2026-11-02 - Hearing Examiner
Summary
- CVA26-00029, 1518 W Fort St: approved on the consent agenda (the applicant agreed with staff's terms and there was no public opposition).
- CVA26-00019, 1224 W Hays St: variance to reorient an existing detached garage for a legally nonconforming triplex and deviate from alley-loaded parking standards. Staff recommended denial; the applicant argued the path of travel is dangerous because of a power pole and that similar side-loaded garages work nearby. The examiner denied the variance for the reasons in the staff report, adding that the code's suitability test relative to nearby buildings was not met.
- CVA26-00043, 2649 E Freight St: variance for three access points onto Freight St and building placement. The city said the development code allows up to two access points, while the highway district's draft comments supported three. The examiner granted the building-placement variance and denied the three-access variance, and encouraged the city to revisit the hard two-access limit so it can flex with use and parking demand.
- CVA26-00036, 5620 W Fairview Ave: approved on the consent agenda.
- CZC26-00201, 2177 S Illinois Ave: appeal of the approval of two accessory dwelling units. Staff recommended deferral because of late correspondence and changed building-permit details; with all parties able to return, the examiner deferred it to the December 7, 2026 hearing.
Built from the posted agenda and the video captions (57:24); the minutes are not posted. Auto-caption wording may contain errors.
Agenda
- CVA26-00029, 1518 W Fort St: setback and parking variance.
- CVA26-00019, 1224 W Hays St: alley-loaded parking variance.
- CVA26-00043, 2649 E Freight St (18.83 acres): site design and access variance.
- CVA26-00036, 5620 W Fairview Ave: access variance.
- CZC26-00201, 2177 S Illinois Ave: appeal of an administrative approval for two ADUs.
Sources
- Agenda: https://pub-cityofboise.escribemeetings.com/FileStream.ashx?DocumentId=916 (web view: https://pub-cityofboise.escribemeetings.com/Meeting.aspx?Id=a27f8cfd-d0fb-439c-9e4c-30af7e555027&Agenda=Agenda)
- Video: https://www.youtube.com/watch?v=royT4ddaWEk
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
00:01Good afternoon and welcome to the city
00:03of Boise hearing examiner public
00:05hearing. A few things to start out with
00:07for tonight's proceedings.
00:08Everyone from the public entering the
00:10hearing virtually has been automatically
00:12muted and cannot speak. As the item
00:14you're interested in comes up for
00:15discussion, you will be called upon and
00:17unmuted.
00:18There is a chat function in Zoom. This
00:20is not part of the record and should
00:21only be used if technical difficulties
00:23arise.
00:24Our procedures for public hearings begin
00:26with a presentation from the planning
00:27team. Then we'll go to the appellant and
00:29or applicant and then the representative
00:31of the registered neighborhood
00:33association followed by questions from
00:35the hearing examiner.
00:36After that, we proceed to public
00:38testimony starting with those who are in
00:39person, then who signed up on the sign
00:41up sheet in advance, and then anyone who
00:44raises their hand virtually.
00:46If you are attending through your
00:47telephone, you can type in star nine to
00:49raise your hand.
00:50Each speaker should state their name and
00:52address for the record.
00:53Each member of the public is allowed up
00:55to three three minutes for testimony. We
00:57are strict with this time as it is
00:58limited in code.
01:00Finally, the applicant and or appellant
01:01is allowed time for rebuttal after which
01:03the hearing will be closed and the
01:05hearing examiner will deliberate and
01:06render a decision.
01:10>> Thanks Sabrina. So looking at
01:12this afternoon's agenda, we have the
01:13minutes from last month
01:15and then five new business items. The
01:18first one
01:19is a variance over at 1518 Fort Street
01:23for Timber and Love. We are recommending
01:24approval
01:26and have not received any correspondence
01:28against that. So that is eligible for
01:30the consent agenda.
01:32Item number two is a variance at 1224
01:35West Hayes Street.
01:36There is a recommendation of denial, so
01:38we will be hearing that one.
01:40Item number three is a variance at 2648
01:44Freight Street.
01:47We are having a partial denial, partial
01:50approval recommendation.
01:51So we will be hearing that.
01:54Item number four
01:56is a variance at two uh excuse
01:595620 West Fairview.
02:02Um the recommendation is for approval.
02:04So we can try for consensus. We haven't
02:07received any other correspondence
02:09related to that. And then finally
02:11item number five is a appeal of a zoning
02:15certificate approval for two accessory
02:17dwelling units at 2177 South Illinois
02:20Avenue.
02:22Um there were some late correspondence
02:23in there. We're recommending to defer
02:25that to the December hearing date.
02:28Um
02:30and with that, that's the entire agenda.
02:32And I'll turn it over to you Mr.
02:34Gillespie.
02:35>> Thank you Mr. Holmes. My name is Milt
02:37Gillespie. I'm an independent decision
02:39maker hired by the city of Boise and
02:41approved by the city council.
02:43I make decisions on variances and
02:45administrative appeals.
02:47Any request to reconsider these
02:49decisions must be formally requested in
02:52writing pursuant to the city code.
02:55Tonight we utilize a consent agenda.
02:57This means that if the applicant agrees
02:59with the staff report and if there is no
03:02public opposition,
03:03the item will be placed on the consent
03:05agenda. All items that are placed on the
03:07consent agenda are approved with one
03:10motion without further public comment.
03:14Uh tonight we have at least two items
03:16that are not on the consent agenda. And
03:18for those and any others,
03:20uh we will hold a full public hearing in
03:21the order just uh out detail the few
03:24minutes ago with the staff.
03:26Thank you all for attending.
03:28Okay.
03:29So uh let's I propose we do the consent
03:32agenda first then take care of the
03:34deferral
03:35and then move on to whatever's left in
03:37the order it's on the agenda.
03:39So uh without objection the uh regular
03:44meeting minutes from October 5th, 2026
03:46are
03:47placed on the consent agenda.
03:51First item for consideration is number
03:53one CVA 26-29
03:56located at 1518 West Fort Street. Is the
03:59applicant present?
04:02So noted.
04:03And Mrs. applicant, are you in agreement
04:05with the terms and conditions of the
04:06staff report?
04:08So noted.
04:10Uh is there anybody here tonight either
04:11online or in person who wishes to
04:13testify in opposition to CVA 26-29
04:18located at 15 18 West Fort?
04:24Seeing none, item one is placed on the
04:26consent agenda.
04:28The next item for the consent agenda is
04:30item four. This is CVA 26-36
04:35located at 5620 West Fairview Avenue. Is
04:39the applicant present?
04:41So noted.
04:42And Mr. applicant, are you in agreement
04:45with the terms and conditions of the
04:46staff report?
