2026-10-01 - Transportation Advisory Board
Summary
Built from YouTube auto-generated captions; the City's posted agenda and minutes were not read. Names and figures are as captioned and may be misspelled.
- Quorum was present. The public forum had no speakers, though written comments went to the board in advance. The minutes of the September 3 meeting were approved by roll call.
- Police report: The Labor Day enforcement campaign (71 stops, 59 hours) closed out the fiscal year's STEP grant work at 849 stops and 625 hours. The 2027 STEP grant budget is approved and is expected to be roughly double last year's, so enforcement should roughly double. School zones remain a priority, and October patrols will focus on traffic complaints tied to road closures from construction on the south side along Book Road, Route 59 and the Wolf's Crossing and Route 248 corridor.
- Bicycle and Pedestrian Plan Update: Staff, with the consultant, presented the final draft after revisions responding to the September 3 comments, including a feasibility study for an off-street bicycle connection through downtown, an implementation overview, and clearer language on protected bike lanes and the no-build sidewalk policy. Three speakers supported the plan; one asked that the plan keep public land near the Riverwalk open as an option for the downtown "missing mile." Board members asked about guarantees and funding: staff said it is a 30-year planning document with no projects approved or budgeted, a funding chapter lists grant options, much of it is signage and pavement markings, and staff will report to the board twice a year starting in 2027. The councilmember present noted a planning-level cost of about $54 million over 30 years. The board recommended adoption by roll call, 8-0. The City Council adopted it October 20.
- Old business: The overnight parking survey closed September 18 with more than 2,000 responses, including about 1,800 written comments; staff are still reviewing and will bring results at a future date. See Overnight Parking Survey.
- No new business; the meeting adjourned.
Agenda
Agenda items are summarized above; the full agenda is on Legistar.
Sources
- Legistar meeting calendar: https://naperville.legistar.com/Calendar.aspx
- Video: https://www.youtube.com/watch?v=4bk4CYTMCsk (City of Naperville YouTube channel, streams)
- Video (City's own archive): https://naperville.granicus.com/MediaPlayer.php?view_id=2&clip_id=1858
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
11:30All
11:42right. I would like to call the
11:44Transportation Advisory Board meeting
11:46for October 1st, 2026 to order. Staff,
11:50please conduct the roll call.
11:52>> Mr. Stro,
11:54>> here. Mr. Ol.
11:56>> Mr. Kriswinsky here. Miss Nyer
11:59>> here.
12:00>> Mr. Hurley
12:01>> here.
12:01>> Miss Rose
12:02>> here.
12:03>> Mr. Yang
12:04>> here.
12:05>> Mr. Hanley
12:06>> here.
12:07>> Mr. Webb.
12:09>> Councilman McBroom
12:10>> here.
12:13>> We have a quorum. The meeting is
12:15officially called to order. The first
12:17order of business tonight is the public
12:18forum. During the public forum, members
12:20of the public have the opportunity to
12:22address the transportation advisory
12:24board on issues which are not part of
12:26tonight's agenda. Please keep your
12:29comments limited to three minutes.
12:30Staff, do we have anyone signed up to
12:32speak as part of the public forum?
12:35>> We do not.
12:40>> Giving no public speakers, um does uh we
12:43will close the public forum. Um, let the
12:46record state that we did have written
12:48comments that were given to the board in
12:50advance of the meeting.
12:53Our next order of business are the
12:54reports and recommendations.
12:57First up is agenda item 26119.
13:01Approve the minutes of the September
13:033rd, 2026 transportation advisory board
13:05meeting. I will entertain a motion to
13:08have a discussion on this item. Do we
13:09have a motion and a second to approve
13:11the minutes of the September 3rd, 2026
13:13transportation advisory board me?
13:16>> So moved.
13:17>> Mr. Early.
13:19>> Second.
13:20>> Mr. Stum,
13:23do we have any revisions or comments
13:26regarding the minutes?
13:32Staff, can we please call the role? All
13:34those in favor signify by saying I. And
13:37those opposed, nay.
