2026-10-28 - Planning and Zoning Commission
Summary
Built from the City's posted agenda and minutes and the video's YouTube auto-generated captions. Auto-captions are imperfect, so names, numbers and speaker attributions may be misheard; staff, the applicant's representatives, public commenters and most individuals are not named here. Staff reports and packets were not opened. Date check: the YouTube title says October 29, but the page date of October 28 is correct. The agenda and minutes are for October 28, and the chair opens the meeting in the captions as Wednesday, October 28, 2026.
- The meeting opened with the executive-session notice and a roll call; one commissioner was excused and the chair said she would stay until 5:00 PM, when the vice chair would take over. No one spoke in the open call to the public. The October 14 minutes were approved as written by voice vote (5-0 per the posted minutes). (Flagstaff)
- Four public hearings were held together on the STL 290 project, a proposal by one applicant for about 290 acres of State Trust land northeast of Pine Canyon Estates along the John Wesley Powell Boulevard extension. Staff said the Commission would not vote that night: specific plans require two hearings, and the votes were expected at the next meeting. (STL 290 Specific Plan and Rezones)
- Minor Regional Plan amendment (reviewed under the 2030 Regional Plan, which was in place when the application was vested): move activity center S12 north to a collector road near the proposed lodge, remove activity center S17 as redundant with the John Wesley Powell corridor and hard to develop given the topography, and realign the road network map to the current John Wesley Powell alignment. Staff recommended approval; the applicant held three neighborhood meetings with roughly 11 attendees in total and staff had received no public comments.
- STL 290 Specific Plan: 20 development areas and five phases; the proposal targets about 785 homes, a 120-key lodge and about 80,000 square feet of commercial space, with roughly 70 acres of parks, common and preserved open space, about 3.8 miles of off-street trails and the Arizona Trail kept open and realigned on site. Staff described modifications: higher minimum densities in some areas, no single-family homes in five development areas, added building heights (up to 48, 60 or 75 feet in various areas), reduced setbacks, community-wide planned residential development open-space treatment, and block-length exceptions replaced by pedestrian connections. The golf course in the already-approved by-right area would be allowed clubhouse-type uses without a new conditional use permit. Staff noted the zoning would allow roughly 605 to 1,312 units, a larger range than the target.
- Concept rezones: about 139 acres from rural residential to R1 (target about 443 units, range roughly 315 to 721) and about 72 acres to suburban commercial, highway commercial and medium-density residential (target about 296 units in the medium-density areas), all keeping the resource protection overlay. Proposed conditions include conformance with the specific plan and sample building footprints, compliance with a development agreement, and reversion to rural residential if civil plans are not approved within two years.
- Transportation and infrastructure: the master traffic analysis (sealed September 15, 2026) estimates about 11,900 weekday external trips at full buildout; John Wesley Powell must connect to South Fourth Street before permits beyond the first phase areas and the existing by-right development, and the draft development agreement under negotiation would tie roundabouts at Lone Tree to dwelling-unit counts (about the 200th and 370th) rather than calendar years. Water, sewer and drainage analyses were reported as reviewed and approved; the water and sewer study was extended in October 2025. Staff said the project is not expected to strain police or fire service initially.
- Commissioner questions and requested follow-up for the next hearing: how the school district reached its capacity conclusions (the project projects about 226 students, the district letter supports it, and the applicant said the superintendent welcomes the growth) and how far children would walk; reclaimed water, including a prior contract and a possible future request, and the water features (the applicant said the open space is not contingent on more reclaimed water and it will address this next time); no affordable housing component and whether housing type or square-footage ranges are guaranteed (they are not, only enabled); a clearer zoning map because the specific plan's color-coded map shows housing types, not zones; local hiring; and access to forest and trails for the wider public. (Zoning Map Amendment Process)
- One participant commented on reclaimed water for groundwater recharge, whether the golf course extension could be open to the public (the applicant said it is a private Pine Canyon expansion), Habitat for Humanity starter homes and a grocery store. No members of the public commented on the hearings. The public hearings were closed for the night and continued to the next meeting.
- A commissioner asked about ways to cut entitlement time and cost; the applicant said the application was deemed complete in November 2025 and that every added requirement raises housing cost.
- The next meeting was moved from the usual second Wednesday (November 11, Veterans Day) to Thursday, November 12 at 4:00 PM at City Hall. The meeting adjourned at about 6:43 PM per the posted minutes.
- Data caution: the posted minutes record no motions or votes on the hearings and the captions confirm none were taken. Several figures (acreages, unit ranges, dates) were read from auto-captions and may be misheard.
Sources
- Agenda: https://public.destinyhosted.com/35247/agenda/agenda.cfm?seq=4823
- Minutes: https://public.destinyhosted.com/35247/agenda/minutes.cfm?meetingId=4824
- Agenda and minutes portal: https://public.destinyhosted.com/35247/agenda/ (Agendas and Minutes page https://flagstaff.az.gov/991/Agendas-Minutes)
- Video: https://www.youtube.com/watch?v=MKh9M_mq4ko (YouTube, https://www.youtube.com/@FlagstaffCityGovernment)
- Town: Flagstaff
Video
Transcript
These are auto-generated captions; names and numbers may be misheard. Personal names, applicant and owner names are redacted, and staff below director level are omitted by name.
Transcript
I'd like to call to order the planning
and zoning commission meeting for
Wednesday, October 28th, 2026.
And um there's a notice of option to
recess into executive session. And
that's pursuant to ARS
38-431.02.
That uh notice is hereby given to the
members of the commission and to the
general public.
um that at this meeting the commission
may vote to go into executive session
which will not be open to the public and
we would do that for legal advice and
discussion with the commission's
attorney on any item listed on today's
agenda pursuant to ARS
38431383.
I'll move into roll call.
>> [name] present.
>> [name] present.
[name] is excused. [name]
>> present
[name]
>> here. [name]
>> here.
>> And I would just like to make a note
that chair [name] will be here
until 5:00 and then at that time [name] will take over chair position.
>> Thank you very much.
So, right now we have an open call to
the public and at this time any member
of the public may address the commission
on any subject within our jurisdiction
that is not scheduled before the
commission today. Due to open meeting
laws, the commission cannot discuss or
act on items presented during this
portion of the agenda. to address the
commission on items that are on the
agenda. Please wait for the chair to
call for public comment at the time the
item is heard. Are there any um open
public comments at this time?
hearing and seeing none. Um I will move
on to approval of the minutes of the uh
meeting that was held on October 14th,
2026.
Move to approve the minutes from October
14th, 2026.
>> As written. As written.
>> Second.
>> Okay. So, it was um motioned by
Commissioner [name] and seconded by
Commissioner [name] to approve the
minutes of October 14th, 26. All in
favor say I.
>> I.
>> I.
>> I.
>> All opposed.
Motion carries.
So, now we'll move into the public
hearing. And the first item on the
agenda is public hearing item
PZ2500159-2.
and it is a request for a minor
amendment to the Flagstaff Regional Plan
2030 by the applicant. And I'll let
um [staff] give her presentation.
Um [staff], current planning
manager with the city of Flagstaff. So
my presentation's going to be on the
screen there. So if we need to
Hey, this is better because I can see it
from
>> Yeah, it's not quite better than what
you're right.
>> All right, so our first item is um
STL 290 minor regional plan amendment.
Um this is a request for a minor
amendment to the Flagstaff Regional Plan
2030
uh by the applicant. Um there are
three parts to this request. There is
the request to move the center of an
activity center S12 to the north on the
maps where it's shown on the plan. um to
remove an activity center at 17 and to
realign the road network to follow the
John Wesley Pal Boulevard future
extension.
Um,
so this minor regional plan amendment
request is connected to three other
entitlement cases that include a new
specific plan as well as two concept
zoning map amendments.
Um the property,
okay, the subject property existing
conditions,
the subject property is about 210 acres
of undeveloped land. Um it is an this
Lshaped piece of property that used to
be owned by the state that is in the
process of being purchased by the
applicant. So a little history
Um
part of this is that that land was 4
five acres.
It is it is slowly changed over time to
have some byite development that
development area 16 that we'll get to um
came in first. So part of that has is
affected the acreage. Um there's some
other acreage that um that the applicant
is in partnership with their neighbors
to the west to develop also by rights.
So that was in the plan was taken out of
the plan. So um this plan over the
course of review has shifted a bit in
acreage. So if you're seeing things like
I I believe the the TIA has a different
number associated with it. Um so there's
some other references to different
acreage. Don't let that throw you out.
It's all this project. So [laughter]
>> clarify. Yes.
>> The 290 does that include that I think
it was 126 acres that were in 16. Is
that part of
>> includes part of that and and I think
it's covered in other places but just to
get out there now there's some by right
residential development that has been
platted but there is also an amenity
space that was included in this plan
that covers the golf course um if
there's a future clubhouse things like
that. So that is part of the plan but
the residential component is not part of
the plan.
Right? So the proposed development and
I'm going to try and be clear about what
is proposed versus what is a range or
allowed uses. Um so keep that in mind as
we talk about this. There is a proposed
use, but there are also uses that may be
allowed as part of that specific plan,
as part of that reszone. So, what is
proposed
is 785 dwelling units, 120 key travel
accommodation use, that's what we call
hotels in the zoning code. um and an
estimated 80,000 square ft of commercial
space as well as natural and um
recreational spaces.
Um so that first request is to relocate
the future suburban activity center S12.
So you can see on the image on the top
right that S12 is currently located um
down on that John Wesley Pal alignment.
Um this request is to move it further
north onto this um this collector
roadway um on as part of the
development. Um it would in it would be
including the parcel at development area
five that is where they're proposing to
do that travel accommodation or the
applicant often refers to it as the
lodge. Um, [snorts] so it's it is along
that proposed collector roadway and
connects to John Wesley Pal not just
through that roadway but through
internal streets and the trail system.
Um, another request is to amend the road
network. So again, um the history in
this area, um years ago, John Wesley Pal
was designed to connect down through the
south end of Fourth Street through a
neighborhood and come into this area
from the east. Um
that has changed over time. We have a
different alignment now. So what is
being proposed by the applicant actually
aligns more closely with what the John
Wesley Pal boulevard um is proposed to
actually be. Um I did talk about in my
staff report how it it gets a little
choppy towards the north. There's not
quite the same amount of connection, but
both both the existing re or sorry, both
the 2030 regional plan as well as our
future 2045 plan show that area as a an
area to be studied um where the road
alignments are not fixed. Um, so I think
that gives us a little more flexibility
that this is still up in the air as far
as alignments.
And that third request is to remove
activity center S17.
Um, the 2030 plan does show it as this
neighborhood scale future suburban
activity center. Um it feels a bit
redundant looking at John Wesley Pal as
this suburban corridor that would
support um commercial and higher density
along the corridor to then also have an
activity center. Um and the applicant,
you know, is making um arguments talking
about the topography there and the
resources in the area and how that makes
that sort of concentrated
development of density that much harder
um as opposed to being able to to
stretch that out along the corridor.
Um so the findings for a minor regional
plan amendment um is that it needs to
meet the requirements of the general
plan and the subdivision code. Um
goals and policies should be considered
um that it's in conformance with the
overall vision. Um, I give you some
quotes from our regional plan that or
the 2030 plan that the Flagstaff
regional plan establishes the vision for
the future growth and development of
Flagstaff and founding area through
goals and policies and reminds us that
general plans are not static documents.
They recognize growth as a dynamic
process which may require revisions to
the plan as circumstances or changes for
it.
again the plan's sub vision um I think I
should back up a little bit
when this application came in and was
found complete that's when we vested it
that you are we are reviewing this
against the regional plan in place at
the time that was the 2030 plan we had
not yet adopted the 2045 so every time
I'm referring to the regional plan. I'm
talking about the 2030 regional plan.
