2026-10-06 - Finance Committee

Summary

  • Item 25, golf cart paths: resolution to reappropriate $250,000 from general fund reserves for repair and replacement of cart paths at the airport golf course. The sponsor described the paths as too narrow and in poor condition after a site tour; the recreation director said the old asphalt is no longer viable and concrete is planned. No public comment. Recommended to the full council, with Councilman Moody voting no. See Airport Golf Course Cart Path Repairs.
  • Item 26, Cheyenne Prairie Generating Station: resolution authorizing the mayor to sign a memorandum of understanding on impact assistance with participating counties, cities, towns and fire districts. The city attorney said the application changed, and a member understood available funding drops by about $4 million. No public comment. Recommended unanimously. See Cheyenne Prairie Generating Station Impact Assistance MOU.
  • Item 29D, transit grant: agreement with the Wyoming Department of Health Aging Division for transportation support for people 60 and older, a routine annual state grant. Staff gave the amount as $55,829; the motion was read as not to exceed $59,648, and the clerk was to correct the figure. Recommended unanimously.
  • Item 29E, municipal building parking lot: $132,000 professional services agreement with Martin and Martin Wyoming to redesign the parking lot to current Unified Development Code standards, paid from specific purpose tax funds. Members discussed the link to the building renovation and EV-charging conduit. Two members of the public commented, raising concerns about the building project and contract terms. Recommended, with Councilman Moody voting no. See Municipal Building Parking Lot Redesign Agreement and Municipal Building Renovation Construction Manager.
  • Item 29F, Office of Youth Alternatives: two-year revenue contract worth $598,634 with the Laramie Community Juvenile Services Joint Powers Board for case management, diversion and substance abuse assessments. A public commenter raised timing, termination and data privacy questions; staff and the city attorney said the contract is routine and a data use agreement is in place. Recommended unanimously. See Youth Alternatives Juvenile Services Contract.
  • Item 29G, Johnson Pool: $353,400 agreement with TDSI to take the voter-approved pool design from 65% to 100%, with bid documents and construction administration. The recreation director said the goal is to bid in early 2027 and start construction around April 2027. A public commenter questioned the cost; members defended the voter-approved project. Recommended unanimously. See Johnson Pool Design Agreement.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

01:00You're back there. Thank you. Can

01:02everybody hear online now?

01:05Jeff, can you give me a thumbs up?

01:07>> Yep, I can hear you. Thank you.

01:09>> Okay, thank you.

01:10>> Sorry.

01:11>> Do all that again.

01:14Okay.

01:16Yeah. Okay. We'll call the October 6th

01:19meeting of the finance committee of the

01:21governing body of the sh city of

01:23Cheyenne to order. Um, everybody in the

01:27room knows what they're supposed to do

01:28with their cell phones and how to

01:29approach the podium. Online, use the

01:33raised hand function. All communication

01:35goes through the chair and at the end of

01:37this agenda, no additional business will

01:39be discussed with that. First item

01:42>> number 25 resolution reappropriating

01:45$250,000

01:47from general fund reserves for repair

01:49and replacement of cart pass at the

01:51airport golf course.

01:54>> And are you going to do a staff report,

01:57Jason, or you want me to?

02:00Okay.

02:02>> Okay. Councilman Wolf.

02:04>> Uh thank you, Mr. Chairman. uh through

02:06you. Um this is a um resolution um to um

02:12do some very needed repairs uh and and

02:16upgrade of the uh golf carts golf cart

02:20course

02:22pathways uh at the airport golf course.

02:25Um, now I'm not a golfer, but I did take

02:28a tour um with Director Sanchez um and a

02:32number of uh city councilmen that

02:35President Seager sent up and and it's

02:38abundantly clear that um these um these

02:42pathways um need a lot of uh attention.

02:46they're uh too they're not wide enough.

02:49Um and uh they need to be uh replaced

02:53with um uh new and updated uh materials

02:58and um I'm happy to be a co-sponsor on

03:02this with Chairman Escoel and Dr. Renie

03:06and President Caggrave and Dr. Ammons.

03:10Um and uh so this is a contract uh for

03:15to appropriate $250,000 which is a um

03:19construction estimate that Director

03:21Sanchez u brought to us. Um and um I'll

03:26stand for questions. Um but that's

03:28probably about the sum of my knowledge.

03:31Thank you, Mr. Chairman.

03:34>> Do we go to public comment in the room

03:36on this item?

03:39Do we have any public comment online on

03:41this item?

03:47>> Councilman Crave, do you wish to say

03:49anything?

03:51>> Mr. Chair, can you hear me?

03:53>> We can.

03:54>> Yes. I apologize for not being there

03:56today. Um, it's been kind of a wild

03:58week. I I do apologize. This has been an

04:01ongoing project over the last two years.

04:03We've done small small repairs. Um, and

04:08as we've done those, it's just become

04:09abundantly clear that, at least

04:11[clears throat] in my opinion, that we

04:12need to do this for safety reasons if

04:15nothing else. We have areas uh where

04:18tree roots have up uprooted the um the

04:23pavement product. Um, we have serious

04:27trip hazards throughout the the U golf

04:30course. Um,

04:32I I just don't know if we could repair

04:34it. I would have tried to do that, but I

04:37just don't think a repair is possible

04:39any longer. Uh I do appreciate all of

04:42the council folks that took their time

04:44to spend a couple hours with uh Director

04:46Sanchez and myself and tour the the golf

04:50course. Um this is our only 18-hole golf

04:54course in the community. It gets a lot

04:56of use. Um we have many tournaments

04:58there, including the city tournament. uh

05:01quite often we have either regional or

05:04state high school tournaments there um

05:07it's just it's just at that point that

05:11uh I I don't see any other choice but um

05:14to find the funds to to do this work. So

05:16I would appreciate your support and I'm

05:18I'm open to any questions. Thank you.

