2026-10-01 - Stormwater Management Advisory Commission
Summary
- Routine business: Two absences were excused and the September 3 minutes were approved. No one signed up for public comment.
- Planning Commission liaison: Staff noted one upcoming rezoning case near the Dixie Forest and Spring Forest area (R-4 to R-6 with conditions, including controlling the 25-year storm at each discharge point) with a public hearing the following Tuesday. Staff said neighbors raised many questions about traffic and stormwater, there is no documented flooding near the site, and erosion complaints nearby are in a different drainage basin. A new Planning Commission liaison has been appointed and will attend future meetings.
- Staff updates: Staff won awards at the North Carolina stormwater conference in Winston-Salem, and two staff presentations were well received. A flood risk awareness survey for people in floodprone areas, especially renters, drew about 40 responses after roughly 1,800 mailed cards; staff noted no federal or state rule requires landlords to disclose flood risk to tenants. A public meeting on the East Lane Street Drainage Improvements Project was set for October 8, and a stream cleanup at Worthdale Park for October 24 at 10 a.m. Drainage assistance projects at Wellington Place, Cable Court and Midlands Town Homes are moving toward construction.
- Rainwater Rewards Projects Approval: The commission approved three rain garden and cistern projects on the modified consent agenda. Staff reported more contractors joining the program and a recent jump in residential and commercial inquiries, which they tied to the citywide increase in reimbursement to 90%.
- Glenwood Crest Drainage Improvements Project: A project manager presented the completed rehabilitation of an 80-to-100-year-old private storm pipe network. About 3,700 feet of pipe was studied by camera; 1,150 feet needed work, with 800 feet lined using ultraviolet-cured liners and 350 feet excavated and replaced, and grout injected to fill voids. The contract with the lower of two bids was $2.8 million against an engineer's estimate of $2.4 million, and the project had a 50% contingency. Construction finished in August 2026. He cited challenges with easements from about 30 private properties, tree preservation, a subcontractor's liners that had to be replaced at the contractor's cost, and a state DOT pipe rehabilitation done ahead of the city's work. The liner has a 50-year design life.
- Stormwater Commission FY26 Annual Report: The commission approved the draft final fiscal year 2027 work plan and the fiscal year 2026 annual report for presentation to City Council on Wednesday, November 4 (moved from Tuesday because of Election Day).
- Stormwater Regulations Review Request: Staff said Jones asked at the September 15 council meeting that the commission suggest stormwater regulations for possible review. Members discussed erosion control, floodplain, watershed and detention rules and the 25-year storm conditions offered in rezoning cases, and staff proposed a November or December agenda item. Upcoming topics also include industrial stormwater discharges under the new permit effective July 1 and optional field tours.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:12to the Walnut Creek uh wetland center
00:15for hosting this to rec
00:19um
00:21notice that uh in this call to order the
00:23meeting is being recorded by video and
00:25audio means the recordings will be
00:26posted on the city's website for public
00:28viewing and listening.
00:30In-person attendees of this meeting will
00:32be included in the recording. By
00:34remaining in this meeting, inerson
00:35attendees agreed with both images and/or
00:37voices may be included in this request.
00:40We have a two requests for excused
00:43absences
00:44and
00:47hoping that Colin and Barrett will join
00:50us soon.
00:53We excuse all four or should we
00:56>> I would suggest excuse the two that we
00:58know of now. If we need to come back the
01:01other two, we can check.
01:07>> Okay. So we'll look for a motion to
01:10excuse uh and Nichol
01:17second. All in favor of excusing.
01:20>> Okay. Yeah.
01:25>> Yeah. Thanks to Scott,
01:30>> right?
01:32>> Yeah. Maybe that's where Barrett talking
01:34about right now. [laughter] I have made
01:37that mistake because
01:40um Scott distributed the meeting minutes
01:43from September 3rd
01:45and would like to open the floor for
01:48motions to approve andor conversations.
01:59>> Second. Thank you. Any discussion? All
02:03in favor of approving the minutes?
02:05Thank you, Scott, for taking good care
02:07of us on votes and minutes.
02:11Um, public comments. This is an
02:13in-person meeting. Comments may be made
02:15by attendees uh upon registering. This
02:18person meetings indicating they'd like
02:19to speak. The meeting also publicly
02:22livereamed. Comments cannot be accepted
02:24during the meeting using those virtual
02:26methods. Um comments communications from
02:30residents should be sent via email
02:31address to rale scopec.gov.
02:34>> I don't think we had a anybody signed up
02:37to speak.
02:39>> Not yet. Okay. Thank you.
02:41>> All right. Now we're on the planning
02:42commission and leaison.
02:48Have you had a chance? Uh Ben and I
02:51spoke yesterday morning and there's one
02:54case that has a little bit of storm
02:56water mentioned in it. Um that is going
02:58to go over in North.
03:00>> Okay. Thank you.
03:02>> And the other thing is we're seeking
03:04we're still looking for is planning
03:06commission have they appointed the
03:07liison yet?
03:07>> They did. They did. Okay.
03:10>> Yes. And he'll be joining us for future
03:12meetings which will always take place
03:13the same week.
03:19Yes. And he was he was the leazison for
03:23like a week for a month and they changed
03:26change the chairship and so they had to
03:29turn out to be ahead. So
03:31>> it's fine. Yeah.
03:33>> Anyway, um like uh like uh Commissioner
03:40C said, we have a case Z4325609
03:44road. If you guys have driven in this
03:46area, you still sign for but [snorts] um
03:49uh this has already been planned and
03:52it's scheduled a public hearing uh
03:54Tuesday night. There were uh
03:59uh sort of where Atlanta becomes liter
04:01if you know that area near near Dixie
04:03forest spring forest area.
04:06uh currently zones R4 uh requesting R
04:10six conditional use weather conditions
04:12that they're offering right now is the
04:13rate of storm water be controlled to
04:1525ear storm and as I said the public
04:17hearing is set for Tuesday this case has
04:19seen a lot of questions about all all
04:22sorts of things traffic storm water
04:26height um
04:28uh fit for lack of a better term and so
04:32there's been a lot of neighborhood uh up
04:36up up up up up up up up up up up up up
04:36up up up up up up up upswell about this
04:37one but but I do think they've uh got
04:40some storm water uh complaints around
04:44this property and some are actually in a
04:46different drainage basin which this this
04:48big blue line is the drain bas line.
04:51Everything um north is Perry and
04:54everything south is uh Marsh I believe
04:57Marsh and um so any complaints on this
05:00side of the island obviously wouldn't
05:02wouldn't have anything to do with this
05:03case because doesn't get get there but
05:06there are a few
05:09channel erosion cases and things like
05:11that. So that's what the applicant added
05:15in the 25-year storm detention. Uh
05:18stormwater staff has gotten a laundry
05:19list of questions from neighbors about
05:21this project and we just kind of got the
05:23standard answers. This is what we're
05:24looking for
05:26site plan things like that. But they
05:28have a whole bunch of issues with
05:31traffic as well because this area if you
05:33know it is still looks a little rural
05:36for lack of better term. It's like
05:37two-lane
05:39uh in the shoulder section.
05:42Um any development would have to improve
05:45the roadway in front of their property
05:49the entire road. So um a lot of issues
05:53on that. I did want to give you a sense
05:55because once we met yesterday, this is
05:56actually a zoom in on on the tobo. So
06:00they're kind of the existing res house
06:02is kind of the top of the hill now. So
06:05So they're not really
06:07um draining in one specified manner and
06:10they have options to drain to public
06:12right away public rideway. So there are
06:14options and the one staff comment that
06:17we did make the change in their
06:18condition was to control 25 storm at
06:21each point of discharge since there's
06:22not one point of discharge. So but this
06:26is what the carpet looks like currently.
06:29which says four residential house with a
06:30decent size
06:32uh driveway apartment that area and um I
06:39do believe the residents are a little
06:40bit nervous because if you go back to
06:42this picture there's a couple other
06:45bigles around that could potentially
06:47subdivide later. So I think that's what
06:49and all these other residential
06:50properties are are forward as well. So
06:56from our perspective fits the condition
06:59they're offering.
07:00>> Correct.
07:00>> And most stream there's no flood plane.
07:03>> Yeah.
07:04>> There's no flooding on the chase of
07:07neighbors that we that you have correct.
07:09No
07:12there's not any document flooding
07:15near this site to automatically trigger
07:18any UDO storm requirements or anything
07:20like that. And there's no real cases,
07:22but I mean it definitely would have an
07:24impact on this pocket being arc. So I do
07:26understand why neighbors are concerned
07:28and and I don't want to speak for
07:30commission. We mentioned that storm
07:32water is mentioned in a lot of these
07:33cases. It's like a nice thing to kind of
07:36add add to the list of things that are
07:39wrong with the site.
07:41And you mentioned that there have been
07:44reports about erosion that were in some
07:46of the comments, but those were in the
07:48Marsh Creek water shed and this property
07:50drains completely anticipated.
07:52>> Yeah, there was more in the Marsh Creek.