All right. So, the 2030 plan talks about
the greater Flagstaff community,
embraces the region's extraordinary
cultural and ecological setting on the
Colorado Plateau,
um natural and built environments.
encourage the advance of intellectual,
environmental, social, and economic
vitality for today's citizens and future
generations.
So, in looking at the request number one
to relocate S12,
uh, suburban activity centers have a
pattern of commercial uses as the
primary anchor with supporting
residential around it. Um the regional
plan does consider the preservation of
natural spaces. Um there's goal LU4 that
talks about balancing housing and
employment land uses with the
preservation and protection of our
unique natural and cultural setting as
well as goal CC1 which states reflect
and respect the region's natural setting
and dramatic views in the built
environment. Um, the proposed zoning map
amendments will allow for a target of
484 units within the pedestrian shed of
the activity center resulting in 7.19
units per acre. Um, if I can talk a
little bit about this, I think it's
important to realize that the
development being proposed, this the
lodge, that travel accommodation is not
like the sort of traditional
motel that you need to be able to see
from the highway when you're need a
place to crash on your road trip. This
is more of a a destination that's trying
to really take advantage in a good way,
take advantage of the natural setting,
um the trees, the slopes, the canyons,
the waterways in this area. So although
although activity centers are more
commonly located directly on um on these
major roadways,
this the lodge is set back a little bit
and doesn't necessarily have that same
pattern of extreme density in the center
and then moving out from there. It's
almost like the lodge is the center and
then the house begins at the edges of
that
number two to amend map 25. Um the area
to the north is mapped as identify road
network solutions through future
studies. So that's why I was talking
about how there are some sort of cut off
roadways, but I I have confidence that
your studies will identify that road
network. Um the regional plan 2045 also
has that same comment about a future
connectivity study. Um it does align the
map with the current John Wesley Powell
Road alignment. Um, and because that
John Wesley Pal is seen as a suburban
corridor, I put in the definition of
that suburban corridor as serving larger
capacities of vehicles and people with
more intense land uses and pedestrian
safety as a priority in the setting.
These corridors will be wider with
vaster speed limits, although I think
John Wesley Pal had a lower speed limit.
agreed to 35 um
and emphasizes safe pedestrian and
bicycle crossings. Uh local roads access
the suburban corridor through a
hierarchy of functional road
classifications
and shops and services are in buildings
that front the street.
And then request three um delete S17. Um
again the by removing that activity
center we're essentially pushing
intensity and density along the corridor
rather than trying to cluster it around
an activity center that is also located
in a site that maybe is not ideal for
traditional development.
Um so the citizen participation plan the
applicant um had three neighborhood
meetings um they held those meetings
you'll see this slide or variations of
it um three more times um because they
held those meetings to discuss all four
of these applications. So they had three
meetings. Um the first meeting had five
people. The second meeting had four. The
third meeting had two. Um there weren't
questions or comments from the
attendees. Um
I I inherited this project later in the
game. I have not seen any comments or
received questions from the public. Um
I've reached out to the applicant about
if they've heard anything. Um it's been
pretty pretty cluff.
Um so
staff's recommendation is that the
planning and zoning commission forward
the minor regional plane and rent roof
bus city council with a recommendation
for approval in accordance with the
findings. Um to clarify, we're going to
have two public hearings on this item.
So we're not voting tonight. Um, we'll
vote at our next meeting.
Now,
please
pause while I pull up my next
presentation.
I tried to have them all as one document
and my computer
did not enjoy that and started getting
quite warm.
So,
Hey,
two,
the STL 290 specific plan.
So, this is a request for the adoption
of the STL 290 specific plan, a
regulating document for approximately
290 acres of state trust land. Um, I
included this certificate of purchase
just because getting APNS and addresses
kind of lags behind um, this entitlement
process. Um, but this is located
northeast of Pine Canyon Estates along
the plan John Wesley Pal Boulevard
extension. Um, this, as I referred to
earlier, the specific plan accompanies
two concurrent concept zoning map
amendment cases that we'll get to after
this. um proposing to reszone the
property or some of the property from
rural residential with the resource
protection overlay to a combination of
single family residential R1, medium
density residential MR, suburban
commercial SC, and highway commercial HC
all still with that resource protection
overlay.
Um, we talked about this on the last
one, the subject property,
the L now with a little bite out of
the side there. All right. So, the
specific plan, the specific plan um
defines land use, zoning,
infrastructure, and development
standards for approximately 290 acres of
state trust land. There are 20
development areas that throughout my
presentation I refer to as DAS, not to
be confused with development agreements.
Um, but 20 development areas with
proposed zoning classifications of RR,
R1, MR, SC, and HC. Um, it also
establishes designated open space, parks
and multimodal
trail corridors.
It outlines required water, sewer,
drainage, and public service
infrastructure and provides a phased
approach for constructing roads,
utilities, and amenities. So, you can
see over on the right side the overall
plan showing all those development
areas. We see the activity center and
its proposed location along that
collector.
question. Yes, this is where I wanted to
get some clarification. In previous
case, it was 210 acres. This specific
plan is called 290. Is that is that 290
acres of all of the colored area less
the part that become Juniper Point?
>> Maybe maybe the easier question is how
many acres are going to Juniper Point
out of the out of the original 405? I
believe that's 60 66
>> 66 acres.
>> Yes, that's the part that says not a
part on [laughter]
um so there are a few modifications that
happen in this specific plan. There are
modifications to the density
requirements. Um there's there are
tables included in the specific plan
that address density and development
standards. Um one of the things it does
is actually increase the minimum density
allowed in the RR zone. So um Flag Staff
I'm told is somewhat unique in that we
not only have maximum density but we
also control minimum density in a a lot
of zones. So our zoning code gives a
density range of between zero and one
unit.
Specific plan actually bumps that up to
0.8 to one unit per year in that
development area. Three,
it also increases the minimum density
allowed in the R1 zone. Again, the
zoning code allows for a range between
two and six units an acre. The specific
plan bumps it up to four to six units
per acre in development areas 2, four,
six, and nine.
It also increases minimum density
allowed in the MR zone. The zoning code
allows between six and 14 and the
specific plan requires a minimum of 12
units an acre in development areas 1 and
seven and between 11 and 14 units per
acre in development area 8.
Another modification made by the
specific plan are some of the land use
permissions or that allowed uses table.
Um it prohibits
one unit residential development. You
can think of that as single family
homes. Um it prohibits that use in
development areas 1 7 8 14 and 15.
It also allows the golf course and
related facilities use without a
conditional use permit in development
area 16. Now we all heard that
conditional use permit to allow a golf
game. What this does is now says I think
what I suspect and I'll let the
applicant explain when when they're
presenting, but right what we approved
was just a golf course. And this would
allow them to add like a clubhouse for
certain amenities to that golf course
without having to come in and amend that
conditional use permit.
[staff]
Do you have a a question comment?
>> CJ, you're muted.
>> Oh, sorry. I didn't know that I was up.
Um, my question is about the golf
course. Is it open to the public and
does it use reclaimed water?
Um so we heard a conditional use permit
on the golf course and it included a um
a reclaim water agreement with um with
the city. So yes, it does use reclaim
water as approved as as part of that
discussion. Um as far as being open to
the public, I'll let the applicant
address that. My understanding, how
staff reviewed it was as an amenity
space for the residential development
that was occurring alongside of it.
>> Question, can I ask? Yes. Um, [staff], it's
on the subject of the golf course and
the reclaimed water and I when I read in
the narrative that was for the specific
plan. So when that reclaimed water
contract was redrawn, they saved 30%.
But they're going to be asking for that
30% back in a new contract to to water
with reclaimed water the rest of this
development.
>> So
>> did I understanding from the specific
plan is that there will they intend to
request another agreement for reclaimed
water from the city. Um
I did not I don't think that necessarily
that is a finding to whether the
specific plan is approved or not because
it's not necessarily
promising any sort of entitlement or
saying by by approving the specific plan
we are therefore also appro going to
approve any reclaim water requests.
>> Yeah I just separate
>> I just wanted to bring it up. It wasn't
in your staff report, but it was in
their in their narrative that that was a
big deal that they gave 30% back. It's
coming back out. So, just wanted to make
that known. Thanks.
So, modifications to height
requirements. So, the specific plan
allows greater height in a number of of
these development areas. Uh the maximum
building height in the RR zone is 35
feet. The specific plan would increase
that to 48 feet in development area 16.
That is the golf course area. Um and it
was identified as being needed to allow
for a viewing tower.
Um the maximum building height in and I
just want to clarify that development
area 16 that increase in height is
specifically for the track that includes
the golf course and any amenities. It
does not include the residential tracks
um or laws sorry. The maximum building
height in the R1 zone uh is 35 feet per
the zoning code. A specific plan would
increase that to 48 feet in development
areas 2, 10,19,
and up to 60 feet in development areas
4, 14, and 15.
Uh, the maximum building height in the
MR zone is 35 feet per the zoning code,
and the specific plan allows for up to
60 feet in development areas 1, 7, and
8.
Uh the maximum building height in the HC
zone is 60 feet per the zoning code. Um
additional height in HC is permitted per
the zoning code with a conditional use
permit. Um the specific plan would allow
for an increase up to five stories or 75
ft. Um and that would be permitted that
would they would not need that
additional use permit. Um, the maximum
building height in the SC zone is 35
feet per the zoning code and a specific
plan would allow up to four stories or
60 ft.
Um, there are also modifications to
setbacks. Um, the zoning code includes
minimum setbacks uh requiring 20 feet
setback for parking. Um we have
interpreted that to mean parking
structures, um parking lots, parking
areas, um not your driveway.
And this requirement is removed by the
specific plan for development areas
zoned RR, R1, and MR. Um the development
area 16 again that by rate development
that that subdivision plat was already
approved is not included in this. Um the
specific plan increases the side setback
in the R1 zone um in D
what I wrote there. Um anyway from 3
feet to 5 feet except in development
areas 14, 15 and 19 where the side
setback is reduced to zero feet. Um code
actually the zoning code does allow for
a zero foot setback for attached single
family dwellings uh what people most
commonly call town homes. Um,
and the specific plan decreases the side
setback in the MR zone again. Why am I
anyway from three feet to zero feet and
code allows for again for that zero foot
setback for single family attached
single family dwellings. Um, I do want
to say that even if the setback is zero,
you still have to meet, you know, fire
code, building code for building
separations.
Um, part of the specific plan is um the
idea that the area will be developed as
part of that planned residential
development. There are a few
modifications that the specific plan
allows. um we would apply those PRD
standards sitewise rather than per phase
or per parcel slashdevelopment area. Um
it would count open space collectively
and meets the PRD points um for for
community scale amenities rather than
parcel specific features. So we could
award points for a community park as
opposed to,
you know, a a bench alongside a trail
somewhere. So we get
there maybe less throughout, but I would
hope higher quality
concentrated larger amenities.
Um, another thing the specific plan
addresses is those subdivision standards
that talk about um, block length and
street connectivity. Um, the specific
plan talks about how the street layout
in the activity center does not meet the
regional plan's desired pattern and
block size. Um, this mainly has to do
with topography again and natural
resources. In order to come up with how
the regional plan envisions development
in this flat grid interconnected system,
it is very hard to actually implement in
an area like Flagstaff. Um so the street
network in development areas one, four,
five, six, seven, eight, nine, and 10 um
will most likely have culde-sacs and
blocks that exceed that desired maximum
of a block length because of these
topographical constraints. Um, and the
plan instead proposes alternate
pedestrian connections to substitute for
vehicular block requirements. So, you
may not have
streets for cars that meet those block
standards, but there will be pedestrian
and bike connections that allow people
to move um kind of shortcut between
these roadways.