13:39Mr. Strum
13:40>> I
13:40>> Mr. Olgre
13:41>> I
13:42>> Mr. Kriswinsky
13:43>> I
13:43>> Miss Nyer
13:45>> I
13:45>> Mr. Hurley
13:46>> I
13:47>> Miss Rose
13:48>> I
13:48>> Mr. Yang
13:50>> I
13:50>> Mr. Hanley
13:52>> I
13:53>> motion passes and we approve the minutes
13:56of the September 3rd 2026 transportation
13:59advisory board meeting as submitted.
14:01Next we have the police department
14:03report from Sergeant Muska.
14:07>> Thank you. Good evening. So, I just want
14:08to touch briefly on uh our final step
14:11grant numbers for our for for the year.
14:13Uh Labor Day enforcement campaign was
14:15the last campaign for the 2026 fiscal
14:17year for step grants. So, we have
14:19completed that. Uh Labor Day numbers
14:23briefly were 71 total stops and 59 hours
14:26of enforcement. That brought our total
14:28enforcement numbers for the fiscal year
14:31of 849 stops and 625 hours of uh
14:37directed work.
14:40198 seat belt, 298 speed, 223
14:44uh distracted driving, and the rest were
14:46kind of spread out between other moving
14:47violations and equipment violations. Um
14:50our 2027
14:52step grant budget has been approved by
14:55the state. I just I have not yet
14:57received the final approved uh numbers.
15:01Um I was given a general idea by my uh
15:05leazison that I meet with quarterly that
15:07we will be receiving roughly double um
15:10the budget uh that we received last
15:14year. Um so I fully expect our
15:17enforcement numbers to also effectively
15:20double if not slightly more. Um, police
15:23departments continues to uh have school
15:27zone enforcement be a priority both in
15:30uh park parking and traffic violation
15:32enforcement as we're still early in the
15:34school year. Um, we are going to be
15:37picking up our enforcement visibility in
15:41October. Uh, also directing our efforts
15:44on the traffic complaints that have
15:47increased due to the construction on the
15:49south end of town along Book Road, Route
15:5159 and the Wolves Crossing 248 kind of
15:54corridor. Um, you know, a lot of those
15:57roads are shut down, so people are
15:59redirecting their their driving to other
16:03side streets that aren't used to seeing
16:05the higher flow of traffic, which is,
16:07you know, obviously kicked up uh the
16:09phone calls and the complaints and the
16:10violations in those areas. So, we're
16:12going to be paying particular attention
16:14to those areas this month.
16:18>> Great. Thank you. Does anyone have any
16:20questions or comment for Sergeant Muska?
16:24Hearing
16:28none, we will close the police
16:29department report.
16:31Next, we have 261152
16:33approve a recommendation to adopt the
16:36the update to the city's bicycle and
16:38pedestrian plan. Mr. Prussa, you have
16:40the floor.
16:41>> Thank you. In August 2025, the city
16:44hired Epstein uh consulting firm to
16:46develop an update to the bicycle and
16:48pedestrian plan. Over the past year,
16:50Epstein has worked with staff to
16:51evaluate the existing conditions of
16:53Napville's active transportation
16:54network, perform a level of stress
16:56analysis, and gather public input. The
16:59result of this analysis and public
17:01comments were utilized to develop
17:02project recommendations.
17:04A preliminary draft of the bicycle and
17:06pedestrian plan document was made
17:08available to the public in August 2026,
17:10and an overview of the plan was
17:11presented for public comment at the
17:13September 3rd, 2026 tab meeting. The
17:16project team reviewed all public
17:18comments and revised the document to
17:19produce a final draft of the bicycle and
17:21pedestrian plan. Public comments for the
17:24September 2026 tab meeting showed broad
17:26support for updating the bicycle and
17:28pedestrian plan and expanding bicycle
17:29and pedestrian infrastructure citywide.
17:32The main concerns expressed by the
17:33speakers and writing comments were
17:35whether the proposed recommendations
17:36would provide sufficient safety and
17:38connectivity, whether specific emissions
17:41and neighborhood impacts would be
17:42addressed, and whether the city would
17:44provide the funding and implementation
17:46commitment to turn recommendations into
17:49projects.
