lighting work orders this
2:10:15year. They've turned on almost 9,000
2:10:18lights. Uh and they've done a really
2:10:20really uh yman's job I think is a term
2:10:23we've heard a number of different times.
2:10:24Traffic signals falls within the
2:10:27secretar's office. I drove Claybourne
2:10:29Avenue twice this week just to ensure
2:10:33that Washington Napoleon and uh where's
2:10:37what's the other one? Nashville were not
2:10:39in flash. None of them went into flash
2:10:41prior to that. Every time it rained the
2:10:44lights would go into a red flash mode.
2:10:47And it's simple to fix. you, the
2:10:49operator would just go out and hit the
2:10:51reset button. But in the time that
2:10:53passed, that is not a good way to
2:10:55operate. My personal biggest goal, and
2:10:58we'll talk about it in a bit, is zero
2:11:00fatalities on City of New Orleans
2:11:03streets. We want to get to that place,
2:11:05safer streets, and that is that is a
2:11:08great goal, I believe, for all of us to
2:11:10have within the administration. And it
2:11:12crosses not just DPW, but it's public
2:11:14health, NOPD enforcement. I I will say
2:11:18here that August was the first month in
2:11:2010 years with zero fatalities in that
2:11:23given month. And so we are on a track
2:11:25this year. Even one is too many, but
2:11:28we're really using that as our guiding
2:11:29light. Traffic signs uh we have a good
2:11:32group there. We're working to automate
2:11:34their their um automate their operations
2:11:38and track them through a much more
2:11:39effective work order management system.
2:11:41And we're also responsible for ditches
2:11:43uh and coverts as well. That's the one
2:11:46kind of vestage from the drainage
2:11:48consolidation in 2025 uh that we still
2:11:51maintain. We have a continuous uh
2:11:53improvement administrator that
2:11:55essentially is someone that handles our
2:11:56GIS mapping and our work order mapping
2:11:58system. Uh and we also have a some
2:12:01communication support. We have three
2:12:03employees there. You're familiar with
2:12:04Kristen, Elise, and Andrew. I'm sure
2:12:06there's a lot of work that goes on uh
2:12:08communicating traffic closures, project
2:12:12updates, etc. Um, one thing I did want
2:12:14to touch on as well, we talked about all
2:12:16these new hires. There's this narrative
2:12:18out there that New Orleians don't want
2:12:19to come to work. You're not going to
2:12:20find enough people. We had over 250
2:12:23applicants for these paving positions.
2:12:25New Orleians want to come to work. And I
2:12:27am proud to be able to be a part of
2:12:29providing a living wage job for
2:12:31individuals with a retirement, with
2:12:33health benefits, and we're going to
2:12:35continue looking for folks. If you're an
2:12:36electrician, if you're a laborer, if you
2:12:38want to come work for the city, come
2:12:39apply. We want to see your application
2:12:41because we have the ability to grow and
2:12:44we'll talk about if we go to the next
2:12:45slide uh how we are able to do that
2:12:48because when you look at these numbers
2:12:49it looks like we're taking a
2:12:51considerable haircut which we are and
2:12:53it's not that this is a zero sum issue.
2:12:56It does have an impact for us and
2:12:58everyone's heard it probably four or
2:13:00five times but the budget that you see
2:13:01that adopted 19.9 million is not cash.
2:13:06This year has been a unique year in that
2:13:09I've had I cannot count the number of
2:13:11times folks have come to me and said,
2:13:12"Steve, we've got it in our budget.
2:13:14We're at 75% of the year right now.
2:13:16We've spent 30% of the budget." I don't
2:13:19actually have a budget this year,
2:13:20though, because we have had to overcome
2:13:23some significant hurdles. So, when you
2:13:25look at a cut of $9.8 million from 26 to
2:13:2827, that is serious. That's $10 million
2:13:31we could use for something else. So
2:13:33thankfully at the beginning of the
2:13:35administration
2:13:37uh it was clear to me we were we were
2:13:38able to use bond funds to pay for
2:13:41project managers salaries that are
2:13:43managing bond funded projects. So um the
2:13:46CEO, the mayor and myself got together.
2:13:48We were talking about how are we going
2:13:50to achieve these things like turning
2:13:51lights on and all the things we're
2:13:53talking about hiring additional
2:13:54employees. uh and it came across our
2:13:57minds that if we can pay project
2:13:59managers out of bond funds, can we not
2:14:02pay the individuals who would actually
2:14:04do the physical work? And so we got
2:14:06together with the legislative auditor as
2:14:08well as our bond council Jason Acres and
2:14:11it was established that yes, as long as
2:14:13those individuals are doing bond related
2:14:15work. So we can't do things like fill
2:14:17potholes because it doesn't last 10
2:14:19years or more. We can't do things like
2:14:21crack seal, but for the full depth
2:14:24patching of asphalt, for concrete
2:14:26sidewalks, traffic signals, the control
2:14:29boxes, anything with a life longer than
2:14:3210 years, we can utilize bond funds for
2:14:35that. And so that's why you see with the
2:14:37general fund having a budget of 10
2:14:40million, I would love to have it to uh
2:14:41as 20 or 30. And there are some things
2:14:44that we will have to do this year.
2:14:46Traffic striping. Striping on streets
2:14:49does not fit within the bond fund
2:14:50category, but it is critical to public
2:14:52safety. So, we're going to really be
2:14:54putting a lot towards traffic striping
2:14:56this year. Those sorts of things and
2:14:59being able to parse it and kind of
2:15:01change the way that we keep time. HR has
2:15:04been extremely helpful, as has civil
2:15:06service, in developing time sheet codes.
2:15:09So, I worked in the private sector for
2:15:11the better part of 20 years. I'm very
2:15:13used to filling out a time sheet as a
2:15:15consultant with different line items.
2:15:17We've had to had to change the way we do
2:15:19business around having multiple line
2:15:22items on people's time sheets so that
2:15:24they can accurately track their time and
2:15:26ensure that we are uh we are properly
2:15:28and accurately allocating time between
2:15:31general and bond fund. So, some key
2:15:34components of the 27 budget as I
2:15:37mentioned before uh C uh contracts and
2:15:40ground transportation bureau trans uh
2:15:42transition of some select positions
2:15:44there ensuring that we are updating the
2:15:46funding for multiple positions and that
2:15:48we're budgeting personnel costs across
2:15:50bonds. This is what I was alluding to
2:15:52with the ADP time sheets being able to
2:15:54split salaries and do so accurately. Um
2:15:57other operating funds, we had the
2:15:59transfer of towing and empoundments. I
2:16:01mentioned that that totals out to about
2:16:02$1.18 million uh out of 20 year uh FY26.
2:16:08In addition to the utilization of bond
2:16:10funds, we have some community
2:16:11development block grant funding that we
2:16:13will talk about here just in a moment
2:16:15and the ability uh to use $4 million out
2:16:18of that CDBG funding to offset uh and
2:16:21use that towards some of these gen
2:16:23otherwise general fund expenses. And
2:16:26then remaining reductions are due to the
2:16:28maximization. Again, I mentioned this
2:16:29will be a recurring theme. Maximizing
2:16:31the use of bond funds for eligible
2:16:33capital improvements. And again, that's
2:16:35anything longer than 10 years and over
2:16:375,000 in value. Some of those
2:16:40non-general fund expenditures that we
2:16:42talked about
2:16:442026 budget to 27 budget with personnel,
2:16:47you see a significant increase there. Uh
2:16:50that's again where we're transferring
2:16:51salaries over to utilizing bond funds. I
2:16:54think to council member Harris's comment
2:16:55later, yes, we could use utilize that to
2:16:58pay a contractor, but it is much more
2:17:01cost effective for us to be able to make
2:17:03sidewalks, streets, lighting, and
2:17:06traffic signal repairs in house than it
2:17:08is with a contractor. That is not to say
2:17:10that we will not utilize contractors.
2:17:13We've got tens of millions of dollars in
2:17:16needs and then we have rightaway
2:17:18contracts for districts A through E that
2:17:20are going to be advertised here over the
2:17:22course of the next month.
2:17:24But we can leverage and multiply our
2:17:26effectiveness when we utilize more of
2:17:28that internal labor. So uh that's the
2:17:32the other operating we do see a
2:17:33reduction there from the adopted budget
2:17:35of 26 to 27's proposed budget which
2:17:38again we are cash b we're on a cash
2:17:41basis this year. So having an actual
2:17:43budget that we can work to is going to
2:17:44put us in a better situation so that at
2:17:47the end of end of the year our total
2:17:49goes from 10.5 million to 9.3. Again, a
2:17:52reduction is not all good news, but we
2:17:55do have a workaround to allow us to be
2:17:57able to hire on those additional
2:17:58individuals and deliver on the basics.
