2026-10-20 - Public Infrastructure Committee
Summary
Based on auto-generated captions; names and details may be misheard (for example 'Shunga' for Shunganunga Creek and 'Hunt Tune' for Huntoon Street).
Time on topic (from transcript timestamps; approximate, includes side talk):
- Tuesday, October 20, 2026.
- Recording runs from about 0:07 to the 1:15:30 adjournment with no gaps beyond brief silences (about 25:07-25:47 and 51:44-52:08).
- Committee members present: Chair Banks, Deputy Mayor Hoferer and Councilmember Ortiz; all votes were 3-0.
Other business
0:07-2:09, 1:06:53-1:07:56, 1:09:04-1:09:44, 1:15:04-1:15:30
- Call to order; September 15 committee minutes approved 3-0.
- Public Works update items without their own page: Huntoon Street (Gage to McAllister) reopened to traffic last Wednesday after a long closure that frustrated businesses; Southwest Oakley from 10th to Front Street started Oct 19 with a 10th Street closure of 2 to 3 months and completion targeted for summer 2027.
- No public comment signed up; no staff comment.
Stormwater Master Plan
2:09-25:21
- Zach Stevie (spelling approximate) presented the 2023 plan with Nicole Malat (spelling approximate) introducing: 174 sub-basins, 46 highest risk, projects ranked by business risk exposure.
- Top project, Fourth and California near a magnet school: study this year, design 2027, construction about spring 2028, with public meetings. Councilmember Ortiz raised school bus and parking questions.
- Shunganunga Creek projects depend on an Army Corps study; Butcher Creek impacts may exceed the 2023 plan. Deputy Mayor Hoferer and Councilmember Ortiz asked for a larger readable map; no vote.
Public Engagement Procedure for Construction Projects
25:25-33:35
- Public Works explained the two-meeting process, postcards, 48-hour notices and web updates. Councilmember Ortiz praised the contact sheets. No vote.
Right-of-Way Construction Permit Ordinance
33:42-37:23
- Four ordinances amended: one right-of-way construction permit replaces the traffic disruption permit, plus a 48-hour traffic disruption notice. Recommended to the Governing Body 3-0.
21st Street at Wanamaker Pavement Project
37:29-44:06
- $1.4 million; I-470 approach slab replacement on 21st Street with about 6-week left-turn closures, starting May 2027. Deputy Mayor Hoferer asked that nearby businesses be notified. Approved 3-0.
2027 Micro-Surfacing Pavement Preservation
44:10-48:20
- Northeast quadrant plus Gage, 45th, Kansas and Sardou streets; final list depends on bids. Approved 3-0.
2027 UBAS Pavement Preservation
48:24-51:40
- 10th, Gage and 6th streets, with optional Washburn/Lane and Branner; a map error was to be corrected. Approved 3-0.
Shunganunga Creek Bank Reconstruction
51:44-54:58
- About $300,000 for bank erosion repair, early 2027. Approved 3-0 and recommended to the Governing Body.
10th Avenue Alley Sanitary Sewer Replacement
55:01-1:01:09
- About $1.22 million failing sewer in the Lafayette-to-Indiana alley; Councilmember Ortiz pressed on residents' parking and easements (two by eminent domain). Approved 3-0.
Utilities Capital Plan Amendment
1:01:13-1:06:37
- About $136.5 million added across 22 projects plus 3 new ones. Members asked for time; held to the next committee meeting with no vote.
Topeka Boulevard 15th to 21st Reconstruction
1:07:56-1:09:04, 1:12:30-1:13:10
- Utility conflict needs three extra manholes; 17th and Topeka Boulevard reopened, to close again about Nov 16.
Southeast 29th Street Butcher Creek Box Rehabilitation
1:09:44-1:11:40
- Full closure since Oct 6 for about 6 months; later phases and overlay through summer 2027.
KDOT I-70 Downtown Project Closures
1:11:40-1:12:30, 1:13:11-1:14:58
- I-70 partly reopened; 4th Street and Monroe to reopen before a Kansas Avenue closure in early 2027; Deputy Mayor Hoferer asked for a map for neighbors.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:07Good morning, everyone.
00:09Welcome to the
00:11city of Topeka's October 20th
00:14Infrastructure Committee.
00:16Welcome to both the audience here and
00:19also our audience that may be watching
00:22our meeting today.
00:24With that, I'll go ahead and call this
00:27meeting to order.
00:29With the introduction of our committee
00:31members starting with our Deputy Mayor.
00:35>> Michelle Hofer, District 9.
00:39>> Councilwoman.
00:42>> Councilwoman Ortiz, District 3.
00:45>> David Banks, District 4.
00:48And chair of this committee.
00:51We'll go ahead and
00:53and introduce the first item on our
00:55agenda, which is the consent agenda.
00:58Uh
00:59We'll be looking for and a a motion to
01:01approve
01:02the September 15th Public Infrastructure
01:05Committee meeting uh
01:07minutes.
01:08Uh
01:09Did everyone have a chance to have a
01:12look at those minute those meeting
01:14minutes?
01:17>> I move for approval.
01:19>> Second.
01:20>> Okay, motion has been made and seconded.
01:22So, we'll just accept the
01:25minutes from the last month's meeting.
01:35Our vote on it, 3-0.
01:39So, we'll go ahead with
01:42uh presentations.
01:44Uh internal
01:46pavement preservation proposal.
01:50Who's doing that?
01:51>> What's that?
01:52>> Storm water master
01:53>> I don't think that's what we're on. I
01:54don't think that's what we're on.
01:58>> I'm moving ahead.
02:01Just for eating.
02:05>> I think that might be last last week's.
02:07It's the Stormwater Master Plan
02:08overview.
02:09>> Okay.
02:11Action item
02:13uh 2A the minutes have been approved. Uh
02:17act consent agenda item number three
02:19presentation Stormwater Master Plan
02:22overview.
02:23>> There we go. That sounds more like it.
02:25>> All right.
02:25>> Good morning. Uh Nicole Malat, Deputy
02:27Director of Utilities. I'm really just
02:29here to introduce Zach Stevie, uh
02:31Utility Stormwater Engineer. As
02:34discussed at last month's meeting, uh
02:37there was a request to have an overview
02:39of our Stormwater Master Plan.
02:41And I'm going to turn it over to Zach to
02:44>> All right.
02:44>> go through it.
02:45>> Like Nicole said, my name is Zach
02:47Stevie, Stormwater Engineer. Uh I've
02:49been the Stormwater Engineer since about
02:512020. So, been here been in this role
02:53for about 6 years.
02:55Um this is the Stormwater Master Plan
02:57beside me. Um as you can see, it's it's
03:00a document. Um so, we're going to we're
03:02going to go over it, but obviously I
03:03can't tell you everything that's in here
03:05cuz well, I don't have the time.
03:07Um so, this started in 2020. Um we we
03:11wrapped this this puppy up in uh May of
03:142023.
03:16Um
03:18And just kind of give you a purpose
03:20here. Um
03:21we're trying to provide a citywide
03:22understanding of Stormwater issues.
03:24Right and find risks, improvements,
03:26project priorities. Uh we're attempting
03:29to create coordinated approach for
03:30long-term flood reduction. Um and
03:33obviously most importantly, we support
03:35budgeting, planning, and funding efforts
03:37uh by using data-driven decision-making.
03:39So, hopefully
03:41um when people ask me questions, I have
03:42real responses.
03:44Um
03:46Why it matters. Uh the first Stormwater
03:48sewer in the city of Piqua was built
03:50somewhere around 1878.
03:52Um you'll note that the whatever the
03:54city looked like in 1878, it does not
03:56look like that today.
03:57Um, so some of that has led to
04:00some pretty frequent localized flooding
04:02during large storm events. Um,
04:04especially with all the urban
04:05development that have kind of
04:06exacerbated some of those issues. Um,
04:09first flood plain isn't mapped until
04:111981, so we have a lot of development in
04:13the city that happens before
04:16anybody has any real understanding of
04:18flood flooding in Topeka.
04:21Um, we also of course have aging storm
04:23water infrastructure. Again, first pipe
04:25put in the ground in 1878.
04:27Um, so we need to reduce risk to homes,
04:29businesses, and key facilities.
04:32Um, and we need to be able to make again
04:33defensible decisions um, amid amidst our
04:35many competing needs and limited funds.
04:39Um, so we approach this by first
04:42subdividing the city into 174
04:45sub-basins. So,
04:46each little
04:48uh,
04:50area that you see there,
04:52um, all drains to a point. Um, so of
04:55those 174 sub-basins, we could not look
04:58at all of them. We identified the 46
05:01highest risk basins.
05:03And then we did some pretty uh,
05:06stringent modeling to
05:08figure out which ones were the highest
05:10risk based on a business risk risk
05:12exposure, which we'll talk about here on
05:13the next slide. And then we I I started
05:15identifying projects based on that
05:18business risk exposure.
05:21So, business risk risk exposure um, is a
05:24system to prioritize assets and projects
05:26that
05:27we use basically this is a failure of a
05:30probability of failure times the
05:31consequence of failure, which is pretty
05:33consistent with what we use across asset
05:36management in utilities
05:37and the city as a whole.
05:39Um,
05:40probability of failure is what it sounds
05:42like. It's the chance that a pipe
05:44uh, fails whether that be from condition
05:46or because it's undersized.
05:48Consequence of failure we determine by
05:51several factors, proximity to other
05:53assets, flooding of structures and
05:55roads, and of course proximity to
05:57community needs. A pipe near a hospital
05:59is probably more important than a pipe
06:01at a dead end street.
06:06Um
06:07get a little bit more about business
06:09risk exposure. Um
06:11you know, we classified
06:13a percentage for nuisance flooding,
06:15which is kind of short-term yet frequent
06:17flooding that does not actually result
06:18in damage to structures. So, this is,
06:20you know, you drive by a a road and you
06:22note that it ponds in an area.
06:25Um average annualized loss, so
06:29uh
06:29estimated property damage from flood
06:31events,
06:32average annualized population impact,
06:34just the number of people who are
06:35impacted, and the community impacts,
06:37that's where we get into hospitals,
06:38schools, those kinds of of community
06:40assets um when they're at risk.
