2026-10-12 - Clean Energy Advisory Committee

Summary

Based on auto-generated captions; names and details may be misheard.

Time on topic (from transcript timestamps; approximate, includes side talk):

Topic Minutes Share
Future City Fellowship Solar and Battery Storage Proposal 46 53%
FY26 Energy Usage Review 37 43%
Other business 4 4%
  • Monday, October 12, 2026, 1:00 p.m., Skyline Center, with remote participants.
  • Recording runs 1 hour 27 minutes with no gaps; adjourned at the end.
  • Roll call: Richard Smith (presiding), John Sullivan, Andrea Bennett, Valene Estes, Jess and DJ Klein.
  • The September minutes were approved without discussion.
  • No other votes were taken.

Future City Fellowship Solar and Battery Storage Proposal

0:51-47:13

  • David Ingram, the city's sustainability project manager, introduced the Campbell University Future City Fellowship pilot; the faculty adviser then introduced the student team.
  • Students proposed city-owned rooftop and parking-lot solar plus batteries at fire stations and police headquarters, in three phases (2027-2033, a short second phase, then 2037-2050), to reach 50% clean municipal energy by 2035.
  • Their model put municipal use at about 24 GWh a year now, roughly 50 GWh by 2050. Estimated cost was about $36 million in a static spreadsheet and about $86 million in a Monte Carlo model, driven largely by panel disposal and reinstallation; letting panels degrade to 50% instead of 70% cut the median to about $43 million.
  • They said 100% by 2050 would still need other long-term solutions, and that grants (estimated $600,000 to $14 million) are uncertain.
  • DJ Klein pressed on energy efficiency: the model assumed a straight-line doubling of demand with no efficiency gains. Ingram and Smith said efficiency is a top committee focus and works hand in hand with solar.
  • Suggested follow-up: quantify load shedding savings, and look at resale of retired panels. Members were surprised by the amount of parking-lot area and by the fire stations being grouped with police headquarters.
  • Andrea Bennett asked what surprised the students and about permitting time; the students said 1 to 3 years, likely within 2.

FY26 Energy Usage Review

47:16-1:24:18

  • Ingram reported a slight drop in FY26 electricity use, 22,775,000 kWh in FY25 to 21,543,711 kWh, helped by police headquarters ventilation work, LED replacements and consolidation into Skyline Center.
  • Members asked for a square-footage-normalized (energy intensity) comparison; Ingram will bring it to the next meeting. Discussion of adding submeters per floor at Skyline Center to separate tenant and city use, and a yearly Duke Energy rate review (new time-of-use rates saved money).
  • Fuel data covers 693 of roughly 750 vehicles and excludes the fire department (about 59,000 gallons and $153,000 in FY25). Standard sedans, many of them police Chargers, cost about 22 cents per mile versus about 7 cents for hybrid sedans; light-duty pickups about 21 cents versus about 8 cents for the hybrid Ford Maverick; the two Nissan Leafs used 94.2 kWh costing $91.
  • Members questioned whether police vehicle choices and take-home vehicles could change, noting the Chargers' fuel economy is far below rated. Ingram said he did not have that answer. Andrea Bennett asked for an overall ROI figure for shifting part of the fleet; Ingram will prepare one. He will present the data to asset and property management once fire department figures arrive.

Other business

0:00-0:51, 1:24:18-1:27:02

  • Attendance and minutes at the start (above).
  • Reminders about a nuclear science week banquet and events; a Drive Electric Wilmington event at Carolina Beach State Park the following Sunday (rained out the previous one).
  • The city's LEED for Cities final review was expected back by October 19.

Agenda

Campbell University Future City Fellowship presentation; FY26 total electricity and fuel usage data review; updates on Drive Electric event and LEED for Cities application.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:00I'm sorry. Say that again. Rich,

00:02>> do you have anyone on site with you or

00:04are we all remote today?

00:05>> It is just me here on site.

00:07>> Okay. Then we'll go through uh on Zoom

00:10and just do uh attendance for the

00:12committee members. Uh I'll start.

00:14Richard Smith present. Go around the

00:17room.

00:18>> John Sullivan present.

00:20>> Andrea Bennett present.

00:24>> Valene Estes present.

00:29Jess present.

00:33>> DJ Klein present.

00:36>> Right. I think that's everybody. So,

00:38first uh first issue item of business is

00:41um approval of September minutes. Is

00:43there any discussion around

00:47minutes? Not hearing any. September

00:49minutes are approved. And we'll move on

00:51to item number one. Um the uh future

00:55city fellowship presentation.

00:57But David, I don't know if you want to

00:58give a short introduction to that or if

01:00you just want to pass it off.

01:02>> I am going to give a a short

01:04introduction to to to an introduction

01:07and then we'll uh turn it over to the

01:09students. But yeah, just a little bit of

01:11background. Um back in uh like November

01:16of 2025,

01:18uh Dr. Fowler uh from Campbell

01:21University reached out to the to to me

01:24with the city of Wilmington uh to see if

01:27we would be interested in participating

01:30in their pilot program for the future

01:33cities team u which is a a group of

01:37students uh from the engineering

01:40department and perhaps other departments

01:42at at Campbell University. Um but yeah,

01:46with that I'll I'll pass it off to Dr.

01:49Fowler who was uh with the students

01:52there um at at the university to to give

01:57a little bit more in-depth background

01:58about the program and and the students

02:01involved. Off to you Dr. Fowler.

02:04>> Great. Thank you. Uh what you see in the

02:07students behind me is my senior design

02:09class. Uh they're watching this video as

02:12well. Uh the remaining students are

02:14seniors at Campbell who will be actually

02:17making the presentation. Ah we see

02:19David. Hi David.

02:22Uh I'll give just a brief summary on the

02:25program.

02:26The Discovery Future City Fellowship is

02:30a six-month multiddisciplinary

02:32project-based program that has students

02:35perform realworld problems

02:38solving and safety and s sustainability

02:42standards and career connected

02:45experiences. The students consult with a

02:48partner city.

02:50They tackle a challenge facing the city,

02:52search for improvement, and then design

02:55a sustainable solution through 10, 20,

02:58and 30-year phases.

03:02Discovery was launched uh launched the

03:05future city fellowship in n in 2025 to

03:08introduce undergraduate college students

03:11to engineering safety standards early in

03:14their academic journeys. Collaborating

03:16with the Underwriters Laboratory

03:18Research Institutes or ULRI,

03:22the fellowship integrates safety and

03:24sustainability

03:26standards, the resource reources from

03:31ULRI

03:32and experts in into every stage of the

03:35program. The fellows learn that

03:39standards are essential to pro uh tools

03:41for design, risk management, and

03:43protecting the public rather than just

03:45obligatory obligatory

03:48alliance. This year, the fellows were

03:51from Campbell University, George Mason

03:54University in Fairfax, Virginia, and the

03:56University of Colorado in Boulder. Each

03:59developed their own 30-year

04:01electrification plans for a specific

04:04problem facing each one of those

04:06particular cities. Campbell students

04:08worked with the city of Wilmington and

04:10Mr. David Ingram on a clean energy

04:12project. Mr. Ingram was a superlative

04:16partner helping the students understand

04:18Wilmington's particular constraints.

04:21Enough of me. I'm going to turn it over

04:23and let the students present their

04:25future city project.

04:31Can everyone hear me? Okay.

04:34Right. I'm going to go ahead and request

04:35to share my screen.

04:46And if someone would just confirm.

04:48>> I can see J.

04:52>> All right.

04:52>> We see it.

04:54>> All right. Thank you.

04:56We'll go ahead and get started this

04:57afternoon. First off, a special thank

05:00you to Mr. Ingram, as Dr. Fowler

05:02mentioned, being a great partner and

05:04client throughout this entire process,

05:06but also the Clean Energy Advisory

05:08Committee for taking some time out of

05:10this meeting and allowing us to do our

05:11presentation. We hope that something of

05:14value will come from this meeting and

05:16that something in the future may be

05:19implemented. But we are the Campbell

05:21Future City team. My name is Jay

05:23Mitchell. I'm joined here by my

05:24colleagues Matthew Rogers, Rachel

05:26Stokes, Julian Malm, and of course our

05:29adviser Dr. Kim Fowler, our colleague

05:32Omar Rios could not attend today,

05:34unfortunately.

05:36Just to give you sort of a brief

05:37overview of what we'd like to cover

05:39today. We're going to start off with

05:40some of the key problems that we found

05:42early on facing the city of Wilmington

05:44relating to energy goals and then we're

05:47going to move into the research we did

05:48throughout the project and eventually

05:50into our model and our proposed

05:52solution. Without further ado, let's get

05:54started.

05:57We wanted to start off with some

05:59background information about our client.

06:01We've been working with the city of

06:02Wilmington, North Carolina. And it is

06:05located in the southeastern part of the

06:06state. It's a coastal city. And being a

06:09coastal city, there's challenges related

06:12to energy production, but also some

06:14unique opportunities as we'll discuss

06:15later in the presentation.

06:18We included one key statistic and that

06:20is that Wilmington is one of the top 10

06:22fastest growing metros in the entire

06:25country. And while that's an an exciting

06:27statistic, there are a lot of challenges

06:29that are associated with that. We've

06:32been working with David Ingram. He's the

06:34city's sustainability project manager

06:36and we've met with him throughout the

06:38summer and throughout both semesters in

06:40the spring and fall and he's given us

06:42valuable information and feedback.

06:45We also included two main energy goals

06:47that the city of Wilmington is working

06:49towards and they're both related to

06:51municipal operations. Their 2035 goal

06:54was to have 50% clean energy for

06:56municipal operations and 100% clean

06:59energy for municipal operations by 2050.

