2026-10-22 - Advance Plans Committee

Summary

Based on auto-generated captions; names and figures may be misheard.

  • The committee, a joint city and county planning body, spent the meeting on proposed Unified Zoning Code amendments for data centers. Planning staff recommended that the full Metropolitan Area Planning Commission adopt them and forward them to the City Council and County Commission. The interim control on data center applications began January 14, 2026, has been extended three times and expires December 24. The Planning Commission hearing is set for November 12, and the County Commission would take it up December 16 if a recommendation moves forward.
  • Staff recapped public input from a spring town hall, a roundtable, an open house and an online survey, which centered on land use compatibility, water, energy demand and environmental concerns.
  • The draft defines micro, standard, large and hyperscale data centers, adds general requirements, conditional-use application rules, development standards and a land-use table, strikes the 1,000-acre hyperscale cap, limits construction hours, adds State Historic Preservation Office compliance, requires financial assurance to be re-established when ownership changes, and moves decommissioning plan updates from every five years to every three.
  • By consensus, buildings would not have to be demolished at decommissioning and could be reused, with the site otherwise restored. Members did not reach consensus on requiring data centers to supply their own power; a representative of Evergy, the only invited utility to attend, described the large-load tariff premium, said full self-supply would effectively mean gas generation, and said emergency generator use would follow utility requests and EPA rules.
  • On location, staff clarified that "Option C" means no new location restrictions beyond existing zoning and conditional-use review; most members voiced support, and data centers would be conditional uses in some rural residential districts. Informal consensus also favored no required separation distance between data centers, although concern was raised about dropping the hyperscale acreage cap.
  • Draft noise limits would be 50 dBA and 65 dBC at the property line at night and lower next to residential zoning, with a noise mitigation plan and a compliance study 12 months after operations start. Air quality language requires an assessment, identification of state permits, an inventory of combustion sources including backup generators, and annual emissions reporting. Members leaned toward keeping water discharge monitoring, tracked monthly and reported annually. The county counselor advised that state law largely governs water use and transfer, while members voiced concern about the Equus Beds aquifer.
  • Public comment raised study costs, flood plains, decommissioning and financial assurance, Evergy cost allocation, water transparency, enforcement, hyperscale size and compatibility with rural areas; an industry attorney noted other agencies already regulate air and water. Staff said penalties sit in the broader zoning code (notice of violation, correction period, then court) and may add enforcement slides.
  • The committee was not ready to make a recommendation. It voted without opposition to defer the remaining agenda, including the comprehensive plan, to the next meeting on November 12. Members favored warning the County Commission that a decision may not come before the deadline and asking for an extension.

Issues discussed

Agenda

Agenda posted on the city Agenda Center (amended October 28, 2026). The captions show a data center zoning code review and a comprehensive plan item that was not reached.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:33Good morning, everyone.

00:35Just a quick note that we've asked

00:38planning staff to go ahead and make some

00:39more copies of the handouts. So, folks

00:41didn't get copies of the handouts, we'll

00:43have those shortly. We're going to place

00:45them on the table up front by the

00:46podium. So, feel free to go on up and

00:49grab one when they get here.

01:32>> Everybody ready to go?

01:34>> Yes. [clears throat]

01:38>> Morning, everyone. Uh

01:40Welcome to the Thursday, October 22nd,

01:422026 Advanced Plans Committee meeting.

01:46Um we'll start off by having a roll

01:48call.

01:48>> Commissioner Aldrich.

01:50>> Here.

01:51>> Commissioner McKay.

01:52>> Here.

01:52>> Commissioner Warren.

01:53>> Here.

01:53>> Commissioner High.

01:54>> Here.

01:55>> Commissioner Fry.

01:55>> Present.

01:56>> Commissioner Thiesen. And Commissioner

01:58Johnson.

01:58>> Here.

01:59>> And Mr.

02:00>> Here.

02:01>> Mr. Chairman, you have a quorum.

02:02>> Thank you.

02:03Um today we're going to mainly be

02:06talking about data centers, which is

02:09uh pretty much the entire agenda. Um

02:12Justin is going to present um

02:15agenda item number two first.

02:18Um we suspect that this is going to take

02:21a while and we

02:23recognize the fact there's people in the

02:24audience who probably want to speak

02:26today uh public speaking. So, depending

02:29on time constraints, if

02:31if we think we're going to run out of

02:32time after

02:34um we present item two, then we will

02:37open it up for public speaking at that

02:39point. And then

02:42we will go on from there and

02:44use up the time we have. Uh

02:46as I I think everyone knows, there's

02:48uh the full planning commission meets in

02:51here at 1:30 today. So,

02:53if we get going too long, we're going to

02:55have to make some uh changes. So, bear

02:57with us and uh Justin, you're on.

03:00>> Good morning, Mr. Chairman and Advanced

03:02Plans Committee members. Justin

03:04Constantino with the Planning

03:05Department, here to discuss uh data

03:07center regulations. Next slide, please.

03:11>> Justin, can we

03:12stop for a second and show that

03:14Commissioner Thiessen has showed up and

03:16is here?

03:16>> Certainly. Noted. Yes, sir.

03:19Let's go to the next slide, please, and

03:21then the one right after this.

03:23Thanks, Muhammad.

03:26Thanks.

03:27Um the recommended action this morning

03:29is that the full MAPC adopt the proposed

03:31amendments to the Unified Zoning Code

03:33regarding data centers and recommend

03:34adoption of the proposed amendments to

03:36the Unified Zoning Code by the City

03:37Council and County Commission. Next

03:39slide, please.

03:43Just a few disclaimers. Uh note that

03:44Wichita Sedgwick County is not currently

03:46uh considering any specific data center

03:48applications. Um data centers are

03:50currently permitted under the current

03:52Unified Zoning Code regulations. Uh the

03:55intent of this process is to define data

03:57centers and to clarify these

03:58regulations. Um Um,

04:00uh as I mentioned, uh they're not

04:02currently defined in the current

04:03regulations, but they are currently

04:05permitted. That's where the interim

04:07control period comes into play, and that

04:10is set to expire in December. And then

04:12the regulations and guidance that we're

04:13discussing today on both these agenda

04:15items affect both the city of Wichita

04:18and Sedgwick County. Next slide, please.

04:22Overview of my presentation. I'll go

04:24quickly through the project timeline.

04:25I'll discuss the schedule. I'll go into

04:28the public input that we've received

04:30thus far. I will discuss the draft

04:32regulations. We've gone through this

04:34before page by page, so I will be as

04:36brief and thorough as possible as I can

04:38on the draft regulations. The Advanced

04:40Plans Committee feedback that we've

04:42received from our last two meetings,

04:43that's probably where we will spend the

04:45bulk of our time.

04:46And then again on any unresolved

04:48questions that that we have

04:51going back to those two meetings. And

04:53then we will discuss briefly staff

04:55recommended updates, and then have any

04:57time for question or further discussion

04:59at the tail end of the presentation.

05:00Next slide, please.

05:04So, the project timeline. Next slide,

05:05please.

05:08This process began back in January on

05:10January 14th when the interim control

05:12was initiated by the Board of County

05:13Commissioners. There have since been

05:14three extensions since then, with the

05:17current interim control period set to

05:18expire on December 24th. Next slide,

05:20please.

05:23Currently, we're at the Advanced Plans

05:25Committee meeting where we are looking

05:26at a recommendation to the full MAPC.

05:28So, that is the recommend- our

05:30recommendation for this morning. Next

05:32slide, please.

05:34A little bit more on the schedule. Next

05:36slide, please.

05:38So, we had those two meetings that I

05:40mentioned before on September 24th and

05:43October 8th. Those were the two meetings

05:44that we reviewed draft regulations.

05:46Public notice was sent to the newspapers

05:48on October 19th with our meeting today

05:50as a special meeting where we will be

05:52making potentially a formal

05:53recommendation. Next slide, please.

05:57The MAPC public hearing is set to occur

05:59on November 12th. We have the

06:01Thanksgiving holiday on the 26th. The

06:03Board of County Commissioners would be

06:04looking at this agenda item on December

06:0616th if we were to make a full

06:08recommendation on November 12th. And as

06:10I mentioned before, the interim control

06:12period is set to expire on December

06:1324th. Next slide, please.

06:17Public input. Next slide, please.

06:20There's been various opportunities for

06:21public input throughout the process.

06:23Back in March, we had a listening town

06:24hall that was

06:26um held over um at the Ruffin Building.

06:29We had a commission round table event

06:31that was also held in March. Towards the

06:32tail end of March, we had a public open

06:34house that was at the Sedgwick County

06:36Extension Center. That was on March 31st

06:38and with a corresponding public online

06:40survey that was available for 2 weeks

06:42following that public open house date.

06:44That closed on April 14th. Um all of

06:46those, the public open house and the

06:48public online survey report at least,

06:50there's been um reports on those. Those

06:51are in your packet. Those are available

06:53online at wichita.gov/datacenter.

06:55So, if you want to see uh further

06:56feedback, read every comment and and uh

06:58that we received from those meetings,

07:00you can do that in those two reports.

07:02Next slide, please.

07:04From those public input meetings, we

07:06there were several themes that emerged.

07:08One was land use compatib- uh excuse me,

07:10compatibility and community identity,

07:12water use and water supply, energy

07:14demand, and environmental and health

07:16concerns. So, um as we started drafting

07:19these regulations, that was the focal

07:20point of of a lot of these discussions.

07:22Next slide, please.

07:27Um highlighted here again, energy,

07:29water, environment, and health, land use

07:30compatibility, and community identity.

07:32Next slide, please.

07:36And now into the draft Unified Zoning

07:37Code updates. There's two copies in

07:39here. We have a a clean version um which

07:41we had gone over before, and then we

07:43also have a

07:44um a marked version, and I'll go through

07:46those marked comments shortly. Uh this

07:48slide, what's showing is the Unified

07:49Zoning Code regulations. As I mentioned

07:51before, this is a two-step process.

07:53We're both going through the UZC and the

07:55comprehensive plan. This first agenda

07:57item specifically deals with the Zoning

07:58Code, which is more regulatory in

08:00nature. Next slide, please.

08:04Uh regulatory authorities, we've shown

08:06this slide before. Um a lot of things to

08:08consider as we're going through these

08:09individual topics is that, um, lots of

08:12different entities oversee these topics

08:14from the state level to the federal

08:16level to the local level, um, depending

08:18on the category um, and the topic,

08:21different authorities overview

08:23different, uh, aspects of these topics.

08:26Next slide, please.

08:30So, the components of the draft UZC

08:33language that we'll go through, it's

08:34kind of bit, uh, separated into two

08:35separate sections. The first one is

08:37definitions, the second one is a

08:38supplementary use regulations, and under

08:40the supplementary use regulations

08:42include the application requirements for

08:44any potential applicant for a data

08:45center site, and then the development

08:47standards. Next slide, please.

08:49>> [clears throat]

08:51>> Uh, this is the document that we'll be

08:52looking at and going through today, so

08:54you should have that in your packet. As

08:55I mentioned before, there's a clean

08:56version and a marked version. Um, both

08:58are suitable. Um, I'll go I'll be going

09:00through the marked document, uh,

09:02specifically, and I'll take any redline

09:04items item by item, but I won't be going

09:06through this page by page. We've done

09:08that prior. So, I'll like I said, I'll

09:10try and be thorough on this, but uh,

09:12quick also in the interest of time. Next

09:14slide, please.

09:17So, definitions, we have four categories

09:19of data centers, micro, standard, large,

09:21and hyperscale. Um, each of those

09:23definitions are identified through

09:26square footage, um, megawatt, and uh,

09:29acreage, maximum acreage, and then, um,

09:33uh, that's shown on the first page

09:34there. So, um, as we discussed before,

09:37you'll see the one change on here, and

09:39I'll go into this in a little bit

09:40greater detail. The acreage on

09:41hyperscale, the maximum, uh, uh,

09:45acreage is currently at none, which was,

09:47uh, something that this group discussed

09:48last go-around. I'll go into that in

09:50greater detail on later slides, but

09:52these are the four standard definitions

09:54that we've been working with. Next

09:55slide, please.

09:58General requirements, so this is on page

10:00four of the document, and this is where,

10:02uh, all these these requirements uh,

10:04apply to all data centers. So, when

10:06someone, uh, so basically, uh, long

10:08story short, uh, floodplain exclusion,

10:10underground lines, outdoor storage,

10:11signs, and inspections are all included

10:14as part of the general requirements for

10:16all four definitions, micro, standard,

10:18large, and hyperscale. Um, we have

10:20floodplain exclusion there. They, uh,

10:21shall be located within any 100, uh,

10:24shall not be located within any 100-year

10:26or 500-year floodplain. Um, let's go to

10:28the next slide, please.

10:31Uh, inspections, insurance, and

10:33construction, um, all data centers

10:35subject to reasonable access and

10:37inspection, insurance is required, and

10:39then, uh, this is a new one as well,

10:41which we will highlight again later on,

10:43that construction times for data

10:44centers, except for micro data centers,

10:46shall be limited to the hours of 7:00

10:48a.m. to 10:00 p.m., and, uh, uh, that

10:51mirrors the current municipal

10:53regulations for the city of Wichita.

10:55Next slide, please.

10:58Application requirements, this applies

11:00to all data centers requiring a

11:02conditional use. Um, the applicant is

11:04required to submit a project narrative,

11:06a concept plan, draft grading and

11:08landscape plans, a visual impact

11:09analysis, and noise mitigation plan.

11:12Again, we'll be going into some of these

11:13topics in greater detail on the upcoming

11:15slides. Next slide, please.

11:19Um, again, this are, uh, continued

11:21application requirements that apply for

11:23all data centers requiring a conditional

11:24use. Also requires an air quality impact

11:26assessment, power supply and grid impact

11:29assessment, and water utilization

11:30report. Next slide, please.

11:34Um, let's see, uh, continuing

11:37application requirements, thermal, uh,

11:39impact mitigation plan, electronic waste

11:41plan, emergency response plan, plan, and

11:43traffic transportation assessment. Next

11:45slide, please.

11:48And, uh, construction management and

11:50mitigation plan, soil and groundwater

11:51assessment, emergency response plan, and

11:54ecological, natural, historic, and

11:55cultural resources assessment are all

11:58required. Next slide, please.

12:02Um, decommissioning plan, wanted to get

12:04more specific on this one. This is

12:05required as part of the application

12:07requirements uh, for all data centers

12:09requiring a conditional use. The, uh,

12:11decommissioning plan shall address

12:12facility and equipment inventory,

12:14removal and disposal procedures,

12:16lifestyle management timelines, site

12:18restoration, and notification to the

12:19governing body. We'll go into this one a

12:21little bit more in greater detail on the

12:22later slides as well. Next slide,

12:24please.

12:26Uh development standards. So, we're off

12:28of the application requirements onto the

12:29development standards. So, all of these

12:32items apply to standard, large, and

12:34hyperscale data centers. That's on page

12:3614 of the document. It requires uh

12:39location uh This This is where we get

12:40into specifics of location requirements,

12:43the maximum building size and height,

12:45setbacks, screening, cool roof, and

12:47solar ready design, fencing, lighting,

12:49and ongoing water monitoring and

12:51reporting. So, all of these are are

12:53included in the development standards.

12:55Next slide, please.

12:58Um this also uh includes water

13:00conservation cooling systems, an annual

13:03compliance report that's supposed to be

13:04submitted to uh the planning department,

13:06backup generators and air quality signs,

13:09decommissioning, which we went through

13:10before, but I'll go into it again later,

13:12uh construction timeline, noise

13:13performance standards, and battery

13:15energy storage systems. Next slide,

13:17please.

13:19This is the uh land use table that we

13:22had shown previously. This is a draft.

13:24Um so, we're working through this. Um

13:26the zoning districts are shown from left

13:29to right. On the far left is RR, rural

13:31residential, which is the primary zoning

13:33district for a lot of these potential

13:35locations that we've been looking at.

13:36The P stands for permitted. The C stands

13:39for conditional use. Um and then all of

13:42uh these land uses, whether or not

13:44they're permitted or require conditional

13:46use, are subject to the conditions

13:49listed uh on D6TT.

13:52That's what this document is. That's

13:53what we've been discussing. So, again,

13:55I'll go through that in greater detail,

13:56but um all of these uh land use uh

14:00permissions are subject to the these

14:02conditions. Next slide, please.

14:06So, now I want to get specifically into

14:07the feedback that we received and

14:09discussed on September 24th and October

14:128th. So, next slide, please.

14:15So, uh if you're willing to walk through

14:17this document with me that would be

14:18fantastic. This is addressing

14:20specifically the comments made by this

14:22committee. So based on the feedback that

14:25we had on page one there was discussed

14:28discussion regarding removing the 1000

14:30acre project area limit for hyperscale

14:33data centers that has been

14:35stricken. So you can see that on

14:38approximately line 30 on page 22

14:42or the first page of that.

14:44We did add changes to remove remove

14:47excuse me move the utility major and

14:50utility minor definitions to the second

14:51page that's been done.

14:53Add construction times and hours

14:55limitations for data centers that can be

14:57found on page five.

15:00As I mentioned before we have those

15:02hours listed as 7:00 a.m. to 10:00 p.m.

15:06and staff mirrored those hours based on

15:10the

15:11city Wichita. So

15:14I wanted to go ahead and highlight that.

15:16Adding text to clarify where the

15:18application will be submitted. There is

15:20some discussion about who the applicant

15:22will be submitting this to. So we wanted

15:24to clear that up and note that it would

15:26be going to the planning department

15:29specifically. So we have that listed on

15:32page six in the top paragraph there.

15:35Adding language that the electronic

15:37waste plan shall be reviewed by the

15:38director of the Sedgwick County

15:40Department of Environmental Resources.

15:41That's on page 10 of the document.

15:44So you can see that on

15:48item L. We added a paragraph there

15:50noting that that would be reviewed.

15:52Adding language to add state historic

15:55preservation office compliance to the

15:58ecological natural historic and cultural

16:00resources assessment application

16:01requirement. That is on page 11. So you

16:04can see in the packet it says page 11 of

16:0619

16:07on there. We added that under section Q.

16:11If we could go back to that slide for me

16:14please Muhammad.

16:17Perfect. Thank you.

16:19And then we have it says add language

16:20requiring the applicant to restore the

16:22site to the pre-existing environmental

16:24condition of the land following

16:26decommissioning. That's on page 12 of 19

16:29under um item R 5. So, we added that

16:33line specifically that pre- pre-existing

16:35environmental conditions of the land as

16:37where it should be restored. I want to

16:39stop on this one cuz I know that we've

16:41had this as part of some discussion um

16:44as part of the site restoration, um

16:47should buildings or no buildings be

16:50included in that? Should we um add

16:52language or remove language uh as to

16:55whether or not the building should be

16:57taken down? Cuz we had the discussion of

16:59pre-existing environmental condition

17:01would technically mean no building. Um

17:03but we just wanted clarification on

17:04that. I believe the way that the code is

17:06written now is the internal guts of the

17:09building would be removed, but the

17:10building would remain. But just for

17:12clarity's sake, we wanted to go ahead

17:14and stop and ask that question again

17:16about the buildings or no buildings.

17:29>> Justin, if I could, I'll go ahead and

17:31add just some things that we've heard

17:32throughout the process about the

17:34buildings. Um we have heard that from

17:37some members of the public on on both

17:39sides of this. Um some have indicated

17:42that the preference their preference

17:43individual preference was to have them

17:45removed and that that was their

17:47expectation because

17:49these

17:51because of the expectation these would

17:52generally be located in agricultural

17:54areas. And so, this would be returning

17:57it to something that's more similar to

17:58what's nearby.

18:00On the flip side, we've heard comments

18:02from individuals about that it doesn't

18:04make sense to remove the buildings

18:06because he's a very large there's very

18:08large investment involved in that. And

18:11the possibility of potentially even

18:12reusing the buildings for something

18:14other than that.

18:16So, I just I want to share those in case

18:18it helps you as you discuss and

18:20deliberate and think about it.

18:24>> Okay. Thank you. Is there any other

18:26commission members have a comment about

18:28buildings or no buildings?

18:31Yes, Commissioner High.

18:33>> Are there any other businesses

18:37in which

18:39uh if they left, and let's say Spirit or

18:43Boeing,

18:45uh that we won't will require them to

18:49take down the building?

18:53>> Not that I'm aware of. Um the most

18:55similar thing that we've got is with the

18:57solar panels, but again, that's panels

18:59and that's not structures.

19:02To say that's not buildings.

19:05>> So, we have Boeing were to leave

19:07Wichita,

19:09heaven forbid,

19:10um

19:12and let leave the buildings there,

19:15most likely they're going to take away

19:16the robotics, and they're going to do,

19:18you know, the guts and all that other

19:19stuff, but they're not going to take

19:20down the buildings.

19:21So, we would probably leave the

19:23buildings.

19:30>> Yes, Commissioner Thiessen.

19:32>> Is there precedent for how other

19:34communities and states have handled

19:36this? Not that we need to follow that,

19:38but wondering what other places are

19:40doing.

19:41>> I don't think we've seen that being uh

19:43very prevalent is having the the full

19:45building come down um based on our

19:47research. I'm not sure some communities

19:49do do it, but but based on our research,

19:50we haven't uh found anything definitive

19:52on that.