04:47Also so noted. Is there anyone here
04:49tonight who wishes to testify either in
04:52present or online
04:55uh in opposition to CVA 26-36
04:59at 5620 West Fairview Avenue?
05:05Seeing none, item four is placed on the
05:07consent agenda. So the consent agenda
05:11consisting of the minutes
05:14from October 5th, items one and item
05:16four is
05:17approved without any further discussion.
05:20Okay, next we're going to go to
05:23uh the deferral. So this is item five.
05:27This is
05:28C Z C 26-201
05:33um
05:34and I received a memo this morning from
05:37the city from Mr. Moser, the planner on
05:39this case.
05:41Uh he said that the building permit um
05:45had some changes that weren't
05:46anticipated in the initial application.
05:51And he said quote, as such, in order to
05:53address these changes within the project
05:55report,
05:56the planning team recommends this appeal
05:58application be deferred to the next
06:00available hearing date. Is the city
06:02still of that opinion?
06:05Is the applicant on this present?
06:11No applicant?
06:13>> Mr. Gillespie, I don't see him online.
06:14We did speak with them today and they
06:16are in agreement with the deferral
06:17though.
06:17>> Okay.
06:18Um
06:20okay, is the appellant present? This
06:23because this is an appeal, right?
06:25Is the appellant are any of the
06:26appellants present?
06:30Doesn't seem like it. Okay.
06:32All right. So my last question before I
06:35think about the deferral, is there
06:37anybody here tonight
06:39who would like to testify on
06:42CZC26-201
06:46who cannot come back for our December
06:487th meeting?
06:52Could you step forward?
06:54So what we're going to do if you like,
06:57it's up to you,
06:59is we can hear your testimony about this
07:01item now, but please understand that the
07:03the item may change because of the new
07:07building permit and information, but if
07:09you'd like to testify now, you may.
07:15Yes, it's the same time I'm always on at
07:183 p.m. on the first Monday.
07:23You come back on that date. Okay, thank
07:25you very much.
07:26I think that's actually usually the best
07:29thing for the
07:30quality of the discussion. Is there
07:32anyone else who would like to testify
07:35today
07:36and doesn't want to come back on
07:38December 7th?
07:41Online's clear?
07:45>> We have one member online, Stephanie
07:46Curl. Uh
07:49that describes you. Would you raise your
07:50hand virtually? There's a little button
07:52um at the bottom of the bar.
07:55Perfect.
07:58Stephanie, if you unmute, we should be
08:00able to hear you.
08:03>> Okay. Um I mean I can come back as well.
08:06You said October?
08:08>> Thank
08:08>> you, Ms. Stephanie. I appreciate it.
08:10Okay.
08:11So, since everybody can come back and
08:13since all parties seem to be in
08:14agreement then my decision is to defer
08:17item five to the December 17th 7th 20 26
08:21meeting. Okay.
08:24With that, let's go to our first
08:26hearing. This is number two CVA 26-19
08:33a variance at 1224 West Hayes and we'll
08:37hear first from the city and Mr. Exton.
08:52>> Good afternoon, Mr. Glasspie. Before you
08:53today is a variance to deviate from the
08:55alley loaded accessory parking structure
08:57standards on 0.14 acres in an R3 NCO HDO
09:01residential urban with near north end
09:03character and historic design overlay
09:05zones.
09:07The request is to reorient an existing
09:08detached garage for legally
09:09non-conforming triplex. In this,
09:12variances are requested to deviate from
09:13the required backup space and the
09:15required 5-ft wide paved apron along the
09:17alley.
09:19The site has received legal
09:20non-conforming status which includes the
09:21substandard parking count for a triplex
09:24and the configuration of the parking.
09:26The site currently contains the
09:27appropriate 5-ft wide apron and the 22
09:29ft of backup space in the current
09:31configuration.
09:32While the applicant contends that the
09:33path of travel is dangerous due to an
09:35existing power pole, there are multiple
09:36side loaded garages in the area which
09:38function appropriately.
09:40There is a row of backup parking across
09:41the alley which also does not provide
09:42the adequate 22 ft of backup space.
09:46As summarized in the project report, the
09:48hardships referenced are self-imposed
09:49and created by reorienting the garage.
09:52This in concert with the lack of
09:53visibility since the garage is a fully
09:55enclosed structure
09:56and the row of backup parking result in
09:59safety concerns.
10:01Lastly, while the applicant references
10:02the under parked nature of the site,
10:04this is not adequate or this is not
10:06unique to the property as the Hayes
10:07Street corridor is known to be under
10:09parked and residential parking permit
10:11programs exist for on-street parking.
10:14In conclusion, the planning team
10:14recommends denial and I'd be happy to
10:16stand for any questions.
10:19>> Thank you, Mr. Exton. Is the applicant
10:21pres
10:25>> Mr. Gillespie, we have a David Rojas and
10:28he just got promoted to a panelist, so
10:30he should be able to hear us.
10:32David, if you want to unmute.
10:34>> Hello. Can you hear me?
10:36Hello, Mr. Rojas. This is Mr. Gillespie.
10:39Could you give your name and address for
10:40the record and then you have up to 10
10:43minutes to discuss your variance.
10:46>> Certainly. My name is David Rojas. I
10:48live at 1224 West Hayes in Boise here in
10:51Boise, Idaho.
10:52Um I have I'm applying for this variance
10:56because
10:57when I purchased this property, it kind
10:59of came it had inherited kind of a
11:01difficult parking situation.
11:04The garage doors face east and west or
11:08in a easterly westerly direction and
11:11there's a telephone pole
11:14just outside the front of the garage
11:16doors in addition to the side street
11:18setback that I have to utilize
11:21to go in and out of the garage.
11:25My car's width
11:27takes up most of the entire driveway
11:29with the city considering my driveway.
11:33So I have to go onto that side street
11:36setback which
11:38is attaches to a sidewalk
11:40and is just
11:43right on the on the alleyway going on to
11:4613th Street. You may have seen that
11:48that map that was up earlier.
11:52So really
11:54the building
11:55came with these
11:57these problems. They weren't
12:00self-imposed.
12:02And I'm hoping that my my letter
12:05explanation
12:08expressed the parking situation and the
12:10difficulty of the existing layout, uh
12:14one that had existed since the home was
12:17built in 1910.
12:19Um,
12:20the garage itself has heavy barn doors
12:23that the historical preservation
12:25district does not want to be removed.
12:28Um, that in itself, uh I think
12:31adds
12:32adds a lot of uh
12:33safety issues, uh having to get out of
12:35my vehicle, open up barn doors
12:38and then back my vehicle in. Um, there's
12:40just all kinds of inherent issues with
12:42the parking situation.