06:42And then average asset risk, which is
06:44where we get into condition of pipes and
06:46channels.
06:50So, we took all that data and we started
06:52looking at improvements. Um we used
06:54computer modeling to kind of suggest
06:56some improvements and evaluate those. We
06:57leveraged some our existing GIS data
07:01um and some what they call a 2D model um
07:05that was developed for
07:08other needs uh were both used in to kind
07:10of put this report together. Um we
07:12compared the existing system capacity to
07:14100-year storm requirement. Uh basically
07:17in a 100-year event
07:19on a road, water should be no more than
07:216 in over the crown of the road. So,
07:24even in a 100-year event the road should
07:27contain
07:28a flood event.
07:29Um that helps us that those kind of
07:32requirements help us identify undersized
07:33pipes, maybe some channel issues. Um we
07:36also looked at detention opportunities.
07:40Uh Uh,
07:41we then again took all that data and
07:43started developing
07:45projects. So, each basin of the 46 that
07:47we we analyzed
07:49received planning level CIP projects,
07:52which is what a lot of this report is.
07:53It's just project after project after
07:55project that
07:57could be done. Um, so those include pipe
07:59upgrades, system replacements, channel
08:01improvements, uh, maybe some detention
08:03here and there.
08:04Um, and we'll we'll I'll show you an
08:07example of that we looked at existing
08:09conditions and then what an improved
08:11condition looks like.
08:13Um, these projects include maybe some
08:14constructability concerns, um, potential
08:17utility conflicts, potential structural
08:19conflicts,
08:20potential easement limitations, unique
08:22coordination needs, sequencing needs. We
08:25also include some very high-level
08:27planning level estimates.
08:29Um, it obviously does not provide final
08:31design design plans. So, you can't take
08:33this and just start bidding out
08:35projects. There's there's more work that
08:37has to be done before we do
08:39actually bid a project.
08:42Um,
08:43so
08:44talk a little bit here about uh,
08:46a project we're actually just getting
08:48started on now, which is the the Fourth
08:50and California project. Um,
08:53a little confusing here. I know you're
08:55going to look at this graphic and go
08:56there's no difference between the
08:57picture on the left and the right.
09:00There is a little. Um, it'll be more
09:02evident in the next slide. But this is
09:04uh, existing conditions for the 100-year
09:06storm. The one on the left is when water
09:09drains freely into the Shunga. The one
09:11on the right is when the Shunga Nunga
09:12Creek is high and water backs up. Again,
09:15be a be a bigger difference on the next
09:16slide.
09:18Um,
09:19and we'll note that one of the reasons
09:22this ranks high is that is the Scott
09:23Dual Magnet uh,
09:26Scott Dual Language Magnet School
09:28is right there at Fourth and California.
09:32Um, so when we look at this what what
09:34this project is proposing is coming back
09:36with a larger pipe.
09:38Uh
09:39The master plan shows a 9 by 7.
09:41Actually, as we look at
09:43more detailed modeling with I think we
09:44can get away with
09:46a slightly smaller pipe than that. Um
09:48but
09:49this is where you can really see the
09:51difference when the when the Shunga is
09:52open and flowing
09:54uh we
09:56virtually no problems, right? There's a
09:58little bit of ponding on the streets,
09:59but
10:00we we solved the big portions of it. We
10:02still have a pretty major impact when
10:04the Shunga is uh is not open and
10:06flowing.
10:07But not the same.
10:09Uh
10:10so
10:11it does it does make a a pretty big
10:13impact in both cases, but again, some of
10:15that is controlled by by the Shunga
10:17Nunga Creek.
10:21So
10:22that was an example of a project. Like I
10:23said, there's hundreds of of of sheets
10:26like that in the appendices in this
10:28report.
10:29Uh
10:30these were the just the top 10 based on
10:32a on that business risk exposure.
10:35Um one thing that I wanted to mention,
10:37um
10:38you'll see that
10:40many of those have asterisks by them.
10:42They come from another study that was
10:45done for the Shunga Nunga Creek
10:47following the flood of the 2000 the 2007
10:50event uh where much of the Shunga
10:52flooded. Um
10:54we are currently actually today and
10:57yesterday engaged with uh the Army Corps
10:59of Engineers
11:01getting a a study kicked off on what
11:03participation from them might look like
11:05on some of these improvements.
11:07So
11:08they may
11:10they move they may move around a little
11:11bit depending on what the Corps wants to
11:12do, or they may not be exactly what's
11:14shown again in these plans depending on
11:17what kind of of participation and
11:19cooperation we get from them.
11:21Um
11:22but based on the data we had at the
11:24time, that's kind of where they fall
11:26out. Uh
11:27obviously, we talked a little bit
11:29recently about the Westborough detention
11:31basin, um the Lakeside detention basin.
11:34It's not actually in this list, but
11:36however, if you look at if you were to
11:37look at the project sheet for Hunt Tune
11:39Street, you would find that one of the
11:41projects that would make Hunt Tune
11:43Street most effective
11:46is the Lakeside. So, while it's not on
11:48this list, it was still a high priority.
11:51Um
11:53So, some takeaways.
11:55The plan is a tool. It's not a final
11:57design. Um it's really here to help
12:00the city and and somebody
12:02um in my role kind of make sense of
12:04things. Uh we helps us prioritize and
12:06coordinate major improvements.
12:09Um supports both large-scale
12:11storm sewer upgrades, creates a road map
12:13for long-term flood reduction and and
12:15system resilience. I use it pretty
12:17frequently when public works is getting
12:20ready to do a large project and they ask
12:22me if I have any
12:23concerns or upgrades that I need to
12:25make. That's usually a good time to go
12:27ahead and crack this open and see if we
12:28have
12:29flooding issues I want to try to address
12:31while we do a a public works project.
12:34Um
12:35but like I said, not not final design.
12:38It's not have to be exactly those
12:41projects in that exact order. So,
12:43um that's the end of my presentation.
12:46Um questions, I guess.
12:47>> Questions.
12:48>> Okay.
12:49We'll open up questions. Chair
12:51recognizes Councilwoman Ortiz.
12:54>> Next time you bring a document that big,
12:56kind of warn me cuz that kind of scared
12:58me. I thought we were going to be here
12:59all day.
13:01And I know Joe's got things out there he
13:02wants to get done.
13:04Um Fourth and California is my district.
13:07>> Yes, ma'am.
13:07>> And I'm I was thinking when we did That
13:10was Fifth Street when we put in all that
13:12piping. We didn't go down to Fourth
13:14Street, did we?
13:15>> Correct.
13:16>> Okay.
13:17Um how soon will this happen or do you
13:21or can somebody tell me?
13:22>> So, we like I said, we just started
13:24looking at it. Um
13:26so, we'll we'll still have
13:30We've got to finish up the study which
13:32will be done this year, design
13:35most of next year. Hopefully, I'm
13:36bidding it out
13:38towards the end of next year and we're
13:39talking probably spring of '28
13:42construction.
13:45Okay.
13:46>> Spring of '20
13:48>> of '28.
13:49>> Okay.
13:50>> That's you know, some assumptions about
13:51easements and things.
13:52>> And we'll do it while school's out?
13:55>> We will definitely coordinate with the
13:56school and we will try to make sure that
13:59we can do the bits by the school while
14:01school is out.
14:02My understanding right now is that the
14:06I think that there used to be a bus
14:08loading zone over there that they're not
14:09using anymore. So, that there may be it
14:11may not be
14:13quite as complicated, but yeah, we
14:14definitely we've we'll need to continue
14:16to coordinate with them.
14:18>> Well, I don't know where they moved the
14:19bus loading zone then cuz that was my
14:21um
14:22>> That was what you thought.
14:23>> as well. I I can ask and see.
14:26>> Yeah.
14:26>> But, that was always right there at 4th
14:28and California.
14:29>> Yeah, and that
14:30>> Cuz cuz on the north side, that's where
14:31all the parents pick up and drop off and
14:34the buses were on California itself.
14:37>> Yeah. And I like I said, that's a my
14:39understanding, but I I could be wrong
14:41and that was a conversation that
14:42happened maybe
14:43>> Okay. I'll dig into that.
14:44>> a while ago, so.
14:46>> And we'll be back up here prior to that
14:49requesting authority to go ahead and
14:51move ahead with that project and in SAC
14:53we'll have more information on
14:55timelines and and things like that and
14:58more details of that coordination effort
15:00at that time.
15:00>> And we'll definitely have a
15:02you know, a public meeting somewhere
15:03around 60% and then one before
15:05construction as well and definitely
15:07we'll make sure the school is invited
15:09and aware
15:10and we'll yeah, we'll be talking to
15:12them.
15:13>> Okay.
15:14Um another thing is I'm getting old and
15:16if we can make these just a little bit
15:17bigger for me, that'd be great.
15:19>> Okay.
15:20>> Thank you, Mr. Chair.
15:22>> Thank you.
15:23Deputy Mayor, you have anything?
15:26>> Yeah.
15:28So, I'm trying to understand of this top
15:3010 list.
15:32>> Yes.
15:33>> A lot of it is Shunga
15:35Nunga.
15:35>> Yes.
15:37>> So,
15:39is Fourth and Cal- California going to
15:41make the biggest difference, or is there
15:43another one
15:47going to help?
15:49I guess I'm trying to understand how
15:50Shunga Nunga
15:52piles into each other.
15:54>> each Yes, this
15:55Fourth and California definitely shows a
15:58big impact based on our business risk
16:00risk exposure scoring. Um a lot of those
16:03Shunga projects do as well, though, too,
16:06right? Um
16:08because they if we
16:10can manage to protect some homes there,
16:13well, we will make a a huge impact. Um
16:17so, just based purely on the math,
16:20purely on on
16:23the scoring system we came up with,
16:24Fourth and California shows the highest
16:26highest benefit.
16:28I think you're probably splitting hairs
16:30a little bit between that and
16:32some of the Shunga projects. Um
16:38but yeah, the like I said, we're working
16:40uh on those Shunga projects right now.
16:42We're talking talking with the Corps of
16:44Engineers.