17:51Following the September tab, minor
17:52revisions were made to address public
17:54comments and correct emissions. Key
17:56revisions to the document include the
17:58addition of a recommendation for a
18:00feasibility study for an off- streetet
18:01bicycle connection through the downtown,
18:04an overview of project implementation
18:06that identifies facility design,
18:08crossing improvements, and public
18:09engagement as future steps,
18:12and also clarifying language added to
18:14the application of protected bicycle
18:16lanes, no bu the no sidewalk build side,
18:19the no build sidewalk designation
18:21policy, and an estimated cost summary.
18:24Staff is asking TAB to approve a
18:26recommendation to adopt the update to
18:28the city's bicycle and pedestrian plan.
18:32>> Thank you. I will entertain a motion to
18:34have a discussion on this item. Do we
18:36have a motion and a second?
18:44>> I'll make a motion.
18:46>> Mr. Stum,
18:47>> seconded.
18:49>> Mr. Elder.
18:51Uh, do we have anyone from the public
18:53signed up to speak on this item?
18:56>> Yes. Our first speaker is Ted Borlard.
20:21in public has focused on individual
20:23projects and implementation costs.
20:27We encourage the transportation advisory
20:29board to remain focused on the broader
20:31purpose of the plan. The value of this
20:34plan is ultimately to help residents
20:36move around Neapville safely,
20:39comfortably, and confidently. It is
20:42about improving access to our schools,
20:45parks, libraries, businesses,
20:48transportation, healthcare, all
20:50destinations within our community for
20:53residents of all ages and abilities.
20:57Nest believes this plan is not merely
20:59measured as an expense.
21:02Rather, it is valued as an investment in
21:05our quality of life.
21:08Communities that provide safe connected
21:10opportunities for walking and biking,
21:13improve public health, increase
21:16recreation benefits,
21:19enhance community engagement, and
21:21promote long-term sustainability. These
21:25benefits extend well beyond
21:26transportation, and are enjoyed by
21:29residents regardless of how frequently
21:31they walk or ride a bicycle. The plan
21:35also aligns with the goals that many
21:38Neighborville residents consistently
21:40voice. We want safer streets, improved
21:44mobility, stronger connections between
21:47neighborhoods and destinations, and
21:49greater choices about how to travel
21:51throughout our community. As the board
21:54considers its recommendation, we
21:57encourage continued focus on the plan's
21:59four themes. Safety, accessibility,
22:05connection to our neighbors and
22:06destinations,
22:08comfort and confidence,
22:11and our quality of life. These outcomes
22:14will help ensure Neapville remains a
22:16healthy, vibrant, and attractive
22:19community for our current and future
22:21generations.
22:23Thank you for your consideration.
22:27>> Thank you.
22:29>> Is there anyone else from the public?
22:32>> The next speaker is Nick Folk
22:35Faulk.
22:45>> Great.
22:48Good evening. My name is Nick Faulk. I
22:50live here in Neapville with my wife and
22:52two kids with a third on the way. Uh I'm
22:54here tonight with one simple ask. As you
22:57finalize this plan, please don't limit
22:59the solution to Neapville's downtown
23:02biking missing mile to paint signs and
23:05the roads we already use today.
23:07Neighborville has built an incredible
23:09network of trails and paths, but a
23:11network is only as useful as his
23:12connections. today. If you're riding
23:15north from the trail near Gartner and
23:18Edgewater toward downtown and the
23:20Riverwalk, that network effectively
23:22breaks down. I take it with my family
23:24all the time. You're pushed into streets
23:26and intersections that many families
23:27simply will not use. I ride with my
23:30young kids and I think there's a very
23:32simple test test for our bike
23:34infrastructure. Would you feel
23:36comfortable riding it with your child?
