2026-10-14 - Planning Commission

Summary

Based on auto-generated captions; names and details may be misheard.

Time on topic (from transcript timestamps; approximate, includes side talk):

Topic Minutes Share
Data Center Planning Briefing 70 35%
Corporate Landing Parkway Bulk Storage Yard 32 16%
Hook Lane Subdivision Variance 26 13%
Family Daycare Home Conditional Use Permit 23 12%
Other business 23 11%
Baker Road Townhome Rezoning 7 4%
21st Street Short-Term Rental Permit 6 3%
22nd and a Half Street Short-Term Rental Permit 5 3%
Crescent Community Center Expansion 4 2%
Short-Term Rental Overlay District 4 2%
  • Wednesday, October 14, 2026.
  • The recording covers the informal session (briefing and staff reports, from 0:05 to about 1:54:36) and the formal hearing, which opens about 1:55 and adjourns about 3:21; captions run continuously with no recess.
  • Commissioner Quayar (spelling as heard) was absent.
  • All actions are recommendations to City Council.
  • Every recorded vote was 10-0 except the Hook Lane variance (9-1) and the daycare permit (6-4).

Data Center Planning Briefing

0:40-1:10:35

  • Staff brought back a University of Virginia Weldon Cooper Center economist who spoke at a data center workshop they attended over the summer.
  • Main points: hyperscale data centers are far larger and more power-hungry than older ones; permanent jobs are few and local tax revenue is the main benefit; electricity rates across the PJM grid will feel the demand; water use peaks in summer; little activity so far in Hampton Roads.
  • Advice: demand transparency before approvals, tie incentives to verifiable performance, require public reporting after opening.
  • Commissioner Camp suggested revisiting the city's 2017 data center incentives and definition. Other commissioners asked about a local tech corridor, Lake Gaston water supply, and whether the current model is sustainable. No action.

Short-Term Rental Overlay District

1:10:45-1:11:18, 1:49:26-1:51:26, 1:59:21-2:00:29

  • Agenda item 1, a referral to modify the overlay map, was withdrawn by City Council on October 6. The commission recorded the withdrawal 10-0.
  • Commissioner Plumbley said council wants a smaller map brought back, pulling in the northern lobe toward the ocean front.

Hook Lane Subdivision Variance

1:11:18-1:21:40, 2:11:58-2:27:31

  • Item 2, LBC Ventures LLC: variance to split a large Beachwood parcel into three lots with shared private access. Staff and the neighborhood civic league supported it.
  • The applicant objected to staff conditions barring a separate driveway for the front lot (condition 1) and requiring a garage setback and wider house front (condition 6), saying 46 of 48 nearby homes meet neither. It was pulled from consent.
  • Hank Morrison called the Shore Drive design guidelines (2002) aspirational. Commissioner Skunover moved approval without condition 6 and with condition 1 changed to the applicant's plan; recommended 9-1.

Corporate Landing Parkway Bulk Storage Yard

1:22:22-1:32:46, 2:27:43-2:49:21

  • Items 4 and 5: proffer modification and permit for a roofing contractor's outdoor storage yard in the Corporate Landing Business Park, with perforated metal and slatted chain link fencing; the Development Authority supported it unanimously.
  • Commissioner Camp asked which boundary was being approved and why an earlier decision was being revisited. Two residents spoke against, one of whom had misread it as a public storage facility. A commissioner said he would vote no on consent, so it moved to the regular agenda.
  • Recommended for approval 10-0.

Crescent Community Center Expansion

1:32:46-1:35:28, 2:03:40-2:05:19

  • Item 6 (called item 5 in the informal session): modified conditions for a Salem Road community center to add classrooms, social hall, sanctuary, offices, playground, sports court and 249 parking spaces. Sports court limited to daylight and no pickleball.
  • Approved on consent, 10-0.

Baker Road Townhome Rezoning

1:35:30-1:41:37, 2:05:21-2:06:28

  • Item 7, VB Investments LLC: rezone 1.66 acres from B-2 to conditional A-18 for 23 townhome-style condominiums.
  • Questions on setback, school estimates and fence color; the attorney said some units may be affordable under the city's program.
  • Approved on consent, 10-0.

Family Daycare Home Conditional Use Permit

1:43:18-1:45:24, 2:49:25-3:10:33

  • Item 9: family daycare home for up to 12 children in an existing house; five neighbor letters opposed and one supported.
  • Commissioner Anderson flagged a missing stair railing. Commissioner Camp, the district commissioner, cited the S-shaped street, sight lines and a projected 48 trips a day. The applicant said six children would work.
  • Commissioner Skunover's motion (railing, cap of 10) passed 6-4 after a six-child substitute failed 4-6. No votes: Commissioners Camp, Cromwell and Anderson and the vice chair.

21st Street Short-Term Rental Permit

1:48:42-1:49:26, 3:10:43-3:16:24

  • Item 13: three-bedroom short-term rental; the gravel parking pad must become a code-compliant driveway.
  • Pulled for a hearing; the out-of-state owner answered Commissioner Plumbley's questions by video.
  • Approved 10-0, not to take effect until the rental is in good standing with the commissioner of revenue.

22nd and a Half Street Short-Term Rental Permit

1:51:28-1:52:14, 3:16:26-3:20:56

  • Item 14: three-bedroom short-term rental using leased off-site parking for two spaces.
  • The owner described a quiet street; Commissioner Plumbley said council needs that kind of detail.
  • Approved 10-0 with the same revenue condition.

Other business

0:05-0:40, 1:21:43-1:22:22, 1:41:37-1:43:18, 1:45:24-1:48:42, 1:52:14-1:59:21, 2:00:29-2:03:40, 2:06:28-2:11:58

  • Caitlyn Alcock reminded the commission that the November meeting is on the second Thursday because of Veterans Day.
  • Item 3, Tidewater Structures LLC (modification of proffers), and item 8, Rama TC LLC (rezoning from B-3 to B-4 mixed use with workforce housing overlay), were deferred indefinitely 10-0. The first is waiting on a shared parking agreement with neighbors; the second is being redesigned with less parking and fewer stories because of a covered bus stop.
  • Items 10 and 11 (tattoo parlor and body piercing in a South Lynnhaven Road shopping center) and item 12 (residential kennel for up to six dogs) were approved on consent, 10-0. The kennel had four letters of support and two of opposition.
  • Consent minutes for the September 9 sessions and October 8 site visits were approved with abstentions by those who were absent. A commission retreat followed the meeting, open to the public but not televised.

Agenda

Item list reconstructed from the meeting recording (the event page did not list items). Outcomes are in 2026-10-14 - Planning Commission.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:05[music]

00:09Good morning everyone and thank you

00:11planning commissioners and city staff

00:13for your participation today. My name is

00:15John Cton and I'm the chair of the

00:17Virginia Beach Planning Commission.

00:19Welcome to the October 14th informal

00:22session of the Virginia Beach Planning

00:24Commission. I call this meeting to

00:26order.

00:28got anything, Miss Caitlyn?

00:30>> Um, just one quick reminder, your

00:32November meeting is on the second

00:33Thursday due to Veterans Day, so don't

00:35show up here on Wednesday. We won't be

00:37here. Um, and that's all I have. We are

00:40going to go a little bit out of order

00:42today. We're going to start with the

00:43briefings and then we'll get to the

00:45agenda items. So, um, giving a data

00:48center briefing today. We have Jah

00:49Ferrer. He is the acting director of the

00:52Center for Economic and Policy Studies

00:54at the Welden Coop Cooper Center. Um,

00:56[laughter]

00:57a couple members of the planning staff

00:59along with our deputy city attorney, we

01:01did a attended our data center workshop

01:04training back over the summer, um, where

01:07Joel was one of the presenters and we

01:08found the information that he gave very

01:10helpful. So, we wanted to bring it back

01:12to you understanding the ongoing

01:14conversations there. Um, so with that,

01:27Thank you. Um good morning everyone.

01:30Thank you Mr. Chairman. Thank you uh

01:32members of the planning commission. It's

01:34really a pleasure to be here. Um so um

01:37it has been u a couple of months since

01:41uh I met some of your staff in this uh

01:44presentation that I did in Richmond. uh

01:46and since then we have been having a

01:48very productive conversation uh about

01:50how useful this presentation can be but

01:53I will be totally open to any other

01:56aspects and please feel free to stop me

01:59at any point if you have specific

02:00questions on specific topics what I'm

02:03going to bring here today is kind of an

02:06overview of what we have been uh

02:10learning uh because yes we are mostly

02:13learning uh at the Weldon Cooper Center

02:16for Public Service at the University of

02:18Virginia on our work with data centers.

02:21Just a little bit of context for those

02:24that don't know us. Uh we are the Weldon

02:27Cooper uh center, one of the oldest uh

02:30public service organizations within a

02:33university context in the country. Uh we

02:36have training programs. Uh we are

02:39nationally recognized by our applied

02:41research particularly also on the data

02:43center area. nonpartisan. Uh we try to

02:47provide reliable and timely services and

02:49data to everyone that comes to us. Um so

02:52we serve different kinds of uh policy

02:55makers and from elected officials,

02:58governments, community leaders, uh

03:00universities primarily in the

03:02Commonwealth of Virginia, but also uh

03:04nationally and even in certain cases

03:07internationally. We are currently

03:09tracking data center growth in the

03:11United States and doing plenty of

03:12studies all across the the nation on the

03:15impacts of data centers.

03:18We have uh a research unit that uh works

03:22mostly on energy aspects, economics,

03:25demographics and provides help doing

03:28surveys and local surveys. Uh we have a

03:30leadership development team uh that

03:33works from with local governments uh all

03:35across Virginia. I'll uh spend one

03:39minute in the end just mentioning this.

03:41Um and also we work with uh local

03:44governments in terms of community

03:46promoting community engagement uh and

03:49understanding

03:51like how can we um increase uh the

03:54economic well-being across the

03:55Commonwealth. Now going back to data

03:58centers [laughter]

04:00um our research started with Virginia.

04:03Uh the first work that we did was in

04:052019 for Jar uh many of you probably

04:09familiar with uh it's uh a body of the

04:13uh general assembly that basically uh

04:16the government can consult with JARC to

04:18understand what are the economic impacts

04:20of different incentives that uh are um

04:24that exist on the commonwealth. And in

04:262019 we did a study because at that

04:28point Virginia already had a tax

04:29incentive on data centers. Um and uh but

04:33but nobody paid attention like co in

04:362020 like data centers by then were

04:40there was some clustering in Virginia

04:41already but the way they were small we

04:44were not talking about and I'll I'll

04:46I'll bring that back in one minute. We

04:48were not talking about the dimension of

04:51data centers that we are seeing right

04:53now. So in 2024 we did this study that

04:56was considered one of the first ones

04:58nationwide uh again for JARK because

05:00these studies have to be done every five

05:02years again assessing the impacts of the

05:04tax incentives on data centers in

05:06Virginia [snorts] and our center

05:08particularly um was consulted to do the

05:11economic impact of data centers and the

05:14energy impact of data centers. So if you

05:16want that kind of summarizes my

05:18expertise although after that the

05:21requests have been so many that now we

05:23are doing research on water impacts and

05:25many other dimensions and so I can

05:27always bring you that dimension here. Uh

05:29although have in mind I'm I'm an

05:32economist so technical questions like

05:35you know what happens inside a machine

05:36or a computer rack within a data center

05:39I have no idea. [laughter] So uh I I

05:42mostly know what happens between the

05:44data center and the communities between

05:46the data center and the state

05:48legislators or the state regulation but

05:51not within a data center. Um we so we

05:54study mostly electricity demand water

05:56needs and we try to provide all the

05:58information that communities need uh to

06:01address this issue. We also have been

06:03doing studies on the great lakes a big

06:06concentration of data centers. Oregon

06:08the third state with more data centers.

06:10We were hired by a subcommittee at the

06:13state level to just do a study on

06:15Oregon. So we have been doing this all

06:17across the nation. First question for

06:21everyone that is not informed what is a

06:23data center like uh I feel that nowadays

06:26we most of us probably know what it is

06:29but just for us to understand uh what

06:32they do and why they are important. They

06:34support everyday services, banking,

06:36streaming, uh online shopping, cloud

06:40storage, your emails. I would say that

06:44uh I'm always very skep sk skeptical

06:46when people tell me because [snorts] I

06:48don't like data centers. I I don't use

06:50them. No, I think you are using them

06:52just by leaving right now. Um so they

06:56they are basically uh located around uh

07:00places with a lot of fiber networks. uh

07:04strong connection to um they have to

07:07have telecommunication support uh and

07:10the speed and the the reliability of the

07:13uh of the network the internet network

07:16matters a lot. [gasps] They have a lot

07:18of computing equipment inside it. So

07:20it's piles and piles. Actually we we had

07:22we visit one uh on the day that I met

07:26your staff. um and they have a lot of

07:28computing equipment racks that are piled

07:31in a very concentrated way and that's

07:34where many of the issues associated with

07:36data centers coming from. It's because

07:38of having that concentration that warms

07:40up the air that needs a lot of cooling

07:43and that's many of where the impacts

07:45coming from. So for supporting the

07:48infrastructure and those racks and

07:51billions and billions of computers that

07:53are inside each data center um they have

07:56to have also reliable electricity backup

07:59systems and that's again where many of

08:02the impact starts.

08:04There are different types of location

08:06okay and probably when I will show the

08:08map about Virginia where I show some

08:09data centers located here in Virginia

08:11Beach like you'll say we thought we

08:13didn't have one or I didn't see it. It's

08:15because there are different kinds of

08:17data centers. Retail collocation

08:20uh are the oldest ones that have been

08:22around and they are they are small

08:25facilities. You know many times with

08:27meeting rooms you don't even know it's a

08:29data center. People use it because they

08:31want to store or a certain company wants

08:33to store their files in a secure way

08:35where they have physical access to it or

08:37they have a supercomput to run some

08:39statistical modeling. you you you kind

08:41of don't even know or you know maybe you

08:44think it's just a business center that

08:47can be a data center those are very

08:49small and th those were the main data

08:52centers that were being built nationwide

08:54and in Virginia until 2019

08:57um and they are very connected with the

08:58local businesses so it's something that

09:01I would say is almost part of again of

09:04our daily life of our local firms but we

09:07clearly didn't u they were never a

09:09problem so when they do become a problem

09:12[snorts]

09:12when oh there is another small that is

09:15the telco ones that belong to

09:16telecommunication like Verizon AT&T they

09:20are all across the country very small

09:22you probably won't even notice retail

09:25and telco they are more or less the size

09:28of uh half of the size of a store in a

09:32mall like 50,000 I'll show you some

09:34numbers 50,000 square feet like not not

09:37more like this is can be even the

09:40largest ones, most of them 10,000, some

09:42of them even 5,000. So they are really

09:44small. Um so um many hospitals for

09:49example and many universities actually

09:51have them but they don't disclose them

09:53because it's just a facility a normal

09:54facility that has been there forever.

09:56The problem actually becomes when we

09:58start having uh old hypers scale and

10:01crypto mining data centers crypto

10:03mining. Why? Because these are huge

10:05facilities. So remember the the

10:07comparison with half size of a store on

10:10the mall on average old sale and hypers

10:12scale data centers have the size of

10:14seven football fields just to have it in

10:17perspective. Okay. Uh I'll put this in

10:19the square footage and try to be more

10:21accurate about it but just to have a

10:23perception and so the impacts and the

10:26land they occupy it's definitely much

10:29different than the smaller ones. So we

10:30cannot sometimes we measure data centers

10:33as a number numbers sometimes don't

10:36don't show the footprint because you

10:38know we are talking about different

10:39facilities.

10:41So for for for a local discussion and

10:44it's the first time that I'm I'm I'm

10:47going like most of my consulting has

10:49been around state legislation. So I'm

10:52giving a first step and I would love to

10:54learn with all of you what matters. But

10:56at the local level what I would think

10:58that would matter is like understanding

11:01the building and the campus size because

11:03that matters is not only again we are

11:05can speak about one data center but one

11:08data center can be very different than

11:09the other one. We are talking about

11:11different operating operating patterns.

11:13Okay. Some of them for example have

11:15meeting rooms. Some of them can attract

11:17more local customers. Others are totally

11:19disconnected from the local economic

11:22environment.

11:24um the way they work, the loads they

11:26have because this is important for

11:27example for the system, the kind of

11:29noise they are going to make, how that

11:31will impact residents that live nearby.

11:34Um the the electricity demand because

11:37that might require a substation and

11:40other transmission lines and you know

11:42some put some pressure on the electrical

11:44grid locally. The water and supporting

11:47equipment of course this has been a very

11:50controversial topic, right?

11:52um and I will be there in a moment but

11:55they have huge cooling needs and that's

11:57where the water consumption comes from

12:00and then land use and neighboring

12:01properties of course you know being huge

12:04facilities they have an impact on land

12:06use they compete for land that could be

12:08other used for other purposes uh they

12:11have for sure an impact that we actually

12:13still don't know what it is but on

12:15property prices um you know there there

12:19are visual impacts some people think

12:21they are ugly and that there should be

12:22regulation on how they look. Uh and

12:25definitely noise has been one of the

12:27things that have been has been

12:28mentioned. [gasps]

12:30So when thinking about locally I would

12:32say these are the the the the aspects

12:34that I've been referring here and there.

12:36Of course there are others. There are

12:38many other aspects let me tell you that

12:40are brought to the daylight by uh

12:44lobbyists from both sides you know that

12:48I find it quite difficult to find in my

12:50research and I just in many

12:53circumstances I'm in meetings and I say

12:55well I never heard of that and and so

12:58I'll try to stick to what it's known and

13:00that that we also have also know. So a

13:04little bit of the facility size. So

13:06again, telco were the telecommunication

13:08ones. Uh 50,000 square ft like retail

13:1260,000 you know um not that much power

13:16uh in terms of average. This is a

13:18national national numbers for you to uh

13:21based on a huge database that we have

13:23with all the data centers in the in the

13:25US. Uh, of course there is a minimum

13:28range and a maximum range that can uh

13:32make things tougher in terms of the

13:34classification, but mostly as you can

13:36see a huge difference on the average

13:38square footage. Uh, and with uh old

13:41scale and hypers scale being on average

13:44five, six times the size of the smaller

13:47ones that used to exist, but mostly

13:49hypers scale using 25 times the energy

13:52that the telco ones use. So again an

13:54impact on the energy side. [gasps]

13:57Where are data centers located in the

13:58US? We have 3,000 right now or at the

14:02end of 2025 sorry 3,000 operational data

14:06centers. More 1500 coming. But again

14:09these 1500 are much larger than the

14:123,000 or the average 3,000 that used to

14:15exist. Virginia where are we? 4539

14:19353 coming until 2030. Okay. So in our

14:24database we don't classify data centers

14:26as coming by because they there was a

14:29report on the media. These are data

14:31centers that already have agreements

14:34with the planning commissions with the

14:35city councils that already have gone

14:37through a a whole seing sighting

14:40process. And so like for you guys for

14:44for everyone here to understand we of

14:48all the data centers that we include as

14:49planned in the past only one or two

14:52nationally we have to drop because then

14:55something happened. So this we have

14:57pretty we are pretty confident that they

14:59are all going to be done unless the

15:02industry all shifts dramatically. But uh

15:05so we have 353

15:08in terms of Virginia again a clustering

15:10Nova area, Richmond, Meckllinmberg area.

15:13Um on the 43 39 operational listenings

15:18and the 353 future ones we see a pattern

15:22that is moving down towards I95 to

15:26Richmond and u south of Virginia. Um you

15:30you can ask me why this pattern. um

15:33mostly because the new data centers as

15:35they are getting bigger, they are

15:36looking more for rural areas uh than

15:39before, but they also want to be located

15:41to uh transportation infrastructure

15:45because they are very heavy on

15:47equipment. So they want to make sure

15:49that if there is a problem, they can fix

15:52it quickly. they have to be close to

15:54transmission lines because that's where

15:56they can get the substation done uh in

15:58record time and then being connected to

16:00the grid as fast as possible. Uh and uh

16:06and they are also looking more and more

16:08for water accessibility and that's

16:10becoming a little scarce around the Nova

16:12area and I could talk also a little bit

16:14about that. Uh not many not a lot

16:17happening in the Hampton Roads Virginia

16:19Beach area uh on this front. So also to

16:23uh have that in mind um why local

16:27planning matters uh because of course

16:30there is the aspect related with digital

16:32connections.

16:34In this uh we have seen um actually

16:40a positive impact particularly when data

16:42centers go to rural or seam or or

16:46peripheral uh urban areas that is

16:49sometimes they they bring with um the

16:51fiber optics or the network that didn't

16:53exist on those areas and a kind of this

16:56is something that if regulated can

16:58become a benefit from the communities

17:01but you know comes with issues again I

17:04was mentioning land and neighboring

17:06uses. You know, they are huge facilities

17:09uh that suddenly, you know, are put in

17:12the middle of of of land or or or

17:15residential areas or and they don't look

17:18good. At least I've never found anyone

17:20that said they were very pretty. So, uh

17:23just uh um electricity delivery. This is

17:27a particular aspect. uh the local

17:29utility can must be able to serve them

17:32and to make sure that doesn't conflict

17:34with other uh users and water and waste

17:37water. I would say this is definitely

17:39the big topic when it comes to local

17:41areas because it's the local impact

17:43where the local impact can be felt more.

17:46Um so um one of the things that we found

17:49very difficult is that until a few years

17:52ago

17:54like until two or three years ago

17:56Virginia had already like hundreds of

17:57data centers but they were kind of

18:01navigating uh under the regulations or

18:04there there weren't properly any

18:06regulations on data centers and there

18:08wasn't a public debate about data

18:09centers. So uh one thing that our work

18:14was kind of tough in the beginning is

18:16that for us to provide assistance and to

18:18provide recommendations we need data. We

18:21didn't have any data. Nobody had any

18:22data. Nobody had a clue because it was

18:24like for data centers their secret is

18:28the way they are done the way they run

18:30and that's what they want don't want to

18:31share. And also until until they start

18:36figuring out that backlash was reality

18:38and that they would have to be concerned

18:41about uh community engagement and

18:43working with communities, they would

18:45prefer to arrive into a certain

18:47community, sign MDAs with everyone and

18:49not disclose any of the impacts and

18:51anything that was happening there.

18:53[snorts] Let me tell you, let me tell

18:55you this is very important because I I

18:57don't want to have legal issues is that

19:00there are very different data center

19:02developers and from that perspective you

19:05have I found very different examples

19:07across the country where there are data

19:09centers that work very closely with

19:12communities that because they understand

19:13their impact they are willing to work

19:16with the planning commission with the

19:17city council meeting with constituents

19:20all the time. There are others that I

19:22would say have a more predatory behavior

19:25and try to not disclose and will go to

19:28the place where they have not where

19:29they'll try not to disclose anything and

19:31like to do things their own way um and

19:35being isolated of the rest of the

19:36society but I wouldn't say that I would

19:39say that that they are really uh it's a

19:43mixed bag also of different stakeholders

19:46okay just as a point of interest so so

19:48for us you know starting working with

19:50local um at the local level it was

19:53difficult because we didn't have the

19:55data. One thing that was very important

19:57from our jail study and I want to be

20:00really uh because it was there was until

20:04the jail study there was a bunch of

20:06studies um uh supported by the data

20:08center coalition or promoted by the data

20:11center coalition and they were very

20:13vague on the job creation side. Let's be

20:15clear because now I think there is a

20:17consensus about this. They mostly

20:19support jobs during construction and

20:22even that is they are not that many

20:24because many of them are not local. If

20:26you are thinking about local okay after

20:29the the data center is working they are

20:31a capital intensive infrastructure.

20:33Let's be clear their impact won't be on

20:37the employment level won't be on the

20:39quality of the jobs. They don't pay that

20:42that much above the local average.

20:46uh so this is something that both our

20:49studies for Jark great lakes and Oregon

20:53have shed some light and I think even

20:55now uh the conversation has moved

20:58towards a different uh a different so

21:01even on its peak they represented less

21:04than 2% of all the jobs in Virginia 3 or

21:074% of the jobs in the Nova area mostly

21:09related in construction when the

21:11construction is done they are they go

21:14away those jobs Okay. So, uh um

21:18permanent operations all the data

21:20centers in Virginia [snorts] uh actually

21:22according to our estimations they employ

21:254,000 people for 5,000 will in 2024 but

21:29now probably six 7,000 not more than

21:31that. So it's really a drop in the

21:34bucket of all the employment creation

21:36and this is something that we have to uh

21:38have in mind. [clears throat]

21:40Same same thing on the on the Great

21:42Lakes. 0.14%

21:45of all regional jobs are across the

21:47eight states in the Great Lakes. The

21:48same thing for Oregon by the way like uh

21:51Portland area 0.09%

21:53of the jobs. Of course, then that is

21:55Maro County in Oregon. I don't know how

21:58many of you are familiar with Oregon. I

21:59am now. Uh but

22:03um but but we have to understand that's

22:05where like the different position comes

22:06from. Maro County very rural areas

22:09didn't see an economic development for

22:11decades you know now they are an

22:13epicenter on data centers in the in the

22:16in the west coast uh data centers

22:19actually represent 20% of the employment

22:22so this is important right for a

22:24community and this aspect local taxes

22:28can be a major benefit okay Lenon County

22:30$1.2 2 billion a year right now on the

22:33revenues because of data centers. Okay.