So, do we see that more
circularly or like where I live there's
a ton of cults because it backs to the
the forest. So, but they're all just
like this, you know, one kind of in a
row and then up in another row,
>> which I don't think is necessarily
an issue with this requirement. It's
more when those culde-sacs become very
very long and that if you were in one
culde-sac and you wanted to visit your
friend in the next culde-sac you're
walking all the way down to the end of
your culde-sac down the road and back up
your neighbor's culde-sac. So
>> this would be
>> this would have those pedestrian
connections between those roadways that
would allow people to more easily move
from one roadway to another. And just
two questions I have. Will it will it
also
are they providing access to the to the
forest so that people can walk in the
forest?
>> Yes. Some places. And are there plans
for urban trails in that area?
>> Okay.
>> All of the above.
>> Okay. Thank you.
>> Sorry. Okay. Sorry. Um the so community
services impact analysis. So when we're
looking at a specific plan, we look at
public services impact analysis review.
This includes transportation, water and
wastewater and storm water. Rather than
go through all of that and all of it
again, that is that analysis is included
with the concept zoning map amendments,
but they are relevant to the specific
plan. Specific plan also has spec more
specific analyses that are required. Um
so the following analysis that I
included in this presentation are just
those additional impacts that we look at
when adopting a specific plan.
So the first one is police and fire. Um
it's development. There's new homes. It
increases demand for police services. Um
there's added residential, commercial,
and the lodging use. Um there's also an
increase um demand for traffic
enforcement due to the new roadway
connections.
Um the Flagstaff Police Department is
the serving agency. Its main station is
located about 2.9 miles from the site.
Um current um police department
performance indicates it can absorb the
short-term increases and calls um and
references ongoing crime reduction
success and community policing programs.
Um so overall STL 290 is not expected to
overburden police services in the near
term but long-term growth will continue
will require continued coordination with
the FPD
as any growth in Flagstaff will require
it to to increase. A question on that as
well. If the bond and the sales tax
increase that are being voted upon next
week don't pass, how does that
>> So this analysis was done prior to those
bonds being
at least on staff's radar I think like
planning staff. Um so this is not
necessarily dependent on those on those
bonds. You also have a public safety
development impact fee. You
>> we have a public safety development
impact fee that we do collect.
>> Okay. Thank you.
>> Um this site is located in fire district
number six. Um it's within the response
range of several stations um including
station four that's approximately three
miles away. Um response times are within
NFPA standards um suggesting existing
service capacity is adequate for initial
phases of development.
again there will be an increase um
emergency medical calls that wildland
urban interface exposure um and similar
to police it the result of the analysis
was that it shouldn't strain things
initially but as it grows we'll need to
revisit it
um school. I believe there was an
attachment of a letter from um FUSD that
talked about this. Um the project is
projected to generate approximately 226
students at full buildout. Um they'd be
distributed among Kinsey Elementary
School, the Mount Elden Middle School,
Flagstaff High School. um all of which
currently have adequate capacity due to
districtwide declining enrollment
trends. Um the analysis notes that the
by putting more development on the south
side of the city, it can help stabilize
the district's
distribution of schools and of
enrollment.
um bringing it possibly into better
balance but may necessitate future
boundary adjustments.
Um and I attached the the letter from
FUSD that states that they support the
project and that they're ready to serve
future students. Question about that.
>> Yes. Um does this when you come up with
this re that when they come up with
these recommendations do they take into
account also the additional students
from like Juniper Point Canyon Del Rio
that'll also feed into those same
schools and I mean there's no parcels
being reserved or set aside for school.
they might be zoned where they could
accept a school, but as everything gets
built out, there could be no land left
in the area to build a school. And when
I when I was following the the JW Pal
specific plan, which was never finished,
I'm sure we'll get to that. Um, in 2020,
they in that initial evaluation, there
were going to be two elementary schools
and a middle school in this in the along
the JWPL corridor. Um, and the new
Kinsey school, they're not increasing
their capacity. They're only adding
preK. So, I'm I'm at a I'm at a loss to
how all these numbers will work and that
they that there won't be a school on
this whole south side, an additional
school on this whole south south of the
40. So when planning department or
school district looks at this, I mean
probably Juniper Point didn't trigger a
school or Canyon Del Rio or this, but
collectively they probably do. So could
you address how that gets figured? kind
of piggyback on that too to say
>> that you know
and I could be wrong but my
understanding of the busing system is
that they they don't bus as many
students as they used to and so how far
will students have to walk to Kenzie
that
>> you know they'll bust probably to MEMS
because it's further away and to um flag
high but to Kenzie with young children
how far way are these homes from Kinsey
Elementary School?
>> So, the information that I was given was
the letter from FUSD. I'm not sure how
school department came up with that
result and what they weighed into it.
Part of
guys always beat me to the punch here.
So, part of what I was going to say when
I was done with my presentation is
because we get to have two hearings
is I would love at the end of this to
hear at the end of the meeting and the
applicants presentation to hear what
additional information you might need
for the next meeting so that I can make
sure I have the staff here or I do
additional research or ask people
questions or the applicant can can
provide additional information about
that. So, it sounds like this might be
on that list of of questions that we
want addressed at our next meeting.
>> Madam Chair, I just have one just
comment generally when I've worked on
projects like this find the school have
like their owners. So they start looking
at these things where where they can
accommodate them in order to generate
the letter that they sent. So maybe you
could ask them for more clarification
because they have to be well aware to
accommodate
um new development. So typically in my
experience that's what they've done.
They you know they have their own
internal planning. They keep track of
the subdivision plat. keep track of um
who's pulling permits.
>> Those those planners reach out to the
city and to planning staff and ask us
>> what's what's online, what's coming
next, what's been approved, how many
units, where what's their construction
schedule, like
>> so maybe they could provide a little
more clarification.
>> Yeah, I'd like to see more clarification
from the public school system. Okay. You
want to say something?
>> Yeah. And if I can just add, you know,
we've had multiple conversations um
throughout the John Masley Pal even the
specific area planning the road finding
project. We recently met with [name], I think it was, you know, a
year ago and the context of the larger
picture of what's happening in the
planning area. And so this tracks with
the exact information that they've given
us. [staff] can get more clarification from
them, but just to kind of somewhat
address it tonight. I can let you know,
we have had conversations with them
about the whole entire area while this
is just looking at the specific site and
this is tracking what they're even
saying about just the way that
enrollment is going and where student
and younger families are are living
right now.
>> Yeah.
>> And my my biggest concern is of those
young students if they're having to walk
to school, how far of a
>> And that's a different Yeah. I just
wanted to talk how far of a route is
that. So
>> um so another issue that we look at is
economic development.
The applicant provided us information
about this. Um the construction is
projected to support an average of 1,600
jobs per year um in Cookanino County,
including 1,026
direct construction jobs. Um and a total
annual labor income from construction
activity estimated approximately 90.7
million. And a question of that, would
most of the jobs or construction people
be hired from within the community
rather than brought in from a another
community to build here.
>> I don't know that that's something
necessarily the developer knows at this
point. That would be up to. I mean,
typically you bid these things and if
you have a local contractor, they might
use local subs.
Hard to say. Uh but maybe they can
address that.
Um at full buildout, the development is
expected to generate roughly six million
annually in recurring city revenue
through property taxes, state shared
revenues, sales taxes, BBB taxes, and
franchise fees. In addition to a
one-time construction sales tax payment
of 12.3 million,
um the approximately 80,000 square ft of
commercial development uh could generate
an estimated 277 jobs and the lodging
operation um it's projected to produce
41 million annually in revenue. Uh the
residential component approximately 785
households is anticipated to further
stimulate the local economy through
household spending on goods and
services.
Parks and recreation. Um, the
development includes approximately 18
acres of publicly accessible privately
funded neighborhoods scale parks located
within walking distance of most
residential units. Um the internal
system of multi-use trails would connect
to the Arizona trail um the John Wesley
Pow Boulevard trail corridor and other
existing regional routes improving
overall recreational connectivity. Um
the project also has a preservation of
natural open space areas.
So the findings um the planning and
zoning commission shall find that the
proposed STL specific plan meets the
requirements of the general plan and the
subdivision code. Um this is very
similar to that minor plan amendment. So
the minor plan amendment is required to
be approved in order for the specific
plan to be found in conformance with the
regional plan. So that's
one of many interconnected tentacles of
these projects.
Um the regional plan 2030 area types. So
this area in the 2020 2030 plan was
classified as future suburban
neighborhood. is located within the
city's urban growth boundary and is
intended to accommodate new suburban
residential neighborhoods supported by
commercial services and multimodal
transportation corridors. Um a suburban
neighborhood is characterized by
primarily residential development at low
to moderate densities. Um, it serves as
a transition between rural areas and
more intense urban places. It features a
connected street pattern and access to
parks and open space and local trail and
sidewalk networks that support walking
and biking. It's designed to function as
a complete livable community that relies
on nearby activity centers and corridors
for services, employment, and higher
density housing opportunities.
Uh for place types, um a suburban
activity center is a mixeduse focal
point within the suburban area type.
It's planned to include a combination of
commercial employment, public
facilities, and higher density
residential uses organized in a compact,
walkable pattern. These centers are
intended to serve surrounding
neighborhoods by providing daily goods
and services within short travel
distances. Development within an
activity center typically includes
smaller block patterns, pedestrian scale
design, and multimodal access. Housing
densities are highest closest to the
center with transitions to lower density
residential forms outward into the
surrounding neighborhoods.
Um, a suburban corridor is a linear area
along a major roadway that accommodates
a mix of land uses oriented towards both
[laughter] local and regional travel.
Um, they're intended to support
multimodal transportation. They're often
lined with commercial, mixeduse, or
medium density residential development.
Um, it provides a structure um for
suburban growth by linking neighborhoods
and activity centers and establishing
predictable development intensity along
designated transportation routes. uh
streetscapes and access management
elements are emphasized to balance
mobility with placemaking and safety.
So when we look at goals and policies in
the plan um environmental planning and
conservation
um we're looking at these are just some
of the goals and policies that I pulled
out. Um the applicant also did their own
regional plan analysis. there's no
shortage of goals and policies for you
to consider. Um, so
here, you know, achieving carbon
neutrality for the Flagstaff community
by 2030. A big part of achieving carbon
neutrality is encouraging these walkable
neighborhoods. Um, having commercial
elements near residential development.
Uh we're looking at policies that
encourage um reduction of energy and
material some consumption. Again,
concentrating development and walkable
areas as well as investing in forest
health, watershed protection measures.
Um again, this development is really
trying to work with topography and with
those natural resources in the area. Um
as well as this goal to protect, restore
and improve ecosystem,
native plant and animal community
diversity
um and preserving forests, riparian
areas, wildlife routes, and using native
landscaping. Um the specific plan has a
whole section on landscaping and the
philosophy of of landscaping different
areas of the specific
um looking at open space and recreation.
Um this project meets um this goal OS1.
Um the region has a system of open lands
such as undeveloped natural areas,
wildlife corridors and habitat areas,
trails, access to public lands and
greenway um
etc.
slaughter resources. Um,
satisfying current and future human
water demands and the needs of the
natural environment through sustainable
and renewable water resources and
strategic conservation measures. Um, the
use of reclaim water and rainwater
harvesting wherever appropriate and
practical and incorporating pedestrian
access, trails, walk, watchable,
wildlife opportunities
into natural water courses when
practical.
Community character. Um, one of our
policies is this idea of preserving the
natural character of the region. Um the
specific plan includes architectural
design features and examples of
various um
structures and what some of those
features are that we see repeated
throughout Flagstaff
growth area and land use. um designing
new neighborhoods that body the
characteristics of Flagstaff Flagstaff's
favorite neighborhoods with a mix of
use, a variety of housing types and
densities, public spaces and
connectivity with again these multimodal
trails and transportation.
Um, also increasing the variety of
housing options and expanding
opportunities for employment and
neighborhood shopping within all
suburban neighborhoods.