07:54There's one or two in this drain basin,
07:56but it's far under way, but there's
07:59there's um
08:01erosion and street flooding in this
08:03area, but the city just finished a Dix
08:05road project in this area, too, that was
08:06supposed to handle some of that as well.
08:08And also this is an open I mean just to
08:10location that's about to where we are
08:17and with the R six they could go to town
08:19homes but not apartments that
08:26>> yeah I think it's good to be aware of
08:28these that is a storm water condition
08:30added and storm water issues mentioned
08:33but I would agree that you know I don't
08:35think I don't see a lot
08:37on what our concern on this case.
08:41>> So far in the past couple meetings,
08:43we've been a lot we haven't had hardly
08:46any cases that have any storm water or
08:47human conditions attached to them.
08:49That's why the schedule.
08:52How many times do people offer up 25
08:55years? Is it like 110 cases kind of
08:58thing or is it I wouldn't say it's a
09:01it's a every case or anything like that
09:04but I think it it was it was something
09:07the neighbors were talking about that
09:08they were concerned about storm water
09:10because all their public right away is a
09:12ditch and shoulder section. So they're
09:13worried about what's what's it going to
09:15do to ditches downstream and things like
09:17that.
09:24Yeah, there's multiple sides around
09:25town. Like if you driven through this
09:26area
09:31and just like I say, we have got laundry
09:33list of questions concerned citizens.
09:36That's us in planning and transation.
09:39We've all kind of had long list of stuff
09:41to answer today.
09:46Thanks. So that's information
09:50that
10:03so um we do have on our agenda later
10:06today um hopefully a final review of the
10:10fiscal year 27 work plan and fiscical
10:13year 26 annual report. Um uh we would
10:18ideally like to approve it today so that
10:20we can take it to city council on the
10:22November 4th council. I'm going to just
10:25note for everyone um that that first
10:28council meeting in November is on
10:30Wednesday because Tuesday is an election
10:32is election day. So they move that
10:34council meeting be Wednesday. And so I
10:37think uh chair you're planning to be
10:39there to present it that everyone's
10:41welcome to attend or stream if you'd
10:44like to to see. It'll be a short
10:45presentation of the work annual report
10:48as we do annually.
10:52>> Um is it whatever that Wednesday is
10:55meeting?
10:57The meeting will be the fourth. Yeah.
10:58Yeah. Tuesday is the third which would
11:00normally be the first Tuesday the
11:02council meeting but because that's
11:04election day it will be on the fourth
11:07and our meeting is on the 5th. our
11:09meetings on the correct correct
11:14no staff updates. Uh quick overview of
11:18we did have the North Carolina uh ABWA
11:22Stormwater Conference in Winston Salem a
11:24couple weeks ago. Uh the team was lucky
11:27enough to have a couple of awards. Um,
11:30the Gibson Play Plaza was recognized.
11:32This is Storm Alert award and Scott
11:34Bryant was nice enough to nominate me
11:36for an award which I which I received
11:38which was very exciting
11:45and then stormwater staff delivered two
11:47presentations at the conference. one of
11:49which you will see today. Eric Mayor is
11:53presenting the same presentation on the
11:55Glenwood Crest project that he presented
11:58at at the conference and then um our
12:01asset management team uh Sherry, Claudia
12:04and Kinley also presented on some pure
12:07pipe lining uh projects that that they
12:09did. So both both were very
12:11wellreceived. We were well represented
12:13at the conf. There is a um a survey that
12:18our flood plane team has been um u
12:22putting out to the to the public.
12:23They've made a number of mailings. Uh
12:26there's a link here if you're interested
12:28in uh filling it out, but we're just
12:30looking at what the survey is related to
12:32flood risk awareness. And this is part
12:35of a strategic initiative that um our
12:38team is is working on to assist
12:40residents who live in floodprone areas
12:43uh become more aware and and understand
12:45better what resources are available for
12:47them in terms of potential flood
12:50insurance or or so forth and especially
12:53focus on um renters who may not be as
12:56aware that the um that the home they
12:58live in is is
13:01how many people about that are not
13:04directly city or
13:08>> so far we have done direct mailings um I
13:12believe I'm not sure if someone's here I
13:14think it was 1,800 um direct mail cards
13:18were sent out area you remember how many
13:20we sent out from the tele
13:26>> okay there but yeah it was a direct mail
13:29but they're exploring other methods as
13:32well this is is part of strategic
13:34initiative is trying different ways of
13:36of reaching folks who sometimes may be
13:38hard to reach. See what um success rate
13:41we we have. Um because you know, and
13:44we've talked about this before. Um
13:47people who own their homes are usually
13:50more aware that they're in a flood plane
13:52or a flood run area because their
13:54mortgage company makes them buy flood
13:56insurance. Whereas there is not a um a
13:59similar disclosure
14:02method for rent to know or understand
14:05and there's no legal requirement at the
14:08federal or state level to require
14:10disclosure by landlords that um to their
14:13to their tenants. Um there has been
14:15discussion of of um whether that could
14:18be a a potential federal policy in the
14:21in the future. U but so far it's it's
14:24it's not got um got a lot of traction at
14:27the federal or state level.
14:34>> Thank you. So 1800 direct direct mail I
14:37think we got maybe in the 40ish range of
14:40responses so far. So, um, yeah, and pass
14:43along or if if you would know anyone who
14:46would, you know, be interested in
14:48filling up the survey, please continue
14:50to promote that. Um, there are some
14:52links um and a couple public meetings we
14:55have coming up on October 8th. So, just
14:58next week, is the East Lane uh East Lane
15:02Street public meeting that's in the
15:03Oakwood neighborhood. That's a project,
15:06a capital improvements project that's
15:08nearing the end of u uh design. Uh and
15:12public meeting will review the the
15:15alignment of of that project which is
15:17aimed at um
15:20uh structural um integrity improvement.
15:23You might recall that was the location
15:25that there was a private storm sewer
15:28under a house that failed and um caused
15:31a large sinkhole and the house had to be
15:33demolished. So the city project um will
15:37replace that private system which was in
15:39backyards with a public system that
15:41follows the street rights of way to um
15:44to relocate storm water through through
15:46the streets primarily. Yes sir.
15:48question. I think it was last week city
15:50of Rings out there at the intersection
15:51of L and Oakwood
15:54uh would have been the north west
15:57quadrant and they they dug up there used
16:00to be it was like constant flooding and
16:02the neighbor said there's just a spring
16:04that feeds that corner and I think they
16:07addressed that. Do you know what they do
16:08you have any idea what they were doing?
16:10>> Not familiar with that intersection. I
16:12do know that there was a catch basin at
16:14the corner of Lane Street in Bloodworth
16:17>> that was um that was also a floodprone
16:21area that work was done not to
16:24completely correct it but to to make it
16:27easier for to get drainage but this east
16:29lane project will go through that area
16:31and provide more capacity as well. I'm
16:33not familiar with the intersection that
16:35you're mentioning.
16:36>> It might not been storm water. may have
16:37something else there could have been and
16:40I don't know if we are maint
16:46>> um and then there is on October 24th is
16:49street cleanup at Worthdale Park and um
16:52if anyone to go to that we are finishing
16:55up a construction project it's a stream
16:58restoration project at Worthdale Park as
17:00as well so you can get a a glimpse of
17:02the ongoing work that's uh being done at
17:05at Worthdale Park also
17:08We click on the links and sign up
17:10volunteers.
17:11>> Yes. Yes, that would be the easiest way
17:13to do that. Or um yeah, it be I don't
17:17know the time in the area. Do you know
17:19that the time in the street or dor time
17:22that clean up?
17:24>> Well, it's 10 a.m.
17:26>> 10 10 a.m. So, registration would be
17:29preferable, but you could also just come
17:31at 10 a.m. to work on October 24th. I'm
17:35sure somebody will give you a vest and a
17:37and a bag to to help collect some
17:40litter.
17:42And then lastly, a few uh drainage
17:45assistance projects. Wellington um place
17:48cable court Midlands Town Homes moving
17:51to construction here in the very near
17:52future. So excited about seeing more DA
17:56projects moving moving forward.
17:59And that's all that I have, Mr.
18:02Thank you for that. Um I saw we all
18:06maybe got an email about a bio blitz
18:08starting this week today. I think we're
18:11on the storm water list now. Thank you
18:13for that. Um that's across the city park
18:16sites or something. So that's exciting.
18:19Um and notice they were fixing on six
18:22road that a new building
18:25drainage issue pushing out six foot road
18:28and they were fixing that last week. I
18:30appreciate that. You want to talk about
18:32that?
18:33>> Yes. Yes.
18:35Um, all right.
18:37Any questions for Wayne or staff?
18:43>> Uh, let's see. We now have the modified
18:45consent agenda for the Valley Rainwater
18:47Rewards Projects and Justin and Stephen
18:50are here to talk
18:58like we have three projects on the
19:01>> Yes. Agenda here.
19:03>> Yeah. Thanks.
19:06So, I believe you all received the memo
19:08prior. Um so happy to answer any
19:11questions related to the three projects
19:13I'm proposing today um
19:16for the budget that's on top of that.
19:21>> You can just spin them through a little
19:24project after this.
