2026-10-19 - Water and Sewer Commission
Summary
Based on auto-generated captions; names, numbers and addresses may be misheard.
- September minutes approved. Reservoir at about 42 percent versus a typical 62 percent for the season, with drought watched closely; the plant is in drinking water compliance.
- Director's update: filter backwash valve and roof work at the treatment plant, Quinn Road tank repainting planned for fall 2027, and Ipswich River dam removal pump to be ordered for installation after the June 1 pumping cutoff. See Combined Sewer Overflow Separation Projects.
- Wastewater Treatment Plant Permit Compliance: operator update on the missed permit limits and recovery plan.
- Lead Service Line Replacement Program and State Loans: loan applications authorized.
- Kings Beach Bacteria Source Tracking: subcommittee takeaways and public questions.
- After an executive session on non-union personnel pay (no votes taken), the commission voted to grant middle management the same percentage increase as union employees.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:07Order a roll call.
00:08>> Commissioner Grace here. Commissioner
00:10Matul absent. Commissioner O'Shea
00:13>> here.
00:15>> Commissioner Walsh aba
00:18>> here.
00:20>> All right. First on the agenda is
00:22minutes of the September meeting. People
00:25had a chance to take a look. And does
00:26anyone want to make a motion? Motion to
00:29accept second.
00:31>> All in favor?
00:32>> I.
00:34>> All right. Director's update. Jim is
00:36away. So Andy is uh showing me. So
00:39>> take it away.
00:40>> Um so so Jim has prepared um something
00:43that's in your package and I'll go
00:44through it and uh add my little
00:46editorial appropriate.
00:47>> Yes, that sounds wonderful.
00:49>> Okay. Uh so the water treatment plant um
00:51we're working on replacing a filter
00:54backwash valve. um that was identified
00:56as a as a problem up there. Um
01:00and Apex is working on um engineered
01:05documents for the roof replacement.
01:06That's that's really got to get a roof
01:08up there.
01:09>> Yep.
01:10>> Um the Quinn Quinn Road water storage
01:13tank. Um the repainting so we did a
01:16structural inspection of the vault last
01:18month. Um the plan is to bid it out this
01:21winter and work in the fall of 2027.
01:26Um the so it the paint work is uh very
01:29much temperature weather sensitive.
01:33>> Um and that's the best p best time to
01:35paint is in the fall.
01:36>> Okay.
01:36>> Um
01:38the Ipsswitch River dam removal. Um so
01:41we are working with the winning bidder
01:44on the submittals back and forth. Um
01:48the pump is the is the big big ticket
01:51item. We got to get the pump ordered.
01:52>> Okay.
01:53>> Um there's quite a quite a lead time on
01:55the pump, but we're confident we're
01:56going to have it by the time the um
02:00so we're we're we're not allowed to pump
02:03water after June 1st.
02:06>> And our intent is as soon as the
02:09regulatory window to pump ends, we
02:12install it.
02:12>> Okay. Got it. Okay. So that's that's
02:14kind of the uh
02:15>> So it would be next summer essentially.
02:16>> That's correct. Yep.
02:19>> Um the sewer treatment plant uh the
02:21incinerator is online um reducing the
02:25salts inventory down there which is um a
02:27step in the right direction. Um we had
02:31some back and forth with Violia
02:33regarding performance issues. Um and
02:35they gave us a written response to our
02:37concerns on the 25th September.
02:42um the O5 phase one sewer separation
02:46work. Um so we're currently designing
02:48that work. Um we have a conservation
02:52commission meeting tomorrow night.
02:55Um and then we expect the 90% design
02:59plans in at the end of this month.
03:02>> Okay.
03:02>> Um again, construction for that we're
03:05going to bid it this winter and the
03:07construction for that is going to begin
03:08in the spring.
03:09>> Okay.
03:11Uh we had a city council meeting on the
03:1422nd of September uh regarding the uh
03:18it's regarding the O5 phase one work
03:20which is work I just spoke of.
03:22>> Yeah.
03:22>> Um
03:24Stantech was in attendance and they had
03:26some slides and uh talked talked to
03:29council through it.
03:30>> Okay.
03:30>> Um and I believe that was a um as a
03:33result of
03:34>> discussions we had here.
03:35>> Okay. Um so that includes the alley
03:38street. Uh, we didn't talk about Al
03:40Street. We talked about No, we talked
03:42about O5.
03:44>> Okay. Yeah. Okay.
03:46>> Um, SCADA upgrades, new cameras, um, LAN
03:51computers, working on integrating these,
03:55um, [clears throat]
03:57the Wi-Fi tough books.
04:00We're approaching the end of this that
04:02project. Um and we're actually using the
04:04tough books for the uh lead service
04:09documentation. So the meter division is
04:11using them right now
04:12>> to uh document the um private side of
04:16the service when they install meters.
04:19>> So we have um one of our big problems is
04:21the and I'll get to that um under
04:23business is the amount of services that
04:27we don't know definitively what they're
04:29made of. Mhm.
04:30>> So, this is going to help every meter
04:32they install, they take a picture of it
04:33and uh check. You can't always tell what
04:36it is, but they're going to do their
04:38best.
04:38>> Okay, that's great.
04:40>> Um the website and Facebook's been
04:42updated. Um
04:45and the wind turbine is online and
04:47producing electricity when windy.
04:50Um and then the um lead service line
04:54like I mentioned we'll discuss that
04:56under business but that's going to be uh
04:58>> it's going to require some resources of
05:00of the commission. So
05:01>> yeah couple of questions. Um did were
05:05you part of the meeting with someone
05:07from Violia like an executive came to
05:09visit? Right.
05:10>> Hasn't happened yet.
05:11>> Oh hasn't happened yet.
05:13>> Oh is it this month?
05:14>> It's this month. Sorry. Okay. Um
05:18that's right. Uh the back and forth that
05:21you [clears throat] mentioned um with
05:23the around the issues, is that something
05:24you can share with the commissioners?
05:27>> Um sure.
05:28>> The letters back and forth.
05:29>> Yeah, I can help to be bottom line.
05:33>> Okay. Just I think it's helpful for us
05:34to see it.