2:18:02Some of those key components of the
2:18:03proposed non-general fund 2027 budget.
2:18:06Um Kyle uh included in here the the IMF
2:18:10fair share IEB funds that has been fully
2:18:13transfer transferred over uh to the
2:18:15general and capital fund. Again, most of
2:18:18that being capital and bond funded. 60
2:18:21uh employees funded entirely through
2:18:23bond funds. But again, we're working
2:18:25with those time sheet uh work order line
2:18:27those time line items to be able to
2:18:30utilize accurately when I'm working on a
2:18:32capital project. I am billing my time
2:18:34against the capital expense. That's
2:18:37removing the burden from the general
2:18:38fund and accurately keeping track of
2:18:40time. where we can place uh materials,
2:18:43equipment, and other items with a
2:18:4510-year life. We have those things
2:18:47documented, and we are utilizing bond
2:18:50funds for that. And Kyle, uh we alluded
2:18:52to earlier that $4 million in community
2:18:54development block grant funding that's
2:18:56going towards traffic signal repairs,
2:18:58traffic engineering services, some of
2:19:00that traffic striping that I mentioned
2:19:02earlier, and then some of our materials
2:19:04like asphalt, uh asphalt, concrete
2:19:07signage, etc. One other uh uh pot of
2:19:10other operating funds is the remainder
2:19:12of that energy p penalty settlement. We
2:19:15had right around $3 million if I recall
2:19:18correctly at the beginning of the year.
2:19:192.8 something around those those uh that
2:19:23number. We've got about half of that
2:19:24spent. The other half we will spend in
2:19:262027 and that will be dedicated to uh
2:19:29major roadways like Interstate 10, the
2:19:31highrise 610 etc.
2:19:34looking at budget efficiencies.
2:19:36Um, again, this is one of those
2:19:38situations where bond funds, maximizing
2:19:41the use of bond funds. I'm mentioning it
2:19:43over and over and over again. It's how
2:19:45we're able to do what we're able to do.
2:19:47Uh, reducing some of those external
2:19:49vendor contracts. Again, we're not
2:19:51cutting contractors out. We're And I
2:19:53want to be clear, too, we're maximizing
2:19:55the use of our DBE program. We have a
2:19:57set aside uh on the street right now uh
2:20:00for uh sidewalk paving. We've we've
2:20:03tailored folks. I've met with a number
2:20:05of groups on a number of different
2:20:07occasions looking at the the appropriate
2:20:09size and scope of contracts that will be
2:20:12most competitive for our DBE partners.
2:20:14And what I heard was that bonding
2:20:16capacity is a significant challenge. So,
2:20:18we have uh right now a sidewalk paving
2:20:21contract. That's a scope that a number
2:20:23of DBE providers have in the community.
2:20:25And bonding capacity, so right around a
2:20:28million dollars, so it's not going to be
2:20:29overly burdensome on folks bonds. In
2:20:32addition to that, we're going to have
2:20:33that 35% participation in any contract
2:20:36we advertise publicly. And that's so
2:20:38that we can take those federal dollars
2:20:40as well as the bond dollars and keep
2:20:41them here within the community as much
2:20:43as possible. We're making sure that we
2:20:45have tighter controls on non-essential
2:20:47spending. We've canceled non-use cell
2:20:49phones. We're reducing office supply
2:20:51purchases. As a former sewage and water
2:20:53board employee, and I sit as the mayor's
2:20:55designate, I don't drink bottled water
2:20:57ever. So, drinking it out of the tap is
2:20:59reasonable for us. And I think that's a
2:21:01reasonable if minor expense. I mentioned
2:21:04it a number of different times, but
2:21:05disciplined timekeeping. We talked about
2:21:08the budget being at 75% of the year with
2:21:1130% of the budget expended only happens
2:21:14through the discipline across the team
2:21:16and ensuring that everyone is aware of
2:21:18where we are, where we're going, and how
2:21:20we're going to get there. And I think
2:21:22we're learning those lessons and baking
2:21:24them into our mindsets. Some of our 2027
2:21:28goals, I mentioned it earlier, starting
2:21:30with zero fatalities. And folks may
2:21:32wonder, well, what does that have to do
2:21:34with smoother streets? I believe that it
2:21:36fully it touches every area that public
2:21:38works as well as NOPD. I got an email
2:21:41someone was upset about getting a
2:21:42speeding ticket a couple of weeks ago,
2:21:44and it's I I'm sorry, but we have to
2:21:47follow the speed limit. The rules are
2:21:49there, and we see the effect. It changes
2:21:51human behavior. So, we're going to do
2:21:53those things to keep one another safe.
2:21:55We're working actively and and with
2:21:58great urgency to reduce weight times.
2:22:01So, some of the some of the issues when
2:22:03we started in January of 2026, we didn't
2:22:06even know what the average weight time
2:22:08was for any of those 311 requests that
2:22:10we had. And I think part of it is that
2:22:12it's scary to understand what some of
2:22:14those weight times are. But in order to
2:22:16address a problem, one must first admit
2:22:19that one has a problem. And when we
2:22:21computed those averages, street lights
2:22:24were on average about 450 plus days.
2:22:27Traffic now, not stop signs, I want to
2:22:30be clear, but street name signs, 8 900
2:22:33days. These are metrics that are
2:22:34unacceptable by any standard anywhere.
2:22:38And so by starting with a baseline of
2:22:40understanding where the wait times are,
2:22:42we've been able to appropriately apply
2:22:45resources. Street signs, we're now down
2:22:48to 700 or so days. grossly unacceptable,
2:22:52but we at least know where we are and
2:22:53we're on the right path. Street lights,
2:22:56we've gone from 450 days to just over
2:22:59200 days. We're going to be at less than
2:23:00100 days by the end of the year. And I
2:23:03believe that we we have to be at 30 days
2:23:05or less for a street light being out by
2:23:07the end of next year. And I believe that
2:23:08we're going to get there. I want us to
2:23:10be where at a place where every work
2:23:12item is 30 days or less. There is no
2:23:15reason why we shouldn't be able to get
2:23:17to that place. and building the team
2:23:19that we're building with the with the
2:23:21street maintenance group that's doing
2:23:23not just potholeing. Potholes are
2:23:25important and we will get to a place
2:23:27where we can do 1500 in a week, but if
2:23:30I'm putting 500 pothole patches in a
2:23:32given block, I'm not doing that block
2:23:34justice. That block needs to be milled
2:23:36and overlaid or completely replaced. And
2:23:39we are going to be at a place this year,
2:23:41we're going to mill and overlay our
2:23:42first block internally with our own
2:23:44equipment and our own personnel. And
2:23:46that's going to set us up to a place
2:23:47where we're doing one or multiple blocks
2:23:48a week next year with our own internal
2:23:50personnel. We've got to improve and
2:23:53continue to grow our coordination with
2:23:55sewage and waterboard with that timeline
2:23:56of 2028 integration together. Um the
2:24:00infrastructure coordination council ICC
2:24:02and other vehicles. We've got to utilize
2:24:04those things like Procore where we're
2:24:05working together. The lead service line
2:24:07replacement program. These are all
2:24:09opportunities for us to grow in terms of
2:24:12coordination, working together and and
2:24:15complementing the work that one another
2:24:17is doing. Also, we talked about it a
2:24:20couple of times already today. The
2:24:22execution of the JIR and the bond
2:24:24funding programs on schedule and within
2:24:27budget is an absolute must. Um, I've
2:24:30told my team this multiple times, not
2:24:32just with JR, but also with the bond
2:24:34funding program. We have got to get this
2:24:36money expended and done so efficiently
2:24:39so that our residents can see the
2:24:41effect. If we get to the end of 2027 and
2:24:44we've spent 15% of the bond fund
2:24:46allocation, that will be a gross
2:24:48failure. I need to be at Joe Juso's door
2:24:51in Q4 27 begging him for more cash. Not
2:24:55necessarily on the payroll side. That's
2:24:57budgeted for the next decade. But our
2:24:59contractors, we want to have them have
2:25:01spent all of the funding so that the
2:25:03streets are smooth and drivable. A great
2:25:05example is St. Charles Avenue from
2:25:07Jefferson to Napoleon. That mill and
2:25:09overlay, clean, smooth, well
2:25:12communicated, and you end up with an end
2:25:14product that is very userfriendly with
2:25:16minimal disruption. That's the sort of
2:25:18model we want to have. Also, we're going
2:25:21to change the way that we're doing
2:25:22business within our maintenance group.