19:25>> Yeah. Just so we can see our
19:28>> Sure. Yeah. Do you mind driving or
19:34crashing?
19:36>> Nothing unusual about any of the three.
19:38>> No, nothing unusual. Um, nothing, you
19:40know, particularly to point out and say
19:42that's that's atypical.
19:45So once again, three projects. Uh, one
19:49is integrated as you can see on top.
19:52Basically means there's two different
19:53project types, Ringard and Sistn. You
19:56can see them kind of delineated here
19:58with their typical or they're not the
20:00typical their drainage areas for each
20:04and then below those metrics are a sum
20:06of the total project.
20:09>> Is that right piped all the way?
20:13>> Yeah, it's a pipe.
20:15>> Yeah, we typically recommend piping just
20:16because swailes are um especially like
20:19river rock swailes or something like
20:21that can get very expensive very quick.
20:23um actually dissuade people from moving.
20:30All right. Uh next one, another rain
20:32garden kind of in the corner uh of their
20:34lot downstream capturing majority of
20:37their roof in this case. Uh same ide sp
20:41mostly roof runoff. Um prior one did
20:44have some pvious treatment as well as
20:48well as mainly impervious. This is the
20:50next two are all impervious treatment
20:57and see a similar design uh for this
20:59property too. A little more w little
21:01more open in this case. Um but you know
21:04roughly speaking that's where the rain
21:06garden has been located and they're
21:07capturing majority of their home and
21:09some driveway.
21:12So good projects overall. Um,
21:16you know, like I said, no no issues as
21:19far as far as uh initial review or
21:21scrutiny went after we we you know,
21:26cross-cheed every every item in their
21:28application.
21:29>> Have you seen more interest by
21:31contractors or more availability from
21:33contractors in these projects or
21:36>> Yeah, better depth of contractor.
21:38>> Yes. So I would say that is actually
21:40very observable recently. Um you know
21:43because normally we'd have some key
21:46players. I'd say about three key players
21:48now I've been getting a lot of calls
21:51from additional ones as well. Um one of
21:54which or both of which are promoting a
21:56lot of their clients. So um so yeah you
22:00know key players and I say key players
22:02just just frequent flyers right? Um,
22:05I've I've probably been seeing five, six
22:07plus additions to our contractor list
22:09recently. Um, so it's been it's been
22:12good in that regard. I think that's only
22:13a helpful thing.
22:16Yeah, adds more competition, gives
22:19diverse kind of approach to things,
22:21challenges us in many ways too, just to
22:23to scrutinize and see what they're
22:25doing, what they're not doing. So, yeah,
22:27very good. Uh and and I would say also
22:30at least this last couple weeks like a
22:32huge uptick in interest as well. So
22:36you've been responding to a lot of
22:38consultations
22:39>> on the residential side or commercial
22:41side or not?
22:42>> Both.
22:42>> Yeah, both. You know, residential I
22:44think I don't know if it's ever going to
22:46change. It's definitely our backbone. Uh
22:48that's the majority of our
22:49consultations. But yeah, for me speaking
22:51for myself, I've had two uh commercial
22:55consultations recently. you know, some
22:57large scale plus one of these guys like,
22:59hey, I own 20 properties. I'm trying to
23:01explore this. So,
23:04we'll see. We'll see see what happens. I
23:06never
23:09>> Yeah.
23:13Do you think the change to the 90% um
23:19citywide is driving any of that
23:21potentially or?
23:22>> Yeah. Oh, yeah. I mean, it's I get a lot
23:25of feedback on the generosity of the
23:28program. So, uh, and people who just
23:31hear about it or they're like, "Hey, my
23:34landscaper told me about this. This
23:37doesn't, you know, it almost seems
23:39unreal. Why aren't more people doing
23:40it?"
23:41>> Um, so, so that is absolute feedback
23:45I've been getting. I think that's I
23:47think that is is huge. Now, you know,
23:49obviously every project is unique. We
23:51have to evaluate it. sometimes have to
23:53say, "Hey, you're not eligible for 90%,
23:55you're eligible for 73% or whatever."
23:58But, um, but still it's it's good
24:01feedback, you know, pretty much across
24:03the board.
24:18Second
24:21discussion
24:23all in favor of approvement for the
24:25motion. Okay.
24:27>> All right.
24:28>> Yeah. I appreciate it. Thank you guys
24:31for doing this work.
24:33>> Yeah. Yeah.
24:37Um, now we're going to pass
24:42about what we
24:45crested and drainage improvements
24:46project. Just Eric. All right. Just
24:48Eric. All right. Got the better half
24:50today, right? I hope so.
24:53Thank you for being here after doing
24:55this before. So, you better drive run
24:56with a, you know, a lesser crowd. Hope
25:00not.
25:01>> Again, Eric Mayer. I'm a CIP project
25:03manager for Raleigh stormwater and I did
25:06present this to the American Public
25:07Works Association meeting we had last
25:09month at Winston Salem. I'll be offering
25:12the same presentation to the American
25:13Society of Civil Engineers next month in
25:16Raleigh at the McKinnon Center and here
25:18to talk about the Glenma Crested Drain
25:20Improvements Project on the urban
25:22rehabilitation retrospective.
25:27My agenda will consist of five points. A
25:29brief background on the project, the
25:31engineering study and decision for the
25:34alternative was chosen, the design
25:36permitting stages for this project,
25:39construction phase, and then overall
25:41outcomes.
25:45Historically with Raleigh storm water,
25:47with any capital improvement project,
25:49the methods that's been going forward is
25:51to identify a failing stormwater system
25:54and to upgrade it by digging and
25:56replacing it with a larger pipe.
25:59But now as we come to different
26:00neighborhoods, there are different
26:01concerns and different uh opportunities
26:03to rehabilitate situ
26:11being an older historical neighborhood.
26:14So Raleigh storm water going forward is
26:16going to use more CIP as needed for
26:18different projects as development comes
26:20about.
26:23The first task was to assess the the
26:25given area within the five points as
26:26part of the engineering study. So, a
26:29network of about 3,700 linear feet of
26:31private stormware pipe was identified
26:33and studied using close caption TV
26:36techniques and full camera to identify
26:38and grade each of the different uh
26:40conditions for those pipes.
26:42Within that network, about 2550 or
26:45roughly 70% of that pipe was screened
26:48out and set aside for no work or no
26:51attention needed to be done at the time.
26:53Minor defects here or there, no saving
26:55holes. There was no need to re-lotate
26:57that section of piping.
26:591,150 ft remaining 30% of the alignment
27:03was chosen for further upgrades for
27:05rebilt or excavation replacement.
27:08It should be noted for this project that
27:10it was governed by the presence of sink
27:12holes and overall structural integrity
27:14of piping and not the capacity. Flooding
27:17was not a concern and had not been
27:19reported too much among the uh the
27:21neighborhood.
27:23This project was challenging with the
27:25all the private property efforts because
27:27it was so interrolling with public
27:28alleys specifically Woodland and
27:30Crescent Alley. The five points you had
27:33to be mindful of homes driveways and
27:35other structural considerations and an
27:37overall city system implications for
27:39public runoff.
27:43Again the global crest area within here
27:45is uh as shown star the five points area
27:49again four quarters around here and
27:52avenue a major artery that's working its
27:54way over here.
27:56This area is on the order of 80 to 100
27:58years old and is governed by the
28:00backyard trunk line running from this is
28:02about uh Copper Street through Woodland
28:05Avenue up through Crescent Woodland
28:07Alley crossing DT road at Glow Avenue
28:11working its way down to Alexand. So
28:13these pipes are on the order of 30 to 54
28:15in in diameter.
28:18At the time this work was done and the
28:19city studia there were no public ements
28:22anywhere on it. So system and process
28:24need to be put in place to achieve
28:26public easements for this alignment.
28:28Again, this was documented through about
28:30two decades of calls about sinkholes and
28:32GIS application work. The prime
28:36contractor was solutions with a contract
28:38price of $2.8 million.
28:43Now in this agent system, how do we go
28:45about customizing the solution to bring
28:48about improvements for the overall well
28:49crescent system?
28:54The choices between rehabilitation or
28:56replacement are governed by condition
28:58pipe set study structural integrity
29:02identifying if it's flooding or not
29:03flooding where it is in relation to
29:05homes, garages, walls, fences, other
29:08structures,
29:10being able to achieve and identify
29:12easement widths. Again, tracking those
29:14sink poles
29:16within that 1,150 linear feet I had
29:19spoken about that required some work to
29:21be done on it. 800 linear feet was
29:23identified to be rehabilitated with
29:25cured in place pipelining. The remaining
29:27350 linear feet will be dedicated for
29:31new excavation or equation of pipe.
29:34As I discuss this project, it'll become
29:36apparent that the wire itself will still
29:38the pipe. There needs to be a grounding
29:40program or backbone program, some way to
29:42address the same holes that had been
29:44recorded and identified by the
29:45residents.
