A bike and pedestrian crossing of the Caltrain corridor between California Avenue and Meadow Drive. El Dorado alternatives A1 (about $72 million) and A2 (about $87 million) drew neighborhood opposition; the Commission recommended 6-0 that Council hold both pending conceptual designs of other options.
Based on auto-generated captions; names and figures may be misheard.
Sources
Log
- 2026-09-30 - Planning & Transportation Commission Regular Meeting - Commission recommended holding A1 and A2 until conceptual designs are done for Loma Verde Options B and C, the community hybrid and an overcrossing.
- 2026-11-10 - 2026-11-10 - Rail Committee Regular Meeting: committee recommendation on preferred design alternatives for the Midtown Bicycle and Pedestrian Undercrossing.