2:25:24Up until this point, we've been working
2:25:26across the city on any given day. We'll
2:25:29have a crew somewhere in each of the
2:25:30five council districts. We want to
2:25:32change that up a little bit. Something
2:25:35we saw uh in 2026, there have been at
2:25:38least three different instances where
2:25:40we've been doing work in a specific
2:25:41neighborhood, whether it's 4x6 with the
2:25:43Embutu team in Central City or working
2:25:46out in New Orleans East or the Lower 9th
2:25:48Ward or in Canal Street, uh with some of
2:25:51those with the mayor's executive order.
2:25:53We looked at those weeks and the numbers
2:25:54were considerably higher. We filled way
2:25:57more potholes. We turned more lights on.
2:25:58We replaced a lot more signs. And that's
2:26:01because we were in a specific area. It's
2:26:04easier to manage. It's easier to stage.
2:26:06The communication is cleaner. So, we're
2:26:08going to move from doing work across the
2:26:10city to focusing on 10x 10 sections of
2:26:14the city. And we're going to start that
2:26:15within the next couple of weeks on just
2:26:17putting our crews in one location and
2:26:19being in that neighborhood for about a
2:26:21week's time. So, getting as many lights
2:26:23turned on, as dressing as many streets,
2:26:26uh, as many streets and sidewalks as
2:26:28humanly possible in a given week so that
2:26:30we can maximize the effect. And I
2:26:33believe that neighbors and neighborhoods
2:26:34are going to see that we shouldn't be
2:26:36driving past a 6-month-old 311 request
2:26:39just to do the 10-year-old request. We
2:26:41should do both of them at the same time.
2:26:43And we're in one neighborhood. I believe
2:26:44that we can do that. And that's kind of
2:26:46scratching the surface of of what we're
2:26:48trying to do with within the Department
2:26:50of Public Works. With that, I would like
2:26:52to thank the council for everything that
2:26:54you all are doing, your staff and your
2:26:56offices. Our goal really is to put you
2:26:58out of business. I don't want to be one
2:27:00of the top three complaint getters that
2:27:02you all have. I know that's where we're
2:27:03at. We are not where we need to be right
2:27:05now, but I can see it from here. I
2:27:07believe that we're going to reach that
2:27:08place. Uh we have a great team. Uh and
2:27:11appreciate you all's support and would
2:27:13be happy to answer any questions that
2:27:14you may have.
2:27:15>> Thank you, Steve. Uh it was a pleasure
2:27:17to work with you um when you're at sirin
2:27:19waterboard and it's it's you and your
2:27:22team have done a really great job. Uh Al
2:27:25Davis looks beautiful. I passed by it
2:27:27today. It looks really good and I'm glad
2:27:28you were able to save that tree um which
2:27:31really is an asset in Central City. We
2:27:33see very few trees in Central City. Um I
2:27:36do want to talk about the the safety um
2:27:38Chapatulus traffic study. Has that been
2:27:40completed?
2:27:42We have some What we've got to do is get
2:27:44out there and get that striped. We
2:27:46already have some action items. I
2:27:48believe I executed a purchase order on
2:27:50the striping of that last week, but I
2:27:52will follow up. That is a very important
2:27:54location.
2:27:55>> It's um dangerous and people are going
2:27:57from uh getting tacos and and sandwiches
2:28:01and and crossing over Chapatulus and
2:28:04people have actually gotten hit. Um, so
2:28:06just making sure that we keep our foot
2:28:08on the gas on that traffic study would
2:28:10be great. Um, on the um, in-house work,
2:28:15have you done a costbenefit study for
2:28:17not only personnel but materials?
2:28:20>> Yeah, on materials, I mean, anything you
2:28:23you anything that a contractor
2:28:25purchases, you'll pay a 10% or more
2:28:27markup. Um, depending on the size and
2:28:31the scope of the work. We're pro we're
2:28:33not within DPW the vision is not to do
2:28:35like a six block stretch of full full
2:28:38replacement. Um but for things like
2:28:41routine sidewalk repairs it's a/4 to a
2:28:44fifth or less uh when you do it inhouse
2:28:47and you have more flexibility. You're
2:28:49not running in you you run into the
2:28:51roots around that tree around Al Davis.
2:28:54I'm not dealing with a change order.
2:28:55We're just moving it around. Tim
2:28:57McConnell's calling parks and parkways
2:28:59and we just get it done.
2:29:00>> Yeah, Tim's been great. Um, so do you
2:29:04have adequate space to store these
2:29:05materials? For example, the concrete
2:29:07used to repair Al Davis, those are that
2:29:10was an complete replacement. It wasn't
2:29:11just a repair.
2:29:12>> Correct. Yeah. So, at this point, yes,
2:29:14we do have space for it. But, um, one of
2:29:16the things that we do need to make sure
2:29:17is we get the warehouse out there
2:29:19cleared. Uh, getting the yard cleaned
2:29:21up. That was one of the first things
2:29:22that Tim did was getting some trailers,
2:29:24some empty, vacant, unused trailers off
2:29:27the site. Uh, so we do have plenty of
2:29:29space at the moment, but that is
2:29:30something we're going to have to keep uh
2:29:32keep on top of um is making sure that
2:29:34we've got good safe storage.
2:29:36>> Do we have a a good record keeping
2:29:38system for the inventory uh that we
2:29:40have? For example, stop signs.
2:29:43>> Yes. So, we we have a system for it. It
2:29:46has not yet been fully implemented. So,
2:29:48prior to September of last year, we
2:29:51didn't really ha we didn't have an asset
2:29:53management system. We're now using a
2:29:55system that's uh run by open
2:29:58gov/cardigraph.
2:29:59So if you hear those names, it's the
2:30:01same thing. And the departments, the
2:30:04subd departments within public works
2:30:05have been implementing that
2:30:07individually. So I use kind of crude
2:30:10terms from the Jetsons to the
2:30:12Flintstones. Street Lights were the
2:30:14first to adopt and so they their data
2:30:18around work orders and it manages the
2:30:21asset, the work order and what inventory
2:30:24we have. Okay.
2:30:25>> So all of those things are together.
2:30:26Street signs is the last and we're in
2:30:29the very final stages of getting that
2:30:31getting that off the ground. So this
2:30:33year we will have that in in the system.
2:30:35>> And we have in-house uh street sign
2:30:38creators.
2:30:38>> We do. Yes, we we make many of our own
2:30:41street signs. Uh, I believe that we do
2:30:43actually have a good number of staff
2:30:45there. And for response times on things
2:30:48like a down stop sign or a one-way sign,
2:30:51I believe that we do a good job. I
2:30:53believe that we're there within 24
2:30:54hours. It's that routine stuff like a
2:30:57street name sign. It's still important.
2:30:59It shouldn't take 2 years to get it
2:31:01done. It's just that we haven't had the
2:31:04work order tracking to flag those sorts
2:31:07of things. And we're in the process of
2:31:08implementing that now. We have a lot of
2:31:10peeling street signs in district B. Yes,
2:31:12that need to be replaced. I'm sure Matt
2:31:14has a list of all of those, so we'll get
2:31:16that over to you. There's also, this is
2:31:18very picky, but there's also a stop sign
2:31:20missing and homemade stop signs put into
2:31:23place at Second Ember Ron Street. So,
2:31:25just take a note of that. Um, we're also
2:31:27seeing an uptick in traffic signals
2:31:29being hit by cars. Have we ever looked
2:31:31at recovering from insurance companies,
2:31:34the cost of repair and replacement of
2:31:36those traffic signals? Yes. And I'm
2:31:39turning to Nick Bliss, who is our
2:31:40structural engineer. He brought that up.
2:31:43We we're going to be actively working
2:31:44with our risk management team.
2:31:47If if someone is careless or negligent
2:31:51and runs into a piece of infrastructure,
2:31:53my feeling is we should be responsible
2:31:54for our actions and that should include
2:31:56the replacement of infrastructure and
2:31:58the right of way.
2:31:59>> I I agree. Um Okay. I do want to talk
2:32:02about the uh positions that went over
2:32:05from DPW to NOPD in parking enforcement.
2:32:09Uh we did get um some questions to the
2:32:13LLA about sort of a staff audit because
2:32:16we heard about a couple positions that
2:32:19were transferred over. We're not sure if
2:32:21the budget for those positions was also
2:32:23transferred, but the people weren't
2:32:24there. There was one person who was
2:32:26dead, another who had retired. So, have
2:32:29you do you have any information about
2:32:32any sort of staff audit in your shop?
2:32:35>> Um, within GTB, I believe all of the
2:32:38positions that we've got right now are
2:32:40filled by by actual employees. If
2:32:42anything is vacant, uh, we would not be
2:32:44expending those those dollars and cents,
2:32:46but I am aware of that situation.