29:50This section here I'll discuss is again
29:51the uh section that's on the west side
29:53of Glow Avenue. So it doesn't show the
29:56side east side where Alexander is. This
29:58section here Alexander was lining and
30:01joint replacement joint repair but I
30:03wanted to just highlight for you
30:06the solution need to be customized. So
30:07there's a lot of alternation between
30:09yellow lining
30:11and red excavation. So it was very uh
30:13peace build in the way the contractor
30:15had to plan and work to meet the design
30:18requirements.
30:20This section here on Preston Road along
30:22Woodland Avenue who sectioned down did
30:25not require any additional work. So that
30:26was left alone during project.
30:35The preferred method that storm water
30:36will look to going forward is to use
30:38ultraviolet cured uh glass reinforced
30:41polymer as the methodical lining. This
30:44is chosen primarily because of its
30:45environmental qualities. It has
30:47diminished odor and does not affect the
30:50air quality the same way felt or steam
30:52curing does. There's also less chance of
30:54intrusion into surface waters that may
30:57come about by this application.
31:00Now I get to show you some of my toys
31:02I've collected along the way. Part of
31:05the project in order to evaluate this
31:06was a visit to the Santex plant in
31:08Huntersville, North Carolina, which has
31:10a a large market share of providing
31:12these UV cured liners in North Carolina.
31:15So I want to share with you some of
31:16their typical fiberglass strands that
31:18they have.
31:20You're able to kind of see the whole
31:22process of fabrication. So this uh this
31:24particular piece of fiberglass has
31:26aspirations of becoming either a 12 to
31:2872 in liner along the way
31:35when cured becomes a hard structural
31:37member in place. This is about quarter
31:39inch in thickness.
31:45share with you some pictures not only
31:46from the GL Crescent project, some other
31:48recent projects I've worked on that had
31:50lining elements in. This is a project on
31:53Tomington Drive that we completed last
31:55year as part of the system repair
31:56program. You can just see some of the uh
31:58storage containers. This is where the
32:00liner is stored
32:04and it's brought and delivered to the
32:05site.
32:11This is a section of the liner. Once it
32:13becomes once it goes from that
32:14fiberglass single strand, it becomes a
32:16liner. And you get the varying
32:18thicknesses by just making multiple
32:20layers of that fiberglass element along
32:23the way to get the desired design
32:24thickness
32:32within that system repair package I just
32:34mentioned. This was a uh project on Pine
32:36Street that was completed last year. And
32:38this is an example of the UV light
32:40train. And this is a element that once
32:42the contractor has installed the liner,
32:44he runs this train through. It's got a
32:46series of lights that emit ultraviolet
32:50with the uh hours of the resin and lots
32:52of curing process. So generally the
32:55contractor will run this about a foot a
32:57minute. So about 60 ft an hour in order
33:01to cure in place.
33:05photo of the dentist [clears throat]
33:08on there. It's very similar product.
33:16[laughter]
33:22>> The public engagement program for this
33:23pro process. This project had multiple
33:25processes along the way. The initial
33:27stage involved traditional public
33:29meetings with large gatherings of
33:31interested neighborhood. Again, we got
33:33this large polygon founded by Kalper, by
33:36Fairview, Glenwood and Alexander
33:39invited these households to discuss the
33:41project and let them know the
33:42alternatives that we had put in place.
33:44As the project continued to develop in
33:46terms of easement reporting and
33:48construction sequencing and other way of
33:51the construction meetings became more
33:53customized and more one-on-one means
33:55were necessary to continue to inform the
33:58residents about what they could expect
33:59to see and what would be asked of them
34:01during the construction process
34:07the engineering study. Now we can get
34:09forward and start putting together
34:10design plans to get this project
34:11permitted and built.
34:15Some of the challenges involved because
34:16it was a unique project to storm water
34:18was navigating how the permitting
34:20process would work or would be involved
34:22in terms of doing engineering analyses
34:24for hydraulics and hydrarology
34:27coordination involved with the DUT as
34:29the Glowwood Avenue section where this
34:31project will bisect as a DOT corridor.
34:34they need to be involved with the
34:35project to make sure that there were no
34:37adverse effects to their existing
34:38infrastructure in Glwood Avenue.
34:41We also had to navigate what the
34:43disturbed areas would be and how much uh
34:45permitting that would involve. So during
34:47that permitting process and discussions,
34:50it was determined that since over an
34:51acre of areas be disturbed for aligning,
34:54we still need to go through with the
34:56DEEQ to obtain the appropriate
34:58permission to keep the project moving
35:00forward.
35:03This is the 42-in corrugated metal pipe
35:06underneath Lwood Avenue. And you can see
35:07it's in in rough shape and has uh severe
35:11rusting where the water would be and
35:12just a very irregular cross-section that
35:15would inhibit storm water flow. So
35:18during the coordination process, this
35:19was discussed with the DOT and
35:22discussions were back and forth as to
35:24whether the city would do it ahead of
35:26the project and further coordinate with
35:27D or the best way to sequence it going
35:30forward. So it had been determined that
35:32the DOT would ahead of the city's
35:34project rehabilitate this pipe prior to
35:37the city breaking ground on their own
35:38preferred
35:43as discussed before there about 30
35:46private properties were involved and
35:47there were no easements hand at the
35:48time. So we had to work with according
35:51with the each individual neighbor to
35:54achieve and record the ement in order to
35:55do the work in a single cohesive system.
35:59This also involves again customizing the
36:01solution to accommodate existing fences,
36:04driveway repairs, access, making sure
36:06the landscaping and tree removal was
36:08accounted for and documented.
36:131909 Glenwood Avenue is the property
36:15that the city had bought. It was the
36:16focus or part of the project. The
36:19homeowner had wanted to sell it due to
36:20some sink holes and just some drainage
36:23repairs that had been long overdue. It's
36:25determined by the city that based on its
36:28location, it'll be serve it well to be
36:30able to customize and determine the
36:32final layout for storm water as well as
36:34to have a staging area to store
36:36equipment during construction.
36:41Twists and turns during construction.
36:46This is a new kind of work. So, it took
36:47a challenge some challenges to advertise
36:51to skate from contractors what be
36:52looking at. So the engineer acorn
36:55determined an estimate of $2.4 million.
36:58We ended up having two bids after two
37:01sets of uh bidding iterations and the
37:03lower bid was $2.8 million to get into
37:05fluial solutions.
37:08Contraers are still learning about the
37:10large scale rehabilitation and what's
37:11involved that market. So now I think at
37:13this point we get a little bit more
37:14momentum and be better suited to have
37:17more competitive pricing in the future
37:19as contractors get more familiar with
37:21what the city's been expecting and what
37:23that work will look like along the way.
37:26We found some challenge along the way
37:28working with the subs that we had a
37:29given general contractor who applied for
37:31and won the bid. They hired a sub who
37:33had experience in lining but not enough
37:36experience sufficient enough for the
37:38curing place pipeline that we had
37:39specified. So we ended up having a
37:42subcontractor to a subcontractor which
37:44we had some challenges along the way
37:46getting the project done but it was a
37:48little challenging and different because
37:50of the out ofstate nature of this
37:52contractor. There had to be some
37:53additional coordination efforts involved
37:55just to make sure that we stayed within
37:57the project schedule.
38:02Working in backyards, we had to be
38:03mindful of different access issues,
38:05where fences and gates were, being
38:07mindful of privacy for each of the
38:09homeowners, and being aware of their
38:11concerns for tree removal and for
38:13driveways.
38:17I'll share a uh a pair of
38:20pictures here. And this was for the
38:22frame that needed to be removed. This is
38:24for a 42inch pine tree along the
38:26alignment that was needed to be removed
38:28in order to facilate access along
38:30Woodland Alley. So it was a challenge
38:32getting such a large piece of women into
38:34a narrow narrow space as will ali.
38:44This is the driveway along the project
38:46alignment. They have reported just voids
38:48and sink holes underneath their
38:50driveway. The driveway in this case here
38:52was not paved but there was a ground
38:54stabilization program put in place. That
38:57graph was installed by injecting through
38:59pilot holes before that moment.
39:02[clears throat]
39:22Given the nature of the uh approach area
39:25in terms of this historical nature and
39:26some of the over structures, it was
39:28determined that it would be appropriate
39:30to ask task our materials testing agent
39:32to put together a program of three post
39:35construction inspection assessments as
39:37well as monitoring the various uh site
39:40structures with some crack ages, some
39:42seismic monitoring for sensitive areas
39:44where excavation and replacement was
39:47occurring. So we went through this
39:49program and working with the residents
39:50to gauge their interest in participating
39:52and it gave them a little more comfort
39:54that the city had their best interest at
39:56heart in protecting their homes and
39:58other structures during construction.
40:04Part of that again is the tree removal
40:05and you'll see the picture of the uh
40:07pine tree I'm take I'm sitting around
40:09that was removed. This is a property
40:11here where there were two trees. This is
40:13a 33 inch maple, a 77 inch popppler. So,
40:17we worked with the homeowner and did the
40:20best we could to this popper tree still
40:22in place. The structures that were
40:24rehabilitated were rehabilitated around
40:26to avoid damaging the tree roots.
40:28There's a vertical root zone for each
40:31tree that was dedicated during the
40:32construction.
40:34At the home west, we did remove this
40:37maple tree, so the hammock is no longer
40:39there.