05:21>> Thank you. Do we have any questions for

05:23President Crafe? [clears throat]

05:27>> Any other public comment online?

05:31Nope. Seeing none, we'll come back to

05:33the committee. What's your pleasure,

05:35>> Mr. Chairman? Uh, I move to adopt.

05:38>> Second.

05:39>> It's been moved by Councilman, second by

05:41Councilman White. Any further

05:43discussion?

05:44>> I got some questions.

05:45>> Councilman Moody.

05:46>> Yep. Thank you, Mr. Chair. A couple

05:47questions. Are there any pictures of

05:49these uh trees that are damaging the

05:52sidewalk?

05:53Any uh pictures or I was working when

05:56that tour was going on?

05:58>> Mr. share through you Jason Sanchez

05:59community wreck and event um I can

06:01provide you some pictures if you would

06:03like

06:04>> well go ahead

06:05>> thank you Mr. Chairman through you have

06:07any uh private contractors have they

06:09also said this can't be repaired it has

06:12to be torn out and have to put in lay

06:15down more concrete

06:17>> Mr. share through you. Uh as Councilman

06:20Crave described, we've been working on

06:22this project uh for a couple years.

06:24We've been doing uh making small

06:26progress as we go. Uh the asphalt is no

06:29longer viable and so we're looking at

06:31replacing it with concrete ps.

06:34>> Okay. And then finally, just one more

06:36question, Mr. Chairman.

06:37>> All right. Thank you, Mr. Chairman.

06:38Through you. And then uh who exactly

06:41brought this forward? Was it one of the

06:43council men that brought forward after

06:45the tour?

06:46>> Mr. care for you. Again, uh uh we've

06:49been working on this uh for a couple

06:51years. W 2 and W three have used some of

06:53their contingency funds to help make

06:55improvements to our pathways at both

06:57airport and preview golf course. U

06:59noticing the improvements. Uh some of

07:01the council members joined us for joined

07:03me for a tour. Um I showed what the

07:04progress was and where we are. Um and

07:07then council moved this uh request

07:09forward.

07:10>> All right. Thank you, sir.

07:13And my only comment maybe is that uh

07:17playing out there it's either this or

07:20retrofit all those golf carts with

07:21four-wheel drive.

07:25>> I I have one final com, Mr. Chairman.

07:27>> Go ahead.

07:28>> Thank you. Um I'm not going to vote for

07:31this. I just think now is not the time.

07:33We should have budgeted this if this was

07:36really an issue we should have maybe

07:38looked at with our uh capital

07:40improvement. should have looked at that

07:42too. I just don't think at this time

07:44especially when we need to do fill in

07:46some more potholes and that. Thank you.

07:48>> Okay. All in favor signify.

07:52>> Councilman White, you can go ahead.

07:55>> Thank you, Mr. Chair through you. Uh

07:56just one comment. Uh Mr. Chair, just as

08:00the resolution points out, these pads

08:03haven't been replaced in more than 30

08:06years. And uh just kind of like our

08:09automobile sizes on our roads, these

08:12golf carts haven't gotten any smaller

08:14either. And uh you know to echo kind of

08:18what President Cgraves comments were

08:20when he said we get a lot of rounds of

08:22golf and this is our only 18 hole golf

08:25course in the entire city. It gets I

08:28think Jason had indicated during the

08:31budget session it gets more than 75,000

08:34rounds of golf a year.

08:37And so, uh, $250,000

08:41out of reserves out of out of an a

08:45reserve account that currently has over

08:4750 million, I think is a drop in the

08:50bucket, quite honestly. And I think uh

08:53while I try to golf and certainly would

08:56no one would accuse me of being a golfer

08:58who's had the unfortunate

09:00uh task of playing with me. Uh I can

09:03vouch vouch that this project sorely

09:06needs to be done.

09:09>> Thank you, Councilman White. 75,000

09:11rounds of golf. That's more than there

09:14are people in Cheyenne. So that's it is

09:17being used. Uh with that all those in

09:20favor signifying by saying I

09:22>> I

09:23>> I

09:24>> opposed. No.

09:27>> The resolution to adopt will be moved on

09:31to the full council. The next meeting of

09:33the governing body with Councilman Moody

09:35voting no. Next item,

09:37>> number 26, resolution authorizing the

09:39mayor to execute a memorandum of

09:41understanding with participating

09:43counties, cities, and towns regarding

09:44the allocation of impact assistance

09:47funds associated with the Cheyenne

09:48Prairie Generating Station expansion

09:51project application before the

09:53industrial sighting council

09:55>> and staff report.

09:58>> Mr. Chairman, John Brody, city attorney.

10:00Uh before you we have another resolution

10:03um authorizing the mayor to enter into

10:05anou for impact assistance.

10:08Uh the last one was the Laram wind

10:10project. The one before that was the

10:11chug water project and now we're with

10:13the very generating station expansion

10:15project. Uh this is expanding the Black

10:18Hills uh generating facility um south of

10:21I80 on the east side of town.