2:32:48>> Okay. And I think that's it. Again,
2:32:52thank you for your uh, attention to Al
2:32:54Davis Park. It's been a long time
2:32:56coming. looking forward to the
2:32:58Chopatulis study. And with that, Council
2:33:00Member McCarron.
2:33:01>> Thank you, Madam Chair. Um, thank you,
2:33:03Steve, and to your team. I see some of
2:33:05your team over here. You guys are very
2:33:07responsive and and I'm glad you brought
2:33:10up the St. Charles Avenue cuz that was
2:33:12one where um we had found out that there
2:33:15were like two blocks that weren't going
2:33:17to be completed and we reached out and
2:33:19you guys were able to very quickly, you
2:33:21know, respond to that um and get that
2:33:24done. and you know the residents are
2:33:25very very happy um with the smooth
2:33:27street and that's I think a example of
2:33:30the leadership within your department of
2:33:32being able to just quickly fix something
2:33:34like that and have the ability to do so.
2:33:36Um so we appreciate that. Um just a
2:33:40couple questions. Um the traffic studies
2:33:42okay are they are they required in every
2:33:46instance?
2:33:48No, a traffic study isn't required in
2:33:50every instance, but when we're talking
2:33:52about something like adding or removing
2:33:54a stop sign or adding or removing
2:33:56loading zone signs, there are other net
2:34:00effects. And I, as the director of
2:34:02public works, I just want to be careful
2:34:04that if we're going to add a stop sign,
2:34:06that changes human behavior. We're
2:34:07talking about speeding and other things.
2:34:09I just want to be sure that we're not
2:34:11creating a problem some downstream or
2:34:14upstream of that sign. That's not to say
2:34:15that we have to do it every single time.
2:34:18Um, but especially when there's traffic
2:34:19control, that's something we do want to
2:34:21be aware of. Um, along those lines for
2:34:24like loading zones and such, we generate
2:34:27a lot of revenue out of out of parking
2:34:30spaces. So, for any given hotel loading
2:34:33zone, we could be generating or giving
2:34:35upwards of 10 to$15,000 a year. So, not
2:34:38to say that we have to have a traffic
2:34:40study every time, but when control is is
2:34:42involved, I do want to be sure we're not
2:34:44creating an issue.
2:34:45>> How long do those traffic studies
2:34:46typically take?
2:34:47>> They have taken a considerable amount of
2:34:49time in the past. Uh, with Alyssa on
2:34:51board, we've actually been able to
2:34:53generate some of those in-house. Having
2:34:54two EITs is going to reduce that time
2:34:57frame. Um, it depends on the study and
2:35:00I'm sorry I don't have a better answer
2:35:01than that. But what I can tell you is it
2:35:03is going to get better, dramatically
2:35:05better in 20 at the end of this year and
2:35:07then into 2027. And asking looking at
2:35:10something like a stop sign should not
2:35:12take a full-blown study. We need to get
2:35:15to a place where we can turn those
2:35:16things around within a week, within 30
2:35:19days. We're not there yet, but that's
2:35:20where we want to get to.
2:35:21>> Yeah, that would be great. I mean, I
2:35:22know you I'm talking about the the stop
2:35:24sign situation that we're that we've
2:35:27asked about on it's it's a two-way stop
2:35:29right now in the middle of a
2:35:31neighborhood of St. Paul's school and
2:35:34residents have been asking for it to to
2:35:36be a four-way. I know you guys are are
2:35:38well aware of the situation, but stuff
2:35:40like that where it's like it seems more
2:35:43simple to have a quicker traffic study
2:35:46or something like that to where we can
2:35:48get an answer to residents faster on
2:35:50some of those things. um would be
2:35:52helpful.
2:35:54>> Um as far as the electrical um are you
2:35:57guys doing any um exploring with IBW and
2:36:02the their apprenticeship program and how
2:36:04the city can kind of work with them on a
2:36:07pipeline for workforce development now
2:36:09that we're kind of getting that hiring
2:36:11piece covered. But I know I talk about
2:36:12it all the time, but I think it's a
2:36:14important piece not just of hiring
2:36:17in-house, but also providing workforce
2:36:20development opportunities to have a
2:36:21continuous pipeline coming into the
2:36:23city.
2:36:24>> Yeah, absolutely. IBW, I've met with
2:36:26them actually a handful of times, and
2:36:27they they do have a couple of different
2:36:29programs. Um, one being sort of a labor
2:36:32extension contract, uh, which has, I
2:36:35think, some some merit for if we're
2:36:38looking for short-term hires.
2:36:41It really and truly, we've actually had
2:36:43pretty good luck hiring even
2:36:45electricians. So, and and we're not
2:36:47hiring like 50 or 60 of them. So, again,
2:36:51have contacted and been in contact with
2:36:52IBW. Um, and we will have at least two
2:36:56more electrician slots opening up here
2:36:58over the course of the next two to three
2:37:00weeks. So, definitely want to reach out
2:37:02to them and make sure that they see that
2:37:04out there. Um, but there's there's more
2:37:06talent wanting to come to work for the
2:37:08city than than I had realized when we
2:37:09started.
2:37:10>> That's good. That's good. I think it's
2:37:11it's still worth, you know, getting that
2:37:13pipeline going. Um, going to street
2:37:16lights is my question about um I know
2:37:20we're still working. We have in-house,
2:37:22but we also still have a contractor.
2:37:24About how much longer do you think that
2:37:26we'll need an outside contractor and
2:37:28what does that, you know, cost look
2:37:30like?
2:37:30>> Yeah, great question. I I think we will
2:37:33always need an outside contractor.
2:37:35There's going to be instances um where,
2:37:38for instance, along Interstate 10 out by
2:37:42510, there there needs to be directional
2:37:44drilling underneath the interstate to
2:37:47bring new conduit and power supply. We
2:37:50may someday get to a place where we're
2:37:52doing our own directional boring or some
2:37:54of those other things, but for those
2:37:55more complicated repairs and in
2:37:57particular things like interstate work
2:38:00where a large amount of traffic control
2:38:02is needed, we will probably still
2:38:04continue to utilize contractors. Now,
2:38:07with that said, I we do we are already
2:38:10and want to continue shifting from
2:38:13giving contractors all of the work to
2:38:16letting them focus on the hard stuff.
2:38:18There's plenty of that out there. I
2:38:20mean, 610 has a number of outages right
2:38:22now. I know Councilman Hughes, we're
2:38:24working at the foot of the high-rise as
2:38:26well as on the high-rise. Those are the
2:38:28sorts of things that I would envision a
2:38:30contractor would help us with in the
2:38:31future. But things like changing a fuse
2:38:34or changing out the sensor on the top of
2:38:36a of a fixture, we want to be able to do
2:38:39that in house and not have a contractor
2:38:41have to roll a truck for that.
2:38:42>> Yeah. Yeah, that would be great. Um,
2:38:45just one more thing about the the
2:38:48Council Member Harris brought up the
2:38:49street lights that have been hit by
2:38:51traffic. We had one in in Lake View. Did
2:38:55>> did NOPD let y'all know that it was
2:38:57knocked over? Cuz I think that one
2:38:59little coordination piece might be
2:39:00missing. Um, you know, I don't know
2:39:03whether or not y'all were alerted. I
2:39:04mean, I I texted you and you immediately
2:39:07responded and and got with Scott, but I
2:39:09think that might be one piece of
2:39:11coordination that we might need to make
2:39:13that connection of, you know, if there's
2:39:15a traffic light that's been knocked
2:39:17clean off its face, you know, [snorts]
2:39:19is NOPD alerting someone from DPW or are
2:39:22we waiting till, you know, I notice it
2:39:24or somebody else notices it?
2:39:26>> That's a really good question and one
2:39:27that I will follow up with them on
2:39:28because I'm not entirely sure they were
2:39:30called. They may well have been, but
2:39:32it's certainly a protocol. If you see
2:39:34NOPD, if you see a traffic mast arm lay
2:39:38or a pedestal or whatever laying on the
2:39:40street, call N call DPW.
2:39:43>> Here's a list of people to get in touch
2:39:45with. So,
2:39:46>> case in point, every time there's a fire
2:39:48under or around a bridge, there's an
2:39:50automated phone call and a text message
2:39:52that I get. NOPD could do the same.
2:39:53That's a great idea.
2:39:54>> Yep. Yep. That's all. Thank you.
2:39:57>> Thank you, Council Member Hughes.
2:39:59>> Thank you, Madam Chair. Uh, Director
2:40:00Nelson, let me thank you again. Um,
2:40:04can't stress enough your your great
2:40:05leadership and what I appreciate is
2:40:07that, you know, you you you figure out
2:40:09you don't just make excuses like you you
2:40:11try to figure out how to make things
2:40:13happen. So, I appreciate that. Only
2:40:15thing I want to um follow up on is is
2:40:17safe streets and our commitment to safe
2:40:19streets. And uh as you know, director,
2:40:22in my district, I have several miles of
2:40:25uh service roads.