40:42But along the way, as part of the
40:43consultation, we worked in house with
40:45our urban forestry folks just to
40:47identify limiting areas and how we would
40:49be judicious about tree removal and tree
40:51lim
40:55with an aging system like this where a
40:57lot of the construction solutions years
40:59ago were sort of ad hoc. We had to
41:01determine identify the conditions and
41:03see what remediation could be done along
41:05the way. So this is kind of a typical
41:07condition where you have a lot of stone
41:09or brick constructed drain structures in
41:11place again here because a lot of the
41:14corrugated metal piping really
41:16collapsed. So we had to be mindful of
41:18that. In this case here, this was the
41:201909 Gladwood Avenue box that was
41:22particularly challenging for the
41:24contractor. We end up developing a
41:26solution where this structure was kept
41:28because the contractor's fear about it
41:31collapsing during demolition. So we're
41:32able to redesign to accommodate uh
41:35additional lining, creating a new
41:37manhole to facilitate additional
41:39excavation and replacement.
41:41[clears throat]
41:42At one of the residents, we found there
41:44was a concern about rats that have been
41:46invest infesting there at their home. So
41:48we had to determine if the structure the
41:50drain structure could be changed or
41:52modified to discourage rats from
41:55constant in and out. So that in that
41:57case that modification was switched from
41:59an open throat catch basin to a standard
42:01uh draining but
42:04every once in a great while you may also
42:05see some sewer laterals some conflicts
42:07that you're unaware of. So likewise
42:09we're able to work with the homeowner to
42:11modify our design to avoid damaging
42:14their sewer lateral.
42:18During the course of construction, we
42:19found that there was a case where we had
42:22a 42inch corrugated metal pipe and
42:24during construction, we found that there
42:26were some wrinkles that formed. And
42:28these wrinkles are as a result of just
42:30the corrugated metal pipe crushing like
42:31a soda can. So your cross-section of
42:33your pipe is irregular. It doesn't quite
42:35match a nominal diameter that was
42:38anticipated. And as you can see with the
42:40sand that are around, this condition
42:42right here is is hard. There's no it's
42:44already cured in the place. that water
42:46is just going to sit and it may cool but
42:48it may be may have a hard time getting
42:51around there will not flow as per the
42:53design. So when it was identified the
42:56project team came together and
42:57determined the best course of action was
42:59to grind out those wrinkles and realign
43:02the pipe in order to meet the proper uh
43:05design section.
43:09I'll share with you a uh a recent
43:10project we just finished at Cranon Lane
43:12where the contractor did uh didn't line
43:15up properly and although there's a
43:16wrinkle here because of where the
43:17wrinkle is located uh the wrinkle itself
43:20in this case could not be uh over
43:23couldn't have been avoided because of
43:25the bend in the pipe. So because the
43:27wrinkle was right above the spring line,
43:29it did not inhibit maintenance or flow
43:31was deemed acceptable by that project
43:32team and left in place.
43:40Along the way, we also found that some
43:41of the other liners, the 54in liners
43:43that were planned for Alexander Road had
43:46been uh improperly stored by the
43:47contractor and started curing in place
43:49before they were installed. So we had to
43:51work with the contractor and then they
43:53reorder the liners at their cost and
43:55install them correctly
43:57as the project progress.
44:00When the engineer and the owner work
44:02together, we look for just again close
44:03caption TV review, make sure the line
44:05segments are correct and accounted for
44:07and the line looks good and formed
44:10properly.
44:11identifying any service laterals or any
44:13other uh pipes that flow in there as
44:16well as deting a sampling and testing
44:18program to look at the structural
44:20qualities of the liner making sure it
44:22meets ADM requirements and has the
44:24appropriate thickness based upon the
44:26expected loading involved.
44:32>> I mentioned before earlier about how in
44:34addition to having the aligning
44:35programs, it's appropriate to have a
44:36routing program that helps fill the
44:38voids.
44:39the project I sent before with that
44:41driveway. I'll share I'll share with you
44:44my props. This was the uh this was the
44:46grout was injected in place and this is
44:48a a poly
44:50hydrophilic grout. So only small amount
44:53of grout was injected but just because
44:55of the nature of the water in the soil
44:56it's able to expand significantly fill
44:58in any voids that may come about. So
45:01share that with I call the phone.
45:07Here's a photo of the 1909 Glad Avenue
45:10uh the site that was demolished prior to
45:12construction. And so the sink holes that
45:14were observed there were filled in place
45:16with that same yellow phone.
45:26One of the challenges we have the
45:27contractor was being able to determine
45:29in the bid form a grout. So in the bid
45:33form there was clearly stated that that
45:34grout that you see right there was to be
45:36recorded and docu documented as a liquid
45:38because it's a liquid that's injected in
45:40place and only after it's exposed to
45:41water does it fill up that volume. In
45:44that case, the uh the contractor had to
45:47start billing for the project based upon
45:49that uh that quantity right there, that
45:51volume. We had to have go back to
45:53Webster's dictionary and show that this
45:56is in gallons because gallons is a
45:57liquid measurement and not not that it's
46:00like you can't really quantify what that
46:01would look like. And by doing that we're
46:04able to have some cost control of the
46:06project because that would slow up to
46:08factor 10 15 16 times what the actual
46:10bid might be and be a real costly
46:13problem
46:16satisfaction team. So we were able to
46:18avoid a lot of challenges. We stopped
46:20working by being collaborative with
46:22design team.
46:27>> As we went along the way, we developed a
46:29close out and property restoration
46:31matrix for each property just based upon
46:33landscaping issues, how the structures
46:35were doing and being able just to take
46:37care of walk through the contractor to
46:39identify for punchless purposes what
46:41work was still remaining as the project
46:43continued on.
46:45That's that 77 inch poll I mentioned to
46:47you that was off Avenue just got hit by
46:50lightning in the last few months and
46:52kind of left a nasty scar right along
46:54here. So we're in touch with the
46:56homeowner who was blocking that just to
46:58see if there are any long-term effects
46:59if the popler is going to survive and so
47:02far so good. will be a
47:05night
47:20out.
47:24We finished construction in August of
47:262026. So, contractors left the site at
47:29this time. Now, right now, we're working
47:30through our remaining permanent
47:31compliance. including uh urban forestry.
47:35So now with a storm water conveyance
47:37involved, we're just collecting asphalt
47:38survey data identifying where the new
47:41structures are and close caption TV
47:43inspections
47:45inspections together to the city site
47:46permanent review for the final steps.
47:51Our program outcomes are that trenches
47:53rehab. Having this customized lining
47:55solution will be a workable option going
47:58forward which will help more projects in
48:00more timely more cost effective manner.
48:04The polyurethane grabbing that talking
48:07about with its the foam and its exposure
48:10to water will be another option help
48:12supplement this drive program in
48:14addition to aligning work going forward.
48:17We hope by continue to develop the
48:18relationships with contractors to make
48:20more of a market that more uh good
48:22competition going forward and we get
48:24better bid prices in the future.
48:28Having individualized resident
48:30communication especially during
48:31easements and construction help the city
48:33by developing those good relationships
48:35and helping to keep the communication
48:37going be responsive to the citizens
48:39needs.
48:41It's good for us to be proactive and
48:42identify new technology and be able to
48:44embrace it and work into our toolkit
48:47going forward.
48:49Having regular field meetings bi-weekly
48:51with the design team and the contractor
48:52helped just as a touch point and being
48:54able to respond to issues and pivot
48:56quickly.
48:58The generous owners contingency also
49:00helped with being able to avoid any
49:02costly delays or change orders that may
49:04be problematic with the project and also
49:07keeping the design firm well involved
49:09during construction. For this particular
49:11case, since we're still working and
49:13learning about the curricul pipelining,
49:15we also use the design firm as self
49:17consultant to help with field
49:19construction administration efforts.
49:24Before I uh turn over for questions, I
49:26did want to share sort of before and
49:27after the crime project I mentioned that
49:29I just finished this past month. This is
49:32a before picture and it consists of
49:34three 36-in reinforced concrete pipes
49:36that are emptying into an outfall into a
49:38wetland. You'll see by this first one
49:40that these pots are 50 years old.
49:43They're showing their age. Their wire
49:45fabric is starting to be exposed for
49:47reinforcement. There's moss growing. The
49:48edges are chipped.
49:53And now after uh lining in a fresh
49:56coating using a a spray spray drainage
50:00coating solution, now it's sealed up
50:02there. The edges are kind of are
50:04protected from prer decay. And u this
50:07product turned out well. which was
50:08another asset to our drainage systems
50:10program.
50:14So this is a project we're excited
50:16about. It's got good improvements and
50:17ramifications for our capital
50:19improvements, our system repair, our
50:21drainage systems programs.
50:24Take any questions you might have.
50:27>> Did you rewrite your polyureth?
50:33>> We may do like underlying molding. maybe
50:35limit some noise or [clears throat] and
50:37it was in there and the contractor
50:38understood that. But it's always good
50:41construction side to repeat ourselves to
50:44analyze if need be just to make sure
50:46that everybody understands.
50:48>> Yeah, we'll get to
50:51us
50:55right
51:00in their eyes. They just stay
51:05Yes sir.
