2026-10-29 - Finance Committee
Summary
Built from the posted agenda only; no minutes or video recorded yet.
- Items 1 and 4–8 (routine/procedural): call to order; minutes of July 9, 2026 and October 7, 2026; new business; old business; public access; adjournment.
- Item 2: Reserve Fund Transfer(s) — proposed transfers from reserve funds.
- Item 3a: Article 33 — Walker Pond/Falls Road culvert easements — proposed easements.
- Item 3b: Article 34 — Cedar Street sidewalk Phase 2 easements — proposed easements.
- Item 3c: Article 37 — Sewer Reserve Fund replenishment — proposed replenishment.
- Item 3d: Article 38 — Sewer Department generator — proposed generator.
- Item 3e: Article 39 — Route 20 pump station replacement design — proposed design work.
- Item 3f: Article 40 — Cedar Street water line replacement — proposed replacement.
- Item 3g: Article 42 — Funding of DPW contract, July 1, 2026 – June 30, 2029 — proposed funding.
- Item 3h: Article 43 — Joshua Hyde Public Library elevator — proposed elevator project.
Agenda
Posted agenda: October 29, 2026, 7:00 PM, Town Hall, Sturbridge MA
- Items 1 and 4–8 (routine/procedural): call to order; minutes of July 9, 2026 and October 7, 2026; new business; old business; public access; adjournment.
- Item 2: Reserve Fund Transfer(s) — proposed transfers from reserve funds.
- Item 3a: Article 33 — Walker Pond/Falls Road culvert easements — proposed easements.
- Item 3b: Article 34 — Cedar Street sidewalk Phase 2 easements — proposed easements.
- Item 3c: Article 37 — Sewer Reserve Fund replenishment — proposed replenishment.
- Item 3d: Article 38 — Sewer Department generator — proposed generator.
- Item 3e: Article 39 — Route 20 pump station replacement design — proposed design work.
- Item 3f: Article 40 — Cedar Street water line replacement — proposed replacement.
- Item 3g: Article 42 — Funding of DPW contract, July 1, 2026 – June 30, 2029 — proposed funding.
- Item 3h: Article 43 — Joshua Hyde Public Library elevator — proposed elevator project.