07:04Early on in the research process for

07:06this project and also our discussions

07:09with Mr. Ingram, we noted some key

07:11problems that the city of Wilmington was

07:13facing relating to their energy goals.

07:17One of the first issues was increased

07:19energy demand over the next 30 years.

07:22This could be true for the entire nation

07:25and especially the southeastern US and

07:27the state of North Carolina. When

07:29looking at North Carolina, this

07:31increased energy demand is due to new

07:34data centers, new manufacturing

07:35facilities. In the case of Wilmington,

07:38this growth is mainly due to population

07:40growth and this is where we focus in our

07:42model as will be discussed later.

07:45With this increased energy demand,

07:47there's rising energy cost overall for

07:50the regional grid. And in response to

07:52this increased demand and also rising

07:55cost, Duke Energy has delayed a number

07:57of clean renewable projects such as wind

08:00energy and they're resorting to new

08:02natural gas plants over the next two

08:04decades.

08:06This leads to the issue of Wilmington

08:08cannot rely on the regional grid with

08:11Duke Energy to meet its renewable energy

08:13goals.

08:16And this ties into our main focus for

08:18our project. The regional grid is moving

08:21backwards, but we see a solution where

08:23Wilmington can still move forwards by

08:25taking its energy goals into its own

08:27hands.

08:29We imagine Wilmington generating its own

08:32clean energy by installing solar panels

08:35on city-owned buildings and city-owned

08:36parking lots. We also noted some key

08:39other goals that we wanted the city of

08:41Wilmington to work towards.

08:43We wanted to use solar to meet the 2035

08:46goal of 50% clean energy for municipal

08:48operations and work towards the 2050

08:51goal of 100% clean energy for municipal

08:53operations. We also wanted to focus on

08:56battery storage for critical facilities

08:58for hurricane and weather resilience and

09:00also load shaving. And we're basing our

09:03model and our focus on the assumption

09:05that 40% of Wilmington's power is

09:08already covered by sustainable energy

09:10being nuclear energy.

09:15One of the earliest forms of research

09:16that we did was looking at where

09:18Wilmington's energy production was

09:20already coming from and what energy

09:23production methods were being used.

09:25There's no large-scale local generation

09:27in the city of Wilmington. They're

09:29completely reliant on the Duke Energy

09:31Grid and nearby Duke Energy owns a

09:35natural gas plant and also a nuclear

09:37plant. I mentioned that 40% figure of

09:40nuclear production. That was an

09:42assumption used from the EPA, the

09:45Environmental Protection Agency. They

09:47have a power profile tool. And you can

09:50look at a regional or statewide level.

09:52And for North Carolina, and the region

09:53that Wilmington was in, nearly 40% of

09:57the energy composition came from nuclear

09:59power. There is some small-cale solar

10:02used for municipal operations, and this

10:04is where we target our increase. I'm now

10:06going to hand this off to my colleague

10:08Rachel who's going to go over some of

10:10the key research that we done throughout

10:11the project.

10:22There we go. Everyone hear me?

10:27>> Good.

10:29All righty. So, we're going to go into

10:32our estimates for the municipal

10:34consumption. What we found was that we

10:37need to first take a look at the amount

10:40of energy that municipal operations was

10:43consuming each year. As of 2025, we

10:45found that estimate to be about 24 gatt

10:47hours a year. However, as J mentioned,

10:51Wilmington is one of the top 10 fastest

10:54growing metros. So, that means with the

10:55population growth, so is the municipal

10:58operations. And that's going to create a

11:00bigger pole on the grid. So based on

11:03that, we estimated that the annual

11:05demand for municipal operations is going

11:07to reach approximately 50 gawatt hours

11:09by the year 2050.

11:12And these operations are mainly

11:14consisting of the city-owned buildings,

11:16could be the fleet vehicles, and then

11:18street lights and traffic signals, just

11:20to name a few of these sources.

11:23From there, we looked into where solar

11:26panels could realistically be installed.

11:29We took a look at all of Wilmington's

11:32major municipal properties and that

11:34represented well over 800,000 square

11:36feet of building area. However, after

11:40looking at the unusable roof space due

11:43to HVAC, roof access, shading, and

11:46several other factors, we determined

11:48that there is about 533,000

11:52square ft of roof area that is suitable

11:54for solar installations.

11:56This gives Wilmington a significant

11:58amount of pre-owned

12:01city space that they can use in order to

12:04install these solar panels without

12:05having to look into buying more land.

12:08From there, we moved on to considering

12:09the environmental and structural

12:11factors. Since the city is located on

12:13the coast and does get hit by

12:15hurricanes,

12:17flooding was a very big concern. So,

12:20taking a look at the buildings, we found

12:21that only four of the 30 municipal

12:22buildings were located within FEMA

12:25designated flood zones. And those

12:26buildings as a result will require

12:28additional permitting and elevated

12:30electrical equipment in order to

12:33mitigate the risks of being in that

12:34flood zone. Meanwhile, all the other

12:37buildings were well suited for rooftop

12:39solar installations. After that, we took

12:41a look at the age of each building and

12:44found that only three of them were

12:45constructed before the year 2000. These

12:47older buildings are going to require

12:50more structural assessments. So when we

12:52start installation before that begins or

12:54when the city would

12:56start it as per recommendation,

12:59they will have to focus the structural

13:02assessments on those three buildings

13:03before starting.

13:07After identifying where we can recommend

13:09that solar panels be installed, we

13:11compared three commercially available

13:13options that we thought were best suited

13:15for Wilmington's coastal environment,

13:17namely the Qatron, Jenko Solar, and the

13:20RECC Alpha Pure. Rather than focusing on

13:24efficiency alone, we looked at several

13:26criteria including the dimensions of

13:28these solar panels, the wind load rating

13:31due to hurricanes, manufacturing

13:33location, cost, warranty, the lifespan,

13:36and available recycling programs to try

13:39and keep everything number one within

13:41the US, but also number two affordable

13:43and able to withstand the environment.

13:47Due to the hurricanes, as mentioned

13:50before, one of our highest priorities

13:52was that wind load rating and

13:54maintaining its structural integrity

13:56while handling those loads.

13:59Uh we also looked for the appropriate

14:01safety and environmental testing

14:03requirements for said wind resistance,

14:06long uh term outdoor exposure, and then

14:08also salt mist corrosion since you do

14:10have to worry about that with the ocean

14:12being right there. Outside of that, we

14:15also considered how these panels would

14:19be disposed of at the end of their

14:20lifespan. We wanted to be able to

14:22recommend a manufacturer with the

14:24established recycling program that would

14:26help Wilmington recover some valuable

14:28materials from the solar panels,

14:31simplify their disposal, and also reduce

14:34the number of retired panels sent to

14:35landfills at the end of the day.

14:38After comparing all three of the

14:39options, we found that the Qron uh was

14:41the best fit based on all the criterion

14:44that were looked at. It's manufactured

14:46in Georgia, so it supports domestic

14:49manufacturing. It's also super local,

14:51but it in addition to that, it meets the

14:53wind load requirements for coastal

14:55installations and provides the long-term

14:58reliability that we were looking for. It

15:00is also backed by a established QC cells

15:04recycling program as well. And together,

15:06these advantages make the QTron the best

15:09choice for Wilmington in the long term.

15:13Moving on,

15:15moving on from there, we took a look at

15:17the batteries and we were researching

15:19different kinds of batteries. What we

15:21determined was we wanted to target a

15:23lithium ion phosphate battery due to

15:26them being the most reliable and having

15:28one of the highest cycle lives out of

15:30the different kinds of batteries. What

15:32we found looking at different criterion

15:34such as being able to withstand the

15:36coastal environment, the wind as

15:38mentioned before, and numerous other

15:40factors was that the Tesla branded solar

15:43batteries best fit our need. And so what

15:47we found is that the Tesla Power Wall 3

15:49would act as our smaller size battery.

15:52It has a total capacity of roughly 13

15:551.5 kilwatt hours and the units are

15:57stackable, which is super nice. Average

15:59installation cost is about 14.5 thousand

16:02and these would go on all 10 of the

16:03power stations and the police

16:05headquarters. Meanwhile, the Tesla Mega

16:07Pack is its older sibling that's a lot

16:09bigger with a total capacity of 3.9

16:12megatt hours and it is unfortunately not

16:15stackable. The average installation cost

16:18for these is 1.8 million. So, these

16:20would probably be used sparingly and

16:22would be used on the operations

16:24buildings that are on the same campus as

16:25the fire stations and headquarters

16:27previously mentioned.

16:30Looking further into that, we originally

16:33did our modeling based on a full 12-hour

16:38emergency backup, but we found that that

16:39would require over 200 power walls for

16:41certain buildings. So, we adjusted our

16:43model and focused on the load shaving

16:47setup instead. The main difference

16:48between these two setups is that the

16:50emergency backup batteries would be

16:52completely isolated from the grid and

16:54would have no interaction. These would

16:56just kick in when power would go out

16:58versus the load shaving setup which

16:59would be grid interactive. They would be

17:01tied into the Duke energy grid and they

17:04would oscillate between 100% and a

17:06specified lower limit that the energy

17:09stored within that battery cannot drop

17:11under. And that lower limit would act as

17:13reserves for should power go out, those

17:16can kick in temporarily and provide

17:19power until the generators on a lot of

17:21the emergency buildings can kick in. So,

17:24it just simply bridges that gap.