51:06>> You may have mentioned if uh what is the
51:08life expectancy of this material?
51:11>> The line is a 50-year
51:13>> design extension for existing piping.
51:16>> Okay.
51:17>> And I would say I would expect
51:22that CMT which lasted 100 years which
51:26that's well beyond what that would be
51:28expected to lo.
51:30>> Yeah. I should reiterate that most of
51:32those pipes that we spoke about that
51:33needed that line or corrugated metal
51:35couple were polyropylene but again that
51:37culprit is a rustling out of the metal
51:39pipes at the spring line.
51:42>> I guess I have another question. Um
51:45is this is the application best when the
51:48pipe is is on the larger side that I am
51:51because several years ago I was over
51:53Chapel Hill and they were doing a pipe
51:54bursting thing and I never seen happy.
51:57>> [clears throat]
51:57>> this be a better option than pipe
51:59bursting
52:01situations?
52:03>> It may depend on the technique and the
52:05engineer's preference what the city
52:06would be uh equal to. Again, I think I
52:09mentioned the general for liner size be
52:11about 12 to 72 in
52:13small diameter.
52:15>> I wouldn't pay to do that. I'm sure be a
52:17certain length that'll be agonomical to
52:20shops.
52:22>> I know you presented at the conference.
52:24Are there other cities and towns in
52:25North Carolina that are interested in
52:27this or have tried it already?
52:29>> Durham and Charlotte have ling programs
52:31as well. They also have inspectors who
52:33are getting more familiar with the
52:34NASCAR requirements.
52:36This also applications with sanitary
52:38sewer and with drinking water. So level
52:40of water utilities in general will be
52:43using this across the nation.
52:47two-part question um less technical but
52:50just as you have conversations with land
52:52owners who are impacted by construction
52:56what are the what is the typical kind of
52:58response that you get in those
53:01conversations
53:03um and then geez my tiredness is showing
53:06I forgot the second question
53:08[clears throat]
53:09answer that and then circle back to the
53:11city
53:13>> I came to city about three years ago so
53:14a lot of this effort I spoke about
53:16within signing and the the initial
53:18public engagement was before my time. A
53:20lot of it was working with the
53:21homeowners to tell what they can expect
53:23in terms of just trees were a big driver
53:26of it, their landscaping, being able to
53:28preserve what they could expect in terms
53:30of what it look like after the fact that
53:31back in terms of uh restoration.
53:35They've been very concerned about having
53:36the old streets back there, but that
53:38alley was very impassible. was very slow
53:41going wet and dark and all that darkness
53:43was great in the summer and of course
53:44the shading but since that time now the
53:47area's dried out a lot it's open and
53:49it's a little bit more eventually grow
53:50in there and be an asset going over.
53:54>> Thank you. And I remember the second
53:56part um you mentioned that the city
53:58bought a lot in order to accommodate I
54:00guess there there's a structural issue
54:02then meant to accommodate staging area.
54:04Um is that common with projects like
54:07this? And then what happens to the lot
54:08after the project's finished?
54:10>> So we're the warranty stage after this
54:12project for 199 Avenue. So the
54:15contractor handed off to us. just doing
54:17strong maintenance in terms of mowing
54:18the grass and keeping an eye on it, but
54:20the weather to offer it publicly for
54:23sale in the future.
54:26It does have a a pipe that's bicting
54:28itself
54:30with a long-term stat.
54:33We do consider that fairly regularly.
54:36Um, you might recall, and I don't know,
54:37Matt, if we can, go back to that plan
54:39view that had the the 1909 house on it.
54:43Um, if we were going to keep the pipe in
54:46its previous location, it was a very
54:50tight easement between two houses. We
54:52would have had to, in order to excavate
54:54a new pipe through there, put a lot of
54:57shoring to protect the foundations of
55:00both of those houses, which would have
55:02been very expensive, maybe approaching
55:04the cost of the house itself, and then
55:06you've got a very tight corridor to try
55:08to maintain that and get access. So, um,
55:12that was one consideration. Um, the
55:15pipe, the owner of this house had
55:17recently purchased, but she was
55:19completely unaware of a private
55:21stormwater pipe right next to her house,
55:24which when family was actually having
55:26some foundation impacts to her to her
55:28house. So, she was unable to get
55:30contractors to even go in there and help
55:33her shore up her house foundation. So,
55:35she was a very willing seller. said
55:38these [clears throat] types of um buys
55:40are always voluntary when we're when
55:43we're going in and talking to
55:44homeowners. And then the last the last
55:47point mentioned that we could relocate
55:49that the new pipe through through where
55:51the house used to be, put an easement on
55:53there. Um in addition to the impacts
55:56during construction that allowed us to
55:58stage and have better access, we'll have
56:01longer term access for maintaining that
56:03whole corridor which is all now
56:06public easement. So we'll we'll take
56:08over mitigating that from uh from this
56:11point forward. So there are a lot of
56:12advantages. Um we don't make those
56:15decisions lightly and it's all all
56:17voluntary but there are a lot of reasons
56:18that that really helped facilitate this
56:21project and we did that we were able to
56:22do that very early. So the design
56:24engineer
56:26designed the project knowing that that
56:29decision had been made. you could
56:31realign the pipe and make the design
56:33decisions knowing that that is
56:40um for the bidding like contractors
56:45there's a pretty big disparity between
56:47those two between those two and you
56:49still see the case of like for future
56:51ones like that's not becoming the case
56:54anymore where people understanding what
56:56it's going to be so there's not that
56:59disparity anymore
57:01who did that bit were general
57:02contractors who more in the excavation
57:06>> ling some of a niche field so ling
57:09contractors don't generally take on the
57:10general contractor role in the case of
57:12the smaller products I showed you since
57:14those were smaller smaller dollar
57:16they're a little more to that but the
57:18nature is kind of required overall the
57:20GC to oversee all the site issues that
57:22go with that so
57:25there'll need to be some relationship
57:26building on their side in order to get
57:27to line
57:29area,
57:30>> right? So, we hope to have now we have
57:31data actually to look at
57:37bring that bid in to more like a actual
57:39cost.
57:40>> Was there was there any that bid that
57:43was chosen? Did that cost change at all
57:46dramatically the porcelain project? Were
57:48there changing orders or anything beyond
57:50that% conditions or were they relatively
57:53on budget
57:54>> due the contingencies that we had in
57:56place 50% contingency in the project
57:59where would be on budget?
58:02>> That answers my question. Did you have
58:04to spend more than the 2.8 if you
58:06thought you were going to? So that that
58:08built in is great. Um, and then is there
58:11I guess is there another lining system
58:13[snorts] that doesn't UV? Is there an
58:17older technique or something like that?
58:19And so this UV thing is very unique. Is
58:22that [laughter]
58:25well you mentioned that because I spoke
58:27before again this the plan was to align
58:30to do a new line here from this existing
58:32box all the way to this box. There was a
58:35picture I showed you of some of the
58:38brick channel that brick chamber that
58:40was very kind of there was no water in
58:41there. It was ancient falling apart.
58:43Since the contractor was afraid to
58:45actually go in there and do direct
58:47connection, but they did a point of
58:48entry here by digging that structure may
58:51have had some possibility of failure. So
58:54the decision was made by
58:57the pipe that was here lining this
58:58section and then connecting from here to
59:01here. So the pipe actually moves from
59:03here to here.
59:05Because of the the short pipe distance
59:08and because of the need to be expedition
59:09about it in this particular case, we did
59:12authorize the contract produce belt
59:14length about 20 ft or so. That was a
59:16little different technique compared to
59:18the cure in place, but it was a little
59:20more able schedule was a little easier
59:23to fabricate.
59:29So the curative place linings idea has
59:33been around for
59:35became more popular in the late 80s and
59:3890s and had been applied a lot for
59:41wastewater um pipes and the earlier
59:44technologies. The first one was um hot
59:46water. So they could impregnate the the
59:49liners that you felt with air with a
59:52with an epoxy. There was a heat
59:54activating curing system. So they would
59:56put hot water in there, heat it up. That
59:59would that would cure the wire until it
1:00:01was hard. But then you'd have a pipe
1:00:04full of hot water that had these curing
1:00:07byproducts like styrene, which have
1:00:10toxicity
1:00:12um to to them. um in a in a wastewater
1:00:15pipe that's not really a problem. You
1:00:17can release it and becomes diluted and
1:00:19goes down in the wastewater plant and
1:00:21it's a micro amount of water compared to
1:00:24what the the system flows. In a storm
1:00:27water system though, you don't want to
1:00:29have that amount of water as biological
1:00:31toxicity. You know, you can't release it
1:00:34to the stream. Um you either have to
1:00:36pull it suck it up into a a vacuum truck
1:00:39or something like that. There are even
1:00:41newer methods that have steam, but
1:00:43you're still um creating that styrene
1:00:46that can that can off gas and and have
1:00:49odors. And again, that has some toxicity
1:00:51to it as as well. So, the UV cure has
1:00:54lots of advantages. You don't have that
1:00:56steam off or or the water that you have
1:00:58to try to get rid of. Um it is
1:01:01relatively new but there are multiple
1:01:03manufacturers now so there's plenty of
1:01:05competition um with but we have gone
1:01:08exclusively to ultraviolet light cured
1:01:12cured in place liner now just just for
1:01:14those reasons there it used to be more
1:01:16expensive it's not really important
1:01:18because of the number of manufacturers
1:01:20that have adopted this we we still get
1:01:23good bid
1:01:24>> it should be that that DOT crossing I
1:01:26mentioned that we start that the DOT did
1:01:28prior to our
1:01:30That was right over here. This was Steve
1:01:32Jer.
