South Palo Alto Bike Ped Connectivity

At a glance

A bike and pedestrian crossing of the Caltrain corridor between California Avenue and Meadow Drive. El Dorado alternatives A1 (about $72 million) and A2 (about $87 million) drew neighborhood opposition; the Commission recommended 6-0 that Council hold both pending conceptual designs of other options.

Based on auto-generated captions; names and figures may be misheard.

Sources

Log