2:40:27uh along those service roads are
2:40:30multiple residential neighborhoods, uh
2:40:32several apartment complexes,
2:40:35and uh unfortunately no sidewalks and
2:40:38and no lighting.
2:40:39>> Yeah.
2:40:39>> And so what I'd love to do as soon as
2:40:42possible is is is as you and and and I
2:40:45and anyone else from the administration,
2:40:48uh if we can put our heads together with
2:40:50our New Orleans East legislative
2:40:52delegation, Senator Harris,
2:40:54>> Yes. Senator Bartholomew um and and
2:40:57Representative Henry and then also pull
2:41:00Congressman Carter in and figure out
2:41:02once and for all how we can all work
2:41:04together to get some sidewalks and some
2:41:06lighting installed because as you know
2:41:08director we have people on bikes. We
2:41:10have people on motorized scooters
2:41:13>> trying to get the bus stops trying to
2:41:14get to Walmart and um you know we want
2:41:18to certainly prevent injuries and and
2:41:20fatalities. So, um I'd appreciate if we
2:41:23could work on that collaboratively. And
2:41:26then, um Lincoln Beach and Chef Highway.
2:41:29Uh we've seen several fatalities on
2:41:32both. I think the state recently wrapped
2:41:35up their traffic study of Lincoln Beach
2:41:38Boulevard, but the question is what
2:41:40comes next for Lincoln Beach Boulevard?
2:41:44And then we know we've seen repeated
2:41:45fatalities on Chef Highway.
2:41:48>> Yeah. Uh so any any plans um
2:41:52particularly for chef? Um
2:41:54>> yeah, Chef Highway is one. So lighting,
2:41:57uh traffic signals, making sure they're
2:41:59working and then also
2:42:06NOPD enforcement. Uh I know that's been
2:42:10has been helpful in getting speeds down.
2:42:13Um, but that's that is a key area for us
2:42:15to look at in terms of make first and
2:42:17foremost, we've got street lights out
2:42:18there. We need to make sure they're all
2:42:19turned on. And I know there are at least
2:42:21two areas that Andy and his team were
2:42:22looking at and then making sure the
2:42:24signals are working. Um, and then also
2:42:27looking at a traffic study. Is there
2:42:29something we need to do for in terms of
2:42:30traffic calming?
2:42:32>> Uh, that chef highway is absolutely a
2:42:34key corridor. And I and I know with
2:42:36Lincoln Beach Boulevard, the city in the
2:42:38previous administration um did a a land
2:42:42swap
2:42:44with with with a piece of land I think
2:42:45in in Alers. But that land swap, it's my
2:42:49understanding, was not going to be
2:42:50completely finalized until DOTD did its
2:42:54traffic study and then whatever
2:42:56necessary improvements it needed to do.
2:42:58So maybe when we do that uh joint
2:43:00meeting with our state and federal
2:43:01delegation
2:43:03um you know we can um get some some
2:43:06clarity. I can tell you when I drive on
2:43:08Lincoln Beach Boulevard and this is the
2:43:11consensus for the residents that live
2:43:13there and who drive that corridor, it it
2:43:15is frightening. Um it's frightening
2:43:19because it people treat it like a
2:43:20speedway. Um and and just the constant
2:43:24accidents and fatalities. So, uh, we
2:43:27really need to do something there. So,
2:43:29thank you again, uh, for your leadership
2:43:31and partnership, and I look forward to
2:43:32working with you on that. Yes, sir.
2:43:34>> Thank you, Madam Chair.
2:43:34>> Thank you, Council Member Willard.
2:43:36>> Thank you, uh, Steve. Great job. Um,
2:43:42when I was in 8th grade at Jesuit, I had
2:43:46a teacher, I think it was like a speech
2:43:50debate class. He showed us the pilot
2:43:53episode for Family Guy.
2:43:56It got me thinking.
2:43:59Uh, in one of the Family Guy episodes,
2:44:02Peter has a segment on TV called Grinds
2:44:05My Gears. Okay.
2:44:10One thing that has grinded my gears for
2:44:14a long time is the lack of striping on
2:44:18streets throughout the city of New
2:44:20Orleans. It's one of those pet peeves I
2:44:22have. And so when you talked about
2:44:25including um that as an initiative in
2:44:28the 2027 budget, I got all excited. Uh
2:44:32so can you just touch on like where do
2:44:34you even start with that project? I mean
2:44:36that's
2:44:38>> Well,
2:44:38>> you basically have to do it everywhere.
2:44:40>> Well, [snorts] yes.
2:44:41>> How do you prioritize? Where do you
2:44:42start?
2:44:44where again with that with that initial
2:44:48top-down goal of zero fatalities, it's
2:44:51looking at the high the high injury
2:44:54network, which we do have a a map of
2:44:56that. And I failed to mention two key
2:44:58goals and initiatives for next year. One
2:45:01is a street light master plan. We're
2:45:03going to assess all of the lights across
2:45:06Orleans Parish. We're also doing uh a
2:45:09street a street condition assessment
2:45:12that should and will include striping uh
2:45:15as part of it. Um the the big part of
2:45:18the street assessment that'll be done by
2:45:20the middle part of next year is
2:45:21understanding the pavement condition so
2:45:24that [clears throat]
2:45:24you don't have
2:45:25>> doesn't make sense to stripe if you have
2:45:27>> it doesn't make sense to stripe it if
2:45:29you're going to replace it at the same
2:45:30time. But there are some areas, places
2:45:32where you have bicycle lanes, looking
2:45:35first and foremost at at historical data
2:45:37around fatalities and injuries. Um,
2:45:41those areas, crosswalks, dedicated lanes
2:45:46where you have high interface between
2:45:48pedestrians and vehicles, especially
2:45:50vehicles moving at speed is going to be
2:45:53a major focus for us. Yeah, the striping
2:45:55stuff makes me nuts, too. What's what's
2:45:57made it hard this year is having z no
2:45:59cash. Well, next year I've actually got
2:46:02a budget,
2:46:03>> so we're going to spend it and striping
2:46:06is going to be a key part cuz it doesn't
2:46:08>> If you can find a paint that will last
2:46:1010 years or longer, I want to know about
2:46:12it cuz I'll capitalize that sucker.
2:46:14>> Listen, when you were talking about it,
2:46:16I started thinking about, you know,
2:46:18approaches. Somebody should start a
2:46:19company with with that type of paint and
2:46:22uh even a system to make it more
2:46:24efficient to actually lay the striping
2:46:26down. Um, but just just keep us in the
2:46:29loop on that. You know, this weekend we
2:46:31had terrible weather. Um, I drove around
2:46:34a little bit, you know, to do things.
2:46:37And, uh, especially at night, there's
2:46:39certain streets in the city where it's
2:46:42already tough to see where your lane,
2:46:44you know, ends and begins. Uh, when it's
2:46:47raining, when it's storming, it's it's
2:46:49almost impossible to determine that. and
2:46:51and I was going up broad and that's one
2:46:54of those streets in the city where
2:46:55people do tend to drive fast and so it's
2:46:58dangerous. So, um I you know keep us in
2:47:01the loop. I'm happy to hear that this is
2:47:03part of your planning for 2027.
2:47:06Um
2:47:08you talked about the the flashing lights
2:47:11in the city this past weekend. Uh
2:47:14certain areas didn't experience the
2:47:16flashing lighting flashing lights. Um I
2:47:18know a few parts in Gentilly had it.
2:47:20that I got some text messages about
2:47:23downtown like on Canal that had it. Um
2:47:25can you just touch on the the changes
2:47:28that we've made this year to help um you
2:47:31know remedy that issue and you know the
2:47:34roll out of changes throughout the rest
2:47:36of the city to you know fix that issue
2:47:38throughout the city.
2:47:39>> Absolutely. There were two that I heard
2:47:41of. So if you've got others I would love
2:47:43to see actually we've got that in house.
2:47:45I don't need you to tell me. I know
2:47:46where I know where our guys work. But
2:47:48there are two in particular, Orleans and
2:47:50Broad and Carolton
2:47:54and Orleans. Anyways, those two
2:47:56locations, one there's an issue with the
2:48:00conflict monitor. So, we've got to
2:48:01replace a a piece of the brains inside
2:48:04the control box have to be replaced, and
2:48:06that location has had problems kind of
2:48:08on and off. Um, the other one, I'm not
2:48:12exactly sure what the what the root
2:48:13cause of that is, but with those signals
2:48:15along Claybornne,
2:48:18I mean, it was it was frankly kind of
2:48:19happen stance. I drove by on a Wednesday
2:48:21and they're like those three
2:48:23intersections are in flash. I'm like,
2:48:24all right, whatever. Drove home and they
2:48:26were working. Drove drove again on a
2:48:28Friday and I'm like these same what's
2:48:30going
2:48:30>> Yeah.