19:54>> Yes.

19:55>> Is there anything about the nature of

19:57these buildings that is like

19:59fundamentally different than like other

20:02big warehouse-style buildings that would

20:04make it incompatible for future use?

20:07>> I think just primarily the size. Um but

20:10Scott, did you want to have a comment on

20:12that?

20:14>> Given that it's

20:16involving a lot of computers and

20:18processing, and these are these are not

20:20really designed for humans to be

20:22operating in them as much as they're an

20:24emphasis on the computers and and

20:26mechanics that are taking place inside.

20:28Um

20:30Yeah, I don't It's It's not like taking

20:32office building and then, you know,

20:34taking out all the computers and you're

20:36left with an office building. This is a

20:37a structure that is specifically built

20:40just for computer processing and they've

20:42got all this infrastructure with pipes

20:44and electricity and all of that, but but

20:47it's not like they have windows or it's

20:49really designed with humans in mind.

20:54>> How's the comments?

20:56But certainly could be used in a

20:58warehouse.

20:58>> Yes.

20:59>> I there would be some adaptation, I'm

21:01sure, that would would be necessary.

21:02Now, the question would be, I think, the

21:04degree and I just don't I don't have

21:06have that knowledge. I think it it could

21:08depend on each specific building, but

21:10overall, I would I would just say that

21:14th- these are designed for data

21:15processing and not really for humans to

21:19with the thought that humans would

21:20occupy them.

21:27>> Okay, carry on, Justin.

21:29>> Okay.

21:29>> Yeah, so

21:30>> I guess you got I don't know if you got

21:32it Did you get an idea or not, Scott?

21:33>> N- Not yet. Um I guess I don't want to

21:36let you off the hook that easy, so uh

21:38thanks for asking the question.

21:41>> Well, I think

21:42I don't see how it's any different if if

21:45uh

21:45a business shuts it down and they have a

21:47building and they own the building and

21:49they own the land under it, they're

21:51going to sell that whole thing to

21:52someone

21:54and that someone is going to have to

21:56tear the building down. That's just kind

21:57of the natural process of things. So,

22:01my vote would be leave the buildings.

22:05>> Yes, Commissioner Fry.

22:06>> Thank you. I tend to agree with

22:07Commissioner High in that

22:10>> [clears throat]

22:10>> the building itself could be adaptively

22:12reused, whether it be for

22:15uh manufacturing, warehouse, call

22:18centers. I mean, uh to have a structure

22:21like that, there's an investment made

22:23that could be repurposed. I think that

22:25would something you'd want to explore

22:27rather than just take it out.

22:34>> Commissioner

22:38McKay

22:40Is there any criteria for using existing

22:42buildings?

22:47>> How so? Can you expand a little bit more

22:48on that?

22:50>> Well, I have a building out here and

22:51it's

22:53There's a building on Harry Street just

22:55before you go past the turnpike, under

22:56the turnpike.

22:58And it was a call center one time. And

23:00it's basically an empty building and it

23:02didn't have a lot of anything else.

23:05Is there a

23:06If you're going to have a criteria for

23:09getting rid of them, how you going to

23:10have a criteria if you can reuse them?

23:12>> Okay.

23:13Um so far in the regulations, there's no

23:15criteria that they have to reuse an

23:18existing building. Um

23:20and and

23:21likewise, there's

23:22no criteria about putting a data center

23:25building

23:26uh making modifications to it to make it

23:29usable for another use.

23:31So, hopefully that and there's no

23:33requirement that they use an existing

23:35building in the regulations, either.

23:41>> What I'm saying is is the fact that

23:44if there's an existing good existing

23:46building

23:48and you're saying, well, if we're

23:50talking about tearing down along with

23:53And so, that becomes a single-purpose

23:56building

23:58with the data centers.

24:01If we want to if if data center people

24:03come in and find a building is there a

24:05criteria

24:06is it the same as a new building

24:10or is it different?

24:12Or how do you go about getting from A to

24:14Z?

24:16>> I I we can ask that question. I don't

24:18have that that knowledge right now in

24:21terms of what their specifications are.

24:23The other thing that I would um

24:26The other thing I would share is that

24:28because there's these are evolving very

24:30quickly, I don't know how quickly those

24:33building standards would also change.

24:35So, that's something we can inquire with

24:37Berkeley, but it right now we don't have

24:39a an answer for what their standards

24:41are.

24:44>> Commissioner Matheson.

24:46>> Would keeping the building at all

24:49interfere with what we define as site

24:52restoration including required soil or

24:55groundwater remediation or removal of

24:57hazardous materials?

25:03>> Uh let's see. So,

25:06>> I think in answer to that one, I think

25:09what we would do is we would

25:11clarify that if the building is allowed

25:13to remain, we would state that in there

25:15and then that would of course it would

25:18be the testing and other things to

25:19ensure that they're

25:21not leaving anything toxic and that

25:23they're returning the site overall

25:25excluding the building itself. I mean,

25:27we still want it to be We don't want to

25:29leave any kind of toxic legacy even

25:31though the building is still remaining.

25:33And I'm not saying that the building

25:35would be toxic by any means, but we're

25:38going to we're going to make sure

25:40the intent is to make sure that the site

25:42is not going to be an issue for people.

25:44It's just that whether or not it's got

25:46the structure on it. So, would leaving

25:48the structure inhibit

25:50the ability to make sure that the site

25:52is not going to have an a hazard not

25:54pose a toxic hazard to anyone?

25:57In my opinion, no, it would not.

26:00>> Mr. Hart.

26:02>> Uh

26:03I'm going to

26:05repeat something here. Uh are there

26:07other regulatory agencies that

26:10control that?

26:12>> Yes. I mean, you're going to run into if

26:15there is any toxic issue, you're going

26:16to run into KDHE. You're going to be

26:18working with the EPA according to the

26:20existing regulations.

26:21>> Yeah.

26:22>> Okay. So, I asked that and you can kind

26:24of tell

26:25a little bit from the line of my

26:26questions is is that [snorts]

26:29um

26:30I have an adverse

26:33a feeling that I don't want to duplicate

26:36regulations and I don't want to

26:38overburden some.

26:39I want to right-size the regulations,

26:41but I don't also want to

26:44uh have uh burdensome regulations or

26:47duplicative regulations. And so

26:49uh to the extent that we already have

26:52regulations in place

26:54um

26:56then I'm not going to be in favor

26:59of adding any additional regulations.

27:06>> Anyone else?

27:09Commissioner Theisen.

27:10>> I would also be in favor of

27:12keeping the building on site.

27:17>> So if I could, what I what I understand,

27:20it sounds like there's a general

27:21consensus about

27:23allowing the building to remain. So they

27:25would always have the option to remove

27:27it if they wanted to, but they're not

27:28required to remove it. So we will update

27:32the text to include that. Um please

27:34anyone speak up if there's any other

27:36thoughts on that, but that's how we'll

27:37move forward.

27:38Okay. Thank you.

27:41Thank you very much.

27:42>> Yep.

27:42>> Uh I'll draw your attention to the last

27:44bullet point on this slide, add language

27:46or more requirements to all applicants

27:49on their in their roles. Uh that was

27:51part of the application requirements,

27:53that's paid found on page uh

27:5613 of 19 at the bottom on the paragraph.

27:59We staff added language noting that any

28:01change of ownership or operator shall

28:03necessitate new documentation being

28:05provided to the planning department

28:06establishing or verifying financial

28:08assurance as required by this section.

28:11So we did add language uh based on the

28:13recommendation from this committee.

28:15Next slide, please.

28:20Uh add language or more requirements to

28:22all applicants on their roles. That was

28:23the one I just addressed. Uh so we're

28:25covered there. And then also on I

28:28believe page 13 uh

28:30uh language requirement uh

28:33uh regarding the application um on the

28:36decommissioning plan. Initially, that

28:37language said that we required an

28:39updated decommissioning plan every 5

28:41years. Per this group's discussion, we

28:43wanted every 3 years. So, that change

28:44has been made um right around line 450

28:48there.

28:49Um more discussion. So, uh there was a

28:52discussion regarding the a request to

28:54invite regional energy providers. This

28:56came from our meeting on uh

28:58uh 10/8. As it relates to potentially

29:00requiring data centers to supply their

29:02own power generation,

29:04uh back of meter power generation, and

29:07uh there was a request to invite folks

29:09from Evergy, the Sedgwick County Co-op,

29:11Kansas Gas, and Black Hills. Those

29:13invitations were sent by staff. I do

29:15know that we have a representative from

29:17Evergy in attendance. Um I do know that

29:19Sedgwick County Co-op uh unfortunately

29:21was not able to attend. Um Kansas Gas um

29:24did reach out via phone, provided some

29:26general information, but they were not

29:27able to attend. As far as Black Hills

29:29Energy, I don't believe there is a

29:31representative here from Black Hills.

29:33However, there is a representative from

29:34Evergy. Um

29:36I think we may have an opportunity to

29:38discuss this item a little bit more in

29:40detail later, but

29:43um

29:43I'll go ahead and stop there for a

29:45second. Um again, the the the discussion

29:48regarding requiring data centers to

29:51provide their own energy, the context of

29:54of that discussion was um

29:57whether or not if they do supply their

29:59own energy, what type of energy source

30:02would they be using? Would they be using

30:04uh backup power generators or or or

30:07generators as a primary energy source?

30:09Could gas potentially be used as a

30:11primary energy source? Uh from staff's

30:13conversation with uh Kansas Gas, uh they

30:17did note instances, not necessarily in

30:20in Kansas, but there have been instances

30:22where um because the queue to get access

30:25to the energy grid uh did take a long

30:28time, um that certain data centers did

30:31use gas uh as a primary

30:34uh energy source until they were up and

30:37running with the electrical grid. So,

30:38that was the information that that staff

30:40received from Kansas Gas.

30:42Um, that said, I'll go ahead and stop

30:44there. I wanted to provide a little bit

30:45more context. Scott, do you have

30:47something to add?

30:48>> Go ahead, Scott.

30:48>> If I could, sir. Um, the other thing

30:51with this question

30:52with this conversation, I think it's two

30:53part. Number one, about what should be

30:55in the regs in terms of energy types.

30:58Um, and also, I think the second part is

31:01about the geography question and it's

31:04one that I think is still under

31:05discussion, but the there's a going to

31:08be a relationship to

31:10in terms of what energy source are they

31:12using and also geographically where are

31:14these things going to be located or

31:15where should they be allowed to be

31:17located? So, I just wanted to highlight

31:19that part.

31:20>> [clears throat]

31:20>> And we do get specifically into

31:22geography a little bit later on in the

31:23presentation, so I wanted to go ahead

31:25and note that, but we could also have

31:27further discussion right here. So.

31:29>> I think Commissioner Fry has a question.

31:31>> Yeah, thank you and I have

31:33slept since we had these last meetings,

31:35so I may be

31:37misremembering the conversation, the

31:38discussion,

31:40but I thought it was about the backup

31:42power generation was the question and

31:45not the main power supply because the

31:47whole attraction of

31:49where we're talking about the giant

31:51transmission lines

31:53is why these data centers are talking

31:55about being in this area cuz that's the

31:56main power supply.

31:58I thought the discussion was more about

32:00the backup power generation.

32:02Am I incorrect?

32:03>> You you are correct. We actually covered

32:06both of those topics. So, so the first

32:08one was the the larger geographical

32:10component of showing those maps, showing

32:12the high voltage lines and and proximity

32:14to those lines, but then we also had

32:17another discussion topic regarding

32:19backup generators specifically and how

32:21to regulate those. And the backup

32:23generators discussion was specifically

32:24regarding backup generators as a

32:27supplemental power and whether or not

32:30we've seen in any instances where those

32:32generators have been used as a as a

32:33primary power source. So, your your

32:36recollection is on point. We discussed

32:38both of those.

32:39>> But is there

32:40is there [clears throat] language in

32:41here that's requiring them to supply

32:43their own power generation for primary?

32:46>> Currently no.

32:47>> Thank you.

32:49>> Commissioner Aldrich has a question.

32:51>> Yeah, what I

32:53follow up on that a little bit, you

32:55know,

32:56I'm the one that

32:57made the comments uh relating uh

33:02you know, to the being self-sustainable.

33:05Um

33:06relationship into the rate payers

33:08protection plan uh on that. So,

33:12you know, I keep

33:14hearing on national news, for example,

33:17that

33:18you know, that is going to be a

33:20requirement uh what it sounds like out

33:22of Washington on that. So, that's why I

33:26wanted to have those discussions, you

33:29know, how does that pertain to

33:32not only Sedgwick County, but

33:35you know, elsewhere uh on that. Or is

33:38that just something we don't even talk

33:39about? Uh

33:41you know, so that's

33:43you know, I don't want to be uh

33:47have be limited to just one energy

33:49source uh

33:51whether it's electricity or whatever. I

33:53think they ought to be able to have

33:56uh

33:57all sources available to help reduce

34:00uh

34:01wear and tear on the grid uh and main

34:04thing is is to protect you know, the

34:07citizens out there where they're not

34:08going to be responsible for extra

34:11utility cost for something they have no

34:12control over.

34:18>> Other comments about this section?

34:22See none. Gary Allen.

34:24>> As as I mentioned before, we we do have

34:26a a guest from Evergy in attendance. I'm

34:29just noting that that they are here to

34:30potentially answer any questions that

34:32you might have regarding that. Um so, um

34:35I'll go ahead and just throw that out

34:36there. Um but any other uh thoughts at

34:39all on that one before I move on. Then

34:42let's go.

34:43>> Well, if I could. Um so, currently the

34:46the document is not written with any any

34:49restriction on that they have to provide

34:51their own power. I know that's been a

34:53conversation piece that's come up.

34:56It's come up today, came up previously.

34:58So, I just want to

35:00I guess I just want to

35:02point out that currently the document

35:04does not have that requirement and it

35:05sounds like so far I've not heard a

35:07consensus so far that it should. So, we

35:10will proceed with it the way that it is,

35:12but if there's other thoughts or other

35:14ideas, certainly now would be a good

35:16time.

35:17>> Scott, my whole comments were just

35:20exactly that. Should we require that

35:22they be self-sustainable?

35:25You know, if it's not the consensus uh

35:28you know, of this body, then it's not.

35:32But, I still think that we should ask

35:34that question and we should get a

35:36definitive answer

35:38on that. So, should we require that

35:41you know, they they are

35:43self-sustainable?

35:44If that answer is no, then hey, guess

35:46what? We move on.

35:49>> I think Commissioner Theisen.

35:51Time for that conversation.

35:53>> Um given that we have Evergy here, I

35:56would love to hear from them assuming

35:57they've prepared some remarks and if

35:59not, I I don't have any specific

36:01questions cuz it feels kind of like a

36:03you don't know what you don't know

36:04thing. Um but, if they had any thoughts

36:07um or context to weigh into this, I I

36:09would welcome them if they had any.

36:13>> I I agree. I was wanting to

36:15um hear more from Evergy and and other

36:17folks before That's a great question

36:19that Bob has, but I I need more

36:21information before I can

36:24>> Hi, good morning. I'm Zach Gladhill. I

36:26represent Evergy. My team leads

36:28strategy, long-term planning, which

36:30includes generation, distribution,

36:32transmission planning, as well as all

36:34all of our large customer work. So, very

36:36familiar conversations that uh we're

36:38hearing across the country and across

36:39our service territory. Um

36:41a couple of points I want to bring up.

36:43Uh maybe just the first two and I think

36:45it'll ultimately get to the

36:47self uh self-reliant generation

36:49component. So, the first piece of it is

36:52Evergy has a large load power service

36:54tariff that we've put in place.

36:56What that tariff does is actually

36:58charges data centers a premium when they

37:00connect to our system that goes back to

37:03help put downward pressure on rates for

37:04all of our other customers. So, we think

37:06we were very early in the kind of the

37:08national view of uh

37:11putting rates and tariffs in place.

37:12We've seen a number of folks follow us

37:14and follow our lead uh across the

37:16country. Um the second piece I'll just

37:18touch on really quickly is just

37:20reliability. So, you know, our job is to

37:23manage the grid and operate the grid.

37:25The last thing we we we would ever want

37:26to do was to

37:28serve a customer that would jeopardize

37:30our reliability. You know, reliability

37:32is one of the reasons why customers are

37:33attracted to our service territory. If

37:35we jeopardize that, we essentially, you

37:37know, forfeit any growth opportunities

37:39in the future. Um so, when it gets to

37:41the, you know, the behind the meter

37:42generation, there's there's a lot to

37:44that. Uh we do see data centers that we

37:47have active in our service territories

37:48that have backup power. We've yet to see

37:50anybody have their own generation or

37:52self-supply for the purposes of, you

37:55know, isolating themselves from the

37:56grid.

37:57Um

38:00there's a lot of thoughts on different

38:01ways to do this. If a data center's

38:04going to operate, you know,

38:06365 days a year using its own

38:08self-supply, it has to be gas. It likely

38:11can't be solar and battery storage isn't

38:14a generator. It's just a kind of a

38:15time-shifting mechanism.

38:17Uh so, it has to be gas. So, that's kind

38:18of the the first piece of it. The second

38:20piece of it is kind of going back to the

38:22large load power service tariff.

38:24We charge those customers a premium that

38:26are connected to our system. If they're

38:27not connected to our system, meaning

38:29they have their own self-generation,

38:31then those benefits don't trickle down

38:33back to our other customers. So, happy

38:35to answer any answer answer any other

38:37questions you might have, but just

38:38high-level, that's um

38:40that's kind of how we view it.

38:41I I'll I'll say really quickly, we do

38:43have in our large load power service

38:45tariffs, we we do have an opportunity

38:47for customers provide their own

38:48generation, so that that tariff

38:49structure exists, but we've yet to see

38:51anybody use it.

38:53>> I have a question from Commissioner

38:54Elder, chair.

38:55You know, in short, can you guarantee

38:59that Evergy will pass

39:02savings along

39:05back to the consumer and not be

39:08responsible

39:09for additional uh maintenance and upkeep

39:12to the to the system because of data

39:14centers?

39:15>> The the way that that our

39:18you know, the the the economics work for

39:21regulated utilities is the utility

39:23submits all their costs. Those costs are

39:25divided by the number of kilowatt hours

39:26used. So, when you have a large user

39:29like a data center customer,

39:30those costs are divided by a much larger

39:32number. Meaning that the cost would be

39:35less for each individual uh customer

39:38group. There's different allocations and

39:40it's fairly complex there, but that's

39:42the intent of it is to charge a premium.

39:44You might think about things in the past

39:46where utilities across the country have,

39:49you know, had incentives or other things

39:51to bring large customers into their

39:53service territory. This is the exact

39:54opposite. So, this is charging

39:56essentially a 20% premium to data

39:59centers and data spin centers

40:00specifically, not industrial, not

40:02manufacturing. It helps put downward

40:04pressure on rates.

40:06>> You know, any other concerns that I have

40:09is there's um Texas, for example, the

40:13governor down there has requested an

40:16audit of the of the grid system to make

40:19sure everything can connect could be

40:21handled and everything else. We're we're

40:23not in the dead of winter or the heat of

40:25the summer and all of a sudden

40:27everything crashes. Uh

40:29so, where is Evergy in Kansas uh in your

40:35opinion, are

40:36uh

40:37add on that, you know, is there do you

40:40see any issues, any problems whatsoever

40:43with our current grid system

40:45uh that would anyway, shape or form, be

40:49uh in in danger at all with unlimited

40:52amount of data centers uh possibility uh

40:56area.

40:57>> So, So, Texas has kind of been its own

40:58interesting little piece of the world

41:00from a grid reliability standpoint even

41:02kind of before the data center

41:04uh the boom started. What I'll tell you

41:06is like my group is responsible for

41:08transmission distribution planning from

41:10a long-term standpoint. We won't connect

41:12a data center that's going to jeopardize

41:14that. Like we will do, you know,

41:16sufficient studies. We'll study it

41:17internally with our system as well as

41:19with the Southwest Power Pool, which is

41:20kind of our regional transmission

41:22provider, to make sure that all the

41:24boxes are checked from a reliability

41:26standpoint. Any upgrades that are

41:27required, we would ask the data center

41:29customer to pay for that directly. So,

41:31uh but you know, there's aging

41:34infrastructure across the country. We're

41:35doing our best to address that

41:36proactively, but specific to data center

41:39interconnection, those, you know, those

41:41are

41:41evaluations that we're doing on a

41:43real-time basis with all the customers

41:45that want to locate.

41:46And I Listen, I would say it's not our

41:48job to tell you whether or not you

41:49should have a data center in your

41:50community or not. Our job is to evaluate

41:53customers that come in and serve them

41:54and

41:55uh provide the the reliable service to

41:57all our system.

42:01>> But also, Evergy's is in a position to

42:04uh

42:06have a considerable economic impact uh

42:10on data centers, correct?

42:12>> Well, yeah. I mean, growth, I think

42:14growth is good for for all. So, I think

42:16the the communities, the the tax base,

42:18the the job creation,

42:20uh certainly the the electric sales,

42:23um

42:23it is helpful for for all industries

42:25across our service territory. So, yeah.