10:24Um

10:27we're anticipating um probably more than

10:30a million dollars uh in our impact

10:32assistance request. We'll be using our

10:34cost of service um approach that has

10:36been successful in the past. Uh this

10:39will be a at least as it's stated it's

10:41going to be a 37month um construction

10:43project. One issue I would point out is

10:47um

10:50before the resolution or after the

10:52resolution was drafted and in between

10:55the filing of the application and some

10:58other paperwork that Black Hills had

11:00filed with the uh industrial sighting

11:02division. Uh the scope of the project

11:04has changed a little bit. Uh there's a

11:07reference in the resolution about three

11:09simple cycle combustion tur uh turbine

11:11generators. uh those were actually

11:14approved by the industrial sighting

11:15division in a um a permit um amendment

11:19application. So those have been removed

11:22uh from the application and uh depending

11:25on council's uh preference, we can amend

11:27the resolution to be more clear on that

11:30point. Um but those are no longer part

11:32of the project and that has brought down

11:34the impact assistance funding that's

11:36available uh to the um governments that

11:40are that are involved. Those governments

11:42are going to be uh at this point it

11:44seems Albany County, Laramie County, the

11:47city of Cheyenne, and then a few of the

11:49local uh fire districts. Uh with that,

11:52Mr. Chairman, I'm happy to answer any

11:53questions.

11:54>> Any questions from the committee for our

11:56city attorney, Councilman Wolf?

11:59>> Thank you, Mr. Chairman, through you. Um

12:01uh thank you, uh city attorney Brody.

12:04Um, so what are they what are they

12:07replacing those um three uh uh natural

12:11gas um uh turbines with? What what are

12:15they going to put there for that?

12:19So uh Councilman Wolf uh through you,

12:22Mr. Chairman. Uh th those are still

12:24going into the project. It's just that

12:26the approval for the installation of

12:27those has been already approved through

12:30a different procedural mechanism in

12:31front of the industrial sighting

12:32division.

12:36followup.

12:36>> Uh thank you, Mr. Chairman. Um so then

12:40is the cost associated with that then

12:43removed from the calculation of the

12:47impact assistance tax?

12:49>> Yes, sir.

12:50>> Okay. That's a

12:53followup, Mr. Chairman. Um go ahead.

12:55>> That's a big that's a big number. I

12:57would bet

12:59>> Mr. Chairman, I I believe it changes

13:02downward the available funding by about

13:04$4 million.

13:06>> Oh, okay. Maybe not. All right.

13:07>> Thank you, Mr. Chairman. Thank you.

13:10>> Any further questions for the city

13:11attorney from the committee?

13:19Seeing none, we'll go to public comment

13:21in the room on this item. Any public

13:23comment in the room?

13:27Seeing none, go to public comment

13:29online.

13:31Any public comment online?

13:35Okay, seeing none, we'll come back to

13:36the committee. What's your pleasure?

13:39>> Mr. Chairman, I uh move to adopt.

13:41>> Second.

13:43>> It's been moved by Councilman Wil,

13:44second by Councilman Moody. Any further

13:47comments or questions?

13:50All in favor signify by saying I.

13:52>> I.

13:53>> I.

13:55Seeing that that vote is unanimous, the

13:57recommendation of the finance committee

13:59will be to adopt at the next meeting of

14:01the governing body. Next item,

14:03>> number 29D, agreement between the city

14:05of Cheyenne Transit Program and the

14:07Wyoming Department of Health Aging

14:09Division to provide transportation

14:11support services to persons 60 years or

14:14older under the title 3B program grant

14:17for fiscal year 2027.

14:20>> Staff report.

14:23Good afternoon chair through you Aaron

14:25Johnson transit program. Um this uh

14:28money for 555

14:31excuse me

14:33$55,829

14:36is um program that income that we get

14:38through uh a grant from the department

14:41of aging to help with our local transit

14:43funds and operating expenses. and I

14:47stand for comments.

14:48>> Any comments or questions for from the

14:50committee for Miss Johnson?

14:53>> Mr. Chair, just one quick question.

14:55Erin, great seeing you. Sorry I couldn't

14:57be there in person today. I would just

14:59ask you to let us all know. I know

15:02you've uh transit's been here many

15:05years. How long has this grant been

15:07going on? I I know it's been going on at

15:09least as long as I've been on council,

15:11so this is this is pretty routine each

15:14year, isn't?

15:16Councilman or Cham through you. Um yes,

15:18Mr. White, this has been going on for

15:20several years. Um I believe and I will

15:24have to probably correct the date on

15:25this. I believe it's been in place for

15:27about maybe 15 plus years.

15:29>> Great.

15:30>> Um it is a routine item that we do get

15:32from uh the state uh to help with our

15:36ADA program.

15:37>> Great. Thank you,

15:39>> Mr. Chair. Council Moody.

15:41>> Uh thank you, Mr. Thank you, ma'am. Uh

15:43just uhformational uh the total amount

15:45we're approving is $59,648.

15:49Is that correct?

15:50>> Uh chair through you to Mr. Moody. It is

15:5355,829.

15:55>> Okay. Thank you.

15:59>> That's all I have. Thank you.

16:10Okay, we're correcting that on our

16:13action report.

16:18That how you got it, Madam Clerk?

16:34So in Roman at I it's got the 59,000

16:37figure and then under

16:41A it's got the 55.

16:51Okay. All right.

16:55Okay. So the action reports correct with

16:57any further comments or questions from

16:59the committee.

17:02Seeing none, we'll go to public comment

17:03in the room on this item.

17:06Any public comment in the room?

17:09Seeing none, we'll go to public comment

17:11online. Any public comment online?

17:19Seeing none, we'll come back to the

17:21committee. What's your pleasure?

17:22>> Uh Mr. Mr. Chairman, I move to approve

17:24an amount not to exceed $59,6480.

17:29>> Second.