16:45Um expecting
16:47here
16:48the Corps of Engineers tells me that
16:50their study will have to be done within
16:523 years, and then we'll be moving on to
16:54uh maybe hopefully construction or
16:57implementation of of some of these
16:59Shunga Nunga projects.
17:02>> So, they're looking at the entirety of
17:05it.
17:06>> I'm sorry.
17:07>> They're looking at the entirety of
17:09>> of the Shunga.
17:10>> Shunga.
17:10>> Yep. Yes.
17:12>> Okay. So,
17:14even if we
17:16I guess what I'm concerned about is
17:19if we make one of these changes
17:22is that going to have an impact
17:27a negative impact on any of the others?
17:31I just want to make sure that we're
17:33>> Yeah, we
17:34>> hitting the right part.
17:36>> Understood. We definitely consider
17:38downstream impacts when we when we do
17:40things. Anything we do with core, we're
17:42not going to be able to
17:44what they call it induce damages
17:46downstream or upstream anyway, so
17:47anything we do is going to have to not
17:50cause
17:51damage.
17:52Um
17:54Fourth in California, while it
17:56drains to the Shunga, the
17:59that tail water condition, um
18:01the admittedly somewhat confusing
18:03graphic I showed
18:05uh
18:05the Shunga skin can control how much of
18:07that Fourth in California can outlet
18:09anyway to some extent.
18:12Um but yeah, we definitely look at
18:13downstream impacts. We're not going to
18:14do anything to to hurt ourselves.
18:17Um
18:18>> Zack, is it safe to say you're kind of
18:20tabling the Shunga projects until we get
18:23that bigger study done and and that's
18:26why you're looking at other projects
18:27that we can afford and and can fit into
18:30a plan that maybe aren't so impacted or
18:33impacting work along the Shunga?
18:38>> I guess I I would phrase it as a little
18:41differently in that those Shunga
18:43projects aren't tabled, but part of the
18:44process is working with the core, and
18:47that's what we're doing.
18:49And literally as we speak today.
18:52Um
18:54Fourth in California is project that
18:56falls in that we we kind of mapped out
18:58in the CIP that falls into something
19:00that we can afford to do
19:03in these next 2 years. And
19:06we are further away from constructing a
19:08Shunga project than that by the time we
19:09get
19:11>> through the core.
19:11>> through through through the core.
19:14>> Okay.
19:15Um
19:18So, do we have any other projects
19:21going in next year?
19:24>> So, the one that's going to be built
19:27next year is not
19:29on this top 10 list in part because it
19:31was in the works when this study was
19:33published. Um but that that one is along
19:37Prairie Road. We had some major flooding
19:39on Prairie Road in 2020.
19:42Um
19:43that's kind of
19:44be the big one next year.
19:46Um that's the 2200 block of Prairie
19:48Road, which is just east of Fairlawn.
19:52>> Yeah, I know it's just east of Fairlawn.
19:53I'm trying to figure out 2200, so
19:56>> South of 21st.
19:57>> Actually, it's District 8.
20:01Okay.
20:04So, that's the one that we're looking at
20:06for next year.
20:06>> Correct.
20:08Correct.
20:10And then, you know, obviously we'll have
20:11other stormwater projects in conjunction
20:13with public works um
20:16and you know, maybe some smaller ones
20:17that we can fit in here and there, but
20:19yeah.
20:22>> Okay.
20:24I'm good.
20:25>> Okay. Thank you.
20:26My only question or concern would be
20:29that's the work on the top 10
20:32>> Mhm.
20:32>> uh was a little bit concerned about how
20:34it might affect Butcher's Creek.
20:37>> Yeah, um
20:41we've learned a little more about
20:43Butcher Creek this year
20:45than I I think we knew at the time of
20:47this report.
20:48Um
20:50and I am
20:51you'll
20:56we're working through the impacts of
20:57Butcher Creek. I am likewise
20:59>> Mhm.
21:00>> concerned about what we saw on Butcher
21:01Creek this year. And when we look at the
21:05what we've seen
21:07from the
21:09flood mapping efforts that are
21:12underway at the state level, it shows
21:14some pretty significant changes on
21:17Butcher Creek, some pretty significant
21:18impacts that I don't know were
21:20necessarily reflected when this report
21:22was written in '23. So, that may also be
21:25Like I said, this doesn't have to be
21:26something we live and die by.
21:28Um so, we Butcher Creek is definitely a
21:31consideration going forward.
21:38>> Chair, just just want to reiterate that
21:41last last week when we spoke about
21:44development of an infrastructure
21:45management plan
21:47um that we would take these these types
21:48of plans this as well as our streets
21:51plans um and update that based upon
21:55priority, based upon things that we
21:57know. We shared with you the uh last
21:59week the preliminary report that was up
22:01for Butcher Creek in the Butcher Creek
22:03area that was completed by WSP. So,
22:06to Zach's point, these are these are
22:08living documents that as priorities
22:11arise, as they shift, that we have the
22:13opportunity as this being a planning
22:15document to modify that based upon uh
22:19known and upcoming priorities. So, yeah,
22:23again, the the team uh has put focus on
22:26Butcher Creek to Zach's point
22:28understanding what occurred earlier this
22:30year. Um and so, yes, so again, these
22:33are living documents that we can adjust
22:36as needed based upon priorities.
22:39>> Thank you, city manager. Thank you,
22:41Zach.
22:41>> I have something.
22:42>> Chair recognizes Deputy Mayor.
22:45>> Zach, is it possible
22:48I'm sorry, this thing
22:50part of it's my eyes.
22:53I can't tell where any of these areas
22:55are in the city. Can we get one that's
22:57bigger that kind of gives us an idea of
22:59where the roads are? At least the main
23:02roads, so we can identify
23:05spots and I'd like the whole council to
23:08have a copy of that.
23:09>> Sure.
23:09>> So we can each see what's a problem in
23:12our neighborhoods and keep an eye out
23:14for when we have rain event.
23:17That way we know that it's
23:19this is a problem on our list or if
23:21something comes up and we see that that
23:23area
23:24has a real problem and it hasn't been
23:26identified, we can
23:28>> Yeah, absolutely.
23:29Absolutely. Well, we'll reach out to
23:31vanish and see if I can get a clearer
23:33copy cuz even the copy that's in here is
23:36hard to read. So we'll see if we can't
23:38get a better better copy of it.
23:40>> Thank you. I'd appreciate that.
23:42>> Thank you.
23:43>> One more.
23:44>> Do you recognize this councilwoman
23:46Ortiz?
23:46>> Zack, I'll I will call you. I know 6th
23:49and um Liberty
23:51flood not Liberty.
23:54Maybe it is Liberty, but it floods and I
23:56know you talked about it's not hurting
23:58anything, but when it rains it it
24:01floods. I want to I want to see if
24:02that's on the list and talk to you about
24:04it.
24:04>> Okay. I
24:06Like I said, it it may be in here, it
24:08doesn't sound familiar, um but there are
24:10a lot of projects in here. Um I'll take
24:12a look.
24:13And yeah, we can we can at least look at
24:15it.
24:16>> Let me get make sure that's Liberty
24:17though.
24:17>> Okay.
24:18>> Cuz it's um Locust.
24:21>> All right.
24:22>> No, I would go the other way. Locust and
24:24then Liberty.
24:28It's it's um one street over from
24:32Lafayette. No, there's Lafayette and
24:34then it's the one street east of
24:36Lafayette.
24:38That corner that corner
24:40>> Yeah, I I've done a little work on
24:42Lafayette. I don't
24:45I don't recall 6th and Liberty being in
24:47here, but that we can we can look.
24:49>> Yeah, I'll I'll make sure I get with
24:50you. Okay. Thank you.
24:52>> Lafayette, Locust and then Lawrence as
24:55you move to the west.
24:56>> Laurent Laurant
24:57>> Laurant's
24:58>> to the west.
24:59>> Leland
25:00>> Okay.
25:01>> I got Leland one block east of
25:03Lafayette.
25:03>> We'll figure it out. Yeah.
25:06Mhm, and then Liberty.
25:08Yeah. So 6th and Leland is what
25:11>> I'll drive home.
25:14I'll remind this old brain of these
25:16things so
25:18>> I want to say it. I think it is Leland.
25:20I think you are all right.
25:21>> Okay.
25:25>> Okay. If there are no other questions
25:27from the committee
25:29we'll move on to presentation 3B
25:33public engagement procedure.
25:47Welcome director.
25:49>> Thank you, sir.
25:51Uh so we'll go through a brief
25:53presentation a quick overview
25:55of how we handle public engagement and
25:57then we'll discuss the topic that is the
25:58product of what I'm about. When we're
26:00having projects, how are we
26:02uh
26:03how are we making sure that the public
26:05is aware of the projects, how are we
26:07giving them an opportunity to ask
26:08questions,
26:09uh how are we making sure that they're
26:11staying informed uh of how the project
26:13is progressing. So what we wanted to do
26:14today was go over what our standard
26:16procedures are and how members of the
26:18public can be informed and get
26:20communication about construction
26:22projects in their area.
26:24So the first thing that I want to go
26:26over is the public meetings that are
26:27held as part of construction projects.
26:29Now the public meetings are extremely
26:31important. We typically hold two public
26:34meetings for any construction project.
26:36The first meeting is going to be a
26:37design meeting. That's typically going
26:39to be 6 months or more before the
26:40project actually starts and that's going
26:42to be where the city staff and a design
26:45consultant are there. Uh typically when
26:47we have either 60 or 90% plans. Now the
26:50important thing about the
26:52design meeting is that we're far enough
26:54along at this point that we have an idea
26:56of what the approximate uh cost of the
26:58project is going to be and what the
27:00approximate scope of the project is
27:01going to be.
27:02That way we can answer questions at this
27:04point when people are asking us, "What
27:06exactly is going to happen in front of
27:08my home? Are you going to be doing, you
27:10know, tearing the street out? Are you
27:11just patching? Uh what's going to be
27:14uh interruption to my business? Are you
27:16going to affect my tree? Etc., etc." So,
27:19we need to wait until we have some of
27:20those decisions somewhat mapped out
27:22before we can have the public meeting
27:24for design, but there are still an
27:26opportunity to make design changes. So,
27:28the designs are not final at this point.