12:45Um, and in that same map, as you can
12:47see, all of the alleyway parking is in a
12:50north and south direction. That is what
12:52I'm asking. Uh
12:54that's also what I'm asking to do with
12:56my parking situation.
12:58Um,
13:00and
13:02I just don't see that it would be a
13:04problem to do that considering that is
13:07how the parking situation currently is
13:10for the entire alleyway except my
13:14my my driveway and my parking situation.
13:18Um,
13:20I don't know I I don't really want to go
13:22into what this what the planners um
13:26are objecting to in any real specific
13:29way except that
13:30um I guess I'm I'm I I do think I meet
13:33the criteria for variance.
13:36Um, and I guess I'm opening this up to
13:37questions if you've got for me.
13:45I guess I'll just reiterate that it is a
13:47property specific hardship. It's uh not
13:50self imposed.
13:53>> I understand. Thank you, sir.
13:56All right. So, is there anyone here from
13:58the North End Neighborhood Association
14:00who would like to testify in this
14:01matter? Please.
14:05If you could start with your name and
14:06address, I'd be very grateful.
14:09>> Eric Hagen, 809 North 18th Street.
14:13Uh good evening,
14:15Mr. Glassby,
14:16um
14:17and Mr. Exton.
14:19The North End Neighborhood Association
14:22has discussed Mr. Rohasas project and we
14:26are in support of his variance request.
14:29As anyone who's driven through the North
14:30End,
14:31historic North End, historic Hayes
14:32District, you know all the way around
14:36all 5,000 structures in the North End,
14:38parking garages go right up to the
14:39property lines and there's side access
14:42and there's perpendicular access.
14:44And that's just the way it is in the
14:45North End. The new zoning code obviously
14:50applying it to new construction looks at
14:52it differently.
14:53And
14:55it's in conflict with the existing
14:57fabric of the North End neighborhood.
15:00So
15:02forcing people to demolish a perfectly
15:04good structure,
15:06waste resources and push it into their
15:08into their yard further to meet
15:10perpendicular and the 22 ft of backup
15:12space,
15:14while it might solve some problems, it
15:16creates other problems.
15:18Mr. Rohasas existing structure is about
15:2013 ft from the parking from the garage
15:22right now.
15:23If he moves it in another 6 ft, it's
15:25going to be less than the 8 ft required
15:26for a minimum open space, so
15:29it creates other problems.
15:32The existing conditions in the North End
15:33have existed this way for over 100
15:35years.
15:37Cars have been parking off the alley
15:39without 22 ft of backup space for
15:42decades and it seems to work.
15:46In order to
15:48change that would require a sea change
15:51across the entire North End and then it
15:53would the North End would lose its its
15:54character.
15:59The residential code allows for garages
16:01to be backup right against the rear
16:03property line
16:05for accessory structures, for accessory
16:06garage structures.
16:08This is in direct conflict with the
16:09parking section and the parking section
16:11seems to apply a blanket
16:14requirements of parking that works for
16:16retail strip malls and office buildings
16:19where you're going to have big trucks
16:20that are backing up against each other.
16:22And it requires 22 feet of backup space
16:25and it requires a 5-ft landscape buffer
16:28from the parking spot to the
16:31property line. All of these, while they
16:33make sense for commercial districts,
16:36commercial properties, we don't find it
16:38makes sense for residential districts,
16:40especially historic district like the
16:42North End or the
16:44Hayes district.
16:46So with all of that in consideration, we
16:49do consider
16:51the fact of where his existing house is
16:53and the proposed
16:55and the existing garage does create a
16:58hardship unto itself.
17:00And so with those, we are in support of
17:02his request.
17:04Thank you.
17:06>> Thank you, Mr. Hagens. So I have a
17:07couple of questions.
17:09Not for not for you yet.
17:11So Mr. Exton,
17:13so the garage in question is red one
17:15with the white doors. Is that correct?
17:18>> Mr. Glassby, that is correct, yes.
17:19>> And am I looking down the alley
17:23that is now the subject of discussion?
17:25>> Yes.
17:26>> So
17:27the applicant, just so I'm clear, the
17:29applicant is proposing to in a sense
17:32twist the garage 90 degrees.
17:35Is that correct?
17:37>> Not necessarily rotate the building
17:38itself, but add doors along, if you can
17:41see on my mouse a little bit, along this
17:43plane here. So
17:45>> 90 degree.
17:47But he's not rebuilding the garage.
17:49>> Correct.
17:52>> And
17:54let me make sure I understand this. So
17:56one of the points in your in the city's
17:59report was that then
18:01we'd have
18:02you know, there wouldn't be 28
18:0422 ft from the garage door clear.
18:09You'd be backing into the alley and then
18:11we have people on the other side of the
18:13alley also
18:15doing the same thing.
18:16>> That is correct, yes.
18:17>> Right.
18:19So
18:20in a sense, we're
18:22trading
18:23one non-conforming use for another
18:27non-conforming use.
18:29>> Mr. Gillespie, that is correct. As the
18:31site right now, this entire
18:32configuration has legal non-conforming
18:34status for when it was constructed and
18:36met all the criteria for that.
18:38With reorienting the doors, it would be
18:40creating new non-conformities that don't
18:41currently exist on the site.
18:43>> Thank you.
18:44Um
18:51I don't have any further questions. So
18:53we'll go to public testimony.
18:55So we're on item two. I didn't have
18:58anybody signed up on item two.
19:01Let me just double check that.
19:03Nope, didn't have anyone. So there
19:05anybody present in person who'd like to
19:07testify on this matter?
19:10Is there anybody online who'd like to
19:11testify?
19:13Okay. So that means Mr. Rojas, you have
19:16up to 5 minutes for rebuttal or any
19:19closing comments you'd like to make.
19:22>> Um if we could pull up exhibit F, I just
19:25want to um
19:27or maybe even one step before that, if
19:29we can pull up
19:32exhibit uh
19:36D.
19:38Uh this is a bird's eye view of the
19:40alley itself. Um
19:46I don't know if this is exhibit D, but I
19:48had mine marked exhibit D.
19:51>> Mr. Rojas, I don't have access to all of
19:53the exhibits you submitted. I have
19:54access to this photo.
19:57>> Okay. Well
19:57>> Overall aerial.
19:59>> Well, that's unfortunate. Um well with
20:01that with that sliver that you did show
20:03there, I just want to I just want to
20:04emphasize that
20:06up and down this alley, you have
20:09a you have adjacent parking all the way
20:11up and down the alley. So I don't know
20:13why this 120-ft section of the alley
20:17would make
20:18would would really
20:20interfere and impede any kind of
20:24uh backing up we're pulling in. Um it's
20:26identical all the way up and down the
20:28alley. If we could switch then to
20:29exhibit F we could or or maybe you don't
20:32have that. I did submit these exhibits
20:35um
20:37to you so I'm not sure uh
20:40do you have exhibit F? That's exhibit A.