17:27Um, outside of that,

17:30we went further into giving you a

17:34breakdown with the fire stations and

17:36then the HQs and roughly how many power

17:39walls that would require for our load

17:41shaving setup. And with that, we're

17:42going to hand it off to Matt.

17:47>> Thank you, Rachel. Uh, is my mic

17:49working?

17:51Are we good?

17:53Okay. Yeah,

17:54>> cool. Uh, sorry about that. We'd like to

17:58go through the installation plan that we

18:00came up with for the city of Wilmington.

18:02We split it into three phases. Phase one

18:05runs from 2027 to 2033. And during this

18:08time, we suggest that Wilmington focuses

18:10on permitting, structural assessments,

18:12and obtaining city approval for the

18:14installation of these panels. This also

18:16includes the Duke Energy interconnection

18:17to the grid. During this time, we

18:20suggest that panels are installed on 15

18:22total buildings. That includes all of

18:24the fire stations, the police

18:25headquarters, and the city's operations

18:27campus. These are also all the buildings

18:29that we have the load shaving batteries

18:31on, as mentioned previously. Phase two

18:34is a much shorter phase that focuses on

18:36structural assessments for buildings

18:38built before the year 2000, if they

18:40weren't completed in phase one already.

18:42During this time, the primary objective

18:44is to meet the 2035 clean energy goal of

18:4750% clean energy for all municipal

18:49operations. We suggest that panels be

18:52installed on eight different buildings

18:53during this phase, those being the parks

18:55and recreations buildings and the

18:56remaining public works facilities. The

18:59last phase runs from 2037 to 2050. We

19:03want to maintain the 50% clean energy

19:05goal that we hit in the previous phase

19:07and we suggest that panels be installed

19:10on the remaining municipal buildings,

19:12those including the parking lots and the

19:14convention center. The majority of the

19:16capacity for this project would be

19:18installed during phase 3, but it's still

19:20not enough for Wilmington to meet its

19:232050 target for 100% clean energy. So,

19:26future research for different long-term

19:29energy solutions will have to be done

19:30during this phase.

19:33This is a graph that we made from the

19:36results of our model. This compares the

19:40linearized municipal usage, which is an

19:42estimate guessing how much energy that

19:44Wilmington is going to be producing each

19:46year. Uh to how much we actually

19:48generated, this is a combined number

19:50between our solar panels and the nuclear

19:53energy. There is no fossil fuels

19:55included in this amount generated line.

19:58The orange line is the 50% mark. As you

20:01can see, the gray and orange lines

20:02intersect right at the year 2035. So

20:05that is us meeting the target and then

20:07the line remains above it for the

20:10remainder of the project duration.

20:16We'd like to briefly mention our model

20:18that we used to come up with these

20:20numbers. We used a Monte Carlo setup

20:22which runs hundreds of thousands of

20:24simulations at a time and it uses

20:27randomized inputs. Those being things

20:30like the

20:32amount generated per square foot, the

20:34inflation rate, and a bunch of other

20:37randomized factors to come up with

20:40differing scenarios. This new model that

20:43we come up with or came up with accounts

20:45for a lot of risks that our older models

20:47miss. This includes natural disasters,

20:50the reinstallation costs, disposal cost,

20:53and battery costs, varying inflation

20:55rates, and individual building

20:57footprints.

20:59The total project cost from our old

21:01models was significantly

21:03lower than what we came up with for our

21:06new model and that is primarily due to

21:09the addition of disposal and

21:11reinstallation costs. We still have no

21:13way to account for grants but Jillian

21:15will talk about that later.

21:17These are the results from our model.

21:20The Excel model, which is just a flat

21:23static model, came up with a price point

21:26of about $36 million. Our Monte Carlo

21:29model came up with a price tag of $86

21:31million with a standard deviation of

21:34about $17 million in either direction.

21:36Uh it's important to note that this

21:38figure was calculated with the disposal

21:41point for our solar panels occurring at

21:4470% of their initial production value.

21:47The disposal cost can be reduced

21:50drastically if the solar panels are

21:52allowed to stay online longer before

21:55they are replaced.

22:04>> Um,

22:09um, so one way that solar can be more

22:11accessible for Wilmington is through

22:14things like grants and incentives. So,

22:16Wilmington partners with Souls Smart,

22:18which can help streamline things like

22:20permitting, zoning, and inspections, and

22:23can even reduce some of the costs um

22:26associated with installing solar. There

22:29are also several state and federal grant

22:31opportunities, which could become

22:33available in future. However, funding

22:36for those programs can change over time.

22:39So grants should be viewed as an

22:42additional funding opportunity rather

22:44than something the city can rely on

22:46every year.

22:48Another important part of this plan is

22:50really making sure that the community

22:52and other stakeholders are involved.

22:54Wington has a clean energy advising

22:56committee, you guys, um and they meet

23:00monthly to discuss clean energy goals.

23:03The county also conducted a survey in

23:05July of 2020 to really understand what

23:08residents wanted in terms of energy

23:11development. The results showed that 83%

23:14of respondents were strongly concerned

23:17about the local impacts of climate

23:19change with 55% ranking solar as the

23:24best option for meeting the area's

23:26energy goals. This really shows that

23:28there is already community interest in

23:30expanding solar.

23:33So, we've identified multiple UL

23:35standards that have become really

23:37important to our research. Some of which

23:40include PV hazard control, energy

23:42storage system safety, and PV module

23:45safety testing.

23:48Our UL proposal really focuses on

23:51creating a new certification

23:53specifically for solar panels used in

23:56coastal environments. Right now there

23:58are different standards from

23:59organizations like UL, IEC and ASM. Our

24:04proposal would combine these existing

24:06standards into one certification for

24:08coastal solar panels. The certification

24:11would focus on three main areas.

24:13Construction requirements, safety and

24:16electrical testing, and environmental

24:17durability. This would help make sure

24:19that solar panels being installed in

24:22coastal areas are designed to handle

24:24specific environmental conditions that

24:26they will face.

24:27That concludes our presentation. Thank

24:29you so much for listening and if there

24:30are any questions, we'll take those now.

24:39>> Okay.

24:47>> Yeah,

24:48>> we can't hear you. We can't hear you.

24:51>> Can you hear me now?

24:52>> Yeah, that's better.

24:54>> Okay. Yeah, I'll I'll jump in real quick

24:56just to say thanks again to Dr. Fowler

24:59and um all of the future city uh team.

25:03Y'all were amazing to work with as as

25:06well. Um thoroughly enjoyed it from my

25:09perspective and

25:12it's a pleasure to see uh such detailed

25:15and diligent research and into the

25:18project that you all had on hand.

25:21I did have a question um just in regard

25:24to

25:25uh the the one graph that you had the

25:27linear graph um I believe you explained

25:31it to me before but just for the group's

25:33benefit what uh the dip at the end of

25:36that

25:38uh of your of your gray line what was

25:40what was the um what was that that dip

25:45from if if you can see that

25:51Um, yeah, I can explain that. Sorry, we

25:53have a bunch of laptops in here, so it's

25:55we're trying to make sure that we don't

25:56have overlapping audio. Uh, but the dip

25:59in the graph, uh, that comes from a I

26:02guess a a gap in this particular

26:05iteration of the model where there was

26:07some solar panels that were ready to be

26:10reinstalled but weren't quite

26:11reinstalled yet. Um, so there's like a

26:14dip in performance because the solar

26:15panels installed were producing less and

26:18then whenever they were removed and then

26:20reinstalled, that's where you see the uh

26:23jump in performance come back.

26:27>> Got it. Thanks.

26:28>> Looks like uh

26:30Andrea has a question.

26:33>> I do. Um, first, thank you for the

26:35presentation. Um, I really enjoyed it.

26:37Uh, I was wondering if there was

26:39anything in particular that was that was

26:42um surprising to you all as you were

26:44going through and um looking at all of

26:47the specific

26:49uh you know traits for Wilmington, North

26:51Carolina.

26:54>> I can answer a little bit on this and

26:57Rachel may have something because I'm

26:58going to answer in related to the energy

27:00production methods that we were looking

27:03towards. We eventually settled on solar.

27:06Um, but early on in the process, we did

27:08a lot of research, Rachel and Matthew,

27:10especially in, you know, what types of

27:13energy can be used um for the city of

27:16Wilmington. I mentioned earlier in the

27:18presentation that being a coastal city

27:20has some unique opportunities. Uh, and

27:24we looked at that in terms of energy

27:26production. Could we do something

27:28offshore wind? Could we do tidal energy?

27:31you know, are there any other options

27:32that we have? And I would I can pass

27:35this off to Rachel to do a little bit

27:37more in-depth explanation of of some of

27:39the research we did with that.

27:44>> Yeah. So, one of the very surprising

27:46things is as Jay mentioned is that

27:48despite being located so close to the

27:51ocean and everything, unfortunately

27:55that offshore wind, that tidal, even uh

27:58looking at the river and using the Cape

28:00Fear to generate power was not an option

28:03partially due to regulations where the

28:07city doesn't have jurisdiction over the

28:10water. I forget how far out that is, but

28:13they don't have jurisdiction uh over the

28:15water off the coast. And then several

28:18other factors, but also it was really

28:21interesting. Well, I was the one looking

28:23specifically at solar batteries to see,

28:27hey, which ones are best suited to

28:30handle the coastal environment because

28:32you do have that salt corrosion just due

28:34to it being in the air. And that was a

28:36very big factor. and to see how far like

28:39that just simply weeded out so many of

28:42the options.