17:31>> Been moved by Councilman Moody, second

17:32by Councilman Wolf. Any further

17:34discussion?

17:37>> All those in favor signify by saying I.

17:39>> I.

17:44>> Any opposed?

17:46Seeing that that votes unanimous, the

17:48recommendation of the finance committee

17:50will be to approve at the next meeting

17:53of the governing body. Next item

18:00>> number 29E, professional services

18:02agreement between the city of Cheyenne

18:03and Martin and Martin Wyoming

18:05Incorporated for the redesign of the

18:07municipal building parking lot.

18:10>> Staff report.

18:13Adele Bartell public works staff engine

18:16um for a total of $132,000.

18:19Martin and Martin will provide a new

18:21parking lot design that will bring our

18:23existing parking lot up to the current

18:25udc standards.

18:27Um and I'll take any questions you have.

18:30>> Councilman Moody.

18:31>> Yep. Thank Mr. Chair through you. Uh

18:33thank you ma'am. Um just to clarify, it

18:36says nothing to do with the building

18:37renovation. Is that correct?

18:39>> U Mr. Chair through you. This will be um

18:43dependent on the municipal building

18:45renovation.

18:47>> Okay, good to know. Uh Mr. Follow, Mr.

18:49Chairman. Go ahead.

18:50>> All right, thanks T for you. Um thank

18:52you ma'am. On page four here and for the

18:55public to know it's under the Martin and

18:57Martin um number six it says we will

19:00hire WSP as our electrical sub

19:03consultant for the electrical silver

19:05project to include EV charging

19:07infrastructure

19:09phototric maps and plan for power to the

19:12covered parking support under camp

19:15connection to a future uh solar system

19:18by others.

19:20Um what's this about?

19:23>> Uh Mr. Chair, through you. So this is

19:25just in case the city decides um to save

19:28costs on electricity by using solar

19:31panels. Um it's essentially just conduit

19:35for future purposes.

19:37>> Well, Mr. Chairman,

19:38>> go ahead.

19:38>> All right. Thanks, Cher. Um

19:42we have debate about that, but I was

19:44going to say I don't remember my

19:46constituents saying they want a public

19:47EV charging station. And so I'm just a

19:49little surprised to see us in here. So

19:52if I could have more information on that

19:53by our next meeting, that'd be great. I

19:56don't have any more questions. Thank

19:57you.

19:59>> Any further questions from the committee

20:01for staff? Councilman Wolf.

20:03>> Um thank you, Mr. Chairman, through you.

20:05Um thank you, M. Bartell. Um, so we had

20:10a conversation right before we started

20:12uh about

20:14whether this impacts the

20:18uh old senior center that we're um going

20:21to be renovating. Um, and there's a

20:25driveway in there and a central island

20:28that has some trees and a lot of

20:30cigarette butts. Um and um is that uh

20:35affected by all at all with by this

20:38contract?

20:39>> Uh Mr. Chair, through you. No, it would

20:41just be the um the extents of the

20:44municipal buildings parking lot um as it

20:46is right now.

20:48>> Okay. Um

20:50because there had been some discussion u

20:52Mr. Chairman, a followup. Thank you. Um,

20:56uh, I know, um, President Crave had been

21:00interested in trying to, uh, I think get

21:04some handicap parking in the front of

21:06that, um, the senior center, uh,

21:11building. And so, but that's not that

21:14we're not going to include that at the

21:15moment with this contract.

21:17>> Uh, Mr. through you that would most

21:19likely

21:21be included in the um the renovation

21:25design of that building.

21:26>> Okay.

21:27>> If if it's a possibility.

21:30>> Great. Okay. Thank you. Thank you, Mr.

21:32Chair.

21:37>> Councilman White.

21:40Um I don't have questions. Uh Mr. Wolf

21:43uh asked what I was going to ask. Thank.

21:48>> Okay, we'll go to public comment in the

21:50room.

21:55>> Uh, chairman, members of the committing,

21:56my name is Danny Hayes with Martin

21:58Wyoming. I'm a senior professional

22:00engineer. Um, just to kind of answer

22:02some of the questions you had. Our

22:03original scope was to just include the

22:05parking lot inside basically the back of

22:07the sidewalk in after meeting with city

22:10engineer Tom Cobb and Doug Clon we kind

22:12of expanded the service that does

22:14include that circle drive. So oh was it

22:17two years ago you guys did 21st Street

22:19Tom

22:21>> 21st Street got redone. They kind of

22:23there's that line in the Circle Drive.

22:25So, we're going to kind of come south of

22:27that, address that sidewalk in the

22:29drainage and that circle drive to

22:31hopefully include some parking that

22:33addresses that, you know, the change

22:35from the senior center to the annex

22:37building as well as address um O'Neal.

22:40There's that really 12 in really tall

22:44curb that if you park and don't know

22:45about it, you car plan to address that

22:48as well as the landscaping and items.

22:50And then also on the east side of the

22:52annex that drive into the

22:56um parking garage kind of clean that up,

22:58address some of that worn out pavement

23:00and sidewalk to kind of tie into the

23:03municipal building and annex building

23:04project. That scope has been expanded to

23:07include all that.

23:08>> Questions for Mr. Hayes? I do.

23:10>> Councilman Moody.

23:11>> Yep. Thank you, [clears throat] Mr.

23:12Turner. Through you. Thank you, Mr.

23:13Haynes. Uh question. Um does somebody

23:16from the city approach you about EV

23:18charging infrastructure? or is that

23:19something you guys do on your own?