20:47>> Mr. Rojas, these are the only photos
20:49included in the presentation. All of
20:50your exhibits were part of the staff
20:52report that Mr. Lessbee has access to
20:54and has reviewed.
20:56>> Well that's unfortunate. Um exhibit F uh
20:59essentially highlights the garage
21:01uh um
21:04length and width and a line is drawn
21:06down the block
21:08indicating that all of the cars that are
21:10not parked in the garage are parked
21:12essentially in the same footprint as
21:13that is that is my garage all the way up
21:17and down the alley. So there it just
21:20doesn't make any sense or it doesn't
21:21make it doesn't that that would be
21:25the one thing that's somehow keeping me
21:27from
21:28from reorienting my garage doors. But to
21:31emphasize that there is no no new
21:33structure uh there's there's nothing
21:35happening except the garage doors would
21:38be moving to a north and south
21:40direction.
21:49>> Mr. Rojas, does that conclude your
21:51rebuttal?
21:53>> Well
21:54uh without exhibits um I'm kind of
21:57limited on what I can demonstrate. Um so
22:00I think that
22:01uh if you can picture uh the whole
22:04entire alley again and literally every
22:08property parking in the north and south
22:10direction but me I think oh that thank
22:13you there is exhibit F.
22:15Uh it's just simply showing that
22:18I don't I don't see the hazard or danger
22:21in me backing up or pulling in
22:24the same way that everybody else in the
22:26on both sides of the block, adjacent and
22:28on the on my side of the block,
22:31would be maneuvering. They're identical.
22:34So it's it's something that is
22:39I mean
22:40people would be expecting it.
22:42It's it's
22:43it just seems congruent it's congruent
22:46with every with all the other parking.
22:59>> Mr. Rojas, does that conclude your
23:01remarks?
23:03>> Thank you.
23:04>> Thank you.
23:15So I'd like to thank all the the parties
23:17as usual. Especially like to thank Nina
23:20for being here. It's very nice.
23:23I'm going to deny the variance for the
23:24reasons stated in the staff report.
23:28I think in this particular case I have I
23:30have two specific remarks I just like
23:34I'd like to make and elaborate on the
23:36staff report one.
23:39In this particular case, clearly, if we
23:41just look at the subject property and
23:43the issues specific to that garage,
23:46we're just basically taking a
23:48non-conforming use and adding more
23:50non-conformity.
23:52Cuz right now the orientation of the
23:55garage isn't really the problem. It's
23:57just the size and placement, which it's
23:59been there since 1910.
24:01But if we then flip it around,
24:04turn it 90 degrees, not only is the
24:06garage in the same place with the same
24:08form, but now we have additional
24:10non-conformity related to the 22-ft
24:13backup requirement.
24:15So
24:16that's just against the code. I mean we
24:19that's not something we should do
24:21lightly.
24:23My second point is with respect to how I
24:26think about
24:27uh and evaluate evidence of like what
24:30everybody else on the block is doing.
24:33And my basic um starting point is always
24:36an application
24:37should stand or fall just based on the
24:39conditions
24:41uh of the permitted property or the the
24:44property in question for the permit, in
24:46this case a variance.
24:48And just that. In other words,
24:51people or applicants or or parties
24:55uh need to focus on just the specifics
24:57of the property and not relate it to
24:59things that are really outside the scope
25:01of this application, which is frankly
25:04what everybody else on the block did
25:06over the last 100 years.
25:08Um if we wanted to have hearings that
25:11did that, they would become instead of
25:1320 30 minute hearings, they would become
25:16days long because we would have to get
25:18into the circumstances of each and every
25:20property down that block and then weigh
25:23that very carefully. Um the only place
25:26where that sort of stuff comes into
25:27consideration is when we're the code um
25:31directs us to consider um suitability or
25:35of of a property or of a building
25:37related to the other buildings around
25:39it. That's not the case here.
25:41So for those two reasons plus what's in
25:44the staff report, I'm going to deny the
25:45variance.
25:47Okay.
25:48So we're on to item
25:52four three.
25:54So item three is CVA 26-43
25:57Babcock Design 2649 East Freight Street
26:01and the applicant has 10 minutes of
26:04fame.
26:09Oh, sorry. You're right.
26:11I was looking at you guys and I thought,
26:13what a handsome bunch.
26:14So um sorry, Mr. Exton, why don't you
26:17start?
26:18>> Good afternoon again, Mr. Gelespie.
26:20Before you today is a variance request
26:21to deviate from the general site and
26:23building design standards and the access
26:24and connectivity standards on 18.83
26:27acres in an I-1 AIO WOO O industrial
26:31light with airport influence area and
26:32wildland urban interface overlay zone.
26:35The applicant or the application was
26:37noticed listing the land group as the
26:38applicant, but the correct applicant is
26:40Babcock Design.
26:42Specifically, the requests are to allow
26:44for three access points onto Freight
26:45Street and to allow for the building to
26:46be located more than 100 ft from the
26:48edge of pavement also along Freight
26:50Street.
26:52As it relates to the three access
26:53points, the planning director has
26:54allowed two access points for the site
26:57due to the industrial traffic patterns
26:58as anticipated. The development code
27:00does not allow additional access points.
27:02Since the site is plat and developed,
27:04there is no physical hardship present to
27:06justify those three access points as
27:07proposed.
27:09Summarizing the project report and shown
27:10on screen, other industrial sites have
27:12developed with two access points and
27:13function appropriately.
27:17As it relates to the placement of the
27:17building, there is a pipeline easement
27:19running diagonally across the property.
27:21This easement cannot be relocated and as
27:23summarized in the project report, the
27:24building is as close to the edge of
27:25pavement while still utilizing that
27:27space between the building and the
27:28easement.
27:31The variance request did initially
27:33contain a variance to allow for the
27:34building to be further than 100 ft from
27:36the edge of pavement along Eisenman
27:37Road. As outlined in the project report,
27:39the request was removed from this
27:40application to allow for the applicant
27:42team to still bring these two requests
27:44to the November hearing while working
27:46with ACHD on determining where the
27:48future edge of pavement will be due to
27:50CCD's capital improvement plan.
27:52This process was confirmed and agreed
27:54upon with the applicant on October 12th.
27:56Revised plans were submitted indicating
27:58that the building will not be within 100
27:59ft of the future edge of pavement and as
28:01such either a redesign or an additional
28:02variance request will need to be filed
28:04and this specific request is not before
28:06you today.