22:36So uh um um so kind of almost 40% of the

22:41county's overall budget. So this is

22:44money they didn't have a couple of years

22:46ago. How do you translate this? You

22:48translate this in better parks, better

22:49schools, better roads, right? So, so you

22:53that that's definitely uh something that

22:56is important to acknowledge is like with

22:58these infrastructures

23:00definitely can come uh a lot of tax

23:04revenues at the local level. Now this

23:06can be shaped by tax rates, equipment

23:08evaluation, specific you know the way

23:11you frame this or different different

23:14agreements you know in the case of

23:16Oregon was building a library that

23:18didn't exist in that county uh building

23:21a school but again for this to happen

23:24transparency must be the key and that's

23:26what I always advocate like it's it's

23:28like it has to be clear uh it has to be

23:32a negotiation also right and it has to

23:34be transparent

23:35>> [snorts]

23:35>> Um so um so uh there will be local

23:40costs. I think at this point it's clear

23:42like they are not very pleasant

23:45buildings. They come with noise. They

23:47come with water issues. They also can

23:49bring tax revenues. What is my main

23:52concern in terms of local taxes? Let me

23:54just tell you is that right now we have

23:5795% of don't quote me here but we have a

24:00lot of economic development offices

24:03around the US trying to just attract

24:05data centers. So they get into a

24:08competition that Lden County was never

24:11included on. That is kind of a race to

24:13the bottom where you give away your

24:17potential tax revenues

24:19and the commitments that the data center

24:21has to has to have with the community.

24:24You give them away so that you think

24:26that you are increasing the

24:29opportunities and the chances for you to

24:32attract that data center compared with

24:33the county right next to you.

24:36This is what I say this as a researcher

24:39but I don't have any way how to how to

24:40solve this but this is what we have to

24:43what what we have to uh address and what

24:47we have to solve. There are certain

24:49counties in Virginia

24:51that while let's imagine a a specific

24:54data center would pay a approximately $9

24:58million in Lden County of tax revenues,

25:02there are counties in Virginia that have

25:04such a discount that that same data

25:06center would pay only 0.5

25:09million a year on data centers. Still,

25:11they don't attract them because they

25:13don't have the infrastructure.

25:15But this is the kind of thing that for

25:17me as a regional economist if if I just

25:20mention to you that the most important

25:22benefit of a data center is not job

25:24creation. It's not because they are

25:27pretty. It's not because they will you

25:29know increase the average wages. It's

25:32mostly local taxes. If that's what

25:34counties are giving away that's not

25:37good. Uh so this is kind of the the of

25:42course again it's a negotiation right?

25:44It will there are 20 data center

25:47developers across the US probably more

25:50uh that work for five 10 different

25:52companies. It's a negotiation. Uh you

25:55don't you probably want to keep the

25:57highest revenue

25:59but not making the project go away

26:01unless you decide that you don't want

26:03any data centers which like for me it's

26:05also a possible decision but then you

26:08have to under there are all these

26:10trade-offs that come into play. I I'm an

26:13economist so this is like where I where

26:15I I feel more comfortable with in terms

26:17of the power capacity they are huge in

26:20terms of energy consumption because of

26:22that they will use a lot of our

26:25electricity that is produced regionally

26:29um so uh u 100 megawatt facility can use

26:33530 gigawatts per year they run mostly

26:37right now because of all the

26:38computational uh aspect that is

26:40happening on data centers

26:42uh and and AI they are running close to

26:45100% of the capacity all of them you

26:47know and and so what we see is a huge

26:50impact on the Virginia grid uh for

26:53example we expect our grid our

26:56electricity demand to probably double

26:58until 2035 20 240 let me tell you after

27:01Jark we already updated these numbers or

27:04at least see how our numbers align with

27:05this we are above we are above the the

27:09the the maximum scenario So the double

27:12in 2040. So if you think about this 50%

27:16of all our electricity demand uh being

27:19used by data centers you know uh it's in

27:222040 so they are will be using more than

27:25all manufacturing all residentials like

27:28in in Virginia this we find the same not

27:32the same level but um but uh um yeah

27:37this is already with our numbers updated

27:39so in 2030 we'll probably get there in

27:42Virginia to 50% % of the electricity

27:44demand of the grieving on data centers

27:46but we will have this on Illinois this

27:48in Ohio also in Oregon why Illinois and

27:50Ohio are important and actually Ohio our

27:53estimations go up to 20% already uh it's

27:56because we are all part of PJM so we are

28:00all part of this grid that is where a

28:03huge pressure is being put into now from

28:06the local level uh what what why this

28:09matters because it will it will increase

28:12and we We'll have more discussions. We

28:14already having them how can we increase

28:16capacity and production and that will be

28:18have to be located somewhere probably in

28:20rural areas or around St. James River

28:23but that we will have definitely an

28:25impact in Virginia. More transmission

28:27lines, more substations and so our our

28:30electricity grid and planning will

28:32definitely become one of our topping

28:35concerns. Timing barriers

28:38you know why is this difficult to

28:39address? because a data center takes 18

28:41months to be built to 24 months. Uh a

28:45transmission line since the process that

28:47is planned to the process that is done

28:49takes on average right now in the US 8

28:51to 10 years. A nuclear power plant to be

28:53built takes 15 to 20 years. Uh even a

28:56natural gas power plant if we are

28:58thinking about it takes 7 to 10 years.

29:00Uh and there are now issues about how to

29:03get the material to get it done because

29:05of supply chains. But but but think

29:08about this we are having such an impact

29:10on as an economist for me is the impact

29:12on demand without the supply that can

29:13answer what does it mean increase in

29:15prices now I put myself on your shoes

29:19and the question I would make a person

29:21like me is like well yeah but if

29:23Virginia Beach doesn't have any data

29:24centers as we're part of Luminian and

29:27NOVA is having all these data centers

29:30are we safe from the impacts on the

29:32electricity for example in terms of

29:34rates and I would have to say no, you

29:36are not. You have you will suffer the

29:39electricity the increase and the

29:40pressure on electricity rates the same

29:42way that someone that lives in NOVA will

29:45because that's the way the electricity

29:46markets work. In [snorts] fact, people

29:48in Maryland that have you know 20% of

29:53the data centers that exist in Virginia

29:55or even less they will probably suffer

29:58the impacts on because they we all

30:00belong to the PJM area. So from the

30:02local perspective, if your concerns are

30:04electricity rates,

30:07you can you can definitely address this

30:09as a political statement. I'm not here

30:11to tell any of that, but but you are you

30:14probably your constituents will probably

30:16have the the same impact, not the

30:18infrastructure one, you know, seeing the

30:20transmission lines and having

30:21substations everywhere, but the impacts

30:23on electricity rates as everyone else in

30:26Virginia will. Um so this is goes back

30:29to

30:30financial risks that are involved with

30:33expanding the energy costs and also the

30:36the pressure on the rates needs

30:37legislation but that happens at the

30:39state level. Again a local level mostly

30:41it has to do with local approvity local

30:43approval utility connection trying to

30:46reduce the risks that are associated to

30:48the grid uh because of this uh pressure

30:52water the big topic

30:54cooling needs and and local demands. So

30:57let's let's be clear. All data centers

30:58use water. Even the ones that don't use

31:01why because the the ones that don't use

31:04they have what we call evaporative

31:06cooling. Uh and sorry they have what we

31:09call air cooling systems and because of

31:12that they use more energy. Energy

31:15production is the second after

31:17agriculture large uh consumption of

31:21water that exists. So the only thing is

31:24that we are displacing the water usage.

31:26It's not done locally by a data center

31:29but is being done somewhere else in the

31:31PJM area right and so sometimes it can

31:34be the river that is right next to us or

31:36again other data centers might might

31:38impact the river that is right next to

31:40us through the grid system. At the local

31:43level we definitely can distinguish

31:46different types. We have they have

31:48evaporative cooling. um you know uh that

31:52this implies a lot of local usage of

31:54water dry cooling uh lower direct water

31:57needs but again increases the

31:59electricity huge olive cooling uh at the

32:01server level uh that you know I'm not

32:05very familiar with this one but what we

32:07what we can tell you and we have uh

32:11an NDA also with uh some of utilities

32:15across Virginia where we are looking

32:16closely to the data center clearly there

32:19is there are three types of data

32:21centers. The ones that have summer peaks

32:24and that they rely on air cooling, but

32:27then they need water at one point

32:29because air when it's too warm outside

32:32becomes uh becomes uh inefficient and so

32:36they they they use water in specific

32:39months of the year. There are a couple

32:41of them that are have winter peaks

32:44because of the problem with humidity

32:46inside the data center and this is

32:48something that we didn't even see in the

32:50literature but we are kind of figuring

32:52out but they are a minority also and

32:54they don't use that much water and most

32:56of them have a constant use of water

32:59across the year with slightly peaks on

33:01the summer. Okay. So but definitely one

33:05thing that there is room for uh for a

33:09lot of local regulation is on the water

33:11usage of data centers and to be honest

33:13let me what I've heard from data center

33:15developers is that here not several

33:18years ago but right now they can be more

33:20flexible about okay several years ago

33:23they also because they didn't have to

33:25disclose anything or because everyone

33:27wanted data centers right and there

33:29wasn't a big uh public discussion about

33:31these things they were huge used

33:34consumers. And so we have this situation

33:36for example in in London County where um

33:40the top 20 facilities of a county that

33:43hasund and something almost 200

33:45facilities. The top 20 uses use more

33:48than 70% of the water. So it's it's not

33:52immediately that the data center will

33:55have a huge impact on your water system.

33:57It depends on the cooling. Now until a

34:02couple of years ago they didn't need to

34:04disclose anything. Utilities were like

34:06okay we have a new customer we don't

34:10even know after the first month until

34:12the first month cames how much water are

34:14they going to use. Well I think right

34:16now this is not something that um

34:20represents a good planning of a data

34:22center. we are aware of this aspect like

34:25I think it's a normal conversation that

34:26data centers are having [snorts] some of

34:29them are willing to have this

34:30conversation is about what will be the

34:32impact also what will be the impact on

34:34wastewater and again I know several

34:36examples where they actually work with

34:37the community

34:39to improve the water systems because

34:41they understand the impacts they were

34:43having I know other examples that this

34:44was a no-go in terms of the conversation

34:46and like oh you want to know how much

34:48water we use okay goodbye we are going

34:49to look for another place to locate a

34:51data center So it's again a mixed bag

34:55but what we have learned is that asking

34:57for transparency the facility

34:59information total expect uh uh annual

35:03totals of water consumption but also

35:05something that I think we got it wrong

35:07in the gel study is that we only looked

35:09at annual consumption and what we are

35:11seeing right now what matters is the

35:13peak because if it's a peak in the

35:15summer that means that the data center

35:17will compete for water during the moment

35:20in time where water is usually these

35:22cars in most of the areas in the US.

35:25Okay. Uh with very few exceptions. So we

35:28are in the we are in the north

35:31hemisphere. We have warm summers and

35:34that's where when data centers will

35:36compete. And so they might

35:39you know during the winter is fine but

35:42that might be a couple of weeks in the

35:44summer where things are already tight.

35:47they will become tighter with data

35:48centers and and more critical because

35:50they will pressure demand for this is

35:53something that I can share with you that

35:55for example this their their consumption

35:57increases up to six times

36:00you know depending on the temperature

36:02that is outside I'm sorry that is in

36:04Celsius is because I don't know

36:06[laughter]

36:07my my my brain still works on both words

36:10but like uh it means if the temperature

36:12outside is around 80 Fahrenheit you know

36:15you will have five times the consumption

36:17that you have for example on winter. Uh

36:20and so climate matters uh and this is

36:22something that we have to be um uh aware

36:25of. Just to finish wrapping up other

36:28things, noise. Okay, a lot of backlash

36:31and I I'm no expert on this. Uh I I've

36:34been in data centers that seem to be

36:36very quiet, but again I'm I wasn't

36:37leaving there at night to know if they

36:39were making a huge noise or not. But

36:41this is something that has to do with

36:43the construction. Again, I think it's

36:44part of a normal conversation.

36:47uh air emissions. Why? Because they have

36:49backup generators and they have backup

36:51generators that because they are

36:52critical facilities. Okay, this is a

36:55critical aspect for data centers. Data

36:57centers won't locate in places where you

36:59will put um constraints on uh their

37:03diesel generators on the back because

37:05they cannot be disconnected from the

37:07grid at all. Um

37:10that's that's a secret of their

37:11business. you know their their their

37:12clients won't rely on them 24 like

37:16actually 99.999%

37:18of the time like this is the definition

37:20of a critical facility so they will have

37:23to have backup generators now these are

37:25mostly diesel generators if you have

37:28tight air quality um regulations in your

37:32county for the safety of your

37:33constituents many of them won't locate

37:36there because if that doesn't allow us

37:38to render diesel generators like

37:41something like 2,00 uh or depends 1500

37:46hours per year that this will be a

37:48problem for them. Okay. But now for

37:51example I know a data center in Oregon

37:53that has battery storage as as as a

37:56backup generator. So again there are

37:58solutions. These are of course more

38:00expensive. Uh it might push a data

38:02center to leave the room. Uh but there's

38:05something that you have to have in mind.

38:07construction and land use again building

38:10scale traffic during construction they

38:12are very they build really quickly they

38:13put tons of water occurs in a short term

38:15of time that has local impacts upset

38:18local residents and well like but

38:20something to have in mind

38:22um drainage uh also an aspect water

38:25quality we are also looking again I'm

38:28not an expert on this cooling additives

38:30and aspects related with waste water

38:32they have to be also u put up front um

38:36but I would say that again it has to do

38:38with the campus that is being proposed

38:40and the behavior of the data center when

38:42it comes to u a moment where where they

38:45they they want to locate somewhere. Uh

38:48so for me it's always about transparency

38:50before a local approval. The amount of

38:52times that that I didn't have in the

38:54information that I felt I needed to know

38:56what and assess the impacts. Um so uh

39:00understand the the what the

39:01characteristics of the full campus and

39:03the develop the de development phases

39:05the power needs how they are going to be

39:07connected are they increasing the

39:08resilient of the infrastructure locally

39:11cooling design what is the water source

39:13what is the peak and where it's going to

39:15happen during and al what is the size of

39:18the peak also uh noise generators

39:21drainage of even storm waters these are

39:24huge facilities like Walmart with huge

39:26parking facilities sometimes like well

39:28uh where is the water runoffs going you

39:32know jobs what how many jobs are they

39:35creating you know couple of years ago

39:37they were promising thousands we are not

39:39seeing that anywhere and now they know

39:40we are not seeing that anywhere so but

39:43what are the tax the tax uh the tax

39:46terms between the data center and the

39:48locality and what are the public costs

39:50that that will be supported

39:53uh the need of public reporting after a

39:56facility opens because we want to make

39:58sure that we check you know that and

40:00that we are aware of if they are you

40:04know committed with the contract they

40:06sign with the community. Uh so um local

40:10policy can connect uh promises to

40:13performance. Uh so citing standards and

40:16try to create citing standards

40:19create incentives that are verifiable.

40:22Um uh make sure that they there are

40:25clear agreements on the infrastructure

40:26side uh and there is ongoing oversight.

40:30Uh and so think this also implies some

40:32costs you know for a city council. Let's

40:35are they worth it? uh um

40:39questions for for a local proposal that

40:42I would always do what exactly will be

40:44built what will be the communities what

40:47will the community provide and receive

40:49uh and make sure we have this very

40:51informed conversation about this what

40:53can the community verify over time um

40:56just one note like uh as part of the

40:59wilder center I'm more on the research

41:00side but we also have the Virginia

41:02Institute of Government um and um it has

41:06a local government consulting team that

41:09can actually help uh more on the lawyer

41:11side and the ordinance side. I'm not

41:13such an expert on that but um uh and uh

41:18if you decide to be a member

41:20organization then can provide you

41:21technical support uh on all these

41:24aspects related with the strategy and

41:27they are also looking at data centers

41:28right now. So thank you so much

41:36Commissioner

41:39um I'm very interested in this topic

41:42because I think that we're going to need

41:44especially with AI and emerging

41:46technology. So I'm trying to figure out

41:48not so much if but how and where and

41:50size and so forth. Um because I think

41:52we're going to see mass layoffs and

41:54business closures and so forth if we

41:56don't prepare to um figure out how we're

41:59going to adopt AI and all these sorts of

42:01things. So, I want to I want to get

42:02ahead of this. And in Virginia Beach

42:05specifically, I think of us as having um

42:09amazing resources in the sense we have

42:10the military, we've got government

42:12contractors here, we have so much

42:14retired military that's uh perfect for

42:18developing basically a tech corridor

42:21here. Um and and uh kind of partnering

42:25with uh Northern Virginia and so forth.

42:27I'm trying to figure out if we do go

42:30down the path of trying to um enhance

42:34our tech businesses here. What kind of

42:39data center, what size we would need to

42:42kind of how bad is this? I mean, are we

42:44talking hyper centers? Could we have

42:46multiple small ones? I mean, I have a

42:48series of questions, but um and broadly

42:51speaking, how bad would it be? I I know

42:53we're going to need them. I just don't

42:55know how big they have to be in order to

42:56do some of the things that we're going

42:58to need to think about doing.

43:00>> That's a great question and I I think we

43:04we need I usually separate both topics.

43:08Uh and the reason I separate both both

43:11topics is that there isn't a correlation

43:15on where the data centers are located

43:18and where AI is creating jobs.

43:21AI continues to create jobs in San

43:23Francisco and New York.

43:25They don't have data centers. New York

43:27now has a moratorium on data centers.

43:28California never had a tax incentive on

43:30data centers. In fact, in terms of

43:34density of data centers, California is

43:37as bad as Idaho and like they are one of

43:39the least states with data centers. So,

43:43you don't need to be physically located

43:45to a data center to have an AI job.

43:50So uh we are definitely speaking about

43:54two different job markets, two different

43:57areas of like one thing I know for many

44:00people it seems the same thing or or

44:03because data centers are the backbone of

44:05the technologies boom that we are

44:07looking at right now. But if your main

44:12concern is the impact of AI on the job

44:14market, if your main concern is how this

44:18will impact certain professions and

44:20skills that are right now, uh if your

44:23concern is that your clients learn to

44:25use more AI,

44:27you don't need to be located right next

44:29to a data center. This all goes to the

44:32grid and the grid, you know, and and the

44:35network spreads around everywhere.

44:38[snorts] Uh I don't even know if right

44:40now my phone is connected or using

44:42resources for a data center in Saudi

44:44Arabia. Honestly, I don't nobody can say

44:47that. What I want to have is fast

44:50internet and that my, you know, if I use

44:52AI, it's raining, it's running fast.

44:55[snorts] That I don't even know if that

44:56is a data center in Virginia or a data

44:58center in Texas. So

45:02I I tried to separate both things and

45:04there is a recent study also published

45:06by Arford uh last month that also says

45:09that if you delay the construction of a

45:13data center right now or even if you

45:15cancel the construction of one data

45:17center there are so many right now in

45:20the world and so many planned and also

45:21the ones that exist are becoming better

45:23that you are delaying the advancement of

45:25AI in like six minutes. So it's it's I I

45:30I would simply

45:33for the sake of uh uh uh uh and I' I'm

45:38doing also work on AI but I always try

45:42to you know put one at when I'm

45:44discussing data centers another at when

45:45I'm discussing AI because what we are

45:48seeing again on the job market it's

45:51completely separate locations patterns

45:54they have nothing to do with each other.

45:56Now if you want to locate data centers

45:58because you see there is a path on the

46:00manufacturing market on the supply

46:02chains that's a whole different

46:03conversation

46:05okay we with so many data centers being

46:07built there is definitely a room for

46:09thinking about where are all these

46:11components being manufactured and many

46:13of them are being manufactured overseas

46:17uh and and um and and we are seeing some

46:22you know specific examples of new

46:27products and commodities that are now

46:29being produced in the US because of the

46:31boom of the AI of the data centers that

46:33we are seeing. That's the path that I

46:36would go. But in terms of connecting AI

46:39and data centers, I would be a little

46:41more um I would say there is avenue to

46:44do two separate routes. Let me put it

46:46like this. I was asking because people

46:48were always telling me that proximity

46:51really mattered in terms of the speed

46:54and if we did want to do tech here to

46:56that degree that speed might be an

46:58issue. So that was the reason I asked

47:00that question. I'm glad that it's not as

47:02dramatic as I was originally told.

47:04>> Financial markets. Yes.

47:05>> Okay.

47:06>> That's why there was a clustering in New

47:07York which actually stopped because

47:09actually apparently I'm no expert in

47:11this but makes a difference that you are

47:14located like like 0.0 01 milliseconds

47:17can make a difference in the way your

47:19computer understand if they should buy

47:21or sell the stock. uh but what we are

47:24seeing right now the raise that we are

47:26seeing on AI particularly training new

47:29AI models inference like people asking

47:32questions and having the reply that can

47:34be done in a data center that is located

47:36actually in the other side of the world

47:38like 0.1 second more won't make any

47:41difference for any Amazon customer uh

47:44that is trying to buy uh uh so

47:49um

47:50>> excuse me excuse me

47:51>> oh I'm sorry

47:51>> we got about three other Oh, so sorry.

47:54>> I got a lot of questions. I I can talk

47:56to you later. [laughter]

47:58>> Commissioner Camp and then Commissioner

48:00M.

48:01>> I thank you very much for the

48:03presentation. Very informative.

48:04>> I I would ask that there be some um

48:08review for this region in Virginia Beach

48:13and Chesapeake in 1998 um connected to

48:16Lake Gaston for its water supply down in

48:20North Carolina. And what Lake Gaston is

48:23is a reservoir for Dominion Energy or

48:27its hydroelect electric facility there.

48:30And there's a large use of water there.

48:33And I would like to know about the

48:37effects of drawing water from Lake Gas

48:40and or putting facilities in its

48:42vicinity or

48:44what impacts generally um across our

48:47state and other states are having on um

48:49the draw of power which requires

48:52additional water to be drawn from places

48:54like Lake Gaston. I think that's

48:57important to understand. you know, DEQ

49:01um hands out uh permits um for um for

49:06water wells throughout the state. And

49:09there were communities

49:12that were denied permits for years

49:14because they could not draw sufficient

49:17supply of water. We've drained the

49:20aquafers of uh in large areas in our

49:23state of sufficient water. So what that

49:25meant was you couldn't build homes, you

49:29couldn't grow your city. If you don't

49:31have water, you can't continue to

49:34construct, you can't continue to

49:35develop.

49:37So

49:38water is a a critical uh resource for

49:42our region and we have to be

49:44particularly concerned uh with with

49:47heavy um users of water or as you said

49:50the displacement. you know, you're using

49:52power, so you're drawing water from

49:54these other sources. Lake Gaston, we

49:56draw 60 million gallons a day uh uh from

50:00Lake Gaston. It is in drought condition

50:03right now, you know. So, I'm not trying

50:06to create a a a perception that we're in

50:10danger. What I'm trying to do is to make

50:13sure that we're looking at that as an

50:15issue for our community because our

50:18growth and our economic development is

50:20clearly tied to having a sufficient

50:22water supply. So knowing and I obviously

50:26think we should be a member of your

50:28organization uh uh u but knowing how

50:31this would impact us is is truly a very

50:36important question. I don't are there is

50:38there a department within the uh excuse

50:41me is is there a a division within the

50:43department of environmental quality

50:45within in Virginia that deals with the

50:48usage of our state's water from these

50:51facilities is it DEEQ and so let me let

50:54me just answer your question

50:58and and I'm going to be uh up to my

51:01knowledge until a couple of months ago

51:04all the data centers in Virginia are

51:06connected to the municipality utilities.

51:09There is no direct groundwater.

51:13Uh I think at one point EQ might have

51:17had a couple of requests but they never

51:19move forward. So all of them are

51:23associate are are are connected with

51:27local utilities.