05:35>> Um okay. I didn't have anything. Tom,
05:38you got anything? No, you good. I'm
05:40>> good.
05:41>> Okay. Thank you. Thank you. Um,
05:48all right. Project updates. Uh, Matt,
05:51water treatment plant.
05:53Uh, the water and so is in compliance
05:55with all state and federal drink water
05:57regulations. Uh, the reservoir capacity
06:00as of September 30th was 43.4.
06:03Uh, average for that time of year is
06:0562.4.
06:07As of yesterday, the reservoir capacity
06:09was 42.4.
06:11So the rain did help a little bit slow
06:13down the draw down.
06:14>> The draw down. Yeah.
06:16>> Uh September we had 4.83 inches of rain.
06:21Uh the average is 3.84. So pretty good
06:25end of the month there.
06:27Average uh consumption was 9.21 million
06:31gallons and the average for September is
06:33uh 10.14.
06:36And then nine out of 10 contracted
06:38position to filter the plant. Uh, Viol
06:40is just looking to hire a maintenance
06:42technician.
06:43>> Okay.
06:48Um,
06:49CSO update.
06:51>> I'll take that.
06:52>> Oh, sorry.
06:54>> Yeah, I'll take that one. Um, so PGS or
06:57GOSO continued the closeout tasks for
07:00the Westland uh, phase four and five
07:03work. Um they've removed a lot of the
07:05construction equipment from the layown
07:06areas in the city that were there for a
07:08while and some of the islands. Um today
07:10they were out uh starting the final
07:13paving which was under the phase 2 um
07:16pump station work. So that area in front
07:17of commercial street and Bennett that
07:20intersection
07:22um and Stantech is reviewing the
07:24televised inspection footage for the new
07:27drains to verify the water tightness
07:28that there's no um bad leaks coming in
07:31or infiltration.
07:33Um Andy and I had met with Stant to
07:36review comments for the 60% design plans
07:38for phase one of the ' 05 separation.
07:41We're meeting with them again this week
07:43to review some of the carryover
07:45specifics from that meeting. And then as
07:47Andy said, um there's the Concom meeting
07:50tomorrow and we're expecting the 90% um
07:54designs this month, the end of this
07:56month. Um the SRF construction loan
08:00application was submitted to the state
08:02the beginning of this month which is
08:03great. And then we are continuing the
08:07bi-weekly coordination meetings um with
08:10the city of Len National Grid and other
08:12stakeholders.
08:15>> That's it.
08:20>> Um beach updates.
08:24>> Eric from Apex is here. Um
08:27um so uh between the noracer and now we
08:31got out and did go out and do some
08:33followup on some of the past historical
08:36higher uh concentration areas. We still
08:39found even with the you know almost 3
08:41ines of rain, we still found a lot of
08:42dry spots. So we sandbagged the initial
08:45day and came back over the next two
08:47days. Um we did collect some samples.
08:48Data has just started coming back in
08:51from that. We won't see the
08:52pharmaceuticals for a couple more weeks,
08:54but the bacteria and pneumonia started
08:55coming in today. Um, in response to
08:58that, we're going to be going out
09:00Saturday to go to multi-unit properties
09:02on Timson. Um, basically
09:07uh to try and get into units we have not
09:09physically been in. We've had other
09:10units uh test negative for elicit
09:13connections, but we want to double check
09:15if there's any uh multiple laterals
09:18within the same property. So, there's
09:20about 10 properties. It could be around
09:22two dozen total units, but we're going
09:23to go out Saturday to try to do the die
09:25test directly. Um, so Natalie and Karen
09:28will be reaching out to get some
09:29commission support for that on Saturday
09:31because we found that's the most
09:32productive day to catch people at home.
09:35Um, other than that, um, we are moving
09:40ahead with getting the story map that
09:42we've shared. Um, that is going through
09:44final revisions uh, in the next day or
09:46so. without getting shared with the
09:48group hopefully this week. Um, and then
09:50there's been some coordination with Sam
09:52on trying to get into the about 8 8
09:55properties total um that have been
09:57nonresponsive or refusal for access for
10:00D testing. So, that's ongoing as well.
10:03Um, and then we will want to catch up
10:05and regroup as the O5 phase one comes up
10:09to see if there's a potential for
10:11inclusion of some of that pilot area in
10:13the U middle school area just to be
10:16included as quantities for lining if it
10:18aligns with some of the scope work that
10:20Stantex team is working on. um because
10:23that was a a goal for the prior to beach
10:26season or and the 27 beach season to try
10:29and pilot RNR for some of the stubborn
10:32streets that are still coming up high
10:33hits.
10:36So that's that's the update for now.
10:41>> We'll cover some other things in the
10:42subcommittee notes too as well.
10:45>> Thank you.
10:46>> Um wastewater
10:48>> wastewater treatment plan update.
10:51Okay. So, for the period from August
10:5415th through September, I'm sorry,
10:56September 15th through October 19th,
10:59average flow was 16.6 million gallons
11:01per day. Um, for the month of September,
11:04the average BOD was 44 milligs per liter
11:07and the average TSF was 41 milligs per
11:10liter. These numbers are indicative of a
11:13market improvement, okay, of where we
11:15had been, especially for the months of
11:17June and July when the incinerator was
11:20cooled down and taken offline
11:22>> so that the solids building upgrades
11:24could happen. Uh we talked about that in
11:26previous meetings. Um various components
11:29in the solids building were either
11:31replaced, refurbished or repaired and um
11:36not the incinerator itself,
11:38>> right? But the incinerator needed to be
11:39offline in order for that work to take
11:41place. Um the incinerator went back
11:44online in early September and for the
11:47period the sludge cake was fed into the
11:49incinerator with 355 tons incinerated
11:54which is great. Um piping and electrical
11:58connections for the F swing pump. Um, a
12:02swing pump is a pump that pushes a
12:05little slug of sludge into the pipe that
12:08feeds the incinerator.
12:10>> Currently, there's only one swing pump
12:12down there. Starting this week, there
12:14will be two. Um,
12:16>> the piping and electrical conditions for
12:18what's known as the F swing pump were
12:21completed. So, start of the pump take
12:23will take place this week. Uh this pump
12:26was purchased and installed by Violia to
12:28provide redundancy for the sledge cake
12:30feed system into the incinerator when
12:33either of the swing pumps need repair or
12:36maintenance.