23:22>> Uh M chairman through you that was

23:24approached to the city to include in

23:26case for future it's just infrastructure

23:29so conduit in the ground. There's not a

23:31plan at the time to include any EV

23:33charging stations. It's cheaper to plan

23:36for the future now by putting in conduit

23:39now to where it may go in the future if

23:42that's something constituents or anyone

23:43wants in the future. So, it's really

23:45just the conduit infrastructure in the

23:46ground, not actually putting in EV

23:49charging stations at this time.

23:53Any further questions for Mr. Hayes from

23:56the committee?

24:00See? None. We'll go to public

24:03comment in the room.

24:06Any public comment in the room?

24:09Seeing none, we'll go to public comment

24:11online.

24:15public comment on that.

24:16>> Mr. Miller, you can go ahead.

24:19>> Can you hear me?

24:20>> We can.

24:21>> Um,

24:24uh, for the record, Charles Miller. Um,

24:27I'm speaking directly to item number

24:2929E, the professional services agreement

24:31for the municipal building parking lot

24:33redesign.

24:35Uh, is this a this is $132,000, is that

24:39correct, of specific purpose tax funds?

24:44Yes.

24:46>> Okay. Um well uh a an audit of the

24:51document layout reveals critical

24:53protection failures for city taxpayers.

24:56First look closely at the structural

24:58contradictions between the main body of

25:00this contract and exhibit A. Section 12

25:03dictates dictates that the consultant

25:05bears responsibility for its operational

25:07costs and fees. Yet exhibit A. Section

25:098, paragraph F1 states that permit and

25:13application fees advanced by the

25:14consultant will be reimbursed

25:17uh by the city at cost plus a 10%

25:20markup. Why is this municipality paying

25:22a 10% premium on administrative

25:24boilerplate?

25:26Second, section 7 sets up an illusion of

25:28risk mitigation by demanding consultant

25:31indemnification, but flip to section 16.

25:34It completely guts that protection by

25:36declaring that in the event of a default

25:38or a legal dispute, each party shall

25:40bear its own costs and expenses,

25:43including without limitation attorney's

25:44fees. If this vendor defaults, the

25:47taxpayer is contractually barred from

25:49recovering the legal fees required to

25:51enforce compliance. That is a total

25:53surrender of m municipal leverage.

25:56Third, this contract fails to deliver a

25:58complete project. Section 3 explicitly

26:00lists mandatory jurisdictional

26:02construction signoffs.

26:04uh including grading and utility

26:06certifications as additional services to

26:08be build at hour of variable hourly

26:10rates up to $220 per hour. You are

26:14approving a lump sum contract that

26:16intentionally excludes the final

26:17regulatory certifications needed to

26:19legally occupy and use the parking

26:21infrastructure.

26:23This guarantees future change orders.

26:25This committee must table item 29E until

26:27these structural defects are scrubbed

26:28from the text. Thank you.

26:31Any

26:36further public comment online?

26:38Seeing none, we'll come back to the

26:40committee. What's your pleasure?

26:42>> Uh, Mr. Chairman, I um move to approve

26:46an amount not to exceed $132,000.

26:50>> Second.

26:52>> It's been moved by Councilman Wolf,

26:53second by Councilman White. Any further

26:55discussion? I do.

26:56>> Councilman Moody.

26:57>> Thank you, Mr. Chairman. Through you,

26:59couple things. I mean, first off, the

27:03people did vote against the renovation

27:05of the building, whether we like it or

27:06not, and I'm need to honor the wishes of

27:09the constituents.

27:11And then two, gives me a lot of

27:14heartburn when I see EV charging

27:17infrastructure. Um, people do not want

27:20that here in Wyoming. Maybe except one

27:22town, Teton County, but not here. Again,

27:25the ones at Target and the mall, that's

27:27private property. That is a lot

27:29different. that is not taxpayer

27:31subsidies. It's not public property.

27:33This is public property. So we say it's

27:36just infrastructure.

27:39That means it could happen. It'd be like

27:41almost saying we're going to put in

27:42infrastructure for future gasoline

27:44pumps. That's the way I look at it. So

27:46that's why I will not support this for

27:49those two reasons. And I urge everybody

27:52to vote no on this. Thank you.

27:55>> Okay. Well, we don't know what the

27:57future brings, but [clears throat] with

27:59that, all in favor signify by saying I.

28:01>> I.

28:02>> I.

28:03>> Opposed.

28:05The recommendation of the finance

28:07committee at the next meeting of the

28:08governing body will be to approve with

28:10council Moody voting. No. Next item

28:13>> number 29F. contract between the city of

28:16Cheyenne office of youth alternatives

28:18and the Larmy community juvenile

28:21services joint powers board for case

28:23management services and substance abuse

28:25testing and assessments

28:27>> staff report.

28:30>> Mr. Chairman, committee members, this is

28:32Jay Sullivan, uh director of youth

28:34alternatives. Uh this is a two two-year

28:37contract revenue to the city totaling

28:40$598,634.

28:43Uh the scope of services covered by this

28:46contract is for the community service

28:48case manager position, diversion

28:50coordinator, diversion case worker, and

28:53as indicates in the agenda, the

28:55substance abuse, testing, and

28:57assessments. Uh the end of this contract

29:00would be June 30th of 2028. And I'll

29:03stand by for any questions.

29:06>> Any comments or questions from the

29:07committee for Mr. Sullivan?

29:11Seeing none, we'll go to public comment

29:13in the room. Any public comment in the

29:15room on this item?

29:18Seeing none, we'll go to public comment

29:20online. Any public comment online on

29:23this item?

29:25>> Mr. Miller, you can go ahead.

29:27>> Can you hear me?