42:27We would certainly benefit some degree

42:29to that.

42:30>> I'd sure like to see our utility rates

42:32drop. And I hope that's something that

42:35uh

42:36Evergy would consider even though it

42:38doesn't sound like that they're have any

42:40obligation to do so.

42:41>> Yeah. I mean, you you know, the the

42:43costs for, you know, our industry, so

42:45ignoring data centers, costs for

42:47industries like everything else in our

42:48lives, it's becoming more and more

42:50expensive every year.

42:51The good news is back to the LLPS tariff

42:54rate,

42:55this this premium then goes back to help

42:57reduce customer rate. So, it it it

43:00likely isn't a reduction just given the

43:02the inflation that we're seeing across

43:03the country in all aspects, but

43:06but not for the the data center, it

43:08would be higher. Um so, it's I think

43:10it's a win overall.

43:12>> Commissioner Theesen.

43:14Do you have any concerns with the

43:15regulations as written or what we're

43:18discussing here today?

43:20>> Um

43:21specific to this this

43:23this document.

43:25>> Since we have you here, um yeah,

43:26specific to anything that's in this

43:28document, not just behind the

43:31uh meter power generation.

43:33>> Um I yeah, just got the document this

43:35morning, so I don't know that I've had a

43:37great opportunity for a deep dive in it.

43:39And and I'm not incredibly familiar with

43:41different um city planning regulations.

43:44So, I I read through it briefly, didn't

43:46see anything that that stood out as

43:47problematic.

43:49>> That's fair. Thank you for answering

43:50that, and uh

43:52I invite you that if there's stuff along

43:53the line that you're like, oh, on a

43:55second glance, maybe not what I thought,

43:57I get that.

44:00>> Commissioner Hi.

44:01>> Um

44:02what are the different sources of

44:05energy, uh like wind, solar, what else?

44:08And and

44:09you got it off the top of your heads, uh

44:11percent uh of that input.

44:14>> I don't have it off the top of my head.

44:16So, uh Evergy owns and operates wind,

44:19solar, gas, nuclear, and coal.

44:23Uh we are in the process, and we just

44:26recently published our integrated

44:27resource plan, which is kind of the

44:28forward-looking generation plan for the

44:30next uh

44:32decade. We we update this every year. Uh

44:34it has some battery storage in it. You

44:36know, we've taken kind of an all of the

44:37all of the above approach from a

44:39generation standpoint. So, what you'll

44:41see in that document is there's some

44:42gas, there's some solar, there's some

44:44battery storage uh that we're looking at

44:46here in the near term.

44:47>> And um I'm sure you do, but this I had

44:50to ask, so that if you have a shortage

44:52of one, you could easily fill that

44:55shortage with the other types.

44:57>> You mean like real-time energy, like

44:59electricity? Yeah, so we we we're

45:01connected to the Southwest Power Pool,

45:04you know, the this the system that

45:05basically runs from, you know, North

45:06Dakota to just the northern part of

45:08Texas, and then east to west Arkansas to

45:13kind of the eastern side of Colorado. Um

45:15that that system really helps provide

45:18reliability to all utilities across that

45:21footprint. And so it isn't really a if

45:24we had a problem with one on a day that

45:27we don't have a way to solve that. We

45:28could solve that with our internal

45:29resources or just being connected to the

45:31the broader system.

45:33>> Are you required to share if somebody

45:36outside your area needs more energy?

45:41>> Um

45:43Could you expand just a little bit more?

45:45I'm not sure if I'm following the

45:45question.

45:46>> of your Evergy's circle.

45:49Um do you share any of of electricity

45:54with somebody that may be short?

45:56>> Yes. Yeah, yeah. So So the the the the

45:59transmission system is interconnected

46:01across all those states I mentioned, and

46:04transmission flows back and forth based

46:06on needs and economic demand. So at

46:08times when we have really cheap the wind

46:11production or solar production, we may

46:12be providing that to the broader system

46:14because it's the lowest cost resource.

46:16At times that we don't have that, it may

46:18be coming back to us. So it's a you

46:20know, you just think of it as kind of

46:21just a broad network of of sharing

46:24across the across the country.

46:26>> Okay. So where I was heading is um

46:29I didn't want Kansas to pay for

46:32uh somebody else outside of our area

46:36uh needing energy.

46:39You provided it.

46:40Uh but that then shorts

46:43the uh

46:44energy that we need

46:46within the uh Kansas.

46:49>> Oh, no. No, no, the

46:51anytime that there's a transaction, you

46:53know, really anywhere across the system,

46:55there's an economic uh

46:57payback to the provider and that

46:58provider uh

47:00then transacts that back through fuel

47:01rates. So, that would help, you know,

47:03lower fuel rates.

47:04>> Thank you.

47:05>> Yep.

47:07>> Other questions?

47:10Seeing none, we appreciate you being

47:11here today. Thank you.

47:18>> Before Sorry, Justin, but before we move

47:20on, I Well, the question has been

47:22whether or not to require data centers

47:25to provide their own power.

47:27And I think So, that's the question that

47:29I'm I'm kind of dealing with and I just

47:30want to make sure I'm reading the room

47:32correctly. It

47:34I don't I believe that there's a

47:35consensus to not require that, but I

47:38I guess I'm going to look to you and

47:39just make sure that that's correct.

47:41>> Correct.

47:46>> Commissioner Theisen.

47:46>> I would say that given what we heard

47:48from Evergy and the large load power

47:51service tariff, um if we want that to be

47:54a downward pressure for other rates for

47:57other rate payers, then we wouldn't want

48:00them to

48:01something that I open up to the group

48:02here to make sure I'm saying it right,

48:04that we we wouldn't want them to

48:05generate their own power because then

48:07they wouldn't be able to exert any

48:09downward pressure on

48:10>> Okay.

48:11>> You're in favor, then.

48:13>> [clears throat]

48:16>> Okay. We're ready, Justin.

48:18>> Okay.

48:19>> [clears throat]

48:19>> So, the next line following that is the

48:21fourth bullet point down and this gets

48:22to Commissioner Fry's point early on

48:25regarding the request for Berkeley Group

48:26to do additional research on whether

48:28generators are used in conjunction with

48:29the primary power source

48:32or supplemental power.

48:34Berkeley Group did respond to us via

48:38email and and provided a statement

48:39there. That's this document that you

48:41could see here that's labeled backup

48:42generators for supplemental power.

48:44That's That's at your seat. It's also

48:45listed here.

48:47Um In short,

48:50Berkeley Group found that they should

48:51not be happening and can't really find

48:53any reporting that

48:56people are running backup generators for

48:58supplemental power in non-emergency

49:00times. They did note that what is

49:02happening more frequently is that

49:04emergency generators are are operating

49:07or being given permission or asked to

49:09operate to address grid reliability or

49:11demand response. So,

49:13um again, it's a it's a about a two-page

49:15response there um that has been provided

49:17here. I know that we did request that

49:19Berkeley Group attend this meeting via

49:21Zoom. I believe that they are online.

49:25Um

49:25but uh

49:27I'm not quite sure cuz I'm not seeing

49:28them up there, but um

49:31Scott, did you have anything to to add

49:33on that?

49:33>> Yeah, Momita is going to run back and

49:35check and see if Muhammad shows them and

49:37it's brought into the conversation. Um

49:39what I would add to is that again, we're

49:41working with Berkeley. The context that

49:43they're operating from is they they do

49:45have national experience, but they're

49:47based out of Virginia. So, they're very

49:49focused on the Virginia mar- market and

49:52they've got I would say some some

49:55pretty interesting uh and I guess almost

49:58extreme energy dynamics out there in

50:00terms of their grid.

50:02And so, the the point that they do make

50:04here is that um there is

50:07one data center that because they

50:09couldn't get hooked up was running on

50:11its own power, but as

50:12as we've heard from Evergy, that is not

50:15a scenario that's very common and it's

50:17pretty unique.

50:21>> Good afternoon, Scott. This is Michael

50:23Steiner with Berkeley Group. I am on if

50:25if there are any questions or anything.

50:27>> Thanks, Michael, for being here.

50:29Muhammad, is it at all possible for you

50:30to potentially turn up the volume just a

50:32little bit on Michael? Um if not, that's

50:34okay, but uh if it's at all all

50:35possible, that'd be great.

50:38And and um I'll go ahead and turn it

50:39over to to this group to see if there

50:42are any questions for Michael from

50:43Berkeley Group on this topic

50:44specifically.

50:49>> Commissioner Thorsen.

50:50>> I think a part of the discussion that we

50:52had last time was what the federal

50:54regulations are around um generators. Um

50:59can you address that?

51:01Michael, please and

51:03>> Yes, happy to. So, in looking at this

51:07what if we're talking about generators,

51:08the presumption is we're talking about

51:10emergency generators

51:12and there are specific uh federal EPA

51:15regulations on uh when they are allowed

51:18to operate

51:19um periods of testing and the like. And

51:22I expect and I don't know this

51:24explicitly, but I expect there's also

51:26Kansas state regulations around their

51:28use as well. So, yes, there are EPA

51:32regulations on emergency generators that

51:35control uh

51:38you know, how long they're allowed to

51:39operate, when they're allowed to test

51:41and that sort of thing and that they can

51:43only technically be used in

51:45non-emergency

51:46event or excuse me, emergency events and

51:49limited duration for non-emergency

51:51events such as testing.

51:53Um and what I said and I believe you'll

51:56have my email, but basically

51:58uh as Justin in indicated

52:01um

52:02there have been times in Virginia just

52:04because of the nature of

52:07uh

52:07the grid network there and in demand

52:10where they are potentially being asked

52:13to use emergency generators

52:16for qualifying emergency events uh when

52:19there's grid grid reliability issues,

52:22when there's you know, cold weather

52:24snaps, weather uh issues, grid demand

52:27issues and to ensure that essentially

52:30uh that there's less than potential for

52:33for blackouts associated with that. Um

52:37not sure if those concerns translate and

52:39doesn't sound like they translate to

52:41Kansas today, whether they would in the

52:44future that would remain to be seen. I

52:47think we have some unique conditions

52:48going on in Virginia.

52:50Um but that's um that's what we've

52:52learned.

52:56>> Thank you.

52:58>> Commissioner Altridge.

53:00>> Yeah, this for the Berkeley group. You

53:02mentioned in your

53:04your report, your two-page report, that

53:06Virginia is an importer

53:08uh

53:09of uh power.

53:12Uh so, I can see where

53:15they would have some issues.

53:18There were

53:20uh I don't believe

53:22Kansas is. I think we're

53:24making our own

53:26power here. Is that Is that correct?

53:30>> Yes, I think the

53:32So, the the state and governor recently

53:35released their uh Virginia energy plan,

53:38and there's a heavy discussion in there

53:40about the fact, and this has been going

53:42on for at least a decade plus, I

53:45imagine, but yes, Virginia is a heavy

53:47importer

53:49of electricity to meet the demand, and

53:52the growth in data center development um

53:55has only increased the need for that

53:58import of electricity, and the state of

54:01the transmission network and grid

54:04um have resulted in some challenges with

54:07meeting that demand in certain

54:09geographic areas, northern Virginia in

54:12particular,

54:13um we're seeing

54:15more uh projects for transmission line

54:18upgrades, new transmission lines to

54:21handle that grid reliability issue.

54:24Um and and so, that's certainly kind of

54:27the state of where we are right now.

54:29>> Okay, thank you for that, cuz it it uh

54:31explains a lot.

54:34You know, it sort of

54:35helps ease my concerns a little bit, but

54:38I still have concerns. Thank you.

54:41>> Yes, sir.

54:43>> Other questions for Mike.

54:47See none.

54:49Thank you, Michael, for

54:50being on the line there.

54:52Uh

54:53Commissioner Theisen.

54:54>> What I see in the report from the

54:56Berkeley Group, the third paragraph

54:58here, is that um

55:02emergency generators operating are being

55:04given permission or asked by the utility

55:07to generate power at at their request to

55:10reduce demand on the electrical grid.

55:13The way I read that, that feels like

55:15that's outside of what we can regulate

55:17or what we can put into our zoning

55:20regulations. Is that a fair statement?

55:23>> Scott.

55:24>> Thank you, sir. Um

55:27I think part of the part of the issue so

55:29much with emergency generators is the

55:31air quality impacts. And so, we actually

55:34have some updated text that we would

55:37like to run by you later on to talk

55:39about air quality. So, I I just would

55:43would say we've got some more info on

55:44that one.

55:49>> Who oversees air quality regulations?

55:55>> It's great question.

55:57>> not MABCD.

55:58>> Well,

56:02my understanding is that there we've got

56:05the states involved in that, the feds

56:06are involved in that, and there is the

56:08ability for local governments as well.

56:11Now, what you'll see when we talk about

56:14that is we've got some specific language

56:17in terms of an air quality plan that the

56:20data center would be expected to develop

56:22and then monitoring to report back

56:24whether or not they're following with

56:26that plan.

56:27Um the other thing to keep in mind is

56:29that we are seeing some we've

56:31we've seen some changes in terms of air

56:33quality at the federal level. Um and so,

56:36we're cognizant of that as well in the

56:38language that you see that's that's

56:41recommended at this point.

56:48>> Commissioner Aldridge. This might be a

56:49little premature, but a lot of this goes

56:53to the classification

56:55of what we're doing, whether or not this

56:57is a utility major or minor or

57:00industrial.

57:02And so far, everything that I'm seeing

57:04in here,

57:05uh

57:06staff is

57:08pushing for the utility major or

57:10minor, is that correct?

57:13>> Actually, um in this case

57:16great conversation, great question. So,

57:18the utility major and utility minor um

57:21that that's actually

57:23not not related. It's it's separate from

57:26the data centers. In this case, what

57:27we're recommending is that data centers

57:29have their own definition in the zoning

57:31code. Um and then that there be

57:33conditions attached with that. The

57:36utility major and utility minor, the

57:38reason The only reason why it's included

57:40in this documentation is that because

57:42we're talking about data centers and we

57:44because we know that there are instances

57:46when they do bring behind the meter

57:48power sources with them, we want to make

57:50very clear that those power sources,

57:53when they're behind the meter, require a

57:54conditional use. So, that's why we've

57:57included the language for utility major

57:59and utility minor in the write-up that

58:01you've seen is because we're hoping that

58:03we are recommending that you that those

58:07amendments would also be adopted to

58:08clarify that those absolutely require a

58:11conditional use.

58:12>> Cuz what my concerns are, again, is

58:14regulations and who's going to be the

58:17the

58:19that authority to do that. And if these

58:22are classified solely as utility major

58:25minor,

58:26then the Kansas Corporation Commission

58:29is the one that oversees that. We would

58:32not be having any input

58:35locally or with our local governments.

58:38And that's that's what my concerns are.

58:41>> Yeah, and if it if it helps, um do know

58:44that a data center is under its own

58:46definition. It's not under utility major

58:48utility minor. So, hopefully that that's

58:51helpful.

58:53Thank you.

58:54>> I So, I want a follow-up question on

58:56that if you could. Um

58:58So, repeat what you said about if they

59:01generate power behind the What did you

59:04>> Behind the meter is the

59:06>> Okay.

59:08Um so, now we have some businesses that

59:11do generate their electricity behind

59:13already.

59:15Um

59:16is that true?

59:18>> I'm not aware of one. I'm aware of

59:21There's certainly are a lot of emergency

59:23generators out there. Very familiar

59:25with, you know, seeing those around. Um

59:29but

59:29I'm not aware of one that has its own

59:31power plant besides say like a

59:33university or a larger campus like that.

59:36>> Okay.

59:37Thank you.

59:39>> Commissioner Theisen.

59:40>> Thank you. Is the question here whether

59:42or not we can regulate via the zoning

59:44code how they use backup power?

59:48>> I think that's I think that's part of

59:50it. Um

59:51and

59:52would would you all like to go to that

59:54part of the language? Would that be

59:56helpful now or do you want to wait until

59:57later?

1:00:00>> We're on that discussion.

1:00:02>> Okay. Okay. I well, I didn't want to

1:00:05jump around too much, but um okay, so

1:00:07there is a Sorry, Justin. We'll

1:00:10we're going to pivot just a little bit,

1:00:12but um there's a document that was

1:00:14handed out. Uh this is a brand new

1:00:16document. It's got draft stamped all

1:00:18over it so that it's very

1:00:19distinguishable from the rest of the

1:00:21document. Um what this contains is this

1:00:24contains some uh updated text and um our

1:00:29rec my recommendation our recommendation

1:00:31the staff recommendation is to include

1:00:33this in what if you make a

1:00:36recommendation today to include this in

1:00:38your recommendation.

1:00:39The reason why you're getting this so

1:00:41late is because we continue to

1:00:44look at the the draft regulations and we

1:00:46continue to try and put forward what we

1:00:49think

1:00:50is appropriate or should be recommended.

1:00:53We've had some conversations this week

1:00:55with community members. Uh we've had

1:00:57staff conversations with a staff meeting

1:00:59yesterday. Uh based on that, the

1:01:02Berkeley Group was very kind to work on

1:01:04some language for us.

1:01:06And there are four major points on this

1:01:09one. Um

1:01:10and they hope I think they dovetail with

1:01:13what the community has told us are

1:01:15important. So, there's changes regarding

1:01:18water, there's changes regarding

1:01:20electricity, there's changes regarding

1:01:22air quality, and then there's changes

1:01:24regarding noise.

1:01:26The majority of these are to strengthen

1:01:29what and clarify what the regulations

1:01:31would be concerning those.

1:01:33And then uh there is one where we're

1:01:35rolling back, and then there's one where

1:01:37there's nothing, no changes. And um we

1:01:41have a slide.

1:01:42I don't know, maybe Justin, if you want

1:01:44to step back and go talk with Muhammad

1:01:46and try and get that slide up, that

1:01:47might be helpful.

1:01:49If you remember in the code, there are

1:01:51two parts to the two major parts to the

1:01:53code, which are number one, what's

1:01:55required as part of the application, and

1:01:57number two, what's required as part of

1:01:59the requirements and how you're going to

1:02:01operate. So, for air quality, I just

1:02:03want to take you through that one real

1:02:05quick.

1:02:07So,

1:02:08on page It says page 11 because we did

1:02:11not print out we printed out where there

1:02:14were changes only because we didn't want

1:02:15to we wanted to try and reduce confusion

1:02:17between two different sets.

1:02:20On page 11,

1:02:25you'll see that they have to

1:02:30they're going to have to submit um

1:02:34Hang on just a second.

1:02:39Okay. So, as part of their application,

1:02:42they're going to have to tell us how

1:02:44they're going to monitor air quality.

1:02:47And so, that's what the top of page 11

1:02:50is providing. As well as as we carry on

1:02:54from page

1:02:55uh this got stapled kind of weird. Okay,

1:02:59I see what's happening. That's why I was

1:03:01a little bit thrown off. So, page 10 is

1:03:03actually the next I don't know why

1:03:05they're stapled a little wacky, but

1:03:07on page 10, you can see that they've got

1:03:09to do

1:03:10they've got to tell us about their air

1:03:12quality plan. They've got to include the

1:03:14emission sources,

1:03:16what their anticipated emissions are

1:03:17going to be.

1:03:18Then, number three in my mind is um

1:03:22well, they're all important, but it

1:03:23shows how they're going to monitor and

1:03:26report the air quality.

1:03:28What emission reduction measures they're

1:03:30going to put is number four.

1:03:33And then number five, if there's any

1:03:34changes.

1:03:36Okay, then that carries over to page 11,

1:03:38okay, which is stapled before it, but

1:03:40you'll you'll see that's the tail end of

1:03:42it.

1:03:46So, as part of the application, they're

1:03:47going to tell us what they're going to

1:03:49do in terms of air quality.

1:03:51>> [snorts]

1:03:51>> Then, if we flip to page 19 of this

1:03:55document,

1:03:56you're going to see

1:03:59that there's an annual reporting

1:04:00section.

1:04:01And we've that one has been edited to

1:04:03say there's air quality and emissions

1:04:06now.

1:04:07So, they're going to tell us they're

1:04:08going to be required to report this on

1:04:10an annual basis,

1:04:12how often they how many hours they're

1:04:13running the backup generators,

1:04:16what their fuel consumption is, item B,

1:04:21their estimated pollutants,

1:04:23item C,

1:04:25what they're doing for emissions

1:04:26control,

1:04:27and any identification of any um new

1:04:30standards that would apply.

1:04:34Now,

1:04:35also you can see they're going to have

1:04:37to number three, talk about compliance.

1:04:43And then the very last one at the bottom

1:04:45of this page on 741,

1:04:48you're going to see anything what

1:04:49happens if there's non-compliance.

1:04:53So,

1:04:55so in this way, you can see the

1:04:56strikeout text that's in there. And

1:04:58again, I'm sorry it's stapled kind of

1:05:00wacky, we'll work on that, but

1:05:03you can see in this way we're trying to

1:05:04clarify exactly what the expectations

1:05:06are. And you can see the struck out text

1:05:08because the struck out text led to

1:05:10questions in our in our own staff

1:05:12meeting about how would this be

1:05:13interpreted.