12:37Um piping and electrical connections
12:39were also completed for the centrifuge
12:42what's known as centuge number two.
12:44Again, much like the swing pump, there
12:46was only one centuge working and if it
12:49needed maintenance or repair, it you
12:52couldn't use it feeds the swing pump
12:54which the pump feeds the sludge into the
12:58[clears throat] incinerator. So there
13:01will be redundancy for both the centuge
13:04and the swing pumps. So that means we
13:08won't have the won't have to stop stop
13:10operations incineration operations
13:13>> while repairs are taking place or just
13:15regular maintenance. Um we've talked
13:18about primary clarifiers and primary
13:22clarifier B. The repairs are completed
13:24as online and working. They have drained
13:27primary clarifier C uh drained and
13:30inspected and necessary repairs to the
13:33flight system are ongoing.
13:3632 of 33 positions are filled at the
13:38plant.
13:40And now we can talk about the back and
13:43forth that um Andy alluded to um between
13:47Violia and LWSC. On September 3rd,
13:512026, LWSC issued a letter to Violia
13:55stating that the commission remains very
13:57concerned about the non-compliance with
13:59the plant with the Nifty's permit. A
14:02meeting between the management teams of
14:04both LDWSC and Violia was held on
14:07Wednesday, September 16th. On September
14:1025th, Violia submitted a response to the
14:12commission's letter and provided a
14:14schedule for the plant to get back in
14:16permit limit compliance.
14:19Uh the response letter and schedule that
14:23provided remain available for LWSC to
14:26provide to DPA should they ask for it.
14:32I have Sam Sam Sullivan here who is the
14:35plant manager for Violia down at the
14:37wastewater treatment plant and he's here
14:39to answer any questions the board may
14:41have.
14:44>> Question.
14:45>> Uh I was going through the September
14:46report and um I noticed the LIN pump
14:49station. So the uh hours of maintenance
14:5269.36 hours. Is that just one pump
14:55station? I was
14:56>> that's all the pump stations. So when
14:58they go out and they do the pump
14:59stations, it generates it under one
15:01heading.
15:02>> So all the pump stations are underneath.
15:03Okay.
15:03>> How many pump stations?
15:04>> We have the 13 plus the uh
15:06>> 13 [clears throat] the storm water
15:08station.
15:09>> And um the other item was the uh hours
15:12for the uh primary clarifier. It's 528
15:15hours.
15:15>> So that's just to do one clarifier.
15:17Yeah. That's for the month.
15:18>> Yeah. With with multiple there's some
15:20other guys on it. Multiple guys working
15:22several days a week on it.
15:23>> Yeah. It's it's
15:24>> it's a big project.
15:25>> Sure. Yeah. Sure.
15:27um the um sampling at Demarcus.
15:31>> So I saw you guys did some sampling
15:33there. One of them was out of compliance
15:36a little bit.
15:37>> Mhm.
15:37>> Um what do you do in that case?
15:39>> Uh we don't do anything. We just report
15:41that to you guys.
15:42>> I can answer that. Um they report it to
15:44us and that gets handled through our IP
15:48coordinator who is Joe Boschain who is
15:52works through Andy Ruth. He's in the
15:54engineering office. And typically when
15:56that happens to them, a search charge is
15:58issued to the industry.
15:59>> Yeah.
15:59>> So they pay for it.
16:00>> Right. Right. I'm not looking to uh
16:03discourage business in the city. Right.
16:05>> It's the last thing I want to do is sort
16:06of Right.
16:07>> Okay. Um
16:09uh that's all I have for that.
16:11>> Great. Thank you.
16:12>> Okay.
16:15>> Quick question. Um so what is the
16:17schedule to get back within permit
16:18compliance?
16:19>> Um we're hoping either October or
16:21November.
16:23Right now, we had we had a pretty
16:24significant drop in the the TSS BOD the
16:26last couple months and if we continue
16:28that trend, we should be on track for
16:30the end of October, the beginning of
16:31November.
16:32>> Sorry, can you spell out those acronyms
16:34that you just said?
16:34>> I'm sorry. BD is biological biochemical
16:37oxygen demand.
16:38>> Okay.
16:38>> And then TSS is total suspended solids.
16:41So, those are the two parameters that we
16:42measure coming out of the afternoon.
16:45>> Our permanent limits are 30 and 30
16:47milligrams per liter. We're currently at
16:50441.
16:52>> And that's what's being discharged into
16:53the the harbor.
16:54>> Yes.
16:57>> BOD is like strength of waste water. TSS
17:01is total suspended solids. Uh just to
17:04give you a idea of how much improvement
17:06has happened for the uh month of July.
17:10BOD was 92 milligrams per liter and CSS
17:13was 73. So we've come down quite a bit.
17:18What was it in the months before then?
17:20>> Um, I can tell you in June it was 79. T
17:25BOD and TSS was 53.
17:28>> Um, do you want to go back to I got from
17:31January?
17:32>> Sure.
17:32>> Well, I'll just put it this way. How
17:34many months of those have we been out of
17:36compliance
17:37>> of the calendar year? Yeah.
17:38>> Um, nine.
17:40>> Wow. Okay. The plant has been out of
17:45compliance basically since the mandatory
17:48capital improvements project started
17:50which I believe was about 2 years ago
17:52this month October of 2024.
17:56So that was the $85 million project that
17:58I was telling you about.
18:00>> Um that was [snorts] completed
18:02[clears throat]
18:02>> what was it? February.
18:04>> Uh it was officially completed. Yeah.
18:07This year. Is that saying February this
18:08year?
18:09>> Yeah. this year, February 26,
18:12and it's going to take some time for the
18:14plant to be able to recover this. And D
18:18knows about this.
18:19>> They knew that we would be out of
18:21compliance and they are giving us some
18:23leeway. Now that the plant has now that
18:27the projects are complete and the
18:29incinerator is back online, we're seeing
18:32the numbers come down and like Sam said,
18:34they're expecting it to be either next
18:36month or early or November for full
18:40compliance.