29:29>> Yes, we can.

29:30>> Uh, for the record, Charles Miller, uh,

29:3329F.

29:35>> [clears throat]

29:35>> This body is reviewing a contract to

29:37secure $598,634

29:40for the office of use of youth

29:42alternatives.

29:43While the funding appears beneficial on

29:45the surface, a structural audit of the

29:47contract timeline and data protocols

29:49reveals serious administrative

29:50compliance gaps. First, look at the exe

29:54execution timeline. The performance

29:56period of this agreement explicitly

29:58states that work commenced on July 1st,

30:012026. Yet, the city attorney did not

30:03sign off on the form until September

30:0521st, 2026, and it is sitting before

30:08this committee today on October 6th.

30:11This means municipal employees have been

30:13administering substance abuse testing

30:16and case management for over 90 days

30:18without a legally executed binding

30:20framework. This is a severe breach of

30:22standard operating sequence that exposes

30:24the city to uncolateralized

30:27operational liabilities.

30:29Second, section 3 contains a structural

30:32imbalance regarding funding

30:33availability. It grants the joint powers

30:36board the unilateral right to terminate

30:38this agreement if state or county

30:39funding shifts, providing only a 30-day

30:41notice with zero financial penalty or

30:43liquidation protections for the city.

30:46The Office of Youth Alternatives have

30:48has already locked in fixed salary and

30:50fringe allocations based on this money,

30:52including $222,859

30:56for a diversion coordinator and $199,422

31:01for a caseworker. If the board pulls the

31:04plug, the city's general fund is fully

31:06exposed these personal costs. Third,

31:09section 5, paragraph 1 establishes an

31:11aggressive data mandate. City staff are

31:13legally required to upload highly

31:15sensitive tracking metrics into the

31:16reroute database posted by the

31:18University of Wyoming within two

31:19business days of any case update. We are

31:22contractually locking our local

31:23department into strict rapid turnarounds

31:25for data tracking. Yet there is zero

31:27reciprocal language protecting the data

31:29sovereignty or privacy rights of

31:30Cheyenne families from university level

31:32data handling liabilities. I urge this

31:35committee to require a formal

31:36reconciliation of these retroactive

31:38operational dates before advancing the

31:39item. Thank you.

31:42Thank you. Any further public comment

31:44online?

31:46Seeing none, we'll come back to the

31:48committee. What's your pleasure?

31:49>> Uh, Mr. Chairman, I move to approve an

31:51amount not to exceed $598,6340.

31:56>> Second.

31:57>> It's been moved by Councilman Moody,

31:58second by Councilman Wolf. Any further

32:00discussion?

32:02>> Councilman White.

32:03>> Thank you, Mr. Chair. Is Mr. Brody

32:05available for a question on this? I I

32:09would just like to uh get your take sir

32:13uh in the caller's comments that the

32:16contract had already commenced July 1.

32:19We are in um October

32:23uh 6th. So, so, uh, and then on section

32:28two, this is page three, it it calls

32:31for, um, well, I will say on that, uh,

32:36lowercase number two there, January 15,

32:382027 through October, uh, for the period

32:42of October 1, 2026 through December

32:4531st, 2026. Again, we're in October 6th.

32:49Uh does the fact that we are kind of

32:51over those time periods uh call this

32:54contract into question at all?

33:00>> Mr. Brody.

33:01>> Uh Mr. Chairman, John Brody, city

33:03attorney. Uh in my review of the

33:04contract, I didn't have any concerns. Uh

33:06granted, uh we do have a um a date that

33:11precedes the execution by the parties.

33:13However, this is money that routinely

33:14comes to the joint powers board for the

33:16service of uh juveniles that are in need

33:19of assistance at risk youth. Um I I

33:23think um youth alternatives would

33:25probably have a better uh better

33:28information to share with you on the

33:29mechanics of of data sharing and all the

33:31other uh interests that come up under

33:34this contract. But as a routine matter,

33:36um those issues didn't give me enough

33:40concern to uh stop the contract from

33:42moving forward.

33:44>> Great. Thank you, Mr. Brody.

33:47And I'll just uh close my remarks, uh

33:50Mr. Chairman, by saying in all my years

33:53on council, uh the previous comments

33:55that we just heard was the only time

33:57I've ever heard anybody call into

33:59question uh either youth alternatives or

34:02the services they provide. And so if

34:05they are unhappy with the contract then

34:07maybe they for the full administrative

34:10record would like to uh start a company

34:15and uh make a bid to provide those

34:17services instead.

34:20>> Thank you. Any further comments or

34:22questions from the committee?

34:24>> Mr. Chair

34:26Sullivan.

34:27>> Uh to speak to the the data, the city

34:30has a data use agreement uh with the

34:33University of Wyoming and DFS. This data

34:36is a central collection point to

34:39determine determine the uh uh outcomes

34:42of juveniles across the state uh to

34:45implement best practice approaches as

34:47well. But there is a data use agreement

34:50in place for this. Um, so

34:54I'll stand by.

34:56>> Okay. Thank you,

34:56>> Mr. Councilman Moody.

34:58>> Thank you. Uh, thank you, sir. And just

35:00for the clarify for the public, this has

35:02been going on for decades and this is,

35:05uh, very standard. Am I correct,

35:09>> Mr. Chair? Uh, director Sullivan again

35:11through you. Uh, correct. Uh, the

35:14contract will be retroactive.

35:16uh the joint powers board is is on board

35:19with that knowing that uh the services

35:22we can't just stop services for a delay

35:24in in the contract being implemented and

35:27so uh it will be retroactive to cover

35:29the cost and expenses of those services

35:31to the city uh from January I'm sorry

35:34July 1st forward.