1:05:15We wanted to make sure that we provided

1:05:17you with

1:05:18the most clear um, text that's

1:05:20enforceable.

1:05:24So, hopefully that helps when it comes

1:05:26to the question of backup generators

1:05:28because a big issue that we've heard

1:05:30about from backup generators is what

1:05:32happens with noise and what happens with

1:05:33air quality. So, this is the way that we

1:05:36we're proposing to address the air

1:05:37quality.

1:05:45>> Questions or comments about where we are

1:05:47right now?

1:05:51Commissioner Aldridge.

1:05:52>> I guess we need to get back on

1:05:55track here. So, I won't

1:05:59talk too much about that, but at some

1:06:01point there's other

1:06:04issues, uh, concerns on the draft that

1:06:08you needed to discuss, too.

1:06:10>> Yes, sir. Yeah, we've got some more to

1:06:12go through with you, but that's just on

1:06:13air quality.

1:06:15>> Okay.

1:06:17>> Yeah, I think we can go back to the

1:06:19slide that we were on, Muhammad. So, so

1:06:21several slides back. Um, but hopefully

1:06:24that that rundown that Scott gave you on

1:06:26those draft regulations, uh, this is

1:06:28perfect, Muhammad. Thank you. Help um,

1:06:30potentially answer,

1:06:32uh, the the the the discussion on bullet

1:06:34point four, um, which is whether or not,

1:06:38uh,

1:06:39generators are used in conjunction with

1:06:41a primary power source.

1:06:43Um,

1:06:44should we move on from that particular

1:06:46topic? Is the information that Scott

1:06:48provided, uh, are you comfortable with

1:06:51that right now, um, or would we like to

1:06:53move on to the next item?

1:07:00>> We need a vote. I'll say yeah, I'll move

1:07:01on.

1:07:03Cuz we cuz we again, as Scott mentioned,

1:07:05we will go back through this draft

1:07:07language again later on. So, I'm

1:07:09comfortable with that as well. So, um,

1:07:11the bullet point on the bottom, bullet

1:07:13point five, uh, there was some

1:07:15discussion about more,

1:07:16uh, research on draft language involving

1:07:19beds. The context of that again was, uh,

1:07:21geography. Uh, we should have showed

1:07:23several maps throughout the course of

1:07:25this process.

1:07:27Those maps included prime agricultural

1:07:29farmland. They included the high voltage

1:07:32lines throughout Sedgwick County. And

1:07:35then

1:07:36we had released

1:07:37a map at our meeting. I believe it was

1:07:39on the the 22nd or October 8th showing

1:07:42the high voltage lines with the Equus

1:07:44beds

1:07:46laid out over that in Northwest Wichita.

1:07:48So there was a discussion Excuse me,

1:07:50Sedgwick County. So there was a

1:07:51discussion

1:07:52regarding whether or not

1:07:55geography standpoint and where potential

1:07:58data center projects can be located

1:08:00whether or not

1:08:02there should be a prohibition

1:08:04potentially on

1:08:06the location of data centers near the

1:08:08Equus beds or on the Equus beds.

1:08:10But I wanted to go ahead and and bring

1:08:11up this discussion again

1:08:14to to see if there is any discussion

1:08:16related to the Equus beds geographically

1:08:19speaking.

1:08:22I know that

1:08:24I know that I'll maybe look to Kirk a

1:08:25little bit on this one as I know that

1:08:27there was some discussion about that.

1:08:30Kirk, I don't know if you have anything.

1:08:31If not, that's fine, too.

1:08:35>> Kirk Sponsel, Sedgwick County counselor.

1:08:36I'll let the conversation kind of

1:08:38run run with this a little bit, but I

1:08:40will say

1:08:42generally speaking this is an issue that

1:08:44I've brought up generally in the past

1:08:47that um

1:08:49my legal opinion is that the state has

1:08:51occupied the field in terms of

1:08:52regulations concerning the transfer and

1:08:55usage of water in commercial settings,

1:08:57which is what we're dealing with here.

1:09:00Um and just to extrapolate a little bit

1:09:02just for the purpose of clarification

1:09:05basis, whatever it may be, is there is a

1:09:08specific statute where a lot of

1:09:09authority regarding

1:09:11water usage and regulation is covered by

1:09:13the state agency. And then further on

1:09:16this last year the state adopted a bill

1:09:20which added language into 19101A

1:09:24um which really specifically laid out

1:09:27that hey, um,

1:09:29pursuant to home rule authority,

1:09:31municipalities, specifically counties,

1:09:33do not have the authority to

1:09:35add extra regulations, conditions,

1:09:38duplication of what the state's doing in

1:09:40regard to this matter.

1:09:44>> Commissioner Eldridge.

1:09:46>> Councilor, thank you for that, but I

1:09:49guess what you're saying is that

1:09:53any discussion whatsoever or any

1:09:55requirements we have

1:09:58uh, pertaining to water, water usage,

1:10:00water water treatment, or anything is

1:10:04off the table. We cannot talk about

1:10:07that. We can't regulate that. So, it's

1:10:10they can do anything they want to do

1:10:13uh, on the water, basically, and that's

1:10:17that's where we're at.

1:10:18>> In terms of the water usage and

1:10:20transfer, yes. And I'll go a step

1:10:22further and I say I even looked at the

1:10:24legislative history

1:10:26and the legislative basis regarding the

1:10:28bill they passed this last year to kind

1:10:30of see what they were going towards and

1:10:33um, the person who presented that,

1:10:35Representative Wassinger

1:10:37Wassinger Wassinger,

1:10:39um, she she presented that and she is

1:10:42specifically alluded to

1:10:44zoning regulations that were being

1:10:46applied out in Edwards County in regards

1:10:49to water usage and transfer.

1:10:52So, we're dealing with zoning

1:10:53regulations here.

1:10:54Um, they made the language very broad. I

1:10:57don't necessarily

1:10:59claim that they were contemplating this

1:11:01type of situation,

1:11:03um, but I think the language is broad

1:11:05enough that it does encompass a lot of

1:11:06what we're dealing with here.

1:11:08>> I think he just hit the nail on the

1:11:10head. I don't think that they

1:11:11anticipated anything like this. So,

1:11:15we're a bit of a gray area right here.

1:11:17And if we don't speak up one way or the

1:11:21other on this,

1:11:22I'm

1:11:24I mean, what's going to happen? You

1:11:25think the state's going to? Sometimes

1:11:27the state can't get out of their own

1:11:28way.

1:11:29And you know,

1:11:32I think there's got to be watchdogs or

1:11:34caretakers somehow.

1:11:36Uh you know, and I'm not an

1:11:37environmentalist, but all of a sudden I

1:11:39think I I'm leaning that way for some

1:11:42reason. I just got to make sure our

1:11:44precious

1:11:45resource. You can't function, you can't

1:11:47do anything

1:11:49without water.

1:11:50And when there's lack of water or no

1:11:52water,

1:11:54you know, you can stand stand up and do

1:11:56a rain dance all day long. You know,

1:11:58it's not up to us

1:12:00uh on on that. So, and those are some

1:12:02major concerns

1:12:04that we can't even

1:12:06we can't go down that path. And I'm and

1:12:09that's that's got me it got me

1:12:11concerned, but

1:12:12>> And And I appreciate that. And I think

1:12:14for the record that from day one, the

1:12:16protection of certain natural resources

1:12:19such as water has been at the forefront

1:12:21of concern in this discussion. I I'm

1:12:23just relaying what the state's done and

1:12:25how they may have inadvertently impacted

1:12:28this discussion.

1:12:30>> Thank you, sir.

1:12:32>> Scott.

1:12:34>> So, I think there's a nuance that has

1:12:35come up in some of our discussions when

1:12:37it comes to the aqueous beds. And before

1:12:39we leave this topic, um

1:12:42so my understanding is that when it

1:12:45comes to you the state's occupied the

1:12:46field when it comes to water usage. Now,

1:12:49I think one of the avenues that we've

1:12:51talked about has been well, and actually

1:12:53not avenues, but concerns that we've

1:12:55talked about is contamination though of

1:12:57the aqueous beds. So, I guess I don't

1:13:00know Kirk if you want to speak a little

1:13:02bit about that or if you'd like me to or

1:13:05>> Um that

1:13:07that contamination component that is

1:13:09covered by different statutes. Um I will

1:13:11say under that different statute, there

1:13:14are some authorities that are given to

1:13:16uh

1:13:17I think it's secretaries of health and

1:13:19public safety regarding

1:13:21uh contamination,

1:13:23things defined as sewer, um impacting

1:13:26the water supplies, things of that

1:13:27nature. But that is a different

1:13:30uh, statute where

1:13:33some of their language is not quite as

1:13:35broad as, I think, water usage and

1:13:37transfer.

1:13:39With that said, the state still does

1:13:41have some impacts and regulations in

1:13:43that regard and some authority in that

1:13:44regard.

1:13:45>> Commissioner Hi.

1:13:47So,

1:13:48we need to figure out then risk,

1:13:51um, that there would be a problem. So,

1:13:54if the possibility of risk,

1:13:58uh, that there would be some pollution

1:14:00in the aquisbed, there's going to be

1:14:02some

1:14:02pollution on top of the ground.

1:14:05Um,

1:14:06is if is this a 5% possibility or 25%

1:14:12possibility and then the damage. What's

1:14:15What's the

1:14:16So,

1:14:17uh, what I don't want to do is over

1:14:19regulate something that is a 0.0001

1:14:24possibility.

1:14:31>> Any other comments?

1:14:35Mr. Scott.

1:14:36>> Sorry, not going to let you move on too

1:14:39too soon. So,

1:14:40So, it sounds like

1:14:42it's been indicated by Commissioner Hi,

1:14:45uh, that he'd like to know more about

1:14:47the risks.

1:14:48That is something we can do is we can

1:14:50ask we can do some research on that and

1:14:52ask Berkeley to do some research on what

1:14:53the risk would be. I assume the risk of

1:14:56contaminating of ground water.

1:14:58Is that

1:14:59>> Well, that's true, but also it's the

1:15:03that risk formula needs to,

1:15:05um, have as an input,

1:15:09um,

1:15:10what

1:15:12possible What is in the data set

1:15:15that would be risky to the

1:15:19pollution. So,

1:15:23>> And that, I believe, is covered because

1:15:25we do ask for data on the major

1:15:27components.

1:15:29Um, I'll It'll take some time for me

1:15:31need find that, but I'll look for that.

1:15:33But, I guess

1:15:35there's probably examples of other

1:15:37groundwater contamination that has

1:15:39happened,

1:15:40uh whether it be ag or fertilizer or

1:15:45uh etc.

1:15:46that I mean, this is new territory, so

1:15:48there's got to be protocols and

1:15:50procedures and regulations in place for

1:15:53groundwater contamination already that

1:15:55we don't need to reinvent the wheel

1:15:57here.

1:15:58That's my

1:16:03>> Uh I'll make this comment. From past

1:16:06experience, I

1:16:07I know there's people sitting in this

1:16:09room right now that know

1:16:11a heck of a lot more about the Equus

1:16:13beds than we could ever know.

1:16:15Uh I assume when it's time to speak,

1:16:18they'll come up.

1:16:20You can ask them any of the questions

1:16:22you want. They're mostly from the ag

1:16:23community.

1:16:25But, uh

1:16:27as far as gaining

1:16:29further knowledge about this, that's my

1:16:30only hope is what somebody else knows.

1:16:33So.

1:16:35>> And to Commissioner High's question,

1:16:36too, about um the

1:16:38the

1:16:39equipment being used in data centers and

1:16:41and where that's located, it's got

1:16:44mentioned that we do have language in

1:16:45here as part of the

1:16:47uh definitions we do and part of the

1:16:49application requirements, we do require

1:16:51that they submit uh

1:16:53impact generating equipment um

1:16:55information, I believe, regarding um

1:16:58indoor outdoor equipment. Um and whether

1:17:02that equipment will material materially

1:17:04affect noise, air or emissions, water

1:17:06use or discharge, heat, vibration, odor,

1:17:08etc. So, um we do have that information

1:17:11listed in

1:17:13code.

1:17:13>> In in your suggested regulation?

1:17:16>> Y- yes.

1:17:17>> So, Mike, then I'm asking the question,

1:17:19is is there already regulation

1:17:23that that information is provided by?

1:17:26And

1:17:30does the agricultural community have to

1:17:32provide information, also,

1:17:35um

1:17:37that they're

1:17:38using these chemicals

1:17:40overlook aqueous bed. In other words,

1:17:43again, I don't I want to duplicate

1:17:44regulations and

1:17:46and uh

1:17:48oversight function.

1:17:50>> Just couple quick points. Um so Justin,

1:17:53is that online 417?

1:17:57>> Uh that uh

1:17:59believe that was the one that I was

1:18:01addressing. Uh it's within the

1:18:03decommissioning plan and then it's also

1:18:04defined on the on the first page.

1:18:07>> And just for everyone's clarification,

1:18:08that's not going to show up it's not

1:18:10going to line up with the one that has

1:18:11draft stamped on it. It's the one that

1:18:13you got earlier that's the bigger one.

1:18:15I'm sorry, but that's a result of having

1:18:17two different documents.

1:18:21I'll give you some time to find that if

1:18:23that's helpful.

1:18:31Yeah, line

1:18:32417 it should start out with facility

1:18:34and equipment inventory.

1:19:01So what I've heard so far is that there

1:19:04was conversation about getting some more

1:19:06information about what the risk is of

1:19:08data centers and contamination of ground

1:19:10water.

1:19:11There's also been some conversation

1:19:13about learning what other experts um

1:19:15have to say about that that level of

1:19:17risk. I believe over the aqueous beds is

1:19:21where I think this is. And then there's

1:19:22been conversation also that

1:19:24there are already regulations in place

1:19:27and um

1:19:29unfortunately our ex well, our expert on

1:19:31that would be Susan Erlenwein and she's

1:19:33usually here, but she's not in

1:19:35attendance today, But

1:19:37um, I so I think that comment was

1:19:40understanding that there are regulations

1:19:42that are in place to already kind of

1:19:43address groundwater contamination

1:19:46issues.

1:19:47So, with that

1:19:49that's my recap of where the

1:19:50conversation's been so far. I don't know

1:19:52that we've got a clear directive to do

1:19:54any additional action on on your behalf,

1:19:56but if there's anything that you would

1:19:58like us to do, let us know.

1:20:01>> I would agree with that comment. I think

1:20:02we need to move on.

1:20:05Okay, I'll go over the next slide,

1:20:06please.

1:20:13So, more unresolved questions uh to go

1:20:15through.

1:20:16Um

1:20:17again, geography specifically, we

1:20:19discussed location requirements. And um

1:20:22as I mentioned before, we did show

1:20:24um maps previously regarding

1:20:26high-voltage utility lines, agricultural

1:20:28lands, and equus beds. So, this kind of

1:20:30dovetails a bit off the question that we

1:20:31just had regarding the equus beds. Um

1:20:34but um

1:20:36geographically, as I mentioned before,

1:20:37we showed the land use table. And I

1:20:39think uh that draft land use table, per

1:20:42our discussion, uh there the comfort

1:20:44level seemed to be uh there with this

1:20:46group with the the standard land uses

1:20:50and the zoning districts. But uh the the

1:20:53the second component to that is the

1:20:54location requirements and whether or not

1:20:58there should be any limitation regarding

1:21:00the equus beds, as we as we've just

1:21:01discussed. But then

1:21:03uh

1:21:04the the agricultural lands as well as

1:21:05the high-voltage utility lines. So, we

1:21:07had previously shown a 1-to-3-mi radius

1:21:10map there. Um but then I think the most

1:21:12recent map that we showed um that also

1:21:14contained the equus beds also contained

1:21:16a 4-and-5-mi

1:21:18radius of where potential data center

1:21:21project could be located. So, uh you may

1:21:23recall we had that brown uh line and it

1:21:26showed the rainbow essentially of that

1:21:284-and-5-mi distance. Those maps are

1:21:30included in your packet. Um but I wanted

1:21:32to go ahead and open that up again for

1:21:34discussion to see if there was any uh

1:21:36specific comments regarding location

1:21:38requirements outside of general zoning

1:21:41and land use.

1:21:43>> Was that a question on making a

1:21:45recommendation for one of the options?

1:21:47Wasn't there like an option A, B, and C?

1:21:49And are you wanting a recommendation for

1:21:51one of those options?

1:21:53>> So, let uh let's see. To your question,

1:21:56Commissioner Fry,

1:21:59on page 14 of 19, page 35 overall in the

1:22:04master packet, um we do have some

1:22:07options, yes. So, great memory. Um

1:22:11It talks about uh this is located within

1:22:12the development standards. This is the

1:22:14first item, and we do we have laid out a

1:22:17couple different options there.

1:22:19Um

1:22:20Uh

1:22:21the first one is what I was discussing

1:22:23about uh potential location from 345 kV

1:22:27lines uh within 5 mi, within 3 mi. Um

1:22:31option B um was a potential option to

1:22:35include language to have data center

1:22:36projects located outside of prime

1:22:38agricultural lands. And then option C

1:22:41was no restrictions. So, um we we we

1:22:45left this as an option to be discussed

1:22:48today.

1:22:49Uh so, if there's any uh further

1:22:51comments or questions on this, we're

1:22:53happy to go through those.

1:22:58>> It seems like option C gives us the most

1:23:00flexibility and provides the most

1:23:03viability

1:23:04for any potential projects.

1:23:09>> Agreed.

1:23:17>> Knowing that they still have to go

1:23:19through the permitting process and

1:23:20everything to still meet community

1:23:22acceptance.

1:23:22>> Sure.

1:23:27Any other comments? I know Commissioner

1:23:28Fry and Commissioner High noted uh

1:23:31agreement on that one. Any other

1:23:33comments regarding location

1:23:35requirements?

1:23:37Um regarding those various factors of

1:23:39utility lines, agricultural lands, or

1:23:41Equus beds.

1:23:44>> Option C feels like it might be the

1:23:46opportunity where the community has the

1:23:48greatest input. Um where they can come

1:23:51to the process and say

1:23:54um

1:23:55you know,

1:23:56option A and option B aside, this is

1:23:58what I feel is good or not good based on

1:24:01what any specific project is proposing.

1:24:13>> Yes, Commissioner Oldridge.

1:24:16>> Yeah, I

1:24:17>> [snorts]

1:24:18>> would totally be opposed to option C.

1:24:21Uh you can't just

1:24:24if we're not going to have those

1:24:27discussions as far as where the data

1:24:30centers can be

1:24:32uh

1:24:33put in and you're talking about option C

1:24:37where there's no restrictions, they can

1:24:39be put anywhere in the county, any

1:24:41location.

1:24:43Uh

1:24:44unless I'm totally misunderstanding

1:24:46that.

1:24:48Is that correct? Is that what you're

1:24:49saying?

1:24:50>> Yes, sir. So, option C, the option would

1:24:52place no restrictions on the location

1:24:54where applicants could apply for

1:24:55permission to use property for a data

1:24:57center.

1:25:00>> But there are existing restrictions that

1:25:02would prevent them from just being

1:25:03anywhere.

1:25:04>> When an application would come in as

1:25:06part of a conditional use, we would look

1:25:08at that and and those discussions could

1:25:09be had at that public hearing for that

1:25:12specific application, yes.

1:25:17>> Well, I'm totally misreading this cuz it

1:25:19says this option would place no

1:25:21restriction on locations where the

1:25:23applicant could apply for

1:25:25uh permission to use property for a data

1:25:28center.

1:25:29>> Right, we wouldn't put the

1:25:30>> reading that it can be anywhere in the

1:25:33county.

1:25:33>> Yeah, we wouldn't add language

1:25:35specifically to the code saying you

1:25:37cannot put it here or should be long

1:25:39here. Um specifically, there would be no

1:25:43language, we would rely on the zoning

1:25:45when an application came in and if it

1:25:47was permitted or or or was a conditional

1:25:49use, during that conditional use

1:25:51hearing, we would look at that

1:25:53specifically and then we could still

1:25:54bring up those particular topics and say

1:25:57this is not a good fit or it is a good

1:25:58fit based on the

1:26:01um

1:26:01information provided by the applicant.

1:26:07>> I think

1:26:09Um Commissioner Edwards raised kind of a

1:26:11good point, but the option probably

1:26:13could be worded a little bit clearer to

1:26:17describe that there are existing

1:26:20Certainly.

1:26:22And that you're not we're not requiring

1:26:24additional regulations.

1:26:26>> In short, make it Bob-proof.

1:26:30>> But I do want to make sure that

1:26:32everyone's on the same page in terms of

1:26:34what this would mean. So, we showed that

1:26:37zoning table.

1:26:39Um

1:26:39it would allow

1:26:41all the data centers by conditional use

1:26:44in rural residential. So, as we've

1:26:48talked a lot about

1:26:50the unincorporated county, I just want

1:26:52folks to understand that this option

1:26:54would allow a conditional use

1:26:55application for a data center anywhere

1:26:58that there's rural residential zone

1:27:00zoning.

1:27:07>> As somebody again who is still fairly

1:27:08new here, can you talk to me a little

1:27:10bit about what's allowed in rural rural

1:27:12residential right now?