1:01:34No, I thought that was really
1:01:40did that one.
1:01:40>> Yes,
1:01:44>> no, no, no. I'm sorry. And I want to go
1:01:46back to Commissioner McMillan's question
1:01:48about pipe. So the cured in place lining
1:01:51system, as you can see, it it does
1:01:53decrease the diameter of the of the pipe
1:01:56just a little bit, but because it's
1:01:57smoother, the actual capacity stays
1:02:00about the same really. And as Eric said,
1:02:03capacity wasn't an issue in this in this
1:02:05project. It was really a structural
1:02:07integrity issue. But pipe bursting um it
1:02:11actually brings you can pull a coupling
1:02:13through there with a a new pipe behind
1:02:16it and you can actually expand and and
1:02:19insert a larger pipe that it literally
1:02:22breaks it pushes it out into the soil.
1:02:25You pull a larger size pipe maybe a pipe
1:02:28size sometimes two pipe size depending
1:02:30on soil and depth and all of that. So
1:02:32pipe bursting is actually we have not
1:02:35used that here in storm water. Rolling
1:02:37waterers use that for wastewater
1:02:39projects. But that is another technique
1:02:40where you actually if you do need more
1:02:43capacity and you want a trenchless
1:02:46technique because digging is expensive
1:02:48or there's a surface impacts or so forth
1:02:51that you're trying to minimize. That is
1:02:53another good technique that we'll keep
1:02:56in mind having storm water but could be
1:02:58applicable.
1:02:59>> Yeah. So I have a question just because
1:03:00we get these questions in the work I'm
1:03:02doing right now. But um I assume when
1:03:05you bought the house from the 1909 give
1:03:09market value, right?
1:03:12>> If you sell it
1:03:14in at least the stuff we're working on
1:03:16now, you can't make a profit. You can
1:03:18sell it back and you can go in with
1:03:20market value. So maybe it went up in
1:03:22value in a couple of years or something.
1:03:24But are there there some?
1:03:27>> Well, in this case, the house is gone.
1:03:29Yeah. An easements through there. So, it
1:03:31can never be redeveloped. Um, what we're
1:03:34considering is so we're considering
1:03:37selling it to an adjacent property owner
1:03:40if they just wanted to have more
1:03:41property. They
1:03:42>> Okay.
1:03:42>> Very restricted what they could ever do
1:03:44on this property in the in the future
1:03:46because of the easement that would be
1:03:49through there. But, you know, they could
1:03:51um, you know, have a bigger lawn and
1:03:53play broke. You know, there's a lot of
1:03:55things, especially in that area, having
1:03:57a larger lot would quite some property
1:04:00value increase to an addition. You
1:04:02>> have the same case for the one on East
1:04:03Lane.
1:04:05>> Um, that would that one um, we bought
1:04:08did not buy the house. We bought an
1:04:10extended easement
1:04:12>> for the entire property, but because we
1:04:15were relocating, we're going to be
1:04:17relocating the new s storm sewer outside
1:04:21of that property. There will not be a
1:04:23storm sewer through that property in the
1:04:25future.
1:04:26>> So, we're able to use it for um
1:04:28construction staging similarly, but we
1:04:31we wanted the property owner to keep
1:04:33that walk for the future because that
1:04:36one can be redeveloped.
1:04:37>> Okay? because it will not have a storm.
1:04:39So they still fight through it. They
1:04:41still
1:04:43very little different situ.
1:04:44>> Yeah. Yeah. Absolutely.
1:04:49>> Challenging projects in sure was. Thank
1:04:53you very much. Thank you.
1:05:03Walk us through
1:05:06fiscal year
1:05:10annual report
1:05:1326
1:05:14fiscal year 26.
1:05:17Thank you again Ariel for everything you
1:05:20have done to help.
1:05:22>> Yes.
1:05:23>> Good afternoon commission. We're back
1:05:24with your thanks to Ariel your draft
1:05:27final FY27 work plan and your draft
1:05:30final FY26 annual just really a
1:05:33highlight all the conditions work as you
1:05:36I'm going to let Ariel kick us off as we
1:05:38look at the report first Matt again and
1:05:42then we get to by
1:05:48any questions.
1:06:00Um, thank you [clears throat] everyone
1:06:01for everybody comments and um your
1:06:03suggestions. I looked through everything
1:06:06that Wayne sent to me um and adopted
1:06:09them in the new uh draft. Um yeah, you
1:06:13can yeah, scroll down if there's
1:06:15anything that you know pops up. Um right
1:06:19now I can certainly go back and um add
1:06:22them in. But from here we would just
1:06:25adopt the annual report and then it'll
1:06:28be presented to the council.
1:06:31>> You're suggesting we did move this right
1:06:36comments.
1:06:39>> Yeah, I think it was Yeah. going through
1:06:41and just making some formatting, then
1:06:43moving that summary up to the front. Um,
1:06:46and then at the end, I also um added the
1:06:49photos for these track members. Um, if
1:06:52you want to take a shot today, you
1:06:54certainly can.
1:07:19Yeah.
1:07:21>> Oh, yeah.
1:07:22>> Yeah. No, I was just going to say feel
1:07:24free to stop scrolling through. There
1:07:26weren't a lot of
1:07:30folks. I think moving moving that
1:07:32summary to the front
1:07:34>> was one of them. Do you remember the the
1:07:36other area? Yeah, it was I think there
1:07:40was just some content that that shifted
1:07:42around uh from some sections
1:07:44>> formatting issues. Yeah. Location
1:07:48issues.
1:07:49>> Yep. Yep. And then I think I may have
1:07:51swapped out some photos that I may have
1:07:53got just some better ones to include in
1:07:56but for the most part um most of it
1:07:58stayed the stay about the same.
1:08:04We go to the last page. Let's see. The
1:08:08last
1:08:11Yes.
1:08:13Yeah, I think Wayne took a group photo
1:08:15the last meeting, so I kind of pulled
1:08:17extracted from that, but you know, I can
1:08:18certainly update any head shots if
1:08:20anyone wants an updated one or, you
1:08:23know,
1:08:24but I think yeah, I think that was all
1:08:27the changes.
1:08:32Thanks.
1:08:37back up to the top.
1:08:40They see it in there.
1:08:43That not
1:08:45just heard about near the top of this
1:08:48area. Keep building all this area.
1:08:58Okay.
1:08:59Drive and DC
1:09:01money, things our CIP. We're going to
1:09:04give us a tour of this project right
1:09:06after this. This is a another
1:09:08neighborhood drainage improvement
1:09:09project. It involves channel
1:09:11improvements as well as piping
1:09:13improvements, cover improvements. So,
1:09:14we'll we'll go see that in just a little
1:09:16bit. So, this must be completed through
1:09:18this year. So, that in your hand
1:09:26work
1:09:29both of these. So all improvements
1:09:32thanks to Eric
1:09:36and um we're a little bit biased but we
1:09:38think this is your best work yet.
1:09:41You know it keeps getting better every
1:09:43year since your draft 27
1:09:46um your comments on the annual report.
1:09:49We took your comments on this one as
1:09:51well. So again right up front we've got
1:09:54your charge from city council items.
1:09:56These are actually per ordinance
1:09:57verbatim right here.
1:10:00Uh there's your connection to the city
1:10:02strategic plan right up there. And we
1:10:04didn't look up
1:10:06the city strategic plan and um there are
1:10:10no identifier references to the verb. So
1:10:13we just enter his text as it is here. So
1:10:17ordinance strategic plan. There's the
1:10:20photograph from last time with the
1:10:22commission. uh your mission statement,
1:10:25your vision statement,
1:10:28some updated photographs as well as you
1:10:30go through here thanks to Ariel.
1:10:34You'll see those
1:10:36smacks involved with engagement and
1:10:39outrage
1:10:41updated
1:10:46your guiding themes. This forward these
1:10:49are your identifiers for the guiding
1:10:50themes here just for your work plan
1:10:52items as we go through the through the
1:10:54agenda.
1:10:56And then I think you get into one thing
1:10:58with add really like this year's
1:11:01acknowledgement of the items and we
1:11:02cover all in the first 25% or so of each
1:11:05meeting are these items public comments.
1:11:08So important the plan commission smack
1:11:10the comments right here staff updates
1:11:15emerging matters which is engagement
1:11:18reviewing the budget
1:11:20and the rainwater awards projects and
1:11:23other projects as well as the capture
1:11:25and as of just last year the silver
1:11:28smart so that's part of our agenda so
1:11:30that's roughly 25% of your work is is
1:11:32those labs and then the rest of your
1:11:34priority shows up here is high priority
1:11:37items all the high.