35:37>> All right. Thank you so much and I agree

35:40this is very important you know for our

35:42youth here. You know, I say this I one

35:45friend who from uh Fort Morgan wishes

35:49she had a program like this to help her

35:52out in her use. So definitely be an I

35:54vote. Thank you,

35:55>> Councilman Wolf.

35:57>> Uh thank you, Mr. Chairman, through you.

35:59Um and thank you, Mr. Sullivan, for both

36:02taking your time to come speak to us

36:04today and for running uh this program

36:08which serves an awful lot of uh folks.

36:13um and has for many many years. Um this

36:17is the kind of undertaking that the

36:19governing body um looks at uh as a

36:23matter of really the routine business of

36:26trying to run the city as u effectively

36:30to provide the services that need to be

36:32provided. uh and uh the contractual

36:35arrangements are um long-standing and

36:39critical and and I certainly agree with

36:41uh city attorney Brody that um fact that

36:45the contracts um are uh a bit delayed um

36:50is uh not of u legal concern and um I'll

36:55certainly support this. Thank you. Thank

36:57you, Mr. Sullivan. Thank you, Chairman.

37:00>> Mr. Chairman uh Director Sullivan again.

37:02Uh I would like to just add one thing uh

37:04and I appreciate uh Councilman White's

37:07uh input to our online uh comments. Uh

37:11Youth Alternatives for those that don't

37:13know is actually a criminal justice

37:15agency recognized by the FBI as such

37:19which puts us in the position to provide

37:21those uh probation services, diversion

37:24services, and so forth. So, um, just

37:27thought I'd share that bit of

37:28information out there.

37:31>> Thank you. Seeing there's no more

37:34comments from the committee, uh, all in

37:37favor signify by saying I.

37:39>> I.

37:41>> Seeing that that votes unanimous, the

37:43recommendation of the finance committee

37:44at the next meeting of the governing

37:46body will be to approve. Next item

37:48>> number 29G, professional services

37:50agreement between the city of Cheyenne

37:52and TDSI, the design studio incorporated

37:55for the Johnson pool evaluation and

37:58design project.

37:59>> Staff report.

38:00>> Mr. Chair, Jason Sanchez community

38:02wrecking events before you

38:04[clears throat] and for your

38:04consideration is contract with TDSI for

38:07the to complete the design of the

38:09Johnson pool and for some construction

38:12administrative uh services. Uh I just

38:15want to walk you through uh kind of the

38:17process and if if you recall on the

38:20previous six the community supported uh

38:23the design of the pool. U we we went to

38:2665% on our design because and we didn't

38:29go to 100% because we didn't know if it

38:31would pass on the next ballot and and so

38:34to try to be a good steward of taxpayer

38:36dollars we designed to 65%. When it

38:39passed now this contract will take us to

38:42100% design. It also includes uh help

38:46with the bid documents, construction

38:48administration,

38:49and then at the conclusion of the

38:52warranty period of the pool, the the

38:55TDSI would also come and help us

38:58navigate the warranty period to make

38:59sure we document anything that would

39:01need to be repaired or replaced. So, the

39:04goal in this is that if this is approved

39:06by the governing body, we would finish

39:08the design by January.

39:12February, March, we go out to bid and

39:14I'm hoping to break ground in April if

39:16weather cooperates.

39:18If we are able to break ground in April,

39:21I'm hoping we have construction

39:22completed by the summer of 2028,

39:26which then starts the 2-year warranty on

39:29the construction and then is why this

39:31contract with TDSI extends out to 2030

39:35because two years later, they would help

39:37us navigate the warranty inspections.

39:40Um, I have TDSI in attendance as well

39:44and I will do my best to answer any

39:46questions you might have.

39:50>> Any questions for Director Sanchez from

39:52the committee? Councilman Wolf.

39:54>> Um, thank you, uh, Mr. Chairman, through

39:57you. Uh, thank you, Director Sanchez.

39:59Um, and, uh, I appreciate that

40:02explanation. Um, it kind of jumped out

40:04at me when I read through the contract.

40:07Um, but I'm delighted to see that we're

40:10moving forward with this really

40:13significant uh amenity that the the

40:16voters have uh supported and um that

40:19your department has u you know over many

40:22many years um helped to uh maintain and

40:26now needs to be replaced. And so thank

40:29you. Thank you Mr. Buyers both Mr.

40:31Buyers for uh your work uh on this as

40:35well. Thank you, Mr. Chair.

40:38Councilman White.

40:40>> Thank you, Mr. Chair. Uh, just wanted to

40:42kind of thank Jason. He and I, uh, you

40:46know, he always, uh, sets up the

40:48facilities and is present for our W one

40:51council and coffees. And so I believe it

40:54was back in June, I'd kind of asked him,

40:57you know, you know, if this if if the

41:00six penny project or the Johnson pool

41:02project passes six penny, um, you know,

41:06how what's the turnaround time? How long

41:08is it going to take to break ground? and

41:10he had told me, you know, I already have

41:13a plan in place if it does pass and the

41:16goal is to break ground as quickly as we

41:18can uh so that we can have the project

41:21completed as quickly as we can. And um

41:24this is step one in that process and the

41:27voters overwhelmingly voted to support

41:30that and um I just can't wait till the

41:33groundbreaking.

41:36Okay. Any further comments or questions

41:39for the director from the committee?

41:44Seeing none, we'll go to public comment

41:46in the room on this item.

41:48Any public comment in the room?

41:52Seeing none, we'll go to public comment

41:54online.

