What: Minot International Airport projects, leases and bids.
Where it stands: agendas from 2026-08-17 to 2026-11-16 list GA access road work, the GA apron pavement bid, airfield ditch stabilization, a TSA lease extension, ground leases and the Southside airfield utilities award.
Next: the 2026-11-16 awards are pending grant funding; that meeting has not been held.
Details
Southside airfield utilities base bid $2,355,642.44 to Wagner Construction, Inc., with a Mead & Hunt proposal of $294,077 (2026-11-16 agenda).
Built from agendas only; the posted minutes and agenda packets were not read, so outcomes are not recorded.
Consent: final payments on the Perkett Ditch Improvements Phase 2 ($112,577.30) and for airport wildlife hazard and airfield ditch work; an airport ground lease and hangar agreement was pulled from the agenda; NDDOT Broadway ADA cost participation agreement.
Airport: lease extension with the Transportation Security Administration, an assignment of a hangar lease, and award of the General Aviation apron pavement maintenance bid to Strata Corporation.
Airport: ground leases with Pietsch Aircraft Restoration and Repair Inc. for Lot 5 and Lot 3, Block 1, and award of the Southside Airport airfield utilities base bid to Wagner Construction, Inc. ($2,355,642.44) pending grant funding, with a Mead & Hunt construction administration proposal ($294,077).