18:41>> We had some very promising numbers
18:42coming in. We're usually about two weeks
18:44behind on our live results because the
18:46BOD test is a 5-day test and it takes
18:48some time to do the live report. So, the
18:49numbers that we've seen coming from the
18:51beginning of October look very good.
18:53What is uh what has been the biggest
18:55factor that has helped with the numbers?
18:57Is it the incinerator coming back?
18:58>> The incinerator being back online. Uh we
19:00can process sledge. So we can do just
19:02over a ton of sludge uh an hour when
19:05it's online 24/7 365. When we were
19:08offline, we were relying on what could
19:10be trucked out of the facility via
19:12trailers. So we were pretty much
19:14whatever Cassella could get us is what
19:15we took, which was uh nine trailers a
19:17week, which we could facilitate 14. We
19:20would like to get two two a day, seven
19:22days a week, but they could not do that
19:24because it goes to the landfill. The
19:25landfills aren't always open.
19:27>> So that was kind of a limiting factor
19:29for that downtime.
19:31>> Of course, of course.
19:32>> So um the primary clarifiers, they've
19:34been uh an issue for for many years. So
19:38how how often have all five of them been
19:40running fully?
19:42>> Um since the start of the construction,
19:45most we've had a lot of issues with
19:46them. uh prior before the construction.
19:49I would say that most of them were
19:51running pretty well at you know you
19:53might have one down at a time or
19:54something like that.
19:57>> I took over my job in February of 26 and
20:01I haven't seen all five of them running
20:03yet
20:05>> right now. So there's each clarifier has
20:08two bays if you will.
20:10>> So there's 10 sets of flights right now.
20:13is five of the 10 are operating. Once
20:17clarifier C is on, that'll be seven. And
20:20then the plan is to go to clarifier
20:22>> D
20:23>> E and then D
20:24>> and then D. So this is something BA
20:27knows about. This is something B that
20:28the commission has pressured them about
20:30and they are addressing it.
20:32>> That's the the first step to the entire
20:34process. We get those going everything
20:35else works. The idea is to give the
20:38aeration system what it needs to because
20:39you have a it's a living organism
20:41essentially. So getting
20:42>> primaries is is just settling, right?
20:45>> That's yeah, it's just a settling tank.
20:46That's all it is.
20:47>> But this the secondaries are so settling
20:50everything out of the primaries.
20:51Otherwise, your your your oxygen demands
20:54considerably higher. You have it's
20:55incredibly difficult to treat once it
20:57gets, you know,
20:58>> overloading it essentially. So we do
21:00monitor the what goes into the primaries
21:02and what comes out of the primaries. And
21:03we we test those several times a week so
21:06we know what's going out, what's coming
21:07in. um the numbers going out of the
21:09primary clarifiers are now matching what
21:11we need for the uration system to do
21:12what it needs to do.
21:15>> And just to sort of clarify
21:18that also should help as the order
21:20correct.
21:21>> Yeah. The plan needs to have all
21:24processes, all components working in
21:26order for the plant to work.
21:27>> If it doesn't, the compliance numbers
21:30will be up and odors as well.
21:32>> You get an upset.
21:34>> So plan is basically better than an
21:35upset state for two years now.
21:39>> But again, D is aware of this and
21:41they've been giving us some
21:49good.
21:50>> Can I ask some questions about the
21:51water?
21:52>> Go back to Matt.
21:53>> Yeah, just a second.
21:54>> That's fine.
21:54>> Matt, I just wonder about um the uh dire
21:58situation of the of the drought. Do we
22:00think uh we're going to need
22:02quin water?
22:04>> I'm still keeping an eye on it. Um
22:06>> at what point do we
22:07>> typically 35% capacity is when yeah we
22:12we tested all the K connections so we're
22:14ready to go but it's not thank you
22:20>> any more questions for
22:23>> any more questions for the wastewater
22:25side
22:26>> if not I'm going to let Sam get out of
22:28here he's uh lives in Randolph
22:30>> I got to go south the city sure be
22:33>> Yep
22:34be
22:36since you guys have been there.
22:40>> Thanks. I'll
22:41>> see you tomorrow.
22:42>> So, we can get a copy of the letters.
22:44That'd be great. The board
22:45>> sure
22:46>> back and forth and is or is
22:49>> I have properties here, but I can email
22:51that'll be better. Yeah. Okay. Um, and
22:55so, uh, Lin Water received their
22:57response and are they is Lin Water with
23:00the response that they received or is it
23:02still in discussions or
23:03>> uh, we're satisfied?
23:05>> Okay.
23:05>> Yep.
23:05>> All right. Thank you.
23:08>> Um, I think I have your email address,
23:10but before I leave
23:11>> or or send it to me,
23:13>> I can you
23:20>> Okay. uh business. Um Andy, do you want
23:24to take this or Ryan?
23:26>> Sure. So um this is in regards to the
23:31lead service uh
23:35program, lead service removal program.
23:37Um the US Environmental Protection
23:42Agency established new requirements for
23:44public water systems to monitor,
23:47identify and remove all sources of lead
23:49from drinking water. The rule is
23:51intended to reduce community exposure to
23:53lead and drinking water by requiring
23:56water systems to maintain service line
23:58inventories, improve community
24:00communication, strengthen lead
24:03monitoring requirements, and replace all
24:05lead service lines and galvanized
24:08requiring replacement service lines.
24:11Based on the most recent statewide
24:12inventory, Mass D has identified Lynn as
24:15one of the 25 communities in
24:17Massachusetts with the greatest need.
24:20Current records show approximately 224
24:23known lead service lines and 59 aging
24:27galvanized service lines, plus 7,765
24:32lines whose material is still unknown
24:35and must be identified and replaced if
24:37they turn out to be lead.
24:40Um, before November 1st of 2027,
24:44the commission must have completed the
24:45following.
24:47We have to update the service line
24:49inventory.
24:50We have to update the lead service line
24:53replacement plan. And we have to develop
24:55procedures to comply with enhanced
24:57monitoring, reporting, [clears throat]
24:59and public communication requirements.