23:38At places like Auroran Eagle, my answer
23:41today is no. But I'm encouraged because
23:43I recently attended a Riverwalk
23:45Commission meeting where we spent a
23:47significant amount of time discussing
23:49this exact issue. For decades, there has
23:51been an understandable desire to keep
23:53bikes and the Riverwalk separate. But
23:55what I heard at that meeting was a
23:57willingness to reconsider that
23:58assumption to ask whether Riverwalk
24:01adjacent government-owned land could
24:03help solve this meeting connection while
24:05still protecting what makes the
24:08Riverwalk special. That is a meaningful
24:10opportunity. For example, the long
24:13public area alongside Centennial Beach.
24:16I'm not here tonight uh to tell you that
24:18that is a route that requires engineers,
24:21a professional study um and
24:24community citizen input, but I'm am
24:26asking that we study possibilities like
24:29it before we rule them out. Other
24:31communities like Carmel, Indiana, I have
24:33pictures here I can send afterwards. Um
24:35have found creative ways to use public
24:37land to build beautiful separated bike
24:40infrastructure that works alongside
24:41parks, pedestrians, cars, and existing
24:44community assets. Neapville should give
24:47itself permission to think just as
24:48ambitiously.
24:50So, as this consulting report is
24:52finalized, my request is
24:53straightforward. explicitly acknowledge
24:55the community interest in using public
24:57land and riverwalk adjacent corridors to
24:59solve the downtown missing mile for
25:01bikes and preserve those options for for
25:04further study. Let's make sure the plan
25:06leaves room to solve that connection
25:08well, not just the easiest solution
25:10available today. Thank you.
25:13>> Thank you.
25:23Is there anyone else from the public?
25:25The next and last speaker is Justin
25:28White.
25:42My name is Justin White and I was here
25:44last meeting to present to the uh to the
25:47board here. Um, I am part of the
25:50Neighborville Bicycle Club,
25:51Neighborville Outdoor Alliance, as well
25:52as NEST as a volunteer.
25:55So, last month I spoke about people
25:57whose lives are changed by unsafe
25:59conditions, and those were permanent
26:00changes.
26:03Tonight, I'd like to talk about the
26:04people who haven't been added to that
26:05list.
26:07The student trying to get to school
26:09safely,
26:10the parent deciding where their child
26:12can ride to a library, park, or friend's
26:14house,
26:16the senior trying to rem independent
26:20resident trying to get downtown without
26:22feeling uncomfortable.
26:24A person trying to reach a trail, metro
26:27station, grocery store, or community
26:28destination.
26:31These are the people this plan serves.
26:34Not just cyclists, not just pedestrians.
26:37These are residents of all ages and
26:39abilities.
26:41Throughout the planning process, I saw
26:44recurring themes. safety, access,
26:47connectivity, confidence.
26:51Residents provided feedback on schools,
26:56parks, trails, libraries, downtown, and
26:59community rel uh community destinations.
27:02So, I appreciate the revisions uh that
27:04have coordinated by the city, TED, as
27:08well as Epstein.
27:10The revised draft better reflects the
27:12concerns raised through public
27:13engagement. This is a long range
27:15framework that will provide future
27:18decisions and investments.
27:21Once again, safety, access, and
27:23confidence. So, this goal is more than a
27:26plan.
27:28The goal is fewer names added to that
27:30list. Thank you.
27:33>> Thank you.
27:42Does the board have any questions or
27:44comments for staff or public or from the
27:46public forum
27:58hearing
28:03at this point? Are we approving the plan
28:06or to recommend or
28:09>> uh that that is what staff recommends.
28:12>> Okay. Can I ask a question please? Yeah.
28:15[clears throat]
28:16So I apologize I was not at the
28:19September meeting. Um so I'm trying to
28:21catch myself up a little bit. And uh
28:24what I heard from the
28:27[clears throat] public comment today um
28:30was I think more uh directed at policy
28:37um as far as require you know making
28:41requirements for pedestrian and bike
28:44routes. Um, so does the plan address the
28:50plan is kind of just like, oh, we could
28:52do these projects
28:54more so than an overall policy of like
28:57city of Neapville requiring bike and
29:00pedestrian to be a part of its
29:03infrastructure. Am am I understanding
29:05that?