Transportation
um improving mobility and access
throughout the region. Um, the applicant
has been a partner in the John Wesley
Pal
connection that whole corridor. So by um
constructing their portion of John
Wesley Pal we've
mobility throughout this area of
Flagstaff
um and increasing the availability and
use of pedestrian infrastructure is
including the foots in their development
um maintaining that Arizona trail
throughout the development as well as
their
additional
trail connections the development.
also talks about the cost of development
and part of that is the policy that
requires new development to pay for a
fair and rough proportional share of
public facilities, services, and
infrastructure.
For housing, um we're looking at policy
in H16.
That new development, especially on the
periphery, will contribute to completing
neighborhoods, including connecting to
other neighborhoods, providing parks,
civic spaces, variety of housing types,
and also protecting sensitive natural
and cultural features.
um the specific plan does restrict the
development of single family residential
housing in five areas. So by doing that
they're
showing a commitment to having at least
some diversity in housing types by
saying not everything can just be a
single family
throughout the development. Um they do
say that no affordable housing units are
included in this proposal. Um the app
I'm sure the applicant will discuss this
um but the philosophy being that um by
you can see the allow density in the
area by developing housing any type and
a variety of such that that is helping
address the housing crisis
lack of housing
um economic development. Uh one of our
policies is to support and promote the
diversification and specialization of
the tourism sector with heritage, eco
and adventure tourism. Um I'm not sure
about heritage and adventure, but but
this would definitely to me looks like
ecoourism.
>> I'm sorry because I have to leave.
>> Yes.
>> And so Right.
>> And I'm not going to be able to see the
um presentation.
Could that be
>> You can We can email you the link.
>> Yes. Thank you.
>> Able to watch.
>> Okay.
>> That's right. And then
>> you could rewatch the beginning of it.
[laughter]
>> [staff], as much as I love listening to
you, um probably forward to
five o'clock. But anyhow, um
the last slide had one of my concerns
was, you know, affordable housing and
and my
hope is that by having the different
types of housing that some of it is
affordable without having to say that,
you know, certain percentage and that's
that's just my concern and I can listen
to your presentation because I'm sure
it'll be included. So, thank you. [name]
go for you. Yes. And I tag on to her.
>> Was there discussion at all about I mean
obviously we're reszoning just into a
zone. There's no guarantee of seeing all
these different types of housing. We
know that they can be accommodated but
not necessarily no guarantee that
they're going to
happen. Was there any discussion about
square footage ranges? you know,
minimum, maximums, you know, would that
have been a better way to hone in on the
type of housing that Flagstaff people
that live and work here would really be
interested in? I just I just kind of
wanted to bring it up and ask
>> and I don't know that I have an answer
if that was ever discussed. Um, I know
it's not currently part of the specific
plan
and
the applicant. Thank you.
Okay. So, here's that citizen
participation plan. Um, a few additions
um specifically to specific plans. Um,
specific plans are required to have two
planning and zoning commission hearings.
Um it was also required um to have this
60-day review where we certain
government agencies um are contacted,
it's posted online and we we wait for
comment. Um so
it was posted on June 12th. Um no
comments were received.
Um so the recommendation from staff on
the specific plan is that the planning
and zoning commission forward um
specific plan for adop adoption request
to city council with a recommendation of
approval in accordance with the funding.
Excuse me, [staff]. Do um do we vote on
this? There has to be a second hearing.
>> This will That's what I thought.
>> Voting will happen next time.
>> Next time. So, this is another no vote
today.
>> As well as those zoning
>> next one. Thank you.
Now we get to the concept zoning map
amendments and we have two of these
applications. So this is the first of
the two.
This request is um for a concept zoning
map amendment by the applicant to
reszone approximately
139 acres from the rural residential
zone with the resource protection
overlay to the single family residential
R1 zone with
so this is one of those points where I
want to talk about entitlements. The
specific plan and the reasonzoning
application talk about a target and what
the developer envisions at this point
happening, but I want to make sure that
we're clear about overall entitlements
this development. So, um, if approved,
these two zoning map amendments in in
addition to the specific plan and the
and the regional plan amendment would
allow between 605
and 1,312
units, travel accommodations,
really of unlimited size. And I say this
from a planning standpoint. I would
imagine if if something got so large
that it could trigger additional impact
analyses, but again to be clear, we
don't we don't require an applicant from
a planning standpoint to limit the size
of a hotel or how many rooms.
Um, as well as a range of commercial
uses and those are all listed on that
table two of the specific plan. Um the
applicant and I spent a long time on
that table too. So
deserves your attention. [laughter]
Um of those allowed dwelling units
between 298 and 386 units are prohibited
from being single family dwelling.
>> [staff], is that a percentage of that
range? Is that how you arrived at that?
not a percentage is based on. So that
specific plan took certain development
areas said in that table two you should
pay attention to
in table two it talks about allowed uses
and it prohibits single family dwellings
in certain certain development areas and
those development areas have a density
range. So I looked at the minimums in
those
five I think development areas and the
maximum in those five development areas
and that is how I derived this
>> like you said the minimum development
drives product.
>> Oh I understand the question.
I know, right?
>> And I do want to say we also spend a lot
of time with the activity center and
talking about because activity centers
require a certain density range in
themselves. So again, that specific plan
when I'm talking about how it's bumping
up minimum density, some of that has to
do with with making sure that we're
meeting the required density within that
activity center. So when you see these
minimums of 605 units of 298
nons single family dwelling that those
numbers still meet those minimum density
requirements of all the zones as well as
that activity center.
So the development areas this so re
reszoning to R1 will be development
areas 2 4 6 9 10 11 14 15 17 and 19.
totals is about 139 acres
and it would keep that resource
protection over.
Those areas will accommodate between 315
and 721
dwelling units. Again, the target what
they're proposing is about 443
units. But again, I think it's important
that we think about the range as well as
that intentive target.
I circle all the my little red circles.
And the more time you spend with this,
more of these
will just just come to you and you'll be
able to picture them in your head. Um so
density um development areas 10, 11, 14,
15, 17, 19 will meet the density range
of the R1 zone. Um that's per the zoning
code. And then development areas 2, 4,
6, and nine are required by the specific
plan to have that four to six units an
acre. So again, increasing that minimum
um density requirement.
And then development areas 4, 6, 9, and
10 are located within that pedestrian
shed of the S12 activity center
and contribute to that minimum required
average density of six units per acre. I
believe the target
um based on the target number the
density in that activity center is over
seven units.
Um so phasing just thinking about like
if if these are reszoned
we see development on these. Um so phase
one the light green [clears throat]
includes development areas 14 and 15 and
then um phase three includes development
areas 4 6 9 10 and 11. Phase 4 includes
development area 2 and phase five
includes development areas 17 and 19.
allowed uses. So, development areas 2,
4, 6, 9, 10, 11, 14, 15, 17, and 19 are
allowed, all residential uses that are
permitted in the R1 zone based on the
zoning code. Um out of the development
areas being reszoned R1 development
areas 14 and 15 which is part of that
phase one um
single that one unit residential
development or single family homes is
prohibited in those those two areas.
Um all of these I won't go through all
the numbers again. Um, all of these
development areas are allowed outdoor
public uses as a commercial use. Um,
this is something that the applicant and
I came up with to make sure that the
parks are allowed use in these areas. We
didn't want to get to a situation where
they're trying to develop a park and
we're realizing, oh, wait, we didn't we
didn't account for that in our in our um
permitted uses.
The concept zoning plan review um
it to be complete on November 24th,
2025,
almost a year ago.
And if this reszoning is approved, the
applicant will still need to submit for
either site plan review or subdivision
plat review um prior to submitting for
permits, both civil plans and building
permits.
So we look at resource protection in um
reszones. The resource protection
overlay zone on the subject site
protects flood planes, steep slopes, and
native trees. Um, typically in the R1
zone, um, based on provisions in the
zoning code now requires 50% of the tree
resources to be saved. The applicant is
electing to be part of our tree resource
pilot program um which will have them
working with city planning and fire
staff uh to determine where areas of
tree resources shall be protected. Uh
the concept natural resource protection
plan was submitted as part of this
resoning application. It shows general
areas the applicant intends to maintain
as undisturbed. Um, if this is approved,
the natural resource protection plan
will be required again as part of any of
those site plans or preliminary plat. Um
again thinking about this development
certain development areas the
residential development areas will be
part of that um planned residential
development that enables us to again
look at this in a more holistic way that
instead of saving a couple trees in
random places, we can save lots of trees
and keep in mind um fire safety in the
area
that here's that plan. So purple is
areas um envisioned to be developed
disturbed and you see all the green
areas as places where the intent is to
have all those resources protected.
uh common space and civic space. Uh the
Flagstaff zoning code requires that a
PRD provide a minimum of 15% of the
development area to be common space. Um
as I just talked about the specific plan
u would allow these um this more
holistic look at this. Um the plan does
identify certain development areas um
that will use the PRD standards. Um it
also calls out development areas that
are planned to have these parks. Um so
there are four community parks proposed.
Um, I highlighted development area 19
because that is one of the development
areas that is being proposed to be
reszoned to R1.
>> A question for you.
>> Yes. Um, with regard to common space,
civic space, well, maybe it's not civic
space, but open space, how does the the
golf course from the lower section, does
that is that counting on anything?
>> That does not count towards the
development included in the specific
plan. that that was part of the
previously approved subdivision in that
development area 16. So it doesn't it
doesn't count towards the
>> So we're getting sort of a full bang for
our buck in this area with the 15%.
>> Yes.
>> Thank you.
>> We also look at pedestrian bicycle
circulation systems. Um
so everything needs to meet city
engineering standards. Um the proposed
road network and trail plan has been
provided um to show how those internal
site connections are intended. Uh final
determination of these connections will
be determined during that site plan
subdivision
application review. Uh the Flagstaff
Urban Trail System trails will be
provided along John Wesley Pal Boulevard
and then as I've mentioned the Arizona
Trail currently crosses the property. Um
it'll be realigned
um as the site develops but it will also
the applicant will also be maintaining
public access to that trail
>> on the foots trail.
>> Yes. Um, in some of the fine print it
said that there would be a foots trail
along
that correctly. Um, but I didn't see
like the long, you know, the trail line
on the map. Um, I just wanted to make
sure like where that connectivity goes
as it goes north in the development. You
know, I obviously see it on JW Pel.
That's understandable, but I didn't
quite see how it um works further north.
I'm assuming that'll be part of the
applicant's presentation.
>> Okay. Thank you.
>> And architectural design standards. Um
specific to R1 zoning, the specific plan
does allow for increased height in
overall in 13 of 20 um development
areas.
As far as the R1 zone, um, development
areas 6, 9, 11, and 17 use maximum
height of 35 ft allowed in the zoning
code, while development areas 2, 10, and
19 have that increased maximum height of
48 feet. And development areas 4, 14,
and 15 have a maximum height allowed of
60 feet. Um the application as I
mentioned before includes these
architectural character images of
proposed style materials and design
elements being used in
also included um include in your packet
as well as in the application this are
the sample residential building
footprints and parking areas. So this um
this element shows different types of
envisioned development types as well as
overall sort of layout um design
elements throughout the development.
>> So [staff], so this is a function of a
concept zoning.
>> Yes. showing since we've been learning a
little bit more in detail what the
difference is about all uh about that
>> concept zoning.
>> This is this is a concept zoning map. So
it's just showing where the the
buildings would be blocked out if they
chose to build any of these different
types of housing within that zone. and
staff has proposed a condition that that
part of the reszoning would be
developing in conformance with the
sample residential building footprints
and the areas.
>> So, they'd have to kind of stick with
this layout. But again, it's still not a
requirement that they, you know, build
it a triplex or a garden.
>> It would not be a requirement that they
build a certain building type.
still just going to be medium density
>> what is allowed in the zone or what more
specifically what is allowed in table
two um and then any development would
also need to be in conformance
um part of that concept zoning map
amendment is looking at the impact
analyses
This is what I deferred to now on our
specific plan. So, one of the impact
analyses that is required is the
transportation impact analysis, which
I'm constantly calling the traffic
impact analysis, and I feel like that is
a a vote paw on my part. Um, so
transportation. Um so city staff
reviewed the STL 290 again earlier
earlier times different slightly
different um acreage but the master TIA
that was sealed on September 15, 2026.