25:03So between now and
25:05November of 2027, we our plan is to um
25:12go through the inspections and
25:17we're we're employing a predictive model
25:20to tell us which of these 7,700 unknown
25:24services
25:26um are [snorts] led.
25:29Um it's I don't quite understand it, but
25:32it's it's something that the D um
25:34accepts. Um and to do so, we're we're
25:38applying for an SRF
25:41planning loan application of totaling
25:44$400,000.
25:46After
25:49November 1st of 2027, we have to that's
25:52when it we get kind of locked in and we
25:54have to remove 10% of the lead services
25:57each year. Um, and now it's going to be
25:59an ownorous ownorous undertaking. We've
26:03applied for a construction loan
26:04application in the total of 12 million
26:0712.67 million for that endeavor. Um, and
26:13I'm hopeful tonight you guys can vote on
26:18the uh the motion needed by our bond
26:19council to apply for these SR. There's
26:22two grants. One is the planning 400,000
26:25and the second is for 12.67 million for
26:29construction.
26:33>> And just to clarify the construction is
26:34that um we actually have to pay for the
26:38removal and putting in new lines that
26:40are
26:41>> Yep.
26:41>> Okay.
26:42>> And a lot of it is investigations into
26:44whether you know you have these unknown
26:46services. You have to dig it up at the
26:48at the surface box and look at it and
26:52say, "All right, that's copper and
26:53that's galvanized on that side." So,
26:56[clears throat]
26:56>> assuming we did 10% a year, how long
27:00would that take roughly?
27:01>> Uh, 10 years to you have 10 years to get
27:04them done.
27:05>> Requirement. Yeah, that's part of the
27:06law.
27:07>> And is that do we expect that to be $12
27:10million per year or $12 million for the
27:1210 years?
27:13Um,
27:16that's a good question, but I don't know
27:17the answer to.
27:22>> Are both of these um are these loans or
27:25grants?
27:27>> So, the uh they're both loans, but the
27:30construction loan, the larger of the
27:31two,
27:32>> um the state is offering 40% debt
27:36forgiveness.
27:37>> Yeah.
27:37>> So, basically, it's 60 cents on the
27:40dollar we're paying for this for this
27:42work. Okay.
27:43>> It's still it's still a lot of money,
27:44but
27:45>> um and I don't foresee that
27:48>> um continuing throughout the throughout
27:51the uh this is a federal law, so all
27:54public water suppliers are going through
27:56this. Um so we need to strike while
27:59they're offering it basically.
28:00>> How how long is what's the loan term for
28:02the big one construction? So I know our
28:05other projects are like 30 years out. Do
28:06you know how
28:07>> I would imagine it's the same just
28:09because it's the same loan program.
28:10>> Okay. Um
28:13>> I think the planning was a little
28:14shorter.
28:15>> Yeah. But I think we'll shoot for the
28:18third year for other
28:19>> Yeah. Okay.
28:26>> Can you um just I guess for other
28:28people's you know edification when you
28:30find a lead service line can you just
28:32tell us like what's the process? So you
28:35find Robin has a lead service line. So
28:38then what would the what is the is do we
28:41have a process yet for then how we go
28:43about removing that?
28:44>> Um replace that. Okay. So you send her a
28:47note saying we'd like to remove your you
28:49have a lead service line. Yep. Uh we're
28:51offering to remove it free of charge. Um
28:56please let us into your house. I'm I'm
28:58like literally asking like how does that
29:01>> um it would be pretty seamless. Um it
29:02would well if we have to get in the
29:05house it's not seamless. So, cuz
29:06otherwise you can just Well, you're
29:07going to have to reconnect it to the
29:09you're going to have to disconnect it
29:10from the meter, right?
29:11>> Yeah. There's two there's two sides to
29:13the water service. There's the private
29:14side from the um let me start with the
29:16public side from the water man in the
29:18street to the shut off in the curb.
29:20That's the public side. And then the
29:23private side goes from the shut off in
29:24the curb to the meter in the basement.
29:27Um, typically if you had a say if there
29:30was a leak, if if the leak was on the
29:32private side, the homeowner would be
29:35responsible for it. Leak on the city
29:37side, city's responsible for it. If we
29:39discover lead service, the city's on the
29:41hook to replace the whole thing.
29:42>> Double thing.
29:42>> Yep. So, it's not going to cost the
29:44homeowner.
29:47[clears throat]
29:48>> So, the 40% forgiveness, is that because
29:50we're one of the top 25 in the state or
29:54is that just something that we get
29:55regardless?
29:57Not sure. Not sure how they came into
29:58that number.
29:59>> I don't believe it's a LIN specific
30:01thing based on the on um material that
30:04CDM has shared with me, but I don't know
30:05that 100%.
30:07>> I'm just curious.
30:09>> I can look into it and report back.
30:11>> Sure.
30:14>> And so if we approve this I'm sorry, you
30:16said that the the project you anticipate
30:19starting in November of this year,
30:20November 1st.
30:21>> Um yeah, the planning the planning stuff
30:23we're doing currently.
30:24>> Currently. Okay. And the and the
30:26replacement will start uh November of uh
30:302027.
30:31>> Oh, it starts in November. Okay. Sorry.
30:33Yep. That makes totally more sense. Got
30:35it. Okay.
30:36>> So, we've been
30:36>> started out and then you do the
30:38>> right. And we've been we've been working
30:40on the planning.
30:41>> Yeah.
30:41>> On our own nickel.
30:43>> Um we are currently
30:44>> because our information is online,
30:46right? We have a I've looked at it. We
30:47have a you go on our website, you can
30:48find what we what our records show for
30:51service line
30:52>> materials and whatnot. So
30:54>> yeah,
30:55>> we've mailed letters to folks.
30:56>> Yeah.
30:57>> Yeah.
31:00>> Good question. Is there is there any
31:02advantage to uh
31:03>> just voting on the planning 400,000 and
31:07then kick the 12 million down the road a
31:10bit or should we vote? I I I caution
31:13against kicking it down the road a bit
31:15this just based on this 40% u debt
31:17forgiveness
31:22and this board would vote on any
31:24contract that's issued as well. Right.