41:57>> Mr. Miller, you can go ahead.

42:00>> Can you hear me? And

42:03>> uh for the record, Charles Miller, I'm

42:05speaking directly to item number 29G,

42:07the contract with TDSI for the Johnson

42:09pool. [clears throat] Excuse me.

42:11Director Sanchez just testified that the

42:13department purposefully capped the

42:16initial design at 65% under contract

42:187986 to save costs prior to the

42:21election.

42:22While presented as fiscal stewardship, a

42:25clinical audit of this second agreement

42:27shows that this multi-phase division has

42:29created massive contractual

42:31vulnerabilities for the city. First, the

42:34initial 65% design already cost

42:37taxpayers $247,533.

42:41Today, you are adding $353,400

42:44simply to finish the remaining 35% of

42:47the drawings and provide basic

42:49oversight. That drives total soft design

42:52and administrative costs to $600,933.

42:57For a neighborhood pool estimated to be

42:59only 4,000 to 5,000 square ft, spending

43:02over half a million purely on

43:04administrative paper before breaking

43:06ground is an indefensible soft cost

43:09ratio. Second, look at the extreme

43:11performance term requested today.

43:13Director Sanchez noted this contract

43:15runs all the way to June 30th, 2030

43:18because it hitches the architect to a

43:202-year post construction warranty window

43:22after an anticipated 2028 completion.

43:25Yet, look at the rate schedules in

43:27exhibit A. There is no escalation cap

43:30protecting the city for services

43:31rendered between 2027 and 2030. By

43:34locking the city into a 4-year

43:35operational duration without shielding

43:37the fixed fee against professional labor

43:39inflation tiers, you are welcoming

43:41future billing disputes.

43:43Third, exhibit A explicitly excludes

43:45environmental investigations and

43:46hazardous materials for remediation

43:48design. However, this committee just

43:50approved item 29E for the parking lot

43:52directly adjacent where engineering

43:55staff have formally documented a known

43:58perolthine

44:00and tricollethine toxic chemical plume

44:03in the immediate soil. If TDSI completes

44:06the 100% design by January without

44:08integrated environmental plume data,

44:10your upcoming quarter 2, 2027 bidding

44:13cycle will be completely corrupted the

44:14moment a general contractor digs into

44:16contaminated earth. I urge this

44:19committee to delay approval until this

44:20contract is legally bound to account for

44:22the documented toxic soil plume at the

44:24site. Thank you.

44:28>> Any further public comment online?

44:31Seeing none, we'll come back to the

44:32committee. What's your pleasure?

44:35Uh, Mr. Chairman, I um move to approve

44:39in an amount of $353,400.

44:44Second

44:45>> been moved by Councilman Wolf, second by

44:47Councilman Moody. Any further

44:48discussion?

44:49>> Just a couple clarifications.

44:50>> Councilman Moody.

44:51>> Yep. Thank you, Mr. President. Just a

44:53couple clarifications that again, the

44:55design that was approved by the voters.

44:58So, we honor voters first time. The

45:00voters again want a design, want John

45:03Spool. We're honoring the will of the

45:05people. Again, we're honoring what our

45:07constituents want. That's all it is.

45:09Just keep in mind money is earmarked by

45:11the six penny. Thank you,

45:14>> Councilman White.

45:16>> Thank you, Mr. Chair. Just as Mr. Uh uh

45:18Councilman Moody just pointed out if uh

45:21the previous caller had conducted a

45:23clinical audit of the project and uh all

45:26the discussions that led up to that,

45:29that person would have known that the uh

45:32voters previously approved on a six

45:34penny ballot measure to approve planning

45:37and design for the Johnson pool project.

45:40here in the uh cost that that caller

45:44alluded to on the uh previous design was

45:48funded by that six penny approved ballot

45:52measure, not this one. So, um that's all

45:56I have.

45:58>> Councilman Wolf, thank you, Mr.

46:00Chairman, through you. I mean, I agree

46:01with the comments from my uh colleagues.

46:04Um

46:05uh and um I think there's there's

46:09something that we always need to be

46:12mindful of when we're reviewing these

46:14professional contracts is that um we're

46:17hiring people who are are professionals

46:21who are highly skilled and uh it does a

46:25disservice to them and to the people who

46:28work so hard on this. uh uh our um uh

46:32esteemed purchasing manager and the city

46:35attorney and the director um they're

46:39they are bringing a a wealth of skills

46:43to this and we want contracts. I mean

46:46and we want them to be constructed in

46:48the way that uh director Sanchez and uh

46:52Mr. Barlort have have constructed this.

46:56We want that oversight from the

46:58professionals after the pools build and

47:01through the warranty period. So, um I I

47:05mean I think we owe uh our thanks for

47:10the professionalism and as Councilman

47:13Moody and Council White point out, the

47:15voters have been incredibly supportive

47:17of this and um and that uh says an awful

47:21lot about their trust in this process.

47:24So, thank you. Um, thank you to them and

47:27thank you, Miss Truan.

47:28>> Thank you. We can't wait for the ground

47:30baking and the ribbon cutting and and

47:32this will be really awesome for

47:34Southside Cheyenne.

47:37>> That all those in favor signify by

47:39saying I.

47:39>> I.

47:40>> I.

47:41>> Let's see. And that the vote is

47:42unanimous on this item. The

47:43recommendation of the finance committee

47:45will be to approve at the next meeting

47:47of the governing body.

47:49>> Seeing there is no further business in

47:50front of this committee, we are

47:52adjourned.

47:53>> Thank you, Mr. chairman.

47:54>> Thank you.