51:29So why are we seeing some clusters

51:31[snorts]

51:32in specific and I'm going to be very

51:34careful here so I don't get myself into

51:36trouble but why we are seeing some

51:39clusters around certain specific rural

51:42areas in the US I would say that at

51:44least on the south of the US if you make

51:48a map of where all textiles production

51:52used to be and where data centers are

51:56located you would see some correlation

51:58there and Why? Because these utilities

52:02still have capacity

52:05provided by

52:07DQS or the DQs of other states

52:11and then data centers come and they say

52:13we are we can help you pay the bills.

52:16You know you are going to be still

52:18within your capacity and we are going to

52:20help you pay the bills. to the other

52:23ones that have constraints right now.

52:26That's definitely an issue. But they are

52:28all going and again this might change as

52:31they become more rural. We are not

52:33seeing them becoming more rural and

52:36isolated specifically in Virginia but I

52:39would say as they move to states like

52:41Texas and others they might see more

52:42groundwater and they extracting their

52:45own water. We might see also that happen

52:46if they start having behind the meter

52:48facilities. For example, if they are

52:50producing their own natural gas, they

52:53have their own natural gas electricity

52:54production, then they will start

52:56probably using groundwater.

53:00But we are still not seeing that in

53:02Virginia. So every all the water that is

53:06right now uh providing data centers in

53:09Virginia goes through local

53:12municipalities and utilities. Now, your

53:15question about u the power, you got it

53:19right, Commissioner. Uh we we actually

53:23don't uh but we don't know where the

53:26energy is coming from. What we know is

53:28that North Carolina has far less data

53:30centers than than Virginia. So, it's not

53:33the existence of that facility that

53:35attracted data centers to to their

53:37surroundings. We also know that there

53:39are there might be now some data center

53:41developers that are studying the

53:43possibility of locating near a lake for

53:46example and having the water of the lake

53:48or the sea cooling their system. I'm

53:51originally from Portugal the largest

53:53data center is in the coastal area of

53:55Portugal and is uh cooled by seawater.

54:00They are still very expensive. they are

54:02still not the mainstream technology that

54:04we are seeing everywhere but but

54:07definitely there's something to be wor

54:09to be worried about but right now until

54:13uh as far as I know it's like I would

54:16say just to be on the safe side 99.9% of

54:20them are using water from the

54:21municipalities

54:22>> but our municipal public water is paying

54:24for their operation our infrastructure

54:27is running is used to support the data

54:30centers both by power and water.

54:33>> Mhm.

54:35Yeah. Yeah. Commissioner Camp,

54:39>> thank you for the briefing. I appreciate

54:41especially your nuance on demand, not

54:44just gross measures [snorts] and also on

54:47both the intake and the discharge of

54:50these various services. It's it's clear

54:53we need to be measuring a lot of things

54:55in order to fairly assess these types of

54:57candidate uses. Could you help me out on

55:01the life cycle of the equipment that is

55:03within a data center? It's [snorts] my

55:05understanding that it's typically about

55:07five years and like any business, some

55:10of those components will begin to be

55:12replaced. Some will last longer, but

55:14they're going to want to cut costs over

55:15time and be more efficient. Do you have

55:18the potential that the business you

55:21measured initially migrates into one

55:24producing different measures later as

55:27they swap out equipment within the data

55:30center?

55:33So again, I'm not that's where I'm not

55:38so familiar with. I'm also know that

55:40that's where like probably most of the

55:44secret of the data center relies. But

55:47let me tell you that I I think that what

55:49they are increasing is in terms of the

55:51computational capacity, not the energy.

55:55Um you know uh uh um I I would guess

56:00this is all very new also like one

56:03question that I even have is like

56:06how much a foot loose this industry is

56:08like they put a data center somewhere

56:10and for those that know a data center is

56:12like just for walls and a lot HVAC

56:16system and and computers that have to be

56:19as you said and well changed every five

56:21to eight years like are they going to

56:23have a tax exemption in another state or

56:25in another country and as I said you

56:27don't have to be located right next to a

56:29data center so for them to be you know

56:32uh estim like producing their

56:34computational um outputs so are they

56:38going to one day locate in other

56:40countries and we will see like uh you

56:42know especially with some of the

56:44backlash we are seeing I don't have

56:46answers to any questions I I I don't

56:48know any data center right now that has

56:51reduced its capacity that has closed

56:54It's a it's a growing business. Uh we we

56:58know a couple of real estate projects

57:00associated with data centers that might

57:02have delayed or shut down one year but

57:04the next year they they they

57:07are the man for it. So we we definitely

57:11uh are learning about these and we'll

57:13try to learn with the trends. But what

57:15we are seeing right now is that they are

57:18becoming better and increasing their

57:20efficiency by using the same energy

57:22doubling or tripling the computational

57:24skills capacity not exactly by extending

57:29within the infrastructure or the water

57:31they use. For example, on our data, I

57:35can tell you this and I'm just I I I run

57:38this model yesterday. So, you are the

57:39first person to know about this, but all

57:42the data centers that we have data for

57:44in Virginia at the water level, the

57:46water they used in the fifth year or

57:49sixth year of operation was the same

57:51water they were using in the first year

57:52of operation.

57:53>> Okay. So, that's very helpful. In our

57:56case, our city council adopted a package

57:58of incentives to attract data centers in

58:002017, and they're still on the books,

58:03including a lowered uh business property

58:05rate and a definition of what a data

58:07center is. It sounds from your briefing

58:11like obviously the [clears throat]

58:14the industry has changed and so

58:16revisiting that type of definition and

58:19potentially revisiting incentives that

58:21may have made sense in 2017 versus the

58:25market today may be something prudent to

58:26recommend as well.

58:28>> Yes.

58:29>> Okay. Very good. And then lastly, if I

58:32may, there are other businesses that

58:37create large computing demand.

58:40And one might say that their facilities

58:44are similar to some of these except for

58:47the fact that they are within a

58:48university or within some other type of

58:51of land use.

58:54If there are associated offices or

58:56laboratories or other type of uses,

58:59are those intense demand computing

59:04locations being considered here also or

59:07are you only looking at sort of the

59:09multic customer public carrier uh type

59:13of uses even though the privates might

59:15be similar?

59:17>> Yeah, we don't have information on the

59:18enterprise data centers. Um actually

59:21there are also some of them and since we

59:24are in Virginia Beach for example

59:25military

59:27uh my knowledge is that they are all

59:31much smaller than this hypers scale that

59:32we are speaking about. So there's

59:35definitely a segment of the market a

59:36market segment that is the hypers scale

59:40wholesale

59:41itch big tech companies and there is

59:44another one that is local customers like

59:46UVI has two two or three data centers

59:49the hospitals have data centers right

59:50now some libraries and even some

59:53counties that have to manage a public

59:55library system they have data centers

59:58those are small I have one right next to

1:00:00my house it uses as much energy as

1:00:045 hours old like so it's nothing right

1:00:07and and runs uh the library uh

1:00:11[laughter]

1:00:12uh information so uh there are

1:00:16definitely different uh now I I've heard

1:00:19about different models like for example

1:00:21I've heard about a company that is

1:00:22buying um

1:00:25old storage units and just locating

1:00:28elsewhere but those will be small data

1:00:30centers also um

1:00:34I I I'm definitely this is this is still

1:00:37not part of a trend that we are seeing.

1:00:39The number of small data centers in

1:00:41Virginia that were built in the last

1:00:44three or four years compared with the

1:00:47large ones I would say it's one for 10

1:00:5010 large ones for one smaller ones. So

1:00:53um as a regional economist I'm very

1:00:58I think one thing that we've been very

1:01:00careful is that we continue to allow

1:01:03those data centers that are kind of very

1:01:06related with our local economy with our

1:01:10with the businesses that we have here to

1:01:11continue to be built then we have to

1:01:14understand that the large ones have

1:01:15different impacts and will serve

1:01:16different types of customers. So,

1:01:21>> Commissioner Bch and then Commissioner

1:01:23Ber and then that's it. Okay, I got to

1:01:26move on. I'd like to thank you for the

1:01:30information that you've given us

1:01:31[clears throat] uh as well as staff for

1:01:34um continuing to provide us information

1:01:36as data centers are very fluid and and

1:01:39things change uh very quickly. it seems

1:01:42like with information that how the data

1:01:45centers run and and what type of data

1:01:47centers there are. Um I wanted to touch

1:01:50on one thing that Commissioner Skunover

1:01:52had had mentioned and and maybe to make

1:01:54a little clarification. And I believe

1:01:56that the the city's looking uh to to

1:02:02facilitate a way to uh bring our retired

1:02:06military community to be able to use

1:02:10their knowledge to create businesses

1:02:12that help support the military um

1:02:14privately uh whether it's just

1:02:17supporting the military in general or

1:02:19supporting military operations. And I

1:02:21think maybe what she was talking about

1:02:23the speed and the proximity might be a

1:02:25part of that where um supporting

1:02:28military operations from a private

1:02:31standpoint. Uh it is that is there a a

1:02:34correlation between the proximity um to

1:02:37that type of a a instantaneous data? Do

1:02:40they need to be close by?

1:02:45I

1:02:45>> I think location still matters. Uh

1:02:48that's

1:02:50in fact everyone that has studied

1:02:51historical trends of data centers come

1:02:53up to the conclusion that they locate in

1:02:55Len County and Northern Virginia because

1:02:59Pentagon closing to the federal. So I

1:03:02want I don't want to say that it doesn't

1:03:04matter. Uh

1:03:07the way I would put it it's like it

1:03:09matters less and less.

1:03:11>> Right. Okay. And then um I saw that you

1:03:15had forecasted for future data centers

1:03:18along with the energy demand uh that

1:03:21we're going to have. Did that take into

1:03:23account future energy production or

1:03:28>> future energy different types of energy

1:03:31that that could be done in the future?

1:03:34>> Great question. uh the the

1:03:39on the Jark study we classified both of

1:03:41the scenarios of growing on data centers

1:03:44as very unlikely because of constraint

1:03:46in the energy markets.

1:03:48uh so I would say that we have we taken

1:03:51that into account in the sense that we

1:03:53also said this has this huge problem has

1:03:55to be solved and we don't know exactly

1:03:57what how and there isn't an additional

1:03:59problem is that we are doing this

1:04:01forecast for Virginia and if in 2024 we

1:04:04did this forecast for Virginia and

1:04:06everyone was like oh Virginia is booming

1:04:08on data centers but now Ohio is booming

1:04:11on data centers Atlanta is booming on

1:04:13data centers in Georgia uh Illinois is

1:04:16booming on data centers Um and only very

1:04:19few states like New York hit a plateau

1:04:21and are not having more. Pennsylvania is

1:04:24now moving on data centers and so we are

1:04:27all part of PJM. So one of solutions for

1:04:30Virginia will be just import more energy

1:04:32from other states. But if the other

1:04:34states are also having data centers,

1:04:36they won't have energy for us to import.

1:04:38So I would say that this is like a very

1:04:41complex system that nobody still put it

1:04:44all together. Um I would say that

1:04:48definitely Dominion is thinking about

1:04:50building a new natural gas power plant.

1:04:52We have been seeing and we continue to

1:04:54see a raise in solar energy but we are

1:04:57not building at the speed that to

1:05:01support this energy demand. In fact,

1:05:02what we are seeing is that in many

1:05:04states like Ohio, West Virginia is that

1:05:06they are reopening or delaying the

1:05:09closure of some coal facilities just to

1:05:12continue to provide uh the energy that

1:05:15is now needed for these data centers. So

1:05:19I I think it's a very unlikely scenario

1:05:21that we won't have constraints on the

1:05:23energy side in a couple of years.

1:05:26>> You feel as though the conversation for

1:05:29future [clears throat] energy production

1:05:30[laughter] in

1:05:32in uh alternative energy uh is at the

1:05:37point in which it needs to be or do you

1:05:39think we need to have just as much of a

1:05:42focus on new energy production uh to go

1:05:46along with

1:05:48>> I I I I think we we have to take energy

1:05:51planning really seriously. I I won't go

1:05:54any

1:05:55>> focus there or not so much

1:05:57>> there is there is there is some things

1:05:59being done like we have like recently

1:06:02the the new energy plan uh announced by

1:06:05the spamburger administration we we are

1:06:07having things that are being done

1:06:10um I'm I I I think that the right the

1:06:14most important incentive right now and I

1:06:16have been in several energy conferences

1:06:19is that energy is going to become more

1:06:21expensive And so this is good for energy

1:06:24producers and developers, right? It it

1:06:27it will give opportunities to new ways

1:06:29to produce techn to produce energy for

1:06:31example. Uh at the same time, it it

1:06:35brings issues in terms of affordability

1:06:37like low-income households like energy

1:06:40is like 8% of their budget. So it's

1:06:44definitely something that that there are

1:06:46many moving pieces here. Uh and uh yeah,

1:06:51Commissioner Berado.

1:06:53>> Oh, thank you. [laughter]

1:06:55>> And thank you to Director Walsh and and

1:06:57Chair Cen for providing this really,

1:07:00really important briefing. So, um I

1:07:04appreciate that you're also on top of AI

1:07:07and as I understand it, AI is growing

1:07:10faster than data centers. It's growing

1:07:12faster than anything else. and the need

1:07:14for data storage is growing

1:07:16geometrically.

1:07:18As such in my mind the current model is

1:07:21completely unsustainable

1:07:24and we will be shifting to something

1:07:26else and when that happens I share some

1:07:28of the other comments what's going to

1:07:29happen with all these data centers that

1:07:31are around they will be obsolete. Can

1:07:34you shed any light on the future of data

1:07:38storage beyond the current model?

1:07:41So, one of the things that economists

1:07:43are really bad at is predicting uh

1:07:46crisis and because we just work with

1:07:48forecasts that you know are kind of make

1:07:51sense to us and when the crisis happens

1:07:53like we are usually the last people to

1:07:56admit.

1:07:57Uh I'm I'm going to be completely

1:08:00honest. I I share uh I share with you

1:08:03some of the concerns about the

1:08:04sustainability of this model. Again, the

1:08:06question on energy planning, right? like

1:08:09sure um I'm not so sure that AI as a

1:08:13technology is going to go away. Uh I

1:08:16think it's disruptive. Uh I think it

1:08:19makes us do things in a different way

1:08:21that we used to do in the past. Uh now I

1:08:25have a lot of concerns about the

1:08:27modeling and the way and the model and

1:08:29the way the system is been operating and

1:08:32like and I see some very concerning

1:08:35aspects. for example, energy is one of

1:08:37them. Um, we also track closely the job

1:08:41market. Uh, you know, for the first time

1:08:44in decades, professional services in

1:08:47Virginia are shrinking. Uh, it was one

1:08:50of our largest sectors and you know,

1:08:54consulting firms were moving here. we

1:08:56are hiring with these college uh uh

1:09:00graduates with and giving them great

1:09:02jobs and that stopped two or three years

1:09:05ago. Um and so uh we are still not at

1:09:10the phase where we we will see these

1:09:11amount layoffs

1:09:14but the job market is tough for for for

1:09:16new entry positions and for junior

1:09:18people and you know I I'm I work with

1:09:21students every day and I see how tough

1:09:23it is right now. uh and probably you

1:09:26also have heard this. So I have I could

1:09:29share some of your concerns but I want

1:09:31to make sure that that's not an area

1:09:33where I'm an expert as data center. So

1:09:35I'm just not probably the right person

1:09:37to tell you. I would tell you also that

1:09:40I won't be the the person that will tell

1:09:42you if there is a bubble right now in

1:09:44the market and if the stock market is

1:09:47red. I I don't I don't [snorts] um our

1:09:50economic models usually are pretty bad

1:09:52at forecasting those things.

1:09:54uh now I have concerns and I have

1:09:56concerns about the sustainability of

1:09:58this model also that's why for me

1:09:59planning

1:10:01is really important and mostly

1:10:03understanding uh what are the limits and

1:10:08the restrictions and the constraints

1:10:10that we have that we need to sort it

1:10:12out.

1:10:14>> Thank you.

1:10:14>> Thank you.

1:10:16>> Thank you sir. We've really enjoyed your

1:10:18presentation obviously

1:10:21>> uh and we might need some more of this

1:10:23at some point.

1:10:24>> Thank you. Thank you. And thank you for

1:10:25the wonderful staff that also made my

1:10:28traveling and stay here in Virginia

1:10:30Beach really pleasant. Thank you so

1:10:31much.

1:10:37>> We will switch gears and start going

1:10:39over the agenda items.

1:10:45All

1:10:52right. So, item one, this is uh or was

1:10:56the referral resolution uh regarding the

1:10:58short-term rental overlay district. This

1:11:00was withdrawn by the city council at

1:11:02their October 6, 2026 hearing. Um so,

1:11:06this will not be moving forward at this

1:11:08time.

1:11:18Good morning everyone.

1:11:20>> Morning.

1:11:21>> Item number two is a request for a

1:11:23subdivision variance to section 4.4B and

1:11:26D of the subdivision regulations to

1:11:29address deficiencies in the required lot

1:11:31with street line frontage and lack of

1:11:32direct access to a public street for the

1:11:35proposed lot 7A and 7B. This 36,624

1:11:40foot parcel is zoned R 7.5 residential

1:11:42district and is located within the

1:11:44Beachwood neighborhood as well as the

1:11:45Sore Drive corridor overlay district.

1:11:48The site currently contains a single

1:11:49family dwelling that was constructed in

1:11:511940 which is proposed to be removed

1:11:53with this request. The R7.5 residential

1:11:56district requires a minimum lot area of

1:11:587500 square feet, a minimum lot width of

1:12:0175 ft, and a minimum street line

1:12:03frontage of 60 ft for single family

1:12:05dwellings.

1:12:06While the proposed lot 7C will meet all

1:12:08dimensional requirements of the R7.5

1:12:11residential zoning district, the

1:12:12proposed lot 7A and 7B will be deficient

1:12:15in lot with street line frontage and

1:12:17will lack direct access to a public

1:12:18street. As such, a subdivision variance

1:12:21is required to provide access to the

1:12:23proposed lots. The conceptual site

1:12:24layout depicts a 29 foot wide private

1:12:27access easement. In its [snorts] current

1:12:29form with a lot area of 36,624

1:12:32square feet and a lot width

1:12:33approximately 128 feet. The subject

1:12:36parcel is unique in that it is much

1:12:38larger than the majority of parcels

1:12:39within the Beachwood neighborhood which

1:12:41range in size from approximately 7500 to

1:12:4415,000 square feet and approximately 75

1:12:46to 120 ft in lot width. This lot also

1:12:50has frontages on both Hook Lane and

1:12:52Northampton Boulevard. Northampton

1:12:54Boulevard is an access controlled

1:12:55roadway and thus direct access from the

1:12:57subject parcel to Northampton Boulevard

1:12:59is not permitted.

1:13:01The original parcel was over an acre in

1:13:03size when it was first platted in 1902.

1:13:05The site has been the subject of two

1:13:07takings since its original platting. The

1:13:09first in July of 1962 by the

1:13:10Commonwealth of Virginia for the

1:13:12creation of Northampton Boulevard and

1:13:14the second in 1981 by the city of

1:13:15Virginia Beach for the widening of Hook

1:13:18Lane.

1:13:19>> [snorts]

1:13:20>> Given the unique dimensional

1:13:21characteristics, the parcel has a lot

1:13:23area to accommodate the three proposed

1:13:24parcels, but lacks sufficient street

1:13:26frontage to subdivide as proposed

1:13:27without a subdivision variance being

1:13:29granted. Staff is of the opinion that

1:13:31the proposed layout, which includes one

1:13:33conforming single family parcel along

1:13:34Hook Lane, will conform to the overall

1:13:36characteristics and development pattern

1:13:38of the neighborhood, and approval of the

1:13:39subdivision variance would not adversely

1:13:41affect the surrounding properties or the

1:13:43overall neighborhood. While the proposed

1:13:46layout initially proposed a shared

1:13:47access easement over all three parcels,

1:13:50the updated ex and updated exhibit was

1:13:52provided by the applicant which depicts

1:13:53a separate driveway to serve the

1:13:55proposed lot 7C as a shore drive

1:13:57corridor design guidelines recommend the

1:13:59use of shared access drive. Staff is

1:14:00recommending a condition that access to

1:14:02all proposed lots be via the private

1:14:04ingress egress easement depicted on the

1:14:06conceptual layout and that the separate

1:14:08curb cut and driveway proposed for lot

1:14:107C shall not be permitted. Utilizing a

1:14:12shared access will limit the number of

1:14:13curb cuts along Hook Lane, thereby

1:14:15reducing the number of conflict points

1:14:16for vehicles and pedestrians while also

1:14:19reducing the amount of overall

1:14:20impervious cover. The applicant has

1:14:22provided inspiration images depicting

1:14:24the proposed single family dwellings

1:14:25which appear to be consistent with the

1:14:27character of the surrounding area and

1:14:28the design principles outlined in the

1:14:30shore drive corridor design guidelines.

1:14:32Staff has recommended condition five,

1:14:34which requires the architectural design

1:14:35of the three proposed single family

1:14:37dwellings be consistent with the

1:14:38recommendations outlined in the imagined

1:14:40BB2040 comprehensive plan for the area

1:14:43and be subject to the review and

1:14:44approval of the planning director.

1:14:46Similarly, to further ensure consistency

1:14:48with the SH drive corridor design

1:14:50guideline, staff has recommended

1:14:51condition six to require the front

1:14:52facade of the dwelling fronting hook

1:14:54lane be at least five feet wider than

1:14:56the garage and that the garage portion

1:14:58of the dwelling be set back at least 5

1:15:00ft further than the house from the

1:15:02street. Staff finds the proposal

1:15:04satisfies the criteria found in section

1:15:069.3 of the subdivision regulations and

1:15:08recommends approval of this request

1:15:09subject to the conditions listed in the

1:15:11staff report. Staff has received one

1:15:13letter of support from the Beachwood

1:15:14Civic League. Additionally, the

1:15:16applicant has indicated to staff that

1:15:18they would like to modify the conditions

1:15:20to remove the condition regarding that

1:15:23the three lots share the or share access

1:15:26through the private easement and the

1:15:28condition regarding or condition six

1:15:30regarding the front facade of the

1:15:31dwelling that fronts hook lane.

1:15:35My area I've only heard uh what she just

1:15:39gave us and

1:15:41I'm for consent unless anyone else has

1:15:45Mr. Plumbley,

1:15:47>> when I went by there on Monday, I didn't

1:15:49see a sign out.

1:15:51I looked around for it and then I had to

1:15:53move on. I don't know if if you could

1:15:55check that just to make sure that that

1:15:57was done. Um, explain to me again what

1:16:00the condition is that they want to

1:16:02change specifically.

1:16:03>> It's two conditions they'd like to

1:16:04modify.

1:16:05>> Numbers.

1:16:06>> Yes. And let me just confirm

1:16:10the condition regarding the front facade

1:16:12is condition six of the request and then

1:16:16the condition regarding the sharing of

1:16:20the access easement and I don't have it

1:16:22in front of me but I believe it's

1:16:24condition one. Caitlyn, can you confirm

1:16:26>> it's incorporated in to condition one?

1:16:28So this is the plan that has been

1:16:30presented by the applicant. Um staff

1:16:34would like to condition this plan except

1:16:36for the driveway that is shown to serve

1:16:39proposed lot 7C. We would propose that

1:16:42that not be permitted and that access

1:16:44only come via that shared access

1:16:46easement along the west property line um

1:16:49that would feed lot 7C as well. And I

1:16:52apologize the exhibit's not clear. There

1:16:54was color markings that were done but

1:16:55they appear not to have saved.

1:16:57>> So the thatched area is the right way.

1:17:00Is that what you're saying? That's the

1:17:01proposed

1:17:02>> that's the proposed 29 foot wide shared

1:17:04easement.

1:17:05>> Correct.

1:17:06>> Yes. That they would all share access

1:17:07through that.

1:17:08>> So the house was going to have to be

1:17:09turned

1:17:10>> or have a side loading garage which

1:17:12would be more consistent with the design

1:17:14guidelines.

1:17:16>> It looked like there was a lot of new

1:17:18construction in this area, but I hadn't

1:17:20seen m were there multiple I didn't see

1:17:23any um lots where there were multiple

1:17:25homes on this size of lot. Is it just

1:17:28because this is a unique large lot? Yes,

1:17:30this lot is unique. Like I mentioned,

1:17:32it's got enough lot area to accommodate

1:17:35the three proposed dwellings, but the

1:17:37width of it is what's necessitating the

1:17:38subdivision variance, and it's also a

1:17:40through lot as well as being subject to

1:17:43two right-of-way takings over the years.