31:27So right now we're we're voting or I'm
31:30hopeful that we're voting on um
31:33giving us the ability to apply for these
31:35grants.
31:36>> Yeah.
31:39the the construction project to replace
31:41these lead services is going to be a
31:43huge contract that you as a board will
31:46have to go on as well.
31:47>> Yeah.
31:53>> And I'm just looking at the verbology in
31:56here. It says the amount not to exceed
31:5812.675
32:01for now. So that's what we're voting on
32:02for now.
32:03>> Yes, let's go.
32:08All right. Um, move to adopt the
32:10resolutions prepared by bond council in
32:13connection with the commission's clean
32:14water trust loans for the lead service
32:17line replacement and test pit
32:19construction program and related
32:20planning.
32:22>> Second
32:23local.
32:24>> Yeah.
32:24>> Okay. Commissioner Grace. Yes.
32:28Commissioner Matul absent. Commissioner
32:30O'Shea.
32:31>> Yes.
32:31>> Commissioner Walsh absent. Commissioner
32:34Salona.
32:34>> Yes. Excellent.
32:38Thank you. You're welcome.
32:42Uh the next two item on the agenda are
32:44relates to the Kings Beach subcommittee
32:46uh meeting uh that we had um last month
32:51uh in this very room uh with some of you
32:54all. And um it was I thought it was a
32:57phenomenal meeting. we got to see the
32:59the draft mockup of the um the
33:02dashboard, the story map, the the
33:04everythings. Um but we gave some good
33:07feedback to it and I'm looking forward
33:09to it going online. I think it's going
33:10to be really helpful for people to get a
33:12sense of all the work that's been going
33:14on and they can do their own analyses
33:15and look at all those sorts of things.
33:17So, do you have some things you wanted
33:19to say about us?
33:21>> Um yeah, I mean just uh everybody should
33:23have a copy of the agenda. Um and then
33:26um some of the big takeaways that we
33:28learned during the subcommittee. Um just
33:30some things to to share that are very
33:32big picture. Um it was Mike and myself
33:35which are part of the Kings Beach
33:37subcommittee. Um we had some of the
33:39senior leadership including um
33:43sure I read all the names
33:45for anyone. Um we had the chief engineer
33:48Andy Hall, assistant chief engineer
33:51Brianna Hughes. uh Apex senior project
33:53manager Natalie Palmershine. Sorry if I
33:56said that wrong. And then of course our
33:57executive director Jim Arsenal and
34:00executive secretary Amy Bowden.
34:02Um as
34:06um Mike mentioned um something that was
34:08really important to the committee is
34:10subcommittee is making sure that u we're
34:12getting the information out there about
34:14what we're doing um and allowing people
34:17to understand and be able to look at the
34:19information. So we want to make that
34:20really easy. So, thank you for for
34:22making some headway on that. Um,
34:26we talked a lot about um some of the
34:28areas that um you know why this has been
34:32such a kind of a difficult process. Um
34:35you know it's a very methodical process.
34:37Um one of the challenges about
34:38contamination always isn't always
34:40consistent. Um so location may show
34:43elevated results during one sampling
34:45event and then nothing another time. So,
34:48um, it makes a kind of the systematic
34:50approach to persistence very important.
34:52Um,
34:55Apex mentioned that they're going to be
34:57going out to doing some additional um,
34:59canvasing, which is great. Um, they did,
35:03um, identify many areas for additional
35:06investigation around Tensson, Holland,
35:08Varian, and Jackson, Adam Street
35:10Extension, and Sanderson. Um, and
35:16we already talked about the uh
35:18additional outreach and enforcement
35:19options when necessary. So, thanks for
35:21talking about that today. Um, we talked
35:23about potential um pilot sewer lining
35:26project um that would be part of what's
35:28going out with the uh the cso form five
35:31project next year. Um, we talked about
35:33transparency and and public reporting.
35:36Um
35:38and then the additional dry weather
35:40sampling was planned for October which
35:41you had already talked about. Um,
35:45so sorry a lot of this is uh kind of
35:48talking about it again, but um the other
35:52thing too that I think was a kind of a
35:54big takeaway was um even though some of
35:56the areas have been die tested u making
35:58sure that we go to the individual units
36:00especially in the multifamily homes um
36:03as there can be uh there's the potential
36:05for additional lines that are maybe
36:07coming in that we can catch other ways.
36:09So, um, I just wanted to sort of
36:12highlight that we're very thankful for
36:15everybody's time and everybody's
36:16commitment to continuing to look at this
36:18issue, um, and getting the information
36:20out to the public. So, um, it was a good
36:22meeting and just appreciate everybody's
36:25continued engagement in it.
36:30>> So, you want to mention the um, ling
36:32pipe.
36:34>> Uh, I mentioned that it was part of
36:37state four and five bed. Okay.
36:40>> Okay.
36:42>> Right. Anyone have any questions?
36:44>> Oh, sure.
36:44>> So, outside of the study, is there um
36:47like a a daily sampling done of the
36:50effluent or is it for the beach? How
36:53does the beach determine that they're
36:55shut down?
36:56>> So, um well, there's two. Uh there was a
37:00parallel study that was done this
37:02summer. Um it was funded by the city and
37:06town of Swampskit where they were taking
37:08daily samples Monday through Friday from
37:10both the swampsuit and the layout falls.
37:12Um that report hasn't been issued yet.
37:14They finished um they were trying to do
37:17some wet weather sampling associated
37:20with the noraster to kind of do the
37:23final round that came through at the end
37:24of the month. Um so that report should
37:27get issued sometime later this fall. Um
37:29but they were doing dailies from both.
37:32um that was new and that is not the one
37:35that closes the beach. This was all just
37:37um screening and sampling that was being
37:39done for information gathering. Um but
37:43um samples are collected out in the
37:46water. It's I can't remember the
37:48distance because it varies based on
37:49where the tide is at any time. Those are
37:51the official Department of Public Health
37:53samples that open and close the beach.
37:55So that's separate. It's not done by the
37:58commission or the town directly. Um and
38:00then there's supplemental screening that
38:02is done by DCR for some of their
38:03properties as well.