27:31When we get feedback from the public,
27:32there is still some opportunity to
27:33change the scope of the project. We
27:35typically will also hold a construction
27:37meeting. That construction meeting is
27:39going to be held typically 1 month or
27:40less before the construction start.
27:42We'll have city staff there. We'll also
27:44have the design consultant who drew up
27:46the plans, and then we'll have the
27:47contractor present as well. This is when
27:49the design plans are complete. So, for
27:51the most part, there will be no more
27:53changes at this point to what the what
27:54the construction will be,
27:56and the construction schedule is set.
27:58So, now we have a fairly good idea of
28:00when the construction is going to start
28:02and how long each phase is going to
28:03last. So, if you're a property owner,
28:05you can ask, "Well, how long until you
28:07get in front of my home? Or what is
28:08going to be the sequence of the work
28:10that you're going to do?" Uh we can also
28:12share contact information of the project
28:13managers, the people that are going to
28:15be working on site every day, and also
28:17the city staff that you can get in touch
28:18with if you have questions. And then
28:20we'll have detailed information like
28:22when each phase is going to be projected
28:23and how we're going to maintain access
28:25to each property. So, there's a picture
28:27of one of our public meetings that we
28:28held. Uh the reason these meetings are
28:30so important is you can speak directly
28:33to the decision makers, the people who
28:34are making the decisions on what exactly
28:37this project is going to entail, when
28:38it's going to happen, and how it's going
28:39to be sequenced. Uh you we're also going
28:42to share contact information so we can
28:43each hold each other accountable. You
28:45You a lot of times people want to go out
28:47and talk to whoever's on site and say,
28:49"Well, this isn't what the plan said."
28:51And the contractor might tell you,
28:52"Well, I'm just doing what I'm told."
28:54You have the contact information to
28:55contact the city staff, find out exactly
28:58what the instructions were. Uh let us
29:00know if the contractor is doing
29:01something that wasn't what was agreed
29:03to. Then also, if the contractor is
29:05telling you, "Well, I have to go off the
29:06plans." then you can contact the person
29:08who made those plans and find out why
29:10that decision was made. Uh you can ask
29:12questions. We can review at each
29:14property what exactly is going to happen
29:16in front of your location. And then you
29:18can ask whatever questions you like.
29:20Who's paying for this? How are we paying
29:21for this? Or something as simple as
29:24where am I going to leave my trash can
29:25when the trash person comes to pick it
29:27up when you've got the street closed. Or
29:29how loud are you going to be? Should I
29:30be looking at finding a hotel for some
29:32of this work because I'm not going to be
29:33able to take my afternoon nap. We've
29:35heard all kinds of questions at those
29:37public meetings. We want you to come ask
29:38those questions and have a good
29:40expectation of what's going to happen in
29:41front of your property. Uh we also want
29:43your contact information. So, that's why
29:45it's very important to attend the public
29:46meeting. There's a sign-up. Uh you can
29:48put your email in. That will allow us to
29:51get in touch with you for anything as
29:53important as a major change in the
29:55project schedule or maybe the contractor
29:57just wants to know uh he can email you
29:59to say, "Hey, we're going to be right in
30:00front of your house tomorrow. If you
30:01could get your car off the street, that
30:03way there's no chance of it getting
30:04damaged while we're digging up the
30:05street." Um so, they want that
30:07information as well.
30:09So, how do we invite people to the
30:10public meeting? Uh so, our communication
30:12staff does a great job before any
30:14project. They go out and do a parcel
30:15search. Um they look for all the
30:18adjacent properties to the project and
30:20then they send a postcard. So, what
30:22you're seeing on the screen is an
30:23example of what that postcard looks
30:24like. They're going to send it to both
30:26the physical address and the property
30:29owner's address if they're different.
30:30So, if for example, there's a business
30:32operating at that location but the owner
30:34is a different party, both addresses are
30:37going to receive that notification. Uh
30:39for a larger project, we'll extend one
30:41or two blocks in either direction. We'll
30:43also include uh local school districts
30:46in that communication as well. So, if
30:47it's affecting their bus routes, they'll
30:49know and they can come and attend that
30:50meeting if they so choose. And then also
30:52all public meetings are posted to the
30:54city website. We put them on Facebook,
30:56Nextdoor. We also reach out to any of
30:58the NIAs if there's an NIA active in
31:00that neighborhood so they are aware of
31:01it. And on that postcard, it'll tell you
31:03where the meeting will be held and also
31:05give you contact information. So, if
31:07you're not able to attend, you know who
31:08to reach out to if you have questions
31:10but you can't be there on that
31:11particular night.
31:13Um
31:13for some of our larger projects, some of
31:15the further engagement we do, we'll
31:16actually have the design consultant
31:18visit each business to share contact
31:20information and discuss key information
31:22with the properties that are going to be
31:23adjacent to the work. Um that'll be
31:25things like major access points to their
31:27business or their property. Uh they can
31:29also tell us what key events are
31:31happening. So, if we say, "Oh, we're
31:32going to have We actually have this big
31:34thing we do every year. It's exactly on
31:36this day. Could we possibly get a little
31:38more access for that event?" That's
31:39something they can discuss with the
31:41design consultant. Also, for all
31:43projects, the contractor's required to
31:45provide door hangers and or make
31:46in-person contact. That's typically done
31:4948 hours before any traffic disruption.
31:51Um so, if they can't make contact with
31:53the property owner, they're going to
31:54hang something on the door with a number
31:56that they can reach out and get more
31:57information. And then also 48 hours
31:59before we do any kind of closure on city
32:02streets, there's a traffic disruption
32:03that's sent out that goes to the media.
32:05That also goes to any transportation
32:07organizations like Topeka Metro, the
32:09school districts, anybody who's offering
32:11transportation services in Topeka so
32:13that they know when this road closure is
32:15going to take place and if they need to
32:16set up alternative routes, they know
32:18that's going to take place. And we also
32:20issue press releases for any major
32:21projects so that if any of the local
32:23media has interest, um they can request
32:26interviews uh for stories that they'd
32:27like to do about how it's going to
32:29impact the public.
32:31Um also, we on our city website, we have
32:34uh web pages where you can go and get
32:35updates on projects.
32:38And so you can see where the public
32:39meetings are going to be held and get
32:41any information about um if you didn't
32:43get a chance to view the presentation or
32:44attend the meeting, look at that
32:46presentation and that will also have all
32:48the contact information if you're not
32:49able to attend in person.
32:51So that I'm happy to answer any
32:52questions.
32:54>> Thank you, Director.
32:56Questions from the committee for
32:58Director.
32:59Chair recognizes Councilwoman Ortiz.
33:02>> I don't have a question, but I do have a
33:03comment. I think the sheets with
33:05everybody's information below, I really
33:08like that and the cute code. I really,
33:10really like that. Cuz a lot of times
33:13when people don't get to the meetings,
33:15I'll either send them one of them or
33:16they'll or tell them where the code's at
33:18or whatever. And so they're helpful for
33:20me that I don't have to come back and
33:21ask all those questions. So I hope we
33:23continue to do that.
33:24>> Absolutely.
33:25>> Thank you.
33:26>> Thanks.
33:28Deputy Mayor, question for Director.
33:30>> No.
33:31>> Okay.
33:33I don't have anything. Thank you,
33:34Director.
33:35>> Okay, fantastic.
33:37>> Moving on to
33:39action item
33:40number four on the agenda.
33:42Uh action item 4A, traffic disruption
33:46permits.
33:48>> So
33:49uh what we have for you today is a
33:51proposed change to the ordinance. This
33:52is something that
33:54um we are trying to reflect what is our
33:56actual practices today.
33:58Um so these will be modifications to uh
34:00four ordinances, which you can see.
34:02We've included copies of the ordinances
34:03themselves to show the exact language.
34:06Um but I'll just walk through a brief
34:07presentation of what this would do in
34:09summary. So the first would be adding a
34:11right-of-way construction permit,
34:13removing the traffic disruption permit,
34:15and then also adding and defining a
34:17traffic disruption notice.
34:19Uh so the changes would be we would
34:21change the definition of a right-of-way
34:24permit to remove the language about a
34:26traffic disruption permit, and then we
34:28would add a definition for a
34:29right-of-way construction permit. So
34:31what happens now is according to the
34:33code, uh we have a requirement for a
34:35traffic disruption permit. What we'd
34:37like to do is in lieu of a traffic
34:40disruption permit, we would have a
34:41permit for right of way construction.
34:44So, anytime you're doing construction
34:45that affects the right of way, we'd get
34:47a right of way construction permit.
34:49Currently in the code, um there are
34:51different types of right of way
34:53construction permits. You'd have to have
34:54a separate permit for a sidewalk or for
34:57a driveway. What this would allow you to
34:59do is get one permit. It would encompass
35:01all of the work. You could list out what
35:03work you're doing without having to
35:04apply for separate permits. And then
35:06also,
35:08that would include a component if there
35:09is traffic disruption associated with
35:11it. So, we would be replacing that
35:14traffic disruption permit with that
35:16right of way permit.
35:19And then we also would add a traffic
35:21disruption notice. So, this would mean
35:23that once you have the permit, the
35:25permit would generally outline when
35:26you're going to when you're going to
35:27have construction, but then you would be
35:29required, if this is going to disrupt
35:32actual traffic in the right of way,
35:34you'd have to provide notice 48 hours in
35:36advance so that we could, just like we
35:38talked about with our projects, if
35:40there's a private entity that's
35:41disrupting traffic and they're permitted
35:43to do that, they send out that
35:45notification 48 hours in advance.
35:47Everybody who operates transportation
35:49within the city of Topeka is aware. This
35:52is typically something that's done by
35:54things like franchise utilities, gas
35:55companies, utility companies, or anytime
35:58there's construction and you know, it's
36:00the safest way to perform that is to
36:02block a lane of traffic, uh then they
36:04can
36:05provide this traffic disruption uh
36:06notice.
36:07Uh and then like I said, we'd be adding
36:09the right of way permit requirement,
36:10removing that traffic disruption permit
36:12language. So, this is really just
36:14cleaning up the ordinance, having one
36:16permit that covers multiple types of
36:18construction within the right of way,
36:19and then clarifying if you are planning
36:21to do construction in the right of way,
36:23you need to have a right of way permit,
36:25and you also need to provide a traffic
36:26disruption notice that takes place
36:28immediately before the work is being
36:29performed.