1:17:45>> Okay. Thank you, Commissioner Camp. So

1:17:48it looks to me like condition one was

1:17:51written before the applicant turned in

1:17:54the revised site plan because what the

1:17:57words say here are shall be via the

1:18:01proposed this is for C shall be via the

1:18:04proposed private ingress egress easement

1:18:07depicted well what's depicted

1:18:11isn't that now since they changed it

1:18:14>> so no it it was written after this was

1:18:17subed So when it was initially

1:18:18submitted, there was no driveway under

1:18:20hook lane. It was solely through a

1:18:22[snorts] private ingress egress ement.

1:18:25Now what is shown here still has the

1:18:27private ingress egress easement along

1:18:28the west but then showed a separate

1:18:30driveway to Hook Lane. So what that

1:18:32condition is saying typically we

1:18:34condition the plan, but we want to

1:18:37condition the plan subject to removing

1:18:40the driveway from Hook Lane and only

1:18:43having access for all three lots come

1:18:45from that property. understand what you

1:18:47want to accomplish, but when it says

1:18:50depicted

1:18:51>> and what we have is a picture that

1:18:53doesn't show that, that's my confusion

1:18:56here.

1:18:57>> I'm I guess I'm confused why you don't

1:18:59think it shows the ingress, egress,

1:19:01easement.

1:19:03>> What I see is the driveway going to Hook

1:19:05Lane.

1:19:07>> That's what I see. But the way this

1:19:10condition reads is except that access to

1:19:13all proposed lots shall be via the

1:19:15proposed private ingress egress ement

1:19:17depicted which is depicted along the

1:19:19west

1:19:21property line.

1:19:23>> A little dash right.

1:19:25>> Yes.

1:19:25>> Yeah. Yeah. Yeah.

1:19:26>> And the applicant wants that removed

1:19:27that condition window that restriction.

1:19:30>> That restriction. Yeah. The applicant

1:19:31would like to condition as shown with

1:19:34the driveway

1:19:35>> with the driveway coming down.

1:19:36>> Correct. And what we're saying is that

1:19:37access to all proposed lot shall be via

1:19:40that private ingress e ingress egress

1:19:42easement as depicted and a separate curb

1:19:44cut solely for the benefit of lot C

1:19:47shall not be permitted.

1:19:56And what's the reason why we don't want

1:19:59the the U access onto Hookland?

1:20:02>> So the Shore Drive corridor design

1:20:05guidelines recommend shared access and

1:20:08they also um speaking to garages in

1:20:13particular would prefer a side loading

1:20:15or a detached garage. It's kind of the

1:20:18intention of the design guidelines that

1:20:20the garage not be the dominant feature

1:20:22of a dwelling. And so if it's front

1:20:25loading, it calls for at least a five

1:20:27foot set back from that from the street.

1:20:30Um, but then again shows the preference

1:20:32for side loading or a detach garage. So

1:20:36staff, it was staff's opinion that if

1:20:38you do access via that private ingress

1:20:40egress easement, then access to lot C,

1:20:43it it would accommodate a side loading

1:20:46garage, which would be more in

1:20:47conformance with the recommendations of

1:20:49the design guidelines.

1:20:53>> My question standing. I support the uh

1:20:56chair's

1:20:58proposal to put this on consent as

1:21:00written.

1:21:02>> Well, I do know that the applicant

1:21:04doesn't agree. So, I think they're going

1:21:06to want to discuss the conditions.

1:21:09>> The applicant doesn't agree, then it'll

1:21:11be removed from consent and will be

1:21:13heard later in the agenda.

1:21:16>> But for now, we're going to put it on

1:21:17consent.

1:21:24So this will be heard.

1:21:27>> Yeah. Uh Commissioner Malsh, would you

1:21:31read it then because it's in district 9?

1:21:34>> Sure.

1:21:35>> Understanding it may not be read. It may

1:21:37be redrawn.

1:21:38>> Yes, ma'am. [snorts]

1:21:39>> Thank you.

1:21:43>> Good morning. Item number three is a

1:21:44request for a modification of progress

1:21:47for Tidewater Structures LLC. You may

1:21:49remember this came before you last month

1:21:50for a 30-day deferral. The applicant is

1:21:53now requesting an indefinite deferral as

1:21:54they're still working through a shared

1:21:56parking agreement with some adjacent

1:21:58properties and they didn't want to move

1:21:59forward or they couldn't move forward

1:22:01until they got all that squared away. So

1:22:03now they're requesting an indefinite

1:22:04deferral.

1:22:22Agenda items four and five are request

1:22:25for a modification of profers and a

1:22:26conditional use permit for a bulk

1:22:28storage yard to develop an outdoor

1:22:29storage yard on a portion of this 32.36

1:22:32acre I1 light industrial district zone

1:22:34parcel. The site is located within the

1:22:36Sega 3 South Oceanana and is within the

1:22:38greater than 75 noise zone. The proposed

1:22:41use of a Volt storage yard is considered

1:22:42a compatible use within the noise zone.

1:22:45The site is also located within the

1:22:47corporate landing business park and is

1:22:48subject to the corporate landing

1:22:50business park design guidelines. The

1:22:52outdoor storage yard will be used to for

1:22:55the storage of construction materials,

1:22:56roofing supplies, tools, equipment,

1:22:58vehicles, trailers, and other contractor

1:23:00related items. The applicant also

1:23:02intends to construct an approximately

1:23:0333,000 square foot warehouse building on

1:23:06the site, which is permitted by Wright.

1:23:08On November 9th of 1993, city council

1:23:10granted a conditional reszoning of this

1:23:12site with subsequent proper

1:23:14modifications in 1996 and 2021. Proper

1:23:18four of the 2021 profer stated that

1:23:20except for permanent facility

1:23:21construction, exterior storage shall be

1:23:23prohibited. As such, a modification of

1:23:25profers is required for the proposed

1:23:27use. The zoning ordinance requires the

1:23:30bolts that bolt storage yards be

1:23:31enclosed by category 6 screening. The

1:23:33applicant is requesting a deviation to

1:23:35the required fencing requirements

1:23:37through the provisions of section 221i

1:23:38of the zoning ordinance. The con the

1:23:41submitted concept plan and fence exhibit

1:23:43include category 1 landscaping around

1:23:44the entire perimeter of the site.

1:23:46However, the applicant is requesting a

1:23:48deviation to the installation of a solid

1:23:49fence. The applicant proposes an 8-ft

1:23:52tall decorative fence, perforated metal

1:23:54fence along the northwest and southeast

1:23:56perimeter, and an 8ft tall black vinyl

1:23:58coated chain link fence with privacy

1:23:59slats along the east perimeter. The area

1:24:02proposed for the chain link fence will

1:24:04not be visible from the ride ofway and

1:24:05is adjacent to existing vegetation on

1:24:07the site that is proposed to remain. In

1:24:10staff's review, the request for

1:24:11modification of profers and a

1:24:12conditional use permit for a bolt

1:24:13storage yard are acceptable. The

1:24:16property is identified in the imagine

1:24:17VB2040 comprehensive plan as being

1:24:19within an industrial and logistics place

1:24:21type. These areas are intended to

1:24:23provide a well landscape buffered

1:24:24setting for large-scale industrial

1:24:26logistics and warehousing uses along

1:24:28with supporting services and retailers.

1:24:29The proposed bulk storage yard is

1:24:31consistent with the comprehensive plans

1:24:33land use policies for this area as

1:24:35majority of the land in this vicinity is

1:24:37envisioned for commercial and industrial

1:24:39uses and more specifically uses that are

1:24:41compatible with Maval flight operations.

1:24:44The site is located adjacent to

1:24:45Corporate Landing Parkway, Dunwitty

1:24:46Park, and residential properties at the

1:24:48rear of the site. To minimize the visual

1:24:50and operational impacts of the proposed

1:24:52facility from the ride ofway and

1:24:54surrounding residences, the applicant is

1:24:56proposing to locate the bolt storage

1:24:57yard behind the building and is

1:24:58proposing to retain existing on-site

1:25:00vegetation outside the limits of

1:25:02disturbance.

1:25:04The overall development proposal,

1:25:06including the proposed outdoor storage

1:25:07yard and proposed decorative metal

1:25:09fencing, was presented to the VBDA on

1:25:11September 8th and received unanimous

1:25:13support. In staff's view, the proposed

1:25:15use is compatible with the other

1:25:16industrial uses located within the

1:25:18corporate landing business park and is

1:25:19deemed compatible with naval flight

1:25:21operations. As such, staff is

1:25:22recommending approval of this request

1:25:24subject to the conditions and profers

1:25:25listed in the staff report. And staff

1:25:27has received no opposition to this

1:25:29request and there are no speakers signed

1:25:30up at this time.

1:25:33Commissioner Camps.

1:25:36At the top of this depiction where we go

1:25:40above the vegetative buffer, which is

1:25:42the dashed line running left to right,

1:25:45is that fencing that is continuing up

1:25:48into the vegetative buffer?

1:25:50>> Yes.

1:25:52>> Along the rest of the fence line, you've

1:25:54identified or someone has identified

1:25:56different types of fencing. What

1:25:58[clears throat] is the type of fencing

1:26:00up there in the vegetation?

1:26:03>> So, what's proposed in that area is

1:26:06vinyl coated chain link with privacy

1:26:08slats. And there's also on the side that

1:26:11is

1:26:13adjacent to an existing business, the

1:26:15address of which I don't know

1:26:17immediately is perforated panels.

1:26:19>> So, the drawing you have up right now

1:26:22has blue on that top flat section.

1:26:26>> Yes.

1:26:26>> That's not where I'm talking about. If

1:26:28you flip back to the prior area,

1:26:32you're talking along the dash line.

1:26:34That's where that cuts off. I asked you

1:26:37about the fence that is above the dash

1:26:39line.

1:26:42>> Yes, that is proposed to be vinyl coated

1:26:44chain link with privacy slats.

1:26:46>> I'm telling you that that's not the same

1:26:48area here.

1:26:49>> If I can.

1:26:50>> Yes. the issue um or I think kind of the

1:26:54conflicting thing here right now they

1:26:56have a site plan that's currently in

1:26:59that shows the bulk storage yard not

1:27:02encroaching into that 75 ft buffer the

1:27:06conceptual plan with this application

1:27:08shows it encroaching I think by the

1:27:10nature of this we would say that it

1:27:13would go up and it would follow h

1:27:15however whatever the final boundary we

1:27:17would say that would be the vinyl chain

1:27:19link we've been trying to work back and

1:27:21forth with the applicant to make various

1:27:25um plans, conceptual and site plan, all

1:27:28mesh. Um we just haven't gotten to a

1:27:31point of doing that and that's why we've

1:27:33also included a condition here um

1:27:35specific to that 75 ft reservation area

1:27:39as it is still shown currently.

1:27:41>> All right. So just to put a button on

1:27:44this, I think you're confirming what I

1:27:47saw that these two diagrams have two

1:27:51different areas. The prior one that

1:27:54encompasses more area than what is shown

1:27:56here.

1:27:58Has the staff have the staff and the

1:28:01applicant agreed upon the boundaries

1:28:04that we're talking about or not for the

1:28:07fence?

1:28:09So I I well and I'll try to answer that

1:28:12maybe in two different

1:28:13>> Let me just say why I'm asking it. If we

1:28:16put if we approve this on consent, I

1:28:18want to know what we're approving.

1:28:20That's what I'm asking you.

1:28:21>> The way that we would

1:28:25enforce this is the ultimate boundary of

1:28:27the bulk storage yard area. Whatever.

1:28:30And I'm not I can't see this. Let's see.

1:28:33North northeast whatever that blue line

1:28:35ultimately ends up being. whether it's

1:28:38up a little bit or follows this boundary

1:28:40would be the vinyl coated chain link

1:28:42with flat the um boundary here and

1:28:46because it would also impact what is

1:28:47shown to be perforated the metal panel

1:28:49the orange line would also extend up

1:28:52further. So whatever the ultimate

1:28:54boundary is of the bulk storage yard

1:28:56area because the perimeter of the bulk

1:28:59storage yard has to be enclosed would

1:29:01follow this. Whether or not the ultimate

1:29:03boundary shifts slightly more north and

1:29:07northeast it would follow this layout.

1:29:09>> So [snorts] thank you. You're not asking

1:29:12us for an encroachment into the

1:29:15vegetative offer?

1:29:19>> No. And that's um that's not a part of

1:29:22this application.

1:29:23>> And that's why with um

1:29:25>> condition number

1:29:25>> specific condition

1:29:27>> is that the bulk storage yard should not

1:29:29encroach into that area unless that area

1:29:32is removed with a future plaque.

1:29:34>> Got it. Okay. Thank you. Hopefully my

1:29:37second question's easier. Last month we

1:29:40had a bulk storage yard, same part of

1:29:42the city and one of the things that came

1:29:45up and I'd say it's similar to me is

1:29:47this is that city council had already

1:29:50decided no that you won't have outdoor

1:29:52storage there that it was approved for

1:29:55other uses. Now here we are city council

1:29:58has approved a certain set of conditions

1:30:00just a couple years ago. Why is this

1:30:03back here for another bite at the same

1:30:05apple when it's already settled?

1:30:08Um, it was a request of the applicant.

1:30:12We said we would not bring it forward

1:30:13unless it had been presented to the

1:30:15Virginia Beach Development Authority

1:30:16since it's part of the design guidelines

1:30:19for corporate landing. Um, that speaks

1:30:22to

1:30:23outdoor storage except during

1:30:25construction. Um and so that's why the

1:30:27modification is before you is that to do

1:30:30the outdoor storage that they're

1:30:31proposing would have to modify that um

1:30:36that part of the design guidelines that

1:30:37prohibits outdoor storage. It is

1:30:40something that for the VBDA they said

1:30:44for this specific site given its

1:30:46location in the park and the limited

1:30:48visibility from the public right ofway

1:30:51they felt that it was okay in this area.

1:30:54So that's why the request was brought

1:30:56forth.

1:30:56>> But the same site last time around was

1:30:59not okay. I'm asking what's changed.

1:31:03>> The previous um modification didn't look

1:31:06specifically at this site. It was

1:31:07looking at a larger area of the park

1:31:10overall. So, um, in our conversations

1:31:12with economic development is that, um,

1:31:18they would still want to, um, be mindful

1:31:23of outdoor storage within the park

1:31:24overall. They felt that in this

1:31:26location, given the lack of visibility

1:31:28from the right of way, the outdoor

1:31:31storage was not a concern, but they

1:31:32wouldn't necessarily want that um closer

1:31:36to um drawing a blank right now, but

1:31:39closer to general booth or um where the

1:31:42visibility would be greater from the

1:31:43right away.

1:31:48>> Consent.

1:31:52If it's going on consent, please mark my

1:31:54vote as nay.

1:31:57>> If you're going to vote no, then it

1:31:58would need to be on the regular agenda

1:32:00per the rules of procedure.

1:32:03>> I'm not I'm not trying to trigger a

1:32:04hearing here, but I just I do not care

1:32:07for coming back on the same question

1:32:10again and again till we get the answer

1:32:11we like. So

1:32:13>> So we're going to hear it.

1:32:14>> No, let's go ahead and just go ahead and

1:32:16pass it because it's fruitless at this

1:32:18point. It's 10 to one.

1:32:21Well, I mean, if you want to be on

1:32:22record as no, it's not a big deal. We

1:32:23don't have to discuss it at length in

1:32:25there. Just hear it and vote our way and

1:32:27move on.

1:32:28>> We don't need to have the hearing. It's

1:32:30fine.

1:32:31>> Okay.

1:32:36[snorts]

1:32:42Commissioner will read it. Thank you.

1:32:46Thank you.

1:32:49>> Agenda item five is a request for

1:32:51modification of conditions to a

1:32:52conditional use permit for religious use

1:32:54to modify the previously approved

1:32:55concept plan and building elevations.

1:32:58This site contains a Crescent Community

1:32:59Center which has been in operation on

1:33:01this site since 2020. On September 24th

1:33:05of 2013, a conditional use permit for

1:33:07religious use was granted on this

1:33:08property to develop the site with a

1:33:1012,300T worship center. The conditions

1:33:12specified that the site be developed in

1:33:14substantial conformance to the

1:33:15conceptual site plan and building

1:33:17elevations. Therefore, a modification of

1:33:19conditions is required for their

1:33:20proposed additions. The applicant

1:33:22intends to increase the size of their

1:33:24community center building to add a

1:33:267,800t Sunday school area, a 7,900 ft²

1:33:29family social hall and kitchen area, a

1:33:314,000t sanctuary edition, and a 4,000t

1:33:34administrative space addition.

1:33:36Additionally, the applicant is proposing

1:33:38to construct a 4200 square footston

1:33:40children's playground, a 4,700 foot

1:33:42multi-purpose sports court, and 249 new

1:33:45parking spaces. The proposed additions

1:33:47will match the architecture, materials,

1:33:49colors, and height of the existing

1:33:51building. The parking requirement will

1:33:53be met and exceeded on site. The request

1:33:56for modification of conditions is in

1:33:58staff's opinion acceptable. The site

1:34:00falls within the courthouse context area

1:34:01princess commons and agriculture

1:34:03non-place type which calls for the

1:34:05continuation of low impact and

1:34:06lowintensity businesses and activities

1:34:08that help diversify the city's economy

1:34:10and culture. The proposed expansion will

1:34:12be a continuation of the existing

1:34:13community use and will be consistent

1:34:15with the one-story height and

1:34:16architectural character of the existing

1:34:18building. Staff does not anticipate any

1:34:20adverse impacts to the surrounding

1:34:21property owners as a result of this

1:34:23request. In order to mitigate any

1:34:24potential impacts of the multi-purpose

1:34:26sports court, staff has recommended

1:34:27condition eight to limit the use of the

1:34:29multi-purpose sports court to daylight

1:34:30hours and condition nine to prohibit the

1:34:33use of the court for pickle ball. Since

1:34:35this property is located within the

1:34:36inter facility traffic area, it was

1:34:37recommended by staff that the applicant

1:34:39appear before the TITACAC.

1:34:41The applicant appear before the

1:34:43committee on September 3rd and they

1:34:44voted unanimously to recommend support

1:34:46of this proposal. And again, staff is

1:34:48recommending approval of this request

1:34:50subject to the conditions listed in the

1:34:51staff report.

1:34:56Um

1:34:58the I went to the site visit and the

1:35:00only concerns I had were the u the BMP

1:35:04and storm water but um Alexis is um

1:35:09confirmed my or assured my concerns

1:35:12about that. So I think we're good to go.

1:35:14Okay. Consent.

1:35:17>> Will you read it?

1:35:30>> Good morning again. Item number seven is

1:35:33a request by BB Investments LLC and

1:35:35they're requesting a conditional

1:35:37resoning from B2 Community Business

1:35:39District to conditional A18 apartment

1:35:42district to develop the 1.66 66 acres

1:35:45with a 23 unit town home style

1:35:47condominium development. This is

1:35:49resulting in a density of 13.9 units per

1:35:53acre. The property is located along

1:35:55Baker Road and is currently developed

1:35:57with a daycare center on one lot and a

1:35:59commercial office complex on the other.

1:36:02As depicted on the profer conceptual

1:36:04site plan, the proposed development

1:36:06consists of five three-story buildings,

1:36:09including three buildings with four

1:36:10units, one building with five units, and

1:36:13one building with six. Vehicle access to

1:36:16the development will be provided by a

1:36:18shared driveway from Baker Road. The

1:36:20site will have a maximum lot coverage of

1:36:2241.8% 8% which is complies with the 50%

1:36:26maximum allowed in the A18 for multi for

1:36:29multi multifamily dwellings. The

1:36:32applicant proposes street frontage and

1:36:34building foundation landscaping along

1:36:36Baker Road as well as interior parking

1:36:38lot landscaping throughout the site

1:36:40which satisfies the requirements of the

1:36:42zoning and site plan ordinances as

1:36:44[snorts] shown the proper elevations and

1:36:46renderings. The proposed buildings will

1:36:48consist of materials consisting of

1:36:50premium vinyl siding, premium vinyl

1:36:52board and batten, white PVC trim, black

1:36:55vinyl windows, and a Greystone veneer

1:36:58water table. The buildings will have a

1:37:00maximum height of 33 feet and 8 in,

1:37:03which is below the maximum 35 ft

1:37:05permitted in the A18. Rightway

1:37:07improvements are proposed consistent

1:37:09with the city's act active

1:37:11transportation plan, improving the

1:37:13existing sidewalk along Baker Road to an

1:37:158 foot wide side path along the entire

1:37:18frontage of the site. Additionally, an

1:37:208-ft tall panel style vinyl fence PVC

1:37:24fence and a earth tone color is proposed

1:37:27as well as a 5-ft tall freestanding

1:37:29monument sign at the entrance of the

1:37:31development. and it the the sign will

1:37:34have the required landscaping

1:37:36surrounding the sign as [snorts]

1:37:37specified in section 203B 11.1 of the

1:37:40zoning ordinance. A reduced parking

1:37:42requirement of 1/ half space for a

1:37:44dwelling unit is permitted for

1:37:46developments located within 1/ half mile

1:37:48of a covered bus stop. A covered bus

1:37:50stop is proposed along Baker Road

1:37:53adjacent to the site. However, there is

1:37:55no specific timeline. There is a CIP

1:37:58project under review and I reached out

1:38:00to the project manager. It could be nine

1:38:02months. It could be two to three years.

1:38:04So, we don't know. And so, since the

1:38:06covered bus stop is not currently there,

1:38:09they could not utilize the reduced

1:38:10parking. However, each unit will include

1:38:13one and a half garage and two in a

1:38:16twocar garage and a twocar driveway with

1:38:18an additional six guest parking spaces

1:38:21provided throughout the site. Therefore,

1:38:23the proposed development provided

1:38:25throughout the development proposed

1:38:27development exceeds the zoning

1:38:29requirements for parking um on the site.

1:38:31Overall, staff finds that the proposed

1:38:33conditional resoning request provides an

1:38:35appropriate redevelopment opportunity

1:38:37for the commercially developed site and

1:38:39introduces a residential development

1:38:41pattern that is compatible with the

1:38:43surrounding type 2 neighborhood context.

1:38:46the proposed density, town home style

1:38:49building form, the building height,

1:38:50parking, landscaping, architectural

1:38:53materials, and Baker Road pedestrian

1:38:55improvements. Collectly provide a

1:38:57development that is appropriately scaled

1:38:59and designed for the surrounding area.

1:39:01For these reasons, staff recommends

1:39:03approval of the request subject to the

1:39:05proper listed in your staff report.

1:39:07Staff is unaware of any opposition and

1:39:09we don't have any registered speakers at

1:39:11this time.

1:39:13Yes,

1:39:15>> Michelle. I What is this uh what's the

1:39:19setback distance off of Baker? When I

1:39:21went there, I couldn't

1:39:23get it.

1:39:24>> So, in the A18 is a 30 foot setback.

1:39:28>> So, they're not pulling them any closer,

1:39:30but there's some landscaping there.

1:39:32>> Okay. Thank you.

1:39:33>> Sure.

1:39:34>> Commissioner Mos and Commissioner

1:39:35Anderson. Not that it really matters uh

1:39:37because there's plenty of capacity, but

1:39:38I was just curious to see how they got

1:39:40to the one student per um elementary,

1:39:43one student per middle, and one student

1:39:45per high high school. Um

1:39:48doesn't doesn't need to be really

1:39:50discussed, but I was just maybe later. I

1:39:54was just curious about how they got

1:39:56that. So as an estimate of course they

1:39:58won't be able to actually give real

1:40:00numbers until the development is

1:40:02provided and then at that time they do

1:40:05another evaluation to make sure that

1:40:07everything is that the schools and if

1:40:09they have to make any adjustments to

1:40:11where the kids are going or if they have

1:40:13to add maybe a trailer or something they

1:40:15do that evaluation once they get there.

1:40:17>> Thank you.

1:40:18>> Sure.

1:40:20>> Anderson you know what my question is

1:40:22going to be.

1:40:23>> Yes. about the fence. Even though that

1:40:26it's going to be an earth tone style

1:40:27fence and they added a note there, even

1:40:30though that shows white, it's not going

1:40:32to be white. There is a note that says

1:40:34>> you're not as reluctant for white on

1:40:36this location, but the earth tone will

1:40:39tie in better with their materials that

1:40:42were they're putting on the building.

1:40:44>> So, just look at the picture as the

1:40:45style of the fence, the color.

1:40:48>> Yeah, it's it's just blinding. Purple

1:40:51tie-dye fence is a perfect location.

1:40:54[laughter]

1:40:58>> What are you trying to say? [laughter]

1:41:01>> You cracked me up.

1:41:04[snorts]

1:41:04>> You heard any the forest.

1:41:06>> Thank you. This is this is my district.