City staff conditioned approval on
specific improvements.
Um part of that TIA was talking about um
at full well it breaks it down into kind
of phases of development. Um, but
looking at full build, the proposed
development could generate 11,882
external trips over the course of a
typical weekday with 582
external trips during the AM peak hour
and 950 external trips during the PM
peak hour.
Um, there's also a requirement that John
Wesley Pal needs to be connected to
South Fourth Street prior to the
issuance of a building permit for any
development within the specific plan
area.
This is recently I was recently made
aware of a slight modification to that.
So, four it needs to connect to Fourth
Street. It does not need to connect in
order to finish that byite development
around the golf course in development
area 16. It also does not need to
connect for that phase one um
development areas 14 and 15 in order to
develop but anything after that. So
starting in phase 2 phase 2b needs to
have that connection completed. Oh,
clarification. So, so that just allows
traffic to be able to go all the way
through to Forest Street, but we don't
have we don't have to it's not
conditioned on those other developments.
>> There's usually two different pieces
that feed into it. One is your traffic
see transportation impact analysis um
looking at how these trips are
distributed. So by having the option of
going both west and east um is a good
thing but it also there's an element of
fire safety involved too of how many how
many dwelling units you can have with
one direction versus two directions. So
it's a combination of both those things
that that then require that connection
to be made.
um the
the
all of those um improvements discussed
in the TIA and in that memo that staff
provided that was also attached um talk
about how the development agreement
shall include required improvements,
timings and proportional shares.
Uh we also completed a water and
wastewater impact analysis or a WHISA.
Um that was completed on September 5th
of 2023.
Um and then in December of 2024, the
applicant requested an extension and
water services approved that request for
an extension in October of 2025.
Um the development proposes tapping into
existing water infrastructure at five
possible locations. Um and then off-site
sewer extensions will be required to
reach the existing public system. Uh the
development proposes to connect to the
existing sewer infrastructure at seven
locations. Um, in the southern region of
the development, an 8 inch sewer within
John Wesley Pow Boulevard is proposed to
extend through the new development.
Um,
I went into the storm water analysis a
little bit more in the staff report. Um,
and
at this point in creating presentations,
I was losing steam. So [laughter] just
so the drainage [clears throat] impact
analysis was reviewed by city staff and
approved. Um honestly at this scale and
at this point in development we're
really they have we know that generally
they will deal with storm water. Um and
we will look at it in more detail as
each of these development areas come in.
All right. So the findings, the first
finding, um, we should probably have
this memorized by now, right? Um, the
proposed amendment must be found to be
consistent with and in conformance with
the goals and policies of the general
plan and any applicable specific plans.
So this means in order for you to to
find that the concept zoning map
amendment needs this finding, it's not
just the general plan, it's the amended
general plan as well as the specific
plan being proposed.
So the Flagstaff regional plan 2030
shows this area within the growth
boundary. It's a suburban land use
classification.
So that supports this mix of uses um
neighborhood scale development that
balance housing, recreation, and
employment opportunities.
Um the request for a minor regional plan
amendment
or needs to be um approved in order to
be found in compliance with the regional
plan and it also needs to be found in
compliance with that specific plan.
So applicable goals and policies. Um you
may see some repetition here. Um so I
pulled out some various goals and
policies. We can go into any of these in
more depth. Um the staff report points
out how certain things are being met.
The applicant did their own um regional
plan analysis
policies. Um but again you know
environmental planning and conservation
absolutely
open space. Yes.
Uh water resources. Um this project
helps to bring necessary infrastructure
into this area for future future
development. Um community character. Um
again all of the architectural design
standards, the proposed building
footprints, um and then maintaining that
that the character of the region is not
just those architectural elements but in
balance with these natural elements as
well.
Uh growth areas and land use. um
developing these new neighborhoods that
have a mix of uses and a variety of
housing types. Um increasing the variety
of housing options
and planning suburban development to
include a variety of housing options.
um neighborhoods, housing and urban
conservation uh make available a variety
of housing types at different price
points to provide housing opportunities
all economic sectors. Again, um
development areas to be zoned R1. Two of
those development areas do not permit
single family homes. Um together those
allow a maximum of 53 non-s single
family units. Um the remainder of the
units targeting 391 with a maximum of
668
could be developed as single family
units.
as not the
current proposal, but consider um it has
been stated by staff that higher density
uses improve efficiencies in
infrastructure and support lower housing
costs.
Finding number two, um we're looking at
community benefits and the public good.
Um so if we reszone these areas from RR
to R1 um we are able to provide target
443 dwelling units range 315 to 721
dwelling units. Um the proposal it does
not propose to sorry any affordable
housing units but suggests that the
increase in number of units does help
address Flagstaff's housing crisis.
The proposed development transforms
currently undeveloped property within
the urban growth boundary which is type
of development we would like to see. And
the development invests in public
infrastructure helping to deliver new
roadway, trails, and utility
infrastructure.
Finding number three is that the site
needs to be determined to be physically
suitable
um
etc. Staff believes the proposed
application meets this finding. Um this
was reviewed at IDS. Um and IDS based
its conclusion on the review of all
applicable codes and requirements as
well as those impact analyses for the
site.
A development agreement. So we have a
draft development agreement that's been
prepared. Um the primary purpose of the
agreement is to set out roles and
responsibilities in regard to the
following not limited to. So this is my
working list of items that we are
negotiating. One is forest resources and
the participation of the city's forest
resource pilot program.
uh planned residential development
design elements, the phasing of
utilities, infrastructure, parks, common
space, and trails. Um the offsite water
and sewer infrastructure improvements as
required by that WISA. Um the fact that
the Arizona trail shall remain open,
accessible, and safely passable during
construction. Um here's where I updated
um the comment about John Wesley Pal
connecting to Fourth Street. That needs
to happen before issuance of any permit
beyond development areas 14, 15, and 16
and off-site transportation
infrastructure improvements. Um
currently that would include the
construction of roundabouts.
um specifically at Lone Tree and John
Wesley Pal and Lone Tree and Sunni and
looking at when that would be triggered.
So currently looking at the 200th
dwelling unit and then the 370th
dwelling unit. Um the developer is also
required to contribute their
proportional share of off-site
improvements
um or construct those improvements. This
is all still under negotiation
and final points I hope will be
presented to the commission our second
hearing.
>> Question about that.
>> Yes. The roundabouts off of loan tree.
Um and in the the TIA it mentioned there
was you know uh sta stages of 2008 you
know and those were listed under 2028.
So how does those negotiation and what
they said needs to be done by 2028 how
does that
>> so pan out?
>> My understanding is that the the
transportation impact analysis was
written with years as triggers. that
doesn't always really work in the real
world. And so we are working to
translate years into number of dwelling
units which would more realistically
um capture the the impacts of of that
development.
I was very excited about that. Just want
to add that in.
So, which is sooner?
>> Um, Commissioner [name] has a question.
>> Okay. Commissioner [name],
>> go ahead.
>> Hi. Um, does this also include fire
station number seven in some of the
calculations or is that already taken
out the board?
No,
the applicant would not be responsible
for additional fire station. Um,
so I guess it was I'm not sure it was
ever on the board.
Okay.
we had those same neighborhood meetings.
[laughter]
So this is a recommendation. This um
zoning map amendment does have
conditions.
Um, so the conditions at this point are
that the subject property must be
developed in accordance with the
approved STL 290 specific plan as
the building footprints and parking
areas document. All other requirements
of the zoning code and other city codes,
ordinances, regulations shall be met by
the proposed development.
All terms, conditions, and restrictions
detailed within the STL 290 development
agreement as amended must be fully
satisfied.
The subdivision of the development must
align with the approved zoning
boundaries.
And our favorite, in the event the
property is reszoned and the developer
fails to obtain final civil plan
approval within two years of the
effective date of the reszoning
ordinance, then the city may schedule a
public hear may schedule a public
hearing before the city council for the
purpose of causing the zoning on the
property to revert the zoning back to
the former classification of rural
residential per section 10-20. 20.50.060
of the code.
Salai pull up. [snorts]
So as I mentioned there are two
reasonzoning requests. So this is the
second one. This request is for a
concept zoning map amendment would
reszone approximately 72.14
acres from rural residential with the
resource protection overlay to suburban
commercial zone, highway commercial zone
and the MR zone. All with resource
protection.
Uh similarly, I just want to point out
those entitlements. Um so granted with
this application again we're looking at
this range of the number of dwelling
units the travel accommodation and a
range of commercial uses as listed in
table two of the specific plan. Um again
of those allowed dwelling units between
298 386 are prohibited from being single
family dwellings.
So the first part of the reszoning
request is to reszone two development
areas 13 and 20 to the SC zone. Um
development area 13 is lovingly referred
to in the as the commercial village.
You could see those highlighted. They're
kind of that reddish pink color and have
Um so phases development area
be developed as part of phase 2B and
development area 20 is in that final
phase of phase 5.
allowed uses in these areas um in
development areas 13 and 20 include
general retail business, bars and
taverns, mixed use work, restaurant or
cafe, general services, indoor
commercial recreation facilities,
outdoor public uses, office and public
parking.
We also included certain accessory uses.
So the idea being that you could not do
a telecommunication facility on its own,
but if you had one of the like a general
retail business or an indoor commercial
recreation facilities, then one of these
accessory uses would be allowed. Those
include this stealth or attached
telecommunication facility, a community
garden, farmers market, or flea markets,
which could be permitted with a
temporary use permit.
Um, development area 20 also includes
additional primary uses of dry cleaning,
a veterinary clinic, automobile service
station, and convenience store,
libraries, and museums.
All residential uses that are allowed in
the SC zone by the zoning code could be
allowed in these areas.
Uh the second part of the reszoning
request is to reszone development area 5
to HC the highway commercial zone. Uh
development area five is the location of
the proposed lodge.
Uh this is planned to be part of phase
three.
The allowed uses in development area
five. The primary use is that travel
accommodations and again these accessory
uses would be allowed to come online
in addition to that primary use of the
travel accommodation. So, restaurant,
bars, and taverns, um, including outdoor
public uses, general retail business
uses, stealth with attached telecom
telecommunication facilities, community.
There's no residential uses proposed in
development.
Uh the third part of this reszoning
request is to reszone development areas
1, seven and 8 to the MR zone.
Um these are part of sorry seven and
eight are part of phase three and then
development area one would be part of
phase 4.
Allowed uses in these areas are all
residential uses in the and
except single that single family house
one unitit residential development is
prohibited. Um outdoor public uses is
the only allowed commercial use in these
development areas.
the concept zoning plan review. Um, this
like the other request was uh deemed
complete in November of 2025.
And like the previous one, if approved,
the applicant still needs to submit for
either site plan review or subdivision
review prior to any permits.
um resource protection, common space and
civic space, pedestrian bicycle
circulation systems,
all discussed in the previous zoning
application, extremely similar if not
identical for this request.
Uh compatibility in architectural design
standards. Again, we're looking at that
increased height allowance um in the
specific plan. So development areas 13
and 20, those SC zoned um parcels would
increase the maximum height from 35 ft
to 60 ft. Um development area five where
the lodge is would increase the maximum
height from 60 to 75 ft. and development
areas 1, 7, and 8, the MR zoned parcels
would increase the maximum height from
35 to 60.
Um, and the application also includes
those same architectural character
images of the proposed style, material,
design elements.
Um similarly we have the same sample
residential building footprints and
parking areas being proposed. Um this
second page includes
uh sample building footprint of the
lodge um indicating that parking would
be located both underground as well as
surface lots. and then that um that SC
zone um in development area 13
on the public systems impact analysis,
the transportation impact analysis, the
water sewer impact analysis and the
drainage impact analysis are the same
ones that we looked at for the previous
concept zoning map amendment and are
also relevant to that specific plan.