2:48:31>> rained the previous day. So, I started
2:48:33asking some questions. Well,
2:48:35>> there's the adage about the frog, right?
2:48:37You throw a frog in a boiling pot, they
2:48:39jump out. If you leave the frog in and
2:48:41it slowly, we just get used to this this
2:48:44environment we're in. And and the habit
2:48:46that we had been in within DPW prior is
2:48:50that you just go hit the reset button
2:48:52when something goes into flash. It's
2:48:53simple. It's super easy, but it doesn't
2:48:56solve the root problem. And so the root
2:48:58problems with each of those four
2:49:00intersections on Clayboard were they
2:49:02were all different. So Nashville, they
2:49:04had bad splices. So, believe it or not,
2:49:08ants, fire ants will like eat electrical
2:49:12tape. So, the the ants had chewed in.
2:49:14The splices were bad. So, I mean, this
2:49:16is ridiculous stuff, right? But it's it
2:49:19is what it is. They remade the splices.
2:49:20Nashville hasn't gone into flash again.
2:49:23Washington Avenue was more complicated.
2:49:26There was a problem with the feed from
2:49:28Energy as well as our equipment. And we
2:49:30had to get like three different site
2:49:32visits out there. Um but ultimately got
2:49:35a little more a little more robust feed
2:49:37from Energy. Our equipment we got fixed
2:49:40and it hasn't gone into flash again.
2:49:42Napoleon there was a uh the line under
2:49:44the street had been clipped and so we
2:49:47had to rerun actually DOTD reran the
2:49:49wire and then Poerson Clayborn was going
2:49:52into flash as well. Well that was a
2:49:53number of different issues. The water
2:49:54was pouring off the interstate onto a
2:49:56cabinet so we had to make sure the
2:49:57cabinet was watertight and then we had
2:49:59an issue with some wiring in one of the
2:50:02bases. So each one of these requires a
2:50:05separate look, but it requires someone
2:50:07to be disciplined enough to go back out
2:50:10there and not just hit the button. Or
2:50:12worse yet, and we've finally eliminated
2:50:14the last of these, tape the reset button
2:50:17down. So we're not just going out and
2:50:19doing the easy thing. We're doing the
2:50:21hard things. But what that means then is
2:50:24we're not driving out there again on a
2:50:25Saturday cuz it never rains on Tuesday.
2:50:28It's over the weekend. So just taking a
2:50:30different approach to how we address
2:50:32those things and I mean the team is
2:50:34doing great with that. So you mentioned
2:50:37that one location. I already had a a
2:50:40debrief on Sunday afternoon. I had a
2:50:41text message from our team. Here's the
2:50:43problem. Here's what it is. This is what
2:50:45we're going to have to do. So it's just
2:50:46a different mindset around addressing
2:50:48not just the symptom, but getting to the
2:50:50problem.
2:50:51>> Okay, sounds good. Um I know the uh
2:50:54Elleion Fields right by the uh I 10
2:50:57interstate. Those those lights were 610.
2:50:59I'm sorry.
2:51:01>> Yeah. 610.
2:51:02>> 610. Yes. Sorry. 610. Those are flashing
2:51:05as well. Um, so you mentioned about
2:51:09moving to open gov and cardigraph for
2:51:11work orders. Do you know if sewage and
2:51:13waterboard is going to make that same
2:51:15transition? Because when we process 311
2:51:18tickets, when it gets to sewage and
2:51:20waterboard, you know, it's kind of a
2:51:22black box. They they use their own
2:51:24tracking system software. Uh do you know
2:51:26if they're if they're looking at that
2:51:28transition as well?
2:51:30>> Yeah, so sewage and waterboard is in the
2:51:31midst of rolling out an asset management
2:51:34system right now. Um it will have
2:51:37connectivity to open grove cardigraph.
2:51:41>> I'm trying to decide how much detail to
2:51:43go into on this.
2:51:44>> Well, I just you know if if the systems
2:51:46can communicate, that's okay. That's
2:51:49good.
2:51:50>> If we're all using the same systems, I
2:51:52think that's best. But, you know, as
2:51:54long as they can communicate
2:51:56>> and we're moving again towards that
2:51:57integration in 2028. So, that's part of
2:52:00the conversation. I know Daryl Isles,
2:52:02the chief information officer over at
2:52:03the sewage and water board is way
2:52:05smarter than I am. Uh, and he's aware of
2:52:08this and we're working together to make
2:52:09sure that the systems at a bare minimum
2:52:11have direct connectivity because
2:52:13somebody shouldn't have to a resident
2:52:16and we talked about this sewage and
2:52:17waterway. They shouldn't have to
2:52:18remember two phone numbers. something
2:52:20goes sideways, they should call 311. A
2:52:23work order should be generated and the
2:52:26appropriate team, whether it's sewage
2:52:27and water, parks and parkways, DPW, or
2:52:32SPCA for lack of a better term, there
2:52:33should be one place.
2:52:35>> Yep. Totally agree. Um, all right, move
2:52:37on to my budget questions. So, um, this
2:52:41year we had 3 million from a dedicated
2:52:44millillage, but it's not showing up in
2:52:4627. Um, what's that about?
2:52:49So DPW hasn't had a dedicated millillage
2:52:52for years, but we continued to use that
2:52:55code. And so this year we created the
2:52:59new field operations and the electrical
2:53:01shop to move that into a budget code
2:53:04that didn't say dedicated milling.
2:53:06>> Yeah, because it was confusing. Okay.
2:53:09Um,
2:53:10of the new 60 staff, uh, how many of
2:53:14those have you hired so far, Steve? Oh,
2:53:16>> those are all they've been hired. Yes,
2:53:18actually we're we're approaching 90 new
2:53:21hires across. So
2:53:23>> in addition to the 50 paving personnel,
2:53:26we've got
2:53:27>> electricians, inspectors,
2:53:30folks across, you know, EITs that I
2:53:32mentioned earlier, new director,
2:53:34secretary, chief traffic engineer. So
2:53:36we've sub expanded substantially.
2:53:38>> Okay. Um
2:53:42the field operations staff is growing by
2:53:45three. personnel budget was reducing by
2:53:48about 23,000. Can you explain that? Is
2:53:51that using some capital funding for it?
2:53:54>> That might be because of partial
2:53:55salaries. So some employees like are
2:53:58going to be working both on general fund
2:54:00and bond fund. So we try to acknowledge
2:54:02that you know breakdown of their
2:54:04personnel costs.
2:54:05>> Okay. Um and then on the the traffic
2:54:09sign side, is that the same situation?
2:54:11You're keeping the number of employees
2:54:13the same, but the budget is Okay. Yes.
2:54:16>> Okay.
2:54:17>> Um
2:54:20going through the Questica, the the
2:54:22Allstar Electric contracts caught my
2:54:24eye. Um I think it's a little over 2
2:54:28million for those. It's um I know one is
2:54:30for I think dedicated maintenance. Is
2:54:33that something that we're looking at
2:54:34potentially phasing out over the next
2:54:37year or two as we beef up hiring for
2:54:39those electrical positions?
2:54:42>> Yes. So that going back to some of the
2:54:43questions around what do we plan to do
2:54:46inhouse versus with a contractor
2:54:49>> I don't know that we'll necessarily
2:54:50reduce all stars workload in the first
2:54:53year anyways
2:54:54>> because there's it's a rich environment
2:54:57right but eventually over the course of
2:54:59the next 2 to 3 years that's absolutely
2:55:01where we want to get to is that
2:55:03>> we've addressed we've eaten the
2:55:05elephants and we're handling the routine
2:55:08stuff or better yet we're getting them
2:55:12to to do some some proactive work. We've
2:55:16all heard this preventative maintenance.
2:55:18>> Exactly. Doing preventative maintenance
2:55:20instead of being entirely reactive.
2:55:22>> Okay, that sounds good. Uh what's the
2:55:24unified planning work program contract
2:55:27with the regional planning commission?
2:55:29>> Yeah. So, regional planning commission
2:55:31uh we are a part of that group. Sure.
2:55:34>> Uh and we have dues.
2:55:35>> You're the mayor's representative.
2:55:36>> Yeah, I am the mayor's representative to
2:55:38the regional planning commission. So we
2:55:39have Kyle, I believe that's the dues to
2:55:41to RPC. We have dues to RPC. They also
2:55:44they're they're a funding agency. They
2:55:46do a lot of really valuable work across
2:55:48southeast Louisiana.