29:10>> Yes. I mean, I guess
29:12if you boil it down to if there's an
29:15ordinance change stating that
29:17information, that is not the case. This
29:18is a planning document uh to provide us
29:21guidance on where uh future network
29:25additions uh should be uh placed based
29:28off public feedback and based off where
29:31there are gaps in our network currently.
29:34Um along with that it's uh uh adding
29:38significant bicycle infrastructure to
29:39existing to the existing network uh that
29:42improves safety and then also brings it
29:44in line with existing guidelines from uh
29:47governing documents including METCD
29:49ASHTO
29:50proag. Um
29:54yeah so that that's kind of what this
29:55document states. So the the items
29:59described in the plan um are they a
30:02guarantee or are they just things that
30:04are feasible within our community?
30:06>> Sure. So as a planning document I I
30:09would never say any of these are a
30:10guarantee. Uh but there are um you know
30:14going through this process with the
30:15public uh one of the main concerns is
30:17that you know this could be a document
30:19that sits on a bookshelf and [snorts]
30:21nothing ever gets done uh with it. uh to
30:24kind of keep staff honest and to provide
30:27transparency. Uh one of the
30:29recommendations and requirements in the
30:31plan is that we provide uh a twice a
30:35year update to tab uh regarding the uh
30:39where we're at with uh putting in these
30:42recommendations. Um so we will be doing
30:45that starting uh our first tab in 2027
30:48assuming that this gets approved by city
30:49council in the next month. Um so that I
30:53guess that's how I you know as far as
30:55guarantees that's as far as we can go.
30:57You know a lot of these routes
30:59um especially routes that include side
31:01pass or even uh uh bike lanes uh there's
31:04a lot of engineering constructibility uh
31:07potentially
31:08uh you know utility conflicts that that
31:11could force these routes to change. Uh
31:13but all of that will be part of the
31:15public process by us coming to TAB twice
31:16a year.
31:21So, no, no projects are guaranteed at
31:24this point.
31:27>> No, I I would say no. Nothing's been
31:28approved. Nothing's approved by city
31:30council. Uh we have nothing uh in the
31:34budget for any of these plans. I mean,
31:36these are a lot of these are significant
31:38CIP projects uh that would require
31:41uh you know, fiveyear out budgeting. Um
31:44and that's you know, this is a 30-year
31:45planning document. Did the
31:48[clears throat] consulting engineer uh
31:50identify any like potential funding
31:53mechanisms or grants?
31:55>> Yeah, so at the end of the uh plan of
31:57the document, long document uh but at
32:00the end of it there are uh there is a
32:01chapter on funding opportunities uh and
32:03potential grants that the city can
32:05explore uh to ease the burden on the
32:07taxpayers. Um but a lot of this stuff uh
32:10that's in the plan will be able to get
32:11incorporated through our uh existing CIP
32:15projects and road improvement projects.
32:17Um you know obviously you have the the
32:21side pass and the bike lanes which are
32:22exciting um but a little bit more
32:25complicated but a big chunk of this is
32:26the bike boulevards and the shared use
32:28lane uh lanes and then also improving
32:30our existing infrastructure. And a lot
32:32of that stuff is uh um boils down to
32:36signage and pavement markings that we
32:37can do without any sort of uh long-term
32:40budget commitment yeartoear.
32:43>> Okay. Um there there's been some like
32:47recent development at uh block 59 and uh
32:52as like a user of that new development I
32:54noticed that there's um it's not very
32:57pedestrian friendly or uh accessible via
33:01bikes or at least like for a family um
33:05aspect. So are there any sort of like
33:08policies or anything related to this
33:10pedestrian bicycle plan that would um
33:15like in you know
33:17make it so that new developments have uh
33:21pedestrian and bike friendly access.
33:26>> There's nothing specific within the
33:28plan. Uh I am not familiar on whether or
33:31not there are already requirements in
33:33place on the planning side of uh of the
33:35city of Neapville. Uh so I could
33:37certainly get back uh to you and the
33:39board on uh what that process is when a
33:43new development comes in like block 59.