Finding number one, it has to be
consistent with and in conformance with
the goals and policies of the general
plan and any applicable specific plans.
Um, just like the last one we're looking
at, we're in the urban growth boundary.
It's a suburban land use. um we need the
minor regional plan amendment to be
approved and we need this to be found to
be in compliance with their specific
plan.
looking at applicable goals and policies
very similar again same development um
so environmental planning conservation
open space policies
uh water resources community character
growth and land use um
again we're looking at um
slight var variations. You know, now
that we are including um the commercial
zoned areas and medium density
residential zoned areas, that does a lot
more to encourage this diversity of uses
and diversity of housing types that the
regional plan would like to see.
and economic development. We have we
have our um tourism sector
finding number two um community benefits
and the public good. So the MR zone
development areas aim to provide the
target of 296 dwelling units. Again,
we're looking at a range there between
280 333.
um they pro these development areas
prohibit single family units. So that
encourages some diversity of housing
type
same issues with there's no proposed
affordable housing units but all housing
units are good. Um the and then
we're developing within the urban growth
boundary and investing in public
infrastructure including the road,
trails and utilities.
And then finding number three that the
site is physically suitable. Um,
again, staff believes they've met this
finding and we determine that by
reviewing this through IDS and looking
at applicable codes and requirements as
well as those impact analyses.
Um, this is the same same slide unless I
made a typo. um for the development
agreement looking at those elements that
will be part of that agreement
including the traffic impacts
the same citizen participation plan
and the recommendation. So um
I want to say identical um conditions.
So, we're looking at, you know, being in
accordance with the approved plan as
well as that building footprints and
parking areas document, other zoning
codes and ordinances and regulations.
um meeting the terms and conditions of
the development agreement
subdivision align with that approved
zoning boundary and that we can always
um revert this back to the previous
zoning.
>> Um the specific plan does the the city
write its own document or
what the what the applicant has provided
that we got on all of our attachments.
>> You would adopt what the applicant has
provided.
>> I had a question about like on on the
maps like the only areas that are being
actually reszoned to medium density or
1, seven, and eight. 14 and 15 are shown
as medium density, but there actually
are one. I understand that maybe the
intent is that they want to do something
more in line with medium density, but I
just wanted to call attention to the
zoning is actually R1. Can you clarify?
>> Yes.
>> Any questions?
>> Because that that map is color coding
things but not according to the zone.
It's color coding it based on various
development types and the specific plan
defines certain types of development
like missing middle type one and missing
middle type two. So those areas are
being proposed to be developed with a
certain housing type that happens to be
the same housing type being proposed in
other locations but it is allowed in
that zone but is not the zone itself.
Does that make sense? It
>> does. I just
>> zoning map.
>> It's not a zoning map. So I mean will
there be
>> it's not a zoning map. It is a
>> I just
>> proposed
>> proposed development type
>> and I think like for the purpose of
city's documents and what we all see
what council sees that we should see
what's what a zoning map. So that would
be my that would be my one of my things
for your list.
>> I think I think specific plans are
purposely not zoning maps by by state
statute. Correct.
We could still though as part of the
concept zoning map amendments request a
that's showing what things are being
zoned to. Um, and I think that is why
staff was trying to be very clear about
what is being proposed versus what we
are entitling so that we're clear that
that you know this applicant with the
current plan in this current market is
proposing certain things but we need to
understand that there is some
flexibility about what actually gets
developed and even when you look at the
definition of those certain housing
types. They list a wide range of housing
types. So, um,
and I think it's like
we're using all the the current hot
buzzwords, missing middle, you know, um,
but it's still attached single family
homes, you know, or multifamily. And I
think that, you know, that
just want to be
>> factual about what it is and what it
isn't.
my comment. So if there was a way to
clarify that especially as this moves
forward to council, I think that
so any questions or comments or or
requests
of me or and we can follow up. You can
make additional requests after the
applicant gives their presentation. But
making some of your
be answered.
It's standby.
about
clean bike chairs. There's two of you
here
and commissioners online. [name]
and here on behalf of STL 290,
STL 290,
the applicant, as we said, there's a
variety of different entities that are
involved in this development and it has
changed, right? And and that was great.
[staff] pointed that out and started in the
queue. Uh they purchased this property
in 2020. So this has been six years in
the making and it's been interesting
looking at all the different um analyses
that have been presented at different
times um and different approval dates
and all of that. So this has been a
wellthoughtout
uh worked on plan but it has changed
over the years. Um just a couple notes
I'm gonna hit from the beginning and I
am going as I stated from the beginning
[name] is the most detailed
presenter of anywhere in the state of
Arizona. So I uh I will hit on some of
my notes. I will have some some pictures
uh more pictures than [staff] had on hers.
Um but I will try not to repeat herself.
one thing uh [staff] in terms of the
transportation impact analysis or the
traffic impact analysis.
Oh, it actually references both. I don't
think you've been doing anything
traffic.
>> Yeah, they're both in there, but we're
not going to talk from the audience
because you're not allowed to do that.
Um also, uh [name] asked a
question of Alec as you guys were kind
of discussing,
>> right?
>> Building sizes potentially square
footage on residential units. the goal
of the specific plan and to increase
some of the minimum densities uh and and
to not allow single family
development areas was to do just that
was to was to allow for a diversity of
housing types. We don't know exactly
what's going to be out there uh and what
the market is going to dictate. But by
raising those minimums than what is
allowed by code, that forces a different
product type, right? It just does. You
can't build single family homes and you
need a more dense product to be able to
get the density required on those
parcels. And as for the target, the
reason the target is sitting where it is
kind of in the middle is mostly slope.
You noticed that we kept the RPO on
every parcel. Trees we can work with.
Trees in the pilot program have been
have been great and [staff] has has said on
the record I think for a number of our
projects now um working with the pilot
program we actually can protect greater
swaths of trees. So between the the PRD
option as well as the pilot program, we
get to to protect more substantial
trees. It's the slope in this area and
that's what has us at our target number.
If there are changes, um I have not
changed my slide. I apologize. I'm just
hitting a couple of the of the
questions, but I I'll I'll get into the
presentation here, Commissioner. Um
schools really quickly. Uh the
superintendent who we are in contact
with, yes, is aware of all the different
developments and he is tickled. wants us
to come here in our five-year demand
where they have all Juniper Point and
Kenyon Del Rio. They they do have
planners in the school district. We can
bring additional correspondence, but we
do have correspondence directly from the
superintendent. They're desperate for
more development out there because they
do fear uh your enrollment numbers going
down. If you follow other D other school
districts in the state, they're all
closing.
And so while I I appreciate and you know
I've never had a kindergartener that
could walk to school and now now I've
got kids in university that I think they
walk to school. I hope they go to class.
Uh but they are living on campus and
theoretically they should be able to
walk to school. I've never had that kind
of school opportunity for my kids. And
while that would be ideal, I think the
superintendent is really excited about
the additional homes and the prospect of
of saving because they do see a
five-year downward projection and are
looking forward to more homes there. I
think I hit some of the big ones, but
we'll go through them. Oh, goodness.
Hold on. No, not turn camera.
Oh, perfect. Okay, we have four related
requests. I did split them up, but
again, I'm going to go through them
quickly because I think [staff], I don't
know how how much more information kind
of there is to share. Again, we started
with the original 405 acres, right? And
you guys did see that we gave you more
history when we did as outlined in phase
one currently in development, our buy as
well as the approved conditional use
permit for golf. uh chair [name] to
answer your question that is it's a
private golf course. It is an expansion.
This is a Pine Canyon expansion. Um it
is not counted in the open space for the
balance of the project. This is a Pine
Canyon expansion. Um and that's moving
forward, but that also does include the
development of John Wesley Powell, which
opens up so much more development
opportunities.
Uh again, our phase one uh is in the
southwest corner. Um, and what we're
here talking about today is the balance
of the project. Uh, the original
concept, and we really hit this when we
spoke about the cup, right? So, again,
the the bottom left, the Pine Canyon
expansion does kind of look similar to
our to our uh original proposal. It's an
executive course. So again, as we as we
spoke about when we got the approval for
that, um far less water being used, far
less turf, but the original proposal did
have another championship golf course.
It had way it had larger estate lots and
it had a a mega resort on there. Um and
it did not include the the two
commercial opportunities that we do now
for the citizens, the of Flagstaff
existing and future. and it did not
include the diversity of housing types.
The new proposal is park trail focused
with the community commercial and uh the
lodge.
So we have 20 development areas um
uh 20 development areas. We are
proposing again approximately 785 homes.
As [staff] did point out, the zoning could
allow for additional units, but I'll
tell you as far as the slope resources
um and what's out there today, we can't
get any more out there. If there are any
changes to those codes, we will revisit
that. But our target um is based on both
our our transportation impact study, the
WHISA as well as uh as well as as what
the slope will allow 80,000 uh square
feet of commercial
um and 70 acres of parks, common open
space, and preserved open space. I think
that's really important. I think when
you have the ability to develop all
these together and with the specific
plan, we're able to protect all of that.
We have four parks that are open to the
public and privately funded and
maintained. And then again the 120 key
uh familyfriendly lodge that again as
opposed to relying on a championship
golf course which was the original plan
um it is now Arizona Trail Park system
um and and relying really as [staff] said
taking advantage of in a good way the
natural topography and the beauty in the
area.
Um, we as [staff] said, we're reviewed
under the regional plan 2030. Um, being
that we've been in the queue for for a
long time. So, there may be some
questions about that. I think you guys
all follow the regional plan closely
enough to know that because our
application was in before we are
reviewing it under the 30.
Uh, I don't feel like we really need to
get into this in great detail because
[staff] did such a great job. But again,
we're moving up um S12 and that is to
allow for the lodge and more density um
up there uh just a little northeast of
where it is now. Realign the map for
John Wesley Showl. We've all followed
that that process. I think it is much
better the current alignment um
homes and having to condemn multiple
single family homes and and so that's
kind of a cleanup item because JWP is
now you know well in area and then again
the removal of activity area 17 the
biggest issue with that was is the
topography in the area um and just again
being able to find the balance both
commercial development and that is all
now permitted the commercial development
because we have the John Wesley uh the
JWP corridor in front of it. Uh so yeah,
that allows for our commercial
opportunities as well as some
residential. So these are the three [staff]
went into uh went into them in in great
detail uh so I can answer any questions
but you know
those are the three changes we're asking
for as far as the public outreach.
Again, we had three meetings, 11
attendees. Uh quest, we had a couple
questions, um but no opposition per se.
We did over notice, you know, I think
300
ft is required. We did a thousand um as
well as the HOAs, the daily sun, the
posting, and we posted off of our
property, which we don't normally do,
but again, if we were to post on the
property, you'd have to be an avid hiker
and trespasser uh to to have seen our
sign. Uh so again working with staff uh
again we overnoticed in this way which I
think is great
and and [name] got grief from me on the
one night when we over noticed something
and there were people who waited all
night and they're like wait now I know
what this is it has nothing to do with
me and they were able to to take
themselves off. Um but we did overnotice
in this situation. I do believe
appropriate.
Um do believe that this is consistent
with the regional plan policies again
3.8
miles of trails um seven types of of
housing that are going to be permitted
and and chair [name] to your question I
mean does it guarantee all those housing
types and all those parcels? Not
necessarily. But what we are asking for
in the specific plan in terms of
outlining those you know the different
diversity of housing types and the
height gives us more opportunity to get
more density and to get more product
type. So truly we all these are tools in
a toolbox. Um we didn't have the the new
zoning category that you guys have now.
Uh these were you know putting all the
different tools in in the toolbox.
80,000 square foot of neighborhood
commercial. That is something I heard
from multiple council members.
[name], don't just bring us a mega
lodge for people who are visiting. We
want actually two commercial centers
that can bring us a grocery store that
can bring us a vet that can bring us all
those things for people current and
future. And that is what we did.