1:27:13>> Sure. Rural residential is uh we do not

1:27:16have an agricultural district, but this

1:27:18is the closest that we have to it. So,

1:27:20it allows for um home sites uh minimum

1:27:24of 2 acres in size and agricultural

1:27:27uses. So, it's what the overwhelming

1:27:29majority of the unincorporated county is

1:27:31zoned.

1:27:45>> Are there any other thoughts or comments

1:27:46on Scott's clarification of whether or

1:27:48not we're comfortable with

1:27:51allowing these based on the essentially

1:27:53the the the land use and the and the

1:27:55zoning

1:27:56primarily

1:27:57and going with option C.

1:27:59>> Commissioner Warren.

1:28:00>> I'm looking for consensus. I I would be

1:28:03comfortable with option C.

1:28:14>> So, based on the conversation and just

1:28:16to

1:28:17kind of keep the conversation going, it

1:28:18appears that we have 1 2 3 4 members who

1:28:22have expressed support for option C. We

1:28:25have one member who's expressed that

1:28:27they're not supportive of option C.

1:28:29Are there any other conversations on

1:28:31that?

1:28:32>> Well, again, I just want

1:28:35I'm trying to wrap them around my mind

1:28:37on the wording here.

1:28:38Uh

1:28:40you know, again, option C

1:28:43does not replace any restrictions on

1:28:46where a data center could be located. It

1:28:48could be located anywhere in the county.

1:28:54>> So, what

1:28:55what this dovetails with is the table

1:28:58that we showed earlier. And I

1:29:01Amita, if you could step back and help

1:29:02Mohammed find that slide, that would be

1:29:04really helpful that shows from the

1:29:06zoning table and permitted and

1:29:08conditionally uses.

1:29:11So, um so, this would not place any

1:29:14additional restrictions on Ah, here we

1:29:16go. Where data centers can go above and

1:29:19beyond

1:29:21what this says.

1:29:22Yep. So, I just What we'll do is the

1:29:25zoning districts are across the top. The

1:29:28definitions of data centers goes from

1:29:30top to bottom. So, you'll see that in

1:29:33the rural residential zoning district,

1:29:35it's conditional use for all of them.

1:29:38If you look at the SF 20, you'll see

1:29:40that it's a conditional use also for all

1:29:42of them.

1:29:43But, when you get to SF 10, you'll

1:29:45notice that only data center standard

1:29:48size is allowed by conditional use in

1:29:52SF10.

1:29:53Data center large and hyperscales are

1:29:56not allowed. You cannot apply

1:29:58for zoning permission in those

1:30:00districts.

1:30:01>> So, I have a question for legal. Is this

1:30:03a case where

1:30:05the language could just be simply added

1:30:09no additional restrictions

1:30:12on the location where applicants could

1:30:14apply?

1:30:15Because right now, when I see could

1:30:17apply, that speaks to the restrictions

1:30:20that are already in place. Meaning, you

1:30:22can't apply for this because there's you

1:30:24don't meet the

1:30:27the application is going to meet the

1:30:28existing

1:30:30application criteria. Does that make

1:30:32sense?

1:30:32>> Right. And And I think ideally, if C

1:30:34were the option, I think that would

1:30:36basically mean that 3A is eliminated

1:30:40completely.

1:30:43>> We would just strike the text would be

1:30:45the easiest way.

1:30:46>> The text would just be silent on that.

1:30:48We're looking So, we would be adding

1:30:50language if you all said, "Look, we only

1:30:52want within 5 mi of a 345 kV

1:30:57line." Or, "We don't want it in such an

1:31:00area." But, if it's if we're not

1:31:02addressing those issues, then I think

1:31:03the language would just be silent and we

1:31:05wouldn't address it.

1:31:07>> Does that

1:31:08mitigate Mr. Aldridge's concern that

1:31:10we're just allowing him to go anywhere

1:31:12they want?

1:31:13Because there's existing application

1:31:16requirements that they can't.

1:31:21>> I mean I mean for best point of an

1:31:23example, I'm just going to hearken back

1:31:26to solar. So, solar does have something

1:31:28that contemplates a limit within a

1:31:30certain area. So, with large-scale

1:31:33solar, they had specific language that

1:31:35says,

1:31:36"Hey, you cannot have a large-scale

1:31:39solar application within the urban

1:31:42growth area of a city." So, that's the

1:31:44type of restriction I think is being

1:31:46contemplated here just in different

1:31:47forms. Now, if we wanted if we didn't

1:31:52want that, if we just want solar

1:31:53anywhere, then we would just stayed

1:31:55silent on that. Just being silent

1:31:57doesn't take away the fact that they

1:31:59still have to hit all the other

1:32:00restrictions and regulations that are

1:32:02being put in place elsewhere in the

1:32:03code.

1:32:05>> And Commissioner Fry, thank you for

1:32:07assisting in that clarification.

1:32:10Uh I just

1:32:11you know, I just want to make sure that

1:32:13I've got it wrapped around in my little

1:32:15head.

1:32:16Uh so, this would be the gatekeeper on

1:32:19that. So, I

1:32:20appreciate that. Excellent.

1:32:21>> I'm not the smartest person in the room.

1:32:23Otherwise, I'd be gone.

1:32:27>> Well, I do I do want to emphasize it and

1:32:29thank you again for volunteering in what

1:32:31you do as planning commissioners. This

1:32:32is complex information and you're

1:32:35getting this material um We're working

1:32:38on it as you can see up until the minute

1:32:40of the meeting essentially. And so,

1:32:43you're getting a lot of information

1:32:44thrown at you. You're getting a lot of

1:32:46big questions that are coming to you.

1:32:47Now, fortunately, you've you've you're

1:32:50you're able to wrestle with some of the

1:32:51questions from meeting to meeting, but I

1:32:53do want to say

1:32:55please please don't feel like you're

1:32:56you're not smart or you're not getting

1:32:58something. It's just this is complicated

1:33:00materials and I appreciate you all

1:33:02taking the time to go through it.

1:33:06>> Okay.

1:33:06>> Um yeah.

1:33:07>> Muhammad, if you can go back to that

1:33:08unresolved questions slide, uh we're

1:33:10currently working through that.

1:33:12Perfect. Thank you. So, that I think

1:33:14covers the location requirements. I

1:33:16think we received consensus on that. We

1:33:17did have that discussion earlier about

1:33:19requiring private power supply. I

1:33:21believe we received information on that.

1:33:23So, I think we're comfortable with that

1:33:24bullet point as well. Down to the noise

1:33:26performance standards and um that is on

1:33:31um

1:33:32page, I believe it was 17 of 19 on the

1:33:38um

1:33:41Excuse me. Uh page 19 of 19 18 18 and 19

1:33:44of the uh draft document, uh page 39 and

1:33:4840 on the overall master document, noise

1:33:50performance standards,

1:33:52um

1:33:53and whether or not option A, we should

1:33:55have

1:33:56set residential sensitive noise

1:33:59standards based on DBA and DBC. I

1:34:03believe DBC covers vibration.

1:34:05Or option B, which is an alignment with

1:34:08the existing municipal noise ordinance,

1:34:11which again, just to reiterate, Sutra

1:34:13County does not have a noise ordinance.

1:34:15So, it's got

1:34:16>> Sorry.

1:34:17This is one of the topics where we have

1:34:19some revised and updated recommended

1:34:21language for you. So, if we could, maybe

1:34:23we'll we'll wait until a little bit

1:34:25later to go more in-depth, but at least

1:34:28you This gives you a basis of where we

1:34:30were

1:34:31up until this meeting. And we I want to

1:34:33go through that with you in just a bit.

1:34:37>> Mr. Aldridge, I have a quick question.

1:34:39You know, again, since

1:34:41there is

1:34:43isn't a noise ordinance, if you will, in

1:34:45the county.

1:34:47So,

1:34:49basically, if we come up with one, if

1:34:51you will, for the data centers, how is

1:34:54that going to affect affect any other

1:34:56applications,

1:34:58vet centers, or anything else like that?

1:35:00What ramifications is that going to

1:35:02have?

1:35:02>> Sure. So,

1:35:04noise has been something that the county

1:35:06has wrestled with in terms of what

1:35:07should happen in the unincorporated

1:35:09county.

1:35:10At this point, there's no noise

1:35:12ordinance in the unincorporated county,

1:35:14and so this would be unique just to data

1:35:17centers. So, the ramifications that it

1:35:20would have for other uses, there there

1:35:21would be none

1:35:24at this time. But, if that leads to

1:35:26discussion about whether there should be

1:35:28that's that's always possibility, but at

1:35:30this point, it would only apply to data

1:35:32centers.

1:35:33>> Okay, thank you.

1:35:37>> So, for the next bullet point down, air

1:35:38quality impact assessment, again, we

1:35:40will go over that one with the new

1:35:41regulations, because that's addressed in

1:35:43the new regulations, too. So, I think we

1:35:44can probably tackle those as a group.

1:35:46Let's go to the next slide, please.

1:35:50Water monitoring and reporting, I know

1:35:52that we had a some good discussion on

1:35:54that. A generator use for supplemental

1:35:56power, I believe we we covered that and

1:35:58received consensus on that one, too. The

1:36:00last bullet point, bullet point three

1:36:01regarding clustering, um there's been

1:36:04some discussions about that, whether or

1:36:06not data centers should be generally

1:36:08located uh close in close range or close

1:36:11proximity with each other or if there

1:36:13should be some sort of separation

1:36:14distance between projects. So, uh one of

1:36:18the questions that we've discussed at

1:36:19prior meetings was

1:36:21uh and this again involves geography,

1:36:23where data centers can be located and

1:36:25and if we would like them uh grouped in

1:36:28one specific area or if there should be

1:36:30a separation distance from one project

1:36:33to another.

1:36:36>> Mr. Aldrich.

1:36:37>> Yeah, and just to on that,

1:36:41when you have like going back to the uh

1:36:44solar panels, and we had a a 200

1:36:47uh

1:36:49buffer right there.

1:36:52Uh what you're doing is just adding

1:36:55spreading it things out more. So,

1:36:58maybe that is not a good idea to have a

1:37:02a buffer. Uh you know, where it just it

1:37:05could be con-

1:37:07continuous if that's

1:37:09what winds up happening cuz it's

1:37:10otherwise you you want to I think you

1:37:13would want to sort of limit the spread

1:37:15of data centers in a way. Uh and I also

1:37:19noticed that on the data center and a

1:37:22hyperscale, where it was talking about

1:37:25not to exceed

1:37:27uh 1,000 acres, that's been removed. So,

1:37:31that tells me if it wants to be 2,000

1:37:34acres or or whatever, that would be

1:37:36acceptable, correct?

1:37:38>> Yes, sir. For hyperscales, yes.

1:37:45>> One thing that I wrote down from last

1:37:47time was that these projects are

1:37:49resource and utility intensive, so we

1:37:51could benefit from the concentration of

1:37:53them together. So, I've got some

1:37:54consensus with Commissioner Aldrich on

1:37:56this.

1:38:02>> Yeah, I don't think there should be a

1:38:03buffer.

1:38:08But I also have concerns about unlimited

1:38:12acreage.

1:38:17But we went from a large scale of

1:38:18maximum 25 acres

1:38:21and then all of a sudden

1:38:23you know, this is like going overboard,

1:38:25but if they want to take half the state

1:38:26up, they could knock themselves out. And

1:38:29have a good time with it. And I just

1:38:32I

1:38:32there's got to be some more

1:38:33restrictions. You can't just open that

1:38:36up and say that can just continue

1:38:37anywhere.

1:38:38You know, because then you're putting

1:38:40a lot of

1:38:42uh you're not putting any consideration

1:38:44into the grid system or

1:38:46other utilities.

1:38:49Uh you know, that might pose a problem

1:38:51there, too. So, I still think we need to

1:38:54limit the sales of

1:38:55the size of a

1:38:56hyper scale.

1:38:58>> Commissioner Warren.

1:39:00>> I think this is an area that's going to

1:39:01be self-regulating. Uh

1:39:04we're looking at limited resources.

1:39:07And so I don't think you're going to be

1:39:08able to put a lot of

1:39:10data centers together because you're

1:39:12going to you're going to run out of

1:39:13water too fast.

1:39:14I think you're going to regulation's

1:39:16going to come from from other factors.

1:39:18We don't need it don't need to do it by

1:39:20by

1:39:21uh dictate from us. The market's going

1:39:24to take take care of that because of the

1:39:25resources.

1:39:28>> Okay.

1:39:30>> Anyone else?

1:39:34>> So, before we move on,

1:39:37um

1:39:38it sounds like we've

1:39:40three members have indicated that

1:39:42they're

1:39:43um okay with no separation requirement.

1:39:46In fact, sorry, I think I've got four

1:39:48members so far.

1:39:50Okay. Sounds like we have consensus on

1:39:52that. Okay.

1:39:55>> Okay. Thank you. Let's go on to the next

1:39:56slide, please.

1:40:02>> Okay. So, this gets back into some of

1:40:03those topics that we were discussing

1:40:05earlier. As Scott mentioned, we do have

1:40:08that revised draft language that you can

1:40:11see here.

1:40:12Again, this slide

1:40:15splits up specifically those four

1:40:17topics: air quality, noise, water, and

1:40:18energy. And then

1:40:20application requirements and the

1:40:21development standards. What has been

1:40:23updated on each of these topics in each

1:40:25of those sections. So,

1:40:27air quality I guess would be a good

1:40:29place to start. You can see on

1:40:32line

1:40:334 314 on that document. That's on page

1:40:3610 of 20 Excuse me, nine page nine of

1:40:40of 24. We did make changes to that.

1:40:48Regarding whether or not they should

1:40:51the applicant shall submit

1:40:53an air quality impact assessment

1:40:54identifying anticipated air pollutant

1:40:56emissions associated with the proposed

1:40:58data center including backup power

1:41:00generation and other on-site combustion

1:41:03sources.

1:41:04The assessment shall identify applicable

1:41:07federal and state air quality

1:41:09requirements

1:41:11and approvals from KDHE. And then there

1:41:16is an identification of all combustion

1:41:18sources on the property including backup

1:41:21generators which goes back to our

1:41:22conversation earlier about backup

1:41:24generators. And there is a list of let's

1:41:28see, five

1:41:30bullet points there

1:41:32regarding what should be identified.

1:41:41So, that's the application requirements.

1:41:45And then

1:41:47under the development standards line 697

1:41:53we did have an update there

1:41:55um

1:41:57regarding air quality and emissions. A

1:41:59summary of air pollutant emissions

1:42:01associated with facility operations

1:42:02prepared in accordance accordance with

1:42:04the reporting methodology established in

1:42:06the approved air quality impact

1:42:09assessment.

1:42:10That includes total annual operating

1:42:11hours of backup generators, total annual

1:42:13fuel consumption for on-site combustion

1:42:16sources,

1:42:18estimated annual emissions by pollutant

1:42:20type, a summary of emission control

1:42:22technologies and other emission

1:42:24reduction measures installed,

1:42:26identification of any new, amended, or

1:42:27renewed state or federal air quality

1:42:29permits, and a summary of any air

1:42:31quality complaints received by the

1:42:33facility owner operator, and any

1:42:36responsive actions undertaken.

1:42:39And then there was no change in the in

1:42:41backup generator specifically on line

1:42:44757. That was the language that we had

1:42:46earlier identifying that backup

1:42:48generator shall utilize EPA Tier 4 uh

1:42:52and uh standards or uh EPA Tier 2

1:42:55generators with selective catalytic

1:42:56reduction.

1:43:01So, that covers air quality. Uh I'll go

1:43:03ahead and pause on that specific topic.

1:43:06Again, this is fresh information that

1:43:07you've received, so um we're open to any

1:43:09comment at all on on that updated

1:43:12language.

1:43:16>> It seems very comprehensive.

1:43:19>> Thanks.

1:43:27>> Commissioner Aldridge.

1:43:29We

1:43:29uh at the last meeting we talked about,

1:43:31you know,

1:43:32the requirements

1:43:34of uh um

1:43:36besides the decommissioning is that uh

1:43:39every I think it was the consensus was

1:43:42every 3 years on reporting.

1:43:44>> Yes, sir.

1:43:45>> Uh

1:43:46you know, initially I think the

1:43:48recommendation was 5 years and

1:43:50I suggested two and we compromised on

1:43:52three. Would that be the same

1:43:56here for the periodic monitoring?

1:43:59Uh would that

1:44:01This cuz here it shows 5 years.

1:44:03Shouldn't that be consistent

1:44:06uh throughout at 3 years?

1:44:12Uh

1:44:12>> I think we could certainly look at

1:44:14adding that if that's something that

1:44:16the committee is interested in in

1:44:18adding.

1:44:20>> Well, because we did on the

1:44:21decommissioning

1:44:23bill

1:44:24because we thought that 5 years was out

1:44:27of line.

1:44:28You know, I would think that

1:44:31we should be consistent throughout on

1:44:33any type of monitoring or requirements

1:44:35or studies that they have with what

1:44:37happens to cement instead of 5 years.

1:44:40You know, again

1:44:42I think that we should be consistent. Uh

1:44:46and showed it at 3 years. Would that

1:44:48make sense to do that?

1:44:50>> Good conversation. Um

1:44:52So, what this actually on page 19 line

1:44:56684, there's says an annual report that

1:44:59they're going to have to submit.

1:45:03And in that annual report, there's going

1:45:06to be air quality and emissions

1:45:07information. And it's you've got A, B,

1:45:11C, D, E, F, and G that will be

1:45:15included as part of that annual report.

1:45:18Where the 5 years comes up

1:45:21is on line 736

1:45:24and 735. Um and that's where it's

1:45:27talking about records retention

1:45:29that they're going to have to do. So, um

1:45:31if it's helpful, they they are required

1:45:34to submit an annual report, but then

1:45:36they'll have to retain this records for

1:45:38a period of time.

1:45:42>> I support it as written that well, that

1:45:45piece specifically that they have to

1:45:46report um annually on these pieces and

1:45:49then that they should have a minimum um

1:45:54retention of 5 years.

1:45:56>> Again, going back to my

1:45:58my question, shouldn't we be consistent

1:46:01with any requirements

1:46:04you know, cuz we thought 5 years was

1:46:07too long of a time because mainly cuz

1:46:08things change

1:46:10a lot rapid more rapid than that and I

1:46:13think the consensus that 2 years was not

1:46:15enough, and that's why we came up with

1:46:17the with the 3 years. So, what I'm

1:46:20saying, since we did that on the

1:46:21decommissioning

1:46:23part of it, shouldn't we be consistent

1:46:26throughout

1:46:27uh on this, but you're saying, "No, this

1:46:29is fine." Well, I don't think it is, you

1:46:31know, but again, that's just uh my

1:46:35opinion. I think 3 years would be

1:46:37consistent.

1:46:38>> I don't think you're comparing apples to

1:46:40apples here.

1:46:42I think

1:46:43the way it's written is fine.

1:46:47>> My assessment of this that we're looking

1:46:49at is the 3 years, we felt that 5 years

1:46:51was way too uh infrequent for

1:46:54decommissioning plan updates.

1:46:56And what we're looking at now is

1:46:59operation planning, so tell us every

1:47:01single year what your emissions are.

1:47:04Tell us um what your emission controls

1:47:06are, um air quality,

1:47:11tell us these things every single year.

1:47:12So, separate from the decommissioning

1:47:14every 3 years, which felt like a good

1:47:16compromise, but this, tell us every

1:47:19single year uh what your air quality and

1:47:22emissions are.

1:47:22>> Okay, and they would have to keep that

1:47:24on file for 5 years, is that okay? Okay,

1:47:26I got it. Thank you.

1:47:31>> Okay, so it seems like uh any other

1:47:33comments on air quality or or the the

1:47:35proposed draft language here?

1:47:41Okay.

1:47:41Uh in that case, let's go down to noise

1:47:43uh really quick. So, on noise, um again,

1:47:46there's been two updates both of the

1:47:47application requirements and the

1:47:48development standards. Um I'll uh go to

1:47:52page eight of uh 24, line 247,

1:47:57is where we discuss noise mitigation,

1:48:00um and then uh everything there in

1:48:02redline. Um we noticed that we noted

1:48:04that the application shall submit a

1:48:05noise mitigation plan prepared and

1:48:07certified by a qualified acoustical

1:48:09professional. Um that uh shall include

1:48:14um

1:48:15an acoustic study evaluating anticipated

1:48:17noise from normal and reasonably

1:48:19foreseeable operating conditions

1:48:21including cooling ventilation power

1:48:23supply and energy energy generation

1:48:25equipment.

1:48:26Um

1:48:28and that um the intent is to

1:48:31see the impacts on the surrounding

1:48:34um the the surrounding area.

1:48:36Uh zoning administrator may reasonably

1:48:37require supplemental or amended plans

1:48:40based upon professional staff review and

1:48:42then the noise mitigation plan uh

1:48:44information continues onto the next page

1:48:46page uh nine of 24

1:48:49uh where it gets into a little bit of

1:48:52greater detail uh regarding the

1:48:53vibration assessment uh noise

1:48:56attenuation measures and then uh the

1:48:59operational monitoring program and

1:49:00compliant investigation and corrective

1:49:02actions and procedures for receiving and

1:49:04documenting and investigating these

1:49:05noises.