28:49Um I have two questions that might be

28:53out of kind of the scope of your

28:54project, but um the first one was just

28:57um you know your your Monte Caro model

29:01showed like $61 million worth of the

29:04cost is in the environmental dispo in

29:07the disposal of the um panels. you know,

29:10when these things drop to, for your

29:13instance, a 70% threshold, is there

29:15could that that cost be um

29:19displaced by reselling the panels um to

29:24someone that could use a lower capacity

29:26panel or say donating them or something

29:28like that to where you're kind of

29:30avoiding that actual disposal fee. Um,

29:33and then my other question was just um I

29:36I think this is probably outside of the

29:38scope of your project, but maybe just if

29:40you have any kind of your own thoughts

29:42on it. Um, just any thoughts that you

29:46might have on how the city might go

29:48about like what best approach the city

29:50might take towards funding providing

29:52funding for these projects so that it's

29:54something that um, you know, you can

29:57make you can make sellable to the bean

29:59counters, right? like there's a 30

30:01somewhere between 36 and $86 million

30:04total cost to this. Um, you know, what

30:06is besides the obvious environmental

30:09advantages, you know, is there a

30:11financial argument that can be made to

30:13support it as well? And again, thank you

30:15guys so much for your presentation.

30:16Really, really excellent and enjoyed

30:18seeing it. Thank you.

30:23>> Yeah. So, uh, I did most of the work on

30:25the the modeling so I can speak on that.

30:28Um the disposal cost uh I should also be

30:32uh lumped in with the reinstallation. So

30:35um the assumption that the disposal cost

30:39category makes is that not only are you

30:42like you have to pay to recycle solar

30:44panels from what we understand and you

30:48also have to then pay to reinstall the

30:50panels that you just got rid of. So,

30:52this is making the assumption that

30:54you're removing the solar panels,

30:56sending them back to be recycled, and

30:57then reinstalling panels in that same

30:59year. Um, this cost, like I said, can be

31:02cut down on if you were to say let the

31:05panels degrade to 50% of their initial

31:07value instead of 70%. Uh, that removes

31:11almost all of the disposal costs and

31:13then brings the project cost in line to

31:16about $40 million. I think we actually

31:18have an additional slide on this that

31:20Jay is working on pulling up right now.

31:23Maybe there it is. Okay, it just took a

31:25second. So, this is a just an example

31:27that we had ready uh if you disposed

31:30with 50% instead of uh 70. So, you still

31:34meet your clean energy target um with a

31:38median price of about $43 million

31:40instead of 80. Um, but the production

31:44figure that you get is significantly

31:47lowered. Um, in terms of selling them

31:51off to people that could use a lower

31:52capacity panel, I think that's a

31:54completely valid option. Uh, we didn't

31:56do any research into that, but I think

31:58that that could also help with your

32:01second question of making that u I guess

32:04more digestible to your constituents.

32:07Um, which is just saying that part of

32:09this cost will be reimbursed whenever we

32:11sell the panels when we're done with

32:13them.

32:16Okay.

32:19>> Okay. Can you hear Julian talking?

32:29>> Um, yeah. So when talking about the

32:34financial aspect from grants and um like

32:37federal and state grants, I did look

32:40into possible numbers and we found that

32:43it was about 600,000

32:47to 14 million and I know that's very

32:50wide range but it's based on previous

32:53years and unfortunately with the

32:58the way that federal money seems to

33:01trickle down. It does go back and forth

33:03about every 4 to 8 years, which is

33:05unfortunate, but I would recommend to

33:08really snatch up those opportunities as

33:09they come and as they are re-released.

33:12Um, the good thing is that Wilmington is

33:14in a really good position to apply for

33:16those um grants and I don't see

33:20Wilmington having trouble getting that

33:22money. It's just when that money becomes

33:24available. Um we don't know exactly when

33:27that'll become available, but when it

33:29does, cuz it will within the next

33:30hopefully 30 years, um that they really

33:33snatch that opportunity up.

33:41>> Go ahead, DJ.

33:45>> Yeah, great great presentation. Um a lot

33:48of great work went into this. as it

33:50relates to the model, how did you how

33:53was energy efficiency captured in here

33:57um and the the role it plays in reducing

34:00usage rather than just displacing energy

34:03usage with clean energy technology?

34:08>> Uh so let me I guess ask your repeat

34:13your question back to you just to make

34:14sure that I'm getting it right. uh you

34:15want me to explain um how we came up

34:18with the I guess energy efficiency and

34:20how we determined the um I guess the

34:23degradation of the solar panels and how

34:25that factored into our model is that

34:28>> no not not specific not specifically. So

34:30you have x number of kilowatt hours that

34:34are utilized by the city on an annual

34:36basis. Um instead of completely

34:39displacing x number with with some clean

34:42energy technology say 50% of x to give

34:46you to hit your criteria how much of how

34:50much of that dis how much of that energy

34:52reduction was considered in the model.

34:55So if you used 100 million uh kilowatt

34:58hours in a year, did you assume a 5% or

35:0210% energy efficiency improvement over

35:04time? And one of the case points there

35:07is if you look back when the baseline

35:08was set for the city, I believe most of

35:11the lighting within the city was was uh

35:13metal hali lamps and they've all been

35:15replaced with LEDs. So still using

35:18energy but using a significant amount

35:20less than the original baseline. How did

35:23you account for energy efficiency

35:25implementation?

35:27>> Okay, I I think I understand better. So,

35:29the real answer for this is that we made

35:33our energy assumption targets. Uh the

35:35initial energy assumption was based off

35:37of a 2024 study that uh we found online

35:41that just I don't remember the exact

35:44linker location but we found that figure

35:47uh from there and then we just made a a

35:50really rough assumption that it would uh

35:53double between the years 2025 and 2050.

35:57um there wasn't much consideration for

35:59um uh energy improvement efficiency in

36:03terms of how much you guys are consuming

36:05because that is a a good point that

36:06things like traffic lights and other

36:08electrical systems get more efficient as

36:11uh we make improvements to them. Uh but

36:13we just decided because it's pretty

36:17unpredictable uh at what rate those

36:20things will change or improve that we

36:21just made a

36:23static line and then ran everything in

36:27comparison to that line.

36:30>> So there was no displacement for energy

36:32efficiencies or no accounted for you.

36:35You just assumed there was some you

36:36assumed there was some you assumed there

36:38was some rate of increase

36:40>> but you there was no that increase was

36:43was completely linear.

36:46>> That is correct. That is correct.

36:56>> Yeah. One of the things that this

36:58committee is uh very focused on uh just

37:03addressing this to the future cities

37:05team um one of the things that we're

37:08very much focused on is what can we do

37:11to to drive down the amount of energy we

37:13are we're currently using in the city.

37:15So so that the amount of clean energy

37:18that we have to acquire or purchase or

37:21find grants for is is less. So the the

37:25more things that we can do to kind of

37:26lower that uh baseline uh you know the

37:30more economical

37:32it's going to be for us to achieve those

37:33clean energy goals. So I should have

37:36warned y'all beforehand that I'm sure

37:39that question was going to come from

37:41someone in the committee because uh we

37:44have a very strong focus on on that

37:46effort as well.

37:49just uh I mean just to follow up on that

37:51David I think you know for for

37:54clarification purposes for the students

37:56is that um you know in your research you

37:59found that the city is limited in what

38:01it can do from a generational capacity

38:03right like we we're not a regulated

38:05utility so we're kind of limited in what

38:07we can install what we can produce so

38:10then we're you know kind of to your

38:12point we're forced to look at what we

38:14can control and so obviously

38:17installation on our property is

38:18certainly one one consideration. The

38:21other consideration is how much energy

38:22that we're consuming is something that

38:24we can we can directly affect. Um so

38:27energy efficiency becomes a big focus

38:30for us. A because it's something that we

38:31can control. Uh and b because it's

38:34typically when you're looking at energy

38:36efficiency measures or or bang for your

38:38buck, you see that energy efficiency

38:40usually the amount of dollars you're

38:41putting into it versus the amount of

38:43dollars that you're saving is one of the

38:45best return on investments you can get.

38:47So just from a just from just to kind of

38:49follow up on what David said, that's

38:51kind of one of the some of the reasons

38:52that it's such a focus for us.

38:56>> Yeah. And and it's going to have a it's

38:58going to have a payback with no

39:00additional cost. If you if you look at a

39:02solar panel, right, you have that

39:04replace rate over a period of time. Um,

39:07and the sun's not always shining and,

39:10uh, it's turns out it's not sunny at

39:12night, especially in Wilmington,

39:14compared to maybe Alaska, which, you

39:15know, they have almost 24 hours during

39:18summer days, but, uh, that energy

39:20efficiency is always working for you.

39:27>> Yeah. And so that was one thing that we,

39:30like I said, just or like the team said,

39:32just did not like factor into the uh,

39:36model. We assumed like, hey, assuming

39:38everything stays flat since it is super

39:39hard to account for that. But there was

39:41one option that came up during the

39:42research

39:44that was super interesting. And this

39:46might be something that y'all might want

39:48to look into. It is uh GEBS, grid

39:51interactive uh buildings. And pretty

39:55much what that does is it's just like

39:56updating all the systems. So the

39:58lightings, the HVAC systems, like

40:01everything to be more efficient and go

40:04from there. that might be able to give

40:05you a little more of that bang for your

40:06buck like y'all were talking about just

40:08a second ago. Ultimately, we didn't go

40:11with it due to how much it would cost to

40:13outfit all the buildings, but it does

40:16serve as another option.