[clears throat]
Um, as far as the three uh regional plan
amendments, um, we do believe that we
meet the test. Uh, we believe we fit the
side. It keeps the framework of of what
the the regional plan. I did not go
through all the goals and policies, but
as [staff] said, in our application, there
are many of them. Uh, and we also agree
with all the ones that [staff] brought
forward. So with that uh respectfully
approval of the three regional plan
or I move on to specific plan or reszone
any questions on regional plan that I
didn't hit
>> ask a question and it might not actually
be for you it might actually be for [staff]
um but because that regional plan dealt
with that entire corridor and so besides
the activity centers that fell within
your parcels
There's also U6 that falls into the
bottom of Juniper Point. Um, I know, you
know, just from watching what's on the
calendar and such that there's probably,
you know, maybe some changes to their
plans and their specific plan there.
what I'm concerned about or what I think
we want to see the whole picture of is
you know as far as
know activity centers
um what is you know what there's a lot
changing from the from that regional
plan 2030 um and even from what was
envisioned if there had been a JW PAL
specific plan so do you know if there's
another type of activity center
remaining along the corridor
because now we're just down to basically
one and it's off of JW PAL.
>> So, one thing I think it's nice to note
is that these two activity centers being
moved
all entirely within this property. So,
we're manipulating this and not
necessarily impacting other adjacent
property owners. In the regional plan
2045,
um we no longer have activity centers
like this. We do more um area types and
there are centers either suburban
centers or urban centers um that are
mapped. Um, so
those those are included as part of that
2045.
Um, you could if you want additional
information about the 2045
plan, I could provide that to you, but I
really have to look at
what plan is at place when the
application comes in and make sure that
we're meeting that. Um so future
resonings
um will be looking at 2045 and we'll be
not looking at activity centers will be
looking at those area types as
>> here's a maybe a related question that
does stick within this parcel when you
make that into a suburban corridor and
you have removed an activity center off
of JW PAL. Do you feel that a suburban
corridor in this this type of a case
will serve the same purpose as an
activity center that could have should
have maybe been put at JW Palaba?
>> So I believe that this in the 2030 plan
that this roadway on the map traveling
through a suburban area type was a
suburban court. um the 2030 plan maybe
didn't do the best job of mapping all
the corridor types and kind of
coordinating that, but that's how in
conversations with comprehensive
planning, we've looked at at that
corridor. So, I don't know that we're
necessarily changing the designation at
all. We're just relying more on that
designation
at activity center
17
that
I think also moving the the uh activity
center that we are there's a lot of
right there. So it didn't matter whether
the core was there or not if you're
developing by right. You know I think
moving it allows for the density and the
and the the energy that you were trying
to get from there. I think if we left it
where it was and we're still proposing
commercial along JWP because we can
because of the the commercial corridor.
So, I actually think it it it really
does help fulfill the goals of not the
1acre lots of the Fine Canyon expansion,
but the the higher density residential
as well as the the family lodge as well
as the two commercial opportunities.
>> Yeah. I mean, I I would just
re-emphasize that that corridor allows
under the 2030 plan, the corridor would
allow for higher density, these reszones
to highdensity residential or highway
commercial, the in the same way that the
activity center would. So by moving the
activity center, you're almost now
giving two opportunities for that
increase instead of having them over
overlapped in one.
>> Although I guess my concern would be is
along JW pal except for where the
commercial pieces are, it all is either
RR1. So there's not really the density
there, you know. But anyway, just a
comment. Yes. And I think that I mean I
know I tend to look at it in the context
of so what could we develop there now by
right and are we closing the door or are
we enabling other opportunities in the
future. So by keeping that as this
commercial corridor, who's to say that
in 10 years, 20 years, we don't reszone
it again to something even higher or
redevelop it to actually increase
density. And now we have a plan that
supports that.
>> And sure, the last thing I'd add is
along there, one of the biggest issues
or benefits is the topography, right?
It's part of what makes Flagstaff so
beautiful and you know are the trees and
the topography and so it really has been
a huge balancing act of trying to get
the density and I'll tell you kind of we
there's a little watermelon piece but
some of that residential development
truly with the slope resources that need
to be protected uh we just can't get any
more density and so that's why shifting
things around we really have tried to
get the greatest amount of density on
these parcels as we could.
Okay, carrying on. Okay, specific plan.
And again, I'm true to I I don't I'm not
a fiber. I told you I'm moving a little
faster than [staff] because I knew [staff]
would say all the words. Um
[clears throat]
so again, and these four do work in
conjunction. At my third presentation, I
do take both resoning together. Um but
as far as the specific plan again we are
producing or proposing five phases and
20 development areas with the target of
785
homes um with the 80,000 square ft of
commercial. Again we have kept that RPO
on every parcel.
The trees we're working with it's it's
the slopes um that that that make things
harder yet at the same time, you know,
it's it's it's what the code wants. So
we're trying to truly um have our cake
and eat it to uh eat it too in this in
this situation. So it is a governing
document for approximately 290 acres. It
provides a greater level of detail than
the regional plan and allows us to
cluster some of our development to allow
for additional building heights right in
the in the MR as as uh as [staff] took you
through. And the reason for that is
again we can't get any more density on
those but we want additional height so
that we have a uh more building types
and more building types that are
appropriate. Um the allowed use table
again table two uh allows custom custom
uses um and as well as write the the
primary uses as well as the accessory
uses as [staff] got into. Here is the
illustrative uh document of the specific
plan. Um,
and chair, another question you had on
there was the foots. We do have the
foots along JWP. We also have the foots
going up along Panava Boulevard. Um,
there is a pre-plat in for that right
now. Show the foots on the west side of
the of the street. So, it's going in
with the byite development and then the
foots is going to exit out into Bowen uh
bow and arrow wash. So the foots is
going both north south as well as as
well as east west.
>> So does it need to be shown on if this
is the map that's being submitted with
it does it need to be shown going up
ponava? No, because we've taken Ponava
out of here. Okay.
>> Ponavivera is being developed with the
byite development right now.
>> Is it when Juniper points?
>> Okay. So, Juniper Point will be
responsible.
>> It's on their pre-plat that is
submitted.
>> That's what I was looking for. Thank
you.
>> No, perfect. No, these are all very very
good questions. Again, um the total
shift right in this development from
more high-end estate lots to a diversity
of housing options with a focus on open
space. We've got our four parks as well
as you see in all of these uh different
bubbles, different opportunities
um for density as well as the the lodge
um to commercial building
parks, a central park like that. You
guys are going to have a central park
here stuff. Uh North, Plaza, and East
are the four names. Um [staff] had the
exact same exhibit. So again, taking us
through uh the phasing of it. This is
what we believe is the phasing or
you don't think it's going to change,
but as you know, sometimes things
change, but this is the phasing. Then
the phasing in both the development
agreement and the specific plan have
very specific details and regulations
that a certain amount of open space and
Arizona trail will be constructed with
each residential home. your staff was
very very good at arm wrestling us and
we were going to do it anyway but making
sure that it's in all the documents that
you can't move forward with all the
residential that as we move forward with
different phases that the open space
opportunities are there uh as [staff] said
there will be a temporary alignment
as we're doing our construction um but
it will there will always be an Arizona
Arizona trail that is open and safe to
the public um and we also do have, as I
said, the foots trail, um, north, south,
east, west, as well as a ton of trails
interior to the development.
Again, without this specific plan, we
wouldn't be able to dedicate 15 acres of
public parks and 70 acres of common open
space.
>> On this on this slide, can you talk
about the water features and the ponds
that are the parks and the water?
>> Absolutely. and and [name]. So,
that's a good question and I did have
written down the reclaimed water. I
didn't bring any of our reclaimed water
information because it's not part of
this application. We can and I'll be
prepared to discuss it at the next
hearing.
>> I just think it's going to be an issue,
you know, whenever you're talking water
features and ponds and things like that.
I think that we should address that.
>> So, yeah, I appreciate that. So, the
contingent on having a water feature,
the open space is the open space. our
goal of asking for additional reclaimed
water resources and
on the record I the 30% that was given
back I I
I'll come back and talk to you about
reclaimed water but I don't believe that
there is a request for that with
additional homes and additional
residential units we will also have more
reclaimed water our goal of giving back
that 30% of the reclaimed water that we
had is for that to go to the and to go
to anyone else who is on the list who
needs the water here. Our goal is for
repairarian habitats um for uh what is
the news said it to me
>> biodiversity and habitat.
>> Yeah, not that but what's the area that
we're trying to
>> uh painted canyon
>> painted canyon. Sorry that was [name] who I was talking to in the
back. [name] is giving me a
nod because I'm always going to say who
I'm talking to. uh our goal is to create
is is to be able to keep the natural
habitats. We think I think we told we
spoke at the cup hearing about the
osprey nests that we have in Pine
Canyon. Any um biodiversity that we that
that we are trying to recreate as our
complete right 180 from what we were
proposing before.
trails, open space, habitats, those do
require a little bit of reclaimed water,
but our development is not contingent on
reclaim
that it can add to the biodiversity to
protect the wildlife in the area
preserved open space that we have. But
none of this is contingent on us getting
additional reclaimed water. Are we going
to put in a request for some reclaimed
water infrastructure in the future? Yes.
If it does, if it doesn't get approved,
the open space still stays where it is.
>> Canyon,
>> Picture Canyon,
>> Picture Canyon Chair, we are trying to
recreate some of kind of the opportunity
at Picture Canyon, what they have there.
That's one of our goals. Again, not
contingent on it.
>> That answer your question?
>> Yes. Thank you.
um trail network. Again, when we were in
the discussions of the John Wesley
Powell realignment, there was discussion
about Arizona the Arizona Trail being
relocated on some of our neighbors
property. Our neighbors said no, at
least that we know of at this time. So,
the alignment has always been on the
Arizona Trail. We are realigning it on
our property. We're very excited about
it. It is now the cornerstone of of our
development.
I ask a question about that. So I always
understood that the ACT was maybe going
to be realigned along the Rio flag.
That's not happening. Is that what
you're saying? Doesn't look like they're
open the other parcels are open to that.
>> Sure. They are not my client, so I can't
speak to it, but from what I understand,
>> they said no. Um are are we open to, you
know, building a trail and then they
want to move the Arizona trail and put
it through there because that's a more
appropriate place for it? Sure. we'll
just have a nice wide trail in our
development that that people were able
to use. We just wanted to make sure that
the Arizona Trail was protected and that
there was somewhere for it to go. If it
gets realigned again, we'll just have a
very intricate trail system that we're
enthusiastic about.
>> Thank you.
>> Um
we also have 3.8 miles off street
trails. again, our trails, our trail
heads, um, and the pedestrian
connectivity is is the most important
part of this development. And chair and
call you vice chair, my favorite,
commissioners online. I I think this is
an interesting time also to address and
and we can get into it as we talk about
the
>> there is no affordable housing component
to this. Every development brings
something different. You know, I have
brought to you some reforms for 60% BMI
affordable housing that had a right
turn, right?
Because that development brought
something different to the community.
This development, I submit to you, is
really focused on and I just feel like
this is a good exhibit to discuss it,
but not only the vehicular connectivity,
right? that John Wesley Powell alignment
that you see there in white with the
enhanced crossings
open up so much development
uh and and and opportunity for this part
of Flagstaff. In addition, our focus on
multimodal of the foots, the Arizona
trail, our trail system, our park
system. This this is what I submit to
you is is the is the beautiful thing
about this development that is our focus
is we are spending a lot of money on
transportation. Um John Wesley Powell
the quotes keep going up.
>> I have a question or a comment. Um
because I sit as a liaison to the open
spaces commission obviously we one of
our priorities is to always have an
activity or access to the forest service
land so that things don't get closed
off. So, I do appreciate those two uh
two accessibility points.