28:08In conclusion, the planning team
28:09recommends denial of the request to have
28:12three access points and approval of the
28:14request to locate the building more than
28:15100 ft
28:16away from the edge of pavement along
28:17Freight Street and I'd be happy to
28:18answer any questions.
28:21>> Thank you, Mr. Exton. Now it's your
28:23turn.
28:24Thank you for your forbearance.
28:30>> Thank you. I have a brief presentation.
28:31Am I able to advance the slides from
28:33here or
28:33>> I tell you to do it, Kevin?
28:38>> Did you start with your name and address
28:39for the record, please?
28:43>> Great, it works.
28:44Uh, thank you, Mr. Glesby. Good
28:45afternoon. I'm Jason Densmore with The
28:47Land Group. For the record, our address
28:49is 462 East Shore Drive in Eagle.
28:52Um, I'm here on behalf of the applicant,
28:54uh, Weyer Company, who um sent Dave Ward
28:58to join me. He'll have a small part in
28:59the presentation tonight.
29:01Um, we appreciate staff's work on the
29:03applications and their report that they
29:05summarized for you today.
29:06Um, as you mentioned, we're down to two
29:08variances. The first is the building
29:10placement along Freight Street, and the
29:13second um
29:14has to do with the three driveways.
29:16Because staff recommends approval of the
29:18first variance, I won't spend very much
29:20time on that and will focus most of my
29:22time on the discussion about accesses
29:24from from Freight Street.
29:26Um, our position is pretty simple. The
29:28way the site fronts the street network,
29:30how the building will operate, and the
29:32need to keep trucks and cars separate
29:34from each other all support the relief
29:36that we're asking for related to the
29:38access points.
29:41So as I mentioned, um we're in agreement
29:43with staff's um analysis of the Freight
29:46Street building placement variance and
29:48um
29:49appreciate their recommendation of
29:50approval for that.
29:52We would ask today that you support
29:54their um recommendation and adopt the
29:56findings for that item.
29:59I'll spend more time on the three access
30:01points from Freight Street
30:02um as designed.
30:06Sorry.
30:07Skipping ahead.
30:09The variance number one
30:11um
30:16already lost my place in my notes. I'm
30:18sorry.
30:19Uh, variance number one does deal with
30:21the existing Marathon pipeline easement
30:23that crosses the property diagonally. It
30:25prevents us from putting the building
30:26any closer to Freight Street.
30:28Um, we appreciate staff's
30:31understanding of that issue. We have
30:32designed the building with kind of that
30:35um
30:36articulated frontage to put as much of
30:38the building near Freight Street as is
30:39possible.
30:42Regarding variance number two, this
30:43one's a little bit of a tougher nut to
30:45crack.
30:46Um staff describes the property as
30:48large, flat, undeveloped.
30:51While that's kind of true, it really
30:53doesn't get to the real issue.
30:55Um the property is not constrained by
30:57being large or flat or undeveloped. It's
30:59constrained by its significant frontage
31:02on arterial roadways.
31:03It's pushing 1,900 ft of of frontage on
31:07Eisenman Road, either the north-south
31:09segment or the east-west segment that
31:10turned and goes towards the the
31:12interstate interchange.
31:14But we're not allowed to take front take
31:16access from any of that frontage. The
31:18property has very small frontage, 506 ft
31:21on Freight Street,
31:22of which 150 ft is too close to
31:24Eisenman, and we're not allowed access
31:26there either.
31:27So really our effective frontage is only
31:30about 356 ft where we need to provide
31:34access that can support the the proposed
31:36development.
31:38By consolidating all of our access to
31:40that relatively small frontage, we need
31:42to make sure that it works extremely
31:43efficiently because there's not
31:45opportunity for traffic to be
31:46distributed more widely across the site
31:49or access the roadway network in more
31:51locations.
31:52That fundamentally is the hardship on
31:55our property is that we're constrained
31:56by
31:57the
31:58significant frontage on arterial
32:00roadways that prohibit access.
32:04Um as designed, um we've proposed a site
32:07plan that does require three access
32:10points. From west to east, the one
32:13nearest Eisenman Road would be primarily
32:15for passenger access.
32:16There's some 200 parking spaces along
32:18the west facade of the building that we
32:20want to be able to for employees and
32:23visitors to access readily and get out
32:25onto Freight Street from.
32:27In that area over the pipeline easement
32:28that we were talking about north of the
32:29building, there's around 80 additional
32:31parking spaces there.
32:33Um
32:34by having a second access point
32:36dedicated to passenger access vehicles,
32:38we spread out some of that um passenger
32:41and
32:42passenger car load and uh get those
32:45people access into and out of the site
32:47onto Freight Street in a better
32:48distributed fashion.
32:50And then most importantly, it allows us
32:52uh dedicated truck access from the
32:54turnaround at the west end of Freight
32:56Street
32:56to separate
32:58trucks from and big trucks
33:01from the passenger and vehicle cars.
33:04Um it's really
33:06not a fundamental question about um
33:08having less driveways be safer. It's
33:12if we really don't think that less
33:14driveways is safer. In this case, it's
33:16about having enough driveways to
33:18separate passenger cars and let them
33:20access the site efficiently
33:22completely separate from truck traffic.
33:27In staff's analysis, they compared and
33:29in the slide that you saw a minute ago,
33:31they compared our proposed building
33:32number five to an earlier project also
33:35developed by Boyer Company immediately
33:36across Eisenman from this site that was
33:39Boise Gateway building number one or
33:41Verde.
33:42Um staff compared the two and
33:44concluded that other sites in the area
33:46have been able to work just fine with
33:47two accesses and therefore I think they
33:50posited that our project should also be
33:52able to work just fine with two
33:53accesses.
33:54The comparison wasn't
33:56I don't think apples to apples. Boise
33:58Gateway Building one is only 168,000
34:01square foot building, 142 parking
34:03spaces, and it does have two access
34:04points
34:06to Freight Street.
34:07I think a more appropriate comparison
34:09might be Boise Gateway Building
34:11um two, which was also Amazon's BOI five
34:14distribution center.
34:15Um it's very close. You can see in the
34:17metrics here. Very similar in size,
34:20279,000 square feet versus our proposed
34:23268,000 square feet. Similar number of
34:26passenger vehicle parking spaces at 308
34:28to 272.
34:30But Boise but the Amazon building
34:33um uses four access points to Freight
34:36Street um completely separating
34:38passenger cars and trucks.
34:40Uh it's it's more in our view a similar
34:42paradigm to
34:44the proposed Boise Gateway five, and
34:46helps paint our case a little bit better
34:48about the importance of separating
34:50passenger cars and truck traffic.