33:46Um I'm I assure you that the adequate
33:51at the minimum the baseline requirements
33:53were hit uh for pedestrian access. Uh,
33:56but I'm I I can't speak to what uh
34:00uh to what that process is right now,
34:01but I could get back to you on that.
34:03>> Okay,
34:08>> Councilman McBroom,
34:09>> thank you. I appreciate the questions. I
34:11also missed the September meetings, so
34:13I'm playing a little bit of catchup
34:14here. Um, and
34:17I'll just kind of may maybe shed some
34:19light and Mr. Prow can correct me where
34:22where he thinks I'm wrong. So, if TAB
34:24were to approve this tonight, and it is
34:25a 30-year projection,
34:28um
34:30it's it's a an aspirational goal and
34:33it's a request to the city council to
34:36consider this recommendation. And even
34:38if the city were uh council were to
34:40approve it, it's still somewhat of an
34:42aspirational goal. Um but it does give
34:45direction to the city staff to start
34:48incorporating these things into the
34:50annual CIP. Uh whereas in any given
34:53year, city council could say, "No, we're
34:55not doing that this year." So, um would
34:58you say that's fair? If if city council
35:01were to approve this, it doesn't mean it
35:02ultimately happens even then.
35:05>> Yes.
35:05>> Okay. Um
35:11$54 million, but that's 30 years. I I I
35:16would like to, you know, that's a a
35:19planning document level cost estimate,
35:21right? Um and I I highly imagine that
35:24that number will change.
35:25>> Yeah. And I don't say it to discount it,
35:26but it's just
35:29real money behind it and ultimately
35:31that's going to be the the hurdle moving
35:32forward and but I mean overall I think
35:34it's great. So appreciate the time you
35:36put into it.
35:40>> Great. Thank you. Is there any other
35:41discussion from the board?
35:46hearing none. Uh staff, can we please
35:49take the role? All those in favor
35:51signify by saying I. Those opposed, nay.
35:55>> Stro.
35:56>> Mr. Stro.
35:57>> I.
35:58>> Mr. Ol.
35:59>> I.
36:00>> Mr. Kriswinsky.
36:01>> I.
36:02>> Miss NY.
36:03>> I.
36:04>> Mr. Hurley.
36:05>> I
36:06>> Miss Rose.
36:07>> I
36:07>> Mr. Yang.
36:08>> Hi.
36:09>> Mr. Hanley. I
36:14>> motion passes and we approve the up um
36:17update to the city's bicycle and
36:19pedestrian plan.
36:22>> Next up is old business. Does anyone
36:24have anything for old business?
36:31>> Mr. Prussa.
36:32>> Uh quick update on the uh I've been
36:34given updates every month on our
36:36overnight parking survey. Uh so that
36:38survey ended on September 18th. Uh we
36:40got over 2,000 uh responses which is a a
36:44very uh high amount. Uh survey had a a
36:48list of 10 questions uh within multiple
36:50multiple choice just asking typically
36:52what the need of residents are um and
36:54with the last question being open-ended
36:56uh which had 1,800
36:58uh written responses. So still sifting
37:01through all of that data uh and we
37:03expect to bring something uh at a future
37:05date.
37:06>> Okay. Thank you for the update.
37:10Next up is new business. Does anyone
37:12have anything for new business?
37:18Hearing none, we will close new
37:19business.
37:21I will now entertain a motion and a
37:23second for adjournment.
37:28>> So move.
37:29>> Mr. Ogre second.
37:31>> Miss Rose.
37:33Staff, can we please call the role? All
37:35those in favor signify by saying I
37:37oppose say nay.
37:41>> Mr. Shro
37:42>> I.
37:42>> Mr. Ol.
37:43>> I.
37:44>> Mr. Kriswinsky.
37:45>> I.
37:46>> Miss NY.
37:47>> I.
37:47>> Mr. Hurley.
37:48>> I.
37:48>> Miss. Rose.
37:49>> I.
37:50>> Mr. Yang.
37:51>> Hi.
37:51>> Mr. Hanley.
37:52>> Hi.
37:54>> This concludes the October 1st, 2026
37:57transportation advisory board meeting.
```*