I just wonder like what that might, you
know, maybe could you expand upon what
that might look like? Will other people
that drive into the area, will they be
able to park down there to access the
trails that, you know, end up going to
Fischer Point and things like that?
That's a open space has frankly often
felt ignored. Um, so that's an important
um just want to throw that out there.
and um as you further your plans how
important that is.
>> Chair [name], I appreciate that and and
truly hopefully the open space committee
feels appreciated and loved with this
development as the entire focus is on
multimmodal um connectivity as well as
open space. So yes, we've preserved
those open space. What exactly that
looks like in terms of parking, I don't
know. But it is absolutely important to
us that the public has access to all of
our trails.
>> The greater public, not just the people
that are living there. You know, that if
somebody drives along JW POW, they have
an area to access the forest through
your development.
>> Correct.
>> That's what we're looking for.
>> Arizona Trail will be open to the
public. Um, and you can see it there as
well as Foots trail that goes east west
as well as north south as well as our
our four parks and our integrated trail
network.
Um, housing variety. Again, yes, we are
our target 785.
That is 10%
of the city's um housing plan. Uh, we we
do and and chair, you hit it. their
buzzwords missing middle and medium
density, but truly with the increase of
the minimum density and the parcel size,
um we will have a variety of housing
types. With the current zoning, um
without a specific plan, they'd be all
one to five acre lots, right? And that
certainly doesn't solve any of the
problems. So, with all of these
four applications
melding together, it is the greatest
opportunity for the greatest number of
homes on this acres. Um and again
attainable by design with the different
product types, sizes, all of those
things that you know there is just
different housing opportunities at
different income levels.
Heritage and landscape again preserving
the Ponderosa pine forest, protecting
the Riota flag watershed, extending
trails and the puts um having some
mountain t mountain town parks and uh
and m mountain modern design is our goal
here. really again leaning into
Flagstaff, leaning into what we heard
from the community, leaning into what we
heard uh from your council frankly who
told us to get rid of the other plan and
to do this one or come back with
something better and this is what we
came back with. Uh we've already hit on
these, but I do believe we're in
substantial conformance with the 2030
plan, assuming our
our regional plan amendment is approved.
And uh again, not only homes, but
tourism and economy. [staff] hit on all
those numbers. And I could say there
might be some adventure tourism in our
uh in our hiking trails, but [staff] wasn't
sure about the adventure portion of it.
But I'm sure there'll be adventure up
here. Uh again, this as far as the
goals, it implements the regional plan.
Um we have had enhanced public review as
[staff] uh uh stated with this. Not only
did we have our three neighborhood
meetings, we had everything posted on
the city website. We had our 60-day
comment period um and have notified far
more than what was required by code and
respectfully
request approval.
So, any questions on the specific plan
per se or anything else you'd like me to
come back with at the next hearing?
>> We have any questions uh online of any
of the other commissioners?
>> None. None for [name].
um
>> for me right now.
>> Thank you. Can we just clarify? Um is it
uh Oh, there was a street name San
Francisco Peaks Parkway. Is that what
became Pona Vera? Just wanted to
clarify. I looked all over the maps for
that. Um but that was just in the staff
report. Um any questions?
>> Yeah, I think we would want to do public
comment. Um right now I don't have
anything. Oh, you have one more. Oh,
that's okay. I thought you were
>> I put both together one. Sheriff again.
Still. Sorry about that.
>> Still with the law firm of the applicant.
Still here on behalf of the applicant and
state trust land 401. Uh we have two
concept plan map amendments. I'm hitting
them both at the same time. Um again,
there's the one that is uh our 139 acres
from RR RPO to R1 RPO. Um, and again
then the the other one that has the uh S
C HMR
[staff] went into them in great detail. She
even circled her little red circles I
think are fabulous and probably more um
depictive than than what we have here.
Uh there there are a few parcels that
are not getting reszoned. [name], you
were correct on that. And that is again
mostly because of the topography in the
area. But between the specific the
regional plan amendments, the specific
plan and these two reszone cases um it
it opens up uh again 443 target homes in
the R1 zoning which is 139 acres. Again,
without the reszone, it would be
135 homes at best. And we're targeting
for and that is taking into account all
of the topography.
The second resone case again 296
target
uh homes units as well as the 80,000
square feet of commercial and the family
lodge.
the R1 reszone area again 139 acres 10
development areas R1 will allow for
single family homes but also other
opportunities um we have increased our
some of our minimum densities there and
we'll have a phased delivery but does
allow for a multitude of of housing
types the HC uh SC HCMR reszones that
total 72 acres six development areas
again the goal there is the neighborhood
commercial opportunities, the lodge as
well as some multi-family
housing opportunities.
Uh so what does that look like? Right,
we have both we've got single family
homes and we will we'll have some single
family homes out there. Um we'll also
have some middle housing, some duplexes,
some condos, uh hopefully with some
porches and balconies and a variety of
facades. Commercial opportunities. Um,
again, two different commercial
opportunities. The one right at the at
the, uh, traffic circle, um, will
probably be a little different in terms
of more restaurantbased, those types of
things. The second commercial
opportunity, more, you know, potentially
a grocery store. And then the lodge,
again, leaning into the character, we do
have to go through the site, plant, and
subdivision process. But uh as I've
heard from [staff] multiple times, although
lesson mark uh make it look like
Flagstaff. So again, the goal is to uh
lean to the character and the Rio flag,
the topography in the area, trails and
roads. Again, we've got the John Wesley
Powell uh JWP that will be built along
the foots in phase one. Not only does
that open up our project for
development, but the other parcels for
our neighboring property owners, Arizona
trail realignment.
Um, and uh, the Pontava Boulevard that
yes, chair was San Francisco San
Francisco Peaks, but now we're calling
it Paneava. One thing when projects are
in the queue for six years, we have to
change a few of the names. Uh but we
will have Ponava Boulevard and the Foots
Trail and that is moving forward with
some of the byite development right now.
As I've already said, 70 uh acres of of
open space um mixeduse neighborhoods
with an opportunity 700 opportunity for
more homes. The target is 785 homes
right now and the opportunity of seven
different housing types, 120 key family
lodge uh to work with uh tourism
and economic opportunities.
Finding number one, uh, consistent with
the plans. Finding number two, serves
the public good. [staff] went into this in
much greater detail, but I believe
there's a lot of public good in terms of
uh transportation is is the biggest one.
Miles of of bike trails for both bikes
and pedestrian connectivity and parks
that are open to the public as well as
the 80,000 square feet of neighborhood
commercial. Not only is it the
commercial opportunities, but the
economic benefit
uh we hit onation
site is physically suitable. Yes, I will
say
right now we are squeezing the greatest
number of units we can with the
topography and the slope as it is. Um
it's a slope resource. We do not want to
propose to take the the RPO off of here.
Um but with using the PRD options, the
preservation of the open space, um I do
believe we're getting the best of all
worlds.
Um staff recommends approval. Um, we
this implements all of the all of the
goals that we have in the specific plan.
I do believe all three findings are met.
Um, all of our impact studies have been
reviewed and approved and respectfully
request
a lot of information. So, I'm glad we
all have two weeks to to noodle on it
and uh and come back together.
>> Questions from online?
>> Any other questions? I just have um one
question.
Planning Commission, we've been trying
to look at ways to reduce the cost of
housing and um one of the things we
briefly talked about last planning
commission is like for example, if a
builder buys a lot, they have no idea
what the entitlement costs are. They
have no idea what the pre-development
costs are because the developer usually
bores those costs.
So, um I was curious when you said that
the plan was approved in November of 25
or you are deemed your subittal was
deemed complete and what happened it
we're trying to improve our processes.
what happened in between and maybe you
might want to address that later that we
might be able to improve. I'm glad to
see that um
your um your cases are all at on the on
the same page because before we had them
spread out like six months you had to
wait to refile and stuff like that. You
could do the general plan amendment that
had to be separate. So, I like it that
and plus I think it helps the public and
everybody else you see the whole
project. So, I like that and I think
that hopefully has saved some processing
and um time for developing this. So that
might be something you want to address
later because we're just looking for
ways to improve
um because all that relates to the cost
of housing
>> and and chair vice chair uh you know I
we were deemed complete in November of
last year. We've been working on this.
This hasn't been this isn't an easy
case, right? The same size
infrastructure that's required.
There's a lot that goes into this both
on our side and staff side. I will say
staff worked very very hard and the fact
that [staff] has gotten up to speed and
taken over for [staff] because [staff] knew this
case exceptionally well and so [staff] um
has been working over the weekend to get
up to speed to be able to give the
detail and know it and understand this
projects and the depth that it is. Uh we
were challenged to make it different. It
has been very very expensive. Um, it all
does go into the cost, right? And that's
part of what we talk about and how we're
still, you know, everything
every different department needs wants
different things. I get that. We want a
little bit of everything, but every cost
increases the cost of housing, right?
And that's and that's just what's
tricky, but at the same time, we're
trying to balance all of it to the best
we can.
>> Thank you.
Um, I guess we'll open it up for public
comment.
Is anybody here to comment?
Anybody online?
No public comment.
Okay, I guess we will close the public
hearing for today and reopen it.
And thank you both for the
presentations and um I we also found it
was helpful to have as much as was
overwhelming helpful to have it all
together. Thank you for sending it to us
on Friday [laughter] um a long weekend.
Is there a comment
before I close it out? Um go ahead.
I wasn't sure if now's the right time
just to make it's not really questions,
it's more comments for me. Do you want
those now or later?
>> Whichever you feel comfortable doing.
Sure.
>> Okay. Um, so I just want to thank the
members on planning and zoning that have
so much background because the questions
you are asking are amazing and it's just
great that we have such a depth of
information.
My biggest concern is the reclaim water
contracts. I know you've heard me talk
about these before and I am glad that
they usually limit them to 5 years
because what I see in the future is that
we're going to hopefully
use that reclaim water to recharge lower
Lake Mary groundwater.
Um, so I'm I'm hoping as we move forward
as a city that that's our end goal and
that we are looking at these
developments with that in mind. Um, the
other thing is that whenever we have an
extension of a golf course,
>> my question is why does that always have
to be private? Is there a way to even
have one day a week that's open to the
public? So I know this was an extension
of the Pine Canyon course. I think. But
I'm interested to hear more about that
and if there's any leeway for what could
happen. [remark omitted]
And finally, I would talk about Habitat
for Humanity and their starter homes. I
know that they are really good if you
just give them land. They can build
starter homes um that'll meet that
affordable housing
need. They recently opened up 10 homes.
They had a hundred applications. So, we
still have a need. We are still in a
crisis. And um I hope that will be
something you will consider. I know it's
a long shot. This also is a long shot
always. Uh Trader Joe's. We know we need
a a commercial um grocery store. They'd
only want to locate on Milton, but if
you have some pull and can get Trader
Joe's, you'll be loved by us forever.
And that's it. Thank you.
Thank you.
>> Any other comments, questions?
Um I think I'm going to table any
further comments of mine till the next
time. I'm kind of want to digest some
more of what we, you know, have to kind
of go through. I will just say if if any
of the commissioners
want additional information or have
questions, if you want to email me and I
can work with the applicant and make
sure that we have need for our next
hearing.
>> I was going to offer that. Yes. Any
communication that you could send
through [staff], we're happy to make sure
that we bring you any information you
need.
>> Okay. Um, I think that's that's it then.
Um, we don't have any further comments.
I'll close the public hearing for
tonight for all four of those cases and
then we'll table it to the next meeting.
So,
>> she mentioned 12.
>> Yes. And to make sure everyone's aware,
our next meeting is usually scheduled on
the 11th and stay, but that is Veterans
Day. So, we are rescheduling our meeting
to that Thursday at 4:00 and that will
be at city hall. Let's go back to city
hall for the next one. Okay.
Six was any other miscellaneous items to
and from commission members
and if there no further then I will
adjourn this at 6.
Thank you everyone.
>> Thank you.