38:06>> So how much of an impact does the tide
38:08have on that outfall?
38:10>> Uh we've seen tidal impacts as far up as
38:12the MBTA tracks on the stream
38:16during the right conditions. Um that
38:18means debris and sediment that is coming
38:21off the beach does get washed up into
38:23the main culvert. So that was another
38:26thing that the summer study was looking
38:27at is they were taking sediment samples
38:29from inside the culvers to see if there
38:31was potentially a kind of a resident
38:33bacterial community that could be
38:34contributing to some of the things
38:36because the samples are getting taken
38:38our samples for the ID program were
38:40taken upstream. Now is there and like
38:42when the UV study was underway they were
38:44seeing you know essentially very low
38:47levels leaving the UV unit and then the
38:49alpha was showing an increase. So what's
38:51happening? Why is there like a increase
38:53in bacteria between the discharge from
38:55the UV pilot from two summers ago to
38:57that? So there was some thought as
38:59potentially that the sediments could
39:01become kind of harboring some of that
39:02bacterial growth. Um but that's that
39:06their report will be issued by
39:07Kleinfelder before the end of the year I
39:09believe is their current schedule.
39:11>> Are you going to look at that before
39:13Kleinfelder releases it? I'm just
39:14curious. uh it hasn't been issued yet
39:16but yeah I mean it'll be shared among
39:18the uh Kings Beach steering committee or
39:21which has representatives from the town
39:24the commission and the city so it gets
39:27it will get issued probably to the group
39:34>> and EPA was out
39:38guess that was probably about a month
39:39ago now they did an annual
39:41reconnaissance visit in both Swampskit
39:43and Lynn and they also Alo visited I
39:45believe they went to the storm water
39:46pump station to take a look at that to
39:48collect some just general samples which
39:51is consistent with what kind of started
39:53the resurgence in the ID program for the
39:55commission. That was back in like 2022,
39:58maybe 2021 if I look at the dates right.
40:01But
40:01>> [clears throat]
40:01>> um so um but they did we did help
40:06coordinate their field team to make sure
40:07they're going to locations that we had
40:09good institutional knowledge on because
40:11it all looks pretty different once you
40:13pop the covers and whether you're in a
40:15sewer versus a drain versus one that's
40:17chronically dry versus one that's
40:19regularly flowing. So, we did actually
40:21meet uh with their field team out in the
40:23field to kind of make sure that they had
40:24the, you know, good information on where
40:27they were collecting their samples,
40:34>> but we have not seen EDPA data yet.
40:37>> You haven't seen EPA data yet?
40:39>> No. Uh we did reach out to them about a
40:41week ago and it's coming because they
40:42were pro they're processing it all at
40:44their lab. Um I can't remember
40:47once it was in Nic, but I could be
40:48wrong. summer of Massachusetts. So they
40:50were but they were doing their own
40:51pharmaceuticals, bacteria, ammonia and
40:53all the like. So we do they will share
40:55it with us. They've shared it in the
40:57past once they get the data back. So
41:02>> I can suspend the rules and recognize
41:04Andrea. Do you have a question?
41:06>> Yeah. Would it be okay to ask the
41:07question? Sure please.
41:08>> Um [clears throat]
41:09hi Andrea Moore um Swam resident and I
41:13had a question. Um, as we were going
41:16through and looking at the bannual
41:18consent decrees from both Lyn and
41:20Swampscott, um, one pretty big
41:22difference we noticed from those two um,
41:25Swamp Scots I think started in 2016 or
41:272017 and then Lynn started in I believe
41:292022. But um for phase one of the
41:33Stacy's Brook rehab in Swampscott, the
41:35very first thing that they did was they
41:38did the smoke testing of like over
41:4021,000 linear feet in like the that
41:43catchment area.
41:44>> Mhm. And one thing I noticed from the
41:48Lynn reports over the past from I think
41:512022 to 2025 is what we analyzed so far
41:54is that over that total spans of time
41:5710,000 linear feet have been done um of
42:00smoke testing and it was typically in
42:03like small spurts. So it was like a
42:04thousand here 3,000 4,000 there. I'm
42:07wondering if we're experiencing in Lynn
42:10the difficulty of door knockocking and
42:13letting people in to do die testing. Is
42:16smoke testing a preliminary replacement
42:20to do a larger swath of area more
42:23systematically and one that would not
42:25require door knocking?
42:27>> So we did have done some limited smoke
42:30testing. We struggled with the ability
42:33for that to be effective because a lot
42:35of the major trunk lines on the limb
42:37side of the system are former combined
42:39sewer. So we're talking very large
42:40diameter pipes and controlling the smoke
42:42to get it through the smaller
42:44>> anything that was interconnected. We
42:46were we did Chestnut Street alongside
42:48Lin English in the park and we were
42:50having it travel very long distances but
42:52not having any local impact out any of
42:54the any of the any potential sources on
42:58chestnut. So we kind of went and then we
43:00did it near the middle school.
43:01Ultimately we ended up finding a lot of
43:03inconclusive smoke results that led us
43:06to need to die test anyway and
43:08ultimately that fed the decision to
43:10actually CCTV so camera all 18 miles of
43:14drainage.
43:14>> Okay. And it's not to say we won't
43:17potentially leverage it again, but since
43:21we found it to be inconclusive where we
43:23had analytical data saying something's
43:25going on down here in the middle school
43:27general area and then we had died test
43:28that found a few CCTV that
43:32>> led that preceded that that it really we
43:34were finding we were actually smoke
43:36testing sewer and drain because we were
43:39getting such we would get some
43:41inconclusive results that led us to
43:43certain properties and then we diet test
43:44and they confirmed sanitary sewer, so
43:46they weren't elicit.
43:48>> So, it could be leveraged again within
43:51small areas, but we would probably be
43:52doing it more focused on the sewer
43:55system because it's smaller diameter
43:57pipe that's younger
43:58>> and if it shows where we expect it to,
44:00where do we we were looking for evidence
44:03of properties that should be smoking out
44:04there, Venack, and it's not,
44:06>> right? And that wasn't it wasn't um
44:09helpful in our case, but it did re it
44:11did lead to the CCTV and the die testing
44:14programs, but it's not off the table.