1:11:42We put in the note that the identifiers
1:11:44here are just that just for identifiers.
1:11:46They're not meant to reflect order of
1:11:49high priority. They're all important
1:11:51identifiers. Here's your connections
1:11:53with the guiding above. So all this
1:11:57should be well connected.
1:12:01Got 10 items in there. the opportunity
1:12:07and likely multiple presentations on
1:12:09some of those throughout the years as
1:12:12well. And this is your just more
1:12:14comprehensive items. You can always pull
1:12:17those as we go throughout the year. your
1:12:18your comments, your thoughts on it and
1:12:21coming together as as you had hoped for
1:12:24really help us be
1:12:27old guided by the commission with our
1:12:29staff to help
1:12:40both of these as approved
1:12:46you
1:12:49not too far out.
1:12:53So very thank you again for great work
1:12:57and he's a really public this is I think
1:13:00closing state public engagement
1:13:03and some really high value
1:13:14we're interested in feel like it's
1:13:16comprehensive
1:13:20>> as always you may test
1:13:27There's always a team member condition
1:13:35when we presented Wayne and I presented
1:13:37it's 5 10 minutes. It's not much of a
1:13:40recap but I don't I don't remember it
1:13:43being very extensive. kind of hit the
1:13:45highlights because these are these
1:13:46documents are given to city council
1:13:50comment before extending.
1:13:53>> That's right. So the city council
1:13:55through your action officially agree
1:13:56with your annual
1:13:58work
1:14:07to
1:14:08>> Yes. If you do make a motion to adopt,
1:14:10then we will officially that would
1:14:13officially send at the city council for
1:14:15reviewing
1:14:18for the November 4th city council
1:14:20meeting.
1:14:37Second discussion
1:14:40favor of that motion.
1:14:43Thank you, Scott. Thank you. Appreciate
1:14:45it.
1:14:48Um, let's see. We are wrapping up in
1:14:52record time. I'll just wait because we
1:14:54got some late breaking news for you that
1:14:56we've got.
1:14:57>> Yes, that's my fault for this. Um I will
1:15:02go through some well let us do the late
1:15:04breaking news because we um
1:15:07then we'll talk about that topics kind
1:15:09of ties to that. So be talking about
1:15:11topics for November this summer.
1:15:14>> Wayne, take it away.
1:15:15>> Yes. So, at the um September 15th city
1:15:19council meeting, council member Jones uh
1:15:22brought up an item during her individual
1:15:25inspection
1:15:26um requesting that the Stormwater
1:15:29Management Advisory Commission um review
1:15:32stormwater regulations
1:15:35and um through facilitation with staff,
1:15:39bring back ideas for um any potential
1:15:43review of specific regulations that um
1:15:47the commission would like to um take
1:15:49forward for potential further evaluation
1:15:52by city council. So um I I wasn't able
1:15:56to go back and get the video of the
1:15:57council. I actually missed that meeting
1:15:59because I was in Mrs. S the APWA um
1:16:01conference. Um but I will review that.
1:16:04But my understanding of request is that
1:16:07um they would like the ideas of some
1:16:09more specifics of what which regulations
1:16:12um there may be some interest in in um
1:16:14looking at more closely and then um and
1:16:18then they will help guide the process
1:16:20that we would want to use to review
1:16:24those whether that will be a stakeholder
1:16:26process or something more specific. And
1:16:29and it may depend on the depth of the
1:16:31regular regulation evaluation and the
1:16:34number of um regulations that you all
1:16:37would like to um to consider for for
1:16:40changes. So what we would like to
1:16:42propose at the staff level is we'll look
1:16:44at a future agenda item maybe November
1:16:47December to get the discussion going um
1:16:50to facilitate if there are any specific
1:16:53regulations that you'd like to look at.
1:16:55Are those erosion sediment control? Are
1:16:57they are they flood plan? Are they water
1:17:00by waterershed regulations? Are they
1:17:02storm water the size of storm water
1:17:04detention? The numbers the types of
1:17:07storm you know if there's anything
1:17:09specific that may have come up in um
1:17:12resoning cases for example I know that
1:17:14kind of stirred some of the discussion
1:17:16of well if there's
1:17:19water conditions that are being
1:17:20requested does that mean perhaps our
1:17:23regulations might need revisiting in
1:17:25some of those same areas? so that we're
1:17:27getting more than just resoning cases
1:17:29because resoning cases are only a very
1:17:31small percentage of the overall
1:17:33development that's occurring in the
1:17:35city. So if there's concerns about
1:17:36regulation um so be thinking about that.
1:17:40We'll certainly bring back and and we
1:17:41can even bring back some some ideas and
1:17:44talk a little just to facilitate the the
1:17:47discussion for you. But we'll bring that
1:17:49back at a at a future meeting that that
1:17:52we can then provide council some
1:17:54additional feedback from that work. I
1:17:57would say if staff can um
1:18:01it's a little bit maybe but just go back
1:18:04to find some of the discussions over the
1:18:06last year cases because I think you hit
1:18:08on the key points sensitive lands
1:18:12for flood planes set control concerns
1:18:16possibly the different storm event that
1:18:18we're being you know tracked for or you
1:18:22know
1:18:26um things like It sounds like we started
1:18:28but just you could see some of those
1:18:29things and then eliminate the bats that
1:18:33we were talking about. Maybe there were
1:18:34other things that you had to talk about.
1:18:36I appreciate councelor Jennis bringing
1:18:38this appreciate that she's been an
1:18:40advocate for attending these meetings. I
1:18:42don't know if she's here today but um
1:18:45but um appreciate her bringing it back
1:18:48to us as an opportunity to discuss. And
1:18:51as Wayne noted, we'll see whether it
1:18:54stays with us or it goes to kind of more
1:18:56technical staff thing. We make
1:18:58suggestions, they come up with
1:18:59suggestions, we review the suggestions
1:19:01or we dive off into a subcommittee. I
1:19:04don't know how much
1:19:08these are things that we've talked about
1:19:09that matter and I think development in
1:19:11Raleigh is a really good thing that's
1:19:13happening.
1:19:14We have to figure out what we'll take
1:19:16out.
1:19:20And just to tack on, I think if people
1:19:22are willing to do a little bit of like
1:19:25homework before the next meeting and
1:19:27we're talking about it, I think it might
1:19:28be useful to us for us to review the um
1:19:32kind of video or not the um conditions
1:19:36that the storm water staff put together
1:19:39as like these would be, you know,
1:19:40potential options that developers would
1:19:43choose that would be above and beyond
1:19:44storm water. That document I think is
1:19:46really helpful. Um and then maybe just
1:19:48some of our cases that we've talked
1:19:50about in the past where we've gotten the
1:19:51conditions out of now and what those
1:19:53conditions look like so that we can
1:19:55probably start with that
1:20:00>> and and it has been good and somewhat
1:20:02intentionally that uh Bennett has
1:20:05appreciated the last year that they've
1:20:06come in and kind of given us a download
1:20:08of the
1:20:09uh direct construction regulations the
1:20:12coast development structure challenges
1:20:14the you know large water wersheds
1:20:18So um but there might be some spots
1:20:19where each of us want to dive into
1:20:21regulations and if we have special as
1:20:24well
1:20:28see where that goes. I appreciate the
1:20:29opportunity or council has offered to us
1:20:32to dig into that.
1:20:37And with that, the other items um
1:20:42we looking at obviously more rain
1:20:45rainwater rewards programs which is
1:20:46great or projects which are great.
1:20:49There's that interest that Steve noted
1:20:51the increased interest. Um we're going
1:20:53to talk about industrial stormwater
1:20:55discharges uh to systems. I believe
1:20:58that's a permit issue that we have to
1:21:01discuss right related to our MS portal
1:21:03permit and there have been some changes
1:21:04to that in our new permit which went
1:21:07into effect July 1. we talk about
1:21:10alarming more education for us. Correct.
1:21:16>> Um begin review like say the council
1:21:19request the storm water development sto
1:21:21development requirements and then it
1:21:22looks like we're going to try to do a
1:21:24field tour park
1:21:30trying to line up a few field visits at
1:21:32the end of meetings like we're doing
1:21:33today. So, visits are optional, but a
1:21:36great opportunity to see things
1:21:38happening.
1:21:41And if you have other business, email me
1:21:43and Scott and Wayne, you can copy
1:21:46Nicola. She's going to be out there for
1:21:48her said till early December, I think is
1:21:51what her office said. But, um, you know,
1:21:54Samantha as well, she just kind of, you
1:21:57know, Samantha Nichol and I meet with
1:21:59Wayne and Scott to pick up the agenda.
1:22:03You see something?
1:22:13>> Leave it as followation
1:22:26capital improvement project. Um think
1:22:29we're 10 minutes early.
1:22:32But somebody has to do their special job
1:22:34before we get out of here.
1:22:40>> Josh
1:22:44that sorry didn't mean to get anybody
1:22:46outbody
1:22:53second.
1:22:56All right. All in favor of
1:23:00Okay.
1:23:02>> [music]
1:23:11[music]