2:55:49>> Okay. Um and I know Council Member
2:55:52McCarron was was touching on the the
2:55:54traffic studies. Um, can you let me know
2:55:57what what studies we do or intend to do
2:56:00in-house versus what we're contracting
2:56:02out because it looks like we have
2:56:04funding um for you know those contracts
2:56:08but also funding for an in-house
2:56:11analysis software.
2:56:13>> Yes. So I'll use a couple of examples.
2:56:15So for the example around St. George's
2:56:17with the four-way stop, we should be
2:56:19able to do something like that inhouse.
2:56:21Um, but there are proposals for uh a
2:56:25roundabout. Uh, I've had a couple of
2:56:28folks ask me about a roundabout. A
2:56:29roundabout down by um Peters Alleian
2:56:33Fields kind of where the new where the
2:56:34new park has gone in along the
2:56:36riverfront. Well, something like that's
2:56:37going to be pretty complicated and maybe
2:56:39we could do it in house, but I don't
2:56:41necessarily want to devote all of our
2:56:43time for 6 months to doing just that.
2:56:46So, for big transformative projects,
2:56:47we're going to use an engineer.
2:56:49>> Okay, that makes sense. Um, last
2:56:51question related to the contracts with
2:56:53Fastenol and Granger. Are those tied
2:56:56into the state at all? They are. Okay.
2:56:59>> Those are the same contracts.
2:57:00>> Thought so. Okay. All right. Thank you
2:57:02guys.
2:57:03>> Okay. Thank you,
2:57:04>> Council Member Morell.
2:57:06>> Thank you. I'll be really brief. Uh, as
2:57:09Council Member Willard said, the uh 610
2:57:12uh Legion Fields lights were blinking. I
2:57:15want to bring those to your attention
2:57:16because as you said, we're trying to
2:57:17avoid traffic fatalities. that is a
2:57:20heavily used intersection and as someone
2:57:23who crossed it during that period it was
2:57:25particularly dangerous. Um I do want to
2:57:28make a suggestion and I know
2:57:33I think that what we've seen throughout
2:57:34the city over the last couple of years
2:57:36is that the public is more than willing
2:57:40to do its part to help us identify
2:57:42things like uh potholes
2:57:46uh blinking lights and the like. The
2:57:48challenge that we've seen repeatedly
2:57:50over the last eight years is that,
2:57:53and this is going to sound very bizarre,
2:57:55but 311 is both too little and too much.
2:57:58It's too little in that in order to make
2:58:00a 311 complaint, you have to go through
2:58:03the entire uh process, and that is a
2:58:06very lengthy process of pulling up the
2:58:08internet and going through that entire
2:58:09thing. And more importantly, it has
2:58:11gotten a significantly bad rap in that.
2:58:13People have made 301 complaints for
2:58:15years to no avail. And it is very, very
2:58:20hard to get the public to think cuz 301
2:58:23has been here, I believe, Steve, for
2:58:25almost three administrations.
2:58:28And even under the good administrations,
2:58:30the response time was still so abysmally
2:58:33bad that people really don't see the
2:58:36point of making 311 complaints at all.
2:58:39Now, I say that because not to discount
2:58:41the usefulness of 3 in1. I think it's
2:58:43still a valuable tool, particularly when
2:58:45you have very, very complex issues that
2:58:48are unique to your address or your area,
2:58:50like a business or residential home. But
2:58:54I think that when someone drives by a
2:58:57blinking light, their first thought is
2:59:00not to pull over past the blinking light
2:59:02and fill out a 301 complaint. So, I'm
2:59:05going to make a suggestion.
2:59:07And even saying it out loud kind of
2:59:09makes me want to throw up my mouth a
2:59:11little bit.
2:59:13We should consider using AI.
2:59:16I'm looking at Matt Willard right now
2:59:18cuz I'm sure he loves that. But there's
2:59:21a tremendous amount of meta metadata in
2:59:23a in a photograph. And even if we were
2:59:27able to use something like Nola Ready
2:59:31where people could take a photograph of
2:59:33an issue
2:59:35and that could be sent to a database
2:59:37where the metadata could be pulled
2:59:39particularly when it comes to blinking
2:59:40lights cuz they're people who they can
2:59:42take a second to turn around and take a
2:59:44picture of something that is a dangerous
2:59:46hazard. And as you said, like the
2:59:49blinking lights, they'll come on during
2:59:51the rain, but they'll selforrect to some
2:59:54degree, and you may see that issue go
2:59:56away when the rain goes by. Like having
2:59:59the ability to make it seamless so that
3:00:02a passenger in a car could take a
3:00:03picture of something that's a dangerous
3:00:05issue and that we on the back end could
3:00:08extrapolate the data from it in a way
3:00:10that is useful to DPW. That would be a
3:00:13gamecher. And so I know that we have a
3:00:16ridiculous amount of talented people in
3:00:18the city of New Orleans. I think that
3:00:20that's something that would be worth
3:00:22investigating to see how we can use it.
3:00:23Plus, hut utilizing data and that
3:00:27seamless straightforward way would be a
3:00:29way for us to also reduce some of the
3:00:31need to have people to manually process
3:00:34it. I think, like I said, 301 has a
3:00:35value for complex issues, but a blinking
3:00:40light, a sinkhole, something that is an
3:00:44immediate danger, but something that
3:00:46people are going to pass by driving in a
3:00:49car. I think that to consider that
3:00:52they're going to pull over immediately
3:00:54and look at the cross streets and do all
3:00:56that data, I think it's might be a
3:00:58bridge too far if we're going to rely
3:01:01upon that to identify these problems.
3:01:03So, suggestion. I said the A and the I
3:01:06word out loud, which I don't like, but I
3:01:08think it could be useful in this limited
3:01:10instance.
3:01:11>> Thank you. Thank you. Appreciate it.
3:01:12>> Council member Green.
3:01:14>> Thank you, Steve, again for your uh
3:01:16word. Interesting that we talk about I
3:01:20610 at Allegian Fields because Allegian
3:01:23Fields there is a state thorough affair
3:01:25as is I610. And you mentioned in your
3:01:28presentation that the city was going to
3:01:30be spending some money on I 610 I guess
3:01:33and I 10. And of course the city is
3:01:35responsible for maintaining the lights.
3:01:38The city is respon but the city can't
3:01:40install its own traffic lights for
3:01:42example. It can't do its own striping in
3:01:44certain areas because those thorough
3:01:45affairs such as Broad Street, Gentilli,
3:01:48Chef Mur Highway, Clayborn Avenue, um
3:01:51Lincoln Beach Boulevard, Lakeshore
3:01:54Drive, and the like are all state
3:01:56thorough affairs.
3:01:58I look at my CEO, you know where I'm
3:02:01going with this. So, I'm going to ask in
3:02:03a diplomatic way because the city spends
3:02:06millions of dollars on state thorough
3:02:09affairs in many in many different ways.
3:02:12Steve, I know. Let me finish this cuz I
3:02:14know where you're going. You're not
3:02:15going to be able to answer it. I want
3:02:16the public to understand that there are
3:02:18obligations of the city of New Orleans
3:02:21that are on state thorough affairs that
3:02:24cost us millions of dollars a year.
3:02:27Half of the traffic fatalities in our
3:02:29city occur on state thorough affairs.
3:02:32Interstate 10, Interstate 610, Claymont
3:02:36Avenue, and Sheff Highway in general. So
3:02:39without me getting into the deep
3:02:40politics of it, how can we work better
3:02:43with the state to identify ways in which
3:02:46the state can work with the city of New
3:02:49Orleans to help keep us safer and also
3:02:52to um reduce some of the burdens that a
3:02:54city that is always right now strapped
3:02:57for cash expends.
3:03:00>> Yeah, that's an excellent observation.
3:03:03>> That a good diplomatic way to do that
3:03:04without getting deep into the weeds.
3:03:06There there are two so there are two
3:03:09specific areas that I can point to and
3:03:12weeds may be an unintended pun there but
3:03:15we also pay for grass cutting. We also
3:03:17cut the grass along all of these state
3:03:20routes and there's really only a very
3:03:23small area that the city is compensated
3:03:26for by the state. So we're actually
3:03:28already in conversations with the state
3:03:30around making sure that we're getting
3:03:33the fair share for those grass cuts. The
3:03:36other thing is u we at at the city
3:03:38within the city are responsible for
3:03:40maintaining traffic signals along all of
3:03:43the state routes. So of the 453
3:03:46signalized intersections 170 plus are on
3:03:49state routes and the state um is is act
3:03:52we are in active conversations with
3:03:54getting the cost share corrected uh on
3:03:57those intersections as well. So there's
3:03:59two very discreet examples because
3:04:00you're exactly right. They're state
3:04:02routes, but we maintain them.