36:31That I'm happy to answer any questions.
36:34>> Any questions or comments from the
36:36committee?
36:39I think it makes
36:40total sense.
36:43To
36:43>> is one that we would need a vote to
36:45recommend this to the full governing
36:47body.
36:49>> Okay, motion has been made by
36:50Councilwoman Ortiz
36:52for the amendment.
36:55I'll second.
36:59Okay.
37:00Still reading, Deputy Mayor.
37:11We're good. Motion has been made and
37:13seconded. All in favor
37:16say I.
37:17>> I.
37:17>> I.
37:18>> I.
37:19>> All opposed, same sign.
37:21Okay.
37:23Motion carries, 3-0.
37:29Moving on to
37:31action item 4B,
37:33capital improvement project exceeding
37:36250,000 on 21st and Wanamaker.
37:40>> So, this would be a project with a
37:42budget of 1.4 million dollars. This is
37:45part of our pavement preservation
37:47program that's in the CIP.
37:48Uh what would be what we would be
37:50proposing to do here in 2027 is to do
37:53reconstruction of the 21st 21st Street
37:57approach labs at I-470 and then also
37:59doing patching and spot repair on 24
38:02Street 21st Street, excuse me, from
38:04I-470 to Wanamaker and patching on
38:06Wanamaker from 21st Street to I-470 and
38:09Winding Road. So, if you travel down
38:11Wanamaker, you're probably familiar with
38:13the fact that earlier this summer
38:15um we did an ultra-thin bonded asphaltic
38:18surface between 10th Street and 470 and
38:21then also on Wanamaker from 21st to 29th
38:23Street. We have always anticipated doing
38:26the section between those. However,
38:28before we can apply that uh U-Bass
38:31surface, we need to come in and do some
38:32patching and some filling to make sure
38:34we have a nice smooth surface that we
38:35can lay down on top of. And then also,
38:38if you've ever uh been traveling down
38:4021st Street on and getting on to uh
38:42I-470, you know that those approach
38:45slabs right before the KDOT bridge uh
38:47are fairly well deteriorated. We have to
38:49reconstruct those. Those will be
38:50concrete reconstruction. There will be
38:52closures associated with that. So, we
38:55will have some limited turning
38:56movements. Uh you will not be able to
38:58turn left onto I-470 from 21st Street uh
39:02during that time. So, we will have to
39:03have detours. We anticipate each one
39:05will be about 6 weeks in length. Uh but
39:07this project is very much needed in
39:09order to replace those concrete approach
39:11slabs. Uh we would do this, but there'd
39:13still be traffic open one way, and you'd
39:15still be able to turn right onto I-470,
39:17but we would restrict left turn
39:19movements. And we anticipate performing
39:21this work
39:22uh starting in May. Um we're looking to
39:25avoid the Topeka West calendar year so
39:27that this would not be going on and be
39:28disrupting traffic on 21st Street during
39:30the school year, when we know there's a
39:32lot of traffic to Topeka West. So,
39:34um we'd be recommending approval to
39:36start this project in May.
39:39>> Questions or comments from the
39:40committee?
39:42Chair Reconnaiss Deputy Mayor.
39:44>> I
39:46um
39:48I'm glad to see that it's not going to
39:49be considered during the uh
39:51holiday season, either.
39:55Cuz
39:56even back to school
39:58could be pretty iffy. So, if we can work
40:00around the best we can,
40:03heavy shopping times,
40:05that would be appreciated.
40:06>> Actually, so that was one of the things
40:08we considered um as to why we didn't
40:10attempt to do 21st to 29th and
40:13Huntington to 21st at the the time. We
40:16didn't want to risk disrupting the
40:18holiday shopping season uh and getting
40:19too far into winter. So, we decided to
40:21break that up into two seasons and
40:23hopefully accomplish this during the
40:25summer season when we don't have the
40:26school traffic and and the shopping is a
40:28little bit lighter.
40:29>> And you said time of
40:31work is about 6 weeks?
40:33>> So, we estimate 6 weeks closure
40:37on that left turning movements.
40:39>> Okay.
40:39>> Um onto I-470. Another factor is we know
40:43that KDOT is planning on to do some work
40:45along 470. That's in 2029, but we want
40:48to make sure that if we're going to be
40:50detouring people to other exits, that we
40:52have less congestion and we have good
40:54flow on 470 during that time.
40:57>> Okay, so what you're telling me is it's
41:00say I'm coming from the
41:03east
41:04>> Mhm.
41:04>> and I get to 21st Street and I'm getting
41:07on, which is generally pretty backed up.
41:11I will not be able to turn left
41:14>> Correct.
41:14>> when they're doing the work, but I turn
41:15can turn right.
41:16>> Correct. So, you could get on 470 going
41:18north towards, for example, the Huntoon
41:21exit, but if you were wanting to turn
41:24left going south towards the Fairlawn
41:26and 29th Street exit, that would not be
41:28available to you. So, we'd have detours
41:30either directing you to the
41:33entrance at Huntoon or to Fairlawn and
41:3629th Street if you want to get on going
41:38in that direction.
41:40>> Okay, just
41:42for those rogue people,
41:44if they do come off and they want to
41:46turn left,
41:48if they would go, say, down to
41:50QuickTrip, turn around, and head back
41:53west, could they go straight through?
41:58>> You lost me at QuickTrip.
42:00>> Okay, you come off the exit, you turn
42:03right.
42:03>> Okay.
42:04>> And you've got QuickTrip and you've got
42:06Helping Hands.
42:07>> Quick Shop, got you.
42:08>> So, if they Sorry, yeah, it is Quick
42:11Shop.
42:13The new one threw me off.
42:14>> Yep, understood.
42:15>> But you turn around.
42:16>> Mhm.
42:17>> And you come back out. Can you head
42:19straight west on 21st or will that be
42:21closed that you couldn't?
42:23>> So we anticipate keeping through traffic
42:26on 21st Street east and west. So yes,
42:28you would be able to travel straight
42:30through on 21st Street in either
42:31direction. We would just be limiting the
42:34turning movements.
42:35>> Okay.
42:36Then I'm
42:37>> exiting the interstate would still have
42:39ability to turn left or right as you're
42:42making the exit.
42:43Uh that's our anticipated construction
42:45plan today. We don't have full design
42:46yet, but that's what we're um
42:49intending to keep operable.
42:51>> When we get to the neighborhood meeting,
42:55I want to make sure somebody gets there
42:57from
42:59QuickTrip, Helping Hands, anyone around
43:01there that could see a surge in traffic
43:04of people
43:06that come off the interstate and get mad
43:08and
43:09decide, "Oh, I'll go down here, whip
43:11around, and head back."
43:14It's going to cause problems and I know
43:16people are going to do it.
43:17>> Yeah. Certainly parking lots become
43:19convenient U-turns despite our
43:22>> best
43:23>> our objections to stop them.
43:25>> So yeah, I want to make sure that they
43:27know what's happening.
43:29>> Absolutely.
43:30>> Okay.
43:32And we are going to notify everybody
43:34along along Wanamaker.
43:36>> That's correct.
43:37>> Okay.
43:41>> Any other questions or comment for the
43:43director on this
43:45on uh
43:474B?
43:49>> And I move to approve.
43:51>> Okay. Motion has been made to approve.
43:54>> Second.
43:55>> And seconded.
43:57All in favor, say I.
44:00>> I.
44:01>> I. All opposed,
44:03same sign.
44:05Seeing none,
44:06motion passes 3-0.
44:10Moving on to action item 4C,
44:14resolution for capital improvement
44:16project uh
44:182027 pavement preservation
44:20micro-surfacing project.
44:23>> So, this is a uh program uh as part of
44:26our pavement preservation program. So,
44:28the micro-surfacing program is the
44:30program where we apply a 1/4 in to 3/8
44:33in slurry on top of the road. So, this
44:35is not add structural improvements to
44:36the road, but this does protect the road
44:38from oxidation from sunshine. Also,
44:40protects it from moisture intrusion.
44:42Provides a nice uh clean uniform
44:44pavement surface. So, improves the
44:45driveability.
44:47Um this is something that's typically
44:48done on local roads.
44:50Um we will also be using in 2027 some
44:53additional treatments in addition to
44:54that micro-surfacing, which is a scrub
44:56seal and fog seal. Uh that's an
44:58additional program that we're
44:59experimenting with in some locations.
45:00We've seen good success. Uh so, that
45:03applies a little bit thicker aggregate.
45:05It also gives you a little bit better
45:06crack sealing. And then, we apply a fog
45:08seal on top to really glue all that down
45:11uh and provide a good uniform surface.
45:13Um so, the area that we'll be targeting
45:16targeting in 2027 is the northeast
45:18quadrant. Uh so, that's from the
45:20northeast quadrant of the city. It
45:22doesn't follow the address. That's north
45:24of 21st Street and east of Topeka
45:26Boulevard. Um so, we'll be primarily in
45:28the northeast part of the city in 2027.
45:30We do have a few additional routes um
45:33which will be on Gage from 33rd Terrace
45:35to 37th Street and 44th 45th Street from
45:38Gage to the city limits. Um other
45:40notable streets, Kansas from Highway 24
45:42to Menninger and then Sardou from River
45:45Road to Straights. These are all be
45:46locations where we'll be looking to do
45:48some additional um surface uh treatment
45:50to the road. Gives you better driving
45:52surface and further protects the road
45:54from oxidation
45:56Thought I'd ask for and be open to any
45:57questions or uh request approval.
46:01>> Questions from the Chair recognizes
46:03Deputy Mayor.
46:04>> The solid lines are the ones that are
46:06definitely being done.
46:08The dashed lines are the
46:10um possible additions.
46:13>> So, I believe the dashed lines are the
46:16city boundary and then those double pink
46:18lines are the areas that we will
46:21definitely be doing.
46:22Uh and then the
46:23>> Sorry, we're in black and white.
46:25>> Yep, understood.