34:54again, and to the point that you made on
34:56the last application, this is not about
34:58a look down the alley to see what other
35:00people have done and then applying,
35:02you know, past conclusions on other
35:03projects to this one. We're just
35:05indicating that um we think that more
35:08than two access points is really
35:10important for the safety of Boise
35:12Gateway Building Five to operate
35:13correctly.
35:16ACHD supported the three driveways in
35:19their site specific conditions of
35:20approval and staff report. Um, they
35:22noted of course that direct lot access
35:25to Eisenman Road is prohibited.
35:27They included in condition number seven
35:29their support for the three proposed
35:31accesses to Freight Street,
35:33and they also noted that the traffic
35:35study review, which was based on three
35:37access to Freight Street, required no
35:39additional mitigation and met all of
35:41ACHD's policies.
35:44Um, I'd like to have Dave Ward up just
35:46to provide a little bit of context as
35:48the developer.
35:49He has three of our minutes it looks
35:52like.
35:52>> Thank you.
35:58Thank you, Jason. Thank you, Mr. Exton,
36:00Mr. Gillespie. My name is David Ward.
36:02>> Could you pull that down?
36:04>> Thank you, Mr. Ward.
36:05>> You're welcome.
36:06Uh,
36:07I work for the Boyer Company whose
36:09address is 101 South 200 East, Salt Lake
36:12City, Utah.
36:13>> Thank you, sir.
36:14>> Uh, we have been selected to serve as
36:17the development partner with the City of
36:19Boise for the Boise Gateway Industrial
36:20Park and
36:22uh we we'd like to believe that we are
36:23selected based on our firm's 50-year
36:25history
36:27and our experience and expertise in uh
36:29delivering
36:31high quality large-scale industrial
36:33products throughout the Western United
36:34States. Our firm has completed over 20
36:37million square feet of industrial
36:39uh buildings and we currently have about
36:42a half a million square feet projects in
36:44development right now.
36:46Um, we are constantly looking for the
36:48best practices to implement into all of
36:50our buildings.
36:52And uh
36:53we feel like the
36:56site plan that has been pushed forward
36:58uh represents
37:00industry leading standards
37:02and
37:03are reflective of the hardships that
37:05we've faced as Mr. Densmore noted
37:07because of the restrictions that have
37:09been placed on the access to Eisman
37:11Road.
37:12Uh
37:13in a perfect world of a flat undeveloped
37:16site, we would have loved to have access
37:18off of Eisman Road. It would make the
37:19site work better
37:21and it would serve the tenants in the
37:23building much better, but we understood
37:25um what is currently
37:27uh
37:28in the AC ACHD design manuals as well as
37:32uh
37:33guidance given by city staff on access
37:36to the arterial roads.
37:38So our three driveway
37:40plan is very very intentional in
37:42response to the restrictions that are
37:44being placed on this particular parcel.
37:48And the focus for us
37:50is safety
37:52and the importance of separating that
37:55truck traffic in both directions on the
37:58site because we can't have an a separate
38:00exit for trucks. Everything has to come
38:02in and out of the same driveway.
38:04And keeping a distance and not sharing a
38:07drive access which would be required if
38:09we had two driveways instead of three.
38:12Intermingling
38:14pedestrian
38:15passenger vehicles with trucks access
38:18is not only a bad idea, it's just not
38:20consistent with current design standards
38:22for modern industrial properties.
38:26So
38:28when we look when we asked for this
38:30decided whether we wanted to proceed
38:32with this variance request, we
38:35we decided to move forward because it
38:36felt so strongly about it. This is not
38:38about profit
38:40or making money or reducing costs. In
38:43fact, the proposed solution costs more
38:45than if we were to go forward with a
38:47redesign.
38:49We feel it's just absolutely the right
38:50thing from a safety perspective.
38:53And the hardship is not just on us. The
38:55hardship if we proceed forward will be
38:57on the safety of the people who use the
38:59building and
39:00our neighbors
39:02because we are forcing more traffic into
39:05lines of uh circulation with trucks.
39:08We're pushing more passenger vehicles
39:10into a singular
39:11entrance which then can result in
39:13additional backups on the roads
39:16adversely impacting our neighbors.
39:18>> Thank you, sir.
39:19>> Thank you.
39:21>> All right. Um is there anybody here from
39:28the Southeast Eisenman Neighborhood
39:30Association?
39:34Online. Okay. Hearing none, I get to ask
39:36questions. So I have a first a set of
39:38questions. I'll I usually start with the
39:40city and then I'll ask
39:42the uh applicant some questions. So
39:45Mr. Ekstrom, I just want to make sure I
39:47understand. So the city code really
39:49speaks to how many access points can be
39:51taken off one street?
39:53Is that correct?
39:55Or Or Cuz Cuz this it says you can take
39:59two.
40:00>> That is correct. Yeah. On Shown on
40:01screen right now is the direct quotation
40:03from code
40:05that restricts access to one access
40:08point for all properties across the
40:09city. And it allows the planning
40:11director in consultation with the
40:13Highway District and or Idaho Department
40:15or Idaho Transportation Department a
40:17second access.
40:19Anything above that currently in code
40:21requires a variance to have more than
40:23two access points which is why we're
40:24here today.
40:26>> So on the Amazon property which has four
40:29allegedly
40:31are they taking two off one street and
40:33two off another?
40:35>> Believe that was developed under the
40:37prior code.
40:39>> Okay.
40:39>> Yeah. So
40:40>> it's not really two per street. It's two
40:43total for the site.
40:45>> Correct.
40:45>> So
40:46So
40:50This hypothetically so if Eisenman was
40:53for somehow became available for access
40:55and I want to come back to that in a
40:57minute.
40:58They still would have to get a variance
41:00to put in that third access point from
41:03Eisenman.
41:04>> That is correct.
41:05>> Okay.
41:06Now I want to go back to that issue. So
41:08I did not understand your comments on
41:11future ACHD actions with Could you pull
41:15that page back that up?
41:17Can you talk to me about what this is
41:19telling me that's relevant to this
41:21application?
41:23>> Correct. Yes. So
41:24the CCDC this is within the Gateway
41:27Urban Renewal District. It's on their
41:29capital improvement plan to widen
41:31Eisenman from the two wish lanes that it
41:34is right now to a five lane cross
41:35section.
41:36>> Mhm.
41:37>> The development code does require the
41:39facade of the building to be within 100
41:40ft from the edge of that pavement
41:43if you have parking between the building
41:45and the sidewalk.
41:47With that the planning director has
41:49determined that with us waving
41:51streetscape requirements along Eisenman
41:53since it will be widened we can use that
41:55future edge of pavement of the widening
41:57to measure that 100 ft from as it
41:59relates to the Eisenman frontage.