3:04:03>> And thank you for having those numbers
3:04:05because you didn't know I was going to
3:04:06ask you those questions. That's why I
3:04:07know that you're on the job at the end
3:04:09of the day.
3:04:09>> That's why I got Kyle Kyle. [laughter]
3:04:12>> Well, 170 intersections on state
3:04:15thorough affairs maintained by the city
3:04:17of New Orleans. All of the lights on I
3:04:2010 and 16. And unless I'm wrong, tell me
3:04:23that there's something.
3:04:23>> No, you're correct. The only
3:04:24>> we are responsible for maintaining them
3:04:26all the lights. When we talk about the
3:04:28down ramp of Interstate 10, when we talk
3:04:31about I610, I 10 and the like, the city
3:04:34bears responsibility for that. I'm not
3:04:36trying to bash the state, but I'm going
3:04:38to ask you a question. Why is that the
3:04:41case? And when did that start? And Mr.
3:04:44Meyers, that is a great question for the
3:04:47media to ask. Why does the city incurred
3:04:50those incredible expenses for um
3:04:53maintenance along thorough affairs? And
3:04:56I'm certainly we'd be willing to invite
3:04:58state troopers and state officials to
3:05:00get involved if they could. But what is
3:05:02the challenge with getting us to work
3:05:04more with the state? And I want to make
3:05:06it clear to state representatives and
3:05:08senators. I'm not bashing you, but it's
3:05:10just a fact. If we are prohibited, for
3:05:12example, in the city of New Orleans from
3:05:14creating traffic camera locations, which
3:05:16would slow down traffic on a Sunday, you
3:05:19go from Gentley Boulevard to the
3:05:21lakefront along Allegian Field and it's
3:05:23a speedway. But I don't have a police
3:05:25officer to put there. But maybe I would
3:05:28be able to put a traffic car, for
3:05:29example, whatever you call those speed
3:05:31cars, if it weren't prohibited by the
3:05:33state of Louisiana, by the legislature.
3:05:36Um, maybe you could just comment on
3:05:38general, and let's turn it into a
3:05:40positive flow. How can we work more with
3:05:43the state keeping in mind all of those
3:05:45state thorough affairs that exist
3:05:47throughout the city on which we maintain
3:05:49striping and also traffic lights and the
3:05:51like?
3:05:52>> Yeah. And I again I think you're you're
3:05:54spot on in keeping things positive and I
3:05:56think that's that's been the key. The
3:05:58state has not rebuffed any of our
3:06:00discussions around the traffic signal
3:06:03costs relooking at that. Um in fact I
3:06:05think they've they've budgeted if I
3:06:07understand um an allocation for
3:06:11additional monies to maintain those
3:06:13signals. I think the challenge has been
3:06:15historically knowing to ask, knowing
3:06:18that in fact they do there are 170 plus
3:06:22signalized intersections on state routes
3:06:23and we spend I mean all of those ones on
3:06:27Claybornne that I mentioned now the
3:06:28state did fix Nashville all of their own
3:06:30they were present at each of our site
3:06:32visits and very very helpful um but it
3:06:35is the city's responsibility for the on
3:06:38andm the operations and maintenance of
3:06:39those I think having the wherewithal to
3:06:42ask the questions first is where it
3:06:44starts. Um, and knowledge being the
3:06:47foundation for that. I think with the
3:06:49streets, the the street lights, yeah,
3:06:52the city is responsible for everything
3:06:54except the the the GNO, the Crescent
3:06:57City Connection from the Jefferson
3:06:58Parish line to about the Superdome.
3:07:00Those are all state controlled, but
3:07:02everything else is the cities. Um, now
3:07:04when that started, I I honestly don't
3:07:06know. It's been long before my time. And
3:07:10I know that um our neighboring parishes
3:07:13have a similar setup. Uh some of their
3:07:16lights are owned and maintained by
3:07:18Energy. Um but the state does not
3:07:21maintain any of the lights uh to my
3:07:24knowledge. Most of the lights in
3:07:25Jefferson, but you would admit that it's
3:07:27a special challenge for our city. We
3:07:30have Interstate 10, Interstate 610, a
3:07:33high-rise and long stretches of
3:07:34interstate that go through the city
3:07:36because we have the traffic that
3:07:38requires such. But when we talk about so
3:07:41many lights out, I want the public to
3:07:43understand that we're not talking about
3:07:44lights out that are on Parker Street.
3:07:46Yes, there are. We're not talking about
3:07:48lights out that are on Clue
3:07:50[clears throat] Street. Yes, there are
3:07:51lights there, but we're talking about
3:07:52large numbers of lights, for example,
3:07:54that are on state thorough affairs that
3:07:58I understand that certain relationships
3:08:01have existed for a long period of time,
3:08:03but I sure would like there to be some
3:08:05discussion of what we can do to work
3:08:08better with the state of Louisiana,
3:08:10keeping in mind the challenges that
3:08:12already exist in a city that entertains
3:08:14tens of millions of visitors per year,
3:08:17has so many properties, for example,
3:08:19that don't pay um revenues to the city
3:08:21because they're universities and the
3:08:23churches and the like. We're going to
3:08:25always have challenges, but some of the
3:08:26challenges I think can be overcome with
3:08:28more discussion. And I know that our CEO
3:08:31recognizes that because he's been a
3:08:32member of the council. He's going to be
3:08:34in a position to have some of those
3:08:36discussions with our delegation. But I
3:08:38think it's important for the public to
3:08:40understand that the city of New Orleans
3:08:42in some respects provides significant
3:08:45support to the state of Louisiana by
3:08:47maintaining lights and other matters
3:08:49along those public thorough affairs.
3:08:51Whenever I call the NOPD, they respond
3:08:55whether it's a state thorough affair or
3:08:57not because it's an issue that has to be
3:08:58addressed, but it's still a state
3:09:01thorough affair. So it's an expense that
3:09:03we incur with EMS. For example,
3:09:05Claybourne Avenue runs from this
3:09:07Jefferson Parish border all the way down
3:09:10to St. Bernard Parish and every bit of
3:09:13it is a state thorough affair. But yet
3:09:15we have New Orleans Police Department
3:09:17officers who are out there on Sundays
3:09:19near between St. Bernard and Orleans
3:09:22maintaining
3:09:24what has to be done there to ensure
3:09:26public safety at the expense of the
3:09:28city. Again, Steve, I I just want to get
3:09:31that out that when you're giving your
3:09:33numbers that it's important for
3:09:35everybody to understand in terms of the
3:09:37um relationship that exists and
3:09:40sometimes doesn't exist with the state
3:09:42that we have an interest in working
3:09:45together.
3:09:46>> Absolutely.
3:09:46>> And I hope that we will enhance that
3:09:48working together in the future with your
3:09:50leadership and the leadership of our
3:09:51mayor, CEO, and also state officials.
3:09:55>> Thank you, sir.
3:09:56>> All right. Um, Cali up in Loyola was
3:09:58blinking this morning, so take a look at
3:10:00that. Um, tomorrow is day
3:10:04four of our budget meetings. We have the
3:10:07mayor's office, law department, the
3:10:09aviation board, and municipal and
3:10:12traffic court to IGR and RCA. What is
3:10:14the timing on getting these
3:10:16presentations? We get the ones for today
3:10:17at like 3:45 on Friday.
3:10:25And thank you, Council Member McCarron,
3:10:27for correcting me. We do not meet
3:10:29tomorrow. We get a break from each
3:10:30other. We are [laughter] meeting uh on
3:10:33Wednesday instead.
3:10:34>> Yeah. Um a couple things. One, Steve was
3:10:37nice. There was uh some health issues
3:10:40with one of the people, so we wanted to
3:10:42make sure that was taken care of first.
3:10:44We're obviously trying to get everything
3:10:4524 hours in advance. If we can get them
3:10:47before 24 hours, we're going to do our
3:10:49very best to make sure that happens. And
3:10:51trust me before you ask. Yeah. Um I have
3:10:53followed up with pre people repeatedly
3:10:55to say I'm been here quite a bit and the
3:10:58council would like to get them. So the
3:10:59earlier you can get them to us, the
3:11:01earlier we can provide them to you.
3:11:03>> I I'm especially concerned about the
3:11:05Mondays after furlow days. We have uh
3:11:07staff in the clerk's office who actually
3:11:09have to take their furlow days. So they
3:11:11have to come back in to post these and
3:11:13get these online. So if we can make sure
3:11:15that um the Monday, October 19th, we get
3:11:18them in advance, that would be great. I
3:11:19think that'll be less of an issue since
3:11:21there's no hearings that week before.
3:11:23Thank you.
3:11:23>> Thank you.
3:11:25>> With that, we are ajourned. Thank you.