46:26Um so, those if you look on the screen,
46:28those dashed lines indicate the city
46:29boundary. So, that kind of tells you
46:31where the edge of the city is. So,
46:33typically with this program, we go out
46:35to uh bid and get as many streets done
46:38as we possibly can. So, we don't know
46:40the exact locations until we go out to
46:42bid and see what pricing we'll get back
46:43from the contractors. But, we do have a
46:45couple identified identified locations
46:47which will definitely be included in the
46:49bid.
46:50>> Okay.
46:54Wow, fun boundaries.
47:06>> Motion to approve that we tried before?
47:08>> I wonder if this is the one we just
47:10tried to approve or annex
47:14at 37th and Gage
47:16for St. Paul's Church and another lot.
47:20So, that may be changed.
47:21>> So, this is actually 33rd to 37th.
47:26So, this would be going around
47:28>> is showing me the boundary right here,
47:3037th going south.
47:32>> Correct.
47:32>> So, I think that may be now
47:34in the city boundaries.
47:35>> Yes.
47:40>> Sorry, Sylvia.
47:41>> No, I just I was just nobody said
47:43nothing.
47:49>> You're still pondering, Deputy Mayor.
47:52>> Nope, I'm good now.
47:53>> Okay.
47:54Thank you. Any other questions or
47:56comment from the committee?
47:58Okay. Seeking motion for approval.
48:02>> So moved.
48:03>> Okay.
48:04>> And I'll second.
48:05>> Okay. Motion made by Councilwoman Ortiz,
48:07seconded by Deputy Mayor Halfer.
48:10Uh we'll take our vote.
48:12All in favor,
48:14say I.
48:15>> I.
48:16>> I.
48:16>> I. All opposed, same sign.
48:20Hearing none, motion carries.
48:24We're moving on to action item 4D,
48:27a res- another resolution capital
48:30improvement project uh
48:33pavement preservation
48:35project.
48:37>> Thank you, Mr. Chair. So, in addition to
48:39the micro-surfacing program, this is for
48:41the UBAS or the ultra-thin bonded
48:43asphaltic surface. So, this is the
48:45micro-surface we said was about a
48:47quarter inch to three in- 3/8 inch
48:49slurry. UBAS is about a 5/8 inch uh
48:52treatment that is placed on top of the
48:53pavement, so a little more structure, a
48:55little bit longer lasting.
48:57Um and the locations that we're
48:58proposing to do uh would be 10th Street
49:01from McVicar to I-70, Gage from 6th to
49:0412th, and 6th from Banner to Golden. Uh
49:07if funds allow, we would also include
49:08Washburn and Lane from 17th to 10th, and
49:11Branner from 10th to 15th. In total,
49:13there are three projects. That's because
49:15there are some money from previous years
49:16that was not fully spent that we are
49:18confident we can spend in 2027. So, this
49:21is a program that we've just started uh
49:23treatment program that we've just
49:24started in the past couple of years. Um
49:26we feel very strongly that it's a good
49:28treatment, and we know the best roads
49:29now that uh we feel more confident in
49:31doing more roads in 2027 because we know
49:34where this will work best, and that this
49:36will be a good treatment um for these
49:38particular roads.
49:40Um as I said, it's a 5/8 inch treatment.
49:42It can be applied very quickly.
49:43Typically on these projects, we'll have
49:45to go out and do a little bit of
49:46patching and prep work, and then the
49:48actual uh UBAS surface can be applied
49:51very quickly, so we can do this with
49:52limited closures uh on each of these
49:54locations.
49:55That I'd be happy to answer any
49:56questions.
49:57>> Okay, I've got a question.
49:59>> Absolutely.
50:00>> Chair recognizes Deputy Mayor Halfer.
50:03>> Okay, west of Fairlawn.
50:05Tawana Maker.
50:06>> Correct.
50:07>> That was fairly new. Does it really need
50:09U-Bass?
50:11>> So,
50:12um I don't believe we have anything on
50:15west of Fairlawn 6th Street on this
50:18particular program. So, Fairlawn um
50:20between So, on 6th Street between
50:23Fairlawn and the bridge, there is a a
50:26different program
50:27um where we'll be doing some um
50:30concrete replacement and patching.
50:32>> I'm looking at 10th Street.
50:34>> So, we actually I apologize. There is
50:38So, if you look on the map there,
50:40the
50:41uh we inadvertently mapped out there.
50:43That's from McVicar to I-470. That
50:46should have been mapped from McVicar to
50:48I-70. So, the address you're seeing here
50:51on the screen,
50:54and we'll get an updated map to be
50:56included in the council presentation,
50:57but this is showing from McVicar west.
51:00This should actually be showing from
51:01McVicar
51:01east.
51:02>> East.
51:03Okay.
51:06Yeah, I it wasn't making sense to me.
51:08>> Yeah. So, we'll get that um attachment
51:10updated uh if approved before it goes to
51:12full council.
51:14>> Okay.
51:16>> Any other questions or comments?
51:20>> Motion to approve.
51:21>> Second.
51:22>> Okay, motion has been made and seconded.
51:24Motion made by Councilwoman Ortiz,
51:26seconded by Deputy Mayor to approve.
51:30Uh we'll take a vote. All in favor,
51:33say I.
51:34>> I.
51:35>> All opposed, same sign.
51:38Hearing none,
51:40motion carries 3-0.
51:44Move to action item 4E.
52:08>> That's me, isn't it? So,
52:11>> Thank you.
52:13>> Um, good morning.
52:15>> Good morning, Director.
52:16Good morning, Director. I'm sorry.
52:18>> It's okay.
52:21Um, I just want to make sure that I
52:24have the same thing you do for 4E.
52:32Shunga Creek. Okay.
52:35So, uh, the Utilities Department is
52:38coming before you today, uh, to seek
52:41approval recommendation to move on to
52:43the governing body approval for, um,
52:47reconstruction of the creek bank along a
52:49section of Shunga. Um,
52:51we're referring to this as Shunga Oak
52:53Creek. This project is, um, total
52:57estimated cost of $300,000.
53:00Um, again, reconstruction only. So, this
53:03would not be making any channel
53:05improvements that would improve or
53:08mitigate flooding. This is purely to
53:11address, um, erosion and in bank
53:14degradation that is jeopardizing
53:17structures
53:18at this point. So, um, we've worked
53:21with, uh,
53:22consulting engineer to, um, come up with
53:24this cost and and potential design to
53:27help protect, uh, that bank from further
53:30erosion. So, uh, if approved, we will
53:34look to, um,
53:36negotiating and and working out a
53:38construction plan. So, right now, the
53:40best estimate is early 2027. Definitely
53:44need to be working with weather and and
53:46water levels in that channel
53:48to see what we can do.
53:50However, some of the solution is is
53:52fairly simple. To do stream bank work
53:54for $300,000 is is actually
53:58um
53:58very that's a very good price and
54:01I think a very reasonable approach to
54:04mitigating the damage that's occurred
54:06and and deflecting the water towards the
54:08center line of the channel.
54:10Again, so we can reduce erosion that's
54:13occurring there.
54:15With that, I will stand for whatever
54:17questions you might have.
54:20>> Any questions or comments for Director
54:22Davis?
54:33>> I move to approve.
54:35>> Okay.
54:36Motion has been made. Looking for a
54:38second for approval.
54:43>> Second.
54:44>> Okay.
54:44Motion has been made and seconded. Um
54:47we'll take a vote. All in favor sign I.
54:52>> I.
54:52>> I.
54:54All opposed, same sign.
54:57Hearing none,
54:58motion carries 3-0.
55:01Moving on to action item
55:044F,
55:06resolution capital improvement projects,
55:09Lafayette, Indiana project.
55:12>> Yep. So,
55:14this is another request for approval of
55:16a construction of a project that's ready
55:18for construction and exceeds $250,000.
55:22This is a sanitary sewer replacement
55:25between This is along an alley 10th
55:28Avenue from Lafayette to Indiana.
55:31The total project budget is estimated at
55:341. It's over $1.2 million, so
55:37$1,223,000.
55:41$223,514
55:44for the sanitary sewer replacement.
55:47We're working on easement acquisition
55:49now. We've We've had to really do a lot
55:51of work to get some temporary easements
55:53to do construction in that area, but
55:55once we complete that, hopefully
55:58by the end of November,
56:00we can start construction in early
56:02spring.
56:03Approximately 120 days construction for
56:06this project, so hopefully complete by
56:08late May or early June. We do have a
56:10picture here to show you the condition
56:12of the alleyway. You can see the the
56:15issues that we're having on the surface
56:17there, and that is related to the
56:19sanitary line underneath. So,
56:21pretty hefty replacement cost here
56:25due to the condition of the surface
56:27above and and what's going on underneath
56:29there.
56:33>> Chair recognizes Councilwoman Ortiz.
56:37>> Thank you.
56:38Um Sylvia, this is in my district and I
56:42drive up and down this quite a bit. Um
56:46all of my residents there in that little
56:48strip park in the back. They do cannot
56:51park on 10th Street.
56:53>> That's part of that acquisition that
56:55easement acquisition that we are trying
56:57to obtain so that they have
57:00adequate parking to their residents
57:02through construction.
57:04So, so we're working with them to grant
57:06permission to allow construction and and
57:09still provide them access to their
57:14typical parking spaces as we work
57:16through that project. It's been a little
57:19trying because a couple of the residents
57:22aren't eager to communicate with us.
57:26It's a little overwhelming talking to a
57:29representative who's
57:31uh talking about obtaining easements,
57:33but it's truly for um
57:36temporary access while we're working
57:38through construction to to help
57:40accommodate them and
57:42>> be happy to help you talk to them, but
57:44where are they going to park?
57:46>> Um I mean don't think I
57:48>> I I'm thinking right outside right where
57:50that tree was. That person has three
57:52cars and she parks, you know, in the
57:55back. You can't park in the front.
57:57>> I don't think I have included that plan.
58:01Um but we do have a plan uh to address
58:04each uh resident there. Um
58:07we have also gone through the process of
58:09eminent domain for two that we are
58:12working with. Again,
58:13um so we've provided some of that
58:15information as we work through that
58:17process with the governing body.