1:41:08I haven't heard any opposition and I do

1:41:11believe it complies with the

1:41:12comprehensive plan that calls for mixed

1:41:14use and higher density. Unfortunately,

1:41:17it doesn't have the mixeduse element,

1:41:19but at least it does have the higher

1:41:20density and increased housing and

1:41:23appears to be affordable housing,

1:41:24although not workforce. Commissioner

1:41:26Bjani, could you read it for me? Thank

1:41:29you.

1:41:37>> All right. The next item is item number

1:41:39eight and this is a request from Rama TC

1:41:42LLC and this is a conditional resoning

1:41:44from B3 central business district to

1:41:46conditional B4 mixed use with a

1:41:48workforce housing overlay. You may

1:41:49remember this application um it was

1:41:52deferred indefinitely a couple of

1:41:54meetings ago. The applicant is

1:41:56requesting an indefinite deferral um

1:41:59because they want to revise the plans.

1:42:03um staff reached out to them and let

1:42:05them know about the reduced set um

1:42:07parking requirements because there is a

1:42:09covered bus stop within this area. So,

1:42:11they're able to reduce the parking and

1:42:14lower the stories of the building. So,

1:42:16they want to make those revisions and

1:42:17come back for you as soon as possible.

1:42:19Yes. uh with that deferral um I noticed

1:42:23on one of the pictures um and I don't

1:42:25know what the age group limit on for the

1:42:29uh child care um can you guys can staff

1:42:35>> what's that

1:42:37>> this is on item eight

1:42:38>> oh okay I'm sorry

1:42:41>> any other questions about this one this

1:42:43is an indefinite deferral

1:42:44>> oh okay sorry

1:42:48>> and I will say for my two items that are

1:42:50indefinite deferral. This one and the

1:42:52tide water structures the applicants

1:42:53won't be here but they do have the

1:42:55letters on file so you don't have to

1:42:56call them.

1:42:57>> Thank you.

1:43:06>> Moving too fast.

1:43:18Good morning everyone. Agenda item nine

1:43:21is a request for a conditional use

1:43:23permit for a family daycare home for up

1:43:25to 12 children within an existing single

1:43:27family dwelling. The applicant proposes

1:43:30caring for children ages 2 to 5 in a

1:43:32monastery inspired environment focused

1:43:33on independence, creativity, and school

1:43:35readiness. The daycare will be operated

1:43:38by the applicants with no additional

1:43:39staff. Proposed hours of operation are

1:43:416:30 a.m. to 5:30 p.m. Monday through

1:43:44Friday with staggered drop off and

1:43:45pickup times to reduce congestion in the

1:43:47rideway. The applicant is also actively

1:43:50pursuing licensing with the Department

1:43:52of Education.

1:43:54The fenced in grass backyard will serve

1:43:56as the outdoor play area. An above

1:43:58ground pool and deck are located in the

1:44:00backyard and the applicant proposes

1:44:01installing a 4ft tall metal gate to

1:44:04restrict access to the area. Conditions

1:44:06eight and nine are recommended to ensure

1:44:08the pool area remains properly enclosed

1:44:11fence and fencing is maintained.

1:44:14Community outreach was done by the

1:44:15applicant which included two rounds of

1:44:17letters sent to the surrounding property

1:44:19owners. Staff has received one letter of

1:44:22support as well as five letters of

1:44:24opposition with concerns relating to

1:44:26traffic, property value, safety, and

1:44:28noise. Staff is recommending approval

1:44:30subject to the conditions in the staff

1:44:32report.

1:44:36Mr. Plumbley,

1:44:37>> is there anyone signed up to speak?

1:44:39>> No, there are no speakers.

1:44:40>> Um,

1:44:42I kind of had when I went there, it it's

1:44:45a very um quiet street. Um, I kind of

1:44:50observed it for a little while. That

1:44:52corner is interesting because it both

1:44:54slows traffic down, but it's also kind

1:44:56of a blind curve in a way when you're

1:44:58coming around this. But there,

1:45:00everything's fenced and and it's going

1:45:02to be

1:45:04Thank you.

1:45:07>> Yeah, this is my district. I would like

1:45:09to have the hearing on this one.

1:45:12I have some questions for the applicant

1:45:14based on the letters.

1:45:24Agenda items 10 and 11 are requests for

1:45:27a conditional use permit for a tattoo

1:45:29parlor in a body piercing establishment

1:45:31within a 1500 ft² unit of an existing

1:45:34shopping center. Proposed hours

1:45:35[clears throat] of operation are 10:00

1:45:37a.m. to 7:00 p.m. daily primarily

1:45:39operated by scheduled appointments.

1:45:41However, limited walk-in services will

1:45:42be offered on designated days. The

1:45:44applicant is proposing up to eight

1:45:46employees. A Sunchild studio sign is

1:45:49proposed at the front entrance. A

1:45:51separate sign permit will be required

1:45:52and must comply with the city zoning

1:45:54ordinance. No other exterior

1:45:56modifications are proposed per section

1:45:59203 of the zoning ordinance. Six parking

1:46:01spaces are required and approximately

1:46:03115 are available within the shared law

1:46:05exceeding the requirement. Parking is

1:46:08shared amongst other commercial uses

1:46:09including retail, grocery, and eating

1:46:11and drinking establishments.

1:46:14The proposed uses are compatible not

1:46:16only with the comprehensive plan special

1:46:18use business place type, but also with

1:46:20the uses already present within the

1:46:22shopping center and represent an

1:46:23appropriate reuse of a vacant unit.

1:46:26Staff recommends approval subject to the

1:46:28conditions in the staff report.

1:46:34>> I haven't heard from anybody

1:46:39about it. So consent. Will you read it?

1:46:43Thank you.

1:46:47>> Agenda item 12 is a request for a

1:46:49conditional use permit for a residential

1:46:51kennel for up to six dogs within an

1:46:54existing single family dwelling on a

1:46:551.09 acre parcel.

1:46:58The applicant is seeking approval solely

1:47:00to house her personal pets. No

1:47:02commercial kennel or boarding operations

1:47:04are proposed. The applicant currently

1:47:07houses four dogs on site, which is the

1:47:08maximum permitted by right, and wishes

1:47:10to obtain one or two more. All dogs will

1:47:14reside within the existing single family

1:47:16dwelling and will only be outside for

1:47:18bathroom breaks and fresh air. The

1:47:20backyard is fully fenced that includes a

1:47:21second interior fence that provides an

1:47:23additional layer of containment. No

1:47:25exterior modifications are proposed.

1:47:28The applicant conducted outreach to

1:47:30nearby property owners and staff

1:47:32received four letters of support as well

1:47:34as two letters of opposition.

1:47:36Staff recommends approval of the request

1:47:38subject to the conditions in the staff

1:47:40report.

1:47:44>> District here

1:47:45>> have any speakers?

1:47:47>> There are no speakers signed up.

1:47:49>> Okay. Consent

1:47:51commissioner. Um uh I spoke with uh

1:47:54Holly yesterday morning and as of

1:47:57yesterday morning she had not heard from

1:47:59anybody. So she felt uh consent was

1:48:03>> um good. [snorts]

1:48:04>> Are are these this is the application we

1:48:07received to recent communications about

1:48:10of concern was primarily noise but

1:48:12they've not speak.

1:48:14>> Yeah. I don't know they that came in

1:48:16after I spoke with Holly.

1:48:20[snorts]

1:48:22Commissioner Cromwell, can you read

1:48:24that?

1:48:25>> Sure.

1:48:26>> Thank you. Holl's out.

1:48:28>> If anyone doesn't know, Holly's in

1:48:31Richmond at the recent

1:48:35yesterday of her sister-in-law.

1:48:42Agenda item 13 is request for a

1:48:44conditional use permit for a

1:48:45three-bedroom short-term rental at 511st

1:48:47Street. The three-bedroom dwelling

1:48:49requires three off- streetet parking

1:48:51spaces. The site currently contains a

1:48:53threecar gravel parking pad. The

1:48:55existing parking pad and gravel do not

1:48:57meet the public works design standards.

1:48:59As such, condition two has been

1:49:01recommended that a driveway shall be

1:49:02installed and designed in accordance

1:49:04with all applicable city standards with

1:49:06an approved driveway permit prior to the

1:49:08issuance of the first short-term rental

1:49:09annual permit. The site has no prior

1:49:12zoning complaints, is currently

1:49:14advertised, and the last known

1:49:15documented stay was June 1st of 2026.

1:49:18Based on the considerations, staff is

1:49:20recommending approval of this request

1:49:21subject to the conditions listed in the

1:49:23staff report.

1:49:26Mr.

1:49:28>> So because I didn't bring the map, but

1:49:32my understanding is council wants to

1:49:35send back to us the consideration of the

1:49:38mat that we heard before,

1:49:42not to uh increase back, but to shrink

1:49:46further.

1:49:48Um, and the idea is there's a concern

1:49:51over the continuity with that

1:49:53neighborhood with the lobe. If you were

1:49:56looking at it, the one that sticking up

1:49:58to the right, [snorts] pull that back

1:50:01down um towards the ocean front.

1:50:06And the only concerns I hear about these

1:50:08types of Well, let me let me go back. Is

1:50:11this within the map? Um Um, do you know?

1:50:14>> I do not know. I without having it in

1:50:16front of me, I can't say definitively.

1:50:18>> You can look because I'm going to ask

1:50:19for both of these to be heard uh um

1:50:22these coming up because they're on these

1:50:25half streets and that's where the

1:50:27complaints have come the most. So, I'm

1:50:29going to want to talk to the applicant

1:50:31about the activity on these half streets

1:50:33and I'd like to know where these are

1:50:36within the map that we've got. Kathy may

1:50:39know,

1:50:40>> would we fall into some sort of a

1:50:43strange area if we're taking into

1:50:45consideration the future map and not

1:50:47what we currently have in place? And I

1:50:49don't want to not have the conversation.

1:50:52I just

1:50:52>> I'll be strange about it. Go ahead.

1:50:55>> So, and I can get some help here from

1:50:57Tori, but we just don't know what the

1:50:59boundary is going to be yet.

1:51:00>> Okay. So, where does this fall within

1:51:04the map that we looked at and approved?

1:51:07It remains in the overlay.

1:51:09>> It is within the proper overlay. Both

1:51:12this one and the next

1:51:13>> the most recent that you've seen. Yes.

1:51:15>> All right. That's what I want.

1:51:17>> All three iterations that have

1:51:19>> It's still in the overlay. Both of them.

1:51:21Thank you.

1:51:22>> I still want to hear it. Okay.

1:51:26>> I'm very clear.

1:51:28[laughter]

1:51:30The final item is item 14, a request for

1:51:33a conditional use permit for a

1:51:34three-bedroom short-term rental at

1:51:354142nd and a half street. The

1:51:38three-bedroom short-term rental is

1:51:39required to have three off- streetet

1:51:40parking spaces. The site has a onecar

1:51:42garage, and the applicant has submitted

1:51:44an intent to lease off-site parking

1:51:46agreement to lease two parking spaces at

1:51:48the Jungle Golf commercial parking lot,

1:51:49which is located 0.16 miles from the

1:51:52site. The site has no prior zoning

1:51:54complaints is currently advertised and

1:51:55the last known documented stay was June

1:51:5721st, 2026. Based on the considerations

1:52:00above, staff is recommending approval of

1:52:02this request subject to the conditions

1:52:03listed in the staff report.

1:52:05[clears throat]

1:52:09>> Yes. Thank you.

1:52:14>> On the last item,

1:52:15>> the minutes.

1:52:17Yes, sir.

1:52:18So, I'd like to confirm uh where people

1:52:21are on the minutes. Uh, Commissioner

1:52:23Anderson, you were absent from last

1:52:25month's formal and informal. Do you want

1:52:28to abstain or vote?

1:52:30>> Abstain.

1:52:31>> All right. With regard to the site

1:52:33visits, uh, Commissioners Anderson,

1:52:36Quayar, Mous, and Plumbley, what would

1:52:38you like to do? Are you going to vote or

1:52:40abain?

1:52:42>> Abstain. Abstain. Abstain. And of

1:52:45course, Commissioner Quayar is not here.

1:52:48Um, I was not present at the site visit,

1:52:50but I did familiarize myself with what

1:52:53was discussed by talking with people who

1:52:55were there and the minutes. And I'm

1:52:57satisfied that I can make the motion and

1:52:59cast a vote.

1:53:01So,

1:53:04>> vice chair, you ready?

1:53:06>> I think so. Um, so there is one matter

1:53:10requesting to be withdrawn. That's

1:53:12agenda item one. There are no items

1:53:15requesting deferral for a certain number

1:53:18of days. There are two items requesting

1:53:21indefinite deferral. Agenda items three

1:53:24and eight. There are eight items

1:53:28scheduled to be included on the consent

1:53:30agenda.

1:53:32Agenda items 2, 4, 5, 6, 7, 10, 11, and

1:53:3812. There are three items to be heard.

1:53:42Agenda items 9, 13, and 14. There are

1:53:47several sets of minutes that

1:53:49Commissioner Camp will read.

1:53:54>> Thank you, Vice Chair.

1:53:56>> One question. Are we going right into

1:53:59our retreat following the uh meeting? Is

1:54:02that the plan?

1:54:03>> As long as it begin.

1:54:06>> Okay. Thank you.

1:54:07>> And will will the retreat be televised?

1:54:12It will not.

1:54:12>> It will not.

1:54:13>> Okay.

1:54:14>> And we will be back in here.

1:54:16>> Can I ask why it will not be televised?

1:54:19>> It's just a little bit more complicated

1:54:21in this room and requires additional

1:54:23staff other than just the planning

1:54:25department. And since we were unsure of

1:54:28timing, um we asked not to have it

1:54:36>> and it is but it is open to the public.

1:54:41Hearing will begin at noon. Meeting a

1:54:43journal

1:54:46briefings

1:55:04commission.

1:55:06My name is John.

1:55:10>> My name is John C and I'm the chair of

1:55:12the Virginia Beach Planning Commission.

1:55:14Commissioner Quayar will not be with us

1:55:16today. Uh before we get started, I have

1:55:20asked Commissioner March to lead us in

1:55:22the pledge of allegiance.

1:55:28>> I pledge allegiance to the flag of the

1:55:31United States of America and to the

1:55:33republic for which it stands, one nation

1:55:37under God, indivisible, with liberty and

1:55:40justice for all.

1:55:49At this time, we will introduce the

1:55:50planning commissioners, beginning with

1:55:52the city attorney, followed by the

1:55:54planning administrator, Mrs. Caitlyn

1:55:57Alcock, who will introduce members of

1:55:59staff.

1:56:02>> Tory Eisenberg, deputy city attorney.

1:56:05>> Michael Mach, I have the pleasure of

1:56:06serving the city as the atlarge

1:56:07representative.

1:56:09>> Walter Camp, representing district 1,

1:56:11Kempsville.

1:56:13John Cromwell, District 2, Pungville and

1:56:16Blackwater.

1:56:17>> Hi, Mike Anderson. Represent District

1:56:19Three.

1:56:21>> Katherine Ber, District 4, which

1:56:23includes Virginia Beach Town Center,

1:56:25Burton Station, and all the way up to

1:56:27the Northolk border.

1:56:29>> John Cen, uh, uh, District 9.

1:56:34>> Katherine Skunover, District 5. Brian

1:56:37Plumbley representing beautiful district

1:56:396 from um historic SeaC to the north end

1:56:42of Virginia Beach.

1:56:44>> Susan Hippen, district 7, Centerville.

1:56:47Um Glennwood,

1:56:50Nina Moriani, District 10.

1:56:55>> Caitlyn Alco, planning administrator.

1:56:56Clerking. To my left, we have Brian

1:56:58Harrison and Grace Smith. In the

1:57:00audience, we have planning director

1:57:01Kathy Walsh, deputy director Carrie

1:57:03Bookholt, our zoning administrator

1:57:04Hannah Sabbo. With our planning staff,

1:57:06we have Marshall Coleman, Alexis Bailey,

1:57:08and Ariana Low.

1:57:11>> Thank you very much. Madame Clerk, can

1:57:13you please describe the rules and order

1:57:15of business for today's meeting?

1:57:17>> Yes, Chair Cen. The Virginia Beach

1:57:19Planning Commission takes pride in being

1:57:21fair and courteous to all parties in

1:57:23attendance. It is important that all

1:57:24involved understand how the commission

1:57:26normally conducts its meetings. It is

1:57:28equally important that everyone treat

1:57:29each other and the members of the

1:57:30commission with respect and civility.

1:57:32request that cell phones be put on

1:57:34silent during this meeting. This is an

1:57:36abbreviated explanation of the rules.

1:57:38The complete set of rules is located in

1:57:40the front of the planning commission

1:57:41agenda. Following is the order of

1:57:43business for this public hearing.

1:57:44Withdrawals and deferrals. The

1:57:46chairperson will ask if there are any

1:57:48requests to withdraw or defer an item on

1:57:49the agenda. Consideration of these

1:57:51requests will be made first. Consent

1:57:53agenda. The second order of business is

1:57:55the consideration of the consent agenda

1:57:57which are those items that the planning

1:57:59commission believe are unopposed and

1:58:01which have favorable staff

1:58:02recommendation.

1:58:04Regular agenda. The commission will then

1:58:06proceed with the remaining items on the

1:58:08agenda. When an agenda item has been

1:58:10called, we will recognize the applicant

1:58:11or the representative first. Following

1:58:13the applicant or the representative,

1:58:15inerson speakers will be called next and

1:58:17then the speakers participating via

1:58:18WebEx. Speakers shall be called in order

1:58:21of their registration. Speakers in

1:58:23support or opposition of an item will

1:58:25have three minutes to speak per item

1:58:27unless they are solely representing a

1:58:29large group such as a civic league or

1:58:31homeowners association in which case

1:58:32they will have 10 minutes per item.

1:58:35Individuals representing a group should

1:58:36identify the group of each individual

1:58:38they representing. If a speaker

1:58:40participating via WebEx does not respond

1:58:42or if a technical issue occurs which

1:58:44renders the comments unintelligible,

1:58:46we'll move on to the next speaker or the

1:58:48next order of business. After all

1:58:50speakers have spoken, the applicant may

1:58:51return to the podium and we will have

1:58:53three minutes to offer a rebuttal and

1:58:55answer questions to the commission.

1:58:57Discussion among the commission members

1:58:58will follow. No further public comment

1:59:00will be heard at that point. Please note

1:59:02that the actions taken by the commission

1:59:03today are in the form of a

1:59:04recommendation to the Virginia Beach

1:59:06City Council. The final decision to

1:59:08approve or disapprove an application may

1:59:10be will be made by the city council. The

1:59:12commission thanks you for your

1:59:13attendance and we hope that you

1:59:14experience your experience here today

1:59:16leaves you feeling that you have been

1:59:17heard and treated fairly. Thank you.

1:59:21>> Thank you, Madam Clerk. Next order of

1:59:23business is the consideration of request

1:59:25to withdraw or defer an item.

1:59:27>> Mr. Chairman, um the city of Virginia

1:59:29Beach has requested a withdrawal of the

1:59:32um modification of the map for

1:59:34short-term rental overlay district. And

1:59:36I would move to approve that withdrawal.

1:59:40>> We have a second.

1:59:41>> Second.

1:59:43It has been moved by Commissioner

1:59:44Plumbley and seconded by Commissioner

1:59:47Anderson that this item be withdrawn.

1:59:50Uh are there any one is there anyone

1:59:52abstaining from this item?

1:59:58>> The vote is open.

2:00:11Commissioner Cromwell, your vote.

2:00:14>> My screen's not working on vote day

2:00:17or I, excuse me.

2:00:22>> By recorded vote of 10 to zero, item one

2:00:25has been recommended for withdrawal.

2:00:29[clears throat]

2:00:29>> Our next order of business is

2:00:30consideration of items to be deferred.

2:00:34>> Sorry, Mr. Chair. Sorry to interrupt.

2:00:36>> Please come forward if you have any

2:00:38items to be deferred.

2:00:39>> It's my understanding the two requests

2:00:41for deferral, there's no one here um to

2:00:43represent them on that, but I want to go

2:00:45ahead and make a motion to approve items

2:00:47three and eight for indefinite deferral,

2:00:50which is the request.

2:00:52>> Second.

2:00:54>> It has been moved by Commissioner

2:00:55Plumbley and seconded by Commissioner

2:00:57Ber that these items be withdrawn

2:01:01indefinitely.

2:01:03>> Deferred.

2:01:04>> Deferred. Yes, sir. [clears throat]

2:01:12>> Madam clerk,

2:01:16[clears throat]

2:01:18>> the vote is open

2:01:32by a recorded vote of 10 to zero. Items

2:01:34three and eight have been recommended

2:01:35for indefinite deferral.

2:01:38>> Thank you. The next order of business is

2:01:41the consent agenda and I'm going to turn

2:01:43that over to the vice chair to run this

2:01:45portion of the meeting.

2:01:47>> Thank you, Chair Cen. In addition to the

2:01:50minutes today, we have six items on the

2:01:53consent agenda. These are applications

2:01:56that are recommended for approval by

2:01:58staff and the planning commission

2:01:59concurred. and there are no speakers

2:02:01signed up in opposition.

2:02:04The first item for consideration today

2:02:06are the several sets of minutes of

2:02:08planning commission and I've asked

2:02:10Commissioner Camp to read these into the

2:02:12record.

2:02:13>> Thank you, Madame Vice Chair. This

2:02:15portion of the consent agenda consists

2:02:17of a motion to approve draft minutes as

2:02:20amended by the commission for three

2:02:22planning commission meetings.

2:02:24Specifically, the informal and formal

2:02:27hearings that were held on September 9,

2:02:292026 with Commissioner Anderson

2:02:32abstaining because he was absent and

2:02:35[snorts] the site visits held on October

2:02:378th, 2026 with Commissioners Anderson,

2:02:41Mous, and Plumley abstaining. That

2:02:43completes this item. So moved.

2:02:46>> Second.

2:02:51>> Thank you, Commissioner Camp.

2:02:54The next item on the consent agenda is

2:02:57item two, LBC Ventures LLC. Is there a

2:03:02representative here to speak on this?

2:03:05>> I believe, vice chair, that there is a a

2:03:08condition

2:03:09>> um that the applicant does not want to

2:03:11approve on consent.

2:03:13>> Yeah, we Based on what you all discussed

2:03:15in the informal, if you're putting on

2:03:18consent based on the conditions, we

2:03:19would like it pulled, please.

2:03:21>> So, you do not agree to your client does

2:03:25not agree to the conditions, in which

2:03:27case we will remove you from the consent

2:03:29agenda and have that matter heard.

2:03:31>> Yes, ma'am.

2:03:32>> Thank you, Attorney Bordon. The next

2:03:35item on the consent agenda is item

2:03:39number six

2:03:42and that is Crescent Community Center

2:03:44Corporation. Is there a representative

2:03:46here today to speak on that?

2:03:50>> Welcome back, Attorney Berdon.

2:03:55>> For the record, Eddie Berdon, Virginia

2:03:56Beach attorney representing Crescent

2:03:58Community Center Corporation. I had the

2:04:00privilege of representing them 13 years

2:04:03ago with the original use permit which

2:04:05had a bit of controversy attached to it

2:04:07but they've been very very good

2:04:08neighbors and wellreceived and uh we all

2:04:11the conditions as recommended all 11 of

2:04:13them are acceptable and appreciate

2:04:14Alexis's work on it and appreciate being

2:04:16put on the consent agenda. Thank you.

2:04:19>> Thank you sir. You may be seated. Um is

2:04:22there any opposition to this item being

2:04:24put on the consent agenda?

2:04:27Hearing none. I've asked Commissioner

2:04:29Cromwell to read it into the record.

2:04:32>> This application comes to us at 2480

2:04:35Salem Road.

2:04:38The applicant is requesting a

2:04:40modification of conditions to a

2:04:42conditional use permit for religious use

2:04:45to modify the previously approved

2:04:47concept plan and building elevations on

2:04:50a on this 9.16

2:04:52acre AG2 agricultural district zone

2:04:55parcel located within the inter facility

2:04:58traffic area. The site contains the

2:05:01Crescent Community Center which has

2:05:03operated on this site since 2020. The

2:05:06proposed additions will match the

2:05:08architecture, materials, colors, and

2:05:10height of the existing building. Hearing

2:05:13no opposition to this, we approved it

2:05:16for the consent agenda.

2:05:19>> Thank you, Commissioner Cromwell. The

2:05:21next item on the consent agenda is item

2:05:24number seven, VB Investments LLC. Is

2:05:28there a representative here today?

2:05:32>> Welcome back, Attorney Bordon. Are the

2:05:34conditions acceptable? Yes, they are.