40:19>> Yeah. No, no worries. And I don't, you

40:20know, I certainly don't want to give the

40:22impression or at least I I won't speak

40:24for PJ, but at least for myself, that um

40:27we're I don't think that energy

40:29efficiency is a alternative to the solar

40:33generation. I think it's something that

40:34goes hand in hand. Um, and it's just

40:38something that

40:40kind of need an all the above approach

40:42to this, right? Um, and so it's just

40:44something that works with the the more

40:46energy we can re the more we can reduce

40:48our energy usage, the more impact that

40:50the the solar installations will have.

40:54>> Yeah. And I agree with Rich, not not

40:56taking anything away from the hard work

40:57you all did. Um, but the way that I've

41:00viewed this over my career is that uh

41:03energy efficiency is that first lever

41:05you pull and you can only get down to a

41:08certain number. There's only so much so

41:11far you can go down. You're still using

41:13energy. Now, now how do you displace

41:15that remainder uh with a clean energy

41:18technology? So, no, great work. I just,

41:21you know, I didn't see anything. Maybe

41:23there was some assumption that was made

41:25and that's but it looks like it you guys

41:28did it a different way which is fine.

41:31The cat could be skinned many different

41:32ways.

41:34>> The other thing I wanted to mention is I

41:36think uh a great follow-up project for

41:38this would be to calculate the impact of

41:40the load shedding. Um you guys did a lot

41:43of you know you factored in the battery

41:45storage and you kind of highlighted that

41:47the load shedding is a advantage of

41:49utilizing that. I think a nice follow-up

41:51project would be to try and quantify,

41:54you know, based on energy, current

41:56energy costs and projected energy costs,

41:59what the demand shedding, like what

42:01percentage of the demand could actually

42:02be shed and then following that up with

42:04how much money um you'd be saving from

42:06it. because I think that really that's

42:08kind of a huge lever that would change

42:11the financial metrics of it pretty

42:12substantially as far as if you're

42:14presenting this to city council and you

42:16say hey you need to make a 30 to $80

42:18million investment versus you know hey

42:21but on an annual basis we can expect to

42:23shave this much amount of load and get x

42:25y and z dollars back on a recurring

42:27annual basis I think makes it a strong

42:30selling point to the to the city council

42:35but great presentation guys really

42:36appreciate it. Um, David, I don't know

42:38if that you have any other final

42:40thoughts, follow-up questions, anything

42:42like that.

42:44I

42:44>> I have a question for you all. Uh, were

42:46were there any surprises here for the

42:48committee?

42:57>> Um,

42:58I'm surprised that we have as much um

43:01parking lot space. I think it showed

43:03something like 500,000 square feet uh

43:06yeah 400,000 square feet of parking and

43:09large assets. Um so that was that's

43:12interesting to me. I know the economics

43:15of um so like parking solar um

43:19installations gets a little bit

43:21different because there's the framing um

43:23and the infrastructure can get pretty

43:25steep. Uh, but it's that that's a little

43:28bit eye openening to me because I know

43:29up to this point we've kind of been

43:31considering it just for for rooftop

43:33sites. So, that was definitely something

43:35that stuck out to me.

43:37>> The one little surprising thing to me

43:39was that the uh the fire stations were

43:42bundled in uh police and and uh the

43:46public safety there. You see those two

43:48buildings and uh what we've been looking

43:51at over the course of the last few years

43:53is that we were prioritizing the the

43:56police station uh and and downtown

43:58building just because of the sheer

44:02kilowatt hours being used. Um we didn't

44:05really look at it I mean we our standard

44:07is to use it square footage is as to get

44:10our energy intensity but didn't really

44:12look at fire stations bundled uh as a

44:15entity. So, our prioritization was a

44:18little bit different, but overall, you

44:20know, you getting to the same point.

44:32Anything else from committee members?

44:38Uh the only other thing I think you had

44:40a slide about a phased approach a phase

44:42one two and three that stretch out over

44:47yes 27 to 2050 and I was

44:52curious about phase 1 was the 27 to 2033

44:58um

44:59is there like an average or something

45:01around the amount of time that

45:04permitting you're anticipating that

45:06amount of time usually takes or like

45:08that city approval normally takes or

45:10something along those lines. Um, I liked

45:12how it was chunked out, but I was just

45:13curious if there was any particular way

45:15that you sliced up the different phases.

45:19>> Yeah, I'll pass that off to Jillian. She

45:21has an question.

45:24>> Hi again. So, the permitting actually

45:28isn't as strenuous as you might think.

45:30It's obviously a range normally from 1

45:33to 3 years. So it's not like a 10year or

45:37ridiculous amount of time. Most places

45:39do see the permitting and everything

45:42being done within two years. So I expect

45:45Wilmington is on top of their business.

45:47So I think that it would be done within

45:48two years.

45:55>> Thank you.

46:03Well, if that's everything from the

46:05committee, um, once again, uh, Dr.

46:08Fowler and the entire team

46:12certainly do appreciate this project. It

46:14was again, uh, a lot of fun to work on.

46:18Y'all are certainly uh, welcome to to

46:22stay on for the the rest of our our

46:25meeting. It's a, you know, public

46:26meeting. Um, but yeah, we do have a a

46:29few other things on the agenda uh for

46:31today as well. So, um

46:35yeah, just wanted to say a final thanks

46:37to everyone.

46:38>> Yeah, thank you. It's been a really good

46:41project. I'm just going to ask if there

46:42are any burning questions.

46:46>> Hey, hold your piece. Good. Yeah, thank

46:49you for the opportunity.

46:52>> Thank you very much, guys. I appreciate

46:54the work. um very promising stuff and um

46:58encourage you all to continue on with

47:00your focus. It's definitely something

47:01that's needed right now. Um and every

47:04every little bit helps. So any

47:06contribute any contributions that you

47:08make in the future will have big

47:10impacts. So keep up the good work. Thank

47:12you.

47:13>> Great. Thank you.

47:16>> All right. So with that, uh, David, I

47:18think we'll move on to item number two,

47:21FY26 total electricity and fuel usage

47:24data review.

47:26>> Yeah. Let me see if I can share my

47:29screen now.

47:51Yeah, I'll see that. Okay.

47:56>> Yep.

48:03>> Great screen.

48:10Uh yeah, just wanted to go over how much

48:16electricity and fuel was used in in

48:18FY26.

48:20Um just to keep you all appraised of

48:26where those where those numbers are are

48:28sitting and

48:32on to the first slide here. So,

48:35so this slide has uh total energy and

48:40MN BTUs. Uh but as you can see in in

48:442026 that is fiscal year uh we we did

48:48have a a slight decrease in in overall

48:51energy use. Um you know there were a few

48:56energy efficiency projects that um were

49:00within this period of time particularly

49:02over at the police headquarters um which

49:07you know again we targeting our our

49:09highest energy using facilities. So

49:11there was some ongoing work to some of

49:13the the building systems over there that

49:16required some some maintenance and uh um

49:20and repairs to particularly the outdoor

49:24outdoor air intake systems, the louvers

49:27and all of that to um increase the

49:30amount of kind of free cooling uh that

49:33would be available at at particularly

49:35you know times of year uh such as now

49:38the kind of the shoulder season. So,

49:41um, yeah, there there wasn't a huge

49:44budget last year for energy efficiency,

49:46but I know, uh, that was one of the

49:49efforts that the facilities team was

49:52working on. Um, and not to mention, you

49:55know, as as things like, uh, bulbs are

49:58burning out, uh, you know, any any

50:02replacements now are going to be LED. So

50:05um there's any uh particularly again

50:08over there at police headquarters and

50:10and here in Skyline Center they are

50:12doing um LED replacement for anything

50:15that that burns out. So

50:19uh

50:21as well as just uh consolidating here

50:24into this facility and and getting rid

50:27of um

50:30some of the other facilities that were

50:32around town. I think some of that was

50:36within this FY26 time frame.

50:41So not not a huge drop. Uh so if we're

50:45looking at at just

50:47KWH

50:49FY25 for example

50:53was

50:5522,775

50:58and change kilowatt hours

51:01whereas 2026

51:05was 21,543

51:09711

51:11kilowatt hours total. So,

51:14>> do you have that normalized?

51:17>> That is

51:19just straight

51:20>> I mean, yeah, it's straight energy, but

51:22do you have a chart that shows the

51:23normalization

51:25based off of square footage or and I

51:28think that's the metric you decide the

51:30useful intensity, but I don't remember.

51:34>> Yeah. Um

51:36I can certainly get that for our next

51:38meeting but no this I did not normalize

51:41it for here and part you know part of

51:45that that was such a moving number over

51:47over the fiscal year

51:49>> as uh we are consolidating

51:53um

51:56>> but that's kind of the point David right

51:57yeah as you're consolidating as things

51:59are changing the normalization gives you

52:02a view of you know when you look at

52:06energy intensity it gives you a

52:07directional of are you getting better

52:09and you getting worse.

52:11>> True. Very true. Um yeah let me uh let

52:16me revise that for our next meeting and

52:19we can look at it comparison based on

52:22square footage.

52:24I mean I think we do I'm not sure if

52:26that's uh we we do have that as you know

52:28within our EUI rankings for each

52:31facility. So that's based on square

52:33footage. So

52:37let me get back to to y'all on on that

52:40for as a followup for our next meeting.

52:44>> That's fine because even if you think

52:45about the Skyline Center as they've made

52:47just minor tweaks, we won't see it

52:50really now, but three or four years from

52:52now, we we should start seeing like

52:54we'll start seeing a trend.

52:58>> Yeah.

52:58>> If you're getting worse, if you're

52:59getting worse, you got a problem. Yep.