58:18However, I'm I'm happy to produce those
58:20plans and and walk through that with you
58:23uh so that if there's questions, uh we
58:25can kind of tag team that and help
58:28address the residents. We'll also do a a
58:30meeting in the area to make sure that
58:32they're well aware um with our
58:33contractor when we're planning on
58:35starting that and how we'll work through
58:37the transition of that project. It's
58:39it's a tight area. Um again, we
58:41definitely want to make sure they all
58:43have access and that's why we'll have to
58:45kind of phase through that and stage um
58:48in a way that allows us to complete one
58:50end before we start working on the other
58:52and and
58:53>> Okay.
58:53>> accommodate that, but I I can help walk
58:55through that with you. Um thank you.
58:58Thank you.
58:58>> to be sure cuz
58:59>> So So you can see here uh the different
59:02um
59:03work that we're doing. So it's really
59:05three phases so that we can uh make sure
59:08we continue to provide access there.
59:10>> Okay.
59:11>> So we have rehab work going on uh as
59:14well as replacement. So we're not
59:16completely tearing everything up. Um
59:19and full It's not full replacement all
59:21the way through that alley, but again,
59:24sectioning off where we can to
59:26do the least amount of of
59:29>> Well, I'm just thinking about
59:31one person in the middle and she's got
59:33three cars and then the her neighbor
59:36they have so many cars they park on the
59:40on the next street um which would be
59:44which would be the uh Lawrence
59:48which
59:49was questionable. I took Braxton out
59:52there and
59:53where the work trucks and all that was.
59:55This is right where that those trees
59:58were in that pillar that we replaced
1:00:00there.
1:00:02And that they must have five or six plus
1:00:04what's in their driveway. So, that
1:00:06that's that's just a concern.
1:00:08>> Yep.
1:00:09>> I know I'm going to get a lot of
1:00:09complaints about that.
1:00:11>> It's an extremely valid concern and
1:00:13again, one that we spent a lot of time
1:00:15trying to mark out easements for um but
1:00:18happy to walk through the plan of action
1:00:20there. So, we're all on the same page
1:00:22and again, we'll work with the residents
1:00:24to communicate that as best we can and
1:00:26accommodate the needs that they have as
1:00:29we work through that project.
1:00:33>> And we have to get this done because you
1:00:35said it was um sewer line?
1:00:37>> It yes, it is failing sewer line and
1:00:40it's so
1:00:40>> remind them that this can potentially
1:00:42back up into their
1:00:43>> Correct.
1:00:44>> Okay. Mhm. Just want to make sure I was
1:00:46okay.
1:00:47>> No.
1:00:47>> All right, thank you. Then make Thank
1:00:49you, Mr. Chairman. I make the motion to
1:00:50approve.
1:00:51>> Okay.
1:00:51>> I'll second.
1:00:52>> Okay, motion has been made
1:00:54by Councilwoman Ortiz and seconded by
1:00:57Deputy Mayor.
1:00:59Uh we'll go ahead and take a vote.
1:01:01Uh all in favor
1:01:04sign I.
1:01:05>> I.
1:01:05>> I.
1:01:05>> I.
1:01:07All opposed, same sign.
1:01:09Hearing none, motion carries 3-0.
1:01:13Moving to action item 4G.
1:01:18>> Okay. Um
1:01:21the
1:01:22uh utilities department is is coming
1:01:24before you with this item to review and
1:01:28amend our CIP and CIB. As we shared
1:01:31throughout uh the multiple rate
1:01:33discussions that we've had over the last
1:01:35year, um we are committed to increasing
1:01:37investment in our water, stormwater, and
1:01:40wastewater infrastructure. Um we're here
1:01:42to honor that commitment by requesting
1:01:44approval of that amendment to the CIP
1:01:47CIB um to authorize
1:01:49an increase of funding as we now have
1:01:52those rates set for the next 4 years.
1:01:54So, uh the amendment includes
1:01:58$136,535,050
1:02:03worth of additional authorization to
1:02:05fund 22 existing projects. Um we've
1:02:09increased um funding to 22 different
1:02:12projects and then add three new projects
1:02:15into um our our plans as highlighted in
1:02:18the summary sheet. So, we've given you
1:02:20all of the changes, we've given you
1:02:22individual CIP sheets, and then we've
1:02:25also given you a summary sheet to kind
1:02:27of highlight those
1:02:29those projects and programs that we're
1:02:31um
1:02:31proposing to amend.
1:02:33Um
1:02:34as always with this change, while that
1:02:37while this authorizes us to um have the
1:02:40authority to fund these and and start
1:02:42work, uh we would be coming before the
1:02:45public infrastructure committee uh for
1:02:47individual project approval uh for those
1:02:49projects that are exceeding $250,000.
1:02:52So,
1:02:53with that, I will stand for whatever
1:02:55questions you might have. I know there's
1:02:56a lot of detail in those sheets. Um
1:03:00again, 22 of them are the the detail's
1:03:03not different, it's still funding the
1:03:04same programs, it's just increasing
1:03:06funding so that we can either um move
1:03:09projects up in in timeframe or fund more
1:03:13of a portion of that um earlier on in
1:03:15the process. And then again, adding
1:03:17three new projects that are uh
1:03:20dedicated towards improving
1:03:22infrastructure at the wastewater
1:03:23treatment plants and our major pump
1:03:25stations.
1:03:29>> Any questions or comments for Director
1:03:33Davis on this project?
1:03:37Okay, chair recognizes Councilwoman
1:03:38Ortiz.
1:03:39>> Shelby, can you bring this back to us?
1:03:41Can we have time to look at this?
1:03:44Does it need to be done now?
1:03:46>> Sure.
1:03:47Um
1:03:48unless Nicole says I I I
1:03:51need at least one thing out of there,
1:03:52but she's waving she's she's saying no.
1:03:54No, I think I'm happy to spend some time
1:03:57walking through that if if you need.
1:04:00Um
1:04:01>> I would like that. I don't know about my
1:04:03colleagues, but
1:04:05there's
1:04:05>> For me, I think it is a lot of
1:04:07information to go over and a lot of
1:04:09projects that's
1:04:11an enormous amount of funding, so
1:04:14I think
1:04:15giving us an opportunity to take a
1:04:17second look at it would be
1:04:19>> Sure. I was just going to ask for some
1:04:20clarification. Did you as the committee
1:04:23would like to do that or would you like
1:04:24to move it on to the council so the
1:04:26council as a whole is looking at it?
1:04:29>> I would like to see it come back to this
1:04:31committee.
1:04:31>> Sure. We'll bring it back next month.
1:04:33>> Before we recommend it to go to council
1:04:34unless my colleagues or committee
1:04:36members have some different thoughts.
1:04:40>> Is there any time frame we need to have
1:04:42this done by
1:04:43and to council? Does it need to be at
1:04:46least by the December meeting, a
1:04:48December meeting?
1:04:50So it's approved for the
1:04:52before the year starts?
1:04:55>> Yes, cuz the the major part of this is
1:04:57getting those 2027 projects approved and
1:04:59the funding authorization there for
1:05:01those.
1:05:03Um
1:05:05We can move forward at whatever pace
1:05:06you'd like,
1:05:07but we certainly would like approval
1:05:09sooner rather than later so that we can
1:05:10make that promised investment and get
1:05:12going on it.
1:05:14>> Well, I'm not trying to belabor this,
1:05:16but I do want to make sure I understand
1:05:18what I'm doing and
1:05:18>> It is a lot of information. Yes.
1:05:21>> you you know it like the back of your
1:05:23hand and I don't.
1:05:25>> Well, and again, we're happy to to sit
1:05:27and walk through that. You know, the
1:05:28normal CIP CIB process takes quite a
1:05:31while. We walk through that with with
1:05:33all the other departments and and their
1:05:35capital improvements um plans.
1:05:38This is amendments to those. So, like I
1:05:41said, um the majority the bulk of these
1:05:43changes are just increasing funding in
1:05:46each of those years out um
1:05:49and and then the associated projects
1:05:50with those. Um so, if you guys want to
1:05:53spend time and go through that on your
1:05:55own, if you would like to set up
1:05:56meetings with us, just let me know so we
1:05:58can um make sure we allocate plenty of
1:06:00time to answer whatever questions you
1:06:02have. And then um
1:06:03we can bring it we'll we'll plan to
1:06:06bring it back up at the next committee
1:06:08meeting, but if you need more time than
1:06:10that, I'm certainly happy to to push it
1:06:13back further.
1:06:15>> Can you go?
1:06:15>> I will go either way.
1:06:17>> Okay.
1:06:18So, we want a table
1:06:20until next meeting.
1:06:21>> Just bring back.
1:06:22>> Okay.
1:06:24>> Okay.
1:06:24>> Give us time to talk.
1:06:25>> Okay.
1:06:26Well,
1:06:26>> Thank you.
1:06:27>> recommendation is that we bring it back
1:06:28to committee next meeting.
1:06:30Uh give the committee a chance to review
1:06:34and
1:06:35we'll make a decision at that point.
1:06:37>> Okay. Thank you.
1:06:38>> Thank you, Director Davis.
1:06:42Moving on to non-action item. No action
1:06:45was taken on um
1:06:48uh
1:06:49action item 4G.
1:06:51So,
1:06:53we're moving on to 5A, public works
1:06:57project update.
1:06:59>> So, I'll just run through a quick update
1:07:01on some of the projects we've got going
1:07:03on around town.
1:07:04>> Mhm.
1:07:05>> Uh
1:07:06so, completed projects on tune from Gage
1:07:08McAllister and then we'll go over some
1:07:10projects that are just starting or are
1:07:11currently underway.
1:07:13Um, so, one update to give, uh, Hunt
1:07:16Tune from Gage McAllister. This project
1:07:18started on June 29th. We were able to
1:07:20open this to traffic on October 29th.
1:07:23Uh, and this is a mill and overlay, also
1:07:24some concrete patching, curb and gutter,
1:07:26driveway approaches, and sidewalk
1:07:28replacements. Uh, this is a project that
1:07:30frustrated, I know, a lot of businesses
1:07:31in this area. Uh, we had hoped to keep
1:07:34traffic flowing on this street longer
1:07:35than we could, but, uh, we unfortunately
1:07:37had to close traffic because of the some
1:07:39of the conditions below the surface. Uh,
1:07:41but we were happy to reopen that last
1:07:43Wednesday. So, we do have traffic
1:07:44flowing on that again. We still have a
1:07:46few final items to complete, some
1:07:48driveway approaches,
1:07:49uh, some sidewalks, a little bit of
1:07:50patching, but that is open to traffic
1:07:52now, which we're very happy about.