2:05:36It's profered. And I wanted to mention

2:05:38since it was brought up in the informal,

2:05:41my client will be meeting with um

2:05:43housing and we are hopeful that some

2:05:46some of these units will be um

2:05:48affordable under the city's program.

2:05:52>> Appreciate being on the consent agenda.

2:05:53Thank you.

2:05:54>> Thank you. You may be seated. Is there

2:05:56any opposition to this item being added

2:05:58to the consent?

2:06:01Hearing none, I've asked Commissioner

2:06:03Morjani to read it into the record.

2:06:06>> The applicant VB Investments LLC is

2:06:08requesting to reszone the current

2:06:10property located on 700 and 724 Baker

2:06:14Road from B2 Community to conditional

2:06:17A18 apartment district to develop a 23

2:06:20unit multifamily condominium community.

2:06:23We have received no opposition.

2:06:24Therefore, we have placed it on the

2:06:25consent agenda.

2:06:28>> Thank you, Commissioner Morjani.

2:06:31The next items are together agenda items

2:06:3410 and 11 and that is Brandon Aetta. Is

2:06:39there a representative here today?

2:06:46>> Thank you. Please state your name for

2:06:47the record.

2:06:49>> My name is Adrian Iicata. Uh

2:06:50Representative Brandon ITA.

2:06:53>> All right. And um are the conditions

2:06:56acceptable?

2:06:57>> Yes, ma'am.

2:06:58>> Thank you. You may be seated.

2:07:01Is there any opposition to this matter

2:07:03being placed on the consent agenda?

2:07:08Hearing none, I've asked Commissioner

2:07:10Anderson to read these into the record

2:07:12collectively.

2:07:14>> Thank you, Madam Vice Chair. Uh this

2:07:16applicant uh for a conditional use

2:07:19permit for a tattoo parlor and a body

2:07:21piercing located at 481 South Linhaven

2:07:24Road has uh requested a conditional use

2:07:27permit to operate a tattoo parlor and

2:07:29body piercing establishment within a

2:07:311500 ft² unit of an existing B2

2:07:34community business zone shopping center.

2:07:37Business business will employ up to

2:07:39eight employees. the proposed hours for

2:07:41operation from 10 to 10:00 a.m. to 7:00

2:07:44p.m. daily. Primary operating with

2:07:46scheduled appointments. However, limited

2:07:48walk-in service will be offered on

2:07:51designated days. Um there is no

2:07:54opposition to this application. So, we

2:07:56put uh put it on the uh consent agenda.

2:07:59>> Thank you, Commissioner Anderson.

2:08:02The next item is item 12 and that is Zoe

2:08:08Malay Ducas, property owner. Is there a

2:08:12representative here today?

2:08:17>> Welcome. Please state your name for the

2:08:19record.

2:08:20>> My name is Zoe Ducas. I am the property

2:08:22owner.

2:08:23>> Thank you, ma'am. Are the conditions

2:08:25acceptable?

2:08:26>> Yes. Yes, ma'am.

2:08:27>> Thank you. You may be seated.

2:08:30Is there any opposition to this item

2:08:32being placed on the consent agenda?

2:08:36Hearing none, I've asked Commissioner

2:08:38Cromwell to read it into the record.

2:08:41>> This application comes to us at 312

2:08:44Edinburghough Drive.

2:08:46The applicant is requesting a

2:08:48conditional use permit to operate a

2:08:50residential kennel for up to six dogs

2:08:52within an existing 1826

2:08:56square ft single family dwelling on a

2:08:591.09 acre R10 residential district zone

2:09:03parcel. The applicant is seeking

2:09:05approval solely to house her personal

2:09:09pets. No commercial kennel or boarding

2:09:12activities are proposed and no other

2:09:14animals will be present. All dogs will

2:09:17reside within the existing single family

2:09:20dwelling. Dogs will only be outside for

2:09:22bathroom breaks and fresh air. The

2:09:25backyard is fully fenced and includes a

2:09:27second interior fence that provides an

2:09:30additional layer of containment. Hearing

2:09:32no opposition to this, we placed it on

2:09:34the consent agenda.

2:09:36>> Thank you, Commissioner Cromwell.

2:09:39Chair Cen, that was the last item on the

2:09:42consent agenda. The planning commission

2:09:44places the following applications on the

2:09:47consent agenda. The several records of

2:09:50minutes and agenda items 2, 6, 7, 10,

2:09:5611, and 12.

2:09:59I make a motion that these items be

2:10:02approved by consent.

2:10:04>> Second. Um I do abstain from the one um

2:10:07visit, but I was inquiring with four and

2:10:10five was removed off the um consent.

2:10:12>> That's correct.

2:10:13>> Okay. I just wanted to be clear. Thank

2:10:14you.

2:10:15>> If I could just make one point of

2:10:16clarification, item two was also pulled

2:10:18from the consent agenda.

2:10:21>> Oh, thank you for that correction.

2:10:24>> [clears throat]

2:10:25>> So the remaining items on the consent

2:10:27agenda just for clarity items 6 7 10 11

2:10:32and 12

2:10:36>> hearing there has a motion has been made

2:10:39for approval by commissioner ber vice

2:10:41chair ber and seconded by uh

2:10:44commissioner plumley

2:10:46>> the vote is open

2:10:54by a recorded vote of 10 to zero with

2:10:56all affformentioned abstensions. All

2:10:58affformentioned minutes in items 6, 7,

2:11:0110, 11, and 12 have been recommended for

2:11:04approval by consent.

2:11:08If you had an application that was on

2:11:10the consent agenda today, your request

2:11:13would now be scheduled for an upcoming

2:11:15city council meeting. Staff will contact

2:11:18you about the date. For those applicants

2:11:21on the consent agenda, thank you for

2:11:22your participation and you may remain in

2:11:25the meeting either virtually or in

2:11:27person, but you are free to leave.

2:11:34Our next order of business is a regular

2:11:36agenda. The regular agenda will proceed

2:11:38as follows. Applicant will be given up

2:11:42to 10 minutes to present their item. We

2:11:45will then hear from speakers in support

2:11:47and opposition. The application may then

2:11:50return to the podium for up to three

2:11:53minutes for rebuttal and then answer any

2:11:56questions from the commission.

2:11:58Madame clerk, we are ready for the first

2:12:00item. Our first item is item two, LBC

2:12:03Ventures LLC.

2:12:09>> Mr. Chair, members of the commission,

2:12:10for the record, Eddie Berdon, Virginia

2:12:12Beach attorney representing LBC Ventures

2:12:14LLC. Sorry, we had to pull this from the

2:12:16consent agenda, but um it was not not a

2:12:19secret. Um the I'll start very briefly.

2:12:23Um, since it was on the consent agenda,

2:12:25I won't go into all the hardship, but

2:12:27this the one thing that stands out um is

2:12:30this piece of property was

2:12:31[clears throat]

2:12:32uh first created in 1902. Uh roughly,

2:12:37it's existed for half the time that our

2:12:40country has existed. Uh and it's never

2:12:43been subdivided in spite in spite of the

2:12:46rest of the neighborhood around it

2:12:48pretty much having been done so. Um, the

2:12:52only things that's happened was in 1962,

2:12:54the Commonwealth of Virginia took 5,200

2:12:57plus square feet of the property for

2:12:59Northampton Boulevard. And in 1981,

2:13:03the city of Virginia Beach took 3,277

2:13:06square feet of the property for Hook

2:13:09Lane. So, we have a piece of property

2:13:12that's in an existing long existing um

2:13:17one could probably argue historic uh

2:13:20area of the city. Um and it's a small

2:13:24community. Hook Lane is the essentially

2:13:27the only road in the community. It does

2:13:30have a um a culde-sac that's been

2:13:33created in recent years off the

2:13:35northeast corner of uh the neighborhood

2:13:38uh on a Coral Bay court. Uh the the

2:13:43staff report um indicates that the the

2:13:46lots in the neighborhood are 7500 square

2:13:49feet and greater and that's not exactly

2:13:52accurate. There are a number of lots in

2:13:54this neighborhood that are well under

2:13:567,500 square ft. And the three proposed

2:13:59lots here for which there's really only

2:14:02one variance. That's the um lot in the

2:14:04back, but we'll call it two. This the

2:14:06one in the middle would was approved

2:14:08administratively, but that's fine. Um

2:14:11the these lots are bigger than every

2:14:15other lot in the neighborhood except for

2:14:18two to the west and one to the east of

2:14:21the subject property. Um the the

2:14:23[clears throat] lot on Hook Lane is 100

2:14:25ft wide and contains 10,000 square feet.

2:14:28The other two lots are well in excess of

2:14:32uh 10,000 ft in R 7.5.

2:14:35The um

2:14:39the staff report also indicates

2:14:42incorrectly not in the conditions but

2:14:43what Mr. Camp stated was accurate. It

2:14:46does state on page four that my client

2:14:49submitted a plan. it is that showed a

2:14:52driveway coming to the front lot on Hook

2:14:54Lane from the access that will be shared

2:14:57by the two lots in the back. Um and that

2:15:00never happened. Um never been never been

2:15:03such. So um but the conditions one and

2:15:06six are the conditions that we um have a

2:15:08problem with. the um

2:15:12there are a total of 48 homes, not

2:15:15counting the one that was on this one,

2:15:18um in this neighborhood. And of those

2:15:2048,

2:15:2246 do not have a side loading garage or

2:15:26a garage set back 5T from the front of a

2:15:28house that um has a bigger front facade

2:15:32than the garage. Um, [clears throat]

2:15:36Chesapeake Beach, Ocean Park,

2:15:40Cape Story by the Sea, the north end of

2:15:43Virginia Beach, the Holl's Old Beach,

2:15:45Shadow Lawn, Croatan, Birdneck Lake,

2:15:48Sandbridge Beach, neighborhoods in the

2:15:51city that have some of the most valuable

2:15:54properties residential in the city of

2:15:57Virginia Beach. And those neighborhoods

2:16:02have far far more front-loading garages

2:16:05than anything else. And far far more

2:16:09that are not set back 5t from the front

2:16:13with a side that's in that's not the

2:16:15garage in front of it bigger than the

2:16:18garages. I've built myself with my

2:16:21lovely wife two houses, one in Bneeck

2:16:23Lake and one in Croatan. Both of those

2:16:26houses have garages that sit out well in

2:16:29front of the rest of the house. We

2:16:31happen to be on the water in both cases

2:16:33and that's how we chose. And there are

2:16:35other houses in those neighbor like I

2:16:38say it they exist everywhere. I get the

2:16:41aspirational idea

2:16:43but that's not consistent with the this

2:16:46condition and it's not consistent with a

2:16:49lot of neighborhoods on Shore Drive.

2:16:53So that we we do show a twoft set back

2:16:57further for the garage on the front lot

2:17:00than the than the rest of the house. Uh

2:17:03but it's not five and the rest of the

2:17:04house isn't bigger than the garage. The

2:17:08lots are in small lot subdivisions and

2:17:11what I just let read you a list of other

2:17:14of the Sandbridge um they are 10,000

2:17:17square feet and some are larger. That

2:17:19doesn't change the fact that

2:17:21telling someone that their garage has to

2:17:24be five feet back from the front of the

2:17:26house and the rest of the house has to

2:17:27be bigger than the garage. That's an

2:17:29aspiration. And if you're if you're

2:17:31doing a large lot subdivision in the

2:17:35transition area, which I've represented

2:17:37a few, where we actually did exactly

2:17:39that in the guidelines for that

2:17:41neighborhood for more than one. But

2:17:44that's not what we're dealing with here.

2:17:46We're dealing with an existing

2:17:48neighborhood and all all this this idea

2:17:53does is cause greater expense to a

2:17:58developer who has a beautiful house.

2:18:00You've you've got a copy of it. Um to

2:18:02have to go design a house just for this

2:18:04lot. And I'm sorry, but um we do not

2:18:08agree with condition number six. And we

2:18:11don't agree with condition number one

2:18:13because we were never never planning on

2:18:16adding that to the the driveway. And

2:18:19this street doesn't handle anything. You

2:18:22have to be looking for somebody in this

2:18:23neighborhood. It doesn't cut through to

2:18:25any other neighborhood. It just serves

2:18:27the 40 lots, 48 houses that exist there

2:18:31today. So, we would respectfully request

2:18:34that condition number one be that you

2:18:37approve the plan as it's been submitted

2:18:40in and in including what I passed out or

2:18:42what we've passed out which shows the

2:18:43landscaping. So, this lot in the front

2:18:45will have its own yard, its own fenced

2:18:47in yard and we'll put landscaping

2:18:48between the fence and the driveway

2:18:50that'll serve the two in the back. All

2:18:52the other conditions dealing with shared

2:18:54maintenance and all that. Absolutely

2:18:56perfect. Agree with them 100%. Just

2:18:59those two. number six which should be

2:19:02eliminated in art. We ask that you all

2:19:04recommend it with that elimination and

2:19:06then the um condition one just be

2:19:09modified to be the plan that we've

2:19:11submitted and the only plan that we've

2:19:13submitted. Be happy to answer any

2:19:15questions.

2:19:17>> Are there any questions? I don't we

2:19:18don't have anybody else to speak, do we?

2:19:20>> No one else to speak.

2:19:21>> Okay. So

2:19:22>> I do have questions.

2:19:24>> Um Mr. Remember, Don, as members of the

2:19:27bar, I think we should recognize the

2:19:30passing of Mark Styles. We've not had

2:19:32the chance to talk about it. I was with

2:19:34Judge Lily yesterday. It was such a busy

2:19:37and intense hearing. I didn't have an

2:19:39opportunity to express my condolences,

2:19:41but I want to do that for him, his

2:19:43family.

2:19:44>> Oh,

2:19:45>> the department here that he led for so

2:19:47many years, and the city. So, that's

2:19:49just I didn't want to miss that

2:19:51opportunity.

2:19:52>> Thank you, Mr. way and you're spot on

2:19:56and there there and with less is

2:20:02wonderful person, wonderful judge and

2:20:04did a lot a lot of work with uh with

2:20:07less sandbridge beach and a lot of other

2:20:08other things. Um and Mark is every bit

2:20:13as good a human being if not better than

2:20:15than judge and that's and that but

2:20:17they're in the same they're in the same

2:20:19league. He was one one wonderful and and

2:20:23unfortunately, you know, we lost him way

2:20:26way too soon.

2:20:26>> Very young. Very young.

2:20:28>> But thank you for that. I I appreciate

2:20:30the opportunity.

2:20:32>> I I just wanted to get clear. When I

2:20:34went to the community, it looked like

2:20:36most of the homes had front driveways.

2:20:39Is that is that

2:20:40>> driveways and front garages and and

2:20:44there's actually I counted 15 that don't

2:20:48have garages at all

2:20:50>> and and so it this plan appeared to be

2:20:53to me more in line and less of a

2:20:56deviation than what the city's asking

2:20:57for with the conditions. That was how it

2:20:59appeared to me.

2:21:00>> Correct. There are there are a grand

2:21:02total of two out of 48 houses that have

2:21:06a side loading garage. One is the house

2:21:10next door to this property on the west

2:21:13side where they have it was a beautiful

2:21:15it is a beautiful brick home for which

2:21:17they have added a garage on the

2:21:20northwest corner that was an add-on and

2:21:23then there's a a house on the corner of

2:21:28um Hook Lane and I I they may call it

2:21:31Hook Court but it's the to the east that

2:21:34there's a lot on the corner that has a a

2:21:36newer home for that neighbor.

2:21:37neighborhood. Um, and it has a side

2:21:40loading garage, but it's a side corner

2:21:42lot, so it's easy to do that.

2:21:43>> And, and you've put on the record the

2:21:45only changes you need to those

2:21:46conditions.

2:21:47>> That That is okay.

2:21:50>> Thank you,

2:21:51>> Commissioner Camp.

2:21:53>> Thank you, Mr. Chair. Uh, Attorney

2:21:55Bordon, my question is not for you. It's

2:21:57a question for staff.

2:21:59>> Actually, two questions. Would you be

2:22:02able to tell me when the shore drive

2:22:04design guidelines were adopted?

2:22:09And the related question, which we can

2:22:12look into while we're waiting on that

2:22:14answer, is roughly when were most of the

2:22:17homes here built?

2:22:22>> Uh, good afternoon, commissioners. Uh,

2:22:24for the record, Hank Morrison,

2:22:26comprehensive planning administrator. I

2:22:27don't have the answer to number two, but

2:22:28the design guidelines were uh adopted by

2:22:31council in 2002.

2:22:34>> Thank you, sir.

2:22:34>> Thank you.

2:22:38And with regard to roughly the age of

2:22:41the other homes in the community,

2:22:44>> we're looking for that right now.

2:22:46[snorts]

2:22:47>> It's going to be a minute.

2:22:48>> All right. May I have a followup with

2:22:50Mr. Morrison?

2:22:52>> Sure.

2:22:56>> Mr. Morrison, I know that this

2:22:59particular plan was adopted prior to

2:23:01your arrival uh as our city's

2:23:03comprehensive planning administrator,

2:23:05but would you be able to tell us was the

2:23:08intention of those design guidelines to

2:23:13bring about change in the community

2:23:16versus what had been created organically

2:23:19prior to the adoption of the guidelines?

2:23:23I would I would say that the design

2:23:25guidelines were are an aspirational uh

2:23:29viewpoint into what the community was

2:23:31hoping to achieve as the development

2:23:33continues in the future.

2:23:36>> So what I'm trying to do here with these

2:23:37two questions is to reconcile what we

2:23:40see today and attorney Bordon's comment

2:23:43that what's being asked for in this

2:23:45particular application doesn't align

2:23:48with the rest of what we may see. If the

2:23:50homes were created before the adoption

2:23:52of the guidelines, naturally I wouldn't

2:23:55necessarily expect them to look like

2:23:57what the guidelines say. If they were

2:23:59built more recently at contemporaneously

2:24:03what the guidelines are after, then yes,

2:24:05I would expect them to look more like

2:24:07what the guidelines call for. And that's

2:24:09what I'm trying to understand here. if

2:24:12this application is one more in line

2:24:14with a pattern, although we don't see

2:24:16too many in this older neighborhood, or

2:24:18if this is an exception.

2:24:21Thank you, Mr. Morrison. That's all I

2:24:23had for you. Thank you.

2:24:23>> Thank you.

2:24:24>> Okay. So, we've been able to pull at

2:24:27least a handful of homes and it does

2:24:29range from the 1940s to 2019, more on

2:24:33the 1940s side.

2:24:35So, in general, Director Walsh, would it

2:24:38be reasonably accurate to say that a

2:24:43substantial portion of this neighborhood

2:24:44as we see it today was built out prior

2:24:47to the adoption of the guidelines?

2:24:49>> Yes, sir.

2:24:50>> Okay. Thank you for that clarification.

2:24:58>> Okay. Commissioner Scoonover,

2:25:00>> I move that we approve this application

2:25:03with the request that uh Attorney Berdon

2:25:06requ uh asked us for removing number six

2:25:09and modifying number one to correspond

2:25:11with his application.

2:25:12>> Second.

2:25:14It has been moved by Commissioner

2:25:17Scoover and seconded by Commissioner

2:25:18Plumbley that we approve this item as is

2:25:21the desire of the applicant.

2:25:23>> Is there any time for discussion?

2:25:31If appropriate at this time under

2:25:34discussion, I would like to ask the

2:25:36staff um as I understand it, all

2:25:39applications are run through our traffic

2:25:41department, and I assume there was a

2:25:43reason that they didn't want this side

2:25:46entrance on Hook Lane. I wonder if uh

2:25:50staff could speak to that.

2:25:58And I don't believe that this was a

2:26:00traffic comment. This was based on the

2:26:02shore drive corridor guidelines.

2:26:06>> Is that correct, Hank?

2:26:07>> That's correct. Um so the design

2:26:10guidelines when there's a development of

2:26:12more than one home, they it's encourages

2:26:16the sharing of a driveway. And so um

2:26:19having multiple driveways also creates

2:26:22conflict points for vehicles and

2:26:23pedestrians. So trying to reduce the

2:26:25conflict points and also reduce the

2:26:27amount of impervious surface on the

2:26:29site. That's where that uh suggestion

2:26:32came from.

2:26:33>> Thank you. I appreciate that.

2:26:36[snorts]

2:26:37>> Any further discussion?

2:26:43>> Are we ready for the vote?

2:26:45>> The vote is open.

2:26:52>> [laughter]

2:26:58>> chair cost in your vote.

2:27:00>> It's not showing.

2:27:03>> I can take a verbal vote.

2:27:06>> I'll vote. Yeah. I

2:27:15[snorts]

2:27:23By a recorded vote of 9 to one, item 2,

2:27:26LBC Ventures LLC has been recommended

2:27:28for approval as modified.

2:27:31>> Thank you all very much for your

2:27:32patience and hope everybody has a

2:27:34wonderful Thanksgiving and doesn't get

2:27:36tricked too much. Thank you.

2:27:43>> Our next items are items four and five.

2:27:46Corporate Landing Parkway Development

2:27:47LLC.

2:27:52[clears throat]

2:27:57>> Please state your name for the record,

2:27:58sir.

2:27:59>> Yes. Good morning, chairman, members of

2:28:01the commission. My name is Jerry Harris

2:28:02with Hangar Law in Virginia Beach here

2:28:04on behalf of my client TST Roofing and

2:28:07Glazing for items four and five. Uh we

2:28:10stand before you today asking for

2:28:11approval of two items. First a

2:28:13modification of profers and then also a

2:28:15conditional use permit. The reason these

2:28:17have to come in this order is because

2:28:18under the current profered conditions

2:28:21for this corporate landing business park

2:28:24uh there is an exception in the profers

2:28:25for bulk storage. Uh in discussions with

2:28:28the city the operation that uh TST

2:28:31roofing glazing is a multifaceted

2:28:33general contractor here in the city of

2:28:35Virginia Beach that's growing their

2:28:36operations. Um the purpose of this

2:28:39storage yard is to support that

2:28:40operation. and they're going to put

2:28:42their, you know, equipment and

2:28:43materials, the things that they use to

2:28:45go around the Commonwealth of Virginia

2:28:47down to North Carolina and up and down

2:28:48the eastern seabboard to store it there

2:28:50as an accessory use as we argued uh to

2:28:53part of their property. Um the city

2:28:55didn't agree with that position and

2:28:56therefore we now go through this process

2:28:58to modify the profers to try and allow

2:29:00them to use quote unquote bulk storage

2:29:01at this location. It's not bulk storage

2:29:04in the sense that there's going to be

2:29:05storage of third party items for profit.

2:29:08It's not going to be wrecked cars. it's

2:29:10truly going to be items that support

2:29:12their business operation. Uh and the

2:29:15reason it has to come in twofold is

2:29:16because we first have to modify only

2:29:18condition four of those um commerce park

2:29:21requirements. We've been through the

2:29:23economic development authority. We've

2:29:25gotten their unanimous approval for the

2:29:27concepts that you have on your staff

2:29:29reports that you'll see here. Uh you'll

2:29:31notice the warehouse space first and

2:29:32their office buildings. Um that'll be a

2:29:34two-story building that supports their

2:29:36day-to-day operations. And then you'll

2:29:38see just behind it is what we've labeled

2:29:39as the lay down yard. That's where

2:29:41you'll see this quote unquote bulk

2:29:43storage happening. Uh the intention of

2:29:45the applicant and my client is to have

2:29:47none of this visible from the roadway.

2:29:49You heard during your informal uh

2:29:50session some questions about the

2:29:52fencing. Uh that fencing has gone

2:29:54through economic development. They're

2:29:56perforated metal fencing. It's a nice

2:29:57high quality fence and we're going to

2:29:59put those where you can see it from any

2:30:01of the passing roadways. Uh and then

2:30:04from there um you'll see that there's

2:30:06also the vinyl clad chain link fencing

2:30:08on the back of the property and on the

2:30:10back of the property we don't believe

2:30:11that will be visible. And then also in

2:30:13your plan you'll see if you go back to

2:30:15the other page um where those are going

2:30:18to happen but most importantly all the

2:30:20vegetation that exists on the property

2:30:22that is behind the property that's a 75

2:30:24ft vegetative buffer as well as wetlands

2:30:27behind it will also remain. Um, so what

2:30:29we're hoping is that slight

2:30:31modification, if we go back to the other

2:30:33slide of the fencing, that blue line

2:30:34that you see, it really is going to be

2:30:36visible from the roadway. And then also

2:30:38there's going to be substantial

2:30:39vegetation between that location um and

2:30:42to the rear. So with those things in

2:30:44mind, we are hoping that with the growth

2:30:46of this business that employs 160 folks

2:30:49uh within our community, it's a growing

2:30:51operation. They've received the benefit

2:30:53of an EDIP grant to help the growth of

2:30:55this business. um we're in um we're in a

2:30:59good position with this property to stay

2:31:01on that corner that you see there and um

2:31:04enjoy the growth of a new business in

2:31:06this community. So, I would ask for your

2:31:07support of this application and happy to

2:31:09answer any questions that you may have.