1:49:07Um so again this noise section this new

1:49:10language um

1:49:12is on pages eight and nine.

1:49:14Um

1:49:16I'll go ahead and stop there to see if

1:49:18there's any uh additions.

1:49:20>> Yeah, I think I think also um

1:49:23we also want to cover

1:49:28the operations requirements.

1:49:30>> Which would be on page 796 or am I

1:49:33jumping ahead Scott?

1:49:34>> No, that's great. That's exactly where

1:49:36I'm trying to get to. Yep. 796 if you

1:49:39want to

1:49:40>> And on page and yep and on 796 that's

1:49:43page 22 of 24. This is where it starts

1:49:45to get more into specifics and the noise

1:49:46performance standards uh recommended uh

1:49:50that includes noise limits noise

1:49:51generated by data center operations

1:49:53including cooling ventilation power

1:49:55supply equipment and generator shall not

1:49:56exceed 50 dBA and 65 dBC

1:50:00um as measured at the property line

1:50:02between 9:00 p.m. and 8:00 a.m.

1:50:04Um and uh noise shall not exceed 45 dBA

1:50:08and 60 dBC at any property line

1:50:10adjoining a residential zoning district.

1:50:12Um there is uh further language down

1:50:14there regarding initial compliance

1:50:16verification within 6 months following

1:50:18the commencement of the operations that

1:50:21the owner-operator shall submit an

1:50:23as-built noise and vibration study

1:50:26prepared by a qualified acoustical

1:50:27professional. Periodic monitoring is

1:50:30required. That's on item C. Facility

1:50:32owner or operator shall conduct a noise

1:50:34compliance study 12 months following the

1:50:37commencement of operations and every 5

1:50:38years thereafter. And then item D,

1:50:40complaint complaint investigation and

1:50:43additional monitoring. The facility

1:50:45owner or operator shall maintain

1:50:46procedures for receiving, documenting,

1:50:48and responding to noise complaints in

1:50:50accordance with the approved noise

1:50:51mitigation plan. So, those are

1:50:54items listed under noise. There are

1:50:56additional

1:50:59items listed including changes of

1:51:01operation

1:51:03from the facility

1:51:06and enforcement failure mechanisms as

1:51:08well

1:51:09that if

1:51:10noise performance standards of the noise

1:51:12mitigation plan

1:51:15are not met are not

1:51:19are not followed then an approved

1:51:22corrective action shall constitute a

1:51:23zoning violation and shall be subject to

1:51:26applicable zoning enforcement procedures

1:51:28and remedies.

1:51:33So, this goes back to our previous

1:51:34conversation where we were discussing

1:51:35noise.

1:51:37This would be covered in these updated

1:51:40regulations here.

1:51:42>> I'd love a little bit of clarification

1:51:44on why the monitoring of the noise is

1:51:47different than the annual reporting for

1:51:49air quality and emissions.

1:51:52>> In that specific question, I might bring

1:51:56Michael in.

1:51:57Michael, if you're still available,

1:52:00there was a question regarding

1:52:02the noise monitoring

1:52:05language in the draft and then it was

1:52:07comparing it to the

1:52:09>> to the annual reporting for air quality

1:52:12and emissions. Why what's the what's the

1:52:14distinction there that one of them is

1:52:16reporting annually and And on the noise

1:52:19um, to do it once after you've completed

1:52:22uh or commenced operations and then

1:52:23every 5 years.

1:52:24>> Thanks for the clarification. Michael,

1:52:25did you get that?

1:52:27>> I did. Yes. Um,

1:52:29I I I think they're they're related, but

1:52:32they are different. I think

1:52:33with the air quality uh reporting

1:52:37um, I I think they're

1:52:39noise is more durational,

1:52:42uh I would say.

1:52:44And but

1:52:46I I don't know that we couldn't require

1:52:48if the if the ask is should we require

1:52:51annual noise reporting

1:52:54we we could. I don't know that you

1:52:56necessarily would need to.

1:52:58Um

1:53:01because hopefully the the

1:53:03the measurement of that issue

1:53:06is not a sustained

1:53:08ongoing event.

1:53:10Um, that they are commissioning the

1:53:12facility, that they comply with the

1:53:14noise limits.

1:53:16Uh, that everything is operating within

1:53:18parameters.

1:53:20And then potentially at any given time

1:53:22you could have a a noise issue, a

1:53:25violation, or something to investigate.

1:53:28But I don't know that that's going to be

1:53:30something that would necessitate an

1:53:32annual reporting on that.

1:53:34But in the annual report provisions,

1:53:37there is also

1:53:39a catch-all

1:53:41that talks about reporting on overall

1:53:44compliance with their issued permit.

1:53:48And and so that would capture to some

1:53:50degree

1:53:52you know, any other conditions or

1:53:54regulations that they're continuing to

1:53:56comply with those.

1:53:58But otherwise, you know, there's

1:53:59separate regulations for how noise

1:54:02what the noise standards are.

1:54:04Uh

1:54:05how they're measuring that

1:54:08during operations and then presumably as

1:54:11long as everything's continuing to

1:54:13operate within those parameters, there's

1:54:15no issues, but

1:54:16there's opportunities to ensure that if

1:54:18there are complaints or perceived

1:54:21violations, that those can be

1:54:23investigated.

1:54:27>> That makes sense. Thanks.

1:54:29>> Thank you, Michael.

1:54:32>> Any other questions or comments

1:54:33regarding noise or or or the language

1:54:35that's that's shown here?

1:54:41>> Okay.

1:54:41>> Nope.

1:54:41>> So so I'll go on to to water um and um

1:54:45we discussed this a little bit before um

1:54:48regarding the aquasbeds and then water

1:54:50and regulation and um there is no change

1:54:53to the water utilization report language

1:54:56on uh line 397, which is on page 11 of

1:55:00of 24. Um but then when you get to line

1:55:03670 and 721,

1:55:06which is on pages 19 and uh 20 of 24, um

1:55:13let's see.

1:55:16There is some discussion there. Uh we

1:55:18did have ongoing water monitoring and

1:55:21reporting um including tracking of

1:55:24monthly water usage and monthly water

1:55:26discharge volumes and quality. So that

1:55:29has been uh removed on line 670 and

1:55:33lines

1:55:34uh 721 on page 20, I believe. Uh

1:55:39we also struck water utilization, which

1:55:42was the summary of annual water water

1:55:45consumption and other water utilization

1:55:47data required by the ordinance. So um

1:55:50that was changed. Um but I wanted to go

1:55:53ahead and and stop there and see if you

1:55:55had any questions about the removal of

1:55:57that language from this updated draft.

1:56:00>> Mr. Aldridge.

1:56:02Yeah, my question's not

1:56:04does nothing to do with with usage.

1:56:08Uh

1:56:09so I just want to make that clear, but

1:56:11it's got to do with discharge. Why would

1:56:14we strike the discharge aspect of it?

1:56:18Cuz to me, don't we want to monitor

1:56:21what they're putting out after it's been

1:56:24through the system.

1:56:30>> Kirk, do you have any thoughts on that

1:56:32regarding water?

1:56:35>> Um

1:56:37I I I would say you probably have more

1:56:38flexibility in that regard than the

1:56:40monthly water usage. If you want to go

1:56:42that route, it would

1:56:44I view that more as dealing with the

1:56:47whole um

1:56:49water contamination, things of that

1:56:51nature, sewage discharge of industrial

1:56:53materials. So, that is covered by

1:56:55different

1:56:56statute. Um

1:57:01>> Yeah, cuz I I would think that would

1:57:03might be a little bit on the imperative

1:57:06uh

1:57:06to know what I especially if uh

1:57:10if we're going to

1:57:11if there's going to be any requirements

1:57:14that I want to make sure there's not

1:57:15going to be any metals and

1:57:18you know, any harmful stuff coming out

1:57:20of that. Uh cuz periodically, they're

1:57:22going to want to uh flushing their

1:57:24system uh you know, to keep the corro-

1:57:27corrosive stuff out of there. And if we

1:57:30take this out of there, guess what? We

1:57:31can't monitor that. They can do anything

1:57:33they want to do.

1:57:34So, I'm concerned

1:57:37on that and I think we we still need to

1:57:40have that required that uh in there in a

1:57:42little more detail. Uh

1:57:45that that report that's in there before

1:57:47they dump it in our

1:57:49our system uh that it's got to go

1:57:52through environmental have environmental

1:57:53sign-off on it.

1:57:55You know, I I I get the intake of the

1:57:57water,

1:57:58but

1:57:59we ought to be able to control or at

1:58:01least have requirements on the

1:58:04uh

1:58:04on the discharge.

1:58:10>> Any other commissioners have a comment

1:58:12on that?

1:58:14Yes or no?

1:58:16>> To clarify, we have removed the water

1:58:19utilization and reporting based on

1:58:21previous conversations

1:58:23regarding that

1:58:25water utilization isn't as big of an

1:58:28issue as it maybe once was in other

1:58:30states.

1:58:32>> I I I If I could add a little bit more

1:58:34to that, I think it's

1:58:35it more has to do with that the state

1:58:37has occupied the field

1:58:39when it comes to water usage. And I I

1:58:42want you to know we did have some pretty

1:58:44lively staff discussions about this

1:58:46topic and um

1:58:47we've gone back and forth on in terms of

1:58:50different perspectives on this one. So,

1:58:53um

1:58:54but yes, uh it's because the state has

1:58:56occupied the field when it comes to

1:58:57water utilization.

1:59:00>> So, is is the retention of line 397 in

1:59:04the application requirements

1:59:07that's okay. That's

1:59:09informative and beneficial to the state

1:59:11then since it's kind of within their

1:59:13purview. Um I just want to clarify this

1:59:15distinction between removed it from the

1:59:17development standards but kept it in um

1:59:20our application requirements.

1:59:22>> Yeah, and and I I would just add that

1:59:24the water utilization report um

1:59:27um

1:59:29at a minimum details the design maximum

1:59:31median total daily intake volume,

1:59:33discharge volumes, and

1:59:35destinations as well as the cooling

1:59:37system type and efficiency. It does make

1:59:39reference to um compliance with the

1:59:42Department of Water Resources permitting

1:59:43and regulations. Um and that they do

1:59:46need to provide documentation

1:59:48uh

1:59:49regarding the proposed water discharges

1:59:52that they need to be conducted safely

1:59:54and without adverse impacts. So, we did

1:59:56keep that in there. Um but the removal

1:59:59was specifically apply to um

2:00:02lines 670 and 721, which would remove

2:00:05the ongoing water monitoring and

2:00:07reporting.

2:00:12>> I I would just add this is Michael with

2:00:15Berkeley Group. So,

2:00:17what what we're seeing in terms of water

2:00:19needs and usage and it's going to vary

2:00:21based on

2:00:23you know, the the type of facility, the

2:00:25cooling demands.

2:00:26But it's also going to vary based on the

2:00:29source of the water.

2:00:31And if, you know,

2:00:33not necessarily

2:00:34and Kirk has already indicated, you

2:00:36know, there's maybe limited controls

2:00:38that the county has with respect to

2:00:41regulating

2:00:42water sources.

2:00:45Um if they're using

2:00:47um

2:00:49a municipal system and discharging to

2:00:52that municipal system from a sewer

2:00:54standpoint, then that municipal

2:00:56operator, that system operator is likely

2:00:59going to have

2:01:01protocols and procedures for treating

2:01:03that water before

2:01:05it is

2:01:06um

2:01:08sent to their system.

2:01:10Um similarly, if we're talking about

2:01:14discharge of utilized water

2:01:17on surface to surface waters, there's

2:01:20going to be EPA regulations

2:01:22that apply to treatment of that

2:01:24discharge as well.

2:01:26Um

2:01:28You know, I can appreciate wanting to

2:01:30know more so maybe about discharges to

2:01:33surface water versus discharges

2:01:35to municipal systems.

2:01:37We've also heard and and this is

2:01:40probably more likely with a closed loop

2:01:42system.

2:01:44I I have not seen this in in in process,

2:01:47but I've I've heard this from a locality

2:01:51operator in Georgia or a locality in

2:01:53Georgia where the operator was

2:01:54suggesting that the discharge from the

2:01:57system would be discharged into trucks

2:02:01that would then be taken elsewhere. And

2:02:03I, you know, I would want to know more

2:02:05about that if I were the locality, if

2:02:07that was being sent somewhere else, but

2:02:10there's a variety of different means

2:02:13from utilization, but also discharge of

2:02:16water. Um just to to lay that out.

2:02:21>> Now, what my concerns are if we strike

2:02:25the monthly water discharge volume and

2:02:27qual- quantity,

2:02:29then

2:02:31you're not monitoring it on there. And

2:02:33I'm not talking about the intake of

2:02:35water. I'm talking about the discharge

2:02:37of water.

2:02:39And I I just think that that's

2:02:42imperative that we do that. And I don't

2:02:46you know, want to rely strictly on the

2:02:48state.

2:02:49Well, that's state's requirements and

2:02:51this and the other.

2:02:52You know,

2:02:55I think that we've already shown

2:02:57precedent when we're looking at other

2:03:00industries.

2:03:02You know, that's you've got to

2:03:05they got to meet certain requirements

2:03:07and this and that and the other. You

2:03:08know, put to put it into our system or

2:03:11just you know, on

2:03:13just any type of discharge. So, my

2:03:16concern is if you strike that, then we

2:03:18we lose that that capability. I just

2:03:21want to make sure that we know what's

2:03:23coming out of there. I'd sure like to

2:03:24know the volume.

2:03:26Unless we're you know,

2:03:28I don't think we need to be

2:03:30I think we need to be transparent on all

2:03:32this stuff. That's what I'm what I'm

2:03:33saying.

2:03:34>> So, you would be in favor of keeping

2:03:37reporting on discharge.

2:03:39>> Yes.

2:03:42>> My question for legal then, is there

2:03:45anything that would prevent us from

2:03:47keeping some reporting on water

2:03:49discharge knowing though that it's not

2:03:51necessarily within our purview and it's

2:03:53within the state's?

2:03:54>> Yeah, I mean

2:03:56um

2:03:57Yeah, we you you mentioned it. I mean,

2:04:00the state has some oversight here, but

2:04:03certainly is distinguishable from the

2:04:04other language I was talking about with

2:04:06the actual

2:04:07usage and transfer. So, the language

2:04:09here precluding our involvement isn't

2:04:12quite as broad. So, if you want to add

2:04:14in that

2:04:15H2, I'd kind of refer to the board at

2:04:18this time.

2:04:25>> I see everybody shaking their head yes.

2:04:28>> So, yeah, that's to Commissioner

2:04:30Aldridge's point and and a note about

2:04:33keeping the monthly water discharge in

2:04:35there.

2:04:36Is there any further discussion on that

2:04:38or is there a consensus about keeping

2:04:40that language in

2:04:42regarding ongoing water monitoring and

2:04:44reporting?

2:04:46>> Does it need to be monthly?

2:04:49And that's not me endorsing not monthly,

2:04:52just wondering. Is this Could this be

2:04:54wrapped into annual reporting? And what

2:04:56What might be the consequences of that?

2:04:59>> So, as it was as it was written before

2:05:01it was struck out, it says that that

2:05:03would be There would be a report that

2:05:04would be submitted to the planning

2:05:06department on an annual basis

2:05:08um

2:05:09with the information and that but that

2:05:11it would track monthly the differences

2:05:13from month to month. So, um that's

2:05:17So, in in keeping that I would I would

2:05:20keep that text the same way unless there

2:05:22was

2:05:23comments to change it and modify it.

2:05:26>> Hey.

2:05:27>> Scott, just for clarification,

2:05:30I I think that part of what

2:05:32Commissioner Altridge was talking about

2:05:33was located under

2:05:35um H1 and 2 that was being completely

2:05:38stricken before that point in time.

2:05:40So, if uh

2:05:43I don't know to address that with also

2:05:47I'm losing track of all these numbers.

2:05:49What would we

2:05:50um this water utilization section that

2:05:53you're referring to?

2:05:55Um I I think it's different, but if you

2:05:57want to

2:05:59adjust Commissioner Altridge's concerns

2:06:02with Commissioner Theisen's as well,

2:06:04it could be an annual, but we just

2:06:06include the specific language about

2:06:08discharge volumes and quality within

2:06:10that annual section and I combine them.

2:06:13>> I I think what it would say is um

2:06:17We could reinstate ongoing and we could

2:06:20say water discharge reporting

2:06:23following commencement of operations,

2:06:24the data center operator shall establish

2:06:26and maintain a monitoring program to

2:06:28report monthly water discharge volumes

2:06:31in qua- quality and then the data center

2:06:34operator shall report the above to the

2:06:36planning department on an annual basis.

2:06:40>> Commissioner McKay.

2:06:41If we're going to require

2:06:46the data to be recorded, do we also

2:06:48within that document need to say where

2:06:51it's going to go and what's going to do?

2:06:52I know on the old Venice you can drill

2:06:54another well and put water

2:06:57back into

2:06:58water wells.

2:06:59>> [snorts]

2:07:00>> But you have to

2:07:01document everything.

2:07:03>> So and so not only just the volume and

2:07:06quality, but also the

2:07:09where the discharge is going.

2:07:12>> I think that could be of benefit, so we

2:07:14know then depending on where it's going,

2:07:17if it's surface water dealt with

2:07:19governed by the state, if it's into our

2:07:21municipal water system, then dealt with

2:07:24and governed by what our local

2:07:26regulations are, assuming that we have

2:07:28regulations.

2:07:32>> If you have that system, you know,

2:07:35if it's not the

2:07:37chemicals that are in it or whatever

2:07:39you're

2:07:40testing and checking

2:07:42should be recycled.

2:07:45So.

2:07:49>> I'm going to jump in here for a minute

2:07:51because we are getting in a time crunch,

2:07:53so I hate to have people drive all the

2:07:56way down here and not get to speak, so

2:07:58can I get a show of hands of who who

2:08:00wants to speak today?

2:08:04Six over here, seven, eight, nine, 10.

2:08:08So

2:08:09that's going to take us past 12:30

2:08:11easily.

2:08:12So uh

2:08:13I'm open to suggestions here, Scott.

2:08:16What do you

2:08:17>> Yes, sir. Um

2:08:18well, this gets into a little bit of a

2:08:20larger conversation too, which is about

2:08:21the timing and in terms of the meeting

2:08:24the December 24th uh interim control

2:08:27deadline that the county commission has

2:08:29established. Um if there's there's

2:08:33the schedule the way that it's set up is

2:08:35that today would be the vote because

2:08:38November 12th or 11th would be the full

2:08:41MABC meeting and in order to make that

2:08:44the recommendation would come today.

2:08:47If if a recommendation if you do not

2:08:49make a recommendation today,

2:08:52then what would happen is I would report

2:08:53that back to the county manager's office

2:08:56and then

2:08:57who it's up to the to the BOCC on what

2:09:00they want to do in terms of the the

2:09:02schedule, but I guess at the same time I

2:09:05just want to tell you that it's kind of

2:09:07what would happen if recommendation is

2:09:09not rendered. You're not required to

2:09:12provide a recommendation today. We have

2:09:14we've organized and set up the documents

2:09:16today so that you have that opportunity,

2:09:19but at the same time

2:09:20know that you've got the freedom to do

2:09:22what you think you need to.

2:09:24>> You all think it's good that we give

2:09:26them a heads up

2:09:27board of county commission that we

2:09:30probably aren't going to make a

2:09:32decision now.

2:09:35And yeah, and so give them a heads up

2:09:36they just extend

2:09:38uh their requirement out.

2:09:41>> I definitely concur with that.

2:09:44>> So Justin, were these last two items

2:09:46your the end of your report or

2:09:49>> Uh yeah, pretty close. Uh I think we

2:09:51covered um both air quality, noise, and

2:09:53water energy. There were no changes to

2:09:54the application requirements nor the

2:09:56development standards, so I think we can

2:09:58go to the next slide. I think we were

2:09:59approaching the recommended action

2:10:01again, which I covered at the beginning.

2:10:02As this group has just discussed, we're

2:10:04not fully comfortable with with making a

2:10:07a recommendation as of today.

2:10:09>> Okay.

2:10:10If it's all right with the commission,

2:10:11then we'll start

2:10:13public comment right now. Is that all

2:10:14right? Okay.

2:10:16Thank you, Justin.

2:10:17>> Thank you.

2:10:18>> All right, whoever wants to speak, who

2:10:20wants to go first?

2:10:25Okay, we're done.

2:10:27>> [laughter]

2:10:29>> Please uh

2:10:30state your name and address

2:10:32and you'll have 3 minutes.

2:10:34>> Thank you, commissioners. Yeah, I'll go

2:10:36first cuz I'm closest. Andrew Nave with

2:10:38the Greater Wichita Partnership.

2:10:40505 East Douglas Avenue.

2:10:42Uh thank you for the time and the

2:10:45uh deliberation you've made on this.

2:10:46I'll be brief um but

2:10:48um the partnership is I think we've

2:10:50shared with you all before we convened a

2:10:51task force of data center operators. Uh

2:10:54Dan Rice Security that spoke at your

2:10:56last meeting uh kind of chairs that

2:10:57effort for us.