53:01>> And maybe it's maybe Skyline Center is a

53:03specific example. Maybe there's more uh

53:06people renting. So, you know, maybe

53:08there's a maybe there's a couple of

53:10different ways to dice it up. Maybe

53:11maybe we could look at it on people,

53:13too. PE people in in that building that

53:16actually they're working that remote and

53:19and square footage. I've seen that

53:21before where the building went up,

53:24square footage didn't change, but we put

53:26more people in

53:27>> or or more equipment running or

53:29something.

53:30>> Yeah. Well, that that's certainly been

53:31the case here in Skyline. It's uh the um

53:36percentage of empty space here in the

53:38facility has really decreased here uh in

53:42this last year.

53:43forget what the current percentage but

53:46it's you know up around

53:49and Rachel I don't know if you have

53:50heard anymore but it's over 80% of the

53:54floor space is leased or or or

53:58you know or about to be leased. So

54:01>> unfortunately we don't

54:03>> we don't have granular granular data to

54:06tell us that uh as an example that the

54:0920% that's unoccupied uses this much

54:12energy compared to 80% that is occupied

54:15>> to get that granular but it should we

54:18should be able to come up with some

54:19metric to show improvement because

54:22>> my money I'm putting I'm putting all my

54:24chips on that we've gotten more

54:25improvement as we've consolidated.

54:28Well, I know our EUI score for Skyline

54:31has definitely improved. So, um

54:37I think that yeah, that speaks to I

54:39think more of the space being filled up

54:42as opposed to being empty. And

54:46unfortunately, we only have the one one

54:48meter for this whole building. So it it

54:51as as you mentioned we don't have that

54:54gran granular ability to look at it on a

54:57floor by floor by floor basis. So

55:01>> one thing I will add this is Rachel

55:03Schuler. Um, David, I don't know if you

55:05have information from some of the upfits

55:07like when Mckim and Creed uh redid their

55:10floor, did they install energy efficient

55:13like the LED, all that kind of stuff?

55:14Like did they do any um construction

55:17practices to help reduce some of that?

55:20Um, and some of the other folks as

55:22they've done some upfits. I guess that

55:23would be something that we'd want to

55:24start tracking and looking at as well.

55:27>> Yeah. Yeah. I I I afferred that yes,

55:31some of the upfits have included LED

55:35retrofits on on the floor. So here,

55:38that's that's a good point. Maybe we can

55:40get a I can I can work with the facility

55:43staff here to kind of get a

55:46update on which of the floors have

55:49experienced those kind of retrofits or

55:52upfits as they've gotten leased down.

55:56Any

56:03other any other thoughts there?

56:05Questions? Has there been uh has there

56:08been any followup or conversations with

56:10Duke about what it costs to or the

56:13feasibility of having submeters

56:15installed on each floor so that you can

56:17track what your leases are spending

56:22electricity every month so that you can

56:24separate that out from municipal

56:26operations?

56:28>> Yeah, not that I know of.

56:36So you could I mean I think the like

56:39even a behind the meter

56:41um

56:43solution

56:45>> is like maximum around like 1,500 to two

56:48grand installed which I think is

56:50probably a no-brainer per floor for

56:54Skyline Center. So that even as you're

56:57you know from from one perspective it's

57:00like you should be separating out the

57:02usage from leases versus city operations

57:05and from another perspective it just

57:07helps the financial department determine

57:10what they should be charging for their

57:12leases. I mean if you have a customer

57:14that you charge X and they use you

57:16charge them $100,000 and they spend

57:18$300,000 worth of electricity because

57:20they're doing who knows what you're not

57:22really make you're costing the city

57:23money not making any. So there's

57:27it just makes sense to me from two

57:28standpoints of from like both a

57:30financial and a energy management

57:32standpoint. Um and really like as far as

57:35city operations goes, it's like peanuts

57:37to install.

57:40>> Yeah. Yeah. I I agree. Um having that

57:43floor by floor data would be would be

57:45great information, great data. Um I

57:49don't know how the leases are currently

57:51written down. I don't have

57:54review.

57:54>> Well, and I know PJ's brought up

57:56concerns about like you can't

57:57necessarily, it's not like you can

57:59charge them for electricity because

58:01we're not a a utility. Um, so I'm not

58:03saying that you actually, you know, say,

58:04"Hey, we're putting in these meters and

58:06we're billing you based on your

58:07utility." But if you put in a meter and

58:10then over the course of a year the fin

58:12the the property management company can

58:14look at and say, "Okay, they spent this

58:17much in electricity. we should increase

58:19the the lease rate by this much to

58:21factor in for that. Um I don't think is

58:25a unreasonable thought process for them

58:27to go through.

58:32>> Yeah. Yeah. Certainly something I can

58:35inquire into if facilities folks are

58:40looking into that or interested in in in

58:43looking into it. Um, you know, I I'm

58:47sure I could reach out to our Duke

58:50representative Wilson for, you know,

58:52what technologies they may have that

58:55would be able to help with that. So, um,

58:59yeah, good good input.

59:04Any

59:09other It's

59:09>> also probably It's also probably a good

59:11opportunity to make sure that we're on

59:12the right rate schedule. We talked about

59:15that before.

59:17>> Yeah. Yeah, they Yeah, I know they give

59:20us a rate schedule for the whole

59:21building. So, um

59:26so yeah, that's something we that's

59:29something we go over um on an annual

59:32basis with with Duke Energy. We do a

59:35rate review, you know, annually and look

59:38for potential energy savings. And, you

59:41know, that was it was actually a big

59:43that was a big deal in this last year

59:45when they went to that those time of use

59:48rates for um a lot more of their rate

59:52schedule. So even our small general

59:55service and medium general service

59:57facilities

59:59uh had the opportunity to move to those

1:00:03new time of use rates which was

1:00:06uh significant cost savings. So,

1:00:11I'm I'm sure you were aware of those

1:00:13rate changes, PJ, for

1:00:16facilities.

1:00:25Y'all still hear me?

1:00:30>> I can.

1:00:31>> Okay.

1:00:32>> Yep.

1:00:32>> Yeah. Okay.

1:00:36Uh I'll move move on here unless there's

1:00:38any more questions on the energy usage

1:00:41and I will follow up with uh additional

1:00:44breakdown based on square footage for

1:00:47our next meeting.

1:00:52But for

1:00:56for our fuel usage,

1:00:59um, one caveat here, this total does not

1:01:04include fire department data yet.

1:01:08Uh, I've I've reached out to them for

1:01:11the breakdown by by vehicle type as well

1:01:15as as well as total gallons and total

1:01:18cost. But um you know previously that's

1:01:22or at least in FY25 that made up you

1:01:25know around 59,000 gallons and another

1:01:29$153,000

1:01:32kind of on top of the totals you see in

1:01:35this chart.

1:01:37But uh what you see here represented is

1:01:40the vast majority 693

1:01:43total assets out of out of you know you

1:01:47know a little little over 700 total

1:01:49probably 750 or so total vehicles across

1:01:52the city. So um wanted to go ahead and

1:01:56present the info that we have to date.

1:01:59Um and it it certainly does kind of

1:02:03highlight

1:02:05um the increase in hybrid vehicles that

1:02:10we have while we while we haven't made a

1:02:12significant move towards electrics yet.

1:02:15We still just have the two Nissan Leafs.

1:02:18Um but uh

1:02:22our fleet department is certainly using

1:02:24uh increased purchase of hybrid vehicles

1:02:27to you know drive down fuel usage and

1:02:29and and reduce costs as well. So that's

1:02:33that's been um that's provided a good

1:02:36impact which I've got a couple slides

1:02:40highlighting those. So just in the chart

1:02:43here, um you can kind of see I've

1:02:46highlighted the hybrid sedans versus our

1:02:48regular sedans. That's our greatest

1:02:52number of vehicles, 206 of kind of the

1:02:55standard sedans. And um we have se seven

1:03:00hybrid sedans as well as an additional

1:03:03number of hybrid SUVs.

1:03:06Um

1:03:08we go to the next slide just to kind of

1:03:09highlight some of those what you can see

1:03:11and the the differences.

1:03:13>> Can you go back? Can you go back one

1:03:15slide real quick? Sorry.

1:03:16>> Y

1:03:17>> I was looking at that the cost per mile

1:03:19at 22 and a half cents.

1:03:22>> Yeah, exactly. That was what that's what

1:03:24I was going to highlight here in these

1:03:26in these breakdown slides.

1:03:28>> Okay. Yeah. And then you got the hybrid.

1:03:29Cool. Okay.

1:03:30>> Yeah. So, as you can see, um, kind of

1:03:32the third bullet for the sedan and and

1:03:35for the hybrid is that average cost per

1:03:37mile. So, about 20 c 22 cents per mile

1:03:41for the regular sedans versus about

1:03:45seven cents per mile for the for the

1:03:48hybrids. So, you know, over three times

1:03:51as much to operate

1:03:54um you know, the standard sedans.

1:03:57Granted, um a caveat here is

1:04:00quite a few of those sedans are these

1:04:03Dodge Chargers used by the police

1:04:06department. Uh which is obviously a very

1:04:08different use usage model than you know

1:04:13our typical hybrid sedans that you know

1:04:16regular staff are just using to you know

1:04:18run around town or you know make you

1:04:20know trips around the state or

1:04:22elsewhere.

1:04:24So there is that. But you know again you

1:04:26can't get away from you know what it

1:04:29costs per mile to operate you know the

1:04:33chargers versus

1:04:35the regular types of sedans.

1:04:38And I did uh I did I don't think the

1:04:40slides that you all have I added an

1:04:42additional bullet to these next two

1:04:46slides. I I I included the the average

1:04:49fu total fuel cost

1:04:52uh for FY26 for both types. So

1:04:56a a average per vehicle was 793

1:05:01$1,793

1:05:03for the Chargers versus average per

1:05:06vehicle for the hybrid sedans was only

1:05:09438.