44:16It's just we're finding getting into the
44:18homes and actually verifying is going to
44:20be like we're
44:23the data is telling us to be on a
44:24certain block within certain structures.
44:27And now the new next step is a lot of
44:29these are two three unit properties and
44:31we have had instances where the one you
44:33can get into on that day tests fine.
44:36Mhm.
44:36>> But we've also then had other properties
44:38where a different unit in the same
44:40building is somehow tied into the drain
44:43when the other one's tied to sewer. So
44:45>> So we are we're focusing [snorts] now on
44:47some of those multi-units to make sure
44:49we clear every unit as opposed to just
44:52what we assume is the primary, you know,
44:54everybody's in the same pipe. That's not
44:56always the case. So I now I I think I
45:00understand a little bit better about why
45:01you can't do it so you know easily
45:04compared to swamps because it sounds
45:05like the infrastructure that's
45:07underground is the sizes are you know
45:11just
45:12>> and so then it kind of going back to the
45:15question of like if we know that getting
45:18into the property has proven to be
45:19difficult right I mean we've been trying
45:21to get into 100 properties for 5 years
45:24could you if you are getting consistent
45:26nos or or nobody's home or absentee
45:28landlord or whatever have you. Could you
45:30then employ a smoke test at that
45:32property like individually to try to
45:35just check a box like, hey, we're
45:37getting smoke where we need it to. We're
45:39going to assume we're okay, so we can
45:41kind of make a note and move on to
45:42something different.
45:44>> You could you have to work to try and
45:46control the smoke between structures so
45:48that you're trying to isolate it. It's
45:50not something you can't do. I will say
45:52we're only down to of the properties
45:53we're trying to get in, we only have
45:55eight that have been nonresponsive or
45:57refused. So we're not at like a hundred.
45:59Um the canvasing has been able to get
46:02into properties. Now it's going to be
46:03more of a targeted like
46:05>> we've even spoken at the subcommittee
46:07level of potentially there having to be
46:09some way to property transaction.
46:11There's a die test performed whether
46:13it's by unit or the total number of
46:14units in a property. Now, that would be
46:16citywide as opposed to in Kings Beach
46:18alone
46:18>> as some way to also kind of work through
46:21the system because there's always going
46:23to be the potential that um as
46:26Commissioner Grace said like we're
46:27catching a grab sample and on one
46:29certain day everything's fine and you
46:31come back and there's like what the t
46:34the cameraing found a handful of direct
46:37connections because there was visual
46:39evidence, but if you're out there at the
46:41wrong time of day, you're not going to
46:42see it. And a lot of the system we were
46:44using um a small benefit to the drought
46:48conditions was we were out doing recon
46:50in the system to try and find presence
46:52of water in places you wouldn't expect
46:54it when we've been so dry. Um so it's
46:57it's not for a lack of looking but I do
47:00think smoke or actual physical
47:02inspection from the property to the
47:04street or vice versa would be where some
47:06of those inconclusives might have to
47:08get. We have found that the
47:11some of the system
47:14methods of construction don't allow for
47:16video inspection from the commission
47:18side. Um we have a lot of old systems
47:20where the pipes enter at like basically
47:23the crown of the pipe at like 12:00. So
47:25the camera can't get up and navigate and
47:27go. Um so you would have to try and do
47:29it from the property and then you run
47:31into an issue of
47:32>> you're on private property. What happens
47:35if something on the plumbing side
47:37doesn't work when you're trying to gain
47:38access? Now, you might have to repair.
47:40So, it's not it's it would be property
47:43by property if you could do something
47:45from the basement and confirm where it
47:47goes. Um, we have also targeted some
47:50properties that were inconclusive die
47:52tests. So, basically, we didn't find the
47:53dye in either system.
47:56Um, so sometimes that could be an issue
47:58of just there could be sags in the pipe
48:01and you might need a considerable volume
48:02of water to get to the discharge
48:05location. So we have done retesting on
48:07some of those to try and clear those
48:09inconclusives. U which also gets to also
48:12the problem of just if there's multiple
48:14units and according to the records
48:16there's a single sewer service but one
48:19other one got tied in or was not
48:20disconnected during past sewer
48:22separation. It could be live for one of
48:24three units and the other two are going
48:25to where they're supposed to go. So,
48:28um, but it's definitely a tool in the
48:29toolbox. It's just deploying it would be
48:33trying to get into the properties and
48:35physically die testing would for us has
48:37proved more conclusive than the smoke
48:39testing we attempted earlier.
48:47[snorts]
48:48>> All right. Last under item under
48:50business is non-union non-contract
48:52letter to Jim Arsenal regarding cola. Um
48:57we need to go into executive session for
48:59this. So I'd like someone to make a
49:01motion to go into executive session to
49:03conduct strategy sessions and
49:05preparations for negotiations with
49:07non-UN personnel.
49:11>> Motion.
49:11>> You made that motion. I heard you. You
49:13second it. Okay. Um joining us. I'm
49:17gonna say who's joining us. Is that it?
49:18Sam.
49:19>> Yep. Sam's going to be with us. Uh Ryan,
49:22Andy, Bob, and the commissioners.
49:25>> And will we come back into session?
49:28>> Yes, we will return to session.
49:30>> So, we're going to come back.
49:31>> We will return to open session.
49:32>> Okay. Thank you. Okay.
49:36Me, too. Uh returning to the open
49:38meeting. Uh no votes were taken in
49:40executive session.
49:43>> All right. I would like to make a motion
49:45to grant middle management employees the
49:50same percentage increase in pay as union
49:53employees.
49:54>> Second
49:56roll call.
49:56>> Roll call, please.
49:58>> Commissioner Grace,
49:59>> yes. Commissioner, absent. Commissioner,
50:03>> yes.
50:03>> Commissioner Walsh, absent. Commissioner
50:06Salona,
50:06>> yes.
50:09>> Okay. So, make Oh, sorry. Uh do business
50:15hearing? None. Uh make a motion to
50:17adjurnn.
50:18>> Motion second.
50:20>> I All in favor?
50:21>> I
50:21>> I thank you.