2:10:59Uh

2:10:59development firms can firms that have

2:11:02built and constructed data centers all

2:11:03over the country, architects, engineers.

2:11:05So, have a pretty robust uh industry

2:11:08task force and we've been sharing the

2:11:10the various documents and drafts with

2:11:11them and I'm just going to highlight a

2:11:12few of the the top concerns. Happy to

2:11:14get into economic development aspects as

2:11:17well that would be appropriate for you

2:11:18or for the commission but in the

2:11:20interest of time we'll kind of hit just

2:11:21the the top concerns. You've touched on

2:11:23many of them today already in your

2:11:25deliberations but uh a big one would be

2:11:28uh the conveyance of the conditional use

2:11:30permits as as

2:11:33as they're currently structured or

2:11:34currently stated. Um obviously making uh

2:11:37land use approvals uh with so many

2:11:40contingencies and and subject to's um it

2:11:43can be very costly when it comes to the

2:11:44number of studies especially where we're

2:11:46requiring new studies that typically

2:11:48haven't been required. So, if the

2:11:50regulations could be refined to more

2:11:52clearly delineate and specify what would

2:11:55be affirmatively or or positively

2:11:57received uh in those conditional um

2:12:00conditional use evaluations would would

2:12:02be supremely helpful. Um wasn't touched

2:12:05on I think I didn't hear it talked on

2:12:06extensively today about the flood plain

2:12:08exclusions but requiring existing flood

2:12:10plain information be submitted with site

2:12:13and drainage plans rather than an

2:12:14outright uh restriction or preclusion

2:12:17for flood plains was was a big concern

2:12:19by the group uh that we convened. And

2:12:21also the construction timeline of 2

2:12:23years uh does not leave a lot of

2:12:25flexibility in this day and age for any

2:12:26construction project but especially one

2:12:28as complex as a as a very technical and

2:12:31very advanced um building that data

2:12:33centers typically are. We would propose

2:12:35something longer than 2 years or

2:12:36potentially milestone based timelines

2:12:39that that don't affect a project where

2:12:41the whether it's like the utility

2:12:42connection or the the transformers

2:12:45that are completely out of uh the the

2:12:46applicant or the data center's control

2:12:48could could affect that timeline. So,

2:12:50maybe a project-based timeline. Uh

2:12:52broader than that, just the the some of

2:12:54the discussion is made today about the

2:12:55kind of the just the Catch-22 nature of

2:12:58some of the requirements you're putting

2:12:59in place that you're requiring things

2:13:01that other levels of government are

2:13:02often required to to to to look at and

2:13:06to review and have the professional

2:13:07staff to review.

2:13:09You got to understand that not always

2:13:11and many times planning and zoning comes

2:13:13earlier a development project's process.

2:13:16And so,

2:13:17you're requiring things of them that

2:13:18they haven't got to yet or haven't fully

2:13:20addressed yet, but it's a Catch-22. If

2:13:22they don't do it, many of these other

2:13:24requirements like the state's

2:13:26requirement for Senate Bill 98, the

2:13:28utilities often require a site to be

2:13:30identified and planning some preliminary

2:13:32planning and zoning to be approved. So,

2:13:34there's a a real concern with Catch-22

2:13:36here that we would ask you to

2:13:38reconsider. So, thank you very much.

2:13:40>> Any questions for the speaker?

2:13:43Okay, thank you. Next.

2:13:45Hurry, hurry.

2:13:49Name and address, and you'll have 3

2:13:50minutes.

2:13:51>> Karen Burlette, 55th South and Seneca.

2:13:55Um

2:13:57boy, we covered a lot today. I'm glad

2:13:59you're really digging deep into this.

2:14:01It's becoming pretty apparent that only

2:14:02you and the commissioners are not going

2:14:04to be the only ones that are making

2:14:05decisions here.

2:14:07You got a lot of other

2:14:08legal issues going on, and I don't know

2:14:11how you're going to get it all sorted

2:14:13out, but I'll pray for you.

2:14:15Um

2:14:16as I one of the things with the

2:14:18decommissioning that I that I have

2:14:21is you've got the data center building.

2:14:23We talked about that, but we didn't talk

2:14:25about any of the pieces of equipment

2:14:26that are around the data center.

2:14:28Um

2:14:29you have them listed in here. You know

2:14:30what they are, the generators and such

2:14:32on the outside.

2:14:34And then you have um

2:14:35major utility.

2:14:38Okay, so you're only going to leave the

2:14:39building. You're going to get rid of

2:14:41everything else.

2:14:43But what about the major utility?

2:14:45How are you going to get rid of all all

2:14:46kind of stuff?

2:14:48Um you'll never be able to put that land

2:14:50back to the way it was. You've got all

2:14:52those utilities in there now. Water

2:14:55treatment plants, um,

2:14:57all kinds of stuff. I think that should

2:14:59be considered.

2:15:00And how far this is going to be from

2:15:02farmland? 1,000 ft is not enough. This

2:15:06is a whole metropolis.

2:15:08And it can never be removed.

2:15:11It'll never be the same.

2:15:13So, I'd like to see that enlarged.

2:15:16Um,

2:15:18speaking of the decommissioning plan, it

2:15:19says if it's granted,

2:15:22it will be recorded with the register of

2:15:24deeds. What if you don't get an

2:15:25agreement? What if they present

2:15:27something that you don't like?

2:15:29Is there a clause for that? Who wins if

2:15:31you disagree?

2:15:33If it goes over the 3 years and there's

2:15:35no an agreement agreed upon,

2:15:37does the old one keep going until the

2:15:39new one starts? How is that going to be

2:15:41handled?

2:15:43Um,

2:15:44concerning the project area and the

2:15:45prime agricultural lands, will that also

2:15:48include all the access roads

2:15:51getting into the property?

2:15:53There's a lot lot of construction goes

2:15:56on. We've seen all the messes that can

2:15:58be. Is any of that going to cross cross

2:16:01over into the prime agricultural land?

2:16:04And any test results

2:16:06that we get from water, air, anywhere,

2:16:09should be monitored. We should see them.

2:16:11You should see them. The county, the

2:16:13city should see them. They should be

2:16:15public

2:16:17all the time. This shouldn't be

2:16:20even though all the counties and

2:16:22state and everybody are involved, we

2:16:24shouldn't have to go look everywhere for

2:16:25all of these things. Or it should be

2:16:28made known where they're going to be.

2:16:30And then who will pay for all those

2:16:31monitoring and tests that need to be

2:16:33done?

2:16:34We need to see them. They need to be

2:16:35held accountable. Who's going to require

2:16:37them to be held accountable? Who's going

2:16:39to discipline them if they're not?

2:16:41And then, um,

2:16:42who's going to pay for all that?

2:16:44Testing costs a lot of money.

2:16:47It could be the county, could be the

2:16:49city. City needs to be involved in all

2:16:51this.

2:16:52Especially with the waste treatment

2:16:54stuff that's going on. They need to know

2:16:55what's coming up.

2:16:56>> Your time is up, ma'am.

2:16:57>> Thank you.

2:16:58>> Are there any questions for this

2:16:59speaker?

2:17:01Thank you for being here.

2:17:04Name and address and 3 minutes.

2:17:07>> My name is Mary Grogan. I live at 5627

2:17:11South Tyler Road, Clearwater.

2:17:13Evergy stated that the cost is divided

2:17:16by kilowatt hours, which means that the

2:17:18data centers pay more because they are

2:17:20bigger

2:17:22uh user.

2:17:23But we also carry a part of that cost.

2:17:26If we are bringing new generations

2:17:28online generation online, how is that

2:17:31cost distributed over 3 years? 5 years?

2:17:35If the data center isn't fully online

2:17:37for 5 to 10 years,

2:17:40how much of the infrastructure cost are

2:17:42we already going to be paying

2:17:44and carrying? It's our Is it going to be

2:17:46our responsibility for that full share?

2:17:49With the bulk of the new generation

2:17:52being already paid by the consumers by

2:17:54the data center online,

2:17:56what are they going to pay in the end?

2:17:58And on you said something about water

2:18:00monitoring. I think that input and

2:18:03output should always be monitored. Our

2:18:05water is precious. Our future

2:18:07generations

2:18:09are what we need to look forward to.

2:18:11Thank you.

2:18:12>> Any questions for this speaker?

2:18:15Okay, thank you, ma'am. Next.

2:18:22Name and address and 3 minutes.

2:18:26>> Good afternoon. I'm Holly Martin. Um

2:18:29live at 603 Crestview Court, Andover,

2:18:31Kansas.

2:18:32Thanks for allowing me to speak today.

2:18:34Um I have attended most of the sessions

2:18:37online and had not had a voice until

2:18:39now, but I feel strongly about uh the

2:18:41work that's going on and I um

2:18:44I recommend you for your efforts at this

2:18:46at this point.

2:18:48I have recently been um afforded a

2:18:50document that was provided to you the

2:18:52Board of Commissioners on the 22nd of

2:18:54September. I took the time to read it.

2:18:56Um, there's over 70 pages here. Um,

2:18:59but I think we need to take pause and I

2:19:01I'm very grateful that

2:19:04you have allowed a little bit of delay

2:19:07in in the

2:19:08decision today

2:19:10because after looking at the 630-some

2:19:12pages of things online this morning

2:19:15again, um, from the agenda,

2:19:17I still think we need to go back and

2:19:19take a harder look at size.

2:19:21Um,

2:19:22and and go back into the classification

2:19:24of some of these things because it's

2:19:26constantly changing and we know that,

2:19:28but hyperscale is important, the

2:19:30co-location, enterprise,

2:19:33um, couple other

2:19:34sizes and those are important to set the

2:19:37baseline for all these conversations

2:19:39about zoning.

2:19:40Um, and I think by adding detail to the

2:19:43definitions in the application process,

2:19:44we achieve greater transparency up front

2:19:47about a project and the scope.

2:19:49Also, we need to ensure compatibility

2:19:51with surrounding land use and the

2:19:52comprehensive plan. I've heard talk

2:19:54about it today, but I didn't get to see

2:19:55a map, um, that brought all this

2:19:57together. And I think those are

2:19:59important in terms of

2:20:00showing infrastructure infrastructure

2:20:02capacity. We talked about power lines

2:20:04and so forth, but also the utility

2:20:06services ability to meet all that.

2:20:08Right now, there are areas throughout

2:20:09the county where specific size of data

2:20:11centers would not be feasible,

2:20:12acceptable, or suitable regarding land

2:20:14use. That brings me to another point to

2:20:16add a more detailed map, um, into the

2:20:18regulations regarding our zoning.

2:20:20I don't think there's enough guidance

2:20:22regarding what is permissible and what

2:20:23is not regarding the placement near

2:20:25population areas. And I see this

2:20:27specifically talking about the data

2:20:29centers and things

2:20:32things that were brought forth in that

2:20:33document from, um,

2:20:35the

2:20:36area experts that submitted that

2:20:38original regulatory draft.

2:20:41And when I talk specifically to you like

2:20:43project boundaries, data center

2:20:45projects, development areas, all these

2:20:47things were put forth in that document

2:20:49to the Board of County Commissioners.

2:20:51Um,

2:20:52specifically to the Equus waterbeds,

2:20:55uh, aquifers, and the boundaries of

2:20:57which were set forth on in that map.

2:21:00Talking about the data centers

2:21:02prohibitions within 2 miles of sensitive

2:21:04receptors.

2:21:06Sensitive receptors being established

2:21:08schools, preschools, daycare centers,

2:21:10in-home daycares, health facilities, all

2:21:12those major population areas that we

2:21:15want to protect. Um, and I just I think

2:21:18we need we owe it to all the citizens in

2:21:20the county and our state to take a

2:21:23harder look at some of these things.

2:21:26Um

2:21:27>> Ma'am, um, your time is run out. Um

2:21:29>> Yes.

2:21:30So

2:21:30>> Can you wrap it up real quick, please?

2:21:32>> Yes, um, I just I really

2:21:35want to say like the recommendations

2:21:36that were put forth in that document

2:21:38from the area experts

2:21:41if you take a harder look at some of

2:21:42them. I know you spent a lot of time

2:21:44already, but I mean, I literally spent

2:21:45the last 2 days looking at a

2:21:47side-by-side comparison to see where we

2:21:50could

2:21:51not necessarily restrict ourselves, but

2:21:54protect

2:21:55the future for our county.

2:21:58Um, and that's that's really all I have

2:22:00to say about it.

2:22:02>> I'm going to have to cut you off there.

2:22:03>> Thank Thank you very much.

2:22:05>> for this speaker?

2:22:07Okay. Thank you.

2:22:09Next speaker.

2:22:13Name and address. You'll have 3 minutes.

2:22:17>> Thank you.

2:22:21My name is Cindy Herbst and I live at

2:22:245415 North 199th Street West.

2:22:28I am right smack in the middle of the

2:22:31Monarch Energy proposed data center

2:22:33proposal.

2:22:35Um, with

2:22:37a mile on each side. Um,

2:22:40my husband built our home 30 years ago.

2:22:43It's on 5 acres.

2:22:45Uh, we live out in the country. We enjoy

2:22:47it. We raise cattle.

2:22:50And I just would ask for you guys to

2:22:54take uh, little bit of consideration

2:22:57in knowing and understanding

2:23:01there's two signed landowners and

2:23:03there's three unsigned landowners. And I

2:23:06know looking at the whole Sedgwick

2:23:08County, it may not matter, it may not

2:23:10care, but I ask that you put yourself

2:23:14in a situation like this

2:23:16where you live right here and work 30

2:23:18years for your place

2:23:21and have been able to acquire a little

2:23:23bit of additional farmland and you want

2:23:25to preserve that for future generations

2:23:28and have a love of your neighbors and

2:23:31the community

2:23:33and look for that to be disrupted.

2:23:36I care.

2:23:40And we also um I want to mention have

2:23:44some acreage that we bought

2:23:46in between this project.

2:23:49We've been presented a contract with

2:23:51substantial money.

2:23:53Uh we've been asked for our

2:23:54life-changing number.

2:23:55Our life-changing number is not a

2:23:58number. We wish to be where we're at. We

2:24:00love our area. We want future

2:24:03generations. We want our children to be

2:24:05raised with good work ethic. Our

2:24:07grandkids are coming and our family's

2:24:09growing. And we have no other desire or

2:24:12place where we would love to live.

2:24:14Um one of the concerns Here's the

2:24:16picture of my cattle I was kind of

2:24:18flashing at a couple of you earlier, by

2:24:19the way.

2:24:20Um

2:24:21great butcher beef.

2:24:23Love barbecues and steaks with all that.

2:24:25One of the concerns I have to is the

2:24:27corrective action plans.

2:24:29There's been mentioned, okay, if they

2:24:30don't do the noise, they don't do the

2:24:32water, what's the corrective action

2:24:34plan?

2:24:35Having a background in being a quality

2:24:37engineer,

2:24:38usually there's a timeline and there's a

2:24:40robust

2:24:42corrective action to that. I don't What

2:24:44is there

2:24:46fines and fees or what would we do with

2:24:48that?

2:24:50So, I'll open that back up to you guys.

2:24:52Thank you.

2:24:53>> Thank you.

2:24:54>> a question.

2:24:54>> Question for this speaker. Commissioner

2:24:56Johnson.

2:24:57>> Are your cattle grass-fed?

2:25:00>> They're They are grass-fed and we also

2:25:02grain feed them.

2:25:04And we have a long wait list. We We're

2:25:05not big operators. My husband's actually

2:25:08a concrete construction worker.

2:25:11Um he's been in business for over 30

2:25:13years with two other business partners.

2:25:16They have built hundreds, thousands of

2:25:18homes, and done the concrete flat work

2:25:22um for many of people in our area,

2:25:25including some sitting here today.

2:25:29>> Okay.

2:25:30Other questions?

2:25:34Thank you, ma'am.

2:25:34>> Not for sale. Thank you.

2:25:37>> Next.

2:25:52>> John Hecht.

2:25:53Excuse me. 2942 North Cardington, here

2:25:56in Wichita.

2:25:57After looking at your proposed

2:25:59regulations for the construction of a

2:26:01data center, I would suggest that you

2:26:02re-evaluate the regulation that you

2:26:05have, and go back and better define and

2:26:07make stricter some that you already have

2:26:09in some areas. Concerning noise,

2:26:12your proposed regulations address

2:26:14monitoring, measuring max and average

2:26:16DBA and DBC.

2:26:18Does not address any penalties if levels

2:26:21are exceeded at any time.

2:26:23It also does a poor job addressing tonal

2:26:25noise, which has been shown to cause a

2:26:27lot of problems in humans and in

2:26:29livestock.

2:26:30This needs to be continuously monitored.

2:26:33Water has been a major concern in

2:26:35developing these data centers, also.

2:26:37While the regulations talk about water

2:26:39and safety, there needs to be language

2:26:41in there to have an environmental impact

2:26:43study done prior to any construction to

2:26:46identify potential hazards.

2:26:48There also should be language not

2:26:50allowing any data centers over the Equus

2:26:52Beds aquifer or upstream from municipal

2:26:54water sources.

2:26:56Your recommendations describe a water

2:26:58utilization report detailing daily and

2:27:01maximum water usages, but again, there

2:27:03are no penalties in place for any of the

2:27:05rules which may be broken.

2:27:08There's no mention of water amounts

2:27:09needed also for construction and

2:27:11development.

2:27:12And to a point that was made earlier, we

2:27:14talked about the percentage of risk that

2:27:16may be happen if something does get into

2:27:18the water,

2:27:20it only takes once.

2:27:22It only takes once.

2:27:23Soil is another concern. Even though

2:27:26your regulations call for studies and

2:27:27assessment prior to construction,

2:27:29there's no language in the regulations

2:27:31dealing with any offsite moving of soil

2:27:33or damage to the adjoining fields and or

2:27:36areas if something does occur.

2:27:38There's also no mention of any chemicals

2:27:40or contaminations that may be suspect.

2:27:43Penalties need to be put in place.

2:27:45I suggest you do more research on other

2:27:47data center regulations that are out

2:27:49there that have been put in place or

2:27:51look at the regulations that have been

2:27:53proposed to this group by other groups

2:27:55so that you have a better understanding

2:27:56of what is needed to protect the county

2:27:59and allow these businesses to begin.

2:28:01In summary, there needs to be specific

2:28:03laws and amounts and levels and

2:28:05penalties listed in the regulations that

2:28:07you draw up.

2:28:08KDHE and other regulatory groups have

2:28:11never dealt with anything of this scope

2:28:13or size when talking about data centers.

2:28:16Reading and researching data centers for

2:28:18the last six or eight months has shown a

2:28:20history of regulations being ignored or

2:28:23broken during operation and

2:28:25construction.

2:28:26These regulations need to favor the

2:28:28population surrounding the area where

2:28:29these data centers are located.

2:28:32These are the people you're responsible

2:28:33for.

2:28:36>> Any questions for this speaker?

2:28:38Yes, Weschler.

2:28:40>> Is this a good time to pose question to

2:28:42staff?

2:28:43>> Yeah.

2:28:44>> Another time. Okay.

2:28:46Do we have anything in here regarding

2:28:48penalties and is that within our legal

2:28:51jurisdiction?

2:28:52>> So, we don't in this specific document

2:28:54because it's contained in the larger

2:28:55unified zoning code and this is a

2:28:57portion that would go into it. Now, um I

2:29:01think we should probably base

2:29:03if there will be another meeting to

2:29:04discuss this and based on the

2:29:05conversation, maybe it would be helpful

2:29:07to in- some slides that would discuss

2:29:10enforcement in the next meeting. But for

2:29:13right now, what I would say is that in

2:29:15general, if there's a zoning code

2:29:16violation, it takes a bit for that

2:29:19usually to get worked out because what

2:29:21happens is is that first someone has to

2:29:23go and confirm that that violation is

2:29:25actually taking place.

2:29:27Then there's a letter that goes out with

2:29:30a notice of violation. Usually there's

2:29:32provided about 30 days or time period

2:29:35for corrective action for the property

2:29:37owner to get it into compliance.

2:29:39And then if that still is not achieved,

2:29:41then that's when it goes to court with

2:29:43an official notice of violation. They go

2:29:45to court and then the judge assigns

2:29:47what should happen. Um I'm going to look

2:29:50to the

2:29:50legal staff to correct me or jump in

2:29:53with anything if I got it wrong, but it

2:29:55there's a process that's involved.

2:29:57>> Correct. There's a process that

2:29:59after a few attempted contacts and a few

2:30:03weeks to fix the issue, um a violation

2:30:06is issued

2:30:08and then it ends up in environmental

2:30:10court in the if it's within the city, in

2:30:13the municipal court.

2:30:16>> Any other questions for this speaker?

2:30:18Thank you, sir.

2:30:20I assume you've given a copy of your

2:30:23script to the staff.

2:30:25Yeah.

2:30:27Next

2:30:28speaker.

2:30:34Name and address and you'll have 3

2:30:36minutes.

2:30:38>> Hi, I'm Phoebe Rail. Address 7103 East

2:30:42Chelsea Street in Wichita.

2:30:46Um I wanted to address the claim that

2:30:49the size of data centers will

2:30:51self-regulate based on the availability

2:30:54of resources.