1:05:13I I am going to be presenting this to

1:05:17our folks in the asset and property

1:05:20management department um as soon as I

1:05:22get the fire department data as well. Um

1:05:26they've asked me to

1:05:29show kind of this cost breakdown of uh

1:05:32the different vehicle types that we

1:05:33have. So hopefully they'll um you know

1:05:37find this information very useful. Just

1:05:41when you kind of break it down that cost

1:05:43per mile is kind of really hits when

1:05:45it's

1:05:47showing three times as much.

1:05:51That was kind of the same case here with

1:05:53our next

1:05:54>> Hold on. Hold on. David Richard and I

1:05:57both have questions and I'm gonna let

1:05:58him go first on slide four probably.

1:06:02He's probably gonna say what I'm gonna

1:06:03say. Thanks PJ. Um

1:06:06so in either in that fleet transition

1:06:08study that was done or just kind of in

1:06:11general, has there been any discussion

1:06:13about

1:06:15um or any review about the need for

1:06:18these specific vehicles? Um, I'm just

1:06:21thinking because like there are other

1:06:22cities that I've been to like Raleigh,

1:06:24Durham, and Charlotte that have actual

1:06:28highways rather than our clogged city

1:06:30streets, and they don't

1:06:34have either any or at least not the same

1:06:37proportion of these kind of sports cars

1:06:40like high high horsepower cars. Has

1:06:43there been any like study showing like

1:06:45do we need like is there a reason we

1:06:48can't be putting people into police

1:06:50officers into hybrids and that we need

1:06:52200 Dodge Chargers or is there an

1:06:56opportunity to move to a hybrid vehicle

1:06:58for at least some of these or was that

1:07:01is that just not a consideration? I

1:07:03mean, I know like we asked about does it

1:07:06make sense for police officers to be

1:07:08driving their cars home with them and

1:07:09they were like, "Well, it's a perk and

1:07:11we don't want to take away the perk."

1:07:12And it's just like, "Okay, but like

1:07:14you're costing taxpayers money. So, at

1:07:17some point, does it become worth the

1:07:19conversation or where?" No,

1:07:24>> there part part of that fleet transition

1:07:27study did include

1:07:32studying you know right sizing the fleet

1:07:35uh in regard to do we need this you know

1:07:37in regard to total number of assets do

1:07:39we need do we need this many vehicles so

1:07:42that was that's one part and and that is

1:07:44one part that our fleet department is

1:07:48looking at um do we do we need this many

1:07:51vehicles in in the fleet are there some

1:07:53that are not being utilized and we just

1:07:55get rid of. So that that's part of that.

1:07:58Um in regard to

1:08:01specific vehicles that the police

1:08:03department is using and whether they're

1:08:06necessary, um I I don't have the answer

1:08:08to that currently. Um you know, I know I

1:08:13know some of the vehicles that they use.

1:08:16Um some of some of theirs are hybrids,

1:08:18too. I think particularly some of the

1:08:20SUVs

1:08:21are are hybrid models. So maybe not uh

1:08:26you know I think all of the

1:08:28I I know these Chargers do have some new

1:08:31engine technologies like when they're

1:08:33you know just idling they cut down to

1:08:36you know just like a portion of the

1:08:37engine as opposed to uh you know the

1:08:40full engine. Um so they're they're

1:08:43they're more fuel efficient than the

1:08:45previous ones that they used to get. But

1:08:48um as far as moving

1:08:51away from them entirely, yeah, I I I

1:08:54don't have uh that information.

1:08:57>> Well, I'd be curious to hear if they

1:08:58already have hybrids within the police

1:09:01fleet, then what determines

1:09:04whether they need to purchase a hybrid

1:09:06vehicle or a Charger and

1:09:10what are the different purposes for

1:09:12them? Is there do we have data on how

1:09:16many times a hybrid vehicle has been

1:09:18inadequate for police duties that a

1:09:21Charger would have been able to

1:09:24solve or you know it's just like we're

1:09:26kind of it seems like you're paying

1:09:27these there's you're purchasing premium

1:09:30vehicles that are fuel inefficient

1:09:33and we don't have a lot of data or like

1:09:35information as to like why these are

1:09:37necessary. Now again, like I understand

1:09:40you're not the fleet manager and like

1:09:42it's not really your role to know all

1:09:43these things off the top of your head,

1:09:45but in my mind, these are questions that

1:09:47should be asked since we're considering

1:09:48the fleet.

1:09:50>> Yeah. And just in regard to their

1:09:53take-home vehicles,

1:09:55um yeah, you're right. They they view

1:09:57that as a perk for the job. Um um I I

1:10:01know other cities certainly do the same

1:10:05with their police departments. I think I

1:10:08I don't know if that's a

1:10:10kind of across the board that a lot of

1:10:12police departments, you know, you know,

1:10:15have that as a perk, but it certainly

1:10:18the the case here. Um,

1:10:22yeah,

1:10:24>> let me peel the onion. Let me peel the

1:10:25onion back on on what you said, Rich.

1:10:28And some of it I agree and some of it

1:10:31I'm on the fence on. But so vehicles

1:10:35being brought home, I get it's a perk,

1:10:37but it's also I think it's a benefit to

1:10:40all community members with those cars

1:10:43staying on the road and and traveling

1:10:45between homes and and business or and to

1:10:48the police station or or them doing

1:10:50their course of business versus needing

1:10:52to go get a car to get the right car,

1:10:54etc., etc. Like I think I think it's a

1:10:56really a good a good thing for the city

1:10:58to keep those cars moving um you know

1:11:01after hours and before hours. Um do they

1:11:04use do they have the right vehicles for

1:11:05the reason? Um interesting question

1:11:08Rich. I had not thought about that one.

1:11:10So I I really do like that one because

1:11:12you're right. We don't have interstate

1:11:14within city limits, you know, multiple

1:11:16interstates, multiple uh highspeed

1:11:19areas. So I think that's a really good

1:11:22point. One thing that's of note, David,

1:11:25is I don't know if we typically have V6

1:11:28or V8 models, but I looked up real quick

1:11:30because that 2.2 miles per gallon like

1:11:34caught my attention real fast and I

1:11:35said, I wonder what is the typical

1:11:38advertised miles per gallon for the city

1:11:41um usage. And it's 15 on the V8 model

1:11:45and 18 for the V6 model. And either way,

1:11:48we are drastically underperforming what

1:11:50the average mile per gallon is. And

1:11:52there's a valid reason. And I don't know

1:11:55how we account for this, but these

1:11:57vehicles, particularly in the summer,

1:12:00they don't turn off. I mean, they could

1:12:02not be in their police vehicle for an

1:12:04hour and a half. They just sit there and

1:12:05run, run, run, run all the time, and

1:12:08they're not gaining any miles, but

1:12:09they're burning. So I don't know how we

1:12:12ac account for that in our our

1:12:15information that says you know because

1:12:18of operations this is what we're should

1:12:21be getting and this is what we're

1:12:22actually getting and maybe it's an

1:12:24accepted okay right but I don't know I

1:12:27think communicating that is important

1:12:30and I'm not saying that we're going to

1:12:32change anything we do but I don't think

1:12:35it's it's been brought out definitely

1:12:38not in this slide right we're getting

1:12:39two 12.2 too. Well, what's the should

1:12:42be, right? The should be 15, maybe 18

1:12:44depending what the model is. And

1:12:46therefore, the cost per mile would be X,

1:12:50right? And so, some penalty we're having

1:12:52for the way that these vehicles are are

1:12:54utilized and operated. Again, I'm not

1:12:56saying the police need to change their

1:12:58their process. I just think that if it's

1:13:00communicated, there may be some thoughts

1:13:04of could we do better.

1:13:07>> Yeah. Yeah. the the the police and

1:13:12department and the fire department and

1:13:14the vehicles that they purchase are, you

1:13:16know, I would say both in the special

1:13:19use categories for a lot of their

1:13:21vehicles. Um, but you know, that

1:13:24certainly leaves

1:13:27vehicles and many of the other

1:13:28departments.

1:13:31I think those are the

1:13:32>> Well, you can say it's special use, but

1:13:33in reality, isn't the police fleet more

1:13:35than half of the total fleet?

1:13:38Yeah, it's a big chunk.

1:13:39>> It's not really like quote unquote a

1:13:41special use case if it's the main use

1:13:43case.

1:13:45>> Well, I would say you know all of their

1:13:47vehicles that they need to have pursuit

1:13:50rated uh though and and the fire

1:13:53department with you know their you know

1:13:56their their vehicles that are special

1:13:58needs with the equipment and everything.

1:14:00Not not I'm not talking just fire

1:14:01trucks, but they have a lot of know

1:14:04pickup trucks and other types of

1:14:05vehicles that are, you know, modified to

1:14:08carry the equipment that they need. All

1:14:11of those I'm saying are kind of

1:14:14outside the norm, special use kind of

1:14:16cases. But point I'm trying to make is

1:14:19there's certainly still many vehicles

1:14:22that we have that to me are like

1:14:25lowhanging fruit almost like doing an

1:14:27LED lighting retrofit in you know in

1:14:29this building here. To me it's

1:14:32lowhanging fruit. So I I hope to really

1:14:34be able to highlight that and so we can

1:14:40you know either look at you know

1:14:42additional hybrids or you know more

1:14:44preferably you know beginning to make

1:14:46some

1:14:48strong uh progress on the

1:14:51electrification of some of these

1:14:53vehicles because I've got some

1:14:55additional slides here that

1:14:58highlight those

1:15:00those as well. So

1:15:02that let me may go ahead and go to the

1:15:05next slide which is the next most

1:15:09you know number of vehicles we have are

1:15:11are our v various pickup trucks. So

1:15:15you know our light duty standard pickup

1:15:18trucks such as a Ford F-150

1:15:22you know we have hundreds of those as

1:15:24well and kind of the same kind of cost

1:15:28per mile. you know, versus, you know,

1:15:30we've begun to purchase some of these

1:15:32hybrid like Ford Mavericks, for example.

