East Lane Street Drainage Improvements Project

At a glance

Based on auto-generated captions; names and figures may be misheard.

A capital project, nearing the end of design, to replace a failed private storm sewer in the Oakwood area with a public system following street rights of way. A public meeting on the alignment was set for October 8.

Sources

Log