42:01>> So that was to the benefit of the
42:03applicant basically.
42:04>> Correct.
42:06>> But we don't know anything
42:09but Eisenman would still be an arterial
42:11and it's likely that the ACHD would
42:13still prohibit
42:16>> Mhm. That is correct.
42:16>> for that reason.
42:18>> Correct.
42:18>> Okay.
42:20I want to Okay. Got that. Now I have
42:22questions for both or either.
42:25So um
42:28so can you pull up the page that shows
42:30what you're proposing with the three
42:32access points and then you had
42:35like text blocks next to it that explain
42:38what what you're proposing.
42:41Yeah. Is that it? Can we make that
42:44bigger?
42:47So
42:49let me miss make so you're proposing
42:51three three access parts two of which
42:54are completely dedicated to passenger
42:56vehicles.
42:58>> Yes, that's correct.
43:00>> And number three, which I guess is the
43:02one closest to the freeway, so the
43:04furthest north I think
43:06is trucks only.
43:09>> That's right. It's closest to the
43:10freeway. It happens to be furthest east
43:13and it's accessed off of a
43:15cul-de-sac turn yes, sorry.
43:17>> I got it.
43:17>> North is to the left on
43:18>> Yeah, yeah, I always get
43:20That's why I kept going like this cuz
43:21I'm trying
43:22>> The truck access is being connected to a
43:24cul-de-sac at the end of Freight Street.
43:26>> Right. So people can Okay.
43:29So um your colleague said something I I
43:31didn't fully understand which was if we
43:33went to two
43:36access points
43:38trucks would need to use both because he
43:41said then there would be mingling of
43:42passenger cars and trucks
43:45at the passenger access point.
43:48Is
43:49did I hear that correctly?
43:51>> Uh I'm not sure if you heard it
43:53correctly. I think what we were trying
43:54to say is that if
43:56the
43:57variance request falls down and we're
43:59only allowed two access points to
44:02Freight Street
44:03we will need to reconfigure the parking
44:05to interconnect
44:07uh some of the passenger area to that
44:10truck drive on the east side
44:13which would mean that then we're
44:14co-mingling trucks entering the site
44:17from the cul-de-sac with passenger
44:19vehicles that might be trying to exit to
44:21Freight Street at that easterly
44:22driveway.
44:24>> So I guess my next
44:25>> That's what we're trying to avoid.
44:26>> Right. So my question is why do you have
44:29to
44:32co-mingle why do you have to then
44:36let's just say for purposes of this cuz
44:38this is the only
44:39circulation pattern analysis I have or
44:42is this.
44:43So let's say you eliminate the middle
44:47access point which is now called
44:49passenger access two.
44:51Why do you have to then
44:55connect those parking lot spaces by
44:59passenger access two to the truck lane
45:02that's located further east.
45:04I I I don't understand
45:07why you have to do that. You could just
45:09have one
45:11passenger access for all those parking
45:13spots.
45:14And you'd probably move it a little bit
45:16for, you know, more centrally in fact. I
45:18don't know.
45:20>> What we're we're trying to do is um
45:22allow the people who have parked in
45:23those passenger
45:25vehicle lots to access out to Freight
45:28Street efficiently. And to the extent
45:31that the
45:32one, wherever it is, might become
45:35bottled up from time to time
45:37um
45:38to to get to the other one and go all
45:40the way around the building, around the
45:42fire lane on the south side and then out
45:44is really not
45:45efficient.
45:46Um so we'd like that small area of
45:48parking that's north of the building
45:50over the pipeline easement that we were
45:51talking about
45:53to be able to kind of cross access
45:55within the site.
45:56And that's unfortunately what would
45:58cause that that mingling because then
46:00they're using the truck drive.
46:02>> Do we have a pointer that I can use or a
46:04like a flashy lighty?
46:08So
46:10so Doug, can you get a cursor up there?
46:12Okay, move it all the way down to the
46:14opposite corner. Now move it all the way
46:17across. Now there.
46:18So if I park there
46:20I have and I and I go out the closest
46:24access point. Doug, take me out the
46:26closest access point.
46:28So I have so that guy who parks way down
46:30there, he's going to drive by
46:33200 parking spaces on both sides.
46:36Okay, now take me to the parking those
46:39right there. So that guy, he parks right
46:42there. Now take me out number one,
46:44right? So in order to get out, that guy
46:46has to drive by a fifth of the number of
46:49parking.
46:51So I'm not sure I understand
46:53why does adding that second part
46:57you know, so instead of driving by
46:5930 parking spaces, the guy in the upper
47:01left hand corner has to drive by 10.
47:05So and the the guy still down at the far
47:07corner still has to drive through 200
47:10you know, by. So I'm not
47:12honestly, I'm not understanding your
47:13argument
47:14that adding a second spot in that place
47:19helps that much with congestion cuz the
47:21real congestion is created by having
47:23that long [groaning]
47:27row of parking along Eisenman.
47:29Right? I mean, what we really need for
47:31internal circulation is an Eisenman
47:33connection in the middle of that side,
47:36right?
47:37We don't need another one up on Freight
47:39Street, do we?
47:41Like I don't think the the marginal
47:42benefit of that Freight like I'm not
47:45asking a question. I apologize. Could
47:47you please explain to me again
47:49>> We don't disagree that
47:50>> Can you please explain to me again
47:53like
47:55why you think that middle access has a
47:58material impact on the parking
48:00circulation for vehicles?
48:02>> Yeah, we don't disagree at all that
48:04overall site circulation would be
48:06benefited greatly if there were access
48:08to Eisenman, but both the city and ACHD
48:11have been clear that we're not getting
48:12that.
48:12>> Yeah, and I obviously
48:14I don't have the authority to do that
48:17if if you did, we might have asked for
48:18that as our variance.
48:19>> Yeah.
48:20>> Uh
48:21but because of that limitation and all
48:23of the traffic having to be funneled
48:25back to Freight Street, we think there's
48:28potential, particularly during afternoon
48:30shift change and some of those high
48:32volume times that if all of the
48:35passenger vehicles have to be focused to
48:37just one driveway, it'll be more
48:39congested. And so having a relief valve
48:42at the other access point that doesn't
48:44cross-mingle with truck traffic will
48:47improve site circulation.
48:49It's supportable by ACHD. We just have
48:52this
48:54issue, problem with the code.
48:55>> Problem with the code.
48:56>> two, not three.
48:57>> It says two, not three.
48:58>> That's a problem for me too.
48:59>> And and irrespective of property size or
49:01any other issue, you only get one unless
49:04planning director thinks you should have
49:06two.