2:31:11I do understand it was pulled today

2:31:13because there are two speakers that have

2:31:14signed up. I will confess I haven't had

2:31:16a chance to speak with them. I don't

2:31:17know what their um opposition may or may

2:31:20not be to this application. So, I'll

2:31:21just reserve the time to respond to that

2:31:23at the appropriate time. But otherwise,

2:31:25thank you for your consideration.

2:31:27>> Thank you,

2:31:29Madam Clerk. Call the speakers.

2:31:31>> Our first speaker is John Newwell.

2:31:35Um, I don't have the card yet for the

2:31:37second speaker.

2:31:46>> Hi there.

2:31:47>> Uh, please state your name for the

2:31:48record.

2:31:49>> Uh, my name is John.

2:31:52Um, how how much time is allotted?

2:31:54Again, I apologize.

2:31:55>> Three minutes.

2:31:56>> Okay. [gasps] Um, I would like to

2:32:00preface my written statement with an

2:32:01apology for any nervousness or errors in

2:32:03my speech as well as I was unclear of

2:32:06the original proposal. I think I

2:32:09misinterpreted some things. And as well,

2:32:11this is my first time publicly speaking.

2:32:13So, I would like to thank the board for

2:32:14their patience and this opportunity to

2:32:16speak.

2:32:18So, I saw a sign, a bright orange sign

2:32:22about one month ago today. It was

2:32:25probably outside of uh one of my

2:32:27favorite places to go recreationally. Um

2:32:30I don't know if anyone here has seen the

2:32:31photos, but it is a nice lake with a

2:32:34grass field around it. Um it's a very

2:32:36nice spot.

2:32:38And what I saw on this sign made me

2:32:41especially upset to be honest.

2:32:44um so upset and encouraged me to speak

2:32:47out publicly for the first time, like I

2:32:50said. And in bold handwriting, it stated

2:32:53that the city had plans to repurpose

2:32:56this beautiful, beautiful sight of

2:32:58nature into a bulk storage yard. And to

2:33:01me personally, the idea to put a storage

2:33:03facility on General Booth Boulevard, in

2:33:05my opinion, is a big mistake by our

2:33:06local city government. Already the

2:33:08street is oversaturated with many

2:33:12storage units already. However, these

2:33:13ones are for profit. Um, new stores

2:33:16being constructed, the new McDonald's,

2:33:19even the selling of Malden Bros., it

2:33:21shows that our community is losing what

2:33:24makes it so special in place of profit

2:33:27in my opinion. And

2:33:30I believe that our community should be

2:33:32put first, not private interest. Like I

2:33:35said, there are many, I guess, growing

2:33:38places for income, and I think that is

2:33:40good. But I will say if this type of

2:33:42development continues in place of

2:33:44putting our people first, I think

2:33:47honestly this entire area will become

2:33:49overdeveloped and just gray, dull, and

2:33:53just not what it once was. And I don't

2:33:56think this is the naivity of my youth

2:34:00speaking. I think I've seen firsthand

2:34:02the real experience. Um, I've seen as

2:34:05more development comes, I've seen less

2:34:06people outside, more people staying

2:34:09indoors, just overall it's not really

2:34:12good for our community.

2:34:14And I know what I said sounds very big,

2:34:17very scary. And while it is a

2:34:19hypothetical, I think it starts right

2:34:21here. Every decision and change has an

2:34:24impact, small or big, for better or for

2:34:26worse. So, I propose a very big change

2:34:29for the benefit of our city. And my

2:34:32proposal is instead of building

2:34:33something adverse to our community to

2:34:36enhance what's already there. By my

2:34:39account, there is, like I stated before,

2:34:41many storage facilities already and

2:34:45not enough [snorts] nature, not enough

2:34:47areas for our community to interact

2:34:49together. So, for my proposal, I was

2:34:52thinking to turn the land already there

2:34:56into a nice park, um, a good area for

2:35:00people to interact with each other and

2:35:02stay connected instead of serving

2:35:04private interest. Once again, [gasps]

2:35:07um,

2:35:07>> thank you, sir.

2:35:09>> Your time has expired.

2:35:10>> Yes, sir.

2:35:10>> Uh does anyone have any questions for

2:35:13the speaker?

2:35:14>> May I just ask real quick? Um, this is

2:35:16my district. Um, are you talking about

2:35:20uh you reckon some water? Are you

2:35:23talking about right off of corporate

2:35:24landing? There's water right over here.

2:35:26Is that what you're looking at?

2:35:27>> Yes. Yes. Yes.

2:35:27>> Okay. Um,

2:35:28>> if I saw the zoning right, I thought the

2:35:31lines cut into there, but I could have

2:35:32been wrong. I apologize.

2:35:33>> No, it's okay. Are you aware that this

2:35:35is not exactly on Virginia Duth

2:35:37Boulevard? It's actually back a little

2:35:39bit. So, I don't think you're going to

2:35:40see this from the road. Do you Are you

2:35:41aware of that?

2:35:43>> I was not actually.

2:35:44>> Okay. Well, that's why I want to make

2:35:45sure you knew because I don't think it's

2:35:46quite where you think it's going to be.

2:35:48So, I'm not sure that it's as much of a

2:35:49concern for you, but it might be.

2:35:51>> So, if you look up there on the map,

2:35:54>> um Oh, let's use this. This is my

2:35:55favorite thing ever. I've been wanting

2:35:56to use this. So, you see right there is

2:35:59General Booth Boulevard.

2:36:00>> Yes.

2:36:01>> And this is where that brewery is. It's

2:36:03going to be right back over here. So,

2:36:05you're I don't think you're going to see

2:36:06it from the road. Really?

2:36:08>> I mean, I don't think it's um about

2:36:10visibility. I think it's what it could

2:36:12be used for instead. not really if it's

2:36:14visible or not.

2:36:15>> Does it does it impact your view and in

2:36:18that it's part of his current business

2:36:20and he's trying to expand just to have a

2:36:22space to put the the items he's using

2:36:24for his business. Did that change your

2:36:26view as opposed to it being a for-profit

2:36:28storage facility?

2:36:30>> Um I believe so. Yes. Um in a way, like

2:36:33I said before, I do apologize. I thought

2:36:35it was another um rental storage unit

2:36:38place. Um, I did misinterpret that, but

2:36:40I still believe that that land could be

2:36:42repurposed for something more bettering

2:36:45and nurturing for our community.

2:36:46>> Gotcha. I'm so glad you came today and

2:36:48don't be nervous. Never. [laughter]

2:36:51We all get very nervous speaking public.

2:36:52So, you did a really good job.

2:36:54>> Thank you very much. Appreciate it.

2:36:56>> Any further questions?

2:36:58>> Commissioner Malt,

2:37:00>> I'd like to thank you for coming today.

2:37:01Um, first time public speaking is very

2:37:05nerve-wracking. Uh I remember my first

2:37:07time and I did not do nearly as well as

2:37:10you and I think you did wonderful. I

2:37:12think your aspirations and your goals

2:37:14are wonderful. Um, I think that this

2:37:17[snorts] piece of property, we have to

2:37:19balance uh the

2:37:22private property's ability to do

2:37:25something as if it was a public public

2:37:28property would make it a little bit

2:37:30easier for us to to have some uh wiggle

2:37:33room on what we can and can't allow

2:37:35there,

2:37:36>> of course. But as far as a private

2:37:38property owner and his ability to do

2:37:40things,

2:37:41>> they've come through the process one

2:37:42time and now they're asking from a

2:37:46private property standpoint to to modify

2:37:48it.

2:37:49>> Okay.

2:37:49>> Um so that they can further their

2:37:51business on their own on their own

2:37:53property.

2:37:54>> And I just wanted to make that a little

2:37:55bit clear because

2:37:56>> okay,

2:37:57>> the the private property aspect and then

2:37:59the public property aspect, I think

2:38:01those aspirational goals are right on

2:38:04target for what most people want. um

2:38:06continue doing what you're doing, stay

2:38:08involved. All right.

2:38:09>> Um and and stay encouraged to

2:38:12>> to talk about the things that you find

2:38:14most important in our city because we

2:38:15need more people like that. So, thank

2:38:17you.

2:38:17>> Thank you for your time.

2:38:19>> Thank you. You may be seated.

2:38:21>> Our final speaker is Brian Many.

2:38:37Good afternoon. My name is Brian Mance.

2:38:39I'm a local resident and got the notice

2:38:42of this meeting for this property

2:38:46at the end of September. Um,

2:38:49my concerns were the words bulk storage.

2:38:53Um, I live within the area that can be

2:38:56affected by this. I also work in this

2:38:59area. My company recently bought a

2:39:01property that is actually on your

2:39:03picture. And I know we went through

2:39:06several hoops trying to get things done

2:39:07that we could not do, things that we

2:39:09can't have outside of the building, we

2:39:12can't store things. Um, and then yeah,

2:39:17right up there on the corner on the

2:39:18lake. Um, so I understand corporate

2:39:21landing and I think the aspiration of

2:39:23corporate landing is for

2:39:26less industrialized storage.

2:39:29um

2:39:32changing the rules for what you can put

2:39:33on the property. I understand sometimes

2:39:35there's a need, but

2:39:38the bulk storage at one point once this

2:39:40is changed, some companies may not be

2:39:42here for too long for as long as they

2:39:44expect or they may move and grow and

2:39:46have to expand further beyond what they

2:39:49can do here and go to a bigger site.

2:39:51then this this item has already been

2:39:54changed and the next guy can come in and

2:39:56bulk store something else that we don't

2:39:58want in the neighborhood that isn't as

2:40:00pretty. Um,

2:40:03another item I noticed is the picture he

2:40:05showed of the fence. To me, visually it

2:40:08looked like a chain link fence.

2:40:12As a resident, I would not want to look

2:40:14at that ever. I hate chain link fences.

2:40:17How many of you have seen a chain link

2:40:19fence that looks nice?

2:40:21I don't think any of you have and I

2:40:23don't think any of the residents in this

2:40:25area want to look at another chain link

2:40:27fence. Um,

2:40:30that's pretty much all I had is

2:40:33[laughter]

2:40:34doesn't seem to fit what I think this

2:40:36area is. Thank you. Uh, any questions?

2:40:44Thank you, sir. You may be seated.

2:40:49the applicant like to come back to

2:40:51rebutt.

2:40:58>> Thank you, Mr. Chairman. Um, I'll share

2:41:00the commission's uh support of Mr.

2:41:02Newell's exercising of his first

2:41:04amendment right. That's always nice to

2:41:05see a young man come and do those

2:41:06things. I think his uh confusion may

2:41:08have been clarified in some way about

2:41:10the nature of what is being proposed at

2:41:12this uh location. Uh, but on to Mr.

2:41:15Mance raising some concerns about these

2:41:18um this particular area. I think it's

2:41:20important to to recognize the profers

2:41:22first. This is going to be very limited.

2:41:24It's only going to be limited to storage

2:41:26of the material, supplies, and tools,

2:41:28equipment of this business. By its

2:41:31nature, there is specifically in the

2:41:34proper no third party storage. No

2:41:36portion of the property will be operated

2:41:38as a standalone storage business or

2:41:39storage facilities for persons other

2:41:41than the entities and the owners that

2:41:43occupy that particular place. And then

2:41:45in no circumstance will the items placed

2:41:47in that exterior storage ever exceed the

2:41:49height of this fence. So if you are a

2:41:52lay person, I would suggest you walk by

2:41:54there, you wouldn't really even know

2:41:55that it's being used as a bulk storage

2:41:57yard, which kind of goes back to my

2:41:58first point about I would like to call

2:42:00it an accessory use. I can't do that

2:42:02because of the way that this city code

2:42:04is structured. But under those

2:42:05circumstances, you also have the benefit

2:42:07of 75 foot landscape buffer followed by

2:42:10wetlands where this chain link fence is

2:42:12shown. And while I do uh agree that

2:42:14sometimes chainlink fences uh are not

2:42:16the preferred aesthetic look, in this

2:42:19circumstance, it's really an obstructed

2:42:20view of a chain link fence that also

2:42:22includes that black vinyl wrapping and

2:42:25those slats. Um but with that, we would

2:42:27ask you to still consider that the uh

2:42:29modification of propers and the

2:42:31conditions uh proposed for our um layown

2:42:34yard or bulk swordy yard are appropriate

2:42:36and we'd ask for that approval.

2:42:38>> Happy to answer any final questions.

2:42:40>> Any questions? Commissioner Camp.

2:42:42>> Thank you. Thank you, sir. Maybe you can

2:42:45clarify for us what I was not able to

2:42:48get clarity on during the informal. When

2:42:51we compare the diagram that is being

2:42:54displayed right now with page number 27

2:42:57at the bottom corner, this is the one

2:43:00that has the colored boundaries showing

2:43:02different types of fencing. I'm going to

2:43:05be referring to that top area that is in

2:43:07blue. And if we compare that to the

2:43:10other diagram, I believe it's page

2:43:12number 28. Yes, thank you. That shows a

2:43:17different shape with a different

2:43:18boundary uh extending up into the 70

2:43:21foot five. Please help me understand

2:43:24what's going on here.

2:43:25>> Sure. Uh Commissioner Camp, thank you

2:43:26for that question. And Mr. Mr. Chair, I

2:43:28will let you know this has been a

2:43:29process that's been underway for about a

2:43:31year now between economic development uh

2:43:34my client and then through that process

2:43:36we have to get the economic development

2:43:38support. During process of economic

2:43:40development we have to meet the business

2:43:42park guidelines. In order to do that we

2:43:44had to prepare these site plans. Uh as

2:43:47part of the economic development

2:43:49discussion there was an initial

2:43:50discussion that the 75 ft boundary could

2:43:52be waved. Then during staff review for

2:43:56this commission, it was raised that

2:43:58there is an encroachment into that 75-

2:44:00ft buffer. So what you're seeing there

2:44:02is a legacy site plan that was approved

2:44:05and seen by economic development that

2:44:07does encroach in that small portion into

2:44:09the 75 ft buffer. Staff then noted that

2:44:12and requested the addition of condition

2:44:14five, saying, "Well, you can't really do

2:44:16that until you properly vacate that

2:44:19portion through site plan." And we're

2:44:21here to tell you we're fine with that

2:44:22condition. In fact, I would even tell

2:44:24you that we've already asked our

2:44:25engineers to contemplate a new site plan

2:44:27for when we go through that to just pull

2:44:28that 75 feet back to handle it. So, it

2:44:31is an inconsistency. You're right to

2:44:33point it out, but it's really explained

2:44:34by the length of the process and the

2:44:36number of iterations, particularly

2:44:37having to go before both the economic

2:44:39development and this commission.

2:44:41>> So, since

2:44:43the final word on this is with city

2:44:45council, do you have the ability to

2:44:48clean this up in a finalized site plan?

2:44:51That will be the site plan that

2:44:52accompanies this through city council

2:44:55review.

2:44:56>> Yes. And uh in our discussions with the

2:44:57city attorney's office, we do have some

2:44:59other cleanup work that we have to do

2:45:00related to the subdivision that's

2:45:02happening over here because as you may

2:45:04know or may not know, separate from this

2:45:06application and maybe to Mr. New's um

2:45:08pleasant surprise. My client's also

2:45:10helping the city through a cost

2:45:11participation agreement to build at

2:45:14their expense a new storm water

2:45:15retention pond in the vacant portion

2:45:17next to it. So, as you can imagine,

2:45:19Commissioner Camp, there's a lot of work

2:45:20to still be done with that, and we'll

2:45:21we'll clean all that up all at once.

2:45:24>> All right. Very good.

2:45:26>> Thank you.

2:45:26>> Um, can one other question for you, sir?

2:45:28Pardon me, still recognized.

2:45:32>> The other point that I brought up in the

2:45:33informal was that this parcel came

2:45:36through for review not terribly long

2:45:38ago, and at that time, the particular

2:45:41condition to which you take exception uh

2:45:44was imposed. uh and all of the same

2:45:46parties looked at this and felt that

2:45:48that was the right way to govern this

2:45:50area that bulk storage would not be

2:45:52permitted on this site.

2:45:54Why now should these same bodies

2:45:57reconsider a decision that was made not

2:45:59too long ago in the other direction?

2:46:02What's the what's the reason?

2:46:04>> Thank you, Commissioner and Mr. Chair. I

2:46:06will say that as part of this body's um

2:46:08good work, every application has to come

2:46:10on its own merits. I won't speak to

2:46:12where maybe the pitfalls were on the

2:46:14last application. I do think ours is

2:46:16materially different specifically

2:46:18because of the limitations being offered

2:46:20by profer and condition not being

2:46:22visible at all from the roadway below

2:46:24the fence line. Um having a business

2:46:26that's going to be two stories tall, you

2:46:28know, as I mentioned sort of tongue and

2:46:29cheek. I would defy a lay person to sort

2:46:31of even walk by this and even know that

2:46:33it was a bulk storage yard. It's not

2:46:35another one of these mini storage units.

2:46:37It's just so different than what we

2:46:40normally see in these bulk storage

2:46:41applications that I think that

2:46:44those material differences do carry the

2:46:46day. And what's different because I can

2:46:48also appreciate that you don't want to

2:46:49have one application come for bulk

2:46:51storage and say no and then the next one

2:46:53because then it looks like you're

2:46:54picking winners and losers as opposed to

2:46:56you know perhaps the diligent work that

2:46:58you all do each day. So I think the

2:47:00profers combined with the conditions

2:47:02that we've agreed to already would allay

2:47:04any fears that this is sort of opening a

2:47:07can of worms for this whole business

2:47:08park. You also have the benefit of

2:47:10economic development. Economic

2:47:12development enforces these conditions

2:47:15through the business park and their

2:47:16development guidelines. We've already

2:47:18been through that process successfully

2:47:19with the unanimous support. So I hope

2:47:21that will give this commission

2:47:23confidence that this is the right

2:47:25application to accept our conditions.

2:47:27Thank you, sir.

2:47:30>> Any further discussion?

2:47:31>> Okay.

2:47:32>> I just wanted to clarify because I think

2:47:34the gentleman behind might not have

2:47:35heard what you'd said earlier. You are

2:47:37going to have things like bushes and

2:47:38whatnot. So, you're not really going to

2:47:40see the the fence that he's concerned

2:47:42about. Correct.

2:47:43>> That's correct. If we look here on your

2:47:45um design outline, there's a hard black

2:47:48line that goes around where you see the

2:47:50fencing is going to be. All existing

2:47:52vegetation behind that fence line is

2:47:54going to be undisturbed.

2:47:57And this other question is just for

2:47:58staff because I know that he was

2:47:59concerned that if they went away,

2:48:02somebody else could come and put bulk

2:48:03storage. They would still have to go

2:48:04through a process of approval for what

2:48:06was put there specifically. Is that

2:48:08correct for staff?

2:48:15[laughter]

2:48:16>> Sorry, it wouldn't turn on. They would

2:48:17still need to comply with these

2:48:18conditions. So, it's possible that a new

2:48:20business could move in and still comply

2:48:22with these conditions,

2:48:23>> but it would still go through the

2:48:24regular process. So it would be seen by

2:48:25other people and so forth. It wouldn't

2:48:27just happen. Okay. I just want to make

2:48:28sure for his for his own benefit. Thank

2:48:30you.

2:48:33>> Any [snorts] other questions?

2:48:35>> No, but I'll go ahead and make a motion

2:48:36if I may.

2:48:37>> Yes, ma'am.

2:48:38>> I move to approve the application.

2:48:40Second.

2:48:41>> It has been moved by Commissioner

2:48:44Skunover and seconded by Commissioner

2:48:46Morani that we approve this item.

2:48:51>> The vote is open.

2:49:01>> [clears throat]

2:49:05>> Commissioner Anderson,

2:49:08>> mine's messing up.

2:49:10>> Mine's messing up, too. So, uh, yay.

2:49:15By a recorded vote of 10 to zero, items

2:49:18four and five, corporate Landing

2:49:19Development LLC have been recommended

2:49:21for approval.

2:49:25Our next item is item nine, just subpina

2:49:28police and Marissa Corsel.

2:49:38>> Okay. Yeah. Yeah. Well, it was it was

2:49:41timed out, I guess, when others hadn't

2:49:43timed out. Okay.

2:49:44>> Good afternoon.

2:49:47>> Please state your name for the record.

2:49:48>> Marissa Corsali.

2:49:51>> Thank you.

2:49:52>> Um I'm not too sure. What

2:49:56did you want me to How do I do this? I'm

2:49:58sorry.

2:50:00>> Just tell us what you're trying to do.

2:50:02>> I'm proposing a inh home daycare

2:50:05um running out of my mother's house

2:50:09and it's going to be a monastery style

2:50:11daycare. um a thoughtfully prepared

2:50:15space where children can learn

2:50:16independently, respectfully. Um

2:50:20and it's going to be an organized

2:50:23environment, nothing too chaotic. Um

2:50:26where children could learn in a loving

2:50:29environment and thrive. Um

2:50:34yeah,

2:50:36I also have three letters of support. I

2:50:39would have got him got more but I ran

2:50:41out of time.

2:50:43>> Did do you want me to give that to

2:50:45someone?

2:50:47>> I was already asked a question. Madam

2:50:49clerk, do we have any speakers for this

2:50:51item?

2:50:51>> There are no speakers for this item.

2:50:54>> Okay. Are there any questions? Any other

2:50:57questions for the applicant?

2:51:00>> Hi, thanks for coming in. Um, I do have

2:51:02a question on one of the pictures of the

2:51:05backyard.

2:51:07uh shows the steps and this is your

2:51:09parents house?

2:51:10>> Yes, sir.

2:51:10>> Okay. Um and

2:51:15with the age of the kids that would be

2:51:18uh there

2:51:20uh we I would like to get a uh

2:51:24clarification and look at the steps on

2:51:27the back porch that they are out of uh

2:51:30code. Uh because there as as far as I

2:51:33can tell there are not there is not a

2:51:35railing on those steps unless it's on

2:51:37the left you just can't see it. So I

2:51:39would be worried that there are there is

2:51:42not a railing coming down those steps

2:51:44because there's five steps which would

2:51:46be at least 35 36 inches high.

2:51:48>> You're correct. There isn't a railing

2:51:50but we're willing to I would not um move

2:51:54forward with approving this application

2:51:56on my opinion until that is uh done.

2:52:13So, uh, so you're asking her to to do

2:52:16that before

2:52:18>> I would I would just like to make that a

2:52:20stipulation in the profits somehow.

2:52:25>> We were aware that we needed the gate.

2:52:28Um,

2:52:28>> well, the gates the gates completely

2:52:30different. This is a this is a height

2:52:33hazard and a code hazard,

2:52:34>> right? I would have addressed that if I

2:52:36knew that was a concern, but

2:52:38>> but yeah, if we can put that as a

2:52:41>> we can certainly add that as a condition

2:52:44that would just need to be stated in in

2:52:45any motion.

2:52:47>> Okay.

2:52:49Any other questions? Commissioner K.

2:52:51>> Yes. Hi, Miss Corsali. Thank you for

2:52:53coming down today. Um, I represent

2:52:56District 1, which is where this site is

2:52:59located, and I've been contacted uh by a

2:53:02number of the residents in addition to

2:53:04the letters of objection that we

2:53:06received. So, I'd like to ask you a

2:53:08couple of questions about your proposed

2:53:10business.

2:53:11>> Um,

2:53:13first, do you reside at the home?

2:53:15>> I do not. It's my mother's home.

2:53:17>> Okay. Number two, um, with regard to

2:53:21your business model, you are seeking

2:53:24approval for up to 12 children. How did

2:53:28you arrive at 12?

2:53:30>> Um, under licensing, that's how many

2:53:33children you are that's the maximum

2:53:35amount of children that you can have in

2:53:37a neighborhood.

2:53:38>> Okay. So, you're seeking the maximum?

2:53:39>> Yes, sir.

2:53:40>> All right. Tell me a little bit about

2:53:42the outreach in the neighborhood that

2:53:44you did. So, we sent out letters um

2:53:48shortly after we started this process um

2:53:51to the neighbors.

2:53:52>> When was that, please?

2:53:53>> I'm sorry.

2:53:54>> When was that, please?

2:53:56>> When was that?

2:53:57>> I am sometime in September maybe.