2:30:56Um it has been proved right blatantly

2:30:59false. Um

2:31:01those resources

2:31:03wind up being extracted from the

2:31:05community to support the industry

2:31:07straining community resources to a

2:31:09breaking point.

2:31:10Determining appropriate regulations is

2:31:13your your duty to prevent that. Thank

2:31:17you. That's all I have right now.

2:31:19>> Are there any Hold on a second. Are

2:31:20there any questions for this speaker?

2:31:23Okay.

2:31:24Thank you for coming down being here.

2:31:25Next.

2:31:33Name and address, please. You have 3

2:31:35minutes.

2:31:37>> My name is Joan Omo and I live at 5537

2:31:41North 183rd Street West, Colwich.

2:31:45Um I wanted to speak a bit about the

2:31:47same project that Cindy Herbs mentioned,

2:31:52um the Monarch project.

2:31:54I had some concerns listening when we

2:31:57discussed the reporting monthly of the

2:32:01discharge water.

2:32:04Most of us out there, I think all of us,

2:32:07um drink our well water. We rely on our

2:32:11well water.

2:32:12Um

2:32:13have always loved our well water and was

2:32:15so proud to be over the Equus beds. I

2:32:18can remember my parents and my

2:32:20grandparents speaking about the Equus

2:32:23beds and and how blessed we were to have

2:32:26them and to be over them. And people

2:32:29say, "Oh, your water tastes so good."

2:32:31Um

2:32:33I think that if this project was next to

2:32:36your home,

2:32:38>> [clears throat]

2:32:38>> because it can be built anywhere,

2:32:40um

2:32:42that you would want that water tested

2:32:45monthly and you would want that to be

2:32:47very transparent. You would want to know

2:32:51within days,

2:32:53I mean, at the most, a month, that

2:32:56you've been exposed to something that

2:32:58could threaten your health.

2:33:00You know, our animals are also drinking

2:33:03water. Now, if that discharge water, you

2:33:05may say,

2:33:07"It'll be captured. Nothing could

2:33:08happen." Well, there are times when we

2:33:11have floods and the rain never stops.

2:33:14And I've seen Colwich, which is 1 mile

2:33:17from this

2:33:18proposed facility, I've seen it flooded

2:33:21clear up to the grade school.

2:33:23We have a grade school and a preschool

2:33:25there.

2:33:26If these flood waters should ever happen

2:33:28and get contaminated,

2:33:30it really puts the the health of many

2:33:33others, including children, at risk.

2:33:36I'm just asking that you guys put

2:33:39regulations in

2:33:41that make that very transparent so that

2:33:43we can protect ourselves.

2:33:46Thank you. I appreciate the opportunity

2:33:48to speak to you today.

2:33:51>> Thank you, ma'am. Any questions for this

2:33:52speaker?

2:33:54Okay, next.

2:34:05Yeah, she's already spoke.

2:34:07I'm sorry. You were limited to 3

2:34:08minutes. I'm sorry.

2:34:10Next.

2:34:17Going once.

2:34:18Here we go.

2:34:24Name and address and 3 minutes.

2:34:28>> Hi, I'm Chelsea Cox. I live at 4989

2:34:30North 295th Street, Mount Hope. Um Cindy

2:34:34just wanted to say that if anybody would

2:34:36like a crop tour, she'd be happy to give

2:34:37you one out in these proposed areas.

2:34:40Um I don't really have anything

2:34:41prepared, but I wrote down some notes um

2:34:43from the discussions today.

2:34:45Um I really have a problem with the no

2:34:47limit on the hyperscale facilities. Um

2:34:49you know, it was 1,000 acres. If you

2:34:51really think about how big 1,000 acres

2:34:53is, it's bigger than all the small towns

2:34:56out in that community. You know, how can

2:34:59you

2:35:00let that be available for someone to put

2:35:03such a large facility out in a community

2:35:05like that?

2:35:07Um and as someone else has mentioned

2:35:09about the limited resources, you know, I

2:35:11feel like some of these discussions are

2:35:12oh well, we'll we'll deal with that

2:35:13later. Well, that is the reason that

2:35:15we're talking about it now so that way

2:35:18we don't have to say oops, we should

2:35:20have maybe done this, you know, and I

2:35:22appreciate that you guys are willing to

2:35:24extend the time to take more time to go

2:35:27through these things because of

2:35:29I was a little worried in the beginning

2:35:30that we were going to try and rush and

2:35:32get these, you know, approved today, but

2:35:34it's very apparent that a lot more

2:35:37discussion needs to be done about a lot

2:35:38more topics.

2:35:40Um

2:35:41something little construction times

2:35:42being okay from 7:00 a.m. to 10:00 p.m.

2:35:45There are homes right next to some of

2:35:46these proposed sites. Can you imagine

2:35:48having that type of construction going

2:35:50on at 9:30 at night? I mean,

2:35:53that's just minor, but again, these

2:35:54minor details matter.

2:35:56Um the buildings, there was our

2:35:58discussion about there's going to be

2:36:00basically no other use for humans in

2:36:01these buildings. That's

2:36:03kind of alarming to me, which, you know,

2:36:05it is hard to say that you tear down

2:36:06this huge building, but also, you know,

2:36:08what are we talking about here? These

2:36:10buildings are only built for computers

2:36:11and there's no other usage.

2:36:13It's just mind-blowing to me.

2:36:16Um

2:36:18and Evergy and the large load tariffs, I

2:36:20know Sedgwick County cop wasn't here

2:36:22today, but again, they're they're I

2:36:24believe the servicer of of at least one

2:36:25of these sites. So, do they have the

2:36:27large load tariffs? I I don't know that

2:36:29quite answer that question.

2:36:31Um I think the reporting data in regards

2:36:33to water usage and discharge should be

2:36:35available to the public and that is very

2:36:37important

2:36:38um because water is our most precious

2:36:40resource. Um

2:36:42and in regards to that, this is the

2:36:45option C about the locations about no

2:36:47restrictions because you didn't want to

2:36:49you want more flexibility,

2:36:51but that that's not what we're looking

2:36:52for. We need the protection and that's

2:36:54what we're asking for. Um

2:36:58the having no regulations, yes, gives

2:37:00you flexibility, but then what what are

2:37:02we talking about all this for? We need

2:37:03the protections.

2:37:05Um

2:37:06in regards to water, you know,

2:37:08I I'm in real estate and there's been a

2:37:10lot of discussion in housing

2:37:11developments on the water. And this is

2:37:13in such a much larger scale that I'm

2:37:16baffled at why we are not being as

2:37:20critical of the water with these huge

2:37:23data centers, but we're worried about

2:37:25little two-acre lots.

2:37:26Um

2:37:28it's all important.

2:37:29>> Ma'am, your time is up.

2:37:31>> No.

2:37:33>> Any questions for this speaker?

2:37:36Okay, next.

2:37:41Oh, okay.

2:37:43Next.

2:37:46Name and address and 3 minutes.

2:37:48>> Yep, I'll help keep things moving along.

2:37:50So, Alan Clausen Anderson, I'm the chair

2:37:51of the uh from Lawrence, Kansas.

2:37:53Chair of the energy practice group at

2:37:55Polsinelli law firm as well as professor

2:37:57at the University of Kansas Law School.

2:37:59Uh just a couple themes and I'm happy to

2:38:01talk about the energy issues because

2:38:02what I think as you heard from Evergy

2:38:04today, that comports with what I said

2:38:06last time and may not quite uh some of

2:38:09the materials you received may be true

2:38:11of Virginia or in PJM, but in SPP,

2:38:14Kansas and and with uh

2:38:16the KCC, it comports with that. But, the

2:38:19two topics and I think these have been

2:38:20thematic here that I think are really

2:38:22important is one is there are a myriad

2:38:24of other agencies that regulate many of

2:38:27these issues. And that's a good thing.

2:38:29You know, when we think about uh air and

2:38:31water in particular, KDHE

2:38:35plus the EPA both regulate those. So,

2:38:37when we when we don't have something

2:38:39within these regulations, it's not that

2:38:40we can do whatever we want. We simply

2:38:42can't. It wouldn't be it's no different

2:38:44than other industry you have here in

2:38:45Sedgwick County. It's kind of been

2:38:46referenced, whether be Boeing, Spirit,

2:38:49Coke. You have a lot of industry here.

2:38:51They can't do whatever they want. They

2:38:53also are regulated. And that includes

2:38:56both discharge water. That has to go in

2:38:59to the approved locations for any kind

2:39:01of discharge. I will tell you

2:39:03closed-loop systems aren't discharged,

2:39:05but if there was a situation, which we

2:39:06will assume for the purposes, that's

2:39:08under the KDHE and EPA. Air is the same

2:39:11thing. Those generators have to be

2:39:13permitted. They have limitations on the

2:39:14amount that could be uh discharged and

2:39:17time and of use. So, those have a lot of

2:39:19regulation around them

2:39:21that's important. Storm water discharge,

2:39:23all those just different things. So,

2:39:24that's just one point. You've got a lot

2:39:26of other agencies that do the heavy

2:39:28lifting that make sure we can't just

2:39:29like other industry. The second thing is

2:39:32the flexibility for you to look at a

2:39:33project. Even if you say we're not going

2:39:35to just have limitations in geographic

2:39:37scope or size,

2:39:39enormous amount of review will be going

2:39:40to the project and to put limitations

2:39:42would take off maybe the greatest

2:39:44project that could be delivered and you

2:39:46didn't even know it because you created

2:39:47a limitation. So, those are the two

2:39:48things I want to cover and happy to talk

2:39:50about anything else.

2:39:52>> Questions? Yes,

2:39:54Mr. Thiessen.

2:39:55>> We have seen you at a lot of these

2:39:56meetings. I appreciate your consistency.

2:39:58Can you tell us what your interest is in

2:40:01Sedgwick County regulations given that

2:40:02you are um

2:40:04I've got you noted in here. Um I've not

2:40:06necessarily captured a name every time,

2:40:08but KU guy from Lawrence. Um what's your

2:40:11interest in these Sedgwick County

2:40:12regulations?

2:40:13>> Yes, I represent a lot of the data

2:40:14centers that would be interested in in

2:40:16Kansas and Sedgwick County

2:40:20Yeah.

2:40:21>> Other questions?

2:40:23Thank you.

2:40:24Appreciate it. Next.

2:40:30Name and address.

2:40:32Three minutes.

2:40:35>> Mary Beth Winter, 23700 West 53rd

2:40:38Street, Andale.

2:40:40Um I'm just going to kind of piggyback

2:40:41off of Cindy and Chelsea.

2:40:44Um we would invite any of you to come

2:40:46and

2:40:48take a crop tour of our area between

2:40:50Andale, Colwich, and Garden Plain to see

2:40:53where the two proposed sites are and how

2:40:57close they are to schools, churches,

2:40:59communities, things like that. Um I know

2:41:02you're going across all of Sedgwick

2:41:04County, but it it is affecting us and

2:41:08that's why you're seeing all of us here

2:41:11primarily. So, that's all I have.

2:41:14>> Okay, questions for this speaker?

2:41:16Thank you, ma'am.

2:41:19Next.

2:41:28>> Um, name and address.

2:41:32Three minutes, you know the drill.

2:41:33>> Yeah, good morning. Caitlin Grombach, I

2:41:35think we're familiar with each other by

2:41:36now. I uh my husband and I are property

2:41:38owners out in West Sedgwick County.

2:41:40Um, I appreciate all the time that this

2:41:42committee has taken to consider many of

2:41:45the topics listed in the data center

2:41:46regulations. However, I would urge the

2:41:48committee to take more time, which you

2:41:50are doing, and thank you for that. The

2:41:52current regulations, as they are being

2:41:54considered, are a great base, but they

2:41:55definitely leave ample room for

2:41:57improvement. For example, you currently

2:41:59have no restrictions on the location.

2:42:01That was discussed today. Sedgwick

2:42:03County has already decided to allow

2:42:05rural residential zoning, as Scott

2:42:07mentioned. We do not have an agriculture

2:42:09district zoning.

2:42:10Um, that means, because of this, that we

2:42:13have residential homes sprinkled far and

2:42:14wide. You really can't drive very far

2:42:17without coming to the next home. Yeah,

2:42:19they're not clustered, but they are all

2:42:21the way throughout pretty regularly.

2:42:24Um, we saw with the industrial solar

2:42:26applications that people have a deep

2:42:27concern about living next to these types

2:42:30of facilities. Hyperscale data centers

2:42:32are going to be solar facilities on

2:42:34steroids. Not only are they bringing

2:42:36some of the same issues, but they're

2:42:38also going to be bringing uh energy

2:42:40generation and all of the infrastructure

2:42:42that comes with that. I actually have

2:42:44watched several of your meetings where

2:42:46you discussed regulations for additional

2:42:48dwelling units, I believe ADUs.

2:42:50Um, you considered size. You considered

2:42:53location.

2:42:54Uh, you even looked at specifics such as

2:42:58roof lines and the direction that the

2:42:59siding would be allowed to go.

2:43:02When those regulations were presented to

2:43:04the Board of County Commissioners,

2:43:05Commissioner Howell actually asked why

2:43:07those regulations were structured so

2:43:09particularly.

2:43:11Scott responded, and Scott, I'm going to

2:43:13quote you today.

2:43:15In my mind, it comes down to

2:43:16expectations, and I generally think

2:43:19people are not expecting something very

2:43:20large to be built that dwarfs the

2:43:22principal structure in the rear of the

2:43:24lot. I can think of a couple instances

2:43:26in Wichita where that has occurred and

2:43:28it definitely stands out it's out of

2:43:30place. I think it's a matter of matching

2:43:32people's expectations." End quote.

2:43:35Is there a reason that people in city

2:43:36limits should get more consideration for

2:43:38their expectations than those of us who

2:43:40choose to live in the county? Do you not

2:43:42think a large industrial facility sticks

2:43:44out in a rural community more than a

2:43:45larger structure behind a smaller

2:43:47original structure just because it's

2:43:49placed on a city lot?

2:43:51To me, the expectation that an

2:43:53industrial facility not be placed in

2:43:55rural residential and agriculture areas

2:43:57seems much more reasonable than an

2:43:59expectation to not have a larger new

2:44:01structure behind a smaller original one.

2:44:04Data centers are not new, but the size

2:44:06and scale and multitude of them that is

2:44:09being proposed is.

2:44:11These facilities are not following the

2:44:13patterns that we've come to know and

2:44:14expect with other economic development.

2:44:16We know that five Boeings, five

2:44:18Walmarts, five Cessnas are not going to

2:44:21locate right next to each other. Okay?

2:44:23So, community might be able to say,

2:44:24"Yeah, we're going to accept a Walmart.

2:44:26We think this is okay." But, our

2:44:28communities are being inundated. Our

2:44:30school district has three potential

2:44:32sites already that we know of.

2:44:34There's rumors of a fourth.

2:44:36>> Okay. Uh

2:44:37>> Yeah, can I summarize? I'll get Yeah.

2:44:39>> please.

2:44:39>> Uh public zoning policy was created in

2:44:41response to the Industrial Revolution

2:44:43when people began to notice that public

2:44:45health was negatively affected by

2:44:47industrial sites placed next to

2:44:48residential areas.

2:44:50In 1926, the US Supreme Court compared

2:44:53placing industrial sites in residential

2:44:55to placing a pig in a parlor instead of

2:44:57a farmyard.

2:44:59Stating that separating industrial,

2:45:00commercial, and residential land use

2:45:02very bears a rational relation to public

2:45:05health, safety, and welfare. That's the

2:45:07task you accepted when you accept agree

2:45:09to sit on this committee.

2:45:11>> I'm going to have to cut you off there

2:45:12to be fair to everybody else.

2:45:13>> Yep, that's fine. Thank you.

2:45:14>> Yep.

2:45:15Any questions for this speaker?

2:45:18Next speaker.

2:45:26Name and address?

2:45:2930

2:45:303 minutes.

2:45:31>> Not 30 minutes.

2:45:32>> and uh 19223 West 29th Street, uh

2:45:36Colwich.

2:45:37Just hit a couple points. One,

2:45:39decommissioning plan.

2:45:41You cannot design the decommissioning

2:45:43plan for every scenario that you're

2:45:44going to have right now. What you're

2:45:45trying to do is protect yourself cuz you

2:45:48don't know who the data center developer

2:45:49is financial situation. You want to

2:45:51protect the county

2:45:53if things go bad.

2:45:55And if there's a use for the building,

2:45:57great. But you don't write it with that

2:45:59in mind up front. You write it in if

2:46:01it's not going to be used and you're

2:46:03going belly up, I need to have a

2:46:04financial instrument in front and that's

2:46:06why the 3 years. You won't You don't

2:46:08worry about the plan as much. Do you

2:46:09have the financial wherewithal if you

2:46:12have to take it out? So that's my point.

2:46:13You're trying to protect yourself.

2:46:16That's what you're doing. It's not

2:46:17trying to decide who can use it,

2:46:19whatever. If a plan comes up, great.

2:46:21Then you can give them their money back.

2:46:22Second thing is

2:46:24and we've had [clears throat] a couple

2:46:25discussions

2:46:26with my learned friend over here.

2:46:28Um when I first saw the KCC approved a

2:46:31large tariff back in February, I mean it

2:46:34was approved in November. When I saw it,

2:46:36I said, "Hey, somebody's on top of the

2:46:37ball."

2:46:38But being a business guy, an engineer,

2:46:40who's run operations, I said, "Let's run

2:46:42some cases."

2:46:43The cases don't necessarily support that

2:46:45they're going to cover all that cost.

2:46:47You and

2:46:48my energy folks got away from me before

2:46:50I could get them. But um one of our

2:46:52county commission been trying to set up

2:46:54a meeting for 7 weeks

2:46:56for me to sit down and go through this

2:46:57with them.

2:46:58Can't get any bites.

2:47:00But the thing is

2:47:02>> [clears throat]

2:47:02>> they have a large load tariff.

2:47:04I don't know what the assumptions are. I

2:47:06don't know what the payback period is. I

2:47:07don't know what the assumptions of what

2:47:08they're trying to cover.

2:47:10The new sites are 1.6 billion dollars

2:47:13for 700 megawatts. And it's roughly 200

2:47:16to 2200 dollars per kilowatt of power,

2:47:19okay?

2:47:20So when you go through the math, you go,

2:47:22But I've run a 1 gigawatt case. It

2:47:25doesn't work.

2:47:26And I've used the fixed cost, what goes

2:47:28in fixed cost and in variable. The local

2:47:30residents will get killed.

2:47:33Um that's a strong word, but

2:47:36the tariff is higher than the other

2:47:39industries. It doesn't address what is

2:47:41the locals pay. And Mr. Evergy guy here

2:47:44even said we base it cost across

2:47:46kilowatt hours used.

2:47:50That's a big point. It's not who caused

2:47:53the investment, but everybody's going to

2:47:55pay for it. In certain cases that makes

2:47:57sense.

2:47:58But you think our normal residential

2:48:00growth is going to require three 765 kV

2:48:04lines be built in Kansas?

2:48:07You can't even You could put two or

2:48:09three steel mills in for that. I know

2:48:11what's one going down in Mississippi.

2:48:12So, I'm just trying to say is you got to

2:48:14understand the details

2:48:16and you got to challenge the people to

2:48:18come in with real-life examples, not

2:48:20PowerPoint charts or talking points. I

2:48:22can make anything sound good. Give me

2:48:24specifics.

2:48:26Show me that it really works that way.

2:48:28And if I'm wrong, I'd love it.

2:48:31I don't think I am.

2:48:32>> You're out of time.

2:48:33>> Sorry.

2:48:34That's okay.

2:48:35>> Any questions for this speaker?

2:48:37Nope. Thanks again for being here.

2:48:41Is that it?

2:48:45Going once, twice, three times. All

2:48:46right. Thanks everybody for uh

2:48:49coming down and

2:48:51participating in the process. Um

2:48:53where are we at? Um

2:48:56>> Our next regularly scheduled meeting is

2:48:57November 12th.

2:48:59>> Okay.

2:48:59>> And uh staff will work to

2:49:01>> Do we need to make a motion of

2:49:03what we're doing here by delaying this

2:49:05or not?

2:49:06>> I don't believe so, sir. I because I

2:49:08think I I think it's set up for you to

2:49:11take action, but if you don't take

2:49:12action,

2:49:13I don't think you need a particular

2:49:15motion in that one.

2:49:16>> Okay.

2:49:16>> The other thing to note is that the

2:49:18comprehensive plan was on the agenda for

2:49:20today, so we will put that on the agenda

2:49:22as unfinished business. We'll put it on

2:49:24to the next agenda.

2:49:27>> Okay. I guess we're done.

2:49:28>> No, on that we're going to have to make

2:49:29a motion to defer, aren't we?

2:49:32>> I'll turn to legal. Looks like they

2:49:34advise that would be recommended.

2:49:35>> I would make that motion that we defer

2:49:38the balance of the agenda items

2:49:40uh

2:49:43to the next advanced plans meeting.

2:49:46>> Second.

2:49:47>> All in favor say I.

2:49:48>> I.

2:49:49>> Oppose?

2:49:51Motion carried.

2:49:52>> No opposition?

```*