49:07Thank you.
49:07>> Did you
49:09Did you want to add something?
49:10Why don't you throw your name and
49:12address in the record. Thank you guys
49:13for your patience.
49:14>> apologize if I created any confusion.
49:16The the the concern with if we were not
49:19to make the connection to the truck
49:20drive access and to remove the
49:22centerpiece, the center access for the
49:25passenger vehicles
49:27is the the
49:29potential for congestion as Jason
49:32mentioned and the bottle point will the
49:35bottle the choke point will be the
49:37bottleneck choke point will come at the
49:39access point on Freight Street for the
49:42vehicles, but then also on that internal
49:45spot.
49:46>> right right right.
49:46>> Right where you think everything's
49:47coming together in a very very short
49:49area.
49:50>> Yeah.
49:50>> And and that is you can say is an
49:53inconvenience in lieu of a hardship on
49:55people exiting the site.
49:58What I'm very concerned about is people
50:00getting into the site when you're so
50:03close to the intersection.
50:06>> Mhm.
50:06>> And keep in mind we have
50:09right now it services
50:11over what 450,000 square feet. No, more
50:14than that when you include the Winco
50:15Distribution Center and for future
50:18developable land to the west, that
50:20intersection is only going to get more
50:21and more congested.
50:22>> Right.
50:23>> So having everything of all those
50:25parking spots funnel into that one
50:29access point I
50:31feel is just a real bad idea and the
50:33hardship again is created. We our
50:35initial designs for this included access
50:38off of Eisman Road, but through
50:40discussions with staff at ACHD and the
50:42city, it became very apparent that that
50:44was not desirable and we
50:46we agreed. We went forward with their
50:48desires, but it shifts the challenge to
50:51to another place and now to get pinched
50:53in and to claim there isn't a hardship,
50:55we just disagree with that assessment.
50:59>> Thank you.
51:08>> [clears throat]
51:09>> I'm thinking about
51:11Give me a minute.
51:25Okay, so I don't have any other
51:27questions at this time. I may come back
51:29and ask more questions and we have to
51:31kind of open it up, but it's not like we
51:32have a big public
51:34record here or audience. So um why don't
51:37we go to public testimony and start in
51:39person first? Is there anybody here um
51:42would like to testify on this issue?
51:47So I had three people sign up on the
51:49sign up sheet.
51:50Um
51:53Oop, wrong one.
51:55Nope, I just had one. I just had
51:57Joseph Larea.
52:00That's you. Okay.
52:02Get your three minutes of fame, Mr.
52:04Larea.
52:05>> Uh Joseph Larea, the applicant. Joseph
52:07Larea, the applicant um with Babcock
52:09Design Group.
52:10I live at well 800 uh West Suites what
52:15we 9 9 910. But um
52:18we've been working through this
52:19throughout some time and of course
52:21Eisman would be the best.
52:23But through the hardships of waiting
52:26and the safety issues as well, we feel
52:29that this is the best solution
52:31or a compromise of a solution. And I
52:34just
52:35I thought that was a sign up sheet. I
52:36didn't know I was re-speaking. So
52:38>> It's okay. You did fine.
52:39>> said, I'm in favor of the three
52:41entrances and I think it's a wise idea.
52:44>> Thank you, sir.
52:46Okay, is there anybody online?
52:49All right.
52:50So um
52:52applicants, you have up to 5 minutes for
52:55rebuttal or closing arguments.
53:02I No, let me think about that. I'm I'm
53:04trying to think about it.
53:20So I'm going to just have to ask some
53:21more questions which will recycle
53:23everyone's opportunity to comment and
53:25rebuttal and all that
53:27but
53:28heck.
53:29Um
53:32so I guess my question um
53:36to the city is with respect to the three
53:39driveway plan
53:41does it meet ACHD's
53:44spacing and placing requirements?
53:47It's the applicant said that it did that
53:50they had approved it.
53:51>> Mr. Gillespie, in draft comments
53:52received from ACHD, they indicated ACHD
53:56was fine with the three access points
53:57their per their policy manual. However,
54:00city of Boise's development code in this
54:02specific example
54:04places more stringent requirements with
54:06the two access points.
54:07>> Okay. And so Mr. Accident is is the um
54:13is the two
54:16driveway limit
54:19um it's just a flat that's the only part
54:22of code that this is hanging up on. Is
54:24that or is there some other
54:26like
54:27you know parking or access requirement
54:30that I missed? Cuz I read the staff
54:32report. I only saw reference to the two.
54:35>> Mr. Mr. Gillespie, that is correct. Uh
54:38development code like I showed earlier
54:39references up to two. There is another
54:42section as it relates to kind of some of
54:43those conversations about access to
54:44Eisenman. There is a section in code
54:47that if you have more than one frontage,
54:48it has to be on the lowest volume street
54:50which is why we're
54:51um taking access off of freight street
54:53no matter what.
54:54>> Right.
55:08Okay, thank you very much.
55:11Um, so you can rebut or discuss if you
55:15you have a chance to talk about what he
55:16just talked about if you want to.
55:19And I just asked him about really what
55:22was ACHD to you and what exactly is the
55:25controlling part of code that staff is
55:27relying on?
55:29>> To add to what Mr. Exton said, yes, we
55:33have ACHD support in their draft staff
55:35report for the accesses that we
55:36proposed. Their policy manual does not
55:39does not limit the number of accesses to
55:41an industrial local street like Freight
55:43Street. We're only limited in how close
55:45to Eisenman Road a driveway could be
55:47placed.
55:48As long as we stay out of that 150 ft
55:50zone
55:51adjacent to Eisenman, ACHD's policy
55:54would allow us essentially an unlimited
55:56number of accesses, but they are
55:57supportive of the three.
55:59>> Thank you.
56:09All right.
56:10My decision is to deny the variance CBA
56:1326-43 for the reasons written in the
56:15staff report.
56:17However,
56:19I would like to encourage the city to
56:23revisit the
56:26absolute hard number two
56:28with respect to certain kinds of
56:30development.
56:31I think
56:34it's reasonable that the city adapts
56:36some limitations on number of access
56:39points, but I think that limitation has
56:41to be flexible with respect to the uses
56:44and particularly the number of parking
56:46spaces that a use
56:48is is commanding.
56:52And so that's my decision.
56:56Thank you very much.
56:58I can't
57:00Yeah. Oh,
57:01my bad. So let me clarify
57:04with respect to
57:06you had one, but
57:08I agree with the staff report that we
57:10should
57:11grant the variance with respect to
57:13building placement
57:15and deny the variance respect to a
57:17number of access points for the reasons
57:19stated in the staff report. I apologize
57:21for that.
```*