1:07:54>> And they striped it yesterday.
1:07:56>> Fantastic, happy to hear that. Um, so,
1:07:59Topeka Boulevard from 15th to 21st, uh,
1:08:02this is a project that we had closed the
1:08:04intersection of 17th and Topeka
1:08:05Boulevard. Unfortunately, we did uncover
1:08:07a conflict between sanitary sewer and
1:08:10storm water. In order to resolve that
1:08:12conflict and move that sewer line safely
1:08:14away from the storm water, uh, we are
1:08:16going to have to construct three
1:08:18additional manholes that we were not
1:08:19aware of at the start of the project. In
1:08:22order to do that, those manholes require
1:08:24fabrication, which is causing a delay in
1:08:25the project. So, that left us with a
1:08:28situation where there was not going to
1:08:29be significant work that was able to
1:08:31happen at 17th and Topeka Boulevard.
1:08:33There is still work going on on the
1:08:35project in other locations, but because
1:08:38at that location, uh, we were not going
1:08:40to have productive work happening for
1:08:41some time, we made the decision to
1:08:43reopen the intersection of 17th and
1:08:45Topeka. Once those manholes have been
1:08:47fabricated, we will have that closure
1:08:49again at 17th and Topeka to remove the
1:08:51pavement there and do water line and
1:08:54sanitary sewer work, uh, at the
1:08:56intersection of 17th and Topeka. We
1:08:58anticipate that closure will start again
1:08:59on November 16th, but that is open to
1:09:01traffic as of today.
1:09:04A project that just started yesterday,
1:09:06this is Southwest Oakley from 10th to
1:09:07Front Street. So, this is full depth
1:09:09pavement replacement from 10th to 8th
1:09:10Avenue. We're also doing sanitary sewer
1:09:13replacement from 10th to 8th, and there
1:09:15was a closure of 10th Street which began
1:09:17yesterday. That'll be for sanitary work.
1:09:19We anticipate 2 to 3 months for that
1:09:20closure. Once 10th Avenue is reopened,
1:09:23we'll be closing Watson Avenue, uh
1:09:25moving on to work at that location.
1:09:27That'll be another couple months
1:09:28closure. Uh and then we anticipate
1:09:30completing the project entirely by
1:09:32summer of 2027.
1:09:34So, uh for the most part in these areas,
1:09:36we will have some traffic that is open
1:09:38on these streets, but we do have that
1:09:40full closure at 10th Street
1:09:41unfortunately for the next 2 to 3
1:09:42months.
1:09:44Southeast 29th from Kansas to Adams,
1:09:46this is a project that is long overdue.
1:09:48This is for pavement replacement,
1:09:49milling overlay, waterline, storm sewer,
1:09:51and sanitary sewer replacement. Most
1:09:54importantly, this is rehabilitation of
1:09:55the Butcher Creek Bridge box structure.
1:09:57Um so, that box structure that runs uh
1:10:00underneath 29th Street that carries the
1:10:02water for Butcher Creek has been in need
1:10:04of some rehabilitation for several years
1:10:06now. Unfortunately, because of the the
1:10:08method for that repair and the way the
1:10:10bridge sits under the road, we had to do
1:10:11a full closure of 29th Street in order
1:10:13to make those repairs. Uh that started
1:10:15on 10/6. We're estimating a 6-month full
1:10:18closure. So, between Kansas and that
1:10:20location, right now we're doing
1:10:22waterline, storm sewer, sanitary work.
1:10:24We're also doing some pavement patching
1:10:26and sidewalk at that location.
1:10:28The next phase of that project, after
1:10:30this 6-month closure, we will reopen
1:10:32one-way traffic on 29th Street. So,
1:10:34there'll be one lane each way.
1:10:36Um that'll be for pavement patching,
1:10:38waterline, storm sewer, sanitary sewer
1:10:40sewer, curb and gutter. And that'll be
1:10:42between 201 Southeast 29th Street and
1:10:45Madison Street. So, we'll have we'll
1:10:46work one side of the street, one lane
1:10:48traffic on the other side, and then
1:10:50we'll flop over and do one one-way
1:10:52traffic on the other side.
1:10:53Um that's at the end of the current
1:10:556-month closure. And then at the last
1:10:57phase of the project, there will be a
1:10:59full closure on 29th from Madison to
1:11:01Adams. We will keep access open to local
1:11:03businesses, but we want to make everyone
1:11:05aware during this last phase of the
1:11:07project, we will be forced to close 29th
1:11:10Street traffic completely, and we'll
1:11:12have to close traffic at Adams at the
1:11:14intersection 29th Street because of the
1:11:15way that the utility lines extend out
1:11:18into the intersection of 29th and Adams.
1:11:20Unfortunately, we will have a full
1:11:21closure at that location. Uh that'll be
1:11:23for water line, storm sewer, sanitary
1:11:25sewer, pavement patching, and curb
1:11:27gutter. Uh and then once we've completed
1:11:29that, the final phase, we will reopen
1:11:31traffic one way, and then come back and
1:11:33do that asphalt overlay over the length
1:11:35of the project, uh which we anticipate
1:11:37to be in summer of 2027.
1:11:40Also, some good news from our friends at
1:11:41KDOT. As of last Friday, I-70 was
1:11:44reopened to one lane traffic. I didn't
1:11:45want to tell anyone cuz I don't think
1:11:47everyone's noticed, and traffic's pretty
1:11:48light on the way in in the mornings
1:11:49right now.
1:11:50Um but that is open at Topeka Boulevard,
1:11:538th Avenue, and 10th Avenue. One thing
1:11:55to note is if you're leaving this
1:11:57building, you cannot get on I-70 right
1:11:58out here. You have to go over to Adams.
1:12:00So, the entrance at 8th Street is not
1:12:02open quite yet. Uh KDOT will continue
1:12:04work to open 4th Street and Memorial
1:12:06Avenue. They're hoping to have that done
1:12:08by December of 2026, and then they will
1:12:11be moving on to a Kansas Avenue closure
1:12:13scheduled for early of 2027, and they
1:12:15anticipate the project will be
1:12:16completely done in October of 2027. So
1:12:18again, this is a KDOT project, but we
1:12:20know it's affecting a lot of our
1:12:21residents in Topeka, so wanted to give a
1:12:23brief update. And with that, I'm happy
1:12:25to answer any questions. Go ahead.
1:12:27>> Chair recognizes Councilwoman Ortiz.
1:12:30>> I don't have any questions, but I do
1:12:31have some comments. Thank you for
1:12:32opening what you can, what corners you
1:12:35can. I did drive the I-70. I heard it on
1:12:37the news, and so I thought, let me jump
1:12:39on here. It was pretty slick. Um
1:12:42that just makes my life easier coming
1:12:44down, being able to come down 17th
1:12:46instead of wiggling all around, and I
1:12:48just hope we just keep that
1:12:50going as much as we can because
1:12:53residents are just trying to get where
1:12:54they're going and then especially when
1:12:57they see that there's nothing out there
1:12:59at that corner happening and we just got
1:13:00to close down. Just maybe it'll help
1:13:03just a little bit from that as well with
1:13:05the comments. But thank you for thinking
1:13:07of that and hopefully we'll continue to
1:13:08do that. Thank you, Jason.
1:13:10>> Anything.
1:13:11>> The chair recognizes Deputy Mayor.
1:13:15>> Kansas Avenue
1:13:18and we can be able to get to Topeka
1:13:21Boulevard
1:13:23so we can go over the river because I'm
1:13:26assuming you're also going to close
1:13:29the Kansas Avenue bridge to do that work
1:13:31on the east end.
1:13:32>> That's correct.
1:13:33>> south end.
1:13:34>> So, while KDOT has their closure for
1:13:37Kansas Avenue, we will also be working
1:13:39on some improvements to Kansas Avenue
1:13:41just short of the bridge and also the
1:13:43Kansas Avenue bridge as well during that
1:13:45closure. There will be access across
1:13:47Topeka Boulevard and also access across
1:13:49the Sardou bridge. So, we've been very
1:13:50clear with KDOT that we cannot have a
1:13:52situation where both the Topeka
1:13:54Boulevard and Kansas Avenue bridge are
1:13:55closed at the same time. Correct.
1:13:59>> Cuz I will need that to be very specific
1:14:03for my neighbors because
1:14:05that again it's going to cut us off and
1:14:08make it hard
1:14:10even for anyone to get to the card lot,
1:14:11to get to the street department, any of
1:14:14that. The bus barns.
1:14:18I'd like to see what that's if there's
1:14:20any kind of a map what that's going to
1:14:22look like in the time frame. That would
1:14:24be helpful so I can distribute it to who
1:14:28I usually send to and it can go to those
1:14:31that need it that are also in that area.
1:14:34That's going to be really
1:14:37and I don't know that Fourth Street will
1:14:38be open at that point.
1:14:40>> So, they have com- committed to us that
1:14:41Fourth Street will be reopened before
1:14:43they begin the Kansas Avenue closure.
1:14:45Their next priority is Fourth Street and
1:14:47they also want to get Monroe Street open
1:14:48adjacent to the federal building, and
1:14:50that will occur before they initiate the
1:14:52Kansas Avenue closure.
1:14:54>> Okay, that will help, but
1:14:56it's still a lot to deal with.
1:14:58>> Absolutely.
1:15:00>> That's all I have.
1:15:01>> Okay.
1:15:02>> Thank you, Director.
1:15:04Uh
1:15:04moving on to the actual uh non-action
1:15:07item six, public comment. No one has
1:15:09signed up, so I'll ask if we have
1:15:12comment from uh
1:15:14uh city manager,
1:15:16deputy manager.
1:15:17>> No, sir.
1:15:18>> Okay.
1:15:19Anyone else in our room?
1:15:22Thank you all for joining us today,
1:15:24both here and online, so uh with that,
1:15:29this this committee meeting is
1:15:30adjourned.