1:15:36Again, you know, those are around 8

1:15:38cents a mile. Um, that's what the data

1:15:40has shown in FY26

1:15:43versus the, you know, we we've got

1:15:46F-150s as well as some other, you know,

1:15:51other other pickup trucks. um you know

1:15:53F250s, F350s, but average across that

1:15:59light duty pickup truck category is 21

1:16:02cents per mile to operate those. So, and

1:16:06the average cost for, you know, per

1:16:09vehicle is, you know, nearly 1,300 bucks

1:16:12for the FY26

1:16:15uh versus $274 per per vehicle for the

1:16:20Ford Maverick. So, you know, again, very

1:16:23very much highlights the difference

1:16:25between your typical internal combustion

1:16:28engine versus the hybrid models, how

1:16:31much more energy efficient, cost

1:16:34efficient that they they are.

1:16:39just for to go back to the chart.

1:16:43We've got 147 of the light duty pickups

1:16:47and currently right now we have 15 of

1:16:49the the Ford Mavericks, the hybrids. So

1:16:54>> on those light duties as they as they're

1:16:56rolling off with their leases are

1:16:58needing to be replaced, are they

1:17:00automatically going to the hybrid or is

1:17:02it still an open choice?

1:17:04>> I think it depends on the use case. you

1:17:08know, what's the

1:17:10uh what's the does is there a towing

1:17:13capacity need is, you know, is there a

1:17:17size size need? Because, you know, the

1:17:18Ford Mavericks, they are a little bit

1:17:20smaller. They're kind of a midsize

1:17:23pickup truck. So, if that will fit the

1:17:26use case for the department, um, then

1:17:31it's it's certainly being a

1:17:33consideration. you know, again, I need

1:17:35to present this to uh

1:17:39asset and property management team um to

1:17:44get a little bit more input from their

1:17:46side. But

1:17:49yeah,

1:17:59they they're certainly being much more

1:18:02cost and fuel use efficient. So, it'll

1:18:04it'll be interesting to get their

1:18:06feedback once they they see these

1:18:08numbers

1:18:16and going to our our large fleet of 100%

1:18:21electric vehicles are two Nissan Leafs.

1:18:26So, uh, the total kilowatt hours that

1:18:29were used in FY26 between between the

1:18:32two vehicles was 94.2

1:18:36at a total cost of $91 in electricity

1:18:39cost to operate them.

1:18:44So, that's pretty shocking number, too.

1:18:53I've I've reached out to the department

1:18:54to get what the actual mileage was for

1:18:58that time period and um

1:19:01I should have that here in the next few

1:19:02days as well. But,

1:19:05you know, they were, you know, these

1:19:06were vehicles just used for, you know,

1:19:09perfectly suited for running around town

1:19:12doing the job that they that, you know,

1:19:14this department. These are, I think,

1:19:16mostly kind of storm water compliance

1:19:19folks going around and on and checking

1:19:21the various storm water uh

1:19:25uh storm water ponds and um

1:19:30infrastructure that they they need to

1:19:32check on on a daily basis, but for

1:19:34running around town, they're they don't

1:19:36have a lot of equipment to haul. So,

1:19:38these things have been ideal for the

1:19:41that kind of scenario. So, and there's

1:19:45there's certainly a lot more of those

1:19:47use cases that these would

1:19:50fit the bill just just fine for here in

1:19:53the city. So

1:19:56of course there you know requires the

1:19:59charging infrastructure to go along with

1:20:03additional purchases but you know level

1:20:07two charging as all of these need and

1:20:09that's you know not a significant cost

1:20:12for

1:20:15installing

1:20:17level two chargers

1:20:23And I slid this slide in. Um again, FY26

1:20:28does not include

1:20:30fire department vehicles yet. Um so that

1:20:34number is going to go up, but

1:20:37at least it gives you an idea of kind of

1:20:39historical FY25 going back. We have been

1:20:42seeing, you know, as we've begun

1:20:44purchasing more fuel efficient and

1:20:46hybrid vehicles,

1:20:48um you know, our line is trending down.

1:20:51I hope it as I get these complete

1:20:53numbers for FY26, I hope we see uh um

1:20:58some additional trending down. But yeah,

1:21:02that's that's where we are as as of end

1:21:06of 26. But I I'll follow up with a slide

1:21:10back to you all as well once we get the

1:21:12complete data picture in. But

1:21:18yeah, any any thoughts, questions there?

1:21:26Um, is there a I like the comparison the

1:21:29direct comparison of the vehicles on the

1:21:32slides. Um, and plus one to what they

1:21:34were uh PJ and Rich were saying earlier

1:21:36about like the average cost versus like

1:21:38what we're actually getting out of them.

1:21:40Is there some sort of overall table or

1:21:44overall um like are they asking for any

1:21:47sort of um

1:21:50I'm trying to think like metric around

1:21:52if we

1:21:54you know is

1:21:57I'm trying to think like is there a

1:21:59percentage of if we move to this

1:22:00percentage of the fleet being this the

1:22:02cost savings would be this

1:22:05like the ROI or something along those

1:22:07lines would be this based on the current

1:22:08cost of gas versus, you know, like fuel

1:22:11costs and maintenance.

1:22:13>> Have they asked for like any sort of

1:22:15like general overall?

1:22:17>> They

1:22:19haven't yet because they haven't seen

1:22:21any of this data yet. Um

1:22:25um I would not be surprised if they

1:22:28asked for that. So it wouldn't be hard

1:22:31to

1:22:33um generate a potential cost savings cuz

1:22:36uh you know if we you know if we move to

1:22:40you know

1:22:43say say a quarter of those light duty

1:22:46pickup trucks if we can convert those to

1:22:48Ford Mavericks um you know

1:22:52what would that potential cost savings

1:22:55ROI look like?

1:22:58So, um, yeah, it's a good question,

1:23:02Andrea. I'll I'll have to

1:23:06follow up with with with the committee

1:23:08here as as, uh,

1:23:11I present this data to them and

1:23:14if they come back with any additional

1:23:16questions or and I could certainly have

1:23:18a slide like that ready. That's that's

1:23:22>> I was going to say you can even keep it

1:23:23hidden from the uh presentation and when

1:23:25the question comes through actually I

1:23:27brought some numbers.

1:23:29>> You got you got my brain spinning now.

1:23:31So I'll probably go ahead and whip up a

1:23:33slide like that just to have it on hand.

1:23:35>> Nice.

1:23:37>> Thanks. Hold it for me.

1:24:05Um,

1:24:07yeah. I'm just trying to get back to the

1:24:08agenda here. Sorry.

1:24:18And just uh unless there's any other

1:24:20questions there, just a few few of these

1:24:23updates on item three. Rich, I believe

1:24:26all of y'all received uh the four of

1:24:29you, Rich, Sean, and PJ

1:24:31um received invitations via email for

1:24:35that for that banquet. If not, let me

1:24:39know.

1:24:40And Jeff, I think you had some questions

1:24:43in regard to registering for some of the

1:24:45other events during that nuclear science

1:24:48week. Um open to the public. you can,

1:24:51you know, there's, you know, a a place

1:24:55to register if you go to that link

1:24:56provided here in the agenda.

1:25:04And for any of y'all interested, um,

1:25:07we're having a Wilmington Drive Electric

1:25:10event. There's actually a club here in

1:25:13in this city, uh, EV driving club that's

1:25:16kind of hosting this event.

1:25:19I've got the agenda

1:25:22end here. So, it was supposed to be this

1:25:25last Sunday, but it got rained out

1:25:27because of the weather. But this next

1:25:29Sunday out at Carolina Beach State Park,

1:25:31we're having the Drive Electric

1:25:33Wilmington event. Um we're going to have

1:25:35one of our Nissan lease out there and

1:25:37just be able to talk about um some of

1:25:40the city's goals towards electrification

1:25:43and

1:25:46yeah hopefully just uh you know support

1:25:48uh the EV transition here within the

1:25:51city. So um

1:25:55anyall out that way you're welcome to

1:25:56drop by would be great great to see you.

1:25:58So

1:26:01and

1:26:06We're getting close on time, but um just

1:26:09the last update. I did reach out to our

1:26:11our

1:26:13lead for cities contact. I know this is

1:26:15I kind of had this on the agenda for

1:26:17several months. Um but the last word I

1:26:20had is from them is they're supposed to

1:26:22have our final review back by the 19th

1:26:25of this month. So

1:26:27I hope to hear either next week or by

1:26:30Monday of next week. So, yeah, fingers

1:26:33crossed there.

1:26:35Um,

1:26:36that's that's all I have on the agenda

1:26:38for this month. Um, Rich, I'll pass it

1:26:41off to you for any final thoughts,

1:26:43comments.

1:26:46>> All right. Uh, unless anybody has

1:26:48anything else, I think we can go ahead

1:26:50and adjourn. Thanks everybody for your

1:26:52time and look forward to talking to you

1:26:55all next month.

1:26:58>> All right. Thank you, Rich. See you

1:27:00everyone. Thanks again for joining us

1:27:02this month.