What: Contracts for Part 3 of the Lead Service Line Replacements program, both paid from the Water Supply Revolving Loan Account Fund.
1215-2026: construction contract with JLD Construction Services, LLC, up to $10,756,912 plus up to $2,000 from the Water Bond Fund for prevailing wage services ($10,758,912 total); emergency. Wyche / Bankston; approved 7-0 on 5/18/2026.
1278-2026: planned modification of the construction administration and inspection contract with Stantec Consulting Services, Inc., up to $999,291.15; emergency. Approved on the consent agenda 5/18/2026.
Where it stands: both approved. The minutes do not state how many lines Part 3 covers.
1060-2026, a planned modification of the Murphy Epson, Inc. contract for Lead Service Line Outreach, up to $2,527,488.06 from the Water Supply Revolving Loan Account Fund (with an Ohio Water Development Authority and Ohio EPA loan application; emergency), approved 8-0 (Wyche / Day-Achauer, SR-25).