2:54:01Late August, early September. Um, I

2:54:04don't recall exactly, but it was just

2:54:07basically saying that we are interested

2:54:09in opening this daycare and that um, we

2:54:13are going to be licensed and if they had

2:54:18any questions to contact me, I put my

2:54:20information on there and no one

2:54:21contacted me. Um,

2:54:25so that's pretty much it. And then my

2:54:27mom has a good relationship with a few

2:54:30of the neighbors, so I know she

2:54:32communicated with them.

2:54:34>> Okay. Thank you.

2:54:36In terms of your business model, in

2:54:39reading some of the letters from the

2:54:41neighbors, uh there was discussion about

2:54:44uh not having as many children at the

2:54:47daycare. Can you tell me could your

2:54:50business model work if you had let us

2:54:53say six kids at the daycare rather than

2:54:56the maximum allowed by law?

2:54:58>> Yes. So we um we would like 12 children

2:55:04but I am also comfortable with a smaller

2:55:07group of children just because I have a

2:55:08daughter as well and she's the whole

2:55:10reason for this um daycare. Um, so yeah,

2:55:15six children is perfectly fine with us.

2:55:18We just want to spend as much time with

2:55:20her while earning an income and having a

2:55:24good um outlook on the computer uh

2:55:26community.

2:55:28>> So this is interesting. I didn't expect

2:55:30this. Um, so let me follow your comment

2:55:33a little bit.

2:55:36Is the purpose of this to run a business

2:55:39or is it really

2:55:41>> Well, tell me tell me what your real

2:55:43purpose is here. I think I heard you say

2:55:45it was more to do with your family.

2:55:48>> Yes. So, um the purpose is to run a

2:55:51daycare. It's always been a goal of mine

2:55:54to have my own business and um I work as

2:55:58an occupational therapist assistant

2:56:00right now. And so I leave my daughter 3

2:56:04days a week with my mother. Um, and it's

2:56:06just becoming harder and harder as she

2:56:07gets older. So in my big wonderful

2:56:11brain, I had this idea that I could make

2:56:14an income while being with my daughter

2:56:1824/7, which hopefully that works out.

2:56:21Um, and just

2:56:26I love children. I've been working with

2:56:28children so many years. is I worked as a

2:56:30monatory teacher for three years, three

2:56:32or four years. Um I worked in schools as

2:56:37an occupational therapist. Um right now

2:56:39I work at a skilled nursing home. So

2:56:41children have always been near and dear

2:56:44to my heart. And um so I hope I answered

2:56:48your question. I feel like I'm going

2:56:49>> Yes, that's fine. It's so who is the

2:56:52applicant?

2:56:54>> So it's my mother and I. She will the

2:56:57license will be under her name cuz she

2:57:00lives at the home, but our um our

2:57:03daycare is an LLC.

2:57:06So, it's the both of us.

2:57:08>> So, the LLC is is not applying for the

2:57:12daycare license with the state.

2:57:15>> You doing it personally?

2:57:16>> I'm sorry.

2:57:18>> What is the role of the LLC? Is the LLC

2:57:21seeking a license or are you doing it in

2:57:24your personal names?

2:57:27um

2:57:29the LLC would be seeking the license, I

2:57:32believe.

2:57:33>> Okay. The the reason that I'm asking is

2:57:35this disclosure statement came in with

2:57:38your personal names on it and then it

2:57:41said, "Are you a business?" And it said,

2:57:42"Yes." And then it lists an LLC. I'm

2:57:45trying to just sort out who's who

2:57:46because the LLC doesn't own the

2:57:48property.

2:57:50The one of your well your family owns

2:57:53the property,

2:57:54>> right?

2:57:55All right.

2:57:57>> In terms of the other issues that were

2:58:00raised by the neighbors, we have 28

2:58:04homes uh in this Culdeac area, including

2:58:08the home that you're talking about. Out

2:58:10of those 27 homes, five of them, nearly

2:58:1320% object to this. And and that's

2:58:16serious. That's enough to bring it to my

2:58:20real attention that a common

2:58:22understanding has not been achieved with

2:58:25this neighborhood. [snorts] And one of

2:58:28the challenges here has nothing to do

2:58:30with you or the way you would seek to

2:58:32run your business. It's with the street

2:58:35that if we could display the site plan,

2:58:37the street has sort of an S shape here

2:58:41and you're right out near the front of

2:58:43it and the whole rest of the

2:58:45neighborhood is going to exit past your

2:58:47house after passing through this series

2:58:50of S turns. Now, we understand in a

2:58:54residential area like this, people

2:58:55shouldn't be traveling fast, but the

2:58:58sight lines aren't great. And

2:59:02I believe that human nature is going to

2:59:05lead some of your clients not to drive

2:59:08all the way in and to the end and turn

2:59:10around neatly at the end of the

2:59:12culde-sac. I think they're going to be

2:59:14executing threepoint turns or driveway

2:59:16turns because it's just the quickest,

2:59:18shortest thing to do. And by the traffic

2:59:22count in the staff report, what was 10

2:59:25trips per day, their study says it's

2:59:28going to be 48 trips per day, almost

2:59:31five times the imposition on this

2:59:33neighborhood of what it currently is.

2:59:35So, I understand the neighbors concerns

2:59:37here. Did you talk to any of the

2:59:39neighbors about these concerns?

2:59:42>> Um, I have not. I've only spoken to the

2:59:45neighbors that my mother's familiar

2:59:47with. I'm not sure who sent the letters

2:59:49of opposition. I would love to speak to

2:59:51them. Um, but I have not spoken to those

2:59:56neighbors

2:59:57>> because my concern here is that I don't

3:00:00think there's a lot you can do about it.

3:00:03That if this business was approved to go

3:00:06forward in this site, it's going to

3:00:07place these cars in a particular place

3:00:10where the street is configured that is

3:00:12not optimal. And I can see many good

3:00:17businesses

3:00:18don't fit the site and that's what I'm

3:00:20wrestling with here. And it I don't

3:00:23believe that there's a simple solution

3:00:25to that. U that's a challenge for us.

3:00:30You haven't seen any of the letters?

3:00:32>> I have not. Yes, sir.

3:00:35>> All right. Commissioner Plumbley.

3:00:38Thank you. U Mr. here.

3:00:42How long has your mom lived at this

3:00:44location?

3:00:46>> Um, I was a senior. No,

3:00:51[snorts]

3:00:51>> 2011.

3:00:55>> 2011.

3:00:55>> Yeah.

3:00:56>> Is there is a large lot a house away,

3:01:02big open space. Is that a privately

3:01:05owned lot or is that a public space

3:01:07where people get to? It just see if

3:01:09you're facing your mom's house to the

3:01:12right.

3:01:12>> I think I know what lot you're speaking

3:01:14of. I'm not aware if it's private or

3:01:17>> so there's no access to that.

3:01:19>> Okay. That you were um I was there

3:01:23Monday. It seemed like a and it was I

3:01:26don't know 4:30 in the afternoon. Seemed

3:01:28like a fairly slow lane. Can you

3:01:30describe what how much traffic goes up

3:01:32and down that street?

3:01:35>> Um it doesn't seem to be very busy. in

3:01:39my opinion just people coming in and out

3:01:42from home. Um

3:01:45[snorts] so in my opinion I don't see

3:01:48the big issue with the traffic um as

3:01:52some of the neighbors are concerned

3:01:54with. Um

3:01:57so

3:01:58>> and have you looked into who would want

3:02:02your services in this area? Are there

3:02:04young families in that neighborhood that

3:02:06would want uh these are for kids two to

3:02:09five we're talking about?

3:02:10>> Yes.

3:02:11>> Um are you aware if there going to be

3:02:14clients nearby, folks that want your

3:02:16services nearby or do you know?

3:02:18>> There's always a need for child care and

3:02:20the way I'm promoting it as a monitor

3:02:23style daycare. So it's not [sighs]

3:02:27like just a

3:02:29it's structured. It's more like a

3:02:31classroom. Um, so that's

3:02:36that's my um take on that is there's

3:02:39always a need. I haven't really done too

3:02:41much um research on

3:02:45how many families would come and work

3:02:47with us, but that's and also with

3:02:51licensing. Um there's a lot of

3:02:55um sorry getting a little nervous. Um

3:03:00there's just a lot of regulations and

3:03:02they with them they also um promote your

3:03:05business.

3:03:06>> I see.

3:03:07>> Yeah.

3:03:08>> Okay. Thank you very much.

3:03:09>> Of course,

3:03:12>> Commissioner Ber.

3:03:14>> Thank you for coming today. I don't have

3:03:16any uh qualms about your qualifications

3:03:19to run this. I also agree 100% that

3:03:21there is a real need for this. However,

3:03:24this is a residential neighborhood and a

3:03:27substantial number of your neighbors

3:03:29feel this is inappropriate location for

3:03:31a daycare. And as I listen to you

3:03:34describe it, it really sounds like, you

3:03:36know, it's a business. And there are

3:03:39reasons why businesses don't generally

3:03:42fit inside of residential neighborhoods

3:03:44because of the negative impact on your

3:03:46neighbors. And I'm sure you're sensitive

3:03:49to that also. So, I just wanted you to

3:03:51understand why I'm very hesitant to

3:03:54recommend approval of this application.

3:03:57>> Okay.

3:04:01>> Just a minute.

3:04:02>> Mr. Chair, I'd like to make a motion.

3:04:04>> Well, I've got somebody over here wants

3:04:06to make the motion, too. But I I have a

3:04:07question first. uh for staff uh the

3:04:13number of 12 children.

3:04:15Does the education department refine

3:04:18that number particular to this location

3:04:23or is it just 12?

3:04:26So, in my understanding, zoning has a um

3:04:31a part to play in how many children you

3:04:33have in the home. But uh licensing can

3:04:38decrease the amount of children or

3:04:40increase well we can't go past 12 but if

3:04:44for instance the zoning committee says I

3:04:47could have 12 children in the home but

3:04:49the licensing comes in and sees no this

3:04:51isn't appropriate for 12 children then

3:04:54they can say we could have five or six

3:04:56or what they recommend.

3:05:00So yes, the state department they

3:05:02education department they will set the

3:05:04maximum um that can be at this at the

3:05:07house 12 is the maximum. This commission

3:05:10also has the ability to change that

3:05:12maximum as as you've done on other

3:05:14applications if you think there's a

3:05:15number better suited less than 12.

3:05:20>> Commissioner Scoover wants to make a

3:05:22motion.

3:05:23>> Yes. I'd like to move that we approve

3:05:24this application with two additions. one

3:05:27the requirement of the railing being put

3:05:29on the bottom and Mike if you have any

3:05:30particulars you want to add to that and

3:05:32to limit the ch the u number of children

3:05:34to 10 please

3:05:36>> I'm sorry could you repeat that I

3:05:38couldn't hear it

3:05:39>> yes I wanted to approve the application

3:05:41with two changes one adding the

3:05:44requirement that we put the railing up

3:05:46in the back where uh that what um

3:05:48commissioner Anderson was referencing

3:05:50and to limit the number of children to

3:05:5210

3:05:53>> second

3:05:56discussion.

3:05:57>> Any discussion?

3:05:59>> Yes,

3:06:04I concur with Cath with Vice Chair Ber's

3:06:07comments and had I been recognized, I

3:06:10would have put a motion forward to deny

3:06:13this application. I don't find that this

3:06:16particular site is appropriate for this

3:06:19particular land use.

3:06:22I also believe that the high percentage

3:06:26of neighbors expressing concerns, some

3:06:29of which are very strongly worded,

3:06:32are accommodated by the applicant.

3:06:36Number three, I also feel that the

3:06:38applicant has stated she would be

3:06:40willing to go with a lower limit of six

3:06:44to try to mitigate this and that the

3:06:47limit that is being proposed in the

3:06:49current motion of 10

3:06:52is more than that number. It's not

3:06:55changing it too much from the 12. Six

3:06:57would be a more meaningful change.

3:07:05made a motion. Did you?

3:07:08>> Yes,

3:07:09>> I made a motion.

3:07:10>> So, I guess at this point we would need

3:07:12a substitute motion. Then

3:07:17>> I would like to second uh Commissioner

3:07:19Camp's substitute motion.

3:07:23>> Did he made make a motion?

3:07:26>> All right, let me clean that up. I'd

3:07:27like to make a substitute motion that

3:07:30continues to carry forward Commissioner

3:07:32Anderson's

3:07:33preferred U recommendation with regard

3:07:36to the stairwell handrail and that

3:07:38modifies Commissioner Skoonover's

3:07:41original motion with regard to the

3:07:43maximum number lowering it from 10 to

3:07:45six.

3:07:50>> I will second uh Commissioner Camp's

3:07:53motion.

3:07:54>> Okay. So, we have uh a substitute motion

3:07:58by Commissioner Camp, second by

3:08:01Commissioner Anderson.

3:08:03>> Is there a motion to make the substitute

3:08:05motion the primary motion?

3:08:06>> Yes.

3:08:09>> Yes. I'd like to make the secondary

3:08:10motion a a primary.

3:08:13>> Second.

3:08:17[sighs]

3:08:27The vote is open.

3:08:29>> I just want to add my comment before we

3:08:31vote. The applicant may want fewer, but

3:08:34our city needs more.

3:08:36>> And this is just a vote to make the

3:08:39substitute motion the primary motion

3:08:41just for everyone's awareness.

3:08:49Mine's not showing now, but I don't want

3:08:51to make [laughter] I would like to vote

3:08:52against that.

3:08:56>> Commissioner Cromwell

3:08:57>> I

3:09:01[laughter]

3:09:08>> recorded vote of four to six. The motion

3:09:12to make the substitute motion to May

3:09:13motion has failed.

3:09:20>> So now we go back to the

3:09:22>> So now the motion on the table is still

3:09:24the primary motion made by Commissioner

3:09:26>> Skoonover.

3:09:38Is she open? Madam clerk, are we ready

3:09:40for the vote?

3:09:42>> We're trying to. I think

3:09:44>> we'll do a verbal vote. [laughter]

3:09:50>> Um, one second.

3:09:57>> Commissioner Mulch.

3:09:58>> Hi.

3:09:59>> Commissioner Camp.

3:10:02>> Nay.

3:10:02>> Commissioner Cromwell.

3:10:04>> Nay.

3:10:05>> Commissioner Anderson.

3:10:07>> Nay. [snorts] Vice Chair Ber.

3:10:10>> Nay.

3:10:11>> Chair Cen.

3:10:12>> I.

3:10:14>> Commissioner Skunover.

3:10:16>> I.

3:10:17>> Commissioner Plumbley.

3:10:18>> I.

3:10:19>> Commissioner Hippen.

3:10:21>> I.

3:10:22>> Commissioner Morjani.

3:10:24>> I.

3:10:27>> By recorded vote of 6 to 4. Item nine.

3:10:30Just peina police coral has been

3:10:34recommended for approval as modified.

3:10:39Thank you.

3:10:43>> Our next item is item 13, 5112st Street

3:10:47LLC.

3:10:50>> Ryan, I should have asked the

3:10:52chocolates.

3:10:53Expensive chocolates.

3:11:01[laughter]

3:11:05>> Mr. Chair, I think this applicant is

3:11:07online. Is that is that fair?

3:11:15[clears throat]

3:11:21[clears throat]

3:11:22>> Do what?

3:11:25Hello. It looks like I'm I am present.

3:11:28Correct.

3:11:31>> Yes.

3:11:32>> Oh, good. Hi, this is Kevin Fritz, uh,

3:11:35owner of 5112st Street,

3:11:39and we are, uh, proposing to make this a

3:11:42short-term rental.

3:11:47>> I have some questions for you. This is,

3:11:49um, Brian Plumbley. Um,

3:11:52>> yes, sir.

3:11:53>> Where are you from? Where where are you

3:11:56calling in from?

3:11:57>> I'm currently in northeast Texas.

3:12:02>> Okay. And so you don't reside in

3:12:05Virginia Beach. Is that fair?

3:12:07>> No, we do not. This was uh a purchase

3:12:10for us as a dual use property. It had

3:12:12been grandfathered in. I went and met

3:12:15with the uh uh revenue commissioner. Uh

3:12:19well, actually I did on the phone and

3:12:21then Katie uh Kennedy. And so we

3:12:25originally thought that this was

3:12:26grandfathered in as a short-term rental,

3:12:28but apparently he did not pay his uh or

3:12:31he did not have a renter for two years

3:12:33while his wife was sick. And so we're uh

3:12:36back to the beginning of of the process

3:12:38for the cup.

3:12:40>> Have you met with any of the neighbors

3:12:44surrounding this property to talk about

3:12:46it being a short-term rental?

3:12:49>> Uh no. Uh we our our next door neighbor

3:12:53uh is a renter. Actually, I've got two

3:12:55renters that uh one on the left, one on

3:12:58the right. And then the owner of the

3:13:00property on the left uh I've spoken to

3:13:03and uh have not not specifically said,

3:13:06"Hey, do do you have any issue with this

3:13:08as as a rental?" However, I do know that

3:13:11we're in the uh proposed overlay and uh

3:13:16so I I'm not sure what else to say about

3:13:18that. Have you been to the location?

3:13:22>> Of course. Yes, we have.

3:13:24>> I I shouldn't say of course. No, you uh

3:13:26we we actually have gone uh remodeled

3:13:29the the property uh have stayed in it

3:13:32probably since March a total of I would

3:13:35say a couple of months uh off and on,

3:13:37maybe a month and a half. And then I've

3:13:39met with uh I've met with zoning uh

3:13:42multiple uh individuals within zoning,

3:13:45short-term rental DSC because we've got

3:13:48to work on the parking and then uh yeah,

3:13:52I I think that I can hear myself in the

3:13:55background. So, I think that's the point

3:13:57I'd like to make.

3:13:58>> Do you own a number of short-term

3:14:00rentals?

3:14:01>> No, we do not. We own a number of long

3:14:04long-term rentals, but not a number of

3:14:06short-term rentals. Do you are you aware

3:14:09of because you've stayed there. How does

3:14:11how is it functioned for you getting in

3:14:13and out the the entry point is on the

3:14:16half street? Correct.

3:14:18>> That's correct. It's well positioned. Uh

3:14:20so there is a 19x4 foot parking pad that

3:14:24is currently there. We thought what we

3:14:25were going to do is potentially have to

3:14:29re uh uh surface the back parking, but

3:14:33it has a very accessible uh gate and uh

3:14:37and then a shed in the back and then you

3:14:39just walk across the uh the lawn into

3:14:42the property. We've we've been there

3:14:43both in uh rainy uh time and dry time

3:14:48and find it to be extremely accessible.

3:14:51Is it your intent to have short-term

3:14:53rental year round at that home?

3:14:57>> Uh, I think I this is a dual use

3:15:00property for us. My wife is from

3:15:02Virginia Beach, went to Cox High School,

3:15:04and so eager to get back and and spend

3:15:07time there. Uh, and so we we were

3:15:10considering uh I would say primarily

3:15:13considering short-term rental in the

3:15:15summer with the idea that we could

3:15:16short-term rent it or or midterm rent it

3:15:19in in the winter. But there will be a

3:15:21couple of months that we want to be

3:15:22there at the property.

3:15:23>> Thank you very much. Those are my

3:15:25questions. I appreciate it.

3:15:27>> Absolutely.

3:15:28>> Any other questions?

3:15:31>> I have a motion uh to approve this

3:15:34short-term rental request at this

3:15:36location with the condition that the

3:15:38conditional use permit shall not be

3:15:40activated until the short-term rental is

3:15:42in good standing with the commissioner

3:15:44of revenue and is registered to pay

3:15:46taxes for this use. Second.

3:15:49>> It has been moved by Commissioner

3:15:51Plumbley and seconded by Commissioner

3:15:53Skunover that this item be approved.

3:15:57>> The vote is open.

3:16:09>> Commissioner Anderson, your vote.

3:16:11>> Yay.

3:16:15By a recorded vote of 10 to zero, item

3:16:1813, 511 21st Street LLC has been

3:16:22recommended for approval as modified.

3:16:26Our final item is item 14, Alexandra and

3:16:29Constance Mening.

3:16:38>> Good afternoon.

3:16:39>> Good afternoon. Please state your name

3:16:41for the record.

3:16:41>> Yes, sir. My name is Constance Mening

3:16:45and uh we have applied for a short-term

3:16:47rental permit at 414 22nd and a half

3:16:50street. Um like the gentleman before me,

3:16:53I've uh spent some time there since June

3:16:56when we purchased the property. So some

3:16:58of the questions you asked him, I have

3:17:00some information. Um I've spent quite a

3:17:03bit of time there. We did some painting

3:17:04and remodeling and things like that. So

3:17:06I stayed at the property while I worked

3:17:08on those and I've gotten to know most of

3:17:10the neighbors. Um they're a good group

3:17:13of people. They're mostly

3:17:15my age, some of them older. Um so it's

3:17:18fairly quiet. Um there's as far as the

3:17:22traffic, there's really there's very

3:17:24little traffic, honestly. There's a lot

3:17:26of foot traffic and bicycle traffic, but

3:17:28it's rare that vehicles go back and

3:17:31forth because there's nowhere to go.

3:17:32Unless you live back there, there's

3:17:34really no reason for you to be back

3:17:35there. um some of the parking and

3:17:38actually next door to me. The parking is

3:17:40for the the building that faces the

3:17:44street behind me, which I believe is

3:17:4623rd Street um on the back of our house.

3:17:50So, it's um it's quiet and the everybody

3:17:54knows where they're allowed to park. We

3:17:57kind of cooperate with with each other.

3:17:58If there's delivery to be made or

3:18:00something, we'll ask, you know, to move

3:18:01a car here or there. But um and the only

3:18:04rental that I'm aware of short-term on

3:18:06that block right now is the one directly

3:18:09across the street from ours. And um

3:18:12they've I was there most of July and

3:18:14into August

3:18:16um daily. I stayed there for about six

3:18:18weeks. And um they had renters all the

3:18:21time in and out and they were they were

3:18:24lovely. I mean they were quiet. They

3:18:26were mostly families.

3:18:28um they were, you know, they parked

3:18:30their cars in the in the driveway and

3:18:33walked everywhere or rode bikes. So,

3:18:35there was um I don't know. I think it's

3:18:37it's wonderful. It's a wonderful

3:18:39neighborhood. It's a wonderful location.

3:18:41It's very quiet. And I uh trying to

3:18:44think what else you might have asked

3:18:45him.

3:18:47I I don't reside. You asked him this, so

3:18:49you may want to know. I don't live here.

3:18:50I live in North Carolina. My daughter,

3:18:52though, is a Virginia Beach resident,

3:18:54and she's just a few miles away from the

3:18:55property.

3:18:58Is there anything [snorts] else?

3:19:00>> Well, you were kind enough to meet with

3:19:02me before this formal and we talked

3:19:05about these things. This is the kind of

3:19:07information we need to get up before

3:19:09council because they're considering this

3:19:11area actively. I think it's important to

3:19:12understand the only complaints I've

3:19:15heard, well the primary complaint I've

3:19:16heard is on these half streets where you

3:19:18have uh parking going on in and out.

3:19:21It's has on occasion blocked people's

3:19:23ability to use their property

3:19:25conveniently at times. Doesn't always

3:19:28last that long, but it has been sort of

3:19:30a consistent theme. But I think you've

3:19:32addressed that and I appreciate it very

3:19:34much.

3:19:34>> You're very welcome.

3:19:40>> Commissioner Maul, uh, how long have you

3:19:42owned the property for?

3:19:44>> We purchased it in June of this year.

3:19:46>> Okay.

3:19:46>> So, we haven't rented it yet. we've been

3:19:48going through this process and um my

3:19:51daughter's military so she's gone a lot

3:19:53and I don't work as fast as I used to so

3:19:55I've been working on my own there

3:19:57primarily so that's why I spent so much

3:19:59time there it takes a while for me to

3:20:00paint a room now

3:20:02>> yes

3:20:03>> yeah thank you

3:20:04>> welcome

3:20:07>> any further questions

3:20:10>> Mr. [clears throat] chair of a motion

3:20:11that the conditional use permit uh be

3:20:13granted for short-term rental, but it

3:20:16not be activated until the short-term

3:20:18rental is in good standing with the

3:20:19commissioner of revenue. And I move to

3:20:21approve.

3:20:22>> Second.

3:20:23>> It has been moved by Commissioner

3:20:25Plumbley and seconded by Commissioner

3:20:27Skunover that this item be approved.

3:20:30>> Thank you much.

3:20:32>> The vote is open.

3:20:37>> Commissioner Cromwell, will your vote? I

3:20:43>> by a recorded vote of 10 to zero, item

3:20:4514, Alexandria and Constance Mening has

3:20:48been recommended for approval as

3:20:49modified.

3:20:52>> We thank everyone for coming out today

3:20:54and participating.

3:20:56This meeting is adjourned.